Airworthiness Directives; Airbus Industrie Model A310-200 and A310-300 Series Airplanes
Federal RegisterFeb 2, 1994
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 93-NM-120-AD; Amendment 39-8794; AD 94-01-12]
Airworthiness Directives; Airbus Industrie Model A310-200 and
A310-300 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment supersedes an existing airworthiness directive
(AD), applicable to all Airbus Industrie Model A310-200 and A310-300
series airplanes, that currently requires inspections and test to
detect broken or missing vespel bushes in the flap universal joint
assemblies, and replacement of universal joint bushes, if necessary.
This amendment adds a terminating modification for the currently
required inspections and tests. This amendment is prompted by the
development of a modification that will improve the integrity of the
flap universal joints. The actions specified by this AD are intended to
prevent rupture of the flap universal joints, subsequent partial loss
of lift in one wing, and reduced controllability of the airplane.
DATES: Effective March 4, 1994.
The incorporation by reference of Airbus Industrie Service Bulletin
A310-27-2059, dated March 1, 1993, as listed in the regulations, is
approved by the Director of the Federal Register as of March 4, 1994.
The incorporation by reference of Airbus Industrie Service Bulletin
A310-27-2054, Revisions 2, dated November 9, 1990, as listed in the
regulations, was approved previously by the Director of the Federal
Register as of September 11, 1991 (56 FR 37462, August 7, 1991).
ADDRESSES: The service information referenced in this AD may be
obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707
Blagnac Cedex, France. This information may be examined at the Federal
Aviation Administration (FAA), Transport Airplane Directorate, Rules
Docket, 1601 Lind Avenue SW., Renton, Washington; or at the Office of
the Federal Register, 800 North Capitol Street NW., suite 700,
Washington, DC.
FOR FURTHER INFORMATION CONTACT:
Stephen Slotte, Aerospace Engineer, Standardization Branch, ANM-113,
FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton,
Washington 98055-4056; telephone (206) 227-2797; fax (206) 227-1320.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations by superseding AD 91-16-05, Amendment 39-7095 (56
FR 37462, August 7, 1991), which is applicable to all Airbus Industrie
Model A310-200 and A310-300 series airplanes, was published in the
Federal Register on October 6, 1993 (58 FR 52041). The action proposed
to add a requirement to modify the flap universal joint assemblies.
Installation of this modification would terminate the currently
required inspections and tests to detect broken or missing vespel
bushes in the flap universal joint assemblies.
Interested persons have been afforded an opportunity to participate
in the making of this amendment. Due consideration has been given to
the two comments received.
Both commenters support the proposal.
After careful review of the available data, including the comments
noted above the FAA has determined that air safety and the public
interest require the adoption of the rule as proposed.
The FAA estimates that 25 airplanes of U.S. registry will be
affected by this AD.
The inspections and tests currently required by AD 91-16-05 take
approximately 5 work hours to accomplish, at an average labor cost of
$55 per work hour. Based on these figures, the total cost impact on
U.S. operators of the actions previously required by AD 91-16-05 is
estimated to be $6,875, or $275 per airplane, per inspection and
testing cycle.
It will take approximately 47 work hours per airplane to accomplish
the modification required by this new AD action, at an average labor
rate of $55 per work hour. Required parts will cost approximately
$1,000 per airplane. Based on these figures, the total additional cost
impact associated with the modification requirements of this AD on U.S.
operators is estimated to be $89,625, or $3,585 per airplane.
The cost figures discussed above are based on assumptions that no
operator has yet accomplished the requirements of this AD action.
The regulations adopted herein will not have substantial direct
effects on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, in
accordance with Executive Order 12612, it is determined that this final
rule does not have sufficient federalism implications to warrant the
preparation of a Federalism Assessment.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends 14 CFR part
39 of the Federal Aviation Regulations as follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. App. 1354(a), 1421 and 1423; 49 U.S.C.
106(g); and 14 CFR 11.89.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by removing amendment 39-7095 (56 FR
37462, August 7, 1991), and by adding a new airworthiness directive
(AD), amendment 39-8794, to read as follows:
94-01-12 Airbus Industrie: Amendment 39-8794. Docket 93-NM-120-AD.
Supersedes AD 91-17-05, Amendment 39-7095.
Applicability: All Model A310-200 and A310-300 series airplanes,
certificated in any category.
Compliance: Required as indicated, unless accomplished
previously.
To prevent rupture of the flap universal joints, subsequent
partial loss of lift in one wing, and reduced controllability of the
airplane, accomplish the following:
(a) Prior to the accumulation of 5,500 total landings, or within
350 hours time-in-service after September 11, 1991 (the effective
date of AD 91-16-05, Amendment 39-7095), whichever occurs later, and
thereafter at intervals not to exceed 3,500 landings, perform
repetitive visual inspections and electrical continuity tests of the
flap system.
(b) If any universal joint bushes are missing or broken, prior
to further flight, replace the bushes with new bushes in accordance
with Airbus Industrie Service Bulletin A310-27-2054, Revision 2,
dated November 9, 1990. After replacement, repeat the inspections
required by paragraph (a) of this AD at intervals not to exceed
3,500 landings.
(c) Within 3,500 landings after the effective date of this AD,
modify the flap universal joint assemblies (Airbus Industrie
Modification 10091D20285) in accordance with Airbus Industrie
Service Bulletin A310-27-2059, dated March 1, 1993. Accomplishment
of this modification constitutes terminating action for the
inspection and test requirements of this AD.
(d) Modification of the flap universal joint assemblies (Airbus
Industrie Modification 10091D20285) in accordance with Airbus
Industrie Service Bulletin A310-27-2059, dated March 1, 1993,
constitutes terminating action for the inspection and test
requirements of this AD.
(e) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, Standardization Branch, ANM-113,
FAA, Transport Airplane Directorate. Operators shall submit their
requests through an appropriate FAA Principal Maintenance Inspector,
who may add comments and then send it to the Manager,
Standardization Branch, ANM-113.
Note: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the Standardization Branch, ANM-113.
(f) Special flight permits may be issued in accordance with FAR
21.197 and 21.199 to operate the airplane to a location where the
requirements of this AD can be accomplished.
(g) The inspections, testing, and replacement shall be done in
accordance with Airbus Industrie Service Bulletin A310-27-2054,
Revision 2, dated November 9, 1990. The incorporation by reference
of this document was approved previously by the Director of the
Federal Register, in accordance with 5 U.S.C. 552(a) and 1 CFR part
51, as of September 11, 1991 (56 FR 37462, August 7, 1991). The
modification shall be done in accordance with Airbus Industrie
Service Bulletin A310-27-2059, dated March 1, 1993. The
incorporation by reference of this document is approved by the
Director of the Federal Register, in accordance with 5 U.S.C. 552(a)
and 1 CFR part 51. Copies of these documents may be obtained from
Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707 Blagnac
Cedex, France. Copies may be inspected at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or
at the Office of the Federal Register, 800 North Capitol Street,
NW., suite 700, Washington, DC.
(h) This amendment becomes effective on March 4, 1994.
Issued in Renton, Washington, on January 4, 1994.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 94-452 Filed 2-1-94; 8:45 am]
BILLING CODE 4910-13-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.