DEPARTMENT OF ENERGY

18 CFR Part 348

[Docket No. RM94-1-000]

Market-based Ratemaking for Oil Pipelines

Issued October 28, 1994.

AGENCY: Federal Energy Regulatory Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission is amending its

regulations to adopt filing requirements and procedures with respect to

an application by an oil pipeline for a determination that it lacks

significant market power in the markets in which it proposes to charge

market-based rates. This rule adopts procedural rules in order to

implement the Commission's Order 561 market-based ratemaking policy,

which was published in the Federal Register on November 4, 1993. In

that order, the Commission adopted a simplified and generally

applicable ratemaking methodology for oil pipelines, which is an

indexing system to establish ceilings on those rates. The Commission

also continued its policy of allowing an oil pipeline to attempt to

show that it lacks significant market power in the market in which it

proposes to charge market-based rates. However, an oil pipeline may not

charge market-based rates until the Commission concludes that the oil

pipeline lacks significant market power in the relevant markets.

EFFECTIVE DATE: This final rule is effective January 1, 1995.

FOR FURTHER INFORMATION CONTACT: Jeffrey A. Braunstein, Office of the

General Counsel, Federal Energy Regulatory Commission, 825 North

Capitol Street, NE., Washington, DC 20426, (202) 208-2114.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of

this document in the Federal Register, the Commission also provides all

interested persons an opportunity to inspect or copy the contents of

this document during normal business hours in Room 3104, 941 North

Capitol Street, NE., Washington, DC 20426.

The Commission Issuance Posting System (CIPS), an electronic

bulletin board service, provides access to the texts of formal

documents issued by the Commission. CIPS is available at no charge to

the user and may be accessed using a personal computer with a modem by

dialing (202) 208-1397. To access CIPS, set your communications

software to use 300, 1200, or 2400 bps, full duplex, no parity, 8 data

bits and 1 stop bit. CIPS can also be accessed at 9600 bps by dialing

(202) 208-1781. The full text of this rule will be available on CIPS

for 30 days from the date of issuance. The complete text on diskette in

Wordperfect format may also be purchased from the Commission's copy

contractor, La Dorn Systems Corporation, also located in Room 3104, 941

North Capitol Street, NE., Washington, DC 20426.

Order No. 572

I. Introduction

The Federal Energy Regulatory Commission (Commission) hereby adopts

procedural rules governing an oil pipeline's application for a

Commission finding that the oil pipeline lacks significant market power

in the relevant markets.

The present rule is a companion to Order No. 561.\1\ There, the

Commission adopted a simplified and generally applicable ratemaking

methodology for oil pipelines to fulfill the requirements of Title VIII

of the Energy Policy Act of 1992 (Act of 1992).\2\ That methodology is

an indexing system to establish ceilings on oil pipeline rates. The

Commission also will permit, under defined circumstances, the use of

two alternative methodologies. These are the use of a cost-of-service

methodology and the use of settlement rates. In addition, in Order No.

561, the Commission continued its policy of allowing an oil pipeline

``to attempt to show that it lacks significant market power in the

market in which it proposes to charge market-based rates.''\3\ Under

Order No. 561, however, an oil pipeline may not charge market-based

rates until the Commission concludes that the oil pipeline lacks

significant market power in the relevant markets.\4\ The present rule

adopts procedural rules in order to implement Order No. 561's market-

based ratemaking policy.

---------------------------------------------------------------------------

\1\Revisions to Oil Pipeline Regulations pursuant to Energy

Policy Act, Order No. 561, 58 FR 58785 (November 4, 1993), III

Stats. & Regs.  30,985 (1993), order on reh'g and clarification,

Order No. 561-A, 59 FR 40243 (August 8, 1994), III FERC Stats. &

Regs.  31,000 (1994).

\2\42 U.S.C. 7172 note (West Supp. 1993).

\3\18 CFR 342.4(b) to be effective January 1, 1985.

\4\Id.

---------------------------------------------------------------------------

II. Public Reporting Requirement

The Commission estimates the public reporting burden for this

collection of information under the rule will increase the existing

reporting burden associated with FERC-550 by an estimated 510 hours

annually--an average of 255 hours per response based on an estimated 2

responses. The information filed by the oil pipelines will be collected

by the Commission under FERC-550 ``Oil Pipeline Rates: Tariff

Filings.'' FERC-550 is a designation covering oil pipeline tariff

filings made to the Commission. The estimates include the time for

reviewing instructions, researching existing data sources, gathering

and maintaining the data needed, and completing and reviewing the

collection of information. The current annual reporting burden is 5,350

hours based on an estimated 535 responses from approximately 140

respondents.

Interested persons may send comments regarding these burden

estimates or any other aspect of this information collection, including

suggestions for reducing this burden, to the Federal Energy Regulatory

Commission, 941 North Capitol Street NE., Washington, DC 20426

[Attention: Michael Miller, Information Services Division, (202) 208-

1415]; and to the Office of Information and Regulatory Affairs of OMB

(Attention: Desk Officer for Federal Energy Regulatory Commission).

III. Background

On October 22, 1993, the Commission issued a Notice of Inquiry

(NOI) about market-based rates for oil pipelines.\5\ In the NOI, the

Commission first inquired whether it should continue to permit oil

pipelines to seek market-based rates on a showing that they do not have

significant market power in the relevant markets. The Commission also

inquired about how it should make a market power determination and, in

that connection, raised a number of substantive and procedural issues.

---------------------------------------------------------------------------

\5\Market-Based Ratemaking for Oil Pipelines, Notice of Inquiry,

58 FR 58814 (November 4, 1993), IV FERC Stats. & Regs. Notices 

35,527 (October 22, 1993).

---------------------------------------------------------------------------

On July 28, 1994, the Commission issued a Notice of Proposed

Rulemaking (NOPR) in response to the NOI and the comments to the

NOI.\6\ In the NOPR, the Commission concluded that oil pipelines may

continue to seek market-based rates upon a showing that they do not

have significant market power in the relevant markets. In addition, the

Commission concluded that no consensus existed on the substantive

standards to be used in determining whether an oil pipeline lacks

significant market power in the relevant markets and that, therefore,

the appropriate course of action is to develop oil pipeline precedents

on a case-by-case basis. Accordingly, the Commission did not propose in

the NOPR any substantive rules about market power determinations.

However, the Commission did propose in the NOPR appropriate procedural

rules to govern applications by oil pipelines for a market-power

determination that could lead to market-based rates. The Commission has

received comments on the NOPR from eleven commenters.\7\ In brief,

after analyzing those comments as discussed below, the Commission is

adopting the procedural rules proposed in the NOPR with minor

modifications and some clarifications.

---------------------------------------------------------------------------

\6\Market-Based Ratemaking for Oil Pipelines, Notice of Proposed

Rulemaking, 59 FR 39985 (August 5, 1994), IV FERC Stats. & Regs.

Proposed Regulations  32,508 (July 28, 1994).

\7\Comments were filed by: ARCO Pipe Line Company and Four

Corners Pipe Line Company (ARCO), the Association of Oil Pipe Lines

(AOPL), Marathon Pipeline Company (Marathon), Buckeye Pipe Line

Company, L.P. (Buckeye), Kaneb Pipe Line Operating Partnership, L.P.

(Kaneb), Glenn E. Davis (Davis), Total Petroleum, Inc. (Total),

Alberta Department of Energy (Alberta), Petrochemical Energy Group

(Petrochemical), Natural Council of Farmer Cooperatives (Farmers),

and Sinclair Oil Corporation, Crysen Refining, Inc., Frontier

Refining Company, and Lion Oil Company (Sinclair).

---------------------------------------------------------------------------

IV. The Continuation of Market-Based Rates

As in the NOPR, the Commission concludes that oil pipelines may

continue to seek market-based rates on a showing that they do not

possess significant market power in the relevant markets. Most of the

commenters support or do not oppose the continuation of market-based

rates. Only Sinclair and the Farmers oppose the continuation of market-

based rates. Sinclair maintains that there is no need for a market-

based methodology in light of the indexation approach adopted by the

Commission in Order No. 561, coupled with the cost-of-service

alternative. The Farmers argue that market-based ratemaking is not

needed in that the Order No. 561 ratemaking options provide pipelines

with ample flexibility in obtaining just and reasonable rates and that

market-based ratemaking will create an unnecessary potential for abuse

of market power.

The Commission believes that it is appropriate for oil pipelines to

continue to be able to seek market-based rates because this approach

comports with the spirit of the Act of 1992 by retaining a light-handed

regulatory method to complement the indexing approach adopted as the

generally applicable ratemaking methodology for oil pipelines. In

addition, as the Commission has previously stated, a market-based

approach is clearly within the Commission's authority under the ICA.\8\

Further, the Commission believes that the market-based approach will be

of use in circumstances where the oil pipeline needs the flexibility to

compete provided by market-based rates, rather than other approaches.

Under the market-based approach, the oil pipeline will be able to

engage in competitive pricing in order to react to changes in market

conditions, such as increased demand for its service. This can result

in pricing that is both efficient and just and reasonable. As the court

stated in Tejas Power Corp. v. FERC:

---------------------------------------------------------------------------

\8\Order No. 561, III FERC Stats. & Regs.  30,985 at p. 30,958;

Cf. Elizabethtown Gas Co. v. FERC, 10 F.3d 866 (D.C. Cir. 1993).

In a competitive market, where neither buyer nor seller has

significant market power, it is rational to assume that the terms of

their voluntary exchange are reasonable, and specifically to infer

that the price is close to marginal cost, such that the seller makes

only a normal return on its investment.\9\

---------------------------------------------------------------------------

\9\908 F.2d 998, 1004 (D.C. Cir. 1990).

Traditional regulatory ratemaking is based on historic accounting cost.

But rates based on historic cost do not function well to signal

individuals how to efficiently respond to changes in market

conditions.\10\ Historic cost-based rates, even if indexed for past

inflation, do not perform this function well, which generally requires

one price to change relative to another. Therefore, where appropriate,

it is reasonable to permit a market pricing option.

---------------------------------------------------------------------------

\10\The classic statement on the informational role of prices is

F. Hayek, ``The Use of Knowledge in Society,'' American Economic

Review, XXXV(4) 519-30 (September, 1945). On the natural gas

shortage and its relation to historic cost of service ratemaking see

Stephen Breyer and Paul McAvoy, Energy Regulation by the Federal

Power Commission, Brookings 56-88 (1974).

---------------------------------------------------------------------------

The Commission is confident that the information provided to it by

the procedural requirements adopted in this rule will permit the

Commission to make informed decisions about market power and prevent

the possibility of abuses of market power. In that vein, both Sinclair

and the Farmers in general support the rules proposed in the NOPR.

Those rules will enable the Commission to comply with Farmers Union by

not permitting market-based rates until there is an affirmative showing

that the oil pipeline lacks significant market power in the relevant

markets.\11\ Such a showing will assure the Commission that the oil

pipeline's prices are just and reasonable.\12\

---------------------------------------------------------------------------

\11\Farmers Union Central Exchange, Inc. v. FERC, 734 F.2d 1486,

1510 (D.C. Cir. 1984).

\12\Elizabethtown Gas Co. v. FERC, 10 F.3d 866, 870 (D.C. Cir.

1993), citing Tejas Power Corp. v. FERC, 908 F.2d 998, 1004 (D.C.

Cir. 1990) and Farmers Union Central Exchange, Inc. v. FERC, 734

F.2d 1486, 1510 (D.C. Cir. 1984).

---------------------------------------------------------------------------

V. Legal Basis

The oil pipelines raise several legal objections to the proposed

regulations. In brief, they maintain that the Commission has acted

outside of its authority under the Interstate Commerce Act (ICA)\13\

and has contravened the mandate of Section 1802 of the Act of 1992 by

not adopting streamlined procedures for market-based filings.

---------------------------------------------------------------------------

\13\49 U.S.C. app. 1 (1988).

---------------------------------------------------------------------------

In Order No. 561, the Commission adopted section 342.4(b) of the

regulations, which provides that: ``Until the carrier establishes that

it lacks market power, these rates will be subject to the applicable

ceiling level under Sec. 342.3.'' This rule builds on that requirement

by requiring an oil pipeline to file an application for a market power

determination rather than a rate filing under the ICA. Only after the

Commission concludes that the oil pipeline lacks significant market

power in the markets in which it proposes to charge market-based rates

may it file market-based rates.

The AOPL, Kaneb, and Marathon argue that the Commission has

overstepped its authority under the ICA by precluding an oil pipeline

from charging market-based rates until the Commission has determined

that the oil pipeline lacks significant market power in the relevant

markets. The AOPL and Kaneb maintain that the Commission will be

improperly suspending market-based rates indefinitely when Section

15(7) of the ICA permits suspensions for a period no longer than seven

months. They both contend that the Commission's procedure is

unnecessary in light of the ICA's refund mechanism, which protects the

public interest. The AOPL further maintains that the Commission is

acting inconsistently with its approach to market-based determinations

for gas storage rates while Kaneb contends that the Commission has not

justified disparate treatment between market-based rate filings and

cost-of-service based rate filings, which will be allowed to become

effective, subject to refund. Marathon maintains that the Commission

will violate Section 6(3) of the ICA by opening an investigation before

either a rate can be filed or go into effect.\14\

---------------------------------------------------------------------------

\14\Section 6(3) of the ICA provides: No change shall be made in

the rates, fares, and charges or joint rates, fares, and charges

which have been filed and published by any common carrier in

compliance with the requirements of this section, except after

thirty days' notice to the Commission and to the public published as

aforesaid, which shall be plainly indicated upon the schedules in

force at the time and kept open to public inspection: Provided, That

the Commission may, in its discretion and for good cause shown,

allow changes upon less than the notice herein specified, or modify

the requirements of this section in respect to publishing, posting,

and filing of tariffs, either in particular instances or by a

general order applicable to special or peculiar circumstances or

conditions: Provided further, That the Commission is authorized to

make suitable rules and regulations for the simplification of

schedules of rates, fares, charges, and classifications and to

permit in such rules and regulations the filing of an amendment of

change in any rate, fare, charge, or classification without filing

complete schedules covering rates, fares, charges or classification

not changed if, in its judgement, not inconsistent with the public

interest.

---------------------------------------------------------------------------

The Commission rejects the above arguments as collateral attacks on

Order No. 561. ARCO recognized that the present rule merely implements

that regulation when it stated that ``the Commission has indicated in

Order No. 561-A that it intends to proceed on the basis that it has

this power'' to prevent an oil pipeline from putting into effect a

market-based rate until the Commission concludes that the oil pipeline

lacks significant market power in the relevant markets.\15\

Nonetheless, the Commission sees no merit in the above arguments.

---------------------------------------------------------------------------

\15\Comments at 9.

---------------------------------------------------------------------------

The indexing method sets the maximum lawful rate subject to

exceptions which must be proven. For purposes of analyzing the legal

issues presented, the Commission must assume that market-based rates

would be higher than indexed rates because an oil pipeline is free to

file for rates under the index without justification. Hence, an oil

pipeline must show that it is entitled to an exception to charge more

than the index would permit. In this context, the application is in

essence a request for waiver of the maximum rate. Such a moratorium on

filings for market-based rates (except under the application process)

comports with the Commission's power to restrict filings of proposed

rates higher than those determined by the Commission to be just and

reasonable.\16\

---------------------------------------------------------------------------

\16\Cf., Permian Basin Area Rate Cases, 390 U.S. 747, 780

(1968). (``The Commission may under Sections 5 and 16 [of the

Natural Gas Act] restrict filings under Section 4(d) of proposed

rates higher than those determined by the Commission to be just and

reasonable.'')

---------------------------------------------------------------------------

It is true that this treatment of market-based rates differs from

the Commission's approach to filings by oil pipelines for cost-based

rates. However, the difference is justified. It is appropriate to take

the present action with respect to market-based rates for oil pipelines

in order to ensure that presumed market forces will not be the basis of

effective rates for the transportation of oil when an oil pipeline's

application (i.e., its waiver request) is under consideration.\17\ The

Commission cannot permit market-based rates without an affirmative

showing that the oil pipeline lacks significant market power in the

relevant markets.\18\

---------------------------------------------------------------------------

\17\Farmers Union Central Exchange, Inc. v. FERC, 734 F.2d 1486,

1510 (D.C. Cir. 1984).

\18\Id. With respect to the AOPL's contention about gas storage

rates, the Commission notes that those cases were considered mostly

in certificate proceedings. While Koch Gateway Pipeline Company's

proceeding was a rate filing, it involved the continuation of an

experimental program that had been previously approved as part of a

settlement. 66 FERC 61,385 (1994). In addition, oil pipeline market

cases have been lengthy and have gone beyond the statutory

suspension period.

---------------------------------------------------------------------------

Because the Commission is taking the approach that an oil pipeline

must file an application for market-based rates, Marathon's reliance on

Section 6(3) of the ICA is misplaced. Simply put, there is no rate

investigation. Rather, the investigation is into whether the oil

pipeline possesses significant market power in the relevant markets.

The AOPL also maintains that the Commission is not authorized by

the ICA to adopt market-power filing requirements. It argues that,

under Section 6(3) of the ICA, an oil pipeline seeking to change its

rates need only file a notice of proposed change with the Commission,

and that the Commission's authority under that action is limited to

rules and regulations for the ``simplification'' of schedules.\19\ The

AOPL adds that the ICA does not require the submission of material in

justification of a proposed rate change unless and until that rate

change is set for hearing. It asserts that the oil pipeline's statutory

burden of proof under Section 15(7) of the ICA does not attach until

the matter is set for hearing.\20\ The AOPL last maintains that the

Commission's characterization of the market power application as a

nonrate filing does not cure the statutory shortcoming because if it is

not a rate filing there is no statutory basis for the application. It

further maintains that, in any event, the characterization is wrong as

shown by the caption of this proceeding and the collection of

information form (FERC 550 ``Oil Pipeline Rates--Tariff Filings'').

---------------------------------------------------------------------------

\19\Comments at 18.

\20\Section 15(7) provides in pertinent part:

At any hearing involving a change in a rate, fare, charge, or

classification, or in a rule, regulation, or practice, the burden of

proof shall be upon the carrier to show that the proposed changed

rate, fare, charge, classification, rule, regulation, or practice is

just and reasonable, and the Commission shall give to the hearing

and decision of such questions preference over all other questions

pending before it and decide the same as speedily as possible.

---------------------------------------------------------------------------

As discussed in the order in Cost-of-Service Filing and Reporting

Requirements for Oil Pipelines, issued contemporaneously with this

rule, the Commission has the authority to adopt filing requirements

beyond the mere form of notices and schedules. The Commission may

require information upon which to determine how to act on a filing. In

any event, as discussed above, the Commission views the application

required here as in essence a waiver request, which will enable the

Commission to make the required affirmative finding that the oil

pipeline lacks significant market power in the relevant markets before

it permits market-based rates as an exception to the indexing approach.

Nothing in the ICA prevents the Commission from setting forth the

requirements of a waiver request, including placing the burden of proof

on the person seeking the waiver. Even if the application is a rate

change under Section 15(7), the Commission is not compelled to hold a

hearing, but if it does hold a hearing, the hearing may be resolved on

the written record. The required application simply starts the hearing

process and the statutory burden of proof would affix.\21\ With respect

to the AOPL's arguments about the caption to this proceeding, it merely

reflects the end result of the process--market-based rates. Further,

the form for the collection of information merely recognizes the end-

result--oil pipeline rates and, in any event, is purely ministerial.

---------------------------------------------------------------------------

\21\The AOPL maintains that the scope of discovery is limited

under the Commission's rules of practice and procedure (18 CFR

385.402(a)) to issues set for hearing. It submits that the

Commission will put the ``procedural cart before the horse by

requiring production of discovery--related information before the

scope of contested issues has been established.'' Comments at 40. As

stated in the text, the Commission has the authority to adopt filing

requirements and to set forth the requirements for a waiver as the

first stage of the investigation.

---------------------------------------------------------------------------

The AOPL maintains that the Commission's market power application

process is inconsistent with the Act of 1992 streamlining mandate

because it violates the Act of 1992's requirements that the Commission

``develop streamlined procedures `to avoid unnecessary regulatory costs

and delays','' that ``proceedings address issues raised by parties with

real economic interests, and that Staff initiated proceedings be

limited to `specific circumstances.'''22 It thus ``submits that

the scope of any market power investigation should be limited to (1)

rates subject to a valid protest by an entity with a demonstrated

economic interest in the pipeline's rate, or (2) markets that do not

meet Commission-established screens.''23 It asserts that the

Commission's failure to adopt substantive guidelines does not comply

with the Act of 1992's streamlining mandate.

---------------------------------------------------------------------------

\2\2Comments at 25. ARCO, Marathon, and Davis similarly argue

that the Commission has fallen short of the Act of 1992's

streamlining mandate.

\2\3Id.

---------------------------------------------------------------------------

The Commission has fully complied with the mandate of the Act of

1992. The Commission has adopted the indexing methodology, which is ``a

simplified and generally applicable ratemaking methodology for oil

pipelines in accordance with section 1(5) of Part I of the

[ICA].''24 And, the Commission has adopted streamlined procedures

with respect to rates established under that methodology. The market-

based ratemaking approach is not generally applicable. Therefore, it

must be optional and oil pipeline specific. Indeed, the Commission

doubts that it could have adopted market-based ratemaking as the

simplified and generally applicable ratemaking methodology in light of

the court's holding in Farmers Union that the Commission cannot presume

the existence of competition or that a competitive price will be within

a just and reasonable range.25 In any event, the Commission

believes that the present regulations, in the spirit of the Act of

1992, indeed streamline procedures as to market-based rates by filling

a regulatory void with respect to procedures and by minimizing burdens

by obtaining data at the outset. This should avoid unnecessary

regulatory costs and delays and result in informed decisions with

respect to all markets in which an oil pipeline seeks to charge market-

based rates rather than the generally applicable indexing methodology

or, if appropriate, cost-based rates. In addition, the Commission's

requirements for standing are applicable.26 Last, there is nothing

in the Act of 1992 even suggesting that the Commission must adopt

substantive guidelines for market-based rates, which, as discussed

below, are not warranted at this time.

---------------------------------------------------------------------------

\2\4Section 1801(a) of the Act 1992.

\2\5Farmers Unions Central Exchange, Inc. v. FERC, 734 F.2d

1486, 1510 (D.C. Cir. 1984).

\2\6See section 348.2(g) referring to section 343.2(b).

---------------------------------------------------------------------------

C. Disclosure of Confidential Shipper Information

The AOPL maintains that the NOPR's filing procedures will place oil

pipelines in the untenable position of violating their statutory duty

not to disclose confidential shipper information in order to comply

with the rule. The AOPL asserts that the Commission cannot by rule

repeal the statutory protection of confidentiality provided to shipper

information by Section 15(13) of the ICA. The AOPL asks the Commission

``to clarify that nothing in the NOPR is intended to require the

production of shipper information otherwise protected by ICA Section 15

(13).''27

---------------------------------------------------------------------------

\2\7Comments at 23.

---------------------------------------------------------------------------

Section 15(13) of the ICA makes it unlawful for an oil pipeline to

disclose ``any information concerning the nature, kind, quality,

destination, consignee, or routing of any property tendered to'' the

oil pipeline for transportation, ``which information may be used to the

detriment or prejudice of such shipper or consignee, or which may

improperly disclose his business transactions to a competitor.''

However, Section 15(13) provides certain exceptions to allow ``the

giving of such information in response to any legal process under the

authority of any State or Federal court, or to any officer or any agent

of the Government of the United States * * * in the exercise of its

powers * * *.''

The Commission is concerned about the possibility that an oil

pipeline might violate Section 15(13) and subject itself to a

misdemeanor charge under Section 15(14) of the ICA by disclosing

statutorily protected shipper information. However, the Commission sees

no reason to eliminate the information collection in the proposed rule

on that ground. Under the new procedural rules adopted as

Sec. 348.2,28 the oil pipeline must file its application for a

market power determination with the Commission and provide a copy of

its letter of transmittal, without a copy of the application, to each

shipper and subscriber on or before the day the material is submitted

to the Commission. Thereafter, the shipper or subscriber must make a

written request for a copy of the oil pipeline's complete application,

which must be provided by the oil pipeline.

---------------------------------------------------------------------------

\2\8See infra.

---------------------------------------------------------------------------

The Commission will adopt the following additional approach with

respect to protected shipper information. First, under the exception

provided by Section 15(13), the Commission in this order authorizes an

oil pipeline to disclose information and materials necessary for it to

file its application, which disclosure in the absence of this order

might be deemed to violate Section 15(13). Next, as with all

submissions to the Commission that include privileged information, the

oil pipeline should file its application for a market power

determination with a request for privileged treatment under Section

388.112 of the Commission's regulations. As required by that section,

the oil pipeline must indicate the information for which it is seeking

privileged treatment, including identification of the material subject

to Section 15(13) of the ICA. However, for administrative convenience,

the Commission is requiring the oil pipeline to file the original

application and three copies in an unredacted form rather than only the

original as required by section 388.112(b)(ii) of the Commission's

regulations. The oil pipeline must file the remaining eleven copies

required by section 348.2(a) of this rule and by Section 388.112(b)

without the information for which privileged treatment is sought as

required by section 388.112(b)(iii).

In addition, the Commission will require the pipeline to submit a

proposed form of protective agreement with its request for privileged

treatment and with its letter of transmittal to its shippers and

subscribers. Any shipper or subscriber seeking a complete copy of the

oil pipeline's application must provide the oil pipeline with an

executed copy of the protective agreement at the time it requests a

copy of the oil pipeline's application. The Commission will act

expeditiously to resolve any controversies about protective agreements.

This approach is similar to that used in litigated cases to prevent the

disclosure of sensitive information29 and akin to that suggested

by the AOPL in its comments to the NOI. This approach will be

sufficient to prevent the use of the information to the detriment or

prejudice of a shipper and will not result in the improper disclosure

of business transactions to a competitor.30 Hence, there will be

no violation of Section 15(13).

---------------------------------------------------------------------------

\2\9See, e.g., Phillips Pipe Line Co., Order to Produce Shipper

Information and Enter Protective Order, Docket No. IS94-1-000

(January 19, 1994).

\3\0Id.

---------------------------------------------------------------------------

VI. Substantive Guidelines and Screens and Alternative Procedures

The Commission will not adopt substantive standards, including

screens and rebuttable presumptions at this time. Instead, the

Commission will continue to develop oil pipeline precedents on a case-

by-case basis through the application procedure adopted by this rule.

The AOPL, Marathon, and ARCO maintain that the Commission should

adopt market power guidelines in this rule. The AOPL contends that the

absence of those guidelines threatens to impose undue burdens on all

participants in a market-based rate proceeding. They further assert

that the NOPR's reliance on a lack of consensus was misplaced because

the Administrative Procedure Act (APA) does not require consensus as a

prelude to adoption of a final rule and that, in any event, there was

substantial support for streamlining market power determinations. It

believes that without such substantive guidelines a market power

presentation will be too elaborate and unfocussed because the oil

pipeline will fear selecting an analytical model that unknown to it is

disfavored by the Commission. It thinks the industry is facing a

``regulatory vacuum.''

The AOPL, Marathon, and ARCO suggest the Commission adopt certain

guidelines and threshold screens in connection with establishing

rebuttable presumptions as a means of streamlining market power

determinations. They maintain that the oil pipelines should be able to

use BEAs31 as their geographic markets without justification as

proposed by the NOPR. They further submit that the relevant product

market should be delivered pipelineable petroleum products (AOPL) or

delivered pipelineable barrels of both refined and unrefined products

(Marathon). They also maintain that the Commission should establish

market power screens to establish rebuttable presumptions in connection

with market power determinations. Marathon suggests an HHI32 of

2500. ARCO suggests screens of a market share based on actual

deliveries or capacity of less than 45 percent into, for example, a BEA

or a market share of 55 percent combined with an HHI of 2500 or less

based on capacity data. The AOPL refers to those screens as suggested

by Williams33 and Buckeye34 and refers to a third threshold

of a ten percent market share for potential waterbased traffic.

---------------------------------------------------------------------------

\3\1The term BEA refers to United States Department of Commerce,

Bureau of Economic Analysis Economic Areas. BEAs are geographic

regions surrounding major cities that are intended to represent

areas of actual economic activity.

\3\2The HHI stands for the Herfindahl-Hirschman Index, which

calculates market concentration by summing the squares of individual

market shares of all the firms in the market. For example, if each

of four firms has a 25 percent share of the market, the HHI for the

market would be .2500 ((.25 x .25)4) or 2500 in nontechnical terms.

\3\3Williams Pipe Line Co., 68 FERC  61,136 (1994).

\3\4Buckeye Pipe Line Co., 53 FERC  61,473 (1990), order on

reh'g, 55 FERC  61,084 (1991).

---------------------------------------------------------------------------

On the other hand, Alberta, Total, the Farmers, and Sinclair

support the Commission's decision not to set substantive standards and

to develop precedents on a case-by-case basis. They agree with the NOPR

that no consensus exists among affected groups about substantive

standards and maintain that the Commission should not consider

establishing substantive standards until it has gained more experience

from a number of applications for market rates. Total and the Farmers

submit that the Commission properly rejected the use of HHIs as screens

to avoid arbitrary results. Sinclair approves of the Commission's

decision not to establish generic standards about geographic markets

and to place the burden on the oil pipeline to show the relevance of

any BEA.

The Commission recognizes that the APA does not require a consensus

to adopt rules. However, here, where the Commission has the very

limited experience of two oil pipeline proceedings with respect to

market power determinations, this lack of consensus among the parties

most affected suggests to the Commission that it should proceed

cautiously on a case-by-case basis to ensure that markets are not

presumed to be competitive.35 Hence, the Commission at this time

is not adopting substantive guidelines and screens.36

---------------------------------------------------------------------------

\3\5Farmers Union Central Exchange, Inc. v. FERC, 734 F.2d 1486,

1510 (D.C. Cir. 1984).

\3\6The comments to the NOI, among other things, indicated a

lack of consensus about the use of BEAs and the appropriate level

for an HHI screen.

---------------------------------------------------------------------------

The Commission sees no regulatory vacuum as asserted by the AOPL.

The Commission's procedural regulations set forth clearly what matters

are pertinent in determining significant market power--e.g., geographic

and product markets, HHIs and market share. The Commission does not

view the lack of screens as unfair or unduly burdensome. As with any

proponent, the oil pipeline must make its most persuasive case for its

position.

With respect to specific screen issues, the Commission is not ready

to adopt BEAs as the defined or presumed geographic market in the

absence of more experience in determining relevant geographic markets.

Similarly, the Commission is not ready to adopt a specific definition

of product market. Nor can the Commission at this time adopt

presumptions about market power determinations. The Commission prefers

to gain more experience with specific cases to develop HHI (market

concentration) and market power criteria for oil pipelines.37

These issues should all be pursued cautiously on a case-by-case basis

to ensure that markets are not assumed to be competitive. Of course, as

more experience is gained, precedent can serve as well as presumptions

to provide guidance.

---------------------------------------------------------------------------

\3\7Geographic and product markets and HHIs and market power are

also discussed infra.

---------------------------------------------------------------------------

The AOPL contends that the proposed application process is unfair

because an oil pipeline must shoulder its burden of proof prior to

knowing whether the competitiveness of a market has been challenged.

Both the AOPL and ARCO suggest alternative procedures based on the use

of screens. Total, the Farmers, Petrochemical, and Sinclair approve of

the Commission's procedural rules requiring the oil pipeline to file a

case-in-chief at the outset. Total maintains that this will lessen the

burden on parties to a market power case. It suggests that the burden

could be further minimized and the analytical quality of the data

enhanced if the Commission would direct staff to aggregate oil pipeline

data by origin and destination markets.38

---------------------------------------------------------------------------

\3\8In example, Total states that: ``delivery-based market

shares of pipelines can be aggregated to calculate delivery-based

HHIs. The availability of such studies to shippers would minimize

their burden of constructing an answer to a pipeline's direct

case.'' Comments at 2, 3.

---------------------------------------------------------------------------

As indicated above, the Commission is not adopting any market power

screens. Hence, it rejects the AOPL's and ARCO's proposed alternative

procedures. In any event, the Commission sees no unfairness in adopting

the proposed case-in-chief approach in lieu of the ``Buckeye''

approach.39 The Commission is requiring no more than an oil

pipeline bear its burden of proof in a fashion that ensures that there

is no reliance on presumed market forces.40 Last, the Commission,

as part of this rule, sees no reason to direct staff to aggregate oil

pipeline data.

---------------------------------------------------------------------------

\3\9In general, an oil pipeline tariff filing was not suspended

or investigated unless it was protested. Under the ``Buckeye''

approach, if its rates were protested, the oil pipeline could elect

at the hearing to prove it lacked significant market power, filing

its case-in-chief after discovery. See Buckeye Pipe Line Co., 44

FERC 61,066 (1988).

\4\0Farmers Union Central Exchange, Inc. v. FERC, 734 F.2d 1486,

1510 (D.C. Cir. 1984).

---------------------------------------------------------------------------

ARCO suggests that if an oil pipeline's indexed-based rates are

challenged as substantially exceeding its increase in costs, the oil

pipeline should be allowed to advance a market-based justification of

those rates in a Buckeye bifurcated procedure. The Commission rejects

ARCO's suggestion because it is appropriate to keep cost challenges to

indexed rates separate from market-based rate cases. For example, under

ARCO's proposal, if the oil pipeline failed in its market-based

defense, it would still be able to defend on cost grounds. The

Commission believes it better for the oil pipeline to defend solely on

cost grounds under Order No. 561. An oil pipeline may file an

application for market-based rates at any time.

Buckeye asks about noncompetitive markets after others are found to

be competitive. It asks the Commission to clarify that it will ``permit

substantially competitive pipelines to propose alternative ratemaking

programs or approaches that do not apply the index to their less

competitive markets.''41 It also is concerned about the difficulty

of an allocation of costs between competitive and noncompetitive

markets under a cost-of-service analysis if raised by the shipper or

oil pipeline.

---------------------------------------------------------------------------

\4\1Comments at 8. Buckeye refers to its own program but states

that it does not suggest that it be addressed here.

---------------------------------------------------------------------------

The Commission sees no need to discuss Buckeye's requests and

concerns here. Any oil pipeline seeking a waiver from the index for

another approach for noncompetitive markets may file such a waiver

request with its application for market-based rates.

VII. Monitoring and Constraints

As in the NOPR, the Commission proposes no generic constraints on

the level of market-based prices or on their duration. In addition, the

Commission proposes no mechanism to monitor market-based rates.

Sinclair maintains that the Commission, to discharge its

responsibilities under the ICA, must impose price caps and term limits

on market-based rates. The Farmers submit that any market-based rates

should be experimental and for a trial period such as the three-year

period allowed in Buckeye. They argue that this will allow the

Commission and shippers to judge whether competition is actually

effective in a particular market. In addition, they maintain that the

final rule should require applicants for market-pricing authority to

propose specific safeguards against the risk that competition will not

effectively constrain rate increases.

Alberta maintains that the Commission should require an oil

pipeline to file comprehensive information about the markets in which

it is charging market rates so that the Commission can examine whether

the pipeline has been able to exercise significant market power. It

also suggests that the Commission monitor an oil pipeline's earnings

because comparison of its earnings prior to using market rates to its

earnings thereafter may indicate that it has exerted monopoly power.

Alberta further suggests the Commission reconsider adopting a rate

trigger mechanism as a safeguard against monopoly rents and to provide

a tolerance level around rates to ensure they do not stray from a zone

of reasonableness.

The Commission concludes that there is no need to adopt generic

rules about constraints on the level or duration of market-based

prices. This is a matter to be considered in individual cases in light

of the circumstances there. The Commission does not consider the

market-based rate approach for oil pipelines generically as

experimental or in need of a trial or in need of generic safeguards,

such as rate triggers. All such issues can be discussed in the context

of an individual case.

The Commission will be able to adequately monitor market-based

rates through price changes because the oil pipeline must file its

rates. In addition, the Commission can monitor the oil pipeline's

aggregate earnings through its Form No. 6 filing.

VIII. The Rule

The Commission is amending subchapter P of its regulations,

Regulations Under the Interstate Commerce Act, by adding a new Part 348

to those regulations. Section 348.1(a) requires an oil pipeline to file

a statement of position and supporting statements with its application.

Section 348.1(b) provides that an oil pipeline's statement of position

must include an executive summary of its statement of position and a

statement of material facts. The latter must include citation to the

supporting statements, exhibits, affidavits, and prepared testimony. In

its statement of position, the oil pipeline would be expected to

present its arguments in favor of its position that it lacks

significant market power in the relevant markets. The Commission

received no comments about the specifics of Sections 348.1(a) and

(b).42

---------------------------------------------------------------------------

\4\2The argument that it is unfair to require the oil pipeline

applicant to file a case-in-chief at the outset was discussed above.

---------------------------------------------------------------------------

Section 348.1(a) requires that an oil pipeline seeking a market

power determination include with its application the information

required by section 348.1(c). Under section 348.1(c) the oil pipeline

must include certain designated information. The information required

is mostly factual and is relevant to measuring the oil pipeline's

ability to exercise market power in the relevant markets. That

measurement will enable the Commission to determine whether the oil

pipeline can exercise significant market power by profitably

maintaining its prices significantly above competitive levels for a

significant period.

The Commission is requiring the oil pipelines to essentially file

the same information as the Commission has analyzed in the past in oil

pipeline proceedings with respect to market power determinations. In

brief, the Commission is first requiring the oil pipeline to define the

relevant markets to be analyzed. It must identify the geographic areas

and the products to be analyzed to establish the relevant markets for

which to determine market power. For example, the inquiry might be,

does the oil pipeline possess significant market power over the

transportation of crude oil into the Houston area? Further, the

Commission is requiring the oil pipeline to identify the competitive

transportation alternatives for its shippers, including potential

competition, and other competition constraining its rates. Finally, the

oil pipeline must compute the market concentration for the relevant

markets (the HHI) and other market power measures based on the

information provided about competition. The Commission will be able to

analyze the oil pipeline's information and its measures of market

concentration and power to determine if the oil pipeline lacks

significant market power in the relevant markets.

If a record about a market has been established in an oil pipeline

proceeding, another oil pipeline may make use of all or part of that

record in satisfying its burden to present information to the extent

the other record contains relevant public information which is not out-

of-date.43 The Commission turns to the specific supporting

statements.

---------------------------------------------------------------------------

\4\3FERC Stats. & Regs. Proposed Regulations 32,508 at p.

32,889.

---------------------------------------------------------------------------

A. Statement A--Geographic Market

In Statement A, the Commission is requiring that the oil pipeline

describe the geographic markets in which it seeks to make a showing

that it lacks significant market power. The oil pipeline must explain

why its method for selecting the geographic markets is appropriate. The

Commission also is requiring the oil pipeline to include both relevant

origin and destination markets in its evidentiary presentation. This

will provide interested parties with complete information about

competition at the supply and delivery ends of the pipeline system. The

Commission is not requiring the oil pipeline to file a market analysis

of each point-to-point corridor. The Commission concludes that, in

light of the significant point-to-point traffic in the oil pipeline

industry, this would be too onerous a requirement at the filing stage,

that a point-to-point corridor analysis may exclude competitive

alternatives to the relevant service and, in some instances, it could

provide an inaccurate picture of market concentration. However, a

protestant may, as part of its response to the oil pipeline's

application, seek to prove that in the particular circumstances a

point-to-point corridor approach should be used to determine the

appropriate geographic market.

The Commission is not requiring an oil pipeline to file pursuant to

any particular geographic market definition. But the Commission expects

that oil pipelines will propose to use BEAs as their geographic

markets. In that event, the burden will be on the oil pipeline to

explain why its use of BEAs or any other definition of the geographic

market is appropriate. If a pipeline uses BEAs, it must show that each

BEA represents an appropriate geographic market. Of course, the oil

pipeline may choose to define its relevant geographic markets at a sub-

BEA level, such as by a given radius around its terminals. As with

BEAs, the oil pipeline must explain why this geographic market

definition is appropriate.

The AOPL, ARCO, and Marathon maintain that the Commission should

establish BEAs ``as the generally applicable means for determining

relevant geographic markets'' or ``[a]lternatively the `explanation'

that use of BEAs to define relevant geographic markets complies with

Commission precedent should satisfy a pipeline's obligation to explain

its chosen approach.''44 The AOPL refers to Buckeye and Williams

as such precedents employing BEAs to define relevant geographic

markets.

---------------------------------------------------------------------------

\4\4AOPL's comments at 41.

---------------------------------------------------------------------------

Alberta, Total, and the Farmers support the Commission's geographic

market proposal. Alberta maintains that the geographic size of markets

will depend on many factors. Total submits that there are many

instances where BEAs are larger than a relevant geographic market area,

such as where a pipeline needs two terminals to serve distinct

population centers. It further states that it does not object to the

Commission's proposal to allow pipelines to submit data on a BEA basis,

provided that shippers have the right to contend that the BEA is too

large. In addition, Total states that it supports the Commission's

conclusion that shippers should be entitled to present information

demonstrating that it may be appropriate to utilize a point-to-point

transportation corridor market as the relevant geographic market. The

Farmers maintain that it is far more realistic to define relevant

geographic markets on a fact basis than on the basis of arbitrary BEAs.

The Commission rejects the oil pipelines' requests with respect to

BEAs. As stated above, the Commission believes that the appropriate

geographic markets should be determined in each proceeding based on its

facts. The burden is on the proponent of any particular definition.

The AOPL also argues against the proposal to include origin

markets. It states that the Commission provided no rationale in the

NOPR and that in Buckeye and Williams the Commission rejected arguments

that it consider origin markets and focused only on destination

markets. It adds that this complexity is not needed when there is

little reason to be concerned about monopsony power in origin markets,

that an analysis of each end of point-to-point service would

significantly increase the burden on oil pipelines, and that the

definition of origin market is a matter of some uncertainty owing to

interconnections. The AOPL asserts that a competitive analysis of

origin markets should be required only when proposed by an oil pipeline

or if a shipper raises an issue of market power in origin markets.

On the other hand, Alberta and the Farmers support the Commission's

proposal to include origin markets. Alberta maintains that an oil

pipeline need only possess market power in either an origin or

destination market to exert market power in a transportation corridor.

The Farmers state that while the NOPR properly allows protestants to

seek corridor market definitions, there is no justification for

requiring protestants to bear the burden of proof and that if a

protestant raises the issue of corridor market power, the burden of

proof should remain with the applicant as part of its overall burden of

establishing the relevant geographic market.

The Commission concludes that it is appropriate to include origin

markets in the geographic market information. At this time, the

Commission is still concerned about the possibility of monopsony power.

The Commission agrees with the Farmers that the ultimate burden of

proof is on the oil pipeline to establish the relevant geographic

market. However, a proponent of corridor geographic markets must come

forward with an adequate presentation to warrant rebuttal by the oil

pipeline.

B. Statement B--Product Markets

In Statement B, the Commission is requiring the oil pipeline to

identify the product market or markets for which it seeks to establish

that it lacks significant market power. The oil pipeline must explain

why the particular product definition is appropriate.

Under the ICA, the Commission regulates the transportation of oil

by pipeline.45 In a market power analysis, the Commission must

determine the oil pipeline's ability to exercise market power over this

transportation service. However, a market power analysis in general

cannot be made solely in the context of transportation rates. Where

competitive alternatives constrain the applicant's ability to raise

transport prices, the effect of such constraints are ultimately

reflected in the price of the commodity transported. Hence, the

delivered commodity price (relevant product price plus transportation

charges) generally will be the relevant price to be analyzed for making

a comparison of the alternatives to a pipeline's services. However, in

some instances such as for origin markets or crude oil pipelines, it

may be appropriate to make a case based only on transportation rates. A

pipeline may elect to file such a case and a protestant may argue that

such a case is appropriate. In either event, the burden of establishing

the relevant product market remains on the oil pipeline.

---------------------------------------------------------------------------

\4\549 U.S.C. 1(1)(b).

---------------------------------------------------------------------------

The Commission is not requiring a specific way to define the

product markets. The relevant product market first would be

distinguished between the transportation of crude oil and the

transportation of refined products. Crude oil transportation could

further be divided to include transportation of natural gas liquids

while products transportation could be delineated by type, such as

motor gasoline, distillates, or jet fuel. The oil pipeline should, in

the first instance, select its product market and the burden is on the

oil pipeline to justify its choice.

The AOPL argues that the Commission is unjustifiably retreating

from the standard of Buckeye and Williams--``delivered pipelineable

petroleum products.'' It maintains that this standard should be the

generally applicable method for identifying relevant product markets,

with participants free to argue for exceptions as appropriate.

Total maintains that the Commission has correctly recognized that

crude and product markets can and should be divided further into

differentiated products. It argues that, in order to minimize the need

for discovery, the Commission should require that the delivery data be

submitted by crude and product type and that capacity relied upon in

HHI calculations should be segregated by crude types and product types.

It further submits that oil pipelines should be further required to

identify all alternatives of the same crude type or products which are

being transported by the pipeline seeking a market-power demonstration.

The Commission reiterates that it is up to the oil pipeline to

identify the product market or markets for which it seeks to establish

that it lacks significant market power. As stated above, the Commission

is not establishing at this time any presumptions as suggested by the

AOPL. Nor will the Commission require the oil pipeline to submit

information by crude and product type as proposed by Total. This would

be too onerous at the outset. However, in identifying competition, as

suggested by Total, the type identification should match that of the

oil pipeline's commodity type used to determine the product market.

The AOPL also contends that the Commission's discussion of

transportation in the product context is ``problematic.'' It argues

that if it ``is intended to address relevant price for the purpose of

comparing competitive alternatives to all pipeline transportation, it

simply is misplaced and should be shifted to a discussion of how to

define market power,'' but if the Commission intends to require

relevant product markets to be defined to include transportation, or

the transportation of particular products, the discussion would

represent a significant break with Buckeye and Williams which

recognized that relevant product market could include non-

transportation alternatives, such as refiners.46 It asks the

Commission at a minimum to clarify that ``no such narrowing of the

definition of `relevant product markets' was intended.''47

---------------------------------------------------------------------------

\4\6Comments at 44.

\4\7Id.

---------------------------------------------------------------------------

The Commission is not narrowing the definition of relevant product

market by defining it in terms of the transportation of the commodity.

That definition of relevant product market simply recognizes that the

Commission regulates the transportation rate. As the AOPL maintains,

non-transportation factors, such as competition from refiners, are an

element in an analysis of an oil pipeline's market power with respect

to the pertinent product.

Sinclair is concerned about the NOPR's statement that ``the

delivered commodity price (relevant product price plus transportation

charges) generally will be the relevant price.''48 It assumes, and

seeks clarification, that the term ``product'' applies to both

petroleum products and crude oil. It further urges that the Commission

``state that the use of any delivered price concept in a market power

analysis is directed to the market power which a pipeline exercises

with respect to shippers--not with respect to the price ultimate

consumers pay for refined petroleum products.'' It maintains that the

Commission should do this because shippers, and not end users, are the

protected class under the ICA.49 Sinclair further urges the

Commission to reflect on the particular situations in which the

delivered price concept is useful in market power analysis, such as in

developing the geographic contours of the market. It further contends

that it must be recognized that it is a pipeline's ability to increase

its transportation rates, and not the delivered price, that must be the

ultimate focus of the analysis. It specifically refers to crude oil

origin markets, where the net-back price is pertinent, and to captive

refiners in the origin market of a product pipeline, which refiner

could be adversely affected by a rate increase by an inability to raise

prices in the retail market. Sinclair suggests that protestants should

always be given the opportunity to conduct discovery and present

evidence with respect to a pipeline's ability to unilaterally raise its

transportation rates and that there should not be any narrow bounds on

the relationship between the commodity price and a pipeline's market

power.

---------------------------------------------------------------------------

\4\8IV FERC Stats. & Regs. Proposed Regulations 32,508 at p.

32,890.

\4\9Citing Williams Pipeline Co., 21 FERC 61,260 at p. 61,584

(1982).

---------------------------------------------------------------------------

Sinclair is right that the product referred to in the NOPR was both

petroleum products and crude oil. Sinclair is also correct that the

Commission's analysis reflects market power vis a vis shippers and not

consumers. This is because, whether or not the ICA is intended to

protect consumers, it is the rate paid by shippers that must be just

and reasonable.50 Sinclair's other arguments should be presented

in a particular case when the Commission must consider the appropriate

determination of the geographic and product market. The Commission will

consider requests for discovery when it determines what future

proceedings are appropriate after protests are filed.

---------------------------------------------------------------------------

\5\0Farmers Union Central Exchange, Inc. v. FERC, 734 F.2d 1486,

1507 (D.C. Cir. 1984).

---------------------------------------------------------------------------

C. Statement C--Pipeline Facilities and Services

In Statement C, the Commission is requiring the oil pipeline to

describe its own facilities and services in the relevant markets

identified in Statements A and B. Statement C must include all

pertinent data about the pipeline's facilities and services in those

markets. For example, without limitation, the oil pipeline would have

to include data on the capacity of its facilities, on its throughput,

on its receipts in its origin markets, on its deliveries in its

destination markets and to its major consuming markets, and the mileage

between its terminals and its major consuming markets. Data should be

supplied for each commodity carried, such as jet fuel, gasoline, etc.

The AOPL maintains that, aside from its origin market objection,

the proposed Statement C would require extremely sensitive shipper

receipt and delivery information, which, in many instances, would

constitute disclosure of confidential shipper information in violation

of Section 15(13) of the ICA. It adds that disclosure of data for each

commodity carried would compound the problem. It makes two requests.

First, Statement C should be streamlined to require only information

likely to influence the ultimate market power determination and,

second, some mechanism must be developed to safeguard the

confidentiality of the information filed.

Alberta and Total support the Commission's proposal to collect

detailed data. Total adds that the Commission should direct its staff

to aggregate delivery data submitted by all pipelines serving each BEA

and calculate delivery-based HHIs because the availability of such

studies would reduce the need and difficulty of obtaining such data in

discovery. It further states that the delivery data also will be useful

to determine the extent of excess capacity and to determine the

likelihood that terminals would be constructed in response to a rate

increase because it is necessary to know the extent of available

uncommitted upstream capacity and supplies to serve a new terminal.

The Commission rejects the AOPL's request that Statement C require

only data likely to influence the ultimate market power determination

because it would enable the oil pipeline to make that determination at

the outset. The AOPL's concern about safeguarding the confidentiality

of sensitive information is being addressed through a change in

procedures as discussed above. In this rule, the Commission will not

direct staff to collect aggregate delivery data and calculate delivery-

based HHIs. However, if the Commission receives sufficient data to make

collection warranted, it may reconsider this in the future.

D. Statement D--Competitive Alternatives

In Statement D, the Commission is requiring the oil pipeline to

describe available transportation alternatives in competition with the

oil pipeline in the relevant markets and other competition constraining

the oil pipeline's rates in those markets. To the extent available,

Statement D must include all pertinent data about transportation

alternatives and other constraining competition. For example, the oil

pipeline would have to include data similar to that provided for its

own facilities and services in Statement C, including cost and mileage

data in specific reference to the oil pipeline's terminals and major

consuming markets. The following transport and other competition might

be included in a market power calculation: Other pipelines, including

private pipelines and those passing through the geographic market but

without terminals, pipelines passing near the geographic market,

barges, trucks, and refineries within the geographic market. The

Commission is not excluding any alternative form of transport or other

competition, including, for example, local consumption in origin

markets. However, the burden is on the oil pipeline to justify its

inclusion of transportation alternatives and other competition in its

market power analysis.

The AOPL maintains that the Statement D-type information lies

largely beyond a pipeline's reach. It declares it highly unlikely that

a competing pipeline will provide information such as throughput,

origin market receipts, destination market deliveries, and deliveries

to major consuming markets, particularly by commodity. It states that

to do so would be illegal. It also argues that Statement D potentially

requires the production of much ultimately useless information. It

requests the Commission to require ``only information or estimates

concerning matters ultimately affecting the Commission's determination

of market power'' and to require only ``publicly available information

or [the oil pipeline's] best estimate of competitive

alternatives.''51

---------------------------------------------------------------------------

\5\1Comments at 46.

---------------------------------------------------------------------------

The Commission denies the AOPL's first request. As stated above,

permitting the oil pipeline to submit information or estimates that

only affects the Commission's determination of market power will enable

it to make that determination at the outset. With respect to the second

request, the Commission has modified the proposal in the NOPR to

require the oil pipeline to include pertinent data only to the extent

available. Hence, as requested by the AOPL, the oil pipeline need only

file information that is publicly available or its best estimates of

competitive alternatives, unless the oil pipeline possesses additional

information. Of course, it is in the oil pipeline's interest to make

its best case to satisfy its burden of proof.

E. Statement E--Potential Competition

In Statement E, the Commission is requiring the oil pipeline to

describe potential competition in the relevant markets. To the extent

available, Statement E must include data about the potential

competitors such as a potential entrant's costs and their distance in

miles from the oil pipeline's terminal and major consuming markets.

The AOPL asserts that the most reliable information is possessed by

shippers and not pipelines. It states that it has no objection so long

as the pipeline's best estimates of potential competition drawn from

publicly available information are acceptable.

The Commission has modified the proposal in the NOPR to require the

oil pipeline to include data only to the extent available. Hence, as

proposed by the AOPL, an oil pipeline need only submit its best

estimates of potential competition drawn from publicly available

information, unless the oil pipeline possesses additional information.

Of course, it is in the oil pipeline's interest to make its best case

to satisfy its burden of proof.

F. Statement F--Maps

In Statement F, the Commission is requiring maps showing the oil

pipeline's principal transportation facilities and the points at which

service is rendered under its tariff, the direction of flow of each

line, the location of each of the oil pipeline's terminals, the

location of each of its major consuming markets (cities, airports, and

the like, as appropriate), and the location of alternatives to the oil

pipeline, including their distance in miles from oil pipeline's

terminals and major consuming markets. The statement must include a

general system map and maps by geographic markets and the information

required by this statement may be on separate pages. No commenter

opposed Statement F.

G. Statement G--Market Power Measures

In Statement G, the Commission is requiring the oil pipeline to set

forth the calculation of the HHI52 and its market share with

respect to the relevant markets and the calculation of other market

power measures relied on by the oil pipeline, along with complete

particulars about those calculations. The Commission believes that it

is useful to obtain a showing of market concentration using the HHI.

The HHI must include the oil pipeline and the competitive alternatives

set forth in Statements D and E. The burden is on the oil pipeline to

justify the individual market shares used in calculating the HHIs. In

addition, the Commission is not proposing any particular HHI level,

such as 1800 or 2500, as a screen or presumption, rebuttable or

otherwise. All factors must be considered in determining whether an oil

pipeline lacks significant market power.

---------------------------------------------------------------------------

\5\2Id.

---------------------------------------------------------------------------

The Commission also is requiring the oil pipeline to submit a

market share calculation based on its receipts in its origin markets

and its deliveries in its destination markets, if the HHIs are not

based on those factors. For example, if the destination HHIs are based

on capacity determined market shares, the oil pipeline would have to

submit a calculation showing its share of the market based on

deliveries in the respective destination markets. The Commission is not

proposing any screen or presumption, rebuttable or otherwise, about

particular market share levels. All factors must be considered in

determining whether an oil pipeline lacks significant market power.

The oil pipeline may also include other indicators of the lack of

significant market power for example, it could present evidence about

water transportation as an indication that the oil pipeline lacks

significant market power.

The AOPL objects to the inclusion of origin market information in

HHI and market share calculations and to the production of underlying

HHI and market share calculations as part of an initial submission,

particularly where a market's HHI or pipeline market share is so low as

to preclude a challenge to the market's competitiveness. The AOPL also

maintains that market share data for HHIs should reflect market

capacity and not market deliveries. It argues that the use of delivery

data distorts the analysis of market behavior because it is at best a

``snapshot'' of the market as it existed prior to any purported try to

exercise market power rather than a gauge of the potential of the

market to respond to such an exercise. It maintains that this

prospective response can be evaluated best by considering the market's

capacity to respond. It also argues that delivery data are not readily

available and of questionable accuracy unlike capacity data which tend

to be a matter of public information and more readily available.

Total supports the collection of delivery data in order to

calculate market shares. It further maintains that the delivery

information should be aggregated in order to calculate delivery-based

HHIs to provide the Commission with a picture of how the market is

actually behaving inasmuch as this understanding is essential to

analyzing the rule of potential competition.

As discussed above, the Commission considers it appropriate to

include origin markets in a determination of market power because it is

not ready to exclude the possibility of oil pipeline monopsony power.

The Commission is permitting oil pipelines to submit HHIs based on

capacity rather than on deliveries. They need submit delivery based

data only for market share as another factor to consider in making the

determination whether or not an oil pipeline possesses significant

market power. At this time, the Commission is not going to aggregate

data, but may do so at a later time.

H. Statement H--Other Factors

In Statement H, the oil pipeline would describe any other factors

that bear on the issue of whether it lacks significant market power in

the relevant markets. The oil pipeline must explain why those other

factors are pertinent. Possible other factors are: Exchanges, Excess

Capacity, Competition with vertically integrated companies, buyer

power, and profitability. The Commission is not excluding any factor

and is not limiting the factors to those listed in the NOI. For

example, an oil pipeline might want to show that it has been losing

markets over a period of years or that the relevant market is

expanding. The burden is on the oil pipeline to show the relevance of

any factor to showing its lack of significant market power. No

commenter opposed Statement H.

I. Statement I--Proposed Testimony

In Statement I, the Commission is requiring the oil pipeline to

present proposed testimony in support of its application. This will

serve as its case-in-chief if the Commission sets the application for

hearing. The proposed witness must subscribe to the testimony and swear

that all statement of facts in the proposed testimony are true and

correct to the best of his or her knowledge, information, and belief.

The AOPL opposes Statement I because it does not believe it should

present a case-in-chief prior to the filing of a protest as discussed

above. In addition, it argues that the filing of a case-in-chief at

this stage raises significant due process concerns because it cannot

conduct discovery, as it can now, of other shippers prior to submitting

its case. It points out that all participants except the oil pipeline

will be able to conduct discovery before first filing prepared

testimony. It asks, at a minimum, that an oil pipeline should receive a

15-day period after its initial filing to submit proposed testimony.

There is no entitlement to discovery before an applicant files a

case-in-chief. In addition, the Commission has not ruled that a

participant is entitled to discovery from the oil pipeline or any one

else before it files a protest and its responsive case.53 Last,

the AOPL has provided no justification for a 15-day delay in filing its

proposed testimony.

---------------------------------------------------------------------------

\5\3See infra.

---------------------------------------------------------------------------

The Commission expects the oil pipeline to file a complete

application which should contain sufficient information upon which the

Commission could grant the application after expiration of the protest

period. However, in the event the Commission finds it necessary to

establish a hearing, that process would be greatly expedited because

the applicant's testimony is part of the record already. Thus, this

requirement is intended to expedite the hearing process. The

Commission's experience with gas pipelines, for example, has been that

the proposed testimony often provides essential justification for the

applicant's proposal which is not provided elsewhere in the filing. It

has been the Commission's experience that the process of proposing

sworn testimony often causes an applicant to organize its arguments and

facts in a manner that is easier to understand. This also aids the

protestants in their framing of the issues to pursue.

IX. Procedural Requirements

In new section 348.2 the Commission is adopting several procedural

requirements in connection with applications for a market power

determination. First, an oil pipeline must file an original and 14

copies of its complete application with the Commission but would only

have to provide its letter of transmittal to its shippers and

subscribers. As discussed above, some of the supporting information may

be prohibited from disclosure under Section 15(13) of the ICA. Hence,

the oil pipeline must submit with its application any request for

privileged treatment of documents and information under Section 388.112

of the Commission's regulations and a proposed form of protective

agreement. In the event the oil pipeline requests privileged treatment

under Sec. 388.112, it must file the original and three copies of its

application with the information for which privileged treatment is

sought and 11 copies of the application without that information. The

letter of transmittal must describe the application for a market power

determination and identify each rate that would be market-based, if the

oil pipeline shows that it lacks significant market power in the

relevant market. The pipeline must include a copy of its proposed form

of protective agreement with its letter of transmittal.

Under the regulations, a person must make a written request to the

pipeline for a copy of the complete application within 20 days after

the filing of the application with the Commission. The requesting

person must include an executed copy of the protective agreement. Any

person objecting to a proposed form of protective agreement must file a

motion under Section 385.212 of the Commission's regulations.54

The oil pipeline must provide a person with a copy of its complete

application within seven days after receipt of the written request and

an executed copy of the protective agreement. A protestant must file

its protest to the application within 60 days after the filing of the

application. At that time, the protestant must set forth in detail its

grounds for opposing the oil pipeline's application, including

responding to its statement of position and information, and, if the

protestant desires, presenting information of its own pursuant to

Statements A-I.

---------------------------------------------------------------------------

\5\4The Commission will act expeditiously to resolve any

controversies about protective agreements.

---------------------------------------------------------------------------

The Commission, after examination of the oil pipeline's application

and any protests, will issue an order in which it will rule summarily

on the application or, if appropriate, establish additional procedures

and the scope of the investigation. Additional procedures may or may

not involve a hearing before an administrative law judge.

The Commission is requiring the oil pipelines to file their

applications with the Commission on an electronic medium in addition to

the paper filing. The formats for the electronic filing and the paper

copy will be obtainable at the Federal Energy Regulatory Commission,

Public Reference and Files Maintenance Branch, 941 North Capitol

Street, N.E., Washington, D.C. 20426. The Commission intends to

establish the formats in cooperation with the oil pipeline industry.

The Commission believes that it is sufficient to adopt procedures

only for the submission of applications and responses thereto. Hence,

the Commission is not adopting any regulations with respect to protests

or complaints against existing market-based rates under Sections 15(7)

and 13(1) of the ICA. However, the Commission expects a protestant or

complainant to allege and to present evidence that the pipeline has

developed significant market power. In particular, the Commission would

expect a protestant or complainant to describe any circumstances that

have changed since the Commission made the determination that the oil

pipeline lacks significant market power and could charge market-based

rates.

Petrochemical requests that the Commission publicly notice any oil

pipeline rate filing in the Federal Register as further assurance that

any notice of a proposed rate change is widely disseminated. It further

asks the Commission to clarify that ``pursuant to proposed regulation

Sec. 348.2(b), the copy of the letter of transmittal that is to be

provided to shippers and subscribers on or before the day the

application is filed, must be received by the shipper or subscriber

prior to the date of the application. In other words, the deadline is

an in-hand receipt date, not a posted for mailing date.''55 It

contends that this is necessary to avoid erosion of the 15-day window

for requesting a copy of the entire application.

---------------------------------------------------------------------------

\5\5Comments at 5.

---------------------------------------------------------------------------

It has not been the Commission's practice to publicly notice oil

pipeline tariff filings in the Federal Register because the oil

pipeline must serve all affected persons. However, the Commission has

modified the proposal in the NOPR to require written requests 20 days

after the application was filed rather than 15 days. This should

satisfy Petrochemical's concern about the deadline running from the

date of application rather than receipt by the shipper.

Alberta, Petrochemical, and Sinclair maintain that protestants need

more time than 60 days after the filing of the application as proposed

in the NOPR. Alberta and Petrochemical suggests that the deadline for

filing protests be extended to 90 days.

The Commission believes that protestants will be able to respond

within 60 days of the filing of the application. However, if this

period is insufficient in a particular case, then additional time can

be requested from the Commission under Section 385.2008 of the

Commission's regulations. The Commission will act liberally in

connection with requests for an extension of time.

Petrochemical requests clarification that a complete copy of the

application provided to protestants will include the materials

submitted in electronic format. It argues that the ``ability to obtain

cost and other data in electronic form would save vast amounts of money

that would otherwise be spent in the redundant task of taking a hard

copy generated from computers and then reentering the data into

computer format so that studies and analyses can be performed on the

data.''\56\ The Commission clarifies, as requested by Petrochemical,

that the complete copy of the application must include the materials

submitted in electronic format.

---------------------------------------------------------------------------

\56\Comments at 6.

---------------------------------------------------------------------------

Davis submits that if ``electronic medium'' is defined as computer

modem-based electronic equipment, the electronic filing requirement may

be a hardship on small independent pipeline companies. Davis suggests

the requirement be permissive. Davis also maintains that proposed

sections 348.2 (b) and (c) are redundant to current procedure and place

an additional burden on oil pipelines.

The Commission is not modifying its requirement that applications

must be submitted on an electronic medium. However, an oil pipeline may

submit a waiver request. Last, with respect to Davis' redundancy

argument, the Commission sees to harm in repetition as the new

regulations merely reiterate in part current procedure for convenience.

The Farmers maintain that the protestants have a right to a hearing

where a case involves substantial issues of fact, law, or ratemaking

policy. They argue that because the time for preparing a rebuttal is so

short, shippers need the opportunity for normal prehearing and hearing

procedures to present a meaningful response to an oil pipeline's case-

in-chief and to obtain clarification or explanation of the applicant's

evidence. Alberta also suggests that ``all proceedings must receive

full hearing before an Administrative Law Judge (ALJ) to ensure that

all evidence is thoroughly tested and the Commission has a complete

evidentiary record on which to base its decision.''\57\

---------------------------------------------------------------------------

\57\Comments at 4.

---------------------------------------------------------------------------

The Commission believes that the procedures for proceeding on an

application for a market power determination should be tailored to the

specifics of the case. Hence, the Commission will make no generic

decisions here. The protestants should make their request for a hearing

before an ALJ when they file their protests. The oil pipeline

applicants may make their request after the protests are filed. The

Commission is not establishing provisions for limited discovery. The

oil pipeline and the protestants should file their case-in-chiefs and

responsive pleadings without discovery. The Commission believes that

the oil pipeline and the protestants should have sufficient information

available from public sources or their own experience to submit their

cases. Of course, the Commission encourages the informal exchange of

information to expedite and facilitate the application process. The

protestants may request discovery when their protests are filed. The

oil pipeline applicants may request discovery after the protests are

filed. Both requests must provide a full explanation for the need for

discovery, a hearing, or both.

X. Environmental Analysis

The Commission is required to prepare a Environmental Assessment or

an Environmental Impact Statement for any action that may have a

significant adverse effect on the human environment.\58\ The Commission

has categorically excluded certain actions from these requirements as

not having a significant effect on the human environment.\59\ The

action taken here is procedural in nature and therefore falls within

the categorical exclusions provided in the Commission's

regulations.\60\ Therefore, neither an environmental impact statement

nor an environment assessment is necessary and will not be prepared in

this rulemaking.

---------------------------------------------------------------------------

\58\Order No. 486, Regulations Implementing the National

Environmental Policy Act, 52 FR 47897 (Dec. 17, 1987), FERC Statutes

and Regulations, Regulations Preambles 1986-1990 30,783 (1987).

\59\18 CFR 380.4.

\60\See 18 CFR 380.4(a)(2)(ii).

---------------------------------------------------------------------------

XI. Reporting Flexibility Certification

The Regulatory Flexibility Act (RFA)\61\ generally requires the

Commission to describe the impact that a rule would have on small

entities or to certify that the rule will not have a significant

economic impact on a substantial number of small entities. An analysis

is not required if a rule will not have such an impact.\62\ Most oil

pipelines to whom the rule will apply do not fall within the definition

of small entity.\63\ Consequently, pursuant to section 605(b) of the

RFA, the Commission certifies that the regulations will not have a

significant impact on a substantial number of small entities.

---------------------------------------------------------------------------

\61\5 U.S.C. 601-612.

\62\5 U.S.C. 605(b).

\63\Section 601(c) of the RFA defines a ``small entity'' as a

small business, a small not-for-profit enterprise, or a small

governmental jurisdiction. A ``small business'' is defined by

referent to section 3 of the Small Business Act as an enterprise

which is ``independently owned and operated and which is not

dominant in its field of operation.'' 15 U.S.C. 632(a).

---------------------------------------------------------------------------

XII. Information Collection Requirements

The Office of Management and Budget's (OMB) regulations\64\ require

that OMB approve certain information and recordkeeping requirements

imposed by an agency. The information collection requirements in this

rule are contained in FERC-550 ``Oil Pipeline Rates'' Tariff Filings''

(1902-0089).

---------------------------------------------------------------------------

\64\5 CFR 1320.14.

---------------------------------------------------------------------------

The Commission's Office of Pipeline Regulation uses the data

collected in these information requirements to investigate the rates

charged by oil pipeline companies subject to its jurisdiction, to

determine the reasonableness of rates, and when appropriate prescribe

just and reasonable rates. In addition, the information to be required

by the rule would allow the Commission to determine if an oil pipeline

lacks significant power in the relevant markets when it proposes to

charge market-based rates.

Because the adoption of the procedural rules will create an

expected increase in the public reporting burden under FERC-550, the

Commission is submitting a copy of the rule to OMB for its review and

approval. Interested persons may obtain information on these reporting

requirements by contacting the Federal Energy Regulatory Commission,

941 North Capitol Street, N.E., Washington, D.C. 20426 [Attention:

Michael Miller, Information Services Division, (202) 208-1415].

Comments on the requirements of this rule can be sent to the Office of

Information and Regulatory Affairs of OMB (Attention: Desk Officer for

Federal Energy Regulatory Commission).

XIII. Effective Date

The final rule will be effective January 1, 1995.

List of Subjects in 18 CFR Part 348

Pipelines, Reporting and recordkeeping requirements.

By the Commission.

Lois D. Cashell,

Secretary.

In consideration of the foregoing, the Commission adds Part 348,

Chapter I, Title 18, Code of Federal Regulations, to read as follows:

PART 348--OIL PIPELINE APPLICATIONS FOR MARKET POWER DETERMINATIONS

Sec.

348.1 Content of application for a market power determination.

348.2 Procedures.

Authority: 42 U.S.C. 7101-7352; 49 U.S.C. 60502; 49 App. U.S.C.

1-85.

Sec. 348.1 Content of application for a market power determination.

(a) If, under Sec. 342.4(b) of this chapter, a carrier seeks to

establish that it lacks significant market power in the market in which

it proposes to charge market-based rates, it must file and provide an

application for such a determination. An application must include a

statement of position and the information required by paragraph (c) of

this section.

(b) The carrier's statement of position required by paragraph (a)

of this section must include an executive summary of its statement of

position and a statement of material facts in addition to its complete

statement of position. The statement of material facts must include

citation to the supporting statements, exhibits, affidavits, and

prepared testimony.

(c) The carrier must include with its application the following

information:

(1) Statement A--geographic market. This statement must describe

the geographic markets in which the carrier seeks to establish that it

lacks significant market power. The carrier must include the origin

market and the destination market related to the service for which it

proposes to charge market-based rates. The statement must explain why

the carrier's method for selecting the geographic markets is

appropriate.

(2) Statement B--product market. This statement must identify the

product market or markets for which the carrier seeks to establish that

it lacks significant market power. The statement must explain why the

particular product definition is appropriate.

(3) Statement C--the carrier's facilities and services. This

statement must describe the carrier's own facilities and services in

the relevant markets identified in statements A and B in paragraphs (c)

(1) and (2) of this section. The statement must include all pertinent

data about the pipeline's facilities and services.

(4) Statement D--competitive alternatives. This statement must

describe available transportation alternatives in competition with the

carrier in the relevant markets and other competition constraining the

carrier's rates in those markets. To the extent available, the

statement must include all pertinent data about transportation

alternatives and other constraining competition.

(5) Statement E--potential competition. This statement must

describe potential competition in the relevant markets. To the extent

available, the statement must include data about the potential

competitors, including their costs, and their distance in miles from

the carrier's terminals and major consuming markets.

(6) Statement F--maps. This statement must consist of maps showing

the carrier's principal transportation facilities, the points at which

service is rendered under its tariff, the direction of flow of each

line, the location of each of its terminals, the location of each of

its major consuming markets, and the location of the alternatives to

the carrier, including their distance in miles from the carrier's

terminals and major consuming markets. The statement must include a

general system map and maps by geographic markets. The information

required by this statement may be on separate pages.

(7) Statement G--market power measures. This statement must set

forth the calculation of the market concentration of the relevant

markets using the Herfindahl-Hirschman Index. The statement must also

set forth the carrier's market share based on receipts in its origin

markets and deliveries in its destination markets, if the Herfindahl-

Hirschman Index is not based on those factors. The statement must also

set forth the calculation of other market power measures relied on by

the carrier. The statement must include complete particulars about the

carrier's calculations.

(8) Statement H--other factors. This statement must describe any

other factors that bear on the issue of whether the carrier lacks

significant market power in the relevant markets. The description must

explain why those other factors are pertinent.

(9) Statement I--prepared testimony. This statement must include

the proposed testimony in support of the application and will serve as

the carrier's case-in-chief, if the Commission sets the application for

hearing. The proposed witness must subscribe to the testimony and swear

that all statements of fact contained in the proposed testimony are

true and correct to the best of his or her knowledge, information, and

belief.

Sec. 348.2 Procedures.

(a) A carrier must file, as provided in Sec. 341.1 of this chapter,

an original plus fourteen copies of its application, including its

statement of position, statements, and related material, and a letter

of transmittal and must submit its application on an electronic medium.

The formats for the electronic filing and the paper copy can be

obtained at the Federal Energy Regulatory Commission, Division of

Public Information, 825 North Capitol Street, N.E., Washington, D.C.

20426. A carrier must submit with its application any request for

privileged treatment of documents and information under Sec. 388.112 of

this chapter and a proposed form of protective agreement. In the event

the carrier requests privileged treatment under Sec. 388.112 of this

chapter, it must file the original and three copies of its application

with the information for which privileged treatment is sought and 11

copies of the application without the information for which privileged

treatment is sought.

(b) A carrier must provide a copy of its letter of transmittal and

its proposed form of protective agreement to each shipper and

subscriber on or before the day the material is transmitted to the

Commission for filing.

(c) A letter of transmittal must describe the market-based rate

filing, including an identification of each rate that would be market-

based, and the pertinent tariffs or supplement numbers, state if a

waiver is being requested and specify the statute, section, subsection,

regulation, policy or order requested to be waived. Letters of

transmittal must be certified pursuant to Sec. 341.2(c)(2) of this

chapter and acknowledgement must be requested pursuant to

Sec. 341.2(c)(3) of this chapter.

(d) An interested person must make a written request to the carrier

for a copy of the carrier's complete application within 20 days after

the filing of the application. The request must include an executed

copy of the protective agreement. Any objection to the proposed form of

protective agreement must be filed under Sec. 385.212 of this chapter.

(e) A carrier must provide a copy of the complete application to

the requesting person within seven days after receipt of the written

request and an executed copy of the protective agreement.

(f) A carrier must provide copies as required by paragraphs (b) and

(e) of this section by first-class mail or by other means of

transmission agreed upon in writing.

(g) Any intervention or protest to the application must be filed

within 60 days after the filing of the application and must be filed

pursuant to Secs. 343.2 (a) and (b) of this chapter. A protest must

also be telefaxed if required by Sec. 343.3(a) of this chapter.

(h) A protest filed against an application for a market power

determination must set forth in detail the grounds for opposing the

carrier's application, including responding to its position and

information and, if desired, presenting information pursuant to

Sec. 348.1(c).

(i) After expiration of the date for filing protests, the

Commission will issue an order in which it will summarily rule on the

application or, if appropriate, establish additional procedures and the

scope of the investigation.

[FR Doc. 94-27620 Filed 11-15-94; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.