Revisions to Oil Pipeline Regulations Pursuant to Energy Policy Act of 1992
Federal RegisterAug 8, 1994
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
18 CFR Parts 341, 342, and 343
[Docket No. RM93-11-001; Order No. 561-A]
Revisions to Oil Pipeline Regulations Pursuant to Energy Policy
Act of 1992
July 28, 1994.
AGENCY: Federal Energy Regulatory Commission, Energy.
ACTION: Order on rehearing.
-----------------------------------------------------------------------
SUMMARY: The Federal Energy Regulatory Commission is amending its
regulations to revise the requirements for filing suspension
supplements of oil pipeline tariffs in order to provide additional time
to file suspension supplements; to modify the circumstances under which
oil pipelines may use the cost-of-service methodology for changing
rates in order to more closely track the standard for shipper protests
to an indexed rate; and to modify the requirements for protests to oil
pipeline tariff filings in order to require that a protestant file a
verified statement to support its claim of a substantial interest in
the proceeding. The effect of these actions will be to provide a more
accurate, timely, and balanced approach to oil pipeline ratemaking
under the Energy Policy Act of 1992 and the Interstate Commerce Act.
EFFECTIVE DATE: The amendments to Part 341 are effective September 7,
1994, and the amendments to Parts 342 and 343 are effective January 1,
1995.
FOR FURTHER INFORMATION CONTACT:
Harris S. Wood, Office of the General Counsel, Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, (202) 208-0224.
SUPPLEMENTARY INFORMATION: In addition to publishing the full text of
this document in the Federal Register, the Commission also provides all
interested persons an opportunity to inspect or copy the contents of
this document during normal business hours in Room 3104, 941 North
Capitol Street, NE., Washington, DC 20426.
The Commission Issuance Posting System (CIPS), an electronic
bulletin board service, provides access to the texts of formal
documents issued by the Commission. CIPS is available at no charge to
the user and may be accessed using a personal computer with a modem by
dialing (202) 208-1397. To access CIPS, set your communications
software to use 300, 1200, or 2400 bps, full duplex, no parity, 8 data
bits and 1 stop bit. CIPS can also be accessed at 9600 bps by dialing
(202) 208-1781. The full text of this proposed rule will be available
on CIPS for 30 days from the date of issuance. The complete text on
diskette in Wordperfect format may also be purchased from the
Commission's copy contractor, La Dorn Systems Corporation, also located
in Room 3104, 941 North Capitol Street, NE., Washington, DC 20426.
Before Commissioners: Elizabeth Anne Moler, Chair; Vicky A. Bailey,
James J. Hoecker, William L. Massey, and Donald F. Santa, Jr.
I. Introduction
A. Order No. 561
On October 22, 1993, the Federal Energy Regulatory Commission
(Commission) issued Order No. 561 in this proceeding.\1\ Order No. 561
promulgated regulations pertaining to the Commission's jurisdiction
over oil pipelines under the Interstate Commerce Act (ICA),\2\ to
fulfill the requirements of the Energy Policy Act of 1992 (Act of
1992).\3\
---------------------------------------------------------------------------
\1\Revisions to Oil Pipeline Regulations Pursuant to Energy
Policy Act, Order No. 561, III FERC Statute & Regulations 30,985
(1993), which will be referred to herein as the ``final rule.''
\2\49 U.S.C. app. 1 (1988).
\3\42 U.S.C.A. 7172 note (West Supp. 1993).
---------------------------------------------------------------------------
The final rule reflects the Commission's compliance with the
mandate of Congress in enacting the Act of 1992. In the final rule, the
Commission recognized that Congress deemed certain rates to be just and
reasonable, thereby forming a baseline for many future oil pipeline
rate changes and obviating future debate over the appropriateness of
existing rates, many of which are based on valuation or trended
original cost methodologies. The final rule, in accordance with the
directive of section 1801 of the Act of 1992, provided a ``simplified
and generally applicable'' approach to changing just and reasonable
rates through use of an index system to establish ceiling levels for
such rates. The final rule adopted the annual change in the Producer
Price Index for Finished Goods, minus one percent (PPI-1), as the
appropriate index to determine annual ceiling levels of rates to be
charged by oil pipelines.\4\
---------------------------------------------------------------------------
\4\The Commission stated in the final rule that it would
undertake an examination of the relationship between the annual
change in the index and the actual cost changes experienced by the
oil pipeline industry every five years, beginning in the year 2000.
---------------------------------------------------------------------------
As alternatives to the indexing approach, the final rule permits,
in certain defined circumstances, other rate-setting or rate-changing
methodologies. The final rule permits cost-of-service proceedings to
establish just and reasonable rates, with regard to initial rates for
new service, and also with regard to changes to existing rates where
appropriate.\5\ The final rule retained the Commission's policy of
encouraging settlements of rate issues at any stage in the proceedings.
Finally, the final rule continued to allow pipelines to seek Commission
authorization to charge market-based rates.\6\
---------------------------------------------------------------------------
\5\The Commission, concurrently with the issuance of the final
rule, issued a notice of inquiry to explore ways to improve the
collection of data on oil pipeline costs, and as a first step in
establishing filing requirements for cost-of-service rate filings,
to facilitate these cost-of-service proceedings. See Cost-of-Service
Filing and Reporting Requirements for Oil Pipelines, Notice of
Inquiry, IV FERC Stats. & Regs. 35,528 (October 22, 1993); Notice
of Proposed Rulemaking, Cost of Service Filing and Reporting
Requirements for Oil Pipelines, Docket No. RM94-2-000, issued
concurrently with this order.
\6\The matter of market-based rates is also the subject of a
notice of inquiry issued concurrently with the final rule. See
Market-Based Ratemaking for Oil Pipelines, Notice of Inquiry, IV
FERC Stats. & Regs. 35,527 (October 22, 1993); Notice of Proposed
Rulemaking, Market-Based Ratemaking for Oil Pipelines, Docket No.
RM94-1-000, issued concurrently with this order.
---------------------------------------------------------------------------
In addition to establishing the ratemaking methodologies to be
followed by oil pipelines, the final rule, pursuant to the directives
of the Act of 1992, adopted certain reforms to the Commission's
procedures relating to oil pipeline proceedings. The final rule also
included an updating of Commission regulations pertaining to oil
pipeline tariffs.
B. Order on Rehearing
This order on rehearing grants, in certain respects, the
applications for rehearing that were filed, and clarifies in part the
final rule.\7\ The changes made in the rule on rehearing are:
---------------------------------------------------------------------------
\7\A list of those parties filing applications for rehearing or
requests for clarification is attached as Appendix A to this order,
and the names by which they are referred herein.
---------------------------------------------------------------------------
1. Section 341.4 of the regulations is modified to require the
filing of suspension supplements within 30 days of the suspension
order, instead of 15 as required in the final rule.
2. The ``uncontrollable circumstances'' test of Sec. 342.4 of the
regulations has been modified to provide that the pipeline may use the
cost-of-service methodology for changing rates when it can demonstrate
that its prudently incurred costs have increased to such an extent that
there is a substantial divergence between such costs and the rate
produced by application of the index. This change will more closely
track the standard for shipper protests to an indexed rate as reflected
in Sec. 343.2.
3. Section 343.3 of the regulations has been modified to require
that a protestant must file a verified statement which contains a
detailed description of the nature and substance of the protestant's
substantial interest in the pipeline's tariff filing.
In all other respects, Order No. 561 is affirmed as issued.
The Commission re-affirms that the index approach to oil pipeline
ratemaking should be instituted on January 1, 1995. The indexing
methodology adopted in the final rule is designed to fulfill both the
simplification directive of the Act of 1992 and the just and reasonable
standard of the ICA. It will simplify, and thereby expedite, the
process of changing rates by allowing, as a general rule, such changes
to be made in accordance with a generally applicable index. It will
ensure compliance with the just and reasonable standard by subjecting
the PPI-1 index to periodic monitoring and, if necessary, adjustment,
and, in addition, by providing both pipelines and their customers with
an opportunity to show in individual cases that the indexed ceiling
level does not comport with the just and reasonable requirement of the
ICA.
The Act of 1992 directed the Commission to establish a ratemaking
methodology that is ``simplified and generally applicable,''\8\ and
comports with the just and reasonable standard of section 1(5) of the
ICA. At the outset of undertaking compliance with the Act of 1992, the
Commission was confronted by a significant fact: Congress, in section
1803 of the Act of 1992, deemed the vast majority of existing rates to
be just and reasonable, and subject to challenge only under narrowly
defined circumstances. Thus, with a few exceptions, the oil pipeline
industry's existing rates have been established as a just and
reasonable baseline. Moreover, this is a baseline that has resulted not
from an examination and confirmation of underlying costs, but from a
statutory edict.
---------------------------------------------------------------------------
\8\Section 1801, Act of 1992.
---------------------------------------------------------------------------
This statutory just and reasonable baseline of existing rates,
combined with the mandate to simplify and expedite, has focused the
Commission's task in this proceeding upon formulating a streamlined way
of regulating rate changes. Thus, the indexed rate-cap methodology set
forth in the final rule, and re-affirmed in this order, constitutes a
simplified and generally applicable methodology of changing rates.
Simplification results from the elimination, with rare exceptions,
of rate-specific examinations of costs. Under the indexed rate-cap
approach, rates are allowed to change so long as the resulting rate is
at or below a ceiling level established by the index. This approach is
also generally applicable because a rate cap methodology serves to
constrain rates in the pipeline's markets.
The indexing methodology adopted in the final rule and affirmed
here is fundamentally based upon costs. The index selected, PPI-1, is
that which the evidence in the record indicates most closely
approximates the actual cost changes experienced by the oil pipeline
industry. Thus, changes in rate ceilings should reflect changes in
costs to the pipeline industry. To ensure this nexus is maintained, the
Commission will periodically examine the relationship between the
selected index and the actual cost changes experienced by the oil
pipeline industry. Appropriate adjustments to the index will be made as
warranted by the results of this periodic review.
The indexing methodology also provides a mechanism for ensuring in
individual cases that the actual rates charged are within the zone of
reasonableness required by the just and reasonable standard of the ICA.
A protest may be filed against a rate increase that is within the
applicable ceiling, if the increase is substantially in excess of the
actual increase in costs experienced by the pipeline. The complaint
procedure of section 13(1) of the ICA also remains available to
challenge existing rates that are arguably unjust and unreasonable.
Conversely, a pipeline may file a rate increase that exceeds the
applicable ceiling, if it can show that its prudently incurred costs
are substantially in excess of the cost changes reflected in the index.
In this fashion, the regulatory scheme adopted by the Commission
will provide constant monitoring of the relationship of the index to
the costs of both the pipeline industry as a whole and of individual
pipelines. To the extent this monitoring indicates a discrepancy
between the index and changes in pipeline costs such that the indexed
ceilings do not constrain rates to just and reasonable levels, the
necessary adjustments to the index, or to its application to a
particular rate, will be made.
Although certain petitioners on rehearing have challenged the
Commissioner's authority to do so, judicial precedents make clear that
an agency may lawfully enforce a ``just and reasonable'' standard
through the imposition of rate caps derived from a broad-based
index.\9\ The indexed rate-cap methodology adopted in this proceeding
has firm legal grounding in these precedents and is, with one
exception, no different in substance from the methodologies affirmed in
these cases.
---------------------------------------------------------------------------
\9\See, e.g., Mobil Exploration & Producing Southeast, Inc., et
al. v. United Distribution Cos., 498 U.S. 211 (1991); National Rural
Telecom Association v. FCC, 988 F.2d 174 (D.C. Cir. 1993). See also
Permian Basin Area Rate Cases, 390 U.S. 747 (1968). In Permian, the
area rates for producers were established with reference to an
examination of area costs. Appellants argued on appeal that the
Commission was required to make a rate-specific cost inquiry. The
Court held to the contrary.
---------------------------------------------------------------------------
The exception is the index that is to be used. In the Mobil,
Northern Telecom, and other cases, the index in question was the Gross
Domestic Product--Implicit Price Deflator (GDP-IPD), which is a measure
of general inflation in the economy. In this proceeding, the Commission
has selected the PPI-1 as the index to compute rate caps. This decision
is based upon the conclusion that the PPI-1, which reflects changes in
prices of finished goods, will more closely track the cost changes
experienced by a typical pipeline than will the GDP-IPD. To ensure over
time that this nexus between the changes in the index and the cost
changes experienced by the typical pipeline will be maintained, the
Commission will conduct a review of the PPI-1 index every five years,
beginning in the year 2000.
An agency may lawfully rely upon the rate caps established by the
index to constrain individual rates to just and reasonable levels.
There is, in other words, generally no need, under the indexed rate-cap
methodology, to examine the relationship between changes in costs and
changes in rates on a rate-specific basis. See, e.g., Permian Basin
Area Rate Cases, supra.
Nonetheless, since there may be cases presenting exceptional
circumstances, the methodology includes procedures for both popelines
and shippers to show the need for overriding the presumptive validity
of the rate cap. These procedures reinforce the appropriateness of
using an indexed rate-cap methodology. See Permian Basin Area Rate
Cases (special relief provision);\10\ National Telecom (waiver
provisions). It should be emphasized that these procedures will be
invoked only in truly exceptional cases, in order to achieve the
simplification objective of the indexed rate-cap methodology.\11\
---------------------------------------------------------------------------
\10\In Permian Basin Area Rate Cases, the Court did not reach
the question whether providing for exceptions was legally necessary,
because the Commission's rule contained procedures for exceptions.
\11\In Permian Basin Area Rate Cases, the Court noted with
approval the Commission's stated intention to grant exceptions to
the area rate ceilings only rarely, lest the administrative benefits
of regulating through area rates be undermined. The Court also found
no infirmity with the Commission's decision not to set forth in
advance specific criteria to govern applications for exceptions. 390
U.S. at 772.
---------------------------------------------------------------------------
It bears emphasizing that the choice of the PPI-1 index for use in
the methodology adopted in this rule is not a choice for all time. The
operation of this index will be monitored to ensure that actual rates
charged customers comply with the just and reasonable standard of the
ICA.
II. Issues Raised and Commission Response
A. Choice of Index
1. PPI-1 vs. GDP-IPD
AOPL and its members support the use of a general inflation index,
but claim that the choice of PPI-1 is not supported by record evidence
and is based on flawed statistical analysis presented by Dr. Alfred
Kahn, while voluminous evidence by AOPL (and its members) in favor of
using the GDP-IPD, adjusted upward by 2.5 percent (GDP+2.5), has been
ignored.
Before addressing this criticism directly, it would be useful to
describe briefly how the Commission came to adopt the PPI-1 index for
use in this rule.
The final rule in this proceeding is the result of a notice of
proposed rulemaking (NOPR) initiated by the Commission on July 23,
1993,\12\ in response to the mandate of Congress that the Commission
issued a final order revising oil pipeline ratemaking, contained in the
Act of 1992. On March 18, 1993, the Commission made available for
comment a Proposal for Revisions to Oil Pipeline Regulation Pursuant to
the Energy Policy Act of 1992, prepared by the Commission staff (Staff
Proposal). Staff proposed, among other things, that the Commission
adopt as a primary means of regulating oil pipeline rates an indexing
methodology based on PPI-1. Twenty-four sets of comments were received
on the Staff Proposal.
---------------------------------------------------------------------------
\12\58 FR 37671 (July 13, 1993).
---------------------------------------------------------------------------
In the NOPR, the Commission proposed to use, as its primary means
of regulating oil pipeline rates, an indexing system similar to that
contained in the Staff Proposal. However, rather than the PPI-1, the
Commission proposed to use the GDP-IPD as the index. Forty-two sets of
comments were received from parties representing pipelines, shippers,
State commissions, consumers, and trade associations.
Included in the comments on the NOPR were the sworn statement of
Dr. Alfred Kahn, attached to the comments of Crysen Refining Company,
et al. Dr. Kahn generally supported the use of PPI-1 as best reflecting
the cost changes experienced by product pipelines and reported to the
Commission in the pipelines' annual report to the Commission, Form No.
6. AOPL and the pipelines generally supported the use of the GDP-IPD as
the index, adjusted upward by 2.5 percent, arguing that this index
better reflected pipeline cost changes. Based on these comments, the
Staff paper, and the NOPR, the Commission formulated the final rule,
adopting as the index for pipeline rates the change in the PPI-1.
Numerous applications for rehearing were filed, and on December 9,
1993, Sinclair Oil Corporation and NCFC filed a response to the
application for rehearing of AOPL. This response included the sworn
statement of Dr. Robert Means, supporting the Commission's use of PPI-1
and the Kahn statement generally. Thereafter, on December 22, 1993, the
Commission requested further comments on the issue of the appropriate
index to use for changes to oil pipeline rates.\13\ Six statements and
comments were received. The supplemental comments of AOPL generally
criticized the Kahn and Means studies.
---------------------------------------------------------------------------
\13\65 FERC 61,377 (1993).
---------------------------------------------------------------------------
Based on consideration of the foregoing items, the Commission
reaffirms its decision to use the PPI-1 as the appropriate index for
oil pipeline rate regulation. The choice of PPI-1 was not exclusively
dependent on the evidence submitted by Dr. Kahn. The proposal for using
PPI-1 was first introduced into the record in this proceeding in the
Staff Proposal, before any testimony was submitted. The Staff Proposal
argued that PPI-1 would track industry costs better than the Consumer
Price Index (CPI) and the GDP-IPD because, for example, the latter were
significantly influenced by ``rapidly escalating health care
costs,''\14\ the full extent of which would not be borne by employers.
The Commission ultimately chose PPI-1 in the final rule, but this
choice did not hinge exclusively on Dr. Kahn's testimony nor solely on
his statistical presentation of pipeline costs.
---------------------------------------------------------------------------
\14\Staff Proposal, at 21.
---------------------------------------------------------------------------
AOPL does not dispute that some general measure of inflation should
be used as the index for pipeline rate changes. As AOPL points out,
``The only practical and economically sensible method for addressing
the oil pipeline industry's capital costs under indexation is to rely
upon a general measure of inflation, which by its design captures the
underlying changes in capital costs reflected in the cost of goods
sold.''\15\
---------------------------------------------------------------------------
\15\Request of AOPL for Rehearing and Clarification of Final
Rule, at p. 15.
---------------------------------------------------------------------------
Both the GDP-IPD and the PPI-FG are commonly considered and used as
measures of general inflation. However, the GDP-IPD has flaws, both as
a measure of general inflation and as a contractual price escalator,
despite its common use. The flaws are sufficiently serious for the
Bureau of Economic Analysis of the Department of Commerce (BEA), the
organization responsible for constructing and publishing this index, to
have issued a fact sheet recommending against its use as an escalator:
The Bureau of Economic Analysis does not recommend specific
measures for escalation in contractual or other agreements. However,
we do recommend that the implicit price deflators (for GDP, GNP, and
other components) not be used as measures of price change.\16\
---------------------------------------------------------------------------
\16\BEA's Fact Sheet on the Implicit Price Deflator, attached to
the comments of USAir, Inc., to the notice of proposed rulemaking in
this proceeding, filed August 12, 1993, in Docket No. RM93-11-000.
The two most important flaws of the GDP-IDP are (1) it is not
simply a measure of price change, but it also reflects changes in the
composition of GDP, and (2) it is subject to revision for up to five
years after its publication.
The first problem can be illustrated by health care costs. Health
care expenditures and prices have been rising at a much faster rate
than other components of GDP and non-health care prices,
respectively.17 Because the GDP-IPD reflects both the increased
``weight'' given to health care and the increase in its price, it is an
upwardly biased measure of health care price inflation. For categories
whose share of GDP fall as prices rise, GPD is a downwardly-biased
measure of price change.18
---------------------------------------------------------------------------
\1\7See, e.g., Health Care Financing Review, Winter 1992, Vol.
14, No. 2, at pp. 1, 18.
\1\8For a thorough discussion of alternative measures of
deflating GDP see Young, Alan, ``Alternative Measures of Change in
Real Output and Prices,'' pp. 32-48, and Triplett, Jack, ``Economic
Theory and BEA's Alternative Quantity and Price Indexes,'' pp. 49-
52, Survey of Current Business, vol. 72 number 4, April, 1992.
---------------------------------------------------------------------------
BEA ordinarily revises the GDP-IPD each July and covers the months
and quarters of the most recent calendar year and the preceding two
years. Thus, the July 1994 revision will cover the years 1991, 1992,
and 1993. Comprehensive revisions are carried out at five year
intervals, the most recent of which was released in December
1991.19
---------------------------------------------------------------------------
\1\9For a more detailed account of BEA's release schedule, see
``A Look at How BEA Presents the NIPA's'', Survey of Current
Business,'' pp. 30-32, vol. 73, number 2, February 1993. For the
latest revision, see ``Annual Revision of the U.S. National Income
and Product Accounts'', Survey of Current Business, pp. 9-51, vol.
73, number 8, August 1993.
---------------------------------------------------------------------------
In contrast to the GDP-IPD, the PPI-FG is a fixed-weight index of
the prices of finished goods taken at the producer level. It does not
directly include the prices of services, such as those provided by
medical doctors and hospitals, by teachers, lawyers, and others. It
does reflect indirectly the increased cost of medical care, education,
and legal service, since product costs will rise if the wage-benefit
package that producers must pay reflects the higher prices of medical,
educational, and legal services. Unless offset by productivity gains,
producer prices will rise to reflect these higher costs. The PPI will
reflect the higher costs of services to the extent that they represent
higher costs to producers, but not to the extent that employees rather
than employers absorb these higher service costs. For example, the
benefits portion of the employment cost index rose by over 84% between
1980 and 1990, but the wages and salaries portion grew only by 58%. The
medical care component of the Consumer Price Index rose by 118% during
this period. Yet the total compensation index rose by only 65%.20
Since employers pay the total compensation bill, it is only the latter
that reflects the actual inflationary increase in their total wage
bill. The GDP-IPD reflects both the increase in producer prices that
reflect increases in total worker compensation and the effect of the
increase in medical care prices as seen by consumers, as well as any
increase in the price of housing and education.
---------------------------------------------------------------------------
\2\0Economic Report of the President, January 1993, Table B-43,
397.
---------------------------------------------------------------------------
The cost increases experienced by oil pipelines, which essentially
do business at the wholesale level, has more closely resembled the cost
increase experience of goods producers in the past than that of the
economy as a whole, and it will likely continue to do so in the future.
Therefore, on a broad conceptual basis, the PPI-FG is a more
appropriate choice than GDP for an oil pipeline industry-wide index.
2. Kahn's Analysis
Both Kahn and AOPL provide statistical analyses of pipeline costs
as reported in Form No. 6, to discern whether PPI-1 or GDP+2.5 more
closely tracks these reported changes in oil pipeline costs. These Form
No. 6 data are imperfect and, as AOPL points out, do not necessarily
reflect true valuation and/or bookkeeping costs. Moreover, Form No. 6
does not contain the information necessary to compute a trended
original cost (TOC) rate base or a starting rate base as allowed for in
Order No. 154-B. Thus, all agree that the measure of the capital cost
component of the cost of service is highly unsatisfactory.
Kahn and APOL draw conflicting conclusions from their analyses.
Kahn concludes that PPI-1 better tracks costs for product pipelines,
and is inconclusive about crude oil pipelines. AOPL alleges a number of
statistical flaws in Kahn's analysis, arguing these constitute
sufficient basis to discredit support for PPI-1 as an index.
Kahn constructed a sample of pipelines from Form No. 6 data. He
dropped from his sample those reported pipeline costs in any given year
which were in the upper and the lower 25% of the cost spectrum,
primarily to correct for statistical outliers and for incomplete or
questionable data; and he divided the pipeline universe into strictly
crude carriers and strictly product carriers, eliminating from his
sample all pipeline companies which carry both.
AOPL charges the remaining sample is too small to be statistically
relevant or informative. It particularly objects to the use of only the
middle 50% of reported pipeline costs for computing industry-wide
weighted average costs. It notes the potential downward skewing of
average industry costs by excluding the top 25% of reported pipeline
costs, but neglects to address the potential upward skewing that might
result from eliminating the lower 25%.
AOPL obtained from some of the reporting pipelines, corrections to
the data originally found by Kahn to be incomplete or questionable.
Using these corrected data as supplied by AOPL, Dr. Robert Means21
subsequently expanded Kahn's analysis to all crude and all product
pipelines in the middle 50% of the cost range as reported in any given
year. For reasons explained below, his results would also support the
choice of PPI-1 as an appropriate index to track the central tendency
of reported changes in oil pipeline costs.
---------------------------------------------------------------------------
\2\1Dr. Means' statement is attached to the filing of Sinclair
Oil Corporation and the National Council of Farmer Cooperatives in
response to the application for rehearing of AOPL, on December 9,
1993.
---------------------------------------------------------------------------
As Dr. Means points out in his testimony, the use of only the
median 50% of pipeline costs does not in any way negate the value of
Kahn's sample as an indicator of the way in which the PPI-1 index
tracks normal pipeline costs:
To be applied without exceptions, a price cap index must be
applied to an industry in which the firm's cost changes fall--or,
with efficient operation, can be made to fall--within a moderate
range. Even with corrections, however, the annual rate of increase
in unit operating expenses and net investment for product pipelines
still range from 19.89 to -12.89 percent; for crude oil pipelines,
the range was from 37.75 to -15.32 percent. . . .
No index can match pipelines' actual cost experience over such a
range. However, the remedy for this problem cannot be a different
index. A higher index would alleviate the problem of cost
underrecovery at the upper end of the range. However, any realistic
index would fall short of the requirements of the firms with the
highest rates of cost increase, and it would at the same time
aggravate the problem of cost overrecovery at the lower end.
Precisely the reverse would occur if a lower index was selected.
The composite measure based on the middle 50 percent that was
used by Dr. Kahn therefore is a reasonable method for assessing an
index even in the absence of any question of erroneous data.\22\
---------------------------------------------------------------------------
\22\Means at 18-19.
The median is, in fact, often preferred statistically as a measure
of central tendency in cases where the distribution is highly
skewed.\23\ An average may be substantially influenced by one or two
extreme outliers, whereas the median, or the middle 50% will not.
---------------------------------------------------------------------------
\23\George Snedecor and William Cochran, Statistical Methods,
Sixth Edition, Iowa State U. Press, 1978, at 123.
---------------------------------------------------------------------------
There is some dispute among commentors on how to weight average
costs. Some use barrel/miles; others advocate using barrels. The choice
of weight will significantly affect the average.\24\ Use of the median
obviates the need to decide on appropriate weights, since the median is
determined only by its position relative to the other components of the
series.
---------------------------------------------------------------------------
\24\See, e.g., Answer of Buckeye Pipeline to Brief of US Air,
Inc., dated January 24, 1994, at p. 5, fn 3.
---------------------------------------------------------------------------
As noted by Means, use of a median range of pipeline costs is also
more appropriate than the use of an index that includes all changes in
pipeline costs, no matter how extraordinary. AOPL, in its request for
rehearing, provides considerable evidence that the index of PPI-1 will
not cover all changes in pipeline costs. It asserts that PPI-1 would
not permit pipelines with far-above-average costs to recover those
costs within the index. It also shows that the GDP implicit price
deflator index would be insufficient to cover all pipeline costs, and
that GDP+2.5 percent would better cover the range of extraordinary
costs incurred by individual pipelines in any given year.
The role of an index is to accommodate normal cost changes. Its
purpose is not to guarantee recovery of all costs at any time and in
full, regardless of other circumstances. Even competitive markets do
not do this.
AOPL argues that the more generous index would better track, and
hence permit more complete recovery of, all reported pipeline costs. If
the Commission chose such an index, sufficiently high and generous to
encompass even the most extraordinary costs, it would provide windfalls
to many oil pipelines by allowing rate changes substantially above cost
changes. This would effectively abdicate our responsibilities for rate
regulation under the ICA.
The choice of PPI-1 is intended to permit pipelines to recover
normal costs through normal operation of the index.\25\ Extraordinary
costs can be recovered through either of the alternate rate change
means--cost of service or settlement rates--as provided in the final
rule. In both cases, the pipeline will have an opportunity to recover
its costs.
---------------------------------------------------------------------------
\25\Kahn states in this original testimony, at page 9, footnote
2, that this is the fundamental purpose of an index:
The mere fact that changes in a particular price or cost index,
intended to be applied to all companies across-the-board, diverges
substantially from changes in the costs of individual companies is
not necessarily an infirmity: the same is true in competitive
markets, just as the competitive market price at any given time will
typically allow some companies to make very high profits and others
to suffer losses.
---------------------------------------------------------------------------
In the Commission's judgment, PPI-1 adequately tracks normal
industry average costs. It does not track extraordinary costs. If it
did, it would permit at least some pipelines to capture monopoly rents,
and foster the inefficiencies inherent in the exercise of monopoly
power. PPI-1 may not be the only index that could have been chosen, but
it is adequate and reasonable for purposes of regulating oil pipeline
rates.
There are also strong equity and administrative reasons for
choosing PPI-1 over GDP as an index. The PPI is issued as a final
figure once a year and is not subject to further adjustments. Its use
thus provides a measure of certainty that does not exist with the GDP-
IPD. The GDP-IPD is subject to revisions even five years after so-
called final figures are first issued. Adjustments in the GDP-IPD
several years after rates have been adjusted would mean that rates
would be based on unreliable data, thereby undermining the confidence
of the industry, the financial community, and pipeline customers in the
rates charged.
AOPL takes issue with two lesser points regarding Kahn's analysis.
AOPL alleges that Kahn erred in omitting gathering and delivery costs
(10% of total industry costs) from his analysis. However, the
Commission is concerned with tracking changes in pipeline costs, not in
absolute levels of pipeline costs, of which gathering and delivery
costs comprise a minor part. Omission of these costs therefore provides
some consistency to the costs analyzed without jeopardizing the
validity of the analysis.
AOPL also takes issue with Kahn's use of changes in net plant
investment (i.e., rate of change in depreciated original cost) as a
proxy for oil pipeline capital cost experience. AOPL notes in this
regard that reported historical book investment has nothing to do with
current costs of capital; reported net investment does not reflect the
practice of using parent company equity for investment; and oil
pipelines use trended original cost for determining rate base, which
cannot be calculated from reported data. In brief, AOPL argues that no
generally available or applicable method exists for discerning and
calculating a given pipeline's capital cost changes from reported data,
for which reason an index of general inflation is required to permit
these costs to be tracked. On these grounds AOPL rejects as inaccurate
Means' calculation of the industry's rate of return.
Means acknowledges in his testimony that it is not possible to
determine a trended original cost rate base from publicly available
data. He explains, however, that the relevant question
* * * does not concern the level of pipelines' aggregate rate base,
but rather the rate at which that level is changing. Over the life
of an asset, the average annual rate of change will be the same
under original cost and trended-original cost methodologies. This
follows from the fact that the starting point (original cost) and
the end point (zero) is the same under both.\26\
---------------------------------------------------------------------------
\26\Means, p. 15.
The only capital cost data available for public analysis is in Form
No. 6. Use of such a proxy may be imperfect, but AOPL offers no better
solution. They prescribe use of a general price deflator to reflect
capital costs, which the Commission has accommodated by choosing PPI-1.
AOPL would simply have the Commission choose a different deflator,
namely GDP or even GDP+2.5. As to Means' rate of return calculations,
they are irrelevant to the choice of index.
AOPL's original analysis, in contrast to that of Kahn and Means,
focussed only on operating expenses, which are more likely to be
affected by inflation.\27\ Capital costs, which AOPL did not
specifically address, will reflect depreciation and other adjustments
that tend to reduce over-all pipeline costs.
---------------------------------------------------------------------------
\27\As noted in the final rule, some commentors in fact
suggested that only such operating expenses be indexed, which we
rejected for reasons explained there.
---------------------------------------------------------------------------
3. Construction of Commission Index
USAir, Alberta, and Chevron have urged the Commission to devise its
own index of pipeline costs, using data from Form 6.
Under the best of circumstances, construction, verification, and
testing of such an index within the near future would be extremely
difficult. The data available to the Commission, from Form No. 6, are
currently insufficient for constructing an oil pipeline industry index.
This is particularly true for capital costs, as discussed in more
detail above. Oil pipelines do not file data in their Form No. 6 which
permit calculation of their capital costs on a trended original cost
basis; as noted earlier, this has in part dictated the need for using a
general price inflation index. While the Commission is proposing to
revise Form No. 6 in the NOPR issued concurrently, it is unlikely that
the data will be sufficient to construct an oil pipeline industry
index.\28\
---------------------------------------------------------------------------
\28\See Notice of Proposed Rulemaking, Cost of Service Filing
and Reporting Requirements for Oil Pipelines, Docket No. RM94-2-000,
issued concurrently with this order.
---------------------------------------------------------------------------
Moreover, a FERC-constructed index would entail serious
complications. First, to construct such an index would require the
collection of data over some extended period of time in order to have a
statistically meaningful set of data points.
Second, if the cost data submitted by individual pipelines were to
be used to charge all shippers maximum rates, it may be argued that
each submission would and should be subject to challenge by any shipper
on any pipeline. While such oversight is not necessarily undesirable
per se, it might result in an indexing method that falls short of the
Act of 1992 goals of simplicity and streamlining.
Third, the extensive vertical integration of the oil industry
raises questions concerning meaningfulness of the cost data
supplied.\29\ Although such companies may operate their pipeline
divisions as independent profit centers, vertical integration does
permit integrated companies considerable leeway in allocating common
costs among their various divisions.
---------------------------------------------------------------------------
\29\Although the Commission collects no data on, and does not
have up-to-date information about, the degree to which pipeline
companies are shipping their own oil from one company division to
another, historically the industry has been highly vertically
integrated. According to a Treasury Department staff study,
``Implications of Divestiture'' (June 1976), the top 20 interstate
oil pipeline firms (all major producers and refiners), owned 86.6%
of the interstate trunkline capacity in 1972. A Department of Energy
study, ``United States Petroleum Pipelines'' (December 1980),
reports that in 1980 integrated pipelines owned by the major oil
companies accounted for three out of the top four and 17 of the top
20 pipelines, 66% of total barrel-miles carried, 57% of total
barrels delivered per day, and 67% of the undivided interest
systems.
---------------------------------------------------------------------------
At one extreme, a pipeline could be allocated none of a company's
joint or common costs, giving it low rates, and perhaps noticeably
lowering the average of reported industry costs. At the other extreme,
a company could allocate to its pipeline a share of the company's
world-wide common costs, resulting in higher rates and raising the
industry cost average significantly. In this latter case, if the
integrated pipeline company transports primarily company crude, it
would suffer little loss in volumes transported despite its higher
rates, and could remain indifferent to the actual level of the rate
being charged. Revenues not recovered by the pipeline could be
recovered at the producing, refining, or marketing end of the company's
operations. The Commission is not suggesting that such cost-shifting
would occur, nor that it would necessarily be improper. But the
possibility of it occurring undetected in reported data does exist. The
net result in either case is that the data available to the Commission
for constructing a proper index would be skewed. In any event, the need
to improve data collection with regard to oil pipelines is specifically
the subject of the separate rulemaking proceeding at Docket No. RM94-2-
000.
4. Conclusion
Based upon the record evidence of this proceeding, publicly
available data filed with the Commission by pipelines, and the nature
and characteristics of the PPI and GDP indexes, the Commission
reaffirms its decision to use the annual change in the PPI-1 index to
establish rate ceilings under the indexing system. This decision, as
stated in the final rule, will be reviewed every five years, beginning
with the year 2000.
B. Filing Requirements for the Indexing System
1. Pipeline Filing Requirements
The final rule imposes certain new affirmative filing requirements
on pipelines. These new requirements may be broken down into two
categories. The first category contains those substantive requirements
governing a pipeline's use of the ratemaking methodology established in
the final rule. A pipeline is generally required to use the indexing
system to change rates. In filing for a rate change under the indexing
system, a pipeline must file a proposed rate that is no higher than the
ceiling derived from application of the index. If a pipeline wishes to
file for a higher rate, it must use a cost-of-service or negotiated-
rate methodology and it must justify that use based upon certain
factors that are enumerated in the regulations. These requirements are
contained in Secs. 342.3 and 342.4 of the regulations.
The second new affirmative pipeline filing requirement, contained
in Sec. 342.3(e) of the regulations, concerns rate decreases under the
indexing system. In any year in which the index is negative, and has
the effect of lowering the applicable rate ceiling, a pipeline with a
rate above the new ceiling must file a new tariff to bring that rate
into compliance with the new ceiling, subject to the provisions of the
Act of 1992. This filing must be effective no later than July 1 of the
applicable index year.
AOPL, ARCO, Exxon, MPL, and Phillips challenge the Commission's
statutory authority to promulgate these requirements on filing rates.
Their argument is that the ICA grants to a pipeline sole discretion as
to the substantive content of a rate change proposal. Thus, they argue,
the Commission is without authority to require a pipeline to abide by
the requirements established in the final rule for filing for changes
of rates under an indexing system. According to the petitioners, a
pipeline has sole control over the substantive contents of a rate
filing and, when one is made, the Commission's action in response is
limited by section 15(7) of the ICA to acceptance of the filing, or
acceptance combined with a suspension of the effective date (of no more
than seven months), imposition of a refund obligation, and the
convening of a hearing.
Petitioners' argument that these regulations are unlawful because
the Commission has no authority to prescribe substantive requirements
for rate filings is clearly mistaken. In the first instance, these
requirements are grounded in specific authorities contained in the ICA.
The end result of this rulemaking proceeding as it relates to the ICA
is the same as if the Commission has proceeded in a case specific
adjudication. That is, the Commission has identified rate levels that
comply with the just and reasonable standard of section 1(5), and it
has required that no rates above those levels can be charged to
customers, unless the pipeline can show there are unusual circumstances
justifying higher rates. Thus, contrary to the view that underlies
petitioners' objections, requiring a pipeline to abide by these
determinations, reflected in the final rule, is no different than
requiring a pipeline to abide by the requirements of an order issued
after an adjudication on its existing or proposed rates.
In regard to the rate decrease filing requirement contained in
Sec. 342.3(e), AOPL argues that this provision is inconsistent with the
ICA's scheme on burden of proof. AOPL notes that the ICA places upon
the Commission, or the complainant, the burden of proving that an
existing rate is unjust and unreasonable. Contrary to this provision,
argues AOPL, the final rule's requirement that a pipeline file for a
rate decrease effectively shifts the burden of proof in respect to the
lawfulness of an existing rate to the pipeline.
According to these petitioners, the Commission has acknowledged
this principle in a prior decision. In Kuparuk Transportation Co., 55
FERC 61,122 (1991), the Commission declined to order the pipeline to
make automatic annual filings to change rates based upon a formula-
prescribed ceiling. AOPL argues that the Commission's decision in
Kuparuk was premised upon the necessity of respecting the ICA's burden-
of-proof scheme, in which a pipeline bears the burden of proof on
proposed rates, but the challenger bears the burden of proof of showing
that existing rates are unlawful.
These arguments of the petitioners are not persuasive.
In complying with the directive of the Act of 1992 to craft a
simplified and generally applicable ratemaking methodology for oil
pipelines, the Commission has exercised its substantive authorities
under the ICA, which are intended to ensure that the rates charged by
oil pipelines for transportation services are in accordance with the
standard contained in section 1(5) of that statute:
All charges made for any service rendered or to be rendered in
the transportation of * * * property * * * shall be just and
reasonable, and every unjust and unreasonable charge for such
service or any part thereof is prohibited and declared unlawful.
Sections 13(1) and 15(1) grant to the Commission authority to
enforce the just and reasonable standard with respect to existing
rates. If after an investigation instigated by virtue of a complaint
brought by any person under section 13(1), or upon the Commission's own
initiative, the Commission finds that an existing rate is not just and
reasonable, section 15(1) empowers the Commission ``to determine and
prescribe what will be the just and reasonable * * * rate * * * or the
maximum or minimum * * * to be charged * * *,'' and to order that the
pipeline ``shall not thereafter publish, demand, or collect any rate *
* * in excess of the maximum * * * so prescribed * * *.''
Section 15(7) provides the Commission with similar authority if the
pipeline proposes changes to its rates. Thus, under that section the
Commission is empowered to investigate proposed rate changes and, if it
determines that the proposed change would not establish a lawful rate,
issue an order ``as would be proper'' in the context of remedying an
unlawful existing rate under section 15(1).
The requirements of the final rule reflect, and are consistent
with, the Commission's authority under these ICA provisions to
investigate and establish just and reasonable rate levels. As explained
in detail in the previous section of this order and in the order
issuing the final rule, the Commission has conducted an on-the-record
investigation in this proceeding and has determined that use of a
generic, cost-based formula (PPI-1 index) for changing existing rates,
the vast majority of which have been deemed just and reasonable by act
of Congress, will streamline and expedite the ratemaking process in
accordance with the mandate of the Act of 1992, while at the same time
ensuring that the resulting rates are just and reasonable within the
meaning of section 1(5) of the ICA.
The specific means by which this indexing system will ensure just
and reasonable rates is by establishing, in the language of the ICA,
rate maximums.\30\ Section 342.3(a) of the regulations requires rate
changes to produce rates that are no higher than the applicable
ceilings. This regulatory requirement reflects the Commission's
authority under section 15(7) of the ICA to require that proposed
changes yield just and reasonable rates. Section 342.3(e) of the
regulations provides that pipelines must reduce existing rates to
comply with new ceilings which have been lowered because of the decline
in the index. This regulation reflects the Commission's rebuttable
finding that a rate above the ceiling is unjust and unreasonable, and
under section 15(1) of the ICA, the Commission has the authority to
require existing rates that are determined to be unjust and
unreasonable to be adjusted to lawful levels.
---------------------------------------------------------------------------
\30\Section 1(5) of the ICA.
---------------------------------------------------------------------------
However, the regulations also provide procedures for both pipelines
and their customers to show that the applicable ceilings would not
ensure just and reasonable rates. As explained in detail in the final
rule, and elsewhere in this order, Sec. 342.4 provides that the
pipeline may rebut the presumption in the regulation that the above-
ceiling rate is unjust and unreasonable and that rates above the
ceiling are justified. The pipeline has the burden of proof to show
that the applicable ceilings are too low to allow recoupment of
prudently incurred costs, in respect to both proposed and existing
rates, except for those rates deemed just and reasonable under section
1803 of the Act of 1992. Section 343.2(c)(1) provides similar
protection for customers, by providing for challenges to proposed and
existing rates that are within applicable indexed ceilings, but are
nonetheless so substantially in excess of actual costs as to be unjust
and unreasonable.
Contrary to petitioners' position, nothing in these regulations is
inconsistent with section 15(1) of the ICA, which places the burden of
proving the unlawfulness of an existing rate on the complainant or the
Commission.
The rate decrease requirement of Sec. 342.3(e) is based upon the
Commission's finding, in this proceeding, that a rate level in excess
of the ceiling established by the PPI-1 index is presumptively unjust
and unreasonable.\31\ The section simply applies this finding to an
existing rate that is in excess of a new, lower ceiling, subject to an
opportunity for the pipeline to rebut the presumption to show that its
prudently incurred costs justify the above-ceiling rate. Thus, the
statutory burden of proof has been fulfilled in this proceeding and is
reflected in the regulations.
---------------------------------------------------------------------------
\31\The pipeline would not be required to lower rates below
those deemed just and reasonable by the Act of 1992, since the
Commission is not here making any of the findings required by
Sec. 1803(b) to allow it to prescribe rates below that level.
---------------------------------------------------------------------------
Kuparuk does not compel a different conclusion, for it involved a
distinctly different kind of filing requirement than the rate decrease
requirement of the indexing regulations. In Kuparuk, it was proposed
that a pipeline should be required to make a rate change filing every
year, under section 15(7) of the ICA, which would then be subject to
review by the Commission. In this review, the burden of proof, as in
every case under section 15(7), would be upon the pipeline. This
procedure would have upset the statutory scheme for burden of proof
because the existing rate to be superseded by the required annual
filing, unlike the existing rates subject to Sec. 342.3(e), would not
necessarily have been determined to be unjust and unreasonable. In
contrast, in this rulemaking, the Commission is exercising its
authority under section 15(1) of the ICA to require the pipeline to
file a rate decrease.
ARCO specifically maintains that the Commission has no authority
summarily to reject a rate filing without a hearing, except for
technical formatting reasons. The ICA, ARCO argues, gives a pipeline a
statutory right to a hearing to justify its rate proposal. This
contention is also without merit. The hearing requirement contained in
section 15(1) for existing rates and section 15(7) for proposed rates,
has been satisfied by the notice and comment procedures of this
rulemaking. All interested persons, including affected pipelines, have
had an opportunity to be heard. If a pipeline desires to rebut the
presumption that a rate above the ceiling is unjust and unreasonable,
it will receive an individual hearing on that matter. However, a
pipeline that makes a filing which fails to comply with those
standards, without a showing as to why those standards should not
apply, has no right to a hearing. There simply would be no disputed
facts or issues to warrant a hearing.\32\
---------------------------------------------------------------------------
\32\See, e.g., United States v. Storer Broadcasting, 351 U.S.
192 (1956); See also Davis & Pierce, Administrative Law Treatise,
Sec. 8.3, at 389 (1994):
Even when an agency is required by statute or by the
Constitution to provide an oral evidentiary hearing, it need do so
only if there exists a dispute concerning a material fact.
---------------------------------------------------------------------------
In short, the rate methodology provisions of the final rule,
including the filing and other substantive requirements in the indexing
system, reflect the Commission's exercise of its ICA authority through
promulgation of rules of general applicability, as opposed to issuance
of orders through case-by-case adjudication. An agency's discretion to
exercise its statutory authority in this fashion through a rulemaking,
rather than case-by-case, is well established.\33\
---------------------------------------------------------------------------
\33\See, e.g., Heckler v. Campbell, 461 U.S. 458 (1983); United
States v. Storer Broadcasting, note 32, supra.
---------------------------------------------------------------------------
The simplification mandate of the Act of 1992 lends further support
to the reasonableness of the Commission's decision to proceed through a
rulemaking. Section 1801 of the Act of 1992 directs the Commission to
implement a ``simplified and generally applicable'' ratemaking
methodology. It is the Commission's judgment, based upon its experience
under the ICA and similar statutes, and the evidence compiled in the
record of this rulemaking, that an indexing methodology will fulfill
this simplification and general applicability directive, while at the
same time ensuring that the resultant rates are just and reasonable
under the ICA. By its very nature, an indexing methodology is a generic
approach to establishing rates. The requirements of the indexing
methodology crafted in this final rule therefore are to be applied
generically, through rules, subject, as explained above, to
opportunities for pipelines and their customers to show in any
particular case that the indexed-based ceiling should not apply.
The claims on rehearing against the validity of the filing
requirements contained in Part 342 of the new regulations are therefore
denied.
2. Challenges to Rates
Under Sec. 343.2(c)(1) of the new regulations, a protest against a
proposed rate increase under the indexing system must show that the
``increase is so substantially in excess of the actual cost increases
incurred'' by the pipeline that the proposed rate would be unjust and
unreasonable.
Amoco argues that this standard is too vague. It contends that a
more appropriate standard would be a change in circumstances since the
rate was last changed. Sun, Lakehead, and Buckeye make the same
argument on rehearing, arguing for a standard for bringing protests
that relates to changed circumstances.
Several other pipelines on rehearing challenge the notion of
allowing any protests against a rate increase proposed that is within
the applicable ceiling. Thus, Explorer, AOPL, MPL, and Shell argue that
allowing challenges to rate increases within the ceiling would defeat
the simplification and efficiency goals of the indexing methodology.
They contend that the simplification goal would be defeated by the fact
that protests, and thus contested rate proceedings, would proliferate.
They further contend that the efficiency goal would be defeated because
a pipeline would have no incentive to cut costs if to do so would
merely create a divergence between those costs and the allowable rate
ceiling that could form the basis for a protest.
The position that the protest mechanism should not be available in
cases where proposed rate increases comply with the applicable rate
ceiling must be rejected. As explained in the final rule, under an
indexing system some divergence between the actual costs of a pipeline
and its rates is inevitable. An indexing system relies upon industry-
wide average costs, not company-specific costs, to establish rates.
Moreover, the Commission is requiring that there be a substantial
divergence between actual costs and rates to allow for efficiency gains
that may occur.
The indexing system has been adopted because it complies with
Congress' mandate in the Act of 1992 for a simplified and generally
applicable ratemaking methodology, in conformity with the just and
reasonable standard of the ICA. A measure of the justness and
reasonableness of rates is the cost of providing the service. Thus, the
divergence between a pipeline's actual cost increases, and its rate
increases, while to an extent inevitable under the indexing
methodology, should not be allowed to grow so wide as to negate the
cost basis of the rate increases. The provision in question allows a
protest to be brought against a rate increase that strays too far from
the actual cost increases of the pipeline in recognition of the just
and reasonable standard that is still applicable under the ICA.
This provision should not, contrary to the contention of AOPL, MPL,
Shell, and Explorer, undermine the simplification and efficiency
benefits associated with an indexing system of changing rates.
Prohibiting the hearing of protests that do not state reasonable
grounds for alleging that the proposed rate increase is substantially
in excess of cost increases will reduce the number of protests that
might otherwise be filed in the absence of such a standard. It is true
that prohibiting all protests against proposed rate increases in
compliance with the applicable ceiling would further simplify the
Commission's review of rates. However, as explained above, such a
prohibition would be inconsistent with the just and reasonable standard
of the ICA.
The necessity to comply with the just and reasonable standard is
also part of the reason for rejecting the argument that a cost-based
protest against a proposed rate increase must be rejected in order to
ensure the efficiency benefits of indexing. Another reason for
rejecting this argument is that the regulation in question does shield
a pipeline from cost-based protests where rates are not substantially
in excess of costs, thus allowing a pipeline to capture some efficiency
gains.
Amoco, Sun, Lakehead, and Buckeye claim that the standard of ``so
substantially in excess'' so as to render the proposed rate ``unjust
and unreasonable'' is vague. This contention, while not entirely
inaccurate as a matter of linguistics, is not persuasive as an argument
on rehearing. The extent of the divergence between actual cost
increases to a pipeline and its proposed rate increase that would
justify a finding that the proposed rate is unjust and unreasonable is
not susceptible to mathematically precise definition.
This determination is reinforced by these parties' proposal for an
alternative standard--changed circumstances. Such a standard is not
directly tied to cost changes that may be experienced by a pipeline.
Thus, were this standard to be used, there would be the potential for
wide divergences between a pipeline's costs and its rates that would
nonetheless not be subject to challenge. Such a regulatory regime
clearly would not serve as an effective check on rate increases, and
would therefore be contrary to the Commission's continuing
responsibility to ensure that oil pipeline rates are just and
reasonable.
Reflecting a different perspective from that articulated by the
pipeline petitioners, some shippers have requested rehearing on the
basis that the threshold standard for filing a protest under the
indexing system is too stringent.
Kerr-McGee contends that any rate increase that exceeds the actual
cost increase experienced by a pipeline is unjust and unreasonable. It
argues that protests premised on any divergence from actual costs in
the proposed rate should be allowed.
As the cases demonstrate, the requirement that rates under the ICA
be just and reasonable does not mean that such rates must perfectly
reflect costs, or that non-cost factors may not be taken into account.
In Farmers Union Central Exchange, Inc. v. FERC, 734 F. 2d 1486 (D. C.
Cir.), cert. denied, 469 U.S. 1034 (1984), the court stated that rates
must be within a zone of reasonableness, and that factors other than
costs may be taken into account. Further, Kerr-McGee's argument would,
if accepted, negate the legality of any indexing system to implement
the just and reasonable standard of the ICA. For the reasons explained
at length in the final rule,\34\ the Commission rejects this argument.
---------------------------------------------------------------------------
\34\See III FERC Stats. & Regs 30,895 (1993), at pp. 30,948-51.
---------------------------------------------------------------------------
Holly and Total state that the Commission may not limit protests to
challenging the increment of the rate increase. According to their
view, the Commission's statutory duty is to examine the whole rate when
a rate change is proposed. Holly argues that this is required by the
principle that the lawfulness of a ratemaking process is dependent upon
the end result. Chevron also takes the position on rehearing that the
Commission may not lawfully limit protests to challenging the increase
in the rate, as opposed to the whole rate.
This limitation is necessary in order to preserve the vitality of
the protection for certain existing rates provided in subsection
1803(a) of the Act of 1992. That section deems rates in existence and
unchallenged for the one-year period prior to enactment of the Act of
1992 to be just and reasonable and not subject to a complaint under
section 13 of the ICA, unless evidence is presented to the Commission
which establishes that a substantial change has occurred after the date
of enactment of the Act of 1992 in the economic circumstances of the
oil pipeline which were the basis of the rate; or in the nature of the
services provided which were the basis for the rate; or unless the
person filing the complaint was under a contractual prohibition against
filing a complaint.\35\
---------------------------------------------------------------------------
\35\Subsection 1803(b) of the Act of 1992.
---------------------------------------------------------------------------
This ``grandfathering'' provision of the Act of 1992 protects from
most complaints the vast majority of rates in existence on the date of
enactment. To allow a protestant of a proposed increase of a
statutorily protected underlying rate to challenge the whole rate, and
not just the proposed increase, would be to remove the protection of
section 1803(a) solely on account of the filing of a proposal to effect
a modification of that rate. There is no indication that Congress
intended the protection of section 1803(a), for those rates that
qualify, to be overridden by regulatory actions, or to be of limited
duration. The statute clearly states two conditions under which the
safe harbor afforded rates under section 1803(a) does not apply. Merely
filing a protest against a proposed change to a grandfathered rate is
not one of them.
In addition, limiting a protestant to challenging the increment of
the rate increase is consistent with the ICA. Under section 15(7), a
pipeline proposing a rate change bears the burden of providing the
change will result in a rate that is just and reasonable. On the other
hand, in an investigation of an existing rate pursuant to sections
13(1) and 15(1), the burden of proving the rate is unjust and
unreasonable lies with the complainant (or the Commission, in
investigations begun sua sponte). To allow a protestant in a section
15(7) proceeding, where the burden of proof lies with the pipeline, to
challenge that part of a rate that was pre-existing would therefore be
contrary to the statutory scheme.
It is relevant to note, moreover, that under the indexing system
adopted in the final rule, existing rates to the extent not
grandfathered under the Act of 1992 remain subject to investigation
under the complaint process set forth in section 13(1) of the ICA.
3. Other Issues
Holly and Total argue for an automatic periodic Commission review
of pipeline rates. Total suggests that this be done every five years,
with the pipelines being required to file cost and revenue data to be
used in this process. Total also favors insulating pipelines from
protests during the five year intervals between the cost-based rate
reviews.
The concern reflected in these requests--that under the indexing
system pipeline rates will increasingly diverge from actual pipeline
costs--has been addressed by the Commission in its structuring of the
index system. First, pipeline rates under the indexing system will be
subject to investigation through both the protest and the complaint
procedures of the ICA. Second, under the final rule, every five years
beginning in the year 2000, the Commission will examine the
relationship between changes in the index (PPI-1) and actual cost
changes experienced by the oil pipeline industry. The purpose of this
review will be to ensure that the ceiling rates established under the
indexing system fairly and reasonably track the actual cost changes to
the oil pipeline industry, such that rates in compliance with the
applicable indexed ceiling are just and reasonable within the meaning
of the ICA.
The Commission therefore concludes that the requests of Holly and
Total for a periodic review of pipeline rates should not be adopted.
Finally, Chevron makes several specific proposals for changing the
filing requirements of the final rule. Chevron requests that the
Commission extend the notice period for filing proposed rates to 60
days, and the period for filing a protest in response to such a filing
beyond the 15 days contained in the regulation. Further, Chevron
suggests that a pipeline be required to send notice of its rate
increase filing by telefax or overnight mail.
Chevron's requested changes to the regulations will not be adopted.
The proposal to extend the notice period to 60 days for filing rate
changes is contrary to the ICA. Section 6(3) of the ICA provides that
the notice period shall be 30 days, except that a shorter period may be
provided for by rule or in a particular case. Given this statutory 30-
day notice period, it is not advisable to adopt Chevron's suggestion
that the period for filing a protest in response to a changed tariff
filing be greater than 15 days. A longer period would leave an unduly
short amount of time for the Commission to review the filing and any
protests and make a determination whether to suspend and initiate an
investigation of the filing. Finally, Chevron does not make a
persuasive case for requiring pipelines to telefax or express mail rate
filings, although pipelines are encouraged to voluntarily do so at the
request of their shippers.
C. Establishment of Initial Rates
Section 342.2 of the final rule provides a pipeline with two ways
of establishing an initial rate for new service. An initial rate may be
established through a cost-of-service based filing. As an alternative
to a cost-of-service filing, a pipeline may establish an initial rate
through an agreement reached with at least one non-affiliated person
who intends to use the service in question. Under this alternative,
however, a protest filed against such a settlement rate would require
the pipeline to justify the rate based upon costs.
1. Market-Based Initial Rates
Plantation and WPL seek rehearing of the lack of a provision for
relying upon market forces to justify an initial rate. Plantation
argues that a pipeline has a statutory right to file an initial rate of
its choosing and to defend its lawfulness in accordance with the
suspension and hearing procedures set forth in the ICA. In addition,
Plantation states that the establishment of a rate for a service not
previously offered is a particularly appropriate context for use of
market competition as a justification for the rate because a pipeline
cannot exercise market power in a market it is not already serving.
Based upon the comments and reply comments received in this
proceeding the Commission concluded that an initial rate should be
established either on a cost-of-service or a settlement basis. The
Commission was concerned that a pipeline might be able to exercise
market power to establish an initial rate that was unjust and
unreasonable. In this regard, it is important to note that an initial
rate for new service may, depending upon the circumstances, represent
no more than an additional receipt or delivery point on an existing
pipeline. Contrary to the impression given by Plantation's argument, a
new service may not always, or even most of the time, involve
additional service to a new market. The pipeline offering the new
service, and seeking approval for an initial rate, may be the only or
one of the few transporters in an existing market.
The regulations promulgated in the final rule do expressly provide
a pipeline with an opportunity to use a market-based methodology to
change existing rates, subject to proof that competitive pressures
exist to a sufficient degree to restrain rate changes to just and
reasonable levels. See Sec. 342.4(b). Thus, the Commission has
recognized that under some circumstances a market-based rate may be
lawful. The regulation, however, provides that market-rates may only be
charged after the Commission has determined that such ratemaking
methodology is appropriate and lawful. Until such time, a pipeline must
show some other basis for its rates, such as costs or compliance with
the indexed ceiling.
Rehearing on this issue is denied.
2. Protests of Settlement-based Initial Rates
Plantation and WPL also argue that the settlement option for
establishing initial rates does not go far enough. They contend that
the regulations should not prohibit the shipper agreeing to the rate
from being an affiliate of the pipeline. Further, they maintain that a
settlement initial rate should be immune from protests. Thus, under
their view, the only mechanism for a party to challenge the justness
and reasonableness of a settlement initial rate would be a complaint,
with the burden proof, in accordance with section 13(1) of the ICA,
being upon the complainant. Plantation and WPL asserts that allowing a
protest of a negotiated rate defeats and renders superfluous the
negotiation.
Unlike the case of changes of existing rates, the settlement option
for initial rates only requires the agreement of one non-affiliated
shipper. The purpose of requiring the one shipper who must agree to the
initial rate to be unaffiliated with the pipeline is to ensure that the
agreement is based upon arms-length negotiations. Allowing a protest to
a settlement rate permits those shippers who were not party to that
agreement to protect themselves and other shippers from an unjust and
unreasonable initial rate. The arguments of Plantation and WPL do not
show that these requirements are unreasonable or unfair. In particular,
these requirements should not render initial rate settlements, or the
negotiations preceding them, meaningless. A pipeline will still have an
incentive, and derive a benefit, from seeking to gain the concurrence
of its potential shippers to an initial rate for new service. To the
extent concurrence is obtained, a protest is unlikely. If unanimous
concurrence of potential shippers is not obtained, the regulation still
allows the pipeline to file the initial rate based upon the agreement
of at least one non-affiliated shipper. This one-shipper provision
simply expands the options for a pipeline. The availability of the
protest mechanism in such a case provides balance to the provision from
the standpoint of the interests of shippers.
Rehearing on this issue is therefore denied.
D. Other Rate Changing Methodologies
1. Uncontrollable Circumstances Test
Several parties have asked for clarification or rehearing of the
requirement contained in Sec. 342.4 that there be cost increases
incurred because of ``uncontrollable circumstances'' before carriers
may change rates based on a cost-of-service methodology. AAPC suggests
that the Commission clarify that what constitutes ``uncontrollable
circumstances'' will be determined in individual cases. ARCO and
Lakehead ask that the standard be relaxed to reflect only that a change
in circumstances need occur before the pipeline is allowed to justify
its rates on a cost-of-service basis. MPL argues that the rule is too
restrictive and may prevent pipelines from recovering their costs
associated with catastrophic losses due to accident, equipment failure,
or third-party damage, any one of which might lead to extraordinary
costs and liabilities.
The Commission's intent in the Final Rule was that there be a
change in economic circumstances that justifies use of the cost-of-
service methodology brought about by events or conditions outside the
control of the pipeline. These circumstances would include, but not be
limited to, events such as those alluded to by MPL. It was never the
Commission's intent to provide an exhaustive list in the Final Rule of
what might constitute ``uncontrollable circumstances.''\36\
---------------------------------------------------------------------------
\36\ Some of the items referred to on rehearing were clearly not
within the contemplation of the Commission, such as the suggestion
by ARCO that it might be allowed to raise its rates in the future to
make up for past earnings lost due to competition. (ARCO, pp. 14-16)
---------------------------------------------------------------------------
SFPP and Phillips contend that the pipeline seeking to invoke a
cost-of-service methodology should be governed by the same standard as
those seeking to challenge an indexed rate--i.e., a substantial
divergence between costs and the indexed rate. SFPP asserts that the
Commission should allow cost-of-service treatment in the event of a
divergence in actual costs and indexed rates so substantial that the
existing rate level under indexing is not just and reasonable,
regardless of the nature of the circumstances.
The Commission is persuaded that a modification such as that
proposed by SFPP and Phillips should be made to the test. There indeed
may be instances where prudently incurred costs have increased to such
an extent that the rate produced by the index would not be just and
reasonable. Such cost changes may be the result of planned expansions
or of upgrading or replacement of facilities for safety or
environmental considerations. Accordingly, where the pipeline can show
that the costs are prudently incurred and that there is a substantial
divergence in its costs and the rate that would be produced by
application of the index, the pipeline will be allowed to charge rates
based on a cost-of-service methodology. Section 342.4 will be modified
to reflect this change.
2. Fully Allocated Costs
Amoco, AOPL, and WPL object to the Commission's characterization of
its current methodology as contemplating use of fully allocated costs
to determine proper rates for any movement. In the final rule at
footnote 83, the Commission stated, in response to comments addressing
the issue of whether the cost-of-service methodology should be applied
on a ``stand-alone'' or fully allocated basis, ``The Commission is
proposing no change in its current practice of using fully allocated
rates.'' The Commission cited Opinion No. 154-B as illustrative. In
this regard, the Commission determines the justness and reasonableness
of rates for other modes of transportation it regulates on a fully-
allocated cost basis. However, as the commenters point out, this issue
has not been determined in a fully litigated case by this Commission
under the Interstate Commerce Act. The Commission does not intend by
this rulemaking to decide the issue with finality, and proponents of
``stand-alone'' cost methodology or other costing methodologies will
not be precluded from advocating such methodologies in individual
cases.\37\
---------------------------------------------------------------------------
\37\As AOPL correctly notes, the Commission's Notice of Inquiry
(NOI) at Docket No. RM94-2-000, issued concurrently with the final
rule in this proceeding, encompasses the data to be filed with a
cost-of-service showing, including the issue of whether such data
should be required on a stand-alone or fully-allocated cost basis,
or some other basis. Kerr-McGee's recommendation that the Commission
establish a simplified cost-of-service method will also be
considered in that NOI. See NOI at mimeo p. 8. See also the NOPR in
Docket No. RM94-2-000 issued concurrently with this order.
---------------------------------------------------------------------------
E. Procedures for Streamlining Action on Rates
1. Requirements for Standing
Section 343.3(b) provides that only persons with a substantial
economic interest in a tariff filing have standing to file a protest
against that filing. A protest must be accompanied by a verified
statement as to the protestant's substantial economic interest.
ARCO requests that the Commission amend the regulation on standing
to require the verified statement to explain in sufficient detail the
nature of the substantial economic interest and its connection to the
proposed rate, so that the Commission will be able to make a
determination on the standing of the protestant expeditiously. ARCO
proposes that the regulation be changed to read as follows:
Along with the protest, the protestor shall file a verified
statement which shall contain a reasonbly detailed description of
the nature and substance of the protestor's economic interest in the
tariff filing in question.
In support of its request, ARCO notes that the Commission will have
a relatively short period of time after the filing of the rate, the
protest, and the response to the protest, in which to make a
determination on what action to take. Requiring a protestant to explain
in reasonable detail how it meets the standing requirement will,
according to ARCO, assist the Commission in making a timely decision on
standing.
ARCO's suggested amendment to the standing requirement appears to
be reasonable. ARCO is not advocating a substantive change in the
standing requirement contained in the regulation. Rather, it is
requesting that the Commission require that the basis for standing be
stated in enough detail to allow an informed decision on standing to be
made in a timely fashion. It is obviously to the benefit of the
Commission, in performing its review function, and to the interested
public, that this be done. Moreover, this should not pose a burden for
protestants who possess the requisite substantial economic interest in
a tariff filing. Rehearing is granted on this issue, and Sec. 343.3(b)
will be revised accordingly.
2. Pipeline Response to a Complaint
Under Sec. 343.4(a) a pipeline may file a response to a complaint
no later than 30 days after the complaint is filed. AOPL requests this
section be changed to allow a response to be filed no later than 30
days after service of the complaint, as opposed to filing.
This request will be denied. AOPL has stated no facts indicating
that the procedure set forth in Sec. 343.4(a), which is unchanged from
current practice, provides insufficient time for a pipeline to file a
response to a complaint.
F. Revisions to Existing Procedures
In its application for rehearing, WPL cites five areas of concern
about the revisions to existing procedures contained in Part 341 which
were adopted in the final rule. Each is discussed below.
1. WPL claims that certain regulations increase the burden on
pipelines with no apparent benefit to shippers. It points to an alleged
redundancy in Sec. 341.2(c), which requires that transmittal letters
describe the filing and explain changes to the carrier's rates, rules,
terms, or conditions of service, and Sec. 341.(b)(10)(i), which
requires that tariff changes be indicated and described by specific
symbols. It cites AOPL for the argument that the requirements of the
new regulation would transform a ministerial document into a
substantive summary of the filing, whereas the tariff publication
itself must identify all such changes. It asserts that to have the
letter of transmittal also identify those changes would be superfluous.
WPL reads too much in the Commission's requirements for the
transmittal letter. Simply stated, the Commission desires an
informative transmittal letter which will briefly state the essential
facts--that the carrier is seeking to change its rates and the basis
for its rate change--i.e., it is based on the carrier's application of
the index, or it is based on the carrier's cost of service, or it is a
settlement rate. Moreover, a brief statement of any tariff language
changes proposed will suffice. It is not intended that the carrier
restate the terms and conditions of its tariff filing in the
transmittal letter.
Further, the rule requiring a narrative explanation of tariff
changes in a letter of transmittal is not duplicative of
Sec. 341.3(b)(10)(i) which refers to designating changes in the tariff
by use of uniform symbols. Clearly, these are two separate
requirements. A general explanation of the filing is warranted. The
brief nature of the description required is not burdensome. Indeed,
this requirement is common practice for several carriers which have
been including an explanation of their filing in their letters of
transmittal for some time, even prior to implementation of these
regulations.
WPL also argues that limiting the number of supplements to one
rather than five, which currently exists, will likewise burden the
pipelines, since they must capsulize all their supplements into one
large supplement even if the matter sought to be supplemented could be
done in a single page. WPL suggests that if the intent is to
consolidate all supplements, the result could be achieved by requiring
that subsequent supplements clearly indicate all prior supplements
currently in effect.
The Commission finds the rule allowing only one effective
supplement is reasonable. The previous rules were written when all
tariffs were individually printed by printing press. Now many carriers
have computerized the publication of their tariffs, making it easier to
merely bring forward all the changes into one complete supplement. In
addition, the previous limitations relating to the number of
supplements to be filed to an effective tariff, as well as the
requirements for the length of the supplements themselves, were
confusing and not useful. Since oil pipeline bound tariffs are rarely
in excess of forty pages, the previous maximum supplement limitation of
five supplements to be filed to a tariff in excess of 200 pages was
never reached. Further, under the previous regulations, tariffs of four
pages or less could not be supplemented. The rules as currently revised
allow one effective supplement to a tariff to be filed. In addition to
this one supplement, there are five other types of technical or
ministerial supplements which can be filed and are not included in the
count. These are correction supplements (three allowed per tariff),
suspension supplements, postponement supplements, cancellation
supplements, and adoption supplements. The Commission believes this
series of supplements is ample to meet the carriers' needs. Given the
clarity and uniformity of the rule, the elimination of page
restrictions for supplements, and the exception for certain types of
supplements, the Commission believes the rule is a balanced one. The
Commission denies rehearing on this issue.
2. WPL claims that certain regulations are inconsistent with the
explanatory text. It cites Sec. 341.0(a)(7), which requires that
pipelines post tariffs at the carrier's principal office and other
offices of the carrier where business is conducted with affected
shippers, and the textual statement in the final rule that this section
``requires such posting only at `principal' pipeline offices.''\38\
---------------------------------------------------------------------------
\38\III FERC Stats. & Regs. 30,985, at p. 30,969.
---------------------------------------------------------------------------
The Commission has determined that a carrier should maintain its
tariff in places where it does business with its customers. The
Commission used the term ``principal pipeline offices'' in the
explanatory text of the final rule in this context. Confusion over the
requirement in Sec. 341.0(a)(7) was created by the use of the term
``principal place of business'' in its more legalistic sense; however,
the sense of what the Commission sought to achieve is contained in the
phrase ``and other offices where business is conducted with affected
shippers.''
WPL argues that Sec. 341.3(b)(6)(i) would require that all rules
affecting the rates or services provided for in the tariff publication
must be included in the tariff publication, whereas the text\39\ of the
final rule allows for incorporation by reference.
---------------------------------------------------------------------------
\39\Ibid.
---------------------------------------------------------------------------
As the Commission explained in the explanatory text, incorporation
by reference of rules affecting the rates or services will be allowed,
so long as the document to which reference is made is readily
available.
3. WPL claims that certain regulations, while clear, do not make
sense when applied. It cites Sec. 341.3(b)(6)(iii), which prohibits
tariffs from including rules which provide that traffic of any nature
will be transported only by special agreement, arguing that agreements
such as volume incentive and throughput and deficiency agreements are
common industry practice have long been accepted under the ICA. It
seeks clarification that the Commission is not banning such agreements.
The Commission did not intend to change the current practice
respecting the prohibition of a tariff that provides that traffic of
any nature ``will be transported only by special agreement.'' Such a
prohibition has always existed in the regulations.\40\ The ``special
agreement'' referred to in this context means that the carrier may not
require a special agreement available only to one shipper, which would
be discriminatory to another similarly situated shipper who sought to
ship on the carrier's lines. The Commission did not attempt to bar the
use of non-discriminatory throughput and deficiency agreements, or
volume incentive agreements. Administration of such agreements will
continue as before.
---------------------------------------------------------------------------
\40\Section 341.4(h)(3) of the regulations which existed prior
to promulgation of the instant regulations provided, in part, ``* *
* nor shall any rule be provided to the effect that traffic of any
nature will be `taken only by special agreement' or other provision
of like import.''
---------------------------------------------------------------------------
WPL cites Sec. 341.4(f), which requires pipelines to publish
suspension supplements within 15 days of suspension, whereas the
pipeline does not often receive the suspension notice within sufficient
time to do so. It asks that the Commission telecopy such suspension
notices to the pipeline.
The Commission will modify Sec. 341.4(f) so that suspension notices
must be filed within 30 days of the suspension, thus obviating the need
that suspension notices be telecopied to the pipeline.
4. WPL claims that certain regulations appear to serve no purpose,
citing Sec. 341.2(b) which prohibits pipelines from posting tariffs
more than 60 days before the effective date. WPL argues that the
Commission has given no explanation for this requirement, and its
imposition may hurt shippers who have a shorter period to find
alternatives. Moreover, it argues, such a requirement would
unnecessarily inhibit seasonal rate filings.
The Commission does not agree. The Commission encourages carriers
to keep their shippers informed of proposed changes in a timely
fashion. At times, the carrier may determine that it should notify the
shippers at a date sooner than 60 days of its proposal, and nothing in
the regulations prohibits this. Also, nothing in the regulations
prohibits seasonal filings, as long as there is only one effective date
for the tariff. Moreover, since the deadline for filing a protest is
proposed to be changed to 15 days after the filing date of the tariff
publication and not 12 days before the effective date of the tariff, as
has been the past requirement, shippers could be placed in the
untenable situation wherein they would be judging the tariff filing
under circumstances which could significantly change prior to the
effective date of the tariff. This requirement should have no
significant effect on the planning functions of the pipeline and its
shippers; rather it will streamline the tracking of filings made at the
Commission.
5. WPL claims that certain provisions are not properly included in
the final rule, citing Sec. 341.8, which requires that pipelines
publish in their tariffs rules which in any way increases or decreases
the value of service to a shipper. ARCO and AOPL object to including
such items as prorationing of capacity, product specification, and
connection policies. AOPL argues that the Commission cannot require
publication of non-rate terms and conditions of service; ARCO argues
that there is no statutory authority for this requirement; rather, the
Commission's statutory authority is limited to rates or rate-related
matters, not a ``public interest'' standard, as indicated by the
Commission in the text of the final rule.\41\
---------------------------------------------------------------------------
\41\ARCO, p. 25. See III FERC Stats. & Regs. 30,985, at p.
30,969 (1993).
---------------------------------------------------------------------------
Section 1(3) of the ICA\42\ defines transportation to include ``* *
* all services in connection with the receipt, delivery, elevation, and
transfer in transit * * * storage, and handling of property
transported.''
---------------------------------------------------------------------------
\42\49 U.S.C. app. Sec. 1(3) (1988).
---------------------------------------------------------------------------
Section 1(6) of the ICA\43\ requires all carriers to ``establish,
observe, and enforce * * * just and reasonable regulations and
practices affecting classifications, rates, or tariffs, * * * the
facilities for transportation, * * * and all other matters relating to
or connected with the receiving, handling, transporting, storing, and
delivery of property. * * *''
---------------------------------------------------------------------------
\43\49 U.S.C. app. Sec. 1(6) (1988).
---------------------------------------------------------------------------
Section 6(1)\44\ of the ICA provides that carriers' tariffs shall
---------------------------------------------------------------------------
\44\49 U.S.C. app. Sec. 6(1) (1988).
state the places between which property * * * will be carried, and
shall also state separately all terminal charges, storage charges,
icing charges, and all other charges which the Commission may
require, all privileges or facilities granted or allowed, and any
rules or regulations which in any wise change, affect, or determine
any part of the aggregate of such aforesaid rates, fares, and
charges, or the value of the service rendered to the * * * shipper.
---------------------------------------------------------------------------
* * * (Emphasis added.)
The three items specifically mentioned by the applicants for
rehearing--prorationing policy, line connection policy, and product
specification--all constitute conditions of offering transportation
service by the carrier, or constitute conditions of ``receipt, delivery
* * *, and transfer in transit * * *, and handling'' by the
carrier.\45\ They certainly affect the value of services to the
shipper. Thus, they are encompassed within the term ``transportation''
as defined in the ICA.
---------------------------------------------------------------------------
\45\Section 1(3) of the ICA.
---------------------------------------------------------------------------
It is clearly within the Commission's authority under section 6(1)
to require that such regulations and practices be contained in the
company's tariffs on file with the Commission and open to public
inspection. This is a primary purpose of a tariff--to set forth the
terms and conditions under which the service of the carrier is offered
so as to militate against discrimination and preferential treatment in
favor of one shipper over another.\46\
---------------------------------------------------------------------------
\46\See Atchison, Topeka & Santa Fe Ry., 607 F. 2d 1199 (7th
Cir. 1979); Central R,R, Co. v. Anchor Line, Ltd., 219 F. 716,718
(2d Cir. 1914); Central & S. Motor Frtg. Tar. Assn. v. United
States, 273 F. Supp. (D. Del. 1967).
---------------------------------------------------------------------------
Moreover, these items which are required to be included in tariffs
not only affect the value to the shipper of the service offered by the
carrier, but also can have a direct effect on access to transportation.
Because different carriers implement different policies, a carrier's
prorationing, carrier liability, quality bank, and connection policies
may adversely affect shippers. As the Commission has stated in another
context, ``By requiring publication of such tariff provisions, section
6 [of the ICA] helps ensure rate certainty and uniformity between
shippers and reduces the possibility of discriminatory treatment
between shippers.''\47\
---------------------------------------------------------------------------
\47\KK Appliance Co., 47 FERC 61,076 at p. 61,217 (1989).
---------------------------------------------------------------------------
All items contained in Sec. 341.8 (except for prorationing policy,
carrier liability, quality bank, and line connection policy) have been
listed in Sec. 341.10 of the Commission's regulations for a substantial
number of years, as ARCO has observed.\48\ In fact, Sec. 341.10
required the publication of tariffs which contain all the rules
governing the various items listed in that section, as well as all
rules ``which increase or decrease the value of service to the
shipper.''
---------------------------------------------------------------------------
\48\ARCO, p. 28.
---------------------------------------------------------------------------
The new items specifically added are rules ``which increase or
decrease the value of service of shippers,'' or are required to
diminish the possibility of discrimination. Since they are of the same
character as those contained in Sec. 341.10, which was superseded by
the new Sec. 341.8, the Commission is not convinced that they will
constitute the burden on carriers expressed by AOPL, ARCO, and
Williams.
G. TAPS
ARCO, Unocal, and Alaska each request that the Commission clarify
its intent regarding establishing rates for TAPS carriers and those
delivering to TAPS. ARCO requests that the Commission confirm that TAPS
and other excluded pipelines will continue to be regulated under the
ratemaking standards that are currently in effect, and that nothing in
the final rule should be construed to the contrary. Alaska similarly
asks that the Commission clarify that three pipelines delivering oil to
TAPS--Kuparuk, Endicott, and Milne Point--shall continue to justify
their rates under their respective settlement agreements. Unocal
requests clarification that the TAPS Settlement Methodology (TSM) is
not the sole methodology applicable to TAPS carriers.
It was not the Commission's intent to change, in any way, the
current ratemaking standards for TAPS and excluded carriers. Indeed, as
stated in the final rule, the Act of 1992 specifically excluded TAPS
and any pipeline delivering oil directly or indirectly to TAPS from the
provisions of the Act for ratemaking purposes. As further explained,
TAPS and those excluded pipelines will continue to be regulated under
the ratemaking standards that are currently in effect.\49\ That
continues to be the Commission's intent.
---------------------------------------------------------------------------
\49\III FERC Stats. & Regs. 30,985 (1993), at 30,961.
---------------------------------------------------------------------------
H. Miscellaneous Issues
Chevron asserts that the Commission's procedures are not adequately
defined, and that such lack of definition now generates protracted oil
pipeline rate proceedings. Chevron states that ``at a minimum the
Commission should scrutinize its discovery and decision-making
processes.''\50\ This would entail, according to Chevron, new
regulations that would prevent a pipeline from delaying the rate review
process and that would require issuance of orders and decisions in a
timely manner.
---------------------------------------------------------------------------
\50\Chevron Rehearing, at 8.
---------------------------------------------------------------------------
In response to Chevron's arguments, the Commission believes that
the regulations contained in the final rule will streamline and
expedite the Commission's ratemaking and decision-making processes.
Chevron has not identified any specific changes or additional reforms
that would improve and expedite the implementation of the ICA by the
Commission.
In particular, as Chevron notes, the discovery process can
contribute to delay in the hearing of contested proceedings. The
improved filing requirements that will result from the Commission's
NOPR in Docket No. RM94-2-000 should ameliorate this problem as it
existed in the past. In addition, no specific proposals to expedite and
reform discovery procedures were submitted in the comment phase of this
rulemaking, by Chevron or anyone else.
The Commission Orders
The applications for rehearing and requests for clarification are
granted to the extent reflected herein. In all other respects, such
applications and requests are denied.
List of Subjects
18 CFR Part 341
Maritime carriers, Pipelines, Reporting and recordkeeping
requirements.
18 CFR Parts 342 and 343
Pipelines, Reporting and recordkeeping requirements.
By the Commission. Commissioner Hoecker concurred in part and
dissented in part with a separate statement attached. Commissioner
Massey dissented with a separate statement attached.
Lois D. Cashell,
Secretary.
In consideration of the foregoing, Parts 341, 342, and 343, Chapter
I, Title 18, Code of Federal Regulations, are amended as set forth
below.
The following regulations are effective September 7, 1994.
PART 341--OIL PIPELINE TARIFFS: OIL PIPELINE COMPANIES SUBJECT TO
SECTION 6 OF THE INTERSTATE COMMERCE ACT
1. The authority citation for Part 341 continues to read as
follows:
Authority: 42 U.S.C. 7101-7352, 49 U.S.C. 1-27.
2. In Sec. 341.4, paragraph (f) is revised to read as follows:
Sec. 341. 4 Filing requirements for amendments to tariffs.
* * * * *
(f) Suspension supplements. A suspension supplement must be filed
for each suspended tariff or suspended part of a tariff within 30 days
of the issuance of a suspension order. The suspension supplement must
be served on all subscribers. The supplement must include the date it
is issued, a reproduction of the ordering paragraphs of the suspension
order, a statement that the tariff or portion of the tariff was
suspended until the date stated in the suspension order, a reference to
the docket number under which the suspension order was issued, and a
statement that the previous tariff publication remains in effect.
The following regulations are effective January 1, 1995.
PART 342--OIL PIPELINE RATE METHODOLOGIES AND PROCEDURES (EFFECTIVE
JANUARY 1, 1995)
1. The authority citation for part 342 continues to read as
follows:
Authority: 5 U.S.C. 571-83; 42 U.S.C. 7101-7532; 49 App. U.S.C.
1-85; 42 U.S.C. 7172 note.
2. In Sec. 342.3, paragraph (e) is revised to read as follows:
Sec. 342.3 Indexing.
* * * * *
(e) Rate Decreases. If the ceiling level computed pursuant to
Sec. 342.3(d) is below the filed rate of a carrier, that rate must be
reduced to bring it into compliance with the new ceiling level;
provided, however, that a carrier is not required to reduce a rate
below the level deemed just and reasonable under section 1803(a) of the
Energy Policy Act of 1992, if such section applies to such rate or to
any prior rate. The rate decrease must be accomplished by filing a
revised tariff publication with the Commission to be effective July 1
of the index year to which the reduced ceiling level applies.
3. In Sec. 342.4, paragraph (a) is revised to read as follows:
Sec. 342.4 Other rate changing methodologies.
(a) Cost-of-service rates. A carrier may change a rate pursuant to
this section if it shows that there is a substantial divergence between
the actual costs experienced by the carrier and the rate resulting from
application of the index such that rates at the ceiling level would
preclude the carrier from being able to charge a just and reasonable
rate within the meaning of the Interstate Commerce Act. A carrier must
substantiate the prudence of the costs incurred. A carrier that makes
such a showing may change the rate in question, based upon the cost of
providing the service covered by the rate, without regard to the
applicable ceiling level under Sec. 342.3.
* * * * *
PART 343--PROCEDURAL RULES APPLICABLE TO OIL PIPELINE PROCEEDINGS
(EFFECTIVE JANUARY 1, 1995)
1. The authority citation for Part 343 continues to read as
follows:
Authority: 5 U.S.C. 571-83; 42 U.S.C. 7101-7532; 49 App. U.S.C.
1-85; 42 U.S.C. 7172 note.
2. In Sec. 343.3, paragraph (a) is amended by adding the following
sentence at the end thereof as follows:
Sec. 343.3 Filing of protests and responses.
(a) Protests.
* * * * *
Only persons with a substantial economic interest in the tariff
filing may file a protest to a tariff filing pursuant to the Interstate
Commerce Act. Along with the protest, the protestant must file a
verified statement which must contain a reasonably detailed description
of the nature and substance of the protestant's substantial economic
interest in the tariff filing.
* * * * *
Appendix--List of Parties Seeking Rehearing and/or Clarification of
Order No. 561
Alaska, State of (Alaska)
Alberta Petroleum Marketing Commission (Alberta)
All American Pipeline Company (AAPC)
Amoco Pipeline Company (Amoco)
Association of Oil Pipelines (AOPL)
ARCO Pipe Line Company, Four Corners Pipe Line Company and ARCO
Transportation Alaska, Inc. (ARCO)
Buckeye Pipe Line Company, L.P. (Buckeye)
Chevron U.S.A. Products Company (Chevron)
Colonial Pipeline Company (Colonial)
Conoco Pipe Line Company (Conoco)
Exxon Pipeline Company (Exxon)
Holly Corporation (Holly)
Kerr-McGee Refining Corporation (Kerr-McGee)
Lakehead Pipe Line Company (Lakehead)
Marathon Pipe Line Company (MPL)
Petrochemical Energy Group (PEG)
Phillips Pipe Line Company (Phillips)
Plantation Pipe Line Company (Plantation)
SFPP, L.P. (SFPP)
Shell Pipe Line Corporation (Shell)
Sun Pipe Line Company (Sun)
Total Petroleum, Inc. (Total)
US Air, Inc. (USAir)
Unocal Pipeline Company (Unocal)
Williams Pipe Line Company (WPL)
HOECKER, Commissioner, concurring in part and dissenting in
part:
I largely concurred with the Final Rule adopted in this
docket.\1\ The regulatory regime that will become effective January
1, 1995, for oil pipelines is generally quite simple for companies
whose rates tend to track legitimate cost incurrence. On rehearing,
two serious flaws in the Final Rule persist. Consequently, I will
dissent in part once again.
---------------------------------------------------------------------------
\1\A full exposition of my views on Order No. 561 and on
regulation of the oil pipeline industry are contained in my
statement of November 2, 1993, which will be, belatedly, published
at III FERC Stats. and Regs. 30,985 (1993). Pending publication, a
copy of the November statement may be obtained from the Commission's
public reference room.
---------------------------------------------------------------------------
First, the rule continues to require that protests to indexed
rates will be allowed only where ``the increment of the rate change
produced by application of the index is substantially in excess of
the individual pipeline's increase in costs.'' As I explained in my
prior dissent on this issue, I would have preferred a rule that
allowed protests that can show a substantial divergence between the
rate taken as a whole and the pipeline's total costs. Even with an
index, costs and rates may occasionally become so unrelated that
rates cease to be just and reasonable under the Interstate Commerce
Act. We should provide for such exigencies.
Second, I continue to be concerned that the ``settlement rate
methodology,'' under which existing rates can be changed or initial
rates can be established, may lead to unjust and unreasonable rates
wherever negotiations are not constrained by demonstrable market
forces. This aspect of the rule should only be adopted pursuant to
the market-based rate procedures proposed in Docket No. RM94-1-
000.\2\ While I fully support settlements, I believe that
settlements should be in the public interest and subject to
Commission scrutiny. I believe the procedures established in this
rule do not adequately safeguard against potential abuses of market
power and, indeed, may invite the unlawful use of market power to
obtain rate increases in excess of the indexed rate.
---------------------------------------------------------------------------
\2\Market-based Ratemaking for Oil Pipelines, Notice of Proposed
Rulemaking, issued July ____, 1994, IV FERC Stats. and Regs.
32,______ (1994).
---------------------------------------------------------------------------
For these reasons, as well as those previously expressed in my
November 2, 1993 statement, I respectfully concur in part and
dissent in part to today's Order.
James J. Hoecker,
Commissioner.
MASSEY, Commissioner, dissenting:
I respectfully dissent for the same reasons set out in my
statement, issued November 5, 1993, dissenting from Order No.
561.\3\
---------------------------------------------------------------------------
\3\65 FERC 61,109 (1993).
---------------------------------------------------------------------------
William L. Massey,
Commissioner.
[FR Doc. 94-18873 Filed 8-5-94; 8:45 am]