Wisconsin Power & Light Company, et al.; Electric Rate and Corporate Regulation Filings

Federal RegisterMay 23, 1994

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF DEFENSE

[Docket No. ER94-475-000, et al.]

Wisconsin Power & Light Company, et al.; Electric Rate and

Corporate Regulation Filings

May 13, 1994.

Take notice that the following filings have been made with the

Commission:

1. Wisconsin Power and Light Company

[Docket No. ER94-475-000]

Take notice that on May 9, 1994, Wisconsin Power and Light Company

tendered for filing with the Federal Energy Regulatory Commission an

amendment in its December 28, 1993, filing in this docket.

A copy of this filing has been mailed to the Public Service

Commission of Wisconsin.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

2. Florida Power Corporation

[Docket No. ER94-1221-000]

Take notice that on May 2, 1994, Florida Power Corporation (Florida

Power) tendered for filing a change in the design of its existing

wholesale rate to the City of New Smyrna Beach, Florida (New Smyrna

Beach) and the Reedy Creek Improvement District (Reedy Creek). The

change in the design was requested by New Smyrna Beach and has been

accepted by Reedy Creek. The filing has no significant impact upon the

level of the rates.

Florida Power requests that the change in the rates be made

effective 60 days from the date of the filing, namely on July 1, 1994.

Florida Power states that it has served copies of its filing on New

Smyrna Beach, Reedy Creek and the Florida Municipal Power Agency (a

customer in the same class which has elected to remain on the existing

rate design) and the Florida Public Service Commission.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

3. Boston Edison Company

[Docket No. ER94-1222-000]

Take notice that on May 2, 1994, Boston Edison Company filed a

Contract Demand Agreement between itself and the Town of Braintree

Electric Light Department dated August 19, 1993. The Agreement provides

for the sale by Boston Edison to Braintree of specified amounts of base

and intermediate capacity and associated energy over the period

November 1, 1994 through October 31, 2004. Boston Edison requests that

the Agreement be allowed to become effective on November 1, 1994.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

4. The Cincinnati Gas & Electric Co.,

[Docket No. ER94-1223-000]

Take notice that The Cincinnati Gas & Electric Company (CG&E) on

May 2, 1994, tendered for filing an Interchange Agreement with

American-Municipal Power, Inc.

The Interchange Agreement proposes interchange service schedules

for emergency service, interchange power, short-term power, limited

term power and transmission service. The Agreement is proposed to be

made effective immediately. Copies of the Agreement were served upon

The Public Utilities Commission of Ohio and American-Municipal Power

Ohio, Inc.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

5. Florida Power Corporation

[Docket No. ER94-1227-000]

Take notice that on May 3, 1994, Florida Power Corporation filed

letters dated March 31, 1994, providing ``Rate Limitation Refunds'' for

calendar year 1993 to four of the Company's customers in accordance

with provisions in Exhibit B of their contracts limiting the total

bills for service to them to the amount that would be produced by

applying the applicable Florida Municipal Power Agency rate to that

service. The four customers, the rate-schedule under which each is

served and the Rate Limitations Refund made to each are as follows:

------------------------------------------------------------------------

Rate schedule Customer Refund

------------------------------------------------------------------------

Rate Schedule 114.......... City of Bartow............. $737,044.64

Rate Schedule 115.......... City of Havana............. 84,868.16

Rate Schedule 116.......... City of Newberry........... 56,131.57

Rate Schedule 127.......... City of Mount Dora......... 232,079.83

------------------------------------------------------------------------

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

6. Indiana Michigan Power Company

[Docket No. ER94-1228-000]

Take notice that on May 3, 1994, American Electric Power Service

Corporation (AEPSCO), tendered for filing a transmission service

agreement, dated May 1, 1994. The agreement, executed by Indiana

Municipal Power Agency (IMPA) and Indiana & Michigan Power Company

(I&M), provides for service to be made available to IMPA pursuant to

the Transmission Service and Ancilary Control Area Services, Tariff of

Appalachian Power Company, Columbus Southern Power Company, I&M,

Kentucky Power Company, Kingsport Power Company and Wheeling Power

Company (Transmission Tariff). The Commission has previously designated

the Transmission Tariff as AEPSC Rate Schedule FERC No. 1. Waiver of

Notice requirements was requested to accommodate an effective date of

June 1, 1994.

A copy of the filing was served upon IMPA, the Indiana Utility

Regulatory Commission and the Michigan Public Service Commission.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

7. Oklahoma Gas and Electric Company

[Docket No. ER94-1229-000]

Take notice that on May 4, 1994, Oklahoma Gas and Electric Company

(OG&E) tendered for filing a Letter Agreement dated April 11, 1994,

with the Oklahoma Municipal Power Authority (OMPA) regarding the

installation of facilities for the use and benefit of OMPA.

Copies of this filing have been sent to OMPA, the Oklahoma

Corporation Commission, and the Arkansas Public Service Commission.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

8. PECO Energy Company

[Docket No. ER94-1230-000]

Take notice that on May 5, 1994, PECO Energy Company (PECO)

tendered for filing an Agreement between PECO and New York Power

Authority (NYPA) dated April 22, 1994.

PECO states that the Agreement sets forth the terms and conditions

for the sale of system energy which it expects to have available for

sale from time to time and the purchase of which will be economically

advantageous to NYPA. In order to optimize the economic advantage to

both PECO and NYPA, PECO requests that the Commission waive its

customary notice period and permit the agreement to become effective on

May 9, 1994.

PECO states that a copy of this filing has been sent to NYPA and

will be furnished to the Pennsylvania Public Utility Commission.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

9. Entergy Power, Inc.

[Docket No. ER94-1232-000]

Take notice that on May 5, 1994 Entergy Power, Inc. (Entergy Power)

tendered for filing as a service agreement under Rate Schedule FP a

power sale agreement dated May 4, 1994 and related Service Schedule

AESPI-1 (collectively the Agreement) between Entergy Power and AES

Power, Inc. (AES Power). The Agreement provides for the sale to AES

Power of up to 200 MW of capacity and associated energy on a unit power

basis from July 1, 1994 through June 30, 1995.

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

10. J. Howard Mock

[Docket No. ID-2832-000]

Take notice that on May 2, 1994, J. Howard Mock (Applicant)

tendered for filing a supplemental application under Section 305(b) of

the Federal Power Act to hold the following positions:

Director, Southwestern Public Service Company

Director of Utility Engineering, Utility Engineering Corporation

Comment date: May 27, 1994, in accordance with Standard Paragraph E

at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 825 North Capitol Street, NE., Washington, DC

20426, in accordance with Rules 211 and 214 of the Commission's Rules

of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions or protests should be filed on or before the comment date.

Protests will be considered by the Commission in determining the

appropriate action to be taken, but will not serve to make protestants

parties to the proceeding. Any person wishing to become a party must

file a motion to intervene. Copies of this filing are on file with the

Commission and are available for public inspection.

Lois D. Cashell,

Secretary.

[FR Doc. 94-12523 Filed 5-20-94; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.