Airworthiness Directives; General Electric Company; CF6 Series Turbofan Engines
Federal RegisterMay 5, 1994
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF TRANSPORTATION
14 CFR Part 39
[Docket No. 93-ANE-41; Amendment 39-8907; AD 94-09-18]
Airworthiness Directives; General Electric Company; CF6 Series
Turbofan Engines
AGENCY: Federal Aviation Administration, DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This amendment adopts a new airworthiness directive (AD),
applicable to General Electric Company (GE) CF6-6/-45/-50 series
turbofan engines, that requires an inspection for cracks in the stage 1
high pressure turbine (HPT) disk rim bolt holes, and stage 2 HPT disk
rim and inner bolt holes; and replacement, if necessary, with
serviceable parts. This amendment is prompted by a report of an
uncontained stage 1 HPT disk failure which resulted in an aborted
takeoff. The actions specified by this AD are intended to prevent an
uncontained stage 1 or stage 2 HPT disk failure, which could result in
an inflight engine shutdown, rejected takeoff, or damage to the
aircraft.
DATES: Effective June 6, 1994.
The incorporation by reference of certain publications listed in
the regulations is approved by the Director of the Federal Register as
of June 6, 1994.
ADDRESSES: The service information referenced in this AD may be
obtained from General Electric Aircraft Engines, CF6 Distribution
Clerk, room 132, 111 Merchant Street, Cincinnati, OH 45246. This
information may be examined at the Federal Aviation Administration
(FAA), New England Region, Office of the Assistant Chief Counsel, 12
New England Executive Park, Burlington, MA; or at the Office of the
Federal Register, 800 North Capitol Street NW., suite 700, Washington,
DC.
FOR FURTHER INFORMATION CONTACT: Robert J. Ganley, Aerospace Engineer,
Engine Certification Office, FAA, Engine and Propeller Directorate, 12
New England Executive Park, Burlington, MA 01803-5299; telephone (617)
238-7138; fax (617) 238-7199.
SUPPLEMENTARY INFORMATION: A proposal to amend part 39 of the Federal
Aviation Regulations to include an airworthiness directive (AD) that is
applicable to General Electric Company (GE) CF6-6/-45/-50 series
turbofan engines was published as a notice of proposed rulemaking
(NPRM) in the Federal Register on October 19, 1993 (58 FR 53893). That
action proposed to require an eddy current inspection for cracks in the
stage 1 high pressure turbine (HPT) disk rim bolt holes, and stage 2
HPT disk rim and inner bolt holes; and replacement, if necessary, with
serviceable parts. The inspection, and replacement, if necessary, would
be performed in accordance with GE CF6-6 Service Bulletin (SB) No. 72-
1002, dated February 12, 1993; CF6-6 SB No. 72-1003, Revision 1, dated
June 17, 1993; CF6-50 SB No. 72-1057, Revision 1, dated June 17, 1993;
and CF6-50 SB No. 72-1059, dated February 12, 1993.
Interested persons have been afforded an opportunity to participate
in the making of this amendment. Due consideration has been given to
the comments received.
One commenter supports the rule as proposed.
One commenter states that the compliance end-date of February 28,
1994, in compliance paragraph (b)(6) of the proposed rule should be
replaced by 1,000 cycles in service (CIS) after the effective date of
this AD, in order to avoid forced engine removals. The FAA concurs.
This change is consistent with the results of the failure analysis
performed by the manufacturer, and is supported by the positive
inspection results to date. This final rule has been revised
accordingly.
One commenter states that the compliance end-date of February 28,
1994, in compliance paragraph (b)(6) of the proposed rule should be
extended to one year after the effective date of this AD, in order to
avoid forced engine removals. The FAA concurs in part. The FAA agrees
that the current compliance end-date may cause forced engine removals;
however, an extension of this date alone may still cause an undue
burden on low cycle/low time operators. A cyclic definition in lieu of
a compliance end-date will help alleviate this potential problem. The
manufacturer has informed the FAA that a typical operator accumulates
approximately 1,000 CIS in one year. This change is consistent with the
results of the failure analysis performed by the manufacturer, and is
supported by the positive inspection results to date. Therefore, the
compliance end-date of February 28, 1994, in paragraph (b)(6) in the
proposed rule has been replaced in this final rule by 1,000 CIS after
the effective date of this AD.
Two commenters state that the compliance end-date of May 31, 1994,
in compliance paragraph (a)(1) and (a)(2) should be removed, and 4,500
cycles since new (CSN) should be replaced by 5,400 CSN to avoid forced
engine removals. The FAA concurs. This change is consistent with the
results of the failure analysis performed by the manufacturer, and is
supported by the positive inspection results to date. This final rule
has been revised accordingly.
Two commenters state that the compliance end-date of May 31, 1994,
in compliance paragraph (a)(3) should be replaced by 1,400 CIS after
the effective date of this AD to avoid forced engine removals. The FAA
concurs. This change is consistent with the results of the failure
analysis performed by the manufacturer, and is supported by the
positive inspection results to date. This final rule has been revised
accordingly.
Two commenters state that the compliance end-date of February 28,
1994, in compliance paragraphs (a)(4)(i) and (a)(4)(ii) should be
removed, 3,500 CSN should be replaced by 4,500 CSN, and 3,000 CSN
should be replaced by 3,500 CSN to avoid forced engine removals. The
FAA concurs in part. The FAA agrees that the current compliance end-
date may cause forced engine removals, but the proposed CSN changes are
not consistent with the results of the failure analysis performed by
the manufacturer. The results of this analysis suggest that 3,500 CSN
can be changed to 4,000 CSN; however, 3,000 CSN can not be changed.
This final rule has been revised accordingly.
Two commenters state that the compliance end-date of February 28,
1994, in compliance paragraph (a)(4)(iii) should be replaced by 1,000
CIS after the effective date of this AD, and 3,000 CSN should be
replaced by 3,500 CSN to avoid forced engine removals. The FAA concurs
in part. The FAA agrees that the current compliance end-date may cause
forced engine removals, but the proposed CSN change is not consistent
with the results of the failure analysis performed by the manufacturer.
The results of this analysis suggest that 3,000 CSN can not be changed.
This final rule has been revised accordingly.
One commenter states that the compliance end-date of May 31, 1994,
in compliance paragraphs (a)(5)(i) and (a)(5)(ii) should be removed,
and 4,500 CSN should be replaced by 6,000 CSN to avoid forced engine
removals. The FAA concurs in part. The FAA agrees that the current
compliance end-date may cause forced engine removals, but the proposed
CSN change is not consistent with the results of the failure analysis
performed by the manufacturer. The results of this analysis suggest
that 4,500 CSN can be changed to 5,400 CSN. The final rule has been
revised accordingly.
One commenter states that the compliance end-date of May 31, 1994,
in compliance paragraph (a)(5)(iii) should be replaced by 2,000 CIS
after the effective date of this AD to avoid forced engine removals.
The FAA concurs in part. The FAA agrees that the current compliance
end-date may cause forced engine removals, but the proposed CIS is not
consistent with the results of this failure analysis performed by the
manufacturer. The results of this analysis suggest that 1,400 CIS is
appropriate. This final rule has been revised accordingly.
Although no comments were received regarding compliance paragraphs
(b)(1) to (b)(5), the FAA has changed these paragraphs to be consistent
with the corresponding paragraphs in paragraph (a) of this final rule.
The economic analysis section of the proposed rule assumed that all
inspected disks would require replacement. The manufacturer has
informed the FAA that this assumption is overly conservative based on
analysis and inspection results to date, and that only approximately 2%
of the inspected disks will require replacement. The 2% figure
translates to approximately 10 disks installed on aircraft of U.S.
registry. The economic analysis section of this final rule has been
revised accordingly.
After careful review of the available data, including the comments
noted above, the FAA has determined that air safety and the public
interest require the adoption of the rule with the changes described
previously. The FAA has determined that these changes will neither
increase the economic burden on any operator nor increase the scope of
the AD.
There are approximately 650 GE CF6-6/-45/-50 series turbofan
engines of the affected design in the worldwide fleet. The FAA
estimates that 500 engines installed on aircraft of U.S. registry will
be affected by this AD, that it will take approximately 108 work hours
per engine to accomplish the required actions, and that the average
labor rate is $55 per work hour. Required parts will cost approximately
$77,314 per engine. Based on these figures, and assuming that 10 of the
inspected disks will require replacement, the total cost impact of the
AD on U.S. operators is estimated to be $3,743,140.
The regulations adopted herein will not have substantial direct
effects on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, in
accordance with Executive Order 12612, it is determined that this final
rule does not have sufficient federalism implications to warrant the
preparation of a Federalism Assessment.
For the reasons discussed above, I certify that this action (1) is
not a ``significant regulatory action'' under Executive Order 12866;
(2) is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979); and (3) will not have a
significant economic impact, positive or negative, on a substantial
number of small entities under the criteria of the Regulatory
Flexibility Act. A final evaluation has been prepared for this action
and it is contained in the Rules Docket. A copy of it may be obtained
from the Rules Docket at the location provided under the caption
ADDRESSES.
List of Subjects in 14 CFR Part 39
Air Transportation, Aircraft, Aviation Safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration amends 14 CFR part
39 of the Federal Aviation Regulations as follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. App. 1354(a), 1421 and 1423; 49 U.S.C.
106(g); and 14 CFR 11.89.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by adding the following new
airworthiness directive:
94-09-18 General Electric Company: Amendment 39-8907. Docket 93-ANE-
41
Applicability: General Electric Company (GE) CF6-6/ -45/-50
series turbofan engines installed on but not limited to Airbus A300
series, Boeing 747 series, and McDonnell Douglas DC-10 series
aircraft.
Compliance: Required as indicated, unless accomplished
previously.
To prevent an uncontained stage 1 or stage 2 high pressure
turbine (HPT) disk failure, which could result in an inflight engine
shutdown, rejected takeoff, or damage to the aircraft, accomplish
the following:
(a) Eddy current inspect (ECI) stage 1 and stage 2 HPT disks for
cracks in accordance with the Accomplishment Instructions of GE CF6-
6 Service Bulletin (SB) No. 72-1002, dated February 12, 1993, and
CF6-6 SB No. 72-1003, Revision 1, dated June 17, 1993, as follows:
(1) For GE CF6-6 series stage 1 HPT disks, Part Numbers (P/N)
9137M40P01 and 9687M39P07, with serial numbers (S/N) listed in
Appendix I or II of GE CF6-6 SB No. 72-1002, dated February 12,
1993, which have accumulated less than 2,500 cycles since new (CSN)
on the effective date of this airworthiness directive (AD), ECI the
rim bolt holes at the next engine shop visit after accumulating
2,500 CSN, but not to exceed 5,400 CSN.
(2) For GE CF6-6 series stage 1 HPT disks, P/N 9137M40P01 and
9687M39P07, with S/N listed in Appendix I or II or GE CF6-6 SB No.
72-1002, dated February 12, 1993, which have accumulated 2,500 CSN
or more, but less than 4,000 CSN on the effective date of this AD,
ECI the rim bolt holes at the next engine shop visit, but not to
exceed 5,400 CSN.
(3) For GE CF6-6 series stage 1 HPT disks, P/N 9137M40P01 and
9687M39P07, with S/N listed in Appendix I or II of GE CF6-6 SB No.
72-1002, dated February 12, 1993, which have accumulated 4,000 CSN
or more on the effective date of this AD, ECI the rim bolt holes at
the next engine shop visit, or prior to accumulating 1,400 cycles in
service (CIS) after the effective date of this AD, whichever occurs
earlier.
(4) For GE CF6-6 series stage 2 HPT disks, P/N 9084M52P02 and
9084M52P05, with
S/N listed in Appendix I or II of GE CF6-6 SB No. 72-1003, Revision
1, dated June 17, 1993, which have not accomplished the inner bolt
hole ECI prior to the effective date of this AD in accordance with
GE CF6-6 Shop Manual, GEK 9266, Chapter 72-53-04, accomplish the
following:
(i) For disks which have accumulated less than 2,000 CSN on the
effective date of this AD, ECI the rim and inner bolt holes at the
next engine shop visit after accumulating 2,000 CSN, but not to
exceed 4,000 CSN.
(ii) For disks which have accumulated 2,000 CSN or more, but
less than 3,000 CSN on the effective date of this AD, ECI the rim
and inner bolt holes at the next engine shop visit, but not to
exceed 4,000 CSN.
(iii) For disks which have accumulated 3,000 CSN or more on the
effective date of this AD, ECI the rim and inner bolt holes at the
next engine shop visit, or prior to accumulating 1,000 CIS after the
effective date of this AD, whichever occurs earlier.
(5) For GE CF6-6 series stage 2 HPT disks, P/N 9084M52P02 and
9084M52P05, with
S/N listed in Appendix I or II of GE CF6-6 SB No. 72-1003, Revision
1, dated June 17, 1993, which have accomplished the inner bolt hole
ECI prior to the effective date of this AD in accordance with GE
CF6-6 Shop Manual, GEK 9266, Chapter 72-53-04, and not found
cracked, accomplish the following:
(i) For disks which have accumulated less than 2,000 CSN on the
effective date of this AD, ECI the rim and inner bolt holes at the
next engine shop visit after accumulating 2,000 CSN, but not to
exceed 5,400 CSN.
(ii) For disks which have accumulated 2,000 CSN or more, but
less than 4,000 CSN on the effective date of this AD, ECI the rim
and inner bolt holes at the next engine shop visit, prior to
accumulating 4,500 CSN, but not to exceed 5,400 CSN.
(iii) For disks which have accumulated 4,000 CSN or more on the
effective date of this AD, ECI the rim and inner bolt holes at the
next engine shop visit, or prior to accumulating 1,400 CIS after the
effective date of this AD, whichever occurs earlier.
(6) GE CF6-6 series stage 1 HPT disks referenced in paragraphs
(a)(1), (a)(2), and (a)(3) of this AD, that have been inspected by
ECI in accordance with the procedures outlined in GE CF6-6 All
Operators Wire (AOW) 92-6-09, dated September 24, 1992, or GE CF6-6
Engine Shop Manual, GEK 9266, Chapter 72-53-03, prior to the
effective date of this AD, and whose CSN at the time of inspection
was 2,500 or more, already meet the inspection requirements of
paragraphs (a)(1), (a)(2), and (a)(3) of this AD.
(7) GE CF6-6 series stage 2 HPT disks referenced in paragraphs
(a)(4) and (a)(5) of this AD, that have been inspected by ECI in
accordance with the procedures outlined in GE CF6-6 AOW 92-6-09,
dated September 24, 1992; GE CF6-6 SB No. 72-1003, dated February
12, 1993; or GE CF6-6 Engine Shop Manual, GEK 9266, Chapter 72-53-
04, prior to the effective date of this AD, and whose CSN at the
time of inspection was 2,000 or more, already meet the inspection
requirements of paragraphs (a)(4) and (a)(5) of this AD.
(b) ECI stage 1 and stage 2 HPT disks for cracks in accordance
with the Accomplishment Instructions of GE CF6-50 SB No. 72-1057,
Revision 1, dated June 17, 1993, and CF6-50 SB No. 72-1059, dated
February 12, 1993, as follows:
(1) For GE CF6-45/-50 series stage 1 HPT disks, P/N 9283M31P02,
9283M55P04, and 9283M55P05, with S/N listed in Appendix I, II, or
III of GE CF6-50 SB No. 72-1059, dated February 12, 1993, which have
accumulated less than 2,500 CSN on the effective date of this AD,
ECI the rim bolt holes at the next engine shop visit after
accumulating 2,500 CSN, but not to exceed 5,400 CSN.
(2) For GE CF6-45/-50 series stage 1 HPT disks, P/N 9283M31P02,
9283M55P04, and 9283M55P05, with S/N listed in Appendix I, II, or
III of GE CF6-50 SB No. 72-1059, dated February 12, 1993, which have
accumulated 2,500 CSN or more, but less than 4,000 CSN on the
effective date of this AD, ECI the rim bolt holes at the next engine
shop visit, but not to exceed 5,400 CSN.
(3) For GE CF6-45/-50 series stage 1 HPT disks P/N 9283M31P02,
9283M55P04, and 9283M55P05, with S/N listed in Appendix I, II, or
III of GE CF6-50 SB No. 72-1059, dated February 12, 1993, which have
accumulated 4,000 CSN or more on the effective date of this AD, ECI
the rim bolt holes at the next engine shop visit, or prior to
accumulating 1,400 CIS after the effective date of this AD,
whichever occurs earlier.
(4) For GE CF6-45/-50 series stage 2 HPT disks, P/N 9045M35P18
and 1474M49P06, with S/N listed in the Appendix of GE CF6-50 SB No.
72-1057, Revision 1, dated June 17, 1993, which have accumulated
less than 2,000 CSN on the effective date of this AD, ECI the rim
and inner bolt holes at the next engine shop visit after
accumulating 2,000 CSN, but not to exceed 4,000 CSN.
(5) For GE CF6-45/-50 series stage 2 HPT disks, P/N 9045M35P18
and 1474M49P06, with S/N listed in the Appendix of GE CF6-50 SB No.
72-1057, Revision 1, dated June 17, 1993, which have accumulated
2,000 CSN or more, but less than 3,000 CSN on the effective date of
this AD, ECI the rim bolt holes at the next engine shop visit, but
not to exceed 4,000 CSN.
(6) For GE CF6-45/-50 series stage 2 HPT disks, P/N 9045M35P18
and 1474M49P06, with S/N listed in the Appendix of GE CF6-50 SB No.
72-1057, Revision 1, dated June 17, 1993, which have accumulated
3,000 CSN or more on the effective date of this AD, ECI the rim and
inner bolt holes at the next engine shop visit, or prior to
accumulating 1,000 CIS after the effective date of this AD,
whichever occurs earlier.
(7) GE CF6-45/-50 series stage 1 HPT disks referenced in
paragraphs (b)(1), (b)(2), and (b)(3) of this AD, that have been
inspected by ECI in accordance with the procedures outlined in GE
CF6-50 AOW 92-50-15, dated September 24, 1992, or GE CF6-50 Engine
Task Numbered Shop Manual, GEK 50481, Chapter 72-53-03, prior to the
effective date of this AD, and whose CSN at the time of inspection
was 2,500 or more, already meet the inspection requirements of
paragraphs (b)(1), (b)(2), and (b)(3) of this AD.
(8) GE CF6-45/-50 series stage 2 HPT disks referenced in
paragraphs (b)(4), (b)(5), and (b)(6) of this AD, that have been
inspected by ECI in accordance with the procedures outlined in GE
CF6-50 AOW 92-50-15, dated September 24, 1992; GE CF6-50 SB No. 72-
1057, dated February 12, 1993; or GE CF6-50 Engine Task Numbered
Shop Manual, GEK 50481, Chapter 72-53-04, prior to the effective
date of this AD, and whose CSN at the time of inspection was 2,000
or more, already meet the inspection requirements of paragraphs
(b)(4), (b)(5), and (b)(6) of this AD.
(c) Remove from service disks found cracked, and replace with
serviceable parts. Inspect replacement disks in accordance with
paragraphs (a) or (b) of this AD, if applicable.
(d) For the purpose of this AD, an engine shop visit is defined
as the induction of an engine into a shop for maintenance involving
the separation of any major flange.
(e) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, Engine Certification Office. The
request should be forwarded through an appropriate FAA Principal
Maintenance Inspector, who may add comments and then send it to the
Manager, Engine Certification Office.
Note: Information concerning the existence of approved
alternative methods of compliance with this airworthiness directive,
if any, may be obtained from the Engine Certification Office.
(f) Special flight permits may be issued in accordance with 14
CFR 21.197 and 21.199 to operate the aircraft to a location where
the requirements of this AD can be accomplished.
(g) The inspections shall be done in accordance with the
following service bulletins:
----------------------------------------------------------------------------------------------------------------
Document No. Pages Revision Date
----------------------------------------------------------------------------------------------------------------
GE CF6-6 SB
No. 72-1002................................. 1-12 Original............ February 12, 1993.
Total Pages: 12.
GE CF6-6 SB
No. 72-1003................................. 1-3 1................... June 17, 1993.
4-21 Original............ February 12, 1993.
Total Pages: 21.
GE CF6-50 SB
No. 72-1057................................. 1-2 1................... June 17, 1993.
3-14 Original............ February 12, 1993.
Total Pages: 14.
GE CF6-50 SB
No. 72-1059................................. 1-17 Original............ February 12, 1993
Total Pages: 17.
----------------------------------------------------------------------------------------------------------------
This incorporation by reference was approved by the Director of
the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR
part 51. Copies may be obtained from General Electric Aircraft
Engines, CF6 Distribution Clerk, Room 132, 111 Merchant Street,
Cincinnati, OH 45246. Copies may be inspected at the FAA, New
England Region, Office of the Assistant Chief Counsel, 12 New
England Executive Park, Burlington, MA; or at the Office of the
Federal Register, 800 North Capitol Street NW., suite 700,
Washington, DC.
(h) This amendment becomes effective on June 6, 1994.
Issued in Burlington, Massachusetts, on April 26, 1994.
Jay J. Pardee,
Manager, Engine and Propeller Directorate, Aircraft Certification
Service.
[FR Doc. 94-10502 Filed 5-4-94; 8:45 am]
BILLING CODE 4910-13-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.