Environmental Impact Statements; Notice of Availability

Federal RegisterNov 21, 2025

Ask Donna

What actually matters in this document.

Text

ENVIRONMENTAL PROTECTION AGENCY

[FRL OP-OFA-198]

Environmental Impact Statements; Notice of Availability

Responsible Agency:

Office of Federal Activities, General Information 202-993-3272 or

https://www.epa.gov/nepa.

Weekly receipt of Environmental Impact Statements (EIS)

Filed September 22, 2025 10 a.m. EST Through November 17, 2025 10 a.m. EST

Pursuant to CEQ Guidance on 42 U.S.C. 4332.

Notice:

Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other

Federal agencies. EPA's comment letters on EISs are available at:

https://cdxapps.epa.gov/cdx-enepa-II/public/action/eis/search.

EIS No. 20250138, Draft, NRCS, IA,

Clarke County Water Supply Project, Comment Period Ends: 12/22/2025, Contact: Michael Cagle 515-323-2211.

EIS No. 20250139, Final, USCG, USA, USAF, USN, HI,

Hawaii-California Training and Testing, Contact: Alex Stone 808-226-3896.

EIS No. 20250140, Draft, NRC, TN,

TRISO-X Special Nuclear Material License Application for a Fuel Fabrication Facility, Comment Period Ends: 12/08/2025, Contact: Jill Caverly 301-415-7674.

EIS No. 20250141, Draft, FERC, WY,

Hydropower License re Seminoe Pumped Storage Project, Comment Period Ends: 01/02/2026, Contact: Office of External Affairs 866-208-3372.

EIS No. 20250142, Draft, NRCS, UT,

Gould Wash Flood Protection Project, Comment Period Ends: 01/05/2026, Contact: Anders Fillerup 385-245-7709.

EIS No. 20250143, Final, BLM, TN,

ADOPTION—Ridgeline Expansion Project, Contact: Shayne Banks 601-919-4652.

The Bureau of Land Management (BLM) has adopted the Federal Energy Regulatory Commission's Final EIS No. 20240243 filed 12/20/2024 with the Environmental Protection Agency.

EIS No. 20250144, Final, OSM, WY,

Black Butte Coal Company Federal Lease WYW-6266 Mining Plan Modification, Contact: Marcelo Calle 303-236-2929.

EIS No. 20250145, Final, BLM, UT,

Lisbon Valley Mining Company Copper Mine Plan of Operations Modification Project, Contact: Jill Stephenson 435-259-2100.

EIS No. 20250146, Final, BLM, ID,

Caldwell Canyon Revised Mine and Reclamation Plan, Contact: Barry Myers 208-559-3662.

EIS No. 20250147, Final, USACE, CA,

Delta Conveyance Project Final Programmatic Environmental Impact Statement, Review Period Ends: 11/24/2025, Contact: Leah M. Fisher 916-557-6639.

EIS No. 20250148, Final, FHWA, GA,

I-285 Top End Express Lanes, Contact: Sabrina David 404-562-3630.

EIS No. 20250149, Draft, FHWA, NC,

Independence Boulevard Extension, Comment Period Ends: 01/16/2026, Contact: Clarence W. Coleman, P.E. 919-747-7014.

EIS No. 20250150, Final, USAF, CA,

Authorizing Changes to the Falcon Launch Program at Vandenberg Space Force Base, California, Contact: Hilary Rummel 805-606-3595.

EIS No. 20250151, Draft Supplement, NRC, TN,

Supplemental Environmental Impact Statement for a Construction Permit at the Clinch River Nuclear Site, Comment Period Ends: 12/22/2025, Contact: Madelyn Nagel 301-415-0371.

EIS No. 20250153, Final, DOC, NY,

Micron Semiconductor Manufacturing Facility, Clay, NY, Contact: David Frenkel 240-204-1960.

EIS No. 20250154, Draft Supplement, USACE, MI,

Enbridge Line 5 Tunnel Project Supplemental Draft EIS—Horizontal Directional Drilling Installation Alternative, Comment Period Ends: 12/05/2025, Contact: Katie Otanez 313-226-5479.

EIS No. 20250155, Draft, FHWA, CO,

I-270 Corridor Improvements Project, Comment Period Ends: 01/20/2026, Contact: Bill Schiebel 720-963-3032.

EIS No. 20250156, Draft, FHWA, MA,

Cape Cod Bridges Program, Bourne, Massachusetts, Comment Period Ends: 01/05/2026, Contact: Kenneth Miller, P.E. 617-494-2164.

Dated: November 19, 2025.

Nancy Abrams,

Deputy Director, Federal Activities Division.

[FR Doc. 2025-20586 Filed 11-20-25; 8:45 am]

BILLING CODE 6560-50-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.