Air Plan Approval; Illinois; Revised Format for Materials Incorporated by Reference
Federal RegisterJun 30, 2017
Ask Donna
What actually matters in this document.
Text
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R05-OAR-2016-0599; FRL-9963-76-Region 5]
Air Plan Approval; Illinois; Revised Format for Materials Incorporated by Reference
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule; administrative change.
SUMMARY:
The Environmental Protection Agency (EPA) is revising the format for materials that are made part of the Illinois State Implementation Plan (SIP) through the process of incorporation by reference (IBR). The regulations and materials affected by this format change have all been previously submitted by Illinois and approved by EPA as part of the SIP.
DATES:
This action is effective June 30, 2017.
ADDRESSES:
EPA has established a docket for this action under Docket ID No. EPA-R05-OAR-2016-0599. SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604 and the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.
FOR FURTHER INFORMATION CONTACT:
Christos Panos, Environmental Engineer, Attainment Planning and Maintenance Section, Air Programs Branch (AR 18J), Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 353-8328,
panos.christos@epa.gov.
SUPPLEMENTARY INFORMATION:
Throughout this document, wherever “we,” “us” or “our” is used, it is intended to refer to EPA. Information is organized as follows:
Table of Contents
I. Background
A. Description of a SIP
B. How EPA Enforces SIPs
C. How the State and EPA Update the SIP
D. How EPA Compiles the SIPs
E. How EPA Organizes the SIP Compilation
F. Where You Can Find a Copy of the SIP Compilation
G. The Format of the New Identification of Plan Section
H. When a SIP Revision Becomes Federally Enforceable
I. The Historical Record of SIP Revision Approvals
II. What EPA Is Doing in This Action
III. Incorporation by Reference
IV. Statutory and Executive Order Reviews
I. Background
A. Description of a SIP
Each state has a SIP containing, among other things, the control measures and strategies used to attain and maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution control regulations, emission inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms.
B. How EPA Enforces SIPs
Each state must formally adopt the control measures and strategies to attain and maintain the NAAQS after the public has had an opportunity to comment on them. The states then submit them to EPA as SIP revision requests upon which EPA must formally act. EPA evaluates these submissions to determine whether they meet CAA requirements. If and when these control measures and strategies are approved by EPA, after notice and comment rulemaking, EPA uses the IBR process to make them part of the Federally approved SIP. IBR is a method of incorporating material into EPA regulations in the CFR by referencing the original document(s) without publishing the full text of the material. In this case, the SIP rules are identified in part 52 (Approval and Promulgation of Implementation Plans), title 40 of the Code of Federal Regulations (40 CFR part 52). These rules are approved by EPA with a specific effective date, but are not reproduced in their entirety in 40 CFR part 52. This format allows both EPA and the public to identify which regulations are contained in a given SIP and to help determine whether the state is enforcing those regulations. This format also assists EPA and the public in taking enforcement action, should a state not enforce its SIP-approved regulations.
C. How the State and EPA Update the SIP
The SIP is periodically revised as necessary to address the unique air pollution problems in the state. Therefore, EPA must periodically take action on state SIP submissions containing new and/or revised regulations and other materials; if approved, they become part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the formatting procedures of 40 CFR part 52 for incorporating by reference Federally approved SIP revisions. These procedures include: (1) A revised SIP document for each state that would use the IBR process under the provisions of title 1 CFR part 51; (2) a revised mechanism for announcing EPA approval of revisions to an applicable SIP and updating both the document that has gone through the IBR process and the CFR; and (3) a revised format of the “Identification of plan” sections for each applicable subpart in 40 CFR part 52 to reflect these revised IBR procedures. The description of the revised SIP document, IBR procedures, and “Identification of plan” format are discussed in further detail in the May 22, 1997
Federal Register
document.
D. How EPA Compiles the SIPs
The Federally-approved regulations, source-specific requirements, and nonregulatory provisions (entirely or portions of) submitted by each state agency have been compiled by EPA into a “SIP compilation.” The SIP compilation contains the updated regulations, source-specific requirements, and nonregulatory provisions approved by EPA through previous rulemaking actions in the
Federal Register
.
E. How EPA Organizes the SIP Compilation
Each SIP compilation contains three parts. Part one contains the regulations, part two contains the source-specific requirements, and part three contains nonregulatory provisions. Each state's SIP compilation contains a table for each of the three parts that identifies each SIP-approved regulation, source-specific requirement, and nonregulatory provision. In this action, EPA is publishing the SIP compilation tables that summarize the applicable SIP requirements for Illinois and that will be codified at 40 CFR 52.720. The effective dates in the table indicate the date of the most recent revision to an approved regulation. EPA Regional Offices have the primary responsibility for updating the state SIP compilations and ensuring their accuracy.
F. Where You Can Find a Copy of the SIP Compilation
EPA Region 5 has developed and will maintain the SIP compilation for Illinois. A copy of the full text of Illinois's regulatory and source-specific SIP compilation will also be maintained at NARA.
G. The Format of the New Identification of Plan Section
In order to better serve the public, EPA revised the organization of the section titled “Identification of plan” at 40 CFR 52.720 and included additional information to clarify the enforceable elements of the SIP. The revised format does not affect Federal enforceability of the SIP and is consistent with the requirements of Section 110(h)(1) of the CAA concerning comprehensive SIP publication.
The revised Identification of plan section contains five subsections: (a) Purpose and scope, (b) Incorporation by reference, (c) EPA approved regulations, (d) EPA approved source specific requirements, and (e) EPA approved nonregulatory and quasi-regulatory provisions.
H. When a SIP Revision Becomes Federally Enforceable
All new requirements and revisions to the applicable SIP become Federally enforceable as of the effective date of the revisions to paragraphs (c), (d), or (e) of the applicable Identification of plan section found in each subpart of 40 CFR part 52.
I. The Historical Record of SIP Revision Approvals
To facilitate enforcement of previously approved SIP provisions and provide a smooth transition to the new SIP processing system, EPA will retain the original Identification of plan section, previously appearing in the CFR as the first or second section of part 52 for each state subpart. The original Identification of plan section will be moved to Section 52.750 of part 52 for Illinois. After an initial two-year period, EPA will review its experience with the new SIP processing system and decide whether to retain the original Identification of plan section for some further period.
II. What EPA Is Doing in This Action
We are revising the format of 40 CFR part 52 “Identification of plan” section for Illinois regarding incorporation by reference, by adding Section 52.720(c)(d) and (e), to be consistent with the format described above and in 62 FR 27968 (May 22, 1997). We are adding Section 52.720(b)(1) to further clarify that all SIP revisions listed in Section 52.720(c) and (d), regardless of inclusion in the most recent “update to the SIP compilation,” are Federally enforceable under sections 110 and 113 of the Clean Air Act (CAA) as of the effective date of the final rulemaking in which EPA approved the SIP revision. We are adding Section 52.720(b)(2) to certify that the materials provided by EPA at the addresses in paragraph (b)(3) are an exact duplicate of the official state rules/regulations. We are adding Section 52.720(b)(3) to update address and contact information. Additionally, we are removing sections 52.729 “Control strategy: Carbon monoxide”, 52.745 “Section 110(a)(2) infrastructure requirements” and 52.746 “Control strategy: Lead (Pb)” because the information within those sections is being incorporated into the tables at Section 52.720 and is, therefore, no longer necessary.
This action constitutes a recordkeeping and organizational exercise to ensure that all revisions to the state programs that have occurred are accurately reflected in 40 CFR part 52. State SIP revisions are controlled by EPA regulations at 40 CFR part 51.
EPA has determined that this action falls under the “good cause” exemption in sections 553(b)(3)(B) and 553(d)(3) of the Administrative Procedures Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation and allows an agency to make a rule effective immediately, thereby avoiding the 30-day delayed effective date otherwise provided for in the APA. This action simply reformats and codifies provisions which are already in effect as a matter of law in Federal and approved state programs. Under section 553(b)(3)(B) of the APA, an agency may find good cause where notice and public procedure are “impractical, unnecessary, or contrary to the public interest.” Public comment is unnecessary for this action because EPA is reformatting and codifying existing law. Immediate notice in the CFR benefits the public by removing outdated citations and making the IBR format clearer and more user-friendly.
III. Incorporation by Reference
In this rule, EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, EPA is finalizing the incorporation by reference of the Illinois Regulations described in the amendments to 40 CFR part 52 set forth below. EPA has made, and will continue to make, these documents generally available electronically through
www.regulations.gov
and/or in hard copy at the appropriate EPA office (see the
ADDRESSES
section of this preamble for more information).
IV. Statutory and Executive Order Reviews
A. General Requirements
Under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011), this action is not a “significant regulatory action” and is therefore not subject to review by the Office of Management and Budget. This rule is not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001) because it is not a significant regulatory action under Executive Order 12866. Because the agency has made a “good cause” finding that this action is not subject to notice-and-comment requirements under the Administrative Procedure Act or any other statute as indicated in the
SUPPLEMENTARY INFORMATION
section above, it is not subject to the regulatory flexibility provisions of the Regulatory Flexibility Act (5 U.S.C. 601
et seq.
), or to sections 202 and 205 of the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In addition, this action does not significantly or uniquely affect small governments or impose a significant intergovernmental mandate, as described in sections 203 and 204 of UMRA. This rule also does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal government and Indian tribes, or on the distribution of power and responsibilities between the Federal government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), because it is not economically significant. This rule does not involve technical standards; thus the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. The rule also does not involve special consideration of environmental justice related issues as required by Executive Order 12898 (59 FR 7629, February 16, 1994). In issuing this rule, EPA has taken the necessary steps to eliminate drafting errors and ambiguity, minimize potential litigation, and provide a clear legal standard for affected conduct, as required by section 3 of Executive Order 12988 (61 FR 4729, February 7, 1996).
EPA has complied with Executive Order 12630 (63 FR 8859, March 15, 1998) by examining the takings implications of the rule in accordance with the “Attorney General's Supplemental Guidelines for the Evaluation of Risk and Avoidance of Unanticipated Takings” issued under the executive order. This rule does not impose an information collection burden under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501
et seq.
). EPA's compliance with these statutes and Executive Orders for the underlying rules is discussed in previous actions taken on the State's rules.
B. Submission to Congress and the Comptroller General
The Congressional Review Act (5 U.S.C. 801
et seq.
), as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. Section 808 allows the issuing agency to make a rule effective sooner than otherwise provided by the CRA if the agency makes a good cause finding that notice and public procedure is impracticable, unnecessary or contrary to the public interest. This action simply codifies provisions which are already in effect as a matter of law in Federal and approved state programs. 5 U.S.C. 802(2). As stated previously, EPA has made such a good cause finding, including the reasons therefore, and established an effective of June 30, 2017. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the
Federal Register
. The changes in format to the “Identification of plan” section for Illinois are not a `major rule' as defined by 5 U.S.C. 804(2).
C. Petitions for Judicial Review
EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Illinois SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for these “Identification of plan” reorganization actions for Illinois.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur dioxide, Volatile organic compounds.
Dated: June 5, 2017.
Robert A. Kaplan,
Acting Regional Administrator, Region 5.
Part 52 of chapter I, title 40 of the Code of Federal Regulations, is amended as follows:
PART 52—APROVAL AND PROMULGATION OF IMPLEMENTION PLANS
1. The authority citation for part 52 continues to read as follows:
Authority:
42 U.S.C. 7401
et seq.
Subpart O—Illinois
§ 52.720
[Redesignated as § 52.750 and amended]
2. Section 52.720 is redesignated as § 52.750 and the section heading and paragraph (a) are revised to read as follows:
§ 52.750
Original identification of plan section.
(a) This section identified the original “Air Quality Implementation Plan for the State of Illinois” and all revisions submitted by Illinois that were Federally-approved prior to June 1, 2017.
3. A new § 52.720 is added to read as follows:
§ 52.720
Identification of plan.
(a)
Purpose and scope.
This section sets forth the applicable State implementation plan for the State of Illinois under section 110 of the Clean Air Act, 42 U.S.C. 7401-7671q and 40 CFR part 51 to meet national ambient air quality standards.
(b)
Incorporation by reference.
(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 31, 2016, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Entries in paragraphs (c) and (d) of this section with the EPA approval dates after December 31, 2016, have been approved by EPA for inclusion in the State implementation plan and for incorporation by reference into the plan as it is contained in this section, and will be considered by the Director of the Federal Register for approval in the next update to the SIP compilation.
(2) EPA Region 5 certifies that the materials provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the state implementation plan as of the dates referenced in paragraph (b)(1).
(3) Copies of the materials incorporated by reference into the SIP may be inspected at the Region 5 EPA Office at 77 West Jackson Boulevard, Chicago, IL 60604. To obtain the material, please contact the person identified in the
FOR FURTHER INFORMATION CONTACT
section of this preamble. You may also inspect the material with an EPA approval date prior to June 1, 2017, at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.
(c)
EPA approved regulations.
EPA-Approved Illinois Regulations and Statutes
Illinois citation
Title/subject
State
effective
date
EPA approval date
Comments
Title 35 of the Illinois Administrative Code
Subtitle A: General Provisions
Chapter I: Pollution Control Board
Part 106: Procedural Regulations
Subpart E: Alternative Opacity Procedures
106.501
Scope and Applicability
07/13/88
12/29/92, 57 FR 61834
106.502
Joint or Single Petition
07/13/88
12/29/92, 57 FR 61834
106.503
Request to Agency to Join as Co-Petitioner
07/13/88
12/29/92, 57 FR 61834
106.504
Contents of Petition
07/13/88
12/29/92, 57 FR 61834
106.505
Response and Reply
07/13/88
12/29/92, 57 FR 61834
106.506
Notice and Conduct of Hearing
06/05/90
12/29/92, 57 FR 61834
106.507
Opinions and Orders
07/13/88
12/29/92, 57 FR 61834
Subpart J: Culpability Determinations
106.930
Applicability
07/11/94
07/13/95, 60 FR 36060
106.931
Petition for Review
07/11/94
07/13/95, 60 FR 36060
106.932
Response and Reply
07/11/94
07/13/95, 60 FR 36060
106.933
Notice and Hearing
07/11/94
07/13/95, 60 FR 36060
106.934
Opinion and Order
07/11/94
07/13/95, 60 FR 36060
Subtitle B: Air Pollution
Chapter I: Pollution Control Board
Subchapter a: Permits and General Provisions
Part 201: Permits and General Provisions
Subpart A: Definitions
201.102
Definitions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 101.
Subpart B: General Provisions
201.121
Existence of Permit No Defense
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(h).
201.122
Proof of Emissions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 108.
201.123
Burden of Persuasion Regarding Exceptions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 111.
201.124
Annual Report
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 112.
201.125
Severability
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 113.
201.126
Repealer
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 114.
Subpart C: Prohibitions
201.141
Prohibition of Air Pollution
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 102.
201.142
Construction Permit Required
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(a)(1).
201.143
Operating Permits for New Sources
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(b)(1).
201.144
Operating Permits for Existing Sources
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(b)(2).
201.146
Exemptions From State Permit Requirements
12/23/13
03/13/15, 80 FR 13248
201.147
Former Permits
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(j).
201.148
Operation Without Compliance Program and Project Completion Schedule
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(a).
201.149
Operation During Malfunction, Breakdown or Startups
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(a).
201.150
Circumvention
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 109.
201.151
Design of Effluent Exhaust Systems
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 110.
Subpart D: Permit Applications and Review Process
201.152
Contents of Application for Construction Permit
06/23/98
01/03/00, 65 FR 14
201.156
Conditions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(a)(6).
201.157
Contents of Application for Operating Permit
06/23/98
01/03/00, 65 FR 14
201.158
Incomplete Applications
06/23/98
01/03/00, 65 FR 14
201.159
Signatures
06/23/98
01/03/00, 65 FR 14
201.160
Standards for Issuance
06/23/98
01/03/00, 65 FR 14
201.161
Conditions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(b)(7).
201.162
Duration
12/01/10
04/07/14, 79 FR 18997
201.163
Joint Construction and Operating Permits
06/23/98
01/03/00, 65 FR 14
201.164
Design Criteria
06/23/98
01/03/00, 65 FR 14
201.165
Hearings
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(e).
201.166
Revocation
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(f).
201.167
Revisions to Permits
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(g).
201.168
Appeals From Conditions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(k).
Subpart F: CAAPP Permits
201.207
Applicability
06/23/98
01/03/00, 65 FR 14
Subpart H: Compliance Programs and Project Completion Schedules
201.241
Contents of Compliance Program
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(b)(1).
201.242
Contents of Project Completion Schedule
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(b)(2, 3).
201.243
Standards for Approval
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(c).
201.244
Revisions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(d).
201.245
Effects of Approval
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(e).
201.246
Records and Reports
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(f).
Subpart I: Malfunctions, Breakdowns or Startups
201.261
Contents of Request for Permission To Operate During a Malfunction, Breakdown or Startup
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(b).
201.262
Standards for Granting Permission To Operate During a Malfunction, Breakdown or Startup
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(c).
201.263
Records and Reports
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(d).
201.264
Continued Operation or Startup Prior to Granting of Operating Permit
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(e).
201.265
Effect of Granting of Permission To Operate During a Malfunction, Breakdown or Startup
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(f).
Subpart J: Monitoring and Testing
201.281
Permit Monitoring Equipment Requirements
02/03/89
04/06/93, 58 FR 17780
201.282
Testing
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 106(b).
201.283
Records and Reports
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 106(c).
Subpart K: Records and Reports
201.301
Records
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 107(a).
201.302
Reports
12/23/13
03/13/15, 80 FR 13248
Subpart L: Continuous Monitoring
201.401
Continuous Monitoring Requirements
02/03/89
04/06/93, 58 FR 17780
201.402
Alternative Monitoring
02/03/89
04/06/93, 58 FR 17780
201.403
Exempt Sources
02/03/89
04/06/93, 58 FR 17780
201.404
Monitoring System Malfunction
02/03/89
04/06/93, 58 FR 17780
201.405
Excess Emission Reporting
02/03/89
04/06/93, 58 FR 17780
201.406
Data Reduction
02/03/89
04/06/93, 58 FR 17780
201.407
Retention of Information
02/03/89
04/06/93, 58 FR 17780
201.408
Compliance Schedules
02/03/89
04/06/93, 58 FR 17780
Part 203: Major Stationary Sources Construction and Modification
Subpart A: General Provisions
203.101
Definitions
04/30/93
09/27/95, 60 FR 49778
203.103
Actual Construction
03/22/88
12/17/92, 57 FR 59928
203.104
Actual Emissions
03/22/88
12/17/92, 57 FR 59928
203.107
Allowable Emissions
04/30/93
09/27/95, 60 FR 49778
203.110
Available Growth Margin
04/30/93
09/27/95, 60 FR 49778
203.112
Building, Structure and Facility
04/30/93
09/27/95, 60 FR 49778
203.113
Commence
03/22/88
12/17/92, 57 FR 59928
203.116
Construction
03/22/88
12/17/92, 57 FR 59928
203.117
Dispersion Enhancement Techniques
03/22/88
12/17/92, 57 FR 59928
203.119
Emission Baseline
07/22/83
12/17/92, 57 FR 59928
203.121
Emission Offset
04/30/93
09/27/95, 60 FR 49778
203.122
Emissions Unit
04/30/93
09/27/95, 60 FR 49778
203.123
Federally Enforceable
04/30/93
09/27/95, 60 FR 49778
203.124
Fugitive Emissions
03/22/88
12/17/92, 57 FR 59928
203.125
Installation
03/22/88
12/17/92, 57 FR 59928
203.126
Lowest Achievable Emission Rate
04/30/93
09/27/95, 60 FR 49778
203.127
Nonattainment Area
03/22/88
12/17/92, 57 FR 59928
203.128
Potential To Emit
04/30/93
09/27/95, 60 FR 49778
203.131
Reasonable Further Progress
03/22/88
12/17/92, 57 FR 59928
203.134
Secondary Emissions
03/22/88
12/17/92, 57 FR 59928
203.136
Stationary Source
03/22/88
12/17/92, 57 FR 59928
203.150
Public Participation
04/30/93
09/27/95, 60 FR 49778
Subpart B: Major Stationary Sources in Nonattainment Areas
203.201
Prohibition
04/30/93
09/27/95, 60 FR 49778
203.202
Coordination With Permit Requirement and Application Pursuant to 35 Ill. Adm. Code 201
03/22/88
12/17/92, 57 FR 59928
203.203
Construction Permit Requirement and Application
04/30/93
09/27/95, 60 FR 49778
203.205
Effect of Permits
03/22/88
12/17/92, 57 FR 59928
203.206
Major Stationary Source
03/10/98
05/13/03, 68 FR 25504
203.207
Major Modification of a Source
03/10/98
05/13/03, 68 FR 25504
203.208
Net Emission Determination
04/30/93
09/27/95, 60 FR 49778
203.209
Significant Emissions Determination
04/30/93
09/27/95, 60 FR 49778
203.210
Relaxation of a Source-Specific Limitation
03/22/88
12/17/92, 57 FR 59928
203.211
Permit Exemption Based on Fugitive Emissions
03/22/88
12/17/92, 57 FR 59928
Subpart C: Requirements for Major Stationary Sources in Nonattainment Areas
203.301
Lowest Achievable Emission Rate
03/10/98
05/13/03, 68 FR 25504
203.302
Maintenance of Reasonable Further Progress and Emission Offsets
04/30/93
09/27/95, 60 FR 49778
203.303
Baseline and Emission Offsets Determination
04/30/93
09/27/95, 60 FR 49778
203.305
Compliance by Existing Sources
03/22/88
12/17/92, 57 FR 59928
203.306
Analysis of Alternatives
04/30/93
09/27/95, 60 FR 49778
Subpart F: Operation of a Major Stationary Source or Major Modification
203.601
Lowest Achievable Emission Rate Compliance Requirement
03/22/88
12/17/92, 57 FR 59928
203.602
Emission Offset Maintenance Requirement
03/22/88
12/17/92, 57 FR 59928
Subpart G: General Maintenance of Emission Offsets
203.701
General Maintenance of Emission Offsets
03/22/88
12/17/92, 57 FR 59928
Subpart H: Offsets for Emission Increases From Rocket Engines and Motor Firing
203.801
Offsetting by Alternative or Innovative Means
05/14/93
09/27/95, 60 FR 49778
Subchapter b: Alternative Reduction Program
Part 205: Emissions Reduction Market System
Subpart A: General Provisions
205.100
Severability
11/25/97
10/15/01, 66 FR 52343
205.110
Purpose
11/25/97
10/15/01, 66 FR 52343
205.120
Abbreviations and Acronyms
06/13/05
07/07/08, 73 FR 38328
205.130
Definitions
06/13/05
07/07/08, 73 FR 38328
205.150
Emissions Management Periods
06/13/05
07/07/08, 73 FR 38328
Except 150(e).
Subpart B: Applicability
205.200
Participating Source
06/13/05
07/07/08, 73 FR 38328
205.205
Exempt Source
06/13/05
07/07/08, 73 FR 38328
205.210
New Participating Source
06/13/05
07/07/08, 73 FR 38328
205.220
Insignificant Emission Units
06/13/05
07/07/08, 73 FR 38328
205.225
Startup, Malfunction or Breakdown
11/25/97
10/15/01, 66 FR 52343
Subpart C: Operational Implementation
205.300
Seasonal Emissions Component of the Annual Emissions Report
06/13/05
07/07/08, 73 FR 38328
205.310
ERMS Applications
06/13/05
07/07/08, 73 FR 38328
205.315
CAAPP Permits for ERMS Sources
06/13/05
07/07/08, 73 FR 38328
205.316
Federally Enforceable State Operating Permits for ERMS Sources
06/13/05
07/07/08, 73 FR 38328
205.318
Certification for Exempt CAAPP Sources
06/13/05
07/07/08, 73 FR 38328
205.320
Baseline Emissions
06/13/05
07/07/08, 73 FR 38328
205.330
Emissions Determination Methods
06/13/05
07/07/08, 73 FR 38328
205.335
Sampling, Testing, Monitoring and Recordkeeping Practices
06/13/05
07/07/08, 73 FR 38328
205.337
Changes in Emissions Determination Methods and Sampling, Testing, Monitoring and Recordkeeping Practices
06/13/05
07/07/08, 73 FR 38328
Subpart D: Seasonal Emissions Management
205.400
Seasonal Emissions Allotment
06/13/05
07/07/08, 73 FR 38328
205.405
Exclusions From Further Reductions
06/13/05
07/07/08, 73 FR 38328
205.410
Participating Source Shutdowns
06/13/05
07/07/08, 73 FR 38328
Subpart E: Alternative ATU Generation
205.500
Emissions Reduction Generator
06/13/05
07/07/08, 73 FR 38328
205.510
Inter-Sector Transaction
06/13/05
07/07/08, 73 FR 38328
Subpart F: Market Transactions
205.600
ERMS Database
11/25/97
10/15/01, 66 FR 52343
205.610
Application for Transaction Account
06/13/05
07/07/08, 73 FR 38328
205.620
Account Officer
11/25/97
10/15/01, 66 FR 52343
205.630
ATU Transaction Procedures
11/25/97
10/15/01, 66 FR 52343
Subpart G: Performance Accountability
205.700
Compliance Accounting
06/13/05
07/07/08, 73 FR 38328
205.710
Alternative Compliance Market Account (ACMA)
11/25/97
10/15/01, 66 FR 52343
205.720
Emissions Excursion Compensation
11/25/97
10/15/01, 66 FR 52343
205.730
Excursion Reporting
06/13/05
07/07/08, 73 FR 38328
205.740
Enforcement Authority
11/25/97
10/15/01, 66 FR 52343
205.750
Emergency Conditions
06/13/05
07/07/08, 73 FR 38328
205.760
Market System Review Procedures
06/13/05
07/07/08, 73 FR 38328
Subchapter c: Emission Standards and Limitations for Stationary Sources
Part 211: Definitions and General Provisions
Subpart A: General Provisions
211.101
Incorporations by Reference
01/28/13
10/06/14, 79 FR 60070
211.102
Abbreviations and Conversion Factors
09/14/10
03/23/12, 77 FR 16940
Subpart B: Definitions
211.121
Other Definitions
09/27/93
09/09/94, 59 FR 46562
211.130
Accelacota
09/27/93
09/09/94, 59 FR 46562
211.150
Accumulator
09/27/93
09/09/94, 59 FR 46562
211.170
Acid Gases
09/27/93
09/09/94, 59 FR 46562
211.200
Acrylonitrile Butadiene Styrene (ABS) Welding
09/14/10
03/23/12, 77 FR 16940
211.210
Actual Heat Input
09/27/93
09/09/94, 59 FR 46562
211.230
Adhesive
09/27/93
09/09/94, 59 FR 46562
211.233
Adhesion Primer
09/14/10
03/23/12, 77 FR 16940
211.235
Adhesive Primer
09/14/10
03/23/12, 77 FR 16940
211.240
Adhesion Promoter
05/09/95
07/25/96, 61 FR 38577
211.250
Aeration
09/27/93
09/09/94, 59 FR 46562
211.260
Aerosol Adhesive and Adhesive Primer
09/14/10
03/23/12, 77 FR 16940
211.270
Aerosol Can Filling Line
01/18/94
10/21/96, 61 FR 54556
211.290
Afterburner
09/27/93
09/09/94, 59 FR 46562
211.310
Air Contaminant
09/27/93
09/09/94, 59 FR 46562
211.330
Air Dried Coatings
09/27/93
09/09/94, 59 FR 46562
211.350
Air Oxidation Process
09/27/93
09/09/94, 59 FR 46562
211.370
Air Pollutant
09/27/93
09/09/94, 59 FR 46562
211.390
Air Pollution
09/27/93
09/09/94, 59 FR 46562
211.410
Air Pollution Control Equipment
09/27/93
09/09/94, 59 FR 46562
211.430
Air Suspension Coater/Dryer
09/27/93
09/09/94, 59 FR 46562
211.450
Airless Spray
09/27/93
09/09/94, 59 FR 46562
211.470
Air Assisted Airless Spray
09/27/93
09/09/94, 59 FR 46562
211.474
Alcohol
05/09/95
11/08/95, 60 FR 56238
211.481
Ammunition Sealant
09/14/10
03/23/12, 77 FR 16940
211.490
Annual Grain Through Put
09/27/93
09/09/94, 59 FR 46562
211.492
Antifoulant Coating
09/14/10
03/23/12, 77 FR 16940
211.493
Antifouling Sealer/Tie Coat
07/27/11
03/23/12, 77 FR 16940
211.495
Anti-Glare/Safety Coating
05/09/95
07/25/96, 61 FR 38577
211.510
Application Area
09/27/93
09/09/94, 59 FR 46562
211.530
Architectural Coating
09/27/93
09/09/94, 59 FR 46562
211.540
Architectural Structure
09/14/10
03/23/12, 77 FR 16940
211.550
As Applied
09/27/93
09/09/94, 59 FR 46562
211.560
As-Applied Fountain Solution
05/09/95
11/08/95, 60 FR 56238
211.570
Asphalt
09/27/93
09/09/94, 59 FR 46562
211.590
Asphalt Prime Coat
09/27/93
09/09/94, 59 FR 46562
211.610
Automobile
09/27/93
09/09/94, 59 FR 46562
211.630
Automobile or Light Duty Truck Assembly Source or Automobile or Light Duty Truck Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562
211.650
Automobile or Light Duty Truck Refinishing
09/27/93
09/09/94, 59 FR 46562
211.660
Automotive/Transportation Plastic Parts
05/09/95
10/26/95, 60 FR 54807
211.670
Baked Coatings
05/09/95
10/26/95, 60 FR 54807
211.685
Basecoat/Clearcoat System
05/09/95
07/25/96, 61 FR 38577
211.690
Batch Loading
09/27/93
09/09/94, 59 FR 46562
211.695
Batch Operation
05/22/95
04/02/96, 61 FR 14484
211.696
Batch Process Train
05/22/95
04/02/96, 61 FR 14484
211.710
Bead Dipping
09/27/93
09/09/94, 59 FR 46562
211.715
Bedliner
09/14/10
03/23/12, 77 FR 16940
211.730
Binders
09/27/93
09/09/94, 59 FR 46562
211.735
Black Coating
09/14/10
03/23/12, 77 FR 16940
211.740
Brakehorsepower (rated-bhp)
09/25/07
06/26/09, 74 FR 30466
211.750
British Thermal Unit
09/27/93
09/09/94, 59 FR 46562
211.770
Brush or Wipe Coating
09/27/93
09/09/94, 59 FR 46562
211.790
Bulk Gasoline Plant
09/27/93
09/09/94, 59 FR 46562
211.810
Bulk Gasoline Terminal
09/27/93
09/09/94, 59 FR 46562
211.820
Business Machine Plastic Parts
09/14/10
03/23/12, 77 FR 16940
211.825
Camouflage Coating
09/14/10
03/23/12, 77 FR 16940
211.830
Can
09/27/93
09/09/94, 59 FR 46562
211.850
Can Coating
09/27/93
09/09/94, 59 FR 46562
211.870
Can Coating Line
09/27/93
09/09/94, 59 FR 46562
211.880
Cap Sealant
09/14/10
03/23/12, 77 FR 16940
211.890
Capture
09/27/93
09/09/94, 59 FR 46562
211.910
Capture Device
09/27/93
09/09/94, 59 FR 46562
211.930
Capture Efficiency
09/27/93
09/09/94, 59 FR 46562
211.950
Capture System
09/27/93
09/09/94, 59 FR 46562
211.954
Cavity Wax
09/14/10
03/23/12, 77 FR 16940
211.955
Cement
03/15/01
11/08/01, 66 FR 56449
211.960
Cement Kiln
03/15/01
11/08/01, 66 FR 56449
211.965
Ceramic Tile Installation Adhesive
09/14/10
03/23/12, 77 FR 16940
211.970
Certified Investigation
09/27/93
09/09/94, 59 FR 46562
211.980
Chemical Manufacturing Process Unit
05/09/95
03/23/98, 63 FR 13784
211.990
Choke Loading
09/27/93
09/09/94, 59 FR 46562
211.1000
Class II Finish
06/25/10
03/23/12, 77 FR 16940
211.1010
Clean Air Act
09/27/93
09/09/94, 59 FR 46562
211.1050
Cleaning and Separating Operation
09/27/93
09/09/94, 59 FR 46562
211.1070
Cleaning Materials
01/18/94
10/21/96, 61 FR 54556
211.1090
Clear Coating
09/27/93
09/09/94, 59 FR 46562
211.1110
Clear Topcoat
09/27/93
09/09/94, 59 FR 46562
211.1120
Clinker
03/15/01
11/08/01, 66 FR 56449
211.1128
Closed Molding
09/14/10
03/23/12, 77 FR 16940
211.1130
Closed Purge System
09/27/93
09/09/94, 59 FR 46562
211.1150
Closed Vent System
09/27/93
09/09/94, 59 FR 46562
211.1170
Coal Refuse
09/27/93
09/09/94, 59 FR 46562
211.1190
Coating
09/27/93
09/09/94, 59 FR 46562
211.1210
Coating Applicator
09/27/93
09/09/94, 59 FR 46562
211.1230
Coating Line
09/27/93
09/09/94, 59 FR 46562
211.1250
Coating Plant
09/27/93
09/09/94, 59 FR 46562
211.1270
Coil Coating
09/27/93
09/09/94, 59 FR 46562
211.1290
Coil Coating Line
09/27/93
09/09/94, 59 FR 46562
211.1310
Cold Cleaning
09/27/93
09/09/94, 59 FR 46562
211.1330
Complete Combustion
09/27/93
09/09/94, 59 FR 46562
211.1350
Component
09/27/93
09/09/94, 59 FR 46562
211.1370
Concrete Curing Compounds
09/27/93
09/09/94, 59 FR 46562
211.1390
Concentrated Nitric Acid Manufacturing Process
09/27/93
09/09/94, 59 FR 46562
211.1410
Condensate
09/27/93
09/09/94, 59 FR 46562
211.1430
Condensible PM 10
09/27/93
09/09/94, 59 FR 46562
211.1455
Contact Adhesive
09/14/10
03/23/12, 77 FR 16940
211.1467
Continuous Coater
02/02/98
05/19/98, 63 FR 27489
211.1470
Continuous Process
09/27/93
09/09/94, 59 FR 46562
211.1490
Control Device
09/27/93
09/09/94, 59 FR 46562
211.1510
Control Device Efficiency
09/27/93
09/09/94, 59 FR 46562
211.1520
Conventional Air Spray
02/02/98
05/19/98, 63 FR 27489
211.1530
Conventional Soybean Crushing Source
09/27/93
09/09/94, 59 FR 46562
211.1550
Conveyorized Degreasing
09/27/93
09/09/94, 59 FR 46562
211.1560
Cove Base
09/14/10
03/23/12, 77 FR 16940
211.1565
Cove Base Installation Adhesive
09/14/10
03/23/12, 77 FR 16940
211.1570
Crude Oil
09/27/93
09/09/94, 59 FR 46562
211.1590
Crude Oil Gathering
09/27/93
09/09/94, 59 FR 46562
211.1610
Crushing
09/27/93
09/09/94, 59 FR 46562
211.1630
Custody Transfer
09/27/93
09/09/94, 59 FR 46562
211.1650
Cutback Asphalt
09/27/93
09/09/94, 59 FR 46562
211.1655
Cyanoacrylate Adhesive
09/14/10
03/23/12, 77 FR 16940
211.1670
Daily Weighted Average VOM Content
09/27/93
09/09/94, 59 FR 46562
211.1690
Day
09/27/93
09/09/94, 59 FR 46562
211.1700
Deadener
09/14/10
03/23/12, 77 FR 16940
211.1710
Degreaser
09/27/93
09/09/94, 59 FR 46562
211.1730
Delivery Vessel
09/27/93
09/09/94, 59 FR 46562
211.1740
Diesel Engine
09/25/07
06/26/09, 74 FR 30466
211.1745
Digital Printing
06/25/10
03/23/12, 77 FR 16940
211.1750
Dip Coating
09/27/93
09/09/94, 59 FR 46562
211.1770
Distillate Fuel Oil
09/27/93
09/09/94, 59 FR 46562
211.1780
Distillation Unit
05/09/95
03/23/98, 63 FR 13784
211.1790
Drum
09/27/93
09/09/94, 59 FR 46562
211.1810
Dry Cleaning Operation or Dry Cleaning Facility
09/27/93
09/09/94, 59 FR 46562
211.1830
Dump Pit Area
09/27/93
09/09/94, 59 FR 46562
211.1850
Effective Grate Area
09/27/93
09/09/94, 59 FR 46562
211.1870
Effluent Water Separator
09/27/93
09/09/94, 59 FR 46562
211.1872
Ejection Cartridge Sealant
09/14/10
03/23/12, 77 FR 16940
211.1875
Elastomeric Materials
05/09/95
07/25/96, 61 FR 38577
211.1876
Electric Dissipating Coating
09/14/10
03/23/12, 77 FR 16940
211.1877
Electric-Insulating Varnish
09/14/10
03/23/12, 77 FR 16940
211.1878
Electrical Apparatus Component
06/25/10
03/23/12, 77 FR 16940
211.1880
Electrical Switchgear Compartment Coating
09/14/10
03/23/12, 77 FR 16940
211.1882
Electrodeposition Primer (EDP)
09/14/10
03/23/12, 77 FR 16940
211.1883
Electromagnetic Interference/Radio Frequency Interference (EMI/RFI) Shielding Coatings
09/14/10
03/23/12, 77 FR 16940
211.1885
Electronic Component
06/25/10
03/23/12, 77 FR 16940
211.1890
Electrostatic Bell or Disc Spray
09/27/93
09/09/94, 59 FR 46562
211.1900
Electrostatic Prep Coat
05/09/95
10/26/95, 60 FR 54807
211.1910
Electrostatic Spray
09/27/93
09/09/94, 59 FR 46562
211.1920
Emergency or Standby Unit
09/25/07
06/26/09, 74 FR 30466
211.1930
Emission Rate
09/27/93
09/09/94, 59 FR 46562
211.1950
Emission Unit
09/27/93
09/09/94, 59 FR 46562
211.1970
Enamel
09/27/93
09/09/94, 59 FR 46562
211.1990
Enclose
09/27/93
09/09/94, 59 FR 46562
211.2010
End Sealing Compound Coat
09/27/93
09/09/94, 59 FR 46562
211.2030
Enhanced Under-the-Cup Fill
01/18/94
10/21/96, 61 FR 54556
211.2040
Etching Filler
09/14/10
03/23/12, 77 FR 16940
211.2050
Ethanol Blend Gasoline
09/27/93
09/09/94, 59 FR 46562
211.2055
Ethylene Propylenediene Monomer (DPDM) Roof Membrane
09/14/10
03/23/12, 77 FR 16940
211.2070
Excess Air
09/27/93
09/09/94, 59 FR 46562
211.2090
Excessive Release
09/27/93
09/09/94, 59 FR 46562
211.2130
Existing Grain Handling Operation
09/27/93
09/09/94, 59 FR 46562
211.2150
Exterior Base Coat
09/27/93
09/09/94, 59 FR 46562
211.2170
Exterior End Coat
09/27/93
09/09/94, 59 FR 46562
211.2190
External Floating Roof
09/27/93
09/09/94, 59 FR 46562
211.2200
Extreme High-Gloss Coating
07/27/11
03/23/12, 77 FR 16940
211.2210
Extreme Performance Coating
09/14/10
03/23/12, 77 FR 16940
211.2230
Fabric Coating
09/27/93
09/09/94, 59 FR 46562
211.2250
Fabric Coating Line
09/27/93
09/09/94, 59 FR 46562
211.2270
Federally Enforceable Limitations and Conditions
09/27/93
09/09/94, 59 FR 46562
211.2285
Feed Mill
06/17/97
02/17/00, 65 FR 8064
211.2300
Fill
11/15/94
08/08/96, 61 FR 41338
211.2310
Final Repair Coat
09/14/10
03/23/12, 77 FR 16940
211.2320
Finish Primer Surfacer
09/14/10
03/23/12, 77 FR 16940
211.2330
Firebox
09/27/93
09/09/94, 59 FR 46562
211.2350
Fixed Roof Tank
09/27/93
09/09/94, 59 FR 46562
211.2358
Flat Wood Paneling
07/27/11
03/23/12, 77 FR 16940
211.2359
Flat Wood Paneling Coating Line
06/25/10
03/23/12, 77 FR 16940
211.2360
Flexible Coating
09/14/10
03/23/12, 77 FR 16940
211.2365
Flexible Operation Unit
05/09/95
03/23/98, 63 FR 13784
211.2368
Flexible Packaging
06/25/10
03/23/12, 77 FR 16940
211.2369
Flexible Vinyl
09/14/10
03/23/12, 77 FR 16940
211.2370
Flexographic Printing
09/27/93
09/09/94, 59 FR 46562
211.2390
Flexographic Printing Line
09/27/93
09/09/94, 59 FR 46562
211.2410
Floating Roof
09/27/93
09/09/94, 59 FR 46562
211.2415
Fog Coat
09/14/10
03/23/12, 77 FR 16940
211.2430
Fountain Solution
09/27/93
09/09/94, 59 FR 46562
211.2450
Freeboard Height
09/27/93
09/09/94, 59 FR 46562
211.2470
Fuel Combustion Emission Unit or Fuel Combustion Emission Source
09/27/93
09/09/94, 59 FR 46562
211.2490
Fugitive Particulate Matter
09/27/93
09/09/94, 59 FR 46562
211.2510
Full Operating Flowrate
09/27/93
09/09/94, 59 FR 46562
211.2525
Gasket/Gasket Sealing Material
09/14/10
03/23/12, 77 FR 16940
211.2530
Gas Service
09/27/93
09/09/94, 59 FR 46562
211.2550
Gas/Gas Method
09/27/93
09/09/94, 59 FR 46562
211.2570
Gasoline
09/27/93
09/09/94, 59 FR 46562
211.2590
Gasoline Dispensing Operation or Gasoline Dispensing Facility
09/27/93
09/09/94, 59 FR 46562
211.2610
Gel Coat
01/18/94
10/21/96, 61 FR 54556
211.2615
General Work Surface
06/25/10
03/23/12, 77 FR 16940
211.2622
Glass Bonding Primer
09/14/10
03/23/12, 77 FR 16940
211.2630
Gloss Reducers
05/09/95
10/26/95, 60 FR 54807
211.2650
Grain
09/27/93
09/09/94, 59 FR 46562
211.2670
Grain Drying Operation
09/27/93
09/09/94, 59 FR 46562
211.2690
Grain Handling and Conditioning Operation
09/27/93
09/09/94, 59 FR 46562
211.2710
Grain Handling Operation
09/27/93
09/09/94, 59 FR 46562
211.2730
Green Tire Spraying
09/27/93
09/09/94, 59 FR 46562
211.2750
Green Tires
09/27/93
09/09/94, 59 FR 46562
211.2770
Gross Heating Value
09/27/93
09/09/94, 59 FR 46562
211.2790
Gross Vehicle Weight Rating
09/27/93
09/09/94, 59 FR 46562
211.2800
Hardwood Plywood
07/27/11
03/23/12, 77 FR 16940
211.2810
Heated Airless Spray
09/27/93
09/09/94, 59 FR 46562
211.2825
Heat-Resistant Coating
09/14/10
03/23/12, 77 FR 16940
211.2830
Heatset
06/25/10
03/23/12, 77 FR 16940
211.2840
Heatset Web Letterpress Printing Line
06/25/10
03/23/12, 77 FR 16940
211.2850
Heatset Web Offset Lithographic Printing Line
05/09/95
11/08/95, 60 FR 56238
211.2870
Heavy Liquid
01/28/13
10/06/14, 79 FR 60070
211.2890
Heavy Metals
09/27/93
09/09/94, 59 FR 46562
211.2910
Heavy Off Highway Vehicle Products
09/27/93
09/09/94, 59 FR 46562
211.2930
Heavy Off Highway Vehicle Products Coating
09/27/93
09/09/94, 59 FR 46562
211.2950
Heavy Off Highway Vehicle Products Coating Line
09/27/93
09/09/94, 59 FR 46562
211.2955
High Bake Coating
09/14/10
03/23/12, 77 FR 16940
211.2956
High Build Primer Surfacer
09/14/10
03/23/12, 77 FR 16940
211.2958
High Gloss Coating
09/14/10
03/23/12, 77 FR 16940
211.2960
High-Performance Architectural Coating
09/14/10
03/23/12, 77 FR 16940
211.2965
High Precision Optic
06/25/10
03/23/12, 77 FR 16940
211.2970
High Temperature Aluminum Coating
09/27/93
09/09/94, 59 FR 46562
211.2980
High Temperature Coating
09/14/10
03/23/12, 77 FR 16940
211.2990
High Volume Low Pressure (HVLP) Spray
09/27/93
09/09/94, 59 FR 46562
211.3010
Hood
09/27/93
09/09/94, 59 FR 46562
211.3030
Hot Well
09/27/93
09/09/94, 59 FR 46562
211.3050
Housekeeping Practices
09/27/93
09/09/94, 59 FR 46562
211.3070
Incinerator
09/27/93
09/09/94, 59 FR 46562
211.3090
Indirect Heat Transfer
09/27/93
09/09/94, 59 FR 46562
211.3095
Indoor Floor Covering Installation Adhesive
09/14/10
03/23/12, 77 FR 16940
211.3110
Ink
09/27/93
09/09/94, 59 FR 46562
211.3120
In-Line Repair
09/14/10
03/23/12, 77 FR 16940
211.3130
In-Process Tank
09/27/93
09/09/94, 59 FR 46562
211.3150
In-Situ Sampling Systems
09/27/93
09/09/94, 59 FR 46562
211.3170
Interior Body Spray Coat
09/27/93
09/09/94, 59 FR 46562
211.3190
Internal Floating Roof
09/27/93
09/09/94, 59 FR 46562
211.3210
Internal Transferring Area
09/27/93
09/09/94, 59 FR 46562
211.3215
Janitorial Cleaning
06/25/10
03/23/12, 77 FR 16940
211.3230
Lacquers
09/27/93
09/09/94, 59 FR 46562
211.3240
Laminate
09/14/10
03/23/12, 77 FR 16940
211.3250
Large Appliance
09/27/93
09/09/94, 59 FR 46562
211.3270
Large Appliance Coating
09/27/93
09/09/94, 59 FR 46562
211.3290
Large Appliance Coating Line
09/27/93
09/09/94, 59 FR 46562
211.3300
Lean-Burn Engine
09/25/07
06/26/09, 74 FR 30466
211.3305
Letterpress Printing Line
06/25/10
03/23/12, 77 FR 16940
211.3310
Light Liquid
09/27/93
09/09/94, 59 FR 46562
211.3330
Light Duty Truck
09/27/93
09/09/94, 59 FR 46562
211.3350
Light Oil
09/27/93
09/09/94, 59 FR 46562
211.3370
Liquid/Gas Method
09/27/93
09/09/94, 59 FR 46562
211.3390
Liquid Mounted Seal
09/27/93
09/09/94, 59 FR 46562
211.3410
Liquid Service
09/27/93
09/09/94, 59 FR 46562
211.3430
Liquids Dripping
09/27/93
09/09/94, 59 FR 46562
211.3450
Lithographic Printing Line
09/27/93
09/09/94, 59 FR 46562
211.3470
Load Out Area
09/27/93
09/09/94, 59 FR 46562
211.3480
Loading Event
10/25/94
04/03/95, 60 FR 16801
211.3483
Long Dry Kiln
03/15/01
11/08/01, 66 FR 56449
211.3485
Long Wet Kiln
03/15/01
11/08/01, 66 FR 56449
211.3487
Low-NO
X
Burner
03/15/01
11/08/01, 66 FR 56449
211.3490
Low Solvent Coating
09/27/93
09/09/94, 59 FR 46562
211.3505
Lubricating Wax/Compound
09/14/10
03/23/12, 77 FR 16940
211.3510
Magnet Wire
09/27/93
09/09/94, 59 FR 46562
211.3530
Magnet Wire Coating
09/27/93
09/09/94, 59 FR 46562
211.3550
Magnet Wire Coating Line
09/27/93
09/09/94, 59 FR 46562
211.3555
Maintenance Cleaning
06/25/10
03/23/12, 77 FR 16940
211.3570
Major Dump Pit
09/27/93
09/09/94, 59 FR 46562
211.3590
Major Metropolitan Area (MMA)
09/27/93
09/09/94, 59 FR 46562
211.3610
Major Population Area (MPA)
09/27/93
09/09/94, 59 FR 46562
211.3630
Manufacturing Process
09/27/93
09/09/94, 59 FR 46562
211.3650
Marine Terminal
10/25/94
04/03/95, 60 FR 16801
211.3660
Marine Vessel
10/25/94
04/03/95, 60 FR 16801
211.3665
Mask Coating
09/14/10
03/23/12, 77 FR 16940
211.3670
Material Recovery Section
09/27/93
09/09/94, 59 FR 46562
211.3690
Maximum Theoretical Emissions
09/27/93
09/09/94, 59 FR 46562
211.3695
Maximum True Vapor Pressure
11/15/94
08/08/96, 61 FR 41338
211.3705
Medical Device
06/25/10
03/23/12, 77 FR 16940
211.3707
Medical Device and Pharmaceutical Manufacturing
06/25/10
03/23/12, 77 FR 16940
211.3710
Metal Furniture
09/27/93
09/09/94, 59 FR 46562
211.3730
Metal Furniture Coating
09/27/93
09/09/94, 59 FR 46562
211.3750
Metal Furniture Coating Line
09/27/93
09/09/94, 59 FR 46562
211.3760
Metallic Coating
09/14/10
03/23/12, 77 FR 16940
211.3770
Metallic Shoe Type Seal
09/27/93
09/09/94, 59 FR 46562
211.3775
Metal to Urethane/Rubber Molding or Casting Adhesive
09/14/10
03/23/12, 77 FR 16940
211.3780
Mid-Kiln Firing
03/15/01
11/08/01, 66 FR 56449
211.3785
Military Specification Coating
09/14/10
03/23/12, 77 FR 16940
211.3790
Miscellaneous Fabricated Product Manufacturing Process
09/27/93
09/09/94, 59 FR 46562
211.3810
Miscellaneous Formulation Manufacturing Process
09/27/93
09/09/94, 59 FR 46562
211.3820
Miscellaneous Industrial Adhesive Application Operation
09/14/10
03/23/12, 77 FR 16940
211.3830
Miscellaneous Metal Parts and Products
09/27/93
09/09/94, 59 FR 46562
211.3850
Miscellaneous Metal Parts and Products Coating
09/27/93
09/09/94, 59 FR 46562
211.3870
Miscellaneous Metal Parts or Products Coating Line
09/27/93
09/09/94, 59 FR 46562
211.3890
Miscellaneous Organic Chemical Manufacturing Process
09/27/93
09/09/94, 59 FR 46562
211.3910
Mixing Operation
09/27/93
09/09/94, 59 FR 46562
211.3915
Mobile Equipment
05/09/95
07/25/96, 61 FR 38577
211.3925
Mold Seal Coating
09/14/10
03/23/12, 77 FR 16940
211.3930
Monitor
09/27/93
09/09/94, 59 FR 46562
211.3950
Monomer
01/18/94
10/21/96, 61 FR 54556
211.3960
Motor Vehicles
05/09/95
07/25/96, 61 FR 38577
211.3961
Motor Vehicle Adhesive
09/14/10
03/23/12, 77 FR 16940
211.3965
Motor Vehicle Refinishing
05/09/95
07/25/96, 61 FR 38577
211.3966
Motor Vehicle Weatherstrip Adhesive
09/14/10
03/23/12, 77 FR 16940
211.3967
Mouth Waterproofing Sealant
09/14/10
03/23/12, 77 FR 16940
211.3968
Multi-Colored Coating
09/14/10
03/23/12, 77 FR 16940
211.3969
Multi-Component Coating
09/14/10
03/23/12, 77 FR 16940
211.3970
Multiple Package Coating
09/27/93
09/09/94, 59 FR 46562
211.3975
Multipurpose Construction Adhesive
09/14/10
03/23/12, 77 FR 16940
211.3985
Natural Finish Hardwood Plywood Panel
07/27/11
03/23/12, 77 FR 16940
211.3990
New Grain Drying Operation
09/27/93
09/09/94, 59 FR 46562
211.4010
New Grain Handling Operation
09/27/93
09/09/94, 59 FR 46562
211.4030
No Detectable Volatile Organic Material Emissions
09/27/93
09/09/94, 59 FR 46562
211.4050
Non-Contact Process Water Cooling Tower
01/18/94
10/21/96, 61 FR 54556
211.4052
Non-Convertible Coating
09/14/10
03/23/12, 77 FR 16940
211.4055
Non-Flexible Coating
05/09/95
10/26/95, 60 FR 54807
211.4065
Non-Heatset
06/25/10
03/23/12, 77 FR 16940
211.4067
NO
X
Trading Program
04/17/01
11/08/01, 66 FR 56449
211.4070
Offset
09/27/93
09/09/94, 59 FR 46562
211.4080
One-Component Coating
09/14/10
03/23/12, 77 FR 16940
211.4090
One Hundred Percent Acid
09/27/93
09/09/94, 59 FR 46562
211.4110
One Turn Storage Space
09/27/93
09/09/94, 59 FR 46562
211.4130
Opacity
09/27/93
09/09/94, 59 FR 46562
211.4150
Opaque Stains
09/27/93
09/09/94, 59 FR 46562
211.4170
Open Top Vapor Degreasing
09/27/93
09/09/94, 59 FR 46562
211.4190
Open Ended Valve
09/27/93
09/09/94, 59 FR 46562
211.4210
Operator of a Gasoline Dispensing Operation or Operator of a Gasoline Dispensing Facility
09/27/93
09/09/94, 59 FR 46562
211.4220
Optical Coating
09/14/10
03/23/12, 77 FR 16940
211.4230
Organic Compound
09/27/93
09/09/94, 59 FR 46562
211.4250
Organic Material and Organic Materials
10/19/95
03/21/96, 61 FR 11550
211.4260
Organic Solvent
10/19/95
03/21/96, 61 FR 11550
211.4270
Organic Vapor
09/27/93
09/09/94, 59 FR 46562
211.4285
Outdoor Floor Covering Installation Adhesive
09/14/10
03/23/12, 77 FR 16940
211.4290
Oven
09/27/93
09/09/94, 59 FR 46562
211.4310
Overall Control
09/27/93
09/09/94, 59 FR 46562
211.4330
Overvarnish
09/27/93
09/09/94, 59 FR 46562
211.4350
Owner of a Gasoline Dispensing Operation or Owner of a Gasoline Dispensing Facility
09/27/93
09/09/94, 59 FR 46562
211.4370
Owner or Operator
09/27/93
09/09/94, 59 FR 46562
211.4390
Packaging Rotogravure Printing
09/27/93
09/09/94, 59 FR 46562
211.4410
Packaging Rotogravure Printing Line
09/27/93
09/09/94, 59 FR 46562
211.4430
Pail
09/27/93
09/09/94, 59 FR 46562
211.4450
Paint Manufacturing Source or Paint Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562
211.4455
Pan-Backing Coating
09/14/10
03/23/12, 77 FR 16940
211.4460
Panel
07/27/11
03/23/12, 77 FR 16940
211.4470
Paper Coating
09/27/93
09/09/94, 59 FR 46562
211.4490
Paper Coating Line
09/27/93
09/09/94, 59 FR 46562
211.4510
Particulate Matter
09/27/93
09/09/94, 59 FR 46562
211.4530
Parts per Million (Volume) or Ppm (VOL)
09/27/93
09/09/94, 59 FR 46562
211.4540
Perimeter Bonded Sheet Flooring
09/14/10
03/23/12, 77 FR 16940
211.4550
Person
09/27/93
09/09/94, 59 FR 46562
211.4590
Petroleum
09/27/93
09/09/94, 59 FR 46562
211.4610
Petroleum Liquid
10/19/95
03/21/96, 61 FR 11550
211.4630
Petroleum Refinery
09/27/93
09/09/94, 59 FR 46562
211.4650
Pharmaceutical
09/27/93
09/09/94, 59 FR 46562
211.4670
Pharmaceutical Coating Operation
09/27/93
09/09/94, 59 FR 46562
211.4690
Photochemically Reactive Material
09/27/93
09/09/94, 59 FR 46562
211.4710
Pigmented Coatings
09/27/93
09/09/94, 59 FR 46562
211.4730
Plant
09/27/93
09/09/94, 59 FR 46562
211.4735
Plastic
09/14/10
03/23/12, 77 FR 16940
211.4740
Plastic Part
05/09/95
10/26/95, 60 FR 54807
211.4750
Plasticizers
09/27/93
09/09/94, 59 FR 46562
211.4760
Plastic Solvent Welding Adhesive
09/14/10
03/23/12, 77 FR 16940
211.4765
Plastic Solvent Welding Adhesive Primer
09/14/10
03/23/12, 77 FR 16940
211.4768
Pleasure Craft
09/14/10
03/23/12, 77 FR 16940
211.4769
Pleasure Craft Surface Coating
09/14/10
03/23/12, 77 FR 16940
211.4770
PM 10
09/27/93
09/09/94, 59 FR 46562
211.4790
Pneumatic Rubber Tire Manufacture
09/27/93
09/09/94, 59 FR 46562
211.4810
Polybasic Organic Acid Partial Oxidation Manufacturing Process
09/27/93
09/09/94, 59 FR 46562
211.4830
Polyester Resin Material(s)
01/18/94
10/21/96, 61 FR 54556
211.4850
Polyester Resin Products Manufacturing Process
01/18/94
10/21/96, 61 FR 54556
211.4870
Polystyrene Plant
09/27/93
09/09/94, 59 FR 46562
211.4890
Polystyrene Resin
09/27/93
09/09/94, 59 FR 46562
211.4895
Polyvinyl Chloride Plastic (PVC Plastic)
09/14/10
03/23/12, 77 FR 16940
211.4900
Porous Material
09/14/10
03/23/12, 77 FR 16940
211.4910
Portable Grain Handling Equipment
09/27/93
09/09/94, 59 FR 46562
211.4930
Portland Cement Manufacturing Process Emission Source
09/27/93
09/09/94, 59 FR 46562
211.4950
Portland Cement Process or Portland Cement Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562
211.4970
Potential To Emit
01/18/94
10/21/96, 61 FR 54556
211.4990
Power Driven Fastener Coating
09/27/93
09/09/94, 59 FR 46562
211.5010
Precoat
05/09/95
07/25/96, 61 FR 38577
211.5012
Prefabricated Architectural Coating
09/14/10
03/23/12, 77 FR 16940
211.5015
Preheater Kiln
03/15/01
11/08/01, 66 FR 56449
211.5020
Preheater/Precalciner Kiln
03/15/01
11/08/01, 66 FR 56449
211.5030
Pressure Release
09/27/93
09/09/94, 59 FR 46562
211.5050
Pressure Tank
09/27/93
09/09/94, 59 FR 46562
211.5060
Pressure/Vacuum Relief Valve
09/21/94
01/27/95, 60 FR 5318
211.5061
Pretreatment Coating
09/14/10
03/23/12, 77 FR 16940
211.5062
Pretreatment Wash Primer
09/14/10
03/23/12, 77 FR 16940
211.5065
Primary Product
05/09/95
03/23/98, 63 FR 13784
211.5070
Prime Coat
09/27/93
09/09/94, 59 FR 46562
211.5075
Primer Sealant
09/14/10
03/23/12, 77 FR 16940
211.5080
Primer Sealer
05/09/95
07/25/96, 61 FR 38577
211.5090
Primer Surfacer Coat
09/14/10
03/23/12, 77 FR 16940
211.5110
Primer Surfacer Operation
09/27/93
09/09/94, 59 FR 46562
211.5130
Primers
09/27/93
09/09/94, 59 FR 46562
211.5140
Printed Interior Panel
07/27/11
03/23/12, 77 FR 16940
211.5150
Printing
09/27/93
09/09/94, 59 FR 46562
211.5170
Printing Line
09/27/93
09/09/94, 59 FR 46562
211.5185
Process Emission Source
09/27/93
09/09/94, 59 FR 46562
211.5190
Process Emission Unit
09/27/93
09/09/94, 59 FR 46562
211.5210
Process Unit
09/27/93
09/09/94, 59 FR 46562
211.5230
Process Unit Shutdown
09/27/93
09/09/94, 59 FR 46562
211.5245
Process Vent
05/22/95
04/02/96, 61 FR 14484
211.5250
Process Weight Rate
09/27/93
09/09/94, 59 FR 46562
211.5270
Production Equipment Exhaust System
09/27/93
09/09/94, 59 FR 46562
211.5310
Publication Rotogravure Printing Line
09/27/93
09/09/94, 59 FR 46562
211.5330
Purged Process Fluid
09/27/93
09/09/94, 59 FR 46562
211.5335
Radiation Effect Coating
06/25/10
03/23/12, 77 FR 16940
211.5350
Reactor
09/27/93
09/09/94, 59 FR 46562
211.5370
Reasonably Available Control Technology (RACT)
09/27/93
09/09/94, 59 FR 46562
211.5390
Reclamation System
01/18/94
10/21/96, 61 FR 54556
211.5400
Red Coating
09/14/10
03/23/12, 77 FR 16940
211.5410
Refiner
09/27/93
09/09/94, 59 FR 46562
211.5430
Refinery Fuel Gas
09/27/93
09/09/94, 59 FR 46562
211.5450
Refinery Fuel Gas System
09/27/93
09/09/94, 59 FR 46562
211.5470
Refinery Unit or Refinery Process Unit
09/27/93
09/09/94, 59 FR 46562
211.5480
Reflective Argent Coating
05/09/95
10/26/95, 60 FR 54807
211.5490
Refrigerated Condenser
09/27/93
09/09/94, 59 FR 46562
211.5500
Regulated Air Pollutant
12/07/93
04/05/95, 60 FR 17229
211.5510
Reid Vapor Pressure
01/28/13
10/06/14, 79 FR 60070
211.5520
Reinforced Plastic Composite
09/14/10
03/23/12, 77 FR 16940
211.5530
Repair
01/18/94
10/21/96, 61 FR 54556
211.5535
Repair Cleaning
06/25/10
03/23/12, 77 FR 16940
211.5550
Repair Coat
09/14/10
03/23/12, 77 FR 16940
211.5570
Repaired
09/27/93
09/09/94, 59 FR 46562
211.5585
Research and Development Operation
06/25/10
03/23/12, 77 FR 16940
211.5590
Residual Fuel Oil
09/27/93
09/09/94, 59 FR 46562
211.5600
Resist Coat
05/09/95
10/26/95, 60 FR 54807
211.5610
Restricted Area
09/27/93
09/09/94, 59 FR 46562
211.5630
Retail Outlet
09/27/93
09/09/94, 59 FR 46562
211.5640
Rich-Burn Engine
09/25/07
06/26/09, 74 FR 30466
211.5650
Ringelmann Chart
09/27/93
09/09/94, 59 FR 46562
211.5670
Roadway
09/27/93
09/09/94, 59 FR 46562
211.5690
Roll Coater
09/27/93
09/09/94, 59 FR 46562
211.5710
Roll Coating
09/27/93
09/09/94, 59 FR 46562
211.5730
Roll Printer
09/27/93
09/09/94, 59 FR 46562
211.5750
Roll Printing
09/27/93
09/09/94, 59 FR 46562
211.5770
Rotogravure Printing
09/27/93
09/09/94, 59 FR 46562
211.5790
Rotogravure Printing Line
09/27/93
09/09/94, 59 FR 46562
211.5800
Rubber
09/14/10
03/23/12, 77 FR 16940
211.5810
Safety Relief Valve
09/27/93
09/09/94, 59 FR 46562
211.5830
Sandblasting
09/27/93
09/09/94, 59 FR 46562
211.5850
Sanding Sealers
09/27/93
09/09/94, 59 FR 46562
211.5860
Scientific Instrument
06/25/10
03/23/12, 77 FR 16940
211.5870
Screening
09/27/93
09/09/94, 59 FR 46562
211.5875
Screen Printing
06/25/10
03/23/12, 77 FR 16940
211.5885
Screen Reclamation
06/25/10
03/23/12, 77 FR 16940
211.5890
Sealer
09/14/10
03/23/12, 77 FR 16940
211.5910
Semi Transparent Stains
09/27/93
09/09/94, 59 FR 46562
211.5930
Sensor
09/27/93
09/09/94, 59 FR 46562
211.5950
Set of Safety Relief Valves
09/27/93
09/09/94, 59 FR 46562
211.5970
Sheet Basecoat
09/27/93
09/09/94, 59 FR 46562
211.5980
Sheet-Fed
05/09/95
11/08/95, 60 FR 56238
211.5985
Sheet Rubber Lining Installation
09/14/10
03/23/12, 77 FR 16940
211.5987
Shock-Free Coating
09/14/10
03/23/12, 77 FR 16940
211.5990
Shotblasting
09/27/93
09/09/94, 59 FR 46562
211.6010
Side Seam Spray Coat
09/27/93
09/09/94, 59 FR 46562
211.6012
Silicone-Release Coating
09/14/10
03/23/12, 77 FR 16940
211.6015
Single-Ply Roof Membrane
09/14/10
03/23/12, 77 FR 16940
211.6017
Single-Ply Roof Membrane Adhesive Primer
09/14/10
03/23/12, 77 FR 16940
211.6020
Single-Ply Roof Membrane Installation and Repair Adhesive
09/14/10
03/23/12, 77 FR 16940
211.6025
Single Unit Operation
05/22/95
04/02/96, 61 FR 14484
211.6030
Smoke
09/27/93
09/09/94, 59 FR 46562
211.6050
Smokeless Flare
09/27/93
09/09/94, 59 FR 46562
211.6060
Soft Coat
05/09/95
10/26/95, 60 FR 54807
211.6063
Solar-Absorbent Coating
09/14/10
03/23/12, 77 FR 16940
211.6065
Solids Turnover Ratio (R
T
)
09/14/10
03/23/12, 77 FR 16940
211.6070
Solvent
09/27/93
09/09/94, 59 FR 46562
211.6090
Solvent Cleaning
09/27/93
09/09/94, 59 FR 46562
211.6110
Solvent Recovery System
01/18/94
10/21/96, 61 FR 54556
211.6130
Source
04/17/01
11/08/01, 66 FR 56449
211.6140
Specialty Coatings
05/09/95
10/26/95, 60 FR 54807
211.6145
Specialty Coatings for Motor Vehicles
05/09/95
07/25/96, 61 FR 38577
211.6150
Specialty High Gloss Catalyzed Coating
09/27/93
09/09/94, 59 FR 46562
211.6170
Specialty Leather
01/18/94
10/21/96, 61 FR 54556
211.6190
Specialty Soybean Crushing Source
09/27/93
09/09/94, 59 FR 46562
211.6210
Splash Loading
09/27/93
09/09/94, 59 FR 46562
211.6230
Stack
09/27/93
09/09/94, 59 FR 46562
211.6250
Stain Coating
01/18/94
10/21/96, 61 FR 54556
211.6270
Standard Conditions
09/27/93
09/09/94, 59 FR 46562
211.6290
Standard Cubic Foot (Scf)
09/27/93
09/09/94, 59 FR 46562
211.6310
Start Up
09/27/93
09/09/94, 59 FR 46562
211.6330
Stationary Emission Source
09/27/93
09/09/94, 59 FR 46562
211.6350
Stationary Emission Unit
09/27/93
09/09/94, 59 FR 46562
211.6370
Stationary Source
09/27/93
09/09/94, 59 FR 46562
211.6390
Stationary Storage Tank
09/27/93
09/09/94, 59 FR 46562
211.6400
Stencil Coat
09/14/10
03/23/12, 77 FR 16940
211.6405
Sterilization Indicating Ink
06/25/10
03/23/12, 77 FR 16940
211.6410
Storage Tank or Storage Vessel
09/27/93
09/09/94, 59 FR 46562
211.6420
Strippable Spray Booth Coating
02/02/98
05/19/98, 63 FR 27489
211.6425
Stripping
06/25/10
03/23/12, 77 FR 16940
211.6427
Structural Glazing
09/14/10
03/23/12, 77 FR 16940
211.6430
Styrene Devolatilizer Unit
09/27/93
09/09/94, 59 FR 46562
211.6450
Styrene Recovery Unit
09/27/93
09/09/94, 59 FR 46562
211.6460
Subfloor
09/14/10
03/23/12, 77 FR 16940
211.6470
Submerged Loading Pipe
09/27/93
09/09/94, 59 FR 46562
211.6490
Substrate
09/27/93
09/09/94, 59 FR 46562
211.6510
Sulfuric Acid Mist
09/27/93
09/09/94, 59 FR 46562
211.6530
Surface Condenser
09/27/93
09/09/94, 59 FR 46562
211.6535
Surface Preparation
06/25/10
03/23/12, 77 FR 16940
211.6540
Surface Preparation Materials
05/09/95
07/25/96, 61 FR 38577
211.6550
Synthetic Organic Chemical or Polymer Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562
211.6570
Tablet Coating Operation
09/27/93
09/09/94, 59 FR 46562
211.6580
Texture Coat
05/09/95
10/26/95, 60 FR 54807
211.6585
Thin Metal Laminating Adhesive
09/14/10
03/23/12, 77 FR 16940
211.6587
Thin Particleboard
07/27/11
03/23/12, 77 FR 16940
211.6590
Thirty Day Rolling Average
09/27/93
09/09/94, 59 FR 46562
211.6610
Three Piece Can
09/27/93
09/09/94, 59 FR 46562
211.6620
Three or Four Stage Coating System
05/09/95
07/25/96, 61 FR 38577
211.6630
Through-the-Valve Fill
01/18/94
10/21/96, 61 FR 54556
211.6635
Tileboard
07/27/11
03/23/12, 77 FR 16940
211.6640
Tire Repair
09/14/10
03/23/12, 77 FR 16940
211.6650
Tooling Resin
01/18/94
10/21/96, 61 FR 54556
211.6670
Topcoat
09/14/10
03/23/12, 77 FR 16940
211.6690
Topcoat Operation
09/14/10
03/23/12, 77 FR 16940
211.6695
Topcoat System
05/09/95
07/25/96, 61 FR 38577
211.6710
Touch-Up
01/18/94
10/21/96, 61 FR 54556
211.6720
Touch-Up Coating
09/14/10
03/23/12, 77 FR 16940
211.6730
Transfer Efficiency
09/27/93
09/09/94, 59 FR 46562
211.6740
Translucent Coating
09/14/10
03/23/12, 77 FR 16940
211.6750
Tread End Cementing
09/27/93
09/09/94, 59 FR 46562
211.6770
True Vapor Pressure
09/27/93
09/09/94, 59 FR 46562
211.6780
Trunk Interior Coating
09/14/10
03/23/12, 77 FR 16940
211.6790
Turnaround
09/27/93
09/09/94, 59 FR 46562
211.6810
Two Piece Can
09/27/93
09/09/94, 59 FR 46562
211.6825
Underbody Coating
09/14/10
03/23/12, 77 FR 16940
211.6830
Under-the-Cup Fill
01/18/94
10/21/96, 61 FR 54556
211.6850
Undertread Cementing
09/27/93
09/09/94, 59 FR 46562
211.6860
Uniform Finish Blender
05/09/95
07/25/96, 61 FR 38577
211.6870
Unregulated Safety Relief Valve
09/27/93
09/09/94, 59 FR 46562
211.6880
Vacuum Metallizing
05/09/95
10/26/95, 60 FR 54807
211.6885
Vacuum Metalizing Coating
09/14/10
03/23/12, 77 FR 16940
211.6890
Vacuum Producing System
09/27/93
09/09/94, 59 FR 46562
211.6910
Vacuum Service
09/27/93
09/09/94, 59 FR 46562
211.6930
Valves Not Externally Regulated
09/27/93
09/09/94, 59 FR 46562
211.6950
Vapor Balance System
09/27/93
09/09/94, 59 FR 46562
211.6970
Vapor Collection System
10/25/94
04/03/95, 60 FR 16801
211.6990
Vapor Control System
10/25/94
04/03/95, 60 FR 16801
211.7010
Vapor Mounted Primary Seal
09/27/93
09/09/94, 59 FR 46562
211.7030
Vapor Recovery System
09/27/93
09/09/94, 59 FR 46562
211.7050
Vapor-Suppressed Polyester Resin
01/18/94
10/21/96, 61 FR 54556
211.7070
Vinyl Coating
09/27/93
09/09/94, 59 FR 46562
211.7090
Vinyl Coating Line
09/27/93
09/09/94, 59 FR 46562
211.7110
Volatile Organic Liquid (VOL)
09/27/93
09/09/94, 59 FR 46562
211.7130
Volatile Organic Material Content (VOMC)
09/27/93
09/09/94, 59 FR 46562
211.7150
Volatile Organic Material (VOM) or Volatile Organic Compound (VOC)
03/24/15
12/28/16, 81 FR 95475
211.7170
Volatile Petroleum Liquid
09/27/93
09/09/94, 59 FR 46562
211.7190
Wash Coat
09/27/93
09/09/94, 59 FR 46562
211.7200
Washoff Operations
02/02/98
05/19/98, 63 FR 27489
211.7210
Wastewater (Oil/Water) Separator
09/27/93
09/09/94, 59 FR 46562
211.7220
Waterproof Resorcinol Glue
09/14/10
03/23/12, 77 FR 16940
211.7230
Weak Nitric Acid Manufacturing Process
09/27/93
09/09/94, 59 FR 46562
211.7240
Weatherstrip Adhesive
09/14/10
03/23/12, 77 FR 16940
211.7250
Web
09/27/93
09/09/94, 59 FR 46562
211.7270
Wholesale Purchase Consumer
09/27/93
09/09/94, 59 FR 46562
211.7290
Wood Furniture
06/25/10
03/23/12, 77 FR 16940
211.7310
Wood Furniture Coating
09/27/93
09/09/94, 59 FR 46562
211.7330
Wood Furniture Coating Line
09/27/93
09/09/94, 59 FR 46562
211.7350
Woodworking
09/27/93
09/09/94, 59 FR 46562
Part 212: Visible and Particulate Matter Emissions
Subpart A: General
212.107
Measurement Method for Visible Emissions
05/22/96
03/11/98, 63 FR 11842
212.108
Measurement Methods for PM-10 Emissions and Condensible PM-10 Emissions
05/22/96
03/11/98, 63 FR 11842
212.109
Measurement Methods for Opacity
05/22/96
03/11/98, 63 FR 11842
212.110
Measurement Methods for Particulate Matter
05/22/96
03/11/98, 63 FR 11842
212.111
Abbreviations and Units
10/04/91
10/21/93, 58 FR 54291
212.113
Incorporations by Reference
05/22/96
07/14/99, 64 FR 37847
Subpart B: Visible Emissions
212.121
Opacity Standards
07/13/88
12/29/92, 57 FR 61834
212.122
Visible Emissions Limitations for Certain Emission Units for Which Construction or Modification Commenced on or After April 14, 1972
07/13/88
12/29/92, 57 FR 61834
212.123
Visible Emissions Limitations for All Other Emission Units
07/13/88
12/29/92, 57 FR 61834
212.124
Exceptions
07/13/88
12/29/92, 57 FR 61834
212.125
Determination of Violations
07/13/88
12/29/92, 57 FR 61834
212.126
Adjusted Opacity Standards Procedures
07/13/88
12/29/92, 57 FR 61834
Subpart D: Particulate Matter Emissions From Incinerators
212.181
Limitations for Incinerators
06/04/80
11/27/81, 46 FR 57893
212.182
Aqueous Waste Incinerators
06/04/80
11/27/81, 46 FR 57893
212.183
Certain Wood Waste Incinerators
06/04/80
11/27/81, 46 FR 57893
212.184
Explosive Waste Incinerators
06/04/80
11/27/81, 46 FR 57893
212.185
Continuous Automatic Stoking Animal Pathological Waste Incinerators
12/30/86
09/15/93, 58 FR 48312
Subpart E: Particulate Matter Emissions From Fuel Combustion Emission Units
212.201
Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively Located in the Chicago Area
07/09/86
12/29/92, 57 FR 61834
212.202
Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively Located Outside the Chicago Area
07/09/86
12/29/92, 57 FR 61834
212.203
Controlled Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively
07/09/86
12/29/92, 57 FR 61834
212.204
Emission Units for Which Construction or Modification Commenced on or After April 14, 1972, Using Solid Fuel Exclusively
07/09/86
12/29/92, 57 FR 61834
212.205
Coal-Fired Industrial Boilers for Which Construction or Modification Commenced Prior to April 14, 1972, Equipped With Flue Gas Desulfurization Systems
10/19/81
02/22/84, 49 FR 6490
212.206
Emission Units Using Liquid Fuel Exclusively
04/14/72
05/31/72, 37 FR 10842
212.207
Emission Units Using More Than One Type of Fuel
04/14/72
05/31/72, 37 FR 10842
212.208
Aggregation of Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972
04/14/72
05/31/72, 37 FR 10842
212.210
Emissions Limitations for Certain Fuel Combustion Emission Units Located in the Vicinity of Granite City
05/22/96
07/14/99, 64 FR 37847
Subpart K: Fugitive Particulate Matter
212.301
Fugitive Particulate Matter
10/26/79
02/21/80, 45 FR 11472
212.302
Geographical Areas of Application
05/22/96
07/14/99, 64 FR 37847
212.304
Storage Piles
10/26/79
04/26/82, 47 FR 17814
212.305
Conveyor Loading Operations
10/26/79
04/26/82, 47 FR 17814
212.306
Traffic Areas
10/26/79
02/21/80, 45 FR 11472
212.307
Materials Collected by Pollution Control Equipment
10/26/79
02/21/80, 45 FR 11472
212.308
Spraying or Choke-Feeding Required
10/26/79
02/21/80, 45 FR 11472
212.309
Operating Program
05/22/96
07/14/99, 64 FR 37847
212.310
Minimum Operating Program
10/26/79
02/21/80, 45 FR 11472
212.312
Amendment to Operating Program
10/26/79
02/21/80, 45 FR 11472
212.313
Emission Standard for Particulate Collection Equipment
10/26/79
02/21/80, 45 FR 11472
212.314
Exception for Excess Wind Speed
10/26/79
02/21/80, 45 FR 11472
212.315
Covering for Vehicles
10/26/79
02/21/80, 45 FR 11472
212.316
Emissions Limitations for Emission Units in Certain Areas
05/22/96
07/14/99, 64 FR 37847
Subpart L: Particulate Matter Emissions From Process Emission Units
212.321
Process Emission Units for Which Construction or Modification Commenced on or After April 14, 1972
09/28/79
02/21/80, 45 FR 11472
212.322
Process Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972
09/28/79
02/21/80, 45 FR 11472
212.323
Stock Piles
09/28/79
02/21/80, 45 FR 11472
212.324
Process Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842
Subpart N: Food Manufacturing
212.361
Corn Wet Milling Processes
09/28/79
02/21/80, 45 FR 11472
212.362
Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842
Subpart O: Petroleum Refining, Petrochemical and Chemical Manufacturing
212.381
Catalyst Regenerators of Fluidized Catalytic Converters
09/28/79
02/21/80, 45 FR 11472
Subpart Q: Stone, Clay, Glass and Concrete Manufacturing
212.421
Portland Cement Processes for Which Construction or Modification Commenced on or After April 14, 1972
04/14/72
05/31/72, 37 FR 10842
212.422
Portland Cement Manufacturing Processes
09/28/79
02/21/80, 45 FR 11472
212.423
Emission Limits for the Portland Cement Manufacturing Plant Located in LaSalle County, South of the Illinois River
10/04/91
10/21/93, 58 FR 54291
212.424
Fugitive Particulate Matter Control for the Portland Cement Manufacturing Plant and Associated Quarry Operations Located in LaSalle County, South of the Illinois River
05/15/92
01/12/93, 58 FR 3844
212.425
Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842
Subpart R: Primary and Fabricated Metal Products and Machinery Manufacture
212.441
Steel Manufacturing Processes
09/28/79
02/21/80, 45 FR 11472
212.442
Beehive Coke Ovens
09/28/79
02/21/80, 45 FR 11472
212.443
Coke Plants
05/15/92
01/12/93, 58 FR 3844
212.444
Sinter Processes
09/28/79
09/03/81, 46 FR 44172
212.445
Blast Furnace Cast Houses
05/15/92
01/12/93, 58 FR 3844
212.446
Basic Oxygen Furnaces
05/22/96
03/11/98, 63 FR 11842
212.447
Hot Metal Desulfurization Not Located in the BOF
09/28/79
09/03/81, 46 FR 44172
212.448
Electric Arc Furnaces
09/28/79
09/03/81, 46 FR 44172
212.449
Argon-Oxygen Decarburization Vessels
09/28/79
09/03/81, 46 FR 44172
212.450
Liquid Steel Charging
09/28/79
09/03/81, 46 FR 44172
212.451
Hot Scarfing Machines
09/28/79
09/03/81, 46 FR 44172
212.455
Highlines on Steel Mills
10/26/79
02/21/80, 45 FR 11472
212.456
Certain Small Foundries
09/28/79
02/21/80, 45 FR 11472
212.457
Certain Small Iron-Melting Air Furnaces
09/28/79
07/12/82, 47 FR 30057
212.458
Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842
Subpart S: Agriculture
212.461
Grain-Handling and Drying in General
09/28/79
02/21/80, 45 FR 11472
212.462
Grain-Handling Operations
09/28/79
02/21/80, 45 FR 11472
212.463
Grain Drying Operations
09/28/79
02/21/80, 45 FR 11472
212.464
Sources in Certain Areas
05/22/96
03/11/98, 63 FR 11842
Subpart T: Construction and Wood Products
212.681
Grinding, Woodworking, Sandblasting and Shotblasting
04/14/72
05/31/72, 37 FR 10842
Subpart U: Additional Control Measures
212.700
Applicability
07/11/94
07/13/95, 60 FR 36060
212.701
Contingency Measure Plans, Submittal and Compliance Date
07/11/94
07/13/95, 60 FR 36060
212.702
Determination of Contributing Sources
07/11/94
07/13/95, 60 FR 36060
212.703
Contingency Measure Plan Elements
07/11/94
07/13/95, 60 FR 36060
212.704
Implementation
07/11/94
07/13/95, 60 FR 36060
212.705
Alternative Implementation
07/11/94
07/13/95, 60 FR 36060
212.Appendix C:
Past Compliance Dates
04/14/72
05/31/72, 37 FR 10842
Approved as Rules 202(e), 203(c), 203(d)(3)(A) & (B), 203(d)(5)(L) & (M), 203(d)(8)(J), 203(f)(3) Preamble, 203(f)(3)(F) Preamble, and 203(i).
Part 214: Sulfur Limitations
Subpart A: General Provisions
214.101
Measurement Methods
01/15/91
06/26/92, 57 FR 28617
214.102
Abbreviations and Units
12/05/88
01/28/94, 59 FR 4001
214.104
Incorporations by Reference
01/15/91
01/28/94, 59 FR 4001
Subpart B: New Fuel Combustion Emission Sources
214.121
Large Sources
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(a).
214.122
Small Sources
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(b).
Subpart C: Existing Solid Fuel Combustion Emission Sources
214.141
Sources Located in Metropolitan Areas
03/28/83
09/03/92, 57 FR 40333
thru (a).
214.141
Sources Located in Metropolitan Areas
05/20/86
09/02/92, 57 FR 40126
(b), (c), and (d).
214.142
Small Sources Located Outside Metropolitan Areas
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(c)(1)(B).
214.143
Large Sources Located Outside Metropolitan Areas
02/03/79
02/21/80, 45 FR 11472
Subpart D: Existing Liquid or Mixed Fuel Combustion Emission Sources
214.161
Liquid Fuel Burned Exclusively
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(c)(2).
214.162
Combination of Fuels
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(d).
Subpart E: Aggregation of Sources Outside Metropolitan Areas
214.181
Dispersion Enhancement Techniques
02/03/79
02/21/80, 45 FR 11472
214.182
Prohibition
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e) (intro).
214.183
General Formula
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(1).
214.184
Special Formula
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(2).
214.185
Alternative Emission Rate
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(3).
214.186
New Operating Permits
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(4).
Subpart F: Alternative Standards for Sources Inside Metropolitan Areas
214.201
Alternative Standards for Sources in Metropolitan Areas
03/28/83
09/03/92, 57 FR 40333
214.202
Dispersion Enhancement Techniques
03/28/83
09/03/92, 57 FR 40333
Subpart K: Process Emission Sources
214.301
General Limitation
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(f)(1)(A).
214.302
Exception for Air Pollution Control Equipment
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(f)(1)(C).
214.303
Use of Sulfuric Acid
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(f)(2)(B).
Subpart O: Petroleum Refining, Petrochemical and Chemical Manufacturing
214.381
Sulfuric Acid Manufacturing
02/03/79
02/21/80, 45 FR 11472
Only (a) and (b). Approved as Rule 204(f)(1)(B) and (f)(2)(A).
214.382
Petroleum and Petrochemical Processes
12/05/88
01/28/94, 59 FR 4001
214.383
Chemical Manufacturing
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(f)(1)(E).
Subpart X: Utilities
214.560
Scope
05/20/86
09/02/92, 57 FR 40126
214.561
E. D. Edwards Electric Generating Station
07/11/03
11/10/08, 73 FR 66555
214.Appendix C:
Compliance Dates
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(e)(1).
Part 215: Organic Material Emission Standards and Limitations
Subpart A: General Provisions
215.101
Clean-Up and Disposal Operations
07/28/79
02/21/80, 45 FR 11472
215.102
Testing Methods
05/14/91
08/18/92, 57 FR 37100
215.104
Definitions
01/28/13
10/06/14, 79 FR 60070
215.105
Incorporation by Reference
01/28/13
10/06/14, 79 FR 60070
215.108
Measurement of Vapor Pressures
05/14/91
08/18/92, 57 FR 37100
215.109
Monitoring for Negligibly-Reactive Compounds
06/19/98
01/15/99, 64 FR 2581
Subpart B: Organic Emissions From Storage and Loading Operations
215.121
Storage Containers
07/28/79
02/21/80, 45 FR 11472
215.122
Loading Operations
07/28/79
02/21/80, 45 FR 11472
215.123
Petroleum Liquid Storage Tanks
07/28/79
02/21/80, 45 FR 11472
215.124
External Floating Roofs
01/21/83
06/29/90, 55 FR 26814
215.125
Compliance Dates and Geographical Areas
01/21/83
06/29/90, 55 FR 26814
215.126
Compliance Plan
01/21/83
06/29/90, 55 FR 26814
Subpart C: Organic Emissions From Miscellaneous Equipment
215.141
Separation Operations
07/28/79
02/21/80, 45 FR 11472
215.142
Pumps and Compressors
07/28/79
02/21/80, 45 FR 11472
215.143
Vapor Blowdown
07/28/79
02/21/80, 45 FR 11472
215.144
Safety Relief Valves
07/28/79
02/21/80, 45 FR 11472
Subpart E: Solvent Cleaning
215.181
Solvent Cleaning in General
07/28/79
02/21/80, 45 FR 11472
215.182
Cold Cleaning
07/28/79
02/21/80, 45 FR 11472
215.183
Open Top Vapor Degreasing
07/28/79
02/21/80, 45 FR 11472
215.184
Conveyorized Degreasing
07/28/79
02/21/80, 45 FR 11472
Subpart F: Coating Operations
215.202
Compliance Schedules
07/28/79
02/21/80, 45 FR 11472
215.204
Emission Limitations for Manufacturing Plants
06/19/98
01/15/99, 64 FR 2581
215.205
Alternative Emission Limitations
06/19/98
01/15/99, 64 FR 2581
215.206
Exemptions From Emission Limitations
06/19/98
01/15/99, 64 FR 2581
215.207
Compliance by Aggregation of Emission Units
06/19/98
01/15/99, 64 FR 2581
215.208
Testing Methods for Volatile Organic Material Content
07/28/79
02/21/80, 45 FR 11472
215.209
Exemption From General Rule on Use of Organic Material
07/28/79
02/21/80, 45 FR 11472
215.211
Compliance Dates and Geographical Areas
06/19/98
01/15/99, 64 FR 2581
215.212
Compliance Plan
06/19/98
01/15/99, 64 FR 2581
215.213
Special Requirements for Compliance Plan
07/28/79
02/21/80, 45 FR 11472
215.215
DMI Emissions Limitations
07/28/79
02/21/80, 45 FR 11472
Subpart H: Special Limitations for Sources in Major Urbanized Areas Which Are Nonattainment for Ozone
215.240
Applicability
06/29/87
06/29/90, 55 FR 26814
215.241
External Floating Roofs
06/29/87
06/29/90, 55 FR 26814
215.249
Compliance Dates
06/29/87
06/29/90, 55 FR 26814
Subpart K: Use of Organic Material
215.301
Use of Organic Material
07/28/79
02/21/80, 45 FR 11472
215.302
Alternative Standard
07/28/79
02/21/80, 45 FR 11472
215.303
Fuel Combustion Emission Sources
07/28/79
02/21/80, 45 FR 11472
215.304
Operations With Compliance Program
07/28/79
02/21/80, 45 FR 11472
Subpart P: Printing and Publishing
215.408
Heatset Web Offset Lithographic Printing
09/30/87
06/29/90, 55 FR 26814
Subpart Q: Leaks From Synthetic Organic Chemical and Polymer Manufacturing Equipment
215.420
Applicability
12/14/87
06/29/90, 55 FR 26814
215.421
General Requirements
12/14/87
06/29/90, 55 FR 26814
215.422
Inspection Program Plan for Leaks
08/28/85
06/29/90, 55 FR 26814
215.423
Inspection Program for Leaks
08/28/85
06/29/90, 55 FR 26814
215.424
Repairing Leaks
08/28/85
06/29/90, 55 FR 26814
215.425
Recordkeeping for Leaks
08/28/85
06/29/90, 55 FR 26814
215.426
Reporting for Leaks
08/28/85
06/29/90, 55 FR 26814
215.427
Alternative Program for Leaks
08/28/85
06/29/90, 55 FR 26814
215.428
Compliance Dates
12/14/87
06/29/90, 55 FR 26814
215.429
Compliance Plan
12/14/87
06/29/90, 55 FR 26814
215.430
General Requirements
12/14/87
06/29/90, 55 FR 26814
215.431
Inspection Program Plan for Leaks
12/14/87
06/29/90, 55 FR 26814
215.433
Repairing Leaks
12/14/87
06/29/90, 55 FR 26814
215.434
Recordkeeping for Leaks
12/14/87
06/29/90, 55 FR 26814
215.435
Report for Leaks
12/14/87
06/29/90, 55 FR 26814
215.437
Open-Ended Valves
12/14/87
06/29/90, 55 FR 26814
215.438
Compliance Plan
12/14/87
06/29/90, 55 FR 26814
Subpart R: Petroleum Refining and Related Industries; Asphalt Materials
215.441
Petroleum Refinery Waste Gas Disposal
07/28/79
02/21/80, 45 FR 11472
215.442
Vacuum Producing Systems
07/28/79
02/21/80, 45 FR 11472
215.443
Wastewater (Oil/Water) Separator
07/28/79
02/21/80, 45 FR 11472
215.444
Process Unit Turnarounds
07/28/79
02/21/80, 45 FR 11472
215.445
Leaks: General Requirements
01/21/83
11/27/87, 52 FR 45333
215.446
Monitoring Program Plan for Leaks
01/21/83
11/27/87, 52 FR 45333
215.447
Monitoring Program for Leaks
01/21/83
11/27/87, 52 FR 45333
215.448
Recordkeeping for Leaks
01/21/83
11/27/87, 52 FR 45333
215.449
Reporting for Leaks
01/21/83
11/27/87, 52 FR 45333
215.450
Alternative Program for Leaks
01/21/83
11/27/87, 52 FR 45333
215.451
Sealing Device Requirements
01/21/83
11/27/87, 52 FR 45333
215.453
Compliance Dates and Geographical Areas
01/21/83
06/29/90, 55 FR 26814
Subpart S: Rubber and Miscellaneous Plastic Products
215.461
Manufacture of Pneumatic Rubber Tires
01/21/83
11/27/87, 52 FR 45333
215.462
Green Tire Spraying Operations
01/21/83
11/27/87, 52 FR 45333
215.463
Alternative Emission Reduction Systems
01/21/83
11/27/87, 52 FR 45333
215.464
Emissions Testing
01/21/83
11/27/87, 52 FR 45333
215.465
Compliance Dates and Geographical Areas
01/21/83
06/29/90, 55 FR 26814
215.466
Compliance Plan
01/21/83
06/29/90, 55 FR 26814
Subpart T: Pharmaceutical Manufacturing
215.480
Applicability of Subpart T
05/14/91
08/18/92, 57 FR 37100
215.481
Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers
05/14/91
08/18/92, 57 FR 37100
215.482
Control of Air Dryers, Production Equipment Exhaust Systems and Filters
05/14/91
08/18/92, 57 FR 37100
215.483
Material Storage and Transfer
05/14/91
08/18/92, 57 FR 37100
215.484
In-Process Tanks
05/14/91
08/18/92, 57 FR 37100
215.485
Leaks
05/14/91
08/18/92, 57 FR 37100
215.486
Other Emission Sources
05/14/91
08/18/92, 57 FR 37100
215.487
Testing
05/14/91
08/18/92, 57 FR 37100
215.488
Monitors for Air Pollution Control Equipment
05/14/91
08/18/92, 57 FR 37100
215.489
Recordkeeping (Renumbered)
05/14/91
08/18/92, 57 FR 37100
215.490
Compliance Schedule (Renumbered)
05/14/91
08/18/92, 57 FR 37100
Subpart V: Air Oxidation Processes
215.520
Applicability
12/14/87
06/29/90, 55 FR 26814
215.521
Definitions
12/14/87
06/29/90, 55 FR 26814
215.525
Emission Limitations for Air Oxidation Processes
12/14/87
06/29/90, 55 FR 26814
215.526
Testing and Monitoring
12/14/87
06/29/90, 55 FR 26814
215.527
Compliance Date
12/14/87
06/29/90, 55 FR 26814
Subpart W: Agriculture
215.541
Pesticide Exception
07/28/79
02/21/80, 45 FR 11472
Subpart X: Construction
215.561
Architectural Coatings
07/28/79
02/21/80, 45 FR 11472
215.562
Paving Operations
07/28/79
02/21/80, 45 FR 11472
215.563
Cutback Asphalt
07/28/79
02/21/80, 45 FR 11472
Subpart Y: Gasoline Distribution
215.581
Bulk Gasoline Plants
07/28/79
02/21/80, 45 FR 11472
215.582
Bulk Gasoline Terminals
06/29/87
06/29/90, 55 FR 26814
215.583
Gasoline Dispensing Facilities—Storage Tank Filling Operations
06/29/87
06/29/90, 55 FR 26814
215.584
Gasoline Delivery Vessels
06/29/87
06/29/90, 55 FR 26814
Subpart Z: Dry Cleaners
215.607
Standards for Petroleum Solvent Dry Cleaners
04/03/87
06/29/90, 55 FR 26814
215.608
Operating Practices for Petroleum Solvent Dry Cleaners
04/03/87
06/29/90, 55 FR 26814
215.609
Program for Inspection and Repair of Leaks
04/03/87
06/29/90, 55 FR 26814
215.610
Testing and Monitoring
04/03/87
06/29/90, 55 FR 26814
215.611
Exemption for Petroleum Solvent Dry Cleaners
04/03/87
06/29/90, 55 FR 26814
215.612
Compliance Dates and Geographical Areas
04/03/87
06/29/90, 55 FR 26814
215.613
Compliance Plan
04/03/87
06/29/90, 55 FR 26814
Subpart BB: Polystyrene Plants
215.875
Applicability of Subpart BB
09/30/87
06/29/90, 55 FR 26814
215.877
Emissions Limitation at Polystyrene Plants
09/30/87
06/29/90, 55 FR 26814
215.879
Compliance Date
09/30/87
06/29/90, 55 FR 26814
215.881
Compliance Plan
09/30/87
06/29/90, 55 FR 26814
215.883
Special Requirements for Compliance Plan
09/30/87
06/29/90, 55 FR 26814
215.886
Emissions Testing
09/30/87
06/29/90, 55 FR 26814
215.Appendix C:
Past Compliance Dates
07/28/79
02/21/80, 45 FR 11472
Approved as Rules 104(a), 104(g), 104(h), 205(j), and 205(m).
Part 216: Carbon Monoxide Emissions
Subpart A: General Provisions
216.101
Measurement Methods
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(f).
Subpart B: Fuel Combustion Emission Sources
216.121
Fuel Combustion Emission Sources
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(a).
Subpart C: Incinerators
216.141
Incinerators
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(b).
216.142
Exceptions
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(b)(1,2).
Subpart N: Petroleum Refining and Chemical Manufacture
216.361
Petroleum and Petrochemical Processes
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(c).
216.362
Polybasic Organic Acid Partial Oxidation Manufacturing Processes
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(h).
Subpart O: Primary and Fabricated Metal Products
216.381
Cupolas
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(e).
216.382
Exception, General Motor's Ferrous Foundry in Vermilion County
11/13/92
08/04/94, 59 FR 39686
216.Appendix C:
Compliance Dates
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(g).
Part 217: Nitrogen Oxides Emissions
Subpart A: General Provisions
217.101
Measurement Methods
09/25/07
06/26/09, 74 FR 30466
217.102
Abbreviations and Units
09/25/07
06/26/09, 74 FR 30466
217.104
Incorporations by Reference
09/25/07
06/26/09, 74 FR 30466
Subpart B: New Fuel Combustion Emission Sources
217.121
New Emission Sources
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(a)(1)-(4), 207(a)(5)(A).
Subpart C: Existing Fuel Combustion Emission Sources
217.141
Existing Emission Sources in Major Metropolitan Areas
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(b) and (c).
Subpart K: Process Emission Sources
217.301
Industrial Processes
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(e).
Subpart O: Chemical Manufacture
217.381
Nitric Acid Manufacturing Processes
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(d).
Subpart Q: Stationary Reciprocating Internal Combustion Engines and Turbines
217.386
Applicability
09/25/07
06/26/09, 74 FR 30466
217.388
Control and Maintenance Requirements
09/25/07
06/26/09, 74 FR 30466
217.390
Emissions Averaging Plans
09/25/07
06/26/09, 74 FR 30466
217.392
Compliance
09/25/07
06/26/09, 74 FR 30466
217.394
Testing and Monitoring
09/25/07
06/26/09, 74 FR 30466
217.396
Recordkeeping and Reporting
09/25/07
06/26/09, 74 FR 30466
Subpart T: Cement Kilns
217.400
Applicability
03/15/01
11/08/01, 66 FR 56449
217.402
Control Requirements
03/15/01
11/08/01, 66 FR 56449
217.404
Testing
03/15/01
11/08/01, 66 FR 56449
217.406
Monitoring
03/15/01
11/08/01, 66 FR 56449
217.408
Reporting
03/15/01
11/08/01, 66 FR 56449
217.410
Recordkeeping
03/15/01
11/08/01, 66 FR 56449
Subpart U: NO
X
Control and Trading Program for Specified NO
X
Generating Units
217.450
Purpose
04/17/01
11/08/01, 66 FR 56449
217.452
Severability
04/17/01
11/08/01, 66 FR 56449
217.454
Applicability
04/17/01
11/08/01, 66 FR 56449
217.456
Compliance Requirements
04/17/01
11/08/01, 66 FR 56449
217.458
Permitting Requirements
04/17/01
11/08/01, 66 FR 56449
217.460
Subpart U NO
X
Trading Budget
04/17/01
11/08/01, 66 FR 56449
217.462
Methodology for Obtaining NO
X
Allocations
04/17/01
11/08/01, 66 FR 56449
217.464
Methodology for Determining NO
X
Allowances From the New Source Set-Aside
04/17/01
11/08/01, 66 FR 56449
217.466
NO
X
Allocations Procedure for Subpart U Budget Units
04/17/01
11/08/01, 66 FR 56449
217.468
New Source Set-Asides for “New” Budget Units
04/17/01
11/08/01, 66 FR 56449
217.470
Early Reduction Credits (ERCS) for Budget Units
04/17/01
11/08/01, 66 FR 56449
217.472
Low-Emitter Requirements
04/17/01
11/08/01, 66 FR 56449
217.474
Opt-In Units
04/17/01
11/08/01, 66 FR 56449
217.476
Opt-In Process
04/17/01
11/08/01, 66 FR 56449
217.478
Opt-In Budget Units: Withdrawal From NO
X
Trading Program
04/17/01
11/08/01, 66 FR 56449
217.480
Opt-In Units: Change in Regulatory Status
04/17/01
11/08/01, 66 FR 56449
217.482
Allowance Allocations To Opt-In Budget Units
04/17/01
11/08/01, 66 FR 56449
Subpart V: Electric Power Generation
217.521
Lake of Egypt Power Plant
04/13/78
06/18/01, 66 FR 32769
217.700
Purpose
04/17/01
06/18/01, 66 FR 32769
217.702
Severability
04/17/01
06/18/01, 66 FR 32769
217.704
Applicability
04/17/01
06/18/01, 66 FR 32769
217.706
Emission Limitations
04/17/01
06/18/01, 66 FR 32769
217.708
NO
X
Averaging
04/17/01
06/18/01, 66 FR 32769
217.710
Monitoring
04/17/01
06/18/01, 66 FR 32769
217.712
Reporting and Recordkeeping
04/17/01
06/18/01, 66 FR 32769
Subpart W: NO
X
Trading Program for Electrical Generating Units
217.750
Purpose
12/26/00
11/08/01, 66 FR 56454
217.751
Sunset Provisions
11/02/09
03/01/10, 75 FR 9103
217.752
Severability
12/26/00
11/08/01, 66 FR 56454
217.754
Applicability
12/26/00
11/08/01, 66 FR 56454
217.756
Compliance Requirements
12/26/00
11/08/01, 66 FR 56454
Except (d)(3).
217.758
Permitting Requirements
12/26/00
11/08/01, 66 FR 56454
217.760
NOx Trading Budget
12/26/00
11/08/01, 66 FR 56454
217.762
Methodology for Calculating NO
X
Allocations for Budget Electrical Generating Units (EGUs)
12/26/00
11/08/01, 66 FR 56454
217.764
NO
X
Allocations for Budget EGUs
12/26/00
11/08/01, 66 FR 56454
217.768
New Source Set-Asides for “New” Budget EGUs
12/26/00
11/08/01, 66 FR 56454
217.770
Early Reduction Credits for Budget EGUs
12/26/00
11/08/01, 66 FR 56454
217.774
Opt-In Units
12/26/00
11/08/01, 66 FR 56454
217.776
Opt-In Process
12/26/00
11/08/01, 66 FR 56454
217.778
Budget Opt-In Units: Withdrawal From NO
X
Trading Program
12/26/00
11/08/01, 66 FR 56454
217.780
Opt-In Units: Change in Regulatory Status
12/26/00
11/08/01, 66 FR 56454
217.782
Allowance Allocations to Budget Opt-In Units
12/26/00
11/08/01, 66 FR 56454
217.Appendix C:
Compliance Dates
04/14/72
05/31/72, 37 FR 10862
217.Appendix G:
Existing Reciprocating Internal Combustion Engines Affected by the NO
X
Sip Call
09/25/07
06/26/09, 74 FR 30466
Part 218: Organic Material Emission Standards and Limitations for the Chicago Area
Subpart A: General Provisions
218.100
Introduction
09/27/93
09/09/94, 59 FR 46562
218.101
Savings Clause
10/25/94
04/03/95, 60 FR 16801
218.102
Abbreviations and Conversion Factors
09/27/93
09/09/94, 59 FR 46562
218.103
Applicability
09/27/93
09/09/94, 59 FR 46562
218.104
Definitions
09/27/93
09/09/94, 59 FR 46562
218.105
Test Methods and Procedures
07/27/11
03/23/12, 77 FR 16940
218.106
Compliance Dates
09/14/10
03/23/12, 77 FR 16940
218.107
Operation of Afterburners
09/27/93
09/09/94, 59 FR 46562
218.108
Exemptions, Variations, and Alternative Means of Control or Compliance Determinations
01/24/94
10/21/96, 61 FR 54556
218.109
Vapor Pressure of Volatile Organic Liquids
09/27/93
09/09/94, 59 FR 46562
218.110
Vapor Pressure of Organic Material or Solvent
09/27/93
09/09/94, 59 FR 46562
218.111
Vapor Pressure of Volatile Organic Material
09/27/93
09/09/94, 59 FR 46562
218.112
Incorporations by Reference
12/23/13
03/13/15, 80 FR 13248
218.114
Compliance With Permit Conditions
01/24/94
10/21/96, 61 FR 54556
Subpart B: Organic Emissions From Storage and Loading Operations
218.119
Applicability for VOL
11/15/94
08/08/96, 61 FR 41338
218.120
Control Requirements for Storage Containers of VOL
11/15/94
08/08/96, 61 FR 41338
218.121
Storage Containers
09/27/93
09/09/94, 59 FR 46562
218.122
Loading Operations
09/27/93
09/09/94, 59 FR 46562
218.123
Petroleum Liquid Storage Tanks
09/27/93
09/09/94, 59 FR 46562
218.124
External Floating Roofs
09/27/93
09/09/94, 59 FR 46562
218.125
Compliance Dates
11/15/94
08/08/96, 61 FR 41338
218.127
Testing VOL Operations
11/15/94
08/08/96, 61 FR 41338
218.128
Monitoring VOL Operations
01/28/13
10/06/14, 79 FR 60070
218.129
Recordkeeping and Reporting for VOL Operations
11/15/94
08/08/96, 61 FR 41338
Subpart C: Organic Emissions From Miscellaneous Equipment
218.141
Separation Operations
09/27/93
09/09/94, 59 FR 46562
218.142
Pumps and Compressors
08/16/91
09/09/94, 59 FR 46562
218.143
Vapor Blowdown
09/27/93
09/09/94, 59 FR 46562
218.144
Safety Relief Valves
09/27/93
09/09/94, 59 FR 46562
Subpart E: Solvent Cleaning
218.181
Solvent Cleaning Degreasing Operations
06/25/10
03/23/12, 77 FR 16940
218.182
Cold Cleaning
06/09/97
11/26/97, 62 FR 62951
218.183
Open Top Vapor Degreasing
09/27/93
09/09/94, 59 FR 46562
218.184
Conveyorized Degreasing
09/27/93
09/09/94, 59 FR 46562
218.186
Test Methods
09/27/93
09/09/94, 59 FR 46562
218.187
Other Industrial Solvent Cleaning Operations
07/27/11
03/23/12, 77 FR 16940
Subpart F: Coating Operations
218.204
Emission Limitations
07/27/11
03/23/12, 77 FR 16940
218.205
Daily-Weighted Average Limitations
09/14/10
03/23/12, 77 FR 16940
218.206
Solids Basis Calculation
09/27/93
09/09/94, 59 FR 46562
218.207
Alternative Emission Limitations
07/27/11
03/23/12, 77 FR 16940
218.208
Exemptions From Emission Limitations
10/25/11
04/19/13, 78 FR 23495
218.209
Exemption From General Rule on Use of Organic Material
09/27/93
09/09/94, 59 FR 46562
218.210
Compliance Schedule
06/25/10
03/23/12, 77 FR 16940
218.211
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940
218.212
Cross-Line Averaging To Establish Compliance for Coating Lines
09/14/10
03/23/12, 77 FR 16940
218.213
Recordkeeping and Reporting for Cross-Line Averaging Participating Coating Lines
05/09/95
02/13/96, 61 FR 5511
218.214
Changing Compliance Methods
05/09/95
02/13/96, 61 FR 5511
218.215
Wood Furniture Coating Averaging Approach
02/02/98
05/19/98, 63 FR 27489
218.216
Wood Furniture Coating Add-On Control Use
02/02/98
05/19/98, 63 FR 27489
218.217
Wood Furniture Coating and Flat Wood Paneling Coating Work Practice Standards
07/27/11
03/23/12, 77 FR 16940
218.218
Work Practice Standards for Paper Coatings, Metal Furniture Coatings, and Large Appliance Coatings
03/23/10
03/23/12, 77 FR 16940
218.219
Work Practice Standards for Automobile and Light-Duty Truck Assembly Coatings and Miscellaneous Metal and Plastic Parts Coatings
09/14/10
03/23/12, 77 FR 16940
Subpart G: Use of Organic Material
218.301
Use of Organic Material
09/27/93
09/09/94, 59 FR 46562
218.302
Alternative Standard
09/27/93
09/09/94, 59 FR 46562
218.303
Fuel Combustion Emission Units
09/27/93
09/09/94, 59 FR 46562
218.304
Operations With Compliance Program
09/27/93
09/09/94, 59 FR 46562
Subpart H: Printing and Publishing
218.401
Flexographic and Rotogravure Printing
07/27/11
03/23/12, 77 FR 16940
218.402
Applicability
07/27/11
03/23/12, 77 FR 16940
218.403
Compliance Schedule
06/25/10
03/23/12, 77 FR 16940
218.404
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940
218.405
Lithographic Printing: Applicability
06/25/10
03/23/12, 77 FR 16940
218.407
Emission Limitations and Control Requirements for Lithographic Printing Lines
06/25/10
03/23/12, 77 FR 16940
218.409
Testing for Lithographic Printing on and After March 15, 1996
07/27/11
03/23/12, 77 FR 16940
218.410
Monitoring Requirements for Lithographic Printing
06/25/10
03/23/12, 77 FR 16940
218.411
Recordkeeping and Reporting for Lithographic Printing
07/27/11
03/23/12, 77 FR 16940
218.412
Letterpress Printing Lines: Applicability
06/25/10
03/23/12, 77 FR 16940
218.413
Emission Limitations and Control Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940
218.415
Testing for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940
218.416
Monitoring Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940
218.417
Recordkeeping and Reporting for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940
Subpart Q: Synthetic Organic Chemical and Polymer Manufacturing Plant
218.421
General Requirements
09/27/93
09/09/94, 59 FR 46562
218.422
Inspection Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562
218.423
Inspection Program for Leaks
09/27/93
09/09/94, 59 FR 46562
218.424
Repairing Leaks
09/27/93
09/09/94, 59 FR 46562
218.425
Recordkeeping for Leaks
09/27/93
09/09/94, 59 FR 46562
218.426
Report for Leaks
09/27/93
09/09/94, 59 FR 46562
218.427
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562
218.428
Open-Ended Valves
09/27/93
09/09/94, 59 FR 46562
218.429
Standards for Control Devices
09/27/93
09/09/94, 59 FR 46562
218.431
Applicability
05/09/95
03/23/98, 63 FR 13784
218.432
Control Requirements
05/09/95
03/23/98, 63 FR 13784
218.433
Performance and Testing Requirements
05/09/95
03/23/98, 63 FR 13784
218.434
Monitoring Requirements
05/09/95
03/23/98, 63 FR 13784
218.435
Recordkeeping and Reporting Requirements
05/09/95
03/23/98, 63 FR 13784
218.436
Compliance Date
05/09/95
03/23/98, 63 FR 13784
Subpart R: Petroleum Refining and Related Industries; Asphalt Materials
218.441
Petroleum Refinery Waste Gas Disposal
09/27/93
09/09/94, 59 FR 46562
218.442
Vacuum Producing Systems
08/16/91
09/09/94, 59 FR 46562
218.443
Wastewater (Oil/Water) Separator
09/27/93
09/09/94, 59 FR 46562
218.444
Process Unit Turnarounds
08/16/91
09/09/94, 59 FR 46562
218.445
Leaks: General Requirements
09/27/93
09/09/94, 59 FR 46562
218.446
Monitoring Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562
218.447
Monitoring Program for Leaks
09/27/93
09/09/94, 59 FR 46562
218.448
Recordkeeping for Leaks
08/16/91
09/09/94, 59 FR 46562
218.449
Reporting for Leaks
09/27/93
09/09/94, 59 FR 46562
218.450
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562
218.451
Sealing Device Requirements
08/16/91
09/09/94, 59 FR 46562
218.452
Compliance Schedule for Leaks
09/27/93
09/09/94, 59 FR 46562
Subpart S: Rubber and Miscellaneous Plastic Products
218.461
Manufacture of Pneumatic Rubber Tires
09/27/93
09/09/94, 59 FR 46562
218.462
Green Tire Spraying Operations
09/27/93
09/09/94, 59 FR 46562
218.463
Alternative Emission Reduction Systems
09/27/93
09/09/94, 59 FR 46562
218.464
Emission Testing
09/27/93
09/09/94, 59 FR 46562
Subpart T: Pharmaceutical Manufacturing
218.480
Applicability
08/26/08
11/03/10, 75 FR 67623
218.481
Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers
09/27/93
09/09/94, 59 FR 46562
218.482
Control of Air Dryers, Production Equipment Exhaust Systems and Filters
09/27/93
09/09/94, 59 FR 46562
218.483
Material Storage and Transfer
09/27/93
09/09/94, 59 FR 46562
218.484
In-Process Tanks
08/16/91
09/09/94, 59 FR 46562
218.485
Leaks
09/27/93
09/09/94, 59 FR 46562
218.486
Other Emission Units
09/27/93
09/09/94, 59 FR 46562
218.487
Testing
09/27/93
09/09/94, 59 FR 46562
218.488
Monitoring for Air Pollution Control Equipment
08/16/91
09/09/94, 59 FR 46562
218.489
Recordkeeping for Air Pollution Control Equipment
09/27/93
09/09/94, 59 FR 46562
Subpart V: Batch Operations and Air Oxidation Processes
218.500
Applicability for Batch Operations
05/22/95
04/02/96, 61 FR 14484
218.501
Control Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484
218.502
Determination of Uncontrolled Total Annual Mass Emissions and Average Flow Rate Values for Batch Operations
05/22/95
04/02/96, 61 FR 14484
218.503
Performance and Testing Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484
218.504
Monitoring Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484
218.505
Reporting and Recordkeeping for Batch Operations
05/22/95
04/02/96, 61 FR 14484
218.506
Compliance Date
05/22/95
04/02/96, 61 FR 14484
218.520
Emission Limitations for Air Oxidation Processes
11/15/94
09/27/95, 60 FR 49770
218.522
Savings Clause
11/15/94
09/27/95, 60 FR 49770
218.523
Compliance
11/15/94
09/27/95, 60 FR 49770
218.524
Determination of Applicability
11/15/94
09/27/95, 60 FR 49770
218.525
Emission Limitations for Air Oxidation Processes
11/15/94
09/27/95, 60 FR 49770
218.526
Testing and Monitoring
08/16/91
09/09/94, 59 FR 46562
Subpart W: Agriculture
218.541
Pesticide Exception
09/27/93
09/09/94, 59 FR 46562
Subpart X: Construction
218.561
Architectural Coatings
08/16/91
09/09/94, 59 FR 46562
218.562
Paving Operations
09/27/93
09/09/94, 59 FR 46562
218.563
Cutback Asphalt
08/16/91
09/09/94, 59 FR 46562
Subpart Y: Gasoline Distribution
218.581
Bulk Gasoline Plants
09/27/93
09/09/94, 59 FR 46562
218.582
Bulk Gasoline Terminals
09/27/93
09/09/94, 59 FR 46562
218.583
Gasoline Dispensing Operations—Storage Tank Filling Operations
12/23/13
03/13/15, 80 FR 13248
218.584
Gasoline Delivery Vessels
09/27/93
09/09/94, 59 FR 46562
218.586
Gasoline Dispensing Operations—Motor Vehicle Fueling Operations
12/23/13
03/13/15, 80 FR 13248
Subpart Z: Dry Cleaners
218.607
Standards for Petroleum Solvent Dry Cleaners
08/16/91
09/09/94, 59 FR 46562
218.608
Operating Practices for Petroleum Solvent Dry Cleaners
09/27/93
09/09/94, 59 FR 46562
218.609
Program for Inspection and Repair of Leaks
09/27/93
09/09/94, 59 FR 46562
218.610
Testing and Monitoring
09/27/93
09/09/94, 59 FR 46562
218.611
Applicability for Petroleum Solvent Dry Cleaners
01/24/94
10/21/96, 61 FR 54556
Subpart AA: Paint and Ink Manufacturing
218.620
Applicability
01/24/94
10/21/96, 61 FR 54556
218.621
Exemption for Waterbase Material and Heatset Offset Ink
09/27/93
09/09/94, 59 FR 46562
218.624
Open Top Mills, Tanks, Vats or Vessels
09/27/93
09/09/94, 59 FR 46562
218.625
Grinding Mills
08/16/91
09/09/94, 59 FR 46562
218.626
Storage Tanks
08/16/91
09/09/94, 59 FR 46562
218.628
Leaks
09/27/93
09/09/94, 59 FR 46562
218.630
Clean Up
08/16/91
09/09/94, 59 FR 46562
218.636
Compliance Schedule
09/27/93
09/09/94, 59 FR 46562
218.637
Recordkeeping and Reporting
09/27/93
09/09/94, 59 FR 46562
Subpart BB: Polystyrene Plants
218.640
Applicability
09/27/93
09/09/94, 59 FR 46562
218.642
Emissions Limitation at Polystyrene Plants
09/27/93
09/09/94, 59 FR 46562
218.644
Emissions Testing
09/27/93
09/09/94, 59 FR 46562
Subpart CC: Polyester Resin Product Manufacturing Process
218.660
Applicability
01/24/94
10/21/96, 61 FR 54556
218.666
Control Requirements
01/24/94
10/21/96, 61 FR 54556
218.667
Compliance Schedule
01/24/94
10/21/96, 61 FR 54556
218.668
Testing
01/24/94
10/21/96, 61 FR 54556
218.670
Recordkeeping and Reporting for Exempt Emission Units
01/24/94
10/21/96, 61 FR 54556
218.672
Recordkeeping and Reporting for Subject Emission Units
01/24/94
10/21/96, 61 FR 54556
Subpart DD: Aerosol Can Fillings
218.680
Applicability
01/24/94
10/21/96, 61 FR 54556
218.686
Control Requirements
05/09/95
03/12/97, 62 FR 11327
218.688
Testing
01/24/94
10/21/96, 61 FR 54556
218.690
Recordkeeping and Reporting for Exempt Emission Units
01/24/94
10/21/96, 61 FR 54556
218.692
Recordkeeping and Reporting for Subject Emission Units
01/24/94
10/21/96, 61 FR 54556
Subpart GG: Marine Terminals
218.760
Applicability
10/25/94
04/03/95, 60 FR 16801
218.762
Control Requirements
10/25/94
04/03/95, 60 FR 16801
218.764
Compliance Certification
10/25/94
04/03/95, 60 FR 16801
218.766
Leaks
10/25/94
04/03/95, 60 FR 16801
218.768
Testing and Monitoring
10/25/94
04/03/95, 60 FR 16801
218.770
Recordkeeping and Reporting
10/25/94
04/03/95, 60 FR 16801
Subpart HH: Motor Vehicle Refinishing
218.780
Emission Limitations
05/09/95
07/25/96, 61 FR 38577
218.782
Alternative Control Requirements
05/09/95
07/25/96, 61 FR 38577
218.784
Equipment Specifications
01/28/13
10/06/14, 79 FR 60070
218.786
Surface Preparation Materials
05/09/95
07/25/96, 61 FR 38577
218.787
Work Practices
05/09/95
07/25/96, 61 FR 38577
218.788
Testing
05/09/95
07/25/96, 61 FR 38577
218.789
Monitoring and Recordkeeping for Control Devices
05/09/95
07/25/96, 61 FR 38577
218.790
General Recordkeeping and Reporting
05/09/95
07/25/96, 61 FR 38577
218.791
Compliance Date
05/09/95
07/25/96, 61 FR 38577
Subpart II: Fiberglass Boat Manufacturing Materials
218.890
Applicability
09/14/10
03/23/12, 77 FR 16940
218.891
Emission Limitations and Control Requirements
07/27/11
03/23/12, 77 FR 16940
218.892
Testing Requirements
07/27/11
03/23/12, 77 FR 16940
218.894
Recordkeeping and Reporting Requirements
07/27/11
03/23/12, 77 FR 16940
Subpart JJ: Miscellaneous Industrial Adhesives
218.900
Applicability
09/14/10
03/23/12, 77 FR 16940
218.901
Emission Limitations and Control Requirements
07/27/11
03/23/12, 77 FR 16940
218.902
Testing Requirements
07/27/11
03/23/12, 77 FR 16940
218.903
Monitoring Requirements
07/27/11
03/23/12, 77 FR 16940
218.904
Recordkeeping and Reporting Requirements
07/27/11
03/23/12, 77 FR 16940
Subpart PP: Miscellaneous Fabricated Product Manufacturing Processes
218.920
Applicability
01/24/94
10/21/96, 61 FR 54556
218.926
Control Requirements
01/24/94
10/21/96, 61 FR 54556
218.927
Compliance Schedule
09/27/93
10/21/96, 61 FR 54556
218.928
Testing
09/27/93
10/21/96, 61 FR 54556
218.929
Cementable and Dress or Performance Shoe Leather
04/08/03
05/24/04, 69 FR 29446
Subpart QQ: Miscellaneous Formulation Manufacturing Processes
218.940
Applicability
07/16/98
06/18/99, 64 FR 32810
218.946
Control Requirements
01/24/94
10/21/96, 61 FR 54556
218.947
Compliance Schedule
09/27/93
09/09/94, 59 FR 46562
218.948
Testing
09/27/93
09/09/94, 59 FR 46562
Subpart RR: Miscellaneous Organic Chemical Manufacturing Processes
218.960
Applicability
01/24/94
10/21/96, 61 FR 54556
218.966
Control Requirements
05/09/95
03/12/97, 62 FR 11327
218.967
Compliance Schedule
09/27/93
10/21/96, 61 FR 54556
218.968
Testing
09/27/93
10/21/96, 61 FR 54556
Subpart TT: Other Emission Units
218.980
Applicability
05/09/95
03/12/97, 62 FR 11327
218.986
Control Requirements
01/24/94
10/21/96, 61 FR 54556
218.987
Compliance Schedule
09/27/93
10/21/96, 61 FR 54556
218.988
Testing
09/27/93
10/21/96, 61 FR 54556
Subpart UU: Recordkeeping and Reporting
218.990
Exempt Emission Units
09/27/93
10/21/96, 61 FR 54556
218.991
Subject Emission Units
01/24/94
10/21/96, 61 FR 54556
218.Appendix A:
List of Chemicals Defining Synthetic Organic Chemical and Polymer Manufacturing
09/27/93
09/09/94, 59 FR 46562
218.Appendix B:
VOM Measurement Techniques for Capture Efficiency
09/27/93
09/09/94, 59 FR 46562
218.Appendix C:
Reference Test Methods for Air Oxidation Processes
09/27/93
09/09/94, 59 FR 46562
218.Appendix D:
Coefficients for the Total Resource Effectiveness Index (TRE) Equation
09/27/93
09/09/94, 59 FR 46562
218.Appendix E:
List of Affected Marine Terminals
10/25/94
04/03/95, 60 FR 16801
218.Appendix G:
TRE Index Measurements for SOCMI Reactors and Distillation Units
05/09/95
03/23/98, 63 FR 13784
218.Appendix H:
Baseline VOM Content Limitations for Subpart F, Section 218.212 Cross-Line Averaging
05/09/95
02/13/96, 61 FR 5511
Part 219: Organic Material Emission Standards and Limitations for the Metro East Area
Subpart A: General Provisions
219.100
Introduction
09/27/93
09/09/94, 59 FR 46562
219.101
Savings Clause
10/25/94
04/03/95, 60 FR 16801
219.102
Abbreviations and Conversion Factors
09/27/93
09/09/94, 59 FR 46562
219.103
Applicability
08/16/91
09/09/94, 59 FR 46562
219.104
Definitions
09/27/93
09/09/94, 59 FR 46562
219.105
Test Methods and Procedures
12/23/13
03/13/15, 80 FR 13248
219.106
Compliance Dates
09/14/10
03/23/12, 77 FR 16940
219.107
Operation of Afterburners
09/27/93
09/09/94, 59 FR 46562
219.108
Exemptions, Variations, and Alternative Means of Control or Compliance Determinations
08/16/91
09/09/94, 59 FR 46562
219.109
Vapor Pressure of Volatile Organic Liquids
09/27/93
09/09/94, 59 FR 46562
219.110
Vapor Pressure of Organic Material or Solvent
09/27/93
09/09/94, 59 FR 46562
219.111
Vapor Pressure of Volatile Organic Material
09/27/93
09/09/94, 59 FR 46562
219.112
Incorporations by Reference
12/23/13
03/13/15, 80 FR 13248
Subpart B: Organic Emissions From Storage and Loading Operations
219.119
Applicability for VOL
11/15/94
08/08/96, 61 FR 41338
219.120
Control Requirements for Storage Containers of VOL
11/15/94
08/08/96, 61 FR 41338
219.121
Storage Containers of VPL
09/27/93
09/09/94, 59 FR 46562
219.122
Loading Operations
09/27/93
09/09/94, 59 FR 46562
219.123
Petroleum Liquid Storage Tanks
09/27/93
09/09/94, 59 FR 46562
219.124
External Floating Roofs
09/27/93
09/09/94, 59 FR 46562
219.125
Compliance Dates
11/15/94
08/08/96, 61 FR 41338
219.127
Testing VOL Operations
11/15/94
08/08/96, 61 FR 41338
219.128
Monitoring VOL Operations
01/28/13
10/06/14, 79 FR 60070
219.129
Recordkeeping and Reporting for VOL Operations
11/15/94
08/08/96, 61 FR 41338
Subpart C: Organic Emissions From Miscellaneous Equipment
219.141
Separation Operations
09/27/93
09/09/94, 59 FR 46562
219.142
Pumps and Compressors
08/16/91
09/09/94, 59 FR 46562
219.143
Vapor Blowdown
09/27/93
09/09/94, 59 FR 46562
219.144
Safety Relief Valves
09/27/93
09/09/94, 59 FR 46562
Subpart E: Solvent Cleaning
219.181
Solvent Cleaning Degreasing Operations
06/25/10
03/23/12, 77 FR 16940
219.182
Cold Cleaning
06/09/97
11/26/97, 62 FR 62951
219.183
Open Top Vapor Degreasing
09/27/93
09/09/94, 59 FR 46562
219.184
Conveyorized Degreasing
09/27/93
09/09/94, 59 FR 46562
219.186
Test Methods
09/27/93
09/09/94, 59 FR 46562
219.187
Other Industrial Solvent Cleaning Operations
07/27/11
03/23/12, 77 FR 16940
Subpart F: Coating Operations
219.204
Emission Limitations
07/27/11
03/23/12, 77 FR 16940
219.205
Daily-Weighted Average Limitations
09/14/10
03/23/12, 77 FR 16940
219.206
Solids Basis Calculation
09/27/93
09/09/94, 59 FR 46562
219.207
Alternative Emission Limitations
07/27/11
03/23/12, 77 FR 16940
219.208
Exemptions From Emission Limitations
10/25/11
04/19/13, 78 FR 23495
219.209
Exemption From General Rule on Use of Organic Material
09/27/93
09/09/94, 59 FR 46562
219.210
Compliance Schedule
09/14/10
03/23/12, 77 FR 16940
219.211
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940
219.212
Cross-Line Averaging To Establish Compliance for Coating Lines
09/14/10
03/23/12, 77 FR 16940
219.213
Recordkeeping and Reporting for Cross-Line Averaging Participating Coating Lines
05/09/95
02/13/96, 61 FR 5511
219.214
Changing Compliance Methods
05/09/95
02/13/96, 61 FR 5511
219.215
Wood Furniture Coating Averaging Approach
02/02/98
05/19/98, 63 FR 27489
219.216
Wood Furniture Coating Add-On Control Use
02/02/98
05/19/98, 63 FR 27489
219.217
Wood Furniture Coating and Flat Wood Paneling Coating Work Practice Standards
07/27/11
03/23/12, 77 FR 16940
219.218
Work Practice Standards for Paper Coatings, Metal Furniture Coatings, and Large Appliance Coatings
03/23/10
03/23/12, 77 FR 16940
219.219
Work Practice Standards for Automobile and Light-Duty Truck Assembly Coatings and Miscellaneous Metal and Plastic Parts Coatings
09/14/10
03/23/12, 77 FR 16940
Subpart G: Use of Organic Material
219.301
Use of Organic Material
09/27/93
09/09/94, 59 FR 46562
219.302
Alternative Standard
09/27/93
09/09/94, 59 FR 46562
219.303
Fuel Combustion Emission Units
09/27/93
09/09/94, 59 FR 46562
219.304
Operations With Compliance Program
09/27/93
09/09/94, 59 FR 46562
Subpart H: Printing and Publishing
219.401
Flexographic and Rotogravure Printing
07/27/11
03/23/12, 77 FR 16940
219.402
Applicability
06/25/10
03/23/12, 77 FR 16940
219.403
Compliance Schedule
06/25/10
03/23/12, 77 FR 16940
219.404
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940
219.405
Lithographic Printing: Applicability
06/25/10
03/23/12, 77 FR 16940
219.407
Emission Limitations and Control Requirements for Lithographic Printing Lines
06/25/10
03/23/12, 77 FR 16940
219.409
Testing for Lithographic Printing
07/27/11
03/23/12, 77 FR 16940
219.410
Monitoring Requirements for Lithographic Printing
06/25/10
03/23/12, 77 FR 16940
219.411
Recordkeeping and Reporting for Lithographic Printing
07/27/11
03/23/12, 77 FR 16940
219.412
Letterpress Printing Lines: Applicability
06/25/10
03/23/12, 77 FR 16940
219.413
Emission Limitations and Control Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940
219.415
Testing for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940
219.416
Monitoring Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940
219.417
Recordkeeping and Reporting for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940
Subpart Q: Synthetic Organic Chemical and Polymer Manufacturing Plant
219.421
General Requirements
09/27/93
09/09/94, 59 FR 46562
219.422
Inspection Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562
219.423
Inspection Program for Leaks
09/27/93
09/09/94, 59 FR 46562
219.424
Repairing Leaks
09/27/93
09/09/94, 59 FR 46562
219.425
Recordkeeping for Leaks
09/27/93
09/09/94, 59 FR 46562
219.426
Report for Leaks
09/27/93
09/09/94, 59 FR 46562
219.427
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562
219.428
Open-Ended Valves
09/27/93
09/09/94, 59 FR 46562
219.429
Standards for Control Devices
09/27/93
09/09/94, 59 FR 46562
219.431
Applicability
05/09/95
03/23/98, 63 FR 13784
219.432
Control Requirements
05/09/95
03/23/98, 63 FR 13784
219.433
Performance and Testing Requirements
05/09/95
03/23/98, 63 FR 13784
219.434
Monitoring Requirements
05/09/95
03/23/98, 63 FR 13784
219.435
Recordkeeping and Reporting Requirements
05/09/95
03/23/98, 63 FR 13784
219.436
Compliance Date
05/09/95
03/23/98, 63 FR 13784
Subpart R: Petroleum Refining and Related Industries; Asphalt Materials
219.441
Petroleum Refinery Waste Gas Disposal
09/27/93
09/09/94, 59 FR 46562
219.442
Vacuum Producing Systems
08/16/91
09/09/94, 59 FR 46562
219.443
Wastewater (Oil/Water) Separator
09/27/93
09/09/94, 59 FR 46562
219.444
Process Unit Turnarounds
08/16/91
09/09/94, 59 FR 46562
219.445
Leaks: General Requirements
09/27/93
09/09/94, 59 FR 46562
219.446
Monitoring Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562
219.447
Monitoring Program for Leaks
09/27/93
09/09/94, 59 FR 46562
219.448
Recordkeeping for Leaks
08/16/91
09/09/94, 59 FR 46562
219.449
Reporting for Leaks
09/27/93
09/09/94, 59 FR 46562
219.450
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562
219.451
Sealing Device Requirements
08/16/91
09/09/94, 59 FR 46562
219.452
Compliance Schedule for Leaks
09/27/93
09/09/94, 59 FR 46562
Subpart S: Rubber and Miscellaneous Plastic Products
219.461
Manufacture of Pneumatic Rubber Tires
09/27/93
09/09/94, 59 FR 46562
219.462
Green Tire Spraying Operations
09/27/93
09/09/94, 59 FR 46562
219.463
Alternative Emission Reduction Systems
09/27/93
09/09/94, 59 FR 46562
219.464
Emission Testing
09/27/93
09/09/94, 59 FR 46562
Subpart T: Pharmaceutical Manufacturing
219.480
Applicability
05/09/95
03/12/97, 62 FR 11327
219.481
Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers
09/27/93
09/09/94, 59 FR 46562
219.482
Control of Air Dryers, Production Equipment Exhaust Systems and Filters
09/27/93
09/09/94, 59 FR 46562
219.483
Material Storage and Transfer
09/27/93
09/09/94, 59 FR 46562
219.484
In-Process Tanks
08/16/91
09/09/94, 59 FR 46562
219.485
Leaks
09/27/93
09/09/94, 59 FR 46562
219.486
Other Emission Units
09/27/93
09/09/94, 59 FR 46562
219.487
Testing
09/27/93
09/09/94, 59 FR 46562
219.488
Monitoring for Air Pollution Control Equipment
08/16/91
09/09/94, 59 FR 46562
219.489
Recordkeeping for Air Pollution Control Equipment
09/27/93
09/09/94, 59 FR 46562
Subpart V: Batch Operations and Air Oxidation Processes
219.500
Applicability for Batch Operations
05/22/95
04/02/96, 61 FR 14484
219.501
Control Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484
219.502
Determination of Uncontrolled Total Annual Mass Emissions and Actual Weighted Average Flow Rate Values for Batch Operations
05/22/95
04/02/96, 61 FR 14484
219.503
Performance and Testing Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484
219.504
Monitoring Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484
219.505
Reporting and Recordkeeping for Batch Operations
05/22/95
04/02/96, 61 FR 14484
219.506
Compliance Date
05/22/95
04/02/96, 61 FR 14484
219.520
Emission Limitations for Air Oxidation Processes
11/15/94
09/27/95, 60 FR 49770
219.522
Savings Clause
11/15/94
09/27/95, 60 FR 49770
219.523
Compliance
11/15/94
09/27/95, 60 FR 49770
219.524
Determination of Applicability
11/15/94
09/27/95, 60 FR 49770
219.526
Testing and Monitoring
08/16/91
09/09/94, 59 FR 46562
Subpart W: Agriculture
219.541
Pesticide Exception
09/27/93
09/09/94, 59 FR 46562
Subpart X: Construction
219.561
Architectural Coatings
08/16/91
09/09/94, 59 FR 46562
219.562
Paving Operations
09/27/93
09/09/94, 59 FR 46562
219.563
Cutback Asphalt
08/16/91
09/09/94, 59 FR 46562
Subpart Y: Gasoline Distribution
219.581
Bulk Gasoline Plants
09/27/93
09/09/94, 59 FR 46562
219.582
Bulk Gasoline Terminals
09/27/93
09/09/94, 59 FR 46562
219.583
Gasoline Dispensing Operations—Storage Tank Filling Operations
12/23/13
03/13/15, 80 FR 13248
219.584
Gasoline Delivery Vessels
09/27/93
09/09/94, 59 FR 46562
Subpart Z: Dry Cleaners
219.607
Standards for Petroleum Solvent Dry Cleaners
08/16/91
09/09/94, 59 FR 46562
219.608
Operating Practices for Petroleum Solvent Dry Cleaners
09/27/93
09/09/94, 59 FR 46562
219.609
Program for Inspection and Repair of Leaks
09/27/93
09/09/94, 59 FR 46562
219.610
Testing and Monitoring
09/27/93
09/09/94, 59 FR 46562
219.611
Exemption for Petroleum Solvent Dry Cleaners
09/27/93
09/09/94, 59 FR 46562
Subpart AA: Paint and Ink Manufacturing
219.620
Applicability
09/27/93
09/09/94, 59 FR 46562
219.621
Exemption for Waterbase Material and Heatset-Offset Ink
09/27/93
09/09/94, 59 FR 46562
219.623
Permit Conditions
09/27/93
09/09/94, 59 FR 46562
219.624
Open-Top Mills, Tanks, Vats or Vessels
09/27/93
09/09/94, 59 FR 46562
219.625
Grinding Mills
08/16/91
09/09/94, 59 FR 46562
219.626
Storage Tanks
08/16/91
09/09/94, 59 FR 46562
219.628
Leaks
09/27/93
09/09/94, 59 FR 46562
219.630
Clean Up
08/16/91
09/09/94, 59 FR 46562
219.636
Compliance Schedule
09/27/93
09/09/94, 59 FR 46562
219.637
Recordkeeping and Reporting
09/27/93
09/09/94, 59 FR 46562
Subpart BB: Polystyrene Plants
219.640
Applicability
09/27/93
09/09/94, 59 FR 46562
219.642
Emissions Limitation at Polystyrene Plants
09/27/93
09/09/94, 59 FR 46562
219.644
Emissions Testing
09/27/93
09/09/94, 59 FR 46562
Subpart GG: Marine Terminals
219.760
Applicability
10/25/94
04/03/95, 60 FR 16801
219.762
Control Requirements
10/25/94
04/03/95, 60 FR 16801
219.764
Compliance Certification
10/25/94
04/03/95, 60 FR 16801
219.766
Leaks
10/25/94
04/03/95, 60 FR 16801
219.768
Testing and Monitoring
10/25/94
04/03/95, 60 FR 16801
219.770
Recordkeeping and Reporting
10/25/94
04/03/95, 60 FR 16801
Subpart HH: Motor Vehicle Refinishing
219.780
Emission Limitations
05/09/95
07/25/96, 61 FR 38577
219.782
Alternative Control Requirements
05/09/95
07/25/96, 61 FR 38577
219.784
Equipment Specifications
01/28/13
10/06/14, 79 FR 60070
219.786
Surface Preparation Materials
05/09/95
07/25/96, 61 FR 38577
219.787
Work Practices
05/09/95
07/25/96, 61 FR 38577
219.788
Testing
05/09/95
07/25/96, 61 FR 38577
219.789
Monitoring and Recordkeeping for Control Devices
05/09/95
07/25/96, 61 FR 38577
219.791
Compliance Date
05/09/95
07/25/96, 61 FR 38577
Subpart II: Fiberglass Boat Manufacturing Materials
219.890
Applicability
09/14/10
03/23/12, 77 FR 16940
219.891
Emission Limitations and Control Requirements
07/27/11
03/23/12, 77 FR 16940
219.892
Testing and Monitoring Requirements
07/27/11
03/23/12, 77 FR 16940
219.894
Recordkeeping and Reporting Requirements
07/27/11
03/23/12, 77 FR 16940
Subpart JJ: Miscellaneous Industrial Adhesives
219.900
Applicability
09/14/10
03/23/12, 77 FR 16940
219.901
Emission Limitations and Control Requirements
07/27/11
03/23/12, 77 FR 16940
219.902
Testing Requirements
07/27/11
03/23/12, 77 FR 16940
219.903
Monitoring Requirements
07/27/11
03/23/12, 77 FR 16940
219.904
Recordkeeping and Reporting Requirements
07/27/11
03/23/12, 77 FR 16940
Subpart PP: Miscellaneous Fabricated Product Manufacturing Processes
219.920
Applicability
09/27/93
05/07/96, 61 FR 20455
219.923
Permit Conditions
09/27/93
05/07/96, 61 FR 20455
219.926
Control Requirements
05/09/95
05/07/96, 61 FR 20455
219.927
Compliance Schedule
09/27/93
05/07/96, 61 FR 20455
219.928
Testing
09/27/93
05/07/96, 61 FR 20455
Subpart QQ: Miscellaneous Formulation Manufacturing Processes
219.940
Applicability
09/27/93
05/07/96, 61 FR 20455
219.943
Permit Conditions
09/27/93
05/07/96, 61 FR 20455
219.946
Control Requirements
05/09/95
05/07/96, 61 FR 20455
219.947
Compliance Schedule
09/27/93
05/07/96, 61 FR 20455
219.948
Testing
09/27/93
05/07/96, 61 FR 20455
Subpart RR: Miscellaneous Organic Chemical Manufacturing Processes
219.960
Applicability
09/27/93
05/07/96, 61 FR 20455
219.963
Permit Conditions
09/27/93
05/07/96, 61 FR 20455
219.966
Control Requirements
05/09/95
05/07/96, 61 FR 20455
219.967
Compliance Schedule
09/27/93
05/07/96, 61 FR 20455
219.968
Testing
09/27/93
05/07/96, 61 FR 20455
Subpart TT: Other Emission Units
219.980
Applicability
05/09/95
03/12/97, 62 FR 11327
219.983
Permit Conditions
09/27/93
05/07/96, 61 FR 20455
219.986
Control Requirements
05/09/95
05/07/96, 61 FR 20455
219.987
Compliance Schedule
09/27/93
05/07/96, 61 FR 20455
219.988
Testing
09/27/93
05/07/96, 61 FR 20455
Subpart UU: Recordkeeping and Reporting
219.990
Exempt Emission Units
09/27/93
05/07/96, 61 FR 20455
219.991
Subject Emission Units
09/27/93
05/07/96, 61 FR 20455
219.Appendix A:
List of Chemicals Defining Synthetic Organic Chemical and Polymer Manufacturing
09/27/93
09/09/94, 59 FR 46562
219.Appendix B:
VOM Measurement Techniques for Capture Efficiency (Repealed)
09/27/93
09/09/94, 59 FR 46562
219.Appendix C:
Reference Methods and Procedures
09/27/93
09/09/94, 59 FR 46562
219.Appendix D:
Coefficients for the Total Resource Effectiveness Index (TRE) Equation
09/27/93
09/09/94, 59 FR 46562
219.Appendix E:
List of Affected Marine Terminals
02/15/96
04/03/95, 60 FR 16801
219.Appendix G:
TRE Index Measurements for SOCMI Reactors and Distillation Units
05/09/95
03/23/98, 63 FR 13784
219.Appendix H:
Baseline VOM Content Limitations for Subpart F, Section 219.212 Cross-Line Averaging
05/09/95
02/13/96, 61 FR 5511
Part 223: Standards and Limitations for Organic Material Emissions for Area Sources
Subpart A: General Provisions
223.100
Severability
06/08/09
05/06/13, 78 FR 26258
223.105
Abbreviations and Acronyms
06/08/09
05/06/13, 78 FR 26258
223.120
Incorporations by Reference
06/08/09
05/06/13, 78 FR 26258
Subpart B: Consumer and Commercial Products
223.200
Purpose
06/08/09
05/06/13, 78 FR 26258
223.201
Applicability
05/04/12
05/06/13, 78 FR 26258
223.203
Definitions for Subpart B
05/04/12
05/06/13, 78 FR 26258
223.205
Standards
05/04/12
05/06/13, 78 FR 26258
223.206
Diluted Products
06/08/09
05/06/13, 78 FR 26258
223.207
Products Registered Under FIFRA
05/04/12
05/06/13, 78 FR 26258
223.208
Requirements for Aerosol Adhesives
05/04/12
05/06/13, 78 FR 26258
223.209
Requirements for Floor Wax Strippers
06/08/09
05/06/13, 78 FR 26258
223.210
Products Containing Ozone-Depleting Compounds
06/08/09
05/06/13, 78 FR 26258
223.211
Requirements for Adhesive Removers, Aerosol Adhesives, Contact Adhesives, Electrical Cleaners, Electronic Cleaners, Footwear or Leather Care Products, General Purpose Degreasers, and Graffiti Removers
05/04/12
05/06/13, 78 FR 26258
223.220
Requirements for Charcoal Lighter Material
06/08/09
05/06/13, 78 FR 26258
223.230
Exemptions
06/08/09
05/06/13, 78 FR 26258
223.240
Innovative Product Exemption
06/08/09
05/06/13, 78 FR 26258
223.245
Alternative Compliance Plans
06/08/09
05/06/13, 78 FR 26258
223.250
Product Dating
06/08/09
05/06/13, 78 FR 26258
223.255
Additional Product Dating Requirements
06/08/09
05/06/13, 78 FR 26258
223.260
Most Restrictive Limit
06/08/09
05/06/13, 78 FR 26258
223.265
Additional Labeling Requirements for Aerosol Adhesives, Adhesive Removers, Electronic Cleaners, Electrical Cleaners, Energized Electrical Cleaners, and Contact Adhesives
06/08/09
05/06/13, 78 FR 26258
223.270
Reporting Requirements
06/08/09
05/06/13, 78 FR 26258
223.275
Special Recordkeeping Requirements for Consumer Products That Contain Perchloroethylene or Methylene Chloride
06/08/09
05/06/13, 78 FR 26258
223.280
Calculating Illinois Sales
06/08/09
05/06/13, 78 FR 26258
223.285
Test Methods
06/08/09
05/06/13, 78 FR 26258
Subpart C: Architectural and Industrial Maintenance Coatings
223.300
Purpose
06/08/09
05/06/13, 78 FR 26258
223.305
Applicability
05/04/12
05/06/13, 78 FR 26258
223.307
Definitions for Subpart C
06/08/09
05/06/13, 78 FR 26258
223.310
Standards
06/08/09
05/06/13, 78 FR 26258
223.320
Container Labeling Requirements
06/08/09
05/06/13, 78 FR 26258
223.330
Reporting Requirements
06/08/09
05/06/13, 78 FR 26258
223.340
Compliance Provisions and Test Methods
06/08/09
05/06/13, 78 FR 26258
223.350
Alternative Test Methods
06/08/09
05/06/13, 78 FR 26258
223.360
Methacrylate Traffic Coating Markings
06/08/09
05/06/13, 78 FR 26258
223.370
Test Methods
06/08/09
05/06/13, 78 FR 26258
Part 225: Control of Emissions From Large Combustion Sources
Subpart A: General Provisions
225.120
Abbreviations and Acronyms
08/31/07
10/16/07, 72 FR 58528
225.130
Definitions
08/31/07
10/16/07, 72 FR 58528
225.140
Incorporations by Reference
08/31/07
10/16/07, 72 FR 58528
225.150
Commence Commercial Operation
08/31/07
10/16/07, 72 FR 58528
Subpart B: Control of Mercury Emissions From Coal-Fired Electric Generating Units
225.233
Multi-Pollutant Standard (MPS)
06/26/09
07/06/12, 77 FR 39943
Only (a), (b), (e), and (g).
225.291
Combined Pollutant Standard: Purpose
06/26/09
07/06/12, 77 FR 39943
225.292
Applicability of the Combined Pollutant Standard
06/26/09
07/06/12, 77 FR 39943
225.293
Combined Pollutant Standard: Notice of Intent
06/26/09
07/06/12, 77 FR 39943
225.295
Combined Pollutant Standard: Emissions Standards for NO
X
and SO
2
06/26/09
07/06/12, 77 FR 39943
225.296
Combined Pollutant Standard: Control Technology Requirements for NO
X
, SO
2
, and PM Emissions
06/26/09
07/06/12, 77 FR 39943
Except (d).
Subpart C: Clean Air Act Interstate Rule (CAIR) SO
2
Trading Program
225.300
Purpose
08/31/07
10/16/07, 72 FR 58528
225.305
Applicability
08/31/07
10/16/07, 72 FR 58528
225.310
Compliance Requirements
08/31/07
10/16/07, 72 FR 58528
225.315
Appeal Procedures
08/31/07
10/16/07, 72 FR 58528
225.320
Permit Requirements
08/31/07
10/16/07, 72 FR 58528
225.325
Trading Program
08/31/07
10/16/07, 72 FR 58528
Subpart D: CAIR NO
X
Annual Trading Program
225.400
Purpose
08/31/07
10/16/07, 72 FR 58528
225.405
Applicability
08/31/07
10/16/07, 72 FR 58528
225.410
Compliance Requirements
08/31/07
10/16/07, 72 FR 58528
225.415
Appeal Procedures
08/31/07
10/16/07, 72 FR 58528
225.420
Permit Requirements
08/31/07
10/16/07, 72 FR 58528
225.425
Annual Trading Budget
08/31/07
10/16/07, 72 FR 58528
225.430
Timing for Annual Allocations
08/31/07
10/16/07, 72 FR 58528
225.435
Methodology for Calculating Annual Allocations
08/31/07
10/16/07, 72 FR 58528
225.440
Annual Allocations
08/31/07
10/16/07, 72 FR 58528
225.445
New Unit Set-Aside (NUSA)
08/31/07
10/16/07, 72 FR 58528
225.450
Monitoring, Recordkeeping and Reporting Requirements for Gross Electrical Output and Useful Thermal Energy
08/31/07
10/16/07, 72 FR 58528
225.455
Clean Air Set-Aside (CASA)
08/31/07
10/16/07, 72 FR 58528
225.460
Energy Efficiency and Conservation, Renewable Energy, and Clean Technology Projects
08/31/07
10/16/07, 72 FR 58528
225.465
Clean Air Set-Aside (CASA) Allowances
08/31/07
10/16/07, 72 FR 58528
225.470
Clean Air Set-Aside (CASA) Applications
08/31/07
10/16/07, 72 FR 58528
225.475
Agency Action on Clean Air Set-Aside (CASA) Applications
08/31/07
10/16/07, 72 FR 58528
225.480
Compliance Supplement Pool
08/31/07
10/16/07, 72 FR 58528
Subpart E: CAIR NO
X
Ozone Season Trading Program
225.500
Purpose
08/31/07
10/16/07, 72 FR 58528
225.505
Applicability
08/31/07
10/16/07, 72 FR 58528
225.510
Compliance Requirements
08/31/07
10/16/07, 72 FR 58528
225.515
Appeal Procedures
08/31/07
10/16/07, 72 FR 58528
225.520
Permit Requirements
08/31/07
10/16/07, 72 FR 58528
225.525
Ozone Season Trading Budget
08/31/07
10/16/07, 72 FR 58528
225.530
Timing for Ozone Season Allocations
08/31/07
10/16/07, 72 FR 58528
225.535
Methodology for Calculating Ozone Season Allocations
08/31/07
10/16/07, 72 FR 58528
225.540
Ozone Season Allocations
08/31/07
10/16/07, 72 FR 58528
225.545
New Unit Set-Aside (NUSA)
08/31/07
10/16/07, 72 FR 58528
225.550
Monitoring, Recordkeeping and Reporting Requirements for Gross Electrical Output and Useful Thermal Energy
08/31/07
10/16/07, 72 FR 58528
225.555
Clean Air Set-Aside (CASA)
08/31/07
10/16/07, 72 FR 58528
225.560
Energy Efficiency and Conservation, Renewable Energy, and Clean Technology Projects
08/31/07
10/16/07, 72 FR 58528
225.565
Clean Air Set-Aside (CASA) Allowances
08/31/07
10/16/07, 72 FR 58528
225.570
Clean Air Set-Aside (CASA) Applications
08/31/07
10/16/07, 72 FR 58528
225.575
Agency Action on Clean Air Set-Aside (CASA) Applications
08/31/07
10/16/07, 72 FR 58528
225.Appendix A:
Specified EGUs for Purposes of the CPS (Midwest Generation's Coal-Fired Boilers as of July 1, 2006)
06/26/09
07/06/12, 77 FR 39943
Subchapter i: Open Burning
Part 237: Open Burning
Subpart A: General Provisions
237.101
Definitions
09/07/71
05/31/72, 37 FR 10862
Approved as Rule 401.
237.102
Prohibitions
09/07/71
05/31/72, 37 FR 10862
Approved as Rule 402.
237.103
Explosive Wastes
09/07/71
05/31/72, 37 FR 10862
Approved as Rule 405.
237.110
Local Enforcement
09/07/71
05/31/72, 37 FR 10862
Approved as Rule 406.
237.120
Exemptions
09/07/71
05/31/72, 37 FR 10862
Approved as Rule 403.
Subpart B: Permits
237.201
Permits
09/07/71
05/31/72, 37 FR 10862
Approved as Rule 404.
Subchapter k: Emission Standards and Limitations for Mobile Sources
Part 240: Mobile Sources
Subpart A: Definitions and General Provisions
240.101
Preamble
12/20/94
08/13/14, 79 FR 47377
240.102
Definitions
02/01/12
08/13/14, 79 FR 47377
240.103
Prohibitions
04/14/72
08/13/14, 79 FR 47377
240.104
Inspection
02/01/12
08/13/14, 79 FR 47377
240.105
Penalties
02/01/12
08/13/14, 79 FR 47377
240.106
Determination of Violation
02/01/12
08/13/14, 79 FR 47377
240.107
Incorporations by Reference
03/18/11
08/13/14, 79 FR 47377
Subpart B: Emissions
240.121
Smoke Emissions
02/01/12
08/13/14, 79 FR 47377
240.122
Diesel Engine Emissions Standards for Locomotives
04/07/92
08/13/14, 79 FR 47377
240.123
Liquid Petroleum Gas Fuel Systems
02/01/12
08/13/14, 79 FR 47377
Subpart C: Smoke Opacity Standards and Test Procedures for Diesel-Powered Heavy Duty Vehicles
240.140
Applicability
02/26/01
08/13/14, 79 FR 47377
240.141
Smoke Opacity Standards and Test Procedures for Diesel-Powered Heavy Duty Vehicles
02/26/01
08/13/14, 79 FR 47377
Subpart D: Steady-State Idle Mode Test Emission Standards
240.151
Applicability
02/01/12
08/13/14, 79 FR 47377
240.152
Steady-State Idle Mode Vehicle Exhaust Emission Standards
03/18/11
08/13/14, 79 FR 47377
240.153
Compliance Determination
03/18/11
08/13/14, 79 FR 47377
Subpart F: Evaporative Test Standards
240.171
Applicability
02/01/12
08/13/14, 79 FR 47377
240.172
Evaporative System Integrity Test Standards
07/13/98
08/13/14, 79 FR 47377
Subpart G: On-Road Remote Sensing Test Emission Standards
240.181
Applicability
03/18/11
08/13/14, 79 FR 47377
240.182
On-Road Remote Sensing Emission Standards
03/18/11
08/13/14, 79 FR 47377
240.183
Compliance Determination
07/13/98
08/13/14, 79 FR 47377
Subpart H: On-Board Diagnostic Test Standards
240.191
Applicability
03/18/11
08/13/14, 79 FR 47377
240.192
On-Board Diagnostic Test Standards
12/18/01
08/13/14, 79 FR 47377
240.193
Compliance Determination
12/18/01
08/13/14, 79 FR 47377
Subpart I: Visual Inspection Test Standards
240.201
Applicability
02/01/12
08/13/14, 79 FR 47377
240.202
Visual Inspection Test Standards
02/01/12
08/13/14, 79 FR 47377
240.203
Compliance Determination
02/01/12
08/13/14, 79 FR 47377
240.Appendix A:
Rule Into Section Table
02/01/12
08/13/14, 79 FR 47377
240.Appendix B:
Section Into Rule Table
02/01/12
08/13/14, 79 FR 47377
Part 241: Clean Fuel Fleet Program
Subpart A: General Provisions
241.101
Other Definitions
09/11/95
03/19/96, 61 FR 11139
241.102
Definitions
09/11/95
03/19/96, 61 FR 11139
241.103
Abbreviations
09/11/95
03/19/96, 61 FR 11139
241.104
Incorporations by Reference
09/11/95
03/19/96, 61 FR 11139
Subpart B: General Requirements
241.110
Applicability
09/11/95
03/19/96, 61 FR 11139
241.111
Exemptions
09/11/95
03/19/96, 61 FR 11139
241.112
Registration of Fleet Owners or Operators
09/11/95
03/19/96, 61 FR 11139
241.113
Control Requirements
11/25/97
02/17/99, 64 FR 7788
241.114
Conversions
09/11/95
03/19/96, 61 FR 11139
241.115
Operating Requirements
09/11/95
03/19/96, 61 FR 11139
Subpart C: Credits
241.130
Clean Fuel Fleet Credit Program
11/25/97
02/17/99, 64 FR 7788
241.131
Credit Provisions
09/11/95
03/19/96, 61 FR 11139
Subpart D: Recordkeeping and Reporting
241.140
Reporting Requirements
11/25/97
02/17/99, 64 FR 7788
241.141
Recordkeeping Requirements
09/11/95
03/19/96, 61 FR 11139
241.142
Report of Credit Activities
09/11/95
03/19/96, 61 FR 11139
241.Appendix A:
Emission Standards for Clean Fuel Vehicles
09/11/95
03/19/96, 61 FR 11139
241.Appendix B:
Credit Values
11/25/97
02/17/99, 64 FR 7788
Subchapter l: Air Quality Standards and Episodes
Part 243: Air Quality Standards
Subpart A: General Provisions
243.101
Definitions
07/29/13
05/20/15, 80 FR 28835
243.102
Scope
07/29/13
05/20/15, 80 FR 28835
243.103
Applicability
07/29/13
05/20/15, 80 FR 28835
243.104
Nondegradation
10/25/11
05/23/13, 78 FR 30770
243.105
Air Quality Monitoring Data Influenced by Exceptional Events
07/29/13
05/20/15, 80 FR 28835
243.106
Monitoring
04/14/72
02/21/80, 45 FR 11472
243.107
Reference Conditions
11/27/13
06/10/16, 81 FR 37517
243.108
Incorporation by Reference
06/09/14
06/10/16, 81 FR 37517
Subpart B: Standards and Measurement Methods
243.120
PM
10
and PM
2.5
11/27/13
06/10/16, 81 FR 37517
243.122
Sulfur Oxides (Sulfur Dioxide), and
11/27/13
06/10/16, 81 FR 37517
243.123
Carbon Monoxide
07/29/13
05/20/15, 80 FR 28835
243.124
Nitrogen Oxides (Nitrogen Dioxide as Indicator)
07/29/13
05/20/15, 80 FR 28835
243.125
Ozone
07/29/13
05/20/15, 80 FR 28835
243.126
Lead, and
07/29/13
05/20/15, 80 FR 28835
243.TABLE A
Schedule of Exceptional Event Flagging and Documentation Submission for New or Revised NAAQS
11/27/13
06/10/16, 81 FR 37517
Part 244: Episodes
Subpart A: Definitions and General Provisions
244.101
Definitions
05/15/92
01/12/93, 58 FR 3844
244.102
Responsibility of the Agency
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 402.
244.103
Determination of Required Actions
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 402.
244.104
Determination of Atmospheric Conditions
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 402.
244.105
Determination of Expected Contaminant Emissions
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 402.
244.106
Monitoring
05/15/92
01/12/93, 58 FR 3844
244.107
Determination of Areas Affected
05/15/92
01/12/93, 58 FR 3844
244.108
Failure To Comply With Episode Requirements
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 402.
244.109
Sealing of Offenders
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 402.
Subpart B: Local Agency Responsibilities
244.121
Local Agency Responsibilities
05/15/92
01/12/93, 58 FR 3844
Subpart C: Episode Action Plans
244.141
Requirement for Plans
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 404.
244.142
Facilities for Which Action Plans Are Required
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 404.
244.143
Submission of Plans
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 404.
244.144
Contents of Plans
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 404.
244.145
Processing Procedures
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 404.
Subpart D: Episode Stages
244.161
Advisory, Alert and Emergency Levels
05/15/92
01/12/93, 58 FR 3844
244.162
Criteria for Declaring an Advisory
05/15/92
01/12/93, 58 FR 3844
244.163
Criteria for Declaring a Yellow Alert
05/15/92
01/12/93, 58 FR 3844
244.164
Criteria for Declaring a Red Alert
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 405(e).
244.165
Criteria for Declaring an Emergency
08/18/72
02/21/80, 45 FR 11472
Approved as Rule 405(e).
244.166
Criteria for Terminating Advisory, Alert and Emergency
05/15/92
01/12/93, 58 FR 3844
244.167
Episode Stage Notification
05/15/92
01/12/93, 58 FR 3844
244.168
Contents of Episode Stage Notification
05/15/92
01/12/93, 58 FR 3844
244.169
Actions During Episode Stages
05/15/92
01/12/93, 58 FR 3844
244.Appendix D:
Required Emission Reduction Actions
05/15/92
01/12/93, 58 FR 3844
Chapter II: Environmental Protection Agency
Part 252: Public Participation in the Air Pollution Permit Program for Major Sources in Nonattainment Areas
Subpart A: Introduction
252.101
Purpose
06/01/84
09/25/85, 50 FR 38803
252.102
Applicability
06/01/84
09/25/85, 50 FR 38803
252.103
Definitions
06/01/84
09/25/85, 50 FR 38803
Subpart B: Procedures for Public Review
252.201
Notice and Opportunity To Comment
06/01/84
09/25/85, 50 FR 38803
252.202
Draft Permit and Denial Letter
06/01/84
09/25/85, 50 FR 38803
252.203
Availability of Documents
06/01/84
09/25/85, 50 FR 38803
252.204
Opportunity for Public Hearing
06/01/84
09/25/85, 50 FR 38803
Part 254: Annual Emissions Report
Subpart A: General Provisions
254.101
Purpose
07/17/01
05/15/02, 67 FR 34614
254.102
Applicability
04/20/12
07/03/13, 67 FR 40013
254.103
Definitions
07/17/01
05/15/02, 67 FR 34614
254.120
Applicable Pollutants for Annual Emissions Reporting
07/17/01
05/15/02, 67 FR 34614
254.132
Failure To File a Complete Report
07/17/01
05/15/02, 67 FR 34614
254.133
Voluntary Submittal of Data
05/14/93
05/15/02, 67 FR 34614
254.134
Retention of Records
07/17/01
05/15/02, 67 FR 34614
254.135
Reporting of Errors
07/17/01
05/15/02, 67 FR 34614
254.136
Confidentiality and Trade Secret Protection
07/17/01
05/15/02, 67 FR 34614
254.137
Reporting Schedule
07/17/01
05/15/02, 67 FR 34614
254.138
Issuance of Source Inventory Report
07/17/01
05/15/02, 67 FR 34614
Subpart B: Reporting Requirements for Large Sources
254.203
Contents of Subpart B Annual Emissions Report
07/17/01
05/15/02, 67 FR 34614
254.204
Complete Reports
07/17/01
05/15/02, 67 FR 34614
Subpart
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.