Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals From Electric Utilities
Federal RegisterApr 17, 2015
Ask Donna
What actually matters in this document.
Text
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 257 and 261
[EPA-HQ-RCRA-2009-0640; FRL-9919-44-OSWER]
RIN-2050-AE81
Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals From Electric Utilities
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule.
SUMMARY:
The Environmental Protection Agency (EPA or the Agency) is publishing a final rule to regulate the disposal of coal combustion residuals (CCR) as solid waste under subtitle D of the Resource Conservation and Recovery Act (RCRA). The available information demonstrates that the risks posed to human health and the environment by certain CCR management units warrant regulatory controls. EPA is finalizing national minimum criteria for existing and new CCR landfills and existing and new CCR surface impoundments and all lateral expansions consisting of location restrictions, design and operating criteria, groundwater monitoring and corrective action, closure requirements and post closure care, and recordkeeping, notification, and internet posting requirements. The rule requires any existing unlined CCR surface impoundment that is contaminating groundwater above a regulated constituent's groundwater protection standard to stop receiving CCR and either retrofit or close, except in limited circumstances. It also requires the closure of any CCR landfill or CCR surface impoundment that cannot meet the applicable performance criteria for location restrictions or structural integrity. Finally, those CCR surface impoundments that do not receive CCR after the effective date of the rule, but still contain water and CCR will be subject to all applicable regulatory requirements, unless the owner or operator of the facility dewaters and installs a final cover system on these inactive units no later than three years from publication of the rule. EPA is deferring its final decision on the Bevill Regulatory Determination because of regulatory and technical uncertainties that cannot be resolved at this time.
DATES:
This final rule is effective on October 14, 2015.
ADDRESSES:
EPA has established three dockets for this regulatory action under Docket ID No. EPA-HQ-RCRA-2009-0640, Docket ID No. EPA-HQ-RCRA-2011-0392, and Docket ID No. EPA-HQ-RCRA-2012-0028. All documents in these dockets are available at
http://www.regulations.gov
. Although listed in the index, some information is not publicly available,
e.g.
, Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically in
http://www.regulations.gov
or in hard copy at the OSWER Docket, EPA/DC, WJC West Building, Room 3334, 1301 Constitution Ave. NW., Washington, DC 20460. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566-1744, and the telephone number for the OSWER Docket is 202-566-0276.
FOR FURTHER INFORMATION CONTACT:
For questions on technical issues: Alexander Livnat, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5304P; telephone number: (703) 308-7251; fax number: (703) 605-0595; email address:
livnat.alexander@epa.gov
, or Steve Souders, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5304P; telephone number: (703) 308-8431; fax number: (703) 605-0595; email address:
souders.steve@epa.gov
. For questions on the regulatory impact analysis: Richard Benware, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5305P; telephone number: (703) 308-0436; fax number: (703) 308-7904; email address:
benware.richard@epa.gov
. For questions on the risk assessment: Jason Mills, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5305P; telephone number: (703) 305-9091; fax number: (703) 308-7904; email address:
mills.jason@epa.gov
.
For more information on this rulemaking please visit
http://www.epa.gov/epawaste/nonhaz/industrial/special/fossil/index.htm
.
SUPPLEMENTARY INFORMATION:
A. Does this action apply to me?
This rule applies to all coal combustion residuals (CCR) generated by electric utilities and independent power producers that fall within the North American Industry Classification System (NAICS) code 221112 and may affect the following entities: Electric utility facilities and independent power producers that fall under the NAICS code 221112. The industry sector(s) identified above may not be exhaustive; other types of entities not listed could also be affected. The Agency's aim is to provide a guide for readers regarding those entities that potentially could be affected by this action. To determine whether your facility, company, business, organization, etc., is affected by this action, you should refer to the applicability criteria discussed in Unit VI.A. of this document If you have any questions regarding the applicability of this action to a particular entity, consult the person listed in the preceding
FOR FURTHER INFORMATION CONTACT
section.
B. What actions are not addressed in this rule?
This rule does not address the placement of CCR in coal mines. The U.S. Department of Interior (DOI) and, as necessary, EPA will address the management of CCR in minefills in separate regulatory action(s), consistent with the approach recommended by the National Academy of Sciences, recognizing the expertise of DOI's Office of Surface Mining Reclamation and Enforcement in this area. See Unit VI of this document for further details. This rule does not regulate practices that meet the definition of a beneficial use of CCR. Beneficial uses that occur after the effective date of the rule need to determine if they comply with the criteria contained in the definition of “beneficial use of CCRs.” This rule does not affect past beneficial uses (
i.e.
, uses completed before the effective date of the rule.) See Unit VI of this document for further details on proposed clarifications of beneficial use. Furthermore, CCR from non-utility boilers burning coal are also not addressed in this final rule. EPA will decide on an appropriate action for these wastes through a separate rulemaking effort. See Unit IV of this document for further details. Finally, this rule does not apply to municipal solid waste landfills (MSWLFs) that receive CCR for disposal or use as daily cover.
C. The Contents of This Preamble Are Listed in the Following Outline
I. Executive Summary
II. Statutory Authority
III. Background
IV. Bevill Regulatory Determination Relating to CCR From Electric Utilities and Independent Power Producers
V. Development of the Final Rule—RCRA Subtitle D Regulatory Approach
VI. Development of the Final Rule—Technical Requirements
VII. Summary of Major Differences Between the Proposed and Final Rules
VIII. Implementation Timeframes for Minimum National Criteria and Coordination With Steam Electric ELG Rule
IX. Implementation of the Minimum Federal Criteria and State Solid Waste Management Plans
X. Risk Assessment
XI. Summary of Damage Cases
XII. Summary of Regulatory Impact Analysis
XIII. Uniquely Associated Wastes
XIV. Statutory and Executive Order Reviews
I. Executive Summary
This rule establishes nationally applicable minimum criteria for the safe disposal of coal combustion residuals in landfills and surface impoundments. This section summarizes these criteria. Detailed discussions of the criteria and the Agency's rationale for finalizing these requirements are provided in Unit VI of this document.
A. What are coal combustion residuals?
Coal combustion residuals (CCR) are generated from the combustion of coal, including solid fuels classified as anthracite, bituminous, subbituminous, and lignite, for the purpose of generating steam for the purpose of powering a generator to produce electricity or electricity and other thermal energy by electric utilities and independent power producers. CCR includes fly ash, bottom ash, boiler slag, and flue gas desulfurization materials. A description of the types of CCR can be found in the proposed rule (see 75 FR 35137).
CCR is one of the largest industrial waste streams generated in the U.S. In 2012, over 470 coal-fired electric utilities burned over 800 million tons of coal, generating approximately 110 million tons of CCR in 47 states and Puerto Rico. CCR may be generated wet or dry; however, this composition may change after generation. Some CCR is dewatered while other CCR is mixed with water to facilitate transport (
i.e.
, sluiced). CCR can be sent off-site for disposal or beneficial use or disposed in on-site landfills or surface impoundments. In 2012, approximately 40 percent of the CCR generated was beneficially used, with the remaining 60 percent disposed in surface impoundments and landfills. Of that 60 percent, approximately 80 percent was disposed in on-site disposal units. CCR disposal currently occurs at over 310 active on-site landfills, averaging over 120 acres in size with an average depth of over 40 feet, and at over 735 active on-site surface impoundments, averaging over 50 acres in size with an average depth of 20 feet.
B. Background
The Agency first solicited comments on the regulation of CCR in a proposed rule published in the
Federal Register
on June 21, 2010. This proposal, under the Resource Conservation and Recovery Act (RCRA), addressed the risks from disposal of CCR generated from the combustion of coal at electric utilities and from independent power producers. Two regulatory options were proposed. Under the first option, EPA proposed to list CCR as special waste subject to regulation under subtitle C of RCRA, when destined for disposal in landfills or surface impoundments. Under this option, CCR would require “cradle-to-grave” management and would be subject to requirements for, among other things, composite liners, groundwater monitoring, structural stability requirements, corrective action, closure/post closure care and financial assurance. States would be required to adopt the rule before it went into effect and a permitting program would be established with direct federal oversight. The subtitle C option, as proposed, would also effectively result in the closure of all CCR surface impoundments.
Under the second option, EPA proposed to regulate the disposal of CCR under subtitle D of RCRA by issuing minimum national criteria. Similar to the subtitle C option, this option would require composite liners, groundwater monitoring, structural stability requirements, corrective action, and closure/post closure care. However, consistent with the available statutory authority under subtitle D, EPA proposed this option to be a self-implementing rule with no direct federal oversight, with an effective date six months after publication in the
Federal Register
. This option required all unlined surface impoundments to either retrofit to a composite liner or close within five years.
After reviewing all the comments and additional data received, EPA is promulgating this final rule to regulate the disposal of CCR as solid waste under subtitle D of RCRA. This rule addresses the risks from structural failures of CCR surface impoundments, groundwater contamination from the improper management of CCR in landfills and surface impoundments and fugitive dust emissions. The rule has also been designed to provide electric utilities and independent power producers generating CCR with a practical approach for implementation of the requirements and has established implementation timelines that take into account, among other things, other upcoming regulatory actions affecting electric utilities and site specific practical realities. In order to ease implementation of the regulatory requirements for CCR units with state programs, EPA is also providing the opportunity for states to secure approval of its CCR program through the State Solid Waste Management Plan (“SWMP”). EPA strongly recommends that states take advantage of this process by revising their SWMPs to address the issuance of the revised federal requirements in this final rule, and to submit revisions of these plans to EPA for review. EPA would then review and approve the revised SWMPs provided they demonstrate that the minimum federal requirements in this final rule will be met. In this way, EPA's approval of a revised SWMP signals EPA's opinion that the state SWMP meets the minimum federal criteria.
C. What types of CCR units are covered by this rule?
The final rule applies to owners and operators of new and existing landfills and new and existing surface impoundments, including all lateral expansions of landfills and surface impoundments that dispose or otherwise engage in solid waste management of CCR generated from the combustion of coal at electric utilities and independent power producers. The requirements of the rule also apply to CCR units located off-site of the electric utilities' or independent power producers' facilities that receive CCR for disposal. In addition, the rule applies to certain inactive CCR surface impoundments (
i.e.
, units not receiving CCR after the effective date of the rule) at active electric utilities' or independent power producers' facilities, regardless of the fuel currently used at the facility to produce electricity (
e.g.
coal, natural gas, oil), if the CCR unit still contains CCR and liquids.
The requirements do not apply to: (1) CCR landfills that ceased receiving CCR prior to the effective date of the rule; (2) CCR units at facilities that have ceased producing electricity (or electricity and other thermal energy) prior to the effective date of the rule; (3) CCR generated at facilities that are not part of an electric utility or independent power producer, such as manufacturing facilities, universities, and hospitals; (4) fly ash, bottom ash, boiler slag, and flue gas desulfurization materials, generated primarily from the combustion of fuels (including other fossil fuels) other than coal, for the purpose of generating electricity unless the fuel burned
consists of more than fifty percent coal on a total heat input or mass input basis, whichever results in the greater mass feed rate of coal; (5) CCR that is beneficially used; (6) CCR placement at active or abandoned underground or surface coal mines; or (7) municipal solid waste landfills (MSWLF) that receive CCR.
D. What minimum national criteria are being established for CCR landfills and CCR surface impoundments?
This final rule establishes minimum national criteria for CCR landfills, CCR surface impoundments, and all lateral expansions of CCR units including location restrictions, liner design criteria, structural integrity requirements, operating criteria, groundwater monitoring and corrective action requirements, closure and post-closure care requirements, and recordkeeping, notification, and internet posting requirements.
1. Location Restrictions.
To ensure there will be no reasonable probability of adverse effects on health or the environment from the disposal of CCR in CCR landfills, CCR surface impoundments, and all lateral expansions of CCR landfills and CCR surface impoundments (together “CCR units”), this final rule establishes five location restrictions. The location criteria include restrictions relating to placement of CCR above the uppermost aquifer, in wetlands, within fault areas, in seismic impact zones, and in unstable areas. All of these location restrictions require the owner or operator of a CCR unit to demonstrate that they meet the specific criteria. As discussed elsewhere in this preamble, the five location restrictions apply to all new CCR landfills, all new and existing CCR surface impoundments, and all lateral expansions of CCR units; however, existing CCR landfills are only subject to the location restriction for unstable areas. Units that do not meet these restrictions can retrofit or make appropriate engineering demonstrations to meet this criteria. This final rule requires owner or operators of existing CCR units that cannot make the required demonstrations to close, while owners or operators of new CCR units and all lateral expansions who fail to make the required demonstrations are prohibited from placing CCR in the CCR unit.
2. Liner Design Criteria.
The final rule also establishes liner design criteria to help prevent contaminants in CCR from leaching from the CCR unit and contaminating groundwater. All new CCR landfills, new CCR surface impoundments, and lateral expansions of CCR units must be lined with composite liner, which is a liner system consisting of two components—a geomembrane and a two-foot layer of compacted soil—installed in direct and uniform contact with one another. The final rule allows an owner or operator to construct a new CCR unit with an alternative composite liner, provided the alternative composite liner performs no less effectively than the composite liner. In addition, new landfills are required to operate with a leachate collection and removal system which is designed to remove excess leachate that may accumulate on top of the composite (or alternative composite) liner. Existing CCR landfills are not required to close or retrofit with a composite (or alternative composite) liner and a leachate collection and removal system. These existing CCR units can continue to receive CCR after this rule is in effect; however, the CCR units must meet all applicable groundwater monitoring and corrective action criteria to address any groundwater releases promptly. Existing CCR surface impoundments can also continue to operate as designed. However, if the existing CCR surface impoundment was not constructed with a composite (or alternative composite) liner or with at least two feet of compacted soil with a specified hydraulic conductivity, the rule would require the unit to retrofit or close if the CCR surface impoundment detects concentrations of one or more constituents listed in appendix IV at statistically significant levels above the groundwater protection standard established by the rule.
3. Structural Integrity Requirements.
To help prevent the damages associated with structural failures of CCR surface impoundments, the final rule establishes structural integrity criteria for new and existing surface impoundments (and all lateral expansions) as part of the design criteria. While the applicability of the structural integrity requirements to individual CCR surface impoundments vary depending on factors such as dike heights and the potential for loss of life, environmental damage and economic loss if there is a dike failure, the final rule establishes requirements for owner or operators to conduct a number of structural integrity-related assessments regularly. These include: (1) Conducting periodic hazard potential classification assessments to assess the potential adverse incremental consequences that would occur if there was a failure of the CCR surface impoundment; (2) conducting periodic structural stability assessments by a qualified professional engineer to document whether the design, construction, operation and maintenance is consistent with recognized and generally accepted good engineering practices; and (3) conducting periodic safety factor assessments to document whether the CCR unit achieves minimum factors of safety for slope stability. If a CCR unit required to conduct a safety factor assessment fails to demonstrate that the unit achieves the specified factors of safety, the owner or operator must close the unit. In addition, certain CCR surface impoundments are required to develop an emergency action plan which defines the events and circumstances involving the CCR unit that represent an emergency and identifies the actions that will be taken in the event of a safety emergency.
4. Operating Criteria.
The operating criteria include air criteria for all CCR units, run-on and run-off controls for CCR landfills, hydrologic and hydraulic capacity requirements for CCR surface impoundments, and periodic inspection requirements for all CCR units. These criteria address the day-to-day operations of CCR units and are established to prevent health and environmental impacts from CCR units. The air criteria address the pollution caused by windblown dust from CCR units, and require owners and operators to minimize CCR from becoming airborne at the facility. The run-on controls for CCR landfills minimize the amount of surface water entering the unit that will help prevent erosion, surface discharges of CCR in solution or suspension, and will mitigate the generation of landfill leachate, while run-off controls help prevent erosion, protect downstream surface water from releases from the unit, and minimize storm water run-off volume and velocity. CCR surface impoundments are subject to hydrologic and hydraulic capacity requirements to ensure the unit can safely handle flood flows, which will help prevent uncontrolled overtopping of the unit or erosion of the materials used to construct the surface impoundment. The final rule also requires periodic inspections of CCR units to identify any appearance of structural weakness or other conditions that are not consistent with recognized and generally accepted good engineering standards.
5. Groundwater Monitoring and Corrective Action.
The groundwater monitoring and corrective action criteria require an owner or operator of a CCR unit to install a system of monitoring wells and specify procedures for sampling these wells, in addition to methods for analyzing the groundwater data collected, to detect the presence of
hazardous constituents (
e.g.,
toxic metals) and other monitoring parameters (
e.g.,
pH, total dissolved solids) released from the units. The final rule establishes a groundwater monitoring program consisting of detection monitoring, assessment monitoring and corrective action. Once a groundwater monitoring system and groundwater monitoring program has been established for a CCR unit, the owner or operator must conduct groundwater monitoring and, if the monitoring demonstrates an exceedance of a groundwater protection standard for any of the identified constituents in CCR, must initiate corrective action.
6. Closure and Post-Closure Requirements.
The closure and post-closure care criteria require all CCR units to close in accordance with specified standards and to monitor and maintain the units for a period of time after closure, including the groundwater monitoring and corrective action programs. These criteria are essential to ensuring the long-term safety of closed CCR units. Closure of a CCR unit must be completed either by leaving the CCR in place and installing a final cover system or through removal of the CCR and decontamination of the CCR unit. The final rule establishes timeframes to initiate and complete closure activities, and authorize owners or operators to obtain time extensions due to circumstances beyond the facility's control. As discussed elsewhere in this preamble, the rule also establishes alternative closure procedures in situations where an owner or operator is closing a CCR unit, but has no alternative CCR disposal capacity or is permanently closing the coal-fired boiler unit in the foreseeable future. Finally, owners and operators are required to prepare closure and post-closure care plans describing these activities.
7. Record Keeping, Notification, and Internet Posting Requirements.
The final rule requires owners or operators of CCR units to record certain information in the facility's operating record. In addition, owners and operators are required to provide notification to States and/or appropriate Tribal authorities when the owner or operator places information in the operating record, as well as to maintain a publicly accessible internet site for this information.
8. Severability.
EPA intends that the provisions of this rule be severable. In the event that any individual provision or part of this rule is invalidated, EPA intends that this would not render the entire rule invalid, and that any individual provisions that can continue to operate will be left in place. The following tables provide a summary of the specific technical requirements applicable to existing and new CCR landfills, existing and new CCR surface impoundments, and all lateral expansions of CCR units.
ER17AP15.000
ER17AP15.001
ER17AP15.002
E. When must owners or operators of CCR landfills and CCR surface impoundments meet the minimum national criteria?
The rule becomes effective six months after the publication date of this rule. The final rule establishes timeframes for certain technical criteria based on the amount of time determined to be necessary to implement the requirements (
e.g.
, installing the groundwater monitoring wells and establishing the groundwater monitoring program). In establishing these timeframes, EPA accounted for other Agency rulemakings that are anticipated to also affect the owners or operators of CCR units, namely the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category (78 FR 34432; proposed rule issued June 7, 2013) and the Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units (79 FR 34830; proposed rule issued June 18, 2014). Specifically, EPA developed implementation timeframes that would ensure that owner or operators of CCR units would not be required to make decisions about those CCR units without first understanding the implications that such decisions would have for meeting the requirements of all applicable EPA rules.
F. Deferral of Final Bevill Determination
This rule defers a final Bevill Regulatory Determination with respect to CCR that is disposed in CCR landfills and CCR surface impoundments until additional information is available on a number of key technical and policy questions. This includes information needed to quantify the risks of CCR disposal, and the potential impacts of recent Agency regulations on the chemical composition of CCR. The Agency also needs further information on adequacy of the state programs.
G. Beneficial Use
The final rule retains the Bevill exclusion for CCR that is beneficially used, and provides a definition of beneficial use to distinguish between beneficial use and disposal.
H. Implementation
Because the regulations have been promulgated under sections 1008(a), 4004(a), and 4005(a) of RCRA, the rule does not require permits, does not require states to adopt or implement these requirements, and EPA cannot enforce these requirements. Instead, states or citizens can enforce the requirements of this rule under RCRA's citizen suit authority; the states can also continue to enforce any state regulation under their independent state enforcement authority. (For a more detailed discussion of EPA authorities under RCRA and its relationship to this rule, see 75 FR 35128, June 21, 2010). EPA recognizes the significant role states play in implementing these requirements and EPA strongly encourages states to revise their SWMPs to show how these new criteria will be implemented. EPA would then review and approve the revised plan provided it demonstrates that the minimum federal requirements in this final rule will be met. In this way, EPA's approval of a revised plan signals EPA's opinion that the State's SWMP meets the minimum federal criteria. For a more detailed discussion on the role of the states in implementing this rule, please refer to Unit IX of this document.
I. Characterization of Baseline Affected Entities and CCR Management Practices
This action will affect CCR generated by coal-fired electric utility plants in the NAICS industry code 221112 (
i.e.
, the “Fossil Fuel Electric Power Generation” industry within the NAICS 22 “Utilities” sector code). Based on 2012 electricity generation data published by the Energy Information Administration (EIA), the Regulatory Impact Analysis (RIA) for this action estimated that a total of 478 operational coal-fired electric utility plants in this NAICS code could be affected by this action. These plants are owned by 242 entities consisting of 166 companies, 17 cooperative organizations, 58 state or local governments, and one federal agency. A sub-total of 81 of the 242 owner entities (
i.e.
, 33 percent may be classified as small businesses, small organizations, or small governments). The 478 coal-fired electric utility plants operate a total of 1,045 CCR management units (735 surface impoundments and 310 landfills). These 478 plants generate 110 million tons of CCR, consisting of 201 plants (42 percent) disposing in on-site landfills, 169 (35 percent) disposing in on-site ponds, and 197 (41 percent) disposing in off-site landfills. Because some plants use more than one CCR management method, these plant counts exceed 478 total plants. In addition, 293 of the 478 plants supply CCR for beneficial uses in at least 14 industries. Nineteen of the 293 plants solely supply CCR for beneficial uses. As of 2012, CCR beneficial uses (
i.e.
, industrial applications) involved about 52 million tons annually.
J. Summary of Estimated Regulatory Costs and Benefits
The EPA estimated future regulatory compliance costs and expected future human health and environmental protection benefits can be found in the RIA document which is available from the docket for this action. The estimated costs and benefits for the CCR rule are incremental to the baseline (current) practices by the electric utility industry to manage CCR in accordance with (a) existing state government environmental regulations and (b) utility company CCR management methods.
The RIA estimates the cost of the rule over a 100 year period because of: (1) CCR unit lifespans (40 years to 80 years of age); (2) groundwater migration (estimated time to peak potential exposures of CCR through groundwater migration to drinking water wells is 75 years); and (3) latency periods for onset of illness after exposure to CCR, which can average 20 years.
The table below summarizes the estimated incremental costs and benefits of the rule. The RIA estimates costs to comply with the 12 pollution control requirements associated with the rule, as well as estimated monetized values for 11 expected benefits, and discusses 11 other non-monetized benefits.
EPA Estimated Incremental Costs & Benefits of the CCR Rule
[millions 2013$ over 100-year period of analysis 2015-2114]
3% Discount rate
7% Discount rate
A. Annualized Values
A1. Total Costs
$735
$509
A2. Total monetized benefits
$294
$236
A3. Net Benefits (A2-A1)
($441)
($441)
A4. Benefit to Cost Ratio (A3/A1)
0.40
0.46
B. Present Value
B1. Total Costs
$23,200
$7,260
B2. Total monetized benefits
$8,710
$3,360
B3. Net Benefits (B2-B1)
($14,490)
($3,900)
B4. Benefit to Cost Ratio (B2/B1)
0.38
0.46
II. Statutory Authority
These regulations are established under the authority of sections 1006(b), 1008(a), 2002(a), 3001, 4004, and 4005(a) of the Solid Waste Disposal Act of 1970, as amended by the Resource Conservation and Recovery Act of 1976 (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA), 42 U.S.C. 6906(b), 6907(a), 6912(a), 6944 and 6945(a).
RCRA section 1006(b) directs EPA to integrate the provisions of RCRA for purposes of administration and enforcement and to avoid duplication, to the maximum extent practicable, with the appropriate provisions of other EPA statutes. Section 1006(b) conditions EPA's authority to reduce or eliminate RCRA requirements on the Agency's ability to demonstrate that the integration meets RCRA's protectiveness mandate (42 U.S.C. 6005(b)(1)).
See Chemical Waste Management
v.
EPA
, 976 F.2d 2, 23, 25 (D.C. Cir. 1992).
RCRA section 1008(a) authorizes EPA to publish “suggested guidelines for solid waste management.” 42 U.S.C. 6907(a). RCRA defines solid waste management as “the systematic administration of activities which provide for the collection, source separation, storage, transportation, transfer, processing, treatment, and disposal of solid waste.” 42 U.S.C. 6903(28).
Pursuant to section 1008(a)(3), the guidelines are to include the minimum criteria to be used by the states to define the solid waste management practices that constitute the open dumping of solid waste or hazardous waste and are prohibited as “open dumping”under section 4005. Only those requirements promulgated under the authority of section 1008(a)(3) are enforceable under section 7002 of RCRA.
RCRA section 4004 generally requires EPA to promulgate regulations containing criteria for determining which facilities shall be classified as sanitary landfills (and therefore not “open dumps”). The statute directs that, “at a minimum, the criteria are to ensure that units are classified as sanitary landfills only if there is no reasonable probability of adverse effects on health or the environment from disposal of solid wastes at such facility.” 42 U.S.C. 6944(a).
RCRA section 4005(a), entitled “Closing or upgrading of existing open dumps” generally establishes the key implementation and enforcement provisions applicable to EPA regulations issued under sections 1008(a) and 4004(a). Specifically, this section prohibits any solid waste management practices or disposal of solid waste that does not comply with EPA regulations issued under RCRA section 1008(a) and 4004(a). 42 U.S.C. 6944(a). See also 42 U.S.C. 6903(14) (definition of “open dump”). This prohibition takes effect “upon promulgation” of any rules issued under section 1008(a)(3) and is enforceable through a citizen suit brought pursuant to section 7002. As a general matter, this means that facilities must be in compliance with any EPA rules issued under this section no later than the effective date of such rules, or be subject to a citizen suit for “open dumping” 42 U.S.C. 6945. RCRA section 4005 also directs that open dumps,
i.e.
, facilities out of compliance with EPA's criteria, must be “closed or upgraded.”
Section 7004 lays out specific requirements relating to public participation in regulatory actions under RCRA. Subsection (b) provides that “[p]ublic participation in the . . . implementation, and enforcement of any regulation under this chapter shall be provided for, encouraged, and assisted by the Administrator.” 42 U.S.C. 6974(b).
A. Regulation of Solid Wastes Under RCRA Subtitle D
Solid wastes that are neither a listed nor characteristic hazardous waste are subject to the requirements of RCRA subtitle D. Subtitle D of RCRA establishes a framework for federal, state, and local government cooperation in controlling the management of non-hazardous solid waste. The federal role is to establish the overall regulatory direction, by providing minimum nationwide standards that will protect human health and the environment, and to provide technical assistance to states for planning and developing their own environmentally sound waste management practices. The actual planning and any direct implementation of solid waste programs under RCRA subtitle D, however, remains a state and local function, and the Act envisions that states will devise programs to deal with state-specific conditions and needs. EPA has no role in the planning and direct implementation of the minimum national criteria or solid waste programs under RCRA subtitle D, and has no authority to enforce the criteria. However, states are not required to adopt solid waste management programs, and thus, Congress developed a statutory structure that creates incentives for states to implement and enforce the federal criteria, but that does not necessarily rely on or require a regulatory entity to oversee or implement them. While Congress developed the statutory structure to create incentives for states to implement and enforce the federal criteria, it does not require them to do so. As a result, subtitle D is also structured to be self-implementing.
RCRA sections 1008(a)(3) and 4004(a) delegate broad authority to EPA to establish regulations governing the management of solid waste. Under section 4004(a) EPA is charged with establishing requirements to ensure that facilities will be classified as sanitary landfills “only if there is no reasonable probability of adverse effects on health or the environment from the disposal of solid waste” at the facility. Or in other words, under section 4004(a) EPA is charged with issuing regulations to address all “reasonable probabilities of adverse effects” (
i.e.
, all reasonably anticipated risks) to health and the environment from the disposal of solid waste. Section 1008(a)(3) expands EPA's authority to address the risks from any of the listed activities. Specifically, EPA is authorized to establish requirements applicable to “storage, transportation, transfer, processing, treatment, and disposal of solid waste.” (42 U.S.C. 6907(a), 6903(28)).
EPA interprets the standard in section 4004(a) to apply equally to criteria issued under sections 1008(a)(3) and 4004(a); namely that the criteria must ensure that a facility is to be classified as a sanitary landfill, and thus allowed to continue to operate, “only if there is no reasonable probability of adverse effects on health or the environment” from either the disposal or other solid waste management practices at the facility. Thus, under the combined authority conferred by sections 1008(a)(3) and 4004(a), a facility is an “open dump” if it engages in any activity involving the management of solid waste that does not meet the standard in section 4004(a); or in other words, any activity involved with the management of solid waste that presents a reasonable probability of causing adverse effects on health or the environment. EPA also interprets these provisions to authorize the establishment of criteria that define the manner in which facilities upgrade or close, consistent with the standard in section 4004(a), to ensure there will be no reasonable probability of adverse effects on health or the environment.
As discussed previously, Congress created a regulatory structure that limited EPA's role to the creation of national criteria that would operate even in the absence of a regulatory entity to oversee or implement the criteria. Under RCRA section 4005(a), upon promulgation of criteria under section 1008(a)(3), any solid waste management practice or disposal of solid waste that constitutes the “open dumping” of solid waste is prohibited. The federal standards apply directly to the facility (are self-implementing) and facilities are directly responsible for ensuring that their operations comply with these requirements. States are not required to incorporate or implement these requirements under any state permitting program or other state law requirement, and EPA is not authorized to impose such requirements, directly or indirectly on the states. States and citizens may enforce this prohibition (and therefore, the federal criteria) using the authority under RCRA section 7002.
1
1
EPA also may act if the handling, storage, treatment, transportation, or disposal of such wastes may present an imminent and substantial endangerment to health or the environment, pursuant to RCRA section 7003.
The statute also creates incentives to states to implement the criteria. Chief among the incentives is a greater role in implementation and enforcement of the solid waste program, including to a limited extent the ability to give facilities that are operating within their state additional time to come into compliance with newly promulgated EPA criteria. Specifically, if the facility is located in a state with a plan that was approved under section 4003(b), the state may grant the facility an extension of up to five years from the date the final rule was published in the
Federal Register
to come into compliance with EPA regulations, provided: (a) The facility is listed in a state inventory of open dumps; and (b) the facility has demonstrated that it has considered other public or private alternatives for solid waste management to comply with the prohibition on open dumping and is unable to utilize such alternative. For facilities that meet these requirements, the state may establish a “schedule for compliance” which specifies a schedule of remedial measures, including an enforceable sequence of actions or operations, leading to compliance with the requirements “within a reasonable time (not to exceed five years from the date of publication of criteria under section [1008] (a)(3) of this title).” 42 U.S.C. 6945(a).
As a consequence of this statutory structure—the requirement to establish national criteria and the absence of any requirement for direct regulatory oversight—to establish the criteria EPA must demonstrate, through factual evidence available in the rulemaking record, that the final rule will achieve the statutory standard (“no reasonable probability of adverse effects on health or the environment”) at all sites subject to the standards based exclusively on the final rule provisions. This means that the standards must account for and be protective of all sites, including those that are highly vulnerable.
III. Background
A. EPA's Proposed Rule
On June 21, 2010 (75 FR 35128), EPA proposed to regulate CCR under RCRA to address the risks from the disposal of CCR generated from the combustion of coal at electric utilities and independent power producers. As described in the proposal, CCR are residuals generated from the combustion of coal and include fly ash, bottom ash, boiler slag (all composed predominantly of silica and aluminosilicates), and flue gas desulfurization (FGD) materials (predominantly Ca-SO
X
compounds) and can be managed in either wet (surface impoundments) or dry (landfills) disposal systems. EPA noted in the proposed rule that the constituents of most environmental concern in CCR are metals, such as antimony, arsenic, barium, beryllium, cadmium, chromium, lead, mercury, nickel, selenium, silver and thallium. EPA also presented data showing numerous instances where these constituents (especially arsenic) have leached at levels of concern from unlined and inadequately clay-lined landfills and surface impoundments.
In the proposal, EPA revisited its August 1993 and May 2000 Bevill Regulatory Determinations regarding CCR generated at electric utilities and independent power producers. The results from this effort led the Agency to consider two primary options for the management of CCR and thus, propose two alternative regulatory strategies. Under the first option, EPA proposed to reverse its August 1993 and May 2000 Bevill Regulatory Determinations (58 FR 42466 and 65 FR 32214 respectively) regarding CCR and to list these residuals as special wastes subject to regulation under subtitle C of RCRA when they are destined for disposal in landfills or surface impoundments. Under this proposed option, CCR would be regulated from the point of generation to the point of final disposition and would generally be subject to the existing subtitle C regulations at 40 CFR parts 260 through 268, as well as the permitting requirements in 40 CFR part 270, and the state authorization process in 40 CFR parts 271-272. Among other things, the regulatory requirements included waste characterization, location restrictions, liner and, if applicable, leachate collection requirements for land disposal units, fugitive dust controls, groundwater monitoring and corrective action requirements, closure and post-closure care requirements, financial assurance, permitting requirements, and recordkeeping and reporting requirements. This option also imposed requirements on generators and transporters of CCR destined for disposal, including manifesting (if the CCR destined for disposal is sent off-site). However, in light of practical difficulties in implementing certain subtitle C regulatory requirements, EPA also proposed to revise selected requirements under the subtitle C option. Consequently, EPA proposed, pursuant to its authority under section 3004(x) of RCRA, modifications to the CCR landfill and surface impoundment liner and leak detection system requirements, the effective dates for the land disposal restrictions, and the surface impoundment retrofit requirements. EPA also proposed to establish new land disposal prohibitions and treatment standards for both wastewater and non-wastewater forms of CCR. In part, the proposed
modifications to the treatment standards would result in the closure of existing surface impoundments and the prohibition of all new surface impoundments. (See 75 FR 35128 for a complete discussion of this proposed option).
Under the second option, EPA proposed to retain the August 1993 and May 2000 Bevill Regulatory Determinations and to regulate CCR disposal under subtitle D of RCRA by issuing national minimum criteria to ensure the safe disposal of CCR in surface impoundments and landfills. Under this option, CCR would remain classified as a non-hazardous RCRA solid waste. EPA proposed to establish technical requirements, many of which were nearly identical to the technical standards proposed under the subtitle C option. The technical standards included, among other things, locations standards, liner and leachate collection requirements, groundwater monitoring and corrective action standards for releases from the units, operating criteria, such as fugitive dust control, closure and post-closure care requirements, and recordkeeping and reporting requirements. Under this option, EPA did not propose to establish regulatory requirements that would restrict the generation, transportation, storage, or treatment of CCR prior to disposal, nor did EPA propose to establish financial assurance requirements under RCRA.
2
Also, because of subtitle D's limitations, the proposed rule did not require permits; nor could EPA enforce the national minimum criteria. Rather, states or citizens could enforce the national minimum criteria under RCRA's citizen suit authority, and states could continue to enforce any state regulation that applies to CCR under their independent state enforcement authority.
2
In the proposal, the Agency stated that the RCRA subtitle D alternative did not include proposed financial responsibility requirements and that any such requirements would be proposed separately. The Agency solicited comment on whether financial responsibility requirements under CERCLA section 108(b) should be a key Agency focus under a RCRA subtitle D approach. While the Agency received numerous comments urging the Agency to establish financial responsibility as part of the subtitle D option, the CERCLA 108(b) option did not receive significant support. As discussed in the proposal and reiterated here, EPA will not be requiring financial assurance requirements as part of this rule. The Agency however will continue to investigate the use of other statutory authorities (
e.g.,
CERCLA) to establish financial responsibility requirements for owners or operators of CCR landfills, CCR surface impoundments and any lateral expansion.
The subtitle D proposed option was designed to be self-implementing, meaning that the requirements were such that facilities could comply with the regulatory requirements without the need to interact with a regulatory authority. EPA sought to enhance the protectiveness of the proposed option by requiring certified demonstrations by an independent registered professional engineer to provide verification that the regulatory requirements were being adhered to. In addition, the option provided for state and public notification of the certifications, as well as required posting of certain information on a Web site maintained by the facility and in the operating record. (See 75 FR 35128 for a complete discussion of this proposed option).
3
3
While EPA cannot enforce the subtitle D proposed rules, EPA can take action under section 7003 of RCRA to abate conditions that “may present an imminent and substantial endangerment to health or the environment.” EPA can also use the imminent and substantial endangerment authorities under the CERCLA, or under other federal authorities to address those circumstances where a unit(s) may pose a threat.
The Agency also described other alternatives considered. For example, one subtitle D option, called “D-prime” was structured so that all existing CCR surface impoundments could continue to receive CCR after the effective date of the rule for the remainder of the unit's useful life, irrespective of their liner type, provided the other provisions of the subtitle D option were met (
e.g.,
groundwater monitoring). (See 75 FR 35128 for a complete discussion of this and other possible regulatory alternatives on which the Agency solicited comment.)
Under both the subtitle C and subtitle D alternatives, EPA proposed establishing dam safety requirements to address the structural integrity of surface impoundments. EPA also proposed not to change the May 2000 Regulatory Determination for beneficially used CCR, which are currently exempt from the hazardous waste regulations under section 3001(b)(3)(A) of RCRA. EPA also did not propose to address the placement of CCR in mines, or non-minefill uses of CCR at coal mine sites.
In addition to proposing these two regulatory options for the management of CCR, EPA identified many issues on which it solicited comment, information, and data. Certain solicitations were very general, such as comments on alternative options for regulating CCR, while other requests for comment were very specific in nature, for example, whether clay liners designed to meet a specified hydraulic conductivity might perform differently in practices than modeled in the risk assessment. (The Agency requested comment on issues throughout the preamble; however specific issues for which EPA solicited comment can be found at 75 FR 35221-34224.)
B. Comments Received on the Proposed Rule
The Agency received over 450,000 comments on the proposed rule. The majority of the commenters focused on which regulatory path the Agency should pursue for regulating CCR,
i.e.,
RCRA's subtitle C or subtitle D. A number of commenters, however, argued that no additional regulation was necessary and that the states were adequately regulating the management of CCR. Generally, environmental groups and individual citizens favored a subtitle C rule arguing that state programs have failed and damage cases are growing in number. State organizations, individual states, and industry groups (electric utilities, recycling firms, trade associations), largely favored a subtitle D rule with a permitting program.
One area that received extensive comment was the re-evaluation of the eight Bevill study factors.
4
Numerous commenters provided detailed analysis related to the study factors and provided their own interpretations of the data (
e.g.,
state programs and damage cases). Other areas that received significant comment included beneficial use and the risk assessment.
4
In considering whether to retain or to reverse the August 1993 and May 2000 Regulatory Determinations regarding the Bevill exemption of CCR destined for disposal, the Agency re-examined the RCRA section 8002(n) study factors. These eight study factors are: (1) Source and volumes of CCR generated per year; (2) present disposal and utilization practices (which includes evaluation of existing state regulatory oversight and beneficial use); (3) potential danger, if any, to human health and the environment from the disposal and reuse of CCR; (4) documented cases in which danger to human health or the environment from surface runoff or leachate has been proved; (5) alternatives to current disposal methods; (6) the cost of such alternative disposal methods; (7) the impact of the alternative disposal methods on the use of coal and other natural resources; and (8) the current and potential utilization of CCR (see 75 FR 35128).
Discussion of the specific comments germane to this rulemaking are provided in the relevant sections of this document.
C. Other Actions During Which Comment Was Taken
1. Public Hearings
EPA conducted eight public hearings during the months of August, September, and October in 2010. There were over 1300 individual speakers at the eight public hearings that commented on the proposed rule. Testimony at the public hearings focused generally on whether EPA
should adopt a subtitle C or subtitle D approach for regulating CCR. Many commenters were also concerned with fugitive dust emissions and the affect these emissions had on their health and overall well-being. Other commenters were concerned that adopting a subtitle C rule for CCR would negatively affect the beneficial use of the material. In addition to their testimonies that were entered into the rulemaking record, over 1200 additional documents were submitted in hard copy and entered into the docket (see EPA-HQ-RCRA-2009-0640).
2. Notices of Data Availability
Subsequent to the proposed rule, the Agency published several Notices of Data Availability (NODAs), the first on October 21, 2010, (75 FR 64974); the second on October 12, 2011 (76 FR 63252) and the third on August 2, 2013 (78 FR 46940). Specifically:
• The first NODA invited comment on the responses EPA received on Information Collection Requests that were sent to electric utilities on their CCR surface impoundments, as well as reports and materials related to the site assessments EPA had conducted on a subset of these impoundments.
• The second NODA invited comment on a number of topics, including (1) chemical constituent data from coal combustion residuals; (2) facility and waste management unit data; (3) information on additional alleged damage cases; (4) the adequacy of state programs; and (5) beneficial use.
• The third NODA invited comment on (1) supplemental data for the risk assessment; (2) supplemental data for the RIA; (3) information regarding large-scale fill; and (4) data on the CCR Assessment Program. EPA also sought comment on two technical issues associated with the requirements for CCR management units: closure requirements and regulation of overfills (
i.e.,
CCR management units built directly over pre-existing CCR landfills or CCR surface impoundments).
Specific comments received on each of the three NODAs are discussed in the relevant sections of this rule.
3. Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category Proposed Rule
On June 7, 2013 (78 FR 34432), EPA proposed a regulation that would strengthen the controls on discharges from certain steam electric power plants by revising the technology-based effluent limitation guidelines (ELG) and standards for the steam electric power generating point source category. As part of this proposal, EPA discussed its current thinking on how a final RCRA CCR rule might be aligned and structured to account for any final requirements adopted under the ELG for the Steam Electric Power Generating point source category. Two primary means of integrating the two rules were discussed: (1) Coordinating the design of any final substantive CCR regulatory requirements and (2) coordinating the timing and implementation of the rules to allow facilities to coordinate their compliance planning and implementation and to protect electricity reliability for consumers. EPA stated that consistent with RCRA section 1006(b), effective coordination of any final RCRA requirements with the ELG requirements would be sought in order to minimize the overall complexity of the two regulatory structures, and facilitate implementation of engineering, financial, and permitting activities. EPA solicited comments on how any final CCR final rule might be aligned and structured to account for any final requirements adopted under the ELG for the Steam Electric Power Generation point source category.
D. EPA's CCR Assessment Program
In March 2009, the Agency's CCR Assessment Program (herein referred to as the Assessment Program) was initiated. This effort was in response to the December 22, 2008 dike failure of a coal ash impoundment at the Tennessee Valley Authority (TVA) Kingston Fossil Plant in Harriman, Tennessee where over one billion gallons of coal ash slurry were released, affecting more than 300 acres, including residences and infrastructure. The TVA Kingston impoundment failure ignited a nation-wide concern over the safety of coal ash impoundments; and EPA was tasked with determining whether the potential existed for similar impoundment failures at other coal-fired power plants. In response, EPA developed the Assessment Program to evaluate the structural stability and safety of all coal ash impoundments throughout the country.
5
As of September 2014, 559 impoundments had been assessed at over 230 coal-fired power plants.
5
The focus of the Assessment Program was to assess the structural integrity of CCR impoundments meeting specified criteria. The Agency did not include, as part of its evaluation, the assessment of other conditions/characteristics of the impoundment that may present potential risks to human health or the environment,
i.e.,
groundwater contamination due to an insufficient liner design.
The Assessment Program began as a separate effort from the development of this final rule.
6
However, the information and experience developed in carrying out the site assessments during the Assessment Program is directly relevant to many of the issues addressed in this rulemaking, and provide further technical support for many of the technical criteria. Consequently, many of the final technical criteria were developed in direct response to findings from the site assessments. For example, several of the technical criteria contained in the proposed rule were modified to account for the widely accepted engineering methodologies and practices used in conducting the site assessments, as well as current facility practices documented during the assessments. In a few instances, the criteria were supplemented to better align the technical requirements with the Assessment Program. Included among the final criteria that directly rely on the Assessment Program are the provisions relating to structural integrity assessments to address factors of safety, periodic reassessments, hazard potential classifications, and the hydrologic and hydraulic capacity of CCR surface impoundments. These requirements are further discussed in Unit VI of this preamble.
6
EPA issued two Notices of Data Availability (75 FR 35128 (October 21, 2010) and 78 FR 46940 (August 2, 2013)) specifically soliciting comment on the information generated by the Assessment Program and the materials posted on our Web site.
The Assessment Program focused on impoundments meeting four general criteria that were designed to identify the units most likely to present the same risks as the collapsed TVA impoundment: (1) Above ground or diked; (2) of sufficient height to be susceptible to structural failure (
i.e.,
six feet); (3) receiving CCR; and (4) located at operating coal-fired power plants selling power to the electric grid. Also included in the assessments were a number of inactive impoundments,
i.e.,
impoundments not receiving CCR but still containing CCR and/or liquid. The Agency included these inactive units in the assessment reasoning that these units would be as susceptible to structural failure as units currently receiving CCR, given that they still contained CCR and maintained an ability to impound liquid (
i.e.,
the unit had not been breached). The Assessment Program did not evaluate, however, incised (not having above ground berms or dikes) impoundments or landfills (not containing liquid slurried CCR wastes). EPA chose not to assess these units because they did not share the characteristics of
impoundments likely to raise concern for catastrophic releases, and because no known catastrophic structural failures were associated with these types of units.
Prior to initiating the assessments, EPA consulted with two key dam safety organizations, the Association of State Dam Safety Officials (ASDSO) and the Mine Safety and Health Administration (MSHA) to better understand how these federal and state dam inspection programs operated, including how earthen dams and impoundments were assessed.
7
These groups provided the Agency with critical insight and information for inspecting and evaluating CCR impoundments. The Agency also reviewed various technical documents relating to dam safety and conducting impoundment inspections, many of which were recommended by these organizations. They were: (1) U.S. Army Corp of Engineers (USACE) 2008 National Inventory of Dams (NIDS); (2) Federal Emergency Management Agency's (FEMA) Federal Guidelines for Dam Safety—Hazard Potential Classification System for Dams (April 2004); (3) FEMA's Risk Prioritization Tool for Dams User Manual (March 2008); (4) MSHA's Handbook (PH07-01); (5) MSHA's Coal Mine Impoundment Inspection and Plan Review Handbook (October 2007); and (6) MSHA's Engineering and Design Manual: Coal Refuse Disposal Facility (May 2009); (7) ASDSO's “Summary of State Dam Safety Laws and Regulations,” (2000); (8) ASDSO's “Owner Responsible Periodic Inspection Guidance,” (2005); (9) “Guidelines for Inspections of Existing Dams.” New Jersey Department of Environmental Protection—Dam Safety (January 2008).
7
ASDSO identified for EPA key documents to review including Federal Energy Regulatory Commission (FERC) and MSHA guidance.
In developing the criteria that were used to conduct the assessments, a standard rating system was developed to classify the units' suitability for continued safe and reliable operation. EPA modeled its impoundment condition rating criteria on those developed by the State of New Jersey (see reference above).
1. Conducting the Site Assessments
In order to prioritize the assessments, a preliminary hazard potential classification ranking was identified for each impoundment, based on criteria developed by the FEMA and found generally in USACE's NID. EPA elected to evaluate first those impoundments with a high hazard potential classification, which signifies that a failure or mis-operation of the unit would probably result in the loss of human life.
Upon initiation of the Assessment Program, every owner or operator of a CCR impoundment was contacted by the Agency and supplied with information on the objectives of the assessment and how the assessments were to be conducted. Assessments were conducted in rounds, consisting of groups of 12-26 facilities per round.
8
Prior to each site assessment, to ensure uniformity throughout the study, a statement of work and an impoundment field checklist was developed and adhered to during the assessment.
8
The results of this effort are either presented on a facility by facility basis or are summarized by round. All of these data have been posted on the Agency Web site.
To ensure objectivity, EPA contracted with professional engineers (PEs) in the state where the impoundment was located who were experts in the area of dam safety to perform the site assessments. Each individual assessment was performed by PEs qualified in the areas of geotechnical engineering, hydrology and hydraulics, and overall dam safety. Upon evaluation of a robust set of technical documents addressing dam safety and inspections as well as comprehensive discussions with key dam safety organizations, the Assessment Program developed a comprehensive set of factors that were to be used to evaluate the overall safety of CCR surface impoundments, which concluded that, among other important factors, the static and seismic factors of safety, hydrologic and hydraulic capacity, liquefaction potential analysis and a post-liquefaction stability analysis if the soils of the embankment were identified to be susceptible to liquefaction, and operation and maintenance protocols,
e.g.
instrumentation monitoring, inspection program, emergency response protocols were critical parameters for assessing the overall safety of CCR surface impoundments.
The individual evaluations or assessments were conducted at each impoundment at each facility using standard, accepted engineering practices, including a visual assessment of the CCR surface impoundment, interviews with site personnel, a review of the history of the CCR surface impoundment, and a review of engineering documentation related to the design, construction, operation, and maintenance of the impoundments, including available technical analyses. At each site visit, additional documentation was collected and reviewed as available, including descriptions, along with supporting information, of: (1) The impoundment, including location, size, age, design and/or alterations to the design, and the amount of residuals currently in the unit; (2) known, measured settlement of the impoundment embankment; (3) known, measured movement of the impoundment embankment; (4) observed erosion of the impoundment embankment; (5) seepage; (6) leakage; (7); observed cracking of the impoundment embankment; (8) deterioration, such as scarps, boils, or sloughs, of the — embankment; (9); seismicity; (10) internal stresses; (11) functioning of foundation drains and relief wells; (12) stability of critical slopes adjacent to the units; and (13) regional and site geological conditions. If available, state and federal inspections reports were also reviewed.
9
9
It is important to note that during the assessment, no physical drilling, coring or sampling was conducted, while on site; however, studies were reviewed that often included such information.
In addition, for each assessment, the following factors were identified, to the extent feasible, for evaluation: (1) The presence and adequacy of spillways; (2) hydrologic and hydraulic capacity of the unit; (3) overall structural adequacy and stability of structures under all credible loading conditions through a review of static, seismic, and liquefaction analyses with determined factors of safety; (4) soil, groundwater, surface water, geology, and geohydrology characteristics associated with the unit, including hydrological data accumulated since the impoundment was constructed or last inspected; (5) a history of the performance of the management unit through analysis of data from monitoring instruments, interviews with facility personnel, and review of available operating records; (6) quality and adequacy of maintenance, surveillance, and methods of unit operations for the protection of public safety; (7) location of schools, hospitals, or other critical infrastructures within five miles down gradient of the impoundment; and (8) whether the impoundment is located within federally designated flood plains. Finally, each impoundment and any associated spillways were evaluated to determine whether the impoundment and the spillways could withstand the loading or overtopping from appropriate inflow design flood events.
Each CCR surface impoundment was classified with a hazard potential classification following the New Jersey Department of Environmental Protection
Bureau of Dam Safety and Flood Control's hazard potential ranking. Each impoundment was classified with a hazard potential classification of either; “high,” “significant,” “low,” or “less-than-low.” The hazard potential classification was a qualitative assessment of the potential adverse incremental consequences of a dam failure.
At the conclusion of each assessment, a report was generated and the impoundment was given a condition rating of either; satisfactory, fair, poor, or unsatisfactory. The condition ratings were based on the availability of information on the unit and evaluation of the previously mentioned factors, including the static, seismic, and liquefaction factors of safety. No impoundments received an “unsatisfactory” rating. Numerous impoundments were, however, rated as “poor,” often for lack of appropriate technical documentation in the aforementioned areas. “Poor” or “fair” ratings were also an indication that additional measures were needed to improve the stability of the unit. Of 559 impoundments assessed, 241 received a condition rating of “satisfactory,” 166 received a condition rating of “fair,” and 152 received a “poor” condition rating.
It is important to note that the condition rating did not necessarily imply that the unit had inadequate structural integrity. On the contrary, in many instances a structurally sound impoundment may have been given a condition rating or “fair” or “poor” based on other factors such as a lack of documented information on the unit or insufficient operations and maintenance protocols. For example, an impoundment could be rated as “poor” if it lacked the appropriate technical documentation and analyses regarding structural or hydrologic and hydraulic analyses. EPA rated numerous units as “poor” based primarily on unavailable technical analyses.
Once the assessment was performed, a draft report was prepared. Draft reports were reviewed by the appropriate state agency, the utility, and by EPA.
10
Once comments were received and incorporated, a final report was issued along with recommendations for additional actions to be taken by the facility (if needed). Facilities then developed action plans and schedules to implement the recommendations. EPA also informed facility owners and operators that in addition to implementing their action plans, they need to adopt an ongoing, routine program to assess each surface impoundment and to take necessary corrective measures to ensure the units' continued structural integrity.
10
As noted many times in this document, states play a critical role in implementing and overseeing these units. To assist states in this effort, EPA has, in the majority of cases directly provided the states with all of the information from our assessments. The Assessment Program reports may be accessed at:
http://www.epa.gov/wastes/nonhaz/industrial/special/fossil/surveys2/index.htm.
2. Assessment Program Findings
Upon completion of the Assessment Program, a review was undertaken to ascertain the key findings or lessons learned from the effort. These key findings included: (1) The majority of CCR surface impoundments are currently inspected on a periodic basis; (2) most utilities were readily able to supplement outdated or missing information with new or updated evaluations of their impoundments after the on-site portion of EPA's assessment was conducted; (3) in response to the assessment report recommendations, facilities typically willingly conducted remedial actions; (4) interaction with the states and the utilities assured accuracy in the final assessment reports; (5) placing site assessment materials on an internet site assured that the public, states, and utilities had full access to information about the design and operation of CCR impoundments and did not present either homeland security or other confidentiality concerns; (6) static, seismic, and liquefaction analyses did not pose a significant technical or cost burden on facilities since many already routinely conducted these types of evaluations; (7) state regulatory bodies viewed the assessments as a means to further support existing assessment programs; and (8) the use of PEs to certify all final reports ensured that the assessments reflected the PE's best judgments.
3. Assessment Program's Support for the Structural Integrity Requirements of the Rule
As noted, the findings from EPA's Assessment Program provide technical and factual support for many of the final requirements for structural stability in this rule. A more detailed discussion of several of the most significant of these is presented below. Additional discussion of the relevance of these findings is included throughout Unit VI of this document.
a. Periodic Inspections/Assessments
Consistent with the findings from the assessments and with EPA's recommendations to facilities as part of the Assessment Program, this rule requires that all CCR surface impoundments be inspected at intervals not exceeding seven days for any appearances of actual or potential structural weakness and other conditions that are disrupting or have the potential to disrupt the operation or safety of the CCR surface impoundment. Monitoring of instrumentation is also required to be conducted at intervals not exceeding 30 days. The Assessment Program found that virtually all utility companies conduct some sort of periodic inspection or monitoring at CCR surface impoundments, although practices varied among facilities and between states. The Assessment Program also found that while many facilities were conducting regularly scheduled inspections, some did not adequately document the results of these inspections.
In the final rule, CCR surface impoundments exceeding a specified size threshold,
i.e.,
height of five feet or more and capacity of 20 acre-feet or more or a height of 20 feet or more, are required to perform annual inspections as well as two assessments of structural stability quinquennially, (
i.e.,
every five years) that include a structural stability assessment of specified parameters and a factor of safety assessment. Annual inspections are broader in scope than weekly inspections and are conducted to ensure that the design, construction, operation and maintenance of the CCR unit is consistent with recognized and generally accepted good engineering standards. Annual inspections must include a review of available information regarding the status and condition of the unit and a visual inspection to identify signs of distress or malfunction of the unit and appurtenant structures. The annual inspections must be conducted by a qualified professional engineer.
The Assessment Program also reviewed how detailed structural stability reviews and inspections were recommended to be conducted by FEMA, MSHA, and the USACE guidelines and found that such inspections were recommended to take place every three to five years. Review of state dam safety programs demonstrated that similar detailed inspections were also conducted on a three-to-five year cycle. Therefore, in the final rule, EPA is requiring that structural integrity assessments, including the calculation of factors of safety under various loading conditions, be conducted within 18 months of publication of the rule, and be repeated every five years. The five year review timeframe is based on documentation showing that the factual bases for such reviews are only sound for that time
period, and is consistent with federal dam safety guidance, specifically FEMA. FEMA recommends in
Federal Guidelines for Dam Safety
that dams be formally assessed at a frequency not to exceed five years by a qualified professional engineer. EPA has adopted this timeframe to maintain consistency with FEMA guidance. The inspection and assessment requirements in this rule will ensure that there are consistent and uniform inspection and assessment practices across states and facilities and will ensure that problems related to their stability will be promptly identified and remediated as necessary.
b. Static, Seismic, and Liquefaction Factors of Safety
(1)
Static Factors of Safety.
Factor of safety (FOS) means the ratio of the forces tending to resist the failure of a structure, as compared to the forces tending to cause such failure as determined by accepted engineering practice. This analysis is used to determine whether a CCR surface impoundment's dikes are engineered to withstand the specific loading conditions that can be reasonably anticipated to occur during the lifetime of the unit without failure of the dike, if accepted good engineering practices are employed. Static factors of safety refer to the factors of safety (FOS) under static loading conditions that can reasonably be anticipated to occur during the lifetime of the unit. Static loading conditions are unique from other loading conditions (
e.g.,
seismic, liquefaction) in that static loading conditions are those which are in equilibrium, meaning the load is at rest or is applied with constant velocity.
EPA reviewed a series of USACE guidance documents addressing how to determine static FOS. These documents included, but were not limited to, Engineer Manual EM 1110-2-1902 “Slope Stability” (October 2003), and EM 1110-2-1902 “Stability of Earth and Rock-Fill Dams.” The Agency also assessed the recommendations on how to conduct static analysis contained in the Engineering and Design Manual for Coal Refuse Disposal Facilities, originally published by the Mining Enforcement and Safety Administration (MESA) in 1975 and updated for MSHA in May 2009, and in particular Chapter 6, “Geotechnical Exploration, Material Testing, Engineering Analysis and Design.” Based on recommendations from ASDSO, among others, the Agency adopted the USACE guidance to determine static FOS, both in the Assessment Program and in this rulemaking, as these manuals are recognized throughout industry as the standard routinely used in field assessment of structural integrity.
In EPA's Assessment Program all CCR units were assessed to determine their static FOS. Each assessment classified a CCR unit as having sufficient structural stability under static loading conditions if analysis of critical sections of embankments demonstrated FOS that met or exceeded the values defined by USACE for static specific loading conditions. EPA found that most CCR surface impoundments exhibited sufficient calculated factors of safety under static loading conditions. EPA also found that in those CCR units which insufficient factors of safety against failure due to static loading were calculated, the owner or operator was able to implement actions which increased the factors of safety under static loading conditions to acceptable levels. Oftentimes, these implemented actions were of a simple nature, such as installing riprap (rock armoring the slopes) or buttressing the slopes.
Similarly, this rule adopts the static FOS from USACE Engineer Manual EM 1110-2-1902 “Slope Stability,” with the exception of the rapid drawdown loading condition,
11
which was determined not to be relevant to CCR surface impoundments. EPA found the factors of safety identified by EM 1110-2-1902, specifically the Maximum Storage pool, Maximum Surcharge pool, and End-Of-Construction loading conditions, provided consistent, achievable levels of safety in CCR surface impoundment dikes, comprehensively assessed static stability, and provided sufficient consideration of compounding stresses on dikes (
e.g.,
factors of safety values greater than 1.00 to account for unanticipated loadings acting in conjunction or misidentified strength of materials).
11
Rapid (or sudden) drawdown is a condition in earthen dikes that may develop when the embankment becomes saturated through seepage during a high pool elevation in the reservoir. Rapid drawdown becomes a threat to the dike when the reservoir pool is drawn down or lowered at a rate significantly higher than the excess poor water pressure within the dike can dissipate. Typically, rapid drawdown scenarios are considered for dikes with reservoirs used for water supply and management or agricultural supply. In these scenarios, a high pool elevation is maintained in the reservoir in storage months. Subsequently, the water supply is drawn on in months where there is a demand for the reservoirs contents. This drawing down of the pool can present issues for the structural integrity of the unit. However, the management of CCR surface impoundments differs from that of conventional water supply reservoirs. CCR surface impoundments are never used for water supply, and the only instance in which EPA determined through its Assessment Program that rapid drawdown loading conditions would be relevant to CCR surface impoundments was in the event that the CCR surface impoundment had already released the contents of the impoundment through a breach of the dike or emergency discharge. Since the threat of release of CCR and the reservoir has already been realized, any failure due to rapid drawdown of the embankment is no longer critical to the overall containment of the now-released contents of the CCR unit.
(2)
Seismic Factor of Safety.
Seismic FOS means the FOS determined using analysis under earthquake conditions for a seismic loading event, based on the U.S. Geological Survey (USGS) seismic hazard maps for seismic events with a specified return period for the location where the CCR surface impoundment is located. The seismic FOS analysis is used to determine whether a dam would remain stable during an earthquake or other seismic event. The Agency relied on guidance from USACE and MSHA to evaluate the appropriate methods to determine if a dam would remain stable during a seismic event. This includes the USACE guidance Engineer Circular 1110-2-6061: Safety of Dams—Policy and Procedures 2204, Engineer Circular 1110-2-6000: Selection of Design Earthquakes and Associated Ground Motions 2008, and Engineer Circular 1110-2-6001: Dynamic Stability of Embankment Dams 2004). EPA also reviewed MSHA's 2009 Engineering and Design Manual for Coal Refuse Disposal Facilities, in particular Chapter 7, “Seismic Design: Stability and Deformation Analyses.” These documents are viewed by ASDSO, FEMA and MSHA as generally accepted guidance on how to conduct seismic stability analyses.
As noted earlier, in performing the assessments, EPA directed its engineering contractors to assess seismic stability of CCR impoundments during and following a seismic event with a 2% probability of exceedance in 50 years (
i.e.
probable earthquake within approximately 2,500 years) and a horizontal spectral response acceleration for 1.0-second period (5% of Critical Damping). EPA selected this return period for determining the maximum design earthquake (MDE) by first considering the operating life anticipated for CCR surface impoundments. EPA has identified the operating life of CCR surface impoundments to range between 40-80 years. EPA then consulted the United States Geological Survey (USGS) and ASDSO to determine a conservative probability that should be used in the assessments.
12
To reduce the likelihood of a CCR unit failing during a seismic
event, the Agency assessed various return periods and chose a conservative 2500 year return period. The use of this “return” period was chosen because it is conservative, reflects the fact that many CCR impoundments are located in active seismic zones, and the use of a conservative “return” period ensures that if a unit meets the seismic FOS it is unlikely to fail under most seismic events. By evaluating seismic stability under a conservative return period and requiring the unit to maintain structural stability under that design seismic event, the likelihood of a seismic event occurring at the location of the CCR surface impoundment in which the strength of the unit is exceeded and the unit fails is considerably reduced. Additionally, the unit can reasonably be anticipated to withstand seismic events of a more frequent return period (
i.e.,
smaller magnitude).
12
Wieland, M., “Seismic Design and Performance Criteria for Large Storage Dams”, Proc. 15th World Conf. on Earthquake Engineering, Lisbon, Portugal, Sep. 24-28, 2012.
The Agency assessed CCR impoundments and classified them as having seismic stability if modeling results of critical failure surfaces were calculated to have a FOS greater than 1.0 under the specified seismic loading condition. The Assessment Program found that most CCR impoundments did meet the required seismic FOS. This rule also adopts this seismic stability FOS under the 2% probability of exceedance in 50 years event.
The Assessment Program found that many CCR impoundments had not undergone static or seismic analyses in sufficient detail that an independent professional engineer could assert that they were stable. The assessments gave impoundments a condition rating of “poor” if the utility was unable to provide static and seismic studies of their units conducted in a fashion which represented acceptable professional engineering practice. As the Assessment Program advanced, many utilities independently conducted new or updated static and seismic analyses of CCR surface impoundments in anticipation of their facilities being assessed. By the end of the program, virtually all facilities had conducted or were in the process of conducting static and seismic analyses. While some utilities noted concern over the costs of conducting additional static or seismic stability studies, none found that completing these studies presented any significant engineering challenges.
(3) Liquefaction Factors of Safety
Liquefaction FOS means the factor of safety determined using analysis under liquefaction conditions. Liquefaction is a phenomenon which typically occurs in loose, saturated or partially-saturated soils in which the effective stress of the soils reduces to zero, corresponding to a total loss of shear strength of the soil. The most common occurrence of liquefaction is in loose soils, typically sands. The liquefaction FOS determination in the final rule is used to determine if a CCR unit would remain stable if the soils of the embankment of the CCR unit were to experience liquefaction. EPA relied primarily on one source to evaluate the appropriate methods to determine if a dam would remain stable under liquefaction conditions. This source was “Soil Liquefaction during Earthquakes,” Idriss and Boulanger, Earthquake Engineering Research Institute, 2008.
13
EPA also reviewed several technical resources regarding soil liquefaction, including “Ground Motions and Soil Liquefaction During Earthquakes,” Seed and Idriss, 1982,
14
“Liquefaction Resistance of Soils: Summary report from the 1996 and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils,” Youd and Idriss, 2001,
15
and
Seismic Design Guidance for Municipal Solid Waste Landfill Facilities,
US EPA, Office of Research and Development, 1995.
16
These documents are viewed as generally accepted guidance on how to conduct liquefaction potential analyses and residual strength analyses under post-liquefaction conditions.
13
https://www.eeri.org/products-page/monographs/soil-liquefaction-during-earthquakes-3/.
14
Seed, H. B., and Idriss, I. M., 1982, “Ground Motions and Soil Liquefaction During Earthquakes,” Monograph No. 5, Earthquake Engineering Research Institute, Berkeley, California, pp. 134.
15
Youd, T. L., Idriss, I. M., 2001, “Liquefaction Resistance of Soils: Summary report from the 1996 and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils.” Journal of Geotechnical and Geoenvironmental Engineering, ASCE.
16
United States EPA, Office of Research and Development, 1995, EPA/600/R-95/051, RCRA Subtitle D (258) Seismic Design Guidance for Municipal Solid Waste Landfill Facilities. Available as of the Writing of this policy at
www.epa.gov/clhtml/pubtitle.html
on the U.S. EPA Web site.
As noted earlier, in performing the assessments, EPA assessed the liquefaction potential of soils that compose the embankments of the CCR unit to determine if the soils present in the embankment were of the soil classification and configuration that was susceptible to liquefaction. This determination was based on evidence available through interviews with facility personnel, construction documentation, or representative soil sampling, such as information provided by corings and borings. Identical to the requirements for seismic factor of safety calculation, EPA selected a return period for a seismic event for analysis of liquefaction potential, under a seismic loading which may induce liquefaction in embankments, of a 2% probability of exceedance in 50 years. The discussion of the selection of this return period can be found in the “Seismic Factor of Safety” section above.
The Agency assessed CCR impoundments and classified them as having stability under liquefaction conditions if representative soil sampling, anecdotal evidence from interviews with facility personnel, or construction documentation indicated that there was no susceptibility to liquefaction of the embankment soils or if modeling or analysis in critical failure planes in the embankment expected to be susceptible to liquefaction were calculated to have a FOS greater than 1.00 under post-liquefaction conditions. The Assessment Program found that most CCR surface impoundments did not contain soils in detrimental volumes or configurations in the embankment that would indicate susceptibility to liquefaction. However, the assessment effort found that in embankments with a presence of soils susceptible to liquefaction, most CCR surface impoundments did not meet the required liquefaction FOS.
The Assessment Program found that many CCR surface impoundments had not undergone liquefaction potential analyses or post-liquefaction residual strength analyses in those instances in which liquefaction potential was identified (
i.e.,
soils subject to liquefaction were present). The assessments gave impoundments a condition rating of “poor” if there was no information available to characterize the soils of the embankment, and a condition rating of “poor” or “fair” if post-liquefaction residual strength analysis of soils previously identified as being susceptible to liquefaction had not been available, with the rating dependent on the determined severity of the liquefaction potential in the embankment. Impoundments with calculated liquefaction factors of safety which did not meet or exceed 1.00 were given a condition rating of “poor.”
As the Assessment Program advanced, many utilities independently conducted new or updated liquefaction potential analyses or residual strength analyses of CCR surface impoundments in anticipation of their facilities being assessed. By the end of the program, virtually all facilities had conducted or were in the process of conducting liquefaction potential analyses or residual strength analyses. While some utilities noted concern over the costs of
conducting additional liquefaction potential or residual strength studies, none found that completing these studies presented any significant engineering challenges.
Based on its experience in the Assessment Program and subsequent review of numerous technical resources, EPA determined that a post-liquefaction residual strength factor of safety in the embankment of 1.00 is not sufficient. Liquefaction potential analysis and post-liquefaction residual strength analysis involves a larger degree of uncertainties,
e.g.,
liquefiable stratum configuration, in assumptions and analysis which must be accounted for with a factor of safety above 1.00. The final rule therefore requires CCR surface impoundments which are constructed of soils determined to be susceptible to liquefaction to meet or exceed a liquefaction factor of safety of 1.20. EPA has determined that 1.20 is an appropriate liquefaction factor of safety based on several technical guidances and memos, including
Federal Guidelines for Dam Safety: Earthquake Analyses and Design of Dams,
Document 65, FEMA May 2005, which states that “post-liquefaction factors of safety are generally required to be a minimum of 1.2 to 1.3.”
17 18 19 20 21
17
US Bureau of Reclamation (USBR), “Water Operation and Maintenance Bulletin No. 222,” Denver, Colorado, December 2007.
18
http://www.oregon.gov/odot/hwy/bridge/docs/bddm/pdfs/psha.pdf.
19
Canadian Dam Association. Canadian Dam Safety Guidelines, 2007, 88 pp.
20
Sonmez, H., 2003. Modification of the liquefaction potential index and liquefaction susceptibility mapping for a liquefaction-prone area (Inegol, Turkey), Env. Geology, (44): 862-871.
21
Seed, R.B., Cetin, O.K., Moss, R.E.S., Kammerer, A.M., Wu, J., Pestana, J.M., Riemer, M.F., Sancio, R.B., Bray, J.D., Kayen, R.E., Faris, A., 2003. Recent advances in soil liquefaction engineering: a unified and consistent framework, 26th annual ASCE L.A. Geot. Spring Sem., Long Beach, California, April 30, 71 pp.
c. Impoundment Height and Relationship to Regulatory Requirements
During the Assessment Program, the Agency reviewed the stability issues related to various heights of impoundments. The Assessment Program concluded that impoundments with heights less than five feet or those retaining less than 20 acre feet were unlikely to cause significant environmental or economic loss should they undergo a catastrophic failure. The Agency's review of MSHA and FEMA guidance also noted that “small” units were unlikely to cause significant losses should they fail. Based on the Agency's experience and FEMA and MSHA's guidance, the Agency has concluded that there is a substantial benefit in having impoundments which exceed a specified size threshold,
i.e.,
height of five feet or more and capacity of 20 acre-feet or more or a height of 20 feet or more determine their static, seismic, and liquefaction FOS on a regular basis. The analyses and experience gained in conducting the Assessment Program indicates that a catastrophic failure of a CCR surface impoundment is unlikely to occur so long as the factors of safety are maintained or exceeded throughout the unit's operating life. This conclusion is also consistent with relevant guidance and regulations which do not require such evaluations for units below a certain size threshold.
d. Hazard Potential Ratings
Each impoundment assessed in the Assessment Program was given a Hazard Potential Classification rating of either
Less-than-Low, Low, Significant, and High.
Previous classifications were reviewed and amended as necessary to reflect guidance developed for the Assessment Program. The hazard potential ratings refer to the potential for loss of life or damage if there is a dam failure. The ratings do not refer to the condition or structural stability of the dam. Four hazard potential classifications were used in assessing the impoundments in the Assessment Program:
High Hazard Potential—Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life.
Significant Hazard Potential—Dams assigned the significant hazard potential classification are those dams where failure or mis-operation results in no probable loss of human life, but can cause economic loss, environment damage, disruption of lifeline facilities, or impact other concerns. Significant hazard potential classification dams are often located in predominantly rural or agricultural areas, but could be located in areas with population and significant infrastructure.
Low Hazard Potential—Dams assigned the low hazard potential classification are those where failure or mis-operation results in no probable loss of human life and low economic and/or environmental losses. Losses are principally limited to the owner's property.
Less Than Low Hazard Potential—Dams which do not pose high, significant, or low hazard potential.
There is a substantial benefit in having owners or operators of all CCR impoundments determine the hazard potential classification of their units. The Assessment Program found that many CCR surface impoundments had not been given a hazard potential classification and consequently, their potential threat to human health and the environment if a failure were to occur was not clearly identified, nor had response plans been developed to respond to any catastrophic failure. Moreover, these classifications should be updated over time, particularly to account for changes such as population growth, construction of key infrastructure, or changes to the impoundment's size or operation. The Assessment Program also found that some states do not classify CCR impoundments as “dams” and therefore those units may not be required to determine their hazard potential classification or otherwise evaluate the potential effects of a catastrophic failure. Consistent with the guidance from ASDSO, FEMA, and the state of New Jersey, this rule requires that all diked CCR impoundments determine their hazard potential classification according to the definitions set out in this regulation. For those units with a hazard potential classification of significant or high, the owner or operator of such impoundments is also required to develop an Emergency Action Plan to address the higher potential impacts of a potential failure.
e. Condition Ratings
While the rule does require facilities to evaluate the same engineering factors that went into developing these ratings, the rule does not require that each impoundment be given a condition rating. After evaluation of the use of these ratings, the Agency determined that the rating may have relied too heavily on subjective factors. For that reason, this rule requires that the qualified professional engineer certify, based on quantitative determinations, that an impoundment meets the requirements for FOS and hydraulic and hydrologic capacity. This approach is less subjective and allows the professional engineer to make quantifiable certifications.
IV. Bevill Regulatory Determination Relating to CCR From Electric Utilities and Independent Power Producers
As discussed in the preceding sections, in the proposed rule EPA reopened its August 1993 and May 2000 Regulatory Determinations regarding CCR generated at electric utilities and independent power producers, to re-evaluate whether regulation of CCR under RCRA subtitle C is necessary in light of subsequent information. EPA explained that this was based on several
relatively recent developments, such as a newly completed quantitative risk assessment that concluded that the disposal of CCR in unlined waste management units posed substantial risks, with upper end risk estimates ranging from 10
−2
-10
−4
. Citing to the recent structural failures of surface impoundments, the proposed rule also noted that these wastes have caused greater damage to human health and the environment than EPA originally estimated. Finally, EPA explained that recently collected information regarding the existing state regulatory programs had called into question whether those programs, in the absence of national minimum standards specific to these wastes, had sufficiently improved to address the gaps originally identified in the May 2000 Regulatory Determination. EPA ultimately concluded that federal regulation of this material was necessary, but did not reach any conclusion as to whether regulation under subtitle D would be sufficient or whether regulation under subtitle C would be necessary to adequately address the risks.
Of the over 450,000 comments received on the proposed rule, the vast majority focused on whether the Bevill exemption should be retained, and the corresponding question of whether CCR regulations should be established under RCRA subtitle C or subtitle D. In terms of the sheer numbers, the majority of commenters supported a decision to revoke the Bevill exemption and to regulate CCR under a subtitle C rule. These commenters, largely individual members of the public and environmental groups, generally argued that the Bevill exemption should be revoked because state programs have failed to adequately regulate the disposal of CCR and because the risks associated with the management of these wastes are significant. In support of both points, these commenters pointed to the fact that the number of damage cases that have been discovered has increased substantially since the original 2000 Regulatory Determination, and have continued to grow since publication of the proposed rule in 2010.
By contrast, state organizations, individual states, and industry groups (electric utilities, recycling firms, trade associations), largely favored a subtitle D rule. Overall, these commenters raised concern about the costs of the subtitle C regime, arguing that the subtitle C requirements were more stringent than necessary to address the risks from CCR disposal. Commenters also raised concern that regulation of these wastes under subtitle C would negatively affect the beneficial use of these materials, arguing that the stigma associated with regulating the disposal of CCR as a hazardous waste would “cripple” the current beneficial reuse market. Many of these commenters also argued that EPA lacks the legal authority to regulate these wastes under subtitle C on a variety of grounds, including claims that EPA entirely lacks the authority to revisit its Bevill Regulatory Determination, and that EPA had failed to comply with statutory procedures in doing so.
A. Deferral of a Final Decision on the Bevill Regulatory Determination for CCR Destined for Disposal
In determining whether the Bevill exemption should be retained for CCR, EPA must evaluate and weigh eight factors that were enumerated in section 8002(n) of RCRA. 42 U.S.C. 6921(b)(3)(C). The eight factors are: (1) The source and volumes of CCR generated per year; (2) present disposal and utilization practices; (3) potential danger, if any, to human health or the environment from the disposal and reuse of CCR; (4) documented cases in which danger to human health or the environment from surface run-off or leachate has been proved; (5) alternatives to current disposal methods; (6) the cost of such alternative disposal methods; (7) the impact of those alternatives on the use of coal and other natural resources; and (8) the current and potential utilization of CCR. 42 U.S.C. 6982(n).
EPA addressed each of these study factors in the 1988 and 1999 Reports to Congress, and in reaching our decisions in the August 1993 and the May 2000 Regulatory Determinations to maintain the Bevill exemption for CCR. 58 FR 42466 (August 9, 1993); 65 FR 32214 (May 22, 2000). Consequently, in considering whether to reverse these Regulatory Determinations for CCR destined for disposal, EPA reexamined the RCRA section 8002(n) study factors against all of the available data, which included both the data that formed the basis for the May 2000 Regulatory Determination and the most recent data available. (See 75 FR 35150-35156.)
As discussed at length in the proposed rule, three of these factors weighed the most heavily in the Agency's decision to reconsider its previous Regulatory Determinations. (See 75 FR 35133 and 35156-35158.) The first of these related to the extent of the risks posed by the current management of these wastes. Since the 2000 Regulatory Determination, EPA had completed a quantitative risk assessment that estimated significant risks to human health and the environment. EPA's 2010 CCR risk assessment estimated the cancer risk from arsenic that leaches into groundwater from CCR managed in units without composite liners to exceed EPA's typical risk thresholds of 10
−4
to 10
−6
. For example, depending on various assumptions about disposal practices (
e.g.,
whether CCR is co-disposed with coal refuse), groundwater interception and arsenic speciation, the 90th percentile risks from unlined surface impoundments ranged from 2 × 10
−3
to 1 × 10
−4
. The risks from clay lined surface impoundments ranged from 7 × 10
−2
to 4 × 10
−5
. Similarly, estimated risks from unlined landfills ranged from 5 × 10
−4
to 3 × 10
−6
, and from 2 × 10
−4
to 5 × 10
−9
for clay-lined landfills. EPA's risk assessment also estimated Hazard Quotients (HQs)
22
above 1 for other metals, including selenium and lead in unlined and clay-lined units. However, a number of technical questions were raised regarding this quantitative risk assessment that called into question the accuracy of these risk estimates.
22
For more information on HQs please see Unit X. Risk Assessment of this preamble.
A second and equally significant consideration related to how effectively state regulatory programs address the risks associated with the improper management of these wastes. The existing reports on state regulatory programs had called into question whether the trend in improving state regulatory regimes that EPA identified in May 2000 had materialized to the degree anticipated in the Regulatory Determination. EPA noted concern about the lack of substantial details regarding the full extent of state regulatory authority over the disposal of these materials, and the manner in which states have, in practice, implemented this oversight.
The final consideration, which is tightly related to the first two, was the recent information documenting continued instances involving the contamination of ground or surface water from the management of these wastes. Since the 2000 Regulatory Determination EPA had gathered or received information on 67 “proven or potential” cases involving damage to (
i.e.,
contamination of) ground and surface water, and to human health and the environment from improper management of CCR in landfills and surface impoundments. These also included cases involving the structural failure of surface impoundments and the catastrophic release of CCR.
For each of these key areas, EPA identified a number of issues on which the absence of critical information prevented the Agency from reaching an initial decision on whether to revise the Bevill Determination. Some of these issues or uncertainties have been resolved during the development of the final rule, either as a result of information received from commenters or through additional information and analyses EPA obtained or developed, which were held out for comment in subsequent NODAs. See 75 FR 35128 (October 21, 2010) and 78 FR 46940 (August 2, 2013). However, as discussed in more detail below, critical information necessary to make a final Regulatory Determination is still lacking in two of these three areas. This information bears directly on the extent and magnitude of the risks over the course of the next several years, and the degree to which those risks can be managed sufficiently under each of the two regulatory structures available to the Agency. In the absence of this information, EPA is unable to reach a conclusion on the issue that is central to a Bevill Determination: Whether the risks presented by management of CCR waste streams can only be adequately mitigated through regulation under RCRA subtitle C. As a consequence, EPA is deferring a final Regulatory Determination for these wastes.
23
23
Because EPA is deferring its final Bevill Determination, EPA has not responded to comments that pertain exclusively to that issue. However EPA has responded to significant comments that relate to topics that are otherwise relevant to the final subtitle D regulation. For example, because EPA is relying on the damage cases to support certain aspects of the technical requirements, EPA has responded to comments relating to the accuracy of the facts involved in the damage cases. EPA has not, however, responded to many comments on state programs because the Agency has made no final conclusions on the adequacy of those programs and is not relying on state programs to support any of the final rule's provisions.
Nevertheless, the record is clear that current management of these wastes can present, and in many cases has presented, significant risks to human health and the environment. Although EPA cannot reach conclusions as to the full extent or magnitude of those risks over the long term, the current level of risk clearly warrants the issuance of federal standards to ensure consistent management practices and a national minimum level of safety.
In the following sections, EPA describes the information that was obtained over the course of the rulemaking relating to each area of concern, and the extent to which the new information addressed the issue.
1. Risks Posed by Current Management of CCR and Potential Danger to Human Health From the Disposal of CCR
In the proposed rule, EPA specifically noted that several uncertainties remained in the Agency's quantitative risk analysis of the current management of CCR. Chief among these uncertainties was the evolving character and composition of CCR due to electric utility upgrades and retrofits of multi-pollutant controls needed to comply with the emerging Clean Air Act (CAA) requirements, which could present new or otherwise unforeseen contaminant issues (
e.g.,
addition of calcium bromide to coal prior to combustion increasing mercury capture; use of selective catalytic reduction for post-NO
X
controls forming hexavalent chromium). As EPA explained, changes to fly ash and other types of CCR is expected to occur as a result of increased use and application of advanced air pollution control technologies in coal-fired power plants. These technologies include flue gas desulfurization (FGD) systems for SO
2
control, selective catalytic reduction (SCR) systems for NO
X
control, and activated carbon injection (ACI) systems for mercury control. These technologies are being installed or are expected to be installed in response to federal regulations, state regulations, legal consent decrees, and voluntary actions taken by industry to adopt more stringent air pollution controls. Use of these more advanced air pollution control technologies reduces air emissions of metals and other pollutants in the flue gas of a coal-fired power plant by capturing and transferring the pollutants to the fly ash and other air pollution control residues. Previous EPA studies of whether increased pollutant content would increase the risks correspondingly were inconclusive. For example, EPA evaluated the environmental fate of metals that are captured in CCR through use of enhanced air pollution controls, by characterizing the leaching behavior of 73 air pollution control residues, using the Leaching Environmental Assessment Framework (LEAF) methodology. Materials were tested over the pH conditions and liquid/solid ratios expected during management via land disposal or beneficial use. Leachate concentrations for most metals were highly variable over a range of coal type, facility configurations, and air pollution control residues. In addition, the data showed significantly different leaching behavior for similar residue types and facility configurations. Overall, the variability in leaching of the metals in the CCR was greater than the variability in totals concentrations by several orders of magnitude, suggesting that total pollutant content may not be predictive of leaching behavior, and consequently the risks.
24
24
Thorneloe, S, Kosson, D., Sanchez, F., Garrabrants, A.C., and Helms, G., Evaluating the Fate of Metals in Air Pollution Control Residues from Coal-Fired Power Plants, Environ. Sci. Technol. 2010, 44, 7351-7356.
The Agency received no data from commenters that would aid in resolving this uncertainty. To try to establish some parameters around the uncertainty, EPA attempted to develop estimates of the extent to which this issue could meaningfully affect the risks.
As an initial step, EPA focused on mercury pollution controls, as mercury levels in these wastes was an issue of particular concern in the public comments. It has been established that mercury pollution controls can affect both the mercury content and the general leaching behavior of ash (US EPA 2006, 2008, 2009). Using the limited data available, EPA attempted to evaluate the extent to which mercury controlled wastes could ultimately affect the overall risk associated with disposal of CCR.
EPA conducted a sensitivity analysis that filtered the full 2014 risk assessment results for the subset of fly ash samples generated by facilities that have currently installed ACI systems. The samples were collected from five different facilities that were either installing or evaluating an ACI system for increasing mercury capture. At each facility, samples were collected both before and after the installation of an ACI system. Ultimately the results were inconclusive, likely because of the small sample size, and EPA can draw no conclusions about the exact effects of ACI systems on the risks from CCR disposal. Nevertheless, the analysis provided some useful information. Capturing and transferring pollutants from air emission to the fly ash and other air pollution control residues would normally be expected to increase the risks associated with disposal of these wastes. EPA's analyses, however, showed only a marginal difference in risks for ash generated with or without the use of an ACI system, and in some instances the risks decreased slightly with the addition of activated carbon. The significance of these results should not be overstated—the observed decreases were not consistent and were thought to be an artifact of the relatively small number of model iterations. It is also important to remember that these results provide no information about the potential effects from the installation of
FGD systems for SO
2
control, or SCR systems for NO
X
control, any of which could also significantly affect the characteristics of the wastes. But these results also suggest that EPA should be cautious about assuming that the risks will necessarily increase as a result of the imposition of additional air pollution controls.
Other uncertainties in the risk assessment developed for the proposal related to the extent to which some sampled data with high concentrations of constituents used in the risk assessment accurately reflect coal ash leaching from landfills or surface impoundments. For example, as explained in the proposed rule, some data reflected pore water taken in the upper section of a surface impoundment where coal refuse was placed. There were acid generating conditions and high concentrations of arsenic, but the data demonstrated that the underlying coal ash neutralized the acid conditions and greatly reduced the arsenic which leached from the bottom of the impoundment. EPA also noted that much of the pore water samples and leachate data were several years old, and questions had been raised whether these data accurately reflected current management practices. Finally, EPA noted that recent research indicated that traditional leach procedures (
e.g.,
Toxicity Characteristic Leaching Procedure (TCLP) and Synthetic Precipitation Leaching Procedure (SPLP)) may underestimate the actual leach rates of toxic constituents from CCR under different field conditions.
First, regarding the question of appropriate pH conditions in CCR units, and the resulting leachate concentrations in impoundments where coal refuse was placed, EPA obtained data during the development of this rule directly relevant to this issue. A survey conducted by the Electric Power Research Institute (EPRI) in 1995 had shown that 34 percent of unlined landfills and 68 percent of unlined surface impoundments actively managed CCR with coal refuse. However, more recent data collected by EPA as part of the Clean Water Act ELG rulemaking in 2009-2010 indicates that this management practice has declined significantly to approximately five percent of current units.
EPA also obtained sufficient data to resolve concerns about the accuracy of the concentrations in pore water and leachate used in the risk assessment. EPA received a substantial amount of data on CCR chemical constituents from commenters, which included total concentrations, pore water, and leaching test results for various types of CCR,
i.e.,
bottom ash, FGD gypsum, FGD sludge, fly ash cenospheres, boiler slag, and combined waste streams. This included data from several EPRI reports, which provided field leachate results for bottom ash, fly ash, and FGD solids from a number of landfills and surface impoundments. EPA also received leachate data from the Alaska Department of Environmental Conservation, the Michigan Department of Natural Resources and Environment (MI DNRE), and from the Maryland Department of the Environment on total metals, TCLP, and SPLP results for bottom ash and fly ash. Included among these data were TCLP results for 102 CCR samples and 12 FGD gypsum samples, and two landfill leachate samples, as well as several laboratory reports on CCR leachate from 2008 through 2010. EPA also received several reports from the University of North Dakota Energy & Environmental Research Center, with leaching test results for 58 fly ash, five FGD, and four FGD gypsum samples using various leaching methods other than TCLP, and TCLP mercury results for 15 fly ash samples, as well as leaching test results for five fly ash and two bottom ash samples using 18-hr, 30-day, and 60-day leach methods, plus bulk and trace element data for five fly ash samples, two bottom ash samples, and one slag sample. (See 76 FR 63252, October 12, 2011.)
In addition to the data submitted by commenters, EPA's Office of Research and Development (ORD), in collaboration with Vanderbilt University (VU), developed additional CCR leaching data using a revised methodology, the Leaching Environmental Assessment Framework, or LEAF, consisting of four methods that evaluate leaching potential for various waste forms at different plausible pH values and liquid-solid ratios, in order to more accurately simulate leaching potential over a variety of field conditions. The LEAF methods went through validation working with 20 different laboratories, different waste matrices, and documented in two EPA reports finding good agreement between the labs for the four methods.
25
In addition, EPA compiled decades of data for ten different case studies to compare field and laboratory leach data.
26
These data also showed LEAF methods to be a good predictor of field leachate behavior using geochemical speciation modeling for factors such as oxidation that are difficult to account for in the lab. When considered along with the methods validation, the field-to-lab leachate data comparison provides additional confidence that LEAF methods can more accurately predict environmental release over a range of materials, waste form, pH, liquid-solid ratio, and other parameters influencing leaching behavior such as calcium depletion for a material.
25
Garrabrants A.C., D.S. Kosson, H.A. van der Sloot, F. Sanchez and O. Hjelmar (2010) Background information for the Leaching Environmental Assessment Framework (LEAF) Test Methods, EPA-600/R-10/170, U.S. Environmental Protection Agency, Air Pollution Prevention and Control Division, December 2010.
Garrabrants A.C., D.S. Kosson, L. Stefanski, R. DeLapp, P.F.A.B. Seignette, H.A. van der Sloot, P. Kariher and M. Baldwin (2012a) Interlaboratory Validation of the Leaching Environmental Assessment Framework (LEAF) Method 1313 and Method 1316, EPA/600/R-12/623, U.S. Environmental Protection Agency, Air Pollution Prevention and Control Division, September 2012.
Garrabrants A.C., D.S. Kosson, R. DeLapp, P. Kariher, P.F.A.B. Seignette, H.A. van der Sloot, L. Stefanski and M. Baldwin (2012b) Interlaboratory Validation of the Leaching Environmental Assessment Framework (LEAF) Method 1314 and Method 1315, EPA-600/R-12/624, U.S. Environmental Protection Agency, Air Pollution Prevention and Control Division, September 2012.
26
Kosson D.S., van der Sloot, H.A., Seignette, P.F.A.B. 2014. Leaching Test Relationships, Laboratory-to-Field Comparisons and Recommendations for Leaching Evaluation using the Leaching Environmental Assessment Framework (LEAF), EPA-600/R-14/061. EPA Office of Research and Development, National Risk Management Research Laboratory, Research Triangle Park, NC, 27711. December.
In updating the risk assessment for the final rule, EPA relied on surface impoundment pore water data and impoundment wastewater data, including the data submitted by commenters. For landfills, EPA only used LEAF data to characterize the leachate for the range of materials resulting from various air pollution control technologies. The CCR data documented in three EPA reports
27
and summarized in Thorneloe et al, 2010
28
provides a robust characterization of air pollution control residues from coal-fired power plants and indicates that leaching rates can vary by several orders of magnitude, depending on pH levels and the amount of liquid that comes into contact with the CCR solids (
i.e.,
the liquid to solid ratio).
27
Sanchez F., R. Keeney, D.S. Kosson and R. DeLapp (2006) Characterization of Mercury-Enriched Coal Combustion Residues from Electric Utilities using Enhanced Sorbents for Mercury Control, EPA-600/R-06/008, U.S. Environmental Protection Agency, Air Pollution Prevention and Control Division, February 2006.
Sanchez F., D.S. Kosson, R. Keeney, R. DeLapp, L. Turner and P. Kariher (2008) Characterization of Coal Combustion Residues from Electric Utilities using Wet Scrubbers for Multi-pollutant Control, EPA-600/R-08/077, U.S. Environmental Protection Agency, Air Pollution Prevention and Control Division, July 2008.
Kosson D.S., F. Sanchez, P. Kariher, L.H. Turner, R. DeLapp, and P. Seignette (2009) Characterization of Coal Combustion Residues from Electric Utilities—Leaching and Characterization Data, EPA-600/R-09/151, U.S. Environmental Protection Agency, Air Pollution Prevention and Control Division, December 2009.
28
Thorneloe S.A., D.S. Kosson, F. Sanchez, A.C. Garrabrants and G. Helms (2010) “Evaluating the fate of metals in air pollution control residues from coal-fired power plants,”
Environmental Science and Technology,
44, 7351-7356.
The 2014 risk assessment incorporates these new data, and accounts for both the pH of the waste in field conditions, as well as the liquid-to-solid ratio of the leachate and CCR, which effectively addresses the concerns raised in the proposed rule that TCLP and SPLP methods could underestimate leachate concentrations.
A further area of uncertainty related to one of the primary inputs into the risk assessment. As noted in the proposed rule, the Agency's risk estimates were based on the existing cancer slope factor of 1.5 mg/kg/d
−1
for arsenic in EPA's Integrated Risk Information System (IRIS). However, EPA noted that was in the process of revaluating the arsenic cancer slope factor in light of recent recommendations from the National Research Council (NRC) of the National Academy of Sciences (NAS) in “Critical Aspects Arsenic in Drinking Water, 2001 Update.” In the proposal, EPA estimated that using this NRC data analysis would increase the individual risk estimates by approximately 17 times.
EPA is currently evaluating the arsenic cancer slope factor in light of more recent NRC recommendations, regarding the approach and the science for estimating cancer and non-cancer risk in “Critical Aspects of EPA's IRIS Assessment of Inorganic Arsenic, (NRC 2013).” EPA is in the process of implementing these recommendations, but to date has been unable to finalize its IRIS reassessment. Nor did EPA receive any other information during the development of this final rule that would help to resolve this uncertainty.
A final source of uncertainty in the risk assessment developed for the proposed rule related to the potential impact from the interception of contaminated groundwater plumes by surface water bodies that exist between a waste management unit and a down-gradient drinking water well. It is common for coal-fired utilities to be located near water bodies, which are used as a source of cooling water and waste conveyancing. Releases from surface impoundments located in close proximity to water bodies can be intercepted, which can significantly affect the contaminants that reach drinking water wells. For example, surface impoundments are commonly placed next to rivers, which can intercept the leachate plume and prevent contamination of drinking water wells on the other side of the river. Also, in such circumstances the direction of groundwater flow on both sides of the river may be towards the river; thus, the drinking water well on the opposite side of a river may not be impacted.
Over the course of the rulemaking, EPA was able to obtain sufficient data to model the impact from interception of contamination by surface water bodies. The risk assessment developed for the final rule accounts for the interception of the groundwater contamination plume by surface water bodies, and the resulting decrease in constituent mass to downstream drinking water sources. As a consequence of this modeling, the median risks for surface impoundments and landfills were substantially lower than both the high-end and median risks modeled in the 2010 risk assessment,
i.e.,
by approximately an order of magnitude.
2. Adequacy of Existing State Regulatory Oversight
The assessment of state regulatory programs in the proposed rule was based largely on two reports: A joint U.S. Department of Energy (DOE) and EPA study completed in 2006, “Coal Combustion Waste Management at Landfills and Surface Impoundments, 1994-2004,” and a 2009 survey conducted by the Association of State and Territorial Solid Waste Management Officials (ASTSWMO). EPA's preliminary conclusion was that while states seem to be regulating landfills to a greater extent than in 2000, significant gaps in state programs appeared to remain, particularly with respect to the oversight of surface impoundments.
In reaching this conclusion EPA noted the following findings from the DOE/EPA study: only 19 percent (three out of 19) of the surveyed surface impoundment permits included requirements addressing groundwater protection standards (
i.e.,
contaminant concentrations that cannot be exceeded) or closure/post-closure care, and only 12 percent (two out of 12) of surveyed units were required to obtain bonding or financial assurance. The EPA/DOE report also concluded that approximately 30 percent of the net disposable CCR generated was potentially exempt from all state solid waste permitting requirements (EPA/DOE Report at pp 45-46). For example, at the time of the report, Alabama did not regulate CCR disposal under any state waste authority and nor had a dam safety program. Texas (the largest coal ash producer) did not require permits for waste managed on-site, which is defined as waste managed at any site owned by the generator, up to 50 miles away from the generating facility. Finally, the report found that a number of states only regulated surface impoundments under CWA authorities, and consequently primarily addressed the risks from effluent discharges to navigable waters, but did not require liners or groundwater monitoring.
The more recent 2009 ASTSWMO survey reached similar conclusions. With respect to liner requirements, 36 percent of surveyed states did not have minimum liner requirements for CCR landfills, while 67 percent did not have CCR liner requirements for surface impoundments. Similarly, 19 percent of states surveyed did not have minimum groundwater monitoring requirements for landfills and 61percent did not have groundwater monitoring requirements for surface impoundments. The 2009 ASTSWMO survey also indicated that only 36 percent of states regulated the structural stability of surface impoundments.
In the proposal, EPA identified several issues that complicated its preliminary assessment and prevented the Agency from reaching overall conclusions as to the adequacy of state regulatory programs. First, EPA raised concern about the absence of any real details in the two reports regarding how states, in practice, oversee the disposal or other solid waste management of CCR. For example, even though the disposal units might not be regulated under the state solid waste provisions, some states may use performance based standards or implement requirements to control CCR landfills and surface impoundments under other state programs. Second, EPA noted that most of the more recent data primarily focused on the requirements applicable to new management units, which only represented approximately 10 percent of currently operating units. EPA had little, if any, information that described the extent to which states and utilities had implemented requirements, such as groundwater monitoring, on the many existing landfills and surface impoundments that receive CCR. Moreover, the information in the record for the proposal with respect to these older units was fifteen years old. EPA assumed it to be unlikely that states would have required existing units to install liners, but suggested states may have been more likely to have imposed groundwater monitoring for such units over the last 15 years.
EPA also identified several issues that would be relevant to the Agency's evaluation of the overall adequacy of state regulatory programs. Specifically, EPA explained that it would consider how state regulatory programs have, in practice, evaluated and imposed requirements to address: (1) Leachate collection; (2) groundwater monitoring; (3) whether a unit must be lined and the type of liner needed; (4) the effectiveness of existing management units as opposed to new management units; (5) whether the state requires routine analysis of CCR; (6) whether financial responsibility requirements are in place for the management of CCR; (7) the extent of permit requirements, including under what authorities these disposal units are permitted, the types of controls that are included in permits, and the extent of oversight provided by the states, (8) whether state programs include criteria for siting new units; (9) the extent of requirements for corrective action, post-closure monitoring and maintenance; (10) the state's pattern of active enforcement and public involvement; and (11) whether or not these facilities have insurance against catastrophic failures.
EPA received a substantial amount of information on state programs from commenters. Extensive comments were submitted by a coalition of environmental groups, outlining the alleged gaps in state regulatory programs applicable to the management of CCR. These comments contained a comprehensive analysis of 37 state programs based on the findings of the DOE/EPA 2006 report as well as on an independent compilation of state program requirements. According to these commenters' analysis, only four states (representing approximately four percent of the CCR generated in the U.S. in 2005) required groundwater monitoring in all new and existing landfills, and only six states (representing approximately 19 percent of the CCR generated in 2005) required groundwater monitoring in all new and existing surface impoundments; only five states (representing approximately seven percent of the CCR generated in 2005) required composite liners for all new landfills; and only four states (representing approximately 19 percent of the CCR generated) required composite liners for all new surface impoundments. The commenters' analysis discounted any state law that included any provision that granted permit writers discretion to modify the requirement on a case-by-case basis, and/or to grant waivers and exemptions based on the waste's toxicity, onsite location, and management practice.
EPA also received comments from ASTSWMO, the Environmental Council of the States (ECOS), and 36 individual states. In its comments, ASTSWMO submitted a report with revisions of the aggregated statistics in its 2009 report, which they claim demonstrated that state CCR programs were more robust than described in the proposed rule. These commenters generally agreed with EPA's conclusion that state requirements for key CCR requirements are typically more robust for landfills than for surface impoundments. ASTSWMO's comments included the following examples: 71 percent of the surveyed states required a liner for landfills, compared to 65 percent that required that surface impoundments be lined; 87 percent of surveyed states required groundwater monitoring at landfills, compared to 67 percent of states that required groundwater monitoring at surface impoundments; and while 83 percent of surveyed states required structural stability monitoring at landfills, only 64 percent of surveyed states required it at surface impoundments. The sole exception related to permit requirements, where the report claimed that 91 percent of the surveyed states required a permit of some type for surface impoundments, as compared to 86 percent of states that required a permit for landfills. In addition, ASTSWMO claimed that all 42 surveyed states had the authority to require remediation. The report also alleged that in 43 of 44 states, states had the authority to require surface impoundments to implement repair and maintenance efforts during operation. ASTSWMO also claimed that 43 out of 44 states required that steps be taken to protect human health and the environment, and that 41 of 43 states also had authority to require closure.
According to this revised survey, state requirements also vary with respect to whether they applied to all waste units, or only to new units or lateral expansions. ASTSWMO stated that in 34 percent of the surveyed states, liner requirements applied equally to new and existing landfills, and to both existing and new surface impoundments in 46 percent of the surveyed states. Similarly, ASTSWMO stated that groundwater monitoring was required for both existing and new landfills in 82 percent of the surveyed states, and to both existing and new surface impoundments in 74 percent of the surveyed states.
Nineteen states and state organizations also directly responded to the environmental groups' report by submitting comments on their programs, although only four of these states were among the leading CCR generators: Kentucky, North Dakota, Ohio, and Michigan. These states identified specific instances where the assertions made by the environmental groups were factually incorrect or omitted relevant information. In response to both the proposed rule and the NODA (76 FR 63252, October 12, 2011) most states provided only summaries of their regulatory programs rather than detailed descriptions.
As EPA explained in the proposed rule, there are significant limitations to the kind of aggregated survey statistics presented in ASTSWMO's comments. Such statistics fail to provide the information necessary to meaningfully address the question of how, in practice, state programs regulate the relevant risks presented by the management or disposal of CCR, which was the issue that EPA explained was necessary to resolve. For example, even assuming that 91 percent of the surveyed states actually do require a permit of some type for surface impoundments, this provides no information on the nature or extent of the specific requirements in the permit. As noted in the proposal, most CCR surface impoundments are regulated under a NPDES permit, and while the risks from effluent discharges to navigable waters are addressed, these units are not subject to the provisions designed to protect groundwater, such as liners or groundwater monitoring. Nor does it address the extent of the requirement; for example, although Texas generally requires landfills to be permitted and to monitor groundwater, the majority of CCR units are exempt from these requirements because all industrial wastes managed on-site (
i.e.,
any site owned by the generator, up to 50-miles away from the generator's facility) are exempt. Finally, since the ASTSWMO survey does not identify the individual surveyed states but merely presents aggregated statistics, this information cannot be correlated with the amount of CCR generated, which significantly limits its value; for example, information demonstrating the strength of the regulatory program in a state responsible for two percent of the net CCR generated nationally is less significant than similar information on a state responsible for 25 percent of the net CCR generated.
In addition to the information provided by commenters, EPA independently reviewed state statutes and regulations, with a more detailed focus on the 16 states responsible for approximately 74 percent of the CCR generated in 2009. It is clear from this
review, as well as from information submitted by the commenters, that the degree of state regulatory oversight of these wastes and the overall protectiveness of the particular state programs varies widely.
Overall, the information from commenters and from EPA's own review of state programs generally confirms EPA's original conclusion that significant gaps remain in many state programs. Some programs provide minimal or no regulatory oversight of CCR units. For example, Arizona, New Mexico, and Utah have no regulations applicable to CCR units or entirely exempt CCR from state regulations governing solid waste. Similarly, Mississippi, Montana, and Texas (the largest coal-ash producer) exempt the on-site disposal of CCR (as “non-hazardous industrial solid waste”) from some or all key requirements, such as permits or groundwater monitoring.
29
Such exemptions would cover most of the disposal of CCR within the state, as the majority of utilities dispose of their CCR on-site. Other states, such as Florida, Indiana, Ohio and Pennsylvania, exempt CCR landfills or “monofills” from many requirements. For example, Indiana regulations consider surface impoundments that are dredged at least annually to be “storage units” that are exempt from solid waste regulations, including from corrective action requirements. Many of these states are among the leading generators of CCR wastes. In total, EPA estimates that approximately 20 percent of the net disposable CCR is entirely exempt from state regulatory oversight.
29
See 30 TX ADC 335.2(d);
State programs that entirely exempt CCR management from regulatory oversight, however, are the exception. Most states do regulate the management of CCR to varying degrees, although the particular requirements can vary significantly. Still, some general conclusions can be drawn.
Most CCR surface impoundments are permitted exclusively under NPDES or other surface water pollution prevention programs. In these states, requirements to protect groundwater, such as liners or groundwater monitoring systems, are frequently less robust than the corresponding requirements applicable to CCR landfills.
Many state programs require that new disposal units be lined and groundwater monitoring systems installed, although many exempt existing waste units from the liner and groundwater monitoring requirements. Consequently, for newer units, the facts are less alarming: 89 percent of the 114 CCR surface impoundments constructed between 1994 and 2010 have liners, and 70 percent have composite liners. Similarly, 37 of 45 CCR surface impoundments EPA surveyed had installed groundwater monitoring systems. By contrast, 79 percent of the landfills constructed during this timeframe had installed liners, but only 58 percent were composite-lined. However the majority of the older (pre-1994) waste units still lack liners; 63 percent of older landfills have no liners and 63 percent and 24 percent of older surface impoundments have either no liners or clay liners, respectively.
Information on the extent of groundwater monitoring at older units was either unavailable, or was too unreliable to support any conclusions as to the overall number or percentage of older units with groundwater monitoring systems in most states. ASTSWMO's comments in response to the October 2011 NODA identified eight states
30
that required groundwater monitoring at existing facilities, but only a few of these states addressed this issue in their comments. EPA has some anecdotal evidence on the status of groundwater monitoring in six states, including four states that are among the leading CCR generators. In the wake of the Kingston TVA spill, groundwater monitoring wells were installed at 12 of Illinois's existing surface impoundments, almost doubling the number of monitored surface impoundments in the state. However, 55 additional surface impoundments, both active and inactive, still lack groundwater monitoring systems. In Ohio, 44 CCR units, out of a total of 57 CCR units in the state (42 surface impoundments and 15 landfills) still lack groundwater monitoring, even though all of the surface impoundments were permitted decades ago under Ohio's NPDES program. Ohio acknowledged in their comments that the extent of groundwater risks in the state is poorly documented, as 40 out of 44 unlined CCR units do not have a groundwater monitoring system. In sum, the available information is limited, but at least some of that information indicates that significant gaps remain with respect to the implementation of groundwater monitoring requirements under some state regulatory programs.
30
Georgia, Illinois, Indiana, Iowa, Montana, Ohio, Pennsylvania, and South Carolina.
Of the states that require groundwater monitoring, most appear to require monitoring wells to be placed around the waste unit boundary, although the distance from the unit boundary varies from 50 feet to 150 meters. However, some state programs also authorize a buffer zone or a “zone of discharge,” which allows the facility to defer remediation of groundwater contamination for some period of time, usually until the contaminant plume has migrated to the facility site boundary. Florida, Illinois, North Dakota, and Tennessee are among that states with such a regulatory provision. For example, under Florida regulations, primary and secondary maximum contaminant levels (MCLs) do not apply even beyond the “zone of discharge,” absent a specific order by state regulatory authorities.
Most state programs allow the state regulatory authority to grant variances or exemptions for some or all of the requirements based on site-specific factors. For example, all of the following states require groundwater monitoring at CCR surface impoundments, but also authorize the regulatory authority to exempt or waive those requirements: Alabama, Florida, Georgia, Illinois, Indiana, Kentucky, North Carolina, North Dakota, Pennsylvania, and West Virginia. Contrary to the analysis presented by the environmental groups' comments, the mere fact that state law grants a permit authority the discretion to tailor requirements to account for a facility's site specific conditions does not support a conclusion that the regulatory program is necessarily inadequate. In fact, EPA noted in the proposal that one of the strengths of the subtitle C program was that, as a result of the permit process, requirements could be tailored to account for site specific conditions. Nor does the existence of a waiver process provide any evidence of actual practices; in their comments, a few states acknowledged that state law allowed for variances, but asserted that none had been requested.
To complicate matters further, several states explained that while state law does not mandate certain requirements, state regulatory authorities have, in practice, begun to require them in more recent permits. For example, several states, including Ohio, Texas, Michigan, Florida, and Kentucky, noted that recent practice was to require older disposal units to retrofit or close where they failed to meet relevant standards. Similarly, it appears that in the 16 leading CCR-generating states, 94 percent of new landfills have installed liners (either composite or clay), although only 19 percent of these state programs actually mandate CCR landfills to install a liner. And although only six percent of these state programs require installation of a liner in a new surface impoundment, 75 percent of
new CCR surface impoundments in these states are lined.
All of this information suggests that, at least in some cases, the concerns raised in the proposal regarding the protectiveness of state programs remain warranted. But it also is clear it would be impossible to accurately evaluate whether, in practice, state programs are protective without reviewing individual permit decisions and permit requirements. Such an evaluation would necessarily involve not only a review of the specific permit requirements, but also the site conditions and other factual bases supporting the decision to impose the particular requirements. Unfortunately, this information was not provided by commenters or found in any source currently available to the Agency.
3. Documented Cases in Which Danger to Human Health or the Environment From Surface Run-off or Leachate Has Been Proved
In the proposed rule, EPA described the information it had compiled on specific cases where CCR mismanagement had caused harm to human health or the environment since the 2000 Regulatory Determination. Specifically, EPA explained that it had identified 27 proven damage cases: 17 cases of damage to groundwater, and ten cases of damage to surface water, seven of which are ecological damage cases. Sixteen of the 17 proven damage cases to groundwater involved disposal in unlined units; for the one additional unit, it is unknown whether the unit was lined. EPA also identified 40 potential damage cases to groundwater and surface water. The Agency noted that these numbers likely underestimated the number of damage cases and its expectation that additional cases of damage would be found if a more comprehensive evaluation was conducted, particularly since much of this waste has been (and continues to be) managed in unlined disposal units. EPA also noted its concern that several of the new damage cases involved activities that differ from prior damage cases, including the catastrophic release of waste due to the structural failure of CCR surface impoundments, such as the dam failures that occurred in Martins Creek, Pennsylvania and Kingston, Tennessee, as well as the large-scale placement, akin to disposal, of CCR, under the guise of “beneficial use.”
EPA noted as well that it had received new reports from industry and environmental and citizen groups regarding damage cases. Industry provided information to demonstrate that many of EPA's listed proven damage cases did not meet EPA's criteria for a damage case to be considered “a proven damage case,” that had been developed for purposes of the Bevill Regulatory Determinations. Environmental and citizen groups, on the other hand, had submitted reports alleging the existence of more recent damage cases beyond those EPA had previously documented.
EPA raised questions concerning the following areas associated with the damage cases; first, whether the damage cases discovered to date accurately reflected the true number of damage cases associated with the mismanagement of CCR. Second, EPA highlighted concern regarding the accuracy of the available information on damage cases, as in certain instances, much of the information was largely anecdotal. EPA therefore specifically solicited comments from state regulatory authorities and the facilities involved with the incidents, in the hope of obtaining direct evidence of the facts in each case and to obtain a better understanding of the nature of the damage caused by past and current management practices. For the same reason, on October 12, 2011, EPA published a NODA, soliciting comment on the extensive reports received during the original comment period on the proposed rule. (See 76 FR 63252.)
As discussed in more detail in Unit XI of this document, EPA received a significant number of comments on this topic, both during the original comment period on the proposal, and in response to the NODA. EPA received information on additional damage cases from a number of citizen groups, including the report from Environmental Integrity Project and Earthjustice titled, “Out of Control: Mounting Damages From Coal Ash Waste Sites,” which presented information on 31 alleged CCR damage cases that were not included or were not recognized as damage cases in EPA's July 2007 report. EPA also received an August 26, 2010 report by the Environmental Integrity Project, Earthjustice, and the Sierra Club titled “In Harm's Way: Lack of Federal Coal Ash Regulations Endangers Americans and Their Environment,” which presented an additional 39 alleged CCR damage cases.
31
EPA also received information on ten additional damage cases from state officials in Michigan and Wisconsin.
31
EPA also received several additional reports that contained allegations of further damage cases. However, because these were submitted after the close of the comment period, EPA did not evaluate these damage cases for this rulemaking or otherwise consider the information in those reports.
EPRI submitted two draft reports titled “Evaluation of Coal Combustion Product Damage Cases: Volume 1: Data Summary and Conclusions” (finalized in July 2010), and “Evaluation of Coal Combustion Product Damage Cases: Volume 2: Case Summaries” (finalized in September 2010). In these reports, EPRI provided information that, they claimed, showed that many of EPA's previously identified “proven” damage cases did not meet EPA's criteria for a damage case to be considered “proven.” In response to the 2010 NODA, USWAG submitted a report that reviewed the 70 additional damage cases submitted by citizen groups as part of their comments on the proposed rule. These reports focused primarily on the degree to which the contamination had been contained “on-site” or had migrated off-site of the facility.
In Unit XI of this document, EPA discusses at length all of the comments received and its subsequent analysis of the information obtained throughout the rulemaking. In sum, after analyzing all of the information submitted in response to this rulemaking, EPA has confirmed a total of 157 cases, both proven and potential, in which CCR mismanagement has caused damage to human health and the environment. Although EPA expects that additional damage cases will be discovered in response to the installation of the groundwater monitoring systems required by the final rule, overall EPA has a significantly better understanding of the extent and nature of the damage caused by CCR mismanagement than when the proposed rule was issued. EPA has sufficient confidence in the veracity of the information collected to rely on it in making decisions in this rule.
4. Conclusions
EPA explained in the proposed rule that the decision on whether to retain the Bevill exemption is inherently discretionary, in that it ultimately requires the Agency to make a policy judgment as to the appropriate balance among the eight statutory factors. Chief among the several principles that EPA stated would guide its decision was that any action must protect human health and the environment. To this end, EPA singled out three key areas of analyses that bear directly on that guiding principle: the extent of the risks posed by mismanagement of CCR; the adequacy of state programs to ensure proper management of CCR; and the extent and nature of damage cases.
The first of these largely related to the 2010 quantitative risk assessment of the potential for contamination to
groundwater. During the rulemaking, EPA received information that allowed the Agency to resolve two of the four primary uncertainties identified in the proposal. The risk assessment has been revised with updated pore water concentration data and with LEAF leachate data, and accounts for the potential reduction of contaminants reaching drinking water sources due to interception of contamination by surface water bodies. However, two sources of uncertainty remain: the potential effect of pollution control technologies on the CCR characteristics, and the appropriate IRIS value for arsenic.
EPA's risk assessment evaluated current management practices, and generally did not attempt to account for or evaluate the potential for future changes in the wastes. While EPA has great confidence in the assessment, its ability to definitively resolve this question is therefore limited, given the very real potential for significant changes in CCR characteristics and constituents in the near future, due to the required installation of pollution control technologies. Changes in the CCR characteristics are particularly significant, as the risk assessment concluded that one of the parameters most likely to affect the agency's risk estimates was the characteristic of the wastes.
With respect to the second area, EPA is unable to reach any definitive conclusions as to whether state regulatory programs are so deficient that the level of federal oversight under subtitle C is necessary. Specifically, EPA cannot determine from the available information how states, in practice, have implemented regulatory requirements. At this point, only limited conclusions are possible.
Clear deficiencies exist in some state regulatory programs, and questions remain with respect to others. And many of these concerns exist with respect to programs in states responsible for the majority of CCR generation and disposal. However, most state programs, although they vary considerably, are not clearly deficient on their face. But it is equally clear that exclusive reliance on the regulatory programs as written, without any examination of how states have implemented those requirements in practice, would not support sweeping conclusions about the overall adequacy of state programs. It is critical to ensure that any decision accurately accounts for how the states have exercised their judgment in implementing those requirements, before concluding that state programs cannot adequately oversee the management of CCR without the degree of federal involvement mandated by subtitle C. Notwithstanding EPA's inability to draw conclusions on the overall adequacy of state programs, the high degree of variation across state programs strongly supports the need for federal requirements to establish a consistent national standard of groundwater and human health protection.
In contrast to the other two areas identified in the proposed rule, while some uncertainty remains with respect to the damage cases—namely, whether the 157 identified to date represent the total number of damage cases caused by CCR mismanagement, and whether some of the “potential” damage cases should be classified as “proven” damage cases—at this point, EPA has concluded that the available information provides a sufficient evidentiary base on which decisions can be made. In the absence of the necessary information on two of the three critical areas, however, EPA cannot reach any final conclusions regarding the appropriate balance among the eight statutory factors. Consequently, EPA is also not reaching any final conclusions as to whether a damage case is best categorized as “proven” or “potential.” Such a finding is relevant only to the Bevill Regulatory Determination.
However, as discussed in more detail in Unit XI of this document, the damage cases provide extremely valuable evidence that is directly relevant to the question of whether and how to regulate CCR waste. For example, the damage cases provide “real world” evidence against which to compare EPA's risk modeling estimates, such as evidence regarding the frequency with which particular constituents leach into groundwater. They also provide direct evidence regarding specific waste management practices at electric utilities, along with the potential consequences of those practices. Finally, both the specifics of the damage cases and the fact that they continue to occur provide strong evidence of the need for this rule under subtitle D while EPA obtains the information that will allow the Agency to make a final Regulatory Determination for these wastes.
Thus, even though EPA is not able to reach a final conclusion on the Regulatory Determination for these wastes, the totality of the information in the rulemaking record clearly demonstrates that the risks associated with the current management and disposal of CCR remain substantial. EPA's risk assessment concluded that the cancer risks from unlined surface impoundments ranged from 3 × 10
−4
for trivalent arsenic to 4 × 10
−5
for pentavalent arsenic. Non-cancer risks from these same units also significantly exceeded EPA's level of concern, with estimates ranging from an HQ of 2 for thallium, to HQs
32
of 4 for molybdenum and 8 for trivalent arsenic. The risks associated with unlined landfills were also estimated to be significant, with cancer risks of 2 × 10
−5
for trivalent arsenic. It is important to note that these risk numbers are based on national disposal practices. Risks at an individual site may be even higher based on individual site conditions, waste characteristics, and management practices. EPA's risk assessment identified the potential for higher risks based on different waste pH values and management practices. Multiple constituents presented higher risks when considered in waste management units that co-dispose both ash and coal refuse at more acidic pHs or FGD wastes at more basic pHs. For example, the modeled cancer risks for the co-disposal of ash and coal refuse (pH 1.7-8.2) ranged between 10
−3
for trivalent arsenic to 4 × 10
−4
for pentavalent arsenic. Non-cancer risks were similarly high, ranging between and an HQ of 13 for cobalt, and HQs of 14 for pentavalent arsenic to 26 for trivalent arsenic, based on the ingestion of contaminated drinking water. Although this management practice is declining, recent information indicates that approximately five percent of facilities continue to co-dispose of ash and coal refuse in surface impoundments.
32
For more information on HQs please see Unit X. Risk Assessment of this preamble.
Moreover, EPA's risk estimates are consistent with the continued damage cases compiled through this rulemaking. As further discussed in Unit XI of this document, EPA has confirmed that 157 cases of proven or potential contamination of groundwater have occurred in states across the nation since the initial Regulatory Determination. These damage cases were primarily associated with unlined units and were most frequently associated with releases of arsenic. While new units are typically constructed with composite liners, which under EPA's current risk assessment adequately mitigate the risks, older units still comprise the overwhelming majority of currently operating units. EPA's data show that approximately 63 percent of currently operating surface impoundments and landfills are unlined, and thus more prone to leach contaminants into groundwater. Analysis of the information