ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R08-OAR-2010-0406; FRL-9648-3]
Approval and Promulgation of Implementation Plans; North Dakota; Regional Haze State Implementation Plan; Federal Implementation Plan for Interstate Transport of Pollution Affecting Visibility and Regional Haze
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule.
SUMMARY:
EPA is partially approving and partially disapproving a revision to the North Dakota State Implementation Plan (SIP) addressing regional haze submitted by the Governor of North Dakota on March 3, 2010, along with SIP Supplement No. 1 submitted on July 27, 2010, and part of SIP Amendment No. 1 submitted on July 28, 2011. These SIP revisions were submitted to address the requirements of the Clean Air Act (CAA or Act) and our rules that require states to prevent any future and remedy any existing man-made impairment of visibility in mandatory Class I areas caused by emissions of air pollutants from numerous sources located over a wide geographic area (also referred to as the “regional haze program”). EPA is promulgating a Federal Implementation Plan (FIP) to address the gaps in the plan resulting from our partial disapproval of North Dakota's Regional Haze (RH) SIP.
In addition, EPA is disapproving a revision to the North Dakota SIP addressing the interstate transport of pollutants that the Governor submitted on April 6, 2009. We are disapproving it because it does not meet the Act's requirements concerning non-interference with programs to protect visibility in other states. To address this deficiency, we are promulgating a FIP.
DATES:
This final rule is effective May 7, 2012.
ADDRESSES:
EPA has established a docket for this action under Docket ID No. EPA-R08-OAR-2010-0406. All documents in the docket are listed on the
www.regulations.gov
Web site. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through
www.regulations.gov,
or in hard copy at the Air Program, Environmental Protection Agency (EPA), Region 8, 1595 Wynkoop Street, Denver, Colorado 80202-1129. EPA requests that if at all possible, you contact the individual listed in the
FOR FURTHER INFORMATION CONTACT
section to view the hard copy of the docket. You may view the hard copy of the docket Monday through Friday, 8 a.m. to 4 p.m., excluding Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Gail Fallon, Air Program, Mailcode 8P-AR, Environmental Protection Agency, Region 8, 1595 Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6281, or
fallon.gail@epa.gov.
SUPPLEMENTARY INFORMATION:
Definitions
For the purpose of this document, we are giving meaning to certain words or initials as follows:
• The word
Act
or initials
CAA
mean or refer to the Clean Air Act, unless the context indicates otherwise.
• The initials
ASOFA
mean or refer to advanced separated overfire air.
• The initials
AVS
mean or refer to Antelope Valley Station.
• The initials
BACT
mean or refer to Best Available Control Technology.
• The initials
BART
mean or refer to Best Available Retrofit Technology.
• The initials
CAM
mean or refer to compliance assurance monitoring.
• The initials
CAMx
mean or refer to Comprehensive Air Quality Model.
• The initials
CCS
mean or refer to Coal Creek Station.
• The initials
CEMS
mean or refer to continuous emission monitoring system.
• The initials
CMAQ
mean or refer to Community Multi-Scale Air Quality modeling system.
• The initials
CSAPR
mean or refer to Cross-State Air Pollution Rule.
• The initials
EGUs
mean or refer to Electric Generating Units.
• The words
we, us
or
our
or the initials EPA mean or refer to the United States Environmental Protection Agency.
• The initials
FIP
mean or refer to Federal Implementation Plan.
• The initials
FLMs
mean or refer to Federal Land Managers.
• The initials
GRE
mean or refer to Great River Energy.
• The initials
IMPROVE
mean or refer to Interagency Monitoring of Protected Visual Environments monitoring network.
• The initials
IWAQM
mean or refer to Interagency Workgroup on Air Quality Modeling.
• The initials
LDSCR
mean or refer to low-dust SCR.
• The initials
LOS
mean or refer to Leland Olds Station.
• The words
Lostwood or Lostwood Wilderness Area
or initials
LWA
mean or refer to Lostwood National Wildlife Refuge Wilderness Area.
• The initials
LNB
mean or refer to low NO
X
burners.
• The initials
LTS
mean or refer to Long-Term Strategy.
• The initials
MRYS
mean or refer to Milton R. Young Station.
• The initials
NAAQS
mean or refer to National Ambient Air Quality Standards.
• The words
North Dakota
and
State
mean the State of North Dakota unless the context indicates otherwise.
• The initials
NO
X
mean or refer to nitrogen oxides.
• The initials
NPCA
mean or refer to National Parks Conservation Association.
• The initials
NPS
mean or refer to National Park Service.
• The initials
PM
mean or refer to particulate matter.
• The initials
PM
10
mean or refer to particulate matter with an aerodynamic diameter of less than 10 micrometers or course particulate matter.
• The initials
PM
2.5
mean or refer to particulate matter with an aerodynamic diameter of less than 2.5 micrometers or fine particulate matter.
• The initials
PRB
mean or refer to Powder River Basin.
• The initials
PSAT
mean or refer to Particle Source Apportionment Technology.
• The initials
PSD
mean or refer to Prevention of Signification Deterioration.
• The initials
RHR
mean or refer to the Regional Haze Rule.
• The initials
RH SIP
mean or refer to North Dakota's Regional Haze State Implementation Plan.
• The initials
RMC
mean or refer to the Regional Modeling Center at the University of California Riverside.
• The initials
RP
mean or refer to Reasonable Progress.
• The initials
RPG
mean or refer to Reasonable Progress Goal.
• The initials
SCR
mean or refer to selective catalytic reduction.
• The initials
SIP
mean or refer to State Implementation Plan.
• The initials
SNCR
mean or refer to selective non-catalytic reduction.
• The initials
SO
2
mean or refer to sulfur dioxide.
• The initials
SOFA
mean or refer to separated overfire air.
• The initials
TRNP
mean or refer to Theodore Roosevelt National Park.
• The initials
TSD
mean or refer to Technical Support Document.
• The initials
URP
mean or refer to Uniform Rate of Progress.
• The initials
WEP
mean or refer to Weighted Emissions Potential.
• The initials
WRAP
mean or refer to the Western Regional Air Partnership.
Table of Contents
I. Background
A. Regional Haze
B. Interstate Transport Requirements
C. Lawsuits
D. Our Proposal
1. Regional Haze
2. Interstate Transport, Visibility Prong
E. Public Participation
II. Final Action
A. Regional Haze
B. Interstate Transport, Visibility Prong
III. Changes from Proposed Rule and Reasons for the Changes
A. NO
X
BART for Milton R. Young Station Units 1 and 2 and Leland Olds Station Unit 2
B. NO
X
BART for Coal Creek Station (CCS) Units 1 and 2
C. Other Resultant Changes
IV. Basis for Our Final Action
A. Regional Haze
B. Interstate Transport, Visibility Prong
V. Issues Raised by Commenters and EPA's Responses
A. NO
X
BART for Milton R. Young Station Units 1 and 2 and Leland Olds Station Unit 2
B. Comments on Legal Issues
1. EPA's Authority
2. Interstate Transport Consent Decree
3. Other General Legal Comments
C. Comments on Modeling
D. Comments on Costs
1. General
2. Comments Regarding Our Reliance on the EPA Air Pollution Control Cost Manual
E. Comments on BART Determinations
1. General Comments
2. CCS Units 1 and 2
a. EPA's Use of the Control Cost Manual for CCS
b. CCS Emission Limits
c. CCS Modeling
d. CCS Coal Ash
e. CCS Visibility Improvements Are Minimal
f. Comments on Alternative NO
X
Emission Limits
g. Cost Effectiveness of SNCR and SCR at CCS
h. CCS General Comments
3. Stanton Station Unit 1
4. Leland Olds Station Unit 1
F. General Comments on SO
2
and PM Controls
G. Comments on Reasonable Progress and North Dakota's Long-Term Strategy
H. Comments on Health and Ecosystem Benefits, and Other Pollutants
I. Miscellaneous Comments
J. Comments Requesting an Extension to the Public Comment Period
K. Comments Generally in Favor of Our Proposal
L. Comments Generally Against Our Proposal
VI. Statutory and Executive Order Reviews
I. Background
The CAA requires each state to develop plans, referred to as SIPs, to meet various air quality requirements. A state must submit its SIPs and SIP revisions to us for approval. Once approved, a SIP is enforceable by EPA and citizens under the CAA, also known as being federally enforceable. If a state fails to make a required SIP submittal or if we find that a state's required submittal is incomplete or unapprovable, then we must promulgate a FIP to fill this regulatory gap. CAA section 110(c)(1).
This action involves two separate requirements under the CAA and EPA's regulations. One is the requirement that states have SIPs that address regional haze, the other is the requirement that states have SIPs that address the interstate transport of pollutants that may interfere with programs to protect visibility in other states.
A. Regional Haze
In 1990, Congress added section 169B to the CAA to address regional haze issues, and we promulgated regulations addressing regional haze in 1999. 64 FR 35714 (July 1, 1999), codified at 40 CFR part 51, subpart P. The requirements for regional haze, found at 40 CFR 51.308 and 51.309, are included in our visibility protection regulations at 40 CFR 51.300-309. The requirement to submit a regional haze SIP applies to all 50 states, the District of Columbia and the Virgin Islands. States were required to submit a SIP addressing regional haze visibility impairment no later than December 17, 2007. 40 CFR 51.308(b).
Few states submitted a regional haze SIP prior to the December 17, 2007 deadline, and on January 15, 2009, EPA found that 37 states, including North Dakota, and the District of Columbia and the Virgin Islands, had failed to submit SIPs addressing the regional haze requirements. 74 FR 2392. Once EPA has found that a state has failed to make a required submission, EPA is required to promulgate a FIP within two years unless the state submits a SIP and the Agency approves it within the two year period. CAA section 110(c)(1).
North Dakota initially submitted a SIP addressing regional haze on March 3, 2010. On July 27, 2010, North Dakota submitted a revision to that submittal, entitled “SIP Supplement No. 1.” On July 28, 2011, North Dakota submitted another revision, entitled “SIP Amendment No. 1.”
B. Interstate Transport Requirements
Section 110(a)(1) of the CAA requires states to submit SIPs to address new or revised National Ambient Air Quality Standards (NAAQS) within 3 years after promulgation of such standards, or within such shorter period as we may prescribe. On July 18, 1997, we promulgated the 1997 8-hour ozone NAAQS and the 1997 fine particulate (PM
2.5
) NAAQS. 62 FR 38652. Section 110(a)(2) of the CAA lists the elements that such new SIPs must address, as applicable, including section 110(a)(2)(D)(i), which pertains to the interstate transport of certain emissions.
Section 110(a)(2)(D)(i) contains four distinct requirements or “prongs” related to the impacts of interstate transport. The SIP must prevent sources in the state from emitting pollutants in amounts which will: (1) Contribute significantly to nonattainment of the NAAQS in other states; (2) interfere with maintenance of the NAAQS in other states; (3) interfere with provisions to prevent significant deterioration of air quality in other states; or (4) interfere with efforts to protect visibility in other states.
On April 25, 2005, we published a “Finding of Failure to Submit SIPs for Interstate Transport for the 8-hour Ozone and PM
2.5
NAAQS.” 70 FR 21147. This action included a finding that North Dakota and other states had failed to submit SIPs to address interstate transport of air pollution and started a 2-year clock for the promulgation of a FIP by us, unless a state made a submission to meet the requirements of section 110(a)(2)(D)(i), and we approved the submission, prior to that time.
Id.
On April 6, 2009, we received a SIP revision from North Dakota to address the interstate transport provisions of CAA 110(a)(2)(D)(i) for the 1997 8-hour ozone NAAQS and the 1997 PM
2.5
NAAQS. In prior actions, we approved this North Dakota SIP submittal for the first three prongs of section 110(a)(2)(D)(i). (75 FR 31290, June 3, 2010 and 75 FR 71023, November 22, 2010). This action addresses the fourth prong.
C. Lawsuits
In two separate lawsuits, one in U.S. District Court for the Northern District of California and one in the U.S. District Court for the District of Colorado, environmental groups sued us for our failure to timely take action with respect to the interstate transport requirements and the regional haze requirements of the CAA and our regulations. In particular, the lawsuits alleged that we
had failed to promulgate FIPs for these requirements within the two-year period allowed by CAA section 110(c) or, in the alternative, fully approve SIPs addressing these requirements.
As a result of these lawsuits, we entered into two separate consent decrees in these two jurisdictions. The consent decree in the Northern District of California, as modified on several occasions, required that we sign a notice of proposed rulemaking for prong four of the interstate transport requirements for North Dakota by September 1, 2011. As lodged with the court, but before it was entered, the proposed consent decree in the District of Colorado required that we sign a notice of proposed rulemaking for regional haze requirements for North Dakota by July 21, 2011. Because the latter consent decree was not entered by the court until September 27, 2011, and we signed our notice of proposed rulemaking on September 1, 2011, the July 21, 2011 deadline was mooted.
Both consent decrees, as modified, require that we sign a notice of final rulemaking addressing the regional haze requirements and prong four of the interstate transport requirements by March 2, 2012. We are meeting that requirement with the signing of this notice of final rulemaking.
D. Our Proposal
We signed our notice of proposed rulemaking on September 1, 2011, and it was published in the
Federal Register
on September 21, 2011 (76 FR 58570). In that notice, we provided a detailed description of the various regional haze and interstate transport requirements. We are not repeating that description here; instead, the reader should refer to our notice of proposed rulemaking for further detail.
In our proposal, we proposed to take the following actions:
1. Regional Haze
We proposed to disapprove the following parts of North Dakota's RH SIP:
a. North Dakota's nitrogen oxides (NO
X
) best available retrofit technology (BART) determinations and emissions limits for Milton R. Young Station (MRYS) Units 1 and 2, Leland Olds Station (LOS) Unit 2, and Coal Creek Station (CCS) Units 1 and 2.
b. North Dakota's determination under the reasonable progress requirements found at section 40 CFR 51.308(d)(1) that no additional NO
X
emissions controls were warranted at Antelope Valley Station (AVS) Units 1 and 2.
c. North Dakota's reasonable progress goals (RPGs).
d. Portions of North Dakota's long-term strategy (LTS) that relied on or reflected other aspects of the RH SIP that we were proposing to disapprove.
We proposed to approve the remaining aspects of North Dakota's RH SIP revision that was submitted on March 3, 2010 and SIP Supplement No. 1 that was submitted on July 27, 2010. We proposed to approve the following parts of SIP Amendment No. 1 that the State submitted on July 28, 2011:
a. Amendments to Section 10.6.1.2 pertaining to Coyote Station.
b. Amendments to Appendix A.4, the Permit to Construct for Coyote Station.
We proposed to not act on the remainder of the State's July 28, 2011 submittal.
We proposed to promulgate a FIP to address the deficiencies in the North Dakota RH SIP that we identified in our proposal. The proposed FIP included the following elements:
a. NO
X
BART determinations and emission limits for MRYS Units 1 and 2 and Leland Olds Station Unit 2.
b. NO
X
BART determination and emission limit for CCS Units 1 and 2.
c. A reasonable progress determination and NO
X
emission limit for AVS Units 1 and 2.
d. A five-year deadline to meet the emission limits and monitoring, recordkeeping, and reporting requirements for the above seven units to ensure compliance.
e. RPGs consistent with the SIP limits proposed for approval and proposed FIP limits.
f. LTS elements that would reflect the other aspects of the proposed FIP.
We also proposed approval of a SIP revision in lieu of our regional haze FIP if the State submitted a revision in a timely way that matched the terms of our proposed FIP.
2. Interstate Transport, Visibility Prong
We proposed to disapprove the portion of North Dakota's April 6, 2009, SIP revision for interstate transport in which North Dakota intended to address the requirement of section 110(a)(2)(D)(i)(II) that emissions from North Dakota sources not interfere with measures required in the SIP of any other state under part C of the CAA to protect visibility.
Because of this proposed disapproval, we proposed a FIP to meet the visibility protection requirement of section 110(a)(2)(D)(i)(II). To meet this FIP duty, we proposed to find that North Dakota sources would be sufficiently controlled to eliminate interference with the visibility programs of other states by a combination of the measures that we were proposing to approve as meeting the regional haze SIP requirements combined with the additional measures that we were proposing to impose in a FIP to meet the remaining regional haze SIP requirements.
We noted that acting on both the section 110(a)(2)(D)(i)(II) requirement and the regional haze SIP requirement simultaneously would ensure the most efficient use of resources by the affected sources and EPA.
E. Public Participation
We requested comments on all aspects of our proposed action and provided a two-month comment period, with the comment period closing on November 21, 2011. We also provided a public hearing. Initially, we scheduled the hearing to last four hours on one day. 76 FR 58570. At the request of the Governor of North Dakota, we expanded the time for the public hearing to 14 hours over two days and changed the venue. 76 FR 60777 (September 30, 2011). The public hearing was held in Bismarck, North Dakota on October 13 and 14, 2011.
We received a significant number of comments on our proposed rule, both from commenters, particularly citizens and environmental groups, that supported our proposed action, and from commenters, primarily from state and city agencies, rural power cooperatives, and industrial facilities and groups, that were critical of our proposed action.
In this action, we are responding to the comments we have received, taking final rulemaking action, and explaining the bases for our action, including any changes from our proposed action.
II. Final Action
A. Regional Haze
With this final action we are partially approving and partially disapproving North Dakota's RH SIP revision that was submitted on March 3, 2010, SIP Supplement No. 1 that was submitted on July 27, 2010, and part of SIP Amendment No. 1 that was submitted on July 28, 2011. Specifically we are disapproving:
• North Dakota's NO
X
BART determinations and emissions limits for CCS Units 1 and 2.
• North Dakota's determination under the reasonable progress requirements found at 40 CFR 51.308(d)(1) that no additional NO
X
emissions controls are warranted at AVS Units 1 and 2.
• North Dakota's RPGs.
• Portions of North Dakota's LTS that rely on or reflect other aspects of the RH SIP that we are disapproving.
We are approving the remaining aspects of North Dakota's RH SIP revision that was submitted on March 3, 2010 and SIP Supplement No. 1 that was submitted on July 27, 2010. We are approving the following parts of SIP Amendment No. 1 that the State submitted on July 28, 2011: (1) Amendments to Section 10.6.1.2 pertaining to Coyote Station, and (2) amendments to Appendix A.4, the Permit to Construct for Coyote Station. We are not taking action on the remainder of the July 28, 2011 submittal at this time.
We are finalizing a FIP to address the deficiencies in the North Dakota RH SIP that result from our partial disapproval of the SIP.
The final FIP includes the following elements:
• NO
X
BART determination and emission limit for CCS Units 1 and 2 of 0.13 lb/MMBtu averaged across the two units on a 30-day rolling average, and a requirement that the owners/operators comply with this NO
X
BART limit within five (5) years of the effective date of this final rule.
• A reasonable progress determination and NO
X
emission limit for AVS Units 1 and 2 of 0.17 lb/MMBtu that applies singly to each of these units on a 30-day rolling average, and a requirement that the owner/operator meet the limit as expeditiously as practicable, but no later than July 31, 2018.
• Monitoring, record-keeping, and reporting requirements for the above four units to ensure compliance with these emission limitations.
• RPGs consistent with the SIP limits approved and the final FIP limits.
• LTS elements that reflect the other aspects of the finalized FIP.
B. Interstate Transport, Visibility Prong
We are disapproving a portion of a SIP revision that North Dakota submitted for the purpose of addressing the “good neighbor” provisions of CAA section 110(a)(2)(D)(i) for the 1997 8-hour ozone NAAQS and the 1997 PM
2.5
NAAQS. Specifically, we are disapproving the portion of the April 6, 2009 SIP in which North Dakota intended to address the requirement of section 110(a)(2)(D)(i)(II) that emissions from North Dakota sources do not interfere with measures required in the SIP of any other state under part C of the CAA to protect visibility. Because of this disapproval, we are promulgating a FIP to meet this requirement of section 110(a)(2)(D)(i)(II). To meet this FIP duty, we are finding that North Dakota sources will be sufficiently controlled to eliminate interference with the visibility programs of other states by a combination of the measures in the North Dakota SIP that we are simultaneously approving as meeting the regional haze SIP requirements combined with the additional measures that we are imposing in a FIP to meet the remaining regional haze SIP requirements. We note that North Dakota always has the discretion to revise its SIP and submit the revision to us. Should such a revision meet CAA requirements, we would replace our FIP with North Dakota's SIP revision. We encourage the State to revise its SIP.
III. Changes From Proposed Rule and Reasons for the Changes
A. NO
X
BART for Milton R. Young Station Units 1 and 2 and Leland Olds Station Unit 2
As noted, we proposed to disapprove North Dakota's NO
X
BART determinations for MRYS 1 and 2 and LOS 2 and to promulgate a FIP for NO
X
BART for these units to fill the gap that would have resulted from our disapproval. After considering a recent judicial decision, we have decided to approve North Dakota's NO
X
BART determination for MRYS 1 and 2 and LOS 2 and to not promulgate a FIP for NO
X
BART for these units. We more fully describe the reasons for this change below.
On July 27, 2006, the U.S. District Court for the District of North Dakota entered a consent decree between EPA, the State, and Minnkota Power Cooperative (“Minnkota”). The consent decree resulted from an enforcement action that EPA and the State brought against Minnkota for alleged violations of Prevention of Significant Deterioration (PSD) permitting requirements at MRYS 1 and 2. The consent decree called for North Dakota to make a best available control technology (BACT) determination for NO
X
for MRYS 1 and 2 but also provided a dispute resolution procedure in the event of disagreement regarding the BACT determination.
In November 2010, North Dakota determined BACT for NO
X
to be limits of 0.36 lb/MMBtu for MRYS 1 and 0.35 lb/MMBtu for MRYS 2 based on the use of selective non-catalytic reduction (SNCR) technology, with separate limits during startup. In reaching this decision, North Dakota eliminated selective catalytic reduction (SCR), a higher performing control technology, based on a finding that SCR was not technically feasible to control emissions from North Dakota lignite coal. In particular, North Dakota noted that no SCR has ever been employed on an electric generating unit (EGU) burning North Dakota lignite, that North Dakota lignite has unique properties that have the potential to quickly degrade the SCR catalyst, and that no catalyst vendor supplied with the specifications for the coal at MRYS 1 and 2 would provide a guarantee of catalyst life without first conducting slipstream or pilot tests at MRYS.
EPA disagreed with North Dakota's findings and the selection of selective non-catalytic reduction (SNCR) as BACT and initiated the dispute resolution process under the consent decree. Under the consent decree, the court was tasked with upholding North Dakota's BACT determination unless the disputing party was able to demonstrate that North Dakota's decision was unreasonable. We have included a copy of the consent decree and the court's order in the docket for this action.
On December 21, 2011, following briefing by the parties, and consideration of North Dakota's record for its BACT determination, the court determined that EPA had not demonstrated that North Dakota's findings were unreasonable. The court decided that North Dakota, based on the administrative record for its BACT determination, had a reasonable basis for concluding that SCR is not technically feasible for treating North Dakota lignite at MRYS. The court upheld North Dakota's determination that SNCR is BACT.
There are two critical principles expressed in our BART guidelines that are relevant here. First, as part of a BART analysis, technically infeasible control options are eliminated from further review. For BART, EPA's criteria for determining whether a control option is technically infeasible are substantially the same as the criteria used for determining technical infeasibility in the BACT context. 70 FR 39165; EPA's “New Source Review Workshop Manual,” pages B.17-B.22. Second, the BART guidelines indicate that states generally may rely on a BACT determination for a source for purposes of determining BART for that source, unless new technologies have become available or best control levels for recent retrofits have become more stringent. 70 FR 39164. As a general rule, the selection of a recent BACT level as BART is the equivalent of selecting the most stringent level of control, and consideration of the five statutory BART factors becomes unnecessary.
Over our vigorous challenge of the information and analysis relied upon by North Dakota, the U.S. District Court upheld North Dakota's recent BACT determination based on the same
technical feasibility criteria that apply in the BART context. In light of the court's decision and the views we have expressed in our BART guidelines on the relationship of BACT to BART, we have concluded that it would be inappropriate to proceed with our proposed disapproval of SNCR as BART and our proposed FIP to impose SCR at MRYS 1 and 2 and LOS 2. While LOS 2 was not the subject of the BACT determination, the same reasoning that applies to MRYS 1 and 2 also applies to LOS 2. It is the same type of boiler burning North Dakota lignite coal, and North Dakota's views regarding technical infeasibility that the U.S. District Court upheld in the MRYS BACT case apply to it as well. Thus, with this action we are approving North Dakota's NO
X
BART determinations for MRYS 1 and 2 and LOS 2, and no FIP for these units is necessary. The applicable limits are 0.36 lb/MMBtu for MRYS 1 and 0.35 lb/MMBtu for MRYS 2 and 0.35 lb/MMBtu for LOS 2.
We note, however, that the State has indicated a willingness to pursue the conduct of a pilot study at MRYS and/or LOS to analyze the expected replacement rate of SCR catalyst exposed to flue gas from the combustion of North Dakota lignite at these cyclone units in a low-dust or tail-end configuration. It is our expectation that the results of such a study could be used to inform further evaluation of SCR as a potential control technology when the State evaluates reasonable progress in the next planning period for regional haze. This position is supported by the State's December 20, 2011 letter from North Dakota Department of Health (NDDH), L. David Glatt, to EPA, Janet McCabe.
B. NO
X
BART for Coal Creek Station (CCS) Units 1 and 2
We proposed a NO
X
BART FIP limit for CCS 1 and 2 of 0.12 lb/MMBtu that would apply to each unit individually on 30-day rolling average basis. We based this limit on our proposed finding that SNCR plus separated overfire air (SOFA) plus low NO
X
burners (LNB) was the best available retrofit technology. While we continue to find that SNCR plus SOFA plus LNB is the best available retrofit technology, we are changing the emission limit to 0.13 lb/MMBtu averaged over both units on a 30-day rolling average basis. Evidence submitted by commenters and our own additional research in evaluating comments has led us to conclude that this represents a more reasonable limit to apply on a 30-day rolling average basis.
This limit represents a control efficiency of 48% based on the average annual baseline emission rate of 0.22 lb/MMBtu (2003-2004) provided in the State's BART determination. This value is slightly lower than the 49% control efficiency we assumed in our proposal, a value that was based on the State's analysis. Beginning in 2010, CCS 2 voluntarily started employing LNC3, the more stringent level of combustion controls that the State evaluated in its BART determination. Annual average Clean Air Markets data for this unit reflects a NO
X
emission rate of 0.153 lb/MMBtu. We estimate that SNCR would achieve an additional 25% reduction, equivalent to an emission rate of 0.115 lb/MMBtu. This compares to a value of 0.108 lb/MMBtu that the State originally estimated.
Great River Energy (GRE), the owner of CCS, asserted in comments that SNCR will only achieve a 20% reduction beyond LNC3. We find that 25% is a conservative and reasonable estimate. We considered several sources of information in arriving at this value. First, the Control Cost Manual states that in typical field applications, SNCR provides a 30% to 50% NO
X
reduction. The manual provides a scatter plot with NO
X
reduction efficiency plotted as a function of boiler size in MMBtu/hr.
1
The plot supports GRE's assertion that control efficiency could be lower than 50%, and could approach 30%, for larger boilers such as those at CCS. Second, Fuel Tech (one of the most recognized SNCR technology suppliers) estimates a range of 25% to 50% NO
X
reduction with application of SNCR.
2
Lastly, ICAC has published information that supports a control efficiency of 20 to 30% for SNCR above LNB/combustion modifications.
3
Given this range of control efficiencies, we have settled on a control efficiency—25%—that is lower than the lowest value given by the Control Cost Manual, at the low end of the range estimated by Fuel Tech, and in the middle of the range estimated by ICAC.
1
U.S. EPA, EPA Air Pollution Control Cost Manual, EPA/452/B-02-001, 6th Ed., January 2002, Section 4.2, Chapter 1, p. 1-3.
2
http://www.ftek.com/en-US/products/apc/noxout/.
3
Institute of Clean Air Companies, White Paper Selective Non-Catalytic Reduction (SNCR) for Controlling NO
X
Emissions, February 2008, p. 9.
To arrive at a final BART emission limit, we adjusted the projected annual average of 0.115 lb/MMBtu upward by 10% and then rounded to the nearest hundredth to arrive at 0.13 lb/MMBtu. In our experience, a 5 to 15% upward adjustment is appropriate when converting an annual average emission rate to a limit that will apply on a 30-day rolling average to account for the fact that shorter averaging periods result in higher variability in emissions due to load variation, startup, shutdown, and other factors.
We decided to allow the averaging across Units 1 and 2 in response to comments we received. The BART Guidelines state, “You should consider allowing sources to `'average” emissions across any set of BART-eligible emission units within a fenceline, so long as the emission reductions from each pollutant being controlled for BART would be equal to those reductions that would be obtained by simply controlling each of the BART-eligible units that constitute the BART-eligible source.” 40 CFR part 51, appendix Y, section V. This principle applies here.
C. Other Resultant Changes
Because we are now approving North Dakota's NO
X
BART determinations for MRYS 1 and 2 and LOS 2, the basis for our proposed disapproval of North Dakota's RPGs is slightly changed from our proposal. Disapproval is still warranted because North Dakota's RPGs do not represent our final NO
X
BART FIP limits at CCS 1 and 2 or our final NO
X
reasonable progress FIP limits at AVS 1 and 2 (or the Heskett or Coyote controls that North Dakota included in the SIP). As part of our FIP, we are finalizing RPGs that are consistent with the controls we are imposing at CCS 1 and 2 and AVS 1 and 2, and the Heskett and Coyote controls that North Dakota included in the SIP. For further details regarding our rationale, please refer to our proposal and to our response to comments.
Similarly, because we are now approving North Dakota's NO
X
BART determinations for MRYS 1 and 2 and LOS 2, the basis for our proposed partial disapproval of North Dakota's LTS is slightly changed from our proposal. Partial disapproval is still warranted because we are disapproving North Dakota's NO
X
BART determination for CCS 1 and 2 and NO
X
reasonable progress determination for AVS 1 and 2, and the LTS does not reflect our final NO
X
BART FIP limits at CCS 1 and 2 or our final NO
X
reasonable progress FIP limits at AVS 1 and 2, or corresponding compliance provisions. Except for these missing elements, the LTS satisfies the requirements of 40 CFR 51.308(d)(3), so we are approving the remainder of the LTS. Our FIP fills the gap left by our partial disapproval of the LTS by specifying NO
X
emission limits for CCS 1 and 2 and AVS 1 and 2, compliance schedules, and monitoring, recordkeeping, and reporting
requirements. For further details regarding our rationale, please refer to our proposal and our response to comments.
IV. Basis for Our Final Action
We have fully considered all significant comments on our proposal, and, except as noted in section III, above, have concluded that no other changes from our proposal are warranted. Our action is based on an evaluation of North Dakota's SIP submittals and our FIP against the regional haze requirements at 40 CFR 51.300-51.309 and CAA sections 169A and 169B, and against the interstate transport requirements concerning visibility at CAA section 110(a)(2)(D)(i)(II). All general SIP requirements contained in CAA section 110, other provisions of the CAA, and our regulations applicable to this action were also evaluated. The purpose of this action is to ensure compliance with these requirements. Our authority for action on North Dakota's SIP submittals is based on CAA section 110(k). Our authority to promulgate our partial FIP is based on CAA section 110(c).
A. Regional Haze
We are approving most of North Dakota's RH SIP provisions because they meet the relevant regional haze requirements. Most of the adverse comments we received concerning our proposed partial approval of the RH SIP pertained to North Dakota's BART and reasonable progress determinations.
With respect to the BART determinations that we proposed to approve, we understand that there is room for disagreement about certain aspects of the State's analyses. Furthermore, we may have reached different conclusions had we been performing the determinations in the first instance. However, the comments have not convinced us that the State, conducting specific case-by-case analyses for the relevant units, acted unreasonably or that we should be disapproving the State's BART determinations that we proposed to approve.
With respect to North Dakota's reasonable progress determinations that we proposed to approve, we continue to disagree with the manner in which North Dakota evaluated visibility improvement when it evaluated single source controls and have disregarded this evaluation in our consideration of the reasonableness of North Dakota's reasonable progress control determinations. We also disagree with some of North Dakota's legal conclusions about the necessity of reasonable progress controls for certain sources—specifically, for Coyote Station for NO
X
and for Heskett Station 2 for sulfur dioxide (SO
2
). However, in these instances, North Dakota nonetheless included emission limits in the SIP that reflect reasonable levels of control for reasonable progress for this initial planning period. Here again, we understand that there is room for disagreement about the State's analyses and appropriate limits. And, again, we may have reached different conclusions had we been performing the determinations. However, the comments have not convinced us that the State, conducting specific case-by-case analyses for the relevant units, made unreasonable determinations for this initial planning period or that we should be disapproving the State's reasonable progress determinations that we proposed to approve.
As noted, we are disapproving North Dakota's NO
X
BART determination for CCS 1 and 2 and its NO
X
reasonable progress determination for AVS 1 and 2 and promulgating a partial FIP to establish the required limits and corresponding compliance provisions. For CCS 1 and 2, the State relied on values for costs of compliance supplied by the owner that were admittedly erroneous. As explained in detail in our response to comments, the comments we received have not convinced us that our disapproval of the State's NO
X
BART determination for CCS 1 and 2 is unreasonable, or that our NO
X
BART FIP determination and limits (as modified in this final action) are unreasonable. In particular, we conclude that GRE's latest cost estimates and cost effectiveness values for SNCR, as reflected in its November 2011 comments, are not based on reasonable assumptions and overestimate the costs of compliance. Instead, our consideration of the five statutory BART factors leads us to conclude that SNCR plus SOFA plus LNB is BART, with a limit of 0.13 lb/MMBtu on a 30-day rolling average basis. Also, we continue to find that the costs of SCR are not reasonable given the projected visibility improvement; the comments we received on this issue have not convinced us otherwise.
For AVS 1 and 2, consistent with our proposal, we are disapproving the State's determination under our reasonable progress requirements (40 CFR 51.308(d)(1)) that no additional NO
X
emissions controls are warranted, and we are finalizing a FIP with a reasonable progress determination and a NO
X
emission limit for AVS 1 and 2 of 0.17 lb/MMBtu on a 30-day rolling average basis. Nothing in the comments has convinced us that the State's determination was reasonable or that our proposed FIP was unreasonable. As we noted in our proposal, the costs for installation and operation of combustions controls at AVS 1 and 2 are very reasonable ($586 and $661 per ton) and the predicted NO
X
reductions are substantial—3,500 tons per unit per year. Appropriate single-source modeling also indicates that the visibility benefits will be substantial—0.754 deciviews. Based on these facts, and given that North Dakota's RPGs will not meet the uniform rate of progress (URP), it was unreasonable for North Dakota to reject LNB at AVS 1 and 2. We have determined that the State's rejection of this level of control, and the corresponding RPGs, are not justifiable based on a reasonable consideration of the applicable regulatory factors—costs of compliance, time necessary for compliance, energy and non-air quality environmental impacts of compliance, and remaining useful life of the source. LNB is a modest, widely-used, cost-efficient means to achieve significant NO
X
reductions, and the resultant visibility benefits will be comparable to or greater than the benefits achieved through selected controls at several BART units in North Dakota. We have also rejected comments that call for more stringent controls at AVS 1 and 2 in this planning period. While such controls may be appropriate in a later planning period, we cannot say that the State's rejection of such controls in this planning period was unreasonable. For further details regarding our rationale, please refer to our proposal and our response to comments.
Consistent with our proposal, we are approving the remaining elements of North Dakota's RH SIP because such elements meet the relevant requirements of our regional haze regulations.
B. Interstate Transport, Visibility Prong
The basis for this part of our action remains unchanged from our proposal. Nothing in the comments has convinced us that a change from our proposal is warranted. North Dakota's April 6, 2009 transport submittal contained only a cursory reference to CAA section 110(a)(2)(D)(i)(II)'s requirement for a SIP revision that contains adequate provisions “prohibiting any source or other type of emission activity within the State from emitting any air pollutant in amounts which will * * * interfere with measures required to be included in the applicable implementation plan for any other State under part C [of the CAA] to protect visibility.” Because of the impacts on visibility from the interstate transport of pollutants, we
interpret the “good neighbor” provisions of section 110 of the Act described above as requiring states to include in their SIPs either measures to prohibit emissions that would interfere with the RPGs required to be set to protect Class I areas in other states, or a demonstration that emissions from North Dakota sources and activities will not have the prohibited impacts. North Dakota's April 6, 2009 submittal contains neither. Thus, we are disapproving it. To the extent that the State intended to meet the requirement of section 110(a)(2)(D)(i)(II) with the RH SIP, the RH SIP submission itself is not fully approvable.
As required by section 110(c), we are promulgating a FIP to satisfy the requirements of CAA section 110(a)(2)(D)(i)(II) concerning visibility protection. As explained in section II, the FIP relies on the combination of the North Dakota RH SIP provisions that we are approving and the additions to the regional haze program for North Dakota that we are promulgating in our FIP for NO
X
BART for CCS 1 and 2 and NO
X
reasonable progress for AVS 1 and 2. Because this combination exceeds the stringency of BART and reasonable progress limits that were already factored into the Western Regional Air Partnership (WRAP) modeling for RPGs, this combination meets the visibility prong of CAA section 110(a)(2)(D)(i)(II). This combination of regional haze controls will ensure that emissions from sources in North Dakota do not interfere with other states' visibility programs as required by section 110(a)(2)(D)(i)(II) of the CAA.
For further details regarding our rationale, please refer to our proposal and our response to comments.
V. Issues Raised by Commenters and EPA's Responses
A. NO
X
BART for Milton R. Young Station Units 1 and 2 and Leland Olds Station Unit 2
As noted in section III of this action, in a major change from our proposal, we are now approving North Dakota's NO
X
BART determinations for MRYS 1 and 2 and LOS 2, and we are not proceeding with a FIP for NO
X
BART for these units. We explain the basis for this change in section III.
We received numerous comments that were specific to the NO
X
BART determinations for MRYS 1 and 2 and LOS 2. These related to a variety of issues—modeling and visibility improvement, costs of compliance, technical feasibility, appropriate emission limits, and other issues. The grounds for our decision to approve North Dakota's NO
X
BART determinations for MRYS 1 and 2 and LOS 2 render irrelevant further consideration of these issues. Essentially, we are approving the State's determination of BART based on a federal court's ruling on our challenge to the State's BACT determination for MRYS. In establishing BACT, the State established an emission limit based on what it considered the maximum degree of reduction of NO
X
, taking into account various factors similar to those in a BART determination. Thus, while we disagree with the vast majority of the comments that disputed our technical and legal analyses concerning NO
X
BART for MRYS 1 and 2 and LOS 2, we generally are not summarizing or responding to those comments to the extent they are specific to the assessment of NO
X
BART for MRYS 1 and 2 and LOS 2.
4
However, we are responding to comments that may be relevant to other aspects of this action.
4
Some commenters criticized the credibility and credentials of one of our sub-contractors. Because of their focused nature, we have included a response to some of those comments in our docket for this action, even though the substance of the issues is no longer relevant to our decision.
B. Comments on Legal Issues
1. EPA's Authority
Comment:
Multiple commenters stated that CAA Section 169A and the Regional Haze Rule (RHR) give the states (North Dakota in this instance) the lead in developing their regional haze SIPs. Some commenters went further in stating that North Dakota is given almost complete discretion in creating its RH SIP. These commenters argued that, because North Dakota is given such discretion, EPA lacks the statutory authority to disapprove the State's RH SIP. Specifically, some commenters pointed to the flexibility the State is granted in developing its BART determination, RPGs, modeling protocol and cost analysis. The State of North Dakota, for instance, argued that each factor in the five-factor analysis used to make its BART determination was appropriately weighed based on the State's own discretion. The State therefore argues that the EPA has no basis on which to disapprove the five-factor analysis.
Response:
Congress crafted the CAA to provide for states to take the lead in developing implementation plans, but balanced that decision by requiring EPA to review the plans to determine whether a SIP meets the requirements of the CAA. EPA's review of SIPs is not limited to a ministerial type of automatic approval of a state's decisions. EPA must consider not only whether the State considered the appropriate factors but acted reasonably in doing so. In undertaking such a review, EPA does not “usurp” the state's authority but ensures that such authority is reasonably exercised. EPA has the authority to issue a FIP either when EPA has made a finding that the State has failed to timely submit a SIP or where EPA has found a SIP deficient. Here, EPA has authority on both grounds, and we have chosen to approve as much of the North Dakota SIP as possible and to adopt a FIP only to fill the remaining gap. Our action today is consistent with the statute. In finalizing our proposed determinations, we are approving the State's determinations in identifying BART eligible sources and largely approving the State's BART determinations for seven different emission units subject to BART. Also, we are largely approving the State's reasonable progress determinations. We are, however, disapproving the State's NO
X
BART determinations for two units—CCS 1 and 2—and its NO
X
reasonable progress determinations for two units—AVS 1 and 2.
The State's NO
X
BART determinations for CCS 1 and 2 are not approvable because North Dakota did not properly follow the requirements of section 51.308(e)(1)(ii)(A). Specifically, North Dakota did not reasonably “take into consideration the costs of compliance,” when it relied on cost estimates that greatly overestimated the costs of controls. We have determined that the faults in the cost estimates were significant enough that they resulted in BART determinations for NO
X
for CCS 1 and 2 that were both unreasoned and unjustified. Accordingly, these determinations are not approvable.
We are disapproving the State's determination that no NO
X
controls are needed at AVS 1 and 2 to achieve reasonable progress because the State's determination is not reasonable under the relevant statutory and regulatory requirements.
In the absence of approvable NO
X
BART determinations in the SIP for CCS 1 and 2 and in the absence of an approvable reasonable progress determination concerning NO
X
controls at AVS 1 and 2, we are obliged to promulgate a FIP to satisfy the CAA requirements. Likewise, in the absence of an approvable SIP that addresses the requirement that emissions from North Dakota sources do not interfere with measures required in the SIP of any other state to protect visibility, we are obliged to promulgate a FIP to address the defect. This authority and
responsibility exists under CAA section 110(c)(1).
We also are required by the terms of two separate consent decrees, one in the U.S. District Court for the District of Colorado and one in the U.S. District Court for the Northern District of California to ensure that North Dakota's CAA requirements for regional haze and for 110(a)(2)(D)(i)(II), respectively, are finalized by March 2, 2012. Because we have found that the State's SIP submissions do not adequately satisfy either requirement in full and because we have previously found that North Dakota failed to timely submit these SIP submissions, we have not only the authority, but a duty to promulgate a FIP that meets those requirements.
Our action in large part approves the RH SIP submitted by North Dakota. The disapproval of the NO
X
BART and reasonable progress determinations and imposition of the FIP is not intended to encroach on state authority. This action is only intended to ensure that CAA requirements are satisfied using our authority under the CAA.
Comment:
The NDDH commented that states are free to deviate from the BART guidelines in the preparation of their BART analyses, except for power plants with a capacity exceeding 750 megawatts (MW).
Response:
We agree that the BART guidelines are only mandatory under the regional haze regulations for “fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts.” 40 CFR 51.308(e)(1)(ii)(B). However, the fact that a state may deviate from the guidelines for other BART sources does not mean that the state has unfettered discretion to act unreasonably or inconsistently with the CAA and our regulations. Where the BART guidelines are not mandatory, a state must still meet the requirements of the CAA and our regulations. In other words, the State must still adopt and apply the best available retrofit technology, considering the statutory factors.
Our regulations define best available retrofit technology to mean “an emission limitation based on the degree of reduction achievable through the application of the
best system
of continuous emission reduction for each pollutant which is emitted by an existing stationary facility.” 40 CFR 51.301 (emphasis added). We do not consider that this definition can simply be dismissed under the mantle of state discretion.
In addition, North Dakota's own regulations, which have been submitted for our approval and which we are approving with this action, provide as follows:
“33-15-25-03 Guidelines for best available retrofit technology determinations under the Regional Haze Rule.
Title 40, Code of Federal Regulations, part 51, appendix y, as published in the
Federal Register
on July 6, 2005, is incorporated by reference into this chapter. The owner or operator of a fossil-fuel-fired steam electric plant with a generating capacity greater than seven hundred fifty megawatts of electricity shall comply with the requirements of appendix y. All other facility owners or operators
shall use
appendix y as guidance for preparing their best available control retrofit technology determinations.”
(Emphasis added.) Appendix Y contains EPA's BART guidelines. Our approval of this regulation makes it federally enforceable.
North Dakota appears to disavow the dictates of its own regulation:
“EGUs with a capacity of less than 750 MW * * * are free to deviate from the BART Guidelines in the preparation of their BART analyses.
MRYS * * *
may use
the Guidelines as guidance only.”
State of North Dakota's November 21, 2011 comments, p. 22 (emphasis added). But, the regulation says that EGUs less than 750 MW “shall use” EPA's BART guidelines as guidance, not that they “may use” them as guidance or that they are “free to deviate” from them.
Given that North Dakota's own regulation, which we are making federally enforceable with this action, requires the use of the BART guidelines as guidance for BART analyses, we think it reasonable to conclude that any deviation from the guidelines must be based on a reasonable justification.
Regardless, the BART guidelines are mandatory for CCS, which is the one source for which we are disapproving the State's BART determination.
Comment:
North Dakota meets the presumptive BART limits for NO
X
at CCS 1 and 2, based on the 2005 BART Guidelines. EPA's rationale for disapproving the BART determinations at CCS 1 and 2 is therefore flawed and contrary to the BART Guidelines. EPA appears to be undertaking a national effort to change its BART Rule without going through notice and comment rulemaking to amend or repeal the rule. EPA is doing so by “applying BART determinations made for sources in one state as a new presumptive limit for all states.” Commenter cites 76 FR 58623 of the proposed rule, where EPA justifies a cost/ton “that states other than North Dakota have considered reasonable for BART,” but is higher than the presumptive BART limits.
Response:
We disagree with the commenter. First, for each source subject to BART, the RHR, at 40 CFR 51.308(e)(1)(ii)(A), requires that states identify the level of control representing BART after considering the factors set out in CAA section 169A(g), as follows: States must identify the best system of continuous emission control technology for each source subject to BART taking into account the technology available, the costs of compliance, the energy and non-air quality environmental impacts of compliance, any pollution control equipment in use at the source, the remaining useful life of the source, and the degree of visibility improvement that may be expected from available control technology. 70 FR 39158. In other words, the presumptive limits do not obviate the need to identify the best system of continuous emission control technology on a case-by-case basis considering the five factors. A state may not simply “stop” its evaluation of potential control levels at the presumptive level of control if more stringent control technologies or limits are technically feasible. We do not read the BART guidelines in appendix Y to contradict the requirement in our regulations to determine “the degree of reduction achievable through the application of the best system of continuous emission reduction” “on a case-by-case basis,” considering the five factors. 40 CFR 51.301 (definition of Best Available Retrofit Technology); 40 CFR 51.308(e). Also, our interpretation is supported by the following language in our BART guidelines:
While these levels may represent current control capabilities, we expect that scrubber technology will continue to improve and control costs continue to decline. You should be sure to consider the level of control that is currently best achievable at the time that you are conducting your BART analysis.
70 FR 39171. The presumptive limits are meaningful as indicating a level of control that EPA generally considered achievable and cost effective at the time it adopted the BART guidelines in 2005, but not a value that a state could adopt without conducting a five factor analysis considering more stringent, technically feasible levels of control.
The commenter focuses on narrow passages of the BART guidelines to support its view that the presumptive limits represent the most stringent BART controls that EPA can require for regional haze. However, these passages must be reconciled with the language of the RHR cited above, as well as other passages of the BART guidelines and associated preamble. A central concept expressed in the guidelines is that a
state is not required to consider the five factors if it has selected the most stringent level of control; otherwise, a state must fully consider the five factors in determining BART. 40 CFR part 51, appendix Y, section IV.D.1, step 1.9. Undoubtedly, as the commenter notes, the presumptive limits for NO
X
represent cost effective controls, but it is well-understood that limits based on combustion controls do not represent the most stringent level of control for NO
X
. Thus, a state which selects combustion controls and the associated presumptive limit for NO
X
as BART may only do so after rejecting more stringent control technologies based on full consideration of the five factors. Our interpretation reasonably reconciles the various provisions of our regulations. We clearly communicated our views on this subject to North Dakota while it was developing its RH SIP, and, following our interpretation, North Dakota conducted an analysis of control technologies that would achieve a more stringent limit than combustion controls.
While North Dakota conducted a five-factor analysis to determine BART at CCS, its determination was based on erroneous values for the costs associated with potential loss of fly ash sales due to ammonia contamination, something the source acknowledged in June of 2011. 76 FR 58603. A BART determination based on substantially erroneous cost values does not meet the requirements of the CAA or our regulations to determine the best system of continuous emission control technology considering cost and the other statutory factors. Because we cannot approve the State's BART determination, we are authorized, and in this case obligated, to promulgate a FIP.
In promulgating a FIP for CCS, we arrived at an emission limit that is more stringent than the presumptive limit based on consideration of the five factors. Contrary to the commenter's suggestion, EPA's BART guidelines do not establish a presumptive cost effectiveness level that is a “safe harbor” or “shield” for state BART determinations, or that EPA, when promulgating a FIP, may not exceed in determining BART. Once a FIP is required, we stand in the state's shoes. In considering the cost factor, it is reasonable for us to consider other sources of information to inform our decision, including the cost values other states have considered reasonable. This is not EPA establishing a new presumptive limit or national rule; it is EPA, acting in the state's shoes, conducting a reasonable source-specific consideration of cost and the other regulatory factors. In addition, although not required, we considered cost effectiveness values that the State of North Dakota had considered to be reasonable in reaching its BART determinations. See 76 FR 58623 (“It is also within the range of values that North Dakota considered reasonable in its NO
X
BART determinations * * *”)
Comment:
EPA has failed to articulate, or apply, a SIP review standard that preserves state authority over BART determinations. EPA can't rely on vague references to the overarching purpose of the regional haze program to define what's reasonable. The CAA only requires consideration of the five statutory factors and emission limits that yield a reduction in visibility impairment. EPA has contradicted prior statements in various contexts, such as reports to Congress. EPA has provided no objective measure to gauge EPA's assessment. EPA's vague standards result in arbitrary and capricious decision making. EPA must articulate the standard by which it evaluates and disapproves a SIP and must support its decision with a plausible explanation.
Response:
Our proposal clearly laid out the bases for our proposed disapproval of the State's BART and reasonable progress determinations, and we have relied on the standards contained in our regional haze regulations and the authority that Congress granted us to review and determine whether SIPs comply with the minimum statutory and regulatory requirements. To the extent a cost analysis relies on values that are inaccurate, a state has not considered cost in a reasoned or reasonable fashion. To the extent a state has considered visibility improvement from potential emissions controls in a way that substantially understates the improvement or does so in a way that is not consistent with the CAA, the state has not considered visibility improvement in a reasoned or reasonable fashion. In these circumstances, it is reasonable for EPA to disapprove the relevant aspects of the SIP. In determining SIP adequacy, we inevitably exercise our judgment and expertise regarding technical issues, and it is entirely appropriate that we do so. Courts have recognized this necessity and deferred to our exercise of discretion when reviewing SIPs. See, e.g.,
Connecticut Fund for the Env't., Inc.
v.
EPA,
696 F.2d 169 (2nd Cir. 1982);
Michigan Dep't. of Envtl. Quality
v.
Browner,
230 F.3d 181 (6th Cir. 2000);
Mont. Sulphur & Chem. Co.
v.
United States EPA,
2012 U.S. App. LEXIS 1056 (9th Cir. Jan. 19, 2012).
We disagree with the argument that we must approve a BART determination where the SIP reflects consideration of the five factors and the BART selection will result in some improvement in visibility. We think Congress expected more when it required the application of “best available retrofit technology.”
While the commenter places great emphasis on EPA's prior statements in reports to Congress, these statements have no regulatory effect. Also, these statements are not as supportive of commenter's position as commenter suggests. For example, “some flexibility” does not suggest unfettered flexibility; a report's suggestion that a cooperative approach would make sense does not suggest that EPA will or must approve unilateral decision-making by a state no matter what.
Contrary to the commenter's assertion, we have not destroyed the State's primacy. In fact, we have approved the vast majority of the State's determinations. We are only rejecting the State's unreasonable analyses and decisions. We are authorized to do so.
Comment:
The grounds invoked by EPA to disapprove the RH SIP are legislative in nature and cannot be imposed without advance notice and comment rulemaking. EPA's proposed action on North Dakota's SIP articulates a number of grounds not contained in CAA section 169A that must be met for a SIP to be “approvable.” These additional grounds have never been defined or promulgated with notice and comment rulemaking. For example, EPA's proposed action articulates a two pronged test for BART SIP approval: first, “a state must meet the requirements of the CAA and our regulations for selection of BART”; and second, “the state's BART analysis and determination must be reasonable in light of the overarching purpose of the regional haze program.” 76 FR 58577. The commenter objects to the second prong,
i.e.,
that “the state's BART analysis and determination must be reasonable in light of the overarching purpose of the regional haze program.” According to the commenter, this is a new “reasonableness” standard that is neither defined nor separately set forth in the Act. The commenter asserts that EPA is proposing to measure a BART determination not just against the statutory criteria but also against EPA's own subjective view whether the result reached is reasonable enough to meet the “overarching goal” of the Act. EPA's new subjective reasonable enough requirement imposes a new legislative standard that either goes beyond or, for
the first time, purports to define “the requirements of the Act.” This empowers EPA to disapprove a state BART determination and replace it with its own on reasonableness grounds that have never been defined or first vetted through public notice and comment.
Response:
First, even assuming that EPA's proposed action on the North Dakota RH SIP articulated new grounds for evaluating a regional haze SIP, the proposed action provides the public with the opportunity to comment. As evidenced by the commenter's submission, the commenter had the opportunity to comment on EPA's approach to evaluating the North Dakota RH SIP and to identify any concerns associated with the statement at issue from our proposal and other aspects of our action.
Second, the CAA requires states to submit SIPs that contain such measures as may be necessary to make reasonable progress toward achieving natural visibility conditions, including BART. The CAA accordingly requires the states to submit a regional haze SIP that includes BART as one necessary measure for achieving natural visibility conditions. In view of the statutory language, it is hardly a novel idea that the reasonableness of the state's BART analysis and determination would be evaluated in light of the purpose of the regional haze program. In addition, our regional haze regulations, at 40 CFR 51.308(d)(ii), provide that when a state has established a RPG that provides for a slower rate of improvement in visibility than the URP (as has North Dakota), the state must demonstrate, based on the reasonable progress factors—
i.e.,
costs of compliance, time necessary for compliance, energy and non-air quality environmental impacts of compliance, and remaining useful life of affected sources—that the rate of progress to attain natural visibility conditions by 2064 is not reasonable and that the progress goal adopted by the state is reasonable. 40 CFR 51.308(d)(iii) provides that, “in determining whether the State's goal for visibility improvement provides for reasonable progress towards natural visibility conditions, the Administrator will evaluate” the state's demonstrations under section 51.308(d)(ii). It is clear that our regulations and the CAA require that we review the reasonableness of the State's BART determinations in light of the goal of achieving natural visibility conditions. This approach is also inherent in our role as the administrative agency empowered to review and approve SIPs. Thus, we are not establishing a new reasonableness standard, as the commenter asserts.
Comment:
EPA established a new adequacy criterion when it found that North Dakota's cost analysis did not provide a reasonable basis to make a NO
X
BART determination for LOS 2. It was illegal for EPA to establish a new adequacy criterion without rulemaking.
Response:
While we have decided to approve the State's NO
X
BART determination for LOS 2, this comment may be relevant to other aspects of our final action.
Our prior response largely addresses this assertion. However, in addition, we think the illogic of the commenter's claim is revealed when the potential consequences of the commenter's views are examined. The necessary product of the commenter's view is that a state could rely on irrational values for any of the five factors, and EPA would be powerless to disapprove the SIP. We reject that view. We are not establishing new criteria for approval of a regional haze SIP. We are applying the criteria and requirements already specified in the CAA and our regulations. Cost is one of the factors a state must consider in determining BART. If North Dakota has relied on greatly inflated cost estimates in its consideration of the cost factor, it has not considered cost in any meaningful sense of the word.
It is also our opinion that the commenter, in its effort to put our action in a specific legal box—
i.e.,
“illegal administrative action”—consistently misrepresents the nature of our action. This
is
a SIP review action, and we believe that EPA is not only authorized, but required to exercise independent technical judgment in evaluating the adequacy of the State's RH SIP, including its BART determinations, just as EPA must exercise such judgment in evaluating other SIPs. In evaluating other SIPs, EPA is constantly exercising judgment about SIP adequacy, not just to meet and maintain the NAAQS, but also to meet other requirements that do not have a numeric value. In this case, Congress did not establish NAAQS by which to measure visibility improvement; instead, it established a reasonable progress standard and required that EPA assure that such progress be achieved. Here, contrary to the commenter's assertion, we are exercising judgment within the parameters laid out in the CAA and our regulations. Our interpretation of our regulations and of the CAA, and our technical judgments, are entitled to deference. See, e.g.,
Michigan Dep't. of Envtl. Quality
v.
Browner,
230 F.3d 181 (6th Cir. 2000);
Connecticut Fund for the Env't., Inc.
v.
EPA,
696 F.2d 169 (2nd Cir. 1982);
Voyageurs Nat'l Park Ass'n
v.
Norton,
381 F.3d 759 (8th Cir. 2004);
Mont. Sulphur & Chem. Co.
v.
United States EPA,
2012 U.S. App. LEXIS 1056 (9th Cir. Jan. 19, 2012).
Comment:
EPA has no statutory authority to disapprove North Dakota's BART determination for LOS 2. CAA section 169A(b)(2) leaves that determination expressly and exclusively in the hands of the State. EPA's SIP approval authority under CAA section 110 only permits EPA to confirm whether the State considered the statutory factors; it does not authorize EPA to pass judgment on how the State considers them. The commenter cites the
American Corn Growers
and
UARG
decisions as support for its comments. Nor, according to the commenter, does section 110 permit EPA to propose its own emission controls. By doing so, EPA's FIP “run[s] roughshod over the procedural prerogatives that the Act has reserved to the States” (citing
Bethlehem Steel Corp.
v.
Gorsuch,
742 F.2d 1028, 1036 (7th Cir. 1984)).
Response:
While we have decided to approve the State's NO
X
BART determination for LOS 2, this comment may be relevant to other aspects of our final action. The commenter reads too much into the language of 169A. We do not agree that the language, “as determined by the State,” grants the State unlimited discretion or “sole control” in making a BART determination, any more than the accompanying language, “or the Administrator in the case of a plan promulgated under section 7410(c) of this title,” grants EPA unlimited discretion in making a BART determination in a FIP.
Instead, while States are assigned the primary statutory and regulatory authority to determine BART, and have significant freedom to determine the weight and significance of the statutory factors, they have an overriding obligation to come to a reasoned determination. They may not act unreasonably or in an arbitrary and capricious fashion, and Congress has assigned EPA, as the reviewing agency, the role of determining whether a State's BART determination or reasonable progress determination is reasonable.
The commenter's citations to legislative history are unconvincing. Among other things, they are incomplete. The commenter ignores the intent behind the 1977 legislation:
“The Administrator must promulgate regulations which assure attainment of the national goal * * * Specifically, the regulations must require that States which contain mandatory class I areas, and States
whose emissions cause or contribute to visibility problems in such areas, revise their implementation plan to include two elements. The first element of the plan revision is that the State plan must provide for installation of “best available retrofit technology” for existing major stationary sources which cause or contribute to visibility impairment in such areas.”
95 Cong. Conf. Report H. Rept. 564, at 154.
Commenters suggest that visibility issues are only of state and local concern and that is why Congress left states with sole control. This is inconsistent with the very first sentence of the statute: “Congress hereby declares as a
national goal
the prevention of any future, and the remedying of any existing, impairment of visibility in mandatory class I Federal areas * * *” CAA section 169A, (emphasis added). It is also inconsistent with the legislative history, which states:
“There are certain national lands, including national parks, national monuments, national recreation areas, national primitive areas, and national wilderness areas, in which protection of clean air quality is obviously a critical national concern * * * Indeed, the millions of Americans who travel thousands of miles each year to visit Yosemite or the Grand Canyon or the North Cascades will find little enjoyment if, for example, upon reaching the Grand Canyon it is difficult if not impossible to see across the great chasm. If that were to come to pass—and several of our great national parks, including the Grand Canyon, are threatened today by such a fate—the very values which these unique areas were established to protect would be irreparably diminished, perhaps destroyed.”
95 Cong. House Report 294 at 137.
Thus, we do not agree that Congress assigned us a merely ministerial role; it is not evident how such a limited role would assure attainment of the national goal or the actual imposition of the best available retrofit technology where a state's BART determination is unreasonable, arbitrary and capricious, or not in accordance with the law.
We also disagree that our proposal is inconsistent with the
American Corn Growers
and
UARG
decisions. These cases dealt with EPA's authority to issue generic regulations regarding BART determinations. They did not address EPA's authority in reviewing a SIP.
Contrary to the commenter's assertion, the
Bethlehem Steel
case is inapplicable here. We are promulgating BART and reasonable progress limits under the authority of CAA section 110(c), not through our action on North Dakota's SIP. We have authority to promulgate our FIP under 110(c) on two separate grounds: first, based on our January 2009 finding of failure to submit the RH SIP; and second, based on our partial disapproval of the RH SIP.
Comment:
Commenter stated that EPA is incorrect to assert that NDDH did not adequately consider all five statutory factors for LOS 2. Commenter stated that EPA concludes, in its own BART evaluation, that SNCR + ASOFA (NDDH's BART selection) is cost effective and provides substantial visibility benefits. When a state has taken into consideration the five statutory factors and selected a technology that reduces visibility impairments, it has complied with the statute and EPA must approve the SIP. Since EPA's own FIP analysis proves North Dakota's choice complies with the statute, EPA has no basis to disapprove it.
Response:
While we have decided to approve the State's NO
X
BART determination for LOS 2, this comment may be relevant to other aspects of our final action. The commenter cites no authority in the CAA or our regulations for its assertion that a BART determination that considers the five statutory factors is adequate as long as it provides some reduction in visibility impairment. We know of no such criterion. Instead, our regulations define BART as an emission limitation based on the degree of reduction achievable through the application of the best system of continuous emission reduction for each pollutant which is emitted by an existing stationary facility. The emission limitation must be established, on a case-by-case basis, taking into consideration the technology available, the costs of compliance, the energy and non-air quality environmental impacts of compliance, any pollution control equipment in use or in existence at the source, the remaining useful life of the source, and the degree of improvement in visibility which may reasonably be anticipated to result from the use of such technology. Given that the BART limit must reflect the “application of the best system of continuous emission reduction,” we interpret the Act to require a reasonable consideration of the five factors, one that is not arbitrary and capricious.
Comment:
EPA's effort to impose BART determinations by federal rulemaking impermissibly deprives source owners of the substantive procedural rights they are otherwise afforded under State law. The commenter notes that the State used a permit process to establish BART limits, and that a similar source-by-source adjudication of such limits must be provided by EPA. The commenter also asserts that EPA must allow for examination and cross-examination of witnesses, and that, otherwise, the process is not consistent with due process.
Response:
While the State has chosen to use the permit process to establish BART limits for individual sources, there is nothing in the CAA or our regulations that requires states or EPA to use permits or a source-by-source adjudicatory proceeding to establish BART limits. Both the CAA and our regulations require that BART limits be contained in a SIP. In the absence of an approvable SIP, CAA section 110(c) requires us to issue a FIP. We have issued a partial FIP pursuant to CAA section 307. CAA section 307 provides that its provisions apply in lieu of the Administrative Procedure Act (APA). The procedures provided by CAA section 307 are adequate to ensure due process to source owners. We have provided a substantial opportunity for comment (a two-month long comment period) and an extensive public hearing that lasted 14 hours over two days. The commenter submitted over 140 pages of comments with several attachments, and other commenters submitted comments of similar length. It is not unusual for FIPs to include source-specific limits and requirements. An opportunity for examination and cross-examination of witnesses is not required by the CAA, nor is it required to ensure due process. Individuals and entities affected by EPA's action have had ample opportunity to challenge EPA's conclusions.
Comment:
Sole control over BART determinations for EGUs under 750 MW is left to the states. Congressional intent to exclude federal involvement in BART determinations for smaller generating stations is apparent from the plain text of the statute and is binding on EPA. EPA may not disapprove a state BART determination for an EGU the size of Leland Olds.
Response:
EPA disagrees with the suggestion that Congress intended to totally remove EPA from review of BART determinations for EGUs less than 750 MW. The statute merely says that for EGUs greater than 750 MW, BART must be determined in accordance with guidelines promulgated by EPA. That does not obviate the need for the State to select BART, after considering the five statutory factors. And, it does not remove EPA's review role over SIP submittals.
Comment:
North Dakota has the authority under the RHR to review the new updated cost analyses provided by URS and Golder Associates on behalf of GRE.
Response:
Our action does not prevent North Dakota from reviewing GRE's updated cost analyses, or from submitting a revised SIP. States always have the freedom to submit SIP revisions to EPA. We need not speculate in this action whether such a revision would be approvable. However, such a SIP revision is not the subject of this action, and we are neither obligated nor authorized to wait for such a revision before we finalize our proposed action. To the contrary, we have already exceeded the statutory deadline for promulgating a FIP or approving a SIP for regional haze, and, under two separate consent decrees, we must finalize this action by March 2, 2012.
GRE acknowledged in a June 2011 email that it had made errors in its original cost estimates for NO
X
BART for CCS. The State relied on those erroneous cost figures in its NO
X
BART analysis and determination for CCS in its RH SIP that it submitted on March 3, 2010. This is the main RH SIP submittal that we are acting on today.
Because of the magnitude of these acknowledged errors, it is appropriate to disapprove the BART determination for CCS 1 and 2 that is contained in the March 3, 2010 submittal. We explain in response to a prior comment why selection of the presumptive limits without a valid case-specific analysis supporting such limits as BART is not sufficient to meet the requirements of the regional haze regulations. Based on our disapproval of the SIP, and on separate grounds related to our January 2009 finding of failure to submit, we are authorized and obligated to promulgate a FIP for NO
X
BART for CCS 1 and 2. CAA section 110(c). We have considered GRE's revised cost analyses in the context of our proposed FIP and address those analyses in a subsequent response.
Comment:
Commenter stated that EPA's action is in violation of the 10th amendment to the Constitution.
Response:
Our action does not compel North Dakota to enforce federal law and does not intrude on authority reserved to the states. Thus, our action is consistent with the 10th amendment to the Constitution.
Comment:
Commenter stated that EPA's action is in violation of Article 4 of the Constitution.
Response:
The comment does not specify which aspect of Article 4 we are alleged to have violated. However, we conclude that our action does not violate any aspect of Article 4 of the Constitution.
Comment:
Commenter stated that Federal Land Managers (FLMs) are using their Air Quality Related Values Workgroup (FLAG) report, a guidance document, in highly inappropriate ways.
Response:
This comment appears to relate to how the FLMs respond to proposed PSD permits rather than EPA's proposed actions here. Accordingly, we are not responding to the substance of this comment. Contrary to the commenter's assertion, we do not consider our own actions to be inflexible. We note that we are approving the great majority of the State's BART and reasonable progress determinations.
2. Interstate Transport Consent Decree
Comment:
Commenter states that EPA wrongly uses the Interstate Transport consent decree to justify action by the September 1, 2011 deadline. Commenter claims that EPA separately acknowledged that the Interstate Transport consent decree never addressed the regional haze plan. North Dakota has sought leave of the court that issued the consent decree to intervene in the case. North Dakota is also seeking a declaration from the Court that EPA is exceeding its authority under that consent decree to use it for justification of the regional haze proposal.
Response:
The United States District Court for the Northern District of California rejected the commenter's arguments in an order dated December 27, 2011. We agree that the transport consent decree does not address the regional haze plan. However, as the court in California recognized, we made an appropriate administrative decision to address the CAA's transport requirements and regional haze requirements in the same action. Given that we faced a September 1, 2011 deadline for our proposed transport action under the transport consent decree, and faced an uncertain deadline for proposed action and a January 26, 2011 deadline for final action under the then-lodged regional haze consent decree, we acted in a prudent and reasonable fashion to sign our notice of proposed rulemaking by the September 1, 2011 deadline in the transport consent decree.
Comment:
North Dakota's Interstate Transport SIP, specifically the “visibility” element of CAA Section 110(A)(2)(D)(i)(II), must be approved. North Dakota commented that EPA had no reason not to act on the visibility portion of the State's interstate transport SIP submission according to EPA's 2006 guidance. Another commenter stated that the EPA “admits” in the Proposed North Dakota RH SIP/FIP that the State met the sole obligation of Section 110(A)(2)(D)(i)(II), and that the EPA's reasons for disapproval therefore lack basis.
Response:
We fully explained the basis for our proposed disapproval of North Dakota's interstate transport SIP in our proposal. See 76 FR 58641-58642. We have fully considered the comments, but nothing in the comments has caused us to change our views. As we explained in our proposal, our 2006 guidance was premised on a certain set of assumptions—in particular, that states would submit their regional haze SIPs by the regulatory deadline and that the regional haze SIPs would be the appropriate means for states to establish that their SIPs contained adequate provisions to prevent interference with the visibility programs required in other states. It turned out we were mistaken in our assumptions, and we explained in our proposal that subsequent events have rendered our 2006 guidance inappropriate in this specific action. Thus, we appropriately and reasonably evaluated the State's interstate transport SIP against the statutory requirements and found it deficient. The State disagrees with the way in which we characterized the State's transport SIP in our proposal at 76 FR 58574, but we were clear in our discussion later in our notice that “North Dakota did not explicitly state in its April 6, 2009, submittal that it intended that its Regional Haze SIP be used to satisfy the visibility prong * * *” 76 FR 58641.
Basin Electric misrepresents our proposed action. While we indicated that the State had not explicitly indicated that it was submitting the RH SIP to meet the interstate transport requirements, which left us in an uncertain position, that was not the only basis for our conclusion that the RH SIP did not meet the transport requirements. Instead, we stated, “Most importantly, however, EPA must review the April 6, 2009 submission in light of the current facts and circumstances, and the RH SIP revision that the State ultimately submitted does not fully meet the substantive requirements of the regional haze program * * * To the extent that the State intended to meet the requirement of section 110(a)(2)(D)(i)(II) with the RH SIP, the RH SIP submission itself is not fully approvable.” 76 FR 58642.
The State and Basin Electric assert that we should approve the RH SIP as satisfying the transport requirements even though we are disapproving the SIP as meeting regional haze requirements. We disagree. Under the suggested approach, EPA would simultaneously codify in the Code of Federal Regulations disparate and conflicting requirements—the SIP limits
and associated requirements (or in the case of AVS, the lack thereof) for certain EGUs and the FIP limits and associated requirements for those same EGUs. This could lead to confusion regarding the requirements applicable to the industrial sources affected, including confusion in enforcement actions. Accordingly, we have decided to finalize our proposed disapproval of North Dakota's interstate transport SIP.
Comment:
The NDDH commented that EPA has not provided any credible evidence that the additional emission reductions from the FIP will produce any discernible visibility improvement in out-of-state Class I areas and has not provided any credible evidence that these additional emission reductions are necessary to prevent North Dakota sources from interfering with another state's ability to protect visibility.
Response:
In our proposal, we did not claim that our FIP to address the requirements of CAA section 110(a)(2)(D)(i)(II) would result in visibility improvement in out-of-state areas. We did not have the time or resources to re-do the WRAP modeling that states in the region had relied on in assessing the impacts of emissions reductions and in setting their RPGs. Instead, we noted that the emission limits in our proposed FIP to address certain deficiencies in the State's BART and reasonable progress measures in its RH SIP would exceed the emissions reductions for BART and reasonable progress for these sources that had been factored into the WRAP modeling for RPGs. As a result, we concluded that the limits in the FIP, in combination with the measures in the SIP that we had proposed to approve, would satisfy the interstate transport requirements for visibility. We continue to find that this is a reasonable conclusion. Although there may be other acceptable approaches to satisfying the requirements of CAA section 110(a)(2)(D)(i)(II) that would require additional visibility modeling, the approach that we have adopted does not require that we assess through modeling the visibility improvement that will result from our FIP to assure that North Dakota's emissions do not interfere with measures required in the plans of other states to protect visibility.
3. Other General Legal Comments
Comment:
Some commenters stated that EPA cannot promulgate a FIP until it has taken final action on the related SIP.
Response:
We have the authority to promulgate a FIP concurrently with a disapproval action. As has been noted in past FIP promulgation actions, if EPA “finds that a State has failed to make a required submission * * * or * * * disapproves a [SIP] in whole or in part,” CAA Section 110(c)(1) establishes a two-year period within which we must promulgate a FIP, and provides no further constraints on timing. See, e.g., 76 FR 25178, at 25202. North Dakota failed to submit its RH SIP to us by December 2007, as required by Congress. Two years later, North Dakota had still not submitted its RH SIP. When we made a finding in 2009 that North Dakota had failed to submit its RH SIP, (see 74 FR 2392), that created an obligation for us to promulgate a FIP by January 2011. We are promulgating the FIP concurrently with our disapproval action because of the applicable statutory deadlines requiring us at this time to promulgate regional haze BART determinations and reasonable progress (RP) determinations to the extent North Dakota's BART and RP determinations are not approvable.
We also note that North Dakota made this same argument to the U.S. District Court for the District of Colorado—in a motion opposing entry of a consent decree containing deadlines for EPA to promulgate a FIP for regional haze for North Dakota and in comments on the proposed consent decree. The court rejected North Dakota's argument. First, the court noted that we had proposed action on North Dakota's SIP in our September 1, 2011 proposal and we were, therefore, not proposing to take final action on the regional haze FIP before making a determination on North Dakota's SIP revision. Second, the court indicated that we would be authorized to promulgate the regional haze FIP even without taking final action on North Dakota's SIP. As we had argued, the court found that the duty to promulgate a FIP (triggered by our 2009 finding of failure to submit an RH SIP) remains “
unless
the State corrects the deficiency,
and
the Administrator approves the plan or plan revision,
before
the Administrator promulgates such [FIP].” Order Entering Consent Decree,
WildEarth Guardians
v.
Jackson,
Civil Action No. 11-cv-00001-CMA-MEH, USDC Colorado, p. 17, citing CAA section 110(c) (emphasis and brackets added by the court).
Comment:
Commenter stated that EPA must review the “blanket five year compliance date” to install and operate BART to ensure that it is as expeditious as practicable, as required by the CAA.
Response:
We have reviewed the compliance dates for meeting BART limits that are contained in the portions of the SIP we are approving and in the FIP we are promulgating. These dates are reasonable given the magnitude of the retrofits being undertaken. We note that the State permits that we are approving as part of this action provide for compliance as expeditiously as practicable, but in no event later than five years.
C. Comments on Modeling
Comment:
Several commenters questioned aspects of the single-source CALPUFF modeling that North Dakota included in the SIP and which EPA relied upon in our evaluation of visibility impacts. Among other things, commenters questioned (1) Whether CALPUFF overestimates nitrate formation, (2) whether newer versions of CALPUFF would give more accurate results, (3) the method for establishing natural visibility background, (4) how to establish ammonia background concentrations, and (5) the method for interpreting model results as they relate to visibility improvement. The commenters submitted revised single-source CALPUFF modeling results to address what they believed to be deficiencies in the single-source CALPUFF modeling that North Dakota included in the SIP.
Response:
While each of these comments is addressed separately in detailed responses below, a general response is warranted. We note that many of these comments were submitted by Minnkota and Basin Electric and were directed specifically to EPA's proposal regarding SCR at MRYS 1 and 2 and LOS 2. As we have explained, such comments are not relevant to our final action. Nonetheless, we are responding to most of the comments in the event that they could be interpreted as having broader application to the assessment of visibility improvement from potential control options.
The second point we note is that the source owners are essentially questioning modeling that they conducted and submitted to the State as part of their BART evaluations, and that the State specifically called for and included in the SIP. The State established procedures for single-source BART modeling used to support its SIP in the “Protocol for BART-Related Visibility Impairment Modeling Analyses in North Dakota” (the BART modeling protocol). North Dakota RH SIP, Appendix A.1. North Dakota intended for the protocol to apply to “visibility modeling for both identification of sources `subject to BART' (
i.e.,
BART screening), and for determining the degree of visibility improvement related to the selection of BART controls.” North Dakota RH SIP, Appendix A.1, p. 1. In fact, North
Dakota specifically stated: “[A]ll BART-related single-source modeling for sources in North Dakota must follow the protocol outlined here. Because of this requirement, the NDDH will not expect companies which operate BART-eligible sources to provide individual protocols for their BART-related modeling.”
Id.,
p. 3. North Dakota's protocol conforms to the BART Guidelines.
5
It also follows recommendations for modeling long range transport contained in 40 CFR part 51, appendix W (“The Guideline on Air Quality Models”) and EPA's Interagency Workgroup on Air Quality Modeling (IWAQM) Phase 2 Summary Report and Recommendations for Modeling Long Range Transport Impacts. Furthermore, as discussed in Section 3 of the SIP,
Plan Development and Consultation,
the protocol was developed in consultation with EPA and FLM meteorologists. Adherence to the protocol ensures that a consistent comparison of visibility improvement can be made for potential control technologies across different individual units and different pollutants.
5
There is one aspect of the protocol that does not conform to the BART guidelines—North Dakota's inclusion of the 90th percentile modeling results in addition to the 98th percentile. The use of the 90th percentile modeling results is not consistent with the CAA. 70 FR 39121. We provide more detail about the deficiency in the use of the 90th percentile value in subsequent responses.
As the State's single-source BART modeling followed established guidance and was developed in consultation with FLMs and EPA, we find that it provides a reasonable basis for making control technology determinations. We do not agree with the sources' attempt to deviate from the established protocol for assessing visibility impacts. This is because it would lead to a less consistent and rational assessment of potential control options. Nonetheless, we have considered the revised single-source modeling and the comments submitted by the commenters in making our final action. We conclude that nothing contained in their modeling analysis undermines the single-source modeling that North Dakota included in the SIP.
Comment:
Two commenters stated that the receptor-specific approach to identifying the 98th percentile result in CALPUFF is more technically correct than the default day-specific approach. The commenters also supplied revised CALPUFF modeling based on the receptor-specific approach. These modeling results suggest that controls would achieve less visibility improvement than indicated by North Dakota's single-source BART modeling.
Response:
We do not agree that the receptor-specific approach is more technically correct; it is not part of the standard CALPUFF model and merely serves to decrease the conservatism of the model predictions through the creation of 98th percentile values that are specific to specific receptor locations within a Class I area. The standard CALPUFF approach considers the daily impacts within a Class I area at all receptor points;
i.e.,
the model predicts the highest daily value for each day of the year from all receptors within a Class I area. The 98th percentile reflects the eighth highest of these daily values.
In its BART modeling protocol, North Dakota stated that “the context of the 98th percentile 24-hour delta-deciview prediction is with respect to days of the year, and is not receptor specific.” RH SIP, Appendix A.1, Section 4.0, p. 50. In addition, in establishing the 98th percentile as a reasonable contribution threshold in the BART Guidelines, EPA intended that the day-specific, or “day-by-day,” approach be used. 70 FR 39121. This was the approach EPA considered appropriate to account for the assumptions and uncertainties in CALPUFF; the receptor-specific approach goes beyond what EPA considers appropriate to address these assumptions and uncertainties and would undermine the goal of achieving natural visibility conditions. Therefore, we do not consider the revised CALPUFF modeling results based on the flawed receptor-specific approach that were submitted by the commenters to be useful in assessing visibility impacts..
Comment:
Several of the commenters argue that it is inappropriate to evaluate visibility impacts in comparison to natural background visibility conditions. Instead, the commenters propose to evaluate visibility impacts in comparison to current, degraded visibility conditions. The commenters further argue that EPA's use of natural conditions is inconsistent with section 169A of the CAA and that EPA should amend its BART Guidelines to use current, degraded visibility conditions.
Response:
We disagree. EPA's approach is consistent with Congress's intent in passing section 169A, and the proposal to use degraded visibility conditions is inconsistent with section 169A. Visibility impacts must always be evaluated relative to some reference visibility condition, and a given reduction in ambient PM
2.5
will result in smaller relative improvement in visibility when compared to polluted conditions versus clean conditions. Because current degraded visibility conditions are considerably worse than natural background visibility, comparison of a BART source's impact relative to current degraded visibility conditions would result in a smaller relative benefit than would a comparison relative to natural background visibility. EPA previously considered and responded to the same comment in 40 CFR part 51, appendix Y, promulgated at 70 FR 39104, July 6, 2005. After receiving this comment on the BART Guidelines, EPA considered the approach of assessing a BART-eligible source's impacts on visibility by using current or near-term future conditions, and EPA determined that BART visibility impacts should be evaluated in comparison to natural background visibility. In the final rulemaking EPA wrote (70 FR 39124):
“Using existing conditions as the baseline for single source visibility impact determinations would create the following paradox: the dirtier the existing air, the less likely it would be that any control is required. This is true because of the nonlinear nature of visibility impairment. In other words, as a Class I area becomes more polluted, any individual source's contribution to changes in impairment becomes geometrically less. Therefore the more polluted the Class I area would become, the less control would seem to be needed from an individual source. We agree that this kind of calculation would essentially raise the “cause or contribute” applicability threshold to a level that would never allow enough emission control to significantly improve visibility. Such a reading would render the visibility provisions meaningless, as EPA and the States would be prevented from assuring “reasonable progress” and fulfilling the statutorily-defined goals of the visibility program. Conversely, measuring improvement against clean conditions would ensure reasonable progress toward those clean conditions.”
See, also, Memorandum from Gail Tonnesen, Regional Modeler, to North Dakota Regional Haze File, dated September 1, 2011, regarding “Modeling Single Source Visibility Impacts.” This memorandum is included in Appendix B of the Technical Support Document (TSD) for this action.
Comment:
Two commenters performed new CALPUFF simulations using EPA's current regulatory version 5.881 and submitted these modeling results to EPA during the comment period. The commenters found lower visibility impacts using CALPUFF version 5.8 than did the State with an earlier CALPUFF version 5.711a.
Response:
For these new model results, the commenters did not submit a modeling protocol for EPA review and did not provide a complete copy of the CALPUFF input and output files. As a result, EPA was not able to fully review the data sets used in this modeling.
Moreover, while EPA did approve the use of the Rapid Update Cycle meteorology for modeling the Heskett facility, EPA has not approved this alternate modeling protocol for other BART sources in North Dakota and has not reviewed or approved other modifications to the modeling approach that the commenters used in developing new CALPUFF results.
From the information that the commenters provided, EPA determined that the differences in the new CALPUFF version 5.8 modeling results are due in part to a change in the natural background visibility that was used in the modeling analysis. The State's modeling protocol called for use of the 20% best natural visibility days in its BART analysis while the commenters' new CALPUFF version 5.8 analysis used the annual average natural visibility days. If the commenters had adopted the same approach as North Dakota and compared CALPUFF version 5.8 visibility impacts to the 20% best natural visibility days, the results of the new analysis would have been more similar to the original modeling performed by North Dakota.
We do not find that the commenters' new modeling demonstrates that single-source modeling performed according to North Dakota's BART modeling protocol should be disregarded. That modeling was conducted using the latest version of CALPUFF that was available at the time, and we are approving the great majority of North Dakota's BART determinations that relied on results from that modeling. In our FIP, in which we are merely filling gaps in the SIP, we are not required to conduct new modeling using CALPUFF version 5.8 or disregard the results of the modeling conducted using CALPUFF version 5.711a. In fact, we find the better course is to rely on modeling based on the same version of the model that the State employed to ensure we are using a consistent comparison. See,
Mont. Sulphur & Chem. Co.
v.
United States EPA,
2012 U.S. App. LEXIS 1056 (9th Cir. Jan. 19, 2012).
Comment:
The commenters argue that CALPUFF overstates visibility impact due to the complexity of the chemistry affecting visibility impairment and that EPA acknowledges that “the simplified chemistry in the [CALPUFF] model tends to magnify the actual visibility effects of [a] source.” 70 FR 39121. The commenters further state that when EPA adopted the BART Guidelines, EPA concurred with “the concerns of commenters that the chemistry modules of the CALPUFF model are less advanced than some of the more recent atmospheric chemistry simulations.” Id. at 39123. The commenters also assert that several published papers or presentations show that CALPUFF over predicts nitrate by a factor of 2 to 4 in the winter.
Response:
For the reasons already stated, EPA's reliance on the CALPUFF modeling results that the State included in the SIP is reasonable. In addition, EPA has acknowledged that the simplified chemistry used in the CALPUFF model creates uncertainty in the accuracy of the model for predicting visibility impacts for pollutants such as NO
X
that are converted from the gas phase to aerosol through complex photochemical reactions. However, it is uncertain whether the simplified chemistry will always overpredict visibility impacts. For example, Anderson
et al.
(2010)
6
found that the CALPUFF model frequently predicted lower nitrate concentrations compared to the Comprehensive Air Quality Model (CAMx) photochemical grid model, which has a much more rigorous treatment of photochemical reactions. EPA recognized the uncertainty in the CALPUFF modeling results, and EPA made the decision in the final BART guidelines that the model should be used to estimate the 98th percentile visibility impairment rather than the highest daily impact value as proposed. 70 FR 39121. We made the decision to consider the less conservative 98th percentile (
i.e.,
the eighth highest 24-hour deciview impact in a year rather than the highest) primarily because the chemistry modules in the CALPUFF model are simplified and might in some cases predict a maximum 24-hour impact that is an “outlier.” Id. If recent updates to CALPUFF cause the model to predict lower visibility impacts, the use of the updated model might also require EPA to reconsider the choice of the less conservative 98th percentile for evaluating visibility impacts. In any event, our reliance on CALPUFF modeling is reasonable for the reasons discussed above.
6
Anderson, B., K. Baker, R. Morris, C. Emery, A. Hawkins, E. Snyder “Proof-of-Concept Evaluation of Use of Photochemical Grid Model Source Apportionment Techniques for Prevention of Significant Deterioration of Air Quality Analysis Requirements” Community Modeling and Analysis System (CMAS) 2010 Annual Conference, October 11-15, 2010, Research Triangle Park, NC.
http://www.cmascenter.org/conference/2010/agenda.cfm.
Comment:
Several commenters suggested that the State has unlimited discretion to consider visibility or cost or other factors in any way it wishes, even in ways that are inaccurate or inconsistent with the purpose of the CAA.
Response:
We disagree. We have already largely addressed the assertions in this comment in our responses to comments on our legal authority. Furthermore, as a hypothetical example, EPA would not defer to a state determination that the remaining useful life of a source is one year if relevant evidence indicates the remaining useful life is 20 years. Limits on state discretion are inherent in the CAA and our regulations; otherwise, states would be free to reach decisions that are arbitrary and capricious or inconsistent with the purpose behind the CAA and EPA's regulations. As we have stated, North Dakota's cumulative modeling approach thwarts the goal stated by Congress in CAA section 169A and underlying the RHR.
Comment:
One commenter claimed that pictorial examples demonstrate that the visibility benefits which EPA claims can be achieved with NO
X
control technologies are not perceptible. The commenter compares archived pictures copied from the National Park Service (NPS) Web site, along with the monitored haze index, for days having varying levels of visibility impairment. For example, the commenter compares two pictures from different days for which the haze index changes by 1.26 deciviews and concludes that “no perceptible difference can be seen * * *”
Response:
We do not expect that a 1.0 deciview change in visibility, which is considered a “small but noticeable change in haziness under most circumstances” (64 FR 35725), could be easily perceived in a small picture on the printed page. Moreover, North Dakota did not provide visibility improvement relative to a pre-control baseline as recommended by the BART guideline (70 FR 39170), so many of the estimates of visibility improvement contained in the SIP are misleadingly low. Regardless, the BART Guidelines establish that predicted visibility improvement below perceptibility thresholds does not provide a basis to automatically eliminate a control option: “Even though the visibility improvement from an individual source may not be perceptible, it should still be considered in setting BART because the contribution to haze may be significant relative to other source contributions in the Class I area. Thus, we disagree that the degree of improvement should be contingent upon perceptibility. Failing to consider less-than-perceptible contributions to visibility impairment would ignore the CAA's intent to have BART requirements apply to sources that contribute to, as well as cause, such impairment.” 70 FR 39129. The
importance of visibility impacts below the thresholds of perceptibility cannot be ignored given that regional haze (as contrasted with reasonably attributable visibility impairment) is a problem that is produced by a multitude of sources and activities which are located across a broad geographic area.
Comment:
Commenter states that it takes a larger change in pollutant emissions to cause a perceptible visibility change when the change is measured against current degraded visibility conditions rather than “natural” visibility conditions. Visibility benefits estimated relative to natural background will “tend to be five to seven times larger” than the benefits estimated relative to current degraded visibility. Therefore, using the natural background conditions overstates the visibility improvement that would be achieved by controls at the time of installation.
Response:
As noted in our responses to other similar comments, it is precisely this effect that leads us to conclude that the only approach consistent with the statutory and regulatory goals when considering visibility improvement associated with potential single-source control options is to use natural background values in the model. The goal is reasonable progress, not stasis.
Comment:
One commenter argues that the natural background specified by EPA significantly exaggerates how clean natural conditions actually are. The commenter provides a report on natural visibility background which argues that EPA's estimate of natural conditions significantly understates the extent of natural particulate emissions, including dust and wildfires, which are uncontrollable.
Response:
EPA recognized that variability in natural sources of visibility impairment cause variability in natural haze levels as described in its “Guidance for Estimating Natural Visibility Conditions Under the Regional Haze Rule.”
7
The preamble to the BART guidelines (70 FR 39124) describes an approach used to measure progress toward natural visibility in Mandatory Class I Areas that includes a URP toward natural conditions for the 20 percent worst days and no degradation of visibility on the 20 percent best days. The use of the 20 percent worst natural conditions days in the calculation of the URP takes into consideration visibility impairment from wild fires, windblown dust and other natural sources of haze. The “Guidance for Estimating Natural Visibility” also discusses the use of the 20 percent best and worst estimates of natural visibility, provides for revisions to these estimates as better data becomes available,
8
and discusses possible approaches for refining natural conditions estimates (pages 3-1 to 3-4).
7
Guidance for Estimating Natural Visibility Conditions Under the Regional Haze Rule, U.S. Environmental Protection Agency, September 2003.
http://www.epa.gov/ttncaaa1/t1/memoranda/rh_envcurhr_gd.pdf,
page 1-1: “Natural visibility conditions represent the long-term degree of visibility that is estimated to exist in a given mandatory Federal Class I area in the absence of human-caused impairment. It is recognized that natural visibility conditions are not constant, but rather they vary with changing natural processes (e.g., windblown dust, fire, volcanic activity, biogenic emissions). Specific natural events can lead to high short-term concentrations of particulate matter and its precursors. However, for the purpose of this guidance and implementation of the regional haze program, natural visibility conditions represents a long-term average condition analogous to the 5-year average best- and worst-day conditions that are tracked under the regional haze program.”
8
Guidance for Estimating Natural Visibility Conditions * * *: “The preamble further stated that `with each subsequent SIP revision, the estimates of natural conditions for each mandatory Federal Class I area may be reviewed and revised as appropriate as the technical basis for estimates of natural conditions improve.' ”
For the evaluation of visibility impacts for BART sources, EPA recommended the use of the natural visibility baseline for the 20% best days for comparison to the “cause or contribute” applicability thresholds. This estimated baseline is reasonably conservative and consistent with the goal of attaining natural visibility conditions. While EPA recognizes that there are natural sources of haze, the use of the 20% worst natural visibility days is inappropriate for the “cause or contribute” applicability thresholds. For example, if BART source visibility impacts were evaluated in comparison to days with very poor natural visibility resulting from nearby wild fires or dust storms, the BART source impacts would be significantly reduced relative to these poor natural visibility conditions and would not be protective of natural visibility on the best 20% days.
The commenter and the cited report on natural visibility by Robert Paine appear to suggest that EPA requires the use of the best 20% visibility days for all aspects of visibility analysis. This does not accurately characterize EPA's recommended use of the 20% worst natural visibility days for URP calculations and the 20% best natural visibility days for the “cause or contribute” applicability thresholds. For example, natural visibility conditions at the Badlands National Park for the best 20%, annual average, and worst 20% natural visibility days are 2.9, 5.0, and 8.1 deciviews, respectively.
9
By contrast, current visibility conditions at the Badlands National Park for the best 20%, annual average, and worst 20% days are 6.9, 11.6 and 17.1 deciviews, respectively. The URP calculation uses the worst 20% natural visibility value of 8.1 deciviews, and this value adequately represents the impacts of natural sources of visibility impairment. Finally, as part of the settlement of a case brought by the Utility Air Regulatory Group challenging the BART Guidelines,
10
EPA agreed to issue guidance clarifying that states may use either the 20% best or the annual average in estimating natural visibility in the evaluation of a BART source's impacts. This guidance makes clear that states have the flexibility to use either approach in estimating natural background conditions. The State was not required to use the annual average and did not. Similarly, in issuing a FIP, we are not required to use the annual average either.
9
Natural Haze Levels II Committee Report.
10
Settlement Agreement in
Utility Air Regulatory Group
v.
EPA,
Case No. 06-1056 in the United States Court of Appeals for the District of Columbia Circuit, April 19, 2006.
The commenter cited modeling studies that purportedly show that the model-predicted natural haze levels are substantially larger than the natural haze levels used by EPA. In fact, the results of those studies compare well with EPA's natural background levels. The modeling study by Tonnesen
et al.
11
predicted annual average natural PM
2.5
concentrations in North Dakota in the range of 1.9 to 2.5 ug/m
3
, while the Koo
et al.
study
12
predicted annual average natural PM
2.5
concentrations in the range of 2.5 to 3.1 ug/m
3
in North Dakota. These model estimates are consistent with EPA's estimated 2.6 ug/m
3
annual average PM
2.5
concentration at Class I Areas in western North Dakota.
11
Tonnesen, G., Omary, M., Wang, Z., Jung, C.J., Morris, R., Mansell, G., Jia, Y., Wang, B., Adelman, Z., 2006. Report for the Western Regional Air Partnership Regional Modeling Center. University of California Riverside, Riverside, California, November.
http://pah.cert.ucr.edu/aqm/308/reports/final/2006/WRAP-RMC_2006_report_FINAL.pdf
.
12
Koo, B.; Chien, C.J.; Tonnesen, G.; Morris, R.; Johnson, J.; Sakulyanontvittaya, T.; Piyachaturawat, P.; Yarwood, G.; Natural emissions for regional modeling of background ozone and particulate matter and impacts on emissions control strategies,
Atmos. Env.,
44:19, 2372-2382.
Comment:
One commenter felt that EPA's decision appears to be driven by its desired outcome—more emission reductions—and not by any legal basis for disapproving the North Dakota SIP.
Response:
Our decision is driven by our interpretations of the CAA and our
regulations. We note that we are approving the vast majority of North Dakota's decisions.
Comment:
One commenter stated that EPA should not ignore two of the three years of CALPUFF modeling results in our review of modeling results presented by North Dakota. The commenter suggested that this is inconsistent with EPA's typical practice of using long-term averages when addressing regional haze as is necessary to prevent undue influence from short-term events or unusual meteorological events.
Response:
In our review of the single-source CALPUFF modeling results presented by North Dakota, we cited the change in the maximum 98th percentile impact over the modeled three year meteorological period (2001-2003). As the 98th percentile value is intended to reflect the 8th high value in any year, it already eliminates 7 days per year from consideration in order to account for short-term events, unusual meteorological conditions, and any over-prediction bias in the model. Therefore, the modeling results which we cited in our proposal are designed to exclude influence from unusual events or meteorological conditions and are sufficient to address the commenter's concerns. We also note that our approach is consistent with the method used by North Dakota in identifying subject-to-BART sources where a source is considered to contribute to impairment if it “exceeds the threshold when the ninety-eighth percentile of the modeling results based on any one year of the three years of meteorological data modeled exceeds five-tenths deciviews.” North Dakota RH SIP, p. 63. We find that this is a reasonable method for the purposes of evaluating visibility improvements associated with potential control options.
Comment:
Commenters stated that EPA should not ignore the 90th percentile impact in our review of the CALPUFF visibility results presented by North Dakota.
Response:
In the BART Guidelines, EPA addressed the appropriate interpretation of CALPUFF modeling results within the context of subject-to-BART modeling. We rejected the use of the 90th percentile because it would be inconsistent with the Act: “The use of the 90th percentile value would effectively allow visibility effects that are predicted to occur at the level of the threshold (or higher) on 36 or 37 days a year. We do not believe that such an approach would be consistent with the language of the statute.” 70 FR 39121. On the same page, EPA explained that the 98th percentile was sufficient to account for any overestimation of visibility benefits by CALPUFF.
While the BART Guidelines do allow states to consider the “frequency, duration, and intensity” of a source's visibility impact when making control determinations, the use of the 90th percentile would over-compensate for any uncertainties in CALPUFF and would underestimate visibility benefits from potential control options and unduly bias the resulting analysis. When the 90th percentile is used to assess predicted visibility improvement from a potential control option, the 37th or 38th highest predicted improvement value from 365 predicted daily values is selected; higher predicted improvement values on 36 or 37 days a year are ignored. This is not rational. In the actual BART determination, a state could so dilute the predicted visibility improvement, one of the very goals of CAA section 169A, as to nullify its initial determination using the 98th percentile that the source is subject to BART. Accordingly, the BART guidelines specifically mention the use of the 98th percentile as an option to compare pre- and post-control modeling runs; use of the 90th percentile is not mentioned. 70 FR 39170. Moreover, the FLMs have affirmed the use of the 98th percentile in their most recent guidance for evaluating visibility impacts at Class I areas. FLAG 2010, p. 23.
13
13
The complete reference is: U.S. Forest Service, National Park Service, and U.S. Fish and Wildlife Service. 2010. Federal land managers' air quality related values work group (FLAG): phase I report—revised (2010). Natural Resource Report NPS/NRPC/NRR—2010/232. National Park Service, Denver, Colorado.
Comment:
One commenter stated that CALPUFF overpredicts visibility impacts associated with nitrates due to incorrect (too high) ammonia background. The commenter stated that monitored background ammonia data from Wyoming shows lower concentrations. The commenter also cites a study by Colorado Department of Public Health and Environment (CDPHE) related to the sensitivity of the CALPUFF model to ammonia background concentrations.
Response:
The monthly ammonia background concentrations used by North Dakota were derived from data collected at the State's only ammonia monitor located near Beulah and range from a low of 0.98 ppb to a high of 2.29 ppb. (BART modeling protocol, Table 3-4). Due to their proximity to the North Dakota sources and Class I areas, the Beulah ammonia background concentrations are clearly more representative than those which the commenter cites for Wyoming that “were on the order of only 0.1 ppb.” We also note that, in its revised modeling, the commenter did not use alternate ammonia background concentrations that would differ from those used by North Dakota.
With regard to the ammonia background sensitivity study conducted by CDPHE,
14
the commenter has not shown that the study is relevant to North Dakota. CDPHE found that visibility impacts are “not very sensitive to the background ammonia concentration across the range from 1.0 ppb to 100.0 ppb.”
Id
at 24. Therefore, we disagree with the commenter's assertion that CALPUFF overpredicts visibility impacts associated with nitrates due to incorrect (too high) ammonia background.
14
CALMET/CALPUFF BART Protocol for Class I Federal Area Individual Source Attribution Visibility Impairment Modeling Analysis, Colorado Department of Public Health and Environment, October 24, 2005.
Comment:
One commenter cited a paper by Terhorst and Berkman (2010) regarding the impact of the Mohave Generating Station (MGS), also known as the Mohave Power Project (MPP), on visibility in the Grand Canyon. The MGS was located about 115 km from the Grand Canyon National Park (“GCNP”) and was shut down in 2005. Based on measured values, and after controlling for the prevailing environmental and anthropogenic factors in the region, the authors found virtually no evidence that the MGS closure improved visibility in the GCNP or that the plant's operation degraded it. This was in contrast to air quality transport models, including CALPUFF, that predicted visibility would have improved by 5% or more after closure.
Response:
For the reasons stated in our responses to comments earlier in this section, our reliance on the CALPUFF modeling the State submitted in the SIP is reasonable. In addition, the study by Terhorst and Berkman does not convince us that use of CALPUFF modeling is inappropriate for this action or that the CALPUFF modeling results should be ignored. A model such as CALPUFF essentially holds constant a number of factors in order to isolate the impacts of a single source. As acknowledged by the study's authors, it is extremely difficult in observational analyses to sufficiently control for all factors, including emissions from other sources, to be able to isolate the impacts of closure of a facility, especially one located over 100 km from the Class I area at issue. In fact, the paper notes that coarse soil mass impacts are an omitted variable in the analytical analysis and that changes in those
emissions may have counteracted the visibility improvements expected from the source shutdown.
Comment:
One commenter noted that the BART Guidelines allows states to consider if the time of year is important (e.g., high impacts are occurring during tourist season)”. 70 FR 39130. The commenter provided information that shows that 85% of all visits to Theodore Roosevelt National Park (TRNP) occur during the period from mid-May to mid-October but that nitrate concentrations measured at TRNP and Lostwood Wilderness Area (LWA) during this period are extremely low.
Response:
We agree that our BART guidelines acknowledge that states may consider the timing of impacts in addition to other factors related to visibility impairment. However, states are not required to do so, and to our knowledge, this was not part of North Dakota's analysis. We are not required to substitute a source's desired exercise of discretion for that of the State's. Furthermore, for purposes of our FIP, we stand in the shoes of the State. In that capacity, we are not required to consider the seasonality of impacts, and we have chosen not to. The experience of visitors who come to the Class I areas in North Dakota during periods other than mid-May to mid-October is not discounted.
As a factual matter, the commenter's assertions are misleading. A review of the Interagency Monitoring of Protected Visual Environments (IMPROVE) monitoring data on the WRAP Technical Support System
15
reveals that significant nitrate impacts occur during periods of high visitation at TRNP. For example, the contribution to visibility impairment from nitrates in May and October of 2002 was 26.9% and 37.9%, respectively. There was also relatively high visitation to the Park during these months.
16
15
http://vista.cira.colostate.edu/tss/Results/HazePlanning.aspx.
16
http://www.nature.nps.gov/stats/park.cfm?parkid=467.
Also, the commenter's reference to 40 CFR 51.301's definition of “adverse impact on visibility” is misplaced. This term is defined for purposes of 40 CFR 51.307 only and is not used in 40 CFR 51.308. Section 51.307 applies to new source review only, not to the regional haze program.
Comment:
One commenter states that further controlling NO
X
emissions from North Dakota sources would not advance the goal of improving visibility. The commenter bases this statement on (1) back trajectory analysis that shows that emissions from North Dakota point sources only impact TRNP and LWA a small part of the time, and (2) a modeling study of large North Dakota point sources of NO
X
emissions that followed North Dakota's 2005 EPA-approved protocol and shows that these sources contribute a very small fraction of light extinction attributable to nitrates.
Response:
We disagree that controlling large NO
X
point sources in North Dakota will not advance the goal of improving visibility.
IMPROVE monitoring data shows that nitrates (from all sources) are among the highest contributors to visibility impairment at TRNP and LWA on the worst 20% visibility days. The contribution to visibility impairment from nitrate at TRNP from 2000-2004 ranged between 13.8% and 24.1%, with nitrate contributing more than any other pollutant in 2001 and 2002. Similarly, the contribution to visibility impairment from nitrate at LWA from 2000-2004 ranged between 19.2% and 31.5%, with nitrate contributing more than any other pollutant in 2004.
In order to help states identify the origins of haze-forming pollutants, such as nitrates, the WRAP conducted source apportionment analyses that identify the contribution from source regions and types to specific Class I areas. These source apportionment methods included CAMx Particle Source Apportionment Technology (PSAT) and the Weighted Emissions Potential (WEP). Both of these analysis tools can be found on the WRAP Technical Support System.
17
As described below, these analyses clearly demonstrate that North Dakota point sources are among the largest contributors to nitrates at TRNP and LWA on the 20% worst visibility days.
17
http://vista.cira.colostate.edu/tss/Results/HazePlanning.aspx.
PSAT is a tracer analysis approach that utilizes a mass-tracking algorithm in the CAMx air quality model to explicitly track the chemical transformations, transport, and removal of haze-forming pollutants associated with a particular source region, source type, or combination of the two. The WRAP PSAT results demonstrate that in 2002, North Dakota point sources were the third and fifth largest contributors to nitrate on the worst 20% visibility days at TRNP and LWA, respectively (see charts and tables contained in docket).
The WEP analysis relies on an integration of gridded emissions data, back trajectory residence time data, a one-over-distance factor to approximate deposition, and a normalization of the final results. This method does not produce highly accurate results because, unlike the CAMx air quality model and associated PSAT analysis, it does not account for chemistry and removal processes. Nonetheless, it is more informative than the simpler back trajectory analysis submitted by the commenter because WEP incorporates gridded emissions in addition to back trajectory. The WRAP WEP results show that the grid cells in which the North Dakota BART sources are located have among the highest potential to contribute to nitrate on the worst 20% visibility days at TRNP and LWA (see graphics contained in docket).
Based on the WRAP source apportionment analyses, we find that there is ample evidence to conclude that further controlling NO
X
emissions from North Dakota point sources would advance the goal of improving visibility.
Comment:
One commenter submitted new single-source modeling for the AVS units that are subject to reasonable progress. The new modeling included results based on the current EPA-approved version of CALPUFF and use of annual average natural background conditions.
Response:
In our proposal, we noted that North Dakota provided modeling results showing a “visibility improvement of 0.754 deciviews at Theodore Roosevelt [2002] from the installation of LNB for both units combined.” 76 FR 58632. The commenter's new modeling for the two units combined shows a visibility improvement of 0.39 deciviews at Theodore Roosevelt (98th percentile, 2002). As we have stated elsewhere in response to comments, EPA has not reviewed or approved the specific modeling methodology used by the commenter for AVS; because the newly submitted modeling uses annual average natural background conditions, it is not consistent with North Dakota's protocol for single-source modeling in the BART context. In our consideration of visibility improvement as an additional factor to the statutory and regulatory reasonable progress factors, we are not convinced that we must disregard North Dakota's visibility improvement value of 0.754 deciviews in favor of the commenter's lower estimate. For reasons already explained, we find it reasonable to continue to consider and rely on single-source CALPUFF modeling that has been conducted in accordance with North Dakota's modeling protocol for BART sources.
However, even if we were required to consider the commenter's new modeling results, they would not cause us to change our opinion about our disapproval of the State's determination
that no NO
X
controls are needed at AVS 1 and 2 for purposes of reasonable progress or our determination that LNB must be installed for purposes of reasonable progress. The costs for LNB are very reasonable—$586 and $661 per ton for AVS 1 and 2, respectively. This is well below cost effectiveness values the State found reasonable in making some of its BART determinations. Also, the AVS units are not small EGUs. To the contrary, at 435 MW apiece, they are comparable to some of the larger EGUs in the State, and their NO
X
emissions are considerably greater than emissions from some other EGUs in North Dakota. North Dakota predicted that LNB at AVS would achieve NO
X
reductions of about 3,500 tons per unit per year. These reductions are substantially greater than those that will be achieved at the Stanton Station (maximum reduction of 983 tons per year, based on firing of lignite) and LOS 1 (reduction of 1,246 tons per year reduction), where the State selected SNCR as BART, and significantly greater than the reductions that will be achieved at CCS (reduction of 2,572 tons per year, based on our FIP), the largest EGU in the State. Finally, even the commenter's new modeling predicts combined visibility improvement of 0.39 deciviews for LNB on both units. Even if one were to consider this on a unit-by-unit basis, 0.2 deciviews per unit is significant, and we find that this level of visibility improvement, when considered along with the four statutory factors under reasonable progress, would continue to support our selection of LNB for AVS 1 and 2.
Comment:
One commenter stated that: “EPA has no basis in law for rejecting the cumulative modeling performed by the State for AVS since, as EPA admits, there is no requirement that visibility impacts be addressed under a four-factor analysis for a reasonable progress source. That is, there is no authority that precludes the State from modeling the way it did.” In addition, EPA ignores the fact that reasonable progress is not the same as BART.
Response:
The following language from 40 CFR 51.308(d)(1)(ii) applies because North Dakota established a RPG that provides for a slower rate of progress than would be needed to attain natural conditions by 2064:
[T]he State must demonstrate, based on the factors in paragraph (d)(1)(i)(A) of this section, that the rate of progress for the implementation plan to attain natural conditions by 2064 is not reasonable; and that the progress goal adopted by the State is reasonable.
The factors in paragraph (d)(1)(i)(A) are “the costs of compliance,” “the time necessary for compliance,” “the energy and non-air quality environmental impacts of compliance,” and “the remaining useful life of any potentially affected sources.” “Visibility improvement” is not one of the factors listed. EPA is required to determine “whether the State's goal for visibility improvement provides for reasonable progress towards natural visibility conditions.” 40 CFR 51.308(d)(1)(iii). In doing so, we must “evaluate the demonstrations developed by the State” pursuant to (d)(1)(ii). There is accordingly no explicit requirement for the State to take into account visibility impacts in determining what measures are reasonable. For regional haze, which is caused by emissions from numerous sources located over a wide geographic area, this makes sense. Controls on one specific source may have little measurable impact on visibility, but controls on multiple similar sources would likely have an impact on improving visibility. We note that states are unlikely to reach the national goal without, at some point, focusing on emissions from a range of sources. In these first regional haze SIPs, however, states have focused on those individual sources with the largest potential impacts on visibility.
When a state considers the visibility improvement associated with controlling just one source or a small handful of sources in attempting to demonstrate that its progress goal is reasonable, it is not appropriate for the state to model visibility improvement on a source-by-source basis in a way that is inconsistent with the CAA. As discussed above, given the nature of visibility impairment, a single source's impact on visibility under current, degraded visibility conditions is much less than when compared against a clean background. North Dakota's approach using current degraded background would almost always result in the conclusion that reducing emissions will have little or no impact on visibility.
North Dakota used cumulative modeling, which assumed current degraded background to evaluate and reject single-source control options for reasonable progress for every reasonable progress source in North Dakota. Such an approach to single-source modeling is inconsistent with the CAA. As we explained in the TSD for our proposal, we had previously considered and rejected the use of current degraded background in promulgating the BART Guidelines.
18
The central logic of our interpretation, as expressed in the BART Guidelines, applies with equal force to single-source analysis of potential control options in the reasonable progress context. In the BART Guidelines, we said the following:
18
Memorandum from Gail Tonnesen, Regional Modeler, to North Dakota Regional Haze File, dated September 1, 2011, regarding “Modeling Single Source Visibility Impacts.” This memorandum is included in Appendix B of the TSD for this action.
In establishing the goal of natural conditions, Congress made BART applicable to sources which `may be reasonably anticipated to cause or contribute to any impairment of visibility at any Class I area.' Using existing conditions as the baseline for single source visibility impact determinations would create the following paradox: the dirtier the existing air, the less likely it would be that any control is required. This is true because of the nonlinear nature of visibility impairment. In other words, as a Class I area becomes more polluted, any individual source's contribution to changes in impairment becomes geometrically less. Therefore the more polluted the Class I area would become, the less control would seem to be needed from an individual source. We agree that this kind of calculation would essentially raise the `cause or contribute' applicability threshold to a level that would never allow enough emission control to significantly improve visibility. Such a reading would render the visibility provisions meaningless, as EPA and the States would be prevented from assuring `reasonable progress' and fulfilling the statutorily-defined goals of the visibility program. Conversely, measuring improvement against clean conditions would ensure reasonable progress toward those clean conditions.
70 FR 39124.
In other words, it is our interpretation that North Dakota, if it wished to consider visibility improvement in single-source modeling of potential control options, could only reasonably do so by modeling those controls against natural background conditions. Thus, we reject the commenter's assertion. As we stated in our proposal, the statutory and regulatory goal is reasonable progress toward natural visibility conditions, not to preserve degraded conditions. 76 FR 58629. The State's and commenter's approach resulted in the rejection of very effective and inexpensive controls, and that approach could be used to preclude adoption of controls indefinitely. For the reasons expressed here and in our proposal, that is not reasonable.
Comment:
Two commenters stated that EPA should consider the dollars per deciview ($/deciview) as a measure when making either BART or reasonable progress determinations. Both commenters suggested that EPA relied too heavily on cost effectiveness in evaluating control options. And both commenters claimed that EPA has
endorsed the dollar per deciview approach, citing relevant BART and reasonable progress guidance.
Response:
For BART, the BART Guidelines require that cost effectiveness be calculated in terms of annualized dollars per ton of pollutant removed, or $/ton. 70 FR 739167. The commenters are correct in that the BART Guidelines list the $/deciview ratio as an additional cost effectiveness metric that can be employed along with $/ton for use in a BART evaluation. However, the use of this metric further implies that additional thresholds or notions of acceptability, separate from the $/ton metric, would need to be developed for BART determinations. We have not used this metric for BART purposes because (1) It is unnecessary in judging the cost effectiveness of BART, (2) it complicates the BART analysis, and (3) it is difficult to judge. In particular, the $/deciview metric has not been widely used and is not well-understood as a comparative tool. In our experience, $/deciview values tend to be very large because the metric is based on impacts at one Class I area on one day and does not take into account the number of affected Class I areas or the number of days of improvement that result from controlling emissions. In addition, the use of the $/deciview suggests a level of precision in the CALPUFF model that may not be warranted. As a result, the $/deciview can be misleading. We conclude that it is sufficient to analyze the cost effectiveness of potential BART controls using $/ton, in conjunction with an assessment of the modeled visibility benefits of the BART control. We also note that North Dakota did not rely on the $/deciview metric in its evaluation of BART controls.
Within the context of reasonable progress, the
Guidance for Setting Reasonable Progress Goals Under the Regional Haze Program,
page 5-2, states that “[y]ou should evaluate both average and incremental costs.” This is consistent with the approach under BART. As commenters note, the guidance then states that “simple cost effectiveness estimates based on a dollar-per-ton calculation may not be as meaningful as a dollar-per-deciview calculation, especially if the strategies reduce different groups of pollutants.” However, the guidance makes this statement on the basis that “different pollutants differently impact visibility impairment.” That is, for example, a one ton reduction in SO
2
would have a greater visibility benefit than a one ton reduction of coarse mass. As only SO
2
and NO
X
controls were evaluated for the reasonable progress point sources, and these pollutants have similar impacts on visibility (per the IMPROVE equation),
19
the use of the $/deciview is not particularly relevant or informative. In addition, we did not use the $/deciview metric for our evaluation of RP controls for largely the same reasons as stated above for BART controls. As we noted in our proposal, “it is important to recognize that dollars per deciview values will always be significantly higher, often by several orders of magnitude, than the more commonly used and understood dollars per ton values.” 76 FR 58630. North Dakota's use of current degraded background in its modeling for potential single-source control options had the effect of greatly increasing the disparity between $/deciview and $/ton values because the modeling significantly underestimated the benefits of controls.
19
See Appendix A of our TSD for detailed explanation of the IMPROVE equation.
Comment:
Commenters performed CALPUFF simulations using a revised CALPUFF version 6.4 that includes updates to the chemical and particle transformations and submitted these results to EPA during the comment period.
Response:
We have already explained why we may reasonably rely on the modeling performed in accordance with the State's BART modeling protocol. We have additional reasons for disagreeing that the newer CALPUFF version 6.4 results should be used in this action to determine potential visibility impacts. The newer version of CALPUFF has not received the level of review required for use in regulatory actions subject to EPA approval and consideration in a BART decision making process. Based on our review of the available evidence, we do not consider CALPUF version 6.4 to have been shown to be sufficiently documented, technically valid, and reliable for use in a BART decision making process. In addition, the available evidence would not support approval of these models for current regulatory use. The newer versions of the model introduce additional chemical mechanisms that have not gone through the public review process required for approval by the Agency.
Comment:
North Dakota's proposed RH SIP emission reductions are sufficient to meet the CAA's visibility objectives relative to the 2018 milestone. North Dakota's BART emission reductions properly and effectively reduce statewide haze production by more than the 23.3% fraction of the 60-year RHR timeline (by 2018). EPA improperly asserts that North Dakota cannot meet the 2018 URP. In fact, the infrequency of the winds blowing the major emission source plumes toward the Class I areas and the zero progress toward controlling Canadian and uncontrollable emissions (such as wildfires and windblown dust) are the cause of the inability for North Dakota to meet the 2018 milestone goal, not in-state source emissions. EPA should not penalize North Dakota and reject its RH SIP because North Dakota cannot control impacts from sources beyond its control. In fact, the RHR and the UARG settlement with EPA in 2006 state that, “EPA does not expect States to restrict emissions from domestic sources to offset the impacts of international transport of pollution.”
Response:
Contrary to the commenter's assertion, the Class I areas in North Dakota will not meet the URP in 2018, something North Dakota acknowledges. We are not penalizing North Dakota, and we are not seeking controls in North Dakota to offset impacts from outside the State. We explain elsewhere why we are disapproving North Dakota's NO
X
BART determination for CCS 1 and 2 and its reasonable progress determination concerning AVS 1 and 2. We are acting to ensure that reasonable BART and reasonable progress controls are put in place. North Dakota may not use out-of-state emissions as a basis to ignore controls on in-state sources where such controls are clearly reasonable. We note that we are approving the majority of North Dakota's BART and reasonable progress determinations and that our FIP is modest in scope.
Comment:
One commenter notes that EPA's proposed FIP states that “Appendix W outlines specific criteria for the use of alternate models and it does not appear that those criteria have been satisfied for the use of North Dakota's hybrid modeling.” 76 FR 58624 and 58637. The commenter asserts that “EPA does not, however, identify any criteria North Dakota purportedly did not satisfy.” The commenter then seeks to supply, in retrospect, evidence that the criteria for alternative models, as specified in Appendix W section 3.2, are in fact met.
Response:
As specified in Appendix W, “[d]etermination of acceptability of a model is a Regional Office responsibility.” 70 FR 68232. EPA Region 8 has not determined that North Dakota's hybrid modeling (aka “cumulative modeling using current degraded background”) is acceptable for the purposes of assessing single-source visibility impacts under BART. In June 2007, EPA reviewed the “Modeling Protocol for Regional Haze Reasonable Progress Goals in North Dakota.” Our
review of the protocol at that time was within the context of establishing RPGs, and not within the context of assessing single-source impacts under BART. Instead, and as described above, North Dakota prepared a separate modeling protocol for the purposes of BART. We reiterate that, as the State's single-source BART modeling followed established modeling guidance and was developed in consultation with FLMs and EPA, we find that it provides a reasonable basis for making control technology determinations.
Comment:
Commenter stated that EPA notes in the FIP that “North Dakota is the only WRAP State which opted to develop its own reasonable progress modeling methodology.” Commenter stated that the NDDH modeling approach represents an adjustment, or a refinement (for pollutant transport and dispersion), of the cumulative reasonable progress modeling conducted by WRAP for western states. In particular, the NDDH modeling provides a much better resolution of source to receptor locations. Commenter stated EPA asserts that “[t]he settings North Dakota used in the CALPUFF model within the hybrid modeling system would not be considered technically sound if contained in a regulatory modeling protocol in future projects.” However, NDDH's modifications to the model settings allows North Dakota's specific environment to be considered.
Response:
North Dakota designed its cumulative modeling system specifically to include transported pollutants, in addition to emissions from individual BART sources. North Dakota then used the model results to evaluate BART source visibility impacts relative to the cumulative impact of all other emissions sources. The State's cumulative approach contradicts the model approach recommended by EPA in the BART Guidelines in which BART source impacts are evaluated relative to natural background visibility. As discussed in the response to comments above, EPA specifically considered and rejected cumulative analyses for BART sources in the BART Guidelines. The effect of North Dakota's cumulative modeling approach is to evaluate BART visibility impacts relative to current degraded visibility conditions, and as described in the BART Guidelines and in response to comments above, this would create the paradox that, the worse the current visibility, the less likely it would be that any control would be required. The commenter also describes the State's approach as similar to the cumulative reasonable progress modeling conducted by WRAP for the western states. WRAP's cumulative reasonable progress modeling was designed to evaluate progress in reducing cumulative visibility impacts from all emissions sources for the worst 20% visibility days. WRAP's cumulative modeling did not evaluate the impacts from individual BART sources, and therefore WRAP also performed single source modeling using the CALPUFF model to evaluate single source BART impacts on the best visibility days. Moreover, WRAP followed the BART Guidelines in comparing those BART visibility impacts to natural visibility conditions on the 20% best days. While it could be reasonable to perform modeling for BART sources using CALPUFF with background concentration data from the Community Multi-Scale Air Quality (CMAQ) model, as North Dakota has done, the BART source visibility impacts must still be evaluated relative to natural background visibility. The State's approach of comparing the BART source impacts to cumulative visibility impacts is essentially the same as comparing those results to current degraded visibility conditions, and, therefore, does not follow the guidelines established by EPA and followed by both WRAP and all other states. As noted in other responses, the reasons for our rejection of North Dakota's modeling approach in the BART context also apply to North Dakota's use of that approach to model the visibility benefits of single-source control options in the reasonable progress context.
Comment:
Commenter states that the cumulative approach is exemplified in the refined visibility modeling conducted by WRAP for western states (which EPA has endorsed in Appendix A of the TSD to its FIP proposal).
Response:
Our applicable response to a similar comment is provided elsewhere in this section. Such an approach is suitable for determining the cumulative benefit of an overall control strategy vis-à-vis the URP on the 20% worst days. It is not suitable for evaluating the benefits of potential control options at individual sources.
Comment:
Commenter stated that EPA suggests that using single source modeling based on natural background conditions is appropriate for assessing visibility improvement from BART controls, because the goal of the regional haze program is to ultimately have natural background visibility conditions. NDDH provides a number of technical weaknesses of single source modeling with natural background. For example, North Dakota asserts the single source modeling overstates perceived visibility changes and ignores the impact of all other sources on background visibility.
Response:
We address these assertions in our responses to other comments in this section.
Comment:
One commenter stated that it is appropriate to consider both the degree of visibility improvement in a given Class I area as well as the cumulative effects of improving visibility across all of the Class I areas affected. The commenter contends that not considering the cumulative improvement across multiple Class I areas ignores impacts to all but the most impacted Class I area.
Response:
In its SIP, North Dakota considered the visibility improvement at both TRNP and LWA. Therefore, the modeling analyses presented by North Dakota did not ignore the visibility improvement that would be achieved at areas other than the most impacted Class I area. In our proposal, for convenience, we generally only cited the visibility improvement at Theodore Roosevelt, the most impacted Class I area in the baseline modeling. However, our evaluation of the visibility benefits was made in consideration of all of the single-source modeling results presented in North Dakota's SIP.
Comment:
One commenter stated that they shared our concern that North Dakota did not adequately consider the visibility benefits of the control strategies it evaluated. Specifically, the commenter pointed out that for three EGUs, North Dakota used incorrect techniques to assess (and underestimate) visibility improvements. That is, instead of evaluating a candidate BART strategy by determining the visibility improvement that would result from that particular strategy versus a “standard” baseline (e.g., the proposed SO
2
control options), the only analyses of visibility improvements were of the incremental differences between competing BART options.
Response:
We agree that the visibility improvement of a control technology should be assessed relative to a pre-control baseline. As we have noted elsewhere in our response to comments, this approach is recommended in the BART Guidelines. 70 FR 39170. However, where North Dakota failed to provide this information, we were able to rely on the incremental visibility improvement over lower control options. Our evaluation of the visibility benefits for the three EGUs in question took into account that the lower visibility improvement presented by North Dakota was simply an artifact of the methodology.
Comment:
One commenter stated that North Dakota should have treated TRNP
as single Class I area in their modeling analyses.
Response:
We concur that TRNP should have been treated as a single Class I area in the modeling analyses. However, we have no evidence that doing so would have led to control technology determinations different than those made by North Dakota or EPA.
Comment:
One commenter suggested that EPA could have addressed modeling issues that it identified in its proposal by conducting its own modeling analyses, as it did regarding BART determinations in other EPA regional offices.
Response:
As stated elsewhere in our responses to comments in this section, we find that North Dakota's single-source modeling provides a reasonable basis for making control technology determinations. Therefore, we did not find it necessary to conduct our own modeling analyses.
Comment:
From a visibility impairment standpoint, it appears to be more beneficial to reduce NO
X
than to reduce SO
2
in North Dakota's cool climate. However, by placing more emphasis upon cost per-ton ($/ton) of pollutants removed than on visibility improvement, the advantages of reducing NO
X
versus SO
2
are overlooked if both are measured with the same $/ton yardstick. For this reason, we recommend that the primary emphasis should be placed upon the dollars per deciview of improvement. EPA has stated in its Guidance for Setting Reasonable Progress Goals Under the Regional Haze Program (June 1, 2007), “in assessing additional emissions reduction strategies for source categories or individual, large scale sources, simple cost effectiveness based on a dollar-per-ton calculation may not be as meaningful as a dollar per deciview calculation.” The same logic applies to BART. Nevertheless, the commenter notes that both North Dakota and EPA have based their BART determinations on cost-per-ton of pollutant removed, and the commenter included information to show that the EPA BART proposals are internally consistent and reasonable.
Response:
As noted elsewhere, evidence we have reviewed suggests that the relative benefits are similar. In any eve