The Department of Defense’s (DOD’s) programs to develop new satellites to alert

U.S. military commanders to foreign missile launches, and to support missile defense

objectives, are controversial because of cost growth and schedule slippage. SBIRSHigh, managed by the Air Force, would replace existing Defense Support Program

“early warning” satellites. The Space Tracking and Surveillance System (STSS,

formerly SBIRS-Low), managed by the Missile Defense Agency, would perform missile

tracking and target discrimination for missile defense objectives. The SBIRS-High

program has breached Nunn-McCurdy cost growth limits several times, resulting in

several program restructurings. This is the final edition of this report.

Satellite Early Warning Systems

The United States began developing early warning satellite systems in the 1950s to

alert the National Command Authority to foreign missile launches. The current series is

called the Defense Support Program (DSP). The first DSP satellite was launched in

November 1970; 22 have been launched to date, most recently in February 2004. The

final DSP was delivered to the Air Force in May 2005 for launch later in the year. Each

DSP can operate for up to 10 years.1 Four satellites reportedly are needed for a full

operational capability. Six satellites reportedly were operating in January 2001.2

DSP satellites (built by Northrop Grumman Space Technology, which was formerly

TRW Space and Electronics) use infrared sensors to detect the heat of fuel exhausts

associated with missile launches. Sensors on the satellites also can detect nuclear bursts

associated with the detonation of nuclear weapons. A February 2001 General Accounting

1

Space News, Jan. 7, 2002, p. 14.

2

Space & Missile Defense Report, Jan. 18, 2001, p. 8. More recent data could not be obtained

in the open literature.

Congressional Research Service ˜ The Library of Congress

CRS-2

Office (GAO, now the Government Accountability Office) report3 recounted DOD’s

attempts to build a replacement for DSP over more than two decades. None of the

proposed replacement programs — the Advanced Warning System in the early 1980s, the

Boost Surveillance and Tracking System in the late 1980s, the Follow-On Early Warning

System in the early 1990s, and the Alert, Locate and Report Missiles System in the mid1990s — reached fruition “due to immature technology, high cost, and affordability

issues,” according to GAO. Instead, enhancements were made to the DSP series. For

example, DSP was designed to detect launches of strategic long range missiles (such as

Intercontinental Ballistic Missiles). However, the need to detect short range tactical

missiles, such as Scud, was highlighted during the 1990-1991 Persian Gulf War. In 1995,

DOD added the ALERT (Attack and Launch Early Reporting to Theater) system to DSP

satellites to augment their theater missile warning capabilities.

DSP-type satellites are intrinsically part of any effort to develop a missile defense

system because they provide the first warning that a foreign missile has been launched

(during the missile’s “boost” phase), but DSP also serves other objectives. Since the

1980s, there has been interest in developing a system explicitly to support missile defense

— one that can track missiles as they progress along their flight path (the “mid-course”

phase), detect and track warheads once they are deployed from the missile, and cue

weapon systems to attack the missiles or warheads. A concept for a constellation of many

satellites in low Earth orbit, called Brilliant Eyes, was developed during the 1980s under

the auspices of the Strategic Defense Initiative Office (SDIO). Following a 1994 DOD

study on how best to meet the nation’s early warning needs, Brilliant Eyes was transferred

to the Air Force, which was given responsibility to build an integrated Space-Based

InfraRed System (SBIRS) with satellites in several orbits. Brilliant Eyes was renamed the

Space and Missile Tracking System and became the low Earth orbit component of SBIRS.

Later it was renamed SBIRS-Low. The system to replace DSP was named SBIRS-High,

consisting of satellites in geostationary orbit (GEO, where DSP satellites are placed) and

sensors on other DOD satellites in highly elliptical orbits (HEO).4 In 2001, SBIRS-Low

was shifted back to the Ballistic Missile Defense Organization (BMDO), which was

SDIO’s successor and is now the Missile Defense Agency. That action was taken to stress

that SBIRS-Low’s main purpose is to support ballistic missile defense. The satellite

program has since been renamed again, and is now the Space Tracking and Surveillance

System (STSS).

3

U.S. General Accounting Office. Defense Acquisitions: Space-Based Infrared System-low at

Risk of Missing Initial Deployment Date. GAO-01-6. Washington, U.S. GAO, Feb. 2001. For

more detail on the history of U.S. early warning satellite systems, see Richelson, Jeffrey.

“America’s Space Sentinels.” Lawrence, Kansas, University Press of Kansas, 1999.

4

Geostationary orbit (GEO) exists 35,800 kilometers above the equator. A satellite in GEO

maintains a fixed position relative to a point on Earth. Three or four properly spaced GEO

satellites can view the entire globe, except for the polar regions. HEO orbits can provide

coverage of the polar regions. A classic HEO orbit (called a Molniya orbit after the Soviet

communications satellite system that first utilized it), has an apogee (the highest point of the

orbit) of approximately 40,000 kilometers, and a perigee (the lowest point) of about 500

kilometers, giving the orbit an elliptical shape. With an inclination of about 63 degrees (the angle

at which it intersects the equator), such an orbit allows a satellite to linger or “dwell” over the

northern hemisphere for several hours per orbit, viewing parts of the globe not observable from

GEO. DOD reportedly uses this type of orbit for classified satellites.

CRS-3

SBIRS-High

Purpose, Design, and Cost Estimate. SBIRS-High was designed to perform

four missions: missile warning, missile defense, technical intelligence, and battlespace

characterization (observing and reporting on military activities on a battlefield). The plan

was for the system to consist of four operational GEO satellites (plus a ground spare),

sensors on two classified DOD satellites in HEO, a ground-based Mission Control Station

(MCS), and ground-based relay stations. MCS achieved initial operational capability in

January 2002 using the existing DSP satellites.

In 1996, Aviation Week & Space Technology described the technical capabilities of

SBIRS-High (November 18, 1996, p. 23) that were expected at that time. Reportedly it

would have high speed scanning sensors and staring sensors. After the scanning sensor

detected a launch, it would cue the staring sensor to observe the event and provide more

detailed data. DSP satellites, by contrast, reportedly have only scanning sensors. DSP

takes 40-50 seconds to detect a missile launch and determine its course, while SBIRSHigh was being designed to make those determinations and relay warnings to ground

forces in 10-20 seconds. The extent to which these technical design characteristics are

still planned is unclear from the open literature.

A Lockheed Martin-Northrop Grumman team won a $2.16 billion contract to build

SBIRS-High in 1996. In September 2002, DOD increased the contract to $4.18 billion,

which does not include the cost of three of the five GEO satellites. DOD’s Selected

Acquisition Report for the quarter ending September 2005

[http://www.acq.osd.mil/ara/am/sar/2005-SEP-SST.pdf] shows the original cost estimate

for SBIRS-High as $3.68 billion in FY1995 dollars ($4.15 billion in current year dollars,

i.e., adjusted for inflation), compared with a new estimate of $9.01 billion in FY1995

dollars ($10.64 billion in current year dollars).

Issues. The SBIRS-High program is controversial because of cost growth and

schedule slippage caused by technical challenges that have been encountered in

developing the sensors and satellites. In the FY2002 DOD appropriations act, Congress

denied all procurement funding ($94 million had been requested) because it felt more

research and development (R&D) was required. It added $40 million to the $395 million

requested for R&D. The House Appropriations Committee’s report on the FY2002 DOD

appropriations act (H.Rept. 107-298, p. 140) cited findings by GAO that the program was

facing serious hardware and software design problems including sensor jitter, inadequate

infrared sensitivity, and stray sunlight. (The GAO report is classified). Space News

reported on January 7, 2002 (p. 14) that the program’s cost estimate had grown from $1.9

billion to $4.5 billion, and the first launch slipped from 2002 to 2006. Space News

attributed the cost increase to technical problems, including software development; faulty

cost estimates; budget erosion; and schedule slippage.

In December 2001, DOD made the first of several notifications to Congress that

SBIRS-High breached one of the two “Nunn-McCurdy” cost growth limits: a 15%

Program Acquisition Unit Cost (PAUC) cost increase limit, which requires notification

to Congress; or a 25% limit, where DOD must notify Congress and certify that the

program is essential to national security, that no alternatives will provide equal or greater

military capability at less cost, that new cost estimates are reasonable, and that the

program management structure is adequate. The first breach violated the 25% limit, and

CRS-4

DOD issued the required certification on May 2, 2002. The Air Force restructured the

program. DOD decided to pay for the first two GEO satellites (then scheduled for launch

in FY2006 and FY2007) using research, development, test, and evaluation (RDT&E)

funds. The remaining three satellites would be purchased with procurement funds, with

a two-year gap between the first two and the last three.

A May 2003 report of the Defense Science Board and Air Force Scientific Advisory

Board [http://www.acq.osd.mil/dsb/reports/space.pdf] criticized early program

management of SBIRS-High, and took a cautious attitude concerning whether the

restructured program would succeed. An October 2003 GAO report (GAO-04-48)

concluded the program remained at “substantial risk of cost and schedule increases.” The

program experienced further setbacks. Delivery of the first SBIRS-High sensor, for

launch on one of the HEO satellites, slipped to August 2004 because of electromagnetic

interference between the sensor and other spacecraft equipment. (The second HEO sensor

was delivered in September 2005.) Launch of the first GEO satellite slipped by two years;

that launch is now expected in 2008. DOD notified Congress of additional NunnMcCurdy breaches in June 2004 (of the 15% limit) and March 2005 (15% limit), and in

July 2005 informed Congress than an independent program assessment concluded that the

program exceeded the 25% limit (Inside the Air Force, August 5, 2005). DOD’s Selected

Acquisition Report for the period ending September 2005 indicates that the program

exceeded the 15% Nunn-McCurdy limit during that reporting period. As noted above, the

current cost estimate for the program is $10.64 billion in current year dollars. According

to media accounts (e.g. Aerospace Daily, December 16, 2005, p. 1), DOD sent the

required Nunn-McCurdy certification to Congress on December 12, 2005. While DOD

still plans to buy the first two GEO satellites, it will buy, at most, one more. The funds

that would have been spent for the fourth and fifth GEO satellites reportedly will be used

instead to design an alternative system using state-of-the-art technologies.

FY2006 Budget. DOD requested $756 million. The FY2006 DOD authorization

bill (P.L. 109-163) provides full funding. The FY2006 DOD appropriations act (P.L. 109148) cut $50 million due to excessive program growth (the Senate had approved a $100

million cut). The House Appropriations report calls the program “extremely troubled”

(H.Rept. 109-119, p. 181).

Space Tracking and Surveillance System (formerly SBIRS-Low)

Purpose, Design, and Cost Estimates. The Space Tracking and Surveillance

System (STSS, previously SBIRS-Low) is designed to support missile defense.

Management of the program was transferred from the Air Force back to the Ballistic

Missile Defense Organization (BMDO, the successor to SDIO — see earlier discussion

of Brilliant Eyes), to emphasize that missile defense is its primary objective. BMDO is

now the Missile Defense Agency (MDA). For more on missile defense, see CRS Report

RL31111, Missile Defense: The Current Debate, by (name redacted).

The missile defense system is envisioned as a “layered” defense that can attack

missiles or warheads in three different phases of flight: boost (launch), mid-course

(enroute to a target, when warheads are deployed from the missile), and terminal (after

reentry). The goal of an operational STSS is to track missiles through all three phases;

discriminate between warheads and decoys; transmit data to other systems that will be

used to cue radars and provide intercept handovers; and provide data for intercept hit/kill

CRS-5

assessments. Tracking missiles during the mid-course phase is more difficult than during

boost, because the missile is no longer firing its engines and hence does not have a strong

infrared (heat) signature, making it necessary to track a cold object against the cold

background of space. Similarly, tracking warheads after they have been deployed, and

discriminating between warheads and decoys, is a technically challenging task.

Cost estimates are problematic because there is no final system architecture and the

schedule is in flux. In its February 2001 report, GAO reported that DOD had estimated

the life-cycle cost for STSS (then SBIRS-Low) through FY2022 at $11.8 billion. The

House Appropriations Committee reported in late 2001 (H.Rept. 107-298, p. 250) that the

program’s life cycle cost had grown from $10 billion to over $23 billion. In March 2005,

GAO reported (GAO-05-243) that DOD’s estimate for the program between 2002 and

2011 is approximately $4.5 billion; a life cycle cost was not provided.

Two industry teams were chosen in 1999 for program definition and risk reduction

(PDRR): Spectrum Astro/ Northrop Grumman, and TRW/ Raytheon. DOD was expected

to select one of the teams for the next phase in mid-2002 and the satellites were to have

been launched between 2006 and 2010.5 In the April 2002 restructuring (see below),

DOD merged the teams. Northrop Grumman Space Technology (formerly TRW Space

& Electronics) is the prime contractor, and Spectrum Astro (later acquired by General

Dynamics) is a major subcontractor, for building the satellites.

Issues. This program has gone through several name changes, making it difficult

to track. Congress began expressing concern about it in 1996, when it was known as the

Space and Missile Tracking System, particularly in terms of program management.6

Indications of technical and funding problems publicly emerged in 1999 when DOD

cancelled contracts with TRW and Boeing to build and launch three prototype

demonstration satellites because of significant cost growth.7 In the early 2000s, when its

name was SBIRS-Low, questions arose as to whether it was vital to a missile defense

system. Views vary. Some assert that missile defense cannot be achieved without such

a system, while others argue that there are alternatives, such as ground-based radars.

To some extent, the answer may depend on the nature of the threat the missile

defense system is expected to defeat (e.g., number of incoming warheads, or

sophistication of countermeasures). Radars have been used for early warning of missile

launches for decades, and already are envisioned as part of the missile defense system. To

provide effective coverage, the radars might have to be based not only in the United

States, but in other countries — radars in England and Greenland are part of the early

warning system on which the United States relies today. The question is whether groundbased or sea-based radars can substitute for a space-based system, especially now that the

United States is no longer bound by numerical and geographic limitations imposed on

radars that are part of an anti-ballistic missile (ABM) system by the 1972 ABM treaty.

5

The first launch was scheduled for 2006, but Congress directed DOD to accelerate the schedule

to 2002. The Defense Science Board concluded that 2002 was technically feasible, but 2004

would represent a more efficient approach. (Aerospace Daily, Oct. 3, 1996, p. 18; Space News,

Sept. 16-22, 1996, p. 10.) The date then slipped back to 2006 primarily due to funding issues.

6

Authorizers Blast DOD for SMTS Management. Aerospace Daily, Aug. 8, 1996, p. 207.

7

Ferster, Warren. SBIRS Demonstration Projects Terminated. Space News, Feb. 15, 1999, p. 1.

CRS-6

In its November 2001 report on the FY2002 DOD appropriations bill (H.R. 3338, H.Rept.

107-298, p. 250), the House Appropriations Committee cited an internal DOD study that

indicated ground-based radars are a viable, lower cost, and lower risk, alternative.

Technical challenges continued. In its February 2001 report (cited earlier), GAO

found that five of six critical satellite technologies were too immature to ensure they

would be ready when needed. The House Appropriations Committee, in its November

2001 report (cited above), expressed concern that the program’s life cycle cost had grown

from $10 billion to over $23 billion. Consequently, the committee zeroed funding ($385

million was requested) and instead created a Satellite Sensor Technology program ($250

million) and a Ground Sensor Technology program ($75 million) as an alternative.

Conferees approved the $250 million for Satellite Sensor Technology, but allowed the

Secretary of Defense to spend it either on SBIRS-Low or new technology. It was spent

on SBIRS-Low.

A restructuring plan was submitted to Congress on April 15, 2002. A system

consisting of 20-30 satellites had been envisioned, with the first launch in 2006. The

restructuring plan called for completing two “legacy” demonstration satellites that had

been partially built as part of the 1999 plan, and launching them in 2006 and 2007. New

technologies would be introduced in future satellites, and two new demonstration

satellites would be launched beginning in 2010. In August 2002, DOD awarded Northrop

Grumman Space Technologies an $869 million contract to complete the two legacy

satellites, develop a ground system, and conduct preliminary engineering analysis of the

new demonstration satellites, with options for building eight operational satellites. The

program’s name was changed to Space Tracking and Surveillance System (STSS). MDA

modified the plan in late 2002 after it reduced STSS funding; GAO criticized many of

those changes in a May 2003 report (GAO-03-597).

STSS is proceeding in a series of biennial “blocks.” According to MDA’s FY2006

budget documents, STSS’ Block 2006 is the launch of the two legacy satellites; Block

2008 is an improvement of the ground system; and, in Block 2012, operational satellites

would be integrated into the program. Block 2010, which appeared in FY2005 budget

documents (without descriptive detail), is shown at zero in MDA’s FY2006 documents.

A March 2005 GAO report (GAO-05-243) states that the program content of Block 2010

and beyond is classified (and, thus, funding for Block 2010 could be in the classified

budget). GAO reported that its review of STSS activities in 2004 did not find any

indication that the two legacy satellites would not be able to launch on schedule.

FY2006 Budget. According to DOD’s FY2006 budget documentation, $232

million was requested for STSS in the unclassified budget. No changes were specified

in the DOD authorization bill (P.L. 109-163). In their reports on the FY2006 DOD

appropriations bill (H.R. 2863, H.Rept. 109-119, S.Rept. 109-141), the House and Senate

Appropriations Committees restructured MDA’s budget, moving this program out of the

BMDS Sensors line and creating a new Space Surveillance and Tracking System (SSTS,

instead of STSS) line. The committee reports show the requested funding level as $235.5

million. The final version of the bill (P.L. 109-148) cuts $538,000 from SSTS, the entire

amount requested for Block 12, stating it is a “premature request.” It also adds $5 million

for the airborne infrared surveillance system (AIRS) under this line item.

EveryCRSReport.com

The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the

Library of Congress, charged with providing the United States Congress non-partisan advice on

issues that may come before Congress.

EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The

reports are not classified, and Members of Congress routinely make individual reports available to

the public.

Prior to our republication, we redacted names, phone numbers and email addresses of analysts

who produced the reports. We also added this page to the report. We have not intentionally made

any other changes to any report published on EveryCRSReport.com.

CRS reports, as a work of the United States government, are not subject to copyright protection in

the United States. Any CRS report may be reproduced and distributed in its entirety without

permission from CRS. However, as a CRS report may include copyrighted images or material from a

third party, you may need to obtain permission of the copyright holder if you wish to copy or

otherwise use copyrighted material.

Information in a CRS report should not be relied upon for purposes other than public

understanding of information that has been provided by CRS to members of Congress in

connection with CRS' institutional role.

EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim

copyright on any CRS report we have republished.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.