Energy Efficiency in Congressional Buildings

Congressional research reportJul 3, 2001

Ask Donna

What actually matters in this document.

Text

Order Code RS20935

Updated July 3, 2001

CRS Report for Congress

Received through the CRS Web

Energy Efficiency in Congressional Buildings

nae redacted

Specialist in Energy Policy

Resources, Science, and Industry Division

Summary

This report describes energy efficiency requirements applicable to congressional

buildings and the energy saving activities being undertaken in the Capitol complex. The

Architect of the Capitol (AOC) has the authority and responsibility to provide energy

services and implement energy efficiency measures in congressional buildings. Congress

has used legislative appropriations bills to establish energy efficiency measures under

AOC. In the early 1990s, Congress funded an energy efficient lighting initiative for

congressional buildings. In 1998, Congress set a goal for 2005 to improve energy

efficiency by 20%. A brief comparison with the 30% energy efficiency goal of the

executive branch suggests that the current goal for AOC is lower in absolute percentage,

but calls for a higher rate of improvement. Also, AOC does not currently have access

to the funding and staff resources that the Department of Energy’s Federal Energy

Management Program provides for executive branch agencies.

Authority

By law, the Architect of the Capitol (AOC) operates and maintains the Capitol

complex’s buildings and grounds.1 Specifically:

The Architect is charged with the operation, maintenance, and improvement of the U.S.

Capitol and adjacent buildings and grounds – some 285 acres that include the Capitol

Building, the House and Senate office buildings, the three Library of Congress

buildings, the Supreme Court, the Thurgood Marshall Federal Judiciary Building, the

Capitol power plant, the Capitol Police headquarters, and the Robert A. Taft

Memorial.2

1

The legal responsibilities of the AOC appear in several titles of the United States Code. For more

details, see: CRS Report RS20189. Architect of the Capitol: Appointment, Duties, and Operations,

by (name redacted) and Paul Rundquist.

2

CRS Report RS20189, p. 2.

Congressional Research Service ˜ The Library of Congress

CRS-2

Responsibility for the Capitol power plant is subject to direction by the House Office

Building Commission. The plant provides heating and cooling services to the buildings

listed above as well as to Union Station, Folger Shakespeare Library, Government Printing

Office, and former District of Columbia Main Post Office (now called Postal Square).3

However, many buildings in the Capitol campus receive heating and cooling services from

other sources. For example, the Ford House Office Building receives steam for heating

from the General Services Administration (GSA) and chilled water for cooling from the

Food and Drug Administration.4 Further, the AOC’s maintenance and energy service

responsibilities will be extended to include the $265 million Capitol visitors' center,

scheduled to be completed in 2005.5

AOC funding comes primarily from annual Legislative Branch and Judiciary

Appropriations Acts. In addition to funding through the Appropriations Committees,

statutory authorization for the AOC’s work comes primarily from four congressional

standing committees: House Administration, House Transportation and Infrastructure,

Senate Environment and Public Works, and Senate Rules and Administration.6

Energy Use and Energy Efficiency Measures

In FY2000, AOC’s total energy use was about two trillion British thermal units (Btu)

or, alternatively, about 600 million kilowatt-hours (kwh). This is equivalent to the output

of a 110-MW (million-watt) power plant. Energy input to the Capitol power plant

accounted for about 390 billion Btu, which is about 20% of the total energy use.7 Thus,

most of the energy used in the Capitol complex is obtained from utility companies and

commercial sources.

Energy Management System (P.L. 100-458). In 1988, the Legislative Branch

Appropriations Act for FY1989 (P.L. 100-458) appropriated nearly $1 million for the

AOC to develop a systemwide energy management and control system (EMCS).8 This

system monitors indoor and outdoor air temperatures and provides centralized control of

air conditioning systems throughout the Capitol complex. By reducing mechanicallyproduced cooling energy, the EMCS has saved more than $2.0 million in utility air

3

At one time the Capitol power plant did produce electricity ("power"), but since the mid 1950s

it has only produced steam for heating and domestic hot water and chilled water for cooling

buildings.

4

Personal Communication with Mr. Scott Birkhead, AOC, May 29, 2001.

5

CRS Report 98-920 GOV. The Capitol Visitors’ Center: An Overview, by Stephen Stathis.

6

CRS Report RS20189, p. 6.

7

AOC. Personal communication with Mr. Rick Khan. June 22, 2001. Of the total use, electricity

provided about 51%, natural gas provided 49%, and coal and oil provided less than 1%. The

Capitol power plant only provides steam for heating and chilled water for cooling. It is supplied

almost exclusively by electricity, aided by tiny amounts of natural gas, coal, and oil.

8

AOC. Personal communication with Mr. Rick Khan. The provision was contained in House

Report 100-621, which accompanied H.R. 4587.

CRS-3

conditioning costs since 1990.9 Also, AOC has used several utility incentive programs,

including customer rebates and incentives for new building design and curtailable load.

Energy Efficient Lighting Initiative (P.L. 102-486). Section 168 of the Energy

Policy Act of 1992 (EPACT, P.L. 102-486) directed the AOC to undertake an analysis and

retrofit program for the Capitol and its grounds and the House and Senate office buildings,

including a lighting efficiency program and a report on other potential energy efficiency

measures.10 EPACT specified that the House Committee on Public Works and

Transportation and the Senate Committee on Rules and Administration were to review and

approve the identified measures before AOC implemented them. The law also encouraged

AOC to seek utility incentive programs and directed that cost savings from such incentives

be applied to additional energy and water conservation measures. EPACT authorized such

sums as might be necessary to carry out the program.

The lighting retrofit program was allocated $4.0 million through three public laws:

P.L. 102-90 appropriated $1.0 million for FY1992, P.L. 102-392 appropriated $1.0 million

for FY1993, and P.L. 103-69 appropriated $2.0 million for FY1994. Congressional intent

was clearly to achieve both energy savings and cost savings. The House Report (H. Rept.

103-117) for the Legislative Branch Appropriations Act for FY1994 (P.L. 103-69)

directed the AOC to show how these goals would be achieved:

... the Architect is directed not to obligate these funds until he has forwarded an analysis

and recommendation to the Committees on Appropriations regarding the proposals

received from energy service companies who are experts in this field and which may

enable the savings of the original Federal investment. Also, the Committee believes the

pilot test report does not fully explain how the Architect intends to dispose of those

installations which indicate negative present values (an indication of a non-cost-effective

investment), and how that will affect total estimated project costs. That will need to be

clarified before proceeding. The funds provided, subject to their release, will enable

Phase I (emergency, corridor, 24-hour lighting) retrofits to be made throughout the

Capitol complex, and sufficient funding is available to comply with the first year

requirement of the 4-year proposed plan.11

However, the Conference Report (H. Rept. 103-424) for the Emergency

Supplemental Appropriations Act for FY1994 (P.L. 103-211) reprogrammed $3 million

of the appropriations for the lighting initiative and instead provided authority for AOC to

seek private sector services to conduct the project. The Report says

The conference agreement does not include a rescission of $3,000,000, as included in

the House bill, of funds made available to the Architect of the Capitol for energy

efficient lighting retrofitting in the Capitol complex. The Senate deleted this rescission

and directed the Architect of the Capitol to use these funds for converting and

9

AOC, CECMP, p. 7-9.

10

For each building, the report was to cover heating, ventilation, and air conditioning equipment,

insulation, windows, domestic hot water, food service equipment, and automatic control equipment.

For each of these measures, the report was to include projected installation cost, energy and cost

savings, and payback period.

11

U.S. Congress. House. Legislative Branch Appropriations Bill, 1994. Report to accompany

H.R. 2348. June 8, 1993. p. 19-20.

CRS-4

maintaining property and facilities at Fort Meade for long-term storage needs The

conferees agree with this directive. The energy efficient lighting funds are not needed

because the conference agreement provides authority for the Architect of the Capitol to

use the services of energy services companies to underwrite the cost of the retrofit

program. 12

Another $100,000 of the original $4.0 million in appropriations was also reprogrammed

to other non-energy uses. The remaining $900,000 was used to survey the opportunities

for a lighting retrofit project in congressional buildings. The survey results formed the

basis for issuing a request for proposal. The selected contractor was to be paid from the

energy cost savings over the eight to 10 years following installation.13

The energy service company (ESCO) engaged by AOC completed the lighting project

in 1998. Across the Capitol complex, more than 160,000 energy-saving fixtures with

fluorescent lamps were installed along with motion sensor light switches in public

bathrooms. As a result, electricity use dropped from 329 million kwh in FY1990 to 298

million kwh in FY2000. That represents an annual savings of nearly 31 million kwh, a

10% decrease in use of electricity in a decade.14

Energy Plan and Goal

Comprehensive Energy Conservation and Management Plan (P.L. 105275). Section 310 of the Legislative Branch Appropriations Act for FY1999 directs the

AOC to undertake several energy efficiency measures for buildings in the Capitol

complex.15 AOC completed the Plan in July 2000. It describes AOC’s current and planned

energy efficiency activities. To prepare for the Plan’s execution, AOC is compiling

baseline energy use information starting with 1991.16 As its first step in executing the

Plan, AOC will conduct surveys to identify energy saving opportunities through building

retrofit projects.17 To comprehensively address the opportunities in the Capitol complex,

the surveys must include 16 major buildings, 14 million square feet of floorspace, and a

number of challenges arising from older buildings and historic preservation concerns.18

Another significant challenge is that most organizations in the complex are not under

AOC control. 19

12

U.S. Congress. House. Committee on Appropriations. Making Emergency Supplemental

Appropriations for FY1994 [To accompany H.R. 3759]. Report 103-424. February 11, 1994.

p. 74.

13

AOC. Personal Communication with Mr. Jack Boertlein and Mr. Scott Birkhead, May 29, 2001.

14

AOC This Week. May 21, 2001. p. 1.

15

Also known as the “Gutierrez Amendment.” The provisions of §310 appear in Appendix 1.

16

AOC, CECMP, p. 31. As of July 2000, AOC had compiled electricity data and was in the

process of collecting data for natural gas, water, oil, and coal.

17

AOC, CECMP, p. 1,17, 27.

18

AOC, CECMP, p. 10. Eight of the 16 major buildings are more than 60 years old. Many of

their mechanical and electrical systems have exceeded normal lifetimes.

19

AOC, CECMP, p. 26.

CRS-5

As part of the survey effort, AOC requested that DOE perform an energy audit of the

Capitol complex.20 Also, AOC has a number of individual building projects and studies

underway. This included, as of July 2000, a renovation design underway for the Botanic

Garden; a project funded to upgrade electricity and air conditioning equipment in the

Capitol; a study underway to improve the heating, ventilation, and air conditioning

(HVAC) system in the Cannon House Office Building (HOB); a plan for replacing

mechanical, electrical, and plumbing equipment in the Supreme Court; and a proposal to

study the mechanical system of the Rayburn HOB.21 Further, AOC reports that the EMCS

has become obsolete and that a consultant has been retained to study needs and propose

a plan for a new system.22

AOC also has programs related to vehicle fuel efficiency, substitution, and

conservation. Employees are encouraged to use mass transit and car/van pools, and AOC

actively promotes the acquisition of alternative-fueled and fuel-efficient vehicles. AOC

states that it plans to continue these programs and indicates that it will assist other

legislative branch entities, such as the Capitol police, with developing programs to acquire

such vehicles and to promote use of mass transit and car/van pools.23

AOC indicates that it is presently understaffed for energy responsibilities, causing

“numerous slippages” in energy management activities and “loss” of some energy

efficiency opportunities. To ensure compliance with the law and effective implementation

of the Plan, AOC proposes to create a new Energy Management and Conservation Branch

under its Mechanical Engineering Division. This Branch would require additional staff

resources, including three to seven energy managers, and additional office space.24

Further, AOC intends to use DOE technical assistance and utility incentive programs to

support surveys and projects. After exhausting free assistance from DOE and certain

service contracting opportunities with local utilities, AOC indicates that it would then

seek direct appropriations from Congress to meet the requirements of P.L. 105-275 and

the objectives of the Plan.25 Anticipating that DOE will not be able to perform all building

surveys at no cost to AOC, the Plan says that AOC anticipates the need for appropriations

in FY2002 to hire a consultant to help with the survey requirements of P.L. 105-275.26

Also, in compliance with the law, AOC says it will submit annual reports to Congress that

describe energy use and expenditures for each facility, energy management and

conservation projects, and future priorities

Energy Efficiency Goal for 2005. For buildings of the Capitol complex, a major

provision in P.L. 105-275 required AOC to set a goal to reduce energy use per square foot

relative to 1991 by 20% in 2005. AOC expects that completed, ongoing, and planned

20

AOC, CECMP, p. 17. As of January 2000, DOE had committed to audit the Capitol Building,

but its own resource limits may preclude it from committing to do any others in the complex.

21

AOC, CECMP, p. 10-11.

22

AOC, CECMP, p. 19.

23

AOC, CECMP, p. 25-26.

24

AOC, CECMP, p. 15.

25

AOC, CECMP, p. 28-30.

26

AOC, CECMP, p. 18.

CRS-6

initiatives (many of which were underway before the legislation was enacted) should

enable it to meet that goal.

AOC says a project to replace aging and outdated chillers is the best example of what

its future efficiency efforts will achieve. These devices provide chilled water to cool the

buildings on the Capitol campus. At the Capitol power plant, new equipment in the West

Refrigeration Plant Expansion will replace vintage 1950s chillers in the East Refrigeration

Plant. The new equipment will include high efficiency chillers, steam-driven chillers used

in a combined heat and power (CHP) arrangement, and “free” cooling that employs

outside cold air to chill water.27 If the project keeps to its schedule, AOC estimates a

20% electric energy savings by 2005 and a 35% savings by project completion in 2016.28

AOC says the estimated investment of $5.6 million will avoid other capital costs of $2.5

million and provide annual electricity savings worth $700,000 to $800,000 per year,

yielding a simple payback in about 4.5 years.29

Energy Savings Goal Comparison. Parallel to the AOC goal, Executive Order

13123 directs executive branch agencies to employ energy efficiency measures to achieve

goals for reducing building energy use relative to 1985 levels by 30 percent in 2005 and

by 35 percent in 2010. The Federal Energy Management Program (FEMP) at the

Department of Energy has the primary responsibility for implementing the Order. The

table below compares these goals with that for buildings under the AOC.

Directive

Reference

Year

Progress

Measure

Target Year

Energy

Savings Goal

AOC/Congress

P.L. 105-275,

October 1998

1991

Electricity use

down 10% in

2001

2005

20%

Federal Agencies

E.O. 13123,

June 1999

1985

Energy use down

18.7% in 1998*

2005

2010

30%

35%

* DOE. FEMP. Annual Report for 1998.

The executive branch agencies have been subject to energy efficiency goals for a longer

period of time than the AOC.30 Further, EO13123 contains more detailed requirements

than P.L. 105-275. This includes requirements to employ Energy Star equipment and to

find uses for renewable energy. However, these agencies also enjoy an advantage of

technical assistance and support from extensive staff resources funded at FEMP.31

27

Personal communication with Mr. Scott Birkhead, AOC, May 29, 2001.

28

AOC This Week. May 21, 2001. p. 1.

29

AOC. Comprehensive Energy Conservation and Management Plan. July 2000. p. 12.

30

In 1994, Executive Order 12902 had previously set a goal for reducing energy use relative to

1985 levels by 20 percent in 2000.

31

AOC, CECMP, p. 31.

EveryCRSReport.com

The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the

Library of Congress, charged with providing the United States Congress non-partisan advice on

issues that may come before Congress.

EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The

reports are not classified, and Members of Congress routinely make individual reports available to

the public.

Prior to our republication, we redacted names, phone numbers and email addresses of analysts

who produced the reports. We also added this page to the report. We have not intentionally made

any other changes to any report published on EveryCRSReport.com.

CRS reports, as a work of the United States government, are not subject to copyright protection in

the United States. Any CRS report may be reproduced and distributed in its entirety without

permission from CRS. However, as a CRS report may include copyrighted images or material from a

third party, you may need to obtain permission of the copyright holder if you wish to copy or

otherwise use copyrighted material.

Information in a CRS report should not be relied upon for purposes other than public

understanding of information that has been provided by CRS to members of Congress in

connection with CRS' institutional role.

EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim

copyright on any CRS report we have republished.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.