The General Services Administration and Federal Real Property Management: Overview and Current Legislation

Congressional research reportMar 21, 2008

Ask Donna

What actually matters in this document.

Text

Order Code RL32368

The General Services Administration

and Federal Real Property Management:

Overview and Current Legislation

Updated March 21, 2008

Stephanie Smith

Analyst in American National Government

Government and Finance Division

The General Services Administration and

Federal Real Property Management:

Overview and Current Legislation

Summary

The General Services Administration (GSA), through its Public Buildings

Service (PBS), is the primary federal real property and asset management agency,

with a portfolio consisting of 8,847 buildings and structures with an estimated

replacement value of $68.8 billion in FY2006. GSA is also responsible for

identifying and completing needed repairs to the federal buildings it manages. The

Federal Buildings Fund (FBF), established by Congress in 1972, is the primary

means by which GSA finances the operating and capital costs associated with its

federal building inventory. Created as a revolving fund, the FBF receives revenue

deposits from rent payments charged to federal agencies occupying GSA’s office

space. While revenue to the FBF is the principal source of funding, Congress

annually authorizes how GSA may allocate its FBF assets as new obligational

authority in appropriations funding. In addition, Congress may appropriate more

money for the fund. Generally, FBF revenues are first used for GSA’s building

operating expenses. Congress then allocates FBF funds for construction of new

buildings, as well as for repairs to existing buildings.

On February 4, 2004, President George W. Bush implemented new asset

management guidelines for executive branch agencies with Executive Order 13327.

Section 4 established a Federal Real Property Council (FRPC) within the Office of

Management and Budget to provide oversight for the executive branch’s real property

inventory. With the issuance of E.O. 13327, GSA’s Office of Governmentwide

Policy was formally recognized as the administrator of the executive branch’s

centralized real property database, known as the Federal Real Property Profile

(FRPP).

A major concern for GSA is maintaining its inventory of aging federal

properties, since the FBF has not historically produced sufficient rent revenues to

finance all repair and alteration needs. Investigations by the Government

Accountability Office (GAO) have revealed that GSA and other landholding agencies

could give greater attention and funding to maintaining a streamlined federal

inventory by identifying and disposing of unneeded buildings and structures.

Introduced in the Senate on June 20, 2007, S. 1667 would authorize the

establishment of a five-year pilot program to allow for the expedited disposal of

surplus or underutilized federal real properties. The same day, the legislation was

referred to the Senate Committee on Homeland Security and Governmental Affairs.

On November 14, 2007, the committee approved, by voice vote, an amendment that

would include a provision to allow for no-cost conveyance of surplus federal property

to homeless assistance groups. S. 1667, as amended, was ordered to be reported

favorably by the committee on November 14, 2007.

Contents

Introduction and Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Current Conditions of Federal Building Inventory . . . . . . . . . . . . . . . . . . . . 2

Aging Federal Properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

More Reliable Real Property Data Needed . . . . . . . . . . . . . . . . . . . . . . 5

Funding Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Reliance on Leased Properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Past Congressional Reform Initiatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Bush Administration Activity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Federal Real Property Council . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Proposed Legislation in the 109th Congress . . . . . . . . . . . . . . . . . . . . . . . . . 12

Congressional Initiatives in the 110th Congress . . . . . . . . . . . . . . . . . . . . . . 12

Policy Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

List of Tables

Table 1. FY2006 Federal Agency Profile:Real Property Assets and

Replacement Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Table 2. Agency Rental Cost for Leased Real Property Within the United States,

September 2004 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

The General Services Administration and

Federal Real Property Management:

Overview and Current Legislation

Introduction and Background

Prior to enactment of the Public Buildings Act in 1926, construction authority

for each federal building was approved and funded in separate legislation.1 This

1926 act provided the basic authority for construction of federal buildings by the

congressional authorizations and appropriations process. Congress later enacted the

Public Buildings Act of 1949 to authorize the acquisition of sites and design plans

for federal buildings located outside of Washington, DC, and for improvements to

existing federal buildings.2 The same year, Congress enacted the Federal Property

and Administrative Services Act of 1949.3 This act established the General Services

Administration (GSA) and gave the GSA Administrator responsibility for

administering federal real property. In 1954, Congress amended the Public Buildings

Act of 1949 to authorize the GSA Administrator to acquire titles to real property and

to construct federal buildings through lease-purchase contracts.4 Under this

procedure, a building was financed by private capital, and the federal government

made installment payments on the purchase price in lieu of rent payments. Title to

the property vested in the federal government at the end of the contract period,

generally of at least 10, and not more than 30, years.

When authority for lease-purchase contracts expired in 1957, Congress

approved a successor statute, the Public Buildings Act of 1959.5 The 1959 act reestablished earlier requirements to provide for direct federal construction of public

buildings through the congressional appropriations and authorizations process. This

act, as amended and recodified over the years, remains the basic statute authorizing

the construction and renovation of federal civilian facilities. The act vests the

Administrator of General Services with sole authority to acquire, construct, alter,

repair, remodel, improve, or extend most federal buildings, and to acquire the sites

or additions to sites for such buildings.

1

44 Stat. 630.

2

63 Stat. 176.

3

63 Stat. 377; 41 U.S.C. §251 et seq. Since 1949, the enabling law’s original provisions

have been frequently and substantially amended.

4

68 Stat. 518.

5

73 Stat. 478; 40 U.S.C. §3301 et seq.

CRS-2

The legislation also requires GSA to submit to the congressional authorizing

committees a detailed prospectus of each proposed building project costing more

than $2.59 million (in FY2008) prior to the appropriation of funds, and requires GSA

to submit an annual report to Congress on all projects and to conduct an ongoing

survey of federal building needs.

The Public Buildings Act Amendments of 1972 established the Federal

Buildings Fund (FBF) within GSA to be used for acquisition and maintenance of real

property.6 Beginning in 1975, the FBF replaced direct appropriations to GSA as the

primary means of financing the operating and capital costs associated with federal

buildings. Created as a revolving fund, the FBF receives revenue from rent payments

charged to federal agencies occupying GSA’s office space. While these deposits to

the FBF are the principal source of funding, Congress annually authorizes how GSA

may allocate its FBF assets as new obligational authority in appropriations funding.

In addition, Congress may appropriate additional money into the fund. Generally,

FBF revenues are first used for GSA’s building operating expenses. Congress then

allocates FBF funds for construction of new buildings, as well as for repairs to

existing buildings.7

The FY2008 Consolidated Appropriations Act, signed into law on December

26, 2007, authorizes that an additional amount of $84 million be deposited in the

Federal Buildings Fund.8 The President’s FY2009 budget requests that $525 million

be deposited in the FBF.9

Current Conditions of Federal Building Inventory

GSA, through its Public Buildings Service (PBS), is the primary federal real

property and asset management agency. In FY2006, GSA’s portfolio consisted of

8,847 real property assets with an estimated replacement value of $68.8 billion.10

In addition to GSA, 27 other federal agencies have independent landholding

authorities that enable them to acquire or construct specific types of buildings or

facilities (see Table 1). Numerous studies by the Government Accountability Office

(GAO) reveal that a large portion of the federal government’s real property inventory

is urgently in need of significant and costly repairs.11 In many instances, federal

6

86 Stat. 216.

7

U.S. General Accounting Office, Federal Buildings: Funding Repairs and Alterations Has

Been a Challenge — Expanded Financing Tools Needed, GAO-01-452, April 2001, pp. 6-7.

8

P.L. 110-161, December 26, 2007.

9

U.S. Office of Management and Budget, Budget of the United States Government, Fiscal

Year 2009 – Appendix (Washington: GPO, 2008), p. 1065.

10

U.S. General Services Administration, The Federal Real Property Council, FY2006

Federal Real Property Report: An Overview of the U.S. Federal Government’s Real

Property Assets, July 2007, p. 6.

11

In 2004, GAO changed its name from the General Accounting Office to the Government

(continued...)

CRS-3

facilities are vacant or no longer needed because of agencies’ changing missions.

Problems persist in administering the real property portfolio because of a lack of

reliable data, funding limitations, and GSA’s continued reliance on leasing for office

space.

Table 1. FY2006 Federal Agency Profile:

Real Property Assets and Replacement Value

Agency Name

Agriculture

Air Force

American Battle Monuments

Commission

Army

Commerce

Corps of Engineers

Defense/WHS

Energy

Environmental Protection

Agency

General Services

Administration

Health and Human Services

Homeland Security

Independent Government

Offices

Interior

Justice

Labor

National Aeronautics and Space

Administration

National Archives and Records

Administration

National Science Foundation

Navy

Office of Personnel

Management

Peace Corps

State

State (USAID)

Tennessee Valley Authority

Transportation

11

Real Propertya Assets

% of

Number

Total

59,879

4.776%

171,352

13.666%

Replacement Valueb

% of

Amount

Total

$46,834,160,262

3.065%

$235,808,469,245

15.432%

183

0.015%

4,423,800,000

0.290%

264,961

1,340

146,838

203

18,620

21.132%

0.107%

11.711%

0.016%

1.485%

$262,865,575,017

$2,315,006,096

216,877,416,823

2,787,946,939

$85,697,308,479

17.203%

0.152%

14.193%

0.182%

5.608%

270

0.022%

$741,922,448

0.049%

8,847

0.706%

$68,818,536,686

4.504%

3,357

27,079

0.268%

2.160%

$9,867,744,843

$9,935,179,474

0.646%

0.650%

431

0.034%

$106,028,671

0.007%

184,347

4,363

2639

14.703%

0.348%

0.210%

$185,218,464,155

$15,150,700,400

$4,537,534,555

12.121%

0.992%

0.297%

4942

0.394%

$20,609,244,894

1.349%

41

0.003%

$1,747,256,609

0.114%

612

143,897

0.049%

11.477%

$1,099,880,301

$228,819,202,172

0.072%

14.975%

3

0.000%

$0c

0.000%

417

16,843

1,371

422

69,411

0.033%

1.343%

0.109%

0.034%

5.536%

$8,868,943

$11,543,484,787

$672,727,412

$0d

$6,309,796,350

0.001%

0.755%

0.044%

0.000%

0.413%

(...continued)

Accountability Office. 118 Stat. 811.

CRS-4

Agency Name

Treasury

United States Postal Service

Veterans Affairs

Total

Real Propertya Assets

% of

Number

Total

110

0.009%

111,960

8.930%

9,083

0.724%

1,253,821

100.000%

Replacement Valueb

% of

Amount

Total

$1,056,055,014

0.069%

$20,262,644,625

1.326%

$83,930,650,740

5.493%

$1,528,045,505,940

100.000%

Source: U.S. General Services Administration, The Federal Real Property Council’s FY2006 Federal Real Property

Report: An Overview of the U.S. Federal Government’s Real Property Assets, July 2007, p. 6.

a. Real property assets are federal buildings and structures primarily used for office space, post offices, warehouses,

laboratories, hospitals, vehicle maintenance and repair facilities, industrial and utility plants, and housing facilities.

b. Replacement value is defined as the cost to replace the existing asset in current dollars.

c. The Office of Personnel Management reported $0 replacement value in FY2006.

d. The Tennessee Valley Authority did not report replacement value in FY2006.

Aging Federal Properties. GSA is responsible for identifying and

completing needed repairs to the federal buildings it manages. Maintaining these

facilities is a challenging task, since many of GSA’s largest buildings were

constructed more than 50 years ago, and are often designated as being historically

significant. In 1999, GSA estimated that nearly $4 billion was needed to complete

repairs and alterations to 903 buildings, or approximately 54% of its total inventory.

Of this total, 44 buildings were described as large office buildings or courthouses,

with an average age of 49 years and with estimated repair costs of more than $20

million for each facility.12

GAO investigations reveal that a significant inventory of repairs and alterations

are necessary to renovate federal buildings that have deteriorated, become

functionally obsolete, or have health- and safety-related problems.13 Available data

indicate that, in addition to GSA, other major real property-holding agencies also

have a large inventory of facilities that are deteriorating, underutilized, or vacant. In

January 2003, GAO issued a report on federal property as part of its high-risk series,

which identifies areas vulnerable to mismanagement, waste, or fraud, and concluded

that “a major commitment is necessary to either modernize these facilities or to

dispose of them.”14 Inspections of several deteriorating federal buildings revealed

inadequate and malfunctioning air ventilation and fire safety systems; unsafe water

supplies; and continued structural deteriorations caused by long-standing plumbing

leaks. Other factors impeding adequate workplace conditions included outdated

cooling and heating systems, resulting in significantly higher operating costs, and

12

U.S. General Accounting Office, Federal Buildings: Billions Are Needed for Repairs and

Alterations, GAO/GGD-00-98, March 2000, pp. 3-4.

13

U.S. General Accounting Office, Federal Real Property: Executive and Legislative

Actions Needed to Address Long-standing and Complex Problems, GAO-03-839T, June

2003, pp. 6-7.

14

U.S. General Accounting Office, High-risk Series: Federal Real Property, GAO-03-122,

January 2003, p. 15.

CRS-5

obsolete electrical systems unable to accommodate new information technology.15

Aging and deteriorating office space can also adversely impact federal employee

recruitment, retention, and productivity.

More Reliable Real Property Data Needed. The deteriorating physical

condition of many federal buildings and the corresponding underutilization and

vacancy of many government facilities has serious implications for GSA’s real

property portfolio. Investigations by GAO have revealed that many properties in the

federal inventory are not financially self-sustaining and are no longer relevant to their

agencies’ changing missions.16 By identifying and disposing of unneeded properties,

GSA and other landholding agencies could give greater attention and funding to the

repair of a streamlined federal inventory. Due to the vast size and diversity of its real

property portfolio, GSA is often not able to fully identify and assess each of its

properties to determine those that need repairs, and those for which there is no longer

any substantial federal purpose. In May 1991, GAO first reported that GSA had not

fully implemented a systematic approach for managing its inventory because of a

lack of reliable real property data, causing even more delays in needed building

repairs.17

GSA annually reported summary data on real property owned and leased by the

federal government worldwide, based on inventory reports submitted by the

individual agencies. These inventory reports were not, however, required under law,

and there was no statutory requirement for landholding agencies to submit accurate

or timely data. In July 2000, GAO reported to Congress that a comprehensive and

reliable inventory of federal real property holdings was the first step in identifying

and subsequently managing the government’s large portfolio of federal assets. GAO

investigations also revealed that GSA and the other landholding agencies had poor

or inadequate data assessing the current market value of their properties.18 However,

GAO acknowledged that agency compliance with proposed statutory requirements

for a comprehensive property inventory would be a “challenging task,” based on its

research that the federal government lacked the necessary standards to ensure

complete and reliable information on its property assets.19

Lacking a reliable and comprehensive listing of federal properties, GSA and the

other landholding agencies continued to have limited success in the identification,

maintenance, or disposal of their federal inventories. In response to its earlier

criticisms, GAO reported in June 2003 that GSA had begun to conduct more

systematic reviews of individual facilities, giving funding priority to projects that

might return more rent revenues to the FBF, and disposing of properties for which

15

Ibid, p. 22.

16

Ibid, p. 2.

17

U.S. General Accounting Office, Federal Buildings: Actions Needed to Prevent Further

Deterioration and Obsolescence, GAO/GGD-01-57, May 1991, pp. 3-5.

18

U.S. General Accounting Office, Federal Real Property: Views on Management Reform

Proposals, GAO/T-GGD-00-175, July 2000, p. 5.

19

Ibid.

CRS-6

there is no long-term federal purpose.20 According to GSA officials, GSA intended

to complete implementation of its portfolio restructuring project in 2007, reflecting

a streamlined inventory of self-sustaining and mission-relevant properties.21

Funding Limitations. Even with GSA’s improved accounting of real

property data, funding limitations will likely continue to be the greatest obstacle to

completing urgent repairs and renovations to aging federal facilities. In 1991, GAO

reported that both GSA and the Office of Management and Budget (OMB) estimated

that nearly $4 billion would be required to be deposited into the FBF to complete

needed repairs to federal facilities.22 Ten years later, GAO estimated that $5.7 billion

was required to fund needed building repairs to the nearly 1,700 federal buildings that

GSA manages.23

A major concern for GSA is that the FBF has not historically produced

sufficient rent revenues to finance capital improvements. Generally, FBF revenues

are first used for GSA’s building operating expenses. Congress then allocates FBF

funds for construction of new buildings, as well as for repairs to existing buildings.

Between FY1995 and FY2001, GAO estimated that the FBF received about $5.3

billion each year in incoming rent revenues. Of this total, nearly 90% of the available

funds was used for GSA’s operating costs, rental payments for leased space, and

construction of new buildings, with, on average, only $606 million remaining each

year for completing repairs and renovations.24 Although Congress has annually

increased authorized funding for repairs and alterations within the FBF, these funds

are not expected to be adequate to maintain GSA’s current building inventory.

Funding data compiled by GSA in FY2001 indicate that, in seven previous fiscal

years, Congress had authorized $4.2 billion, or 63%, of the $6.8 billion in new

obligational authority that GSA had requested for building repairs and alterations.25

The federal government’s real property inventory is not static; that is, even as

certain repairs are completed, new problems are identified. In addition, the amount

of funding needed for repairs is greater each year due to cost increases in maintaining

an expanded inventory of properties. As a solution, GAO has stated that GSA must

find a way to generate the additional revenue necessary to upgrade its federal

20

GAO, Federal Real Property: Executive and Legislative Actions Needed to Address Longstanding and Complex Problems, p. 7.

21

U.S. General Accounting Office, Federal Real Property: Vacant and Underutilized

Properties at GSA, VA, and USPS, GAO-03-747, August 2003, p. 11.

22

GAO, Federal Buildings: Actions Needed to Prevent Further Deterioration and

Obsolescence, pp. 3-4.

23

U.S. General Accounting Office, Financial Condition of Federal Buildings Owned by the

General Services Administration, GA0-02-854R, August 2002, p. 1.

24

U.S. General Accounting Office, Federal Buildings: Funding Repairs and Alterations Has

Been a Challenge — Expanded Financing Tools Needed, GAO-01-452, April 2001, p. 15.

25

Ibid, p. 14.

CRS-7

inventory.26 In order to increase the amount of funding available to adequately

maintain these federal properties, GSA officials have also expressed support for

legislative reforms that would authorize the agency to enter into contracts with the

private sector to renovate and rehabilitate federal buildings.

Reliance on Leased Properties. Another factor that adversely affects FBF

revenues and limits monies available for needed property maintenance is GSA’s

reliance on leased office space. Generally, the federal construction or purchase of

buildings provides the most cost effective approach to meet space requirements over

a long period of time.27 In the past decade, however, GSA has primarily relied on

lease agreements to acquire office space because of insufficient funding available to

construct new buildings or repair old ones.28

Over the past decade, GAO has documented GSA’s increasing use of operating

leases to secure needed office space. In 1995, GAO reported that GSA had entered

into 55 long-term lease agreements that would ultimately cost the federal government

$700 million more in extended rent payments than would have total construction

costs for the same space. A 1999 investigation by GAO auditors of nine major lease

agreements proposed by GSA revealed that construction would have been the most

economical option in eight instances, resulting in an estimated $126 million in

savings to the federal government. While this GAO investigation focused on GSA’s

leasing practices, GAO had previously found that the other landholding agencies with

leasing authorities also relied heavily on operating leases. 29

As of September 2004, GSA spent $4.4 billion to lease 162.9 million square

feet of building space, about 70% of the government’s total rental costs (see Table

2, below).30 The same year, it was reported that GSA had leased more than 100,000

square feet of office space in Arlington, VA, as well as leasing partial space in two

other office buildings, totaling 143,000 square feet.31

The annual congressional appropriations and authorizations process favors

operating leases over construction or purchasing agreements, since they appear less

costly in any given year. While operating leases are more expensive over a 10-year

26

Ibid, p. 14.

27

According to GAO findings, lease-purchase contracts, where payments are extended over

a 10- to 30-year period and ownership is eventually transferred to the government, are

generally more expensive than construction contracts, but less expensive than lease

agreements. See U.S. General Accounting Office, High-Risk Series: Federal Real Property,

p. 30.

28

GAO, Federal Real Property: Executive and Legislative Actions Needed to Address Longstanding and Complex Problems, p. 8.

29

GAO, High-Risk Series: Federal Real Property, p. 30.

30

U.S. General Services Administration, Office of Governmentwide Policy, Overview of the

United States Government’s Owned and Leased Real Property: Federal Real Property

Profile, as of September 30, 2004, p. 6.

31

Dana Hedgpeth, “Job Gains Drive Lease Market in Suburbs,” Washington Post, April 12,

2004, p. E1.

CRS-8

period, these total costs are not reflected in a single year’s appropriations request. In

contrast, total costs necessary for proposed construction and lease-purchase contracts

must be included in the first year’s budget authority. According to studies by GAO,

the current budget process enables more expensive leasing transactions to appear to

be more economical in the short term, thus encouraging an “over-reliance” on them

for meeting the government’s space requirements.32

Table 2. Agency Rental Cost for Leased Real Property

Within the United States, September 2004

Agency

General Services

Administration

United States Postal Service

Agriculture

Army

Veterans Affairs

Transportation

Health and Human Services

Navy

Homeland Security

Treasury

Interior

Corps of Engineers

Remaining Agencies (16)a

Total

Leased

Building Area

(Square Feet)

Annual Rental Cost

Total Dollars

% of Total

Per Square Foot

162,935,354

$4,367,795,701

70.69%

$26.81

101,376,121

11,950,446

10,247,040

6,466,005

7,139,919

3,520,966

6,550,700

3,511,862

1,364,601

2,792,558

3,166,178

22,724,993

343,746,743

$793,437,960

$193,804,441

$152,745,599

$109,883,052

$90,304,258

$86,947,570

$73,304,293

$51,861,657

$45,390,806

$37,869,139

$36,324,163

$138,848,579

$6,178,517,218

12.84%

3.14%

2.47%

1.78%

1.46%

1.41%

1.19%

0.84%

0.73%

0.61%

0.59%

2.25%

100.00%

$7.83

$16.22

$14.91

$16.99

$12.65

$24.69

$11.19

$14.77

$33.26

$13.56

$11.47

$6.11

$17.97

Source: Federal Real Property Profile as of September 30, 2004 (website visited Jan. 16, 2007),

[http://www.gsa.gov/gsa/cm_attachments/GSA_DOCUMENT/Annual%20Report%20%20FY2004%20Final_R2M-n

11_0Z5RDZ-i34K-pR.doc], p. 8. Please note that GSA no longer publishes data for annual rental costs for leased

properties, as of September 30, 2004.

a. Interior, Commerce, Justice, Energy, Smithsonian, Independent Government Offices (Commodity Futures

Commission and Broadcasting Board of Governors), Environmental Protection Agency, Labor, National

Aeronautics and Space Administration, Air Force, Government Printing Office, Federal Communications

Commission, National Science Foundation, American Battle Monuments Commission, Peace Corps, National

Archives and Records Administration.

Past Congressional Reform Initiatives

Two major legislative initiatives were introduced in the 106th Congress to revise

federal property management policies. S. 2805, sponsored by Senator Fred

Thompson, would have required the GSA Administrator and landholding federal

agencies to establish and maintain asset management principles for real and personal

property; establish a worldwide inventory of all real property holdings; and establish

32

GAO, High-Risk Series: Federal Real Property: Federal Real Property, p. 31.

CRS-9

financial incentives for federal agencies to improve their property management

practices. H.R. 3285, sponsored by Representative Pete Sessions, would have

authorized the GSA Administrator to enter into partnerships with non-federal sources

to lease federal property. Neither bill was reported out of committee before the

adjournment of the 106th Congress.

In the 107th Congress, S. 1612, introduced by Senator Fred Thompson on

November 1, 2001, was based in large part on President George W. Bush’s “Freedom

to Manage” administrative initiative. Title III of the proposed legislation, entitled

“Federal Property Asset Management Reforms,” incorporated the major provisions

of both S. 2805 and H.R. 3285, which were introduced in the 106th Congress. S. 1612

was not reported out of committee before adjournment of the 107th Congress.

Two similar bills were introduced in the 108th Congress to revise federal

property management policies, H.R. 2548 and H.R. 2573. The first, H.R. 2548, the

Federal Property Asset Management Reform Act, was more comprehensive in its

attempt to allow landholding agencies greater flexibility to manage directly their own

federal properties. Its provisions were similar to those of S. 1612, introduced in the

107th Congress. The proposed legislation would have modified existing federal

property statutes to authorize landholding agencies to enter into the following

transactions: interagency transfers or exchanges of property; subleases of unexpired

portions of existing leases; property exchanges or sales with non-federal sources; or

outleases33 of underutilized real property that must remain in federal ownership. GSA

would have been authorized to review and approve of any such transaction to ensure

compliance with federal property management requirements. If enacted, H.R. 2548

would have authorized federal landholding agencies to retain the proceeds from their

real property transactions. New statutory requirements would have been provided for

the crediting of monetary proceeds to existing agency accounts, which would then be

used to fund that agency’s capital asset expenditures. In order to better administer

these real property assets, H.R. 2548 would have established the position of Senior

Real Property Officer within each federal landholding agency. H.R. 2548 was

ordered to be reported, as amended,34 by voice vote on July 17, 2003. No further

action occurred during the 108th Congress.

The second bill, H.R. 2573, the Public Private Partnership Act, focused on

public-private partnerships as a method to increase funding for the FBF and would

have authorized GSA to administer these transactions. The proposed legislation

would have authorize GSA to enter into agreements with non-federal entities for the

acquisition, lease, construction, maintenance, or renovation of real property under

the jurisdiction of GSA, or other landholding agencies. If enacted, H.R. 2573 would

33

The term outlease refers to an agreement granting the use of property which temporarily

is not required for public use, for a specified period of time, revocable at will or as otherwise

provided in the agreement, for an adequate, specified consideration.

34

The House Government Reform Committee added an en bloc amendment that would

allow landholding agencies to withhold property records for reasons of national security, as

authorized by law. The amendment would also require, in certain instances, that cultural

resource surveys or comprehensive preservation plans be completed before a federal

property is sold, transferred, or leased. There is no written committee report.

CRS-10

have amended current law to authorize GSA to convey interests in real property to

non-federal sources, and would exempt such agreements from existing congressional

approval requirements, and waive other specified legal requirements as necessary.

GSA would have also been authorized to enter into real property transactions under

the jurisdiction of non-landholding agencies only upon the request of agency heads.

GSA would have been required to transmit a report to Congress on all proposed

property transactions as a prerequisite to entering into such agreements. Proceeds

from all real property transactions would be deposited into the FBF. The proposed

legislation would have authorized GSA to enter into real property agreements for a

six-year period from the date of enactment. H.R. 2573 was reported favorably from

the House Government Reform Committee to the full House by voice vote on June

25, 2003.35 No further action was taken on H.R. 2573.

Although no final action was taken on either H.R. 2548 or H.R. 2573, the 108th

Congress revised GSA’s property management policies with the passage of the

FY2005 Consolidated Appropriations Act on December 8, 2004.36 Section 412

authorizes the GSA Administrator to convey real property by sale, lease, exchange,

or leaseback agreements, with net proceeds deposited into GSA’s Federal Buildings

Fund for future real property capital acquisitions and improvements.

Bush Administration Activity

On February 4, 2004, President George W. Bush implemented new federal

property guidelines for executive branch agencies with his establishment of

Executive Order 13327, entitled “Federal Real Property Asset Management.”37 Many

of its provisions are based on his earlier administrative initiatives pertaining to

federal property asset management reforms, which were incorporated as Title III of

S. 1612, introduced during the 107th Congress. In order to increase agency

accountability for real property asset management, E.O. 13327 established the

position of Senior Real Property Officer within each executive branch agency.

Section 3(b) required that each officer prepare and submit to OMB an initial asset

management plan composed of data on the agency’s real property assets, and

proposals for cooperative arrangements with the commercial real estate community.

Federal Real Property Council. Section 4 established a Federal Real

Property Council (FRPC) within OMB to develop guidance and provide oversight for

the executive branch’s real property inventory. The chairman of the council is OMB’s

Deputy Director for Management. Members include each agency’s Senior Real

Property Officer, OMB’s Financial Management Controller, the Administrator of

GSA, and any other federal officials deemed appropriate by the chairman.

35

There is no written committee report.

36

118 Stat. 3259.

37

U.S. President (Bush), “Federal Real Property Asset Management,”E.O. 13327, Federal

Register, vol. 69, February 6, 2004, pp. 5897-5900. President Bush also added federal real

property asset management as the sixth government-wide initiative to be included in the

President’s Management Agenda.

CRS-11

The council was authorized to consider the following performance measures in

assessing the success of the executive branch’s real property activities:

!

!

!

!

!

!

!

!

cost comparisons justifying methods used to acquire new property

leases, exchanges, lease-purchases, or new construction;

total life-cycle costs associated with each federal facility, from

acquisition to final disposition;

statistics on real property disposal activities, such as time, costs, and

final profits;

operating, maintenance, environmental, and security costs for each

federal facility;

data on vacant or under-utilized federal property;

realization of equity value in real property assets;

opportunities for real property transactions with the private sector;

and

development of an improved working environment to increase

productivity.

Section 5 required GSA, in consultation with the FRPC, to provide policy

oversight, and to manage selected properties for the executive branch agencies that

requested such assistance. GSA was authorized by Section 5(b) to establish and

maintain a comprehensive database of the executive branch’s real property inventory,

except when otherwise precluded for reasons of national security. GSA is also

required to publish any asset management measures or standards that may be adopted

by the Federal Real Property Council. E.O. 13327 further required GSA to consult

with OMB and the other landholding agencies to develop new legislative initiatives

to improve the federal government’s management of real property activities. Section

2(b) recognizes that the provisions of E.O. 13327 do not supersede existing real

property law.

In FY2005, the FRPC issued new federal property reporting requirements for

executive branch agencies, which replaced GSA’s existing reporting requirements

and the agency’s comprehensive annual report on federally owned and leased

properties. With the issuance of E.O. 13327, GSA’s Office of Governmentwide

Policy was formally recognized as the administrator of the executive branch’s

centralized real property database, known as the Federal Real Property Profile

(FRPP). Published in June 2006, the Federal Real Property Council’s first executive

summary, the FY2005 Federal Real Property Report, was compiled from data

submitted by executive branch agencies as of December 15, 2005.38 The issuance of

E.O. 13327 did not mandate the reporting of data for public domain land and certain

other types of assets which had previously been compiled and reported by GSA. In

addition, statistics for leased properties are no longer published by GSA.

38

U.S. General Services Administration, The Federal Real Property Council’s FY2005

Federal Real Property Report: An Overview of the U.S. Federal Government’s Real

Property Assets, June 2006.

CRS-12

Proposed Legislation in the 109th Congress

H.R. 3134, the Federal Real Property Disposal Pilot Program and Management

Improvement Act of 2005, was introduced in the House by Representative Tom

Davis and one co-sponsor, on June 30, 2005. The proposed legislation established a

five-year pilot program to allow for the expedited disposal of surplus or underutilized

federal real properties. The OMB Director would be authorized to select the federal

properties to participate in the program, based on the cost and time required to

dispose of real property assets and the availability of unneeded federal properties.

A selected federal property would be sold at or above fair market value, and the

agency that owned the property would be authorized to retain a portion of the

proceeds. If enacted, H.R. 3134 would have codified certain provisions authorized

by E.O. 13327, such as the establishment of a Federal Property Council and the

creation of senior real property officer positions in the federal agencies.

Two amendments were adopted by voice vote on October 26, 2005. The first

amendment authorized the GSA Administrator to notify local governments of the

federal government’s intent to dispose of federal property in their jurisdictions. In

addition, a federal property determined by GSA to be a public benefit conveyance

for use by homeless groups would not be eligible for the five-year pilot program. The

second substitute amendment required that the OMB Director submit an annual

report on the status of the Federal Real Property Disposal Pilot Program to the House

Government Reform Committee and the Senate Homeland Security and

Governmental Affairs Committee. H.R. 3134, as amended, was reported favorably

by the House Committee on Government Reform on October 26, 2005. No further

action was taken in the 109th Congress.

Congressional Initiatives in the 110th Congress

Investigations by the Government Accountability Office (GAO) have indicated

that GSA and other landholding agencies could give greater attention and funding to

maintaining a streamlined federal inventory by identifying and disposing of unneeded

properties.39 Vacant and underutilized federal properties are costly to maintain GAO

reported, and could be “put to more cost-beneficial uses, exchanged for other needed

property, or sold to generate “revenue” for the federal government.40 GSA’s Office

of Property Disposal administers the disposal of real property that is no longer

needed by executive branch agencies. Underutilized federal property can vary

widely, and may include land, office buildings, warehouses, former post offices,

farms, family residences, commercial facilities, or airfields located in the United

States, Puerto Rico, the U.S. Virgin Islands, or the U.S. insular areas in the Pacific

39

U.S. General Accounting Office, High-risk Series: Federal Real Property, GAO-03-122,

January 2003, pp. 15-22.

40

U.S. Government Accountability Office, Federal Real Property: Most Public Benefit

Conveyances Used as Intended, but Opportunities Exist to Enhance Federal Oversight,

GAO-06-511, June 2006, p. 1.

CRS-13

Ocean.41 When a federal agency determines that it no longer needs a property to

carry out its mandate, it reports the unneeded or excess property to GSA. As

authorized by statute, GSA must first make an excess property available to other

executive branch agencies.42 If GSA determines that another federal agency has a

need for the excess property, the property is transferred to that agency in accordance

with the authority delegated and regulations prescribed by the GSA Administrator.

If GSA determines that there is no need within the federal government for a federal

property, it becomes surplus property, and may be made available to state or local

governments and qualified tax-exempt nonprofit institutions through GSA’s public

benefits conveyance (PBC) program.43 In June 2007, the Office of Management and

Budget (OMB) reported that the federal government owned 18,393 excess assets with

a replacement value of almost $13.8 billion, and 3,409 surplus properties valued at

approximately $3.9 billion.44

S. 1667 was introduced on June 20, 2007, by Senators Tom Carper and Tom

Coburn.45 The proposed legislation would authorize the establishment of a five-year

pilot program to allow for the expedited disposal of surplus or underutilized federal

real properties. The OMB Director, in concurrence with agency heads, would be

authorized to select federal properties to participate in the program. Section 623

would authorize the expedited disposal of real properties to be sold for cash at not

less than the fair market value. Federal properties selected for the pilot program

would not be authorized for disposal by “exchange, trade, transfer, acquisition of

like-kind property, or other non-cash transaction.” If the proposed legislation were

enacted, federal properties selected for the expedited disposal program would not be

subject to GSA requirements and procedures for public benefit conveyance of

federal surplus property. An agency that sold a surplus property through the

expedited disposal process would receive reimbursement for any administrative costs

incurred through the sale of the property. In addition, S. 1667 would authorize that

20% of the balance of any proceeds received by the disposal of a surplus property

would be deposited into that agency’s account. The remaining 80% of the proceeds

would be deposited into the U.S. Treasury as miscellaneous receipts. On June 20,

41

U.S. General Services Administration, Office of Property Disposal, Acquiring Federal

Property for Public Uses, p. 1, available at [http://www.propertydisposal.gsa.gov].

42

40 U.S.C. § 524.

43

GSA has primary responsibility for the administration of the program but, as required by

statute (10 U.S.C. § 2687 note), has delegated conveyance authority to the Department of

Defense (DOD) for DOD properties that are closed or realigned as part of the Base

Realignment and Closure (BRAC) process. For additional information, see CRS Report

RS20630, Surplus Federal Property, by Stephanie Smith.

44

When a federal agency determines that it no longer needs a property to carry out its

mandate, it reports the unneeded or excess property to GSA. As authorized by statute, GSA

must first make an excess property available to other executive branch agencies. If GSA

determines that there is no need for a federal property within the federal government, it

becomes surplus property. Executive Office of the President, Office of Management and

Budget, Response to Section 408 of Public Law 109-396, June 15, 2007, p. 2.

45

An identical bill, H.R. 3049, was introduced in the House on July 16, 2007. The bill was

referred to the House Committee on Oversight and Government Reform on July 16, 2007.

CRS-14

2007, the legislation was referred to the Senate Committee on Homeland Security

and Governmental Affairs. On November 14, 2007, the committee approved, by

voice vote, an amendment that would include a provision to allow for no-cost

conveyance of surplus federal property to homeless assistance groups. S. 1667, as

amended, was ordered to be reported favorably by the committee on November 14,

2007.

Policy Considerations

The federal government’s real property inventory is vast, comprising 3.7 billion

square feet of office space. Of this total, GSA is responsible for 387.7 million square

feet of executive branch office space, or 10.4% of total federal space. Maintaining

these facilities is a challenging task, since many of GSA’s largest buildings,

constructed more than 50 years ago, are in poor condition and have become

functionally obsolete. It has been estimated that nearly $5.7 billion would be needed

to restore or repair the 1,700 buildings and structures that GSA manages.

It has been documented that incoming rent revenues deposited into the FBF

have been insufficient to fund needed repairs. Moreover, GSA’s efforts to deal with

a long-standing backlog of needed repairs have been hindered by a lack of reliable

and detailed information about specific properties. In addition, real property law

restricts GSA’s, and other landholding agencies’, ability to generate the additional

revenues necessary to upgrade federal buildings, or to dispose of them when they are

no longer of use. Some observers contend that existing statutory requirements that

have been in place since 1949 often constrain effective federal property management

that is necessary to meet agencies’ changing mission requirements.

The 108th Congress revised GSA’s property management policies with the

passage of the FY2005 Consolidated Appropriations Act, on December 8, 2004.

Section 412 authorized the GSA Administrator to convey real property by sale, lease,

exchange, or leaseback agreements, with net proceeds deposited into GSA’s Federal

Buildings Fund for future real property capital acquisitions and improvements.

Introduced in the 110th Congress, S. 1667 would establish a five-year pilot

program to allow for the expedited disposal of surplus or underutilized federal real

properties. An agency that sold a surplus property would be authorized to keep 20%

of the proceeds, with the remaining 80% of the proceeds to be deposited in the U.S.

Treasury. Both GSA and GAO have long supported reform efforts that would

provide revenues from real property transactions. It also appears that certain types

of transactions with the private sector would continue to be encouraged as the most

cost-effective means to restore federal properties, and to dispose of properties that the

government no longer needs. The following issues may arise as part of congressional

oversight of property management:

!

!

!

Should GSA and/or individual agencies be allowed to enter into real

property transactions?

Should individual agencies be allowed to retain revenues from real

property transactions, or should revenues be deposited into the FBF?

Do individual agencies currently have the proven ability to

effectively manage their own properties?

CRS-15

!

What type of safeguards must be in place to ensure that such

transactions are effectively administered?

Enactment of reform initiatives, such as S. 1667, could fundamentally change

existing law by giving federal agencies new incentives to manage and dispose of their

real property inventories. Other issues regarding property management may also need

to be addressed to resolve long-standing problems. GAO has reported that the federal

government’s continued reliance on leased property remains as one of the major

obstacles to a viable and self-sustaining federal property portfolio. As stated earlier,

the current budget process favors lease agreements that appear more economical. One

option that Congress may choose to consider would be to include a reference to the

total cost of lease agreements in the annual appropriations and authorizations process

to better reflect the actual long-term costs associated with leasing.

President Bush’s establishment of the Federal Real Property Council and the

appointment of Senior Real Property Officers have initiated reforms in property

management for executive branch agencies. Congressional enactment of H.R. 3134

in the 109th Congress would have codified these provisions into law. To emphasize

the broad applicability of property management reform, President Bush included

federal real property asset management as the sixth government-wide initiative of the

President’s Management Agenda in February 2004.

Increased accountability among OMB, GSA, and the executive agencies may

produce more reliable and detailed budget submissions to Congress in the future. In

addition to Congress and the executive branch, local and foreign governments, the

private sector, and various advocacy groups, such as historic preservation

organizations, all have a vested interest in how the federal government acquires,

manages, and disposes of its real property. A diversity of views could be expected

should Congress choose to directly address this issue.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

The General Services Administration and Federal Real Property Management: Overview and Current Legislation · RL32368 | Frix