North Slope Infrastructure and the ANWR Debate

Congressional research reportOct 10, 2003

Ask Donna

What actually matters in this document.

Text

Order Code RL32108

CRS Report for Congress

Received through the CRS Web

North Slope Infrastructure and the ANWR Debate

October 9, 2003

M. Lynne Corn

Specialist in Natural Resources

Resources, Science, and Industry Division

Congressional Research Service ˜ The Library of Congress

North Slope Infrastructure and the ANWR Debate

Summary

The rich biological resources and wilderness values of northeastern Alaska have been widely

known for about 50 years, and the rich energy resource potential has been suspected for much of that

time. The future of these resources in the coastal plain of the Arctic National Wildlife Refuge

(ANWR) has been debated in Congress for over 40 years. One aspect of the debate in recent years

has been proposals to limit the footprint of energy development.

The term “footprint” has not been formally defined and the variety of features it might include

varies with observers. Yet the word is used regularly in discussions regarding impacts of

infrastructure on the natural environment. Without attempting to fix a definition or suggest

consensus where it may not exist, this report catalogues the range of features of development that

various observers might include in their use of the word, beginning with features that nearly all

parties would consider as part of development’s footprint. It should be emphasized that the report

does not give an overview of the ANWR development/wilderness controversy as a whole, the

impacts of development, the portion of the Refuge that might be affected by an acreage limitation,

or specific provisions of any legislation. Rather, it seeks to provide an understanding of the terms

used only in this aspect of the ANWR debate. As background, the report considers current and

planned development at the Alpine complex, the most advanced energy development on the North

Slope, and how its lessons might apply to development in the Refuge.

Trends in technology and the emphasis on more compact development could aid in reducing

development’s footprint. Over the last two decades, the size and number of structures in newly

developed areas have gotten smaller or fewer: drill pads are substantially smaller, and support

facilities and roads are fewer than in older areas. Some of this reduction occurred because of

regulation (e.g., to limit wetlands impacts or reduce waste discharge), but some also occurred

because smaller structures are usually cheaper: gravel, water, culverts, waste pits, and so on can all

be costly to build, use, and/or maintain. The result is a certain degree of incentive to industry to

consolidate and to make structures smaller (or, in the case of waste pits, eliminate them), even in the

absence of regulation.

On the other hand, key distinctions between the coastal plain of the Refuge and the coastal plain

of currently developed areas are worth noting. Among these differences are the Refuge’s more

rolling terrain with far less standing water, and its relatively large distance from much of the existing

North Slope infrastructure, which could force the building of additional, closer infrastructure to make

development more economically practical. These differences, combined with possible constraints

on development that might imposed in the 1002 area to limit environmental impacts, should

Congress decide to open the area to development, suggest that any generalization about footprints

drawn from modern existing developments such as Alpine, although instructive, may be qualified.

Ultimately, the presence, distribution, and economic recoverability of any oil will combine with local

conditions to determine the significance and impact of any footprint limitation. (For a broader

treatment of this issue, see CRS Report RL31278, Arctic National Wildlife Refuge: Background and

Issues.) This report will not be updated.

Contents

The Alpine Complex: Past and Future . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

The Components of Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Gravel Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Gravel Drill Pads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Airfields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Connector Roads in Drill Site Complex . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Stream Crossings, Culverts, and Bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Major Roads Connecting Complexes or Existing Developments . . . . . . . . . . . . . . . . 10

Exploration Roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Marine Facilities: Ports, Causeways, and Seawater Treatment Facilities . . . . . . . . . . 11

Other Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Infield Pipeline Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Main Pipelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Gravel Mines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Water Impoundments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Other Types of Affected Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Multi-Season Insulated Ice Pads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Adjacent Areas Affected by Human Presence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Visual “Footprint” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

A Look to the Future: Reliance on Ice Technology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Distinct Aspects of the 1002 Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

List of Figures

Figure 1. North Slope Developed Areas and 1002 Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Figure 2. Initial Layout of Alpine Oil Field . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Figure 3. Early Development of Alpine Oil Field . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Figure 4. Proposed Expansion of Alpine Complex . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Figure 5. Nuiqsut Gravel Mine and Pipeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Figure 6. North Slope Gravel Road . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Figure 7. Cross-Section of Vertical Support Members for Pipelines . . . . . . . . . . . . . . . . . . . . . 12

(Congressional readers please note that the figures in this report may be viewed in color on the CRS

Web page at [http://www.crs.gov/]. Enter the report number in the box shown in the upper right of

the Web page.)

North Slope Infrastructure and the ANWR Debate

In the debate over energy development in the Arctic National Wildlife Refuge (ANWR), a key

issue has been whether the environmental impacts of development can be limited and if so, how.

Much of the recent focus of that debate has been on the “footprint” of development, and how to limit

the footprint so as to limit the environmental impact of development. The term “footprint” has not

been formally defined and the variety of features it might include varies with observers. Without

attempting to fix a definition of the word, or suggest consensus where it may not exist, this report

catalogues a range of features of development that various observers might include in their use of

“footprint.” It begins with features that nearly all parties would consider as part of development’s

footprint, and concludes with those which fewer parties would include. In some cases, it provides

illustrations of these features.1

When Congress expanded the boundary of the Arctic National Wildlife Refuge (ANWR) in the

Alaska National Interest Lands Conservation Act (ANILCA, P.L. 96-487) in 1980, it designated

about 8 million acres within the earlier boundaries of the Refuge as wilderness — off-limits to nearly

all forms of development. However, in §1002 of ANILCA, Congress required the Department of

the Interior (DOI) to prepare a detailed study of the Coastal Plain of the Refuge (now also called the

1002 area) and to recommend how it should be managed. In §1003, Congress directed that

“production of oil and gas from the Arctic National Wildlife Refuge is prohibited and no leasing or

other development leading to production of oil and gas from the range shall be undertaken until

authorized by an Act of Congress.” This provision effectively postponed a decision on development

versus wilderness designation of 1.5 million acres of the coastal plain. (See Figure 1, showing

ANWR and developed areas.)

Interior finished its detailed analysis of oil potential, wildlife resources, impacts, and mitigation

measures in April 1987. In this report to Congress (called the Final Legislative Environmental

Impact Statement, or FLEIS), DOI estimated the chance of recovering economic quantities of oil at

19%, a figure that is very high by industry standards. The report recommended that the entire area

be made available for leasing. The report and its recommendation generated controversy, as have

virtually all subsequent reports on this topic. In intervening years, estimates of oil potential and

industry’s enthusiasm have varied, but support for ANWR oil development remains strong among

various parties, including many Alaskans. Likewise, opposition to energy development continues

to be strong among many observers, based on concern for the area’s wildlife and wilderness values.

The specific placement and extent of energy infrastructure would be strongly dependent on the

location of any oil discoveries, including their distance from other discoveries. But within that

context, the trend in North Slope energy development has been toward compactness, reduction in

numbers and mileage of roads, centralization or reduction of support facilities, reduction of

1

Development advocates have proposed to limit the size of this footprint. The extent to which such

legislation might apply to Native lands within the 1002 area is unclear. For treatment of this aspect of the

debate, see CRS Report RL31115, Legal Issues Related to Proposed Drilling for Oil and Gas in the Arctic

National Wildlife Refuge.

CRS-2

hazardous wastes, and concentration of exploration and early development activities in winter (when

the frozen tundra makes cross-tundra travel possible, and when exploration roads can usually be built

from ice). Over the last two decades, the size and number of structures in newly developed areas

Figure 1. North Slope Developed Areas and 1002 Area

Source: Originally obtained from FWS website, http://www.r7.fws.gov/nwr/arctic/devmap.html, in June,

2003, but site has since been modified. Map somewhat modified for clarity in monochrome.

have gotten smaller or fewer: drill pads are substantially smaller, and support facilities and roads

are fewer than in older areas.2 Some of this reduction occurred because of regulation (e.g., to limit

wetlands impacts or reduce waste discharge), but some also occurred because smaller structures are

usually cheaper: gravel, water, culverts, waste pits, and so on can be costly to build, use, and/or

maintain. The result is a certain degree of incentive to industry to consolidate and to make structures

smaller (or, in the case of waste pits, eliminate them), even in the absence of regulation. Thus the

footprint of development in ANWR could be smaller than for comparable earlier development on

the North Slope.

Advances in drilling technologies are a major factor in the size and location of the footprint.

Drilling technology has evolved from a single hole straight down into a prospect, to directional,

extended reach, horizontal, multilateral, and designer wells. Under very favorable conditions, drill

pads can now be located as much as 5 miles in horizontal distance from a target; the current world

record for horizontal drilling is 7 miles at two sites, one in China, and the other at the Wytch Farm

oil field on the south coast of England. Modern designs permit more efficient production of

hydrocarbon reserves, and allow easier connection to production facilities, with fewer pipelines.

2

For a review of advances in arctic petroleum development, see CRS Report RL31022, Arctic Petroleum

Development: Implications of Advances in Technology.

CRS-3

They also reduce the number of wellheads. Cuttings generated during drilling may be reinjected into

special wells for waste disposal rather than the more permanent waste pits used in the past.3 All of

these advances play a role in decreasing the acreage covered by gravel.

However, in considering the extent of needed infrastructure, two crucial influences are worth

noting. First, the size and location of infrastructure would depend on where the oil is, and how much

oil can be economically extracted. If oil development were authorized in the 1002 area, and if oil

were not found in economically sufficient quantity or quality, only the impacts of exploration would

remain.4 Similarly, if oil were found only in one part, particularly in the west near existing

development, the impacts on the eastern portion would be much reduced. Second, distance from

other energy development would affect the requirements for new developments. Discoveries in the

western portion of the 1002 area might be able to rely on some infrastructure outside of the Refuge.

This infrastructure might be some of the facilities which exist already. However, since existing

facilities, including permanent roads, are scarce, there might be a demand for new facilities

concentrated just outside of the Refuge boundary, across the Canning River. If discoveries were

found only farther east in the 1002 area the need for support infrastructure within the Refuge (rather

than 100 or more miles to the west) would become more pressing.

This report begins by examining the Alpine complex, an oil field at the extreme western edge

of current development, often cited as the North Slope’s most advanced oil field. The report reviews

the most modern, compact technologies now in use. It is followed by a catalogue of those features

that might be considered as part of North Slope development infrastructure. The description includes

all of the “oil-related facilities” cited in the FLEIS (p. 99) as being associated with full development,

as well as other features or affected areas that are mentioned in discussions of this issue. It refers

to issues arising in future reliance on ice technology. The report concludes by identifying physical

differences between the 1002 area and the developed areas on the North Slope and discusses how

those differences might affect the footprint.

The Alpine Complex: Past and Future

Alpine was originally developed by ArcoAlaska, and is now managed by ConocoPhillips. It

began production in November 2000 and the surface area of the oil field was initially estimated at

40,000 acres. It is regarded as an example of environmentally conscientious production and is

commonly held as the standard that might be expected if the 1002 area were developed. At the

Alpine development, the two gravel pads currently in place are permitted by the Army Corps of

Engineers at 36.3 acres for the main pad (also known as CD-1) and 10.1 acres for the satellite pad

(CD-2). (In contrast, drill pads constructed in the 1970s averaged about 44 acres.) The larger pad

is the main production pad, and includes a central processing facility, housing, and storage area,

along with wellheads. The secondary pad contains only drilling facilities and wellheads; workers

there commute from the main pad. Together, the two pads support 112 wells.5 (See Figure 2 and

and Figure 3, showing initial phases of Alpine development.) A third pad (CD-3) of about 30 acres

3

For more extensive discussion of these technologies, and for illustrations of types of drilling methods, see

CRS Report RL31022, previously cited.

4

While these impacts are not negligible, they are substantially less than the impacts of development and

production.

5

“ConocoPhillips plans five new Alpine satellite pads, signs MOU for EIS.” Petroleum News. vol. 9, no.

9, ( Jan. 27, 2003).

CRS-4

Figure 2. Initial Layout of Alpine Oil Field

Source: ARCO Alaska, Incorporated. Permit Application to U.S. Army District Engineer, Alaska, Permit

No. 2-960874, Colville River 18. Jan. 22 and 24, 1998. Map somewhat simplified for clarity in

monochrome.

Figure 3. Early Development of Alpine Oil Field

Source: Photo by Pamela A. Miller, Arctic Connections (used with permission). Photo taken from northeast

(top right corner of map in Figure 2).

Notes: Arrows indicate the following features:

1 — Main (sales) pipeline carrying crude oil south and then east to Kuparuk;

2 — Alpine (main) pad #1 (CD-1);

3 — Airstrip;

4 — Connecting road;

5 — Alpine Satellite Pad (CD-2).

CRS-5

is planned 6 miles northeast of the main pad. A fourth pad (CD-4) in the complex, 4 miles southwest

of the main pad is expected to total about 41 acres.6 (See Figure 4, showing plans for Alpine

complex expansion.) Three additional pads are planned west of this area, in the National Petroleum

Reserve-Alaska (NPR-A).

The current airfield for the Alpine complex (permitted at 35.7 acres and about 1 mile long)

doubles as part of the road connecting the first two drill pads. In summer, access to Alpine is by

aircraft only, with 6 to 8 aircraft, including large cargo planes, arriving daily.7 A second airfield is

planned as part of CD-3. It is expected to be 1.1 miles long and occupy 17.1 acres.8 Since there

would be no dormitory facilities at this pad, workers would be based at the main Alpine pad, and

would use ice roads or small planes for daily operational access. Reliance on aircraft for summer

transport reduces or sometimes eliminates the need for connecting roads.

The current connector road in the Alpine complex is over 2 miles long and covers 14.6 acres.

Along with the airfield, it links the first two pads in the complex. However, “the frequency of air

traffic is higher than was anticipated during the permitting of Alpine..., and the safe joint use of the

airstrip has become increasingly difficult.”9 Added development would place increased demands

on the airfield. The conflict with increasing vehicular traffic means that “any alternative that

increases use across this section of road may require a separate road that would allow separate and

discrete use by rolling stock and fixed wing traffic.”10 No road is planned at this time to connect the

main Alpine pad to CD-3, although a 0.1 mile road (0.6 acres) would connect the drill pad to its own

airstrip, and a raised pipeline would transport oil from the pad to the processing facility on the main

pad.11 A second road of 3.8 miles with a 32 foot wide driving surface is being planned to connect

CD-4, south of the main pad.12 A permit application estimates that the footprint of this road would

be approximately 26.6 acres.13 ConocoPhillips plans an additional 3 satellite pads in the complex,

in the NPR-A, connected by a bridge across the Colville River to the main pad, via a gravel access

road over 20 miles long (see Figure 4). At the first two Alpine pads, the permit issued by the Army

Corps of Engineers provided for 1.7 acres of culverts, bridges, and stream crossings.

6

Rose Ragsdale, “Phillips looks to develop Alpine satellites, seeks state OK on sites.” Alaska Oil & Gas

Reporter. (Feb. 5, 2002.)

7

W. Wayt Gibbs, “The Arctic Oil and Wildlife Refuge,” Scientific American (May 2001), p. 68.

8

Phillips Alaska, Inc. Colville River Unit Satellite Development CD North Draft Plan of Operations (July

31, 2001).

9

“Supporting Documentation for Alpine Satellite Development Program. Preliminary Alternatives and

Environmental Conditions. Final.” CononcoPhillips and Anadarko (February 2003). p. 12.

10

Ibid.

11

Colville River Unit Satellite Development CD North Draft Plan of Operations. Phillips Alaska, Inc. (July

31, 2001).

12

Rose Ragsdale, “Phillips looks to develop Alpine satellites, seeks state OK on sites.” Alaska Oil & Gas

Reporter (Feb. 5, 2002). Also, Colville River Unit Satellite Development CD South Draft Plan of

Operations. Phillips Alaska, Inc. (July 31, 2001). p. 7.

13

Colville River Unit Satellite Development CD South Draft Plan of Operations. Phillips Alaska, Inc. (July

31, 2001).

CRS-6

Figure 4. Proposed Expansion of Alpine Complex

Source: BLM website, [http://www.alpine-satellites-eis.com/alpeis.nsf/?Open], under “Learn about the Alpine Satellite Development Plan,” viewed

on August 13, 2003.

Notes: Solid (red) line indicates existing pipeline; dashed (red) line shows proposed pipelines. Dotted (green) line shows proposed roads. Irregular

splotches mark the area’s numerous lakes. Map modified slightly for clarity in monochrome.

CRS-7

Pipelines, whether for crude oil, diesel fuel, fiber optics, electrical conduits, water, or natural

gas, are raised on support arms, typically 5 to 10 feet above the tundra. (See Figure 5, showing

pipeline and gravel mine.) At the Alpine complex, these Vertical Support Members (VSMs) are

spaced 35 to 55 feet apart. Up to 450 VSMs, providing ground clearance of at least 5 feet, were

planned in the initial phase at the Alpine complex for pipelines within the field.14 The bases of these

supports must be protected from sinking into the tundra; this requires sinking the VSM into the

stable layer of permafrost, disturbing a few square feet of tundra.

Figure 5. Nuiqsut Gravel Mine and Pipeline

Source: Photo by Joel Bennett © 2003 (used with permission). Arrows added and photo modified slightly

for clarity in monochrome.

Notes: Gravel mine indicated by large arrow; pipeline carries oil from Alpine main pad (CD-1) to Kuparuk

field, where it is sent on to TAPS. Small arrows indicate some of the pipeline supports.

For the initial phase of development, the Corps of Engineers issued a permit to Nuiqsut

Contractors for a 150-acre gravel mine (see Figure 5). Some portion of the gravel was to meet needs

in the nearby Native village of Nuiqsut. A new marine facility was not required for construction at

the Alpine complex. Instead, barges were used in August 1999 to transport 15 modules of heavy

equipment through the Bering Strait to the Kuparuk complex (see Figure 1) on the North Slope for

the initial development of the Alpine complex. These modules, totaling nearly 12,000 tons, were

14

U.S. Army Corps of Engineers. Permit Evaluation and Decision Document. Application Number 2960874. Waterway Number: Colville River 18. (Feb. 13, 1998). p. 3.

CRS-8

held at Kuparuk until March 2000, when they were transported via ice road15 on the frozen Beaufort

Sea and then inland via ice road to the Alpine development.16

Fresh water used for ice construction at Alpine comes from lakes (accessed with state permits)

and is hauled by truck to the appropriate site. These specially designed trucks hold 4,200 to 10,500

gallons. Water for human use comes via pipes from lakes near the main pad. Currently,

ConocoPhillips has “no plans to change the current processes for water withdrawal or ice road

construction for CD-3 or CD-4 or any of the proposed National Petroleum Reserve Alaska (NPR-A)

satellites.”17

Another important factor affecting footprint at the Alpine complex is the ability to use extended

reach drilling (ERD) or horizontal drilling to reach oil at some distance from the wellhead.18 “All

of Alpine’s wells, [both] producers and injectors, are horizontal, with the well angled to pass

horizontally through the producing reservoir. Horizontal footages within the reservoir range from

3,000 feet to 6,000 feet, with one 6,000 foot horizontal section and three wells with horizontal

sections more than 5,000 feet in length [from the wellhead].”19

In sum, the initial phases of development of a field whose surface extent was estimated at

40,000 acres directly disturbed about 250 acres, plus an undetermined area indirectly affected (see

discussion below). Developers were also able to rely on some support from facilities for staging in

the Kuparuk field. As oil prospects nearby have improved, the size of development infrastructure

has continued to increase.

Recent developments in Alaska suggest that for economic reasons, access to the Alpine area

may not remain roadless indefinitely. The Alaska Department of Transportation and Public Facilities

is beginning to study a project to build industrial roads to support the state’s oil, gas, and mining

industries, where lack of adequate transportation in remote areas is a significant handicap to

development. A department spokesman said that “it found the best investment returns would come

from transportation improvements for North Slope oil and gas: a four-stage project, involving roads

and a bridge across the Colville River [into the NPR-A] to provide all-season access.”20 The project

would provide a gravel road link from the Dalton Highway (which parallels TAPS) near Pump

Station 2, west and then north to a permanent bridge crossing the Colville River and linking (a) the

15

Ice roads and pads are created by special trucks that spray increasing layers of fresh water (sometimes

mixed with chipped ice) on the tundra, gradually building up a thick ice layer capable of supporting large

trucks, exploratory drill rigs, etc. The structures usually last only one winter, but under certain circumstances

can be protected from summer heat for use in a second season.

16

A. John Whitehead, Vice President, Western North Slope Business Unit, ConocoPhillips. Letter of May

30, 2003, to author.

17

Ibid.

18

ERD wells have horizontal displacement of at least 2 to 5 times the vertical depth, regardless of the angle

of bend in the drill path. A horizontal well is, technically, one that reaches a certain depth and then turns at

a 90 degree angle to reach a geological structure. While the terms differ technically, ERD will be used in

this paper to include both types of wells, unless otherwise indicated.

19

Kristen Nelson, “Drilling in the fast lane: Alpine drilling passes million-foot drilling mark on 69th well,”

Petroleum News (June 8, 2003), citing remarks of Mike Alvord, Alpine drilling team leader.

20

Kristen Nelson, “Building resource roads,” Petroleum News (April 27, 2003), p. 1, citing comments by

Mike McKinnon, senior planner, Alaska Department of Transportation and Public Facilities.

CRS-9

village of Nuiqsut (through a planned road to be funded by the Bureau of Indian Affairs), (b) planned

roads for development of the NPR-A west of the Colville River, and (c) the western edges of the

existing road system supporting the Tarn and Meltwater fields, which are satellites connected to the

road network at the Kuparuk oil field (and from there to the Prudhoe Bay fields).21

The Components of Infrastructure

This section catalogues features which have been considered in discussions on the footprint of

development. It is primarily a description of the features per se, rather than their environmental

impacts. Features at the beginning of the catalogue tend to be mentioned as forming part of

development’s footprint more frequently than features at the end.

Gravel Structures

Gravel Drill Pads. In 1987, the FLEIS in its full development scenario assumed that 50 to

60 pads, averaging 20-32 acres each, would be built; these would cover 1,200 to 1,600 acres (FLEIS,

p. 99). Now, 26 years later, the projected average pad size compares well with the 29 acre average

of the first 4 Alpine pads, but it seems unlikely that as many as 50 to 60 pads would be needed in a

contemporary scenario. The FLEIS (p. 86) noted that the maximum extended reach for drilling then

was somewhat over 2 miles if the oil reservoir was deep enough. In contrast, modern Extended

Reach Drilling (ERD) under optimum conditions can reach more than twice that distance, and in

actual practice on the North Slope has reached 3.78 miles at one wellhead. Consequently, assuming

the same full development scenario posited in the FLEIS, fewer than 50 pads might be needed. (See

modern drill pads in Figure 3.)

Airfields. Two large (130 acres each) and two small (30 acres each) airfields were

contemplated in the FLEIS (p. 99) in a full development scenario. Under the Alpine model (with

its airfield that would have been considered small in the FLEIS), for equivalent discoveries, more

airfields would be likely to be built than the four that were envisaged in the full development

scenario in the FLEIS, since each complex would need its own airfield(s). (See airfield in Figure

2 and Figure 3.) The reliance on multiple airfields could be reduced, but at the cost of additional

roads linking more pads to fewer airfields.

Connector Roads in Drill Site Complex. Gravel roads connect drill pads in a complex.

These roads may be as thick as 6.5 feet of gravel above the surface of the tundra.22 Gravel connector

roads could lower costs over the long haul once production begins (though development may be

continuing on the same pad) since they would obviate the need for annual construction of some of

the ice roads used for winter transport of heavy equipment and might reduce the number of airfields

that would be needed for summer travel. (See connector road in Figure 2 and Figure 3.)

21

Kristen Nelson, “Building resource roads,” Petroleum News, (April 27, 2003). Anchorage, Alaska. p. 1.

Also, Patricia Jones, “BIA road project progressing in Nuiqsut,” Petroleum News (Sept. 29, 2002),

Anchorage, Alaska,. p. 1. It is unclear why the proposed state road would not continue north on a short spur

to link directly with CD-4, the southernmost pad now being developed in the Alpine complex. However, by

linking westward to roads in the NPR-A, some of which are planned as part of the Alpine complex, an allweather gravel road to the Alpine complex might be achieved, albeit though a circuitous route.

22

National Research Council, Cumulative Environmental Effects of Oil and Gas Activities on Alaska’s North

Slope (Washington DC: March 2003), p. 108. (Hereafter referred to as NRC Report.)

CRS-10

Stream Crossings, Culverts, and Bridges. A variety of structures must be built to

manage water or to cross streams in the arctic environment. In the arctic spring, as rivers and ponds

swell with melting runoff, and water drains slowly across the tundra, culverts are needed to prevent

the creation of impoundments on the upper side of the road that might threaten the road itself. In

addition, main pipelines must be designed to cross over or under streams and rivers, and bridges may

be needed to carry traffic across major rivers.

In its full development scenario, the FLEIS (p. 99) estimated that a maximum of 25 major river

or stream crossings could be required. It noted (p. 92) that “bridges and culverts would be designed

and constructed to provide cross drainage for roads in a manner that prevents erosion or adverse

effects on the fisheries.” For similar discoveries, a modern scenario would require similar

precautions, but to the extent that fewer miles of roads are constructed, then fewer bridges and

culverts would need to be constructed. The number of stream crossings for a main pipeline (carrying

crude oil from all of the 1002 area fields to TAPS) could be expected to be similar in a modern

scenario, but (assuming the same hypothetical discoveries) the infield pipelines would likely be

reduced, because fewer drill pads are needed in a modern scenario to produce the same amount of

oil.

Major Roads Connecting Complexes or Existing Developments. In the exploration

and development phases, ice roads not only reduce environmental impacts, they also reduce costs,

relative to building gravel roads and pads at each new prospect which may — or may not — contain

oil. However, once a find is confirmed, gravel drill pads are put in place and (as is occurring at the

Alpine complex), gravel roads may also be put in place to link some if not all of the gravel pads. If

a pad in a complex is not linked by a road to other facilities in the same complex, an airfield may be

required at the unlinked pads, as at CD-3 in the northern part of the Alpine complex. All-weather

gravel roads serve to reduce the number of flights, as well as demands on fresh water for ice roads

each winter when heavy equipment must be transported.23 (See Figure 6, showing road with 2

trucks.)

Exploration Roads. Ice roads and ice pads are the norm in current exploration technology,

although in some cases gravel structures must be used. For example, in the state lands south of

current developments, between the Colville and Canning Rivers, a new area is being opened for lease

sales by the Alaska Department of Natural Resources. This area is in the foothills of the Brooks

Range, and has a topography more similar to the rolling hills common in the 1002 area than to the

areas that have been developed to date near the coast. Among these hills, ice roads and ice pads have

proven potentially unsafe or difficult to construct. State regulations for the area require that

exploration activities must use ice roads and ice pads, but exceptions “including the use of gravel,

may also be granted on a site specific basis, if it is determined, after consulting with [the Alaska

Department of Fish and Game], that no feasible and prudent alternatives exist for constructing an

exploration road or pad.”24

23

State and industry planning for remote fields west of Prudhoe Bay suggest that for marginal fields,

proximity to all-weather gravel roads can help in making a marginally profitable lease more profitable by

lowering long term access costs. This factor could be important in ANWR, since the westernmost boundary

of the 1002 area is roughly 30 miles east of Badami, the easternmost producing field to date — and which

was recently shut down for its marginal economics. (See map, Figure 1.) Thus gravel roads may be a factor

in deciding whether to develop some marginal fields.

24

Alaska Department of Natural Resources, Division of Oil and Gas, Chapter 7, Mitigation Measures North

(continued...)

CRS-11

Figure 6. North Slope Gravel Road

Source: FWS file photo; modified slightly for clarity in monochrome.

Notes: Roads on North Slope constructed to a height of at least 5 feet to maintain stability of permafrost.

Marine Facilities: Ports, Causeways, and Seawater Treatment Facilities. In 1987,

the FLEIS (p. 89) contemplated two marine facilities in a full development scenario; these were

estimated to cover 200 acres (p. 99). Camden Bay and Pokok Lagoon were considered possible sites,

since surveys suggested that dredging would not be necessary at those locations in order to bring in

summer barges carrying heavy equipment. Because heavy cargo arrives during only a few weeks in

the arctic summer, the facility must include docks for several barges, and gravel pads to store offloaded cargo.25 The marine facility might also require its own temporary camp and support facilities,

depending on its distance from other facilities. A port capable of receiving barges already exists at

Kaktovik, a Native village on Barter Island along the coast of ANWR. New construction might be

avoided if arrangements can be made to use or modify this facility — an option not analyzed by the

FLEIS.

Marine facilities would probably also include plants (possibly supported on barges) to treat

seawater for use in production to maintain pressure in an oil field; causeways would link such

24

(...continued)

Slope Foothills Areawide Oil and Gas Lease Sale 2003, p. 3. (Available at [http://www.dog.dnr.state.ak.us/

oil/] on April 23, 2003).

25

The three causeways (West Dock, East Dock, and Endicott) now in current developed areas on the North

Slope total 7.7 miles, and occupy 227 acres as measured at mean sea level (NRC Report, p. 310).

CRS-12

facilities to the shore.26 A saltwater treatment plant is now located at end of the 2.5 mile long West

Dock on a barge in relatively shallow water. Raised insulated pipes then carry water from the

treatment facility to production facilities (see above). Between 1996 and 2001, North Slope

operations used an average of 46 million gallons per day of treated seawater.27

Figure 7. Cross-Section of Vertical Support Members

for Pipelines

Source: BLM website, [http://denali.ak.blm.gov/nwnpra/index.html], Figure IV-05. Caption retained from

original document. Viewed on August 13, 2003.

26

Water produced from an oil field may also be used for re-injection if it is available.

27

NRC Report, p. 78.

CRS-13

Other Structures

Infield Pipeline Supports. Infield pipelines, besides collecting crude oil produced from

wells, also supply natural gas and water for injection to maintain pressure in the oil field, support

communications equipment, supply diesel fuel for transportation, and provide electric power and

water for human use. (See Figure 5 and Figure 7, showing infield pipeline and supports.) They are

grouped together so that a number of the various kinds of pipelines rest on the same Vertical Support

Members (VSMs), often with space to spare so that other pipelines can be added at a later date. The

diameters of these pipelines vary with function, ranging from a few inches (fiber optic cable) to 14

inches (crude oil or water and gas, with diameters possible for larger finds).28 Infield pipelines, with

their supports, would link development complexes to a larger main pipeline (see below) which

would carry crude oil over much longer distances from within the 1002 area to existing main

pipelines and ultimately to TAPS. Whether for infield lines or for main lines, the very small crosssectional areas of the bases for the support arms would take up only a small fraction of the total

gravel footprint that might be expected from ANWR development, as well as a small fraction of the

area under the pipeline.

Main Pipelines. In 1987, the FLEIS full development scenario (p. 99) assumed that the main

oil pipeline that would collect oil from the various fields in the 1002 area for shipment to TAPS

would be elevated (for caribou passage), run generally east-west, extend 100 miles inside the 1002

area, and occupy about 610 acres within the 1002 area, based on a 50 foot width for a right of way.29

It would include two to three pump stations, with one or two stations inside the Refuge and the

others between the Refuge boundary and the start of the TAPS pipeline. Each pump station was

expected to require a roughly 7-acre gravel pad for “pumping, oil storage, power, pipeline equipment

and repair and communications facilities, [as well as] living quarters for about 30 people, and

environmental support systems ...” (FLEIS, p. 91). The extent to which the pump station pads or the

right of way could be reduced with modern technology is unclear, since the size of a pipeline itself

would be partly a function of the volume of oil flowing through it. However, it is possible that the

50 foot right of way for the pipeline would no longer be necessary.

Gravel Mines. Gravel, whether for pads, airfields, causeways, or roads, is mined from nearby

sources such as river beds and, more recently, upland sites. In 2001, 24 open pit gravel mines

occupied 6,364 acres (average pit: 265 acres) on the North Slope.30 About 10 to 15 gravel mines

were considered necessary for full development in the FLEIS; they were estimated to occupy 500750 acres total. The mine at the Alpine complex (Figure 5, above) occupies 150 acres, falling

between the current average size and the smaller gravel mines contemplated in the FLEIS. Some

portion of the gravel from this mine was to meet needs in the village of Nuiqsut, and the size of the

permitted mine may have been designed to allow the expansion of the Alpine development to some

of the additional satellite pads and associated connector roads now in the planning phases.31 It is not

28

See Figure 7. The FLEIS (p.89) estimated a range of 8-24 inches for infield pipeline diameters.

29

In effect, the FLEIS considered the “footprint” of the pipeline to be the full 50 foot width of the right of

way times its length, rather than the area occupied by the bases of the VSMs; no figure was given for the area

occupied by the supports. In addition, the FLEIS assumed another 50 foot right of way for a transportation

corridor. However, modern technologies might not require such a corridor; see “Major Roads,” above.

30

NRC Report, p. 65.

31

Not all of the gravel in the complex will be taken from this source, however, since the CD-North Draft Plan

(continued...)

CRS-14

known what size of gravel mine would have been required to construct only the original two pads

at Alpine. In the 1002 area, consolidation of gravel mines might be considered desirable; this might

be accomplished by digging fewer or deeper pits, as at Alpine. However, consolidation would result

in hauling gravel over longer distances, and possibly constructing more roads. The FLEIS (p.111)

noted that effects of gravel extraction can be reduced by using gravel from exposed and unvegetated

bars along streams that are not fish-bearing or from gravel terraces adjacent to river beds.

Water Impoundments. In 1987, the FLEIS stated that the use of desalinated seawater

“might not be economically feasible for ice roads and airstrips” (p. 88). To avoid construction of

gravel roads during most exploration, operations using ice technology have expanded since 1987,

and exploration requires far more water than was contemplated then. A year’s supply of fresh water

for exploration camp use would typically be about 360,000 gallons. In addition, 1 to 1.5 million

gallons are needed for an ice road 1 mile long, 30-35 feet wide, and 6 inches thick.32 In the winter

of 2001-2002, ConocoPhillips alone built more than 100 miles of ice roads for exploration on the

North Slope.33 This effort would have required over 100 million gallons of fresh water.

In the past, when freshwater has been needed for ice construction or for camp use in some of

the developed areas, and could not be readily obtained from deep lakes, water impoundments were

sometimes created in the tundra to supply additional water. One method for creating these

impoundments is to excavate gravel mines in the flood plain of a stream or river, and then to wait

for spring floods to overflow the stream, fill the excavated pits, and recede, leaving an artificial deep

lake.34 While an attempt is made to avoid fish-bearing streams or to use higher ground, these

artificial deep lakes may provide overwintering fish habitat where none existed, and become

attractive to food fish such as grayling or arctic char — an effect some would consider beneficial.

Other Types of Affected Areas

In this category are features which were not mentioned in the FLEIS list of “oil-related facilites”

(p. 99). In one case, the technology did not exist in 1987. In other cases, the features are described

here because environmental, scientific, or Native groups have argued that development’s footprint

should include not only areas covered by gravel, or the features described above, but also other areas

that may be affected by development. At this point, the term shades into the environmental effects

of development taken as a whole. The most commonly mentioned of these affected areas are

included below.

Multi-Season Insulated Ice Pads. Tundra vegetation which has been covered by ice roads

or pads generally recovers within a season or two if the ice is allowed to melt and the area is not

subsequently covered with a gravel structure. As a result, ice covered areas are rarely considered to

be part of development’s footprint. However, to prolong the season for drilling and eliminate the

time required for mobilizing and demobilizing heavy equipment as well as allow more time for

31

(...continued)

of Operations proposed to obtain the necessary 462 thousand cubic yards of fill from either of two other

sources.

32

BLM, cited in NRC Report, p. 63.

33

A. John Whitehead, Vice President, Western North Slope Business Unit, ConocoPhillips. Letter of May

30, 2003 to author.

34

Normally, the gravel excavated in this process would be used for construction elsewhere.

CRS-15

technologically advanced drilling, pads are sometimes insulated and preserved over the summer so

that they can be used during a second winter. (See CRS Report RL31022 for more on advanced

drilling technologies.) Where this occurs, vegetation around the edge of the insulated pads is

sometimes killed by being simultaneously thawed and blocked from sunlight. In addition, some

decrease in plant life has been observed two years after such pads were allowed to melt.35

Adjacent Areas Affected by Human Presence. The cumulative effects of oil

development on the North Slope have been recently and extensively reported by the National

Research Council (NRC) of the National Academies of Science and of Engineering and the Institute

of Medicine in Cumulative Environmental Effects of Oil and Gas Activities on Alaska’s North

Slope.36 A number of the environmental effects described in the NRC report bear on the footprint

debate. While many of these effects have been described above, a few of the remaining effects will

be mentioned briefly here. (For details, consult the NRC report citations below.) The NRC noted

that the data were more complete or clear for some effects than others.37 In some cases the effects

were minor, in others substantial. In some instances, there was an absence of quantitative data.

Examples of the effects of existing development noted in the NRC report included:

! changes in air quality, considered by NRC to be partly a result of long-range transportation

of some pollutants, and partly due to locally produced smog, but with largely unknown effects

due to lack of long term monitoring (p. 117);

! effects on water flows due to gravel mining in rivers, but diminishing with movement of

mining to upland areas; interruption of water flows where culverts are inadequate or poorly

located (p. 118);

! effects of clouds of dust, which may kill all vegetation within 16 feet of heavily traveled

roads; modern techniques can result in fewer effects than older roads, but still produce dust

(p. 124-126); and

! effects of existing development on caribou cows with young calves (whose general avoidance

of development interferes with free movement between feeding and insect-relief areas);

effects stretch out 1.2 to 2.5 miles around pads and roads. (p. 176).

Visual “Footprint”. In terms of the footprint debate, the relative significance of the visual

effect including its human impacts, constitutes a major bone of contention between development

opponents and advocates. Development advocates stress the decreasing size of some of the items

described above, growth in a caribou herd in the developed area, responses to cleaning up any oil

spills and other environmental protections. They particularly argue that future development effects

cannot be judged in terms of the effects of past development (now over 30 years old in some places)

because advances in technology are reducing environmental impacts, and many structures are smaller

or less numerous than they would have been with older technology. (Implicitly, they define footprint

as a much narrower term that does not include visual impacts.)

35

NRC Report, p. 140-141.

36

National Research Council. Cumulative Environmental Effects of Oil and Gas Activities on Alaska’s North

Slope (Washington DC: March 2003), 452 p.

37

The NRC Report noted a wide variety of effects of development, both harmful and beneficial, and

ecological as well as economic. The effects listed in this report sample only those which can be construed

as related to development’s footprint in the natural environment.

CRS-16

Development opponents stress their view that development’s “footprint” should include more

than those features commonly mentioned by development advocates.38 When pipelines, gravel roads,

bridges, and gravel pads rise several feet above the surrounding area in a treeless environment, set

wherever possible so as to avoid disturbing water flows (i.e., usually on higher ground), their visual

impact can be felt for miles. In addition, seismic exploration, especially with modern methods

requiring close spacing of tests across the tundra, results in dense networks of trails “producing a

serious accumulating visual effect.”39 The NRC (p. 239) commented:

The common practice of describing the effects of particular projects in terms of the area directly

disturbed by roads, pads, pipelines, and other facilities ignores the spreading character of oil

development on the North Slope and the consequences of this to wildland values. All of these

effects result in the erosion of wildland values over an area far exceeding the area directly

affected.

A Look to the Future: Reliance on Ice Technology

Current North Slope exploration and development rely on ice technology, as described above.

But if current warming trends continue, use of this technology appears to be at risk in northern

Alaska, whether in ANWR or elsewhere. The state now permits industry to engage in oil exploration

and ice construction on the North Slope when the top 12 inches of tundra are frozen and snow cover

reaches 6 inches; cross-tundra travel and ice construction must cease once these conditions no longer

prevail in spring.40 Warmer winters have caused ice road use to drop from 200 days 20 years ago

to the 2002 level of 103 days per year.41 As a result of the constraint on exploration, the U.S.

Department of Energy, the State of Alaska, three petroleum companies, and Yale University will

fund a study to develop a model that might result in this standard being modified to determine

whether seismic exploration can occur safely at a lower standard.42 However, according to the NRC

Report (p. 154), the current standard “is not based on scientific evidence. The variations in snow

depth and density across the North Slope are not considered in the establishment of opening dates

38

The website of the Alaska Wilderness League, [http://www.alaskawild.org/pressroom.html] (viewed on

October 6, 2003) for example, describes this approach to the issue. Maps of North Slope development

created by wilderness supporters sometimes make no distinction between roads and pipelines, suggesting that

they view these structures as equally affecting the footprint, as they would define it. See, for example

“Broken Promises: the Reality of Big Oil in America’s Arctic” by The Wilderness Society (Washington, DC,

2003), p. 5.

39

NRC Report, p. 154.

40

Federal law, regulation, or lease stipulations could ultimately set different standards for the 1002 area.

41

U.S. Dept. of the Interior, Bureau of Land Management. Environmental Assessment National Petroleum

Reserve-Alaska (NPR-A) Exploratory Drilling Program Puviaq #1 and #2 Exploration Wells,

ConocoPhillips Alaska. (December 2002). p. 4-22. See also Kristen Nelson, “Building resource roads,”

Petroleum News. April 27, 2003. Anchorage, Alaska. p. 1. Also, Department of Energy Press Release,

“DOE Joins Alaska in Replacing 30-Year Old ‘Ad-Hoc’ Rule with Science-Based Model for Protecting

Tundra.” June 3, 2003. (Available October 6, 2003, at [http://www.energy.gov/engine/content.do]; search

for “tundra.”)

42

Department of Energy Press Release, “DOE Joins Alaska in Replacing 30-Year Old ‘Ad-Hoc’ Rule with

Science-Based Model for Protecting Tundra.” June 3, 2003. (Available June 4, 2003, at

[http://www.energy.gov/HQPress/releases03/junpr/pr03121_v.htm].)

CRS-17

for seismic exploration each year, and 15 cm (6 in.) of snow is not sufficient to protect the tundra

in many areas of the North Slope.”

Distinct Aspects of the 1002 Area

With respect to infrastructure needs, the 1002 area is distinct in two important respects from

current development. The first is its terrain. The 1002 area is made up largely of low rolling hills

with braided rivers containing gravel bars. While the terrain per se would present no unusual

difficulties for oil development, it presents some relatively new challenges due the natural

environment of the North Slope. Modern arctic exploration and development methods rely heavily

on ice technologies not only in the exploration phase but also in the development and production

phases when winter ice roads substitute for gravel roads under certain conditions. Freshwater

supplies are essential to this technology.

However, the flat terrain of developed areas to the west (where there are numerous ponds to

serve as water sources) is characteristic of only part of the 1002 area, chiefly south of Kaktovik, and

to a lesser extent near the mouth of the Canning River; elsewhere in the 1002 area the topography

is more rolling. Small thaw lakes, like those that are nearly ubiquitous in developed areas to the

west, are concentrated only in those very flat areas. Nearly all of the lakes are less than 640 acres

and most are less than 6 feet deep, and freeze solid during winter (making them impractical as

resources for ice road construction).43 Consequently, fresh water is not as readily available as in

currently developed areas, although impoundments might be constructed.

Moreover, regardless of water supply, ice technology is reportedly considered impractical in

hilly terrain (a common condition in the 1002 area).44 Reduced water supplies, together with hilly

terrain less favorable to ice technology, pose a problem if industry were to rely on ice technology to

reduce development’s footprint in the 1002 area.

The second distinctive characteristic is the distance of the 1002 area from major existing

infrastructure.45 The need for new infrastructure would depend substantially on whether existing

facilities could serve new areas, or whether operational costs were best controlled by building new

facilities close by. For example, the nearest dock serving industry is at Endicott (roughly 40 miles

west of the far western edge of the 1002 area). The closest current onshore oil field with a gravel

road is over 20 miles west of the boundary at Badami, a field that was recently closed due to poor

economics. In contrast, the Alpine complex was able to use West Dock and the large Kuparuk

development as a staging area and for some of its support needs. Additionally, as described above,

a permanent road into the general area (if not to the main pad at Alpine) has drawn support as a

means of improving economic prospects for the NPR-A.

43

U.S. Dept. of the Interior, Fish and Wildlife Service. Final Report Baseline Study of the Fish, Wildlife, and

Their Habitats Vol. 1 (December 1986), p. 30.

44

45

Kristen Nelson, “Building resource roads,” Petroleum News ( April 27, 2003). p. 1.

As noted above, this report does not address whether a footprint limitation might apply to Native lands in

the Refuge. If there were such a limitation, worded to apply only to federal lands but not Native lands,

infrastructure might be preferentially located on Native land, possibly resulting in a substantial development

footprint that technically stayed within a legislative limit. See CRS Report RL31278 and CRS Report

RL31115, cited above.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.