Public Transportation New Starts Program:
Background
name redacted
Specialist in Transportation Policy
January 17, 2013
Congressional Research Service
7-....
www.crs.gov
R42921
CRS Report for Congress
Prepared for Members and Committees of Congress
Public Transportation New Starts Program: Background
Summary
The New Starts program is a discretionary funding program for the construction of new fixedguideway public transportation systems and the expansion of existing systems. Eligible projects
include transit rail, including subway/elevated rail (heavy rail), light rail, and commuter rail, as
well as bus rapid transit (BRT) and ferries. Public transportation, as defined in federal law, does
not include transportation by school bus, intercity bus, or intercity passenger rail (Amtrak).
The New Starts program is one element of the federal public transportation program that is
administered by the Federal Transit Administration (FTA) within the Department of
Transportation. In July 2012, the New Starts program was reauthorized through FY2014 as part of
the Moving Ahead for Progress in the 21st Century Act (MAP-21; P.L. 112-141). Funding is
authorized at $1.9 billion for FY2013 and FY2014, or about 18% of the overall federal public
transportation program budget. Unlike FTA’s other major programs, funding for the New Starts
program comes from the general fund of the U.S. Treasury, not the mass transit account of the
highway trust fund. Moreover, the New Starts program provides discretionary funding whereas
the other major programs provide funding by formula.
The program underwent several significant changes in MAP-21:
•
Funding can now be used for substantial investments in existing fixed guideway
lines that increase the capacity of a corridor by at least 10%, termed “core
capacity improvement projects.” MAP-21 also authorizes the evaluation and
funding of a program of interrelated projects.
•
MAP-21 retains the definition of Small Starts projects as those costing less than
$250 million and seeking $75 million or less in federal funding. But MAP-21
does not specifically reserve funding for Small Starts projects as was the case in
prior law.
•
MAP-21 simplifies the New Starts process by reducing the number of major
stages from four to three. The new stages are termed project development,
engineering, and construction.
•
MAP-21 eliminates the alternatives analysis that is separate from the alternatives
analysis required by National Environmental Policy Act of 1969 (NEPA).
•
MAP-21 provides FTA with authority to advance projects more quickly in certain
circumstances.
A recent focus of both Administration and congressional concern has been the rating scheme by
which projects are evaluated, particularly the notion of cost effectiveness. Among other things,
MAP-21 changes the definition of cost effectiveness from incremental travel time saved to cost
per rider. This would likely improve the rating of projects that generally provide shorter trips,
such as streetcars.
Congressional Research Service
Public Transportation New Starts Program: Background
Contents
Introduction...................................................................................................................................... 1
Funding ............................................................................................................................................ 2
Program Characteristics ................................................................................................................... 5
Types of Eligible Projects .......................................................................................................... 5
New Starts Funding Process ...................................................................................................... 6
Small Starts ................................................................................................................................ 8
Project Rating ............................................................................................................................ 8
New Starts Program Legislative History ....................................................................................... 10
Figures
Figure 1. Federal Public Transportation Program Funding Shares .................................................. 3
Figure 2. New Starts Program Funding ........................................................................................... 4
Figure 3. New Starts Planning and Project Development Process................................................... 6
Contacts
Author Contact Information........................................................................................................... 13
Congressional Research Service
Public Transportation New Starts Program: Background
Introduction
The New Starts program provides federal funds to public transportation agencies on a largely
competitive basis for the construction of new fixed guideway transit systems and the expansion of
existing systems (49 U.S.C. §5309). In federal law, “fixed guideway” is defined as “a public
transportation facility: using and occupying a separate right-of-way for the exclusive use of
public transportation; using rail; using a fixed catenary system;1 for a passenger ferry system; or
for a bus rapid transit system” (49 U.S.C. §5302(7)). Bus rapid transit (BRT) is distinguished
from regular bus transit by high-frequency service at widely spaced stops and a combination of
various elements that might include transit stations, level-platform boarding, separate right-ofway, traffic signal priority, and special branding.2 It should be noted that public transportation, as
defined in federal law, does not include transportation by school bus, intercity bus, or intercity
passenger rail (Amtrak).
Most New Starts funding has been provided to transit rail systems for subway/elevated rail (heavy
rail), light rail, or commuter rail projects. With federal support, a number of cities, such as
Charlotte, Denver, Minneapolis, and Salt Lake City, have opened entirely new rail systems, and
many other cities have added to existing systems. Two current extension projects supported by
New Starts funding are the Second Avenue subway in New York City and the Dulles Airport
Corridor Metrorail extension in northern Virginia.3 Rail transit route-mileage almost doubled
between 1985 and 2009, with light rail mileage almost quadrupling, commuter rail mileage
doubling, and subway mileage growing by 25%. Transit rail systems now provide about 44% of
public transit trips (up from 31% in 1985), with most of the rest, about 51%, provided by bus.4
BRT systems have proliferated over the past few years, partly with the help of New Starts
1
A catenary system involves overhead wires that supply electrical power to transit vehicles.
In federal law there are two types of BRT projects (49 U.S.C. §5309(a)(3)): (1) fixed guideway BRT projects defined
as “a bus capital project: (A) in which the majority of the project operates in a separated right-of-way dedicated for
public transportation use during peak periods; (B) that represents a substantial investment in a single route in a defined
corridor or subarea; and (C) that includes features that emulate the services provided by rail fixed guideway public
transportation systems, including: (i) defined stations; (ii) traffic signal priority for public transportation vehicles; (iii)
short headway bidirectional services for a substantial part of weekdays and weekend days; and (iv) any other features
the Secretary may determine are necessary to produce high-quality public transportation services that emulate the
services provided by rail fixed guideway public transportation systems”; and (2) corridor-based BRT projects defined
as “a small start project utilizing buses in which the project represents a substantial investment in a defined corridor as
demonstrated by features that emulate the services provided by rail fixed guideway public transportation systems,
including defined stations; traffic signal priority for public transportation vehicles; short headway bidirectional services
for a substantial part of weekdays and weekend days; and any other features the Secretary may determine support a
long-term corridor investment, but the majority of which does not operate in a separated right-of-way dedicated for
public transportation use during peak periods.” See also, U.S. Department of Transportation, Federal Transit
Administration, Characteristics of Bus Rapid Transit for Decision-Making, Washington, DC, February 2009,
http://www.nbrti.org/docs/pdf/High%20Res%20CBRT%202009%20Update.pdf.
3
U.S. Department of Transportation, Federal Transit Administration, Annual Report on Funding Recommendations
Fiscal Year 2013: Capital Investment and Paul S. Sarbanes Transit in Parks Program, Washington, DC, 2012, pp. 1011 and 13, http://www.fta.dot.gov/documents/FY13_Annual_Report_main_text_1_30_12.pdf.
4
U.S. Department of Transportation, Research and Innovative Technology Administration, Bureau of Transportation
Statistics, National Transportation Statistics, Washington, DC, table 1-1, http://www.bts.gov/publications/
national_transportation_statistics; American Public Transportation Association, Public Transportation Fact Book 2012:
Appendix A (Washington, DC, 2012), table 1, http://www.apta.com/resources/statistics/Pages/transitstats.aspx.
2
Congressional Research Service
1
Public Transportation New Starts Program: Background
funding.5 BRT has particularly benefited from a category of less costly New Starts projects
known as Small Starts.
The New Starts program is one element of the federal public transportation program that is
administered by the Federal Transit Administration (FTA) within the Department of
Transportation. In July 2012, the New Starts program was reauthorized through FY2014 as part of
the Moving Ahead for Progress in the 21st Century Act (MAP-21; P.L. 112-141). The program
underwent several significant changes in MAP-21. This background report explains how the New
Starts program is structured under MAP-21. It begins by discussing program funding and
concludes with a legislative history.
Funding
The New Starts program is one of six major funding programs administered by FTA, accounting
for about 18% of FTA’s budget (Figure 1).6 Unlike FTA’s other major programs, funding for New
Starts comes from the general fund of the U.S. Treasury, not the mass transit account of the
highway trust fund. Moreover, the New Starts program provides discretionary funding whereas
the other major programs provide funding by formula.7
New Starts funding averaged about $1.5 billion per year in the period from FY2004 to FY2008.
Since FY2009 New Starts funding has tended to be greater than this, but more variable (Figure
2). The regular appropriation in FY2009 was supplemented with $750 million from the American
Recovery and Reinvestment Act of 2009 (ARRA; P.L. 111-5). Rescission of New Starts budget
authority affected FY2009 and FY2010 funding; the FY2010 rescission of $280 million
approximately matches funding for the Access to the Region’s Core (ARC) tunnel project, which
was cancelled by New Jersey in October 2010. The cancellation of ARC likely contributed to the
reduction of funding in FY2011.8
For FY2012, Congress decided to fund bus rapid transit projects recommended by FTA for New
Starts funding from the discretionary Bus and Bus Facilities program instead. The Senate
Appropriations Committee report noted: “these projects are eligible for funding from Bus and
Bus Facilities, and this shift will make it possible for the Committee to better support the rail
transit projects in the Capital Investment Grants [New Starts] program.”9 Prior to the passage of
5
According to data from the Bus Rapid Transit Institute, as of May 2012 there were 25 transit agencies operating 60
BRT routes. See, Bus Rapid Transit Institute, “Currently Operating BRT,” http://www.nbrti.org/docs/pdf/Survey/
Currently%20_Operating_May_2012.pdf.
6
For a discussion of all FTA programs, see CRS Report R42706, Federal Public Transportation Program: An
Overview, by (name redacted).
7
Formula funds are distributed to transit agencies, local governments, and state governments based on a variety of
factors including population, population density, and bus and fixed-guideway route miles and vehicle miles.
8
Transportation Weekly, “Final FY11 Approps Deal Provides Zero High Speed Rail Funding, Slashes Mass Transit
New Starts,” Volume 12, Issue 19, April 12, 2011, p.1; Federal Transit Administration, Annual Report on Funding
Recommendations Fiscal Year 2011: New Starts, Small Starts, and Paul S. Sarbanes Transit in Parks Program,
Washington, DC, 2010, p. 7., http://fta.dot.gov/documents/NewStarts_mainText_Jan_2010.pdf.
9
U.S. Congress, Senate Committee on Appropriations, Subcommittee on Transportation and Housing and Urban
Development, and Related Agencies, Transportation and Housing and Urban Development, and Related Agencies
Appropriations Bill, 2012, 112th Cong., 1st sess., September 21, 2011, S.Rept. 112-83, p. 75, http://www.gpo.gov/fdsys/
pkg/CRPT-112srpt83/pdf/CRPT-112srpt83.pdf.
Congressional Research Service
2
Public Transportation New Starts Program: Background
MAP-21, bus program funding was discretionary, but heavily earmarked. In MAP-21, the Bus
and Bus Facilities program is about half its previous size and funding is distributed by formula.
Figure 1. Federal Public Transportation Program Funding Shares
FY2013-FY2014
State of Good
Repair
20%
Urbanized Area
Formula
42%
Rural Area Formula
6%
Growing States and
High Density States
Formula
5%
Bus and Bus
Facilities Formula
4%
Seniors and
Disabled
2%
Other General
Funded
2%
New Starts
18%
Other Trust Funded
1%
Source: Federal Transit Administration, MAP-21 Fact Sheet: Funding Summary, http://www.fta.dot.gov/documents/
FTA_Funding_Summary_Fact_Sheet.pdf.
The majority of federal funding for New Starts and Small Starts projects has come through the
New Starts program, but such projects may also be supported by other federal programs, such as
the FTA’s Urbanized Area Formula program and the Federal Highway Administration’s (FHWA’s)
Congestion Mitigation and Air Quality Improvement (CMAQ) program. Funding amounts from
these other programs tend to be relatively small. In an analysis of New Starts and Small Starts
projects from October 2004 through June 2012, the Government Accountability Office (GAO)
found that almost 92% of federal funding for New Starts projects came from the New Starts
program, 5% from FHWA flex funding (such as CMAQ), 1% from other FTA programs, and 2%
from other federal sources. In Small Start projects, 80% came from the New Starts program, 14%
from FHWA flex funds, and 7% from other FTA programs.10
10
U.S. Government Accountability Office, Public Transit: Funding for New Starts and Small Starts Projects, October
2004 through June 2012, GAO-13-40, November 2012, http://www.gao.gov/assets/660/650030.pdf.
Congressional Research Service
3
Public Transportation New Starts Program: Background
Figure 2. New Starts Program Funding
FY2005-FY2014
3
Bus and Bus Facilities Program Funding
American Recovery and Reinvestment Act
New Starts Program Funding
2.5
Billions of Dollars
2
1.5
1
0.5
0
FY2005
FY2006
FY2007
FY2008
FY2009
FY2010
FY2011
FY2012
FY2013
FY2014
Source: Senate Appropriations Reports; Federal Transit Administration, MAP-21 Fact Sheet: Funding Summary,
http://www.fta.dot.gov/documents/FTA_Funding_Summary_Fact_Sheet.pdf.
Notes: FY2004 through FY2012 is appropriated funding. FY2013 through FY2014 is authorized funding. Includes
rescissions of budget authority in FY2009 ($58.5 million) and FY2010 ($280 million).
Whatever the funding source, the maximum federal share of a New Starts project is 80%. Every
year since FY2002, however, the Senate Appropriations Committee has included in its report a
directive to FTA not to sign any grant agreements for New Starts projects (though not Small Starts
projects) with more than a 60% federal share. Projects approved for New Starts funding typically
have had less than a 60% federal share, often much less.11 MAP-21, however, establishes an
exception to these limitations for up to three BRT projects per fiscal year; these are required to
have a federal share of at least 80% (49 U.S.C. §5309(l)(8)).
Consistent with the law, GAO found that the federal government paid 45% of the cost of New
Starts projects, on average, with local sources paying 48% and state sources 7%. The average
federal share in Small Starts projects, by contrast, was 67%, with 24% from local sources and 9%
from state sources. The vast majority of state and local contributions come from public funds
raised by taxes, bonds, and tolls. Only about 4% of the local funding of New Starts projects came
from private investment or public-private partnerships, according to GAO.
11
See, for example, U.S. Department of Transportation, Federal Transit Administration, Annual Report on Funding
Recommendations Fiscal Year 2013: Capital Investment and Paul S. Sarbanes Transit in Parks Program, Washington,
DC, 2012, pp. 6, 7, and 25, http://www.fta.dot.gov/documents/FY13_Annual_Report_main_text_1_30_12.pdf.
Congressional Research Service
4
Public Transportation New Starts Program: Background
Program Characteristics
Types of Eligible Projects
MAP-21 made substantial changes to the New Starts program, including project eligibility. New
Starts program funds now may be used for substantial investments in existing fixed guideway
lines that increase the capacity of a corridor by at least 10%. These types of projects are termed
“core capacity improvement projects.” MAP-21 also authorizes the evaluation and funding of a
program of interrelated projects.
Since the enactment of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
Legacy for Users (SAFETEA; P.L. 109-59) in 2005, the New Starts program has distinguished
between projects costing less than $250 million and seeking $75 million or less in New Starts
funding, known as Small Starts, and projects above these thresholds, known as New Starts.
Beginning in FY2007, SAFETEA reserved $200 million per year of the overall New Starts
program authorization for Small Starts. While the distinction between Small Starts and New
Starts remains, MAP-21 does not specifically reserve funding for Small Starts projects. As
discussed in more detail below, however, Small Starts projects do pass through a simpler approval
process.
As enacted in MAP-21, there are three types of projects eligible for New Starts funding:
•
Fixed Guideway Capital Projects, involving construction of an operable
segment of a new fixed guideway system or an extension of an existing system,
including BRT projects in which the majority of the project operates in a
separated right-of-way dedicated to public transportation during peak periods.
•
Small Starts Projects, defined as a new fixed guideway project or a corridorbased BRT which costs less than $250 million and receives less than $75 million
of federal assistance. A corridor-based BRT is required to emulate rail service,
but the buses do not need to run most of the way in a separated right-of-way
dedicated to public transportation use.
•
Core Capacity Projects, involving expansion of an existing fixed guideway
corridor to increase capacity by 10% or more. These types of projects, aimed at
eliminating what are sometimes called core capacity constraints, might include
expanding stations to handle more cars, upgrading electrical systems to allow
longer trains, and upgrading signaling systems to allow more trains per hour.12
These projects may also be combined in a Program of Interrelated Projects, which is defined as
the simultaneous development of two or more fixed guideway or core capacity projects.
12
Cambridge Systematics, “Implications of Investments Targeted at Reducing Transit Passenger Bottlenecks,”
National Surface Transportation Policy and Revenue Study Commission, Briefing Paper 4L-04, March 3, 2007,
http://transportationfortomorrow.com/final_report/pdf/volume_3/technical_issue_papers/paper4l_04.pdf.
Congressional Research Service
5
Public Transportation New Starts Program: Background
New Starts Funding Process
Federal funding for major New Starts projects is typically committed in a Full Funding Grant
Agreement (FFGA), usually a multi-year agreement between the federal government and a transit
agency. An FFGA establishes the terms and conditions for federal financial participation,
including the maximum amount of federal funding being committed.13 To obtain an FFGA a
project must pass through an approval process specified in law (Figure 3).
Figure 3. New Starts Planning and Project Development Process
Source: Congressional Research Service; Federal Transit Administration, Capital Investment Program Listening
Session, Presentation at APTA Annual Meeting, October 3, 2012, http://www.fta.dot.gov/map21/index.html.
MAP-21 simplifies the New Starts process by reducing the number of major stages from four to
three. The new stages are termed project development, engineering, and construction.14 To enter
the project development phase, the applicant now needs only to apply to FTA and initiate the
review process required by the National Environmental Policy Act of 1969 (NEPA; P.L. 91-190).
The bill eliminates the duplicative alternatives analysis previously required to be conducted
separately from the alternatives analysis required by NEPA. In general, alternatives analysis is an
evaluation of different solutions to a transportation problem in a specific area or corridor and the
choice of locally preferred alternative (49 C.F.R. §611.5; 40 C.F.R. §1502.14).
13
U.S. Government Accountability Office, Public Transportation: Improvements Are Needed to More Fully Assess
Predicted Impacts of New Starts Projects, GAO-08-844, Washington, DC, July 2008, http://www.gao.gov/new.items/
d08844.pdf.
14
Previously, the New Starts process involved four major phases: planning and alternatives analysis; preliminary
engineering; final design; and construction.
Congressional Research Service
6
Public Transportation New Starts Program: Background
Along with the NEPA work during project development, the project sponsor must develop the
information needed by FTA to review the project’s justification and local financial commitment.
Generally, the applicant has two years to complete project development, although an extension
can be granted in certain circumstances. MAP-21 requires FTA to use an expedited process to
review a sponsor’s technical capacity if it has successfully completed a fixed guideway or core
capacity project in the recent past. MAP-21 also provides authority to advance projects more
quickly using special warrants for projects of which the federal share is $100 million or less or
50% or less of the total project cost. According to FTA, special warrants are “ways in which
projects may qualify for automatic ratings on the project justification criteria,”15 thus not
requiring further detailed analysis. In a rulemaking FTA provided this cost-effectiveness example:
if there is a certain level of transit ridership in the corridor today, and the proposed project
falls within total cost and cost per mile parameters defined by FTA, then it would be
‘‘warranted’’ by FTA as cost-effective, it would receive an automatic medium rating on the
cost-effectiveness criterion, and the project sponsor would not need to undertake or submit
the results of certain analyses.16
FTA permits a project to enter into the engineering phase once the NEPA process is concluded,
the project is selected as the locally preferred alternative, the project is adopted into the
metropolitan plan, and the project is justified on its merits, including an acceptable degree of
local financial commitment. If the project is a core capacity project it also has to be in a corridor
that is over capacity or is projected to be at or over capacity within the next five years. There are
additional requirements for interrelated projects: the projects must be logically connected; when
evaluated as a whole, they must meet the requirements of the New Starts program; and there must
be a project implementation plan showing that construction of each project will start in a
reasonable time frame. The engineering phase is when the preparation of final construction plans
and cost estimates are made, and may also include right-of-way acquisition and utility relocation.
After engineering work is completed, FTA determines whether to sign an FFGA allowing the
project to enter construction. FTA retains some oversight of a project as it is constructed to ensure
compliance with the terms of the FFGA. Moreover, FTA must request the funding that is to be
provided under the terms of the FFGA for each approved project from Congress each fiscal
year.17 In some cases, FTA may assure a project sponsor of its intention to obligate funds for a
project through what is known as a Letter of Intent (49 U.S.C. §5309(k)(1)). FTA may also
obligate some of the funding expected to be provided in an FFGA through an Early Systems
Work Agreement (49 U.S.C. §5309(k)(3)). Although not a guarantee of full funding, an Early
Systems Work Agreement provides funding so that work can begin before an FFGA is awarded.
Several of the changes made to the New Starts process under MAP-21 address the criticism that it
has taken too long to develop and deliver projects. Along these lines, MAP-21 also creates a pilot
program, limited to three projects, for expediting New Starts project delivery.
15
Federal Transit Administration, Fact Sheet: Fixed Guideway Capital Investment Grants ("New Starts”), Section
5309, http://www.fta.dot.gov/documents/MAP-21_Fact_Sheet_-_Fixed_Guideway_Capital_Investment_Grants.pdf.
16
Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 78 Federal
Register 1992-2037, January 9, 2013, p. 2026, http://www.gpo.gov/fdsys/pkg/FR-2013-01-09/pdf/2012-31540.pdf.
17
See, for example, U.S. Department of Transportation, Federal Transit Administration, Annual Report on Funding
Recommendations Fiscal Year 2013: Capital Investment and Paul S. Sarbanes Transit in Parks Program, Washington,
DC, 2012, http://www.fta.dot.gov/documents/FY13_Annual_Report_main_text_1_30_12.pdf.
Congressional Research Service
7
Public Transportation New Starts Program: Background
Small Starts
For Small Starts projects, those requesting $75 million or less in federal assistance and costing
$250 million or less in total, there are just two phases, project development and construction. As
with New Starts, entry into project development only requires the project sponsor to apply to FTA
and initiate the NEPA process. Consequently, for Small Starts there is only one formal decision
for FTA and that is whether to award funding and, hence, move the project into construction.
Funding for a successful Small Starts project is provided in a single grant, if possible, or in an
expedited grant agreement which provides a multi-year commitment similar to an FFGA.
Unlike SAFETEA, which reserved $200 million of the overall program authorization for Small
Starts, MAP-21 does not reserve funds for Small Starts projects in FY2013 and FY2014. This
may change the mix of New Starts and Small Starts projects that are funded, particularly because
the newly permitted grants for core capacity projects could reduce the amount of funding
available for other projects. Core capacity projects are unlike all existing New Starts and Small
Starts projects because, by definition, they are located in cities and corridors that already have
fixed guideway service. It remains to be seen, however, how many core capacity projects will be
submitted for New Starts funding, and the relative cost of these applications.
Project Rating
In determining whether to approve a project’s move from one step to the next in the New Starts
process, FTA computes an overall project rating by averaging the summary ratings of the project
justification criteria and local financial commitment criteria.18 In order to advance from project
development to engineering and from engineering to construction, a project must achieve an
overall rating of at least medium on a five-point scale (low, medium-low, medium, medium-high,
high). The project justification criteria for New Starts projects are enumerated in MAP-21. Some
of the specific measures are defined in a rulemaking which began before enactment of MAP-21
and further detailed in proposed policy guidance.19 Other measures will be dealt with in
subsequent policy guidance and rulemaking.
The project justification criteria in MAP-21 are the following:
•
Mobility improvements. Prior to MAP-21 this criterion included the number of
transit trips and travel time savings, giving greater weight for benefits going to
people who are transit-dependent, compared with a hypothetical baseline
alternative that represented “the best that can be done to address identified
transportation needs in the corridor without a major capital investment in new
infrastructure.”20 FTA has redefined the mobility improvements criterion. It is
18
For the rating system immediately prior to MAP-21 see, U.S. Department of Transportation, Federal Transit
Administration, Capital Investment Program FY2013 Annual Report: Evaluation and Rating Process, Washington,
DC, August 2011, http://www.fta.dot.gov/documents/FY13_Evaluation_Process.pdf.
19
Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 78 Federal
Register 1992-2037, January 9, 2013, p. 2026, http://www.gpo.gov/fdsys/pkg/FR-2013-01-09/pdf/2012-31540.pdf;
U.S. Department of Transportation, Federal Transit Administration, “Proposed New Starts and Small Starts Policy
Guidance,” January 9, 2013, Washington, DC, http://www.fta.dot.gov/documents/NewStartsPolicyGuidance.pdf.
20
U.S. Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 75 Federal
Register 31385, June 3, 2010.
Congressional Research Service
8
Public Transportation New Starts Program: Background
now measured by total trips on the project, but retains the extra weight given to
trips made by transit-dependent passengers. This measure is no longer compared
to a baseline alternative. Apart from being simpler, FTA notes that this new
measure will increase the relative importance of shorter transit trips.21 In the
previous scheme, projects serving shorter trips were at a disadvantage in the
competition for funds because riders would have had less opportunity to save
time than those using projects serving longer trips.
•
Environmental benefits. Previously these benefits were measured as the air
quality designation of the project’s location, but in its rulemaking FTA broadens
this to the “direct and indirect benefits to the natural and human environment,
including air quality improvement from changes in vehicular emissions, reduced
energy consumption, reduced greenhouse gas emissions, reduced accidents and
fatalities, and improved public health.”22
•
Congestion relief. This was previously included in the cost effectiveness
criterion, but only by assuming that “congestion relief adds about 20 percent to
the travel time savings generated by the project.”23 Because this criterion was
added by MAP-21 the specific measures used in the evaluation will be decided
upon in future policy guidance and rulemaking.
•
Economic development effects. Prior to MAP-21, this was evaluated on the
basis of transit-supportive plans and policies, such as zoning regulations near
transit stations, that would foster economic development should the project go
forward. In its rulemaking, FTA includes an evaluation of affordable housing
plans and policies in the project area.
•
Land use (or capacity needs of the corridor for core capacity projects). In the
past this has involved measuring existing land uses and parking supply in the
corridor and station areas. FTA, in its rulemaking, adds a measure of publically
supported housing in the corridor.
•
Cost-effectiveness as measured by cost per rider. Prior to MAP-21, cost
effectiveness was measured by a project’s cost and predicted effect on reducing
users’ travel time.24 FTA will now use the cost per rider measure instead.
According to FTA, this measure will simplify the evaluation and balance the
benefits of long- and short-distance trips.
MAP-21 eliminated operating efficiencies as a project justification criterion and added congestion
relief. FTA proposes to give equal weight to each of the six factors within the project justification
21
Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 78 Federal
Register 1992-2037, January 9, 2013, p. 2027, http://www.gpo.gov/fdsys/pkg/FR-2013-01-09/pdf/2012-31540.pdf.
22
Ibid., p. 2026.
23
Ibid., p. 2025.
24
The definition used by FTA prior to MAP-21 was “the incremental cost per hour of transportation system user
benefit between the baseline and build alternatives.” See, Federal Transit Administration, Capital Investment Program
FY 2012 Evaluation and Rating Process, Washington, DC, 2012, p.8, http://www.fta.dot.gov/documents/
FY12_Evaluation_Process(2).pdf. See also, U.S. Government Accountability Office, Public Transportation:
Improvements Are Needed to More Fully Assess Predicted Impacts of New Starts Projects, GAO-08-844, July 2008,
pp. pp. 16-18, http://www.gao.gov/assets/280/278603.pdf.
Congressional Research Service
9
Public Transportation New Starts Program: Background
evaluation. FTA also proposes to give the project justification criteria a 50% weight of the overall
score; the other 50% will be determined by a project’s local financial commitment.
To be approved for federal funding a New Starts project must have an acceptable degree of local
financial commitment. This includes financing that is stable, reliable, and timely; sufficient
resources to maintain and operate both the existing public transportation system and the new
addition; and contingency money to support cost overruns or funding shortfalls (49 U.S.C.
§5309(f)(1)). These factors are largely unchanged in MAP-21, as is FTA’s authority in assessing
these factors to evaluate the extent to which local financing exceeds the required non-federal
share. However, MAP-21 did add another consideration in assessing local financial commitment:
“private contributions to the project, including cost effective project delivery, management or
transfer of project risks, expedited project schedule, financial partnering, and other public-private
partnership strategies” (49 U.S.C. §5309(f)(2)(F)).
Prior to MAP-21, the weighted measures determining a project’s local financial commitment
were capital finances (50%), operating finances (30%), and non-New Starts funding share (20%).
In the new proposed scheme, local financial commitment will be judged on current capital and
operating condition (25%), commitment of capital and operating funds (25%), and the
reasonableness of capital and operating cost estimates and planning assumptions as well as capital
funding capacity (50%). FTA also proposes that if the New Starts funding share is less than 50%
of the project’s capital cost then the overall local financial commitment rating will be raised one
level.
New Starts Program Legislative History
The New Starts program evolved from Section 3 of the Urban Mass Transportation Act of 1964
(P.L. 88-365). In 1994, Section 3 became Section 5309 in a revision without substantive change
of Title 49 of the United States Code.25 Beginning in the 1970s, as the commitment of, and
demand for, federal funding began to grow, the Department of Transportation issued a series of
policy statements on the principles by which it would distribute discretionary money to so-called
“new starts.” These statements issued in 1976, 1978, 1980, and 1984 introduced a series of
principles that were written into federal law, including long-range planning, alternatives analysis
incorporating a baseline alternative, cost effectiveness, local financial commitment, multi-year
contracts specifying the limits of federal participation, supportive local land use planning, and a
ratings system.26
Congress inserted many of these principles into law in the Surface Transportation and Uniform
Relocation Assistance Act of 1987 (STURAA; P.L. 100-17). STURAA established the criteria by
which New Starts projects would be judged in order to be eligible for federal funding, and also
required DOT’s recommendations for funding in the subsequent fiscal year to be detailed in an
annual report to Congress. The criteria enacted in STURAA required a New Starts project to be
25
Revision of Title 49, Transportation, United States Code (P.L. 103-272).
U.S. Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects; Final Rule,”
65 Federal Register 76863-76884, December 7, 2000, http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=
2000_register&docid=00-30921-filed.pdf. See also Daniel Duff, Edward J. Gill, Jr., and G. Kent Woodman, Legal
Handbook for the New Starts Process, Legal Research Digest 30, Transit Cooperative Research Program, February
2010.
26
Congressional Research Service
10
Public Transportation New Starts Program: Background
based on an alternatives analysis and preliminary engineering, to be cost-effective, and to be
supported by an acceptable amount of local financial commitment that is stable and dependable.
In the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA, P.L. 102-240),
Congress added to the cost-effectiveness criterion the justifications of mobility improvements,
environmental benefits, and operating efficiencies. ISTEA also added a list of lesser
considerations such as congestion relief, energy consumption, transit supportive land use policies
and future patterns, and economic development. A New Starts project would still need to be based
on alternatives analysis and preliminary engineering and to have an acceptable amount of local
financial commitment.27
The Transportation Equity Act for the 21st Century (TEA-21; P.L. 105-178) left the existing law
mostly unchanged, but added a few additional considerations such as the costs of sprawl and the
technical capacity of a grantee (usually a transit agency) to undertake a project. TEA-21 also
required FTA to rate projects overall as “highly recommended,” “recommended,” or “not
recommended.” TEA-21 also made it a requirement that FTA formally approve a project to move
from preliminary engineering into final design. FTA published its Final Rule in response to TEA21 in 2000,28 and subsequently published several program guidance documents.29
SAFETEA changed the three-point scale, introduced in TEA-21, to a five-point scale of high,
medium-high, medium, medium-low, and low. It also elevated two factors—economic
development effects and public transportation supportive land use policies and future patterns—
from considerations to project justifications. SAFETEA also created the Small Starts program.
Prior to the enactment of SAFETEA, FTA issued a “Dear Colleague” letter announcing that it
would target funding to those projects which received a medium or better rating for cost
effectiveness.30 According to FTA this was in response to concerns expressed by Congress, GAO,
and the DOT’s Inspector General about recommending for funding projects that received a
medium-low on cost effectiveness.31 Following the passage of SAFETEA, in a Notice of
Proposed Rulemaking (NPRM) on August 3, 2007, FTA proposed that a medium rating be
required for FTA to recommend a project for funding, and for cost effectiveness to be weighted as
50% of the project justification measure. The other 50% would consist of land use and economic
27
FTA issued a Notice in 1996 explaining the way in which it would evaluate New Starts projects, and amended that
Notice in 1997. See U.S. Department of Transportation, Federal Transit Administration, “Section 5309 (Section 3(j)
FTA New Starts Criteria,” 61 Federal Register 67093-67107, December 19, 1996; U.S. Department of Transportation,
Federal Transit Administration, “Section 5309 (Section 3(j)) FTA New Starts Criteria,” 62 Federal Register 6075660758, November 12, 1997.
28
U.S. Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects: Final Rule,”
65 Federal Register 76864-76884, December 7, 2000.
29
These were Advancing Major Transit Investments Through Planning and Project Development (2003), Additional
Guidance on Local Initiation of Alternatives Analysis Planning Studies, and New Starts Baseline Alternative Review
and Approval Procedures.
30
Jennifer L. Dorn, Administrator, Federal Transit Administration, “New Starts Rating and Evaluation,” Dear
Colleague Letter, C-03-05, March, 9, 2005, http://www.fta.dot.gov/newsroom_297.html.
31
U.S. Government Accountability Office, Public Transportation: Opportunities Exist to Improve the Communication
and Transparency of Changes to the New Starts Program, GAO-05-674, Washington, DC, 2005, p. 23,
http://www.gao.gov/assets/250/246862.pdf.
Congressional Research Service
11
Public Transportation New Starts Program: Background
development combined into one criterion at a weight of 20%, mobility benefits (20%),
environmental benefits (5%), and benefits to transit-dependent riders (5%).32
This proposal was not well received by the House Transportation and Infrastructure Committee,33
or by those responding to the notice.34 Some of the concerns were that, contravening the intent of
SAFETEA, the rule would place too much emphasis on cost effectiveness and would not
sufficiently evaluate or weight the economic development effects of transit projects. This, critics
contended, would favor projects designed for suburban commuters, such as commuter rail and
bus rapid transit projects, over more centrally located transit projects such as streetcars.35 Because
of these concerns, Congress included language in the Consolidated Appropriations Act, 2008 (P.L.
110-161), preventing FTA from implementing a final rule. In the SAFETEA-LU Technical
Corrections Act of 2008 (P.L. 110-244), Congress amended 49 U.S.C. Section 5309 to require
that FTA “give comparable, but not necessarily equal, numerical weight to each project
justification criteria in calculating the overall project rating.” This was carried forward in MAP21 (49 U.S.C. §5309(g)(2)(B)(ii) and 49 U.S.C. §5309(h)(6)).
FTA withdrew the 2007 NPRM in February 2009, and then in July 2009 issued final guidance
establishing cost effectiveness as 20% of the project justification rating. The other factors were
economic development (20%), mobility improvements (20%), land use (20%), environmental
benefits (10%), and operating efficiencies (10%). This was followed in January 2010 with an
announcement that FTA was withdrawing the policy of only recommending for funding projects
that received a medium cost-effectiveness rating or better in favor of recommending projects with
an overall rating of medium or better (although projects must score a medium or better on both
project justification and local financial commitment).36 At the same time FTA announced that it
intended to issue a new NPRM for changes to the evaluation for New Starts and Small Starts
projects. In this regard, FTA issued an Advance Notice of Proposed Rulemaking on June 3, 2010,
requesting comments on how to improve measurement of cost effectiveness, environmental
benefits, and economic development.37 An NPRM was issued January 25, 2012, along with
32
Federal Transit Administration, “Major Capital Investment Projects,” 72 Federal Register 43328-43377, August 3,
2007.
33
U.S. Congress, House Committee on Transportation and Infrastructure, Hearing on the Federal Transit
Administration’s Proposed Rule on the New Starts and Small Starts Programs, “Summary of Subject Matter,” 110th
Cong., 1st sess., September 26, 2007, H.Hrg. 110-72 (Washington: GPO, 2007).
34
U.S. Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 74 Federal
Register 7388, February 17, 2009, http://www.gpo.gov/fdsys/pkg/FR-2009-02-17/pdf/E9-3208.pdf.
35
K. Siggerud, Director of Physical Infrastructure, U.S. Government Accountability Office, Preliminary Analysis of
Changes to and Trends in FTA’s New Starts and Small Starts Programs, Statement Before House Subcommittee on
Highways and Transit, May 10, 2007, GAO-07-812T, http://www.gao.gov/new.items/d07812t.pdf; T. Herrick, “A
Streetcar Named Aspire: Lines Aim to Revive Cities,” Wall Street Journal, June 20, 2007, B1.
36
Ray LaHood, Secretary of Transportation, “Dear Colleague New Starts and Small Starts Project,” January 13, 2010,
http://www.fta.dot.gov/documents/Dear_Colleague_New_Starts_and_Small_Starts_Project.pdf.
37
Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 75 Federal
Register 31385, June 3, 2010.
Congressional Research Service
12
Public Transportation New Starts Program: Background
proposed New Starts/Small Starts policy guidance.38 A final rule was published January 9, 2013,
along with revised proposed policy guidance.39
Before the changes in the proposed rulemaking were finalized Congress enacted MAP-21,
making substantial changes to the New Starts program. Some of the changes proposed by FTA in
its January 2012 NPRM were incorporated into the law. For example, MAP authorizes the use of
warrants for projects in which the federal funding is $100 million or less or the federal funding
share is 50% or less (49 U.S.C. §5309(g)(3)). Some other elements of the program subject to
proposed new rules were changed by the law and some changes in the law were not considered in
the proposed new rules. For example, operating efficiencies has been dropped from the list of
project justifications and congestion relief added. FTA will deal with these sorts of issues in
future rulemaking and policy guidance.
The rulemaking and revised proposed policy guidance establish some significant changes in the
evaluation of New Starts/Small Starts projects. According to the rulemaking, FTA has two broad
goals: to measure a broader range of benefits and to simplify the evaluation process. To
accomplish the first goal FTA will, for example, evaluate environmental benefits by measuring
anticipated changes in air quality criteria pollutants, energy use, greenhouse gas emissions, and
safety. Environmental benefits in the previous evaluation scheme were based solely on an area’s
air quality designation. To accomplish the second goal, FTA will take a number of steps including
simplifying measures, eliminating the baseline alternative requirement, and improving the ways
in which data are submitted to FTA and evaluated. One of the simplified measures is to evaluate
mobility improvements as the estimated total number of trips generated by the project with an
extra weight for trips by transit-dependent people. Prior to the rulemaking five measures were
used to estimate mobility improvements including incremental travel time saved per passenger
mile over the baseline alternative. This change, along with changes to the cost effectiveness
measure required by law, will likely improve the rating of projects that generally provide shorter
trips, such as streetcars.
Author Contact Information
(name redacted)
Specialist in Transportation Policy
[redacted]@crs.loc.gov, 7-....
38
Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 77 Federal
Register 3848-3909, January 25, 2012, http://www.gpo.gov/fdsys/pkg/FR-2012-01-25/pdf/2012-1198.pdf; Department
of Transportation, Federal Transit Administration, “Proposed New Starts/Small Starts Policy Guidance,” January 25,
2012, http://www.fta.dot.gov/12304_14971.html.
39
Department of Transportation, Federal Transit Administration, “Major Capital Investment Projects,” 78 Federal
Register 1992-2037, January 9, 2013, p. 2026, http://www.gpo.gov/fdsys/pkg/FR-2013-01-09/pdf/2012-31540.pdf;
U.S. Department of Transportation, Federal Transit Administration, “Proposed New Starts and Small Starts Policy
Guidance,” January 9, 2013, Washington, DC, http://www.fta.dot.gov/documents/NewStartsPolicyGuidance.pdf.
Congressional Research Service
13
EveryCRSReport.com
The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the
Library of Congress, charged with providing the United States Congress non-partisan advice on
issues that may come before Congress.
EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The
reports are not classified, and Members of Congress routinely make individual reports available to
the public.
Prior to our republication, we redacted names, phone numbers and email addresses of analysts
who produced the reports. We also added this page to the report. We have not intentionally made
any other changes to any report published on EveryCRSReport.com.
CRS reports, as a work of the United States government, are not subject to copyright protection in
the United States. Any CRS report may be reproduced and distributed in its entirety without
permission from CRS. However, as a CRS report may include copyrighted images or material from a
third party, you may need to obtain permission of the copyright holder if you wish to copy or
otherwise use copyrighted material.
Information in a CRS report should not be relied upon for purposes other than public
understanding of information that has been provided by CRS to members of Congress in
connection with CRS' institutional role.
EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim
copyright on any CRS report we have republished.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.