Transportation, Housing and
Urban Development, and Related Agencies
(THUD): FY2013 Appropriations
(name redacted)
Specialist in Housing Policy
(name redacted)
Analyst in Transportation Policy
(name redacted)
Specialist in Housing Policy
January 22, 2014
Congressional Research Service
7-....
www.crs.gov
R42578
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Summary
The Transportation, Housing and Urban Development, and Related Agencies (THUD)
appropriations subcommittee is charged with providing annual appropriations for the Department
of Transportation (DOT), Department of Housing and Urban Development (HUD), and related
agencies. The HUD budget generally accounts for the largest share of discretionary
appropriations provided by the subcommittee. However, when mandatory funding is taken into
account, DOT’s budget is larger than HUD’s budget, because it includes funding from
transportation trust funds. Mandatory funding typically accounts for a little less than half of the
bill total.
In the deliberations on FY2013 THUD funding during the second session of the 112th Congress,
the House passed a THUD bill (H.R. 5972) and the Senate Committee on Appropriations reported
out a THUD bill (S. 2322), but this bill was not passed by the Senate. Thus Congress did not
enact a separate THUD funding bill prior to the beginning of FY2013.
THUD appropriations for FY2013 were provided through a pair of continuing resolutions (CRs):
P.L. 112-175 provided funding from the beginning of FY2013 through March 27, 2013, and P.L.
113-6 provided funding through the end of FY2013. These CRs provided funding at roughly the
FY2012 level. These CRs included several exceptions (anomalies) for individual DOT and HUD
accounts. P.L. 113-6 also included an across-the board rescission of 0.2%.
FY2013 THUD funding was further reduced by the imposition of a sequester, per the terms of the
Budget Control Act. The sequester reduced DOT funding by around $1.6 billion, and HUD
funding by around $3 billion.
In terms of final FY2013 THUD funding, Congress enacted $71.3 billion for DOT in FY2013;
after the sequester reduction, DOT received around $70.6 billion. Congress enacted $33.4 billion
for HUD in FY2013, pre-sequester. Accounting for sequestration, HUD was provided with about
$31.4 billion in FY2013.
Congressional Research Service
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Contents
Introduction to Transportation, HUD, and Related Agencies (THUD) ........................................... 1
Status of the FY2013 THUD Appropriations Bill ........................................................................... 2
FY2013 THUD Funding Consideration During the 112th Congress.......................................... 3
The Disaster Relief Appropriations Act, 2013........................................................................... 4
The Budget Control Act and FY2013 Sequestration ................................................................. 4
The Further Continuing Appropriations Act, 2013 .................................................................... 6
THUD Funding Trends .................................................................................................................... 6
Changes in Appropriations Subcommittee Structures Make It Difficult to Track
Trends ..................................................................................................................................... 6
FY2013: Detailed Tables and Selected Key Issues .......................................................................... 7
Title I: Department of Transportation ........................................................................................ 7
Selected Budget Issues ........................................................................................................ 9
Title II: Department of Housing and Urban Development ...................................................... 16
Selected Budget Issues ...................................................................................................... 20
Title III: Related Agencies ....................................................................................................... 22
Selected Budget Issues ...................................................................................................... 23
Figures
Figure A-1. Allocation of THUD Net Discretionary Budget Authority, FY2012 .......................... 25
Figure A-2. Allocation of THUD Total Budgetary Resources (Including Contract
Authority), FY2012 .................................................................................................................... 25
Tables
Table 1. Status of FY2013 Transportation, Housing and Urban Development, and Related
Agencies Appropriations .............................................................................................................. 2
Table 2. Transportation, Housing and Urban Development, and Related Agencies
Appropriations, FY2012-FY2013................................................................................................. 3
Table 3. Funding Trends for Department of Transportation and Department of Housing
and Urban Development, FY2007-FY2013 Request.................................................................... 7
Table 4. Department of Transportation FY2013 Detailed Budget Table ......................................... 7
Table 5. Amtrak Grants, FY2012-FY2013 .................................................................................... 15
Table 6. HUD FY2013 Detailed Budget Table .............................................................................. 17
Table 7. Appropriations for Related Agencies, FY2012-FY2013 .................................................. 22
Table A-1. Budget Savings in FY2012 THUD Appropriations Bill .............................................. 26
Congressional Research Service
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Appendixes
Appendix........................................................................................................................................ 24
Contacts
Author Contact Information........................................................................................................... 26
Key Policy Staff ............................................................................................................................. 26
Congressional Research Service
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Introduction to Transportation, HUD, and
Related Agencies (THUD)
The Transportation, Housing and Urban Development, and Related Agencies (THUD)
appropriations subcommittees are charged with drafting bills to provide annual appropriations for
the Department of Transportation (DOT), Department of Housing and Urban Development
(HUD), and related agencies. Typically, these bills are reported out by the appropriations
committees and passed by the House and Senate, which then produce a conference agreement.
Title I of the annual THUD appropriations bill funds the Department of Transportation. The
mission of DOT is to serve the United States by ensuring a fast, safe, efficient, accessible, and
convenient transportation system that meets vital national interests and enhances the quality of
life of the American people today and into the future.1 DOT is primarily a grant-making and
regulatory organization; its programs are organized roughly by mode, providing grants to state
and local government agencies to support the construction of transportation infrastructure for
highways, transit, and intercity passenger rail, while providing regulatory oversight to promote
safety for the freight rail, commercial trucking, and maritime industries. The exception is
aviation; the Federal Aviation Administration (FAA) not only administers grants for airport
development and regulates the safety of aviation operations, but also operates the air traffic
control system of the United States, and it thus accounts for the majority of the employees
of DOT.
Title II of the annual THUD appropriations bill funds the Department of Housing and Urban
Development. HUD’s mission is to create strong, sustainable, inclusive communities and quality
affordable homes for all.2 HUD’s programs are primarily designed to address housing problems
faced by households with very low incomes or other special housing needs. These include several
programs of rental assistance for persons who are poor, elderly, and/or have disabilities. Three
rental assistance programs—Public Housing, Section 8 Vouchers, and Section 8 project-based
rental assistance—account for the majority of the department’s nonemergency funding. Two
flexible block grant programs—HOME and Community Development Block Grants (CDBG)—
help communities finance a variety of housing and community development activities designed to
serve low-income families. Other, more specialized grant programs help communities meet the
needs of homeless persons, including those with AIDS. HUD’s Federal Housing Administration
(FHA) insures mortgages made by lenders to home buyers with low downpayments and to
developers of multifamily rental buildings containing relatively affordable units.
Title III of the THUD appropriations bill funds a collection of related agencies. The related
agencies under the jurisdiction of the subcommittee are a mix of transportation-related agencies
and housing and community development-related agencies. They include the Access Board, the
Federal Maritime Commission, the National Transportation Safety Board, the Amtrak Office of
Inspector General (IG),3 the Neighborhood Reinvestment Corporation (often referred to as
1
http://www.dot.gov/about.html#whatwedo.
http://portal.hud.gov/hudportal/HUD?src=/about/mission.
3
The Amtrak IG’s office has typically been funded through Amtrak’s general appropriation; recently, an incident
where the Amtrak Board replaced the Inspector General raised questions about the whether the independence and
effectiveness of the Amtrak IG’s office was being compromised. In the wake of that incident, Congress has been
providing funding for the Amtrak IG’s office separately, under the Related Agencies title of the appropriations act, to
(continued...)
2
Congressional Research Service
1
Transportation, HUD, and Related Agencies: FY2013 Appropriations
NeighborWorks), the United States Interagency Council on Homelessness, and the costs
associated with the government conservatorship of the housing-related government-sponsored
enterprises, Fannie Mae and Freddie Mac.
Status of the FY2013 THUD Appropriations Bill
Table 1 provides a timeline of legislative action on the FY2013 THUD appropriations bill, and
Table 2 lists the total funding provided for each of the titles in the bill for FY2012 and the
amount requested for that title for FY2013. As is discussed in the next section, much of the
funding for this bill is in the form of contract authority, a type of mandatory budget authority.
Thus, the discretionary funding provided in the bill (often referred to as the bill’s 302(b)
allocation) is only around half of the total funding provided by this bill.
Table 1. Status of FY2013 Transportation, Housing and Urban Development, and
Related Agencies Appropriations
Subcommittee
Markup
Bill
House
Senate
House
Report
H.R. 5972
(112th
Congress)
June 7,
2012
April 17,
2012
June 20,
2012
S. 2322
(112th
Congress)
House
Passage
Senate
Report
June 29,
2012
April 19,
2012
Conf.
Report
Conference Approval
House
Senate
March 6,
2013
March 21,
2013
March 20,
2103
267-151
318-109
73-26
H.Rept.
112541
H.R. 933
(113th
Congress)
Senate
Passage
Public
Law
S.Rept.
112-157
P.L. 113-6
March 26,
2013
Source: CRS Appropriations Status Table.
(...continued)
underline the independent role the Amtrak IG’s office is expected to play in oversight of Amtrak.
Congressional Research Service
2
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Table 2. Transportation, Housing and Urban Development, and Related Agencies
Appropriations, FY2012-FY2013
(in millions of dollars)
FY2012
Enacted
Title
FY2013
Request
FY2013 House
(H.R. 5972/
112th)
FY2013
Senate
Comm.
(S. 2322/
112th)
FY2013
Enacted:
Presequester,
Including
0.2% Acrossthe-Board
Rescissions
(ATB)
FY2013:
Postsequester
Title I: Department
of Transportation
$71,574
$73,356
$69,664
$70,203
$71,300
$70,354
Title I Discretionary
$19,505
$14,293
$17,634
$18,104
$17,909
$17,001
Title 1 Mandatory
$52,069
$59,063
$52,029
$52,099
$53,391
$53,353
Title II: Housing and
Urban Development
$37,434
$33,555
$33,583
$34,961
$33,416
$31,424
$373
$374
$388
$373
$372
NA
Total
$109,381
$107,285
$103,635
$105,537
$105,088
NA
Total Discretionary
$57,312
$48,223
$51,606
$53,438
$51,697
NA
Total Mandatory
$52,069
$59,063
$52,029
$52,099
$53,391
NA
Title III: Related
Agencies
Sources: Table prepared by CRS based on information available in H.Rept. 112-541, S.Rept. 112-157, FY2012
enacted, FY2013, and FY2014 President’s Budget, table prepared by HUD (FY2013 HUD post-sequester enacted
levels); DOT Operating Plan (FY2013 DOT post-sequester enacted levels). “Total” represents net total
budgetary resources. Totals may not add up due to rounding and scorekeeping adjustments. Figures do not
include emergency supplemental funding.
Note: Figures include advance appropriations provided in the bill, rather than advance appropriations that will
become available in the fiscal year. The former are the amounts generally shown in committee press releases;
the latter are the amounts against which the committee is generally “scored” for purposes of budget
enforcement.
FY2013 THUD Funding Consideration During the 112th Congress
The President’s FY2013 budget requested $73.4 billion in new budget resources for DOT. The
requested funding was $3.5 billion (5%) more than the amount provided for FY2012 (not
counting $1.7 billion in FY2012 emergency funding). Both the House-passed bill and Senate
Committee on Appropriations’ bills recommended roughly the same level of funding as in
FY2012 (not counting the emergency funding). The House-passed FY2013 THUD bill (H.R.
5972) included no funding for the Transportation Investments Generating Economic Recovery
(TIGER) grant program or for the high speed and intercity passenger rail development program,
two priorities of the Administration. The Senate THUD bill (S. 2322) proposed to fund the
TIGER program and provide a minimal level of funding for high speed rail development ($100
million, compared to the $1.0 billion request). The Administration request proposed a
restructuring of DOT surface transportation programs reflecting a reauthorization proposal (a
similar proposal was included in last year’s request). The appropriations committees did not
support the requested restructuring; in July 2012, Congress passed surface transportation
Congressional Research Service
3
Transportation, HUD, and Related Agencies: FY2013 Appropriations
reauthorization legislation that did restructure DOT’s surface transportation program but differed
from the Administration proposal.
The President’s FY2013 budget requested nearly $34 billion in net new budget authority for HUD
in FY2013. This is about $4 billion less than was provided in FY2012. However, in terms of new
appropriations for HUD’s programs and activities, the President’s budget actually requested an
increase of more than $512 million compared to FY2012. The difference—a decrease in net
budget authority versus an increase in new appropriations—is attributable to an estimated
increase in the amount of excess receipts available from the FHA insurance fund, which are used
to offset the cost of the HUD budget. S. 2322 included about $35 billion in net new budget
authority for HUD. That is about $1 billion more than the President’s request and over $2 billion
less than was provided in FY2012. H.R. 5972 included $33.6 billion for HUD, which is less than
the Senate proposed but more than the President requested.
The Administration threatened to veto the House bill. In part this threat came because of the
House’s overall discretionary funding level for FY2013, which was below the ceiling allowed for
FY2013 under the terms of the the Budget Control Act of 2011. Another stated reason for the
threat is opposition to certain program funding levels in the bill, such as zeroing out the DOT
TIGER and high speed rail programs and the HUD Choice Neighborhoods and Sustainable
Communities programs, as well as cuts to HUD homeless assistance grants and other programs.
FY2013 appropriations were not enacted before the start of the fiscal year, so Congress enacted a
continuing resolution (H.J.Res. 117) providing funding for federal agencies at roughly the
FY2012 level for the first six months of FY2013. The 112th Congress adjourned without enacting
final FY2013 appropriations.
The Disaster Relief Appropriations Act, 2013
On January 29, 2013, President Obama signed the Disaster Relief Appropriations Act, 2013, into
law (P.L. 113-2). The act provided $50.7 billion in supplemental funding and legislative
provisions to address both the immediate losses from Hurricane Sandy, as well as to support
mitigation for future disasters. The act contained $13.07 billion for DOT, including funding for
repairs to public transportation ($10.9 billion) and roads ($2.0 billion).
The act contained $16 billion in funding for HUD, all of which was provided to the Community
Development Block Grant (CDBG) program. The law established a number of terms and
conditions for the funding that vary from the rules covering the regular CDBG program. In
addition, P.L. 113-2 included language to allow HUD to make funding adjustments in the Section
8 Housing Choice Voucher for local public housing authorities affected by the storm.4
The Budget Control Act and FY2013 Sequestration
FY2013 discretionary appropriations were considered in the context of the Budget Control Act of
2011 (BCA, P.L. 112-25). The BCA established discretionary spending limits for FY2012-
4
For more information about the supplemental, see CRS Report R42869, FY2013 Supplemental Funding for Disaster
Relief, coordinated by (name redacted) and (name redacted).
Congressional Research Service
4
Transportation, HUD, and Related Agencies: FY2013 Appropriations
FY2021.5 It allowed for the adjustment of the discretionary limits for several different purposes,
including for appropriations designated as being for disaster relief and appropriations designated
as emergency requirements.
The BCA also tasked a Joint Select Committee on Deficit Reduction to develop a federal deficit
reduction plan for Congress and the President to enact by January 15, 2012. The failure of
Congress and the President to enact deficit reduction legislation by that date triggered an
automatic spending reduction process established by the BCA, consisting of a combination of
sequestration and lower discretionary spending caps that were scheduled to begin on January 2,
2013. However, prior to that date, Congress enacted the American Taxpayer Relief Act of 2012
(ATRA, P.L. 112-240), which made several substantive changes to the BCA, including a delay of
the scheduled BCA sequester until March 1, 2013, and a reduction of the total amount scheduled
to be sequestered.6
The sequestration process for FY2013 required automatic, largely across-the-board spending cuts
at the program, project, or activity level to achieve equal budget reductions from both defense and
nondefense funding. The level of cuts was to be determined by the Office of Management and
Budget (OMB), under terms specified by the Balanced Budget and Emergency Deficit Control
Act of 1985, as amended by the BCA and ATRA.
On March 1, 2013, President Obama ordered the BCA-mandated sequestration. OMB calculated
that it required a 7.8% reduction in non-exempt defense discretionary funding, a 5.0% reduction
in non-exempt nondefense discretionary funding, a 5.1% reduction for most non-exempt
nondefense mandatory funding, and a 7.9% reduction for non-exempt defense mandatory
funding.7 The majority of DOT’s budget was exempted from sequestration per Section 255 of P.L.
99-177 as amended, so the overall reduction in DOT funding was closer to 2%, though because of
the exclusions the impact was uneven, with affected accounts being reduced by 5%. Nearly all of
HUD’s budget is non-exempt discretionary funding,8 and thus was subject to a 5% reduction in
funding for FY2013. These percentages were then applied to the funding levels in place at the
time in order to calculate dollar amount reductions for each non-exempt account. According to a
report accompanying the order, funding for DOT’s programs and activities for FY2013 was
reduced by about $1.6 billion; funding for HUD’s programs and activities for FY2013 was
reduced by about $3 billion as a result of the sequester.9
5
For more information about the BCA, see CRS Report R41965, The Budget Control Act of 2011, by (name redacted),
(name redacted), and (name redacted).
6
For more information about ATRA, see CRS Report R42949, The American Taxpayer Relief Act of 2012:
Modifications to the Budget Enforcement Procedures in the Budget Control Act, by (name redacted)
7
Office of Management and Budget, Memorandum for the Heads of Executive Departments and Agencies (M-13-06),
“Issuance of the Sequestration Order Pursuant to Section 251A of the Balanced Budget and Emergency Deficit Control
Act of 1985, as Amended, March 1, 2013.”
8
A very small amount of HUD funding is considered non-exempt mandatory ($3 million); about $250 million in the
tenant-based rental assistance account is considered exempt from sequestration because it is administered jointly with
the Veterans Administration; and HUD’s revolving loan fund accounts are also considered exempt from sequestration.
9
These totals include the sequester of amounts provided both by the continuing resolution, as well as the emergency
supplemental disaster funding provided for DOT’s Public Transportation Emergency Relief Program ($10.9 billion)
and HUD’s CDBG program ($16 billion) in response to Hurricane Sandy. The DOT total does not include a $316
million reduction in transfers to the Highway Trust Fund, which does not affect program funding for FY2013. See
“OMB Report to the Congress on the Joint Committee Sequestration for FY2013,” March 1, 2013.
Congressional Research Service
5
Transportation, HUD, and Related Agencies: FY2013 Appropriations
The Further Continuing Appropriations Act, 2013
Congress passed H.R. 933, as amended, which included continuing appropriations for THUD and
several other federal agencies, on March 21, 2013; it was signed into law on March 26, 2013, as
P.L. 113-6. Division F of P.L. 113-6, the Further Continuing Appropriations Act, 2013, provides
funding for THUD in Titles I and VIII. Funding is provided generally at the level and under the
conditions provided in FY2012, as modified by anomalies, the application of the sequester, and a
0.2% across-the-board rescission in section 3004 of the act.
Anomalies include the following:
•
For DOT, adjusting the funding levels of certain accounts changing certain
statutory references to reflect provisions of P.L. 112-141, the surface
transportation authorization act enacted after passage of FY2012 THUD
appropriations.
•
Funding increases for some HUD programs. These include the Homeless
Assistance Grants, Section 8 tenant-based rental assistance, the Public Housing
Operating Fund, and Indian Housing Loan Guarantees.
THUD Funding Trends
Changes in Appropriations Subcommittee Structures Make It
Difficult to Track Trends
Between 2003 and 2008, the House and Senate Committees on Appropriations reorganized their
subcommittee structures three times. Prior to FY2005, DOT and HUD were funded in separate
appropriations bills under the jurisdiction of separate subcommittees. From the time those
departments were placed under the jurisdiction of the same subcommittee through FY2008, the
list of other agencies also under the jurisdiction of the Transportation, Department of Housing and
Urban Development, and Related Agencies subcommittees changed as well.
These changes make year-to-year comparisons of Transportation and Housing and Urban
Development appropriations bills complex, as their appropriations appear in different bills in
combination with various other agencies. Other factors, such as supplemental appropriations for
response to disasters (such as the damage caused by the Gulf Coast hurricanes in the fall of 2005)
and changes in the makeup of the Department of Transportation (portions of which were
transferred to the Department of Homeland Security in 2004), also complicate comparisons of
year-to-year funding. Table 3 shows funding trends for DOT and HUD over the period FY2007FY2012, omitting emergency funding and other supplemental funding, and the amounts requested
for FY2013. The purpose of Table 3 is to indicate trends in the funding for these agencies, which
is why emergency supplemental appropriations are not included in the figures.
Congressional Research Service
6
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Table 3. Funding Trends for Department of Transportation and Department of
Housing and Urban Development, FY2007-FY2013 Request
(in billions of current dollars)
FY2007
FY2008
FY2009
FY2010
FY2011
FY2012
FY2013
Request
DOTa
$63.2
$64.7
$67.2
$75.7
$68.7
$71.6
$73.4
HUD
36.2
37.6
41.5
46.9
41.1
37.4
33.6
Department
Source: U.S. House of Representatives, Committee on Appropriations, Comparative Statement of Budget
Authority tables from FY2005 through FY2011. Unless otherwise noted, amounts are reduced to reflect acrossthe-board rescissions.
Note: Figures do not include emergency or supplemental funding.
a.
Figures include mandatory funding.
FY2013: Detailed Tables and Selected Key Issues
Title I: Department of Transportation
Table 4 presents an account-by-account summary of FY2013 appropriations for DOT, compared
to FY2012.
Table 4. Department of Transportation FY2013 Detailed Budget Table
(in millions of current dollars)
FY2013
Senate
Comm.
(S. 2322/
112th)
FY2013
Enacted:
Presequester,
Post-0.2%
ATB
FY2013
Operating:
Postsequester
FY2012
Enacted
FY2013
Request
FY2013
House
(H.R. 5972/
112th)
Essential Air Servicea
143
114
114
114
143
136
National Infrastructure
Investments
500
500
—
500
499
474
780
783
261
830
781
742
Operations
9,653
9,718
9,718
9,698
9,634
9,148
Facilities & Equipment
2,731
2,850
2,750
2,750
2,725
2,588
Research, Engineering, &
Development
168
154
149
134
167
159
3,350
3,350
3,350
3,350
3,343
3,343
15,902
15,145
15,966
15,932
15,870
15,238
Department of Transportation
Selected Accounts
Office of the Secretary (OST)
Total, OST
Federal Aviation Administration
(FAA)
Grants-in-Aid for Airports (AIP)
(limitation on obligations)
Total, FAA
Congressional Research Service
7
Transportation, HUD, and Related Agencies: FY2013 Appropriations
FY2013
Senate
Comm.
(S. 2322/
112th)
FY2013
Enacted:
Presequester,
Post-0.2%
ATB
FY2013
Operating:
Postsequester
Department of Transportation
Selected Accounts
FY2012
Enacted
FY2013
Request
FY2013
House
(H.R. 5972/
112th)
Federal Highway Administration
(FHWA) (total)
41,545
42,569
39,883
39,883
40,359
40,321
Motor Carrier Safety Operations
and Programs
248
250
244
248
250
250
Motor Carrier Safety Grants to
States
307
330
307
309
309
309
555
580
551
572
560
560
Operations and Research
250
338
274
259
250
248
Highway Traffic Safety Grants to
States
550
643
502
550
553
553
800
981
776
809
809
801
High-speed and intercity
passenger rail grant program
—
—b
(2)
100
—
—
Network Development
—
4,000
—
—
—
—
1,418
—c
1,802
1,450
1,415
1,344
—
4,046
—
—
—
—
1,632
2,731
2,015
1,758
1,628
1,546
Formula and bus grants
8,361
—
8,361
8,361
8,461
8,461
Capital investment grants (New
Starts)
1,897
—
1,806
2,032
1,951
1,855
10,550
10,733
10,369
10,705
10,708
10,597
349
344
338
387
349
327
Assistance to small shipyards
10
—
—
9
10
9
Pipeline and Hazardous Materials
Safety Administration (PHMSA)
201
276
205
224
201
191
Research and Innovative
Technology Administration
(RITA)
16
—
14
—
16
15
Office of Inspector General
80
84
84
84
80
75
Federal Motor Carrier Safety
Administration (FMCSA)
Total, FMCSA
National Highway Traffic Safety
Administration (NHTSA)
Total, NHTSA
Federal Railroad Administration
(FRA)
Amtrak
System Development
Total, FRA
Federal Transit Administration
(FTA)
Total, FTA
Maritime Administration
(MARAD)
Congressional Research Service
8
Transportation, HUD, and Related Agencies: FY2013 Appropriations
FY2013
Senate
Comm.
(S. 2322/
112th)
FY2013
Enacted:
Presequester,
Post-0.2%
ATB
FY2013
Operating:
Postsequester
FY2012
Enacted
FY2013
Request
FY2013
House
(H.R. 5972/
112th)
Saint Lawrence Seaway
Development Corporation
32
33
33
33
32
31
Surface Transportation Board
28
30
30
28
29
28
Appropriation (discretionary
funding)
17,942
19,685
17,770
18,240
17,909
17,001
Limitations on obligations
(mandatory funding)
52,069
59,062
52,029
52,099
52,652
52,652
Exempt contract authority
(mandatory funding)
739
739
739
739
739
701
Total non-emergency budgetary
resources, DOT
70,750
73,356
70,538
71,008
71,300
70,354
Emergency appropriations
1,662
—
—
—
13,070
12,417
Subtotal—new funding
72,412
74,230
70,538
71,008
84,370
82,771
—d
17,001
Department of Transportation
Selected Accounts
DOT Totals
Rescissions
-3,886
-57
-135
-135
—d
Net new discretionary budget
authority
19,505
14,294
17,634
18,104
17,909
Sources: Table prepared by CRS based on information available in H.Rept. 112-541 (for FY2012 enacted,
FY2013 request, and FY2013 House Committee) and S.Rept. 112-157 (for FY2013 Senate Committee).
Information on post-sequester funding levels provided by DOT.
Notes: Table subtotals may not add due to omission of some accounts. Subtotals and totals may differ from
those in the source documents due to treatment of rescissions, offsetting collections, etc. The figures in this
table reflect new budget authority made available for the fiscal year. For budgetary calculation purposes, the
source documents may subtract rescissions of prior year funding or contract authority, or offsetting collections,
in calculating subtotals and totals. Table does not include funding provided under continuing resolutions. The
FY2013 figures do not reflect $100 million in mandatory funding.
a.
FY2012 does not reflect the $50 million in mandatory funding received by the Essential Air Service each
year. The FY2013 figures do not reflect $100 million in mandatory funding.
b.
The Administration requested $4 billion for a proposed new Network Development program, which would
have included the High Speed and Intercity Passenger Rail Grant Program.
c.
The Administration requested $4 billion for a proposed new System Development program, which would
have included grants to Amtrak.
d.
Across-the-board rescission of 0.2% already reflected in figures.
Selected Budget Issues
Program Authorizations
On July 6, 2012, new surface transportation authorization legislation was signed into law. P.L.
112-141, Moving Ahead for Progress in the 21st Century (MAP-21), was enacted after the House
had passed, and the Senate Appropriations Committee had reported out, their FY2013 THUD
Congressional Research Service
9
Transportation, HUD, and Related Agencies: FY2013 Appropriations
bills. MAP-21 authorizes funding levels similar to those the affected DOT administrations
(FHWA, FMCSA, NHTSA, and FTA) received in FY2012, but it made changes to the program
structure of several of those DOT agencies.
Comparison of FY2012 and FY2013 Figures
DOT funding has typically increased from year to year. The FY2011 appropriation broke that
trend, and in both FY2011 and FY2012 Congress provided lower levels of funding for DOT than
in FY2010. The Obama Administration’s FY2013 budget request reflected a reauthorization
proposal for DOT surface transportation programs. This included a proposed restructuring of
some surface transportation programs with overall funding roughly at the level provided in
FY2012, plus a $50 billion supplemental appropriation requested for FY2012 to provide an
immediate boost to transportation infrastructure improvement and job creation. This up-front
additional funding was described as an alternative to the typical surface transportation
reauthorization funding plan, in which funding levels gradually increase over an authorization
period of several years. This proposal would have front-loaded a large increase in funding in the
first year of the Administration’s proposed six-year surface transportation reauthorization plan.
The Administration had made a similar proposal in its FY2012 budget request—restructuring the
DOT surface transportation program structure, and requesting an additional $50 billion in upfront funding—which Congress did not support. Thus, while the FY2012 enacted funding and the
appropriation amounts recommended in H.R. 5972 and S. 2322 for FY2013 were comparable,
comparing these figures to the amounts requested in the FY2013 budget for DOT’s surface
transportation programs is complex.
Overall, the FY2013 request totaled $73.4 billion in new budget resources for DOT. The
requested funding was $3.5 billion (5%) more than the amount provided for FY2012 (not
counting $1.7 billion in emergency funding provided in FY2012). Both the House-passed bill and
Senate Committee on Appropriations’ bill would have provided roughly the same level of funding
as in FY2012 (not counting the emergency funding). The final enacted amount, $70.6 billion, is
slightly less (about $100 million) than the FY2012 enacted amount
Highway Trust Fund Solvency
Virtually all federal highway funding, and most transit funding, comes from the highway trust
fund, whose revenues come largely from the federal motor fuels excise tax (“gas tax”). For
several years, expenditures from the fund have exceeded revenues; for example, in FY2010,
revenues were approximately $35 billion, while authorized expenditures were approximately $50
billion.10 Congress transferred a total of $34.5 billion from the general fund of the Treasury to the
highway trust fund during the period FY2008-FY2010 to keep the trust fund solvent. In January
2012 the Congressional Budget Office projected that the trust fund would become insolvent
around the end of FY2013, given current revenue and expenditure levels.11 The MAP-21
10
Revenues from Federal Highway Administration, Highway Statistics 2010, Table FE-10 (“D. Net Excise Taxes”)
(http://www.fhwa.dot.gov/policyinformation/statistics/2010/fe10.cfm); authorized expenditures represent the total
limitations on obligations for FHWA, FMCSA, NHTSA, and FTA, for FY2010.
11
Congressional Budget Office, The Budget and Economic Outlook, Fiscal Years 2012 to 2022, January 2012, p. 126,
http://www.cbo.gov/sites/default/files/cbofiles/attachments/01-31-2012_Outlook.pdf. The Highway Trust Fund has two
accounts, one for highway expenditures and one for transit; CBO estimates that the highway account will be unable to
meet obligations in a timely manner sometime during FY2013, while the transit account will reach that point sometime
(continued...)
Congressional Research Service
10
Transportation, HUD, and Related Agencies: FY2013 Appropriations
legislation enacted in 2012 authorized additional transfers from the general fund to the Highway
Trust Fund to keep the fund solvent through FY2014.
One reason for the shortfall in funding in the highway trust fund is that the federal gas tax has not
been raised since 1993, while improved fuel efficiency and inflation have reduced the amount of
fuel consumed and the value of the tax revenues. The tax is a fixed amount assessed per gallon of
fuel sold, not a percentage of the cost of the fuel sold. That means that whether a gallon of gas
costs $1 or $4, the highway trust fund receives the same amount from each gallon sold (18.3 cents
for each gallon of gasoline, 24.3 cents for each gallon of diesel). Meanwhile, the capacity of the
federal gas tax to support transportation infrastructure has been diminished by inflation (which
has reduced the purchasing power of the revenue raised by the tax) and increasing automobile
fuel efficiency (since more efficient vehicles are able to travel farther on a gallon of fuel,
increasing efficiency reduces the amount of tax generated by each mile of vehicle travel). The
Congressional Budget Office has forecast that gasoline consumption will be relatively flat during
the period 2013 to 2022, as continued increases in the fuel efficiency of the U.S. passenger fleet
will offset increases in the number of miles people will drive.12 It forecasts highway trust fund
revenues of $41 billion in FY2022, well short of even the current annual level of authorized
expenditures from the fund.13
A host of reports produced by the Department of Transportation, congressionally created
commissions, and nongovernmental groups generally assert that the nation is not spending
enough to maintain its existing transportation infrastructure, let alone to make desired
improvements.14 These reports call for considerably higher levels of spending on transportation
infrastructure, by both the federal government and the states.
A dilemma faced by Congress is how to provide the additional funding needed to maintain the
current level of transportation infrastructure spending, let alone to support significant increases in
that funding. While raising the federal gas tax is seen as the simplest and most efficient way to
provide significantly increased funding for transportation infrastructure in the near future, there
appears to be little support in Congress or in the Administration for raising the gas tax during the
current period of economic difficulty. Even if there were support for higher gas taxes, increases in
vehicle fuel efficiency resulting from previously enacted legislation and greater use of electric
vehicles are likely to constrain motor fuel consumption, leaving in question the longer-term
viability of motor fuel taxes as the principal source of surface transportation funding.15
(...continued)
in FY2014.
12
Ibid., p. 91.
13
Ibid., Table 4-3.
14
For example, Paying Our Way, the Report of the National Surface Transportation Infrastructure Financing
Commission (http://financecommission.dot.gov/Documents/NSTIF_Commission_Final_Report_Mar09FNL.pdf);
Transportation for Tomorrow: the Report of the National Surface Transportation Policy and Revenue Study
Commission (http://transportationfortomorrow.com/final_report/index.htm), U.S. Department of Transportation’s 2010
State of the Nation’s Highways, Bridges, and Transit Conditions and Performance Report to Congress
(http://www.fhwa.dot.gov/policy/2010cpr/).
15
For more information on the difficulties facing the Highway Trust Fund and alternative proposed revenue sources,
see CRS Report R41490, Surface Transportation Funding and Finance, by (name redacted) and (name redacted)
(available upon request).
Congressional Research Service
11
Transportation, HUD, and Related Agencies: FY2013 Appropriations
As it did last year, the President’s FY2013 budget proposed to change the name of the highway
trust fund to the transportation trust fund and to increase authorized expenditures from the fund to
a total of $476 billion over the next six years. This money would have gone to increasing the
funding levels of existing surface transportation programs, and the Federal Railroad
Administration and the Federal Transit Administration’s New Starts transit construction program
would have been added to the programs financed by the fund. This proposal reflected, in part, a
recommendation of the National Commission on Fiscal Responsibility and Reform to expand the
highway trust fund to cover rail infrastructure—but the commission also recommended increasing
the gas tax by 15 cents per gallon by 2015, and thereafter limiting expenditures from the fund to
match its revenues.16 The budget request did not propose an increase in the gas tax; it proposed to
offset the additional spending with savings assumed from reducing overseas military operations.
This proposal was not supported by Congress.
TIGER Grant Program
The Transportation Investments Generating Economic Recovery (TIGER) grant program
originated in the American Recovery and Reinvestment Act (P.L. 111-5), where it was referred to
as national infrastructure investment. It is a discretionary grant program intended to address two
criticisms of the current structure of federal transportation funding: that virtually all of the
funding is distributed to state and local governments who select projects based on their priorities,
making it difficult to fund projects that have national or regional impacts but whose costs fall
largely on one or two states; and that the federal funding is divided according to mode of
transportation, making it difficult for major projects in different modes to compete for the limited
amount of discretionary funding. The program provides grants to projects of regional or national
significance in various modes on a competitive basis, with recipients selected by the federal
DOT.17
Congress has continued to support the TIGER program through the annual DOT appropriations
acts. There have been four rounds of TIGER grants (from ARRA funding, and from FY2010FY2012 annual appropriations). The Administration requested $500 million for FY2013, the
same amount provided in FY2012.
The House-passed bill did not provide any funding for the program, noting that the
Administration has not defined the selection criteria by which recipients are selected. The Senate
Committee on Appropriations recommended $500 million. This program was not included in the
MAP-21 authorization act.18 The FY2013 enacted bill funded TIGER at the FY2012 level, $500
million; after sequestration reductions and rescission, the program received $474 million.
16
The National Commission on Fiscal Responsibility and Reform, The Moment of Truth, December 2010,
Recommendation 1.7, p. 24, http://www.fiscalcommission.gov/sites/fiscalcommission.gov/files/documents/
TheMomentofTruth12_1_2010.pdf.
17
Although the program is, by description, intended to fund projects of national and regional significance, in practice
its funding has gone more toward projects of regional and local significance. In part this is a function of congressional
intent, as Congress has directed that a portion of the funding go to projects in rural areas and has set low minimum
grant thresholds ($1 million for rural projects); in part it may be a function of the program funding—$500 million is not
a great deal of money relative to the cost of projects which will have national and regional impacts, as such projects
may cost hundreds of millions of dollars each; and in part it has been a function of the choices of DOT, which has
chosen to award grants to dozens of projects each year, with virtually all of the grants for less than $20 million.
18
MAP-21 includes a similar discretionary program, Projects of National and Regional Significance; to be eligible for
that program, a project must have eligible project costs expected to be exceed $500 million.
Congressional Research Service
12
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Essential Air Service (EAS)
The EAS program seeks to preserve air service to small communities whose level of ridership
makes air service unprofitable by subsidizing the cost of that service. The costs of the program
have more than doubled since FY2008, in part because route reductions by airlines have resulted
in an average of six new communities being added to the program each year.
Supporters of the EAS program contend that preserving airline service to small communities was
a commitment Congress made when it deregulated airline service in 1978, anticipating that
airlines would reduce or eliminate service to many communities that were too small to make such
service economically viable. Supporters contend that subsidizing air service to smaller
communities promotes economic development in rural areas. Critics of the program note that the
subsidy cost per passenger is relatively high,19 that many of the communities in the program have
very few residents flying out of their airports, and that some of the airports receiving EAS
subsidies are little more than an hour’s drive from major airports.
The Administration requested $114 million for the EAS program. This appeared to be a cut from
the FY2012 enacted figure of $143 million, but in fact the Administration’s request represented
an increase over the FY2012 figure. This is because the EAS program is funded from two
sources: in addition to the annual discretionary appropriation for the program, there is a
mandatory annual authorization of $50 million financed by overflight fees collected from
commercial airlines by the Federal Aviation Administration (this funding does not appear in the
appropriation budget tables).20 Thus, the total funding provided for the EAS program in FY2012
was $193 million (the $143 million appropriation added to the $50 million mandatory funding).
The Administration’s FY2013 request proposed to increase the mandatory funding from $50
million to $100 million; added to the $114 million discretionary funding requested, that would
have provided a total of $214 million for the EAS program. This would have been an 11% ($21
million) increase over FY2012.
Both the House-passed bill and the Senate Committee on Appropriations’ bill supported the
Administration request. The bills also supported the request to eliminate the 15-passenger aircraft
requirement. The EAS program has required airlines to use, at a minimum, 15-passenger aircraft
to service EAS communities, even though many of these communities typically have fewer than
15 passengers per flight. Eliminating the minimum 15-passenger aircraft requirement is seen as a
way to reduce EAS program costs. The same request was made last year, and was included in the
FY2012 appropriations act.
The current Federal Aviation Administration authorization act (P.L. 112-95, enacted February 14,
2012) included reforms intended to limit EAS program costs, some of which were included in the
FY2012 appropriations act. These include limiting funding to those communities which received
subsidies in FY2011, and limiting coverage to airports that average at least 10 passengers per day
(unless they are more than 175 miles from the nearest hub airport).21 The legislation also repealed
19
To remain eligible for the program, a community’s subsidy per passenger must not exceed $1,000. The per passenger
subsidy varies greatly among the communities in the program, ranging from a low of $6 to a high of $2,372. The DOT
investigates cases where the subsidy exceeds $1,000. A chart of EAS subsidies per passenger per community is on pps.
19-21 of S.Rept. 112-157 (http://www.gpo.gov/fdsys/pkg/CRPT-112srpt157/pdf/CRPT-112srpt157.pdf).
20
These overflight fees apply to international flights that fly over, but do not land in, the United States. The fees are to
be reasonably related to the costs of providing air traffic services to these flights.
21
P.L. 112-95, Title IV, Subtitle B—Essential Air Service.
Congressional Research Service
13
Transportation, HUD, and Related Agencies: FY2013 Appropriations
the local participation program, a pilot program established in 2003 under which communities
assumed a portion of the cost of their EAS subsidy.
The final FY2013 enacted bill provided $143 million for the program, the same amount as in
FY2012; after sequestration reductions and rescission, the program received $136 million.
High Speed and Intercity Passenger Rail
The budget proposed a total of $2.5 billion for high speed and intercity passenger rail funding
under two new accounts which realign existing programs: $1.5 billion for System Preservation
(which would primarily fund maintenance and improvement of existing intercity passenger rail
service, i.e., Amtrak) and $1 billion for Network Development (which would fund new intercity
passenger rail projects). The budget described high speed rail development as the signature
initiative of the Administration’s proposal for surface transportation reauthorization. It is seen as a
way of creating new jobs; providing a new transportation option for intercity travel; and
increasing the capacity, competitiveness, and environmental sustainability of the transportation
system. The Senate Appropriations Committee recommended $100 million for the program. The
House-passed bill did not include any funding for new high speed rail projects.
To date, Congress has provided $10.1 billion for DOT’s high speed and intercity passenger rail
grant program, beginning with $8 billion in the American Recovery and Reinvestment Act of
2009. However, all of that funding was provided by the 111th Congress. The 112th Congress
provided no funding for the high speed and intercity passenger rail grant program for FY2011,
and rescinded $400 million of the unobligated portion of the $10.5 billion already appropriated; it
also provided no funding for the program for FY2012. The final FY2013 enacted funding bill did
not provide any funding for the program.
The $10.1 billion provided in the 111th Congress went to the High Speed and Intercity Passenger
Rail Grant Program. In common usage, references to “high speed rail” are generally taken to
mean systems such as those of Japan, France, Spain, and China, where trains travel on dedicated
networks at speeds greater than 150 miles per hour. Perhaps because it is convenient to abbreviate
references to this program by dropping the middle phrase “and intercity passenger rail,” it is often
taken to be a program intended only to fund high speed lines similar to those in other countries.
But much of the funding in this program has gone to develop intercity passenger rail service with
top speeds of 90 or 110 miles per hour.
In its public comments the Administration has emphasized the high speed rail portion of the
program. However, there is only one state, California, that is actively pursuing development of a
high speed rail line similar to those the Administration has pointed to in Europe and Asia, one that
would provide dedicated tracks for passenger trains traveling at speeds greater than 150 mph.
California has received $3.6 billion in federal funding for this project, but the total cost of
constructing the line is estimated at more than $70 billion, and the financing prospects are
uncertain.
Amtrak
The Administration budget proposed to place Amtrak funding into a new Federal Railroad
Administration account—System Preservation—for which $1.546 billion was requested. This
account would fund publicly owned passenger rail asset development and maintenance, primarily
Congressional Research Service
14
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Amtrak. Amtrak received $1.418 billion in capital, operating, and debt service grants in FY2012.
Amtrak also submits a grant request to Congress, separate from the Administration’s budget
request. Amtrak requested $2.167 billion for FY2013.22 Amtrak’s authorized funding level for
FY2013 is $2.256 billion.23
The Senate Committee on Appropriations recommended $1.450 billion for Amtrak grants; that is
$32 million (2%) more than Amtrak received in FY2012. The House-passed bill recommended
$1.802 billion.
Table 5 shows the amount of funding appropriated for Amtrak grants in FY2012, requested by
the Administration for FY2013, recommended by the House and Senate Committees on
Appropriations, and final enacted.
Table 5. Amtrak Grants, FY2012-FY2013
(in millions of dollars)
Grant
FY2012
FY2013
Administration
Request
FY2013
House
(H.R. 5972/
112th)
FY2013
Senate
Comm.
(S. 2322/
112th)
FY2013
Enacted:
Presequester,
Post-0.2%
ATB
FY2013
Enacted:
Postsequester
Operating
Grants
466
—
350
400
465
442
Capital and
Debt
Service
Grants
952
—
1,452
1,050
950
902
1,418
1,546
1,802
1,450
1,415
1,344
Total
Grants
Sources: H.Rept. 112-541, S.Rept. 112-157.
Notes: Both the House and Senate would direct $271 million of the Capital and Debt Service Grants to debt
service. The House would allow the Secretary of DOT to use up to $80 million of the Capital and Debt Service
grants for Amtrak operating assistance, if needed. The Administration did not request funding for these accounts,
but requested $1.546 billion for a new “System Preservation” account, which would be available to Amtrak.
The major difference between the House and Senate funding was a proposal in the House bill to
create a new program within the Amtrak Capital and Debt Service Grants account—Bridge and
Tunnel grants—to fund “high priority, state-of-good-repair, intercity infrastructure projects owned
by Amtrak or States.” The House bill included $500 million for this new program. The federal
share for projects funded under this program would be up to 80%. This proposal was not included
in the enacted bill.
22
Amtrak, FY2013 Grant and Legislative Request, February 1, 2012, Table 1; available at http://www.amtrak.com
(About Amtrak>Reports and Documents>Grant and Legislative Requests).
23
Sections 101 & 102, Passenger Rail Investment and Improvement Act of 2008, Division B of P.L. 110-432.
Congressional Research Service
15
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Federal Transit Administration New Starts and Small Starts
(Capital Investment Grants)
The majority of FTA’s $10 billion funding is funneled to transit agencies through several formula
programs. The largest discretionary grant program is the Capital Investment Grants programs
(commonly referred to as the New Starts program). This program funds new fixed-guideway
transit lines24 and extensions to existing lines. There are two primary components to the program,
based on project cost. New Starts include capital projects with total costs over $250 million which
are seeking more than $75 million in federal funding. Small Starts include capital projects with
total costs under $250 million which are seeking less than $75 million in federal funding.
Congress appropriated $1.955 billion for the Capital Investment Grants program in FY2012. For
FY2013, the Administration requested $2.2 billion for the program. The Senate bill would have
provided $2.0 billion, a 2% increase over FY2012 but $200 million less than requested. This
would have covered the majority of the costs for existing and pending full funding grant
agreements. The House bill would have provided $1.817 billion, $138 million (7%) below the
FY2012 level. The final FY2013 enacted bill provided $1.955 billion; after sequestration
reductions and rescission, the program received $1.855 billion.
New Starts projects must go through a multi-stage process, during which they are repeatedly
evaluated by FTA. Projects must receive positive ratings to proceed to the next step. The final
step is signing of a full-funding grant agreement (FFGA) with FTA. The FFGA details how much
funding the project will receive from FTA and the steps of project development. One purpose of
the FFGA is to encourage accurate estimates of project costs; cost overruns are the responsibility
of the grantee.
New Starts Funding Share
The federal share for New Starts projects, by statute, can be up to 80%. Since FY2002, DOT
appropriations acts have included a provision directing FTA not to sign any full funding grant
agreements that provide a federal share of more than 60%. This provision is in the FY2013 House
bill, but not the Senate bill.
Critics of this provision note that the federal share for highway projects is typically 80% and in
some cases is higher. They contend that, by providing a lower share of federal funding (and thus
requiring a higher share of local funding), this provision tilts the playing field toward highway
projects when communities are considering how to address transportation problems. Advocates of
this provision note that the demand for New Starts funding greatly exceeds the amount that is
available, so requiring a higher local match allows FTA to support more projects with the
available funding. They also assert that requiring a higher local match likely encourages
communities to scrutinize the costs and benefits of major proposed transit projects more closely.
Title II: Department of Housing and Urban Development
Table 6 presents an account-by-account summary of FY2013 appropriations for HUD compared
to FY2012.
24
Fixed-guideway refers to systems in which the vehicle travels on a fixed course; for example, subways and light rail.
Congressional Research Service
16
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Table 6. HUD FY2013 Detailed Budget Table
(in billions of dollars)
FY2013
Senate
Comm.
(S. 2322/
112th)
FY2013
Enacted:
Pre-sequester,
Post-0.2% ATB
FY2013
Enacted:
Including
Sequestration
Reductions
FY2012
Enacted
FY2013
Request
FY2013
House
(H.R. 5972/
112th)
Management and Administration
1.332
1.349
1.325a
1.339
1.329
1.262
Tenant Based Rental Assistance
(Sec. 8 vouchers)b
18.914
19.074
19.134
19.396
18.909
18.172
Public housing capital fund
1.875
2.070
1.985
1.985
1.871
1.777
Public housing operating fund
3.962
4.524
4.524
4.591
4.253
4.054
Choice Neighborhoods
0.120
0.150
0.000
0.120
0.120
0.114
Family Self Sufficiencyc
0.000c
0.060
0.000c
0.000c
0.000c
0.000c
Native American housing block
grants
0.650
0.650
0.650
0.650
0.649
0.616
Indian housing loan guarantee
0.006
0.007
0.006
0.006
0.012d
0.012
Native Hawaiian Block Grant
0.013
0.013
0.000
0.013
0.013
0.012
Native Hawaiian loan guarantee
0.000e
0.001
0.000e
0.000e
0.000e
0.000e
Housing, persons with AIDS
(HOPWA)
0.332
0.330
0.332a
0.330
0.331
0.315
Community Development Fund
(Including CDBG)
3.308
3.143
3.404
3.210
3.301
3.135
Sec.108 loan guarantee; subsidy
0.006
0.000f
0.006
0.000f
0.006
0.006
HOME Investment Partnerships
1.000
1.000
1.200
1.000
0.998
0.948
0.054
0.000g
0.060
0.054
0.053
0.051
2.146
2.029
1.933
Accounts
Appropriations
Self-Help Homeownership
Homeless Assistance Grants
1.901
2.231
2.005h
Project Based Rental Assistance
(Sec. 8) b
9.340
8.700
8.700
9.876
9.322
8.872
Housing for the Elderly
0.375
0.475
0.425
0.375
0.374
0.355
Housing for Persons with
Disabilities
0.165
0.150
0.165
0.150
0.165
0.156
Housing Counseling Assistancei
0.045
0.055
0.045
0.055
0.045
0.043
Manufactured Housing Fees Trust
Fundj
0.007
0.008
0.004
0.006
0.006
0.006
Rental Housing Assistancej,k
0.001
0.000
0.000
0.000
0.001
0.001
FHA Expensesj
0.207
0.215
0.215
0.215
0.207
0.196
GNMA Expensesj
0.020
0.021
0.021
0.021
0.019
0.018
Research and technology
0.046
0.052
0.052
0.046
0.046
0.044
Fair housing activitiesl
0.071
0.068
0.068
0.068
0.071
0.067
Office, lead hazard controlm
0.120
0.120
0.120
0.120
0.120
0.114
Congressional Research Service
17
Transportation, HUD, and Related Agencies: FY2013 Appropriations
FY2013
Senate
Comm.
(S. 2322/
112th)
FY2013
Enacted:
Pre-sequester,
Post-0.2% ATB
FY2013
Enacted:
Including
Sequestration
Reductions
FY2012
Enacted
FY2013
Request
FY2013
House
(H.R. 5972/
112th)
Working capital fund
0.199
0.170
0.170h
0.230n
0.199
0.189
Inspector General
0.124
0.126
0.126
0.125
0.124
0.118
Transformation Initiative
0.050
0.000o
0.050
0.043
0.050
0.047
Appropriations Subtotal (Including
advances provided in current year for
subsequent year)
44.241
44.763
44.791
46.169
44.624
42.632
Housing Certificate Fund
-0.200
0.000
0.000
0.000
0.000
0.000
TBRA Prior Year Advance
Rescission
-0.650
0.000
0.000
0.000
0.000
0.000
Rental housing assistance
rescission
-0.232
0.000
0.000
0.000
0.000
0.000
Rescissions Subtotal
-1.082
0.000
0.000
0.000
0.000
0.000
Manufactured Housing Fees Trust
Fundp
-0.004
-0.004
-0.004
-0.004
-0.004
-0.004
Federal Housing Administration
(FHA)q
-5.172
-10.434
-10.434
-10.434
-10.434
-10.434
GNMA
-0.650
-0.770
-0.770
-0.770
-0.770
-0.770
Offsets Subtotal
-5.826
-11.208
-11.208
-11.208
-11.208
-11.208
Total Non-Emergency Budget
Authority Providedr
37.334
33.555
33.583
34.961
33.416
31.424
0.100
0.000
0.000
0.000
16.000s
15.200s
37.434
33.555
33.583
34.961
49.416
46.624
Accounts
Rescissions
Offsetting Collections and
Receipts
Emergency Funding
Total Budget Authority
Provided, Including
Emergency Funding
Sources: Table prepared by CRS based on H.Rept. 112-541, the House Appropriations Committee report to
accompany H.R. 5972 (FY2012 enacted levels); the President’s FY2013 budget documents, including HUD
Congressional Budget Justifications (FY2013 requested levels); H.R. 5972 and H.Rept. 112-541 (House-proposed
levels); S. 2322 and S.Rept. 112-157 (Senate Committee-proposed levels); the FY2014 Senate Appropriations
Committee Report, S.Rept. 113-45 (FY2013 enacted levels); and FY2012 enacted, FY2013, and FY2014 President’s
Budget, table prepared by HUD (FY2013 enacted levels, reflecting sequestration).
a.
A floor amendment (H.Amdt. 1331) reduced HUD’s salaries and expenses by $2 million and provided an
additional $2 million for HOPWA.
b.
Amounts shown reflect the amount provided in the bill for both the current year and the amount provided
in the bill for the next year in the form of an advance appropriation. The amount available to the account in
the fiscal year is actually the amount provided in the bill for the current year plus the advance provided in
the prior year. Any differences in advance appropriations are generally reflected as scorekeeping
adjustments calculated by CBO.
c.
The Family Self Sufficiency program has traditionally been funded in the tenant-based rental assistance
account. The President’s FY2013 budget requested that a modified version of the program be funded in a
separate account. Both the House and Senate bills included funding for this program within the tenant-based
Congressional Research Service
18
Transportation, HUD, and Related Agencies: FY2013 Appropriations
rental assistance account, and the Consolidated and Further Continuing Appropriations Act (P.L. 113-6)
continued funding through the tenant-based account.
d.
P.L. 113-6 provided increased funding for the Indian Housing Loan Guarantee Program ($12 million, as
compared to $6 million in FY2012) to support a higher level of loan commitment authority in FY2013 ($976
million as compared to $360 million in FY2012). Program activity has been increasing in recent years, and
on multiple occasions HUD has had to suspend new mortgage guarantees under the program when it
exhausted its available budgetary resources. (It most recently suspended new mortgage guarantees in early
March, 2013; that suspension lasted until additional budget authority was provided in P.L. 113-6). P.L. 113-6
also authorized an increase in the guarantee fees that HUD charges under the program; increasing
guarantee fees charged to borrowers could reduce the amount of appropriated funds necessary to cover
program costs.
e.
Amounts for the Native Hawaiian loan guarantee round to less than $1 million. Enacted levels were
$386,000 in FY2012 and $385,000 in FY2013.
f.
The President’s budget requested a new fee structure for the Section 108 loan guarantee account, which
would have eliminated the need for appropriations. S. 2322 adopted this proposal, but it was not enacted.
g.
The Self-Help Homeownership Opportunity Program (SHOP) account funds both SHOP and capacity
building activities. In each of the last several years, the President’s budget request has proposed not funding
SHOP, noting that activities funded under SHOP are also eligible activities under the HOME program. The
President’s budget request included funding for capacity building activities, but under the Community
Development Fund account. However, recent appropriations laws have continued to fund both SHOP and
capacity building under the SHOP account.
h.
A floor amendment (H.Amdt. 1347) reduced HUD’s Working Capital Fund by $5 million and provided an
additional $5 million for Homeless Assistance Grants.
i.
In addition to HUD’s housing counseling assistance program, Congress in recent years has provided funding
specifically for foreclosure mitigation counseling to the National Foreclosure Mitigation Counseling Program
(NFMCP), administered by the Neighborhood Reinvestment Corporation (also known as NeighborWorks
America). NeighborWorks is not part of HUD, but is usually funded as a related agency in the annual HUD
appropriations laws. The President’s FY2013 budget requested $85.9 million for the NFMCP, while the
Senate and House bills proposed $80 million, the same as the FY2012-enacted level. Ultimately the
Consolidated and Further Continuing Appropriations Act (P.L. 113-6) funded the NFMCP at the FY2012
level of $80 million (prior to reduction by the across-the-board rescission and sequestration).
j.
Some or all of the cost of funding these accounts is offset by the collection of fees or other receipts, shown
later in this table.
k.
The Rental Housing Assistance account is used to provide supplemental funding to some older HUD rentassisted properties and, when funding is provided, it is typically offset by recaptures. Funding is not
requested in this account every year.
l.
Fair housing activities consist primarily of grants for the Fair Housing Initiatives Program (FHIP) and the Fair
Housing Assistance Program (FHAP). Through FHIP, nonprofit organizations receive grants so that they can
help people who have complained of discrimination, investigate complaints, and promote the fair housing
laws. FHAP consists of grants to state and local agencies that enforce their own fair housing laws. In
FY2012, FHIP received $42.5 million and FHAP $28.0 million. In FY2013, pursuant to the Consolidated and
Further Continuing Appropriations Act (P.L. 113-6), funding levels were the same as in FY2012, less the
0.2% across-the-board rescission and sequestration.
m.
For more information about lead paint programs, see CRS Report RS21688, Lead-Based Paint Poisoning
Prevention: Summary of Federal Mandates and Financial Assistance for Reducing Hazards in Housing, by (name red
acted).
n.
The Senate Appropriations Committee proposal for the Working Capital Fund (WCF) included $60 million
more than the President’s budget request. According to the Senate Appropriations Committee Report
(S.Rept. 112-157), it would have provided this additional funding to the WCF for technology modernization
activities in lieu of the President’s request for transfer authority to the Transformation Initiative.
o.
The President’s budget request proposed that the Transformation Initiative be funded solely by transfers
from other HUD accounts.
Congressional Research Service
19
Transportation, HUD, and Related Agencies: FY2013 Appropriations
p.
Appropriations language specifies that the overall amount appropriated to the Manufactured Housing Fees
Trust Fund is to be made available to HUD to incur obligations under this program pending the receipt of
fee income; as fee income is received, the appropriation amount is reduced, so that the final appropriation
coming from the general fund is less than the overall appropriated amount. HUD is directed to make
changes to the fees it charges as necessary to ensure that the final fiscal year appropriation is no more than
what is specified in the appropriations language.
q.
Amounts shown here reflect the Congressional Budget Office’s re-estimate of the President’s budget
request, so figures may not match those shown in the President’s budget documents. The President’s
budget request initially showed $688 million in mandatory funding needed to make a required transfer of
funds between FHA accounts by the end of FY2012. After the budget was released, HUD announced that it
no longer expected to need that mandatory funding due to increases in FHA reserves from recent legal
settlements with mortgage servicers and higher mortgage insurance premiums. However, HUD was
required to make a mandatory transfer of $1.7 billion at the end of FY2013, which is not reflected in this
table. For more information, see the “FHA Mutual Mortgage Insurance Fund (MMIF)” section of this report.
r.
Total shown reflects amount provided in the bill, not the amount available in the fiscal year. Any difference
is attributable to differences in advance appropriations. In FY2013, the amount of advance appropriations
provided in the bill was $229 million more than the amount available in the fiscal year as a result of
sequester reductions to the advance appropriation provided in FY2012 for use in FY2013. This difference is
typically treated as a scorekeeping adjustment by the Congressional Budget Office. The total, sequesterreduced, non-emergency funding available in FY2013, accounting for the scorekeeping adjustment, is
$31.196 billion.
s.
Provided for CDBG in P.L. 113-2.
Selected Budget Issues
FHA Mutual Mortgage Insurance Fund (MMIF)
FHA’s single-family mortgage insurance program is intended to be self-financing. The fees that
FHA collects from borrowers are deposited in its insurance fund, the Mutual Mortgage Insurance
Fund (MMIF), and have historically been sufficient to cover the expected losses from the loans
insured. However, if the MMIF ever does not have enough money to cover expected losses on
defaulted loans, it can draw on permanent and indefinite budget authority with the U.S. Treasury
to cover any shortfalls without congressional action.
The FY2013 President’s budget showed that, for the first time, HUD anticipated that the MMIF
would need to draw on this permanent and indefinite budget authority for $688 million during
FY2012.25 The budget estimated that this money would be needed to make a required transfer of
funds from the MMIF’s secondary reserve account to its primary reserve account, in order to
account for an increase in the estimated future losses expected to occur over the life of the loans
insured by FHA. The anticipated need for these funds did not mean that FHA was currently out of
money; at the time, FHA had about $33 billion in reserves that it could use to pay claims,26 and
those funds would have had to be exhausted before any additional funds from Treasury would
have been spent. Rather, the budget included these funds because it was estimated that the funds
that FHA had on hand would not be enough to cover all of its expected future losses on insured
25
Office of Management and Budget, The Appendix, Budget of the United States Government, Fiscal Year 2013,
Department of Housing and Urban Development, p.636, http://www.whitehouse.gov/sites/default/files/omb/budget/
fy2013/assets/hud.pdf.
26
U.S. Department of Housing and Urban Development, FHA Single-Family Mutual Mortgage Insurance Fund
Programs Quarterly Report to Congress FY2012 Q1, March 26, 2012, p. 11, available at http://portal.hud.gov/
hudportal/HUD?src=/program_offices/housing/rmra/oe/rpts/rtc/fhartcqtrly.
Congressional Research Service
20
Transportation, HUD, and Related Agencies: FY2013 Appropriations
loans. Any funds drawn from Treasury would have been held in reserve to pay for these expected
future losses.
After the FY2013 President’s budget was released, HUD stated that it no longer expected to need
this funding from Treasury in FY2012. Rather, it expected that it would receive enough money
from recent increases in the fees it charges for mortgage insurance and legal settlements to cover
any increases in expected losses.27 Therefore, FHA did not have to draw on its permanent and
indefinite budget authority with Treasury in FY2012.
However, FHA did ultimately use its permanent and indefinite budget authority to draw $1.7
billion from Treasury at the end of FY2013 in order to make its required transfer of funds
between reserve accounts in that year.28
Funding for Project-Based Section 8 Rental Assistance Contracts
The project-based rental assistance (PBRA) account provides funding to administer and renew
existing project-based Section 8 rental assistance contracts between HUD and private multifamily
property owners. The President’s budget requested about $600 million less for this account than
was provided in FY2012. The President’s budget documents acknowledged that the funding level
requested would not be sufficient to fund the full 12-month renewal of all of the existing
contracts. Instead, the department planned to “short-fund” the contracts, meaning fund them for
partial terms (less than 12 months). The budget also requested policy changes, and indicated that
the department was pursuing other administrative policy changes that would result in program
savings.29 S. 2322 proposed about $1.2 billion more for the PBRA account than was requested by
the President, stating that the committee rejected the President’s proposal to short-fund Section 8
project-based rental assistance contracts and instead would provide sufficient funding to renew all
contracts for 12 months. The House bill, H.R. 5972, adopted the President’s request for the
Section 8 project-based rental assistance account. Ultimately the PBRA account was funded at the
FY2012 level ($9.340 billion), less amounts for the 0.2% across-the-board rescission (reducing
funding to $9.322 billion30), and sequestration (about another $470 million31). That amount was
27
See, for example, U.S. Congress, Senate Committee on Appropriations, Subcommittee on Transportation and
Housing and Urban Development, and Related Agencies, Hearing on the Proposed Fiscal 2013 Appropriations for the
Federal Housing Administration, 112th Cong., 2nd sess., March 8, 2012, during which Acting FHA Commissioner Carol
Galante stated that “So the budget projection in the President’s budget was that if there were no additional policy
changes, and MIP [mortgage insurance premium] increases, and no additional funds through enforcement actions, and
the economics that the projections were based on stay the same and the volumes stay the same, that we could draw
$688 million from Treasury. Given the changes ... [t]hose two things, obviously, you know, take away the need for the
$688 million.”
28
The President’s FY2014 budget anticipated that FHA would need funds from Treasury to make the required transfer
of funds in FY2013, although the amount that the MMIF ultimately needed was higher than the amount anticipated in
the President’s budget.
29
The full list of program changes are listed in HUD’s Congressional Budget Justification, Project-Based Rental
Assistance, p. A-3, available at http://portal.hud.gov/hudportal/documents/huddoc?id=project-based-2013.pdf.
30
S.Rept. 113-45.
31
Office of Management and Budget, Report to Congress on the Joint Committee Sequestration for Fiscal Year 2013,
March 1, 2013, p. 31, http://www.whitehouse.gov/sites/default/files/omb/assets/legislative_reports/
fy13ombjcsequestrationreport.pdf. Note that this reduction is greater than the sequester reduction shown in Table 6
because it reflects the sequester reduction in the advance appropriation available in FY2013, whereas Table 6shows
only the advance provided in FY2013 for use in FY2014, which was not subject to a sequester reduction.
Congressional Research Service
21
Transportation, HUD, and Related Agencies: FY2013 Appropriations
not sufficient to “fully fund” PBRA contracts, thus requiring HUD to short-fund contracts in
FY2013.
Community Development Block Grants
The Community Development Fund (CDF) funds several community development-related
activities, including the Community Development Block Grant (CDBG) program, the federal
government’s largest and most widely available source of financial assistance supporting state
and local government-directed neighborhood revitalization, housing rehabilitation, and economic
development activities.
For FY2013, the Administration requested $3.1 billion for CDF, which was less than the $3.3
billion appropriated in FY2012. S. 2322, the Senate Appropriations Committee-passed bill,
recommended $3.2 billion for CDF, approximately $100 million more than the President’s
request. H.R. 5972, the House-passed bill, proposed $3.4 billion for CDF, almost $300 million
more than the President’s request and $200 million more than proposed in S. 2322. The FY2013
Consolidated and Further Continuing Appropriations Act (P.L. 113-6) funded CDF at $3.3 billion;
after the 0.2% across-the-board rescission and sequestration, the amount available for CDF was
approximately $3.1 billion.
Title III: Related Agencies
Table 7 presents appropriations levels for the various related agencies funded within the
Transportation, HUD, and Related Agencies appropriations bill.
Table 7. Appropriations for Related Agencies, FY2012-FY2013
(in millions of dollars)
FY2013
Senate
Comm.
S. 2322/
112th)
FY2013
House
(H.R. 5972/
112th)
FY2013
Enacted:
Includes 0.2%
Rescission
but not
Sequestration
FY2013
Enacted:
Includes
Sequestration
Reductions
FY2012
Enacted
FY2013
Request
Access Board
7
7
7
7
7
7
Federal Maritime Commission
24
26
25
25
24
23
National Transportation Safety
Board salaries and National
Transportation Board
102
102
102
102
102
NAa
Amtrak Office of Inspector General
21
22
25
19
20
NAb
Neighborhood Reinvestment
Corporation (NeighborWorks)
215
213
225
215
215
204c
United States Interagency Council
on Homelessness
3
4
3
4
3
d
Related Agencies
Sources: Table prepared by CRS based on H.Rept. 112-541, the House Appropriations Committee report to
accompany H.R. 5972 (FY2012 enacted levels); the President’s FY2013 budget documents, including
Congressional Budget Justifications (FY2013 requested levels); H.R. 5972 and H.Rept. 112-541 (House-proposed
levels); S. 2322 and S.Rept. 112-157 (Senate Committee-proposed levels); the FY2014 Senate Appropriations
Congressional Research Service
22
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Committee Report, S.Rept. 113-45 (FY2013 enacted levels); and agency operating plans (post-sequestration
enacted levels).
Notes: NA means final post-sequester funding levels are not publicly available.
a.
The sequester reduction calculated by OMB for the National Transportation Safety Board was $5 million.
Office of Management and Budget, Report to Congress on the Joint Committee Sequestration for Fiscal Year 2013,
March 1, 2013, p. 66.
b.
The sequester reduction calculated by OMB for the National Railroad Passenger Corporation Office of
Inspector General was $1 million. Office of Management and Budget, Report to Congress on the Joint
Committee Sequestration for Fiscal Year 2013, March 1, 2013, p. 66.
c.
The NeighborWorks FY2013 Operating Plan, available at http://www.nw.org/network/aboutUs/policy/
documents/FY2013OperatingPlan.pdf.
d.
The sequester reduction calculated by OMB for the Interagency Council on Homelessness is $500,000 or
less. Office of Management and Budget, Report to Congress on the Joint Committee Sequestration for Fiscal Year
2013, March 1, 2013, p. 68.
Selected Budget Issues
NeighborWorks America and the National Foreclosure Mitigation Program
The Neighborhood Reinvestment Corporation, commonly known as NeighborWorks America, is
a government-chartered non-profit corporation that supports a variety of community revitalization
activities such as generating investment in communities and providing training and technical
assistance related to affordable housing. In addition to its regular annual appropriation, since
2008 NeighborWorks has also received additional funding to distribute to housing counseling
organizations to use solely for foreclosure prevention counseling. This program is known as the
National Foreclosure Mitigation Counseling Program (NFMCP).32
In FY2012, NeighborWorks received a total of $215.3 million: a regular annual appropriation of
$135 million, of which $5 million was to be used for a multifamily rental housing program, and
an additional $80 million for the NFMCP.
The President’s FY2013 budget request included $213 million for NeighborWorks, a decrease of
just over $2 million from FY2012. This included a regular annual appropriation of $127 million,
a decrease of more than $8 million from the FY2012 enacted level, and $86 million for the
NFMCP. The Senate committee-passed bill proposed funding NeighborWorks at the same level as
FY2012: $135 million for its regular activities and $80 million for the NFMCP. The Housepassed bill proposed increasing funding for NeighborWorks to $225 million. Of that amount, $80
million was designated for the NFMCP. The FY2013 Consolidated and Further Continuing
Appropriations Act (P.L. 113-6) funded NeighborWorks at the FY2012 level, including funding
for the NFMCP, of $215.3 million. The application of the across-the-board rescission in P.L. 1136 reduced funding to $214.9 million,33 and sequestration reduced funding to $204.1 million.34
32
For more information on the NFMCP, see CRS Report R41351, Housing Counseling: Background and Federal Role,
by (name redacted).
33
S.Rept. 113-45.
34
Neighborhood Reinvestment Corporation, NeighborWorks America Statement of Sources and Uses of Funds
Comparison of FY2013 Justification to FY2013 Operating Plan, http://www.nw.org/network/aboutUs/policy/
documents/FY2013OperatingPlan.pdf.
Congressional Research Service
23
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Appendix.
Composition of the THUD Funding Bill
Budget Concepts Relevant for THUD
The numbers cited in discussions of the THUD appropriations bills can be confusing. Different
totals may be published by the committees in their tables and press releases, reported in the press
or by advocates, and even presented in this report, all of which may be correct. This is possible
because the THUD appropriations bill includes different types of funding mechanisms and
savings mechanisms, which can result in different figures being reported for the same programs,
depending on how the numbers are being presented. The following section of this report explains
the different types of funding often included in the THUD appropriations bill.
Most of the programs and activities in the THUD bill are funded through regular annual
appropriations, also referred to as discretionary appropriations.35 This is the amount of new
funding allocated each year by the appropriations committees. Appropriations are drawn from the
resources of the general fund of the Treasury. For some accounts, the appropriations committees
provide advance appropriations, or regular appropriations that are not available until the next
fiscal year.
In some years, Congress will also provide emergency appropriations, usually in response to
disasters. These funds are sometimes provided outside of the regular appropriations acts—often
in emergency supplemental spending bills—and are generally provided in addition to regular
annual appropriations. Although emergency appropriations typically come from the general fund,
they may not be included in the discretionary appropriation total reported for an agency.
In addition to appropriations, much of the Department of Transportation’s budget is derived from
contract authority. Contract authority is a form of budget authority based on federal trust fund
resources, in contrast to “regular” (or discretionary) budget authority, which is based on the
resources of the general fund of the Treasury. Contract authority for DOT is generally derived
from the Highway Trust Fund and the Airport and Airways Trust Fund.
Congressional appropriators are generally subject to limits on the amount of new non-emergency
discretionary funding they can provide in a year. One way to stay within these limits is to
appropriate no more than the allocated amount of discretionary funding in the regular annual
appropriation act. Another way is to find ways to offset a higher level of discretionary funding. A
portion of the cost of providing regular annual appropriations for the THUD bill is generally
offset in two ways. The first is through rescissions, or cancellations of unobligated or recaptured
balances from previous years’ funding. The second is through offsetting receipts and collections,
generally derived from fees collected by federal agencies.
35
According to Congressional Quarterly’s American Congressional Dictionary, discretionary appropriations are
appropriations not mandated by existing law and therefore made available annually in appropriation bills in such
amounts as Congress chooses. The Budget Enforcement Act of 1990 defines discretionary appropriations as budget
authority provided in annual appropriation acts and the outlays derived from that authority, but it excludes
appropriations for entitlements.
Congressional Research Service
24
Transportation, HUD, and Related Agencies: FY2013 Appropriations
When the Appropriations Committee subcommittees are given their “302(b) allocations”—that is,
when the total amount that the Appropriations Committee has to spend for a fiscal year is divided
among the subcommittees—that figure includes only net discretionary budget authority (nonemergency appropriations, less any offsets and rescissions); contract authority from trust funds is
not included. This can lead to confusion, as the annual discretionary budget authority allocations
for THUD are typically around half of the total funding provided in the bill, with the remainder
made up of contract authority, or offset in some way.
The Budget Control Act of 2011 (BCA), which was enacted into law (P.L. 112-25) on August 2,
2011, following negotiations over raising the ceiling on the national debt, established overall
limits, or caps, on the amount of total federal discretionary appropriations that can be provided
for each of FY2012 through FY2021. Within these annual spending limits, decisions about the
actual amount of appropriations for individual programs or agencies will continue to be made
through the regular appropriations process. Under the law, these limits are to be enforced through
a sequestration process involving the cancellation of budgetary resources (i.e., spending cuts).
This means that if the limits are breached, spending for each non-exempt program will be cut by a
uniform percentage.
Allocation Across Agencies
Once the THUD subcommittees receive their 302(b) allocations, they must decide how to allocate
the funds across the different agencies within their jurisdiction. As shown in Figure A-1, when it
comes to net discretionary budget authority (appropriations, less any offsets), the vast majority of
funding allocated by the appropriations committee generally goes to HUD (about two-thirds in
FY2012). However, as shown in Figure A-2, when taking into account contract authority—
which, as noted earlier, is not allocated by the appropriations committees—the total resources
available to DOT are greater than the resources available to HUD.
Figure A-1. Allocation of THUD Net
Discretionary Budget Authority, FY2012
DOT
HUD
Related Agencies
Figure A-2. Allocation of THUD Total
Budgetary Resources (Including
Contract Authority), FY2012
DOT
HUD
Related Agencies
0.7%
34.0%
65.3%
Source: Prepared by CRS based on information
available in S.Rept. 112-157.
0.3%
34.2%
65.4%
Source: Prepared by CRS based on information
available in S.Rept. 112-157.
Impact of Offsets
Besides the level of the 302(b) allocation, one of the most important factors in determining how
much in new appropriations the THUD subcommittee will provide in each year is the amount of
savings available from rescissions and offsets. Each dollar available to the subcommittee in
rescissions and offsets serves to reduce the “cost” of providing another dollar in appropriations.
Congressional Research Service
25
Transportation, HUD, and Related Agencies: FY2013 Appropriations
As shown in Table A-1, in FY2012, without rescissions and offsets, it would have “cost” the
THUD Subcommittee an additional $6 billion to provide the same amount of appropriations.
Table A-1. Budget Savings in FY2012 THUD Appropriations Bill
(in millions of dollars)
Components of THUD Budget Authority
FY2012
New Appropriations (Including Advance Appropriations)
$66,668
Savings
$-6,356
Rescissions of Prior Year Funding
$-530
Rescissions of Contract Authority
$-1
Offsetting Collections and Receipts
$-5,826
Total Net Budget Authority
$57,312
Source: Table prepared by CRS based on Comparative Statement of New Budget (Obligational) Authority for
Fiscal Year 2012 and Budget Estimates and Amounts Recommended in the Bill For Fiscal Year 2013, S.Rept. 112157. Figures include emergency funding.
In any given year, the amount of these “budget savings” can be higher or lower, meaning that the
“cost” of providing the same level of appropriations may be higher or lower.
Author Contact Information
(name redacted)
Specialist in Housing Policy
[redacted]@crs.loc.gov, 7-....
(name redacted)
Specialist in Housing Policy
[redacted]@crs.loc.gov, 7-....
(name redacted)
Analyst in Transportation Policy
[redacted]@crs.loc.gov, 7-....
Key Policy Staff
Area of Expertise
Name
Phone
General DOT funding, passenger rail,
NHTSA, FMCSA, surface transportation
safety and security
D. Randall Peterman
7-....
Aviation safety, aviation security, Federal
Aviation Administration,
(name redacted)
Transportation
Congressional Research Service
/redacted/@crs.loc.gov
7-....
/redacted/@crs.loc.gov
26
Transportation, HUD, and Related Agencies: FY2013 Appropriations
Area of Expertise
Name
Phone
Airport Improvement Program, Federal
Highway Administration, transportation
trust funds
(name redacted)
Federal Railroad Administration, freight
transportation, Maritime Administration,
Surface Transportation Board
(name redacted)
Federal Transit Administration, surface
transportation policy
(name redacted)
7-....
/redacted/@crs.loc.gov
Public Housing, Section 8 rent assistance,
(project-based and vouchers), general HUD
funding
(name redacted)
7-....
/redacted/@crs.loc.gov
Community Development, including CDBG
(name redacted)
7-....
/redacted/@crs.loc.gov
FHA, HOME, Housing Counseling,
NAHASDA
(name redacted)
7-....
/redacted/@crs.loc.gov
Section 202 and Section 811, homelessness
assistance, including HOPWA
(name redacted)
7-....
/redacted/@crs.loc.gov
Neighborhood Reinvestment
Corporation/NeighborWorks
(name redacted)
7-....
/redacted/@crs.loc.gov
Interagency Council on Homelessness
(name redacted)
7-....
/redacted/@crs.loc.gov
United States Access Board
(name redacted)
7-....
/redacted/@crs.loc.gov
Amtrak IG
D. Randall Peterman
7-....
/redacted/@crs.loc.gov
Federal Maritime Commission
(name redacted)
7-....
/redacted/@crs.loc.gov
7-....
/redacted/@crs.loc.gov
Housing and Urban Development
Related Agencies
Congressional Research Service
7-....
/redacted/@crs.loc.gov
27
EveryCRSReport.com
The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the
Library of Congress, charged with providing the United States Congress non-partisan advice on
issues that may come before Congress.
EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The
reports are not classified, and Members of Congress routinely make individual reports available to
the public.
Prior to our republication, we redacted names, phone numbers and email addresses of analysts
who produced the reports. We also added this page to the report. We have not intentionally made
any other changes to any report published on EveryCRSReport.com.
CRS reports, as a work of the United States government, are not subject to copyright protection in
the United States. Any CRS report may be reproduced and distributed in its entirety without
permission from CRS. However, as a CRS report may include copyrighted images or material from a
third party, you may need to obtain permission of the copyright holder if you wish to copy or
otherwise use copyrighted material.
Information in a CRS report should not be relied upon for purposes other than public
understanding of information that has been provided by CRS to members of Congress in
connection with CRS' institutional role.
EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim
copyright on any CRS report we have republished.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.