December 5, 2024
Federal Aviation Administration Oversight of Boeing
Commercial air travel is one of the safest forms of
transportation, and fatal crashes are extremely rare.
Between 2013 and 2022, U.S. air carriers flew more than
175 million cumulative flight hours and experienced six
fatal crashes resulting in 15 total fatalities. The
International Air Transport Association found that global
airline safety performance improved by 61% over the past
decade. Although design flaws and manufacturing defects
have seldom played a significant role in commercial
aviation crashes, two fatal mishaps and additional serious
incidents involving Boeing airplanes have brought its
design and manufacturing processes under global scrutiny.
As the sole producer of large transport airplanes in the
United States, Boeing is a major focus of Federal Aviation
Administration (FAA) oversight. In the wake of these
events, FAA has increased oversight and inspections of
Boeing aircraft development and manufacturing, and
Congress has scrutinized both Boeing and FAA. Some
ongoing challenges to effective FAA oversight of Boeing
include production pressures spurred by continued global
demand; the complexity of a distributed and diverse supply
network; challenges at FAA to recruit, retain, and train its
inspector workforce; and heavy reliance on delegated
aircraft design and production certification functions.
Boeing Commercial Airplanes
Boeing Commercial Airplanes (BCA) is a business unit of
the Boeing Company, a global aerospace conglomerate.
BCA employs about 48,000 workers, primarily at facilities
in Washington State and South Carolina. Boeing produces a
number of commercial airliners, including the narrow-body
737 and three wide-bodies: the 767, 777, and 787
Dreamliner. In 2023, it ended production of the iconic 747
jumbo jet. More than 10,000 Boeing jetliners are in service
around the world, and more than 5,400 of its airplanes are
currently on order. In 2023, Boeing delivered 528 airplanes,
a 10% increase over 2022. However, production caps
imposed by FAA in early 2024 amid concerns over quality
assurance along with a 2-month machinist strike have
slowed deliveries by about 20%, compared with 2023.
Long-standing Safety Concerns
For over a decade, FAA has been raising concerns about
Boeing aircraft. In 2015, Boeing entered into a settlement
agreement with FAA following multiple failures to take
corrective actions regarding observed deficiencies in quality
assurance. As part of the agreement, Boeing committed to
implementing a Safety Management System (SMS),
adopting a regulatory compliance plan, and stepping up
audits and verification processes to oversee suppliers and
component parts. Despite these actions, concerns over the
quality and safety of Boeing airplanes and the adequacy of
FAA oversight of Boeing design and manufacturing
practices have persisted. These concerns have primarily
focused on Boeing’s two most modern commercial
airplanes: the Boeing 737 Max and the Boeing 787
Dreamliner.
Trouble with the Max
The 737 is considered Boeing’s narrow-body stalwart.
Boeing has delivered almost twelve thousand 737s since the
model’s initial introduction in 1967. The most recent
iteration, the Boeing 737 Max, made its debut in 2016,
offering more quiet, fuel-efficient engines and other
performance improvements. However, two catastrophic
passenger airline crashes overseas—Lion Air Flight 610 on
October 29, 2018, and Ethiopian Airlines Flight 302 on
March 10, 2019—led to a 20-month worldwide grounding
of all 737 Max airplanes and halted deliveries until
November 2020. Broader concerns over the certification of
the 737 Max prompted intense scrutiny of FAA’s
delegation of certification responsibilities to Boeing,
culminating in legislation requiring sweeping reforms to the
aircraft certification process and FAA’s oversight of aircraft
manufacturers and their certification units. The 2020
Aircraft Certification, Safety, and Accountability Act
(Division V of P.L. 116-260) required FAA to reform
policies and practices related to aircraft certification and
mandated industry-wide implementation of FAA-approved
SMS programs.
On January 5, 2024, a Boeing 737 Max airplane operated
by Alaska Airlines experienced an in-flight separation of a
door plug, a covering for an emergency exit opening that is
installed when a door is not required. Following the mishap,
which caused some injuries and no fatalities, FAA launched
an investigation of Boeing manufacturing processes and
ordered a comprehensive audit of the 737 Max production
lines and supply chain to evaluate compliance with FAAmandated quality procedures.
A February 2024 incident, where the rudder controls of a
United Airlines Boeing 737 Max became stuck during
landing at Newark Liberty Airport, prompted a National
Transportation Safety Board (NTSB) investigation. NTSB
found that incorrectly assembled rudder actuator bearings in
an automated control unit are susceptible to freezing,
possibly limiting rudder movement in cold weather. A
similar incident involving an Aeromexico 737 Max in
March 2023 prompted Boeing to issue a notice to operators.
In September 2024, NTSB urged FAA and Boeing to take
immediate corrective action. In October 2024, FAA issued
a safety alert advising operators of affected aircraft to carry
out rudder system checks before landing and to follow
stuck-rudder procedures if a jam is suspected.
Boeing had previously experienced rudder system issues
with its 737 jets. In the 1990s, design flaws in 737 rudder
control systems resulted in two fatal crashes in the United
States. NTSB concluded that under certain conditions,
https://crsreports.congress.gov
Federal Aviation Administration Oversight of Boeing
faulty rudder control units could jam, potentially causing an
in-flight loss of control. On the basis of these findings, FAA
ordered additional maintenance inspections and ultimately
mandated the replacement of rudder control systems on all
affected Boeing 737s in 2002.
Dreamliner Woes
Boeing’s 787 Dreamliner, the company’s most modern
wide-body offering, has also faced quality concerns. Boeing
has delivered more than 1,100 since the 787 first entered
into service in 2011, and no fatal crashes involving this
aircraft type have occurred. However, multiple
whistleblowers have come forward with safety concerns
about 787 assembly in South Carolina. One whistleblower
made allegations of installed defective parts and said that
piles of metal shavings that could damage wiring, as well as
tools and other debris, were often left behind on aircraft.
This whistleblower, who died by suicide in March 2024,
was seeking damages through the legal system for alleged
retaliation by Boeing. Another whistleblower raised
concerns that processes for joining 787 fuselage sections
could damage the aircraft structure and alleged that Boeing
retaliated against him after he alerted FAA. That
whistleblower headlined an April 2024 hearing before the
Senate Permanent Subcommittee on Investigations about an
alleged lax safety culture at Boeing. Boeing maintains that
the whistleblower’s concerns had already been voluntarily
disclosed to FAA and corrective actions were taken, and it
has contested his allegations of retaliation. The
whistleblower cases parallel FAA findings of multiple 787
quality control issues and possible falsification of records.
third-quarter 2024 earnings report, Boeing stated that it has
an order backlog of over 5,400 airplanes, up substantially
from the backlog of about 4,300 airplanes reported in
September 2022. It stated that aircraft deliveries in the first
nine months of 2024 totaled 291 airplanes, compared with
371 for the same period in 2023. Boeing will likely face
persistent production pressures for years to come that could
pose challenges for FAA in effectively monitoring safety
compliance and manufacturing quality assurance, especially
as production restrictions are eased.
Further complicating FAA’s role is that the supply chain of
Boeing airplane component parts is highly distributed and
diverse, stretching from Asia to Europe. Fuselage sections
for the 787 are fabricated in Japan, South Korea, Italy, and
Wichita, KS, prior to being joined during final assembly at
Boeing’s Charleston, SC, plant. Similarly, sections of 737
fuselages are fabricated in Wichita, KS, and shipped by rail
to Renton, WA, for final assembly. Across its product lines,
Boeing relies on over 700 primary suppliers as well as a
network of sub-tier suppliers scattered across the world.
The DOT OIG found that Boeing oversight of suppliers is
limited, and this has, in some instances, allowed for the
introduction of substandard parts. Measures to ensure that
suppliers can produce conforming parts was a significant
element of Boeing’s 2015 settlement agreement, but
concerns have persisted, with documented conformity
failures of 787 parts.
Following the January 2024 Alaska Airlines mishap, FAA
halted any expansion of Boeing 737 Max production,
capping it at the existing post-grounding, post-pandemic
level of 38 deliveries per month, shy of its 50 per month
target. FAA said it will not lift the cap until Boeing
implements a comprehensive action plan to (1) improve
SMS and employee safety reporting programs, (2) simplify
work processes and instructions, (3) enhance supplier
oversight, (4) improve employee training and
communication, and (5) increase internal audits. In May
2024, Boeing released an action plan outlining immediate
steps to improve its production systems and supply chain
quality oversight. However, FAA’s ability to effectively
monitor and evaluate these changes remains in question. An
October 2024 Department of Transportation Office of
Inspector General (DOT OIG) audit found that FAA’s
oversight processes for identifying and rectifying Boeing
production problems were not effective. The audit asserted
that FAA does not use data-driven methods to target
oversight and lacks a tracking system capable of identifying
systematic compliance deficiencies. The DOT OIG also
found that FAA does not sufficiently review design
approvals intended to ensure that aircraft components from
suppliers conform to approved design specifications. It
found that FAA has not assessed the effectiveness of
Boeing’s SMS and has not established criteria for
reinstating its delegated certification functions and units.
The DOT OIG also raised concerns that FAA
manufacturing inspectors focus too heavily on daytime
activities and on processes they are familiar with rather than
basing oversight on systematic evaluations of risk. More
broadly, FAA faces continued challenges in recruiting,
retaining, and training its inspector workforce. Although
FAA is attempting to address these challenges through a
comprehensive aviation safety workforce plan, it could
continue to face hurdles in maintaining a skilled workforce
and providing appropriate resources to effectively oversee
complex organizations such as Boeing. As a result, FAA
plans to continue to rely heavily on delegated authorities,
particularly the Organization Designation Authorization
(ODA) program that tasks dedicated units at companies
such as Boeing to carry out certain testing, evaluation, and
certification functions on FAA’s behalf. The ODA
program, however, came under intense scrutiny during the
2019-2020 grounding of the 737 Max. In 2022, Boeing was
stripped of its delegated authority to issue airworthiness
certification for completed 787 aircraft pending
improvements to quality control and manufacturing
processes. Similarly, after the January 2024 door-plug
mishap on Alaska flight 1282, FAA restricted certain
Boeing 737 ODA functions pending satisfactory
implementation of comprehensive reforms. The FAA
Reauthorization Act of 2024 (P.L. 118-63) mandates annual
ethics training for ODA unit members and requires FAA to
develop a forum for reviewing and sharing ODA best
practices. Assuring trust and conducting effective oversight
of delegated aircraft design and manufacturing activities at
Boeing could remain a persistent challenge for FAA.
Ongoing Challenges
Bart Elias, Specialist in Aviation Policy
Increased Scrutiny of Boeing
FAA’s production cap and the machinists strike have
squeezed Boeing’s ability to meet customer demand. In its
https://crsreports.congress.gov
IF12843
Federal Aviation Administration Oversight of Boeing
Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff to
congressional committees and Members of Congress. It operates solely at the behest of and under the direction of Congress.
Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has
been provided by CRS to Members of Congress in connection with CRS’s institutional role. CRS Reports, as a work of the
United States Government, are not subject to copyright protection in the United States. Any CRS Report may be
reproduced and distributed in its entirety without permission from CRS. However, as a CRS Report may include
copyrighted images or material from a third party, you may need to obtain the permission of the copyright holder if you
wish to copy or otherwise use copyrighted material.
https://crsreports.congress.gov | IF12843 · VERSION 1 · NEW
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.