Opposition Brief — Baltimore & Ohio Railroad v. Skidmore
Supreme Court brief1948
Ask Donna
What actually matters in this document.
Text
COPY Office - Supreme Court, U. S,
FILED
JUL 19 jo4¢
CHARLES ELMORE UAUPLEY
CLERK
IN THE
Supreme Court of the United States
OCTOBER TERM, 1947.
No. BE 85
THE BALTIMORE & OHIO RAILROAD COMPANY,
Petitioner,
—against—
BUZZY SKIDMORE,
Respondent.
BRIEF IN OPPOSITION TO PETITION FOR WRIT
OF CERTIORARI.
/ WILLIAM A. BLANK,
Attorney for Respondent.
a
) Wim Samvzs,
) Of Counsel,
) On the Brief.
Tue Court PREsS, N. Y. C.
INDEX.
PAGE
PE +s «cas sbeus hbtee dad wabee nie toe 60048004 1
Respondent’s Contention .................ee eee eeee 2
PLS cv ie Caweed te ukandeehks saedehealr weenie 3
Porxst I—Petitioner was negligent in directing re-
spondent to perform such laborious work in an
area continuously covered with snow and hard
ice over a long period of time ............... 7
Porst II—The manner in which the work was being
done on the day of the accident was not of
respondent’s own Choice .............ccceeces 17
Porst 111—The refusal of the Trial Judge to direct
the jury to bring in a written verdict did not
constitute reversible error ................0.. 26
Rs «shee Reon pad ORL S SAAS kOe Gy eé Rae Ahan 34
Tas_e or Cases Crtep:
American Bridge Co. v. Bainum, 146 Fed. 367
i a Mc ME We bnlevdek bddba ck acke sbeuasaeennn 17
Atchison, T. & S. F. Ry. €e. v. Ford, 171 Okla. 516,
AE SE aU nwt iawis cakueSchexwcdwenctue 17
Bailey v. Central Vermont Ry., 319 U. S. 350 ....... 13
pew v. B. & O. BR. Co., 333 U. &. GOO... oc cans 12,13
Boston € M. R. KR. v. Kyle, 156 F. 2d 112 (C. C. A.
DRG Sts Gee hneee skeen chian clack ckhandsih: 13, 24, 25
Boston & M. R. R. v. Meech, 156 F. 2d 109 (C. C. A.
1), cert. denied 329 U. S. 763, 67 S. Ct. 124. .13, 23, 24
Cartwright v. Atchison T. & S. F. Ry. Co., 228 Fed.
ME 5's KeNhe Aus RAR HRRAhEhee Chak ann dea bhadkc akin 25
Central Trust Co. of New York v. United States Light
and Heating Co., ct al., 233 Fed. 420 ........... 32
estan neaneees sett
ii
PAGE
Central Trust Co. v. Chicago, Rock Island, etc., Co.
ee es eh Oe Gh es ek BO ik ve bvndacee dancer 33
City of New Orleans v. Malone, 12 F. 24.17 ......... 32
Clark v. Howard, 88 Fed. 199 (C. C. A. 8).........., 17
Ellis v. Union Pacific R. Co., 329 U. S. 649 2.0.0.0... 12
Erie R. Co. v. Downs, 250 Fed. 415 (C. C. A. 2) ....30,31
Fleming, et al. v. Husted, 164 F. 2d 65 (C. C. A. 8)... 13
Fletcher v. Baltimore & Potomac Railway, 168 U. S.
Beh ee We CR OP heh ce hee cat has Cavees TAS 22, 23
Hlandy v. Reading Co., 66 F. Supp. 246 ............. 15
Jesionowski v. Boston & Maine Railroad, 67 S. Ct.
PMs Sha kia CACM RAMS INS baka WOO SEEOe CARER 13
Keith v. Wheeling & L. E. Ry. Co., 160 F. 2d 654 ..... 13
Lavender v. Kurn, 327 U.S. 645 ... 0... cc cece 12
Lillie v. Thompson, 68 S. Ct. 140 ................. 11,12
Lillie v. Thompson, 162 F. 2d 716 (C. C. A. 6) ...... 12
Lilly v. Grand Trunk Western R. Co., 63 S. Ct. 347,
ge Ge Be rere ree 1]
McAuliffe v. New York Central € H. R. R. R. Co., 172
App. Div. 597, 158 N. Y. S. 922 (2d Dept.) ...... 31
McGivern v. Northern Pacific Railway Co., 132 F. 2d
rn ec cea wnewas ahaa kel ced nantes 16
Missouri Pac. R. Co. v. Aeby, 48 8S. Ct. 177, 275 U.S.
RD ere ere Terr Tes 14, 15
Myers, A. Howard, et al. v. Bethlehem Ship Building
Corporation, 303 U. 8S. 41, 82 L. Ed. 638 ....... 32, 33
Newton, Charles D. v. Consolidated Gas Company of
New York, 259 U. S. 101, 66 L. Ed. 845 ......... 32
Palum v. Lehigh Valley R. Co., 165 F. 2d 3 (C. C. A. 2) 23
Ramsouer v. Midland Valley R. Co., 135 F. 2d 101
(C. C. A. 8)
ili
PAGE
Rashaw v. Central Vermont Ry., Inc., 133 F. 2d 253
SEA, MA: Mon ER WN AGRGN Wows NKR KOs eS uekate hone bucts 9
Raudenbush v. Baltimore & O. R. Co., 160 F. 2d 363
EER, WE ON Brn 0004 6 hen 6c cacebandcetceces 10
Tennant v. Peoria &€ P. U. Ry. Co., 321 U. S. 29 ..... 13
Tiller v. Atlantic Coast Line R. Co., 63 S. Ct. 444,
a ee Oe re ree 13, 15, 16
Tiller v. Atlantic Coast Line R. Co., 323 U. S.574.... 18
Unadilla Valley R. Co. v. Caldine, 278 U. S. 139, 49
a we Oe ei OE ine pCUGA Cad A ckGeus ck cies 25
United States v. Haupt, et al., 136 F. 2d 661 ......... 33
United States v. Socony Vacuum Oil Co., 60 S. Ct. 811,
310 U. 8. 150, 84 L. Ed. 1129 (rehearing denied
60 S. Ct. 1091, 310 U. S. 658, 84 L. Ed. 1421)..... 2
W. B. Grimes Dry-Goods Co. v. Malcolm, et al., 17
er es I I Dh o's a ks oc caanchences 29, 30
Wichita Falls € S. R. Co. v. Wade, 57 S. W. 2d 332
a ee EE hehe be bina'e kdb hue ceRK RL 17
Orner Avutnoritirs Crrep:
Equity Rule 68 (33 Sup. Ct. XXXVITT) ............ 32
Federal Employers’ Liability Act (Title 45 U.S. C. A.):
Es Sn cheen ii cohian Mined ows ban dn Ge 1
EE eb cG DG a bond smtavns babadacetech« 15
Federal Rules of Civil Procedure, Rule 49 ......... 34
Hughes on Federal Practice ....................5: 27
————
—_--~»~
_— oe
IN THE
Supreme Court of the United States
OCTOBER TERM, 1947.
No. 857.
>
>
Tue BartrmoreE & Onto Rartroap Company,
Petitioner,
—against—
Buzzy Sximmore,
Respondent.
-s
as
BRIEF IN OPPOSITION TO PETITION FOR WRIT
OF CERTIORARI.
Statement.
The Cireuit Court of Appeals, Second Cireuit, in
a unanimous decision by Frank, L. Hand and Swan,
Cireuit Judges, affirined a judgment recovered by
Buzzy Skidmore, the plaintiff, hereinafter referred
to as the respondent, against The Baltimore & Ohio
Railroad Company, the defendant, hereinafter re-
ferred to as the petitioner, in an action to recover
damages for personal injuries sustained by the re-
spondent, after a trial before Inch, D. J., and a jury
in the Eastern District of New York. The action was
instituted under the Federal Employers’ Liability Act
(45 U. S. C. A., Sections 51-59) by the respondent
against the petitioner to recover damages for injuries
suffered by the respondent on January 19th, 1945 be-
cause the petitioner negligently supervised the opera-
OA AIL IIE A OP
2
tion of certain work and failed to furnish respondent
with a safe place within which to do his work, and
because the petitioner negligently failed to supply re-
spondent with sufficient help for the work then being
done, all of which resulted in the falling of a heavy
spreader underneath a coal hopper car with the con-
sequent result that the respondent suffered devastat-
ing injuries.
Respondent’s Contention.
Petitioner’s application is opposed because the de-
cision herein, 167 F. 2d 54, and the judgment en-
tered thereon by the Cireuit Court of Appeals for the
Second Circuit, is wot in conflict with applicable deci:
sions of this Court or the decisions of the various
Circuit Courts of Appeals. Moreover, Points I and
II contained in petitioner’s brief in effect argue that
the jury verdict in the instant case was against the
weight of the evidence. Such an argument before
this Court is definitely untenable as is indicated by
this Court’s decision in United States v. Socony
Vacuum Oil Co., 60 S. Ct. 811, 310 U. 8. 150, 84 L. Ed.
1129, wherein Mr. Justice Douglas remarked at page
856 :
‘*Certainly, denial of a motion for a new trial on
the grounds that the verdict was against the
weight of the evidence would not be subject to
review.”’
Rehearing was denied by this Court 60 S. Ct. 1091,
310 U. S. 658, 84 L. Ed. 1421.
— oe
The Facts.
The respondent, a 41 year old car man, employed
hy and in the petitioner’s Lorain, Ohio, car shops for
a four year period of time prior to the accident, re-
sided with his wife and three children in Lorain, Ohio
(fols. 88, 89, 176).
On January 19th, 1945, at 7:30 A. M., respondent
reported for work at the foreman’s office, at which
time and place Mr. Beaver, another car man, and
respondent, assigned by the petitioner as a two man
erew received a written work order calling for in-
stallation of eight new doors on a specified coal hopper
located or spotted on a track in the petitioner’s yard
(fols. 89, 91-94, 118-122, Exhibit 11, p. 264).
An examination of Exhibits 1-7 (pp. 244-255) re-
veals that the coal hopper in question was comprised
of four hopper compartments and when fully equipped
earried four sets of doors, two doors to each set
riveted on to a door spreader or cross-bar as part of
its underearriage. When so equipped these coal
hopper doors would, by means of latches and tumbler
locks connected to said doors (fol. 108), swing open
and shut as the oceasion called for when unloading
or loading coal. Each door weighed 96 pounds and
each spreader weighed 190 pounds (fols. 142, 143).
Invariably the petitioner would cause one or more of
its ears, in for repair, to be located or spotted on any
given track before car men reported for work so
that a ear man’s written work order would also indi-
eate the car and track where he was scheduled to work
(fol. 96).
Respondent testified that when it was necessary to
patch old doors or replace less than complete sets of
doors it was the custom and practice in the peti-
eae —
tinner’s Lorain yard for burner crews to burn off the
impaired doors or parts thereof and leave the door
spreaders attached to and suspended from the remain-
ing good or unimpaired doors underneath the cars,
whereupon two car men acting as a team would to-
gether replace the single doors and then key them or
tentatively line them up with the suspended spreaders
after which a rivet crew would permanently rivet them
together. He further testified that when all eight
doors of a car hopper had to be replaced with new
ones, it was the custom and practice in petitioner’s
Lorain yard for a burner crew to completely burn
down the doors and spreaders, salvaging the spreaders
however, whereupon another crew would clean up the
debris from under the coal hopper, and carry the
salvaged spreaders to a door bench located in another
part of the yard. There, respondent testified, the door
bench crew would permanently rivet the new doors to
the salvaged spreaders after which a crane or tractor
crew would cart the attached doors and spreaders back
to the spotted coal hopper and deposit them across the
rails and under the hoppers. Then the car man crew
consisting of three men, not two men, would with the
aid of a large hydraulic jack, hang the complete units
in their required places on the undercarriage pins of
the coal hopper (fols. 97-139, Exhibits 7, 8, 9, 10,
pp. 256-263).
All of the respondent’s testimony relating to the
prevailing custom and practice in the petitioner's
Lorain yard at the time of the accident was corrobo-
rated by Mrs. Skidmore, employed by the petitioner
as a car man’s helper at that time and for two years
prior thereto (fols. 405-414).
John Wilson, respondent’s foreman also corrobo-
rated respondent’s testimony on custom and practice
— :
(fols. 627, 642-648). Wilson further testified that if
all four doors on one side of the car were burned off,
replaced with new doors, and then the four doors on
the other side of the car were similarly burned off and
replaced with new doors, then the spreaders would, all
during this operation, remain suspended on the old
and new doors respectively without ever dropping to
the ground. He, however, did not believe that to be a
good practice because as he expressed himself, ‘‘ You
will lose too much time that way” (fols. 646-649).
Edgar Beaver, the other car man who was working
with the respondent as a team at the time of the acci-
dent, also corroborated respondent’s testimony on the
prevailing custom and practice in petitioner’s Lorain
yard (fols. 672-677).
When Beaver and respondent started working on
the spotted coal hopper car at 7:30 that morning they
noticed that all eight of the old doors and the four
connecting spreaders had been burned down. The
debris was lying underneath the coal hopper and the
salvaged four spreaders were separated and detached
from the eight doors. Subsequently that day eight
new doors, not attached to the spreaders, were brought
to Beaver and respondent where the coal hopper was
spotted (fols. 113, 138, 685-689).
On that day and for a continued period of at least
one month prior thereto the entire yard was covered
with snow and hard ice, notwithstanding the fact that
the petitioner employed a couple of hundred men in
that yard daily (fols. 122-125, 194, 195, 617, 654, 655).
Neither before nor during the work progress of
Beaver and respondent that day did any of petitioner’s
employees clear up the hard ice condition where
Beaver and the respondent were working (fol. 124).
6
When the eight new doors were delivered to Beaver
and the respondent they proceeded to hang them and
the spreaders separately although respondent had
never installed or seen any one install doors and
spreaders in that manner (fols. 131-134). At about
3:15 P. M., while attempting to install the last spreader
(fols. 143-146), respondent testified :
‘*Q. In other words, just before the accident the
last unit you and Beaver were trying to get on
was this 190 pound spreader; is that correct? A,
That is correct.
Q. Now, will you tell us from that point on,
where you were, how you worked and just what
happened, Mr. Skidmore? <A. Well, Mr. Beaver
was on one side of the car and I was on the other,
and we had to get down on our knees. I was down
on my knees on the hard, slick, slippery ice, and
had the bar stuck through the holes through the
door for to bring our spreader up to have it ready
to hook it on.
Q. In other words, the idea was to get the
spreader high enough you had to use a pull to get
it up and then use the bar to stick through a hole
in the door and get it through a hole of the
spreader? <A. That is correct.
Q. And then put in a temporary bolt? A. Yes,
sir.
Q. All right, go on from there. You say you
were down on your knees? <A. I was down on my
knees on the hard, slick, slippery ice. When I
lifted this door spreader up here my knees went
down like that (indicating) and that jerked me
down forward, and I felt a terrific snap back in
the area of my spine down low (indicating).”
POINT I.
Petitioner was negligent in directing respondent to
perform such laborious work in an area continuously
covered with snow and hard ice over a long period of
time.
Both sides agree that on the day of the accident
complained of and for a continued one month period
of time prior thereto, the petitioner’s entire yard, in-
cluding the place where respondent was assigned to
work that day, was completely covered with snow and
hard ice notwithstanding the fact that all during this
period of time the petitioner employed a couple of
hundred men in that yard daily (fols. 122-125, 194,
195, 617, 654, 655).
Respondent further testified, and his testimony was
in no wise contradicted, that neither before nor dur-
ing the work progress of Beaver and himself that day
did any of petitioner’s employees clear up the hard
ice condition where Beaver and the respondent were
working that day (fol. 124).
That the petitioner directed the work to be done
in the dangerous area complained of is evidenced by
its written work order calling for installation of eight
new doors on a specified coal hopper located or spotted
on a track in the petitioner’s yard which was com-
pletely covered with snow and hard ice (fols. 92, 118,
120). The respondent further testified:
‘*Q. Then would it be the custom at the yard,
and was it carried out during the years that you
were a car man, to spot or locate a car at a par-
ticular place in the yard where you were to go to
work? <A. Well, they would spot them there in
inianeiaiiail ——
the yard just any place where they were doing
the work, you know.
Q. That is what I mean. They would spot them
for you before you would come to work? <A. That
is right.
Q. Then when you got your written order it
would eall for doing work on a certain car
located on a certain track? <A. That is right”
(fol. 96).
It is therefore abundantly clear that respondent
had absolutely nothing to do with the spotting or
locating of the coal hopper in question on the track
in the area where the work was specifically called for.
Regarding the petitioner’s contention contained in
the first point of petitioner’s brief, one is moved to
ponder what interpretation the petitioner places on
the 1939 amendments to the Federal Employers’ Lia-
bility Act. Concededly, the petitioner owed respond-
ent the duty to furnish him with a safe place to work.
It must also be coneeded that by the 1939 amendments
respondent did not assume the risks of his employ-
ment.
Does it not suffice, at least to the extent of creating
a jury question, that the petitioner, notwithstanding
the fact that it employed more than two hundred men
daily in the Lorain Yard at the time of the accident,
directed by written order that the work in question
be done in an area completely covered by snow and
hard ice?
Would the petitioner have this learned Court be-
lieve that the jury should not be allowed to deliberate
on this most vital issue? Does the petitioner sincerely
believe that under these circumstances and the condi-
tions existing at the time of the injury, it actually
provided respondent with a safe place to work?
_ =
If the petitioner had a mind to be guided by the
Congressional amendments of 1939, or if at least in
some slight degree it considered the safety of its em-
ployees it would in this case have caused that area of
hard ice to be dissolved or chopped up and removed,
before assigning respondent to perform such danger-
ous and laborious work at the place where the coal
hopper in question had been spotted or located.
That an icy condition existing two days prior to an
accident presented a jury question as to negligence
was fairly recently decided. Under such circum-
stances what interpretation can this Court place on
a similar iey condition existing for more than one
month continouously prior to the accident?
In Rashaw v. Central Vermont Ry., Inc., 133 F. 2d
953 (decided February 3, 1948, C. C. A., 2nd Cir.),
Chase, Cireuit Judge, ably held at pages 254 and 255:
““* * * we shall treat his fall for the purposes
of this appeal as one from the bridge.
There was no substantial dispute as to the con-
dition of the bridge. The ties on which the rails
rested were very slippery because of ice which
was thick enough to make them rounded on the
top. * * * There was undisputed evidence that
the bridge had been in about the same icy condi-
tion two days before the accident when the con-
ductor walked over it with the assistant superin-
tendent of the northern division of the railroad.
* * * *
The case as thus made presented a jury ques-
tion as to the negligence of at least the defendant
railroad in allowing the bridge to remain in its
icy condition when the plaintiff’s intestate was
required to cross it to do his work.’’ (Italies the
writer’s. )
10
Another case dealing with similar facts recently
decided, is Ramsouer v. Midland Valley R. Co., 135
F. 2d 101 (C. C. A., Eighth Cir., decided April 7,
1943), where Gardner, Circuit Judge, cogently com-
mented on pages 105 and 106:
‘“* * * There had been freezing weather, alter-
nating with milder temperatures, for about a
week, with some precipitation in the nature of
sleet and snow. The sleet and snow had not re-
cently fallen. * * *
Viewing the evidence in the light most favor-
able to plaintiff, we think it presented a genuine
issue of fact from which a jury might reasonably
decide that Ramsouer’s injuries resulted in whole
or in part from the negligence of the defendant
(1) in that it failed to maintain this switch track
in a reasonably safe condition, or place it in such
condition by removing the ice and snow at least
from the curve therein prior to attempting the
switching operation; * * *.’’ (Italies the
writer’s. )
See also Raudenbush v. Baltimore & O. R. Co., 160
FP. 2d 363 (C. C. A., Third Cir.), decided February
19, 1947, where the Court aptly remarked on page
367 :
‘The place of work here was a switch yard. It
is a place of moving cars and locomotives and no
reason exists why, within the confines of such
yard, the employer should not be required to
exercise a reasonable degree of care to pre-
vent an accumulation of snow or ice in such
quantity and location as would constitute a
menace to the safety of the employces in the per-
formance of their various duties. * * *’’ (Italics
the writer’s.)
—
11
Under the rulings of the various Circuit. Courts of
Appeals, it would conclusively appear that no con-
ceivable reason existed which would entitle the peti-
tioner in this action to assume it had the right to
direct its employees to perform laborious work in
areas completely and continuously covered by snow
and hard ice for more than one month prior to the
accident as was proven in this case.
See also Lilly v. Grand Trunk Western R. Co., 63
S. Ct. 347, 317 U. S. 481, 87 L. Ed. 411, where
Mr. Justice Murphy delivering the opinion of the
Court clearly enunciated on page 351:
“The use of a tender, upon whose top an em-
ployee must go in the course of his duties, which
is covered with ice seems to us to involve ‘unneces-
sary peril to life or limb’—enough so as to per-
mit a jury to find that the Boiler Inspection Act
has been violated.’’ (Italics the writer’s.)
Foreseeability, it is believed, is the crux of this case.
Could the petitioner have foreseen that under all of
the prevailing conditions on January 19th, 1945 such
an accident could have occurred ?
The most recent cases decided by the Supreme Court
of the United States and the various Circuit Courts
of Appeals indicate that the Trial Court in this action
did not err in submitting to the jury for its ultimate
determination the factual issues here involved.
In Lillie v. Thompson, 68 S. Ct. 140, decided on
November 24th, 1947, the petitioner a 22 year old
female telegraph operator was employed by the
respondent’s railroad to work alone between the hours
of 11:30 P. M. and 7:30 A. M. in a one .oom frame
building situated in an isolated part of the railroad’s
12
yard. The petitioner’s duties were to receive and
deliver messages to men operating trains in the yard.
About 1:30 A. M. on the night of her injury, peti-
tioner responded to a knock thinking that some of
the respondent’s trainmen were seeking admission.
She opened the door and before she could close it a
man not in the respondent’s employ entered and beat
her with a large piece of iron, seriously and perma-
nently injuring her.
The petitioner sued for damages under the Federal
Employers’ Liability Act and her contention was that
she was injured as a result of the respondent’s negli-
gence in sending her to work in a place he knew to be
unsafe without taking reasonable measures to pro-
tect her.
The District Court dismissed the complaint for
failure to state a cause of action and entered sun-
mary judgment for the respondent. The Circuit
Court of Appeals affirmed without opinion (6 Cir,
162 F. 2d 716). The Supreme Court in a per curiam
opinion appropriately held, on page 142:
‘“*We are of the opinion that the allegations in
the complaint, if supported by evidence, will war-
rant submission to a jury. * * * That the fore-
seeable danger was from intention or criminal
misconduct is irrelevant; respondent nonetheless
had a duty to make reasonable provision against
it. Breach of that duty would be negligence,
and we cannot say as a matter of law that peti-
tioner’s injury did not result at least in part from
such negligence.”’
See also Ellis v. Union Pacific R. Co., 329 U.S.
649; Lavender v. Kurn, 327 U.S. 645; Blair v. B. &
_— :
13
0. R. Co., 323 U. S. 600; Tennant v. Peoria & P. U.
Ry. Co., 321 U. 8. 29; Bailey v. Central Vermont Ry.,
319 U. S. 350; Tiller v. Atlantic Coast Line R. Co.,
318 U. S. 54; and the second Tiller case, 323 U. S.
574; Jesionowski v. Boston & Maine Railroad, 67 8.
Ct. 401; Boston & M. R. R. v. Meech, 156 F. 2d 109
(Cc. C. A. 1), cert. denied 329 U. 8. 763; Boston & M.
R. R. v. Kyle, 156 F. 2d 112 (C. C. A. 1); Fleming,
et al. v. Husted, 164 F. 2d 65 (C. C. A. 8).
In that connection this Court is respectfully re-
ferred to the case of Keith v. Wheeling & L. E. Ry.
(o., 160 F. 2d 654, wherein Hicks, Cireuit Judge,
after elaborating on the opinions contained in the
most recent cases passed upon by the United States
Supreme Court, dealing with this question, says the
following on page 658:
“We do not review the facts of these cases but
it is plain from their examination that the author-
ity of courts by direction of a verdict, to with-
draw from the consideration of a jury matter
bearing upon the question of the defendant’s
negligence and its proximate relation to the in-
jury is now very restricted indeed.” (Italies the
writer’s. )
Under all of the circumstances in this case there-
fore the jury certainly had a right to pass on so in-
tegral a question when determining that petitioner’s
negligence brought about this accident in whole or
in part.
The eases cited in petitioner’s brief relating to this
subject, more particularly contained in its first point,
are clearly distinguishable from the facts involved
in the instant case and the writer therefore presumes
to make some comment on said cited cases.
14
In Missouri Pac. R. Co. v. Aeby, 48 S. Ct. 177,
275 U. S. 426, 72 L. Ed. 351, appearing on pages 9
and 10 of the petitioner’s brief, the Court in reciting
the facts there involved said, among other things, on
page 179:
‘** * * When it rained, there accumulated in
this and other depressions on the platform pnd-
dles of water, which gradually disappeared. By
the time of the accident, the depression in front
of the steps had become somewhat larger and
deeper, by reason of rains and constant use. Its
surface was rough. No ice had formed there after
respondent came. The platform was dry the
evening before the accident.’’ (Italics the
writer’s. )
It is therefore apparent that the facts themselves
are clearly distinguishable in that the ice formation
in that case existed for only a matter of a few hours
prior to the accident, whereas in the instant case it
continued over a period of more than one month, with
which fact the parties to this action are in complete
accord.
Moreover, immediately following the quoted por-
tion appearing on pages 9 and 10 of petitioner’s brief,
relating to the Missouri case, Mr. Justice Butler, writ-
ing for the Court, aptly remarked on page 179:
‘** * * The obligation in respect of station plat-
forms and the like owed by carriers to their pas-
sengers or to others coming upon their premises
for the transaction of business is greater than
that due their employees accustomed to work
thereon. The reason is that the latter, familiar
with the situation, are deemed voluntarily to take
_—_ sarees
15
the risk of known conditions and dangers.”
(Italics the writer’s.)
The Missouri ease was decided on January 3rd, 1928,
some eleven years prior to the abolishment of the
assumption of risk defense. (See Title 45 U.S. C. A.,
Section 54.) No longer are federal employees, under
the Federal Employers’ Liability Act, deemed volun-
tarily to assume the risk of known conditions and
dangers. That the Courts so interpret in this day
and age the holding in the Missouri case is clearly
apparent from an examination of the opinion in
Handy v. Reading Co., 66 F. Supp. 246, where the
Court held, on page 249:
“To sustain its motion for judgment non
obstante veredicto, defendant relies upon the
cases of Missouri Pac. R. v. Acby, 1928, 275 U. 8.
426, 48 S. Ct. 177, 72 L. Ed. 351, * * *.
Furthermore, it will be seen that the cases re-
lied upon by the defendant were decided before
the Amendment of 1939, withdrawing assumption
of risk as a defense in Federal Employers’ Lia-
bility cases. The decision of the Supreme Court
in the Tiller case, supra, indicates that the deci-
sion in the Aeby case was responsible in part for
the Amendment of 1939.”’
In Tiller v. Atlantic Coast Line R. Co., 63 8. Ct.
444, 318 U. S. 54, 87 L. Ed. 610, Mr. Justice Black
ably remarked on pages 446 and 447:
«“* * * We hold that every vestige of the doc-
trine of assumption of risk was obliterated from
the law by the 1939 amendment, and that Con-
gress, by abolishing the defense of assumption of
risk in that statute, did not mean to leave open
the identical defense for the master by changing
eaten a
16
its name to ‘non-negligence’. As this Court said
in facing the hazy margin between negligence and
assumption of risk as involved in the Safety
Appliance Act of 1893, 45 U. S. C. A., Section 1
et seq., ‘Unless great care be taken, the servant’s
rights will be sacrificed by simply charging him
with assumption of the risk under another name;’
and no such result can be permitted here.’’
The case of MeGivern v. Northern Pacific Railway
Co., 132 F. 2d 213 (8th Cir.) cited on page 10 of
petitioner’s brief, is clearly distinguishable and_be-
comes most evident upon examination of certain of the
quoted facts and holdings therein enunciated by
Gardner, Circuit Judge, on page 217, wherein he
states:
‘“* * * The steps on this switch engine were,
when the crew began to use them, free of snow.
The accumulation of snow and ice during the
progress of the work was a natural and normal
consequence due to the recently fallen snow in the
yards. There were no inherent imperfections in
these steps rendering them less fit for the use
for which they were intended. * * * The condi-
tion of these foot boards was continually changing
because of the snow being carried on to them by
the workmen and packed down. * * *
* * * Under the prevailing conditions which
were perfectly obvious snow on the foot boards
could not have been avoided. It was a natural
and necessary result of existing climatie condi-
tions.’’ (Italics the writer’s.)
How in all sincerity can facts such as are contained
in the McGivern case be compared with the facts in
the instant case where the snow and hard ice condition
existed for more than a month?
_
17
The case of American Bridge Co. v. Bainum, 146
Fed. 367 (3rd Cir.) also appearing on page 10 of
petitioner’s brief, is not a Federal Employers’ Lia-
bility case, and is in no wise in point with the facts
herein involved.
The Wichita Falls & S. R. Co. v. Wade, Court of
Civil Appeals of Texas, 57 S. W. 2d, 332, also ap-
pearing on page 10 of petitioner’s brief, was decided
on December 24, 1932 prior to the abolishment of the
assumption of risk defense and the decision therein
was clearly based on a defense of assumption of risk
for there the Court held, on page 337:
“* * * we believe that the defense of assumed
risk was conclusively established, independently
of the issue of defendant’s negligence.”’
The cases of Atchison, T. & S. F. Ry. Co. v. Ford,
171 Okla. 516, 43 Pae. 2d, 459 and Clark v. Howard,
88 Fed. 199 (8th Cir.) both cited on page 11 of
petitioner’s brief, were similarly cases decided prior
to 1939 when the defense of assumption of risk still
prevailed for the benefit of railroads.
POINT II.
The manner in which the work was being done on
the day of the accident was not of respondent’s own
choice.
As to the condition in which Beaver and the re-
spondent found the spotted coal hopper the morning
of the accident, Beaver, petitioner’s witness, testified
(fol. 669) :
**Q. And the job as you did it that day, as you
ones a
now say, that car had all the doors burned off?
A. Yes, but we were putting in single doors and
spreaders separate.”’
In the same vein, Wilson, petitioner’s witness, also
testified (fol. 643):
‘*@. There is no question in your mind but that
all the doors, the old doors, the eight doors, were
burned off? A. That is right, they were burned
off.”’
Respondent on that score testified (fol. 113):
“*Q. Now, when you came to work on the morn-
ing of the accident how did you find the car that
you received working orders on? What condi-
tion was it in? A. It had all been burned down
clean; all the doors, spreaders, everything,
dropped underneath the car.
Q. And was the spreader, were the spreaders
that you say were under the cars, were they
there without doors attached? <A. Yes, sir.’
These facts coupled with the assignment called for
in the work order of the day, Exhibit 11 (p. 264),
lead to the inescapable conclusion that the petitioner
directed the work on said coal hopper be done by
Beaver and respondent in the manner specifically
employed. If the petitioner desired that the work
be done in any other manner, it would have had an-
other crew clean up the debris; cart the old spreaders
to the work or door bench where still another crew
would rivet the four salvaged spreaders on to eight
new doors; whereupon a third crew would by means
of a crane or tractor haul back the attached doors
and spreaders to the spotted coal hopper and deposit
them across the rails and under the hopper. Then
the car-man crew consisting of three and sometimes
19
four men, with the aid of a large hydraulic jack
would hang the complete units under the coal hopper.
At one point in his testimony, Beaver, petitioner’s
witness, testified that the method employed on that
day by him and respondent was a customary one
when he said (fols. 652-654) :
“Q. Now, you heard Mr. Skidmore describe
the manner in which you were putting up the
spreaders on that day in question? A. I did.
Q. Would you say that that was the ordinary
custom and practice and that you had followed
it yourself for a long time? A. I had put them
up that way myself, yes.
Q. Do you recall ever working with Mr. Skid-
more on that particular job before? A. No. I
ean’t say that I did.
* * * *
Q. Have you observed other men in the yard
working in two’s putting up spreaders the same
way? <A. Yes, I have seen lots of them do it
that way.
Q. You have seen lots of them do it that way?
A. Yes.”’
Wilson, another witness for petitioner, corrobo-
rated this testimony when he said (fol. 621):
**Q. —will you say that the work was done that
day in the usual and customary manner? A.
That is right.’’
It conclusively appears therefore that the method
employed that day by Beaver and the respondent was
one of the customary methods practiced in petitioner’s
yard although respondent had never personally in-
stalled or seen any one install doors and spreaders
20
in that manner in the petitioner’s yard (fols. 132,
133). The only plausible deduction therefore is that
Wilson, the petitioner’s foreman, with full knowledge
of the fact that the undercarriage of the coal hopper
had been completely burned down, ordered, and di-
rected that the work be done in the manner it actually
was being done by Beaver and respondent at the time
of the accident.
True it is, that this practice called for only two
men to hang the doors and spreaders. Petitioner
approved that unsafe method of doing the work be-
cause it saved time, a factor most essential to the
petitioner for as its witness, foreman Wilson, testi-
fied (fol. 648):
**A. Well, that wouldn’t be good practice, be-
cause that work has to be done before the men
get over there. You will lose too much time that
way.
Q. You will lose time? A. That is right.”’
That a safer method of doing the work, calling
either for a three or four car-man crew rather than a
two man crew was sometimes followed by the peti-
tioner is not only deducible from respondent’s testi-
mony heretofore referred to, but from that of peti-
tioner’s witness, Beaver, who testified (fols. 669, 670,
675, 676):
**Q. All right. Now, wasn’t it the practice, sir,
the company practice there, that when you had
to put in—when the car was burned off all around
so that the doors were burned off and the spreader
was burned down, that you would use three and
four men for the job of installation? A. Well,
if it was a full unit both doors and spreaders,
they used three sometimes, and I have saw four.
—
21
Q. And the job as you did it that day, as you
now say, that car had all the doors burned: off?
A. Yes, but we were putting in single doors and
spreaders separate.
* * * ~
Q. But the car was burned off all around? A.
Yes. :
Q. And where you put in all new doors in a
car that has been burned all the way down, now
you have to put in a unit, don’t you, of doors and
spreaders, because the doors have been burned
away and the spreaders have been burned away?
A. If they are all burned down.
Q. Now, they have a work bench where spread-
ers are riveted on to doors haven’t they? <A. Yes.
Q. And when they do that the whole unit is
brought over by a tractor or a crane? A. Yes.
Q. And swung under as far as you can get it
under the car? A. That is right.
Q. Then the whole unit is jacked up by a jack
which does the lifting instead of your back
muscles; isn’t that so? A. That is right.
Q. And the man comes along and just works
the jack, and that lifts the weight up into place?
A. Yes.
Q. And the pins are put in? A. Right.
Q. That is the practice that obtained out there?
A. Yes.
Q. And you saw it done that way? A. Yes,
sir.”’
It is therefore clearly apparent that the petitioner
employed two separate methods of doing that type of
work in its yard, but elected to use the unsafe method
to save time, wages and manpower.
22
Our courts have uniformly held that although rail-
roads adopt and follow certain customs and practices
of doing different types of work in their yards, when
it is once proven that such customs and practices are
dangerous in nature, sufficient negligence is established
to warrant jury verdicts against them for injuries
sustained as a result thereof.
In Fletcher v. Baltimore & Potomac Railway, 168
U. S. 135, 18 S. Ct. 35, there existed a custom and
practice on the defendant’s railroad that employees
of the railroad were allowed the privilege of bringing
back with them for their own individual use for fire-
wood, sticks of refuse timber left over from their work
after repairing the defendant’s roads, such as solid
pieces of bridge timber, cross-ties, ete. It was the
constant habit of the men, over a number of years, to
throw off these pieces of firewood while the train was
in motion at such points on the road as were nearest
their homes, where the wood was picked up and car-
ried off by some of the members of their families or
other persons waiting there for it. The only caution
given the men on the part of the servants or agents
of the railroad was that they should be careful not to
hurt anyone in throwing the wood off. The foreman
of the gang was the man who usually gave such in-
structions.
In that case, as the train passed the plaintiff, an
employee of the defendant, another workman on board —
threw from the car on which he was standing, a stick
of bridge timber about six inches square and about
six feet long. It struck the ground and rebounded,
striking the plaintiff, and permanently injuring him.
_—
23
Mr. Justice Peckham, who delivered the opinion of
the Court, cogently commented, at page 142:
«* * * Tf, however, it had been proven in that
ease that it was the custom on the part of the
porters on that car to throw these bundles off
while the train was in motion, and that this cus-
tom was known to the officers of the company,
and was permitted by them, with the simple in-
junction that the porters should take care, and
not hurt anybody, and if the jury found that the
act was one dangerous in its nature, we think
there is no doubt that the defendant would be
liable for the injuries resulting from any one of
such acts.”? (Italies the writer’s.)
In Palum v. Lehigh Valley R. Co., a most recent
ease decided by the Cireuit Court of Appeals, Second
Circuit, 165 F. 2d 3, decided January 7th, 1948, deal-
ing with customs and practices of railroads, Augustus
N. Hand, Cireuit Judge, aptly remarked on page 5:
“It would certainly have been safer to send a
fireman over the route who was familiar with it
and there was evidence indicating that this safer
method, if not invariably practiced, was generally
employed. In such circumstances we think it was
required by the recent decisions of the Supreme
Court to leave to the jury the question of whether
that safer method should not have been chosen.”
(Italics the writer’s.)
In Boston & M. R. R. v. Meech, 156 F. 2d 109,
Woodbury, Circuit Judge, appropriately held, on page
111:
“Tt may be that the locomotive was being
operated in the way usual and customary for the
maneuver which resulted in the death of the de-
24
cedent, but nevertheless the fact remains that it
could have been operated more carefully. Another
man could have been assigned to ride with the
hostler to keep a lookout from the fireman’s side
of the cab or from the rear of the tender for
workmen in the vicinity of the engine house, who
might be presumed to be busy and hence inat-
tentive at times to their own safety, * * *.”
(Italics the writer’s.)
A writ of certiorari to the United States Supreme
Court in that action was denied on October 28, 1946,
as reported in 67 S. Ct. 124.
Interesting is this language because of the fact that
in that case the Court properly reasoned that another
man could have been assigned on the job in question.
The same situation exists here for had the defendant
ordered this job done with a three or four man crew on
secure ground, this accident would never have oe-
curred.
Further, on the question of using safer methods as
distinguished from practices usual and customary
amongst railroads, this Court’s attention is called to
the case of Boston & M. R. R. v. Kyle, 156 F. 2d 112,
where in a per curiam opinion, the Court held:
“Tn affirming the judgment below it will suffice
to say that there is ample testimony in the record
to indicate, first, that although the plaintiff was
experienced in the kind of work he was doing
when he was hurt, he was at that time working
under the direction and subject to the orders of
his fellow machinist, and, second, that although
the latter directed that their work be done in the
usual or customary way, there was a safer way
in which it could have been done * * * and that,
if this safer method of procedure had been fol-
—~SEO
—
25
lowed, the injury which befell the plaintiff would
not have occurred.”’ (Italics the writer’s.)
It is therefore apparent that the establishment of
a custom and practice on any given railroad as to the
manner of doing a certain type of work, does not in
and of itself exempt the railroad from liability.
Juries at all times are permitted sufficient leeway to
deliberate as to whether or not the established cus-
toms and practices are dangerous ones, or, in the
alternative, whether safer methods could not have
been employed under the circumstances. Respond-
ent contends therefore that the jury in the instant
ease was properly allowed to pass on this question
and, as is evidenced by its verdict, actually did find
that the petitioner’s practice of using a two car-man
crew on this assignment was a dangerous one and
that it was safer to use its other practice of assigning
a three car-man crew and using its other parapher-
nalia, such as work and door benches including their
crews, crane and/or tractor equipment and maneuvers
including its crew, ete.
For the reasons incorporated and outlined herein
it beeomes unnecessary to comment upon the cases
cited in the second point of petitioner’s brief since
those cases do not apply and are distinguishable from
the facts in the instant case. In addition the cases of
Cartwright v. Atchison T. & S. F. Ry. Co., 228 Fed.
872 and Unadilla Valley R. Co. v. Caldine, 278 U. 8S.
139, 49 8. Ct. 91, 73 L. Ed. 224, were decided prior
to the abolishment of the assumption of risk defense.
an
26
POINT Ill.
The refusal of the Trial Judge to direct the jury to
bring in a written verdict did not constitute reversible
error.
Immediately prior to summation of both counsel,
petitioner’s attorney submitted to the Court Exhibit
C for Identification as the proposed form of a written
verdict by the jury. In denying said request the
Court remarked:
“The Court: I return your request. It is
really nothing more than will be covered by my
charge to the jury. As to having a written ver-
dict, I see no necessity for it at the present time.”
to which procedure petitioner’s counsel excepted (Ex-
hibit C, p. 295, fols. 697-699).
On page 14 of his brief, petitioner’s counsel claims
that as a result of the Trial Court’s ruling on this
request,
“The defendant has been prejudiced by the
Court’s refusal.’’
This contention is clearly fallacious.
It is conceded that if the Court thereafter failed to
include in its charge, the general contents of said ex-
hibit and petitioner’s counsel timely took exception
thereto, thereby affording the Trial Court an oppor-
tunity to eure such omission, then reversible error
would have been committed upon the Court’s refusa!
to amplify its charge or direct the written verdict
requested.
27
An examination of the record, however, reveals
beyond any question of doubt that all the matter con-
tained in Exhibit C was fully covered in the Court’s
charge, all of which petitioner’s counsel fully appre-
ciated, for when the Court upon completion of its
charge specifically inquired whether petitioner’s coun-
sel took any exceptions or desired any requests, Mr.
Combs remarked :
“Mr. Combs: I have none, your honor’? (fols.
723, 700-724).
Petitioner’s counsel in a criticizing vein further
argues, on page 14 of his brief, that:
“The Cireuit Court held that under Rule 49—
Federal Rules of Civil Procedure—the Trial
Judge has full, uncontrolled discretion in the mat-
ter and that, therefore, the Cireuit Court cannot
hold that the Trial Judge erred when, as here, for
any reason or for no reason whatever, he refused
to demand a special verdict.”’
Hughes on Federal Practice, interpreting said rule,
states:
“See, 24303. Special Verdict Discretionary.
Under the rule the court is not required to sub-
mit a special verdict in any case. The rule
merely authorizes the court to submit a cause on
special verdict, the language of the rule being
‘may’ thus leaving it within the discretion of the
court. whether or not a cause should be so sub-
mitted.”’
Concededly therefore the Trial Judge may make
one of two rulings in this type of case, namely, to de-
cide whether to accept at the jury’s hands a general
or a special written verdict. For defeated counsel to
—
whimper immediately that this discretionary power
has been abused merely because the Trial Court
directed that a general verdict be returned and to per-
mit such counsel to accuse an Appellate Court of
having erred in not reversing for this reason, is
similarly fallacious.
True, much has been written by some Appellate
Courts on the desirability and preference of special
jury verdicts over general jury verdicts to the end
that Appellate Courts could more easily detect error
creeping into jury deliberations.
With full realization that the following argument
is being submitted to the highest Appellate Court of
this great and revered land, the writer is moved to
inquire if our worthy and learned Federal Trial
Judges, bearing their most difficult tasks during the
tenure of a civil jury trial, as in the instant case, are
in no wise to be considered? Are they not sufficiently
competent and adequately equipped to be entrusted
with the discretionary power actually afforded them
under said rule to properly determine in any given
ease whether their juries shall hand down in one in-
stance a general verdict and in another a special
verdict? Are our much respected Federal Trial
Judges not in the best position, having questioned
and carefully observed the individual jurors during
the course of a civil jury trial, to intelligently deter-
mine the type of verdict the particular jury shall
deliberate on as being fair to all litigants concerned?
The writer sincerely reasons that the rule in ques-
tion was so promulgated by this very learned and
respected Court with some such thoughts in mind
and therefore fails completely to follow the untenable
argument of the petitioner’s counsel in his contention
28
_— aire
29
that the trial judge abused his discretionary powers
in this instance.
That the Cireuit Court of Appeals below, by its
ynanimous affirmance, similarly rejects petitioner’s
contention, is most evident from an examination of
the following excerpts included in the opinions of
Circuit Judges Frank and L. Hand. Judge Frank
states, 167 F. 2d 54, at pages 55 and 56:
«“* * * Since the judge properly charged with re-
spect to a deduction for contributory negligence,
pursuant to the Act, we must assume that the jury
made such a deduction. * * *.
Defendant argues that the judge erred in deny-
ing its request for a special verdict. We cannot
agree.”
Again on pages 66 and 67:
«* * * the federal district judge, under the
Rule, has full, uncontrolled discretion in the
metter: * * *.
Accordingly, we cannot hold that a district
judge errs when, as here, for any reason or no
reason whatever, he refuses to demand a special
wie, => *"
L. Hand, Cireuit Judge, remarks on page 70:
“T coneur in holding that there was evidence
to support the verdict, and that it was not an
error to refuse to take a special verdict along with
a general verdict.”’
In W. B. Grimes Dry-Goods Co. v. Malcolm, et al.,
17S. Ct. 158, 164 U. S. 483, Mr. Justice Harlan aptly
remarked on page 160:
‘‘The submission of special questions to the jury
30
is, under the statute, in the discretion of the court,
It was so held in Railway Co. v. Pankhurst, 36
Ark. 371, 378. Independently of the statute of
Arkansas, this court has held that ‘the personal
conduct and administration of the judge in the
discharge of his separate functions was neither
practice, pleading, nor a form or mode of pro-
ceeding’, within the meaning of the practice act
of June 1, 1872 (17 Stat. 197), now section 914
of the Revised Statutes, and that ‘the statute was
not intended to fetter the judge in the personal
discharge of his accustomed duties, or to trench
upon the common-law powers with which in that
respect he is clothed.’ Association v. Barry, 131
U. S. 100, 119, 9 Sup. Ct. 755, 761.”’
See also, Erie R. Co. v. Downs, 250 Fed. 415, decided
by the Cireuit Court of Appeals, Second Circuit, prior
to the abolishment of the assumption of risk defense
in the Federal Employers’ Liability actions, where
Rogers, Circuit Judge, cogently commented at page
420:
‘‘There was no special question submitted as to
whether the accident happened as a result of one |
of the risks which defendant claimed that the
plaintiff assumed. If the plaintiff had assumed
the risk, that fact constituted an absolute defense.
The defendant claims that by not including the
question as to whether plaintiff had assumed the
risk in the number of questions upon which the
court required a special finding it in effect with-
drew from the consideration of the jury that ques-
tion. Counsel for defendant expressly requested
the submission of a special question on assumed
risks. The court said: ‘I decline to send that as
a special question to the jury’. Counsel took an
exception. The court then said: ‘That they will
take care of in their general verdict’. We are
_ oe
31
not prepared to say that this constituted re-
versible error, as the jury had been fully
instructed on that subject, and must have under-
stood perfectly that, if plaintiff assumed the risk,
he could not recover.”’ (Italics the writer’s.)
In McAuliffe v. New York Central & H. R. R. R.
(o., 172 App. Div. 597, 158 N. Y. 8, 922 (2d Dept.),
the Court remarked at pages 926 and 927:
‘‘Defendant’s counsel asked the trial court to
direct the jury to find specially ‘what proportion
of the plaintiff’s negligence contributed to the
accident, in case they should find that the plain-
tiff’s negligence was not the sole cause of the
injury’. This the court denied, to which defend-
ant excepted. The federal statute, by which con-
tributory negligence lessens the damages, is
borrowed from the early negligence rule in
Illinois, and the existing Georgia practice now
embodied in Georgia statutes (Thornton, Fed.
Emp. Liability (3d Ed.) See. 78); also from the
admiralty rule of apportionment (60 Cong.
Record, p. 4536, quoted by Thornton, p. 169).
* * x *
At the date of this trial (February 15-24, 1915)
juries did not generally return special verdicts
under this statute. * * *
* * * Vet, according to the trial practice as
understood and followed a year ago, both in the
federal and state tribunals, we cannot say that
the court committed reversible error in refusing
counsel’s request.”’
In support of petitioner’s contention that the Cir-.
euit Court erred in declaring that the trial judge had
full, uncontrolled discretion in this matter and that
therefore it could not hold the trial judge erred
when he refused to demand a special verdict, counsel
—
for petitioner cites, on pages 14 and 15 of his brief,
six separate Federal Court decisions none of which,
it is respectfully argued, apply to the proposition of
law here involved.
32
The ease of Charles D. Newton v. Consolidated Gas
Company of New York, 259 U. 8. 101, 66 L. Ed. 845,
involved Equity Rule 68 (33 Sup. Ct. XX XVIII)
which provided as quoted by this Court on pages 104,
105:
*“‘The District Court may * * * appoint a master
pro hac vice in any particular case. The com-
pensation to be allowed to every master shall be
fixed by the District Court, in its discretion, hav-
ing regard to all the circumstances thereof, and
the compensation shall be charged upon and
borne by such of the parties in the cause as the
court shall direct.”’
In that case the District Court allowed a duly ap-
pointed Special Master for 282 days work, fees
amounting to $118,000. This Court in reducing said
amount to $49,250 cogently commented, page 105:
“‘Diseretion within intendment of the rule is
a judicial one. It does not extend to arbitrary
and unreasonable action; and our review is limited
to the question of its improvident exercise.”’
The cases of Central Trust Co. of New York v.
United States Light and Heating Co., et al., 233 Fed.
420 and City of New Orleans v. Malone, 12 F. 2d 11,
dealt with the same proposition, namely, the fixing of
fees by a Federal District Judge.
The case of A. Howard Myers, et al. v. Bethlehem
Ship Building Corporation, 303 U. 8S. 41, 82 L. Ed.
— wae
33
638, stands for the principle that since the District
Court had no jurisdiction of a shipbuilding company’s
suit to enjoin the National Labor Relations Board
from holding hearings on a complaint filed by the
Board against the company, the Cireuit Court of
Appeals should have reversed the District Court’s
decree granting a preliminary injunction.
Central Trust Co. v. Chicago, Rock Island, etc.,
(‘o., 218 Fed. 336, 134 C. C. A. 144, involved the de-
nial by a Federal District Judge of a petition for
leave to intervene in a foreclosure suit where the
Appellate Court held, on page 339:
“The general rule is that the denial of a peti-
tion to intervene is discretionary and therefore
not appealable. The discretion, however, must
be exercised in accordance with recognized judi-
cial standards.”’
United States v. Haupt, et al., 136 F. 2d 661, was
a criminal lawsuit involving many questions, one of
which dealt with the Trial Court’s refusal to sever
on motion of some of the defendants whereupon the
Appellate Court held, on page 672:
“The crux of the attack upon the alleged un-
fairness of the trial revolves in the main around
the court’s denial of defendants’ motion for sever-
ance. It is earnestly insisted that it was im-
possible under the circumstances for the indi-
vidual defendants in a joint trial to obtain a fair
and impartial hearing. * * * The main argument
as to the alleged unfairness of a joint trial has
to do with the prejudicial effect of certain evi-
dence offered by the government.”’
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.