Petition for A Writ of Certiorari — United States v. Albert & Harrison, Inc.
Supreme Court brief1947
Ask Donna
What actually matters in this document.
Text
pe ee ar
Inthe Supreme Gaurt of the Winited States
OcToBER TERM, 1946
No. 1075
THE UNITED STATES, PETITIONER
Vv.
ALBERT & HARRISON, INCORPORATED
PETITION FOR A WRiT OF CERTIORARI TO THE COURT
OF CLAIMS
The Solicitor General, on behalf of the United
States, prays that a writ of certiorari issue to re-
view the judgment of the Court of Claims of the
United States entered in the above-entitled case
on December 2, 1946.
OPINION BELOW
The opinion of the Court of Claims (R. 18-21)
is reported at 68 F. Supp. 732.
JURISDICTION
The judgment of the Court of Claims was en-
tered on December 2, 1946 (R. 22). The juris-
diction of this Court is invoked under Section 3
(b) of the Act of February 13, 1925, as amended.
41)
am
2
QUESTIONS PRESENTED
1. Whether a bidder was coerced into entering
into a Government contract where, after being in-
formed of the award of the contract, he seeks to
withdraw his bid as unduly low because of alleg-
edly misleading drawings but nevertheless signs the
contract because of a threat to enforce the bid
bond.
2. Whether, after signing the contract in the
above circumstances am completing performance,
the contractor may recover as extras certain work
required by the contract.’
STATUTE AND CONTRACT PROVISIONS INVOLVED
The pertinent provisions of the Davis Bacon
Act (Act of August 30, 1935, 49 Stat. 1011) and
of the contract and specifications here involved
are set forth in the Appendix, infra, pp. 16-23.
STATEMENT
The facts as found by the court below may be
summarized as follows:
1 Should a writ of certiorari be granted, the Government
reserves the right to submit argument on the additional ques-
tion whether the determination of the Secretary of Labor of
prevailing wage rates as the minimum below which the con-
tractor may not pay is a representation to the contractor that
he will not be required to pay more, so that when the Secre-
tary determines a higher minimum wage rate for the area
generally but does not increase the rate fixed in the contract,
and the contractor pays the higher rate to his employees after
a dispute to which the Government is not a party, the Gov-
ernment is liable for the difference between the contract and ~
higher rate.
3
On April 23, 1941, Albert & Harrison, In-
corporated (contractor) entered into a contract
with the United States, acting through the
Ordnance Department, United States Army, for
the renovation of Buildings M-4, N-5, and L-3
at the Raritan Arsenal, Metuchen, New Jersey,
in accordance with certain specifications, sched-
ules and drawings which were made part of the
contract (R. 7). The work was completed by
July 5, 1941, and the contractor has been paid the
contract price, as adjusted for change orders,
except for the deduction of $950 as liquidated
damages for delay (R. 7). On December 10,
1941, contractor filed with the contracting officer
a claim for additional brickwork and for the
difference in bricklayers’ wages, which claim was
rejected on March 6, 1942 (R. 17). Subse-
quently, on June 29, 1942, the Secretary of War
and on April 8, 1943, the General Accounting
Office rejected the claim (R. 17-18). Suit was
thereafter brought in the court below to recover
for (1) alleged additional brickwork, (2) in-
creased costs on bricklayers’ wages and (3) re-
mission of liquidated damages. Judgment for
$19,766.95 was entered for contractor on all three
claims.”
* The United States does not seek review of, nor does it in-
tend to argue, if a writ of certiorari is granted, the propriety
of that portion of the judgment below relating to the remis-
sion of $950 liquidated damages.
a
4
1. Alleged Addittonal Brickwork.—Specifica-
tion S-C 1, Appendix, infra, p. 21, and Article 1
of the contract, Appendix, infra, p. 16, stated that
the brickwork on the buildings was to be done in
accordance with the drawings.’ The drawing of
the two buildings M4 and L-3 (D-197) indicates
fourteen large doors in the east and west wall
of each building, and bears the notation parallel
to the exterior wall line:
Replace existing doors, east and west
walls with brick and doors as indicated.
On this drawing there is also an elevation indi-
eating a portion or bay of outside walls contain-
ing one door. There are seven of these bays
shown in each wall. On each side of the door
in this ‘‘Typical Bay,” there appears the word
“Brick” in very light letters. The light letter-
ing of the word indicates that the existing wall is
brick. The area is not heavily hatched in as
showing new work.
Section G-C 2 of the specifications, Appendix,
infra, p. 20, advised bidders of the desirability of
visiting the site of the work but contractor pre-
pared its bid without complying with this sugges-
tion (R. 12). On April 23, 1941, contractor was
notified that its bid was accepted (R. 11), and
’There is no question that the drawing of building N-5
(D-198) indicated all existing and proposed openings in the
building; and hence the contractor has not sought any addi-
tional compensation for the brickwork done on that building
(R. 11).
A. S. Harrison, contractor’s secretary and treas-
urer, who had prepared the bid, went to the
arsenal to sign the contract (R. 11). Mr. Har-
rison then noticed that buildings L-3 and M-4
contained 116 doors and openings not shown on
the drawings and of which he had no prior
knowledge (R. 11) although all these openings
could be plainly observed at the site (R. 12).
When informed that all these openings were to
be bricked up, Mr. Harrison stated that the bid
did not include the work of bricking up the open-
ings, and that new bids should be called for (R.
11). The Government’s construction engineer at
the arsenal advised that if contractor failed to
sign the contract and proceed, its bid bond would
be forfeited (R. 11). Mr. Harrison left without
signing, but returned on the following day, at
which time he renewed his request that new bids
be called for (R. 11). This the contracting officer
refused to do, indicating that the drawing D-197
contained the necessary information, including
all doors and work -to be performed, and stating
that contractor must proceed with the work (R.
11). Contractor signed the contract (R. 12),
and on May 5 started the work under oral protest
(R. 12).*
‘Subsequently, contractor received a “Revised Drawing”
D-197 which indicated revision as of May 2, 1941, and showed
clearly 144 openings, including the 116 here involved. This
drawing, contractor contended, was handed to its representa-
tive by the contracting officer’s assistant, but the contracting
officer contended that the drawing was a tracing, unapproved
eo Bate ts NO a a et
6
The court below held that the specifications and
drawings had the effect of misleading contractor
into making a bid which it otherwise would not
have made (R. 20); that enforcement of the bid
bond would expose the contractor to liability to
the Government (R. 20); and accordingly that.
contractor was coerced ‘‘into signing the contract
when the Government had no right to a contract
based on the [contractor’s] bid’’ (R. 20). The
court, Judge Whitaker dissenting, found con-
tractor entitled to recover $17,600 on this claim.
(R. 18).
2. Labor Claim.—In accordance with the Davis
Bacon Act of 1935, Article 28 of the contract,
by him and not connected with contractor’s work (R. 12).
On May 17, 1941, contractor wrote to the commanding officer,
Reritan Arsenal, that it had examined the revised drawing
and requested advice “whether you want us to do this work
and we will submit our proposal to you” (R. 12). In reply,
the contracting officer, on May 19, 1941, advised that drawing
D-197 had not been revised and requested the return of any
copies of that drawing bearing a revision date subsequent
to the date of the contract. On May 21, 1941, contractor
again wrote to the commanding officer :
“In accordance with your instructions, we are proceeding
with the removals of the doors and the bricking up of the
openings under protest.” (R. 12.)
To this, the contracting officer replied on May 24, 1941:
“Receipt of your letter of May 21, 1941, relative to the
renovation of buildings N-5, M-4 and L-3 at this arsenal,
is acknowledged.
“Jt is presumed that the instructions to which you refer
in your letter are my oral directions to you to proceed with
the work as called for in the contract. ‘These instructions
are confirmed and made a matter of record.” (R. 12.)
No appeal was taken at that time from the action of the
_contracting officer expressed in these letters.
oT
7
Appendix, infra, p. 20, and ion S—C 9 of the
specifications, Appendix, infri, “obligated the
contractor to follow a schedule of minimum
wage rates determined by the Secretary of
Labor on October 26, 1940 to be the prevailing
rates of wages for crafts specified to be employed
on this contract. The Secretary had found the rate
of wages for bricklayers to be $1.50 per hour
(R. 14). On April 4, 1941, the Department of
Labor increased the prevailing rate of wages for
bricklayers in the Raritan Arsenal area to $1.75
per hour (R. 14).
When contractor started work on the contract,
the business agent of the bricklayers’ union
claimed to it that the prevailing wages for brick-
layers for the area of the site was $1.75 per
hour and that the Department of Labor’s rep-
resentatives had sometime in April of 1941 recog-
nized such rate in the area (R. 14). An ar-
rangement was made between contractor and the
bricklayers’ union to submit the question to arbi-
tration (R. 14). After completion of the work,
the arbitrator decided that $1.75 per hour was
the prevailing wage rate for bricklayers in that
area (R. 14).
While conceding that the specifications were
undoubtedly prepared before the new wage scale
was recognized, the court below held that this
new wage scale was set some weeks before the
contract was made, and contractor should have
733920472
nteeremnetiisetietaaeeteaneaiaa
I te EN selena
8
been advised (R. 20); that although the deter-
mined rate is only a minimum, it is the prevailing
rate which “‘is by hypothesis the rate customarily
paid and the rate at which a contractor could
expect to hire his labor’? (R. 20) ; accordingly, it
held that since ‘“‘the claim of the bricklayers for
$1.75 was based entirely upon the fact that the
prevailing rate as determined by the Secretary
of Labor was, in fact $1.75,” and “the Govern-
ment had represented that it was $1.50” (R. 20-
21), contractor is entitled to recover because of the
misrepresentation (R. 21). It entered judgment
for $1,216.95 on this claim (R. 18).
SPECIFICATION OF ERRORS TO BE URGED
The Court of Claims erred:
(1) In holding that in the circumstances of the
present case the threat to enforce the bid bond
was coercive.
(2) In holding that the contractor after sign-
ing, executing and completely performing the
contract may recover extra compensation for the
alleged additional brickwork.
(3) In holding that the wage rates determined
by the Secretary of Labor were representations
on which the contractor was entitled to rely as
the rates which he could expect to hire labor.
(4) In failing to hold that under the instant
contract contractor was not required to pay more
than the wage rates determined therein.
er
(5) In holding that the Secretary’s determina-
tion of minimum rates for the Raritan area at
a level higher than those determined in the
instant contract was cause for imposing liability
on the United States for contractor’s increased
labor cost.
(6) In entering judgment for respondent on
the two claims here involved.
1. The holding of the court below permitting
the contractor to recover its costs for bricking up
the 116 doors in controversy, on the theory that
the threat to enforce the bid bond coerced it into
signing the contract and hence entitled it to
recover extras in excess of the contract price,
is not only unsound but conflicts with the decision
of the Court of Appeals for the District of
Columbia in Board of Trustees, etc. v. O. D. Wil-
son Co., 133 F. (2d) 399 (App. D. C.), and is
inconsistent with the court below’s earlier deci-
sion in Massman Construction Co. v. United
States, 102 C. Cls. 699, certiorari denied, 325
U.S. 866.
In both the Massman and the Wilson cases,
the courts refused to allow recovery for extras to
a contractor who allegedly had discovered the
omission of certain items of cost from his bid
prior to the signing of the contract, but had
signed the contract under threat of enforcement
of his bid bond. In the Massman case, the Court
10
of Claims held that if the District Engineer
reasonably thought that the contractor did not
have the right to be released from its bid bond
without penalty, his refusal voluntarily to release
the contractor was not improper. In the Wilson
case, the Court of Appeals did not regard the
threat to enforce the bid bond as coercive, since
if the contractor had the right to rescind, the
Board of Trustees had no power to make good
its threat. Both these cases are correct since the
question of liability on the bid bond was litigable
(Moffett, Hodgkins, etc. Co. v. Rochester, 178 U.
S. 373), and the courts have consistently held that
where one is entitled to litigate, there is no duress
or unconscionable conduct justifying rescission or
reformation of the transaction allegedly induced
thereby. Hartsville Oil Mill v. United States, 271
U. S. 43; Silliman v. United States, 101 U. 8. 465;
In re Prima Co., 98 F. (2d) 952, 964-966 (C. C. A.
7), certiorari denied sub nom. Keig v. Harris
Trust & Savings Bank, 305 U. 8S. 658; McKenzie-
Hague Co. v. Carbide & Carbon Chemicals Corp.,
73 F. (2d) 78, 83-85 (C. C. A. 8); Dick v. Mare
& Rawolle, 4 F. (2d) 879 (App. D. C.), certiorari
denied, 268 U. S. 688; Williston on Contracts
(Rev. Ed., 1937) § 1606.
These principles, we submit, are controlling in
the present case. As in the Massman case, the
contracting officer reasonably thought that the
contractor had no right to be released without
penalty, and hence his refusal to release the con-
il
tractor was not improper. The specifications de-
scribed the work to be done as follows: “The ren-
ovation of Building — by the replacing of existing
doors with brick, metal doors and sash as in-
dicated.’”” At most, there was an ambiguity as
to what the phrase “‘as indicated” modified. The
contracting officer construed it to modify “brick,
metal doors and sash,” rather than “‘replacing.’’*
In these circumstances, the contracting officer “‘had
the right, and probably the duty, to insist upon
what he, reasonably, thought were the Govern-
ment’s rights”’ (102 C. Cls. at 719).
In the present case, as in the Wilson case, the
contractor chose to sign the contract “under no
mistake, for it then knew all the facts including
its former mistake’’ (133 F. (2d) 400). More-
over, as in the Wilson case, the contractor had
the choice of refusing to sign and litigating its
right to withdraw or of signing the contract and
assuming the risk of not recovering for the al-
leged extras. If, as the court below found, the
contractor had the right to withdraw its bid
(R. 20), it of course, would not have been subject
to any liability on its bid bond and the contracting
officer “‘had no power to make good [his] threat.
[His] denial of the right to rescind did not con-
clude the question. Appellee could litigate it.
*This construction is binding since the specifications
G-C 15, Appendix, infra, pp. 20-21, clearly stated that the
contracting officer shall be the interpreter of the drawings and
the specifications.
ee ae TLE
nee OLLI CEI I
Appellant was equally entitled to litigate it or, as
it did in effect, threaten to litigate it. It follows
that there was no duress. Appellee simply chose
to contract and perform rather than have its right
to rescind judicially determined. It is bound by
the contract and cannot recover in this action.”
(133 F. (2d) at 400.)
The contractor’s execution of the contract ‘‘un-
der oral protest’? (R. 12) because of the mistake
in its bid price adds nothing to its rights. The
contractor, having chosen not to rescind its bid,
conceivably voidable if based on a mistake of
fact (Williston on Contracts (Rev. Ed., 1937)
§§ 15, 1626), elected to contract with the Gov-
ernment at its bid price (R. 12) and thus ter-
minated any right to reformation thereof. See
Restatement of Contracts § 431 (comment g);
Williston, supra, § 1528; cf. Restatement of
Restitution § 68. In the Wilson case, where the
contractor likewise signed the contract, ‘‘reserv-
ing all rights arising from its estimator’s mis-
take’? the contractor ‘“‘could not on any theory
contract, perform, collect the full contract price,
and then repudiate the contract and recover as if
there had been none. It could not acquire such
a right by purporting to ‘reserve’ it” (133 F. (2d)
at 399, 400). To allow the contractor relief in
these circumstances would ‘‘be making for the par-
ties the very contract which one of them, the Gov-
ernment, expressly refused to make * * *
13
though requested to do so by the [contractor]”’
(Massman Construction Co. v. United States, 102
C. Cls. at 717).
The court below did not refer to the Wilson
ease, and attempted to distinguish the Massman
ease on the ground that in that case, “the Govern-
ment was in no way at fault or responsible for
the [contractor’s] mistake and the [contractor]
was probably not entitled to withdraw its bid’’
(R. 20). This distinction, we submit, is wholly
lacking in significance. While in the present case
the contractor may not have been wholly re-
sponsible for the situation which arose, it clearly
contributed to it by failing to visit the site and
inspect the work on which it was bidding. More-
over, whether the contractor was coerced into
signing the contract is not determined by fixing
responsibility for the erroneous bid. Finally, if,
as the court below held, the United States were
solely responsible for the alleged error, the denial
of recovery in the present case would appear a
fortiori to follow, for then there could be no
doubt that the contractor could not be held on
its bid bond; there could be no doubt that there
was no economic pressure on it to sign the con-
tract, and hence no justification for finding coer-
cion. Cf. Board of Trustees v. O. D. Wilson Co.,
supra, at 400.
2. The questions here presented are important
and merit review by this Court. In addition to
14
conflicting with the Wilson case, the decision be-
low by permitting bidders to withdraw their bids
without penalty in the present circumstances
vitiates the value of the irrevocable bid bond by
resurrecting the evils which the Government's
present system of sealed bids was designed to
eliminate. If, after the bids have been opened,
the reletting of the contract may be required
where there is any ambiguity in either the draw-
ings or specifications, any subsequent bid could
be expected to be lower than the second bid only,
and not to be the lowest amount for which the
work could be done. If, on the other hand, the
contractor is permitted to sign the contract and
thereafter recover for the alleged extras, the net
effect may very well be that the contract actually
is not let to the lowest responsible bidder, for the
sum of the contract price plus the extras which
the contractor is allowed will frequently be in ex-
cess of the rejected competitive bids. As the
court below recognized in the Massman case, ‘To
make the system work without undue delays and
without the opening of the bids being used un-
fairly to obtain a disclosure of what competitors
are offering, it is necessary that the bids be firm
bids, backed by a guaranteed willingness to sign a
contract at the bid price. To have a set of bids dis-
carded after they are opened and each bidder has -
learned his competitor’s price is a serious matter,
and it should not be permitted except for cogent
reasons’? (102 ©. Cls. at 718-719). No such
cogent reasons, we submit, are here present.
CONCLUSION
For the reasons stated, it is respectfully sub-
mitted that this petition for a writ of certiorari
should be granted.
GerorcE T. Cite
Acting Solicitor General.
AUARY 1947. J
]
eT OF SHE PH
APPENDIX
1. The pertinent provisions of the Davis Bacon
Act, Act of August 30, 1935, 49 Stat. 1011, 40
U. S. C. 276a et seq. follows:
Sec.1. * * * the advertised specifica-
tions for every contract in excess of $2,000,
to which the United States or the District
of Columbia is a party, for construction,
alteration, and/or repair, including paint-
ing and decorating, of public buildings or
public works of the United States or the
District of Columbia within the geograph-
ical limits of the States of the Union or the
District of Columbia, and which requires
or involves the employment of mechanics
and/or laborers shall contain a provision
stating the minimum wages to be paid vari-
ous classes of laborers and mechanics which
shall be based upon the wages that will be
determined by the Secretary of Labor to be
prevailing for the corresponding classes of
laborers and mechanics employed on proj-
ects of a character similar to the contract
work in the city, town, village, or other civil
subdivision of the State in which the work
is to be performed, or in the District of
Columbia if the work is to be performed
there; and every contract based upon these
specifications shall contain a stipulation
that the contractor or his subcontractor
shall pay all mechanics and laborers em-
aren directly upon the site of the work,
unconditionally and not less often than
once a week, and without subsequent de-
(16)
duction or rebate on any account, the full
amounts accrued at time of payment, com-
puted at wage rates not less than those
stated in the advertised specifications, re-
gardless of any contractual relationship
which may be alleged to exist between the
contractor or subcontractor and such labor-
ers and mechanics, and that the scale of
wages to be paid shall be posted by the con-
tractor in a prominent and easily accessible
place at the site of the work; and the
further stipulation that there may be with-
held from the contractor so much of ac-
crued payments as may be considered neces-
sary by the contracting officer to pay to
laborers and mechanics employed by the
contractor or any subcontractor on the
work the difference between the rates of
wages required by the contract to be paid
laborers and mechanics on the work and the
rates of wages received by such laborers and
mechanics and not refunded to the contractor,
subcontractors, or their agents.
Sec. 4. This Act shall not be construed to
supersede or impair any authority other-
wise granted by Federal law to provide for
the establishment of specific wage rates. :
2. The pertinent provisions of the con-
tract follow:
Art. 1. Statement of Work.—The con-
tractor shall furnish the materials, and
perform the work for:
The renovation of Buildings N-5, M4
and L-3, at Raritan Arsenal, Metuchen,
New Jersey, in accordance with Drawings
D-198, D-197, C—164, and C-—165, General
and Special Conditions and Specifications,
in accordance with Contractor’s proposal
dated April 22, 1941, Item one (1) to
three (3) inclusive, and Amendments Nos.
REE FSS TR
18
1 and 2, dated April 18, 1941 and April 21,
1941, respectively.
Item la. Building N-5: The renovation
of Building N-5 by the replacing of the tile
in existing East & West walls with brick.
The brick veneer of the North & South
walls. New metal doors and sash. The
construction of certain office and toilet
space, together with the necessary plumb-
ing, masonry, metal work and glazing.
b. Building M-4: The renovation of
Building M-4 by the replacing of existing
doors with brick, metal doors and sash as
indicated. The brick veneer of the North
and South walls. New metal doors and
and South walls. New metal doors and
sash. The construction of certain office
and toilet space together with the necessary
plumbing, masonry, metal work and
glazing. * * * mie
Art. 2. Specifications and drawings.—
The contractor shall keep on the work a
copy of the drawings and specifications
and shall at all times give the contracting
officer access thereto. Anything mentioned
in the specifications and not shown on the
drawings, or shown on the drawings and
not mentioned in the specifications, shall
be of like effect as if shown or mentioned
in both. In case of difference between
drawings and specifications, the specifica-
tions shall govern. In any case of dis-
erepancy in the figures, drawings, or spec-
19
ifications, the matter shall be immediately
submitted to the contracting officer, with-
out whose decision said di shall
not be adjusted by the contractor, save
only at his own risk and expense. The
contracting officer shall furnish from time
to time such detail drawings and other in-
formation as he may consider necessary,
unless otherwise provided. U com-
pletion of the contract the work shall be
delivered complete and undamaged.
7 ” * * *
Art. 5.* * * Except as otherwise
herein provided, no charge for any extra
work or material will be allowed unless the
same has been ordered in writing by the
contracting officer and the price stated in
such order.
* * * * *
Art. 17. Rate of wages (in -accordance
with the act of August 30, 1935, 49 Stat.
1011 (U. S. Code, title 40, sections 276a
and 276a-1), this article shall apply if the
contract is in excess of $2,000 in amount
and is for the construction, alteration,
and/or repair, including painting and
decorating, of a public building or public
work within the geographical limits of the
States of the Union or the District of
Columbia).
(a) The contractor or his subcontractor
shall pay all mechanics and laborers em-
ployed directly upon the site of the work,
unconditionally and not less often than
once a week, and without subsequent de-
duction or rebate on any account, the full
amounts accrued at time of payment, com-
puted at wage rates not less than those
stated in the os regardless of
any contractual relationship which may
be alleged to exist between the contractor
A ORME EC OO EE LEE LE ONS III
20
or subcontractor and such laborers and me-
chanies; and the scale of wages to be paid
shall be posted by the contractor in a prom-
inent and easily accessible place at the site
of the work The contracting officer shall
have the right to withhold from the con-
tractor so much of accrued payments as
may be considered necessary by the con-
tracting officer to pay to laborers and me-
chanics employed by the contractor or any
subeontractor on the work the difference
between the rates of wages required by the
contract to be paid laborers and mechanics
on the work and the rates of wages re-
ceived by such laborers and mechanics and
not refunded to the contractor, subcon-
tractors, or their agents.
* * * * *
Art. 28. Rates of wages.—The Act of
Congress (Public No. 403, 74th Congress)
approved August 30, 1935, ‘‘To amend the
Act approved March 3, 1931, relating to the
rates of wages for laborers and mechanics
employed by contractors and subcon-
tractors on public buildings,’’ applies to
this contract. A schedule of minimum
wage rates has been determined by the
Secretary of Labor on October 26, 1940,
to be the prevailing rates of wages for the
crafts specified to be employed under this
contract.
3. The pertinent provisions of the speci-
fications follow:
G-C 2. Visiting site—The bidder should
visit the site and acquaint himself as to
local conditions, availability of water,
electric power, roads, soil conditions, and
the relation of finished grade of the
building to existing grades and the natural
surface of the ground.
21
G-C 15. Interpretation of contract.—
Unless otherwise specifically set forth the
Contractor shall furnish all materials,
labor, ete., vy yd to qenpinte, the work
according to the true intent an i
of the drawings and specifications, of which
intent and meaning the C. O. shall be the
interpreter. Except when otherwise indi-
cated, no local terms of classifications will
be considered in the interpretation of the
contract or the specifications forming a
part thereof.
G-C 27. Discrepancies.—Where no fig-
ures or memoranda are given, the drawings
shall be accurately followed according to
scale. In any case of discrepancy in the
figures on drawings, the matter shall be
immediately submitted to the C. O. without
whose decision said discrepancy shall not
be adjusted by the Contractor, save only
at his risk; and in the settlement of any
complication arising from such adjustment
the Contractor shall bear all extra expense
involved.
In case of difference between drawings
and specifications, the specifications shall
govern.
G-C 33. Extras.—Except as otherwise
herein provided, no charge for any extra
work on material will be allowed unless
the same has been ordered in writing by
the Contracting Officer and the price stated
in such order.
S-C 1. Description of work.—The work
includes the furnishing of material and
equipment and performing all necessary
labor to construct and complete the fol-
lowing :
A. Building N-5.—The renovation of
Building N-5 by the replacing of the tile
in existing East & West walls with 8’
22
brick walls. The brick —— of the
North & South walls. Certain roof repairs.
New metal doors & sash as required. The
construction of certain office and toilet
space together with the necessary plumb-
ing, masonry, metal work, painting &
glazing. Remove old concrete chimney on
north wall.
B. Building M-4.—The renovation of
Building M-4 by the replacing of existing
doors with brick, metal doors & sash as
indicated. The brick veneering of the
North & South walls. Certain roof repairs.
New metal doors & sash where required.
The construction of certain office & toilet
space together with the necessary plumb-
ing, masonry, metal work, painting &
glazing.
C. Building L-3.—The renovation of
Building L-3 by the replacing of existing
doors with brick, metal doors & sash as in-
dicated. The brick veneering of the North
& South walls. Certain roof repairs. New
metal doors & sash where required. The
construction of certain office and toilet
space together with the necessary plumb-
ing, masonry, metal work, painting &
glazing.
At the Raritan Arsenal, Metuchen, New
Jersey, in accordance with the specifications
herein contained; and drawings:
D-198 Bldg. N-5
D-197 Bldg. L-3 & M-4
C-164 Steel Swing Door Details
C-165 Steel Roller Curtain Door
Details
S-C 9. The act of Congress.—( Public
No. 403, 74th Congress) approved August
30, 1935, “To amend the Act approved
March 3, 1931, relating to the rates of
wages for laborers and mechanics employed
Le buildings, "applies to thie projesteomd
c ”’—applies i
in accordance with the sovdion of’ tana
Act the following ule of minimum
wage rates has been determined by The
Secretary of Labor on October 1940,
to be the prevailing rates of wages for the
crafts specified to be employed on the
construction of:
Post Raritan Arsenal.
Qe Pemenestepinininin Middlesex.
State New Jersey
Classification of labor: Rate per hour
. . . e .
Bricklayers_ $1.50
U. S. GOVERNMENT PRINTING OFFICE, 1947