Jn the Supreme Court of the United States
OcToBER TERM, 1960 |
a
%
il -
t
(NITED STATES ‘OF AMERICA- AND ‘ATOMIC ENERGY
COMMISSION, PETITIONEEBS
SB
INTERNATIONAL UNION OF. ELECTRICAL, RapIO aND
MACHINE Workers, AFL-CIO, et Au. °°
ON WRIT OF CERTIORARI TO THE UNITED STATES COURT OF
APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT
REPLY BRIEF FOR PETITIONERS
' ARCHIBALD COX,
s _ Solicitor General,
WILLIAM H. ORRICK, SJr.,
Assistant Attorney General,
DANIEL M. FRIEDMAN,
Assistant to the Solicitor General,
MORTON HOLLANDER,
‘ ; Attorney,
Department of Justice, Washington 25, D.C.
v
NEIL D. NAIDEN,
General Counsel,
COURTS OULAHAN, ;
Deputy Géneral Counsel, . ee
LIONEL KESTENBAUM,
* Attorney, f ar
Atomic Energy Commiaston, Washington 25, D.C
St ee
yo INDEX
‘ Arguinent:,
I. The propriety of the issuance a the orig-
inal construction permit in 1956 is
irrelevant to the only issue before the
court, namely, the validity of the 1959
amended construction permit
II. ‘The Commission's findings ssattstied the
regulations _ — — -
’
HII. The Atomic Energy Act of 1954 saihion
iZeS Regulation 50.35 and the Comniis-
Sion’s two-step licensing procedure.
TV. Respondents’ assertions as to the safety
hazards of atomic, reactors generally
-and of the PRD@ reactor in particular
are contrary to the facts
* * V. The Commission’s findings on the safety
7 of the site are adequate
Conclusion_-— | |
Appendix A ; ;
Appendix B es
Appendix C
CITATIONS
Cases:
Bowles v. Seminole Rock ('o., 325 U.S: 410.
Federal Broadcasting System v. Federal Com-
munications Commission, 225 Fk. 2d 560,
certiorari denied, 350 U.S. 923... *
Inland Empire Council v. Millis, 325 U.S. 697
(1)
‘ ~
HPQ C1 1 . — J >
i?
Page
bee |
46)
49
66
14
yo
.
II
Statutes and Regulations:
Atomie Energy Act of 1954, S Stat. O19, as
amended, 42 U.S.C. 2011: |
Page
Section 103 _- 20, 24
Seetion 104_- 20, 21, 22, 24; 25
-Seciion 104(b)___. uae 19, 21
Section 104(d).....\-.--:,..--4.--- 21,31
Section 105 _ _ - ; ; 24
Section 161__- 19
Section 182_ 19, 20, 22, 23, 24, 25, 33, 34, 35, 36
Section 182(a)_.. -. 2”, 21, 22, 24, 25, 26, 27
Section IS2{b)___ “4, 24
io Section 182(¢) = 24 ogi
Section 1S2(d)_. : rae 24
Section 184... -) | 24
Section 185__ > - : 19,
20, 22, 23, 24, 25, 28, 29, 30, 32. 37 |
Section I86__ ge oe
Section sy... ; 20, 24, 35
Atomic Ene rev Regulations 0c F.R.): eae
Seetion 20_ _- ' Se 42
section 50.34. al oe a
“eetion 50.35 . Pein SS
"dy 14, 18, 16, 17, 19, 25, 26, 29, 32,39
. Section 50.40.22 15, 16:17
Section 50.57 (Cum. Supp. 1961)__ _- “19
| Proposed Section 100.11 (b), 26 F.R. 1235 47
Miscellaneous: | 1
Aceident Facts, 1960 ed., National Safety °
Council, Chicago, fll., p. 26 eee 44°
AEC Press Release D-72, Mareh 30, 1961 2 - - 44
+ Argonne National Laboratory Summary
Status of Fast Breeder Reacter Program,
dated December 1, 1960. .—__. Aaeae 45,
100 Cong. Ree. 12014, 3 Leg. Hist. 3759. 35,3435
“>
Miscellaneous Continued » :
Estep, Radiation Lujuries anil Statistics: The
Need for a New Approach to Injury Litiga-
tion, 59 Mich. L. Rev. 259 |
25 Ked. Reg. 1225. _ -
26 Fed. Reg. 1224___-
Hearings before Joint Committee on Atceinic
Energy on Governmental Inde sunity for
Private Licensees and AEC Contractors
Against Reactor Hazards, S4th _Cong,, 2d
Sess., pp. 62- 63
Hearings Be fore the’ Joint’ Committee on
Atomie Energy on ‘8. 3323 and H.R. S862,
“S3rd Cong., 2d Sess., pp.° 119-120; 2 Leg.
Hist. 1753
—— on Development, Growth and State
of the Atomie Energy Industry, hefore the
Joint Committee on Atomie Energy, 87th
Cong., Ist Sess., p. 10300) - pares
Joint Committee on Atomic Energy, A Study
of AEC Procedures and Organization in
the Licensing of Reactor Peeilities, 85th
3Y
36, 37
’ Cong., Ist Sess. (Joint Commuttee Print .
1957):
Pp. 6, 96, 107-108 _
Pp. 136-155
Joint Cominittee on Atomic Energy, Imprev-
ing the AEC Regulatory: Process, “Sth
Cong., Ist) Mess. (Joint Comittee Print
- 1961): “i .
Vol. 1:
3]
Pp. 447-448
Vol 2) pid Se
_IVv
Miscellaneous—Continued ce
— Bureau of Standards Handbooks:
andbook 59 (1954, Supp. 1958)______-
Handbook 69 (1959). = _. pope
- New York Times, , April 7 7, 1961, p. 12. ee
PRDC's Eighth Quarterly Technical Report, ,
Prgeeannt TM, Boe ee oe.
S. 3323, 1 Leg. Hist. 181, ag ue oN.
S. 3690, 1 Leg. Hist. 645; 718__. 22-8. aot
Sn the Supreme Court of the Bnited States
‘ Oc TOBER TERM, 1960 ©
7 No. 454
COMMISSION, PETITIONERS
| ve |
INTERNATIONAL UNION OF Exrecrricar, RApio AND
MacHINE Workers, AFL-C1O, Ev AL.
é
APPEALS FOR THE DISTRICT: OF COLUMBIA CIRCUIT
’
‘ &
REPLY BRIEF FOR PETITIONERS
rye eS 2 ° ieee . i r
Mie central issne in this case is whether the pro-
cedure followed by the Atomie Energy Commission
with the PRDC: Reactor’ accords with. the .Atomic
Energy Act of 1954. -'Phe Commission. held’ a hearing
on the PRDC application for a license to construct
and operate the Fermi -reactor and found (R. 708):
reasonable assurance in the record, for the
purposes:of this provisional. construction per-
mit, that a utilization faéilitv of the general
type. proposed in the PRDC’ Applieation , and
amendme nts thereto ean be constrneted and
(14) |
2
‘Univep Srares-or .AMERICA AND ATOMIC: ENERGY
OX WRIT OF GERTIORARI TO THE UNITED STATES COURT: OF -
to protect the public health and safety: in connection ©
2
operated ‘at the location without undue risk to
the health and safety of the publie.
The Commission thereupon issued a provisional con-
struction permit. It also announeed that it would
not issue a license to operate unless. it was demon-
strated at a further hearing that the reactor as
finally designed would be operated without danger.
to the health and ; saféty of the public (R. 712, 718-
719). : ,
In our opinion this oR conforms exactly to
the Commission’s’ regulations and its consistent prac-
tice in other cases’ involving large ‘developmental re-
actors. Consequently, our main brief is chiefly con-
cerned with the interpretation of the Atomie Knergy
Act. . ian
Respondents have introduced a diffuse variety of
additional questions, Although the only order under
review is the order dated May 26, 1959, continuing
the construction permit, as amended, they attack the
-original provisional construction ‘permit issued Au- .
gust 4, 1956. It is now necessary, therefore, to give
the Court a brief account of that aspect of the pro-
éeeding. See pp. 3-7, infra. ;
Respondents also argue that the Commission’s find-
ings in this case do not conform to its own regula- —
‘tions... The argument ~ .based partly aipon conten-
tions concerning the meaning of the regulations and
partly upon respondents’ interpretation of the Com-
mission's findings, which waries from = time to time
throughout its briefs Since the meaning of the fiid-
ings must be established before’ one can determine
whether the findings éariforn to-the regulations and
3
the sti atute, We shay abso “dis wins this ISSUC before.
turning back to the central qitestion in the case. See
“pp. 7-19, dufra. |
Finally, since respondent’8 appended to their brief
(a list of so-called “accidents” at atomic’ reactors, we
shall discuss: the extraordinarily high safety record.
"of this field of activity. See pp. 41-45, infea.
I
THE PROPRIETY OF THE ISSUANCE. OF THE ORIGINAL
CONSTRUCTION PERMIT IN 1956 IS IRRELEVANT TO THE
ONLY ISSUE REFORE THE COURT, NAMELY, THE VALIDITY
OF THE 1959 AMENDED CONSTRUCTION PERMIT
The PRDC application was filed on January 6,
1956. Under the Act and regulations at that time,
the Commission was. authorized to issue provisional
constretion permits without a hearing provided that
it gave ‘any protestants an opportunity to be heard
-Uupom request filed within 30 days after issuance.
The Commission referred the application to the Ad-
visory Cunmitteé on Reactor Safeguards. - The Com-
mittee reported (R. 587-593) that there was imsuf-
ficient- information available at that time to give
assurance that the PRDC reactor could be operated at
the site without’ publie hazard and that it was doubt-
ful whether.even an accelerated program of research
"and development would give the assurance before the
scheduled completion of the reactor in the summer of
1959. The Commission conducted further investiga-
tions and on August 4, 1956, granted a provisional
construction permit CR. 516-523). Commissioner
Murray -dissented.
eer om, . . 4 .
‘There was sharp criticism of this, procedure from
the Joint Congressional Committee on Atomic Energy
and. in Congress, both because: the Commission had
‘Sassued a construction permit without a hearme and
also beeause it had acted in-the face-of a discour: aging
ACRS. report.” The Atomic Energy Act of 1954 was
subsequently amended to require a hearing before the
issuance of eoustruction permits, to provide A statue
tory basis for tlie, Advisory Committee's activities,
and to require that itt report be made public. The
handling of the PRDC Applieation at this stage and
especially the alleged’ suppression “ef the ACRS re-
port * became ‘an item in the political contest over the -
A full explanation of the considerations that led the Coni-
mission to issue the original permit, including its analysis of
the ACRS repor:, is contained ina #56 letter from the Com-
mission to the Joint Committee on Atomic “Energy, set. forth
at pages 136-155 of A Study of AF C Procedures and Organi-
zation in the Livensing of Reactor Facilities. Sith Cong., Ist
oe: Sess. (Joint Committee Print 1957).
“ae Respondegts state (Br. 17, n. 15) that the PRDC project
has not, since the 1957 legislatian, been seferred to the Advi-
sory Committee. While no formal reference is required until
‘application is made for an operating,license (Section, 182(b)},
the Advisory Committee has beei regularly reviewing the
PRDC project to date, and its stibeommittee has had periodic
meetings with thé AEC -staff and PRDC personnel. /mprar-
ing the AF¢ Regilatory Process, Sith Cong., Ist Sess. ( Joint
Committee Print 1961), Vol. 2, pp. 177-179. A> formal
‘repost will be rendered by the ‘Advisory. Committee prior to
the hearing upon an application for an operating license.
* The Commission’s uniform policy, until the 1957 legislation,
was to consider such communications from the ACRS as in-
ternal documents protected by executi¥e privilege. See /m-
proving the AEC Regulatory Process, supra, Vol. 1, pp. a4i-*
448,
<«. -. oe
v
4
7]
‘nomination of Cormiuissioaer Strauss ti be Secretary
of Commerce, .
Three points concerning this mitial phase of the
PRDC proceeding should be clearly understood... ,
. The original provisional construction permit is
not before this Court. After the original phase was
completed, the AC RS report was release d, and a full
hearfng -was . held. The Commission made specific —
findings concerring the safety of the Fermi reactor
upon: new and -more*complete evidence. Not even
Respondents argue that any mistakes in the original
issuance of the provisional constriction permit in-
validated the order under ‘teview. .And /whatever
may be the merits of that e arlier cor troversy, it in-
volved no violation-of the. statute.
2 The report of the Advisory Committee on Re-
it Safeguards castS no’ doubt upon’ the Commis-
sion’s finding that there is reascnable assurance’ that -
a reactor ofthe general type proposed in the PRDC
applieation: can be constracted and opetated safely.
at Lagoona Beach. More than two years had inter-
vened between the ACRS report and the Commission’s
findings after the hearing. During this period atomic
science and engineering were developing with great
rapiditv. The completion date for the -LRDC_ re-
“actor had been set back, thus allowing more time for
_ research and development. The Chairman of the
» Advisor Vv Committee on Reactor Safeguards testified.
at the hearing that although there was not then suf-
‘ficient proof of its safety to permjt a re tor of Be
tvpe proposed to be opér ated at Lagoona Beac h,>
6
was “very probable that the necessary information
will be obtained?’ (R. 674). Dr. Harvey, Brooks, an
ACRS member, testified paw there was reasonable as-
surance that such information would be available in
time to meet the PRDC time schedule and that
would furnish “the -necessary assurance “that the
PRDC reactor ¢an be operated at a site such as that
proposed without undue ‘hazard to the health ‘and
safety of the public.””. Other ACRS members testi- -
fied. to stibstantially the same effect: (R. 674-75).-
3. The Congressional criticism of the handling of
the PRDC case which is cited by respondents does
not. refer to the issues involyed in the present CAS
but to. the proc ‘edure followed in the issuance. of the
original provisional construction permit. ‘Thus, the
material under the heading * Pertinent amendments
to the Act after issuance of originalvonstruction per-
mit’? (Resp. Br. 15-17) is rélevant, at most, only to
the issuance of the original permit, and has nothing :
to do with the issues before, the Court. Similarly, the
colloquy between Senator ‘Anderson and Commis-
‘sioners Wilson ‘and Olson (Resp. Br. 55-56), in which
the Commission’s handling of the Fermi project was
criticized, related to the eriginal issuance of the per-
mit in 1956, not to the permit here under review. THis
is ‘also true of the cited Congressional criticism “a
the Commission’s failure to make public the ACRS |
report (Resp. Br. 61-62), and the statements by Sen-
ator Anderson .and Representative. Holifield ¢riti¢is-
ing the Commission for not having held a hearing be-
fore issuing the permit (Resp. Br. 5, n. 53 61-63). >
a”
.
e = - —_
oe. 4
*
In short, .all of the Congressional criticism that re-
spondents stress so heavily related to an issue not
involved in this case—the issuance of the original |
permit in 1956. The only issue before the Court is
the.validity of the amended constriction permit issued
*in 1959, and that depends woon what was done in
issuing it, not upon what happened in the earlier
proceedings. involving the superseded permit. Cf.
Inland Empire Council vy. Millis, 325 U.S. 697, 706- °
fF 6 710; Federal Broadcasting System _v. Federal Com-
munications Commission, 225 F. 2d°560, 563, 564-
) 565 (CLA. D.C.), certiorari denied, 350 US. 923.
cr 65 (CLA. D.C.), cert | 1, 350 U.S. 923 ¥
If
THE COMMISSION'S .FINDINGS SA'FISFIED THE .
REGULATIONS so =
o . 3
Respondents’ argument that the Commission's find-
ings satisfy. neither the regulations nor the statute
rests upon shifting grounds. Af~ time& they seem
to acknowledge thar the findings relate to both. the
construction and operation of ‘the reactor but eon-
tend that the findings are denigrated by the Com-
: Mission’s statement that the findings were, made for
the purposes of issuing a construction permit (see.
Hrigf for Respondents, pp. T1-12; 14-15, 52, 70-71, ——
75, 78-79). At other times they -seem to argue that
the findings relate only to the construction and not
to the operation of the reactor, and, for thiis reason,
full to satisfy the regulations (see Brief for Re-
<pondents, ‘pp. 46-49, 57, 59, 60-61, 72, 78, 80). On
still other cceeasions the argument is tipparently based
bon a contention coneerning the Meaning of the
. )
<s . . %
—
regulations themselves (see Brief for Respondents.
pp. 49-50, 53-54, 56, 60, 81).
We deal with these points seriatim.
. The controlling regulation’ is Regulation 50.35,
under Which the Commission was proceeding because
PRDC was not in a position to supply all the’ tech-
nical infprmation required to complete the applica
tion. The pertinent sentence of Regulatfon 50:35 |
provides— 7
_ * * * Tf the Commission is satisfied that it has
information sufficient to provide reasonable as-
surance that a facility of the general type pro-
posed can be constructed and operated at the
proposed Jocation without undue risk to the
health. and safety of the public and that the
omitted inférmation will be supplied, it may
process the application and issue a construc-
-tion permit on a provisional basis without the
* omitted information subjeet to its later pro-
duction and an evaluation by the Commission
that the final design provides reasonable _as-
. surance that the health and safety of the pub-
lic awill not he endangered. a5
“After weighing the evidence on the safety of fast
ipo reactors, the Corfimission, found (Finding 18,
.706)— | | . wg
(a) It lias not heen positively ‘established
_ that a fast breeder reactor [of the PRDC type]
ean be operated without a- credible possibility
of releasing significant quantities of fission
- oducts to the environment;
(b) There is reasonable assurance that the-
oretical and experimental inyestigatious * * *
will establish definitively, prior to the sched-
/
|
Q .
uled completion date of the PRDC reactor,
Whether ort not the reactor proposed \ by
Applicant can be so aperated ;' .
(c) There is reasonable assurance that evi-
‘dence will establish’ that the reactor proposed
by Applicayt can be se operated.
These three findings properly focus attention upon
what the Commission did, and did not, find in the
proceedings leading to the order eontinuing the
PRDC construction permit. The Comniission’s safety
standards are very high. In order to issue an op-
erating license the Commission would have had to.
find that the PRDC fast breeder reactor, as finally
designed, could be operated without a credible pos-
sibility. of releasing significant quantities of fission
products to the atmosphere. The Commission did.
= make this finding beeause the proof which fur-
ther research and experimentation was expected to
‘develop before the completion of the PRDC reactor
was not available at the’time of the hearing. The’
Commission did find that there was reasonable as- .
surance that this proof would be available before | .
the operation was licensed (Finding 21, R. 707; Find-
ing 31, R.-710). Indeed, the Commission plainly
announéed that it would not issue an operating li-
cense unless the proof became available (Finding 37,
R. 712; R. 676, 679-680, 718-719). y
The Commission thén went on to disguss the La-
coona Beach site and found that if the expected preof
concerning the safety of the reactor became available,
~ Lagoona Beach would be a safe loeation (Finding a.
R. 707-768). .
, | 10
The Commission then pulled these two groups .of
spe together into its final conclusion (Finding 22;
- 108)— a ;
The Comnelasiat finds reasonable assurance in
the yecord, for the purposes of: this provisional
construction permit, that a utilization facility
-of the general type proposed in the PRDC
Application and amendments thereto can be_
constructed and operated at the location with-
out undue risk to the health and safety of the
public. a
e
This finding follows the very ers of Regulatior
90.35 with two exceptions: (a) the parenthetical
phrase ‘“‘for the purposes of this provisional . con-
struction permit” is “not in the regulation; and (b)
- the regulation does not include the specific refer-
ence to the PRDC Application.
(a) The phrase quoted above does not denigrate |
or qualify the finding that there was reasonable as-
surance that a reactor of the general type proposed
could be constiucted -and operated at the location.
without undue risk to the public health and. safety.
The argument that. the parenthetical phrase deni-
grates the finding ignores both the acknowledged issue
before the Commission and the thrust and focus of
its entire opinion and findings. Admittedly, the issue
was properly: framed in terms of Regulation 50.35 in-
_the notice of hearing (R. 576, 578). The issue ‘is also ;
stated in those terms in.a portion of the opinion re- =
jecting respondents’ legal arguments (R. 645-646).
The facts are found in ‘those terms in the opinion (R.
676-677). They are again stated in proper terms in
11
»
dealing, first, with the inherent safety of the reactor
(R. 706), and, second, with its location (R. 707-708).
But then, the respondents say, when the Commission
pulled these admittedly proper findings together into
the ultimate finding, it suddenly disregarded the regu-
lation and its own prior findings, changed its meaning
and, although it used the very language of Regulation
50.35, except for the parenthetical phrase, found some-
thing different than what the regulation contemplated.
This is patent nonsense, The phrase modifies the
verb *finds.”’ awespondents had been arguing to the .
Commissron ‘that it was prejudging. the question
whether a License to operate should issne, Respondents
were also contending that the evidence would not sup-
port the kind of safety fi:ding required for a license.
iy stating explicitly the limited purpose for which the
finding was made the Commission pre&rved respond-
ents’ ‘rights, warned PRDC, and reemphasized the lim-
ited character of the question before it,
(b) Respondents erroneously assert that we seek to
.distinguish between an initial finding of safety with
respect to a reactor of the general type proposed: and
a finding of safety with respect to the operation: of
the proposed reactor and from this false premise they
apparently argue that the Commission's faidings are
insufficient under Regulation 50.35 because the Act
Mequires a finding as to the opefating safety of the
‘proposed reactor. ; aaa
So far as compliance with the regulations is in
volved, the short. answer is that. Regulation D385 re-
quires a safety finding concerning “a facility of the
“ : 2 a
general type proposed.’’ The Commiss#on made the —
finding with respect to “a utilization facility of the
general type ‘proposed in the PRDC Application”
(R. 708). The correspondence is exact. os
More fundamentally, the fallacy in respondents’
argument is that it is a play upon words. In one
sense the PRDC application related te a specifie ré-
actor—sa_ reactor, to be built at Lagoona Beach int
accordance with ¢értain speci ifications. In. another
sense ,eVery reference to the reactor described in the .
PRDC application covered only a general type be-
cause the details of the design had not been frozen
and some had not even been tentatively described.
So long as the final design remained open, a reference
to the PRDC reactor would be specific in the sense
that it referred: to one identifiable Iroject with ecer-
tain specifieations but it would deseribe only a class
or type of reactor within the definition of which the -
final design would fall. Phrases like general type de-
pend upon relative specificity and must be construed
with reference to the subject matter.’
The words ** facility of the vene ‘ral type proposed”
havé been used in the foregoing sense in every’Com-
mission proceeding involving a major developmental
reactor (see pp. 13-14, 49-61, tufra). The phrases
facility of the general type proposed”’ and “final de-
sign” draw. the contrast between the. incomple te ‘in-
formation available When an application may be filed
and a construction permit is issued; and the nsinute
specification of every deta which must be evaluated
hefore issting a license to operate. — The deseription in.
an application for a reactor at a specific location de-
i
scribes only a general type of ‘reactor. soe long as a
number of final designs might be developed* within:
“the seope of the application. This process is. still
going forward. in the PRDC proceeding. ©
The Commission has consistently granted | provi-
sional construction permits for developmental power
reactors under Regulation 50.35. on the basis of find-
ings of rensonable assurance of the operating safety
of ‘the general type of reactor proposed. In each of
the eight other instances in which, up to the time of
the decision here under review, the Commission has
issued a provisional construction permit for a devel-
opmental power reactor, it did so upon the same find-
ings it made. here, namely, reasonable asstirarice that
a reactor of -the propesed type could beusafely con-
structed arid operated at the proposed site. In none
of them was the safety finding made in terms of the
particular reactor to be constructed. ‘In all of them,
as in the instant case, the Commission -provided, in
accordance with Regulation 50.35, that operating au-
thority would not be granted unless it found,- upon.
completion of construction, that the final design pro-
Vides reasonable assurance that publie health and
safety will not be endangered by operation. We have
set out, -in Appendix A, infra, pp. 49-61, excerpts
from ‘the. construction permits and Commission deci-
As we pomted ont in our main brief (pp. 57-69), it is.im-
material that in\this ease the Commissien made the findine,
“for the png of this) provisional construction permit.”
That, however? is the. sole basis upon which respondents at
tempt to distinguish, the settled) @Monmiission practice (Resp.
Dr. Tx. TO), ° : ‘ !
59222 61 ¢
“~
)
14
sions in each of the other power reactor cases, which
show that safety findings have unjformly been made in -
the terms of: Section 50.35 and, in a majority of the.
cases (ingluding this one), specific? unresolved prob-
lems have been identified. In addition, there have
been numerous other imstances of non-power reactors
(where the safety -problefiis generally are not as-diffi-
cult to solve as in developmental. power facilities) in
which the Commission, in, authorizing construction, has
e xpressly made findings with respect to a reactor of thé
general type proposed ard has prev ided that an op-
erating license would not issue until safety problems
had been successfully resolved." :
Even if Regulation 90.35 were far less cles ar than it
is, this ‘settled administrative interpretation, by the
Commission of its own regulation would be entitled 4
to opp: weight.”” Bowles v. Seminole Rock
C'o., 325 US. 410, 414. ae
| Respondents point (Bi. 53-56) to a proposed revi-
sion of Regulation 50.35, published for publie com-
ment in February 1960, which would have changed
the standard for granting provisional construction
permits to “reasonable: assurance that the proposed
location is suitablé from a safety Standpoint for a
facility. of the size (power level in the case of ‘re-
actors) and general design eonce pt proposed, that the
applicant has identified any major featurestor com-
ponents on which further research and development
‘E.g.. Westinghouse Electrie Cos (Westinghouse Testing Re-.
actor), CPTR-1, July 3.1957: Georgia Tnstituté of Teehnol-
ogy, CPRR-A7, June 15, 1960; University of Virginia, CPRR=
rd; September 13, 1950, ‘
15
‘work is needed to determine their acceptability from
a-safety standpoint, and that the applicant: will ¢on-
duct a research and development program which will
- investigate the unresolved safety questions” (25 Fed.
Reg. 1225). But that) revision, which admittedly
would have changed the standards: presently em-
bodied in Regulation’ 50.35, was never adopted; and
its mere proposal casts no doubt upon the validity
‘of the existing standards under which this permit was
issued. ih. | . | .
2.*At a number of ‘points respondents argue that
the Commission’s safety findings are insufficient be-.
cause they relate only to the construction of the
PRDC reactor (Brief for Respondents, pp. 57, 59,
72, 78, 80)... The opinion and férmal findings, how-
ever, discuss. the safety of both construction and éper-
ation (R. 676-677, 706, 708). They are focused upon
the safety pf operation (R. 669-677, 706). A mere
| reading of the opinion and findings is enough to dis-
pose of raspondents’ argument upon this point.
3. Respotidents’ remaining: argument to the ‘effect
that: the Commission’s findings do not ‘comply .with
its own regulations is based upon Regulation 50.40,
Which appears at pages 135-136 of our main brief. It
is headed ‘Commo Standards”’ and lists the “eon-
siderations’? \by which “the Commission will be
euided’’ in determining whether a license should be
issued: (a) the processes to be performed, the operat-
ing procedures and technical specifications provide
-regsonable assurance that the applicant will comply
with the Commission's’ regulations and “that the
health and safety of the publie will net be endan- .
‘16
gered’; (b) the applicant is technically and finan-
cially qualified to engage in the proposed activities, ©
and (¢) the issuance of the permit ‘will not. * * * be
inimical to the comnion defense and security or to the
health and safety of the public.”* Respondents point
to a passage in the opinion (R. 644) stating that at
the construction permit stage of the proceeding these
considerations were to be applied to whe. \..s being '
licensed—the construction—and then go on to argue \
that the Commission should have applied them to.
what was not then being licensed—actual operation.
‘The argument has two fatal defects. .
a. The Commission’s opinion and findings, taken as
a whole, show that the Commission did-in fact guide
itself by each of the considerations listed in Regula-
tion 50.40, including the probable safety of opera-
tions. Seetion 50.40 does not require any specific
finding about safety .of operations at any specific
stage in the proceedings leading to a license to oper-
ate. It leaves the Commission free to * give such
weight to.the several considerations.as it deems ap-
propriate to the particular phase of the proceedings.
Section 50.35 is the provision which specifies what
findings shall be made, and when they shall be
made, in a case involying a provisional construction
permit. As shown above, the Commission’ s safety find-
_ Ings fully satisfy that section. .
b. The Commission’s interpretation of Regulation
90.40 is consistent with the words and supported by -
Commission practice. Regulations 90.35 and 50.40 are
obviously intended to be consistent and Regulation
00.35, being the more specific, is the controlling pro-
\
i
17
vision With respect to construction permits. The een-
eral Seetion 50.40: covers licenses for different kinds
of activities and the very concept of common stand-
ards means that the standards will be ‘applied to the
thing for which permission is sought—in this éase the
construction of a reactor.
This interpretation of Section 50.40 of the regula-
tions is supported by the Commission’s practice in
other cases. We have set forth in Appendix B, infra,
-pp. 62-65, pertinent excerpts from the construction -
permits ind Commission decisions for each of the nine
other licensed power reactors showing the Commis-
sion’s finding under Section 50.40. In none of them
Was any safety finding made, in the terms of Section
50.40(a); in all of them the safety findings were made
in terms of Section 50.35. Thus, the Commission
obviously views Section 5@:35, and not Section 50.40
fa), as governing the issuance of a provi isional con-
struction permit. The Commission deemed Section
50.40(b), relating to the applicant’ s technical and
financial qualifications, applicable in all eases, al-
though there are variations in the findings made there- |
under. Some of the findings relate to qualification
co construct and to operate, others only to construct.
Seven of thepermits (including. the amended PRDC
- permit) are supported by findings under Section |
0.40(¢) that the issuance of the construction permit
would not be inimical to the commoy defense and secule
rity and to the public health and safety, the remaining.
‘three did not, make any finding thereunde 4. Each of
the construction permits for these reactors was ex-
plicitly. subject to the later production of omitted
*
.
, ae
technical information, vette be evaluated by the Com-
Mission, showing that ‘‘the final design provides rea-
‘Sonable assurance that the health and safety of the.
public will ‘not be endangered.” For example,
granting the construction permit for the Yankee re-
actor at Rowe, Massachusetts, the Commission said—
The construction permit must be provisional
at this stage of the proceeding principally be-
pause Yankee has not completed: the design of
‘the reactor and certain features of the proposed
“facility present unresolved questions which
might affect its safe opexation. -* * * * [T]he
experimental: program outlined in the appliea-
tion will probably produce .the information
needed to resolve these, questions prior to con-:
sideration of: final design and operating pro-
cedures and conversion of the constructior
permit toa leerise. | ,
For other illustrations see pp. 49-65, infra.
Respondents’ assertion that a. different procedure
was followed in the PRDC case rests upon the use of
the sparenthetical phrase “for the purposes of this
“provisional construction permit” in Finding 22. “As
we have shown above,,this phrase does not denigrate
or qualify the finding (see pp. 10-11; supra). No one
can conscientiously deny’ that the Commission . has
always followed the tayo-step procedure in the cases
involying developmental power reactors, making a
. finding before it issued the provisional construction
‘permit of the probability that a safe final design
would he developed and. reserving a ‘decision upon, the
safety of the final design until the hearings ite: the
issuance of a license, A definitive finding on operat-
ing safety of the final design has been made at the
a * ; a
0
b
Ti
nt
»°
19
“tque-of the construction permit issuance only in cases
invoting small reactors which are practically pro-
duction-line items and as to which there are then ne
unresolved safety problems.
r
Ss
.* fmnymteo
Nise
Ill
THE ATOMIC ENERGY ACT OF 1954 AUTHORIZES REGUL re
TION 50.35 AND -THE COMMISSION'S TWO-STEP. LICENS-
ING PROCEDERE: 4
We turn now to the central issué—whether Regula-
tion 50.35 andthe two-step procedure followed by the
Commission are authorized by the Atomic Energy Act
of 1954. In our main brief, we showed that the regu-
lation and practice are authorized by Section 104(b),
which governs the issuance of licenses, arid by the
broad rule-making pewer granted by: Section 161 to
prescribe | regulations necessary “to, —— health.
‘or to minimize danger to life or prope tty.” We also
showed that Section 185. foreshadows the two-step
procedure? : :
1. Respondents contend, however, that the substan-
tive standard for the issuance of construction permits
Is contained in Section 182; and that this section’ re-
quires the Commission, before authvrizing construe-
tion, to make a definitive finding as to. the operating
safety of the proposed reactor, - This argument 1s
‘Fhe second step of this procedure—the issuance of the
operating. license—itself may involve several steps... Thus, Reg-
ulation 50.57 (10 C-F.R.-50.57, Cum. Supp. 1961) authorizes the
issuance of a provisional operating license where “it appears de-
sirable to obtainsactual or further operating experience before
issuance of an operpting license for the full term, up to forty
(40) years, requested in the application.”
5!
20
fallacious in three respects: (a) Section 182 does not
'.preseribe the substantive standards governing the
granting of licenses, but only thie content and form of
license applications and related procedures. (b) The
provisions @f Section 182 upon. which respondents
rely apply only to operating licenses, and not to con-
~ struction permits. (ec) In any event, the Commis-
sion’s findings in this case do satisfy the standards of
Section 182, if applicable..
a. As pointed out in our main brief (pp. 38-39),
the Commission’s reactor licensing authority is’ con-—
tained in Sections 103 and 104, in the «chapter of, the
Act éntitled ‘‘Atomie Energy Licenses’*; and it is
those sections, rather than Sections 182 or 185, that
define the substantive standards: for licensing. The
latter sections are in the chapter faptioned “Judicial
Review and Administrative.Procedure.’’ Section 182,
captioned ‘License Applitations,” merely specifies
what information all applications for a license must
contain and in what form (182(a)), and sets out cer-
tain procedures to be followed. Section 185 pvovides
for the issuance of construetion permits, and in-
dicates the circumstances in which, upon completion
of construction, the Commission is to issue an operat-
ing license. .
‘In the case of “applications for licenses to operate
_ production or utiization facilities’’ “(such as_ the
PRDC reactor here involved), Section 182(a) ‘states
the requirements. for the contents of applications in
greater detail than for other licenses. It requires
such applicant to submit specified technical material
g
21.
cand such--other information as:the Commission. may
deen necessary “to enable it to find-that the utilization
or production of special nuclear material * * * will.
provide adequate protection to the healfh and safety
of the public.” While this provision requires the
furnishing of information: upon which the Commis-
sion makes findings with respect to public health and
safety, the Commission’s duty to make such. findings
flows not from Section 182(a) but-from the substan-
tive provisions governing the issuance of licenses. It
is to the latter provisions, therefore, that’ ome must
look to ageertain what findings the Commission must
make and when if must make them, At the very
most, the references to findings in Section 182(a) may
throw light on the meaning of the previsions which
deal with the isfuanée of licenses and pe rts; it cas
not control them.
The standards for the licensing of all research and
development reactor facilities, including» authority
both to construct and to operate, are contained in See-
tion 104.) Seetion 104(b) authorizes the Commission:
to issue licenses for developmental power reactor fa-
cilities, and provides that in ‘issuing licenses under
- this. subsection’? the Commission shall impose “such
regulations.and terms of lieense as will permit the
Commission to fulfill its obligations * * * to
the health and safety of the public.” Section 104(d)
prohibits the issuance of a license if,in the Commis:
protect
sion’s opinion, such issuance ‘would: bes inimical to
* * * the health and safety of the public.”
2
99
_ The statutory question in this case, theréfore, is not,
“cas respondents phrase it, whether Section 182 rather
than Section 185 prescribes, the standards for the: is-
suance of construction permits, but whether the find-
ings made by the Commission in tue first ste ‘p of its
two-step licensing procedure satisfy the requirements -
of Section 104. We submit that they clearly do.
Congress has given the Commission the broadest dis-
cretion to adopt what procedures it deems appropriate
“to protect the health and safety of the public.” The
provisional construction permit system, allowing con-
struction based on findiags of reasonable assurance .
that the type of reactor proposed can be safely -built
-and operated: at the site and that remaining safety.
problems ‘can be resolved, followed by a definitive
- safety determination before operation is authorized,
fully achieves such protection. See our main brief,
pp. 36-66: . i a
Ifycontrary to.our view, Section 182(a) should be
read to prescribe substantive safety standaads, still the
standards would apply only to licenses to operate, not to
licenses to construct. The first sentence of this section
provides: “Each application for a license hereunder
shall be in writing and shall specifically state’ such in-
formation as the Commission * * *
* * &
may determine to
be necessary to dee “ide
plithut es the ¢ ‘ommiission may deem appropriate for
the license."” The second sentence, which is the only’
one referring to findings om public, health and safety,
provides that, ‘In connection with applications for
lreenses do operate production or utilization facilities,
* % x#°°
the applicant shall state
‘eee J
qualifications of the ap-
(emphasis added), fol-
5
?
Jowe do by a specification of certain additional informa-
‘tion to be furnighed. Language could hardly be plainer
to indicate that the requirements of the second sentence
of Section 182 are applicable ohly to /icenses to operate
production or utilization fae ‘ilities, and not to lice Tises
to construct them. Had Congress intended the sec ‘ond:
sentente to be applicable to licenses to construct, it
would either not have limited it to “licenses to oper-
ate,’’ or else it would have specifi¢ally provided for
‘such broader’ applicabilify—as it did: in Section, 185,
which provides for construction permits for “appli-
cants for lfeenses to construct or modify production
or utilization facilities.”
A further indicatioh that the second sentence of
Section 182 applies only to licenses to ope rate, and
not to licenses to construct, is that-it requires the sub-
mision of information to enable the Commission to
find that “the utilization or production of special
nuclear miuterial’’ will provide adequate protection —
public héalth and safety. “[U]tilization or pro-
duction of special nuclear material” in a reactor takes _
place. in connectidn with its operation, not its
construction, = oe
eRespoudents argue: (Br. 36), however, that the
second sentence of Section 182 must apply to construe-
tion permits because the last sentence, of Section 185
states that [forall other purposes of this Act , a con-
_struetion permit is deemed to be a ‘license: *?* There
are two answers: ea |
lirst, many of the provisions of the. Act apply to
ieerses generally. Other’ provisions apply to specific
iD
24
kinds of licenses. The broadest effeet whieh the last
sentence of Section 185 can sensible be given is te
“make a construction permit the equivalent of a license
-for the purpose of those provisions which are applica-
ble to lieenses renera lv (¢.9., Section 105, 104, 105,
IS2(b), 182(e), 182(d), 184, 186, 189), Plainly, the
sentence does not make the permit the equivalent of any
particular kind of license, or@f every particular kind
of license, And since the sbeand sentence of Section
182(a) applies only to licenses to operate, it is not ap-
plicablé to licenses generally, and therefore not appliea-
ble toa construction permit,
Second, respondents’ argument ignores the fact that
a construction permit is made the equivalent of a b-
cense only “[f]lor all other purposes ef this Act.”
(Emphasis added.) This must mean purposes ether
than those of Section 185. It follows that the con-
struction permit is not2a license for the purpose of
determining whether Scetion 185 incorporates by ref-
erence any substantive st: indards contained in Section
182 or autlrizes the Commission to issue a permit
with Jess complete information than Section 182 would
require: for the: purpose of issuing an operating’ |i-,
Cense, Obviously, -Seetion 185 answers this question
by stipulating ‘that the Commission may. proceed to
‘issue a permit in the absenee of the complete
information. , , phe
fespondents ‘stress (Br. 33-34). that Section 185
pon completion of construe-
nit and the satisfaction of
merely provides that,
tion pursuant to the pe
certain conditions, the Comnvssion shall issue a *'li-
cense,” but does not specify that it he a liecnse “to
«
*
OF
\ ss
operate. © But, in the context of this case, ‘it could «
m nothing else. In other situations, the leense to
be issued upon completion of construetion may be
license to sell; to transfer, or te export... The sig-
nificant fact is that Section 185 distinguishes between
| the imifial. stage of construction pursuant to a con-
struction permit, and Wie subsequent stage of opera-
‘hon, sale, transfer or export pursuant to a second, .
and different, license. It» thus supports the Com-
IMisSLOn's regulation (850.35) providing for different
‘safety findings at the two stages of licensing. See
-our main brief, pp. 49-52. ae
~ Respondents also. point out (Br. 31-32) that the
second sentence of Section 182(a) specifies, among
the information to be furnished in connection with
“applications for operating licenses, **the place of the
-use,”’ and that this information ordinarily is needed
te describe the facility to be constructed. From this
they argue that the second sentence of Section 182-
eONOTS: licenses to coustruet. But the fact that in-
‘ormation which the statute requires te be submitted
in an applieation for an operating. license may also
we ouseful in connection Vv ith a construction permit
dees not establish that a sta itory requrement which
is limited in. terms to “ligenses to operate”? should
he construed to apply to construction permits, and
there is nothing. inconsistent in’ the Commission's
requiring the same, information:to be supplied in an
i pplication for a construction permit as the statute
requites for an ope rating lic emse. © ar ‘
This conelusion is borne out by the Commission's
reculadons governing the submussion of imformation
26
& a
in license applications. The Commission. has impie-
mented Seétion 182 (a) by prescribing, in Regulation
50.34, the detailed technical information pertinent. to’
health and safety that must be meluded in all apph-
cations: for reactor licenses. If the nature of the
“proposed reactor is such that complete information
‘an be submitted at the construction permit. stage
(as is true today for many research reactors), then.
the: applicant can obtain a nonprovisional permit.
‘e., the: Commission makes the ‘definitive safety find-
ings when it authorizes construction. In such a ease,
an operating license will ordinarily be issued upon
completion of, construction merely upon a showing
that the construction as been carried out in ac-
cordance with the permit. |
Where, however, “because of the nature of a
proposed project, an applicant is not in a positidn
to supply initially [te., in the applieation for the
construction permit]. all of the technical information
otherwise required’’. by See tion 50.34 for a definitive
safety determination, Regulation 50.35 provides for
the issuance of a’ coustruction permit ‘ton a pro-
visional basis’? upon findings of reasonable assurance
(le that a ‘facility of the general type proposed”
ean be safely constructed and operated at the pro-
posed site, and (2)*that ‘‘the omitted: information
will he supplied’? (that is, that. the applicant . will
be able to establish, prior to operation, the safety of
the final design).
Thus, the Commissieu’s regul: tions prov ide bor the
submission, of the maximum’available safety, informa-
tion in an application for a construction pe mit, and
ie a 7
authorize: the granting of a provisional construciuon
permit onty where, because of the nature of a pro-
posed project,” all information necessary for a detini-
_ tive safety determination carnot be then supplied,
¢ In any event, ‘if Section 182(a) does provide
standards governing the issuance of construction per-
mits, we submit that the Commission's -safety | find-
ings inthis case met those standards.
Section 182(i) merely requires the submission of
such information as the Commission may require
“to find that the utilization or production of special
nuclear material will * **
provide adequate prto-
tection. to the health and safety of the public.” Here’
the, Commission’s ultimate finding that a reactor of
the general type proposed in the PRDC appkeation
can be safely constructed and operated at the-loca-
tion without undue risk to public health and safety
(Fdg. 22, R. 708) rested’ on subsidiary findings of
reasonahle assurance. that, prior to authorizing op-
eration, it ean be established that “the proposed
reactor” is inherently safe and that ‘‘no eredible ac-
cident can release significant quantities of fission
products into the atmosphere” (Fdgs. 21, 18, R. 707-
708, 706). In other: words, the Commission found.
reasonable assurance that it will be .deronstrated
that this reactor can’ be safely operated. ;
These subsidiary. findings would not have, been.
sufficient to authérize operation,.since various health
and safety problems still remain to be resolved. But
a finding of future safe operation, made at the time
‘constriction is authorized and ‘several years prior
to operation, may, be based upon less completé and
. 28
definite information than the definitiyg, safety evalu-
ation to be made at the tithe that operation is au-
thorized. As the Commission stated (R. 679, em-
phasis’ in original), ‘The degree of ‘reasonable as-
surance’ with respect to safety that satisfies us in.this
case for purpeses of the provisional construetion
permit would not be the same as we would require
in considering the issuance of the ‘operating license.”
-The Commission thus ‘here found, in substance,
that ‘‘the utilization * * * of special nuclear ma-
terial” (in the operation of the,.reactor) “will pro-
vide adequate protection to the health and safety of
the ,ublie,” since it found (Fdg. 18, R. 706, em-
phasis in original) reasonable assurance that it will
be demonstrated “that thé reactor proposed by Ap-
plicant” ‘‘ean be operated without a credible possi-
bility. of releasing significant quantities of fission préod-
ucts [in]to the environment.’”’ And the Commission
has explicitly provided in the construction permit ’
that it will not grant an ‘operating license unless: it:
“has found that the final design provides reason-
able assurance that the health and safety of the public
will not be endangered by operation of the facility
in accordance with the specified —e, (R. 718;
see, also, R. 679-680 412).
2. We hie eG cor main brief (pp.°37, 39-52)
that Section 185 sanctions the: Commission’s settled
practice, pursuant to its regulations, of granting a
provisional construction permit on findings of rea-
sonable assurance of safe cperation of the particular.
type of reactor proposed, subject toa definitive safety
determination after construction and. preliminary
29
t@ting is completed but before an operating license
is issued. We pointed out (ibid )-that Section 185
provides a) that a construction permit is to be
granted “if the application is otherwise acceptable
tou the Commission,” and (2) that (a) upon com-
pletion of construction, (b) the filing “of any ‘addi-
tional iniformation needed to , bring~ the original
‘pplication up to’date, (¢) upon finding that the
facility has been-constiucted ‘and will operate” in
conformity with the amended application “and in
conformity with the provisions of this Act and ‘of
the niles and regulations of the Commission,’’, and
(d) in the absence of any good’ cause being shown
to. the Commission why the granting of a license
would not be in accordance with the Act, the Commis-
* Respondents distort our position when they state (Br. 35)
that we construe Section 185 as providing “no statutory safety
“andards for, and no limit on. the Commission’s discretion in
regard to, the .issuance of construction permits.” Our point is |
that the broad language in Section 185 governing the issuance
of construction permits leaves it to the Commission’s disere-
tion to select an appropriate method for meeting the* basic
statutory standard in Section 104 that ali licenses must pro-
vide adequate protection, to public health and safety. In
Regulation 50.35 the Commission has provided that an appli-
cant for construction authority, who is unable initially to sup-_
ply ak the technical information necessary for @ definitive
safety evaluation (as in this‘case), maybe granted a construe- \
_ tion permit upon a provisional basis. But such authority is
issued only’ upon finding reasonable assurance that a facility
of the proposed type can be safely built and operated, .and
that the information necessary for an ultimae finding of
operating safety of the particular reactor will ‘be supplied. |
This procedure fully satisfies the standards of Section 104 of
adequately: protecting the pd\blic health and safety. See our
main brief, pp. 49-52.* / . - ij
£92233 --61——3 . ,
ya
#
sion shall issue a_ license. We cone 0.)
that the latter two criteria—operatinn i in watny
with the Actgand the rules and regulations, and the,
“good cause” requirement—were. intended to assure
that the statutory criteria for safe operation would
‘be met ‘before an operating license is -issued.
» Respondents —— (Br. 36-39), however, that.
the “good eause’’ prevision gives the Commission the
right to refuse an operating license for safe y reasons
only if “some objector” raises the Soe ald that the
third requirement (construction and operation in ac-
cordance with the Act and rules: and reculations)
requires only a finding “that the terms of the con-
struction permit have been ecarricd out”, (Br. 37,
cantina in original). Since one of the “terms” of
_ every provisional. construction permit, including this
‘ one (R. 718-719), is that all unresolved safety prob-
lems be satisfactorily resolved, respondents’ argu-
ment falls of its own weigl®. Furthermore, the re-
quireme nt of; completion of construction in accord-—
ance with the permit is only one*of -two standards mm
the thir® condition. The Act requires the Comnis-
sion to find that the facHity has heén constructed and
will operate not only in conformity with the applica-
tion, but also’ “in Conformity with the provisions of
this Act and of the [Commission ’s] rules and regula-
tions.”” Oper ation in conformity with the Act neces-
sarily means operation consistent with the public
health and safety’ protection standards that the Act.
contains. Thus, Section 185 requires the Commis-
sion, before granting an operating license, .to find
not only that the construction permit has been com-—
a
*«
31
built will not be “inimical to * * * the health and
safety of the public’: (See tion 104 ( d)). -The good
cause provision furgher confirms ‘the view that the
Commission, before Prauting an operating. license,
must find that oper ition will be saf e, since it permits
other persons (including ‘membe: 3 of the Commis-
4
bring to the Commission’s attention any adverse > facts
hearing upor@operating s safety.
In this: case, the Commission explicitly stated in the
cense Will not be issued “unless eee the Commis-
pubhe will not be endangered by operation. of the
facility in accordance with the specified procedures”
» 718) ; and that, upon completion of construction
in accordance with -the permit, an ope rating license
sion of additional proceedings, if they be necess ary
operation” (R. 719): See also Finding” 37, which
states (R. 712, emphasis in original) : ,
Proceedings for a license to operate the pro-
posed PRDC plant shall be held at a time later
to be determined, after the completion of con-
struction. In that proceeding the safety and
financial considerations’ of -the PRDC project
~~ will-be in issue, and we shall ‘ again consider
whether the PRDC plant” can be operated with
_ _ reasonable assurance for the protection of the
peeing health and safety of the public,
Vv
sion’s staff or intervenors such as respondents) to,
amended: construction permit that an, operating li- |
-sloni Siw found that the final design provides reason- |
2
able assurance that the health and safety of the
will issue only “upon .a further finding, after conclu-’
or appropriate, of reasonable assurance of safety of -
er
“plied with, but alee that operation | of the reactor as”
82
In short, the Commission has m: ide it explicit that
it ‘will. not rant. an operating license for the PRDC
reactor unless it finds that he reactor can be operated
safely.. As the Commission emphasized. in “its opin-
_ion (R. 646-647, emphasis adde@) : “There can be no
doubt that public safety is the first, last, and a per-
manent consideration in any decision on the issuance ,
of a construction permit or a iicense to ‘operate a‘nu-
clear facility’ Section 185 plainly authorizes -the
Commission to refuse an operating license unless it
finds that the reactor ean be safely operated, even
if construction has been done in full accord with the
. design presented at the construction permit stage;
-and Regulation 50.35 provides for a definitive safety
determination prior to the grant of an operating li-
a ee a construction permit is’ issued on a
provisional basis. ;
~ The Commission’s provisional construction permit
procedure,. based tipon a' finding of operating safety
of the. general type of reactor propoged when con-
struction is authorized, subject to a further definitive
safety evaluation of the proposed final reactor design
before operation is permitted, provides much
‘vreater protection to the public health and safety
than respondents’ suggestion that all definitive safety
findings should be made when the construction ‘per-
mit ‘is issued since the Commission must issue an
operating license as long as* construction is carried |
out in accordance with the permit. For under the
-Commission’s _ two-step, . procedure the Commission
makes its final definitive safety determination on the’ fF
basis of the latest scientifie knowledge and experience
33
.
.
available, including that developed during the
construction period.” Respondents, however, would
require the Commission to base its determination of
ultimate operating safetyggpon information available
when construction Is arR thorized, which may be
several years before operation begins. We submit
that the strong Congressional concern for safety re-
peatedly m ianifested in the Act is clearly furthered by
the Ceieialaaleai! s settled practice. -
3. Neither of the two items of legislative history
that respondents cite (Br. 39-44) supports their ©
_argument that Section 182 applies to construction
permits. |
a. The first item—a colloquy between Senator Hum-
phrey and Senator Hickenlooper during which the
latter stated that a. license and construction permit
are. equivalent—did not relate to safety matters at.
all, but to whether the various procedures (such as
notice, appellate review and licensing. preferences)
applicable to the issuance of operating licenses would
also be applicable to the issuance of construction per-
mits. See our-main brief, pp. 57-61. The proposed
- ameridment of Senator Humphrey, which he. subse-
queiitly withdrew upon being informed that amend-
ments alréady made to the bill covered the. problem,
was that ‘‘no construction permits shall be issued
by’ the Commission until after the completion of the
procedures established by y section 182 for the consid-
eration of applications for licenses under this act’’
— (100 Cong. Ree. 12014, 3 Leg. Hist: 3759, emphasis
added).
=
The.*‘procedures”’ of Section 182 to which this pro-
_ posed amendment related were:the giving of notice of:
license applications and the grant.to various public
bodies of preferred consideration: in licensing, not
any “precedures’’ with respect to the kind of safety
findings the Commission must make in issuing .con-
struction permits. This is shown not only by the legis-
lative history cited in our main brief, but by the fol-
lowing italicized statement that was omitted from re-.
spondents’ quotation (Br. 42) from the Senate debate
(100 Cong. Ree, 12014, 3 Leg. Hist. °7 — a
Mr. Humpurey. * * *
In other words, as I understand, under the
bill a construction permit cannot be interpreted
in any other way than being equal to or a part
of the licensing procedure. Is that correct?
Mr. HickeNLoorer. The Senator is correct.
The staff has worked on this matter. ‘An.
amendment was offered on, I believe, July 16,
to section .189, having to do with hearings or
judicial review, anf that section was tied up
_ with other sagtions of the bill. A, license and
'-a construction permit are equivalent. They are
the, same thing, ‘and one cannot operate until
the other is granted. |
The same is true with reference to hearings.
Thérefore, we believe, and we assure the Sen-
ator, .that the amendment ‘is not essential to
the problem which he is attenipting to reach.
Mr. Humpnurey. Let me ask the chairman of
the committee if subsection b of section 182,
which applies to license applications, also ap-
plies to construction permits? Subsection b
reads: |
Sey FS
: 30
nt
b. The Commission shall not issue any license
for a utilization or production facility for the
~. generation of commercial power under section
103, until if has given notice in writing to such
regulatory agency as may have jurisdiction over
the mate: and services of the preposed activity,
and Qntil it has published notice of such appli-
cation once each week for 4 consecutiv : weeks
in the Federal Register, and until 4 weeh ‘s after
‘the last notice. ert
Mr. HicKENLQOPER. The sovliae fa The
answer to the Senator’s question is “Yes”
Mr. Humpurey. Jn other. words, the’ revised
sections on judicial review and on hearings
and the revised section 182 on license applica-
tion all apply directly to construction permits?
Mr. HickENLooper. Yes.
Mr. Humpnrey. With that statement, Mr.
President, I withdraw my amendment. The
‘only purpose of the amendment was to clarify
that section. I am graieful to the chairman
for having done it before the amendment was
considered.
The notice requirement referred to in the foregoing
italicized statement (now in Section 182(c)) was
_ one of the procedural revisions designed to give
greater rights for public bodies which Senator Hum-
phrey and other opponents of the draft bill, were
able to obtain on the floor of the Senate. It—like the
rest of the statements during the debate upon which
Respondents rely—had no reference to safety find-
ings, and it affords no support. for respondent’s con-
clusion that ‘Congress, by making the procedural pro-
visions of Section 182 and Section 189 applicable to
°
.
g
36
construction pe rmits, also made applicable the ope pate
ne safety” findings referredto-in-Seetion 182,
° b. The second item cited (Br. 39-40) is a tolloquy
from hearings in 1954 involving the testimony of an
industry witness, Mr. McQuillen. It appears that Mr.
slcQuillen was coneerned, (1) with the administrative .
burden on an applicant where his proposed activities -
would, under the bill, require allegedly up to nine
different licenses and (2) with what he viewed as.
the failure of the bill to provide that licensees ‘‘would
have the assurance that when they had the facility
finished in accordance with each of their require-
‘ments they would be able to run, it.”? Chairman
Cole’s comment, cit@d by’ respondents, that “un? .
doubtedly”’ the bill as drawn ‘‘would be so operated”’
does not seem, as respondents contend, to have. been
directed to the second poiit, but rather to the first.’
7 Respondents reach their-conclusion by omitting to quote that
portion of the colloquy which, because it immediately precedes
Chairman Cole’s interjection, was apparently. the statement —
to which he was directing his attention. This was a statement
by Representative Hinshaw:
Representative Hinsuaw. That seems to me to be: rea- °
sonable, that you should put all the conditions into 1-license
that can be put into 1 license. That would be fair enough.
Chairman Cote. Would you mind my interruption? Why,
cannot that: be done under the terms of the bill as it is now?
Mr. McQuitten. I think it undoubtedly would be so
operated.
Chairman. Cote, Of course it would.
[Hearings Before The Joint .Committee on Atomic Energy
on S. 3323 and H.R. —_ 83d Cong., 2d Sess., p. 119, 2 Leg.
‘Hist. 1758.] \
The problem particularly referred to ‘e Representative Hin-
shaw was subsequently cleared up by a committee amendment
which added Section™461(h) to the bill, authorizing the Com-
4
PRATT ORAL CR 8nd FG SE ERE TD EOL ST Oe Tay OEE lt
6
Ps °
to the estan pola i the eaathuden respondents craw —
‘would fot follow, The next statement of the witnéss,
in response to Representative Cele’s statement, was:
“But the terms "of. the construction-permit seetion
would need a little amendment, I think,. to- make
‘construction and license at the -— of that upon con- .
strnetion as ‘required fit together’ * (Hearings, fr. 7,
supra).. In other words, the industry. witness himself
recognized that. Section 185 as drafted would not
automatically insure an operating license merely be-
cause construction was carried out in accordance with
the terms of the permit.
4, Respondents challenge (Br. 58-64) our dailies
(Main Br. 62-66) that Congress has acquiesced in the
Commission’s two-step provisional construction permit
procedure, on the ground that the Commission alleg-
edly never informed Congress that it grants such per-
mits upon finding reasonable assurance of safe opera-
tion of the general type of reactor proposed, and
defers a definitive safety finding of the final design
until the reactor has been construed-and is to. be
licensed to operate. The argument takes: various
forms. Thus, they contend (Br.°59) that the Com-
mission never informed Congress that its regulations
construction would not endanger public ‘health and
Mission to: aida in a sittgle application one or more of the
activities for which a license is réquired by this Act” and to
“edmbine in a single license one or more of such acffyities”.
Compare S. 3323, 1 Leg. Hist. 181, 234, with S. a? Teg.
Hist. 645, 718. * | er
‘
~ on construction permits require only "a finding that
Be
~ 38
safety. The Commission hasénever taken that view,
It did not take that view in the present case. Here,
as in all other provisional construction permit cases,
the Commission aeted on the basis of findings of rea-
sonable assurance that a reactor 6f the proposed type’
_-could be safely constructed and operated at the: ‘pro-
posed site (R. 676-77, 706, 708). <a |
Respondents _also « contend (Br. 60) that the Commis-
sion in this case departed from its practice in other
provisional construction permit eases (of which Con-
gress was aware), beeause here the safety findings were
made “‘for the purposes of this provisional construction
permit.”’ The argument is entitled to-‘no more weight
in this context than it is elsewhere (seé supra, pp. 10-11,
18, and our main brief, pp. 67-69). Respondents also
refer (Br. 60-64) to Congressional criticism of the is-
suance of the original PRDC permit in’ 1956. That
point, however, has no relevance to the issue before
‘this Court: the validity of the amended permit issued
‘n 1959. See supra, pp. 3-7. And it was -the pro-
cedure followed ‘in issuing such amended permit that ‘
_ the Commission brought to the attention of Congress.
If, despite the material set forth in our main brief
(pp. 62-66), there were. any: doubt as to whethér the
Commission had informed,Congress as’ to the basis |
upon which it issues provisional construction permits,
such doubt is dispelled by the very Commission state-
ment that respondents quote at page 60 of their brief.
The Commission there advised the Joint Committee. -
that—. K
The Commission staff reviews these reports as
they are submitted, holds informal meetings .
. , ; re~.
39
with the applicant, discusses the safety aspects
of the reactor with its advisers (ACRS,), con-
siders the progress of the developmental pro- |
grams Which are heing carried out by the ap-
plieant, and finally arrives at a point when it
believes that there is reasonable assurance that.
the unresolved safety problems can be resolved
in a way that will make it possible for the ap-
plicant to operate the proposed reactor at the
proposed site without. undue risk to the health,
safety, and property of the public. At this junc-
ture, the Commission may issue a conditional
construction permit. [Emphasis added]
If respondents’ claim 1s that the Commission’s re-
porting to Congress was -insufficient to show ac-
quiescence by the latter because the Commission never
_ specifically used the precise terminology of Regula-
tion 50.35 (“a facility of the general type proposed”’),
the short answer?is. that it did. On May 15, 1956, the
then general manager of the Commission advised the
Joint Committee (Hearings Before the: Joint Com- —
mittee -on Atomic Energy. on Governmental Indem-_
‘- nity for Private ‘Licensees and AEC Contractors.
against Reactor Hazards, 84th Cong., 2d Sess., pp.
62-63, emphasis added) :
** * We havé established —_ procedures.
whereby the applicant may submit the results
of his hazard evaluation step by step as a series
of preliminary hazard summary reports. At
such a time as we are satisfied that we have
information sufficient to provide reasunable as-
surance that a facility of the general type pro-—
e
40
posed can be constructed and operated’ at
‘proposed location without undue risk to. the
health and safety of the public, we can issue
a construction -permit for the facility. Such a
permit is, of course, conditional and will not
‘- eonvert to a license to operate until the com-
- plete hazard summary report has been sub-—
‘ mitted, and we have made a finding based
thereon that the final design of -the specific
facility provides reasonable assurance that the
- health and safety of the public will not be en-
dangered by operation of the reactor in eacivel
-. ance with specified procedures. _
. This is the type of construction permit that
we will probably have tq issue for all of the
power demonstration reactors, and even for
many of the research, testing, and medical re-
actors,‘ for the next few yéars.
The foregoing statement is an exact description
of the proceduré followed by the Commission in this
very case.
The two Jvint Committee staff studies of the Com-
mission’s regulatory, program have’ similarly shown
full knowledge of, ® basis upon which the Commis-
sion issues provisional construction permits. Joint,
- Committee on Atomic Energy, A Study of AEC Pro-
cedures and Organization in the Licensing of Reactor
Facilities, 85th Cong., 1st Sess. (Joint Committee
Print 1957), pp. 6, 96, 107-108; Joint Committee on
Atomic Energy, Improving the AEC Reguiatory
Process, 87th Cong., Ist Sess. (Joint Committee Print
1961), Vol. 1, p. 31, Vol. 2, p. 154. Moreover, the |
Commission sends copies of all construction permits -
and its decisions thereon to the Joint Committee.
: Al
cee | TV
_- RESPONDENTS? ASSERTIONS AS TO THE SAFETY HAZARDS
OF ATOMIC REACTORS GENERALLY AND OF THE PRDC
RE ACTOR ” PARTICULAR ARE CONTRARY TO THE: FACTS ©
Respotidents make numerous unsupported and un- |
warranted statements, with respect to the operating -
safety hazards of atomic: reactors generally and the
PRDC reactor in. particular. For example, ‘after >
noting--the ‘ government’s statement in its brief ‘that
there had been only one fatal reactor accident in this
country, on January 3, 1961, they state (Br. 15).
that ‘‘many. reactor accidents’ have occurred, some
causing serious injuries to. reactor personnel and un-
determined. injuries to the surrounding population.”’
In support of this-statement, they cite a four-page
“List of Reported Atomic Reactor Accidents’ con-
tained in the appendix to their brief, pp. 105-108).: We: -
have set forth in Appendix C, infra, pp. 66-91, a de-
tailed description .and explanation of each of the al-
leged “‘accidents’’ in the United States, and of those
elsewhere for which information is‘ ‘available, pre-
pared by the Commission’ s Division of Licensing and
Regulation. : .
This material shows that, cantrary ‘to respondents’
statement, reactors have indeed been eperated in the
‘United States with a ‘‘remarkable- safety . record”’
(R. 879). Of the 22. “accidents”, in this country:
cited by respondents, only one (to which we pre-
viously referred) involved any fatalities, and that one
enna, "ar the death of three operators inside the
reactor building. Three resulted. in overexposure of
a
Pisa
42
operating employees to radiation, with no ‘reported.
injuries. Several others caused a temporary increase
in radiation levels in the facilities which, however,
did not result in overexposure of any persons.” -The
remaining 13 “accidents” involved only various dif-
ficulties in operation, ranging from corrosion of a
component, requiring, replacement, to damage to the
reactor. - ¥hile these may have necessitated cleanup
and maintenance work, they did not, present hazard
to operating personnel or to the public. None of the’
incidents involved any person not employed in the
+ reactor itself.
We recognize, of course, that an atomic reactor ac-
. . . c < . ! . .
cidgewt, if it sould oceur, might cause serious public
* anfury. But it is precisely because of this danger that |
“such extraordinary safety precautions are taken in
industry. The Commission’s elaborate health and
’ safety program is based upon a full recosnition of the
dangers and, also, of the means available to prevent
any injurious consequences. Atomic reactors may
yet be a mystery to the average layman. But there
is a wealth of ‘scientific information which teaches.
that this new source of’ controlled eriergy can be, and’
® Part 20 of the Comntfission’s regulations prescribes the ap-
plicable radiation exposure limits—permissible radiation levels
-and concentrations of radioactive material for persons in re-
stricted ‘frehs, i.e, employees in atomic energy facilities, and
_ for tnrestricted areas accessible to the publig. These limits, |
based in part upon long-term experience with X-rays and
radium, provide ‘substantial margins of safety to permit con-
tinuous exposure without deleterious effects. The Commis-
sion’s regulations conform to the Recommendations of the -
National Committee on Radiation Protection, National Bureau
of Standards Handbooks 59 (1954, Supp. 1958), 69 (1959).
43 as a
is being, safely utilized for beneficial ends. Statijes
show, as one well-knewn commentator in the atomie *
energy field (Professor Estep of the University of
Michigan Law School) ree éntly stated (Estep, Radi-.
~ ation Injuries and” Statistics: The Need for a New
AppPach to Injury Litigation, 59 Mich, li. Rev. 259,
260) that:
An amazing safety record has been achieved by
the nuclear industry so far and» enough is’
known. about radiation safety to support an
argument that it is safer to handle radiation
than many other types of material which in-
dustrialized countries have _ using for’
decades, * * *.-
While accident statistics are not available for those
“engaged in the operation of atomic reactors as such, ;
the. Commission, has statistics showing, the accident
rate in. its own installations. For the year 1960, this -
was 1.68. disabling injuries per millitn man*hours
worked. This is far below the National Safety Coit,
cil’s industry-wide average for 1959 (the latest figures
available) of 6.47 ‘injuries per million man-hours
worked: Only. one: industry reported by th¢ National
Safety Council had’.a lower rate than the Commis-
sion’s instAllations: communications, with .96 injuries.
The Commission’s’ aceident rate is lower then that
in such industries as aircraft manufacturing (2.01),
chemicals (3. 32), ; textiles (4.34), printing and pub-
lishing (5.52), tobacco (6.50), pulp and paper (7.44),
meat. packing (8.20), and air transport .(15.32). In
terms of days lost per million man-hours worked, the
Commission’s 1960 reeérd of 198 is far below the
we re
_—_
44
; industry-wide average of 754, and is bettered by only
four industries. (communications, wholesale and retail
trade, electrical equipment, and storage and ware- -
housing). ‘Accident Facts, 1960 edjtion; published by
the National Safety Council, Chicago, IIl., p. 26; AEC
Press Release D-72, March 30, 1961.
. Sir John Cockroft, a prominent British physicist to
whose statements respondents refer (Br. 7, n._7),°
recently stated that the working force of more than
30,000 persons in Great Britain’s atomie power in-
dustry has suffered no ill effects from radiation.
_* New York Times, April 7, 1961, p. 12. 2
With respectso the safety hazards of this partic ‘ular
reactor, respondents, citing a recent. motion filed by
PRDC with the Commission requesting an extension
of time for completion of construction, state (Br. 9)
, that PRDC has not yet solved its bownig problem,
, the danger that fuel elements may bend toward
ne other, causing nuclear instabilities. That motion
itself; however, and other public documents filed by
PRDC, indicate that it believes that the bowing prob-
lem has been solved.” Moreover, the experiments that
* Respondents r@fer (Br. 7, n. 7) to a statement by Sir John
that an accident in Britain’s Windscale reactor in 1957 released
more radio-activity than is released during an explosion of an
atomic bemb of the irhing fe -In the Windscale acci”
dent, a release and dispersal of fission products’ into
the atmosphefe resulted not from an explosion, but from a fire
in the graphite moderator (which PRDC will not have) and
from the absence of gas-taght containment (which PRDC will:
have). There were no reported injuries from the Windscale
accident. See infra, pp.,83-84.
*PRDC’s Eighth Quarterly Technical Report, dated Sep-
tember 10, 1960; PRDC Application for Extension of Construc-
_ tion Permit, dated’ October 28, 1960.
45 Co
have been conducied since the decision in this case at
the Commission’s Experimental Breeder Reactor N Oo.
1 have apparently confirmed that the problem is sol-
uble, as the Commission anticipated (R. 672, 704).”
In any-event, the Commission has made it clear that
PRDC will not receive -a license to operate until it
has demonstrated that the bowing problem has bgen
solved (R. 676, 712 , 718-719).
Respondents also’ refer (Br. 8, n. 8) to a regent
statement in a periodical that the maximum credible
accident”’ for the PRDEC reactor has not been defined.
The Commission stated in fhis case that it requires
applicarits to identify the worst accident deemed
credible, so that the. Commission can evaluate it-and
determine “whether the worst aecident deemed cred-
ible ean have: hazar dous consequences to the publie,’”
and that PRDC had. “not yet t done so (R. 678-679).
The Commission made it explicit, however, that it.
would not issue an operating license until this evalua-
tion had been made and it is shown that the reactor
can be safely ‘operated. While the maximum “cred-
ible aceident” may hot have yet been determined, this
: does not mean that there are no knewn limits to a
possible accident in theagPRDC reactor. Indeed, Dr.’
Bethe discussed “ineredible accidents’? and the sate-
guards against them (R. 765-767).
" Argonne National ‘Laboratory Shimmaty Status of Fast,
Breeder Reactor Program, dated December 1, 1960. This
technical report, filed by the AEC Staff, and the PRDC report
cited in the preceding. footnote, have been incorporated .in the
public record of this’ proceeding. and served upon all parties,
pursuant to Commission Order ia sages |
592233614,
Ss
46
V
‘THE COMMISSION ’s FINDING S ON THE SAFETY OF THE
SITE ARE ADEQUATE *
Respondents make no attempt to dotena the riling
below (R. 964) that #the Commission’s safety find-
ings are deficient in an additional respect,’’ namely,
that although “Congress intended no reactor should,
v ithout compelling reasons, be located where it will
expose so large a population to the possibility of a
nuclear disaster * *,* [i]t does not appear that the
Commission found compelling reasons or saw that
such reasons were necessary.’ ~ Instead, they argue
| (Br. 87) that all the court realiy meant was that “the
most compelling reasons are not a substitute for suffi-
- cient safety findings concerning the reactor iiself.’’ ”
Their discussion of this issue is primarilyzan attack
upon ‘the sufficiency of the Commission’ s findings as
to the safety of this particular sité. . :
Respondents contend that the Commission did not
“relate * * * the site problem to population density”’
(Br. 83). ‘Binding 19 (R. 707), however, expressly
states the population distribution within various dis-
tances from the site, ranging from one to thirty
‘miles, and recognizes that during the summer months
the population, within five miles. would be increased
due to vacationing transients and people visiting
beaches. The Commission’s ultimate finding (R. 708)
of reasonable assurance that df reactor of this type
“an be constructed and operated “at the loeation’’
. 13 Respondents’ further contention (Br. 87) that the ruling
is dictum is refuted by the opinion itself.
~~
47.
without undue risk to public health and safety was.
thus made in-the light of the population density in
the area. There is mo basis for respondents’ conten-
ings, merely because it did not repeat the. language
of the finding in the initial decision that referred to
“the population density around the site” (R. 614)..
tion (Br. 85) that the Commission ‘actually rejected ts
“population “ density’? in making its safety find-
Respondents also refer (Br. 88-90) to the Commis- |
' sion’s proposed tegulations on Reactor Site Criteria,
published on February 11, 1961, 26 F.R. 1224, and
suggest that the Commission has ““belatedly’® changed
its policy to consider -population densities near re-
actor sites. On the contrary, as the Commission ex-
plained in recént Congressional hearings, and as the
regulations themselves indicate, the published cri-
-teria do not represent a departure from prior prac-
tice, but are a publication and crystallization of the
criteria which the Commission has regularly applied
to reactor location. Hearings on Development, .
Growth, and State of the Atomic Energy Industry, »
before the Joint Committee on Atomic Enérgy, 87th
Cong., Ist Sess., p: 103 (stenographie transcript).
Indeed, respondents themselves concede (Br. 89).
that the location of the PRDC reactor would be ac-
ceptable under the published criteria. This can be.
shown from the proposed regulations. Sample figures
are presented for appropriate distances from popu-_
lation centers, given according to reactor power level,
which can be utilized as an “initial estimate’’ for a
-particular reactor. (10 C.F.R. 100.11(b), 26 E.R.
1225.) The figures vary from 0.7 miles fora reactor
48
‘of 10 thermal megawatts, 6 miles for a reactor of 300
thermal megawatts (the size of PRDC), and up to
17.7 miles for.a reactor of 1500 thermal megawatts.
The PRDC reactor, however, will be located 25 miles
from Toledo and 30 miles from Detroit. Even under
the Commission’ s qualifications that distances may
have to be greater from very large cities, and for re-
actors with noveMdesign features (which respondents
stress), there is no reason to doubt that the PRDC site |
is well within the proposed standards. .
ee eee
. CONCLUSION
For the foregoing reasons, and for those set forth
in our main brief, the judgment of the court of ap-
peals should be reversed.
Respectfully inbinsiteed.
ARCHIBALD Cox,
Solicitor General.
WituismM H..Orrick, Jr.,
Assistant Attorney General.
: DANIEL M. FRIEDMAN, -
v Assistant to the Solicitor General.
Morton HOo.ianper,
io : Attorney. .
Nem. D. Naren, 2
General Counsel,
. Courts OULAHAN,
Deputy General Counsel,
LIONEL. KESTENBAUM,
_ Attorney;
Atomic Energs y Commission.
Apru, 1961. ‘on
e
APPENDIX A
Excerpts From Construction Permits Issvep FOR
PoweER ReEactoRS AND ACCOMPANYING COMMISSION
Decisions RELATED TO. Sarety Fixpincs UNDER
SecTION: 50.35 OF BHE CoMMISSION’s, REGULATIONS ,
‘1. Consolidated. Edison. Company of New York, :
Ine., Construction Permit No. CPPR-1 issued May 4,
» 1956:
“The Atomic Energy Commission — the ©
‘Commission’) has found that: * * *
‘‘E. Consolidated has submitted sufficient ‘nition
tion’ to provide reasonable assurance that a ‘utiliza-
tion facility of the general type proposed by Con-
solidated ean be constructed and operated at the
proposed location without undue risk to the health
and safety of the pyplic and that additional informa-
tion required to comiplete its application — be
supplied. ;
* * 7 * _ *
“(4) This permit is subject to submittal by _
solidated to the Commission (by. proposed amend-.
ment, of the application).of the complete, final Haz-
ards Summary Report (portiens—ef-whieh may be
submitted and evaluated from time tostime) and a
finding, by the Commission that the final design pro-
vides reasonable assurance that the health and safety
of the publie will not be endangered by operation of
the reactor in accordance with the specified pro-
~ cedures.”
2. Commonwealth Edison Company, Construction —
Permit No. CPPR-2, issued May 4, 1956:
(30)
.
a
The ‘Aelenie Energy Commission (hereinafter the
‘Commission’) has found that: * * *
“CE) Commonwealth has submitted sufficient infor-
mation to provide reasonable assurance that a utiliza-
tion facility of the general type proposed by’ Common-
wealth can be constructed and operated. at the proposed
location without. undue risk to the health and safety
of the public and that additiona! information required
to complete its application will be supplied.
* * , * * *, *
“(4) kn peek is subject to submittal by Com-
monwealth to. the Commissien (by .proposed amend-
ment of -the application) of the complete, final Haz-
ards Summary Report (portions of which may be
submitted and evaluated from time to time) and a
finding by the Commission that the final design, pro-_
vides reasonable assurance that the health and safety |
of the-publie will not. be endangered by operation of
the menceor in accordance with the specified | proce-
dures.”’
3. General Electric Compéiny, Construction Permit
. No. CPPR-3, issued May 14, 1956 =
“The Atomie Energy Sintec wir (hereinafter the .
‘Commission’) has found that: * * *
“KE. GE has. submitted sufficient - information to,
provide reasonable assurance that a utilization facil-
ity of the general type proposed by GE ean be con-
structed and operated at the pr oposed location with-
- out undue risk to the health and safety of the public
and that additional information required to complete °
its application will bé supplied.
* * . . oe | . *.
“(4). This permit is subject to stibmittal by GE to—
-the Commission (b¥ proposed amendment of the ap-
plication) ‘of the complete, final Hazards Summary
Report (portions of. which may he submitted and
51
maluated from time to time) and ; i finding by the
Commission that the final design as reasonable
assurances that the health and. safety of the public
will not he endangered by operation of the reactor in
accordance with the specified procedures.” oo
4. Power Reactor Development Company, Con-
struction Permit. No. CPPR-4, as amended, is set -
forth at R. 715, the Commission’s decision at R. 636.
5. Yankee Atomic Electrie Com pany, Construction
Permit No. CPPR-5, issued November 4, .1957:
“EK. The applicant may proceed’ to design and eon-
struct the proposed reactor without further authori-
zation in accordance with the application and amend-
ments thereto. However, this does not constitute
final approval of any technical specification of the
reactor. Before the license is issued to eperate the
facility, the Commission must finally approve all tech-
‘nical specifications. If the ‘applicant desires final
approval. of any particular technical specification
prior to the issuance of the license to operate, he may
request that the Commission grant specifie approval
of any technical specification by appropriate amend-
ment to this permit. :
“This permit is previsional to ‘the extent that :
license authorizing pperation.of the reaetor will et
he issued hy the Commission unless Yankee has sub-
mitted to the Commissign’ (by proposed amendment
‘to the application) the*Complete, final Hazards Sum-
mary Report (portions of: which may be submitted
and evaluated from time to time) and the Commis-
‘sion has found that thé final design provides: reason-
directing issuance of the permit, stated :
able assurance that the hea!th and safety of the publie
will not be endangered by operation of the reactor in
accordance with the speciffed procedures.’
The Commission’ s Order dated October 31, 1957,
a
>
52
“Ir Is Fou nD THat: * * *
‘“‘D. There is sufficient information: to prov ide rea-
sonable assurance that a reactor of the general type
_ proposed can be constructed and eperated at the pro-
posed location without undue risk to the health and
safety of the publie; and that additional information
required to complete the application will be supplied.
‘‘The Commission belieyes that the applicant has
identified the subjects which should be further inves-_
tigated and that the plans described for earrying out
these investigations: will produce the information
wlfich will be needed prior to consideration of final
design and operating -procedures and, conversion of
this construction permit to’a license.”’
~The Commission’s accompany ing Memorandum of
Opinion stated: .
“The reactor will be a pressurised water, re actor
generally similar to the pressurized water reactor
(PWR) now nearing completion at Shippingport,
Pennsylvania. .Considerable information and. expe-
rience -have been acquired from the design and opera-
tion of pressurized’ water reactors by the Commission
and the Department of Defense. Additional infor-
mation and experience will be gained from continued
operation of these reactors; and frem the design and ,
operation of other pressurized water reactors, prior
to completion of the Yankee. reactor. The aceumv- .
lated ‘experience and information now. available .as to
such reactors, together with the information eon-
tained in the application, warrant the conclusion that
there is at the present time reasonable assurance that
a facility of the type proposed by Yankee can be con-|
structed and operated at the proposed location with-
out undue risk to the health and’safety of the public.
Accordingly, we have decided to authorize issuance of
a construction permit to’ Yankee on a_ provisional
basis pursuant to Section 50.35 of our regulations.
a ae
eo.
—.
a
.
53 f 4
“The construction permit must be provisional at
this stage of the proceeding pr incipally because Yan-
kee has*not completed the design of the reactor and
certain features of the proposed facility present un-
resolved questions which might affect its safe opera-
tion? ‘These features have been identified and dis-
cussed in the testimony furnished at the hearing by .
Dr. Clifford K. Beck, Chief of the Hazards Evalua-
-. tion Branch and in the report of the Advisory Com-
mittee on Reactor Safeguards.* - We agree with Dr.
Beck and the Advisory Committee that the experi-
mental program outlined in the application will prob-
ably produce the. information needed to resolve these
questions prior to consideration of finak design and.
operating procedures and conversion of the construc-
tion permit to a license.’’
6. Saxton Nuclear Reswiiisaiin Corporation, Con-
struction Permit No. oe issued February 11,
1960: .
es ih "* D. The aaitials may proceed to design
and construct the facility described in the application
and amendments. thereto without further authoriza-
tion: However, this does not constitute tinal approval
of any technical specification of the facility as distin-
guished from the general design concept proposed.
“Before the license is issued to operate the facility, the
Commission must finally approve all teehnical speci-
fications. If the applicant desires final approval of
‘any particular technical specification prior to the is-
suance of the license to operate, he may request that
the Commission. grant specifie approval of any tech-—
*“As identified in the testimony of Dr. Beck and in the re-
port of the Advisory Committee on Reactor -Safeguards, these
quest yr include :
“i. The addition of neutron absorbers ;
“2. Intentional design inte the reactor of nucleate boil-
ing; and ;
“3, Large plutonium build-up. * | (« ‘ommission’s foot note.)
7 54 soe
nical specification by appropriate amendment te this
peimit. on °
2. "This permit is proy yisional -to, the. extent.that a
license authorizing operation of the facility will not
be issued by the Commissign unless Saxton Nuclear
Experimental Corporation has submitted to the Com-
mission (by amendment to the application) the com-
plete, Final Hazards Summary Report (portions of
which may be submitted and evaluated from time to.
time) and the Commission has found that the firtal
design provides reasonable assurance that the health
and safety of.the public will iret be endangered by
operation of the fagility in accordance with the spec-
‘ified procedures.” , é
The Hearing Examiner’s Intermediate Decision,
issued January 21, 1960: *
“Coneéptual design «nd design criteria for the ma-
jor components of. thé facility: have. been developed
in considerable detail in Saxton’s application and in
testimony: at the hearings. Although detailed ‘engi-
neering design of*the Saxton reactor is not complete,
the information provided, as:partly summarized here-
after, supports the conclusion that there is reasonable |
assurance that the Saxton reactor can be satisfactorily
designed and safely. operated. After all e1 ngineering
details of the plant have been settled, Saxton will sub-
mit additional information to the Commission as an
amendment to its application for construction permit,
in the form of a‘final hazards summary report, which |
information will be considered at the hearing on the
operating license.
* : * * *- *
.
*The decisions of hearing examiners, cited in Appendices. A-
and B, became-final decisions of the Commission in the absence of
exceptions by the sims or review by the Commission.on its own
motion. ; ‘
’
55
“4. Sufficient information has been presented to pro-
vide reasonable assurance that a nuclear reactor of
' the general type described in the application and Pre-
liminary Hazards Summary Report can be constructed
and operated at the proposed location without endan-
gering the health and safety of the public.
* * * | es: oe
“6. There. is reasonable assurance that. technical
information omitted from, and required to complete,
the afSplication will be supplied.’”. -
7. Carolinas-Virginia Nuclear, Power Associates,
Inc., Construction Permit No. CPPR-=7, issued May
4, 1960: |
oe This permit itisiens the sainitioned to con-
struct the facility in accordance with the application
and amendments thereto heretofore filed in this’ " pro-
ceeding without further authorization.
“D. If the applicant desires Commission approval
of any particular technical specification: (such as the
use.of Zirealoy for pressure tubes), prior to consider-
ation of a license to operate, it may request that the
Cémmission grant specifie approval of any, tethnical
specification by appropriate amendment to. this
permit.
“KE. This permit is ptovisional to the extent that a
license authorizing operation of the facility will not
he issued by the Commission until evidence has. been
adduced by Carolinas Virginia Nuclear Power Associ-
ates, Ine. concerning: the tests performed of all .de- .
signs and components of this proposed utilization
facility, including, among others, specially designed ~
use of heavy water, the U-pressure tubes, and their.
use of Zirealoy, and a basis Has thereby been estab-
’ lished as-to all components when operated as a unit,
that. there is adequate protection to the health and
safety. of the poe as.required by the Atomic Energy
a)
_ 56
Act, as amended, and by the rules and regulations
of the Commission.”’ >
The Hearing Examiner’ s Intermediate Decision,
issued: April 12, 1960:
‘‘The final design of the reactor has not been com-_.
pleted; but criteria for its major components have
_ been developed in considerable detail in the evidence
produced in this proceeding. Present analyses and
calculations from these preliminary design param-
eters indicate that no _ particularly unfavorable
safety. characteristics will arise from the nuclear,
thermal, or hydraulic features of the reactor. The
‘research and development program now being con-
ducted by CVNPA, supplemented by the experience
of ‘similar reactors operating earlier than the reactor,
affords reasonable assurance that the presently un-
resolved safety questions concerning its unproved fea-
tures can be answered. and thus assure that the
reactor can be satisfactorly designed and safely oper- -
ated. The final design criteria will evolve from the
full-seale critical experiments which will begin in the
spring of 1960. After all of the engineering details
of the nuclear plant have been settled, CVNPA will
submit additional information to the Commission as
an amendment to its License Application in the form
of a final hazards simmary report.
' “As will be provided hereinafter, in view of the
untested character, of certain components, and new
design. problems involved in this nuclear reactor, -
conditions will.be attached to this construction permit °
requiring proof by tests of the adequacy and safety
of the pressure U-tubes,“specially designed for the
use’ of heavy water and the zircaloy clad fuel elements,
before this construction permit may be converted to
an operating license. This evidence will be addi-
_ tional to that presented as the basis for opinions that
‘the completed project has been constructed in accord-
“ 57
anee with the specifications of this. construction per-
“mit and will provide reasonable assurance that the
health and safety of the public will not be endan-
gered by its operation.
+ * * . * *.
**3. There is sufficient information to provide rea-
‘sonable assurance that the utilization facility of the
general type proposed in the application, as Amended,
by CVNPA can be constructed at the location speci-
fied therein without endangering and _ will: provide
adequate protection to the health and wore of the
publie. ,
“4. There ds reasonable assurance that the techni-
eal information omitted from and required to com-
plete the application, inéluding particularly that
related to the special designed use of heavy water,
the U-pressure tubes, ‘and the use of zirealoy clad-
ding of the fuel elements, will be supplied.”’
. 8. Northern States Power Company, Construction
Permit’ No. CPPR-8, issued May 12, 1960:
“C. This permit authorizes the applicant to con-
struct the facility in accordance. with the application
and amendments thereto heretofore filed in this pro-
ceeding without further authorization.
“D. If the applicant desires Commission. approval.
of any particular technical specification (such as the
design details of the various components and special
design features, including the nuclear superheater,
the. aluminum alloy fuel elements, and -circulation
control system), prior to consideration of -a license
to operate, it may request that the Commission grant
specifie approval of any ‘technical specification by
appropriate amendment to this permit.
“EF. This permit is provisional to. the extent that
a license authorizing operation of the facility will not
be issued by.the Commission until the proposed re-
search and development program has bee ‘n completed
7 58 ,
s
> | Z 8
-and evidence has been adduced ‘by’ Northern ‘States
Power Company and it has been found by’ the Cor
mission, that the Northern States Power Company’s
proposed nuclear utilization facility, incliding ameng
other components which must be proven acceptable
hy tests described in the Intermediate Decision dated
April 21, 1960, the novel features respecting the fuel
_ elements in the boiler region of the core, the ineor-
poration of a superheater with unproven types of
fuel elements as an integral part ef the basic reactor.
core, and the proposal that a variable rate of primar -..
coolant recirculation be utilized for Controlling the’
power level of the core, has been constructed and can
we operated with adequate protection to and without —
eadangering the health and safety of the publie in ac-_
cordance with the requirements.of the Atomi¢ Energy
Act, as amended, and by the Rules and Regulations
of the. Comniissien.” : |
The Hearmg Examiner’ s Fnserinndiite Deci ision,
issued April 21, 1960:
“As stated, the proposed facility is a boiling water
reactor having several n&& features and unique char-
acteristics . with which there has been no previous ex-
perience in any other reactor of a size comparable to
that proposed by NSP. These are the use of alumi-
num alloy as a cladding for fuel.in the boiler core, the
use of ‘cermet fuel of the type proposed to be used and
the superheater core, and the variable rate of primary
coolant recirculation proposed to be used for control-
ling the power level of the core. *
* . ad ® * *.
‘For the purposes of an operating license, both
NSP and the Staff are agreed that further analysis
.and research and development explorations must be
-eonducted before a judgment can be made: that the
superheater, the altiminum cladding, and the recireu-
59
lation rate of the primary coolant can be safely 1 incor-
porated into this particular reactor.
‘* * * am
“3. There is sufficient information available to pro-
vide reasonable assurance that the utilization facility
of the general type proposed in the application, as
ate | by NSP can be constructed and operated at
the location specified therein without endangeri ing and
will provide adequate protection to, the health and
safety of the public. : “ane |
“4. Thére is reasonable assurance” that, in accor-
‘dance with (1) research and development programs
outlined in the evidence, (2) the tests proposed to be
undertaken of the components, and (3) the availabil-
ity of proven features to be incorporated in the reac-
tor should necessity therefore require, the technical
information omitted: from the application will be sup-
pled, including particularly that related to fuel ele-
we ments to be utilized in the boiler region of the core,
the nuclear. superheater and its fuel elements proposed
to be incorporated as an integral part of the basic
reactor core, and the controls of the 1 variable rate of
primary coolant recireulation.”’ ;
9. Consumers Power Company, Construction Per-
mit No, CPPR-9, issued May 31; 1960:
-“C. This permit authorizes the applicant to con-
strict the facility in accordance with the application
‘and amendments thereto heretofore filed in this pro-
ceeding without further authorization.
5“T). If the applicant desires Commission: approval
+ of any particular technical specification, prior to con-
sideration ofa license to operate, it may request that
“the Commission gragt specific approval of any tech-
nical specification by appropriate en to this
permit.
&,
.
: maximum. specifi: power densities proposed can be
. ° :
,
. “Ki. This permit is: provisional to the extent that a,
license authorizing operation of the facility will not be
issued by the Commission unless Consumers Power
Company has -submitted ‘to the Commission (hy
amendment to the applicationy the complete Final
- Hazards Summary Report (portions of which may be
submitted and evaluated from time to time) and the
Commission has found that the final: design provides
reasonable assurance that the health and safety of: the
public will not be endangered’ by operation of the
facility in accordance with the specified. procedures.
The Hearing Examiner’s aa Decision, q
issued May 6; 1960: ;
‘*The determination of the existence of .y-asonable
assurance that the utilization facility can be con-
structed and operated at the proposed site without
undue risk to the health and safety of the public is
limited by the present récord to the conventional type
of boiling water reactor with a. power density of 30
kilowatts per liter.. Many details of the design of
Consumers’: project remain to be conipleted. The Staff
of the Commission has expressed ‘the view that while |
it is believed that experiments will develop satisfac- |
‘tory designs, it. remains to be demonstrated that the fF
safely achieved, .and that clarification must be pro- .
vided on.the need for in-core instrumentation which
may appear to be necessary as: performance parame-
‘ters are better understood. The adequacy of the con-
trol rod drive mechanisms may warrant re-examina-
tion at a later stage inthe design calculations.
Pe ene. * * . *
. “3. There is sufficient information available-to pro-
vide reasonable assurance that the utilization facility
of the general type proposed in the application by ©
Consumers can be constructed and operated at the
61
location specified without endangering and will pro-
' ‘vide adequate protection to the health and safety. of
.
ro
the public. 6
“4. There is reasonable assurance that, in aceord-
ance With the research and- development programs
‘outlined in the evidence and the availability of alter-
nate proven features to be incorporated in the reactor
should necessity therefore require, the technical infor--
mation omitted from the application will be supplied.”
10. Pacific Gas & Electric ('0., Construction Permit
No. CPPR-10, issued November 9, 1960: | ;
“C, This permit authorizes the. permittee to con- |
struct the facility in ‘accordance with its application,
as amended, and as described i hearing record
in this proceeding, without furf uthorization.
“DT. If the permittee desires Commission approval
of any particular technical specification or modifica-
tion, pyior to consideration of a license to operate, it
may request that the Commission grant specific ap-
proval thereof, by appropriate. cmenement to this
permit.”’ .
The Hearing Examiner’s dititiaialinte Decision, is-
sued October 17, 1960:
“Tssue (1) The applicant has submitted sufficient ©
information to provide reasonable assurance that a
utilization facility of the general type proposed in the °
application can be constructed and operated at the -
proposed location without undue risk to the héalth and
safety of.the public;
“‘Tssue (2) There is reasonable assurance that the
technical information omitted from and required to
complete the application will be supplied. sd
‘The ftirther finding with respect to “the nuclear :
power reactor facility which is proposéd” and the res-
ervation on certain safety questions, were discnssed i in
our main brief, p. 44, fn. 12. eee
592283 e1——5-
®
“APPENDIX B-
Excerpts From ConstTRUCTION PERMITS ISSUED FOR -
Power REACTORS AND ACCOMPANYING CoM MISSION
Decisions. RELATED TO o SEctIoN 50.40 or THE Reau-
LATIONS ‘
r%
os
1. Consolidated Edison Company of Mew York,
Inc., Construction Permit No. CPPR-1:
“C. Consolidated is financially qualified to assume
responsibility for the payment of Commission charges
for the special nuclear material to be turnished by
‘ the Commission, to uadertake and carry out the pro-
posed use of the material for a reasonable period of —
time, and to- construct and operate the reactor in
~aceordance with the regulations contained in Title 10,
Chapter 1, C.F.R.
ae | Consolidated and the Babeock & Ww ileox Com-
pany, the contractor selected -by Consolidated to de-
sign and construct said reactor, are technically quali-
fied to design and construct the reactor.’
2. Commonwealth Edison Company, Construction
‘Permit No. CPPR-2: oe
.“C, Commonwealth is finakgially qualified to as-
sume responsibility for the payment of Commicsion
charges for the special nuclear material to be fur-
nished by the Commission, to.undertake and carry
out the, proposed use of the. material for a reason-
able peried of time, an@ to construct and operate the
reaetor.in accordanee with the regulations contained
in Title 10, Chapter 1, C.F.R.
<i Commonwealth’ and General Electric Company,
the contractor selected by Commonwealth to design
and construct said reactor, are technically qualified
to design and construct the reactor.”
(@ 8 8 83
63
3. General Electrie Company, a Permit
No, CPPR-3: . ’
“C, GE is financially ae to ‘construct and »
operate the reactor in accordance with the regula-
v
tions contained in Title 10, Chapter 1, C.F.R.; to
assume financial. responsibility for the payment of
Comniission charges for special nuclear material and
to undeftake and carry out the proposed use of such
material for a reasonable period of time.
“D. GE is technically qualified to design and con-
struct: the reactor.”
_ 4. Power Reactor. Development Company, Con-
struction Permit No. CPPR-4,.as amended is set
ey at R. 715, the Commission’s decision at R. 630.
. Yankee Atomic Electric Company, Construction
Permit No. CPPR-5. _
The Commission Order, Octobér 31, 1957, states:
“C. Yankee-and its contractors; Westinghouse Elee- |
trie Corporation and Stone & Webster Engineering
Corporation, are technically qualified to design and
construet the proposed. reactor, —
* , * * ae x
“KE. The issuance of a construction permit to
. Yankee will not be inimical to the common defense
and security or to the health and safety of the publie”
6. Saxton Nuclear Experimental Corporation, Con-
struction Permit-No.‘CPPR-6.
The Hearing Examiner’s Intermediate Decision
states: .
“3. Westinghouse Electric oraceuin techni-
cally qualified to design and construct the reactor, and
accordingly, Saxton has provided for adequate tech-
nical qualifications to design and construct the pro-
- posed aaa i
* * * oe *
a 64
“5, Saxton is financially qualified to ‘design and
construct the proposed facility. ; .
* ae * * 4 * *
“7, The,issuance of a construction permit to Saxton
will not be inimical to the common defense and secu-
rity or to the health and safety of the public.’’
7. Carolinas Virginia Nuclear Power Associates, |
Inc., Construction Permit No, CPPR-7. .
The Hearing Examiner’s Intermediate Decision
states: - &
“5. CVNPA, Westinghouse, and Ste & Webster,
collectively, are technically qualified design and
construct the proposed utilization facil
“6. CVNPA is financially qualified’ to engage in
the proposed activities in accordance with the Atomic
_ Energy Act, as amended, and the rules and regulations
of the Commission. |
- “7, The issuance of the proposed construction per-
mit to CVNPA, substantially in the form attached to
the Notice of Hearing issued herein, as modified by the
order hereinafter. made, will not be inimical to the
common defense and security or to the health and
safety of the public.”
8. Northern States Power Company, Construction
Permit No. CPPR-8. :
The —— Examiner’ 's Intermediate Deeision
“i NSP and Allis-Chalmers Manufacturing Com-
pany, collectively are technically qualified to design,
construct, and operate the a eel utilization
facility.
“6. NSP is financially qualified, and as supple-
mented by contributions from associated electric utili-
ties is able to engage in the activities proposed in its ©
application in accordance with the Atomic Energy
bo = = >
‘Ae t, as amended, and the’ Rules and Re —— of -
ne c ‘ommission. |
. The issuanee-of. the proposed construction per-
mit to NSP, substantially in the form attaehed to the |
Notice of Hearing issued herein, as modified by thé
‘Order hereinafter made, will not he inimieal te the
common deferise and security or to the, health and
safety of the pubhie.’ ou
% Consumer Power Company, Construction Pernnit
No. CPPR-9.
The es Examiner's Inte wrinédiate. Decision
sti a Ss
. Consumcrs, General Electric iggy ir and
Rote Corporation, collectively, are tec ‘hnically
qualified to design, construct, and operate the il
posed utilization facility.
“6. Consumers is financially qualified and able to
engage in the aetivities proposed in its application in
accordance with the Atomic Energy Act, as amended,’
and the Rules and Regulations of the Commission.
“7. The issuance of the construction permit in sub-_
stantially the form attached hereto will not be inimical
to the common defense and security, nor to the health.
and safety of the public.”
‘10. Pacific Gas and Electric Company, Construction
Permit No. CPPR-10. ;
The Hearing Examiner’s Intermediate Decision
states: . *
“Tssue (3) The applicant, collectively with ave al
Electric Company and Bechtel Corporation as here-
in proposed, is technically queued to design and con-
struct the proposed facility;
‘Issue. (4) The applicant is financially qualified to
engyge in the proposed activities; and
“Tssue ¢5)° Construction of the reactor will not be
inimical to the common defense and security or to the
health and safety of the public.’”
>»
APPENDIX €
AnaLysis oF ResrponpENTS’ List oF ALLEGED RrEAcToR
>
ACCIDENTS, PREPARED BY AEC Division oF Lic ENSING |.
A ND Recu LATION
* as
be P %*
Re RE ACTORS IN TuiE UNITED STATES
A. Accidents Causing Death or Obse rved Injury to
. Operating Personnel - ,
1. Reactor: SL-1, National Reactér Testing Sta-
tion, Arco, Idaho, boiling water reactor, used for
power production, prototypé for low-power plant at a
remote site.
Date: January 3, 1961.
Nature of Incident: Reactor ‘exeursion occurred
during shutdown for maintenance. Control rods were
disconnected from drives and nuclear instrumentation
was not in use. Some of the control rods ere ejected
from the core. °
Radiation level: Over 1000 ‘ities in the reactor
building. ‘
Injurtes:* 3 fatalities, the operating ‘personne! in
the reactor building.
Evaluation: Evaluation. of this aecident is still in
progress. It appears that ‘maintenance procedures
were partially at fault and that the reactivity condi-
tion of the reactor was not adequately known or un-
derstood at the time of the incident. Although the |
reactor was not housed in ’a containment. building,
offsite contamination was low, despite the very exten-
sive contamination inside the reactor building. No
-significant radioactive..material was released ‘beyond |
the reactor area.
-*. “Injuries” in this’ analysis refers to clinically observed or
reported injuries. |
; (66)
ee
.
67
LB. Accidents Causing Radiation Overes posure to Op.
— Personnel Without. Observed Injury
. Reactor: General Electric Test Reactor (GETR 3 ;
r aoe California, pressurized water reactor,
- used for materials testing.
Date: March 10, 1960. : ;
Nature of Incident: A technician preparing a
GETR fuel element for transfer from the storage
pool to the Materials Lahetapory inhaled tracer
amounts-of radioiodine, |
Radiation level: 48 rads to the hy roid. (Other
employees received doses to the thyroid of from: 1.8
to 7 rem).
Injuries: iii :
. Evaluation: This was not a reactor accident. Its
connection with the GETR consists only in that the
fuel element from which the iodine was released had
previously been used in the reactor. There were no
perceptible injurious consequences. Such conse-
quences can be caused only by radiation exposure
to the thyroid many times greater than these. -
3. Reactor: Materials Testing Reactor (MTR), Na-
tional Reactor Testing Station, Arco, Idaho, water- -
cooled and -moderated reactor with highly enriched
plate fuel, used for materials irradiation and testing
purposes. |
Date: July 23, 1956. : ey .
Nature of. Incident: Eight men were working on the.
top of the reactor near the reactor tank opening
(which was uncovered), the reactor being shut down |
for refueling and maintenance. The water level in
the reactor tank was lowered during the shutdown —
period to facilitate insertion and removal of experi-.
ments in the reactor. The men were exposed when a
“ radioactive reactor component was placed in a posi-
68 1
tion where it Was notGdequately shielded hecause ot
the lowered water level. :
Radiation Level: External doses at top of reactor
were as follows: 21 r, 6.2 r, 3.9 r, G1 or, 10.6 r, 2.9 r,
2.6 r, and 2.5 r.
Injuries: The men sere placed tile T - routine med-
ical observation, but no illness or other radiation-
induced effects, were observed. on
Evaluation> This incident was caused by inadequate
radiation monitoring and questionable Juaimtenance
procedures. , No radioactive material was_ released
from the reactor, and the reactor was not affected by.
the incident. No effect on persons other than those
whose action was responsible for the unsafe-radiation
condition were affected or. could have been affected.
Full-time radiation monitoring service has since been °
provided at the reactor tank opening to prevent any
such future exposures. |
4. Reactor: Chigago Pile, Argotinie National Labo-.
ratory, Illinois.
Date: June 1952.
Nature of Incident: Manual withdrawal of a con-
trol rod from a reactor caused an accidental super-
criticality. When the: eontrol rod . -was released, the
reactor was shut down. : : ‘
Radiation Levels: Personnel exposures. for the four
persons standing ‘on or near the reactor were 190 remy -
160 rem, 70 rem, and 12 rem.
Injuries: The four persons exposed were hospital! :
ized for observation and no injuries or symptoms of
radiation illness were noted. ;
Evaluation: This reactor is an experimental facility
at a National Laboratory, and has a considerable de-
sf
; 69
cree of flexibility. The above accident was‘caused by
the operators’ fathrre to drain the -reactor of water.
before the control red was withdrawn. Criticality in
the drained reactor would have been impossible.’ Tn-
clided in the protective measures taken after the
accident was the absolute prevention of access to the
room when the reactor was not drained of water.
C. Other Accidents and Operating Difficulties
5. Reactor: Dresden Nuclear Power Station: (Com-
monwealth Edison Co.), Dresden, Tllinvis, boiling. wa-
ter reactor, used for powex production as central sta-
tion, : ; :
Date: November 15, 1960. *
Nature of Incident: One ef. the 80 control .rods
failed to. follow its drive mechanism upon a rod with-
drawal, rod was then driven into core and locked in
place. Subsequent’ examination, after shutdown of
reactor, revealed that index tube in drive had frac-
tured, and disclosed surface cracks in some drive:
components made of 17-PH steel.
. : Radiation level: None.
‘Injuries: None. .
Evaluation: ‘The situation resulted from stress _
corrosion of the steel used in the shaft of the drive
mechanism. No accident occurred and no hazard ex-
isted.” All otber. drive mechanisms perfermed ‘satis-
factorily and appropriate precautions were taken with
the*failed drive. The,drive. mechanisms have been
-- modified, by use of different materials, different heat
. treatment and fabrication controls, to reduce suscep-
. Z : ’
ae 1
70
tibility to stress ¢errosion and eliminate further op-
erational difficulties. ;
6. Reactor: Westinghouse Test Reactor (WTR),
Waltz Mill, Pennsylvania, pressurized water reactor,
used for high-flux materials irradiation,
Date: April 3, 1960,
Nature of Incident: Fuel element had a small (about
one-half square incli) area in which bond between
- fuel and clad was defective. A hot spot developed,
the fuel swelled and led to coolant flow restriction
and subsequent fuel element failure. |
Radiation level: 46 r per hr. in the reactor head
tank. No one was exposed to this, however, —
Injuries: None. No exposures: to employees or
others.above permissible limits.
Evaluation: Although this incident was: a serious
nuisance and produced large quantities of low-level
waste, no hazard was involved. The reactor system
was, designed in anticipation of possible fuel element
failure (the normal practice in high-power reactor
design) and no significant activity escaped the facility.
- Remedial actions inchide more ‘careful inspection of
the fuel elements before their insertion into the reac-
tor and. the installation of addittonal waste holdup
tankage and a larger waste’ evaporator to facilitate
cleanup after any future incidents of this type.
7. Reactor: Homogeneous ‘Reactor Experiment No.
2 (HRE-2), Oak Ridge National Laboratory, Oak
Ridge, “Tennessee ; aqueous homogeneous reactor used
for experimental and developmental purposes.
Date: February 1960:
Nature of Incident: Corrosion of the barrier be-
tween the core and*blanket regions caused an addi- |
tional hole. in this barrier. A similar hole which
oceurred about .two years previously had not been
repaired, and since that time, the reactor had been
oe ere
71.
operating: with fuel solution in both: the core and
the blanket regions: Thus no substantial change in the
condition of the reactor was preduced by this new
leak. | .
Radiation Level: Now.
Injuries: None..
Evaluation: This was not an ace ident. ‘One of the
principal purposes of the facility is the testing of
compatibility of materials, and leaks such as this are
vot considered ineidents or even unexpected events,
hut rather constitute experimental results. No radio-
active material was released when this second hole
was produced, ;
8. Reactor: Sodium Reactor Experiment (SRF),
Santa Susana, California, sodium-cooled, graphite-
moderated reactor used: for experimental _ and devel-
opmental purposes. |
Date: July 24, 1959.
Nature of I neident: Decomposition products of or-
ganie impurities in the coolant caused . overheating
and melting of fuel. The core was. extensively dam-
aged but no .significant amount of radioactive ma-
terial was released. .
Radiation Level: None.
Injuries: None.
Evaluation: One of the primary purposes of this
facility is the investigation of the compatibility of ma-
terials for- use in such a facility, and an incident such
as this is not totally unanticipated. There are ap-
propriate safety procedures and no hazard resulted.
9. Reactor: Situation referred to under “ANP” ac-
tually occurred in Heat Transfer Reactor Experiment
No.. 3 (HTRE-3) at National Reactor Testing Sta-
tion, Arco, Idaho, gas-cooled, solid-moderated reactor,
used for experimental purposes for aircraft propul-:
ston ene
> the blanket region in.addition to the core.’ No -fuel
©
‘leased from the reactor. ; is
. bunker.
‘of a nuclear propulsion plant, releases of radioactive
to others existed as a consequence.of this release.
Pig |
- Date: November 18, 1958.
Nature of Incident: Radioactive material was re-
Radiatign Level: O8-per cent 6f, the site Was con-
taminated.. No persons were exposed™ahd no evacu-
ntion of personnel was necessary, sinée._ facility _
operations are carried out remotely froma shtelded
Injuries: None. .
valuation: This reactor is an experimental facility
designed and located so that in experimental testing
hd
material to the atmosphere may be permitted to occur ,
safely. Thus, no hazard to operating personnel or.
10. Reactér: Homogeneous Reactor Experiment No.
‘2 (HR#-2), Oak Ridge National Laboratory, Oak
Ridge, Tennessee, aqueous homogeneous reactor, used
for experimental and developmental purposes. —-
Date: April 4;1958. es
Nature@pf Incident: Corrosion of the barrier be-
tween core and blanket regions ef the reaetor pro-
duced a hole in this barrier. Liquid fuel thus filled
é
or radioactive material escaped from the reactor,
and operation was continued with fuel in both regions.
Radiation Levei: None. , » *
Injuries: None. | is
‘Evaladtion: This was not an accident. One of the
principal putposes of this fa¢ilitY’ is the testing of
inaterials compatibility and jeaks such as this are not
unexpected, and constitute useful experimental re-
sulfs. (See Itera 7.) |
11.. Reactor: Godiva, Los Alamos Scientific Lahovi-
“tory, New Mexico; bare, fast. critical assembly, used
ror hasie fast reactor studies.
* 7
Date: February 12, 1957. a .
, Nature. of Incident: A yemotely operated fission-
able material assembly produced.a neutron exeursion
greater than’ intended, resulting in damage to -the
“_usse mbly. *'Total energy of the excursion was 1.2 x
10" fissions or about one kilowatt heur,
Radiatiow Level: None, at the point of neatest ap-
proach to the facility (about one-quarter of a mile
from the assembly). ;
Injuries: None.
Evaluation: This facility is an experiment. re
for the purpose of intentionally prodiicing neutron
bursts and is constructed and operated in a manner .
much different than a normal reactar plant. It is
unshielded, Because of the experimental nature of
~ the f facility, all persons are éxcluded from its vieinit
and it is. remotely controlled from a safe Males,
one-quarter mile away. Although the particular neu-
ron burst cited here was larger than was intended,
and was severe enough to violently disassemble the |
system. and shut down the assembly, no hazard to any
re rsons existed. . .
‘12. Reactor: Kinetic Experiment on Ww ater Boilers
(KEWB). Santa Susana, California; aqueous homo-
geneous reactor (water boiler), used for burst experi+_
ments in aqueous homogeneous reactors. . |
. Date: January 4, 1957. .
Nature of I neident: A small quantity of volatile ra-
-dioactive material was released into the reactor room
by leakage from around a valve stem when the valve
Was operated. This resulted from failure of a vaewum
pump which normally maintained a negativ’ pressure
on the gas sampling line in which the valve was lo-
‘ated. ~The building was evacuated until activity
levels returned to normal background ‘(less than one
dey) .
74
Radiation Level: Above normally-accepted levels
for continuous indefinite breathing. Building was
vacated in about 10 seconds, and no dose of any sig-
nificance was received by personnel., (No. detectable
external dose, internal dose Tess than 50 mr, no activ-
ity detectable by urinalysis.)
Injurics: Nore.
Evaluation: The equipment that failed Was a part
of the auxiliary plumbyig system and not an integral
part of the reactor system., Required cleanup effort
was comparable to that which might be required rou-
tinely in a radioisotope laboratory.’ As already noted,
monitoring « procedures adequately detected the con-
tamination and evacuation was completed without
difficulty, so that there was no hazard to personnel] or,
others,
13. Reactor: Howmogeucous Reactor Experiment No.
(HRE-2), ‘Oak Ridge National “Laboratory, Oak .
Ridge, Tennessee; aqeous homogeneous reactor, used %
for development and experimental Parposes.
Date: November 1956. © 7
Nature of Incident: Microscopic cracking ¢: aused by
stress corrosion was discovered in the helium leak de-
tector systém and in some of the flanges to which the
system’s tubing is connected. The condition’ was dis--
covered during preliminary non-nuc ‘le ar checkout tests
of the plant.
Radiation Level: None.
Injuries: None. — | |
Evaluation: This was nut a reactor incident. No
nuclear materials were involved in, the plant, which
had not yet been fueled for operation. Corrosion was
caused by chloride ion contamination of the stainless
steel leak-detection tubing, as a result of inadequate.
cleaning and inspection of this auxiliary system tub-
ing. (Extreme eare had-‘been taken to ‘exclude all
.
s
75
chlorides from the components of the reactor system:
itself, but less care was apparently exercised with re-
spect to the auxiliary tubing.) This defect was dis-
covered during noui-nuclear checkout of the system
‘‘pnlumbing.’’ The purpose of such checkout is to dis-
close any such system defects before nuclear fuel is
‘jnstalled in thé plant. The discovery: of the stress
corrosion condition caused a delay of many monfhis in
the startif of the HRE-2, but no safety problems
were involved.
14. Reactor: Seawolf Submarine (S2G), interme-
diate, sodium-cooled reactor, used for naval propul-
sion, experimental. fe” fe
Date: September 6, 1956. pes :
Nature of Incident: Several leaks were detected in
superheater and steam generator tubes over a period
of time. These tubes are of double-walled construe-
tion with a barrier of- non-radivactive NaK in the
annulus between the walls, and proved very difficult to
maintain 100% leaktight.
Radiation Level: None.
Injuriés: None. oe
Evaluation: Materials problems such as this are not
uncommon in experimental and development systems.
Leaks had developed in the land-based prototype for
the reactor (S1G), and their occurrence in the actual
ship reactor was not totally unexpected. In order to
stop the leaks, ‘it was necessary to’ block off the af-
fected tubes, resulting in a decrease in the maximum
power and speed attainable by the ship. Since the
leaks were internal and steam contamination was pro-
tected against by means of the intermediate NaK_bar-
rier, no que ion of radiation or radioactive material
was ipvoived. The ineident was a signifieanf.opera-
tional nuisance and development probicm, but no
safety problem Was presented.
76
15. Reactor: Experimental Breeder Vidasee No, 1
(KBR-1), National Reactor Testin:; Station, ‘Arco
Idaho, fast breeder, sodium cooled reactor, used for
experimental fast reactor studies.
Date: November 29, 1955. , |
Nature of Incident: While the reactor was under-
going a series of scheduled experiments, rapid power
surges were intentionally introduced and fuel temper-
“atures. were intentionally forced above their nortial
limits. Automatie protective instrumentation and
shutdown devices were disconnected in ofder to per-
mit the power surge tests. without auteomatie shut-
‘down. During the last test of the series, the reactor
overheated rapidly and extensive fuel melting ov-
curred before the operator eguid initiate manual shut-
down. —
Radiation Level: None.
Injuries: None. .
Evaliation: The EBR-1 is. an experime ntal re-
actov located in a remote site in .erder that Gt can he
opel rated under ‘extreme conditions and in’ an ab-
normal manner without producing -a safety hazard.
When the meltdown occurred, the tests being per-
forméd, involved the introduction of deliberate and
severe abnormali‘ies, with normal automatic protec-
tive equipment disconnected, and the possibility of
damage to the ‘reactor under such conditions was
clearly realized. The damage which did occur’ wes
thus more an experimental result than a reactor in-
¢ident, and resulted in no adverse consequences from
the safety standpoint.
16. Reactor: One of the Sentood Protiation Reac-
tors, Hanford, Washington, graphite moderated.
water covled reactor, used for plutonium production.
Date: November 1, 1955.
ay *
Rip o
Naturé of Inctdent: A ruptured fuel slug was forei-
Ply loosed and then flushed from its tube by a high
, pressure water ‘stream. A flash of flame occurred as
the slug came out of the tube-at the rear of the re-'
actor. The back of the reactor required decontamina-
tion. Seme of the surrounding area on the site was
slightly contaminated.
Radiahoun Level: Unknewn (ow in occupied
locations). : : een he!
Injuries: None, :
Evaluation: The. inecide nt necessitated a dete mi-
nation. effort, but thére Was no actual or potential ef- |
fect on operation of the reactor, and no potential
propagation of the fuel slug failure. to other tubes of
the reactor. Fuel slug failures are provided for in the
design of the reactor and plant equipment. Monitor-
ing instrumentation is in continuous use for the
detection of plugging or reduction of coolant flow in
the reactor tubes, and equipment is available for
removal of failed fiiel slugs from the tubes without
> = :
hazard to plant personnel or others. The plant is so
located that the release of fission produc ts associated -
with. fuel failures such as this do not constitute an
sare contamination problem or ‘hazard. .
. Reactor: Raleigh Research Reactor (North
pre State College), Raleigh, N.C., aqueous ho-
mogeneous ‘(water boiler) reactor, used for Univer-
sity researeh and training.” « 2
Pate: May 1955. @ ; .
Nature of Fnewdent: The stainless steel vore of the
renetor developed a leak, allowing fuel solution to
ieak into the surrounding chamber and into the cool-
ing. water, .
Radiation eo None.
Injuries: None.
592233- 61-6 ; :
es by : © : ;
Evaluation: ‘This failure is typical of the materials -
problems that have been associated with this and-other
solution-type" reactors. Reactors «wf this type are
designed so that a core tank leak will not permit fuel
solution containing radioactive material to escape.
from the reactor system, _thus protecting ‘against
hazard if Jeaks such as this do oceur,
18. Reacter: Mate? rials Testing Reactor (MTR),
National Reactor Testing Station; Are, Idaho; water
moderated and cooled reactor with highly enriched
plate fuél, used for materials. irradiation and testing
purposes. |
Date: June 1954.
Nature of Incident: Bulging of some fuel plates was
discovered. This caused contact between plates and
overheating in a few localized spots, Some fission
products were released te the coolant. ;
‘Radiation Levels: Up to 3 rvhr on contact at some
‘points in the cooling system. .
Tn juries: None. = — Ry ee j
Evaluation: The inereased ‘radiation levels of the .
cooling system caused some short-term operating prob-
lems, because the allowable working time for mainte-
nance of the cooling system was redueéd. During
normal oper: ation, the system is well shielded and no
_ problem was produced by the incident. Onee the
source of activity had been removed, maintenance tire -
limitations were able te be relaxed. Fuel elements
- were modified to prevent a recurrence of this incident.
_No. hazard to operating personnel or others existed as
a result of this incident. .
19. Reactor: Godiva, Los Alamos Seientifie Labora
tory, New Mexico, bare, fast, critical assembly, nee
for hasie fast reactor studies: :
Date: February 3, 1954. :
Nature of TIneident: The reactor was made exces-
79
sively supereritieal during a study of the properties
of supercritical bursts. This: study imvolved above-
normal burst magnitudes. An error in preparation
for the experiment caused this particular burst to be
vreater than expected, by abou! a factor of three. Phe
total eriergy generated in the bufst was approximately
one-half ef one kilowatt-hour (6 x 10% fissiows ).
° ‘Radiation Levels: None, at the point of nearest ap-
proach to the fae ility.
Injuries: None.- | .
—Evatvation: “Ag indicated. in item 11,. this experi-
mental facility is operated remotely to assure safety
of personnel under normal conditions and also under
the abnormal conditions of an aceident. The only.
adverse effect of the experiment was damage to the
assembly, to the extent of #600, and time lost in re-
pair of the ASSE “nbly before the next burst.
20. Reactor: Clementine, Los Adamos Scientifie Lab-
oratory, New Mexico, plutonium-fuckea, fast, rier
cury-cooled reactor, used for basic fast reactor studies.
_ Date: Prior to dismantling of reactor in December
1957.
. Nature of Incidtnt: One of the fuel elements firiled,
rtleasing: plutonium into the mereury coolant: Since
the résearch and development studies lipon the reactor.
had Been completed, it was shut down and late Y
dismantled. |
Radiation Levels: None known. This f@lure is not
of a type whieh would be expected to release a signifi-
cant amount of radivactive niaterial. :
Inj jurtes: None. ,
Evaluation: This was not a reac tor aceigent. The
facility was of a very early fast reactor design and
was constructed for developmental purposes. Materi-
als failures of this type cited here.are not unexpected
or unprepared for in-such facilities, Since the re-
80
actor’s planned objectives had been fulfilled at the
time of the failure, it was decided not to clean up the .
coolant and resume peraien, but to dismantle the
reactor. ;
“91. Reactor: One of fhe reactors at cLos Alitnnios: Ser
-entifie Laboratory, New Mexico.
Date: December 1949. ;
‘Nature of Incident: Supereriticality oce urred in the
ene tor, caused by manual testing of control ‘rod
in a a ; * :
Radiation Levd: One employee was exposed to 2.5r
(not abeve permissible level in effeet at that time).
Injurtes: None. |
Evaluation: The meident oecurréd in an. experi-
mental facility at a remote site. It was caused by
inannal eontrel red testing. Such testing is charac-
teristi¢ only of the early stave éf reactor development
at the time of the incident { L449) and is not practiced
today.
29 Reactor: X- 10 Reactor, Oak Ridge National
Laboratory, Onk Ridge, Tennessee, graphite -moder-
ated, air cooled reactor used for research and isotope
production. . |
Date: 1947-1948,
Nature of Incident: Fuel elements of the type in use
during this period éxperierncea failures at a low rate.
Qn two occastons, one in 1947 and one in 1948, such
failure went undetected antil the fuel element jacket
had swelled enough to restrict cooling air flow in one
echannel2 This eaused overheating and failure of other
elements in the channel. In each instance, the channe!
was damaged in removal of the elements and_ its’
further use was abandoned. There are 1248. channels
in the reactor of which 821 are fueled.
Radsation Levels: None.
fujuriess None,
a
?
81
— Evaluation: From the standpoint of hazard, this was
hot a reactor accident. The reactor operates at a low
power level and contains many. thousands of fuel ele-_
ments, so that the quantity of. fission produets ‘con-
tained in each element is very small. Furthermore,
the restriction of air flow caused in an ineident sueh as
this serves to block the normal’ path of release of any —
radioaetive material which might escape from a failed:
fuel element. While the incident affected operating
efficiency, there Was no danger t any employee or
member of the public.
HI. REACTORS IN ®OREIGN COUNTRIES*
‘A. Accidents Causing Death or Observed Injury to
Ope rating Personnel
93. Reactor: Critica assembly at the Boris-Kidrich |
Institute, Yugoslavia; natural uranium, heavy water
moderated, . critical assembly, used for Peasearch
piirposes. .
Date: October 18, 1958.
Nature of Ineiden’. Accidental criticality caused
by uneontrolled pumping of heavy water into theoun-
~ shieided tank of the critical assembly.
Radia: om Leve?: The average exposure to personne!
located at distances varying frojn 10 ft. to 25 ft. from
the reactor is reported to haveSeen 49 rems of thermal
neutrons, 223 rems of epithermal neutrons, 116 rems
of fast neutrons, and 295 rems.of gamma -radiation.
Injuries: One person died a@s a result of over-
exposure. Five persons received severe overdoses of
radiation but have been reported Yecovering after
receiving medical treatment.
Fv aluation: The facility was a zero-power critical
assembly, used for research. It was unshielded and
oe
*The analysis of foreign - incidents listed lL respondents is
based solely upon published reports and statements.
2
82
the procedure for starting up was to pump the moder-
ator, heavy water, into the reactor tank. This°is a
major operation and should have been properly: scked-
uled and properly controlled. The severe accident
reported came about because (1) there was a, failure
to control and schedule the pumping, which should not
have been undertaken with persons near the unshielded
assembly; (2) the monitoring, seram and other safety
systems had been turned off. ° .
B. Accidents C ausing Radiation Overesrposure to Op-
erating Personnel Without Observed Injury :
24. Reactor: NRU, Chalk River, Canada, natrral
urantum reactor heavy water moderated-and cooled,
used for plutonium production, research and mate-
rials testing.
Date: May 23, 1958.
Nature of Incident: The incident which triggered
the chain of events leading to mere serious difficulties
was in itseif minor. The reactor went threugh an au-
tumatie shutdown initiated by an excessive rise-of-
power. This rise-of-power may have been caused by
a phenomenon known as water logging of failed fuel
elements. It was decided to remove three damaged fuel
elements.. During this phase of operations, one of the
three damaged’ fuel elements jammed after .being-
raised part way into the carrier flask and was with-
out cooling for 10 minutes. The resulting. overheat-
ing Amd oxidation caused a3 ft. long piece to fall out
of the earrier flask when it, was being moved ov er to-.
wards the storaze area, and to burn/in the open air of
the reactor room. before being extinguished with wet
sand. ee S: :
Radiation Level: Reported radiation in the reactor
room after the first incident was 100-1000 mr/hr.
However, after the second incident, the radiation
fields were probably m excess of 1000 r/hr.
83
Injuries: Eighteen employees: were exposed to radi-
ation as a result of this incident. Of these exposed,
during the ineidert, none reéeived exposure higher
than’5.3 roentgens. During the eamup and removal
of debris, the highest*e ‘xpostre received was about 6
roentgens. . None of these 18 individuals showed any
evidence of: injury.
Evaluation: ‘The initial incide nt was a minor one,
‘Contamination of ‘the reactor room and expostre .of
personnel resulted from the attempt to move the high-
ly radioactive damaged fuel element without assuring
that the.transfer operations could be performed prop- -
erly. : 4 ;
© 25. Reactor; Wandscale Windseale, Engi and,
natural uranium, graphite — air cooled. re-
actor, used for phuitonitum pixposes.
Date: Octoher 10, 1957.
Nature of Incident: During a spec ‘ial annealing op-
eratton (Wigner release) of the graphite pile, there
was a failure of fuel cladding, which led to exposure
of the uraniunt fuel, oxidation and thén to fire in the.
combustible mass of graphite and uranium metal.
Radioactivity was released out the stack (through a
filter), dispersed to the atmosphere and ‘caused con-
tamination in the vicinity.
Radiation Level: Not given.
Injuries: Fourteen workers had exposures over the
“normal 3.0 r for a 13-week period, the highest expo-
-sure being 4.66 r. “No. injuries reported from such
exposures or from nearby contamination.
Evaluation: This-incident took place during a spe-
‘cial plant operation’ undertaken to release energy
stored in graphite by effects of irradiation. This
phenomenon of a graphite pile, and:the necessity, for
‘such’ operation, was discovered earlier (see item 41).
« It was reported that this incident occurred bee: wise
tne operator failed to take sufficient time to perform
‘the Wigner release and there were inadequacies in the
operator’s training and the written procedures. This
reactor is cooled by blowing air through the pile econ-
sisting of fuel elements and graphite slabs and ex-
‘ hausting the air out of the.stack. Hence, this reactor
type does not exhibit the gas-tight plant containment
_ usually -associated with power reactor installations.
‘As a result, the radioactive material: was released to.
the atmosphere. ‘he incident necessitated extensive
repair and deeontamination. However, there were no —
excessive exposures to radiation and no injury ¢on-
* sequences detected or reported.
C. Other Accidents and Operating Difficulties
26. Reactor: G-2, Marcoule, France, natural’ ura-
nium reactor, graphite moderated, CO: cooled, used
for plutonium production.
Date: July 6,1960.
. Nature of Incident: There was a ‘mechanical rupture
of a joint between the loading mechanism and a fuel
canal, As a result, a small quantity.of CO: gas under
operating pressure of 220 psi escaped into the reactor
hall.
Radiation Level: Not reported. It was stated by a
spokesman for Le Commissariat 4 1’Energie Atomique
that the escaping gases were only slightly radioactive.
Injuries: None reported. |
Evaluation: Mechanical failure of a component led .
-to escape of small amount of radioactivity int tic
reactor hall, which was immédiately detected by the
monitoring instruméntation. The reactor was shut
down, pressure reduced to stop the leak. and appro-
priate maintenance work undertaken. No hazard to
health and safety of operating personnel was pre-
sented. |
84
85
27. Reactor: Research Reactor, Berlin, Germany,
aqueous homogeneous reactor, light water moderated
and couled, used for research purposes.
_ Date: Mare 1960. —
Nature of Incident: A welded metal ‘piece came
loose inside the catalyst chamber and impeded the flow
of gas, ; :
Radialion Level: None. There Was no escape of ra-
‘dioactivity outside the reactor.
Injuries: None reported.
Evaluation: Water decomposes under radiation to
hydrogen and oxygen, and this reactor was equipped
with a loop through which these non-radioactive gases
were drawn, introduced into a catalyst chamber and -
-returned to the reactor vessel as water. The failure
of a component of. that chamber did not present any
safety problem. :
28. Ievactor: J Japanese Research Reactor #1, Tokai
Mura, aqueous liémogeneous reactor, light water mod-
erated and cooled, used for research pares
Date: December 8, 1959.
Nature of I ncident: Officials at the reactor plant
‘stated that a minor incident occurred which resulted
in radioactive contamination of the reactor section,
and that the radioactivity was completely contained
in the reactur section. Insufficient- information is
available to us to give further details or permit of any
evaluation. |
29. Reactor: AGN-211, Basel, Switzerland, solid
-homogeneous reactor, polyethylene’ moderated, —
water cooled, used for research purposes.
Date: November 10, 1959.
Nature “of Incident: ‘Failure of the polyethylene -
vs
matrix around the fuel.
Radiation Level: Radioactivity level of the reactor
Water inereased to a maximum of 3 x 10° microcuries
i)
-
per em’ after 114 hrs. of operation at 100 watts. No
increase in radiation in areas accéssible to indivicuals.
_ Injuries: No, overexposure or injuries reported.
_ Evaluation: In this small research reactor, the fuel’
is dispersed as grains ina polyethylene matrix im-:
_mersed. the reactor water. Due to a failure of the
bonding between some of the fuel grains and the:
matrix, small quantities of gas escaped into the re-
actor water. The leak stopped upon reduction .of
power to 950 watts. This difficulty had no adverse
consequences for the health and safety of personnel. |
30. Reactor: EL-2, Saclay, France, natural
uranium, heavy water moderated, CO: cooled reactor,
used for research and isotope: production.
Date: Fehruary 16, 1959. |
Nature of Incident: Overheating of fuel element
r9 resulted’ in rupture of cladding and the escape of
‘adioactivity into the CO: stream.
Radiation Level: It is reported that there’ was no
trace of radioactive contamination outside the reactor
into the reactor room proper.
Injuries: No overexposure or injuries reported.
Byaluation: A breach in the ititegrity Of the cladding
in a fuel element caused escape of fission products
_into the coolant, a minor operating difficulty. The
moniforing system is equipped to detéct such escape.
In each of such reported incidents at Saclay, the diffi-
culty-was immediately detected. Thereafter, the reac-
tor was shut down and appropriate maintenance work
done to locate and replace any defective fuel element,
and clean up the coolant gas where necessary. In
some eases. the repair work was apparently time- —
consuming. and expensive: However, there was no
threat to the health and safety of the Fs ian
personnel at fhy time. ;
*
?.. Reactor: EL-2, Saclay, France, nawrrar’
uranium, heavy water moderated, CO: eooled reactor,
used for research and isotope production.
Date: December 27, 1958.
_' Nature of Incident: Failure of the c itil of a fuel
element resulting in escape of radioactivity into the
‘CO: stream.
Radiation Level: Certain components in the closed’ -
CO: system indicated 4 times the maximum permissible
— devel. $
Injuries: No overexposure or injuries oe
_ Evaluation: Same as in item 30.
32. Reactor: Calder’ Hail, Calder Hall, ‘Suskind
natural uranjum reactor, graphite moderated, CO:
cooled, used for power production.
Date: June 28, 1958.
Nature of Incident: ‘There was a mec ‘hanical failure
of .a steam turbine. :
Radiation Level: None.
— Injuries: None. | Bo
Evaluation: The failure of the steam turbine led‘to
a shutdown of the reactor, since the latter was pro-.
ducing steam for the turbine. The incident, how-
ever, was a mechanical failure in the turbine which
had nothing to do with the nuclear installations of
‘tthe plant. ;
33.. Reactor: F1:-8, Saclay, France » slightly enric hed
urgnium reactor, heavy water cooled and, moderated,
- used for iniaeel and materials festing. |
Date: April 13, 1958.
Nature of Incident: Aluminum channel in which.a
fuel-element was situated broke-and fefl as result of
_. vibration and lack of support. This intérrupted the —
forced circulation eooling of the fuel element, and led ©
to overheating and rupture of the fuel element.
i
88
‘Radiation Level: Nw contamination of the reactor
room, established by analysis of the air as well as
check of the personnel. Any radioactivity which es-
‘aped from the fuel slug was confined to the primary
coolant and the closed helium. gas systems.’
Injuries: No overexposure or injuries reported.
Kraluation: The release of radioactivity into the:
coolant by this mechanical. failure of a component
was promptly detected. The situation is similar to
‘that evaluated in item 30.
34. Reactor: SAPHIR, Wiire nlingen, Switzer Wand.
pool type reactor, 20% enric ‘hed uranium, light Water
eooled and moderated, used for research Purposes.
Nature of Incident~ No incident of any kind is re-
ported at the referenee given in respondents’ brief.
. Reactor: EL-2, Saclay, Fronee, natural: ura-
nium, heavy water moderated, CO: cooled reactor,
use? for research and isotope production. -
Date: November 26, 1957.
Nature of Incident: Overheating of an aliminum
clad uranium slug because of insufficient. cooling water
flow, hele in’ él: idding released radioactivity into cocl-
ing water.
Radiation, Level: No inerease ofthe radiation level: .
in the reactor hall reported.©
Injuries: No overexposure or injuries reported.
= aluatidn: Same as item 30,
Reactor: G-1, Mareoule, France, nataral uran-
a graphite iqderated, air-cooled reactor, used for
_ power produetion demonstration and plutoniun pro,
duction. ;
Date: October 26, 1956. ; ucts
Nature of Incident: The failure of the canning ex-
posed an uranium slug with subsequent oxidation and
dispersion of. fission products inte the reacter’s cool-
ing air. P
ay
Radiation Level: Wt was reported that the maxi-
mum coneentration of radioactive material in the air.
was 5 x 10°* microctries‘em’ for a few minutes at
the base of the stack. It is nefed, however that the-
ieasurements of the activity in the air by th stations
ontside theesite always remained well under the max-
imggm permissible lint. |
Injuries: It was reported that personnel were not
exposed to radiation above permissible limits and-no
INjUTIOUS CoNseqiences were noted.
Evalaation: The faihire of fuel eanninge released a
small qnantity of radioactive fission products into the
coolant. This was promptly detected by monitoring |
Wistrumentation. The reactor was shut down and ap-
prapriate action taken. The report stated that a mi-
ner aceident of this order is not rungenene either for
the personnel or for the reactor,
37. Reactor: -J EE P, Kieller, Norway, natural
‘uranium, heavy water modersted and cooled reactor,
‘used for research piirposss.
Date: February, 1954.
_ Nature of: Incident: The incident occurred in a
‘channel of the reactor used for irradiation purpe-es.
The aluminum canning im an irradiation channel
failed, expesing an uranium slug, with subsequent
oxidation. .
* Radiation Level: Not given, but. required evacua-
ion of reactor hall. .The-report stated that radio-
active dust spread into the «reactor hail when the
’ irradiation channel was opened, personnel were evacu-
ated and had to don protective ciothing and masks
hefore reentering the building.
Injuries: No overexposure or injuries reported. -
Fvaluation: «This incident did not involve the
reaetor fuel elements or any defect in the operation
of the reactor itself. The. failure occurred in a can
C
‘ as
90
placed in the reactor to be irradiated for experimenta!
purposes. It was apparently due to careless ex-
perimental’ procedures, and necessitated approprrate
mamMtenance and decontamination.
38. Reactor: Windscale #1, Windscale, England,
natural uranium, graphite moderated, air cooled reac-
tor, used for plutonium production. |
Nature of Incident: No incident is-reported im the
reference given in respondents’ brief.
39; Reactor: Russian heavy water research: reactor
‘-(HWRR), slightly ‘enriched uranium reactor, heavy
water moderated and cooled, used for research
purposes.
Date: 1958.
Nature of Incident: Failure. of the cladding of an
uranium rod, releasing radivactivity into the rez actly
vessel.
Radiation Level: The presen nee of fissivs products. in
the reactor’s helium blanket was re ported.
Injuries: No overexposure or injuries reported.
Evaluation: As reported, the initial incident was a
failure of fuel cladding, a minor difficulty which was
decected and which led to appropriate routine ‘deas-
ures to replace the fuel element. The subsequent
falling of the element and damage to the reactor tank,
necessitated a difficult repair job. However, such re-
pairs-ean be done safely and no injury or overex-
posure is reported. :
40. Reactor: NRX, Chalk River, Canada, natural
uranium, heavy water moderated, light water cooled
reactor, used for research purposes.
Date: December 13, 1952.
Nature of Tneident: During an experiment, a power
surge. oceurred because’ of mechanical failure of the
safety shutdown system, resulting in melting of part
of the fuel reds.
A : ni
91
Radiation Lével: Not given. Plant personnel were
required to evacuate the site. |
Injuric sr No overe Xposure or other tv pe of Injuries
reported. At times during the repair work it! Decrmne
necessary to allow individuals to take a thirteen-week
dosage (3.9 roenfeen) iv a matter of a day or two and
subsequently bar thet. froii the radioactive area for.
ape riod of 15 weeks. .
Etaluction: This accident tools place during R pe-
riod of experimental work with the reactor and was
probably associated with special, experimental eondi-
tions. It was a serious accident in terms of the exten-
sive repair and decontamination work required in the
reactor building and the reactor vessel. No adverse
health and safety consequences were noted to operat-
= hi “rsonnel and there was no danger to the public.
. Re actor: Windseale #1, Windseale, Eneland,
ni bate urantum, graphite moderated, air cooled reac-
tor, used for plutonium production.
Date: Se ‘pte mber 1952.
Nature of Incident: Unexper éd release of energy
accummilated in the graphite blocks, manifested as an
Jncrease in the temperature of the graphite pile.
Radiation Level: Not reported. ier
Injuries.. No overexposure or injuries reported.
Evaluation: This was an unexpected minor oceur-
rence which’ did not result in any officially reported
_ercotherwi- + known consequences to. the health’ and
safety of the personnel or the publie. It alerted ‘the
plant management to the “Wigner effect,’ the aceu-
mulation ef energy in -granhite subject. to irradiation,
and Jed to the develop.cent of procedures or periodic
deliberate releases of Wi Igner energy. See item 25,
US GOVERNMEN? PRINTING OFFICE. 1961
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.