No. 10-548
In the
Supreme Court of the Gnited States
KAISER EAGLE MOUNTAIN, INC.,
AND MINE RECLAMATION CORPORATION,
Petitioners,
¥.
NATIONAL PARKS &
CONSERVATION ASSOCIATION, et al.,
Respondents.
A.
On Petition for Writ of Certiorari
to the United States Court of Appeals
for the Ninth Circuit
MOTION FOR LEAVE TO FILE BRIEF
AMICUS CURIAE OF PACIFIC LEGAL
FOUNDATION AND BRIEF AMICUS
CURIAE OF PACIFIC LEGAL FOUNDATION
IN SUPPORT OF PETITIONERS KAISER
EAGLE MOUNTAIN, INC., AND MINE
RECLAMATION CORPORATION
vv
M. REED HOPPER
Counsel of Record
BRANDON M. MIDDLETON
Of Counsel
Pacific Legal Foundation
3900 Lennane Drive, Suite 200
Sacramento, California 95834
Telephone: (916) 419-7111
Facsimile: (916) 419-7747
E-mail: mrh@pacificlegal.org
E-mail: bmm@pacificlegal.org
Counsel for Amicus Curiae Pacific Legal Foundation
]
MOTION FOR LEAVE TO FILE
BRIEF AMICUS CURIAE
Pursuant to Supreme Court Rule 37(2), Pacific
Legal Foundation respectfully moves this Court for
leave to file an amicus curiae brief in support of the
Petition for a Writ of Certiorari filed by Kaiser Eagle
Mountain, Inc., and Mine Reclamation Corporation
(Kaiser).
Counsel of record for all parties received the
Foundation’s notice of intent to file a brief amicus
curiae at least ten days prior to the brief’s filing.
Counsel for Petitioners Kaiser, Respondents United
States Department of the Interior, et al., and
Respondent National Parks and Conservation
Association have consented in writing to this filing.
Consent letters have been lodged with the Clerk of this
Court.
Counsel for Respondents Donna Charpied, et ai.,
did not respond to Pacific Legal Foundation’s repeated
requests for consent to file. Pacific Legal Foundation,
therefore, respectfully submits this motion for leave to
file the attached amicus curiae brief.
~
Pacific Legal Foundation respectfully requests
that its motion for leave to file an amicus curiae brief
be granted.
DATED: November, 2010.
Respectfully submitted,
M. REED HOPPER
Counsel of Record
BRANDON M. MIDDLETON
Of Counsel
Pacific Legal Foundation
2900 Lennane Drive,
Suite 200
Sacramento, California 95834
Telephone: (916) 419-7111
Facsimile: (916) 419-7747
E-mail: mrh@pacificlegal.org
E-mail: bmm@pacificlegal.org
Counsel for Amicus Curiae
Pacific Legal Foundation
QUESTION PRESENTED
Does a court err by vacating an agency’s action
and remanding for further administrative proceedings
that will have no effect on the agency’s decision or
serve any other substantive purpose?
ll
TABLE OF CONTENTS
MOTION FOR LEAVE TO
FILE BRIEF AMICUS CURIAE ...............
QUESTIONS PRESENTED ............ atence ee
TABLE OF AUPTHUI Te cc ec ccs i ccans 1V
INTRODUCTION AND
SUMMARY OF ARGUMENT ............. 2
[. THIS COURT SHOULD
GRANT CERTIORARI BECAUSE
THIS CASE INVOLVES A CIRCUIT
CONFLICT OVER AN IMPORTANT
FEDERAL QUESTION ABOUT
THE SCOPE OF NEPA IN
DEFINING PROJECT OBJECTIVES ....... 4
A. Contrary to the Seventh and
Ninth Circuits, the D.C. Circuit
and Tenth Circuit Permit Agencies
to Consider Non-federal Objectives
in a Purpose and Need Statement....... 8
B. Contrary to the D.C. and Tenth
Circuits, the Ninth Circuit Joined
the Seventh Circuit in Erroneously
Removing the Discretion of Federal
Agencies To Consider a Mix of
Federal and Non-federal Goals
in a Purpose and Need Statement ...... 13
lll
TABLE OF CONTENTS—Continued
Page
Il. THE ENDLESS ADMINISTRATIVE
AND JUDICIAL HURDLES CREATED
BY THE NINTH CIRCUIT'S DECISION
ARE IMPORTANT TO FEDERAL
AND NON-FEDERAL PARTIES
THROUGHOUT THE COUNTRY
AND WARRANT REVIEW ...........
CONCLUSION .. es
lV
TABLE OF AUTHORITIES
Page
Cases
Baltimore Gas & Elec. Co. v. Natural Resources
Defense Council, Inc., 462 U.S. 87 (1983) ...... 2
Citizens Against Burlington, Inc. v. Busey,
938 F.26a 190 (D.C. Ci. 1981) ..... 2... 4, 6-18
City of Alexandria v. Slater,
198 F.3d 862 (D.C. Cir. 1999) ......... 12-13, 15
City of Angoon v. Hodel,
803. F.2d 1016 (9th Cir. 1986) ............ 15-16
City of Carmel-By-The-Sea v. United States Dep't
of Transp., 123 F.3d 1142 (9th Cir. 1997) ...... 6
Colo. Envtl. Coal. v. Dombeck,
185 F.3d 1162 (10th Cir. 1999) .... 4, 6, 11-13, 17
Hoosier Environmental Council, Inc. v.
U.S. Army Corps of Engineers,
105 F. Supp. 2d 953 (S.D. Ind. 2000) ......... 16
Louisiana Wildlife Fed’n v. York,
761 F.2d 1044 (Sth Cir. 1985) .............. 6,9
Marsh v. Oregon Natural Resources Council,
490 U.S. 360 (1989) ........0 0. cee eee ee ee. 2
National Parks & Conservation Ass’n v. United
States Dept. of Interior, 606 F.3d 1058
(ie Car. BO)... we ee 2-4, 7, 13-15, 17-21
Robertson v. Methow Valley Citizens Council,
Me he Oe CIO) ik cece eeiaveeveeys a 3%
Roosevelt Campobello Int'l Park Comm'n v. EPA,
Gee £.c8 1061 (ist Cir, TORE) 26 ccc cc ccce ens 8
V
TABLE OF AUTHORITIES—Continued
Page
Simmons v. U.S. Army Corps of Engineers,
120 F.3d 664 (7th Cir. 1997) 4, 7, 16-17
Van Abbema v. Fornell,
807 F.2d 633 (7th Cir. 1986) 4,7, 16-17
Vermont Yankee Nuclear Power Corp. v. Natural
Res. Def. Council, Inc., 435 U.S. 519 (1978)... 5, 8
Federal Statutes
42 U.S.C. § 43832(2)(C)
§ 4332(2)(C) (an)
49 U.S.C. APP. § 2201(a)
49 U.S.C. APP. § 2201(a)(7), (11)
Federal Regulations
40 C.F.R. § 1502.13
§ 1502.14(a)-(C)
§ 1508
Miscellaneous
48 Fed. Reg. 34,263 (July 28, 1983) ..
Czarnezki, Jason J., Comment, Defining the
Project Purpose under NEPA: Promoting
Consideration of Viable EIS Alternatives,
70 U. Chi. L. Rev. 599 (2003)
INTEREST OF AMICUS CURIAE'
Pacific Legal Foundation is a nonprofit, public
interest organization that provides a voice in the courts
for Americans who believe in limited government,
private property rights, and individual freedom.
Thousands of individuals, organizations, and
associations support the Foundation’s’ efforts
nationwide.
In this case, the Ninth Circuit has determined
that a federal agency may not take into account the
objectives of a private applicant when considering
alternatives for a joint federal-private project under
the National Environmental Policy Act (NEPA). This
crabbed reading of the Act raises an important
question about the scope of environmental review
under federal law and adds to a split among the
circuits. Resolution of this conflict would further the
public interest.
Pacific Legal Foundation participated as amicus
curtae in support of Kaiser’s petition for rehearing en
banc below and has participated in many Supreme
' Counsel of record for all parties received the Foundation’s notice
of intent to file a brief amicus curiae at least ten days prior to the
brief’s filing. Counsel for Petitioners Kaiser, Respondents United
States Department of the Interior, et al.,and Respondent National
Parks and Conservation Association have consented in writing to
this filing. Consent letters have been lodged with the Clerk of this
Court.
Counsel for Respondents Donna Charpied, et al., did not
respond to Pacific Legal Foundation’s repeated requests for
consent to file.
No counsel for any party authored this brief in whole or in part,
and no counsel or party made a monetary contribution intended to
fund the preparation of this brief. No person or entity, other than
Amicus, made a monetary contribution to its preparation.
Court cases involving NEPA. See, e.g., Robertson v.
Methow Valley Citizens Council, 490 U.S. 332 (1989);
Marsh v. Oregon Natural Resources Council, 490 U.S.
360 (1989); Balttmore Gas & Elec. Co. v. Natural
Resources Defense Council, Inc., 462 U.S. 87 (1983).
The Foundation’s amicus curiae brief in this case
emphasizes the _ significant conflict over the
requirements of a NEPA purpose and need statement
that exists between the Ninth Circuit’s decision below
and a similar decision from the Seventh Circuit and
contrary decisions from the D.C. Circuit and Tenth
Circuit. This conflict is described in detail in Pacific
Legal Foundation’s amicus curiae brief and provides a
compelling reason for this Court to grant Kaiser’s
Petition for a Writ of Certiorari.
INTRODUCTION AND
SUMMARY OF ARGUMENT
This case is typical of the “result-oriented”
decisions from the Ninth Circuit with which this Court
is all too familiar. See National Parks & Conservation
Ass'n v. United States Dept. of Interior, 606 F.3d 1058,
1079 (9th Cir. 2010) (Trott, J., dissenting) (criticizing
the “result-oriented notion” that the Bureau of Land
Management’s purpose and need statement is
“narrowly drawn” as “utterly wrong”). In National
Parks, the Ninth Circuit invalidated the Bureau of
Land Management’s (Bureau) NEPA analysis of a
vitally important land exchange between the Bureau
and Kaiser. The land exchange is necessary to address
a “ ‘critical’ landfill capacity shortfall in Southern
California” and would lead to the development of “‘one
of the world’s safest landfills and a model for others to
emulate.’ ” Jd. at 1079, 1099 (internal citations
omitted).
The Ninth Circuit’s decision, however, overtur!
decades of work on this project by Kaiser, local
governments, and federal agencies. Under the Ninth
Circuit’s decision, NEPA has effectively become
something much more than a procedural statute—the
court in this case has forced the parties to “hit[] the
reset button ... unnecessarily sending [them] back to
a Sisyphean hill which cannot be climbed in a lifetime.’
Id. at 1078. (Trott, J., dissenting).
Indeed, the “final irony” of the Ninth Circuit’s
decision is that the court has sent this case “back to
the Bureau of Land Management .. . to do something
[it] has already adequately done: consider the value of
the land involved as a commercial landfill.” Jd. at
1075. (Trott, J., dissenting). The Ninth Circuit's
decision warrants review because the court has
unnecessarily remanded the case to the Bureau for
further, but needless, consideration. See Petitioners
Kaiser Eagle Mountain, Inc., and Mine Reclamation
Corporation’s Petition for Writ of Certiorari at 18.
The underlying problems on the merits of the
National Parks decision, however, cannot be ignored.
The Ninth Circuit determined that the Bureau’s NEPA
analysis was. deficient because the agency’s
Environmental Impact Statement acknowledged the
goals of Kaiser in proposing the land exchange to the
Bureau. See National Parks, 606 F.3d at 1070-72
(majority opinion). But nothing in NEPA or its
implementing regulations forecloses an agency from
recognizing non-federal objectives in considering the
purpose and need for the proposed action. See 42
U.S.C. § 4332(2)(C)(jii) (An Environmental Impact
Statement must discuss “alternatives to the proposed
action.”), and 40 C.F.R. § 1502.13 (An Environmental]
impact Statement ‘shall briefly specify the underlying
purpose and need to which the agency is re sponding in
proposing the alternatives including the proposed
action.’)
To the contrary, such a consideration is required
As Judge Trott cogently noted in dissent, “|o]f course
BLM acknowledged Kaiser's purpose — the law requires
BLM to do so! For private, non-federal proposals,
‘la]gencies are precluded from completely ignoring
a private applicant’s objectives.’” National Parks, at
1079 (Trott, J. Dissenting) (brackets and ellipses in
original dissent) (quoting Colo. Enuvtl. Coal. |
Dombeck, 185 F.3d 1162, 1175 (10th Cir. 1999), and
citing Citizens Against Burlington, Inc. v. Busey, 938
F.2d 190 (D.C. Cir. 1991)).
The Ninth Circuit’s decision in National Parks
also conflicts with D.C. Circuit and Tenth Circuit case
law regarding how an agency must write a NEPA
purpose and need statement “in a setting where a
private entity approaches a government entity with a
joint proposal that will benefit both.” National Parks,
606 F.3d at 1078 (Trott, J. dissenting). See Dombeck
185 F.3d at 1175 (Agencies . are precluded from
ignoring a private applicant's objectives.”) (citing
Burlington, 938 F.2d at 196). The Ninth Circuit has
joined the Seventh Circuit in effectively precluding an
agency from taking into account the “‘means by which
a particular applicant can reach his goals’” in pursuing
a project requiring federal approval. See Simmons v
U.S. Army Corps of Engineers, 120 F.3d 664, 669 (7th
Cir. 1997) (quoting Van Abbema v. Fornell, 807 I*.2d
633, 636 (7th Cir. 1986) and contrasting Burlington,
938 F.2d at 198-99)
Given this conflict, the adverse ramifications thi
Ninth Circuit's decision will have in this case, and thi
uncertainty the decision will cause for cooperative
projects between federal and non-federal partie
throughout the country, thi ourt should grant
Kaiser's petition
THIS COURT SHOULD GRANT
CERTIORARI BECAUSE THIS CASE
INVOLVES A CIRCUIT CONFLICT OVER
AN IMPORTANT FEDERAL QUESTION
ABOUT THE SCOPE OF NEPA IN
DEFINING PROJECT OBJECTIVES
NEPA requires agencies to prepare Environmental!
Impact Statements for “major Federal action:
significantly affecting the quality of the human
environment.” 42 U.S.C. § 43832(2)(C) \)
Knvironmental Impact Statement must include a
discussion of “alternatives to the proposed action,” 42
U.S.C. § 4332(2)(C)(iil) Although “the term
‘alternatives’ is not self-defining,” this Court has held
that a “‘detailed statement of alternatives’ cannot be
found wanting simply because the agency failed to
include every alternative device and_ thought
conceivable by the mind of man,” and that “[t]ime and
resources are simply too limited to hold that an impact
statement fails because the agency failed to ferret out
every possible alternative, regardless of how
uncommon or unknown that alternative may have been
at the time the project was approved.” Vermont
Yankee Nuclear Power Corp. v. Natural Res. Def
Council, Inc., 435 U.S. 519, 551 (1978). Moreover. the
courts of appeals uniformly recognize “the harm that
an unbounded understanding of alternatives might
(D.C 7
Clarmel-By-The-S¢ rl Stal Deptof Trans;
LZ0 Sd 1142 L155) (9th Cou 1997) CT he
linvironmental Impact Statement need not consider at
infinite ranve of alternative
fea ple Ori (CcItINne OC. ] it
Ave ies are also obligated to “bmniefly pecily tl
inderlying purpose and need to which the agency 1
responding in proposing the alternative but the
courts disagree as to how 1 agency may ensure a
finite range ol alternatives to an agen iction through
i purpose and need tatement see 4 Cor R
2.13. There is indeed a “contlict of how to constru
the stated project purpose under NEPA” when thi
impetus behind the project is the proposal of a no
federal applicant. See Jason J. Czarnezki, Comment
Defining the Project Purpose under NEPA; Promot
Consideration of Viable EIS Alternative TOU. €
ite 99 619 (2003)
rhe Dt \) 1 i] fmency ma
delimit the universe the action reasonable
ilternatives by “considerjing| an apphcant’'s want
when the agency formulate th won Ow!
propo ed action Burlington VIS 8d ‘ . Lt
he ‘Tenth Circuit likewise holds that nen al
precluded irom completely InOring | privat
apphicant objective (folorado knovtl. Coal
Domobeck, 185 F.3d 1162, 1175 (10th Cir. 1999) (e1tins
( ens Against Burlington, 938 I°.2d at 196). See also
Lousiana Wildlife ked'n York, 761 F.2d 1044, 1048
(5th Cir. 1985) (per curtam) (“|The] contention, that the
iiternative mav not be viewed with the ipplicant
7
objectives in mind, is not substantiated by either case
law or the applicable regulations.”).
However, an agency's consideration of a non-
federal applicant’s objectives in a NEPA purpose and
need statement “is a losing position in the Seventh
Circuit,” which holds that an agency “cannot restrict
its analysis to those ‘alternative means by which a
particular applicant can reach his goals.’” Simmons,
120 F.3d at 669 (quoting Van Abbema, 807 F.2d at 638
and contrasting Burlington, 938 F.2d at 198-99).
According to the Seventh Circuit, consideration of non-
federal objectives is foreclosed in a purpose and need
statement because “the evaluation of ‘alternatives’
mandated by NEPA is to be an evaluation of
alternative means to accomplish the general goal of an
action; it is not an evaluation of the alternative means
by which a particular applicant can reach his goals.”
Van Abbema, 807 F.2d at 638.
The Ninth Circuit in this case joined the Seventh
Circuit by prohibiting purpose and need statements
that “exclude[] alternatives that fail to meet specific
private objectives.” National Parks, 606 F.3d at 1072.
This rule of law is in direct conflict with then-Judge
Thomas’ admonition in Burlington that an agency’s
purpose and need statement is “shaped by the
application at issue” and that “Congress did expect
agencies to consider an applicant’s wants when the
agency formulates the goals of its own proposed
action.” Burlington, 938 F.2d at 199. The conflict over
an agency’s duty to consider the objectives of a non-
federal applicant in a NEPA purpose and need
statement is explained in greater detail below and
warrants review by this Court.
8
A. Contrary to the Seventh and Ninth
Circuits, the D.C. Circuit and Tenth
Circuit Permit Agencies to Consider
Non-federal Objectives in a Purpose
and Need Statement
In Burlington, the D.C. Circuit considered
whether the Federal Aviation Administration’s (FAA)
stated objectives for an airport expansion in Toledo
were reasonable. Burlington, 938 F.2d at 193-99. The
expansion plan involved the FAA, the Toledo-Lucas
County Port Authority (Port Authority), and
Burlington Air Express, Inc., a private company that
intended to relocate to Toledo pending the Port
Authority’s accommodation of its operations. Id. at
192.
As an initial matter, the court concisely
summarized the role agencies play in ensuring that
environmental impact statements do not “wither into
‘frivolous boilerplate’” by discussing a vast array of
“(f]ree-floating ‘alternatives’ to the proposal for federal
action.” Burlington, 938 F.2d at 195 (quoting Vermont
Yankee, 435 U.S. at 551). The court remarked that an
alternative is reasonable and must be discussed “only
if it will bring about the ends of the federal action.”
Burlington, 938 F.2d at 195. Thus, the goals of the
federal action, as set forth in the purpose and need
statement, “delimit the universe of the action’s
reasonable alternatives.” Jd.
The court next confirmed the primary role
agencies have both in discussing the alternatives and
defining the goals which limit the discussion of
alternatives: “We have held before that an agency
bears the responsibility for deciding which alternatives
to consider in an environmental impact statement... .
9
It follows that an agency thus bears the responsibility
for defining at the outset the objectives of an action.”
Id. at 195-96 (citations omitted). The court further
explained that an agency’s definition of objectives is to
be upheld “so long as the objectives that the agency
‘hooses are reasonable,” just as courts uphold an
agency’s discussion of alternatives “so long as the
alternatives are reasonable and the agency discusses
them in reasonable detail.” Jd. at 196.
Under this deferential standard, “an agency may
not define the objectives of its action in terms so
unreasonably narrow that only one alternative from
among the environmentally benign ones in the agency’s
power would accomplish the goals of the agency’s
action, and the EIS would become a foreordained
formality.” Jd. (citation omitted). But “[nJor may an
agency frame its goals in terms so unreasonably broad
that an infinite number of alternatives would
accomplish those goals and the project would collapse
under the weight of the possibilities.” Jd.
An agency ensures that its stated goal ina NEPA
action is neither unreasonably narrow _ nor
unreasonably broad by “look[ing] hard at the factors
relevant to the definition of purpose.” Jd. In other
words, “[w]hen an agency is asked to sanction a specific
plan, the agency should take into account the needs
and goals of the parties involved in the application,” as
well as the views of Congress as expressed in statutory
mandates. Jd. (citing 40 CF.R. § 1508.18(b)(4);
Louisiana Wildlife Fed’n v. York, 761 F.2d at 1048; and
Roosevelt Campobello Int'l Park Comm'n v. EPA, 684
F.2d 1041, 1046-47 (1st Cir. 1982)).
With these principles in mind, the D.C. Circuit
upheld the FAA’s purpose and need statement and
LO
explained why it was appropriate to consider the
interests of the Port Authority and Burlington Air
Express, not simply those of the FAA. The court
emphasized the agency’s narrow statutory mandate,
which is to “nurture aspiring cargo hubs,” not to
“determine the siting of the nation’s airports.”
Burlington, 938 F.2d at 197 (citing 49 U.S.C. APP.
§ 2201(a)(7), (11)) (other citations omitted). Congress
wanted the FAA to “facilitate the development of and
enhancement of such airports,” but left the precise
manner of accomplishing this mandate to the
discretion of the agency. See id. at 197 n.5 (quoting 49
U.S.C. APP. § 2201(a)). Thus, the FAA was entitled to
look beyond its administrative capacity in defining the
goals of the agency’s action. The agency validly “took
into account the Port Authority’s reasons for wanting
a cargo hub in Toledo,” including the Authority’s
expectations that the cargo hub would create hundreds
of full and part-time jobs and that “the expanded
airport, and Buriington’s presence there, [would]
attract other companies to Toledo.” Burlington, at 197-
98.
Under its deferential approach to agency action
under NEPA, the court upheld FAA’s purpose and need
statement: “Having thought hard about” the federal
and non-federal factors put before the agency, “the
FAA defined the goal for its action as helping to launch
a new cargo hub in Toledo and thereby helping to fuel
the Toledo economy,” and “evaluated the
environmental impacts of the only proposal that might
reasonably accomplish that goal—approving the
construction and operation of a cargo hub at Toledo
Express. It did so with the thoroughness required by
law.” Jd. at 198 (citation omitted).
L]
Importantly, the court also rejected the argument
that the FAA should have considered other ways in
which Burlington Air Express could have built a
permanent cargo hub, noting that “Congress did expect
agencies to consider an applicant’s wants when the
agency formulates the goals of its own proposed action.
Congress did not expect agencies to determine for the
applicant what the goals of the apphcant’s proposal
should be.” Jd. at 199. The FAA was not required to
“canvass the business choices that Burlington faced
when it considered leaving Fort Wayne” because
federal agencies have “neither the expertise nor the
proper incentive structure to do so (it has no
shareholders who would suffer from mistaken
judgments).” Jd. at 197 n.6.
Indeed, the court was not permitted to excise the
agency’s consideration of the Port Authority’s and
Burlington’s needs: “We are forbidden from taking
sides in the debate over the merits of developing the
Toledo Express Airport; we are required instead only
to confirm that the FAA has fulfilled its statutory
obligations.... All that this court decides today is that
the judgment was not uninformed.” /d. at 199 (citing
Robertson v. Methow Valley Citizens Council, 490 U.S.
332, 351 (1989)).
The Tenth Circuit followed the D.C. Circuit in
Dombeck, holding that “agencies . . . are precluded
from completely ignoring a private applicant’s goals.”
Dombeck, 185 F.3d at 1175 (citing Burlington, 938 F.2d
at 196). In Dombeck, Vail, a private company,
proposed to expand its existing ski area into a part of
the White River National Forest known as Category
lil. See Dombeck, 185 F.3d at 1165-66. Pursuant to its
authority over national forests, the Forest Service
12
approved Vail’s site-specific plan and completed a
NEPA review of the proposed expansion’s
environmental impacts. See id. at 1166. However,
after the NEPA review was completed, one individual
and various groups sued the Forest Service, claiming
that the agency “blindly adopted Vail’s articulated
purpose and need” for the expansion project. Jd. at
1175.
The Tenth Circuit rejected the plaintiffs’ claim,
holding that agencies are required to “take
responsibility for defining the objectives of an action
and then provide legitimate consideration to
alternatives that fall between the obvious extremes.”
Id. Under this deferential approach, the Forest Service
was well within its di cretion to consider “the White
River Forest Plan, prior Forest Service planning and
permitting decisions in accordance with the National
Forest Ski Area Permit Act of 1986, and Vail’s
expressed needs and goals, when drafting the
statement of purpose and need for the Category III
expansion environmental impact statement.” Jd.
(emphasis added).
Thus, the rule in Burlington and Dombeck is that,
where a project involves private parties, federal
agencies are not only permitted but required to
consider a mix of public and private goals in a purpose
and need statement. Because NEPA “does not
substantively constrain an agencys choice of
objectives; to the contrary, it is those very objectives
that provide the point of reference for a determination
whether an alternative is ‘reasonable’ in the first
place.” City of Alexandria v. Slater, 198 F.3d 862, 867
(D.C. Cir. 1999). These decisions provide agencies with
a necessary means to “ ‘delimit the universe of the
13
action’s reasonable alternatives’” and are in line with
a court’s obligation to review “whether an agency’s
objectives are reasonable, and whether a particular
alternative is reasonable in light of these objectives . . .
with considerable deference to the agency’s expertise
and policy-making role.” Id.
B. Contrary to the D.C. and Tenth
Circuits, the Ninth Circuit Joined the
Seventh Circuit in Erroneously
Removing the Discretion of Federal
Agencies To Consider a Mix of
Federal and Non-federal Goals in a
Purpose and Need Statement
The Ninth Circuit in this case was satisfied that
the Bureau’s purpose and need statement included an
“unquestionably ... valid BLM purpose”: the need to
meet long-term landfill demand. National Parks, 606
F.3d at 1071. It hkewise noted that “[o]ther circuits
have held that agencies must acknowledge private
goals.” Jd. at 1070 (citing Burlington, 938 F.2d at 196,
and Dombeck, 185 F.3d at 1175). However, in a sharp
contrast to Burlington and Dombeck’s approval of an
agency's consideration of non-federal objectives, the
court then proceeded to chide the Bureau for honestly
acknowledging that Kaiser has an interest in the land
exchange as well. National Parks, 606 F.3d at 1072.
The court took the agency to task for “requir[ing] that
Kaiser’s private needs be met” and _ excluding
alternatives that failed to meet Kaiser’s private
objectives. Id.
That is wrong. An agency’s purpose and need
statement cannot be invalid simply because it
considered public and private objectives and then
“define[d] goals for its action that fall somewhere
14
within the range of reasonable choices,” as the Bureau
did in this case. See Burlington, 938 F.2d at 196. This
is especially so given the ramifications to an agency if
it does not disclose private, non-federal objectives. As
Judge Trott observed: “[o]f course there is a private
purpose driving this project. But the project benefits
both parties, not just Kaiser. To isolate one without
factoring in the other is patently illogical.” National
Parks, 606 F.3d at 1078 (Trott, J., dissenting).
The majority in National Parks also expressed
concern that most of the alternatives considered by
BLM would result in Kaiser acquiring federal land.
See National Parks, 606 F.3d at 1072 (majority
opinion) (listing alternatives and observing that “[a]]]
of these options, save the No Action alternative, would
result in landfill development of some sort and would
require some portion of the land exchange to occur’).
It ruled that BLM arbitrarily excluded the
consideration of a landfill on other Kaiser property.
See id.
The majority opinion, however, conflicts with
Burlington because agencies are not required to
“canvass the business choices” faced by a private entity
that las chosen to pursue a project. Burlington,
938 F.2d at 197 n.7. If this view applied in the D.C.
Circuit, the FAA in Burlington would have been
required to analyze the alternative of Burlington Air
Express building a cargo hub somewhere else besides
Toledo. But this view was explicitly rejected by the
D.C. Circuit in Burlington. See id. at 198-99.
In addition, while the Bureau considered six
alternatives in National Parks compared to FAA's
consideration of only two alternatives in Burlington,
the majority chastised the agency for failing to
15
consider “several alternatives that would have been
responsive to the need to meet long-term landfill
demand, such as a landfill on other Kaiser property,
waste diversion, offsite landfill locations, landfill
mining, alternative Townsite locations, and aiternative
Townsite uses.” National Parks, 606 F.3d at 1072.
The court’s list of alternatives, however, has no
discernable limit and contradicts Burlington’s holding
that agencies may include “goals of an action [that]
delimit the universe of the action’s reasonable
alternatives.” Burlington, 938 F.2d at 195. See also
City of Alexandria, 198 F.3d at 867 (“[A]n alternative
is properly excluded from consideration in an
environmental impact statement only if it would be
reasonable for the agency to conclude that the
alternative does not ‘bring about the ends of the federal
action.’”) (quoting Burlington, 938 F.2d at 195).
Indeed, the Ninth Circuit impermissibly focused
on the general goal “to meet long-term landfill
demand,” National Parks, 606 F.3d at 1071, divorced
from “the application at issue” and “the goals of the
applicant’s proposal.” Burlington, 938 F.2d at 199.’
9
, The Ninth Circuit’s decision prohibiting agencies from
“exclud[ing] alternatives that fail to meet specific private
objectives,” National Parks, 606 F.3d at 1072, is a departure from
its prior recognition that an agency’s purpose and need statement
may address a a non-federal applicant’s needs. See City of Angoon
v. Hodel, 803 F.2d 1016, 1021-22 (9th Cir. 1986) (per curiam)
(holding that to preclude an agency from considering a non-federal
applicant’s needs “is to visit upon it a task that would involve
almost endless speculation). The majority in National Parks
attempted to distinguish Angoor, noting that the issue in Angoon
“was whether the Corps should issue a permit,” as opposed to land
exchange at issue in National Parks. National Parks 606 F.3d at
1071. But the Ninth Circuit’s analysis in Angoon was actually
(continued...)
16
This is the functional equivalent of the rule in the
Seventh Circuit that “the evaluation of ‘alternatives’
mandated by NEPA is to be an evaluation of
alternative means to accomplish the general goal of an
action; it is not an evaluation of the alternative means
by which a particular applicant can reach his goals.”
Van Abbema, 807 F.2d at 638.
The Van Abbema rule requires courts to invalidate
purpose and need statements which contain private,
non-federal objectives and allow agencies to consider
alternatives which reflect a mix of public and private
goals. Thus, the Seventh Circuit in Simmons
invalidated a purpose and need statement because it
did not articulate the general goal of water supply for
Illinois residents and instead referenced the specific
goal of a single reservoir for two localities—the single
reservoir had been proposed to the Army Corps of
Engineers by non-federal applicants as the means by
which to accomplish the general goal of water supply
for the residents. See Simmons, 120 F.3d at 667.
Following Van Abbema, the court in Simmons forced
the Corps to consider two or more sources of water
instead of a single reservoir, holding that an agency
“cannot restrict its analysis to those ‘alternative means
by which a particular applicant can reach his goals.’”
Id. at 669 (quoting Van Abbema, 807 F.2d at 638 and
contrasting Burlington, 938 F.2d at 198-99). See also
Hoosier Environmental Council, Inc. v. U.S. Army
Corps of Engineers, 105 F. Supp. 2d 953, 1000 n.23
(S.D. Ind. 2000) (“In [Simmons], the court noted
* (...continued)
based on the Corps’ purpose and need statement and not on the
fact that the validity of a permit was ultimately at issue. See
Angon, 803 F.3d at 1021.
y |
[Burlington’s| disagreement with its interpretation of
the proper scope of relevant alternatives, but continued
to apply the Van Abbema formulation.”). Compare
National Parks, 606 F.3d at 1072 (“The BLM may not
. adopt|] private interests to draft a narrow purpose
and need statement that excludes alternatives that fail
to meet specific private objectives.”) with Simmons,
120 F.3d at 669.
But the Van Abbema rule is not followed in the
D.C. Circuit or Tenth Circuit because it is premised on
“critical flaws.” See Burlington, 938 F.2d at 199. See
also Dombeck, 185 F.3d at 1174 (declining plaintiffs’
request to adopt Van Abbema rule).
Van Abbema’s “assertion that an agency must
evaluate ‘alternative means to accomplish the general
goal of an action” likewise “trouble|d]” the D.C. Circuit
in Burlington. Burlington, at 199 (quoting Van
Abbema, 807 F.2d at 638). As the D.C. Circuit noted,
[ljeft unanswered in Van Abbema ... is why
and how to distinguish general goals from
specific ones and just who does the
distinguishing. Someone has to define the
purpose of the agency action. Implicit in Van
Abbema is that the body responsible is the
reviewing court.... [H]owever, NEPA and
binding case law provide otherwise.
Burlington, 938 F.2d at 199.
In this case, the Bureau defined the purpose of the
land exchange in a manner that reflected a mix of
public and private goals, similar to the purpose and
need statements in Burlington and Dombeck. See
National Parks, 606 F.3d at 1071 (discussing four goals
13
in Bureau’s purpose and need statement).” Yet the
Ninth Circuit rejected the deferential approach to
agency decision-making under NEPA in favor of a
standard which limits agencies to consideration of only
ry’ 4 “ce ”” ~
general goals. This “general goals” standard is an
ambiguous concept that forecloses an agency’s ability
to respond to a proposal that “arouses the call for
action” and thereby establishes goals which “delimit
the universe of the action’s reasonable alternatives.”
Burlington, 938 F.2d at 195
sharp contrast to the Council on Environmental!
Quality’s own guidance regarding NEPA regulations
See 48 Fed. Reg. 34,263, 34,267 (July 28, 1983) (“There
is...no need to disregard the applicant’s purposes and
199. It also stands in
,
needs and common sense realities of a given situation
in the development of alternatives.”).
More importantly, National Parks conflicts with
D.C. Circuit and Tenth Circuit precedent, leaves public
and private parties uncertain “in a setting where a
private entity approaches a governmental entity with
a joint proposal that will benefit both,” and should
accordingly be reviewed by this Court. See National
Parks, 606 F.3d at 1078 (Trott, J., dissenting)
j ry ’ rT
‘he majority's mischaracterization of securing a “long-term
income source” provided by the landfill as a private objective
instead of a public goal underscores its failure to abide by the
deferential role courts play in reviewing NEPA purpose and need
statements. See Petitioners Kaiser Kagle Mountain, Inc., and
Mine Reclamation Corporation’s Petition for Writ of Certiorari at
yA |
THE ENDLESS ADMINISTRATIVE AND
JUDICIAL HURDLES CREATED BY THE
NINTH CIRCUIT'S DECISION ARE
IMPORTANT TO FEDERAL AND NON-
FEDERAL PARTIES THROUGHOUT THE
COUNTRY AND WARRANT REVIEW
The Ninth Circuit halted a landfill project that
would have addressed “a ‘critical’ landfill capacity
shortfall in Southern California. National Parks, 606
F.3d at 1079 (Trott, J., dissenting) (citing
administrative record). But Kaiser’s project would ot
only have benefitted Californian residents—the landfill
would also have been the first to comply with new
Environmental Protection Agency guidelines and could
have become “‘one of the world’s safest landfills and a
model for others to emulate.” Jd. at 1075, 1077-78
(quoting Technical Advisory Panel composed of
eminent scientists and engineers from major California
Universities) (emphasis in dissent omitted) [n
addition, the land given up by Kaiser under the land
exchange would have enhanced contiguous federal land
in Southern California that protects endangered and
threatened species See id. at 1082-84 (citing
administrative record)
Despite Kaiser's cooperation with ‘tate and
federal agencies for nearly two decades in order to
achieve these laudable goals, the project’s statu
remains uncertain See Petitioners Kaiser Eagle
Mountain, Inc., and Mine Reclamation Corporation’
Petition for Writ of Certiorari at 32-35. The Ninth
Circuit has remanded the case to the Bureau “to do
something BLM has already adequately done: consider
the value of the land involved as a commercial!
landiill ending the parti back toa Sisypheun hi
which cannot be climbed in a lifetime Vationa
Parks, 606 F.3d at 1075, 1078 (Trott, J., dissentiny)
he delay in this case has already cost Kaiser million
f dollars and speaks ill of the administrative and
udicial proce eos. See td. at 1076 (notiny th it Kase)
ain attempt to accomplish its goals” has cost it mor
than $50,000,000). As Judge ‘Trott asked Ihlow many
of the people who started this project are still employed
by Kaiser, are still in public service, or for that matter
ire still alive? Yet, the process has developed an
eternal life of its own as full employm« nt forall swept
iliong with or bv it ld. at 10%
he vnihicance Of leaving the panel majority
pinion in place is best summarized in the opening
line yf Judge Trott di} ent What ine person
would want to attempt to acquire property tor a
landhill? Our well-mean renvironmental laws have
unintentionally made ucn in endeavor i fool
errand. National Pari HO6 | qat lv »(irott
d enting)
Judge Trott s points are appropriate and relevant
to Kaiser and all private entities that wish to work
cooperatively with federal agencr Cf. td. at lOMZ
(“Of course Katser has its own yvoals it hopes
iccomplish from this project, and of course it hopes to
make profit, but it seems blindingly apparent that it
voauls dovetail with the public’s need for a landfill.”)
Navivating through the administrative state is difficult
enough, especially when the voyage ts fraught with the
uncertain specter of litigation At a certain point
howeve ¥ the hurdles become foo burde nsome and i
company will choose to go no further in the pursuit olf
i publi objective Thi Court review of Nattonal
a |
Parks is, therefore, necessary to ensure that the Ninth
Circuit’s decision does not lead to this disturbing
consequence for projects throughout the country.
&
4
CONCLUSION
Review of National Parks is warranted because (in
addition to the Seventh Circuit) the Ninth Circuit’s
.ecision conflicts with decisions from the D.C. Circuit
and Tenth Circuit and leaves federal and non-federal
parties uncertain in circumstances “where a private
entity approaches a government entity with a joint
proposal that will benefit both.” Jd. at 1078. If allowed
to stand, National Parks is likely to lead regulated
entities to grow “weary ... and throw in the towel,
thwarted and defeated not by substance, but by
interminable process.” Jd. This is contrary to the
public interest.
For these reasons, Amicus Pacific Legal
Foundation urges this Court to grant the petition for a
SD D
writ of certiorarl.
DATED: November, 2010.
Respectfully submitted,
M. REED HOPPER
Counsel of Record
BRANDON M. MIDDLETON
Of Counsel
Pacific Legal Foundation
3900 Lennane Drive,
Suite 200
Sacramento, California 95834
Telephone: (916) 419-7111
Facsimile: (916) 419-7747
E-mail: mrh@pacificlegal.org
E-mail: bmm@pacificlegal.org
Counsel for Amici:s Curiae