Appendix — Rueth Development Co. v. United States
Supreme Court brief2003
Ask Donna
What actually matters in this document.
Text
la
APPENDIX A — OPINION OF THE UNITED STATES
COURT OF APPEALS FOR THE SEVENTH
CIRCUIT DECIDED JULY 10, 2003
IN THE
UNITED STATES COURT OF APPEALS
SEVENTH CIRCUIT
No. 02-2045
UNITED STATES OF AMERICA,
Plaintiff-Appellee,
v.
RUETH DEVELOPMENT CO. and HAROLD G RUETH,
Defendants-Appellants.
- Appeal from the United States District Court for
the Northern District of Indiana, Hammond Division.
No. 2:96-cv-540—James T. Moody, Judge
ARGUED ApriL 9, 2003—DEcIDED JuLy 10, 2003
Before FLAUM, Chief Judge, and POSNER and KANNE,
Circuit Judges.
FLAUM, Chief Judge. In 1996 the United States sued
the Rueth Development Company and Harold Rueth
(collectively “Rueth”’) under the Clean Water Act, 33 U.S.C.
§ 1251 et seg. (“CWA” or “the Act”), for failure to obtain a
permit before discharging dredged or fill material into four
fae
2a
Appendix A
acres of wetlands located in Dyer, Indiana. Rueth chose to
settle the suit and entered into a consent decree that required
him to restore the wetlands by specified dates. When he failed
to meet those deadlines, the government moved to enforce
the agreement, seeking over $6,750,000 in penalties. Rueth
responded by petitioning for modification or vacatur of the
consent decree based on the Supreme Court’s decision in
Solid Waste Agency of N. Cook County v. United States Army
Corps of Eng’rs, 531 U.S. 159 (2001) (““SWANCC”), which
he claimed was a material change in law affecting the decree’s
validity. The district court disagreed, granted the
government’s motion to enforce, and assessed penalties in
the amount of $4,018,500, and Rueth appeals. We affirm.
I. BACKGROUND
In April 1991 the Environmental Protection Agency
(“EPA”) issued an administrative compliance order under
33 U.S.C. § 1319(a), finding that Rueth had illegally
discharged dredged or fill material into wetlands located in
the Castlewood subdivision of southeastern Dyer. The fill
was specifically found to have been placed in wetlands
“adjacent to an unnamed tributary to Dyer Ditch, which flows
north to Hart Ditch, which flows north to the Little Calumet
River, which is a navigable water of the United States.”
The compliance order directed Rueth to cease all discharges
and restore the wetlands to their original condition, warning
that noncompliance could result in the assessment of
substantial penalties under the CWA.
Rueth then proceeded to apply for an after-the-fact permit
from the United States Army Corps of Engineers (“Corps”).
3a
Appendix A
The Corps declined to give approval, however, noting its
concern that Rueth was presenting his development plans in
a piecemeal fashion in an attempt to avoid a comprehensive
review of their cumulative environmental impact. The Corps
stated that it would reconsider its position if Rueth modified
his plans so that less than ten acres of wetlands were affected.
Rueth did not submit new development plans, reapply
for a permit, or undertake the restoration activities outlined
in the administrative compliance order. Instead, he filed a
complaint for equitable relief in the district court, claiming
that the government lacked regulatory jurisdiction over the
wetlands in the Castlewood subdivision. But because the
administrative compliance order was a pre-enforcement
action not subject to judicial review, the district court
dismissed the suit, and we affirmed, stating that Rueth could
contest jurisdiction if and when the EPA sought judicial or
administrative enforcement of penalties against him. Rueth
v. EPA, 13 F.3d 227, 230 (7th Cir. 1993) (“Rueth I”). We
also remarked in passing,
We acknowledge that our holding places Rueth
somewhat in limbo until such time as the EPA
seeks to enforce the compliance order or assess
administrative penalties. ... Responsibility for
this predicament does not fall entirely on the EPA
and the Corps of Engineers, as any reasonable and
experienced developer such as Rueth should
have known that the wetlands were potentially
subject to regulation. Perhaps Rueth is in its
present predicament because it attempted to short
cut and take an end-run around the permit
4a
Appendix A
requirement. . . . Ofcourse, Rueth now argues that
it had no idea the wetlands at the Castlewood
development were “waters of the United States”
{within the meaning of the CWA]. As our decision
in Hoffman Homes, Inc. v. EPA, 999 F.2d 256, 261
(7th Cir. 1993), makes clear, however, nearly all
wetlands fall within the jurisdiction of the CWA
since one test for whether the wetland affects
interstate commerce is whether migratory birds
use the wetland. Decisions such as Hoffman
Homes, give full effect to Congress’s intent to
make the Clean Water Act as far-reaching as the
Commerce Clause permits. On the other hand, it
is not inconceivable that the EPA or the Corps of
Engineers might completely overextend their
authority. In such a case, we suggest to those
agencies that we will not hesitate to intervene in
pre-enforcement activity, but this is not the case
as we are of the opinion that the wetland at issue
falls under the broad definition of “waters of the
United States” in Hoffman Homes.
Rueth I, 13 F.3d at 230-31 (citation omitted).
By November 1996 Rueth had still not performed the
tasks outlined in the administrative compliance order,
prompting the government to file this enforcement action.
The complaint asserted two bases for the government’s
regulatory jurisdiction: (1) adjacency—specifically, that the
Castlewood wetlands were “adjacent to waters which flow
into the Little Calumet River, an interstate stream, which
itself is a ‘water of the United States’ within the meaning of
Sa
Appendix A
the CWA,” see 40 C.F.R. § 230.3(s)(7); and (2) effect on
interstate commerce, see id. § 230.3(s)(3). In addition to
injunctive relief, the complaint requested that the district
court assess a civil penalty under 33 U.S.C. § 1319(d) for
each day that Rueth was in violation of the CWA and the
administrative compliance order.
After over a year of negotiations, the parties entered into
a proposed consent decree, which the court then entered as a
final judgment in January 1999. In the consent decree,
Rueth agreed to perform a number of “milestone” tasks—
such as excavating fill, sealing and raising storm sewers,
and replacing wetland vegetation—by set deadlines.
The agreement also required Rueth to pay a $23,000 civil
penalty and set forth additional stipulated penalties that would
result from failure to meet “any milestone” according to the
specified timetable.
Rueth ultimately completed the wetland restoration at a
cost of around $100,000 but failed to perform a number of
the interim milestones in a timely fashion. Because of this
failure, the government moved to enforce the stipulated-
penalties provision of the consent decree, alleging that Rueth
had “in very large part” disregarded his obligations under
the agreement. For instance the government asserted that
Rueth was 67 days late in paying the $23,500 penalty, 579
days late in excavating the fill and performing the storm-
sewer tasks, and 158 days late in replacing the wetland
vegetation. The government sought a separate stipulated
penalty for each alleged violation of the agreement, resulting
in a grand total of $6,757,500.
6a
Appendix A
But before the district court could rule on the
government’s motion to enforce, Rueth moved under
Fed. R. Civ. P. 60(b)(5) for modification or vacatur of the
consent decree based on the Supreme Court’s decision in
SWANCC. Rueth claimed that SWANCC, which held that
“navigable waters” as defined in the CWA does not extend
to isolated intrastate waters solely because they are used as
habitat by migratory birds, made “legal what the decree was
designed to prevent,” thus rendering it unenforceable.
The district court disagreed, however. It concluded that
SWANCC did not affect the validity of the decree because
the government had not invoked the Migratory Bird Rule as
a basis for its jurisdiction but sought rather “to regulate the
[Castlewood] Site on the theory that it is an ‘adjacent
wetland.’” Then, the court made a factual finding that the
Castlewood wetlands were “adjacent” to navigable waters
because they have “an [effect] on flows to Dyer Ditch, and
ultimately the Little Calumet River,” which “is itself a
navigable waterway.” The court thus denied Rueth’s Rule
60(b)(5) motion, granted the government’s motion to enforce
the consent decree, and imposed penalties in the amount of
$4,018,500.
Rueth then moved under Rule 59(e) to alter or amend
the judgment, claiming that there was no evidence whatsoever
that the Castlewood wetlands were “adjacent” to a navigable
waterway. He also claimed for the first time that the language
of the consent decree did not allow for stipulated penalties
to be separately imposed for each uncompleted or delayed
“milestone” task. Though the district court denied the motion,
it agreed with Rueth that the question of “adjacency” was
still open to dispute and therefore vacated that portion of its
Ta
Appendix A
earlier order. Nonetheless, the court held that, even assuming
the wetlands were isolated and not adjacent, Rueth was still
not entitled to modification or vacatur of the consent decree
because he waived his right to contest the government’s
regulatory jurisdiction by entering into the agreement.
The court also upheld its award of stipulated penalties, and
Rueth now appeals.
II. Discussion
Section 404(a) of the CWA grants the Corps authority to
issue permits “for the discharge of dredged or fill material
into the navigable waters at specified disposal sites.” 33
U.S.C. § 1344(a). “Navigable waters” is defined elsewhere
in the Act as “the waters of the United States, including the
territorial seas.” Jd. § 1362(7). The Corps has in turn defined
“waters of the United States” to include “waters such as
intrastate lakes, rivers, streams (including intermittent
streams), mudflats, sandflats, wetlands, sloughs, prairie
potholes, wet meadows, playa lakes, or natural ponds, the
use, degradation or destruction of which could affect
interstate or foreign commerce.” 40 C.F.R. § 230.3(s)(3)
(2003).
In SWANCC the Supreme Court held that § 230.3(s)(3),'
as Clarified by the Migratory Bird Rule, 51 Fed. Reg. 41217
(1986), exceeded the authority granted to the Corps under
§ 404(a) of the Act. The Migratory Bird Rule, which the Corps
1. Section 230.3(s)(3) was formerly codified at 33 C.F.R.
§ 328(a)(3) (1999). For simplicity we will cite to only § 230.3(s)(3)
throughout this opinion.
8a
Appendix A
issued in 1986 to clarify the reach of its jurisdiction, had
provided that § 404(a) extends to intrastate waters that
provide habitat for migratory birds. But the Court concluded
that nothing in the text of the statute indicated any
Congressional intent to extend the jurisdiction of the Corps
to “ponds that are not adjacent to open water.” SWANCC,
531 U.S. at 168. Instead, § 404(a)’s use of the word
“navigable” had “the import of showing . .. what Congress
had in mind as its authority for enacting the CWA: its
traditional jurisdiction over waters that were or had been
navigable in fact or which could reasonably be so made.”
Id. at 172.
The question before us now is what effect, if any,
SWANCC has on the validity of the consent decree in this
case. In moving to modify or vacate the decree, Rueth relied
on the third clause of Fed. R. Civ. P. 60(b)(5), which provides
that a court may relieve a party from a final judgment if “‘it is
no longer equitable that the judgment should have prospective
application.” To obtain relief under this provision, Rueth
bears the burden of showing “that a significant change in
circumstances warrants revision of the decree.” Rufo v.
Inmates of Suffolk County Jail, 502 U.S. 367, 383 (1992).
One instance where modification might be warranted is if
the “statutory or decisional law has changed to make legal
what the decree was designed to prevent.” Jd. at 388.
Rueth contends that that is what SWANCC did here.
Specifically, he asserts that SWANCC stripped the
government of power to regulate the Castlewood wetlands
because they are isolated and intrastate; therefore, the consent
decree “is void ab initio and should be rescinded.”
a
4
x
5
ee
#
3
bmi
3
a ;
? uy
tS
:
Pe
t
MEA LPS
9a
Appendix A
The government, not surprisingly, believes otherwise.
Though the complaint did cite § 230.3(s)(3) as one basis for
regulatory jurisdiction, the government claims that SWANCC
is nonetheless irrelevant because the complaint did not
specifically invoke the Migratory Bird Rule; instead, the
alleged interstate-commerce nexus under § 230.3(s)(3)
“rested on other important ecological functions of the
wetland, such as water filtration, flood control, and wildlife
habitat.” Essentially, the government is urging us to give
SWANCC its narrowest reading possible—that use as habitat
by migratory birds is insufficient to bring purely isolated,
intrastate ponds within the Corps’ jurisdiction under the
CWA. Or, in other words, SWANCC did nothing more than
invalidate the Migratory Bird Rule. Section 230.3(s)(3),
however, extends the Corps’ jurisdiction to intrastate waters
for reasons other than those having to do with use by
migratory birds. For instance it includes waters that “are or
could be used by interstate or foreign travelers for recreational
or other purposes,” waters “[f]rom which fish or shellfish
are or could be taken and sold in interstate or foreign
commerce,” and waters that “are used or could be used for
industrial purposes by industries in interstate commerce.”
The government claims that SWANCC left these provisions
intact, whereas Rueth claims that SWANCC deprived the
Corps of all power to regulate any intrastate water based on
a nexus to interstate commerce. We conclude that they are
both partly right—the government because SWANCC does
not expressly make § 230.3(s)(3) illegal, and Rueth because
his reading ultimately may be the only logical extension of
the case. The Court’s concern with the Migratory Bird Rule
was that it conferred regulatory jurisdiction over waters that
were not actually or potentially “navigable”; § 230.3(s)(3)
10a
Appendix A
suffers from the same infirmity. For instance, that fish or
shellfish can be taken from a water and sold in interstate
commerce does not make that water any more “navigable”
than it would be if it were frequented by migratory birds.
The same holds true for intrastate waters that are used by
interstate travelers or for industrial purposes by industries in
interstate commerce.
But what effect SWANCC has on the Corps’ jurisdiction
under § 230.3(s)(3) is a question that we need not decide in
this case. For it is clear that SWANCC did not affect the law
regarding the government’s alternative asserted basis for
jurisdiction—adjacency under § 230.3(s)(7). The Corps’
adjacency jurisdiction is well-established; it was upheld by
the Supreme Court in United States v. Riverside Bayview
Homes, Inc., 474 U.S. 121 (1985), and was reaffirmed in
SWANCC. Recognizing this, Rueth offers a number of reasons
why we should find that the Corps lacks adjacency
jurisdiction here. First, he claims that the government has
offered no evidence that the Castlewood wetlands are actually
adjacent to navigable waters. But this is beside the point.
The government never had to present such evidence because
of the very fact that Rueth chose not to litigate the case. Rueth
also points out that the district court’s order denying his post-
judgment motion “assumed” that the wetlands are isolated
and not adjacent. He attaches too much significance to the
court’s assumption, however; the court proceeded on the
theory that the wetlands are not adjacent only because it
thought that Rueth would lose regardless. Finally, Rueth
asserts that the wetlands’ link to navigable waters is too
attenuated to establish adjacency, alleging that the wetlands
are “merely adjacent to a tertiary tributary of a navigable
SS pero a EP REA ED RUE COIR DD ENNIS gy OEE Se Ee ae ee Teo eM OR ne EEN ee ee pee .
WoT He LST TT ANE eee PT ENTRANT eR LOS Ne Poe ETE te ¥ vole OE RR Pt em OR Te Te ene ray ee any
LORS LAEMMLI MRE PPI ee Rec enn eC ty we SARC OnE vile, ao m ‘ * aia wie “y ;
lla
Appendix A
water (adjacent to an unnamed tributary of Dyer Ditch which
is a tributary of Hart Ditch which is a tributary of the Little
Calumet River).” But this simply raises the question of what
“adjacency” means, which SWANCC did not address at all.
Rueth, moreover, waived his right to litigate the issue when
he signed the consent decree. And further, it is not even
apparent that the necessary contiguity to a navigable water
is missing here. In Riverside Bayview Homes, the Court found
mere surface runoff into nearby navigable waters to be a
meaningful enough connection to give rise to the Corps’
adjacency jurisdiction. 474 U.S. at 134. And recently, in
United States v. Deaton, No. 02-1442, 2003 WL 21357305
(4th Cir. June 12, 2003), the Fourth Circuit upheld the Corps’
exercise of adjacency jurisdiction over a parcel of land whose
only connection to navigable waters was surface runoff that,
after a “winding, thirty-two-mile path,” emptied into the
Chesapeake Bay.’
Despite the government’s assertion of adjacency
jurisdiction, Rueth seems to suggest that it would nonetheless
be manifestly unfair to hold him to the terms of the consent
2. As the court described it, the surface runoff drained into a
roadside ditch, which in turn “drain[{ed] into a culvert under Morris
Leonard Road. On the other side of the road, the culvert drain[ed]
into another ditch, known as the John Adkins Prong of Perdue Creek.
Perdue Creek flows into Beaverdam Creek, a natural watercourse
with several dams and ponds. Beaverdam Creek is a direct tributary
of the Wicomico river, which is navigable. Beaverdam Creek empties
into the Wicomico River about eight miles from the [defendants’
property. About twenty-five river miles further downstream, the
Wicomico River flows into the Chesapeake Bay, a vast body of
navigable water.” /d., 2003 WL 21357305, at *2.
. 228
Appendix A
decree because, at the time he settled the case, the law was
well-established that the Corps could exercise jurisdiction
over isolated intrastate waters. As Rueth points out, we told
him in his first appeal that “nearly all wetlands fall within
the jurisdiction of the CWA since one test for whether the
wetland affects interstate commerce is whether migratory
birds use the wetland.” Rueth J, 13 F.3d at 231 (citing
Hoffman Homes, Inc. v. EPA, 999 F.2d 256, 261 (7th Cir.
1993)). This statement is obviously no longer accurate after
SWANCC, but regardless, we fail to see how it has any effect
on the validity of the decree. Back when the EPA filed its
complaint in 1996, Rueth was faced with a choice: he could
either contest the government’s jurisdiction or forego the
costs and settle the case. Having reasonably concluded that
his chances of succeeding on the jurisdictional challenge were
not good, Rueth chose the latter course. The defendants in
SWANCC chose the former. Now, Rueth seeks a free ride on
the defendants’ success in SWANCC, but the mere fact that
the Supreme Court has cast doubt on one of the complaint’s
legal bases is not a ground on which to reopen the case.
See United States v. Krilich, 303 F.3d 784, 792 (7th Cir. 2002)
(“Krilich IIT’); Cincinnati Ins. Co. v. Flanders Elec. Motor
Serv., Inc., 131 F.3d 625, 628-29 (7th Cir. 1997). As we stated
in Krilich III, which also involved a Rule 60(b)(5) motion to
_ vacate a consent decree based on SWANCC,
If a party believes that the waters at issue on his
own property are not properly subject to the EPA’s
authority, whether under the rationale of Hoffman
Homes I, SWANCC or under some other theory,
he should not stipulate otherwise. But that is
exactly what Krilich did, to his continued dismay.
ENTE, SIMON IETS LER RRP BES LAE
panes
OEE AE SORBONNE RT 2 oe ae eH,
ee
EME AL ALL SRAM IOUT ee
gs
13a
Appendix A
He expressly agreed that certain waters on his
property constituted “waters of the United States,”
subject to regulation by the EPA. Like most parties
that enter into a settlement or plea agreement, he
presumably made a tactical! decision that the terms
of the Consent Decree were more favorable than
the costs or risks of continued litigation.
Accordingly, we conclude that SWANCC effected
no relevant change in decisional law such that the
district court should have modified the Consent
Decree. Nor does SWANCC establish that the
EPA’s entry into and continued enforcement of the
Consent Decree are ultra vires acts. “To hold that
a Clarification in the law automatically opens the
door for relitigation of the merits of every affected
consent decree would undermine the finality of
such agreements and could serve as a disincentive
to negotiation of settlements in . . . litigation.”
Id. (quoting Rufo, 502 U.S. at 389).
Rueth spends much of his brief explaining how Krilich
III is distinguishable from this case, but ultimately the
distinction comes down to this: in Krilich III the defendant
had conceded that there was some basis for the Corps’
jurisdiction other than effect on interstate commerce, whereas
here, Rueth conceded only that there was some basis for
jurisdiction. But this is a distinction without a difference.
Even assuming Rueth is right that SWANCC made illegal the
government’s assertion of jurisdiction under § 230(s)(3),
if the case is reopened, the parties would still have to litigate
whether the government has adjacency jurisdiction under
l4a
Appendix A
§ 230(s)(7). Six years ago, however, Rueth made the
conscious decision, given the uncertainties of litigation, not
to contest that issue. It would render the consent decree
worthless to allow him to do so now. See Rufo, 502 U.S. at
389.3
So the district court was right not to modify or vacate
the consent decree, but Rueth maintains that, even so, the
court erred for several reasons in calculating the stipulated
penalties. He first contends that the language of the decree
does not support the imposition of cumulative stipulated
penalties for each uncompleted “milestone” task; rather,
according to Rueth’s reading, the court should have imposed
penalties based on days of noncompliance regardless of the
number of violations, which would have reduced the total
penalty to less than $1.5 million. Unfortunately for Rueth,
he has waived this claim by raising it for the first time in his
Rule 59(e) motion.* Anderson v. Flexel, Inc., 47 F.3d 243,
247 (7th Cir. 1995). The government made clear in its motion
to enforce that it was seeking a separate penalty for each
violation of the decree. Yet in his opposition to the motion,
Rueth did not argue that the stipulated-penalty provision was
unclear on its face but asserted only that the penalties sought
were “unconscionable and unenforceable” because they “bear
3. Rueth might have an additional problem in that the relief he
seeks—mainly, to be excused from paying the stipulated penalties
that accrued as a result of his missing the deadlines set forth in the
decree— may not be “prospective” in nature. Fed. R. Civ. P. 60(b)(5).
There is no need for us to address this issue, however.
4. Notably, the district court did not even mention the claim in
its order denying Rueth’s motion. .
FRA Se
WLS RAS RPE SR SAS
15a
Appendix A
no rational relationship to the potential harm which the
plaintiff could have reasonably foreseen at the time it
prepared the Consent Decree, and because the size of the
penalties is grossly disproportionate to the degree of harm
to the EPA or the environment resulting from the alleged
delays.” Not until his Rule 59(e) motion did Rueth raise any
question regarding the proper construction of the stipulated-
penalty provision. Further, even had Rueth not waived his
claim, we find the government’s interpretation of the decree .
to be the more reasonable one in any event. We agree with
Rueth that the stipulated-penalty provision is facially
ambiguous, so in order to resolve the ambiguity we must
“look at the evil which the decree was designed to rectify.”
Goluba v. Sch. Dist. of Ripon, 45 F.3d 1035, 1038 (7th Cir.
1995) (quotations omitted). The clear intent of this decree
was to require Rueth to restore the wetlands by performing
Six discrete milestone tasks in a relatively short (eleven-
month) timeframe. Rueth knew that he had to comply with
all six milestones in order to be in compliance with the CWA.
Yet if he is right that the stipulated penalties accrue only by
day of violation rather than per violation, there would be no
incentive for him to complete any of the other five tasks if
he is in violation of one. For this reason we cannot sustain
Rueth’s interpretation of the decree. To do so would render
the number of violations irrelevant to the total penalty, which
would in turn contravene the intent of the parties at the time
the contract was made.
Rueth’s next argument is that the district court erred by
failing to hold a hearing to determine whether the EPA had
consented to the delays in completing the storm-sewer tasks.
The consent decree, however, has a force majeure provision,
l6a
Appendix A
which states that untimely performance would only be
excused if Rueth provided a written request to the EPA. Rueth
did not present any evidence that he did so. Thus, pursuant
to the express terms of the decree, Rueth waived his right to
obtain an extension of the deadlines, and so the court did not
err in refusing to hear evidence on his claim that the decree
had been orally modified. See United States v. Alshabkhoun,
277 F.3d 930, 936 (7th Cir. 2002); United States v. Krilich,
126 F.3d 1035, 1036-37 (7th Cir. 1997).
Rueth also contends that, before the court imposed the
penalty, it should have considered the statutory criteria (such
as seriousness of the violation and ability to pay) provided
in the CWA. 33 U.S.C. § 1319(d). His argument is without
support. Rueth negotiated and freely entered into the consent
decree and is therefore bound by its terms, including those
setting forth penalties, see Alshabkhoun, 277 F.3d at 935;
the statutory factors no longer have any relevance. Likewise
meritless is Rueth’s argument that the penalties violate due
process. Their apparent severity is due to the fact that Rueth
was so negligent in complying with the decree that he himself
negotiated; indeed, he was up to 579 days late in completing
some of the milestone tasks. Given these circumstances we
cannot say that the penalty amount is unreasonable, especially
considering that it is but a small fraction of the maximum
penalty that could have been imposed under the CWA.
See id.
ELLER LEA RET Pt TEA LOLI AON ND Bee EO
STR at ees ee et paste oe oad
SAPD EOI IP IEE
a
4
D
2
4
e *
*
*
*
%
17a
Appendix A
III. CONCLUSION
The district court did not err in denying Rule 60(b)(5)
or 59(e) relief, and so the judgment is AFFIRMED.
A true Copy:
Teste:
Clerk of the United States Court of
Appeals for the Seventh Circuit
18a
APPENDIX B — ORDER OF THE UNITED STATES
DISTRICT COURT FOR THE NORTHERN DISTRICT
OF INDIANA, HAMMOND DIVISION
DATED FEBRUARY 21, 2002
UNITED STATES DISTRICT COURT
NORTHERN DISTRICT OF INDIANA
HAMMOND DIVISION
No. 2:96 cv 540
UNITED STATES OF AMERICA
V.
RUETH DEVELOPMENT COMPANY,
AND HAROLD G. RUETH
ORDER
Presently before the court for resolution is “Defendants
Motion to Alter or Amend Judgment,” filed on October 11,
2001. Defendants ask this court to rule that (1) wetland 6 is
an “isolated wetland” for purposes of the Clean Water Act
(“CWA”), and (2) the Environmental Protection Agency
(“EPA”) “lacks jurisdiction to seek to enforce the Consent
Decree.” (Mot. at 1.) For the following reasons, the court
VACATES IN PART its September 25, 2001 Order, and
DENIES Defendants’ Rule 59(e) motion.
19a
Appendix B
I. BACKGROUND'
On November 1, 1996, EPA filed a civil complaint
alleging that Defendants violated CWA, by causing unlawful
dredging and filling at two parcels in the Castlewood
Development, located in southeastern Dyer, Indiana (“Site”
or “Castlewood”). Instead of proceeding to trial, Defendants
and EPA settled the suit. The settlement was memorialized
in a Consent Decree. Pursuant to Section XII of the Decree,
the Department of Justice solicited public comment on the
proposed Consent Decree. See Notice of Lodging of Consent
Decree Pursuant to the Clean Water Act, 63 Fed. Reg.
at 60,024 (Nov. 6, 1998). No comments were received.
This court subsequently entered the Consent Decree on
January 26, 1999. It required Defendants to (1) cease unlawful
discharges; (2) restore the property’s wetland in accordance
with the “Castlewood Development Wetland Restoration
Plan” within the agreed-to-timeline; and (3) “pay a civil
penalty of $23,500, payable within thirty (30) days of the
entry of this Consent Decree.”?
On the belief Defendants had failed to fully perform their
obligations, EPA subsequently moved to enforce the Consent
Decree. See Robert V. Percival, The Bounds of Consent:
Consent Decrees, Settlements and Federal Environmental
Policy Making, 1987 U. Cui. LEGAL F. 327, available at WL
1987 UCHILF 327, at 4 (“Once the agreement is embodied
in a consent decree, the government may seek relief for a
1. The factual and procedural background are more fully set
forth in the court’s September 25, 2001 Order.
2. Consent Decree at § 17.
20a
Appendix B
breach of the agreement directly from the court without filing
a new lawsuit.”). On September 25, 2001, this court granted
EPA’s motion to enforce the Consent Decree, and lodged a
judgment in favor of EPA (and against Defendants) for
stipulated penalties. On October 11, 2001, Defendants timely
filed a motion pursuant to Fep.R.Civ.P. 59(e), arguing the
court erroneously awarded the judgment for stipulated
penalties because (1) this court drew the wrong factual
conclusion about the adjacency of wetland 6 (or, in the
alternative, that the court should have conducted a hearing
to receive ecological and hydological evidence on the issue),
and (2) EPA has no jurisdiction to seek enforcement of the
Consent Decree.
II. LEGAL STANDARD
A party may file a “motion to alter or amend a judgment”
within ten days after the entry of such judgment. Fep.R.Crv.P.
59(e). The motion must set forth, with “reasonable
specification,” the grounds upon which the moving party
seeks relief. Zalano v. Northwestern Med. Faculty Fdn., Inc.,
273 F.3d 757, 760 (7th Cir.2001) (mandating a minimum of
specificity to trigger Fep.R.Civ.P. 59(e) review); Martinez v.
Trainor, 556 F.2d 818, 819-20 (7th Cir.1977). “A party may
not introduce evidence or make arguments in a Rule 59
motion that could or should have been presented to the court
prior to judgment.” United States v. 47 West 644 Route 38,
Maple Park, Iil., 190 F.3d 781, 783 (7th Cir.1999); see also
Caisse Nationale De Credit Agricole v. CBI Indus., Inc., 90
F.3d 1264, 1270 (7th Cir.1996); LB Credit Corp. v. Resolution
Trust Corp., 49 F.3d 1263, 1267 (7th Cir.1995). “A Rule 59(e)
motion may only be granted if there has been a mistake of
2la
Appendix B
law or fact or if there is newly discovered evidence not
previously available.” Gendron v. United States, 154 F.3d
672, 675 (7th Cir.1998); see Figgie Int'l. Inc. v. Miller, 966
F.2d 1178, 1180 (7th Cir.1992).
Ill. DEFENDANTS’ CONTENTIONS
In their jointly-filed motion, Defendants make two
arguments. First, they assert the court prematurely concluded
wetland 6 is an “adjacent wetland” and subject to the EPA’s
regulatory jurisdiction under the CWA. According to
Defendants, the court should instead find that the Site is
situated upon an “isolated wetland” and therefore beyond
the regulatory reach of the CWA. Alternatively, Defendants
argue this court should receive expert ecological and
hydrological testimony on the issue of whether the Site sits
upon an “isolated wetland.” Under the circumstances, a
Rule 59(e) motion appears to be the proper procedural device
to pursue the remedy Defendants seek. Second, Defendants
argue that EPA lacks jurisdiction to seek enforcement of the
Consent Decree entered by this court. Defendants maintain
that intervening United States Supreme Court case law has
stripped EPA of regulatory jurisdiction over the Site.
According to Defendants, EPA is therefore powerless to
petition this court to assess stipulated penalties as provided
in the Consent Decree. The court will address each argument
in turn.
Ga |
22a
Appendix B
A. Wetland 6 is an “isolated wetland”
First, Defendants maintain the Site does not contain an
“adjacent wetland.” See 33 C.F.R. § 328.3(b) (defining
“wetlands”) & (c) (defining “adjacent”). As previously
stated, the court, in its September 25, 2001 order, concluded
otherwise. In so doing, the court referred to EPA’s
memorandum in support of its motion to enforce the consent
decree, particularly Exhibit A thereto, which purports to be
“Consent Decree, United States v. Rueth Development Co.,
Civil Action Number 2:96CV-540-JM, entered January 26,
1999.” (Mem. in Supp. of Motion to Enforce Consent Decree,
at Index to Exhibits (emphasis in original) (“Memo In
Support”)) According to this Index of Exhibits, Tab 1
contained the Consent Decree, and only the Consent Decree.
The court then reviewed the obligations Defendants had
agreed to undertake as a result of the Consent Decree.
One provision required that “Defendants shall conduct and
complete the ‘Castlewood Development Wetland Restoration
Plan’ which is attached to this Consent Decree as Exhibit
1.” (Consent Decree at 9 16.) The parties also agreed
“Tt}]he ‘Castlewood Development Wetland Restoration Plan’
shall be an enforceable obligation of this Consent Decree.”
(Id. at J 16.c.) The court, eager to peruse the contents of the
“Castlewood Development Wetland Restoration Plan,” turned
to the rear of Tab 1. Two pages after the signature page for
the presiding district judge (i.e., the undersigned) appears a
page with the following printed upon it: EXHIBIT 1.
(emphasis in original [hereinafter “Tab 1/Exhibit 1”] )
~The court understood this page to signal the beginning of
the “Castlewood Development Wetland Restoration Plan.”
In other words, it was assumed (albeit subliminally) that on
23a
Appendix B
the next page would commence the contents of the
“Castlewood Development Wetland Restoration Plan.”
The first page of what is Tab 1/Exhibit 1 of EPA’s Memo
in Support (and what simultaneously purports to be the
“Castlewood Development Wetland Restoration Plan”)
contains the following statement: “Castlewood is an existing
residential subdivision located in Dyer, Indiana, south of U.S.
30 and just west of the Schereville town line. . . . Within this
proposed development area is a wetland encompassing
approximately 7.3 acres. The existence of this wetland
necessitates this assessment.” (emphasis added) The fourth
paragraph on that first page states: “The proposed
development area was naturally undulating but has been
modified by past sand and/or gravel mining activities.
Therefore, some areas are scraped and others contain
indiscriminate spoil piles. Jn the center of the property is
a large wetland of about 7.3 acres.” (emphasis added)
The court further proceeded to study the “exhibit” and noted
the following two sentences:
The topographic map of the area (St.John, Indiana)
shows that the natural drainage is to the north to
Dyer Ditch, then to Hart Ditch and the Little
Calumet River. Shallow wetlands existed along
this natural drainage, but the spoil piles
interrupted that water flow and dammed the valley
to create the deeper wetland.
(Tab 1/Exhibit 1 at 10.) Continuing with its review of
the document, the court took special note of two portions
printed within the section entitled “Discussion and
i) Lae
24a
Appendix B
Recommendations.” First, this section provided the following
conclusion: “The wetland on the Castlewood property
provides habitat for numerous wildlife species. /t also has
an affect on flows to Dyer Ditch, and ultimately the Little
Calumet River.” (Tab 1/Exhibit 1 at 15 (emphasis added).)
The “Discussion and Recommendations” section further
determined that “[t]he Castlewood wetland is under the
jurisdiction of the U.S. Army Corps of Engineers under
Section 404 of the Clean Water Act of 1972.” (/d. at 16.)
This document clearly indicates that one wetland is present
on the Site, water molecules that collect in the wetland
ultimately come in contact with water molecules from the
Little Calumet River,’ and that the wetland is subject to
federal regulatory jurisdiction pursuant to CWA § 404.
Armed with the ecological and hydological conclusions
embodied in Tab 1/Exhibit 1, the court then referred back to
the body of the Consent Decree proper. Since the court was
lead to believe that the contents of Tab 1/Exhibit 1 were the
“Castlewood Development Wetland Restoration Plan,”
(Consent Decree at 3.), and that the “Castlewood
Development Wetland Restoration Plan,” is “an enforceable
obligation,” (id. at J 16.c.), this court concluded that the set
of ecological and hyrdological propositions contained in Tab
1/Exhibit 1 were previously agreed upon. Proceeding under
the assumption EPA and Defendants had both subscribed to
these ecological and hydrological findings, the court found
that no factual dispute could possibly exist on issues relating
to the wetland. Based upon what the court perceived to be
3. The court took judicial notice of the fact that the Little
Calumet River is a navigable waterway. See Fep.R.Evip. 201(c)
(“A court may take judicial notice, whether requested or not.”).
Leh gated iA GIRL Det Te CEA A SIRS AES Oto
25a
Appendix B
mutual understandings, it was concluded that the wetland
present upon the Site is an “adjacent” (and not an isolated)
wetland for purposes of CWA. (See Sept. 25, 2001 Order at
4-5 (citing Tab 1/Exhibit 1).) This precluded Defendants from
establishing what they believe is vital to their case, namely
that the wetland that is the subject of this litigation is not the
kind of ecological system that is within the regulatory
purview of CWA.
In Defendants’ memorandum in support of their Rule
59(e) motion, they inform the court that it “misinterpreted
Exhibit 1 to the Consent Decree, and ignored disputed
issues of fact.” (Mem. in Supp. of Mot. at 4.) Neither of these
characterizations is entirely true, but prompted the court to
investigate the source of Defendants’ discontent. First, the
court did not ignore a disputed factual question because, as
mentioned supra, based upon the documents the parties
presented, there appeared to be no material fact in dispute.
Second, the court did not misinterpret “Exhibit 1 to the
Consent Decree.” The court merely arrived at its decision by
reference to the documents submitted by the parties, working
under the assumption the documents were indeed what they
purported to be. In fact, upon (another) review of that
document, it is clear the court properly interpreted its
contents.
The element of truth to which the court referred comes
in when a subsequent review of EPA’s submission reveals
that it perpetrated a “bait and switch” of sorts. The document
upon which this court so heavily relied, “Tab 1/Exhibit 1” is
not what it purports to be. In the place where the “Castlewood
Development Wetland Restoration Plan” was supposed to
26a
Appendix B
be (i.e., right after the page with the symbols “EXHIBIT 1”
printed upon it) was a report prepared by Elizabeth
Secora McCloskey (“McCloskey Report”).* The bona fide
“Castlewood Development Wetland Restoration Plan”
appears nowhere in the EPA’s package of exhibits annexed
to its Memo in Support of the Motion to Enforce the
Decree. That is no small accomplishment: EPA annexed
seventeen exhibits, not one of them was the “Castlewood
Development Wetland Restoration Plan.” Failing to-include
the “Castlewood Development Wetland Restoration Plan” as
the real Exhibit 1 to the Consent Decree was the “bait”
half of the operation, inserting the McCloskey Report, was
the “switch.” Surprisingly, in the ten months and roughly
half-dozen filings between EPA’s tendering of the “bait and
switch” exhibit and this court’s September 25, 2001 Order,
Defendants failed to provide a true, accurate, and complete
copy of the Consent Decree (and proper exhibits thereto),
and/or bring the court’s attention to the fact that the Consent
Decree annexed to EPA’s memorandum is very misleading.
In its response to this Rule 59(e) motion, EPA recognizes
this mistake. (Resp. at 5, fn.2 (“[The McCloskey Report]
4. Defendants drove this point home in their memorandum.
The Consent Decree in this case is attached as Exhibit 1
to the Plaintiff’s “Memorandum in Support of United
States’ Motion to Enforce the Consent Decree.” Exhibit
1 to the Decree, attached by the government, is entitled
“Environmental Assessment, Castlewood Edition, Dyer,
Indiana,” dated February 21, 1990, prepared by Elizabeth
Secora McCloskey.
(Mem. in Supp. of Rule 59(e) Mot. at 3 (emphasis added).)
27a
Appendix B
was incorrectly attached as Exhibit 1 to the Consent Decree
... Ms. McCloskey’s report should have been attached as
Exhibit 1 to the Declaration of Gregory T. Carlson.”).)
As aresult, Defendants have clearly met their burden of
demonstrating to the court that the parties never achieved
mutual assent on the contents of the McCloskey Report,
which undergirds this court’s previous finding that the
wetland at issue in this litigation is an “adjacent wetland” as
that phrase is used in CWA jurisprudence. This court,
therefore, VACATES the portion of its September 25, 2001
Order finding of an “adjacent wetland” upon the Site.
B. Whether EPA lacks jurisdiction to seek
to enforce the Consent Decree
Even assuming Defendants can show that wetland 6 is
an “isolated wetland” for purposes of CWA, the inquiry does
not end. Such a finding does not automatically undercut the
validity of the Consent Decree, or the supplemental judgment
resulting from this court’s grant of EPA’s motion to
enforce the Consent Decree. Rather, Defendants must now
demonstrate that, as a result of wetland 6 being an “isolated
wetland,” EPA “lacks jurisdiction to seek to enforce the
Consent Decree.” (Def. Mem. in Supp. of Mot. at 19.)
Defendants jurisdictional argument flows from the United
States Supreme Court decision in Solid Waste Agency of
Northern Cook County v. Army Corps of Engineers, 121 S.Ct.
675 (2001) (5-4 decision) (“SWANCC’”).
In SWANCC, a group of suburban Chicago municipalities
decided to purchase some real property located in Cook and
ae
28a
Appendix B
Kane counties. See id. at 678. The owner at the time, Chicago
Gravel Company, had previously used the parcel for sand
and gravel pit mining operations, but ceased those operations
there about 1960. See id. In the intervening decades, “the
old mining site eventually gave way to a successful stage
forest, with its remnant excavation trenches evolving into a
scattering of permanent and seasonal ponds of varying size
and depth.” Jd. (parentheticals omitted). As a result of the
presence of these bodies of water, the defendants contacted
the Army Corps of Engineers (“ACOE”) and inquired whether
these man-made bodies were subject to federal regulation
under CWA, and if so, whether “a federal landfill permit was
required.” Jd. ACOE eventually asserted jurisdiction because
migratory birds were observed at the site. See id. In common
parlance, this is the Migratory Bird Rule. See 51 Fed. Reg.
41,217. Notwithstanding its diligent attempts to secure the
applicable CWA permit, ACOE refused to grant one.
The municipalities then filed suit in district court, pursuant
to the Administrative Procedures Act, 5 U.S.C. § 701 et seq.,
“challenging both the [ACOE] jurisdiction over the site and
the merits of its denial of the . . . permit.” Jd. at 679. ACOE
secured a summary judgment in its favor on the jurisdictional
issue and the municipalities abandoned their challenge to
the denial of the permit. See id. The Seventh Circuit affirmed,
rejecting the position that ACOE “had exceeded their
statutory authority in interpreting the CWA to cover
nonnavigable, isolated, intrastate waters based upon the
presence of migratory birds.” Jd. The Supreme Court granted
certiorari.
The Supreme Court, in its five-to-four decision, reversed
the Seventh Circuit. The Court determined the promulgation
29a
Appendix B
of the Migratory Bird Rule, was beyond the authority Congress
had bestowed upon ACOE. See id. at 684. Since the Migratory
Bird Rule was the sole basis upon which ACOE asserted
regulaiory jurisdiction over the real property at issue, the Court
ruled the municipalities were entitled to judgment as a matter
of law.
Defendants argument based on SWANCC is fairly
straightforward. They assert that just like the real property in
SWANCC, the Site’s wetland 6 is not an “adjacent wetland,”
and therefore no CWA jurisdiction exists. According to
Defendants, this means the court should alter the supplemental
judgment entered in this case on September 25, 2001. A fair
reading of SWANCC, however, indicates it is sufficiently
distinguishable, and does not form a basis for Rule 59(e) relief.
There is a fatal difference in procedural posture. When faced
with the prospect of regulation under CWA § 404(a), the
municipalities in SWANCC could have acquiesced, settled with
ACOE, and developed the real property consistent with ACOE
specifications. Instead, the municipalities made a rational
determination that the expected benefits derived from fully
litigating the jurisdictional issue outweighed the expected
detriment. From the municipalities’ perspective, it “made sense”
to litigate rather than forfeit the right to contest the jurisdictional
issue and come to a negotiated settlement. See Percival, supra,
at *8 (“Parties ordinarily can be expected to settle a lawsuit
only if the terms of the settlement are more favorable than the
expected outcome of a trial discounted by the additional
costs of continuing the litigation.” (citing William M. Landes,
An Economic Analysis of the Courts, 14 J.L. & Econ. 61, 66-69
(1971))).
30a
Appendix B
Defendants charted a different course, which naturally,
yielded different results. To fully appreciate the difference
in procedural posture between SWANCC and this case
requires a return to January 1991. At that time ACOE notified
Defendants “that its activities at the Castlewood site were
resulting in the unauthorized discharge of fill materials into
wetlands.” Rueth v. EPA, Civ. A. No. H91-152, 1992 WL
560944 at *1 (N.D.Ind. Nov. 24, 1992) (Lozano, J.), aff'd,
13 F.3d 227 (7th Cir.1993). Three months later, EPA issued
an administrative order, indicating Defendants violated the
anti-dumping provisions of the CWA. EPA also mandated a
restoration of the wetland to its previous condition. See id.
Less than one month after the administrative order issued,
Defendants filed suit requesting a declaration that ACOE
“does not have jurisdiction over the property at issue.” Jd.
Judge Lozano dismissed the action for lack of subject matter
jurisdiction, holding that administrative agency orders “are
not reviewable until the enforcement stage.” Jd. at *2. Judge
Lozano also provided guidance on the availability of a federal
judicial forum.
Developers, when confronted with the [ACOE]
preliminary determination of jurisdiction over
land, may react in two ways. They may submit to
the administrative permitting process and
subsequently, through the Administrative
Procedure Act, 5 U.S.C. § 704, obtain judicial
review of a permitting decision (a final agency
action) under the arbitrary and capricious
standard. Or, they may ignore the agency and risk
compliance orders followed by enforcement
penalty proceedings, and obtain de novo review
3la
Appendix B
in district court. Either of these two options, in
any event, affords the developer his or her day in
court.
Id. at *3 (citation to Banks v. Page, 768 F.Supp. 809 (S.D.Fla.
1991) omitted). Dissatisfied with this outcome, Defendants
appealed, and (as indicated by the citation to the district court
opinion, supra ) the Seventh Circuit affirmed. In so doing,
the panel made some observations bearing on the issue
presently before this court.
We acknowledge that our holding places Rueth
somewhat in limbo until such time as the EPA
seeks to enforce the compliance order or assess
administrative penalties. In the interim, we are
cognizant of the fact that Rueth might conceivably
encounter some problems, such as securing bank
loans or obtaining title insurance. Responsibility
for this predicament does not fall entirely on the
EPA and the [ACOE], as any reasonable and
experienced developer such as Rueth should have
known that the wetlands were potentially subject
to regulation. Perhaps Rueth is in its present
predicament because it attempted to short cut and
take an end-run around the permit requirement.
Indeed, the prudent course for any developer is to
secure the necessary permits prior to commencing
construction. This is what the Clean Water Act
mandates in [33 U.S.C.}] § 1344(a) when it
requires developers to obtain permits prior to
filling wetlands. Of course, Rueth now argues that
it had no idea the wetlands at the Castlewood
32a
Appendix B
development were “waters of the United States.”
As our decision in Hoffman Homes, Inc. v. EPA,
999 F.2d 256, 261 (7th Cir.1993), makes clear,
however, nearly all wetlands fall within the
jurisdiction of the CWA since one test for whether
the wetland affects interstate commerce is whether
migratory birds use the wetland. Jd. Decisions
such as Hoffman Homes, give full effect to
Congress’s intent to make the Clean Water Act as
far-reaching as the Commerce Clause permits. On
the other hand, it is not inconceivable that the EPA
or the [ACOE] might completely overextend their
authority. In such a case, we suggest to those
agencies that we will not hesitate to intervene in
pre-enforcement activity, but this is not the case
as we are of the opinion that the wetland at issue
falls under the broad definition of “waters of the
United States” in Hoffman Homes.
Rueth, 13 F.3d at 230-31 (dicta). Based upon this round of
litigation, a rational business manager in Defendants’ position
would have impounded the following information into the
operating calculus-of the firm: (1) that Defendants would
have a federal judicial forum available to contest the
jurisdictional issue (either offensively, in a suit against
EPA pursuant to the Administrative Procedures Act;* or
defensively, in an action brought by EPA against Defendants
for violations of CWA); and (2) that based upon the law of
this circuit, Defendants’ chances of succeeding with the
jurisdictional challenge were slim.
5. This was the procedural device employed by the
municipalities in SWANCC. 121 S.Ct. at 679.
=
33a
Appendix B
On November 1, 1996, EPA filed a civil complaint
alleging Defendants violated CWA sections 301(a) and 404.
At that moment, Defendants were faced with a choice.
Defendants could have contested the EPA’s regulatory
jurisdiction, thereby encountering certain risks. First, based
upon the Seventh Circuit’s dicta, Defendants chances of
succeeding were not good. Second, the costs (in attorneys’
fees, expert witnesses, discovery, etc.) of pursuing the
jurisdictional issue would be substantial. Last, contesting
EPA’s jurisdiction could have thwarted attempts to negotiate
a settlement. The municipalities in SWANCC chose this risky
route, whereas Defendants, approached the probiem in a more
risk averse manner. They agreed to settle the litigation (and
have that settlement embodied in the Consent Decree).°
6. Presumably, Defendants could have reserved the right to contest
EPA’s jurisdiction over the Site. Alternatively, Defendants could have
negotiated a provision in the Consent Decree allocating rights and
obligations of the parties in the event case law in this circuit changed.
This latter approach was taken by the developer in United States v.
Krilich, 152 F.Supp.2d 983 (N.D.IIl. 2001), appeal docketed, No. 01-
2746 (7th Cir. July 3, 2001). In the Krilich consent decree, the parties
made the following agreement:
20A. The Defendants shall continue to treat wetland
and open water areas depicted on Exhibit | as waters of
the United States until the mandate issues in Hoffman
Homes, Inc. v. EPA, 961 F.2d 1310 (7th Cir.1992) and until
proceedings related to any appeal, petition for certiorari,
or remand are completed. Following completion of these
proceedings, unless pertinent portions of the Seventh
Circuit’s April 20, 1992 decision are reversed, Exhibit 1
areas W2A, W2B, W3, W5B, and W9 shall be excluded
from the obligations imposed in Paragraph 17.
Id. at 990.
34a
Appendix B
This decision is perfectly understandable. Defendants felt
the jurisdictional issue was a “loser,”’ and the costs of what
appeared to be protracted litigation would be prohibitive.
Cf. Percival, supra at *2 (“Joint gains from settlement are
possible because settlements save the parties the expense of
further litigation.”). Defendants decision, however, was not
without costs of its own. First (and fatally for purposes of
this motion), Defendants waived certain rights. See generally
id. at *2 (“Each party gives up something it might have won
had the litigation continued.”). “Waiver is the intentional
relinquishment or abandonment of a known right.” United
States v. Williams, 272 F.3d 845, 854 (7th Cir. 2001); see
also United States v. Olano, 507 U.S. 725, 733 (1993). By
assenting to settlement in this action,* Defendants waived,
for example, the right to contest the EPA’s regulatory
jurisdiction, which would have been an element of the EPA’s
substantive claim. See United States v. Krilich, 209 F.3d 968,
972 (7th Cir. 2000) (“[T]he interstate connection, i.e. that
the waters involved were ‘waters of the United States,’ is
merely an element of the United States’ Clean Water Act case
under section 301.”), cert. denied, 531 U.S. 992 (2000);
see also United States v. Wilson, 133 F.3d 251, 264 (4th Cir.
1997) (indicating proof of interstate nexus is an element of
criminal liability under CWA); United States v. Ahmad, 101
F.3d 386, 391 (Sth Cir. 1996) (recognizing the existence of
“purely jurisdictional elements’’).
7. But see SWANCC, 121 S.Ct. at 684 (reversing Seventh
Circuit).
8. See Consent Decree at 4 5 (“This Consent Decree shall
constitute a complete and final settlement of all civil claims against
the Defendants in connection with Defendants’ alleged violations of
the CWA as set forth in the Complaint.”).
35a
Appendix B
Moreover, a consent decree “is an agreement that the
parties desire and expect will be reflected in, and be
enforceable as, a judicial decree that is subject to the rules
generally applicable to other judgments and decrees.”
Rufo v. Inmates of Suffolk County Jail, 502 U.S. 367, 378
(1992) (emphasis added). In this case, EPA moved to enforce
the judgment entered by way of the Consent Decree. As a result
of EPA’s motion, this court lodged a supplemental judgment in
favor of EPA. Defendants, ‘in their Rule 59(e) motion, seek to
alter the latter of the two judgments entered in this cause, but
since the latter judgment is merely the result of exercising rights
contained in the earlier judgment, Defendants must also attack
the former judgment (or more specifically, rights therein
allocated to EPA), which is exactly how Defendants cast their
argument. (See Rule 59(e) Mot. at 1 (EPA “lacks jurisdiction to
seek to enforce the Consent Decree.” (emphasis added)).)
Even assuming the wetland at issue in this litigation is beyond
the regulatory reach of EPA (on account of its ecological
“isolation’’),? and further assuming EPA has no power to enter
into the agreement that eventually was entered as a judgment
by this court, Defendants still can not obtain Rule 59(e) relief
because “(t]he fact that a party to a consent judgment lacked
av‘hority to consent (as defendants contend is true of the [EPA]
in light of SWANCC) does not void the judgment itself.” Krilich,
152 F.Supp.2d at 991 (citations omitted). “A judgment is void
if it is without subject matter jurisdiction, there was no personal
jurisdiction over a party, or the judgment was entered without
due process of law.” Jd. On this Rule 59(e) motion, Defendants
contest not the subject matter jurisdiction of this court, but rather
9. But see SWANCC, 121 S.Ct. at 693-96 (Stevens, J., dissenting)
(arguing migratory birds act as the “adjacency factor” linking
otherwise isolated wetlands).
36a
Appendix B
EPA’s regulatory reach, a contention which does not render void
the judgments entered in this action. The Consent Decree
remains, therefore, what it has always been: a valid and
enforceable judgment. (See Consent Decree at | 37 (“Upon its
entry by this Court, this Consent Decree shall have the force
and effect of a final judgment.”).)
One can think of this issue another way. EPA, at this
stage of the litigation, does not seek to exercise regulatory |
jurisdiction over the Site. They are merely asserting their
rights as a creditor to a judgment previously entered in the
form of a Consent Decree. The immediate source of EPA’s
authority to obtain stipulated penalties in this case is the
judgment of this district court entered on January 26, 1999.
C. Other Issues ~
Defendants make several additional arguments in their
memorandum in support of the Rule 59(e) motion that require
a moment to address. First, they assert “[t]here exists a
genuine issue of fact as to whether [EPA] consented to delays
in the storm water-related tasks.” (Mem. at 9.) Assuming
arguendo, any factual dispute is not material to the matters
before the court. In the Consent Decree, the parties
specifically provided for the situations where EPA would
consent to extending deadlines and the method by which
Defendants could obtain consent from EPA.
b. If the required task has not been completed,
Defendants shall submit a written notice in
accordance with the requirements of Section VIII
(Force Majeure) below. Failure to submit such
37a
Appendix B
written notice shall constitute a waiver of
Defendants right to obtain an extension of time
under the provisions of Section VIII (Force
Majeure) below. Submission of any notice shall
not relieve Defendants of their obligation to
comply with any requirement of this Consent
Decree.
(Consent Decree at { 23.b. (emphasis added)) The governing
provision of the Force Majeure provides as follows:
24. If an event occurs which causes or may cause
Defendants to fail to comply fully and timely with
any requirement of this Consent Decree,
Defendants shall notify in writing EPA and the
Department of Justice, at the addresses stated in
Section X (Addresses for Submissions) below,
within fourteen days (14) of the date when
Defendants first learned of the violation, or within
fourteen days (14) of the date when Defendants
should have known of the event by the exercise
of due diligence. The notice shall describe in
detail....
(Id. at 4 24.)
25. If the parties to this Consent Decree agree that
the violation of a provision of this Consent Decree
has been or will be caused by circumstances
beyond the control of the Defendants . . . the time
for performance of such provision shall be
extended in writing by EPA....
38a
Appendix B
(Id. at 25.) Since Defendants have not produced evidence
tending to prove they obtained EPA’s consent in accordance
with the provisions of the Consent Decree, this theory of
Rule 59(e) relief fails. Cf United States v. A & A Farms,
No. 01-1380, slip op. at 8 (7th Cir. Jan. 18, 2002) (“This
provision, however, required A & A to notify the government
in writing of the alleged Force Majeure event in order to
excuse a deadline. Because A & A failed to do so, A&A
cannot now claim that compliance with the schedule was not
possible.” (citation omitted)).
Next, Defendants insist “[t]he court failed to consider
statutory criteria in calculating penalties.” (Mem. at 11.)
According to Defendants, imposition of stipulated penalties
pursuant to a consent decree requires the court to utilize
statutory damages criteria. This position has no support in
the law of this circuit. In fact, a panel of the Seventh Circuit
recently affirmed an approach to stipulated penalties similar
to the one undertaken in this case. The panel wrote:
[In] United States v. Krilich, 126 F.3d 1035
(7th Cir.1997), ... we upheld the imposition of
over $1 million in stipulated penalties. Krilich, a
property owner, entered into a consent decree to
settle the government’s Clean Water Act
claims. Krilich, 126 F.3d at 1036. In the decree,
Krilich promised to restore the subject wetlands
according to a schedule. Krilich missed the
scheduled deadlines and the government moved
to enforce the decree’s stipulated penalties
provision. /d. The district court granted the motion
and we affirmed. In so doing, we noted that Krilich
39a
Appendix B
had negotiated the decree, entered into it freely,
and never properly modified any of the deadlines.
Id. at 1037. Accordingly, Krilich was bound to
pay the stipulated penalties set forth in the consent
decree. We believe that the result in Krilich is
warranted in the instant case.
A&A Farms, at 7. Nothing in the text of A&A Farms (or, by
implication, Krilich) suggests the court must incorporate
statutory considerations into the calculation of stipulated
penalties, especially if the parties did not make the applicable
reference. Introducing factors not previously agreed upon by
the parties into the calculation of stipulated penalties would
render nugatory the “stipulated” part of the doctrine. Instead,
this court analyzed the stipulated penalties framework the
parties agreed upon in the Consent Decree, (See Consent
Decree at Ff 19-22.), and found it reasonable in light of the
CWA. Accord A&A Farms, at 5 (noting stipulated penalties
are enforceable as long as the provisions in the consent decree
establishing them are reasonable); South Suburban Hous. Ctr.
v. Berry, 186 F.3d 851, 856 (7th Cir. 1999). Then, the court
applied the penalty provisions in the Consent Decree to the
circumstances of this case. Since the text of the Consent
Decree does not signal this court to incorporate statutory
criteria into the penalty-imposing calculus, the court did not
do so.
40a
Appendix B
IV. CONCLUSION
For the foregoing reasons, the September 25, 2001 Order
in this action is hereby VACATED insofar as it concludes
wetland 6 is an “adjacent wetland” as that term is used in
CWA jurisprudence. Since this factual determination does
not impact the judgment embodied in the Consent Decree or
the September 25, 2001 judgment enforcing it, “Defendants’
Motion to Alter or Amend Judgment,” is hereby DENIED.
SO ORDERED.
s/ [illegible]
JUDGE, UNITED STATES
DISTRICT COURT
Enter: February 21st 2002
4la
APPENDIX C — ORDER OF THE UNITED STATES
DISTRICT COURT FOR THE NORTHERN DISTRICT
OF INDIANA, HAMMOND DIVISION ENTERED
SEPTEMBER 25, 2001
UNITED STATES DISTRICT COURT
NORTHERN DISTRICT OF INDIANA
HAMMOND DIVISION
No. 2:96 CV 540
UNITED STATES OF AMERICA
V.
RUETH DEVELOPMENT COMPANY, and
HAROLD G. RUETH
ORDER
The United States of America, acting on behalf of the
Environmental Protection Agency (“EPA”), movés to enforce
a consent decree between EPA and Rueth Development
Company and Harold G. Rueth (“Defendants”), entered with
this court on January 26, 1999 (“Consent Decree”).
Defendants have filed cross-motions for dispute resolution
and modification. Since the court feels the parties’ briefs are
adequate to address all the issues presented, a hearing is not
necessary and therefore Defendants’ “Request for Evidentiary
Hearing on Pending Motions” is DENIED. For the reasons
that follow, the court GRANTS the EPA’s motion to enforce
the Consent Decree and awards stipulated penalties in the
amount of $4,018,500 and ORDERS Defendants to complete
excavation as set forth in the Consent Decree within ninety
.
ook tetas
42a
Appendix C
(90) days of entry of this Order. The court also GRANTS
Defendants’ cross-motion for dispute resolution insofar as it
relates to wetland delineation and annual reporting and
DENIES Defendants’ motion to modify the Consent Decree.
Since the court has disposed of all issues without reference
to Exhibit A to Defendants’ Petition for Modification, EPA’s
“Motion to Strike” is DENIED AS MOOT.
BACKGROUND
On November 1, 1996, EPA filed a civil complaint
alleging that Defendants violated sections 301(a)' and 404?
of the Clean Water Act (“CWA”), by causing unlawful
dredging and filling at two parcels in the Castlewood
Development, located in southeastern Dyer, Indiana
(the “Site”). Prior to trial, Defendants and EPA agreed
to settle the case.’ In accordance with Section XII of the
1. “Except as in compliance with this section and sections 1312,
1316, 1317, 1328, 1342, and 1344 of this title, the discharge of any
pollutant by any person shall be unlawful.” 33 U.S.C. § 1311(a).
2. “The Secretary may issue permits ... for the discharge
of dredged or fill materials . . . at specific disposal sites.” 33 U.S.C.
§ 1344(a).
3. Defendants’ counsel signed the Decree on August 3, 1998.
The government had three signatories: David Ullrich, Acting EPA
Administrator for Region 5 (signed the Decree on September 10,
1998); Steven Herman, EPA Assistant Administrator for Enforcement
and Compliance Assurance (September 30, 1998); and Steven Rusak,
Department of Justice’s Environmental & Natural Resources Division
(October 21, 1998).
43a
Appendix C
Decree,‘ the Department of Justice solicited public comment
on the proposed Consent Decree. See Notice of Lodging of
Consent Decree Pursuant to the Clean Water Act, 63 Fed.
Reg. at 60,024 (Nov. 6, 1998). The United States received
no public comments.* The court subsequently entered the
Consent Decree on January 26, 1999. It required the
Defendants to (1) cease unlawful discharges;° (2) restore the
property’s wetlands in accordance with the “Castlewood
Development Wetland Restoration Plan” within the agreed-
to timeline;’ and (3) “pay a civil penalty of $23,500, payable
within thirty (30) days of the entry of this Consent Decree.””®
This court retained jurisdiction over the action to enforce,
modify, construe and resolve disputes arising out of the
Consent Decree.
4. Section XII of the Consent Decree provides:
34. Defendants consent to the entry of this Consent
Decree without further notice. The parties agree that after
the lodging of this Consent Decree, and prior to its entry,
the United states shall, pursuant to 28 C.F.R. § 50.7,
publish a public notice of this Consent Decree and
provide an opportunity for public comments. The United
States reserves the right to withhold or withdraw its
consent to entry of this Consent Decree based upon such
public comments.
5. The public comment period was thirty days from the date of
publication in the Federal Register. See id.
6. See Consent Decree, at J 15.
7. See id. at Ex.1 (Plan) & J 16 (Timeline).
8. Id. atG 17.
Pa emt MS Nie RS a ei Mi en rs ae PEt oA ll
Ait AR 7
44a
Appendix C
Now, EPA moves to enforce the Consent Decree. It seeks
an order requiring Defendants to complete excavation as
agreed in the Consent Decree, as well as stipulated penalties
and other appropriate relief. Defendants oppose the United
States’ motion and themselves move for dispute resolution
and modification under the Decree on various grounds.
JURISDICTION
Defendants urge modification of the Consent Decree
because “the U.S. EPA and/or U.S. Army Corps of Engineers
has lost jurisdiction of the property which is the subject of
the Consent Decree.” (Def. Pet. for Modification of Consent
Decree, at 2.) “{[MJodification of a consent decree may be
warranted when the . . . decisional law has changed to make
legal what the decree was designed to prevent.” Rujfo v.
Inmates of Suffolk County Jail, 502 U.S. 367, 388 (1992).
By way of “decisional law,” Defendants direct the court’s
attention to the Supreme Court’s decision in Solid Waste
Agency v. Army Corps of Engineers, 121 S.Ct. 675 (2001)
(“SWANCC’”). Since SWANCC has narrowed the Army Corps
of Engineers’ regulatory jurisdiction under the CWA, the
court first addresses this part of Defendants’ motion.
In SWANCC, the Army Corps of Engineers had
sought to regulate abandoned sand and gravel pits which had
evolved into a scattering of permanent and seasonal ponds.
See id. at 678. They based jurisdiction solely on the
existence of migratory bird species observed at the site (a.k.a.
The Migratory Bird Rule). See id. The Supreme Court held
this exercise of regulatory jurisdiction by virtue of the
45a
Appendix C
Migratory Bird Rule, “exceeds the authority granted to [the
Army Corps of Engineers] under § 404(a) of the CWA.”
Id. at 684.
In light of SWANCC, Defendants urge this court to rule
that the Army Corps of Engineers has no power to regulate
the Site. There are two fundamental factual differences
between Defendants’ Site and the real property at issue in
SWANCC. First, Defendants-Site is home to a natural wetland
which flows into connecting bodies of water. (See Consent
Decree, at Ex. 1.) In SWANCC, the bodies of water at issue
were isolated mining pits and ponds. In other words,
a molecule of water residing in one of these pits or ponds
could not mix with molecules from other bodies of water.
At Defendants’ Site, however, water molecules currently
present in the wetlands will inevitably flow towards and mix
with water from connecting bodies, including the Little
Calumet River. Secondly, the “Migratory Bird Rule” was the
sole basis of regulatory jurisdiction asserted by the Army
Corps of Engineers in SWANCC. With respect to Defendants’
Site, however, the government has never invoked the
Migratory Bird Rule. Instead, the government seeks to
regulate the Site on the theory that it is an “adjacent wetland.”
Under § 404(a) of the CWA, the Army Corps of
Engineers has the power to regulate wetlands adjacent to
navigable waterways. See United States v. Riverside Bayview
Homes, 106 S.Ct. 455 (1985). The holding in Riverside
Bayview Homes, as reaffirmed in SWANCC, turns on “the
significant nexus between the wetlands and ‘navigable
waters.’” SWANCC, 121 S.Ct. at 680. Since the Riverside
pe ee
46a
Appendix C
Bayview Homes standard remains applicable to wetlands, the
court considers whether the wetland on Defendants’ Site has
a “significant nexus” to a navigable waterway.
Defendants’ Site is a wetland which “has an affect on
flows to Dyer Ditch, and ultimately the Little Calumet River.”
(Consent Decree Ex. 1, at 15.) The Little Calumet River is
itself a navigable waterway.’ A drop of rainwater landing in
the Site is certain to intermingle with water from the Little
Calumet River. The relationship between the wetlands and
the navigable waterway is direct. The Site, therefore, has the
“significant nexus” to a navigable waterway necessary to
trigger Army Corps of Engineers’ regulatory jurisdiction
under CWA § 404(a).
THE CONSENT DECREE
A. Stipulated Penalties for Violations of the Consent Decree.
The United States seeks enforcement of Article VI of
the Consent Decree (“Stipulated Penalties”) for Defendants’
failure to (1) timely pay the $23,500 fine and (2) complete
the agreed upon tasks within the prescribed timeline.
Defendants argue Article VI of the Consent Decree is a
liquidated damages provision and an unenforceable penalty
because the amounts are unconscionable and bear no relation
9. “Navigable from the Indiana-Illinois State Line for 21.24 river
miles to Burns Waterway Harbor; and navigable for an additional
17.75 river miles to its junction (as Kemper Ditch) with Interstate
94. (The river is also navigable in Illinois.)” Natural Resources
Commission—Lake Michigan and Other Navigable Waters, at http:/
/www.state.in.us/ nrc/policy/III.html.
47a
Appendix C
to harm suffered.'® (See, e.g., Def. Mem. in Opp. to U.S.
Motion to Enforce Consent Decree, at 5, 10.)
“Although consent decrees have the force of a court
order, they are also a form of contract to be construed
according to basic principles of contract interpretation.”
Ahern v. Board of Educ., 133 F.3d 975, 981 (7th Cir. 1998).
“The source of the obligations in the decree is the parties’
will, not federal law.” Kasper v. Board of Election Comm'r.,
814 F.2d 332, 338 (7th Cir.1987). “[T]he intention of the
parties is the key to deciding whether a provision is to be
considered a penalty or liquidated damages.” United Order
of Am. Bricklayers and Stone Masons Union No. 21 v.
Thorleif, 519 F.2d 331, 332 (7 th Cir.1975). The parties titled
Article VI “Stipulated Penalties for Future Violations of
Consent Decree” (emphasis added) and use the phrase
“stipulated penalties” five times in the text of Article VI.
There is no evidence, in the text of the Consent Decree,
Defendants’ briefs or otherwise suggesting an intent to
liquidate damages. Therefore, the court finds the parties
10. An Agreement, made in advance of breach, fixing the
damages therefor, is not enforceable as a contract and does not affect
the damages recoverable for the breach, unless
(a) the amount «o fixed is a reasonable forecasi of just
compensation for the harm that is caused by the breach,
and
(b) the harm that is caused by the breach is one that is
incapable or very difficult of accurate estimation.
RESTATEMENT (SECOND) OF ConTRACTS § 339.
48a
Appendix C
intended Article VI of the Consent Decree to act as a
stipulated penalty and not liquidated damages.
The next question is whether the stipulated penalty
provision of Article VI is enforceable. In U.S. v. Krilich, 948
F.Supp. 719, 726 (N.D. Ill. 1996), aff’d., 209 F.3d 968
(7th Cir. 2000), cert. denied sub nom. Krilich v. U.S.,
531 U.S. 992 (2000), the court found “it would not be
unconscionable or otherwise inappropriate to have a
provision that imposes a penalty” in a consent decree to settle
CWA claims. The rationale for imposing the stipulated
penalties was that the parties “were reaching a compromise
regarding possible statutory penalties.” Jd. Under CWA, the
maximum statutory penalty is $ 25,000 per day for each
violation. See 33 U.S.C. § 1319(d). In light of this maximum
penalty, the court concluded it was not unconscionable to
enforce the stipulated penalty provision of $2,500 per day.
See id. at 726-27 (imposing stipulated penalties of
$1,307,500).
Prior to signing the Consent Decree, Defendants had two
options available. They could either litigate or settle. Had
they litigated, Defendants would have assumed the risk of
court-imposed civil penalties of up to $ 25,000 per day for
each violation of the CWA."' The amount of the penalties
11. In determining the amount of civil penalty the court shall
consider the seriousness of the violation or violations,
the economic benefit (if any) resulting from the violation,
any history of such violations, any good-faith efforts to
comply with the applicable requirements, the economic
impact of the penalty on the violator, and such other
matters as justice might require.
33 U.S.C. § 1319(d).
49a
Appendix C
would have been a function of factors not within Defendants’
direct control. Understandably, Defendants decided they did
not want to assume the risk of litigation. By settling,
Defendants traded the litigation risk for the certainty of
prescribed penalties and definite triggering events. As it
turned out, the Defendants and the government agreed upon
a schedule of stipulated penalties:
A. For day 1 up to and including $1,500.00 per day
day 30 of non-compliance
B. For day 31 up to and including $2,000.00 per day
day 60 of non-compliance
C. For day 61 and beyond of $2,500.00 per day
non-compliance
(Consent Decree, at § 19.) Defendants made a rational
decision about the risks associated with litigating the case.
Defendants arrived at this agreement through arms-length
negotiations and they were represented by competent counsel
throughout the process. Before entry of the Consent Decree,
the court found the terms to be reasonable and fair.
(See Consent Decree, at pg. 2.) In addition, the stipulated
amounts represent a small fraction of the maximum penalty
a court might impose under CWA. The court therefore finds
the stipulated penalty provision of the Consent Decree is
enforceable.
50a
Appendix C
(1) Payment of $23,500 penalty.
Defendants haa agreed to pay the $23,500 civil penalty
no later than thirty days after the court’s January 26, 1999
entry of the Consent Decree. On May 4, 1999, Defendants
remitted that amount to the government. (See Mem.
in Support of U.S. Motion to Enforce the Consent Decree,
at Ex. 4.) At no time prior to late payment of this penalty did
Defendants exercise their rights under the force majeure
provisions of the Consent Decree. See Consent Decree at
q 24 (“If an event occurs which causes or may cause
Defendants to fail to comply fully and timely with any
requirement of this Consent Decree, Defendants shall
notify in writing EPA and the Department of Justice.”). Since
Defendants remitted payment 67 days late, Defendants are
jointly and severally liable in the amount of $122,500.”
12. Calculated as follows: $45,000 for the first 30 days
(at $1,500 per day), plus $60,000 for the next thirty days (at $ 2,000
per day), plus $17,500 for the final seven days (at $ 2,500 per day).
Sla
Appendix C
(2) Completion of agreed upon tasks.
Defendants also agreed to complete the following tasks:
Task Deadline
a. Excavation December 31, 1998
b. Seal seven stormsewer inlets December 31, 1998
c. Raise one stormsewer inlet December 31, 1998
d. Replace stormwater pipe December 31, 1998
with solid pipe or encase in
impermeable material
je. Initial seeding and planting April 30, 1999
(Consent Decree, at § 16a.) The government asserts
Defendants have not adhered to the timeline and they move
to enforce the stipulated penalties.
Defendants argue, however, they should be liable for no
penalties whatsoever. In particular they claim, “[t]he delay
in completion of the excavation task until September 1999
was caused primarily by the fact that four of the deadlines in
the Decree had passed at the time the Decree was entered.”
(Def. Mem. in Opp. to the U.S. Motion to enforce the Consent
Decree, at 11.) Defendants had multiple opportunities to
remedy this. Defendants’ first chance was to bring its issue
with the deadlines to the court’s attention before the Consent
Decree was entered. Since they expressly assumed the risk
52a
Appendix C
of cumbersome governmental procedures,'? Defendants had
the burden of bringing this matter to the court’s attention.
Second, after the Consent Decree was entered, Defendants
had the right to notify the EPA and Department of Justice as
prescribed in the force majeure’* provision of the Consent
Decree. Defendants failed to invoke either of these readily-
available methods to communicate their need for additional
time.
In addition, the court is skeptical that the delay until
September 1999 was caused primarily by the government’s
slow response time. Counsel for Defendants signed the
agreement on August 3, 1998.'* Counsel is therefore
presumed to know that (1) the December 31, 1998 deadlines
were five months away and (2) the agreement was subject to
a public comment period of thirty days. This means that if
the government took only thirty days to finalize its approvals
and the court instantaneously entered the settlement,
Defendants would have had four months from the date of
13. “Defendants consent to the entry of this Consent Decree
without further notice.” (Consent Decree, at] 34.)
14. 25. If the parties to this Consent Decree agree
that the violation of a provision of this Consent
Decree has been or will be caused by
circumstances beyond the control of the
Defendants . . . the time for performance of such
provision shall be extended in writing by EPA for
a period equal to the actual delay resulting from
such circumstances.
15. See supra note 3.
53a
Appendix C
entry until the December 31, 1998 deadline. Had Defendants
completed excavation within four months of entry of the
Consent Decree, the court could perhaps appreciate
Defendants’ position that the government’s response time was
a factor in the excavation delay. Yet, it tock eight months
from the date of entry for Defendants to substantially perform
their excavation duty under the Consent Decree. Defendants
present no reason why the court should let Defendants off
the hook for stipulated penalties.
Nevertheless, Defendants’ point is well taken; EPA must
bear some of the burden associated with their unwieldy
procedures. On the day the Consent Decree was entered,
January 26, 1999, the deadline had already expired for the
first four tasks. Under the technical terms of the Consent
Decree, stipulated penalties had begun to accrue on December
31, 1998. Clearly, for the court to impose penalties for the
period of time before the Consent Decree was entered would
be inequitable. The court, therefore, in the exercise of
discretion, extends a four month “credit” to Defendants, by
calculating stipulated penalties from the date four months
(120 days) after January 26, 1999.
a. Excavation.
Defendants agreed to complete excavation no later than
December 31, 1998. They began excavation during the
week of September 20, 1999. (See Mem. in Support of
U.S. Motion to Enforce the Consent Decree, at Ex. 9 & 10.)
On October 1, 1999, the excavation work was complete.
The government notes that only 95% of the work was
completed by that time. For that reason, the government also
seeks penalties beyond October 1, 1999.
54a
Appendix C
Defendants’ completion of 95% of excavation work
brought them into substantial compliance with the Consent
Decree. The ‘ourt believes it would be inequitable to
bring the fuli ...ith of the penalty provision to bear on
Defendants for the period of time after which they were in
substantial compliance. The court, therefore, in the exercise
of discretion, will only consider the imposition of penalties
up to October 1, 1999.
After applying the four month credit, Defendants were
127 days late in completing the excavation work as agreed
in the Gonsent Decree. Therefore, the court finds the
Defendants jointly and severally liable for $ 272,500"° in
stipulated penalties for the untimely completion of the
excavation.
b. Seal seven stormsewer inlets; c. Raise stormsewer iniet;
d. Replace stormwater pipe with solid pipe or encase in
impermeable material.
Defendants agreed to seal seven stormsewer inlets, raise
a stormsewer inlet and replace a stormwater pipe or encase
it with impermeable material, no later than December 31,
1998. Defendants did not complete these tasks until October
1, 2000, 613 days after the Consent Decree was entered.
Defendants seek to avoid stipulated penalties for the untimely
completion. They assert “the completion of these tasks was
delayed by circumstances involving changed facts, and
concerns by the Town of Dyer.” (Def. Mem. in Opp. to the
16. Calculated as follows: $ 45,000 for the first 30 days
(at $1,500 per day), plus $ 60,000 for the next 30 days (at $ 2,000
per day), plus $ 167,500 for the final 67 days (at $ 2,500 per day).
55a
Appendix C
U.S. Motion to enforce the Consent Decree, at 12.) The force
majeure to which the parties agreed was designed to address
precisely this situation. See supra note 14. Defendants proper
remedy for the delays was to assert their rights under the
force majeure, not to seek modification of the decree after
the fact.!’
After applying the four month (120 day) credit,
Defendants are liable for 493 days of penalties. The court
finds Defendants jointly and severally liable in the amount
of $1,187,500'* for each of the three - :timely tasks for a
total stipulated penalty of $3,562,500.
e. Initial seeding & planting.
Defendants also agreed to complete initial seeding and
planting no later than April 30, 1999. Defendants admit
the seeding and planting was finalized on October 5, 1999.
(See Mem. in Support of U.S. Motion to Enforce the Consent
Decree, at Ex. 17.) This constitutes a delay of 158 days.
The government also seeks stipulated penalties for
Defendants’ failure to make timely notification of the seeding
and planting. The general purpose of the Consent Decree was
to clean up the Site and return it to environmental compliance.
17. In addition, if the court absolves Defendant from the
stipulated penalties on the grounds Defendants suggest, the court
would be reading the force majeure out of the Consent Decree.
18. Calculated as follows: $45,000 for the first 30 days
(at $1,500 per day), plus $60,000 for the next 30 days (at $2,000
per day), plus $1,082,500 for the final 433 days (at $2,500 per day).
56a
Appendix C
The parties agreed to accomplish this through the completion
of certain tasks. Defendants have complied with the specific
substantive task of seeding and planting but failed to strictly
adhere to the notification requirements. Notification
requirements serve important objectives and compliance with
them is required. Yet, the court will not exercise its equitable
powers in favor of imposing additional penalties for merely
failing to notify where the substantive portion of the task
has been completed. Therefore, the court finds Defendants
jointly and severally liable in the amount of $61,000."
B. Defendants’ Motion for Dispute Resolution.
Next, the court considers Defendants’ Petition for dispute
resolution. Defendants seek dispute resolution with respect
to the portion of the Consent Decree requiring them to
“{cjonduct wetland boundary delineation of areas required
to be restored under this consent decree” no later than June
1999. (Consent Decree, at J 16.) Defendants propose a
revised deadline for wetland delineation of September 30,
2000. (See Def. Pet. for Dispute Resolution under Consent
Decree, at ¥ 25.) In the interest of producing an accurate
boundary delineation, the court adopts Defendants’ proposal
for the revised deadline of September 30, 2000. Defendants
remain obliged to secure all notifications, approvals and
consents as prescribed in the Consent Decree.
Defendants also seek dispute resolution with respect to
the portion of the Consent Decree requiring them to “[s]ubmit
19. Calculated as follows: $45,000 for the first 30 days
(at $1,500 per day), plus $16,000 for the next 8 days (at $2,000
per day).
57a
Appendix C
annual monitoring report[s]” for the five year period ending
September 2002. (Consent Decree, at § 16.) Defendants
propose that they produce six annual reports, from September
2000 through September 2005, inclusive. (See Def. Pet. for
Dispute Resolution under Consent Decree, at J 25.) Since
an important objective of the Consent Decree is to ensure
prospective environmental health of the Site, the court grants
Defendants’ petition for dispute resolution with regard to the
annual monitoring reports.
As for the other issues raised in defendants’ Petition for
Dispute Resolution, the court has previously addressed them
in the discussion of stipulated penalties.
C. Completion of Excavation.
The government also seeks excavation of the remaining
5% of the Site. This is described as a “115 foot by 40 foot
area within the wetland restoration area.” (Mem. in Support
of U.S. Motion to Enforce Consent Decree, at Ex. 2, § 24.)
According to EPA officer Gregory T. Carlson, Defendants
had not excavated this area as of September 25, 2000. (/d.)
Defendants claim they have completed all excavation and
there is no duty under the Consent Decree to perform further
excavation. They assert the EPA’s conclusions about the duty
to excavate the 115' x 40' area “were based upon erroneous
interpretations of data and of the Restoration Plan.”
(Def. Mem. in Opp. to the U.S. Motion to Enforce the
Consent Decree, 11.)
The affidavit of Defendants’ environmental consultant,
Eric Ellington, (“Ellington Affidavit”) however, suggests the
58a
Appendix C
need for additional excavation. In particular, paragraphs 16
and 17 of the Ellington Affidavit refer to requests for “95%
completion inspection” and paragraph 20 notes Mr. Carlson
of EPA’s review and approval of the “95% earthwork
completion.” This is a clear acknowledgment by Defendants’
consultant that Defendants needed to excavate another 5%.
Defendants are hereby ordered to do so no later than ninety
(90) days from the filing of this Order. If Defendants have
already excavated the remaining 5%, they merely need to
satisfy the notification and approval requirements of the
Consent Decree. If the Defendants have a bona fide dispute
over “interpretations of data and of the Restoration Plan,”
the court refers Defendants to the Dispute Resolution
provisions” of the Consent Decree.
For the foregoing reasons, IT IS THEREFORE
ORDERED THAT Defendants are jointly and severally
liable for $4,018,500 of stipulated penalties for violations
of the Consent Decree.
IT IS FURTHER ORDERED THAT Defendants
complete excavation as required in the Consent Decree no
later than ninety (90) days from the date of the issuance of
this Order.
THE COURT FINDS THAT Defendants substantially
complied with their boundary delineation duty by September
30, 2000, GRANTS dispute resolution in favor of Defendants
by declining to assess stipulated penalties for completion of
the aforementioned delineation and ORDERS Defendants
20. See Consent Decree, at IX.
59a
Appendix C
to comply with all notification and consent requirements
relating thereto, as set forth in the Consent Decree.
IT IS FURTHER ORDERED THAT Defendants
submit annual monitoring reports in accordance with the
specifications set forth in the Consent Decree, from
September 2000 through September 2005, inclusive.
IT IS FURTHER ORDERED THAT Defendants’
“Request for Evidentiary Hearing on Pending Motions”
is DENIED.
IT IS FURTHER ORDERED THAT Defendants’
“Petition for Modification of Consent Decree” is DENIED.
IT IS FURTHER ORDERED THAT the “United
States’ Motion to Strike” is DENIED AS MOOT.
THE CLERK IS DIRECTED TO ENTER
JUDGMENT in favor of the United States of America,
against Rueth Development Company and Harold G. Rueth,
jointly and severally, in the amount of $4,018,500,
for stipulated penalties for violations of the consent
decree between these three parties entered by this court on
January 26, 1999.
SO ORDERED.
s/ Moody
JUDGE, UNITED STATES DISTRICT JUDGE
Enter: September 25, 2001
60a
APPENDIX D — CONSENT DECREE OF THE UNITED
STATES DISTRICT COURT FOR THE NORTHERN
DISTRICT OF INDIANA
DATED AND FILED JANUARY 26, 1999
IN THE UNITED STATES DISTRICT COURT
FOR THE NORTHERN DISTRICT OF INDIANA
Civil Action No. 2:96CV-540-JM
UNITED STATES OF AMERICA,
Plaintiff,
v.
RUETH DEVELOPMENT COMPANY,
and HAROLD G. RUETH,
Defendants.
CONSENT DECREE
WHEREAS, the United States of America, on behalf of
the United States Environmental Protection Agency (“EPA”),
filed a complaint herein on November 1, 1996, (“Complaint”)
alleging that defendants Rueth Development Company and
Harold G. Rueth (collectively the “Defendants”) have
violated the Clean Water Act (“CWA”), 33 U.S.C. §§ 1311
and 1344; and
WHEREAS, the violations alleged involved unlawful
dredging and filling of federally regulated wetlands on certain
property located in southeastern Dyer, Indiana, referred to
6la
Appendix D
in the Complaint as Castlewood Unit No. 3A and Castlewood
Unit No. 3B (the “Site”), described in local land records as
the South Half of Section 18, Township 35 North, Range 9
West of the Second Principal Meridian; and
WHEREAS, the Defendants are alleged to have owned
or controlled the Site, to have carried out the unlawful
dredging and filling at the Site, or to have controlled and
directed the unlawful dredging and filling at the Site; and
WHEREAS, the Defendants deny unlawfully dredging
and filling federally regulated wetlands at the Site or
otherwise violating sections 301(a) and 404 of the CWA,
33 U.S.C. § 1311(a) and 1344, at the Site; and
WHEREAS, the parties to this Consent Decree wish to
settle and compromise this case; and
WHEREAS, the parties to this Consent Decree agree that
settlement of this case is in the public interest and that entry
of this Consent Decree without further pretrial proceedings
or a trial of any issue of fact or law in this case is the most
appropriate means of resolving this matter; and
WHEREAS, the Court finds that this Consent Decree is
a reasonable and fair settlement of this action and that it
adequately protects the public interest in accordance with
the CWA;
NOW, THEREFORE, before the taking of any testimony
and without trial or adjudication of any issue of fact or law,
and upon consent of the parties by their attorneys and
authorized officials,
62a
Appendix D
IT IS HEREBY AGREED, ORDERED, ADJUDGED
AND DECREED as follows:
DEFINITIONS
A. “Castlewood Development Wetland Restoration
Plan” means the specifications and criteria for wetland
restoration and mitigation embodied in the following five
documents, all of which are attached hereto as Exhibit 1 and
incorporated herein by reference: (1) “Wetland Restoration
Castlewood Development, Dyer, Indiana - Unit 3B,”
(2) “Wetland Restoration - Demolition, Castlewood
Development, Dyer, Indiana - Unit 3B,” (3) “Wetland
Restoration - Grading/Re-vegetation, Castlewood
Development, Dyer, Indiana - Unit 3B,” (4) “Wetland
Restoration - Details, Castlewood Development, Dyer,
Indiana - Unit 3B,” and (5) “Wetland Restoration -
Specifications, Castlewood Development, Dyer, Indiana -
Unit 3B.” In case of ambiguity or conflict between the
Castlewood Development Wetland Restoration Plan and this
Consent Decree, the provisions of this Consent Decree shall
control.
B. “Vegetative Performance Standards” mean the
following: (1) by the end of the second full growing season,
75% vegetative coverage in each plant community zone;
(2) by the 5th anniversary of the planting/seeding date, 80%
coverage in each plant community zone; (3) no greater than
20% of species coverage within any plant community zone
may be non-native species; and (4) each plant community
zone is dominated by facultative plus (“FAC+’’), facultative
wetland (“FACW”), or obligate (“OBL”) plant species in
63a
Appendix D
accordance with the National List of Plant Species That Occur
in Wetlands: North Central (Region 3).
C. “Non-native species” mean those species identified
as such in the Fourth Edition of Plants o/ the Chicago Region,
by Floyd Swink and Gerould Wilhelm, me Academy of
Sciences Press, 1994.
D. “Dominance” means more than 500 of the dominant
plant species (as measured by percent area coverage) from
all strata are Obligate (OBL), Facultative Wet (FACW) or
Facultative (FAC) (excluding Facultative Minus (FAC-)) on
the National List of Plant Species That Occur in Wetlands:
North Central (Region 3).
I. JURISDICTION AND VENUE
1. This Court has jurisdiction over the subject matter of
this action and jurisdiction over the parties pursuant to
28 U.S.C. §§ 1331, 1345 and 1355, and CWA section 309(b),
— 33: U.S.C. § 1319(b).
2. The Complaint states a claim upon which relief
can be granted pursuant to CWA sections 301, 309 and 404,
33 U.S.C. §§ 1311, 1319, and 1344. -
3. Venue is proper in this District pursuant to 28 U.S.C.
§ 1391(b), and CWA section 309(b), 33 U.S.C. § 1319(b).
64a
Appendix D
I]. APPLICABILITY
4. The provisions of this Consent Decree shall apply to
and be binding upon the parties to this action, their officers,
directors, servants, employees, successors or assigns and any
person, firm, association or corporation who is, or will be,
acting in concert or participation with the Defendants,
whether or not such person has notice of this Consent Decree.
Each of the Defendants shall provide a true copy of this
Consent Decree, including all exhibits thereto, to any
successor to his or her interest, and shall simultaneously
notify the EPA and the United States Department of Justice,
at the addresses specified in Section X (Addresses for
Submissions), below, that such copy to any successor in
interest has been given. In any action to enforce this Consent
Decree, none of the Defendants shall raise as a defense the
failure of any agents, employees, successors or assigns, or
of any person, firm or corporation to take any actions
necessary to comply with the provisions hereof.
5. This Consent Decree shall constitute a complete and
final settlement of all civil claims against the Defendants in
connection with Defendants’ alleged violations of the CWA
as set forth in the Complaint; and pertaining to civil penalties
for Defendants’ alleged CWA violations as set forth in the
Complaint. The United States, however, does not waive its
rights concerning criminal violations pursuant to section
309(c) of the CWA, 33 U.S.C. § 1319(c), or violations
concerning imminent and substantial endangerment pursuant
to section 504 of the CWA, 33 U.S.C. § 1364.
65a
Appendix D
6. The transfer of ownership or other interest by any of
the Defendants in the Site shall not alter or relieve the
Defendants of their obligation to comply with all the terms
of this Consent Decree. Should any of the Defendants make
a transfer of ownership or any interest in the Site prior to the
termination of the terms of this Consent Decree, Defendants
shall notify EPA of such transfer and shall reserve such rights
as are necessary to compiy successfully with the terms of
this Consent Decree.
7. By entering this Consent Decree, Defendants do not
admit that they have committed the violations of the CWA
as set forth in the Complaint.
8. Except as provided in Paragraph 41 of this Consent
Decree, this Consent Decree shall not constitute and shall
not be interpreted to be a permit to discharge pollutants
pursuant to CWA sections 402 or 404, 33 U.S.C. §§ 1342 or
1344. The United States does not, by its consent to the entry
of this Consent Decree, warrant or aver in any manner that
Defendants’ compliance with this Consent Decree will result
in compliance with section 301 of the CWA. Notwithstanding
EPA’s review and approval of any plans, Defendants shall
remain responsible for compliance with the terms of this
Consent Decree and the CWA.
9. This Consent Decree in no way affects or relieves
the Defendants of their obligations to comply with any
federal, state, or local law, regulation, or permit.
66a
Appendix D
10. This Consent Decree is not a settlement of, and in
no way affects the United States’ mghts to seek penalties,
injunctive relief, or remedial actions with respect to any
violation by the Defendants of federal, state or local
laws, regulations, or permit conditions not alleged in the
Complaint.
11. This Consent Decree in no way affects the rights of
the United States as against any person not a party hereto.
Ill. PARTIES
12. The Plaintiff is the United States of America.
The United States Department of Justice is authorized to
bring this suit pursuant to 28 U.S.C. §§ 516 and 519, and
CWA section 506, 33 U.S.C. § 1366.
13. Rueth Development Company is an Indiana limited
partnership, with a business address of 1006 165th Street,
Hammond, Indiana.
14. Harold G. Rueth is and was at the time of the
violations alleged in this Complaint, a general partner in
Rueth Development Company.
. IV. INJUNCTIVE RELIEF
NOW, THEREFORE, with the consent of the parties, it
is hereby ORDERED:
67a
Appendix D
CESSATION OF UNAUTHORIZED DISCHARGES
15. Defendants are permanently enjoined from taking
any actions, or causing others to take any actions, at the Site
which result in the discharge of dredged or fill material into
waters of the United States, as defined by the CWA and
regulations promulgated thereunder, except as in compliance
with an individual permit issued pursuant to CWA section
404(a), 33 U.S.C. § 1344(a), with any applicable general
permit issued by the United States Ar:ny Corps of Engineers,
or as may be necessary to effect remediation pursuant to
Paragraph 16 of this Consent Decree.
RESTORATION
16. Defendants shall conduct and complete the
“Castlewood Development Wetland Restoration Plan” which
is attached to this Consent Decree as Exhibit 1. The parties
acknowledge and agree that the objective of the “Castlewood
Development Wetland Restoration Plan” is to replace the lost
functions and values of the filied wetlands described in the
Complaint by creating and restoring freshwater wetlands in
the Restoration Area. To satisfy the obligation of this
Paragraph 16, Defendants are ordered to do the following:
a. The Defendants shall conduct any and all Wetland
Restoration at Castlewood Estates in accordance with the
following schedule:
DEADLINE
December 31, 1998
December 31, 1998
December 31, 1998
=P Pe PP
68a
Appendix D
TASK
Complete excavation of soils to the
wetland subgrade according to the
Limits of Work in the “Castlewood
Development Wetland Restoration
Plan,” attached hereto as Exhibit 1.
Cement in or seal the grated stormsewer
inlets with water tight solid covers at
the following locations:
1. northeast corner of Lot #25;
back end of Lot #29;
back end of Lot #30;
back end of Lot #31;
southwest corner of Lot #26;
northwest corner of Lot #26; and
northern curb/gutter of Canterbury
Court (just south of the southwest
corner of Lot #26).
Raise the stormsewer inlet at the
northeast corner of Lot #32 to a mean
sea elevation of 643.4 feet. The
elevation must be verified by a
certified professional land surveyor.
69a
Appendix D
December 31, 1998 A portion of the stormwater pipe
April 30, 1999
June 1999
behind Lots #28 - #32 will be
excavated or televised and, if found to
be constructed of perforated pipe, will
either be removed and replaced with
solid pipe or encased in impermeable
material. Defendants shall notify EPA
no less than one week prior to
commencing this procedure.
Complete initial seeding and planting
according to the seeding mixes
provided for in the “Castlewood
Development Wetland Restoration
Plan,” attached hereto as Exhibit 1.
Conduct wetland boundary delineation
of areas required to be restored under
this consent decree through ay)plication
of EPA’s approved delineation manual.
This delineation report shall be
included in the August - September
1999 annual monitoring report.
b. The Defendants shall submit monitoring reports
pursuant to the following schedule:
August - September 1999
Submit annual monitoring report
within 2 weeks of the field monitoring
day or the next business day.
70a
Appendix D
August - September 2000
Submit annual Monitoring report
within 2 weeks of the field monitoring
day or the next business day.
August - September 2001
Submit annual monitoring report
within 2 weeks of the field monitoring
day or the next business day.
August - September 2002
Submit annual monitoring report
within 2 weeks of the field monitoring
day or the next business day.
August - September 2003
Submit annual monitoring report
within 2 weeks of the field monitoring
day or the next business day.
Defendants’ monitoring reports shall describe and quantify:
(1) maintenance of erosion control measures; (2) site inundation
and soil saturation; (3) local precipitation records for the five
month period preceding the annual monitoring event and daily
records for the thirty (30) day period preceding the annual
monitoring event; and (4) attainment of vegetative performance
standards. Monitoring work shall be conducted in August of
each monitoring year during 1999 - 2003.
7la
Appendix D
c. The “Castlewood Development Wetland Restoration
Plan” shall be an enforceable obligation of this Consent
Decree.
d. Defendants shall provide notices and plans if
necessary under paragraph g to EPA’s project manager, as
identified in Section X (Addresses for Submissions) of this
Decree, and an opportunity for inspection by EPA upon the
completion of the following milestone events:
(i) Within thirty (30) days after the removal of
dredged and fill material, excavation, final grading, and the
raising or sealing of stormsewer inlets, but before seeding
and planting has begun (in this notice Defendants shall
provide EPA’s project manager with spot elevations of grades,
including the height of the stormwater inlet at the northeast
corner of lot 32 in addition to the other information
Defendants are required to provide under the provisions of
this Consent Decree);
(ii) Within, two weeks after the completion of
seeding and planting required by the “Castlewood
Development Wetland Restoration Plan;” and
(iii) Within 30 days prior to the 1999-2003 August
field monitoring dates noted in “Castlewood Development
Wetland Restoration Plan” referred to in Paragraph 16b.
The notices shall include: a description of the actions
taken to implement the “Castlewood Development Wetland
Restoration Plan” since the previous notice or approval of
the “Castlewood Development Wetland Restoration Plan;”
72a
Appendix D
information regarding problems or unresoived delays
encountered or anticipated that may affect the schedule for
implementation; efforts made to mitigate any actual or
anticipated delays; and all other information required by
Section VII (Notices) of this Consent Decree.
e. Following EPA’s receipt of a notice of completion
of a milestone event as required in Paragraph 16(d), EPA
shall have thirty (30) days to conduct an inspection.
Defendants agree that they will not continue with any
subsequent steps required by the “Castlewood Development
_Wetland Restoration Plan” until EPA has performed its
inspection and has approved the work; provided, however,
that if EPA has not conducted an inspection within thirty
(30) days of its receipt of the notice, then Defendants may
proceed to the next step of the “Castlewood Development
Wetland Restoration Plan.” :
f. Following EPA’s inspection after the completion
of seeding and planting, if EPA agrees that the task has been
completed as approved, EPA will issue a Certification of
Completion. Following Certification, Defendants shall
perform all operation and maintenance activities required
under the “Castlewood Development Wetland Restoration
Plan” as approved. If EPA disagrees that the task has been
completed as approved, EPA will issue a letter specifying in
detail all deficiencies.
g. Should any of the wetlands restored, created or
enhanced pursuant to Paragraph 16 of this Consent Decree
fail to achieve the performance standards specified in the
“Castlewood Development Wetland Restoration Plan” by the
73a
Appendix D
date of the fifth anniversary of planting, Defendants and the
United States shall meet to develop the subsequent steps
necessary to achieve the objectives of the “Castlewoc d
Development Wetland Restoration Plan” and a schedule
for completing the subsequent steps (“Subsequent Steps”).
If Defendants and the United States are able to establish
mutually agreeable Subsequent Steps, then within ninety (90)
days of such notice from EPA, Defendants shall incorporate
the Subsequent Steps into an amended “Castlewood
Development Wetland Restoration Plan.” Defendants shall
implement the amended “Castlewood Development Wetland
Restoration Plan,” as approved by EPA, in accordance with
the schedule in that amended “Castlewood Development
Wetland Restoration Plan,” and the amended plan shall
be an enforceable obligation of this Consent Decree.
If Defendants and the United States are unable to establish
mutually agreeable Subsequent Steps within the time frame
set forth above, then either party may petition the Court for
resolution in accordance with the dispute resolution provision
in Section IX (Dispute Resolution) of this Consent Decree.
h. If the Defendants do not complete the
“Castlewood Development Wetland Restoration Plan”
required under this Paragraph 16 and the requirements of
Paragraph 16(a) and 16(b) above, they will be subject to
stipulated penalties as provided in Section VI (Stipulated
Penalties) of this Consent Decree.
i. The Defendants shall be responsible for making
timely applications for and obtaining all necessary permits
from all governmental bodies for the mitigation, restoration
and enhancement work required by the “Castlewood
Development Wetland Restoration Plan.”
74a
Appendix D
V. CIVIL PENALTIES
17. The Defendants shall pay a civil penalty of $23,500,
payable within thirty (30) days of the entry of this Consent
Decree. Payment shall be made in accordance with the
provisions of Paragraph 20 below, and mailed to the
Department of Justice, at the address set forth in Section X
(Addresses for Submissions) below. Civil Penalties shall be
paid in addition to any payments which may be required under
Section VI (Stipulated Penalties) below.
18. In the event that payment of the civil penalty
assessed in this Consent Decree is not made, this Consent
Decree shall be considered an enforceable judgment for
purposes of post-judgment collection, in accordance with
Fed. R. Civ. P. 69, and other applicable federal statutory
authority.
VI. STIPULATED PENALTIES FOR FUTURE
VIOLATIONS OF CONSENT DECREE
19. Unless excused by the provisions of Section VIII
(Force Majeure) below, Defendants shall incur the following
stipulated penalties for failure to comply with any milestone
set forth in the “Castlewood Development Wetland
Restoration Plan,” attached hereto as Exhibit 1, and any
milestone set forth in Paragraph 16 and Paragraph 17 of this
Consent Decree, or any other requirement of this Consent
Decree to which the United States reserves its rights under
the CWA. The stipulated penalties shall be paid within five
days of the day of non-compliance.
75a
Appendix D
A. For day | up to and including $1500.00 per day
day 30 of non-compliance
B. For day 31 up to and including $2000.00 per day
day 60 of non-compliance
Cc. For day 61 and beyond of
non-compliance $2500.00 per day
20. The civil penalty provided for in Section V (Civil
Penalties) above, and any stipulated penalties incurred under
this Consent Decree shall be paid by certified or cashier’s
check, payable to the “Treasurer of the United States of
America,” and delivered to the United States Department of
Justice at the address specified in Section X (Addresses for
Submissions) below. Upon making such payment, Defendants
shall simultaneously send EPA, at the address specified in
Section X (Addresses for Submissions) below, a copy of the
check and the letter transmitting it.
21. In the event that Defendants fail to make timely
payment of any of the monies due pursuant to this Consent
Decree, interest will be charged *n accordance with the rate
established by the Secretary of the Treasury pursuant to
31 U.S.C. § 3717, from the time payment is due until the
time it is made.
22. Nothing in this Consent Decree shall be construed
to limit any other remedies available to the United States for
violations of this Consent Decree, such as the institution of
contempt proceedings, or any provisions of law, including
CWA section 504, 33 U.S.C. § 1364. The stipulated penalties
76a
Appendix D
set forth in Paragraph 19 above shall not limit the United
States’ right to apply to the Court for the maximum civil
penalties allowed by the CWA per day of violation of the
CWA. Any disputes about the Defendants’ liabinty for
stipulated penalties that cannot be resolved by the parties
hereto shall be resolved by motion to this Court, in
accordance with the Dispute Resolution provisions of Section
IX (Dispute Resolution) below.
Vil. NOTICES
23. All notices required to be filed pursuant to
the “Castlewood Development Wetland Restoration Plan,”
attached hereto as Exhibit 1, and as required under Paragraph
16 of this Consent Decree shall be provided to EPA and the
United States Department of Justice at the addresses specified
in Section X (Addresses for Submissions) of this Consent
Decree, and shall state whether or not all of that work required
by that particular milestone has been completed.
a. If the required task has been completed, the notice
shall specify the date on which it was completed, attach any
photographs, videotapes, or other appropriate evidence of
- such completion and include a certification by the Defendants
that such completion has been achieved. Such certifications
shall be made in the following form:
I/we certify that the information contained
in and/or accompanying this (submission)
(document) is true, accurate and complete.
As to (the) (those) portion(s) of this
(submission) (document) for which I/we
77a
Appendix D
cannot personally verify (its) (their) truth and
accuracy, I/we certify, as the company
official(s) having supervisory responsibility
for person(s) who, acting under my/our direct
instructions; made the verification, that this
information is true, accurate and complete.
If the notice is prepared by a contractor or consultant retained
by one or more of the Defendants, the certification shall
consist of two parts: first, a statement in the above form
signed by an officer of the contractor or consultant; and
second, a statement signed by one of the Defendants, which
shall state as follows:
As the (individual) (company official) having
responsibility for the oversight of the
(contractor) (consultant) who prepared this
document, I certify that I have made a
reasonably diligent effort to verify the truth
and accuracy of the document and that it is,
to the best of my knowledge, true, accurate, :
and complete.
b. If the required task has not been completed,
Defendants shall submit a written notice in accordance with
the requirements of Section VIII (Force Majeure) below.
Failure to submit such written notice shall constitute a waiver
of Defendants’ right to obtain an extension of time under the
provisions of Section VIII (Force Majeure) below.
Submission of any notice shall not relieve Defendants of their
obligation to comply with any requirement of this Consent
Decree.
78a
Appendix D
Vill. FORCE MAJEURE
24. If an event occurs which causes or may cause
Defendants to fail to comply fully and timely with any
requirement of this Consent Decree, Defendants shall notify
in writing EPA and the Department of Justice, at the addresses
stated in Section X (Addresses for Submissions) below,
within fourteen days (14) of the date when Defendants first
jearned of the violation, or within fourteen days (14) of the
date when Defendants should have known of the event by
the exercise of due diligence. The notice shall describe in
detail: the event or events which have caused the violation,
the anticipated length of time the violation may persist, the
measures taken or intended to le taken by Defendants to
prevent or minimize the violation, and the timetable by which
those measures will be implemented. Failure to comply with
the notice requirements of this section shall constitute a
waiver of Defendants’ right to obtain an extension of time
under Paragraph 25 below as to the particular violation
involved. Defendants shall also give written notice within
fourteen (14) days of the occurrence of any event which gives
Defendants reason to believe that such event will cause a
violation of any provision of this Consent Decree.
25. If the parties to this Consent Decree agree that the
violation of a provision of this Consent Decree has been or
will be caused by circumstances beyond the control of the
Defendants or of any entity controlled by Defendants,
including consultants and contractors, and that Defendants
and such entities could not have reasonably foreseen and
prevented such violation, the time for performance of such
provision shall be extended in writing by EPA for a period
79a
Appendix D
equal to the actual delay resulting from such circumstances,
and stipulated penalties shall not be due for the delay.
26. If the parties to this Consent Decree are unable to
agree whether the violation was caused by circumstances
beyond the control of Defendants or any entity controlled by
Defendants, or whether the length of time for fulfilling the
provision should be extended, the matter may be submitted
by any party to the Court for resolution, in accordance with
the requirements of Section IX (Dispute Resolution) below.
The Defendants shall bear the burden to prove that any delay
was caused by unforeseen circumstances beyond the
Defendants’ control. If the violation is then determined to
have been caused by circumstances beyond the control of
Defendants and of any entity controlled by Defendants,
including consultants or contractors, and that Defendants
could not have reasonably foreseen and prevented such
violation, Defendants shall be excused as to that violation
for the period of time the violation continues due to such
circumstances.
27. Neither reasonably foreseeable technical problems,
changes in Defendants’ financial circumstances, nor
unanticipated or increased costs or expenses associated with
the implementation of actions required by this Consent
Decree shall serve as the basis for changes in this Consent
Decree or extensions of time for the performance of its
requirements.
80a
Appendix D
IX. DISPUTE RESOLUTION
28. Any dispute arising under or with respect to this
Consent Decree shall in the first instance be the subject of
informal negotiations among the parties to this Consent
Decree for a period of fifteen (15) working days from the
time notice of the existence of the dispute is given. The period
for negotiations may be extended by written agreement of
the parties to this Consent Decree.
29. If a dispute cannot be resolved by informal
negotiation under Paragraph 28 above, then the position
advanced by the United States shall be considered binding
unless, within fifteen (15) days after the end of the informal
negotiations period, Defendants file a petition with this Court
setting forth the matter in dispute, the efforts made by the
parties to resolve it, and Defendants’ proposed resolution.
The United States shall have twenty (20) days to file a
response to Defendants’ petition with an alternative proposal
for resolution of the dispute. In proceedings on any dispute
under this Paragraph, Defendants shall have the burden of
showing that their proposal meets the requirements of this
Consent Decree and the CWA.
30. The filing of a petition asking the Court to resolve a
dispute shall not of itself extend or postpone any obligation
of Defendants under this Consent Decree, but the payment
of stipulated penalties with respect to the disputed matter
shall be stayed pending resolution of the dispute. To the extent
Defendants show that a delay or other noncompliance was
due to a force majeure event or otherwise prevails on the
disputed issue, stipulated penalties shall be excused.
8la
Appendix D
X. ADDRESSES FOR SUBMISSIONS
31. Any payment of monies due under the terms of this
Consent Decree, notices, or other submissions required to
be submitted to EPA or the United States Department of
Justice shall be delivered to the following addresses:
A. To The United States Department of Justice:
Steven E. Rusak, Trial Attorney
U.S. Department of Justice
Environment and Natural Resources Division
10th & Constitution Avenue, N.W.
Washington, D.C. 20530
B. TOEPA:
Gregory T. Carlson, Project Manager
Watershed & Nonpoint Source
Programs Branch
EPA - Region 5 (WW-16]J)
77 West Jackson Blvd.
Chicago, IL 60604
Richard Murawski, Esq.
EPA - Region 5
Office of Regional Counsel, CA-29A
77 West Jackson Blvd.
Chicago, IL 60604
82a
Appendix D
32. Any notice or other communications given by the
United States to the Defendants shall be submitted to the
following address:
Michael L. Muenich, Esq.
3235 45th Street
Highland, Indiana 46322
XI. COSTS OF SUIT
33. Each party shall bear its own costs and attorneys’
fees relating to the matters covered by this Consent.Decree.
Should the Defendants subsequently be determined to have
violated the terms and conditions of this Consent Decree,
Defendants shall be liable to the United States for any costs
and attorneys’ fees incurred by the United States in any action
against the Defendants for such noncompliance.
XII. PUBLIC COMMENT
34. Defendants consent to the entry of this Consent
Decree without further notice. The parties agree that after
the lodging of this Consent Decree, and prior to its entry, the
United States shall, pursuant to 28 C.F.R. § 50.7, publish a
public notice of this Consent Decree and provide an
opportunity for public comments. The United States reserves
the right to withhold or withdraw its consent to entry of this
Consent Decree based upon such public comments.
83a
Appendix D
XI. CONTINUING JURISDICTION OF THE COURT
35. This Court shall retain jurisdiction of this action until
termination of this Consent Decree in order to enforce this
Consent Decree in any manner consistent with applicable law,
or to resolve all disputes arising hereunder as may be necessary
or appropriate for the construction, modification or execution
of this Consent Decree.
36. During the pendency of this action, any party may apply
to the Court for any relief necessary to construe or effectuate
this Consent Decree. The United States reserves all legal and
equitable remedies available to enforce the provisions of this
Consent Decree. Rueth Development Company and Harold G.
Rueth reserve all legal and equitable remedies available to
enforce the provisions of this Consent Decree.
37. Upon its entry by this Court, this Consent Decree shall
have the force and effect of a final judgment. Any modification
of this Consent Decree shall be in writing and, except for
extensions of time pursuant to this Consent Decree provided in
Section VIII (Force Majeure) above, shall not take effect unless
signed by the parties and approved by the Court.
38. This Consent Decree shall terminate after the
Defendants fully and completely fulfill all obligations under
the Consent Decree, including completing the requirements of
the Workplan, and paying any amounts, penalties or
costs that may be due under this Consent Decree. When
appropriate, Defendants shall notify the United States, at the
addresses set forth in Section X (Addresses for Submissions),
that Defendants have fulfilled all obligations of this Consent
Decree. If EPA agrees that all obligations have been fulfilled,
84a
Appendix D
Defendants and EPA will file a joint request with the Court to
terminate the Consent Decree. Any dispute between the parties
as to the completion of all obligations under the Consent Decree
shall be resolved pursuant to Section [IX (Dispute Resolution)
of the Consent Decree.
XIV. COMPUTATION OF TIME
39. In computing any period of time prescribed or allowed
by this Consent Decree, the day of the act after which the
designated period of time begins to run is not to be included.
The last day of the period so computed is to be included, unless
it is a Saturday, Sunday or legal holiday, in which event the
period runs until the end of the next day which is not a Saturday,
Sunday or legal holiday.
XV. JOINT OBLIGATIONS
40. All obligations undertaken collectively in this Consent
Decree by the Defendants are joint and several in nature. Should
one or more of the Defendants fail to perform, the remaining
Defendants shall be responsible for performance of the
obligation, including the payment of any stipulated penalties
that have accrued.
XVI. MISCELLANEOUS
41. The United States acknowledges that Nationwide
Permit 32, found at 33 C.F.R. Part 330 (56 Fed. Reg. 59,110,
59,144 (Nov. 22, 1991)), authorizes discharges of dredged
or fill material placed or remaining in the area depicted on
Exhibit 1, and for work undertaken in accordance with and
in compliance with the terms of this Consent Decree, all
subject to the conditions provided in the Nationwide Permit.
85a
Appendix D
XVII. SIGNATORIES
42.._Each undersigned representative of a party to this
Consent Decree certifies that he or she is fully authorized to
enter into the terms and conditions of this Consent Decree
and to execute and legally bind such party to this document.
FOR THE DEFENDANTS:
s/ Michael L. Muenich s/ 08/03/98
MICHAEL L. MUENICH, Esq. Dated
3235 45th Street
Highland, Indiana 46322
FOR THE UNITED STATES OF AMERICA:
LOIS J. SCHIFFER
Assistant Attorney General
Environment & Natural Resources Division
United States Department of Justice
s/ Steven E. Rusak Oct. 21, 1998.
STEVEN E. RUSAK Dated
Trial Attorney
Environmental Defense Section
Environment & Natural Resources Div.
601 D Street, N.W.
Washington, D.C. 20004
(202) 514-9275
86a
Appendix D
FOR THE UNITED STATES OF AMERICA:
s/ Steven A. Herman 9/30/98
STEVEN A. HERMAN Dated
Assistant Administrator for
Enforcement and Compliance Assurance
U.S. EPA
Washington, D.C. 20460
FOR THE UNITED STATES OF AMERICA:
s/ David A. Ullrich September 10, 1998
DAVID A. ULLRICH ; Dated
Acting Regional Administrator
U.S. EPA - Region 5
77 West Jackson Blvd.
Chicago, IL 60604
JUDGMENT IS HEREBY ENTERED in accordance with
the terms of the foregoing Consent Decree this 26 day of
January, 1999.
s/ [illegible]
UNITED STATES DISTRICT JUDGE
United States District Court
for the Northern District of Indiana
87a
APPENDIX E — STATUTORY PROVISIONS
INVOLVED
33 U.S.C. § 1311 provides in pertinent part:
§ 1311. Effluent limitations
(a) Illegality of pollutant discharges except in
compliance with law.
Except as in compliance with this section and
sections 1312, 1316, 1317, 1328, 1342, and 1344
of this title, the discharge of any pollutant by any
person shall be unlawful.
33 U.S.C. § 1344 provides in pertinent part:
§ 1344. Permits for dredged or fill material
(a) Discharge into navigable waters at specified
disposal sites.
The Secretary may issue permits, after notice and
opportunity for pubiic hearings for the discharge
of dredged or fill material into the navigable
waters at specified disposal sites. Not later than
the fifteenth day after the date an applicant
submits all the information required to complete
an application for a permit under this subsection,
the Secretary shall publish the notice required by
this subsection.
88a )
Appendix E
33 U.S.C. § 1362 provides in pertinent part:
§ 1362. Definitions
(5) The term “person” means an individual,
corporation, partnership, association, State,
municipality, commission, or political subdivision
of a State, or any interstate body.
(6) The term “pollutant” means dredged spoil,
solid waste, incinerator residue, sewage, garbage,
sewage sludge, munitions, chemical wastes,
biological materials, radioactive materials, heat,
wrecked or discarded equipment, rock, sand, cellar
dirt and industrial, municipal, and agricultural
waste discharged into water. * * *
(7) The term “navigable waters” means the waters
of the United States, including the territorial seas.
* * *
(12) The term “discharge of a pollutant” and the
term “discharge of pollutants” each means (A) any
addition of any pollutant to navigable waters from
any point source, (B) any addition of any pollutant
to the waters of the contiguous zone or the ocean
from any point source other than a vessel or other
floating craft.
SS rae
FR or SIT A OO nag
89a
Appendix E
(14) The term “point source” means any
discernible, confined and discrete conveyance,
including but not limited to any pipe, ditch,
channel, tunnel, conduit, well, discrete fissure,
container, rolling stock, concentrated animal
feeding eperation, or vessel or other floating craft,
from which pollutants are or may be discharged.
This term does not include agricultural stormwater
discharges and return flows from irrigated
agriculture.