No. 01-178
IN THE
Supreme Court of the sited State ™ |
TRIGEN-OKLAHOMA CITY ENERGY CORPORATION,
Petitioner,
Vv.
OKLAHOMA GAS & ELECTRIC COMPANY,
Respondent.
On Petition for a Writ of Certiorari to the
United States Court of Appeals for the Tenth Circuit
REPLY BRIEF IN SUPPORT OF
PETITION FOR WRIT OF CERTIORARI
BERNAYS T. BARCLAY GRIFFIN B. BELL
KING & SPALDING KEVIN R. SULLIVAN
1185 Avenue of the Americas Counsel of Record
New York, NY 10036 JEFFREY S. BUCHOLTZ
(212) 556-2100 KING & SPALDING
1730 Pennsylvania Avenue, N.W.
Washington, DC 20006
(202) 737-0500
October 9, 2001 Attorneys for Petitioner
QUESTION PRESENTED
Whether a state-regulated private utility enjoys state-
action immunity from antitrust liability for its
monopolization of an unregulated market by means of non-
price anti-competitive conduct neither approved nor
supervised by the State.
il
TABLE OF CONTENTS
QUESTION PRREGIICI IGM sccscsnessticisessssensnalabiisteebtsmnsticssacabissn i
TABLE OF AUTH it ccsecnsistubicaiiineintinkenennescs ili
REPLY BRIEF IN SUPPORT OF PETITION
FOR WRIT OFF CORT peli ciasstanrapbirnibniteicstetumsescestectnens ]
CONCLUSIGIN .......::nsisssianstneeaaaialaaaaaaaaaanaiad 10
ill
TABLE OF AUTHORITIES
Cases: Page:
AT&T v. Central Office Tel., Inc.,
I I I ic cehicshianhcecihehesninsniivedbaniincthiaheease 9
Cantor v. Detroit Edison Co..,
I, re IT aciencchasconinseusnsbestanncdiasinedans 4,5,6
Continental Ore Co. v. Union Carbide Corp.,
SE STE snciitivsiniiinsdeaisicuinniiasenpeinianceiesinnicnnbesi 9
DFW Metro Line Servs. v. Southwestern
Bell Tel. Corp.,
ES ad | Ea TD 4
FTC v. Superior Court Trial Lawyers Ass'n,
A PEE SII sci cassecicdnndsinecinieineisiententanennnnonss 10
FTC v. Ticor Title Ins. Co.,
Seno ReMO passim
In re Lower Lake Erie Iron Ore Antitrust Litig.,
a BE 2 | | en 9
Major League Baseball Players Ass’n v. Garvey,
121 S.Ct. 1724 (2001) (per curiam) ................:ceeees 8
National Collegiate Athletic Ass’n v. Smith,
Se itis ME CID ccteninsncenccssncsesen FN pe As ERO:
Otter Tail Power Co. v. United States,
ss Er eee
iV
Patrick v. Burget,
er Pe GE aisestnccnicsnnsticntnsnstnnienennensninnedeiainnnid 8
Ticor Title Ins. Co. v. FTC,
Fe a Oe CE i BED iiccticcssninncsinacentntiintornenies 7
Ticor Title Ins. Co. v. FTC,
Oe ae Be eG Fe ccicncsicticinistittctntbintineioninni 7
Town of Concord v. Boston Edison Co.,
EES gl =, nen mn se 5,8
Town of Hallie v. City of Eau Claire,
Re ET aT Se 6,7
Walker Process Equip., Inc. v.
Food Mach. & Chem. Corp.,
Re Se Se Ce wiiwsinieiinteiiansniiensititsimindigitaliigaiiial 10
Wharf (Holdings) Ltd. v. United Int’! Holdings, Inc.,
EAS Bee Ge Ce F arinsheniebiniccinnsieieniencidaianioainital 8
Constitutional Provisions, Statutes, and Rules:
te ARR ners cnn per ee aeRO NEN oy
BD Chstiiw SF ae sccivsscnnensonienviinstnnniensinintiienaimninaninnalinneniennisininiutinne 6,8
BO Bs C0 FP Fa cceninensnseritinsiinsanipnsingeeatiictiatiiiaaiiasibniiieniiians 6
REPLY BRIEF IN SUPPORT OF PETITION FOR
CERTIORARI
_ The decision below holds that if a utility’s rates are
regulated, it is immune from antitrust liability, even if the
particular anti-competitive conduct challenged is non-price
predation neither authorized nor supervised by the State.
This decision extends private-party immunity far beyond
what this Court’s precedents countenance, and it comes at a
critical time of transition when market-power concerns in
many industries are heightened and the need for vigorous
antitrust enforcement is correspondingly great. See Pet. 8-
12; Brief of Amici Curiae National Energy Marketers Ass’n,
et al. 2-8; Brief of Amici Curiae United States Combined
Heat and Power Ass’n, et al. 1-4, 9-12. By basing immunity
on status rather than conduct, the decision below will sow
confusion and frustrate the States’ ability to protect their
citizens. By raising a litany of unrelated issues and failing to
face the question presented, respondent OG&E’s brief in
opposition further underscores the need for review.
OG&E’s brief in opposition cannot obscure the reality
that the decision below departed from this Court’s
precedents by conferring blanket immunity based on
OG&E’s status as a regulated utility, despite the fact that
Oklahoma neither authorized nor supervised the anti-
competitive conduct at issue. OG&E does not contend that
Oklahoma clearly authorized or actively supervised the non-
price predatory conduct for which the jury found OG&E
liable, including misrepresentations, contractual interference,
and improper payments. Rather than meet the question
presented, OG&E attempts to change the subject.
First, in its defense of the Tenth Circuit’s state-action
immunity holding, OG&E proceeds as if the jury found it
liable for charging predatory rates. is is mere evasion;
Trigen does not challenge any of OG&E’s rates. Second,
even though the decision below rested entirely on state-
action immunity, much of OG&E’s opposition does not
|
|
|
2
address this issue at all but rather reargues the weight of the
evidence and complains of trial rulings on other issues.
OG&E distorts the record and misstates the law on these new
issues, but that ultimately is beside the point, for OG&E
offers no support for its suggestion that this Court reach out
to resolve these fact-dependent issues in the first instance.
OG&E’s inability to face the question actually presented
testifies powerfully to the need for review.
1. OG&E does not dispute that, under this Court’s
precedents, a private party is not immune unless its
“particular anticompetitive conduct at issue” was both
clearly authorized and actively supervised by the State. F7C
v. Ticor Title Ins. Co., 504 U.S. 621, 634 (1992) (emphasis
added). Our petition described OG&E’s “extensive and
varied non-price predatory conduct” in furtherance of its
Plan of Action to “remove customers from Trigen.” Pet. 2-3.
The petition made crystal clear that Trigen did not and does
not claim that OG&E’s rates are predatory. Pet. 1-4; see
also 10" Cir. App. vol. I at 36-41 (amended complaint).'
And the petition explained that the Tenth Circuit adopted an
unprecedented status-based immunity by holding that “[a]s a
state-regulated electric utility, OG&E has clearly met the
two-prong test for state action immunity,” Pet. App. 9a, even
though the court did not and could not find that the
challenged non-price predatory conduct was authorized or
supervised by Oklahoma.
a. Precluded by the record from contending that
Oklahoma authorized or supervised the non-price conduct
' Trigen’s claims concerning the County and Corporate Tower do not
involve OG&E’s rates even in passing. One aspect of Trigen’s claim
conceming Oklahoma City is OG&E’s misrepresentation of the benefits
that the City would obtain with OG&E’s RTP tariff, but this claim in no
way challenges the RTP tariff itself. Trigen’s claim is not that the RTP
tariff is predatory, but the opposite: that because OG&E could not win
the competition for the City on the basis of price, OG&E resorted to
misrepresentations and other non-price predation. See also Pet. 4 & n.3.
3
that Trigen challenges here, OG&E has rewritten Tngen’s
complaint as a challenge to OG&E’s rates. Thus OG&E
attributes to Trigen an “assertion that the OCC does not
actively supervise OG&E’s rates.” Opp. 14. Trigen has
made no such assertion. For this reason, OG&E’s detour
into the 1996-97 OCC proceedings is irrelevant. Whether or
not these proceedings show that the OCC’s review of
OG&E’s rates is “detailed, deliberate and judicious,” Opp.
12, these rate proceedings plainly cannot show that
Oklahoma clearly authorized and actively supervised the
non-price conduct at issue in this case.
OG&E’s account of these OCC proceedings also is
incorrect. OG&E claims that the OCC’s February 11, 1997
Order “specifically rejected Trigen’s position on the RTP
tariffs.” Opp. 13. The Order did no such thing -- it involved
unrelated issues and did not even mention the RTP tariff.”
b. When OG&E does not misdirect the Court’s attention
to its rates, it offers vague and unsupported assertions that
the court below correctly found that Oklahoma supervises
“OG&E” (Opp. 15), “OG&E’s activities” (Opp. 15, 17), or
“OG&E’s conduct” (Opp. 7). These empty generalities
cannot come close to satisfying this Court’s private-party
immunity precedents. As our petition explained, “[n]o one
? This Order is reprinted at App. la, infra. OG&E’s statement that “the
OCC considered and rejected Trigen’s similar allegations” in the 1996-97
proceedings is equally disingenuous. In the OCC, contrary to its position
in the court below, OG&E argued successfully that “the Commission is
without jurisdiction to determine or adjudicate the private dispute
between Trigen and OG&E now pending in the federal District Court,
and the Commission is equally without jurisdiction to entertain
allegations of anticompetitive practices which might occur now or in the
future.” OG&E Mot. in Limine (filed Jan. 17, 1997) (reprinted at App.
21a, 28a, infra); compare Pet. App. 13a-14a (holding below that the
OCC has exclusive jurisdiction over Trigen’s state-law antitrust and tort
claims). In addition, any implication that Trigen settled its claims in the
Settlement Agreement approved by the OCC on February 11, 1997 is
untrue; Trigen was not a party to that Agreement. See App. 9a, infra.
4
disputes that the OCC ‘supervises OG&E,’ [Pet. App. 10a],
to some extent and in some respects. The relevant question
under this Court’s precedents, however, is whether ‘the
particular anticompetitive conduct at issue . . . [was]
supervised by governmental actors.’” Pet. 15 (quoting TJicor,
504 U.S. at 634). OG&E, like the Tenth Circuit,
conspicuously fails to address that critical question.”
c. Although OG&E disclaims any blanket, status-based
immunity and describes the decision below as
“unremarkable,” Opp. 7, 10-11, this description does not
withstand examination. First, OG&E embraces the holding
below that its “alleged ‘bad acts’” could not “somehow
destroy” its immunity. Opp. 18-19. Under Ticor, however,
not even a regulated utility has immunity “in the air,”
divorced from an analysis of the State’s involvement in the
“bad acts” at issue. OG&E offers no response at all to our
explanation of the Tenth Circuit’s error in beginning from a
premise -- indeed, a seemingly conclusive presumption -- of
blanket immunity for regulated utilities. See Pet. 17.
OG&E likewise embraces the holding below that because
“OG&E is selling only one thing -- electricity at state-
regulated rates,” it is immune for any and all conduct. Pet.
App. 1la (emphasis added). OG&E does not dispute that it
would be subject to “antitrust standards” under Cantor v.
Detroit Edison Co., 428 U.S. 579, 596 (1976), if it
“engage[d] in business activity in [a] competitive area[ ] of
the economy.” See Opp. 16-17. But OG&E contends that it
> Citing DFW Metro Line Servs. v. Southwestern Bell Tel. Corp., 988
F.2d 601 (5™ Cir. 1993), OG&E chides Trigen (Opp. 15) for supposedly
making the “‘ludicrous’”” argument that “the OCC does not actively
supervise OG&E.” The very sentence quoted by OG&E, however,
demonstrates that the DFW court analyzed whether the State supervised
“the conduct in question,” 988 F.2d at 607, not merely whether it
supervised “the defendant.” Because the plaintiff challenged the rates
that the defendant charged it and those rates were actively supervised, the
court held that the defendant was immune for the conduct in question.
See id. at 605-07.
> ee
5
could not have been so engaged, because it “was only
attempting to market and sell one product, electricity.” Jd.
There can be no mistaking the import of the Tenth
Circuit’s holding. Every electric utility sells electricity at
regulated rates. If an electric utility’s sales at regulated rates
immunized anything and everything that the utility might do,
then every electric utility would enjoy a blanket immunity
based on its status “[a]s a state-regulated utility,” Pet. App.
9a. Such a result would make nonsense of this Court’s
admonition that “there can be no doubt about the proposition
that the federal antitrust laws are applicable to electrical
utilities.” Cantor, 428 U.S. at 596 n.35 (citing Otter Tail
Power Co. v. United States, 410 U.S. 366 (1973)); accord,
e.g., Town of Concord v. Boston Edison Co., 915 F.2d 17, 21
(1* Cir. 1990) (Breyer, C.J.) (“Even though Boston Edison is
a regulated firm, it has no blanket immunity from antitrust
laws.”’).
The court below also ignored the record in holding that
OG&E could not be “engage[d] in business activity in [a]
competitive area[ ] of the economy” under Cantor because it
sells only electricity, see Pet. App. 1la-i2a, and OG&E
ignores the record in defending that holding. Most
obviously, OG&E conceded that “Trigen and OG&E are
direct and substantial competitors.” OG&E 10" Cir. Br. 9.
Even without that concession, it would be difficult to
understand why OG&E implemented a “Plan of Action” to
“remove customers from Trigen” if OG&E was not engaged
in a competitive area of the economy.
OG&E disputes Trigen’s definition of the relevant
market as the market for cooling services, and asserts that the
Tenth Circuit rejected that definition. See Opp. 6, 8, 24-25.
It is unclear whether OG&E means to defend the holding
below that OG&E is immune because it was not engaged in a
competitive area of the economy, or to raise a separate
challenge to the verdict. OG&E is wrong regardless.
6
First, as our petition explained, immunity attaches to
conduct, not to markets or products. Because Oklahoma did
not clearly authorize or actively supervise OG&E’s conduct
challenged here, OG&E is not immune. The proper market
definition might relate to other issues under § 2 of the
Sherman Act, but_it does not determine whether OG&E is
immune. See Pet. 19-20. Accordingly, even if the Tenth
Circuit had held that the jury’s market-definition finding was
not supported by the evidence, such a conclusion would not
have justified the court’s holding that OG&E was immune.
Second, contrary to OG&E’s assertions, the Tenth
Circuit did not purport to reject the jury’s market-definition
finding. The court did not mention the jury’s finding or the
standard of review under Fed. R. Civ. P. 50, see Pet. 18-19,
and properly so: the evidence abundantly supported the
jury’s finding.* Rather, the court appears to have held that
OG&E could not have been participating in the competitive
cooling-services market for purposes of Cantor because it
does not sell chillers. As explained above, this holding
cannot be reconciled with the record, and it in any event
misconceives the immunity inquiry by focusing on what
products OG&E was selling rather than on whether the State
authorized and supervised OG&E’s conduct at issue.”
* OG&E’s parade of horribles (Opp. 24) ignores that (1) the jury heard
evidence demonstrating that consumers perceived OG&E and Trigen as
the only real alternatives for cooling services, and that the cost of the
additional input of a chiller did not significantly affect their choice, 10"
Cir. App. vol. IX at 2304-36, 2349-59, 2408-13; (2) OG&E opted not to
offer any evidence on this issue; and (3) products and services need only
be reasonably interchangeable, and not technologically identical, to be in
the same market, Pet. 19-21 & n.16; see also Brief of Amici Curiae
United States Combined Heat and Power Ass’n, et al. 7-9.
* OG&E also argues (Opp. 19-20) that because a municipality’s anti-
competitive conduct can be immune even if not actively supervised by
the State, its conduct directed at municipalities should be immune
without any supervision. OG&E cites Town of Hallie v. City of Eau
Claire, 471 U.S. 34 (1985), but ignores that the Court took pains to
7
2. a. Much of OG&E’s opposition does not defend the
state-action immunity holding below at all, but argues that
OG&E should prevail on other grounds. In the first place, as
arguments against certiorari, these arguments are baffling.
Just as in Ticor, the decision below rested solely on state-
action immunity grounds, and it therefore squarely presents
the question addressed by our petition.° The prospect that
the respondent might prevail on other grounds on remand is
as beside the point here as it was in Jicor. See also Ticor
Title Ins. Co. v. FTC, 998 F.2d 1129 (3d Cir. 1993)
(considering McCarran-Ferguson Act and Noerr arguments
on remand from this Court). Moreover, to the extent that
OG&E suggests that this Court should reach these new
distinguish private parties from municipalities: “We may presume,
absent a showing to the contrary, that the municipality acts in the public
interest. A private party, on the other hand, may be presumed to be
acting primarily on his or its own behalf.” Jd. at 45 (footnote omitted).
Moreover, OG&E errs in accusing Trigen of “attempt{ing] to veto
government action.” Opp. 20. Trigen sued OG&E because OG&E --
and not the County or City -- implemented a predatory Plan of Action to
remove customers from Trigen and monopolize the cooling-services
market. In any event, because Oklahoma did not clearly authorize
OG&E’s non-price predation, OG&E would not be immune even if
(contrary to fact) no supervision requirement applied. See Pet. 16.
° Compare Pet. App. 6a (“Because we hold that the state action doctrine
mandates the dismissal of the federal antitrust claims . . . we decline to
reach the Noerr-Pennington and filed rate doctrine defenses. Nor is it
necessary to address OG&E’s arguments concerning reversible error at
trial . . . .”) with Ticor Title Ins. Co. v. FTC, 922 F.2d 1122, 1140 n.17
(3d Cir. 1991) (“Because we hold that Ticor’s setting of collective rates .
. . ls immune from antitrust liability under the state action doctrine, it is
unnecessary to consider whether the same activity is also exempt from
antitrust regulation under the McCarran-Ferguson Act . . . [or] the Noerr-
Pennington doctrine.”). OG&E’s claim that the Tenth Circuit “did
address several key elements of these other grounds,” Opp. 21, is
unfounded. The decision below did not reach in any manner OG&E’s
Noerr, filed-rate, or antitrust injury arguments, OG&E’s challenge to the
jury’s finding of anti-competitive conduct, or OG&E’s complaints about
the jury instructions or the district judge’s evidentiary rulings.
8
issues in order to affirm the judgment below on other
grounds, see Opp. i, that suggestion ignores this Court’s
practice. See, e.g., National Collegiate Athletic Ass'n v.
Smith, 525 U.S. 459, 470 (1999) (“we do not decide in the
first instance issues not decided below’). OG&E offers no
reason why this Court should depart from its usual practice
by reaching out to resolve these fact-intensive issues.
b. OG&E’s arguments on these new issues are meritless
in any event. Because these arguments are beside the point
as just explained, and because Tnigen’s briefs in the court
below respond fully to them, we point out here only a few of
OG&E’s errors.
First, OG&E maintains that what it light-handedly terms
its “marketing and sales efforts’ (Opp. 18 n.9) were
innocuous and not anti-competitive as required by § 2. See
also Opp. 8-9, 25-26. But in offering a selective and
tendentious account of its conduct, see, e.g., Opp. 18 n.9,
OG&E forgets that, as the verdict-loser, the record must be
viewed in the light least favorable to it. See, e.g., Wharf
(Holdings) Ltd. v. United Int’l Holdings, Inc., 121 S.Ct.
1776, 1779 (2001); Patrick v. Burget, 486 U.S. 94, 98 n.3
(1988); cf Major League Baseball Players Ass'n v. Garvey,
121 S.Ct. 1724 (2001) (per curiam). For example, OG&E
fails to explain how its method of “Tngen competition” --
paying $138,000 for no apparent work to the son of a county
commissioner whose vote OG&E needed -- qualifies as
“competition based on price and service,” Opp. 3 n.1. Nor
does OG&E explain what misrepresentations, interference
with contract, and wining and dining public officials have to
do with “competition’s basic goals -- lower prices, better
products, and more efficient production methods.” Town of
Concord, 915 F.2d at 22; see also Pet. 2-3 & n.1.
Second, in its argument based on the filed-rate doctrine,
OG&E again quarrels with the verdict, dismissing what the
jury must be presumed to have found was a
misrepresentation as merely an “incorrect estimate[ ],”’ and
9
seeking to shift the blame to its “consultants.” Opp. 23.
OG&E also misstates the law. This Court has not held that
“[t]he filed-rate doctrine bars any suit based on incorrect
estimates of a tariffed service, ‘even if a carrier intentionally
misrepresents its rate.”” Id. (quoting AT&T v. Central Office
Tel., Inc., 524 U.S. 214, 222 (1998)). This Court’s
statement, when quoted in full, makes clear that Central
Office bars a suit to enforce a promised rate that differs from
the filed rate: “Thus, even if a carrier intentionally
misrepresents its rate and a customer relies on the
misrepresentation, the carrier cannot be held to the promised
rate if it conflicts with the published tariff.” 524 U.S. at 222.
The jury did not order OG&E to charge Trigen a non-filed
rate, and it did not award Trigen a refund of the difference
between any promised non-filed rate and OG&E’s filed
rates. Instead, the jury awarded Trigen the profits that it lost
because of (among many other things) OG&E’s
misrepresentations to the City of the average cost that it
would obtain using the RTP tariff. See also supra at 2 n.1.
The filed-rate doctrine has no application here. See, e.g., In
re Lower Lake Erie Iron Ore Antitrust Litig., 998 F.2d 1144,
1159 (3d Cir. 1993) (filed-rate doctrine “does not preclude
liability based on non-rate anticompetitive activity”).
Third, OG&E’s claim of Noerr immunity is misplaced as
well. The Noerr doctrine is an interpretation of the Sherman
Act designed to avoid penalizing citizens for exercising their
right to “petition the Government for a redress of
grievances.” U.S. Const. amend. I. The Petition Clause,
however, does not guarantee a right to wine and dine
government purchasing agents. As this Court emphasized in
Continental Ore Co. v. Union Carbide Corp., 370 U.S. 690,
707-08 (1962), when a company is “engaged in private
commercial activity, no element of which involved seeking
to procure the passage or enforcement of laws,” applying the
Sherman Act does not “remotely infringe upon any of the
constitutionally protected freedoms spoken of in Noerr.”
10
Extending Noerr immunity to OG&E’s purely commercial
activity would remove government contracting from the
coverage of the antitrust laws. Moreover, Noerr protects
efforts to procure legislation that permits activity that
otherwise would be unlawful; it does not protect activity that
otherwise is unlawful just because that activity is directed at
a government. See, eg. FTC v. Superior Court Trial
Lawyers Ass'n, 493 U.S. 411, 424-25 (1990); Walker
Process Equip., Inc. v. Food Mach. & Chem. Corp., 382
U.S. 172, 177 (1965). Accordingly, OG&E did not
immunize its predatory conduct by including governments
among its targets.
CONCLUSION
~ For the reasons stated herein and in Trigen’s petition,
certiorari should be granted.
Respectfully submitted,
Bernays T. Barclay Griffin B. Bell
KING & SPALDING Kevin R. Sullivan
1185 Avenue of the Americas Counsel of Record
New York, NY 10036 Jeffrey S. Bucholtz
(212) 556-2100 KING & SPALDING
1730 Pennsylvania Ave., NW
Washington, DC 20006
(202) 737-0500
October 9, 2001 Attorneys for Petitioner
APPENDIX
INDEX
APPENDIX Page
A. Order of the Oklahoma Corporation Commission
approving joint stipulation and settlement agreement
(Cause No. PUD 960000116) (Feb. 11, 1997) ........ la
B. OG&E Bnef in Support of Motion in Limine (Cause
No. PUD 96000016) (Jan. 17, 1997)......:-sssessesseees 21a
*
*
APPENDIX A
BEFORE THE CORPORATION COMMISSION
OF THE STATE OF OKLAHOMA
IN THE MATTER OF THE ) CAUSE NO.
APPLICATION OF OKLAHOMA ) PUD 960000116
GAS AND ELECTRIC COMPANY )
FOR AN ORDER OF THE ) ORDER NO.
COMMISSION AUTHORIZING ) 409383
APPLICANT TO MODIFY ITS )
RATES, CHARGES AND )
TARIFFS FOR RETAIL )
ELECTRIC SERVICE IN )
OKLAHOMA )
Hearings: May 16, June 17, July 11, 25, August 8,
29, September 5, 12, 19, 26, 30, October
10, 11, 17, 21, 24, 31, and November 7,
13, 14, 21, 22, 1996 before the
Administrative Law Judge;
November 22, 25, December 16, 18, 1996,
and January 6, 13, 14, 15, 16, 21, 22, 23,
1997 before the Commission en banc.
Appearances: H.D. Binns, Jr., Robert D. Stewart, Jr.,
Diane S. Goldschmidt, and John W.
Harbour, Jr., Attorneys for Oklahoma Gas
and Electric Company;
Maribeth D. Snapp, Andrea P. Johnson,
Cece Wood, and Jacqueline T. Miller,
Attorneys for the Public Utility Division,
Oklahoma Corporation Commission;
2a
Rick D. Chamberlain and Mickey S.
Moon, Attorneys for the Attorney General
of the State of Oklahoma;
William J. Bullard and Kimberly K.
Blaylock, Attorneys for the Oklahoma
Industrial Energy Consumers and Air
Liquide America Corporation;
J. * Gist, James D. Satrom, and G.
Dean Luthey, Jr., Attorneys for Terra
International (Oklahoma), Inc.;
George M. Makohin, Attorney for GPM
Gas Corporation;
John A. Gaberino, Jr., Robert A.
Huffman, Jr., and Vivian C. Hale,
Attorneys for Oklahoma Natural Gas
Company/ONG Transmission Company;
D. Kent Meyers, Robert E. Bacharach,
Bernays T. Barclay, and Erik J. Swenson,
Attorneys for Trigen-Oklahoma Energy
Corporation;
John J. Breathwit and Babette Patton,
Attorneys for The PowerSmith
Cogeneration Project;
Cody B. Waddell, Attorney for the
Commission on Marginally Producing Oil
and Gas Wells;
3a
Richard R. Wilfong, Attorney for
Oklahoma Gas and Electric Company’s
Shareholders’ Association;
W. Bland Williamson, Steven J.
Goetziinger, Henry A. Meyer, III, and
John J. Randolph, Attorneys for
Oklahoma Independent Petroleum
Association;
John Lovett and Brent B. Moore,
Attorneys for Oklahoma Mid-Continent
Oil and Gas Association;
Cheryl A. Vaught, Attorney for Mid-
Continent Power Company, Inc.; and
Thomas F. Golden and William R.
Burkett, Attorneys for AES Shady Point,
Inc.
ORDER APPROVING JOINT STIPULATION
AND SETTLEMENT AGREEMENT
BY THE COMMISSION:
The Corporation Commission of the State of Oklahoma
(“Commission”) being regularly in session and _ the
undersigned Commissioners being present and participating,
the Joint Stipulation and Settlement Agreement made and
executed by Oklahoma Gas and Electric Company (“OG&E”
or “Applicant” or “Company’), the Public Utility Division of
the Oklahoma Corporation Commission (‘Staff’), the
Attorney General for the State of Oklahoma (“AG”), the
Oklahoma Industrial Energy Consumers (“OIEC”), Terra
International (Oklahoma), Inc. (“Terra”), Air Liquide
4a
America Corporation (“Air Liquide”), The PowerSmith
Cogeneration Project (“PowerSmith”), the Commission on
Marginally Producing Oil and Gas Wells (“Marginal Well
Commission’), Oklahoma Gas and Electric Company’s
Shareholders’ Association (“Shareholders”), the Oklahoma
Independent Petroleum Association (“OIPA”), Mid-
Continent Power Company (“MCPC”), Oklahoma Mid-
Continent Oil & Gas Association (“CO&G”), and AES
Shady Point, Inc. (“AES”), all hereinafter collectively
referred to as the “Stipulating Parties,” comes on for
consideration. A copy of the Joint Stipulation and
Settlement Agreement (hereinafter referred to as the
“Stipulation”) is attached hereto as “Attachment A” and
incorporated herein by reference.
PROCEDURAL HISTORY AND
SUMMARY OF THE EVIDENCE
On May 2, 1996, OG&E filed its Notice of Intent with
attached exhibits indicating the Company’s intent to file for
rate review in accordance with the Commission’s Rules
(OAC 165:70). The Attorney General of the State of
Oklahoma filed a Motion to Intervene on May 10, and that
Motion was granted May 21, 1996, by Commission Order
No. 402038. On June 12, the Company filed its Motion for
Protective Order.
One June 17, 1996, OG&E filed with the Commission an
Application seeking to reduce its Oklahoma jurisdictional
gross annual revenues, exclusive of gross receipts or
franchise taxes, in the amount of $14.2 million effective with
its first billing period in the month of March, 1997.
Concurrently with the filing of the Application, the Company
filed its Application Package comprising the Minimum
Standard Filing Requirements as required by OAC 165:70.
Contained in the Application Package, consisting of two
Sa
volumes,’ OG&E submitted the prefiled testimony of Mr.
James R. Hatfield, Mr. William D. Steinmeier, Mr. Charles
A. Benore, Mr. Don L. Young, Mr. Jack T. Coffman, Mr.
Byron F. Johnson, Mr. John Gunesh, and Mr. William L.
Wylie, along with schedules and exhibits for the test year
ending December 31, 1995, reflecting Oklahoma
jurisdictional operational pro forma revenues. of
$1,011,873,001. Based upon the pro forma adjusted test
- year as reflected in the Company’s exhibits, OG&E
requested in its Application that its pro forma Oklahoma
jurisdictional revenues be reduced by $14,209,880 effective
with the first billing cycle in the revenue month of March
1997.
The Commission granted OG&E’s request for protective
order by issuing Order No. 402839 on June 24, and attached
a Proprietary Agreement form for the use of the parties in
this proceeding. On July 3, the OIEC and Terra filed
motions to intervene, and on July 8, 1996, the Staff filed its
statement reflecting substantial compliance with OAC
165:70 by the Applicant with respect to the Application
Package submitted and filed with the Commission. GPM
filed its Motion to Intervene on July 16, and July 17, 1996,
the Commission issued Orders Numbered 403464 and
403465 which respectively set the hearing on the merits of
this cause before the Commission en banc and granted
intervenor status in this proceeding to Terra and OIEC. On
July 24, 1996, Trigen filed its Motion to Intervene. On July
30, the Commission entered Order No. 403870 granting
GPM’s Motion to Intervene, and on August 14, the
Commission entered Order No. 404252 granting Trigen’s
Motion to Intervene.
' Volume I containing the Application and the prefiled testimony of all
OG&E’s witnesses supporting Applicant’s direct case was received in
evidence as Exhibit 8; Volume II containing Company’s Test Year
schedules and exhibits supporting the requested rate reduction was
received in evidence as Exhibit 9.
6a
On August 23, 1996, Air Liquide and ONG filed Motions
to Intervene, and on August 29, the Marginal Well
Commission filed its Motion to Intervene in this proceeding.
On September 6, 1996, PowerSmith filed its motion seeking
intervenor status, and on the same date the Commission
issued Order No. 404968 granting Air Liquide’s and ONG’s
Motions to Intervene. Thereafter, on September 10, the
Commission granted intervenor status to the Marginal Well
Commission by Order No. 405042. On September 11, the
Shareholders filed its Motion to Intervene, and on the
following day the OIPA moved to intervene in the case.
GPM filed its list of major issues in this case on September
13; Staff and ONG filed their lists of major issues on
September 17; Terra, Air Liquide, and OEIC filed their lists
of major issues on September 18; and the AG and the
Marginal Well Commission filed their lists of major issues
on September 19. MCPC and CO&G filed motions to
intervene on September 20. The Commission granted
OIPA’s Motion to Intervene by Order No. 405461 issued on
September 24. On October 2, AES filed its Motion to
Intervene. The Shareholders were granted intervenor status
on October 3, 1996, by Order No. 405736.
The Commission issued its Scheduling Order for this
proceeding in its Order No. 405789 on October 4, 1996, and
on October 14, 1996, Staff, the AG, OIEC, and Terra filed
responsive testimony addressing Applicant’s revenue
requirement. Staff filed exhibits supporting its position” and
prefiled responsive testimony of B. Aurobindo, David
Dorsey, Malini Ghandi, Glen Gregory, Susan Hayes, David
Jones, George Kiser, Larry Manning, George Mathai,
Michael Read, G. David Scalf, Vibha Thacker, Steve Wilt,
and Miranda Xing. The AG filed prefiled responsive
? Staff Accounting Exhibit was admitted in evidence as Exhibit 94 and an
amendment thereto was admitted in evidence as Exhibit 134.
7a
testimony of Michael Brosch’ and Steve Carver along with
exhibits supporting their position; OIEC filed prefiled
responsive testimony of Mark Garrett, Michael Gorman, and
James Selecky; Shareholders filed prefiled testimony and
exhibits of Donald A. Murray; and Terra filed prefiled
testimony and exhibits of Douglas Burton. On October 15,
1996, statements of position were filed by ONG, Air
Liquide, and Trigen. Thereafter, on October 21, 1996,
pursuant to the Scheduling Order, Staff, the AG, OIEC,
Terra, GPM, and the Marginal Well Commission filed
responsive testimony addressing issues other than
Applicant’s revenue requirement. In that connection, Staff
filed prefiled testimony of David Brammer,’ Lynn Ferry, and
Kenneth Zimmerman; the AG filed additional prefiled
testimony of Michael Brosch; OIEC filed additional
testimony of James Selecky; Terra filed additional testimony
of Douglas Burton; GPM filed testimony of John F. Brown;
and the Marginal Well Commission filed testimony of A.M.
Alloway. On October 29, OIPA filed prefiled responsive
testimony of Mickey Thompson, and on October 31, 1996,
Staff Witness Ferry filed prefiled testimony amending her
previously filed testimony.
The Commission issued its Notice of Hearing” on
October 28, 1996, setting the hearing on the merits in this
case before the Commission en banc to commence on
November 22, 1996, and on November 20, 1996, Proof of
> Portions of Mr. Brosch’s prefiled testimony were admitted in evidence
as Exhibits 346, 347 and 348.
* Direct testimony admitted in evidence as Exhibit 135 and Amended
testimony admitted as Exhibit 197.
> Admitted in evidence as Exhibit 139.
° Exhibit 157 in the record of this cause.
8a
Publication’ of the Notice of Hearing and the Affidavit of
Publication® of the Notice of Hearing were filed by the Tulsa
World and by The Daily Oklahoman, respectively. In
addition, the Company gave actual notice of the hearing to
be conducted by the Commission to all of its Oklahoma
jurisdictional customers through a bill insert? in compliance
with the Commission’s Notice of Hearing.
The Company filed prefiled rebuttal testimony of its
witness, Mr. William Steinmeier, on November 5, and on
November 6, 1996, OG&E prefiled rebuttal testimony and
exhibits of Mr. Martin Blake, Mr. Mike Davis, Dr. Jay
Lukens,'° Mr. Don Rowlett,’ and of all remaining witnesses
who filed testimony in support of Applicant’s request for rate
reduction. In further compliance with the Scheduling Order,
on November 18, 1996, the parties to this proceeding filed
and exchanged summaries of all testimony filed and those
parties not presenting witnesses in support of their position
were given an opportunity to file statements of positions.
This cause came on for hearing before the Commission
en banc on November 22, 1996, as specified in the Notice of
Hearing, and with all parties present and participating, the
hearing on the merits was continued on the record to 1:30
p.m. on November 25, 1996, to give the parties additional
time to negotiate a settlement of the issues related to the
Application filed herein. Thereafter, on November 25, 1996,
with all parties present and participating, the Stipulating
Parties, as identified in the Stipulation attached hereto as
Attachment A, announced a settlement in principle of most
” Exhibit 276 in the record of this cause.
* Exhibit 275 in the record of this cause.
* Exhibit 345 in the record of this cause.
'° Exhibit 187 in the record of this cause.
'! Exhibit 188 in the record of this cause.
9a
of the issues in this proceeding. The Commission thereupon
continued this cause to 9:00 a.m. on December 16, 1996, to
give the Stipulating Parties an opportunity to prepare and file |
the Joint Stipulation and Settlement Agreement. On
December 16, 1996, this cause came on for hearing and the
parties announced that thirteen of the sixteen participants in
this cause had reached a settlement and compromise of all
issues, and this matter was continued to December 17, 1996
at 1:30 p.m. to allow the stipulating parties an opportunity to
execute a settlement document. On December 17, 1996, the
stipulating parties confirmed their acceptance of the
settlement and advised the Commission that a majority of the
stipulating parties had executed the Joint Stipulation and
Settlement Agreement. The non-stipulating parties'” advised
the Commission that they had been unsuccessful in reaching
a settlement with all of the stipulating parties, and this matter
was continued to January 6, 1997, at 9:30 a.m. for further
proceedings.
On January 2, 1997, the executed Joint Stipulation and
Settlement Agreement’? (“Stipulation”) was filed with the
Commission, and on January 6, 1997, this cause come on for
hearing before the Commission as scheduled. At that time
the Commission determined that a hearing should be had to
determine whether the Stipulation should be accepted by the
Commission and to give the non-stipulating parties an
opportunity to present their objections to the Stipulation as
filed. To those ends this cause was continued, to be
reconvened at 9:30 a.m. on January 13, 1997, before the
Commission. At the appointed time on January 13, 1997, the
hearing on the merits with respect to the Stipulation was
commenced and continued through January 16, 1997. The
hearing on the merits resumed on January 21, 1997, pursuant
'2 ONG, GPM and Trigen.
'3 Exhibit 320 in the record of this cause, incorporated herein as
Attachment “A”.
10a
to the Order of the Commission and continued through
January 23, 1997, at which time the Commissioners voted
unanimously to adopt the Stipulation as submitted and
directed the Office of General Counsel to prepare a Final
Order for the Commission to enter in this cause.
FINDINGS OF FACT AND
CONCLUSIONS OF LAW
Based upon the Commission’s review and evaluation of
the pleadings, testimony of witnesses, the Stipulation, and
evidence contained in the record for this case, and upon full
and final consideration thereof, the Commission makes the
following findings and conclusions:
The Commission finds that it has jurisdiction with
respect to the issues raised by the Application filed herein by
virtue of Article IX, Sections 18 and following of the
Constitution of the State of Oklahoma, 17 O.S. §151 et seq.,
OAC 165:5-7-61, and OAC 165:70-3-1 et seg. The
Commission further finds that notice was given and made of
these proceedings as required by law and the Notice of
Hearing issued by the Commission herein, by publication
and by actual notice to all of Applicant’s Oklahoma
jurisdictional customers.
The Commission finds that the position taken by ONG
and GPM in this proceeding should be rejected. ONG and
GPM urged the Commission to require OG&E to implement
competitive bidding for natural gas transportation service,
and for natural gas supplies to the extent that OG&E does
not already procure natural gas on a competitively bid basis,
within one year rather than in the three years to which
OG&E has committed in the Stipulation. The Commission,
having considered the arguments of the parties regarding the
time for competitive bidding, finds that the position
advocated to ONG and GPM is not supported by the
evidence and should therefore be rejected. The Commission
lla
further finds that the three year timeframe established by the
Joint Stipulation for competitively bidding OG&E’s
transportation service for natural gas is fair, just, and
reasonable and supported by the evidence in the record.
Mr. Coffman testified on behalf of the Company that in
order to maintain a reliable supply of electricity to OG&E’s
customers, OG&E would need adequate time to evaluate the
integration of the Company’s generating stations using
diverse rather than a single natural gas transportation system.
The testimony before the Commission with respect to the
Company’s integrated fuel management system, the need for
the Company to provide reliable electric service, the savings
which OG&E’s customers have already experienced as a
result of the Company’s fuel cost reduction efforts, and the
Company’s commitment to have competitively bid natural
gas transportation services in place not later than Apnil 30,
2000, all support a finding, and the Commission finds that
paragraph 4 of the Joint Stipulation and Settlement
Agreement is fair, just and reasonable.'4
The Commission further finds that the rate reduction set
forth in the Stipulation represents a balance of the competing
interests of all of the Company’s classes of customers. —In
that connection the Commission notes that all of the
Company’s classes of service were represented by the
signatories to the Stipulation. The Commission specifically
finds that while cost of service should be considered, it
should not be the sole determinant in determining rates
which are fair, just, and reasonable and in the public interest.
Included among the factors which this Commission also
considers in designing rates are customer impact, social
considerations and environmental matters. The Commission
finds that the rate design proposed in the Stipulation
* The testimony of Don R. Rowlett (Tr. Jan. 14, 1997. pgs rk-59 - rk-
64), Dr. Jay C. Lukens (Tr. Jan. 15, 1997, Pgs ja-125 - ja-131 and ja-170
- Ja-172), and David Brammer (Tr. Jan. 15, 1997, pgs 1w-172 - lw-188).
The Commission also takes judicial notice of Order No. 380443.
12a
represents an appropriate recognition of cost of service as
well as these other factors. The Commission notes
particularly that the rate reduction to the residential and all
other classes is appropriate and justified as consistent with
the goal of this Commission to provide the citizens _of
Oklahoma with reasonable rates for utility services. The
Commission further finds that the Chain Account
Aggregation Rider and the load curtailment nders outlined in
the Stipulation and as further explained by Staff witness, Mr.
Brammer, and Company witness, Mr. Wylie, are fair, just
and reasonable and are fully supported and cost justified.'°
Furthermore, intervenor Trigen has _ presented this
Commission with no evidence to support its assertion that
the tariffs proposed for these riders contain provisions which
are unduly discriminatory on their face. Therefore, the
Commission finds that the specific relief requested by Trigen
is not supported by substantial evidence. Notwithstanding
this finding, however, as will be reflected below, the
Director, Public Utility Division for this Commission, shall
provide all parties to this proceeding with an opportunity to
review the final tariffs implementing the Stipulation before
they are accepted for filing.
The Commission, therefore, finds that the revenue
requirement and rate design approved herein are fair, just
and reasonable and in the public interest and that the
Stipulation represents a fair, just and reasonable settlement
of all of the issues which were raised related to this
proceeding, the terms and conditions of the Stipulation are in
the public interest, and said terms and conditions are
supported by substantial evidence.
'S Testimony of David Brammer (Tr. Jan. 22, 1997, pgs bwm-34 - bwm-
45) and William L. Wylie (Tr. Jan. 13, 1997, pgs bwm-18 - bwm-61).
13a
ORDER
IT IS THEREFORE THE ORDER OF THE
COMMISSION that the Stipulation attached hereto as
Attachment A should be and the same is hereby approved in
all respects, and OG&E is hereby authorized and directed to
file appropriate tariffs with this Commission and to do all
things necessary to implement the Stipulation; and that the
Company should be and is hereby authorized to rebase its
Fuel Cost Adjustment tariff consistent with the findings
made herein.
IT IS FURTHER ORDERED that the annual
compensation to be paid to ENOGEX by OG&E for natural
gas transportation service to the Company’s electric
generating stations as set forth in the Stipulation is fair, just
and reasonable, and that the Applicant is hereby authorized
and directed to recover such costs from its Oklahoma
jurisdictional customers in the same manner as set forth in
the Stipulation.
IT IS FURTHER ORDERED that OG&E shall provide
the Director of Public Utility Division, with appropriate
tariffs implementing the provisions of this Order along with
appropriate proof of revenues. After providing all parties to
this proceedings an opportunity to examine the Company’s
proposed tariffs and to provide informal written comments to
the Director with respect thereto, and upon determination by
the Director that such tariffs conform to the terms, conditions
and provisions of this Order, the Director shall advise the
Commission that the tariffs recommended for approval by
the Director conform to the terms, conditions and provisions
of this Order. If the Commission determines upon its review
that the tariffs recommended for approval by the Director
conform to the terms, conditions and provisions of this
Order, the Commission will issue and order directing that
such tariffs be accepted for approval by the Public Utility
Division and such tariffs will be effective with OG&E’s first
l4a
billing period in the month of March, 1997.
CORPORATION COMMISSION
OF OKLAHOMA
/s/ CODY L. GRAVES, CHAIRMAN
Concurring Opinion Attached
/s/ BOB ANTHONY, VICE CHAIRMAN
/s/) ED APPLE, COMMISSIONER
DONE AND PERFORMED this 11" day of February, 1997.
BY ORDER OF THE COMMISSION:
/s) CHARLOTTE W. FLANAGAN, Secretary
15a
BEFORE THE CORPORATION COMMISSION
OF THE STATE OF OKLAHOMA
IN THE MATTER OF THE ) CAUSE NO.
APPLICATION OF OKLAHOMA ) PUD 960000116
GAS AND ELECTRIC COMPANY )
FOR AN ORDER OF THE
COMMISSION AUTHORIZING
APPLICANT TO MODIFY ITS
RATES, CHARGES AND
TARIFFS FOR RETAIL
ELECTRIC SERVICE IN
OKLAHOMA
a i i
CONCURRING OPINION OF
COMMISSIONER BOB ANTHONY
I concur with the Commission decision to accept a
stipulated rate reduction because the settlement agreement
allows the Commission to immediately initiate another case
(1) seeking a further rate reduction and (2) making changes
in the punitive and discriminatory provisions of today’s
order. Also, testimony suggests ratepayers could potentially
benefit by more than $100 million in savings from reduced
gas transportation expenses if OG&E considers alternatives
to self-dealing with its affiliate Enogex, Inc. for
transportation of gas. Therefore, this Commission can still
quantify the potential benefits available to OG&E and its
customers of basing gas transportation decisions on
economic efficiency instead of favoritism. For example, the
Commission can determine the benefits OG&E should derive
from using competitive bidding for transportation of gas to
its generating units and incorporate these savings into
electric rates on a more accelerated basis than required by
this order.
l6a
Legal Requirements for a “Black Box Settlement”
During the proceedings, I advised the parties of my
concern that the record needed to meet certain legal
requirements for a commission dealing with a “black box
settlement.” Mere statements by witnesses that a stipulated
agreement is “fair, just, and reasonable” do not constitute a
~ valid basis for adopting a proposed settlement.
The Kansas and Missouri matters I had mentioned to the
parties set forth arguments and decisions which may have
bearing on today’s order of the Oklahoma Corporation
Commission. For example, on October 15, 1996, the
Citizens’ Utility Ratepayer Board filed a brief before the
Kansas Corporation Commission (KCC) in Docket No.
193,787-U stating:
“Black Box” settlements are unlawful and provide no
reasonable basis on which the Commission can make
the requisite determinations of (1) rate base, (2) a fair
rate of return, and (3) reasonable operating expenses,
as required in any contested rate investigation. See,
Southwestern Bell Tel Co V_ State Corporation
Commission 192 Kan 39, 46-47, 609 P2d 1157
(1980). The Commission should accordingly reject
the stipulation and agreement dated October 1, 1996,
because it fails to impart sufficient information or
evidence to base a determination.
Similar arguments were presented to the KCC through briefs
filed by Kansas Industrial Consumers on September 13, 1996
and Farmland Industries, Inc., on September 13, 1996 in
Docket Nos. 193,306-U and 193,307-U. Furthermore, on
September 7, 1995 in State of Missouri v Public Service
Commission of the State of Missouri (Case No. CV194-
1441CC) the Circuit Court of Cole County, as a conclusion
of law,-stated:
17a
when it entered into the “Settlement Agreement”
it acted unlawfully and in total disregard for the
administrative system established for PSC actions, in
that this decision was not supported by substantial
and competent evidence upon the whole record, but
rather was made arbitrarily and capriciously without
any evidentiary basis
I am concerned that the findings and conclusions of
today’s order regarding revenue requirements, rate design
and other matters involving regulatory policy are not
supported by substantial evidence in the case record. |
believe because the rate reductions ordered by the
Commission in this cause are not based upon evidentiary
findings regarding rate base, reasonable operating expenses,
and a fair rate of return that the conclusions could be found
arbitrary and capricious if contested by a party to the
proceedings. In other words, I believe today’s “black box
settlement” could be found unlawful if Challenged, and |
believe punitive and discriminatory prévisions, such as those
affecting Trigen, should not have been presented to the
Commission on a “take-it or leave-it” basis.
However, I concur in accepting the rate decrease ordered
herein because it will benefit the ratepayers of OG&E and
the economy of Oklahoma. Yet, I regret that larger benefits
may have been possible upon a more thorough presentation
of evidence before the Commission.
The closing arguments of the Oklahoma Attomey
General speak volumes when they state, “. . . taking into
account the likely outcome of litigation in the absence of the
stipulation[,] we believe that on that basis the stipulation
constitutes a fair, just, and reasonable resolution of this case .
. .” (January 23, 1997, Tr. 29). What does the Attorney
General mean when referencing “the likely outcome of
litigation”? In Order No. 380443 issued by a 2-1 vote of the
Commission on [illegible] February 25, 1994 the outcome of
18a
litigating the last major OG&E rate case was determined.
Over my dissent, Commissioner Graves and Watts ordered a
$24.0 million annual rate reduction. This 1994 order showed
the Attorney General its recommended rate reduction of
$52.0 million and the $71.1 million rate reduction
recommended by the Commission’s own staff were largely
rejected by the Commission. In the current rate case the
Attorney General agrees to a stipulated $50.7 million rate _
reduction (which goes to $55.7 million for the second and
third years) despite the $96.852 million rate reduction
supported by the testimony of the Attorney General’s own
witness on January 21, 1997 (Tr. 151) and despite the $94.5
million rate reduction recommended by the audit of the
Commission’s Public Utility Staff.
The Integrity of the Commission’s Hearing Process
On June 18, 1996 the Attorney General filed an
emergency application (Cause No. PUD 960000167)
expressing his concern about restoring “the confidence of the
public in the Commission’s ratemaking proceedings...” The
application stated, “Upon information and belief, the
integrity of the Commission’s hearing process continues to
be subverted today by ... ex parte communications...”
Although the Commission has not adopted new rules
prohibiting ex parte communication, there currently are
Oklahoma Rules of Professional Conduct which pertain to
lawyers (O.S. Title 5, Chapter 1, Appendix 3A). Rule 3.5
states, ““A lawyer shall not ... seek to influence a judge ... or
other decision maker ... of a tribunal ... in an adversary
proceeding, communicate or cause another to communicate
as to the merits of the cause, with a judge or an official
before whom the proceeding is pending ...” Rule 3.6(a)
states, ““A lawyer shall not make, participate in making,
counsel or assist another person to make an extrajudicial
statement that a reasonable person would expect to be
disseminated by means of public communication if the
19a
lawyer knows or reasonably should know that it will have a
substantial likelihood of materially prejudicing an
adjudicative proceeding, including an administrative
proceeding.”
The public comment file of this rate case shows a letter-
writing campaign was conducted largely on behalf of the
Company’s position. I believe the Attorney General is
concerned about improper conduct in deciding utility cases,
and he should consider initiating an examination of the
conduct of the attorneys representing OG&E in this case.
Did Mr. H. D. Binns, Jr. and Mr. Robert D. Stewart, Jr.
condone, direct, or know of efforts by OG&E personnel
initiating or facilitating a letter-writing campaign intended to
influence the commissioners who would decide their case? |
personally received over one hundred letters in support of the
Company. A few individuals who wrote letters also
personally told me of either receiving correspondence as a
Shareholder or being solicited to write commissioners by an
OG&E community service representative. Counsel for
OG&E chose not to respond to a request for an explanation
as set forth on December 12, 1996 in a letter from the
Commission’s Deputy General Counsel. Also, on January 6,
1997 during the proceedings of this case before the
Commission en banc (Tr. 43), Vice-Chairman Anthony
asked OG&E’s General Counsel, Mr. Binns, “...do you have
any reason to believe that OG&E had its employees or
agents or officers or lobbyists solicit letters to be written to
the Commissioners?” In response, Mr. Binns stated, “... I
would respectfully decline to respond to that question.”
In my Dissenting Opinion of March 14, 1994, filed in
response to Order No. 380443 and attached hereto, I set forth
concerns about improper conduct by representatives of
OG&E in the last major rate case. Someone needs to address
a situation which apparently continues to exist.
20a
Respectfully submitted this 11" day of February, 1997.
/s/ Commissioner Bob Anthony
2la
APPENDIX B
BEFORE THE CORPORATION COMMISSION
OF THE STATE OF OKLAHOMA
IN THE MATTER OF THE ) CAUSE NO.
APPLICATION OF OKLAHOMA ) PUD 960000116
GAS AND ELECTRIC COMPANY )
FOR AN ORDER OF THE )
-COMMISSION AUTHORIZING)
APPLICANT TO MODIFY ITS __)
RATES, CHARGES AND )
TARIFFS FOR RETAIL )
ELECTRIC SERVICE IN )
OKLAHOMA )
BRIEF IN SUPPORT OF MOTION IN LIMINE
INTRODUCTION
On July 24, 1996, Tngen-Oklahoma Energy Corporation
(“Trigen”) filed its Motion to Intervene’ in the captioned
proceeding. As justification for its intervention, Trigen
alleged:
“As a significant industrial customer on the OG&E
system, Movant is interested in any proceedings in this
cause which may affect the rates charged to industrial
and commercial customers by OG&E.””
' On November 8, 1996, Trigen filed a “Clarification of Record” which
served to correct the original Motior. to Intervene to reflect that the
Motion “should have stated that Intervenor Trigen-Oklahoma Energy
Corporation’s wholly owned subsidiary is an industrial customer on the
system of Oklahoma Gas and Electric Company.”
? Motion to Intervene, $2(b)[.]
22a
The Commission granted intervenor status to Tngen on this
basis, without objection by OG&E, in its Order No. 404252.
On October 10, 1996, Tngen filed its List of Major Issues,
which filing is a prerequesite [sic] to the filing of testimony
and exhibits pursuant to OAC 165:5-7-61(f). Thereafter, on
October 15, 1996,. Trigen filed a Statement of Position, the
effect of which was to advise the parties that Trigen did not
intend to file testimony or exhibits pursuant to OAC 165:5-7-
61. Trigen did not file testimony of any witness addressing
the specific issues relevant to Trgen’s intervention;
nevertheless, on November 18, 1996, Tngen filed an Exhibit
List in violation of OAC 165:5-7-61(f)(2).° Since Trigen
failed to file testimony pursuant to OAC 165:5-7-61(f)(1),
the Commission’s Rules do not permit the filing of a List of
Major Issues to be addressed by the intervenor’s witness(es).
Since Trigen failed to sponsor a witness in this cause,
Trigen’s Exhibit List and List of Major Issues should be
disregarded by the Commission in examining Tngen’s
standing in this case.
Trigen’s Statement of Position makes it clear that
Trigen’s intention in these proceedings is to protect its
interest as a claimed competitor of OG&E rather than as
OG&E’s customer. As will be demonstrated below, while
Trigen has standing to address the appropnateness of the rate
which OG&E intends to charge Tngen for electric services
consistent with the Final Order issued by the Commission in
these proceedings, Tngen has no standing to have this
Commission address the competitive relationship, if any,
> OAC 165:5-7-61(f)(2) provides: “The Commission Staff, the Attorney
General and any intervening party of record shall provide to the utility,
thirty (30) days prior to filing responsive testmony, a list of any major
issues the party anticipates to raise in connection with the utility’s
application for a general rate change. Said list of anticipated major issues
shall be updated, as necessary, up to five (5) days prior to filing
responsive testimony.”
23a
between OG&E and Trigen in the marketplace.
Furthermore, the Commission lacks jurisdiction to adjudicate
a private matter between OG&E and Trigen; the
Commission’s jurisdiction is expressly limited under
Oklahoma law, and private disputes must be litigated in the
district courts.
ARGUMENT
Proposition 1: The Commission lacks jurisdiction to
adjudicate issues involving private rights. |
The Corporation Commission is a constitutionally
created agency possessing legislative, executive and judicial
powers,” but the Commission possesses only such power and
authority as has been granted to it by the Constitution and
Statutes.” The jurisdiction and authority of the Commission
is limited to that which has been expressly or by necessary
implication conferred upon it by the Constitution.®° It is well
settled in Oklahoma law that the Commission has no power
or authority to settle disputes of a private nature. In Smith et
al. v. Corporation Commission et al., 101 Okl. 254, 225 P.
708 (1924) the Oklahoma Supreme Court reversed a decision
of the Commission awarding attorneys’ fees in a case against
Oklahoma Gas and Electric Company brought by certain
customers for the failure of the Company to maintain
adequate natural gas pipeline pressure to serve the
customers. In defining the power and authority of the
Commission, the Court held at page 256:
* See Continental Tei. Co. of Oklahoma v. Hunter, 590 P.2d 667, 668
(Okl. 1979).
* Id.
* St. Louis-San Francisco Ry. Co. v. State, 268 P.2d 845 (Okl. 1954).
24a
It has jurisdiction to supervise, regulate, and control
public utilities, in so far as their public duties are
concerned, and to establish rates to be charged by them
for a public service, and if rates in excess of those
established are collected, it has the authority to adjust
controversies between the utility and the consumer by
determining the amount of refund due the consumer, and
to whom the same should be paid, and it may enforce the
payment of such overcharge in the same manner that
fines and penalties imposed by it are authorized to be
collected by law, and when such overcharge is collected,
it shall be by the cemmission paid to the parties to whom
it is due. Its jurisdiction is limited to those controversies
wherein the nights of a public utility and the patrons
thereof are involved. It has no power or jurisdiction to
adjudicate differences between private litigants or
purely private matters between a utility and a citizen.
(Emphasis added).
Fhe Court went on to state that the Commission has no
power to fix or decree a lien upon the funds in its hands
belonging to the patrons or to fix the amount of an attorney’s
fee that should be paid by either the consumer or the utility
or to determine controversies between attorney and client.
In Chicago, R.I.&P. Ry. Co. v. State et al., 158 Okl. 57, 12
P.2d 494 (1932), the Court quoted the above language from
the Smith case and at pages 59-60 went on to state:
In the above decision this court held that the Corporation
Commission had jurisdiction as to all matters where the
public and the utility were involved, but that the
Corporation Commission had no power or
jurisdiction to adjudicate differences which are
purely private between a utility and a citizen. The line
of demarcation being that so long as the matter in
25a
controversy is one that affects the public, then the
Corporation Commission would have jurisdiction to
consider the same, but where said matter in
controversy is a private matter merely between the
company and the individual then the same becomes a
private matter between the corporation and the
individual and not a public concern and not being of
public concern, the Corporation Commission does not
acquire jurisdiction thereof. (Emphasis added).
In Central States Power & Light Corp. v. Thompson et al.,
177 Okl. 310, 58 P.2d 868 (1936), Thompson brought an
action in the District Court alleging the defendant utility had
sold natural gas to Thompson’s cleaning and pressing plant
under the utility’s residential tariff instead of its industrial
tariff and seeking a refund of overpayments to the utility for
a period of three years. The utility asserted inter alia that
since its tariffs were fixed by the Oklahoma Corporation
Commission, the Commission had exclusive jurisdiction
over the cause of action. On appeal, the Court followed its
decision in the Smith and Chicago, R.I.&P. case, quoting at
length from the latter case, and finding that the District Court
had both personal and subject-matter jurisdiction.
The Court has consistently applied the private action
standard of the Smith Case to hold that the Commission has
no jurisdiction to litigate private disputes in the absence of
specific statutory authority to the contrary.’ Thus, in 1939,
the Court determined that the Smith line of cases did not
apply where the Commission had been granted legislative
authority to settle disputes arising between lessees of oil and
gas drilling and spacing units.* Similarly, the Commission
has exclusive jurisdiction by virtue of its statutory authority
” See Russell v. Walker et al., 160 Okl. 145, 15 P.2d 114.
* Croxton et al. v. State et al., 186 Okl. 249, 97 P.2d 11.
26a
to determine refunds where a public utility charges its
patrons in excess of the lawful rate in force at the time a
charge is made or which should have been applied to the
service rendered in the absence of an approved contract or
tariff.” Conversely, in Southwestern Light & Power Co. v.
City of Elk City, 188 Okl. 540, 111 P.2d 820 (1941), the
Court held that “(w)hile the Corporation Commission has
complete authority and jurisdiction in rate-making cases to
fix utility rates, and in proper cases may order refund of
excessive rate collections over the legal rate, there is no
authority to construe contractual rights... .”'°
In Gibson v. Elmore City Telephone Company, 411 P.2d 551
(Okl. 1966), the District Court dismissed a case involving a
dispute over the division of toll revenues collected for the
transmission of messages over the lines of both utilities for
lack of subject matter jurisdiction. The Supreme Court
reversed and remanded to the District Court holding that the
litigation involved solely a dispute between two private
concerns over the division of toll charges. At page 553 the
Court said:
It is not contended that the rates charged were in excess
of the rates fixed by the Corporation Commission. The
Corporation Commission has no jurisdiction over a
controversy between two private concerns. Such
controversy can be adjusted only in a suit between the
parties in a court of competent jurisdiction. (Emphasis
added).
_
Cases determining that the Commission has no jurisdiction
® State ex rel. Hales v. Public Service Co. et al., 187 Okl. 182, 102 P.2d
139 (1940).
'© 188 Okl. at 541-542. See also, St.Louis-San Francisco Ry. Co. v.
State, supra, at footnote 6.
27a
to determine a private right of action are not limited to
contract or property law. The Court has also held that the
Commission has no jurisdiction to try an action for
damages'' or for tortious or negligent conduct.'? Neither
does the Commission have jurisdiction to enforce a private
cause of action granted by statute.’ Since the Commission
is not a court of general jurisdiction, \it has no authority to
enter a money judgment against any party.'* Where a matter
is a private concern between a public utility and one of its
patrons, the courts and not the Commission have jurisdiction
to determine the controversy.'°
In this proceeding, Trigen attempted to have this
Commission address issues currently pending before the
United States District Court between Trigen and OG&E.
Subsequently, that attempt was withdrawn on the record by
counsel for Trigen.’® Notwithstanding the withdrawal of
those issues by Trigen, Trigen continues to advocate that the
Commission should somehow prohibit anticompetitive
behavior in futuro. Based upon the Commission’s
'' Kingwood Oil Company v. Hall-Jones Oil Corporation, 396 P.2d 510
(Okl. 1964); Merritt v. Corporation Commission, 438 P.2d 495 (Ok.
1968).
'2 Continental Tel. Co. of Oklahoma v. Hunter, 590 P2d 667 (Okl. 1979).
'> See Burmah Oil & Gas Company v. Corporation Commission, 541
P.2d 834 (Okl. 1975) where the Court granted a writ of prohibition
enjoining the Commission from issuing an order requiring Burmah Oil &
Gas Co. to furnish a landowner gas service pursuant to statute.
'* Fent v. Oklahoma Natural Gas Co., 804 P.2d 1146 (Okl. App. 1990);
Lear Petroleum Corp. v. Seneca Oil Co., 590 P2d 670 (Okl. 1979).
'S See Gibson, supra, at page 554; see also Thompson, supra.
'€ Application of Oklahoma Gas and Electric Company, Cause No. PUD
960000116, Transcript of Proceedings, January 6, 1997, pgs 13, 14.
28a
constitutional and statutory authority as construed by the
Supreme Court, the Commission is without jurisdiction to
determine or adjudicate the private dispute between Trigen
and OG&E now pending in the federal District Court, and
the Commission is equally without jurisdiction to entertain
allegations of anticompetitive practices which might occur
now or in the future.
While there are no reported cases in Oklahoma involving a
private dispute based upon antitrust law principles, the Ohio
Supreme Court was presented with a persuasive case in 1982
where anticompetitive practices were alleged at the Ohio
Public Service Commission against a telephone company. In
ARMCO, Inc. v. P.U.C. of Ohio, et al., 23 0.0.3d 361, 433
N.E.2d 923, Ohio Bell Telephone Company sought and the
P.U.C. permitted the company to implement flexible rate
tanffs. The Privately Owned Telephone Suppliers
Association appealed contending inter alia that the P.U.C.
“erred in refusing to consider the anticompetitive intent and
effect of the . . . tariffs.”’’ The Ohio Supreme Court
concluded that it is not the function of the P.U.C. to
administer antitrust laws, “but rather to fulfill its
statutory duty, to protect utility customers from unjustly
discriminatory rates... “The Court found that the Ohio
Commission “is without jurisdiction to entertain
allegations of anticompetitive practices unless the statutory
conditions precedent, ‘free service or service for less than
actual cost’ obtain.”'®
Proposition 2: Trigen lacks standing to assert a
private claim against OG&E in this
proceeding.
'? 433 N.E.2d at 929-930.
"id.
I a a aa ia a in eae ie a cine at Ae OE ey
29a
Trgen was granted intervenor status as a member of a
customer of OG&E, and in that capacity Trigen has standing
to inquire with respect to the effect which OG&E’s proposed
rates, charges, and terms and conditions will have on Trigen
as a member of the class. Trigen does not have standing,
however, to assert a private claim or dispute it may allege to
have against OG&E; neither does it have standing to assert
the possibility that OG&E’s rates, charges, or terms and
conditions of service might be administered by the Company
in a manner which Trigen asserts would be anticompetitive.
Public utility law does not recognize nor does it grant
standing to competitors to complain about the indirect effects
of utility rates on their business. In Pennsylvania Petroleum
Association v. Pennsylvania Power & Light Company, 412
A.2d 522, 524 (Pa. 1980), the Court stated as follows:
“A customer claiming that a utility rate is in excess of
what will give a fair return may seek to have it lowered.
The seller of a competing product cannot force the utility
to raise rates that it alleges are detrimental to its
competitive position, as protection of such an interest is
not an objective of the regulatory scheme.” Citation
omitted.
See also, Crown American Corporation v. Pennsylvania
Public Utility Commission, 463 A.2d 1257, 1260 (Pa.
Cmwith. 1983). (“Crown’s argument is untenable as a basis
for the rejection of Rule SF. Any economic disadvantage
which may be the result of the Rule is not unreasonable,
because the protection of Crown’s economic interests and
competitive position, and of those similarly situated, is
neither an objective of Section 1502, nor of the regulatory
schedule of the [Public Utility] Code in general. See,
Pennsylvania Petroleum Association v. Pennsylvania Power
& Light Company, 488 Pa. 308, 412 A.2d 522 (1980).”
30a
CONCLUSION
By its own admission as justification for its intervention
(found in first paragraph of this Introduction) Trigen has no
standing to assert actual or possible private causes of action
against OG&E in this proceeding. By law, the Commission
has no jurisdiction to entertain allegations of a private nature
in the context of a proceeding to determine the prospective
rates of a regulated utility. Therefore, Tngen should be
prohibited from raising any issues in the form of cross-
examination questions herein which go beyond its standing
to address the effect which OG&E’s proposed rates, charges,
and terms and conditions of service would have on Trigen as
- a member of a customer class of OG&E.
Respectfully submitted,
Oklahoma Gas and Electric Company
By /s/ Robert D. Stewart, Jr.
Robert D. Stewart, Jr., OBA #8628
321 N. Robinson
Oklahoma City, Oklahoma 73102
(405) 553-3658
and
H.D. Binns, Jr., OBA #799
Rainey, Ross, Rice & Binns
735 First National Center West
120 N. Robinson
(405) 235-1356