IN THE

Supreme Court of the United States

ENRON POWER MARKETING, INC.,

Petitioner,

Vv.

NORTHERN STATES POWER Co., et al.,

Respondents.

On Petition for Writ of Certiorari to the

United States Court of Appeals

for the Eighth Circuit

APPENDIX TO

PETITION FOR WRIT OF CERTIORARI

JEFFREY D. WATKISS Louis R. COHEN

RONALD N. CARROLL Counsel of Record

BRACEWELL & JOSEPH E. KILLORY, JR.

PATTERSON, L.L.P. MICHAEL PLOTNICK

2000 K Street, N.W. WILMER, CUTLER & PICKERING

Suite 500 2445 M Street, N.W.

Washington, D.C. 20006 Washington, D.C. 20037-1420

(202) 828-5800 (202) 663-6000

Counsel for Petitioner Enron Power Marketing, Inc.

3,3" ¢

AR TRO NL EET LST RO or rr em eee es -

TABLE OF CONTENTS

APPENDICES:

A.

Opinion of the Court of Appeals, Northern

States Power Company v. FERC, 176 F.3d 1090

(as amended, July 20, 1999) .............cccccccecceeceeeee

Order of the Federal Energy Regulatory Com-

mission in Northern States Power Company

(Minnesota) and Northern States Power Com-

pany (Wisconsin), 83 F.E.R.C. {| 61,098 (April

SN cit iceacteicsesenctiienneitasarvadnatesvanioepoutepniciancgne

Order of the Federal Energy Regulatory Com-

mission in Northern States Power Company

(Minnesota) and Northern States Power Com-

pany et in 83 F.E.R.C. ¥ 61,338 ore

29, 1998) . ia

Order of the Federal Energy Regulatory Com-

mission in Northern States Power Company

(Minnesota) and Northern States Power Com-

pany (Wisconsin), 84 F.E.R.C. 9 61,128 (July

OE ROOD: ait Ba eda

Order of the Federal Energy Regulatory Com-

mission in Northern States Power Company

(Minnesota) and Northern States Power Com-

pany (Wisconsin), 89 F.E.R.C. 9 61,178 (Nov.

15, 1999) (order on remand) ................--..---..-++-

Promoting Wholesale Competition Through Open

Access Non-Discriminatory Transmission Serv-

ices by Public Utilities and Transmitting Utili-

ties, Order No. 888, [1991-96 Reg. Preambles]

F.E.R.C. Stats. & Regs. nore at 31,643

(1996) (pertinent portions) . :

Order No. 888-A, [Regs. Ae teat Ill

F.E.R.C. Stats. & Regs. {| 31,048 (1997) (perti-

SE IID | inc sa sscesnssnciccicnanssatianadatacconsectennnenegnes

Order of the Court of Appeals denying rehear-

ing and rehearing en banc (Sept. 1, 1999)

Page

la

128

36a

42a

44a

5la

2lla

281la

ii

TABLE OF CONTENTS—Continued

Sections 201, 205, 206, 211, 212, 213 and 318 of

the Federal Power Act, 16 U.S.C. §§ 824, 824d,

824e, 824j, 824k, 8241 and 8251...

Sections 1, 4, and 5 of the Natural Gas Act, 15

USL. §§ 717, 71%c, and 7174 .......................

Pro Forma Open Access Transmission Tariff of

Northern States Power Companies (July 1,

1997) (pertinent portions) .... tt

First Revised Open Access Transmission Tariff

of Northern States Power Companies (February

17, 1998) (pertinent portions)

Letter from Gary Johnson, Vice President and

General Counsel, Northern States Power Co. to

David Boergers, Secretary, FERC (Nov. 19,

1999) ......... SF5 8 Foie CE. SRS eet Ss ee RR Ie A

Page

283a

308a

3l4a

319a

la

APPENDIX A

UNITED STATES COURT OF APPEALS

EIGHTH CIRCUIT

No. 98-3000

NORTHERN STATES POWER COMPANY,

A MINNESOTA CORPORATION:

NORTHERN STATES POWER COMPANY,

A WISCONSIN CORPORATION

Petitioners,

MINNESOTA DEPARTMENT OF PUBLIC SERVICE

DAIRYLAND POWER COOPERATIVE,

Intervenor on Appeal,

Vv.

FEDERAL ENERGY REGULATORY COMMISSION

Respondent,

WISCONSIN ELECTRIC POWER COMPANY:

SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY:

MISSOURI RIVER ENERGY SERVICES:

ENRON POWER MARKETING INCORPORATED

Intervenor on Appeal

Submitted March 8, 1999.

Decided May 14, 1999.

As Amended July 20, 1999,

2a

Before FAGG, LAY, and WOLLMAN, Circuit Judges.

LAY, Circuit J.

On April 24, 1996, the Federal Energy Regulatory

Commission ("FERC") promulgated Order No. 888' requiring

"all public utilities that own, control or operate facilities used

for transmitting electric energy in interstate commerce to have

on file open access non-discriminatory transmission tariffs that

contain minimum terms and conditions of non-discriminatory

service." Order No. 888, 61 Fed.Reg. 21,540 (1996). FERC's

Stated goal was to encourage competition in the wholesale bulk

power market place "and to bring more efficient, lower cost

power to the Nation's electricity consumers." Jd. Order No. 888

became final and effective on July 9, 1996. Thereafter,

Northern States Power Company ("NSP") filed proposed

revisions of its Open Access Transmission Tariff ("NSP

Tariff") to comply with the requirements of FERC Orders Nos.

888, 888-A, 888-B and 888-C and to file new tariffs that were

consistent with the pro forma tariff of Order No. 888.

' See Promoting Wholesale Competition Through Open Access Non-

Discriminatory Transmission Services by Public Utilities; Recovery of

Stranded Costs by Public Utilities and Transmitting Utilities, Order No. &&

[Regs. Preambles Jan. 1991-June 1996], FERC Stats. & Regs. 931,036,

clarified, 76 FERC 461,009 and 76 FERC {61,347 (1996), modified, Order

No. 888-A [Regs. Preambles], III FERC Stats & Regs. 431,048 (1997), order

on rehearing, Order No. 888-B, 81 FERC 461,248 (1997). on rehearing,

Order No. 888-C, 82 FERC $61,046 (1998), petitions for review pending

sub nom. Transmission Access Policy Study Group, et al. v. FERC, Nos. 97-

1715, et al. (D.C.Cir., Mar. 30, 1998) (hereinafter collectively as "Orders”).

° Order accepting Open Access Transmission C ompliance Tariff.

Accepting in Part and Rejecting in Part Proposed Revisions, Instituting

Investigation, Establishing Hearing Procedures and Refund Effective Date,

and Consolidating Dockets, 83 FERC 961,098 (April 30, 1998); Order on

Requests for Clarification, 83 FERC 461,338 (June 29, 1998): Order

Denying Requests for Clarification, Rehearing and Stay, 84 FERC 461,128

(July 31, 1998) (hereinafter collectively as "Curtailment Orders").

a i

3a

FERC rejected the proposed changes to the NSP Tariff's

curtailment provisions on the grounds that: 1) NSP had defined

curtailment priorities only through general references to

unexplained procedures; 2) NSP had failed to demonstrate that

the proposed terms were consistent with, or superior to, the pro

forma tariff terms required by Order No. 888: and 3) NSP's

description of the proposed procedures was misleading.

Thereafter NSP filed this petition for review. On August 25,

1998, this court denied NSP's stay request and shortly thereafter

denied FERC's motion to transfer the case to the United States

Court of Appeals for the District of Columbia, or to hold the

case in abeyance pending the omnibus appeal of FERC's Order

No. 888 rule-making in the D.C. Circuit.

JURISDICTION

Initially, FERC has moved to dismiss these proceedings for

lack of jurisdiction. It argues that the petitions for review filed

by NSP constitute a collateral attack upon Order 888. In

essence, NSP challenges FERC's regulation and possible

curtailment of bundled retail electric sales°, arguing that such

actions are outside of FERC's jurisdiction. In its Curtailment

Orders, both rejecting and accepting NSP's petitions, FERC

failed to raise the issue of collateral attack. Nevertheless,

FERC now asserts that NSP's proposed revisions were not

timely and should have been made at the time Order No. 888

was being promulgated. It urges that the belated challenges by

NSP should have been included in the rule-making proceedings

pending before the United States Court of Appeals for the

District of Columbia. We disagree.

‘NSP defines "bundled" electric sales to its retail customers as follows:

" ‘Bundled’ service means the generation, transmission, and distribution of

electricity together with all other services (meter reading, billing, equipment

repair, supply curtailment) hecessary to satisfy the customer's complete

electric service needs." Petitioner's Brief at 2.

4a

Section 313(b) of the Federal Power Act ("FPA"), 16 U.S.C.

$8251 (b), provides that "[a]ny [aggrieved] party to a proceeding

under [the FPA] ... may obtain a review of such order in the

United States Court of Appeals for any circuit wherein ... the

public utility to which the order relates is located or has its

principal place of business." /d. The proceedings in this

petition for review relate to the proposed tariffs filed by NSP

pursuant to Order No. 888. Involved are the differing

interpretations of the Orders as they affect the tariffs filed by

NSP.

FERC asserts, as it must, that it has no intention of

regulating retail sales to NSP customers, while also maintaining

that its curtailment provisions apply only to wholesale sales,

over which it has explicit jurisdiction. FERC concedes that its

jurisdiction relates only to terms and conditions of electric

transmission service provided by public utilities engaged in

interstate commerce. See Respondent's Brief at 34. FERC's

order requires that there be no discrimination in curtailment of

electrical power when power constraints take place between the

wholesale customer, who falls under FERC's jurisdiction, and

the native/retail consumers, who are regulated solely by the |

state. See Order Denying Requests for Clarification, Rehearing |

and Stay, 84 FERC 961,128 (1998). NSP points out that under

FERC's interpretation, the direct effect of FERC's curtailment

orders will cause a nonjurisdictional disruption of service

affecting NSP's native/retail consumers.

We conclude that these adverse arguments defeat FERC's

jurisdictional objections and lay bare the distinction between

the rule-making proceedings pending before the United States

Court of Appeals for the District of Columbia and the present

petition for review in this case. We therefore reject FERC's

argument to dismiss for lack of jurisdiction.

THE MERITS

The fundamental issue to be decided on this appeal is

whether FERC may, through its tariff orders, require NSP, a

Sa

public utility, to curtail electrical transmission to wholesale

(point-to-point) customers on a comparable basis with its

native/retai] consumers when it experiences power constraints.

FERC acknowledges that it cannot permissibly affect state

regulation of retail rates and practices. FERC argues that it has

simply required that, as to transmission curtailment, NSP may

not discriminate against a third party in favor of its own

native/retail consumers. Thus, it asserts that Order No. 888

makes clear that a transmission provider must curtail electrical

transmission on a comparable and nondiscriminatory basis,

including the provider's own use of the system. Under the

tariff, public utilities will not be allowed to continue

curtailment practices that give priority to bundled, native/retail

load consumers over point-to-point users involved in interstate

commerce. FERC suggests that there is no justiciable issue

here. It reasoned:

The pro forma tariff requires comparability of

curtailments when consistent with Good Utility Practice.

The Commission would not expect NSP Companies to

violate Good Utility Practice when implementing

curtailments. Further, the pro forma tariff allows the

Transmission Provider the discretion to curtail firm

transmission service when an emergency or other

unforeseen condition impairs or degrades the reliability of

its transmission system. Absent such system reliability

concerns, however, NSP Companies must engage in a pro-

rata curtailment.

Order on Requests for Clarification, 83 FERC 62,338

(1998).

However, the mere fact that the provider may exercise

curtailments within its sole discretion is not the problem. The

problem arises when NSP exercises its discretion to curtail

service, but may then do so only by curtailing both wholesale

and native/retail electric sales on an equal basis and not by

giving preferential treatment to its native/retail load. Thus,

NSP argues, when there exists a power constraint, by providing

6a

Curtailment to its native/retail consumers on a pro rata basis

with wholesale users, NSP will be forced to provide

interruptible service to its native/retail consumers. According

to NSP, a pro rata curtailment will detrimenially affect

native/retail consumers who have no other alternatives available

to obtain electrical service. NSP urges that when wholesale

(point-to-point) customers are curtailed in electrical

transmission, the wholesale customer has alternative sources

from which to obtain continuous electrical supply, through

either the purchase of electricity from another provider, or via

their own power generation facilities. Illustrative of this

argument, NSP points to the circumstances involving

Wisconsin Electric Power Company ("WEP"), an intervenor in

this proceeding, and itself when WEP experienced curtailment

of electrical transmission by NSP in the summer of 1998. WEP

had to resort to alternative power, albeit at a higher price due to

the emergency curtailment.’ Unless we totally miscomprehend

the arguments involved, we feel that FERC's observation that

no inherent conflict exists between its mandates and practical

application is viewed through an adversarial bias.

The more fundamental issue involved here, aside from the

practicalities of the situation, is whether FERC has the

jurisdiction to affect the curtailment practices of NSP when

dealing with NSP's native/retail consumers. FERC argues that

it does not, in any way, attempt to affect state regulation of

retail rates and practices. At the same time, FERC points out

that its jurisdiction over interstate sales is not made in a

vacuum. As in Conway Corp. v. FPC, 510 F.2d 1264

(D.C.Cir.1975), aff'd sub nom., FPC v.C. onway Corp., 426 U.S.

* Wisconsin Electric Power Company argues in its intervenor brief that

NSP should be required to furnish electrical transmission on a comparable

basis with its native/retail customers so as to obviate Wisconsin Electric

Power Company from having to black out its own retail customers, If such

an argument assumes that NSP must black out its retail customers so that

Wisconsin Electric Power Company's customers may have continuous

service, we deem such argument unrealistic.

Ta

271, 96 S.Ct. 1999, 48 L.Ed.2d 626 (1976). it argues the

jurisdiction of the FPC is not "insulated from nonjurisdictional

factors." Id. at 1272. ta Conway, an eectric utility was

engaged in jurisdictional (wholesale) and nonjurisdictional

(retail) sales. A portion of the utility's wholesale customers

competed against it by reselling electricity purchased from the

utility to other retail consumers. The wholesale customers

alleged that the wholesale price was inflated in order to prevent

them from competing for retail business. The Supreme Court

held that the Federal Power Act authorized FERC to examine

the entire factual context surrounding the wholesale rates.

including facts related to the nonjurisdictional _ retail

transactions. See Conway, 426 U.S. at 280. 96 S.Ct. 1999,

FERC relies upon the language of the United States Court of

Appeals for the District of Columbia in C onway that FERC may

take into consideration nonjurisdictional concerns "when

germane to the meaningful execution of a jurisdictional

function." Conway, 510 F.2d at 1272. We have no

disagreement with these abstractions. However, one of the

problems in the Conway case is the distinction pointed to by

Judge Douglas Ginsburg in Altamont Gas Transmission

Company v. FERC, 92 F.3d 1239 (1996). In Altamont, as the

result of perceived discrimination against interstate gas

shipments, FERC authorized a utility to begin building a new

facility, but lowered the utility's allowed rate of return until the

utility could demonstrate that its rates and policies no longer

discriminated against interstate shippers. In taking note of the

Supreme Court's delineation in Conway, Judge Ginsburg

posited that jurisdictional implications of a nonjurisdictional

transaction are germane only "{i]f the undue preference or

discrimination is ... traceable to the level of the jurisdictional

rate." Id. at 1247 (citing Conway, 426 U.S. at 277. 96 S.Ct.

1999). We have the same difficulty here, at least by analogy,

that the alleged discrimination is traceable to the

nonjurisdictional sale of bundled service provided by NSP to

8a

the native/retail consumer rather than to the service provided to

interstate customers.”

As NSP points out, it is given monopolistic control by the

five states in which it operates. NSP is a vertically integrated

electrical utility and provides electrical service throughout

Minnesota, Michigan, North Dakota, South Dakota, and

Wisconsin to an estimated two million retail customers. NSP

argues that the exclusive grant given by these states to sell to

native/retail consumers is on a quid pro quo basis: to wit, that

NSP's native/retail consumers may depend on bundled sales

without curtaiiment of service. In Order No. 888, FERC

recognizes its own jurisdictional limits and states "[w]e reiterate

that we are not requiring the transmission provider to unbundle

transmission service to its retail/native load nor are we

requiring that bundled retail service be taken under the terms of

the Final Rule pro forma tariff." /d. at 21,604. This apparent

concession is statutorily driven. Under 16 U.S.C. §824(a),

Congress has expressly provided that "Federal regulation ...

extend[s] only to those matters which are not subject to

regulation by the States." /d. Section 824(b)(1) provides:

The provisions of this subchapter shall apply to the

transmission of electric energy in interstate commerce and

to the sale of electric energy at wholesale in interstate

commerce, but except as provided in paragraph (2) shall

not apply to any other sale of electric energy or deprive a

State or State commission of its lawful authority now

exercised over the exportation of hydroelectric energy

which is transmitted across a State line. The Commission

shall have jurisdiction over all facilities for such

transmission or sale of electric energy, but shall not have

* We think it can also be questioned whether the bundled electric sales,

as defined n. 3 supra, is in the same class of service provided in the sale of

electrical power to point-to-point customers. We find the difference in the

products sold in itself justifies preferential treatment to native consumers

beyond the reach of Tariff Order No. 888.

9a

jurisdiction, except as specifically provided in this

subchapter and subchapter III of this chapter, over facilities

used for the generation of electric energy or over facilities

used in local distribution or only for the transmission of

electric energy in intrastate commerce, or over facilities for

the transmission of electric energy consumed wholly by the

transmitter.

Id.

NSP argues that to comply with FERC's interpretation of

Order No. 888, as requiring comparable and equal service to

point-to-point customers, along with its native/retail consumers,

would violate state regulatory laws. For example, in the state

of Minnesota NSP may not shed its retail load absent an

emergency or when electric supply is limited or unavailable.

See Northern States Power Company, MINNESOTA

ELECTRIC RATE BOOK, GENERAL RULES AND

REGULATIONS, Section 6, Curtailment or Interruption of

Service, §6.2 (Add.41); Minn.Stat. §216B.37-.42. The state

tariffs in the other states provide similar limitations.° Thus,

NSP argues that if it is required to provide comparable

transmission to both its retail and wholesale customers on a pro

rata basis, that its native/retail consumers will face power

Outages contrary to the obligation set out in the state tariffs, in

turn causing conflict with the long-held position that once a

tariff has been approved, it has the force of law and is binding

upon the parties. See Montana-Dakota Utilities Co. v.

Northwestern Public Service Co., 341 U.S. 246, 251-52, 71

S.Ct. 692, 95 L.Ed. 912 (1951). NSP urges that state authority

over its bundled service is jeopardized if FERC requires, under

the guise of nondiscrimination, pro rata curtailment of the

power supply to NSP's native/retail consumers.

As indicated, when the circumstances require curtailment in

the transmission of electricity, most wholesale customers may

* See Mich.Comp.Laws Chapter 460; N.D.Cent.Code Title 49: S.D.

Codified Laws Title 49; Wisc. Stat. Chapter 196.

10a

use alternative supplies from other utilities or generate power

themselves, and can avoid power outages through such practice.

The native/retail consumer, however, is unable to turn to

alternative sources of supply. For these reasons, NSP urges that

Good Utility Practice requires that wholesale transactions be

curtailed before a utility is forced to shed its native/retail load.

Thus, we find that NSP, through FERC's interpretation, is

placed between the proverbial rock and hard place, and will in

effect be in violation of either a state tariff or Order No, 888.

FERC responds simply that it does not operate in a vacuum

and that it is not exercising any of its regulatory powers

directly, but that through the enforcement of a federal tariff,

there could be a lawful, indirect effect upon NSP’s services to

its native/retail consumers. NSP urges that this allows FERC

to do indirectly what it is prohibited from doing directly,

intercede in a matter reserved by Congress to the states. See

Altamont, 92 F.3d at 1248. FERC’s ultimate answer to all of this

is that where there is a clash between its tariffs and the state

law, the federal tariff must prevail under the Supremacy Clause.

We cannot agree.

Before reviewing constitutional concerns relating to the

Supremacy Clause, it is fundamental that this court must first

satisfy itself that FERC has Congressional approval to regulate

NSP in the manner now attempted. Congress has drawn a

“bright line" between state and federal regulation. Here, there

is no conflict between the state and federal regulatory schemes.

In fact, FERC concedes that it has no jurisdiction whatsoever

over the state's regulation of NSP’s bundled retail sales

activities. See Order No, 888-A, 62 Fed.Reg. 12,274, 12,299

(1997). Additionally, any reliance upon Nantahala Power &

Light Co. v. Thornburg, 476 U.S. 953, 106 S.Ct. 2349, 90

L.Ed.2d 943 (1986), for the proposition that a state must defer

to FERC’s decision making for fear of running afoul of the

Commerce Clause is also misplaced. In Nantahala, the Court

applied the “fixed rate doctrine" under which interstate power

rates filed with or fixed by FERC had to be given binding effect

by state utility commissions in determining intrastate rates.

rap shana ont erence etc

ila

This is not an issue here. In Nantahala, the Court was dealing

with hydroelectric power and facilities which obtained its

power supply from the Tennessee Valley Authority, as well as

navigable waters and dams placed thereon. In the present case,

we have nothing comparable to the generation of electrical

power that was involved in Nantahala. Cf. FPC v. Louisiana

Power & Light Co., 406 U.S. 621, 92 S.Ct. 1827, 32 L.Ed.2d

369 (1972). We think it obvious that the indirect effect of

Order No. 888, as interpreted by the Commission, is an attempt

to regulate curtailment of electrical power to NSP's native/retail

consumers. Despite FERC’'s denial as to nonjurisdictional

regulation, we find it has transgressed its Congressional

authority which limits its jurisdiction to interstate transactions.

As such, its attempt to regulate the curtailment of electrical

transmission on native/retail consumers is unlawful, as it falls

outside of the FPA's specific grant of authority to FERC.

This cause is remanded to FERC to allow amendment te its

curtailment orders, as now interpreted under Order No. 888, so

as to not encroach upon the authority of the regulatory

commissions of the states.

IT IS SO ORDERED.

12a

APPENDIX B

BEFORE THE

FEDERAL ENERGY REGULATORY COMMISSION

Docket Nos. OA97-25-000, OA97-606-000, ER98- 1890-000,

ER98-2060-000, and EL98-40-000

NORTHERN STATES POWER COMPANY (MINNESOTA) AND

NORTHERN STATES POWER COMPANY (WISCONSIN)

Order Accepting Open Access Transmission Compliance

Tariff, Accepting in Part and Rejecting in Part Proposed

Revisions, Instituting Investigation, Establishing Hearing

Procedures and Refund Effective Date, and Consolidating

Dockets

(Issued April 30, 1998)

Before Commissioners: James J. Hoecker, Chairman: Vicky

A. Bailey, William L. Massey, Linda Breathitt, and Curt Hébert,

Jr.

This order addresses various filings made by Northern States

Power Company (Minnesota) and Northern States Power

Company (Wisconsin) (collectively, NSP Companies)

concerning their open access transmission tariff and

transmission rates. We will accept the open access tariff

compliance filings and set one of the rate provisions for

hearing, accept in part and reject in part the proposed revisions

to the open access tariff, suspend the proposed revisions for five

months and set them for hearing, institute an investigation into

I3a

NSP Companies’ rates and establish a refund effective date, and

consolidate these dockets for purposes of hearing and decision.

BACKGROUND

On October 11, 1996, NSP Companies filed in Docket No.

OA97-25-000 an open access transmission tariff to comply with

the Commission's order No. 888.' On December 24, 1996, NSP

Companies filed a revised Attachment H to the open access

transmission tariff—which addresses the annual transmission

revenue requirement for network integration transmission

service—to modify the methodology for calculating credits for

customer-owned facilities.” On June 27, 1997, NSP Companies

filed in Docket No. OA97-606-000 a revised open access

transmission tariff to comply with the Commission's order No.

888-A.

On February 17, 1998, NSP Companies filed, in Docket No.

ER98- 1890-000, changes to the rates for firm point-to-point

transmission service under their open access transmission tariff

to reflect 1998 test year cost-of-service data. NSP Companies

also proposed changes to the rates and terms and conditions for

' See Promoting Wholesale Competition Through Open Access Non-

Discriminatory Transmission Services by Public Utilities; Recovery of

Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888,

61 Fed. Reg. 21,540 (1996), FERC Statutes and Regulations, Regulations

Preambles January 1991-June 1996 P 31,036 (1996), order on reh'g, Order

No. 888-A, 62 Fed. Reg. 12,274 (1997), FERC Statutes and Regulations

$31,048 (1997), order on reh'g, Order No. 888-B, 81 FERC 961,248 (1997),

order on reh'g, Order No, 888-C, 82 FERC 461,046 (1998).

FNNSP Companies had previously requested a waiver of the requirement

to file an Order No. 888 compliance tariff, which we denied. Northern States

Power Company, et al., 76 FERC 61,250, at 462,293 ( 1996).

’ This revised filing was docketed in Docket No. OA97-25-000. and was

also inadvertently docketed as the separate Docket No. O.A97-162-000.

Docket No, OA97- 162-000 has been closed, and all matters relating to the

revised Attachment H will be considered as part of Docket No. OA97-25-

000,

I4a

various ancillary services, modifications to existing tariff terms

and conditions, and changes to the rates applicable under iong-

term transmission agreements with certain municipal

customers. NSP Companies request an effective date of May I,

1998 for these changes.

On March 2, 1998, in Docket No. ER98-2060-000, NSP

Companies filed proposed changes to the rates and terms of

service for the network integration transmission provisions of

the open access transmission tariff. The proposed changes

would increase the annual transmission revenue requirement to

reflect the 1998 test year cost-of-service data, change the |

mechanism for calculating the annual transmission revenue i

requirement to allow for annual updates starting May 1, 1999,

and modify certain existing tariff terms and conditions. NSP

Companies also request a May 1, 1998 effective date for these

changes.

NOTICE OF FILING AND RESPONSES

Notice of NSP Companies’ filing in Docket No. OA97-25-

000 was published in the Federal Register, 61 Fed. Reg. 59,433 |

(1996), with comments, protests and interventions due on or

before November 29, 1996. Motions to intervene were filed by

Commonwealth Edison Company (Commonwealth Edison),

Electric Clearinghouse, Inc. (ECI), and jointly by the Missouri

Basin Municipal Power Agency and the Minnesota cities of

Marshall, St. James, and Sauk Centre (Joint Municipals). A

motion to intervene and protest was filed by the Coalition for a

Competitive Electric Market (CCEM).

Notice of NSP Companies’ filing in Docket No. OA97-606-

000 was issued July 16, 1997, with comments, protests and

interventions due on or before July 30, 1997.° Wisconsin

* Notice of this filing was originally erroneously made in Docket No.

ER97-3487-000, but was corrected with an errata issued July 17, 1997 in

Docket No. OA97-606-000.

15a

Municipal Intervenors (WMD), which consists of The Wisconsin

Public Power Inc. SYSTEM and the municipalities of Bangor,

Barron, Cornell, Medford, and Rice Lake, filed a motion to

intervene on August |, 1997.

Notice of NSP Companies’ filing in Docket No. ER98- 890-

000 was published in the Federal Register, 63 Fed. Reg. 10,599

(1998), with comments, protests and interventions due on or

before March 20, 1998. A notice of intervention was filed by

the Public Service Commission of Wisconsin (Wisconsin

Commission). Motions to intervene were filed by Wisconsin

Electric Power Company (WEPCO), Otter Tail Power

Company (Otter Tail), Wisconsin Power & Light Company

(WP&L), Minnesota Power & Light Company (Minnesota

P&L), Minnesota Municipal Utilities Association (Minnesota

Municipal), city of Kasson, Minnesota (Kasson), city of

Buffalo, Minnesota (Buffalo), and WPS Energy Services, Inc.

(WESI). Motions to intervene and protests were filed by

Minnesota Wheeling Association (Minnesota Wheeling),

Wisconsin Public Service Corporation and WPS Energy

Services, Inc. (Wisconsin Public Service), the cities of Medford

and Rice Lake, Wisconsin (Medford and Rice Lake),

Commonwealth Edison, United Power Association (UPA),

Enron Power Marketing, Inc. (Enron), Southern Minnesota

Municipal Power Agency (Southern Minnesota), Dairyland

Power Cooperative (Dairyland), Cooperative Power

Association (CPA), Missouri Basin Municipal Power Agency

and the cities of Hillsboro, Marshall, St. James and Sauk Centre

(MBMPA), ECI, and Wisconsin Public Power Inc. (WPPI).

Central Minnesota Municipal Power Agency (CMMPA) filed

a motion to intervene out of time and protest. Some of the

intervenors requested other forms of relief. including motions

to reject the filing, requests for hearing and investigation,

requests for summary disposition, and motions to consolidate

Docket Nos. ER98-1890-000 and ER98-2060-000. NSP

Companies filed a response to the motions to intervene and

requests for relief.

16a

Notice of NSP Companies’ filing in Docket No. ER98-2060-

000 was published in the Federal Register, 63 Fed. Reg. 12,087

(1998), with comments, protests and interventions due on or

before March 20, 1998. Motions to intervene were filed by

Wisconsin Public Service, Anoka Electric Cooperative

(Anoka), WP&L, Minnesota Municipal, Otter Tail. Motions to

intervene and protests were filed by Minnesota Wheeling,

Medford and Rice Lake, National Rural Electric Cooperative

Association (NRECA), UPA, Southern Minnesota, Dairyland,

CPA, MBMPA, and WPPI. In addition, a motion to intervene

out of time was filed by Northwestern Wisconsin Electric

Company (Northwestern Wisconsin), and a motion to intervene

out of time and protest was filed by CMMPA. Some of the

intervenors requested other forms of relief, including motions

to reject the filing, requests for hearing and investigation,

requests for summary disposition, and motions to consolidate

Docket Nos. ER98-1890-000 and ER98- 2060-000, NSP

Companies filed a response to the motions to intervene and

requests for relief.

DISCUSSION

A. Procedural Matters

The notice of intervention of the Wisconsin Commission,

and the timely, unopposed motions to intervene of the persons

listed above serve to make them parties to the respective

proceedings in which they sought intervention. See 18 C.F.R.

§385.214 (1997). We will grant the motions for leave to

intervene out of time by WMI in Docket No. OA97-606-000,

Northwestern Wisconsin in Docket No. ER98-2060-000, and

CMMPA in Docket Nos. ER98-1890-000 and ER98-2060-000.

The other requests for relief will be discussed below.

17a

B. Open Access Transmission Tariff Compliance Filings in

Docket Nos. OA97- 25-000, and OA97-606-000

1. Non-Rate Terms And Conditions

We find that the open access transmission tariffs filed by

NSP Companies in Docket No. OA97-25-000 in order to

comply with Order No. 888, and in Docket No. OA97-606-000

in order to comply with Order No. 888-A, contain non-rate

terms and conditions that reflect the pro forma terms and

conditions established in Order Nos. 888 and 888-A.

Accordingly, we will accept these terms and conditions as of

the effective dates discussed below.

CCEM in its protest requested several changes in NSP

Companies’ terms and conditions concerning — specific

procedures and forms for implementing the right of first refusal,

reciprocity and creditworthiness procedures, the minimum term

for firm point-to-point service, and deadlines for requesting

short-term firm services. We will reject these proposed changes.

As we said in our prior orders addressing the non-rate terms and

conditions of open access compliance tariffs, we are concerned

at this point only with whether the compliance tariff conforms

with the pro forma tariff terms and conditions.* We find that

NSP Companies’ terms and conditions, in these respects, do

conform. We will, consistent with our prior orders, grant the

clarification requested by CCEM that a transmission customer

need not identify the specific source that will provide ancillary

services until the time for scheduling service. As we said

before, however, should the customer fail to make the

demonstration at the time of scheduling, it risks not being

* See Atlantic C ity Electric Company, et al., 77 FERC 961,144, at pp.

61,535, 61.537 (1996), order on reh'g, 82 FERC 461.075 (1998) (Atlantic

City Electric); See also Allegheny Power System, Inc., et al., 77 FERC

$61,266 (1996), order on reh'g, 82 FERC 961.251 (1998) (APS I), and

American Electric Power Service C orporation, et al., 78 FERC 461,070,

order on reh'g, 82 FERC 461,204 (1998) (AEP).

18a

allowed to schedule energy because of the lack of ancillary

MO

services,

2. Rates and Rate Terms and Conditions

NSP Companies are considered to be "Group |" public

utilities under Order No, 888,° which means that they had an

Open access transmission tariff on file before the date of

issuance of Order No. 888.’ As such, NSP Companies were

required to include in their Order No. 888 open access

compliance tariff the same rates as were in the pre-Order No.

888 tariff, except where changes were necessitated by the

revised non- rate terms and conditions.” We find, with one

exception, that NSP Companies have included in their Order

No. 888 compliance tariff the rates from their pre-Order No.

888 tariff without change.

The one change NSP Companies made to the rate provisions

concerns crediting for customers that own transmission

facilities. NSP Companies added a provision which (1)

establishes a methodology for computing the credit NSP

Companies will give a customer that owns transmission

facilities that operate as part of the integrated grid, and (2)

increases the network rate to reflect any su... credits granted

under the crediting methodology.’ As initially tendered in

* Atlantic City Electric, 77 FERC at p. 61,537.

* Order No. 888, FERC Statutes and Regulations at p. 31,964.

"Id. at p. 31,768. The NSP Companies’ pre-Order No. 888 open access

tariff was accepted subject to required modifications in Northern States

Power Company, 74 FERC 961,142 (1996),

" Order No. 888, FERC Statutes and Regulations at p. 31,770. See also

Allegheny Power System, Inc., et al., 80 FERC 461,143, at pp. 61,528-29

(1997), reh'g pending (APS II).

” For example, if NSP Companies negotiate a credit of $10,000/year in

recognition of the transmission facilities provided by one customer, NSP

Companies would increase the annual network revenue requirement by

$10,000, thereby increasing each network customer's rate to reflect its load

ratio share of the $10,000 payment.

19a

Docket No. 0A97-25-000, NSP Companies proposed to make

a filing under Section 205 in order to implement the credit and

the increase in the network rate. However, NSP Companies

amended the originally filed tariff on December 24, 1996, to

eliminate the filing requirement, i.e., to treat the surcharge as an

automatic adjustment clause.

The proposed methodology for computing customer credits

implements one of the pro forma tariff terms and conditions.

Therefore, we find that the change NSP Companies made to

their pre-Order No. 888 rates was necessitated by Order No.

888, and we will accept it for filing. However, our preliminary

review indicates that the proposed methodology has not been

shown to be just and reasonable, and may be unjust,

unreasonable, unduly discriminatory, or otherwise unlawful.

Accordingly, we will set this crediting methodology and rate

revision, including the reasonableness of using an automatic

adjustment clause, for hearing. Under Order No. 888, any rate

change necessitated by Order No. 888, such as this one, was

subject to a blanket suspension and is subject to refund."” The

crediting mechanism hereby set for hearing encompasses the

provision as contained in the filings in Docket Nos. OA97-25-

000 and OA97- 606-000. As discussed further below, we will

consolidate the hearing on this issue with the hearing on issues

concerning customer credits that have been raised in Docket

Nos. ER98- 1890-000 and ER98-2060-000.

We will reject the protests of CCEM and ECI to the extent

they protest aspects of NSP Companies’ ancillary service rates

that are unchanged from the pre-Order No. 888 rate. As we said

in APS Il, we will not set for investigation during the

compliance process rates that have simply been carried over

from a previous tariff and have already been determined to be

not unjust, unreasonable, or unduly discriminatory.'' We will

also reyect CCEM's proposal to add language concerning credits

Order No. 888, FERC Statutes and Regulations at p. 31,769,

"APS II, 80 FERC at p. 61,537.

20a

for non-firm customers whose service is interrupted. We

clarified the policy with respect to this issue in APS II and made

it applicable to all transmission providers. '” Accordingly, no

further change is required.

3. Effective Dates For Open Access Compliance Tariffs

NSP Companies requested an effective date of October 11,

1996 for its Order No. 888 compliance tariff filing in Docket

No. OA97-25-000, which was the date that it filed the tariff. We

will, however, make that tariff effective July 9, 1996, the date

on which all Order No. 888 compliance tariffs were to go into

effect.'* This will not affect any customer's bills because the

basic rates are unchanged, but it will ensure that NSP's

obligation to obtain transmission service under its pro forma

tariff for its own unbundled transactions began on July 9, 1996.

NSP Companies requested an effective date of November 1,

1996, for the revision it filed on December 24, 1996 conceming

crediting for transmission facilities as it applied to network

integration customers. NSP Companies explain that that is the

date that several customers commenced network integration

service and that the revision benefits customers. We will grant

waiver to permit this revision to become effective November 1,

1996.

NSP Companies requested an effective date of J uly 1, 1997,

for their Order No. 888-A compliance filing in Docket No.

OA97-606-000. We will, however, make the Order No. 888-A

compliance filing effective May 13, 1997, which is the date that

the changes required by Order No. 888-A became effective. '4

” APS II, 80 FERC at pp. 61,549-50.

“ Order No. 888, FERC Statutes and Regulations at p. 31,769.

“ See Order No. 888-A, FERC Statutes and Regulations at p. 30,500.

2la

C. Docket Nos. ER98-1890-000 and ER98-2060-000

1. Non-Rate Terms and Conditions

In Docket Nos. ER98- 1890-000 and ER98-2060-000, NSP

Companies have made what we have identified as ten changes

‘to the non-rate terms and conditions of their open access

transmission tariff. In Docket No. ER98-1890-000. NSP

Companies (1) revised Section 13.5 to limit their redispatch

obligation to NSP resources "under its control": (2) added a

reference to "redispatch costs" in Section 16.1: (3) changed the

word "schedule" to "request for service" in Section 18.4 dealing

with the determination of ATC: (4) changed Schedule 2 to add

limitations as to when NSP Companies will provide reactive

supply service; (5) revised Schedules 5 and 6 to specify that

customer-supplied operating reserves must be “acceptable to"

NSP Companies; and (6) revised Sections 14.6 and 18.3 to

establish earlier deadlines for reserving and scheduling nonfirm

service. In Docket No. ER98-2060-000, NSP Companies (1)

revised the definition of the customer's network load (Section

1.23) to include the "reserved capacity of the Network

Customer's firm point-to-point Transmission Customers;" and

(2) revised the definition for load ratio share (Section 1.17) to

replace the transmission provider's "total system load" with its

"Transmission System" load. With respect to all of these

changes, NSP Companies have either not attempted to

demonstrate how they are consistent with or superior to the pro

forma tariff, or have totally failed to even identify the change

made other than through redlining the revised page.

In New York State Electric & Gas Corporation, 78 FERC

(61,114, at pp. 61,434-35 (1997), reh'g denied, 82 FERC

{61,209 (1998), the Commission explained that it would reject

proposed changes found in the red-lined version of a revised

tariff but not otherwise identified or discussed in the filing, and

changes that were identified, but with no demonstration that the

changes were consistent with or superior to the pro forma tariff.

We will continue to strictly place the burden on the filing utility

to demonstrate that revised terms and conditions are consistent

22a

with or superior to the pro forma tariff. Accordingly, we will

reject NSP Companies’ proposed changes that are listed in the

preceding paragraph.

NSP Companies have made two revisions to non-rate terms

and conditions where they have attempted to demonstrate why

they are consistent with or superior to the pro forma tariff. First,

in Docket No. ER98-1890-000, NSP Companies propose to

eliminate Section 2.1, which deals with the initial allocation of

available transmission capacity, because the time frame for

requesting such an initial allocation has now expired by its own

terms. We will accept this revision because NSP Companies

have adequately explained how it is consistent with the pro

forma tariff.

The second revision that NSP Companies have attempted to

support involves the curtailment procedures in the pro forma

tariff. In Docket No. ER98-1890-000, NSP Companies have

revised the curtailment procedures in Sections 13.6 and 14.7 to

provide that curtailments would be made in accordance with the

Mid-Continent Area Power Pool (MAPP) Line Loading Relief

procedure (LLR). NSP Companies state that, under the MAPP

LLR, when a curtailment is required for a facility, a Power

Transfer Distribution Factor (PTDF) is calculated for

transactions utilizing the affected transmission facility. The

PTDF is the percentage of each current transaction that flows _

over the facility, e.g., if 5 MW of a 100 MW schedule flows

over the affected facility, its PTDF on that facility is 5%. NSP

Companies state that, under the MAPP LLR, all schedules with

a PTDF of 5% or higher are subject to curtailment under the

LLR before all schedules with a PTDF less than 5%. NSP

Companies' prepared direct testimony offers the following

explanation of the MAPP LLR:

Schedules are curtailed in priority order. All schedules

with a PTDF greater than 5% in a priority group are curtailed

before schedules are curtailed in the next higher priority

23a

group. Within each priority group, schedules are currently

curtailed on a pro-rata basis."” [emphasis added]

NSP Companies provide no description of "priority groups" and

do not explain whether the phrase “schedules are currently

curtailed” indicates that NSP Companies intend to adopt MAPP

practices, as they change from time to time, without a filing

with the Commission. NSP Companies’ witness asserts, without

elaboration, that the MAPP LLR is consistent with the pro

forma tariff requirement that curtailments "be made on a non-

discriminatory basis."

Several intervenors shave protested this change in the

curtailment provisions.’ ° They explain that, under the MAPP

LLR, there are 14 different priority groups which, among other

things, establish different priorities for firm services based on

factors such as the type of power sale that is being transmitted,

e.g., Short-term firm service would be curtailed before longer-

term firm service. Intervenors complain that these curtailment

priorities do not track the pro forma tariff curtailment priorities,

and do not provide curtailment on a comparable, non-

discriminatory basis.

We will reject NSP Companies’ proposed revisions to the

curtailment provisions. First, it is unacceptable to define tariff

curtailment priorities through a general reference to a MAPP

procedure that is unexplained in the tariff and that may change

from time to time. The specific curtailment priorities must be

delineated in the tariff and subject to change only by a filing

with the Commission under Section 205.'’ Second, the Order

'’ Prepared Direct Testimony of Mr. David B. Grover, Exh. No. ___

(NSP- 200(DBG)), at 5.

'* Among those protesting this change is ECI, Enron, Commonwealth

Edison, and Wisconsin Public Service

” This is consistent with the Commission's recent order finding that

Western Resources, Inc.'s proposed tariff provisions did not adequately

describe its proposed new curtailment terms. Coalition Against Private

Tariffs, 83 FERC 461,015 (1998).

a 24a

No. 888 requirement that tariff terms be demonstrated as

consistent with or superior to the pro forma tariff is not met by

NSP Companies’ one sentence assertion that this is the case.

Finally, NSP Companies’ description of the MAPP LLR is

severely misleading. Nothing in NSP Companies’ description

provides an appreciation of the number of curtailment priorities

or the basis for the priority used under the MAPP LLR.

2. Rates and Rate Terms and Conditions

In Docket No. ER98-1890-000, NSP Companies propose to

increase the rate for firm point- to-point service; to revise the

ancillary service rates in its tariff in several respects, including

the initiation of a reactive supply charge (there was no charge

for this service in the present tariff); to reduce the energy

deviation band for energy imbalance service from 4% to 1.5%;

to tie the charge for energy imbalance deviations to data

published by Continental Power Exchange (CPEX) concerning

the rates negotiated by utilities using its brokering services;

and to add some ancillary service charges to bilateral

agreements which presently do not include charges for these

particular ancillary services. In Docket No. ER98-2060-000,

NSP Companies proposed to increase the Annual Transmission

Revenue Requirement (ATRR) for network service and to

change the mechanism for calculating ATRR."”

'* While many transmission providers assess a penalty charge of 100

millskWh for energy imbalances outside the deviation band, NSP

Companies’ present tariff assesses a charge based on its own marginal energy

costs. NSP Companies state that the present rate actually creates an incentive

to under schedule when NSP’s marginal energy costs are less then the

prevailing market price for energy. NSP Companies propose to adopt the

highest price reported by CPEX for the day on which the deviations

occurred.

'’ NSP Companies have also identified revisions to four provisions of the

pro forma tariff that are related to their proposed rate changes, and these will

be accepted, subject to the outcome of the Commission's review of the rate

proposals. These revisions are: (1) revised the definition of network load

(Section 1.17) to eliminate references to a 12 month rolling average: (2)

aerate artnet

25a

A number of intervenors contend that NSP Companies’

filings in Docket Nos. ER98-1890-000 and ER98-2060-006

should be rejected as deficien;. They complain that certain

aspects of the cost methods are not explained (e.g., how

administrative and general expenses were functionalized to

transmission) and that the data on various Statements are not

cross-referenced to the Supporting statements, They also

contend that the workpapers are not adequate. Finally, they note

that NSP Companies have made a computational error in

developing the unit charge.

Our review indicates that NSP Companies’ submittals meet

the minimum threshold filing requirements, and we will

therefore not reject the filings as deficient. However, we will

summarily direct NSP Companies to file revised rates to correct

a computational error. As noted by the intervenors, and

acknowledged by NSP Companies, NSP Companies made an

error in transferring the demands developed on Statement BB

(91,691 MW) to Statement BL (89.913 MW), where those

demands are divided into the revenue requirement to develop

the unit charge. Correction of this error will reduce the

transmission rate by about 8%. NSP Companies have made

similar errors in developing some of the ancillary service rates.

Accordingly, although NSP Companies have submitted revised

cost-of-service statements,”’ we will direct NSP Companies to

also file revised rates to correct these computational errors

based on the demand data reflected in its cost study within 30

days of the date of the order herein.

revised the definition of the transmissionprovider's monthly transmission

peak (Section 1.48) to clarify that the current definition ("maximum monthly

usage") includes "all network and Firm Point-to-Point Transmission

Service;" (3) defines the annual billing year to begin in May each year

(Section 34.1); and (4) changes the network load calculation from a rolling

12 month average to single annual recalculation (Section 34.3.1 ).

” See NSP Companies’ Response in Docket No. ER98-1890-000.

26a

Our preliminary analysis of NSP Companies’ proposed rate

changes indicates that they have not been shown to be just and

reasonable, and may be unjust, unreasonable, unduly

discriminatory or preferential, or otherwise unlawful.

Accordingly, with the corrections made to the computational

errors noted above, we will accept the proposed rates for filing,

suspend them and make them effective subject to refund, and

set them for hearing, as ordered below. We will consolidate for

hearing all rate related issues in Docket Nos. ER98-1890- 000

and ER98-2060-000, and will also consolidate with this hearing

the issues related to customer credits for transmission facilities

as discussed above with respect to Docket Nos. OA97-25-000

and OA97-606-000.

In West Texas Utilities Company, 18 FERC 961,189 (1982),

we explained that where our preliminary examination indicates

that proposed rates may be unjust and unreasonable, but may

not be substantially excessive, as defined in West Texas, we

would generally impose a nominal suspension. Here, our

examination suggests that the proposed rates may yield

substantially excessive revenues. Therefore, we shall suspend

the proposed rates, and the related changes to rate terms and

conditions, for five months, to become effective, subject to

refund, on October 1, 1998.

Because the ultimately approved rates in this docket may be

lower than the last clean rate (i.e., the rates approved in Docket

Nos. ER94-1090-000 and ER94-1113-000),”' we will also

institute an investigation of the proposed rates under Section

206 of the Federal Power Act, in Docket No. EL98-40-000, and

establish a refund effective date.

In cases where, as here, the Commission institutes a Section

206 investigation on its own motion, Section 206(b) requires

that the Commission establish a refund effective date that is no

*' The last clean rate is that last rate in effect not subject to any refund

obligation. See Federal Power Commission y. Sunray DX Oil Company, 391

U.S. 9, 21-24 (1968).

27a

earlier than 60 days after publication of notice of the

Commission's investigation in the Federal Register, and no later

than five months Subsequent to the expiration of the 60- day

period. In order to give maximum protection to consumers, and

consistent with our precedent,”? we will establish the refund

effective date at the earliest date allowed. This date will be 60

days from the date on which notice of Our initiation of the

investigation in Docket No. EL98-40-000 is published in the

Federal Register,

Section 206 also requires that, if no final decision is

rendered by the refund effective date or by the conclusion of the

180-day period commencing upon the initiation of a proceeding

pursuant to Section 206, whichever is earlier, the Commission

shall state the reasons why it has failed to do so and shall state

its best estimate of when it reasonably expects to make such a

decision. To implement that requirement, we will direct the

presiding judge to provide a report to the Commission no later

than 15 days in advance of the refund effective date in Docket

No. EL98-40-000 in the event the presiding judge has not, by

that date: (1) certified to the Commission a settlement which,

if accepted, would dispose of the proceeding; or (2) issued an

initial decision. The judge's report, if required, shall advise the

Commission of the status of the investigation and provide an

estimate of the expected date of certification of a settlement or

issuance of an initial decision.

D. Joint Transmission Arrangements

NSP Companies’ filing in Docket No. ER98-2060-000 raises

an issue with respect to certain joint transmission arrangements

that warrants special procedures. Historically, there has been a

close interdependence, for transmission purposes, among NSP

Companies and neighboring transmission facility owners, which

include Southern Municipal, Dairyland, CPA, UPA, and

* See, e.g., Cambridge Electric Light Company, 75 FERC 461,177

(1996); Canal Electric Company, 46 FERC 461,153. reh'g denied, 47 FERC

961.275 (1989).

28a

CMMPA. NSP Companies had entered into agreements with

these neighboring facility owners, some dating as far back as

the 1960's, related to joint planning and joint use of

transmission facilities. Over the years, these joint transmission

agreements have been the subject of considerable dispute, not

only as to the compensation provisions, but as to the extent to

which the other party was permitted to use NSP Companies’

transmission system. In 1995 and 1996, pursuant to various

settlement agreements,” these neighboring facility owners

became network transmission customers under NSP

Companies’ open access tariff. As such, they qualified under

Section 30.9 of the pro forma tariff for billing credits

applicable to Network Customers that own transmission

facilities that are integrated into the Transmission Provider's

Transmission System.

In their filing in Docket No. ER98-2060-000, NSP

Companies now contend that the crediting for facilities owned

by these network customers is not working as envisioned.”

NSP Companies state that, in retrospect, they do not believe

that the Commission intended for the crediting provisions to

apply in some of the circumstances presented under NSP

Companies’ historical joint transmission arrangements. They

suggest that the crediting provision was intended to apply only

to tariff customers that owned discrete facilities located within

the NSP Companies control area. They assert that some of the

utilities with whom they had joint transmission arrangements

own extensive facilities, which in some instances result in

customer credits that equal or exceed the network rate that

would otherwise be billed. NSP Companies add that the

application of the crediting provision in these circumstances

** Some of these settlements were intended to gain the neighboring

facilities owners’ support for the NSP Companies’ ultimately unsuccessful

efforts to merge with Wisconsin Electric Power Company to form Primergy.

* NSP Companies’ position with respect to customer credits is presented

in the Prepared Direct Testimony of Mr. Anthony G. Shuster, Exh. No. <<

NSP-105 (AGS).

29a

could arguably be interpreted to require them to pay these

customers the difference, thereby allowing the customers to

effectively collect transmission revenues from NSP Companies

and other tariff customers, even though they ‘have no

transmission tariff on file with the Commission.

NSP Companies admit that they voluntarily entered into the

network service agreements, but state that the concept has not

operated as anticipated. They also assert that they are not trying

to avoid any payments that the neighboring facilities owners

may be due for NSP Companies’ use of their facilities, but want

to avoid cost-shifting and timing problems associated with the

existing method of crediting for use of these facilities. NSP

Companies’ remedy, as proposed in Docket No. ER98-2060-

000, is to revise Section 34.1 of their tariff to cap the credit at

the amount of the charge for network service that would

otherwise apply, i.e., credits may reduce the customer's bill to

zero, but NSP would not be required to make payments to the

customer if the credit exceeded the bill. NSP Companies also

propose various revisions to the mechanism for calculating the

credit. NSP Companies acknowledge that they are receptive to

other solutions, and ask that the Commission provide some

guidance on these issues.

The neighboring facilities owners protest NSP Companies’

proposal. Southern Municipal argues that NSP Companies

should not be surprised that they would be a net payer as a

result of the crediting mechanism since it replaces a joint

transmission agreement which assigned substantial cost

responsibility to NSP Companies for the joint transmission

system. Southern Municipal contends that data developed in

support of the settlement clearly indicated that its credit was

expected to exceed its bill and that NSP Companies would be

making payments to Southern Municipal each month. Finally,

Southern Municipal states that it is involved in continuing

disputes about which facilities are eligible for credits, and upon

the Commission's directive in response to its protests in other

dockets, it has attempted to resolve these disputes through the

ADR process under NSP's open access tariff. Southern

terrence

30a

Municipal also contends that all affected parties have urged

NSP Companies to convene joint Network Operating

Committee meetings to reach a broad resolution of these issues,

but that NSP Companies have resisted these efforts.

CMMPA supports Southern Municipal's comments.

CMMPA also complains that the NSP Companies’ proposal is

at odds with a moratorium which fixes CMMPA's credit for

three years. CPA/Dairyland and other intervenors challenge

NSP Companies attempted reliance on the approach in the prior

transmission agreements. CPA/Dairyland note that those earlier

agreements required investment equalization and did not

contemplate that the parties’ benefits and burdens would be

disproportionate. Finally, UPA argues that a regional tariff is

preferable and should be pursued now. UPA also contends that

NSP Companies’ current proposal (which caps the credit at the

amount of the network charges that would otherwise be billed)

is an attempt by them to relitigate a fundamental term and

condition of Order No. 888 that should be summarily rejected.

The Commission agrees with NSP Companies that Section

30.9 of the pro forma tariff was not intended to be the

foundation for joint transmission arrangements. Clearly, the

Commission did not expect that a customer facility which was

integrated with the transmission provider's system would, at the

same time, comprise part of the customer's own integrated

transmission gr/d. Section 30,9 was not designed to provide the

framework for the complicated arrangements necessary to

operate joint transmission systems such as the case here. That

said, it is also clear that NSP Companies created this untenable

situation by negotiating settlements promising something that

was not required under the pro forma tariff. We will reject the

last sentence of NSP Companies’ proposed revision to Section

34.1 of the tariff, which places a cap on customer credits,

because NSP Companies have not demonstrated how that

change is consistent with the negotiated settlements. We believe

that this issue presents special circumstances, and is not an

issue that can be resolved through litigation of the appropriate

terms for NSP Companies’ open access tariff. While the

3la

intervenors should not be deprived of the benefits of their

settlement bargains, those bargains also cannot be forced to fit

into the pro forma tariff.

We will therefore sever from the rest of the hearing ordered

herein the issue of appropriate compensation mechanisms for

use of the transmission facilities encompassed by network

service by NSP Companies to Southern Municipal, Dairyland,

CPA, UPA, and CMMPA. Because all of the affected parties

seem to recognize the desirability of a negotiated, regional

solution, we will assign this severed issue to a settlement judge.

We would expect that the settlement judge and the parties will

search for a solution that takes into account the promises

embodied in the prior settlements, and that resolves these

matters jointly and comprehensively and without resort to

bilateral negotiaticns that fail to reflect the joint operation of

these transmission facilities. We will direct that the settlement

judge report to us within 90 days from the date of this order,

and if these efforts appear unsuccessful, we will consider other

procedures.

E. WPPI's Request for Summary Disposition

WPPI is NSP Companies’ customer under two bilateral

transmission agreements: the long-term transmission agreement

for deliveries to certain western Wisconsin cities (WTA), and

the long-term transmission agreement for deliveries to eastern

Wisconsin (ETA), both of which were negotiated in 1990, The

WTA currently includes three ancillary services: scheduling,

load following and energy deviations, while the ETA includes

only scheduling. In Docket No. ER98-1890-000, NSP

Companies propose to revise the transmission rates in each

agreement to track the changes proposed for the tariff rates: to

add a reactive supply charge to each agreement; and to revise

the other ancillary service provisions in the WTA to track

changes proposed for the tariff.

WPPI moves for summary disposition, asking that we rule

that NSP Companies are prohibited by contract from seeking

certain changes to the transmission agreements. WPPI argues

ee ee ee

32a

that while the WTA and ETA allow for changes to rates, NSP

Companies do not have the right under those agreements to

unilateraily change the non-rate terms and conditions. WPPI

challenges specifically the addition of reactive supply charges

for each agreement and the proposed revisions to the energy

imbalance charges in the WTA. We will deny WPPI's request.

WPPI's contention that charges for reactive power and the

deviation band for energy imbalances are non-rate terms and

conditions is without merit. How much WPPI will pay for

reactive power is Clearly a rate matter, and the sole purpose of

an energy imbalance deviation band is to demarcate the point at

which the price changes from energy returned in kind (inside

the band) to a higher charge (outside the band). Also, WPPI is

incorrect in its contention that, under the WTA, energy

imbalance provisions are not covered under the provisions

permitting unilateral rate changes because they are not

contained in the exhibit listing rates. Section 7.04 of the WTA

states:

All compensation provisions under this Agreement are

subject to unilateral rate change filings by NSP at any time

under Section 205 of the Federal Power Act, and complaint

filings by WPPI at any time under Section 206 of the

Federal Power Act. NSP shall have the unilateral right, on

any basis whatsoever, to make unilateral rate change

filings for firm transmission services provided hereunder

Clearly, the location of the compensation

provision—whether or not it is in the rate exhibit—does not

affect NSP Companies’ ability to file changes to any

"compensation" provision. Finally, the absence of a reactive

power charge in the WTA and ETA is not surprising because

the rates were last revised to track NSP companies’ pre-Order

No. 888 tariff rates and that tariff did not include a rate for

reactive power. WPPI may pursue at hearing the amount of

credit it should receive, if any, for reactive supply provided by

its generating units.

33a

WPPI also argues that NSP Companies have eliminated

provisions from the WTA and ETA dealing with revenue

credits and credits for customer-owned transmission facilities

contrary to agreements reached as part of the Primergy merger

settlement. WPPI contends that these are also unilateral

revisions to non- rate terms that are not permitted under the

ETA and WTA. Contrary to WPPI's claim, NSP Companies

have not proposed any revision to the WTA or ETA related to

the revenue credits and Customer-supplied transmission.

Further, it does not appear that those settlement provisions were

ever codified in the WTA and ETA, Accordingly, WPPI's

request for summary disposition is denied.

The Commission orders:

(A) NSP Companies’ open access transmission tariff filed in

Docket No. OA97-25-000 is hereby accepted and set for

hearing in part, as discussed in the body of this order, to be

effective July 9, 1996.

(B) NSP Companies’ open access transmission tariff revision

to Attachment H filed on December 24, 1996, is hereby

accepted and set for hearing, as discussed in the body of this

order, to be effective November 1, 1996.

(C) NSP Companies’ open access transmission tariff filed in

Docket No. OA97-606-000 is hereby accepted and set for

hearing in part, as discussed in the body of this order, to be

effective May 13, 1997.

(D) NSP Companies’ proposed revisions to their open access

tariff made in Docket Nos. ER98-1890-000 and ER98-2060-

000 are hereby accepted in part, rejected in part, and, as

accepted, suspended for five months and made subject to

refund, and set for hearing in part, as discussed in the body of

this order, to become effective October 1, 1998.

(E) NSP Companies are hereby directed to submit amended

rate sheets reflecting the corrected computational error, as

discussed in the body of this order, within 30 days of the date

of this order, :

34a

(F) Pursuant to the authority contained in and subject to the

jurisdiction conferred upon the Federal Energy Regulatory

Commission by Section 402(a) of the Department of Energy

Organization Act and the Federal Power Act, particularly

Sections 205 and 206 thereof, and pursuant to the Commission's

Rules of Practice and Procedure and regulations under the

Federal Power Act (18 C.F.R. Chapter I), a public hearing shall

be held in the consolidated dockets concerning the justness and

reasonableness of NSP Companies’ proposed rates and rate

terms, as discussed in the body of this order.

(G) Pursuant to the authority contained in and subject to the

jurisdiction conferred upon the Federal Energy Regulatory

Commission by Section 402(a) of the Department of Energy

Organization Act and by the Federal Power Act, particularly

Section 206 thereof, and pursuant to the Commission's Rules of

practice and procedure and the regulations under the Federal

Power Act (18 C.F.R. Chapter I), a public hearing shall be held

in Docket No. EL98-40-000 concerning the justness and

reasonableness of NSP Companies’ rates and rate terms, as

discussed in the body of this order.

(H) The Secretary shall promptly publish in the Federal

Register a notice of the Commission's initiation of the

proceeding in Docket No. EL98-40-000.

(1) The refund effective date in Docket No. EL98-40-000,

established pursuant to Section 206(b) of the Federal Power

Act, will be 60 days following publication in the Federal

Register of the notice discussed in Ordering Paragraph (H)

above.

(J) Docket Nos. OA97-25-000, OA97-606-000, ER98-1890-

000, ER98-2060-000, and EL98-40-000 are hereby consolidated

for purposes of hearing and decision.

(K) A presiding administrative law judge, to be designated

by the Chief Administrative Law Judge, shall convene a

conference in these proceedings to be held within

approximately 15 days of the date of this order, in a hearing

35a

room of the Federal Energy Regulatory Commission, 888 First

Street, NE., Washington, DC 20426. Such conference shall be

held for the purpose of establishing a procedural schedule. The

presiding judge is authorized to establish procedural dates, and

to rule on all motions (except motions to dismiss) as provided

in the Commission's Rules of Practice and Procedure.

(L) The presiding administrative law judge shall advise the

Commission, no later than 15 days prior to the refund effective

date established in Docket No. EL98-40-000, in the event that

the presiding judge has not by that date certified to the

Commission a settlement which, if accepted, would dispose of

the proceeding or issued an initial decision, as to the Status of

the proceeding and a best estimate as to when the proceeding

will be disposed of by the presiding judge.

(M) Pursuant to Rule 603 of the Commission's Rules of

Practice and Procedure, 18 C.F.R. §385.603 (1997), the Chief

Administrative Law Judge is hereby directed to appoint a

settlement judge in this proceeding within approximately 15

days of the date of issuance of this order, for the limited

purpose of considering the issue severed from the hearing, as

discussed in the body of this order. The designated settlement

judge shall have all powers and duties enumerated in Rule 603

and shall convene an initial settlement conference as soon as

practicable. The settlement judge will report to the Commission

on the status of the negotiations and the prospects for settlement

within 90 days of the date of this order.

(N) The motions to intervene out of time, motions to reject,

and motions for summary disposition are disposed of as

discussed in the body of this order.

(O) NSP Companies are hereby informed of the rate

schedule designations shown on the Attachment to this order.

36a

APPENDIX C

BEFORE THE

FEDERAL ENERGY REGULATORY COMMISSION

Docket Nos. OA97-25-000, OA97-606-000, ER98- 1890-000,

ER98-2060-000, and EL98-40-000

NORTHERN STATES POWER COMPANY (MINNESOTA) AND

NORTHERN STATES POWER COMPANY (WISCONSIN)

Order on Request for Clarification

(Issued June 29, 1998)

Before Commissioners: James J. Hoecker, Chairman; Vicky

A. Bailey, William L. Massey, Linda Breathitt, and Curt Hébert,

Jr.

On May 18, 1998, Northern States Power Company

(Minnesota) and Northern States Power Company (Wisconsin)

(collectively, NSP Companies) requested clarification of our

April 30, 1998 order (April 30 Order) in this proceeding.' The

requested clarification concerns our rejection of NSP

Companies’ proposed modification of their open access

transmission tariff that was intended to revise the curtailment

procedures to be in accordance with the Mid- Continent Area

Power Pool (MAPP) Line Loading Relief (LLR) procedure.

' Northern States Power Company (Minnesota) and Northern States

Power Company (Wisconsin), 83 FERC 461,098 (1998).

a

37a

Commonwealth Edison Company (Commonwealth Edison),

Wisconsin Electric Power Company (WEPCO), and Electric

Clearinghouse, Inc. (ECT) filed answers to NSP Companies’

request. We will grant NSP Companies’ requested clarification

in part and deny it in part, as discussed below.

Our April 30 Order rejected NSP Companies’ proposal to

revise their open access transmission tariff curtailment

provisions to reflect the MAPP LLR because the proposed

curtailment procedure was not adequately explained in the

tariff, and NSP Companies did not demonstrate that the

revisions were consistent with or superior to the pro forma

tariff,

NSP Companies state in their request for clarification that

they will make a compliance filing to return their tariff's

curtailment provisions to the pro forma language, and that they

are not asking the Commission to rule on the merits of the

LLR.* NSP Companies assert, however, that using the pro

forma language in their open access tariff subjects them to

potentially conflicting obligations as between the tariff and the

MAPP Agreement. NSP Companies, therefore, ask us to

approve of several procedures they propose to implement to

avoid conflicting obligations.

As a general matter, NSP Companies explain that the

MAPP LLR procedures are required to ensure regional

reliability. NSP Companies describe this procedure as follows:

Under MAPP requirements, if NSP or any other MAPP

utility encounters a situation which demands loading relief for

any of its transmission facilities, that entity has the right to

"Id. at p. 61,469,

* NSP Companies state that they would rely on the outcome of the

complaint case filed in Commonwealth Edison Company v. Mid-Continent

Area Power Pool, Docket No. EL98-19-000 (Commonwealth Edison y.

MAPP) for the merits of the LLR procedure. We will address

Commonwealth Edison's complaint in a separate. future order.

38a

invoke the MAPP LLR procedures. When a utility requests

MAPP to invoke LLR, the MAPP Security Center gathers all

schedules, including the schedules NSP has accepted under its

open access Tariff, notes the priority of each under MAPP LLR

and orders utilities, including NSP, to effect interruptions as

required under LLR.*

NSP Companies state that they intend to continue to

implement MAPP LLR requests to interrupt or curtail

schedules, but will ensure that the curtailment priority assigned

to all transactions under the NSP Companies’ tariff is the

priority required under the pro forma tariff. NSP Companies

explain that the MAPP LLR has a number of curtailment

categories for firm transactions, based upon the length of the

transaction. However, they state that by directing MAPP to

assign all of NSP Companies’ firm tariff transactions, regardless

of their duration, to the MAPP LLR highest firm priority group,

NSP Companies can ensure that MAPP does not direct any

curtailments that are inconsistent with NSP Companies’ pro

forma tariff. We find that this is reasonable and consistent with

our April 30 Order.” Contrary to ECT’s assertion, the procedure

* NSP Companies Request at 4.

* We note that in the Commonwealth Edison v. MAPP proceeding,

MAPP has filed a letter informing the Commission that effective June 2,

1998, all firm transactions under MAPP member tariffs are provided the

same, and highest, curtailment priority under the MAPP LLR. ECT asserts

there is a conflict created in that the MAPP letter referred to priority level 15

as the highest, and NSP Companies referred to priority level 14 as the

highest. Although we do not know the reason for this discrepancy, our

clarification ts based on NSP Companies’ representation that they will report

all firm transactions at the “highest available priority,” whatever that may be.

Commonwealth Edison's answer to NSP Companies’ request states that

it appreciates NSP Companies’ unplementation proposals, but asserts that

other MAPP members’ transmission customers will not benefit from this and

that a solution involving all of MAPP is required. As Commonwealth Edison

is concerned about the actions of transmission providers other than NSP

Companies, its concer is more appropriately addressed in its pending

complaint case,

39a

proposed will result in curtailment priorities that are consistent

with the pro forma tariff.

NSP Companies also explain that they, rather than MAPP,

have the responsibility for ensuring that curtailment priorities

for firm point-to-point transactions under NSP Companies’

tariff are the same as the curtailment priorities for NSP

Companies’ network/native loads. Section 13.6 of the pro forma

tariff requires (to the extent practicable and consistent with

Good Utility Practice) that curtailments to firm point-to-point

transactions, network customers, and native load be done on a

comparable basis, NSP Companies state that, when MAPP

orders LLR for a constrained facility over which power flows

to network/native load and firm point-to-point customers, NSP

Companies will redispatch the system in a manner that will

maintain comparability, For example, NSP Companies state

that when 50% of the load on a constrained interface is firm

point-to-point transactions and 50% is network/native load,

NSP Companies will redispatch their system to absorb half of

the load reductions required to relieve the constraint. We find

that this procedure is reasonable and comports with the

comparability requirements of the pro forma tariff.

Next, NSP Companies state that, in the Situation where

there is a need to reduce loads on facilities that are being used

to serve both NSP Companies’ network/native loads and NSP's

firm point-to-point tariff customers, but NSP Companies have

exhausted all network/native load generation redispatch

options, they do not believe they are required to shed network/

native load in order to preserve comparability with curtailments

of firm point-to-point transmission provided under their tariff.

" WEPCO asserts that, if NSP Companies can avoid shedding

network/native load by redispatching, it is not effecting a proportional

curtailment of load,We disagree, NSP Companies have committed to effect

a proportional curtailment of load on the constrained facilities, Having taken

this action, NSP Companies, like any other transmission user, have the

option to continue to serve load using other resources or transmission paths,

as long as those actions are otherwise consistent with the pro forma tariff,

40a

NSP Companies argue that this procedure is fair because it sold

transmission service "based on the assumption that curtailment

of firm service and its subsequent forced redispatch is

permitted."’ NSP Companies add that MAPP uses a smaller

Capacity Benefit Margin (CBM) than other regions, and

therefore withholds less transmission capacity "for emergency

uses,” allowing for the calculation of a greater Available

Transmission Capability (ATC) for firm transmission

transactions as compared to other regions.

We cannot, based on the facts before us, grant clarification

that it is acceptable for NSP Companies to curtail firm point-to-

point transactions without directing pro-rata curtailments for its

network/native load, because that procedure would not comport

with the pro forma tariff.® The fact that NSP Companies expect

that their tariff customers may have redispatch options in

circumstances when NSP Companies do not is not a criterion

under the pro forma tariff for disproportionate curtailments of

firm point-to-point services. Also, the fact that NSP Companies

may have granted requests for firm point-to-point service in the

expectation that they would not be required to adhere to the pro

forma tariff curtailment terms provides no basis to grant

clarification that NSP Companies need not adhere to its tariff

terms. Moreover, NSP Companies’ suggestion that it is a

practice of MAPP utilities to calculate ATC more expansively

” NSP Companies Request, Affidavit of Terry L. Volkmann at 7.

* In Order Nos. 888 and 888-A, the Commission rejected the argument

that native load should be protected from load shedding under pro rata

curtailments. See Promoting Wholesale Competition Through Open Acess

Non- Discriminatory Transmission Services by Public Utilities; Recovery of

Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888,

61 Fed. Reg. 21,540 (1996), FERC Statutes and Regulations, Regulations

Preambles January 1991-June 1996 ¢3 1,036, at pp. 31,748-49 (1996), order

on reh'g, Order No, 888-A, 62 Fed. Reg. 12,274 (1997), FERC Statutes and

Regulations $31,048, at pp. 30,278-79 (1997), order on reh'g, Order No,

888-B, 81 FERC 461,248 (1997), order on reh'g, Order No, 888-C, 82 FERC

$61 046 (1998).

4la

than other regions, also in the expectation that network/ native

load transactions will have a higher curtailment priority than the

firm point-to-point tariff transactions. is unsupported and

unpersuasive,

Finally, NSP Companies assert that for them to shed load

under certain curtailment circumstances may reduce system

transfer stability, and they rely on this as an additional reason

why they should not be required to do so.” This presents a

different issue. The pro forma tariff requires comparability of

Ccurtailments when consistent with Good Utility Practice. The

Commission would not expect NSP Companies to violate Good

Utility Practice when implementing curtailments. Further, the

pro forma tariff allows the Transmission Provider the discretion

to curtail firm transmission service when an emergency or other

unforeseen condition impairs or degrades the reliability of its

transmission system. Absent such system reliability concerns,

however, NSP Companies must engage in a pro-rata

curtailment,

The Commission orders:

NSP Companies’ request for clarification is hereby granted

in part and denied in part, as discussed in the body of this order.

” NSP Companies Request, Affidavit of Terry L. Volkman at 6.

42a

APPENDIX D

BEFORE THE

FEDERAL ENERGY REGULATORY COMMISSION

Docket Nos. OA97-25-003, OA97-606-003, ER98- 1890-004,

ERYS8-2060-004, and EL98-40-003

NORTHERN STATES POWER COMPANY (MINNESOTA) AND

NORTHERN STATES POWER COMPANY (WISCONSIN)

Order Denying Requests for Clarification,

Rehearing, and Stay

(Issued July 31, 1998)

Before Commissioners: James J. Hoecker, Chairman; Vicky

A. Bailey, William L. Massey, Linda Breathitt, and Curt Hébert,

Jr.

On July |, 1998, as supplemented July 21, 1998, Northern

States Power Company (Minnesota) and Northern States Power

Company (Wisconsin) (NSP) filed an "Emergency Request For

Clarification, Or Rehearing And Conditional Motion For Stay"

of the Commission's June 29, 1998 order in this proceeding.

Northern States Power Company (Minnesota) and Northern

States Power Company (Wisconsin), 83 FERC 461,338 (1998).

The Commission's June 29 order made several clarifications in

response to an NSP request, one of which was that it was not

acceptable for NSP to implement transmission line loading

relief by curtailing firm point-to-point transmission customers

before network/native load customers.

————eeeeeeeeeeeeeeeeee

43a

NSP now argues that the Commission does not have

jurisdiction over bundled retail service, and the Commission

should clarify that the order was not intended to apply the tariff

curtailment requirements to network service that NSP uses to

serve bundled retail load. NSP asks that the Commission

immediately stay the order if the curtailment provisions apply

to network load. !

DISCUSSION

We deny NSP's requests for clarification, rehearing, and

stay. The Commission's June 29 order was clear that NSP

cannot give preferential treatment to its native load when

curtailing transmission. The Commission does not regulate

bundled retail sales, but the pro forma open access transmission

tariff implemented by Order No, 888° does require that

wholesale transmission users be treated comparably to the

transmission provider's native load customers, including retail

customers, See tariff Sections 13.6 and 1.19.

Finally, NSP has not shown that justice requires granting its

Stay request,

The Commission orders:

NSP's requests for clarification, rehearing, and Stay are

hereby denied.

' NSP also asks us to clarify the curtailment priority of certain firm

transmission agreements with Wisconsin Public Power, Inc. As our June 29

order did not address that issue, it is not an appropriate subject for

clarification or rehearing of that order.

’

See Promoting Wholesale Competition Through Open Acess Non-

Discriminatory Transmission Services by Public Utilities: Recovery of

Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888,

61 Fed, Reg. 21,540 (1996), FERC Statutes and Regulations, Regulations

Preambles January 1991-June 1996 431,036, at pp. 31,748-49 (1996), order

on reh’g, Order No. 888-A, 62 Fed. Reg. 12,274 (1997), FERC Statutes and

Regulations 431,048 at pp. 30,278-79 (1997), order on reh'g, Order No. 888-

B, 81 FERC 461,248 (1997), order on reh'g, Order No.888-C, 82 FERC

461,046 (1998).

44a

APPENDIX E

UNITED STATES OF AMERICA

FEDERAL ENERGY REGULATORY COMMISSION

Before Commissioners: James J. Hoecker, Chairman; Vicky A.

Bailey, William L. Massey, Linda Breathitt, and Curt Hebert, Jr.

Docket No. 0A97—25-004, 0A97-606-004, ER98-1890-005,

ER98-2060-005, EL98-40-004

NORTHERN STATES POWER COMPANY (MINNESOTA)

NORTHERN STATES POWER COMPANY (WISCONSIN)

ORDER ON REMAND

(Issued November 15, 1999)

On May 14, 1999, the United States Court of Appeals

for the Eighth Circuit, in Northern States Power Co., et al. v.

FERC, 176 F.3d 1090 (1999), reh'g denied (9/1/99) (NSP),

instructed the Commission to allow amendment to its Northern

States Power Company (NSP) curtailment orders, as now

interpreted under Order No. 888, consistent with the Court's

opinion.” In this order, we modify our prior orders to permit

NSP's proposed curtailment procedures, but subject to NSP

filing further revisions to its curtailment provisions to reflect

the narrow circumstances addressed in the Court's order as well

as revisions to NSP’s rates for firm point-to-point transmission

service to reflect the inferior quality of service provided to

point-to-point Customers compared to the service provided to

native load customers,

* 176 F.3d at 1096

45a

Background

In Docket No. ER98-1890-000, the proceeding relevant to

this order on remand, NSP proposed, among other things, to

increase its rate for firm point-to-point transmission service

and, as a separate matter (i.e., unrelated to the revised rates), to

revise the curtailment procedures in Sections 13.6 and 14.7 of

its Open access transmission tariff to provide that curtailments

would be made in accordance with the Mid-Continent Area

Power Pool (MAPP) Line Loading Relief procedure (LLR). The

Commission rejected NSP's proposed revisions to the

curtailment provisions because those revisions improperly

defined tariff curtailment priorities through a general reference

to a MAPP procedure (which the Commission found NSP to

have described in a misleading manner) and were not

demonstrated to be consistent with or superior to the pro forma

tariff. The Commission accepted in part and rejected in part

NSP's proposal, suspended its effectiveness for five months, to

become effective October 1, 1998, subject to refund, and set

certain matters for hearing." Subsequently, in response to a

request for clarification, the Commission rejected, as

irreconcilable with Order No. 888, NSP's assertion that it is

acceptable for NSP to curtail firm point-to-point transmission

service without directing pro rata curtailments of transmission

service for its network/native load. Northern States Power Co.,

83 FERC 61,098, clarified, 83 FERC 61,338. reh'g,

clarification and stay denied, 84 FERC 61,128 (1998 ).

The Commission explained with respect to NSP's

clarification request:

* The Commission also instituted an investigation under section 206 of

the Federal Power Act because the ultimately approved rates may be lower

than the last clean rates. 83 FERC at 61,470-71. On April 28, 1999. the

presiding administrative law judge certified an uncontested offer of

settlement that is designed to resolve all remaining issues pending between

NSP and the active parties (the curtailment issue is not part of the settlement

offer). See 87 FERC 63,003 ( 1999). This certification is currently pending

before the Commission,

SC eee nme

46a

For example, NSP Companies state that when 50% of the

load on a constrained interface is firm point-to-point

transactions and 50% is network/native load, NSP

Companies will redispatch their system to absorb half of the

load reductions required to relieve the constraint. We find

that this procedure is reasonable and comports with the

comparability requirements of the pro forma tariff?

However, the Commission disagreed with NSP's argument

that when NSP has exhausted all of its network/native load

generation redispatch options (and the transmission

constraint had not been fully relieved) it can direct the

curtailment of firm point-to-point transactions without

directing pro rata curtailments of transmission service for its

network/native load. /d.

The Court, however, concluded as follows:

We think it obvious that the indirect effect of Order No.

888, as interpreted by the Commission, is an attempt to

regulate curtailment of electrical power to NSP's native/retail

consumers. Despite FERC's denial as to nonjurisdictional

regulation, we find it has transgressed its Congressional

authority which limits its jurisdiction to interstate

transactions. As such, its attempt to regulate the curtailment

of electrical transmission on native/retail consumers is

unlawful, as it falls outside of the FPA's specific grant of

authority to FERC.°

The Court instructed the Commission to allow

amendment to its NSP curtailment orders, as now interpreted

under Order No. 888, consistent with the Court's opinion. f

> 83 FERC 61,338 at 62,369 (footnote omitted).

° 176 F.3d at 1096.

"Id.

47a

Discussion

The Court addressed NSP's concerns in the context of a

narrowly circumscribed _ factual circumstance the

implementation of curtailment over a transmission constraint

after NSP has exhausted all of. its network/native load

generation redispatch options, but the firm point-to-point

transmission customer still has options with which to avoid

having to shed load."

NSP itself has asserted (in response to the Commission's

petitions for rehearing before the Court) that "this case is quite

narrow."” It maintained to the Court that

[t]his case addressed the relatively rare circumstance in

which generation redispatch is inadequate or unavailable to

relieve the transmission constraint fully. The June 29

Curtailment Order clearly required NSP to curtail pro rata even

if redispatch has been exhausted. In that circumstance, NSP

would be required to curtail electric power by reducing service

to native load customers on the constrained line, thereby

causing blackouts. NSP stands ready under its tariffs to shed

load in tandem with other transmission customers. Being forced

under the Curtailment Orders to shed load, however, merely to

preserve a wholesale transaction's economic expectancy when

that customer has redispatch options that could be used to help

solve the problem, goes too far,'”

* Id. at 1093,

” Response at 3 n.3.

és Response at 4. NSP also pointed to a recent Commission decision, in

which the Commission stated:

[W]e emphasize that the pro forma tariff does not prescribe procedures for

curtailing loads, whether wholesale or retail. Rather, it prescribes procedures

for reducing transmission on a constrained transmission facility.

48a

The Commission will permit NSP to amend its open access

transmission tariff to reflect its proposed curtailment procedures

that would be effective in such "rare circumstances.” However,

it grants that permission subject to NSP also filing further

revisions to its curtailment provisions to reflect the

circumstances addressed in the Court's order, ‘e¢., the

implementation of curtailment over a transmission constraint

after NSP has exhausted all of its network/native load

generation redispatch options, and the firm point-to-point

transmission customer whose firm service is being curtailed still

has options with which to avoid having to shed load.

Specifically, if NSP amends its open access transmission tariff

to reflect its proposed curtailment procedures, NSP must also

revise its tariff to:

(1) curtailment that does not reflect a pro rata approach, will

follow to ensure that NSP has exhavced all of its redispatch

options, including invoking all cptions to purchase power

from other suppliers and to purcaase emergency energy from

neighboring utilities;

(2) specify a methodology that NSP will use to confirm that

any firm point-to-point transmission customer that is

curtailed in excess of its pro rata curtailment has redispatch

or other options available at the time NSP determines, under

the procedures in (1) above, that NSP has exhausted all of its

redispatch options; and

(3) specify a method to compensate a firm point-to-point

transmission customer for any redispatch costs the customer

may incur to protect NSP's native load and network

customers from pro rata curtailment, including the cost of

Response at 10 (citing North American Electric Reliability Council, 88

FERC 61,046 at 61,124 (1999) (emphasis in original), According to NSP,

"[t}his statement implies that FERC now intends ‘curtailment’ to be limited

to redispatch, a positive development but a fundamental departure from the

requirements in the Curtailment Orders.” /d.

49a

any transmission service (on the customer's system) that the

Customer would need to support its redispatch on behalf of

NSP's native load and network customers. ''

In addition, if NSP amends its tariff to reflect its proposed

curtailment procedures, NSP must revise its rates for firm point-

(0-point transmission service effective October 1, 1998 (the date

its rate revisions went into effect subject to refund) to recognize

the inferior quality of that service compared to the service

provided by NSP to its native load and network

customers, and provide cost support for such rates consistent

with section 35,13 of the Commission's regulations. See 18

C.RR. 35,13 (1999),

" Bor example, assume that NSP must reduce the use of a transmission

line by 100 MW at a time when NSP and a firm point-to-point transmission

customer each account tor 50 percent of the total use of the line. Under the

pro forma tariff, NSP and its firm point-to-point customer each would reduce

its use of the line by 50 MW. Assume that, after following the procedures in

(1) above, NSP can only remove 25 MW through redispatch of its system,

but as confirmed by the procedures in (2) above, the firm point-to-point

customer has additional redispatch options beyond those needed for its 50

MW pro rata curtailment. If NSP curtails its own uses by 25 MW and

curtails the firm point-to-point customer's use by 75 MW, the customer has

provided 25 MW of redispatch service to NSP. NSP must compensate the

firm point-to-point customer for this Service just as it would for any other

redispatch service offered voluntarily by other market participants.

. The Commission notes that the issues in this case would likely not

arise in the context of a one-service tariff, under which there would no longer

be point-to-point and network services but only a capacity reservation type

tariff (see, e.g., Capacity Reservation Open Access Transmission Tariffs,

Notice Of Proposed Rulemaking, FERC Stats, & Regs. 32,519 (1996)).

Similarly, the distinction between third-party and native load service would

hot arise under a tariff administered by a regional transmission organization,

which, for example, manages congestion on a regional basis (see Regional

Transmission Organizations, Notice Of Proposed Rulemaking, FERC Stats.

& Regs, 32,541 (1999)),

50a

The Commission orders:

NSP is hereby ordered, unless it chooses to withdraw its

proposal to amend its tariff with respect to curtailment

procedures, to file revised curtailment provisions and revised

rates, as discussed in the body of this order, within 30 days of

the date of this order.

By the Commission.

(SEAL) /s/_ David P. Boergers

DAVID P. BOERGERS

Secretary

Sla

APPENDIX F

BEFORE THE

FEDERAL ENERGY REGULATORY COMMISSION

61 F.R. 21540 (May 10, 1996) 18 CFR Parts 35 and 385

[Docket Nos. RM95-8-000 and RM94-7-001: Order No.888]

Promoting Wholesale Competition Through Open Access

Non-Discriminatory Transmission Services by Public

Utilities; Recovery of Stranded Costs by Public Utilities and

Transmitting Utilities

Issued April 24, 1996,

SUMMARY: The Federal Energy Regulatory Commission

(Commission) is issuing a Final Rule requiring all public

utilities that own, control or Operate facilities used for

transmitting electric energy in interstate commerce to have on

file open access non-discriminatory transmission tariffs that

contain minimum terms and conditions of non-discriminatory

service. The Final Rule also permits public utilities and

transmitting utilities to seek recovery of legitimate, prudent and

verifiable stranded costs associated with providing open access

and Federal Power Act section 21 | transmission services, The

Commission's goal is to remove impediments to competition in

the wholesale buik power marketplace and to bring more

efficient, lower cost power to the Nation's electricity

consumers,

I. Introduction/Summary

Today the Commission issues three final, interrelated rules

designed to remove impediments to competition in_ the

wholesale bulk power marketplace and to bring more efficient,

lower cost power to the Nation's electricity consumers.' The

legal and policy cornerstone of these rules is to remedy undue

discrimination in access to the monopoly owned transmission

wires that control whether and to whom electricity can be

transported in interstate commerce. A second critical aspect of

the rules is to address recovery of the transition costs of moving

from a monopoly-regulated regime to one in which all sellers

can compete on a fair basis and in which electricity is more

competitively priced.

In the year since the proposed rules were issued,’ the pace of

competitive changes in the electric utility industry has

accelerated. By March of last year, 38 public utilities had filed

wholesale open access transmission tariffs with — the

Commission, Today, prodded by such competitive changes and

' These rules are the rules on open access and stranded costs in the

above dockets (FERC Stats. & Regs. 31,036), and an accompanying rule on

Open Access Same-Time Information System and Standards of Conduct

(OASIS Final Rule) (FERC Stats. & Regs. 31,037) being issued

contemporaneously. The Commission also is issuing contemporaneously a

notice of proposed rulemaking on capacity reservation open access

transmission tariffs in Docket No. RM96-11-000, FERC Stats. & Regs.

32,517. These final rules and proposed rule are being published

concurrently in the Federal Register.

*On March 29, 1995, the Commission issued two notices of proposed

rulemaking conceming open access transmission and stranded cost recovery.

Promoting Wholesale Competition Through Open-Access Non-

Discriminatory Transmission Service by Public Utilities and Recovery of

Stranded Costs by Public Utilities and Transmitting Utilities, Notice of

Proposed Rulemaking and Supplemental Notice of Proposed Rulemaking,

60 FR 17662 (April 7, 1995), FERC Stats. & Regs. 32,514 (1995). On

December 13, 1995, the Commission issued a notice of proposed rulemaking

on information systems. Real-Time Information Networks and Standards of

Conduct, Notice of Proposed Rulemaking, 60 FR 66182 (December 21,

1995), FERC Stats. & Regs. 32,516 (1995).

—

S3a

encouraged by our proposed rules, 106 of the approximately

166 public utilities that Own, control, or operate’ transmission

facilities used in interstate commerce have filed some form of

wholesale open access tariff. In addition, since the time the

proposed rules were issued, numerous State regulatory

commissions have adopted or are actively evaluating retail

Customer choice programs or other utility restructuring

alternatives. These events have been spurred by continuing

Pressures in the marketplace for changes in the way electricity

is bought, sold, and transported. Increasingly, customers are

demanding the benefits of competition in the growing electricity

commodity market.

The Commission estimates the potential quantitative benefits

from the Final Rule will be approximately $3.8 to $5.4 billion

Per year of cost savings, in addition to the non-quantifiable

benefits that include better use of existing assets and

institutions, new market mechanisms, technical innovation, and

it imperative that this Commission take the necessary steps

within its jurisdiction to ensure that all wholesale buyers and

Sellers of electric energy can obtain non-discriminatory

transmission access, that the transition to competition is orderly

und fair, and that the integrity and reliability of our electricity

infrastructure is maintained.

In this Rule, the Commission seeks to remedy both existing

and future undue discrimination in the industry and realize the

Significant customer benefits that will come with open access,

Indeed, it is our Statutory obligation under sections 205 and 206

“The Commission's notice of Proposed rulemaking in the above dockets

Proposed to apply the Proposed requirements to public utilities that own

wd/or control facilities used for the transmission of electric energy in

interstate commerce. "Own and/or control" is intended to include public

utilities that “operate” facilities used for the transmission of electric energy

in interstate commerce. However, we have modified the Final Rule

regulatory text to remove any ambiguity.

S4a

of the Federal Power Act (FPA) to remedy undue

discrimination,

To do so, we must eliminate the remaining patchwork of

closed and open jurisdictional transmission systems and ensure

that all these systems, including those that already provide some

form of open access, cannot use monopoly power over

transmission to unduly discriminate against others, If we do not

lake this step now, the result will be benefits to some customers

at the expense of others. We have learned from our experience

in the natural gas area the importance of addressing competitive

transition issues early and with as much certainty to market

participants as possible.

Accordingly, in this proceeding and in the accompanying

proceeding on OASIS, the Commission, pursuant to its

authorities under sections 205 and 206 of the FPA:

* Requires all public utilities that own, control or operate

facilities used for transmitting electric energy in

interstate commerce

¢ To file Open access non-discriminatory transmission

tariffs that contain minimum terms and conditions of

non-discriminatory service;

¢ To take transmission service (including ancillary

services) for their own new wholesale sales and

purchases of electric energy under the open access

tariffs;

¢ To develop and maintain a same-time information

system that will give existing and potential transmission

users the same access to transmission information that-

the public utility enjoys, and further requires public

utilities to separate transmission from generation

marketing functions and communications;

e Clarifies Federal/state jurisdiction over transmission in

interstate commerce and local distribution and provides

for deference to certain state recommendations; and

ne ite 83 oe .

ol

a

ae,

bo

at

=

FS

e.

5Sa

* — Permits public utilities and transmitting utilities to seek

recovery of legitimate, prudent and Verifiable stranded

COSIS associated with providing open access and FPA

section 211 transmission services.

Open Access

The Final Rule requires public utilities to file a single open

access tariff that offers both network, load-based service and

point-to-point, contract-based service. The Rule contains a pro

forma tariff that reflects modifications to the NOPR's proposed

terms and conditions and also"permits variations for regional

practices. All public utilities subject to the Rule, including

those that already have tariffs on file, will be required to make

section 206 compliance filings to meet the new pro forma tariff

non-price minimum terms and conditions of non-discriminatory

transmission. Utilities may propose their own rates in a section

205 compliance filing.

The Rule provides that public utilities may seek a waiver of

some or all of the requirements of the Final Rule. In addition,

non-public utilities may seek a waiver of the tariff reciprocity

provisions,

The Final Rule does not generically abrogate existing

requirements contracts, but will permit customers and public

utilities to seek modification, or termination, of certain existing

requirements contracts on a case-by-case basis. As to

coordination arrangements and contracts, the Rule finds that

these arrangements and contracts may need to be modified to

remove unduly discriminatory transmission access and/or

pricing provisions. Such arrangements and agreements include

power pool agreements, public utility holding company

agreements, and certain bilateral coordination agreements. The

Rule provides guidance and timelines for modifying unduly

discriminatory coordination arrangements and contracts, and

Specifies when the members of such arrangements must begin

to conduct trade with each other using the same open access

tariff offered to others. The Rule also provides guidance

S6a

regarding the formation of independent system operators

(ISOs).

The Rule does not require any form of corporate

restructuring, but will accommodate voluntary restructuring that

is consistent with the Rule's open access and comparability

policies,

As discussed in the NOPR, not all owners or controllers of

interstate transmission facilities are subject to the Commission's

jurisdiction under sections 205 and 206 of the FPA and

therefore are not subject to this Rule's open access

requirements. Therefore, the Final Rule retains the proposed

reciprocity provision in the pro forma tariff. Without such a

provision, non- Open access utilities could take advantage of the

competitive opportunities of open access, while at the same

time offering inferior access, or no access at all, over their own

facilities. Thus, open access utilities would be unfairly

burdened. We note that some non-jurisdictional utilities have

expressed an interest in a mechanism for obtaining a

Commission determination that their transmission tariffs satisfy

the reciprocity provisions in the pro forma tariffs, and we

provide such a mechanism in the Rule.

The Final Rule does not generically provide for market-

based generation rates. Although the Rule codifies the

Commission's prior decision that there is no generation

dominance in new generating Capacity, intervenors in cases may

raise generation dominance issues related to new capacity. In

addition, to obtain market-based rates for existing generation,

we will continue to require public utilities to show, on a case-

by-case basis, that there is no generation dominance in existing

capacity. Further, in all market-based rate cases, we will

continue to look at whether an applicant and its affiliates could

erect other barriers to entry and whether there may be problems

due to affiliate abuse or reciprocal dealing.

Finally, contemporaneously with this Rule the Commission

issues an NOPR on capacity reservation tariffs as an alternative,

57a

and perhaps Superior, means of remedying undue

discrimination,

Transmission/Local Distribution

The Rule clarifies the Commission's interpretation of the

Federal/state jurisdictional! boundaries over transmission and

local distribution. While we reaffirm our conclusion that this

Commission has exclusive jurisdiction over the rates, terms,

and conditions of unbundled retail transmission in interstate

commerce by public utilities. we nevertheless recognize the

very legitimate concerns of state regulatory authorities as they

contemplate direct retail access or other state restructuring

programs. Accordingly, we Specify circumstances under Which

we will give deference to state recommendations. Although

jurisdictional boundaries may shift as a result of restructuring

programs in wholesale and retail markets, we do not believe

this will change fundamental state regulatory authorities.

including authority to regulate the vast majority of generation

asset Costs, the siting of generation and transmission facilities,

and decisions regarding retail service territories. We intend to

be respectful of state objectives so long as they do not balkanize

interstate transmission of power or conflict with our interstate

open access policies.

Stranded Costs

With regard to stranded costs, the Final Rule adopts the

Commission's Supplemental proposal. It will permit utilities to

seek extra-contractual recovery of stranded costs associated

with a limited set of existing (executed on or before July 11,

1994) wholesale requirements contracts and provides that the

Commission will be the primary forum for utilities to seek

recovery of stranded costs associated with retail-turned-

Wholesale transmission Customers, It also will allow utilities to

seek recovery of stranded costs Caused by retail wheeling only

in circumstances in which the state regulatory authority does

not have authority to address retail stranded costs at the time the

retail wheeling is required. The Rule retains the revenues lost

58a

approach for calculating stranded costs and provides a formula

for calculating such costs.

Environmental Issues

The Commission has prepared a Final Environmental Impact

Statement (FEIS) evaluating the possible environmental

consequences of changes in the bulk power marketplace

expected to occur as a result of the open access requirements of

this Final Rule. The FEIS focuses, as do most commenters, on

possible increases in emissions of nitrogen oxides (NOx) from

certain fossil-fuel fired generators, which could affect air

quality in the producing region and in areas to which these

emissions may be carried.

In response to comments on the Draft EIS, the Commission

performed numerous additional studies. The FEIS finds that the

relative future competitiveness of coal and naturai gas

generation is the key variable affecting the impact of the Final

Rule. If competitive conditions favor natural gas, the Rule is

likely to lead to environmental benefits. Both EPA and the

Commission staff believe this projected scenario is the more

likely one. If competitive conditions favor coal, the Rule may

lead to small negative environmental impacts. However, even

using the most extreme, unlikely assumptions about the future

of the industry, the negative consequences are not likely to

occur until after the turn of the century. Because the impacts

will remain modest at least until 2010, there is no need for an

interim mitigation program. In addition, even if the data

showed more significant negative consequences requiring

mitigation, the Commission does not have the statutory

authority under the Federal Power Act or the expertise to

address this possible far-term problem. The Commission

believes, however, that there is time for federal and state air

quality authorities to address any potential adverse impact as

part of a comprehensive NOx regulatory program under the

Clean Air Act.’

442 U.S.C. 7401, et seq.

LOPE Spe eee OEE ee”

ai Nee 3

SANTO ANS ret

59a

Despite our conclusions regarding the lack of environmental

impacts expected to result from the Rule, the Commission fas

examined a wide variety of proposals for mitigating possible

adverse effects. We share the view of most commenters that

the preferred approach for Mitigating increased NOx emissions

generally is a NOx cap and trading regulatory program

comparable to that developed by Congress to address sulfur

dioxide emissions in the Clean Air Act Amendments of 1990.5

The Commission has examined various means of establishing

such a program, including use of existing federal authorities

under the Clean Air Act. cooperative efforts by state and federal

air quality regulators, and development of a new emissions

regulatory program administered by the Commission under the

Federal Power Act. The Commission has concluded that a NOx

regulatory program could best be developed and administered

under the Clean Air Act. in cooperation with interested States,

and offers to lend Commission Support to that effort should it

become necessary.

Conclusion

4

The Commission believes that the Final Rule will remedy

undue discrimination in transmission services in interstate

commerce and provide an orderly and fair transition to

competitive bulk power markets.

a ok ok

Ill. Background

In the NOPR, we set out a detailed statement of the events

leading up to this rulemaking. We repeat that background here.

updated to reflect what has happened since March 1995, and

discuss why it is necessary to undertake regulatory reform in the

electric industry at this time. We do so to provide the necessary

backdrop to our action in adopting this Rule.

A. Structure of the Electric Industry at Enactment of

Federal Power Act

*42 U.S.C.A. 765 1b-e.

60a

The Federal Power Act was enacted in an age of mostly self-

sufficient, vertically integrated electric utilities, in| which

generation, transmission, and distribution facilities were owned

by a single entity and sold as part of a bundled service

(delivered electric energy) to wholesale and retail customers,

Most electric utilities built their own power plants and

transmission systems, entered into interconnection and

coordination arrangements with neighboring utilities, and

entered into long-term contracts to make wholesale

requirements sales (bundled sales of generation and

transmission) to municipal, cooperative, and other investor-

owned utilities (IOUs) connected to each utility's transmission

system, Each system covered limited service areas. This

structure of separate systems arose naturally due primarily to

the cost and technological limitations on the distance over

which electricity could be transmitted.

Through much of the 1960s, utilities were able to avoid price

increases, but still achieve increased profits, because of

substantial increases in scale economies, technological

improvements, and only moderate increases in input prices.”

Thus, there was no pressure on regulatory commissions to use

regulation to affect the structure of the industry.’

B. Significant Changes in the Electric industry

In the late 1960s and throughout the 1970s, a number of

significant events occurred in the electric industry that changed

the perceptions of utilities and began a shift to a more

competitive marketplace for wholesale power.” This was the

beginning of periods of rapid inflation, higher nominal interest

* Paul L. Joskow, Inflation and Environmental Concern: Structural

Change in the Process of Public Utility Regulation, 17 J. Law & Econ, 291,

312 (1974); see also Charles F. Phillips, Jr., The ie austen ot Public

Utilities 11 (1988).

Te Te

‘See Joskow, supra at 312; see also Phillips, supra at 12.

* See Joskow, supra at 312; see also Phillips, supra at 12-13.

Ola

rates, and higher electricity rates.” During this time, consumers

became concerned about higher electricity rates and questioned

any price increases filed by utilities,"

During this same time frame, the construction of nuclear and

other capital-intensive baseload facilities--actively encouraged

by federal and some state governments--contributed to the

continuing cost increases and uncertainties in the industry."

These investments were made based on the assumptions that

there would be Steady increases in the demand for electricity

and continued large increases in the price of oil.” However,

due to conservation and economic downturns, the expected

demand increases did not materialize. Load growth virtually

disappeared in some areas, and many utilities unexpectedly

found themselves with excess capacity." In addition, by the

1980s, the oil cartel collapsed, with a resulting glut of low-

priced oil."" At the same time, inflation substantially increased

the costs of these large baseload generating plants,'’Surging

interest rates further increased the cost of the capital needed to

finance and capitalize these projects and completion schedules

*See Joskow, supra at 312-13; see also Phillips, supra at 13. The Arab

oil embargo resulted in significantly higher oil prices through the 1970s. See

Richard J, Pierce, Jr., The Regulatory Treatment of Mistakes in Retrospect:

Canceled Plants and Excess Capacity, 132 U. Pa. L. Rev, 497. $01 (1984).

" See Joskow, supra at 313: see also Phillips, supra at 13,

4 See generally Jersey Central Power & Light Company v. FERC, 810

F.2d 1168, 1171 (D.C. Cir. 1987),

2 ig,

See Pierce, supra at 503, By 1983, the Department of Energy had

estimated that the sunk costs for canceled nuclear plants alone amounted to

$10 billion, Id. at 498,

tid,

'S See Bernard S. Black & Richard J. Pierce, Jr.. The Choice Between

Markets and Central Planning in Regulating the U.S, Electricity Industry, 93

Col. L. Rev. 1339, 1346 (1993) ("Actual costs of nuclear power plants vastly

exceeded estimates, sometimes by as much as 1000%."),

62a

were significantly extended by, in part, more stringent safety

and environmental requirements."

As a result, expensive large baseload plants for which there

was litthe or no demand, came onto the market or were in the

process of being constructed, Accordingly, between 1970 and

1985, average residential electricity prices more than tripled in

nominal terms, and increased by 25% after adjusting for general

inflation.” Moreover, average electricity prices for industrial

customers more than quadrupled in nominal terms over the

same period and increased 86% after adjusting for inflation."

The rapidly increasing rates for electric power during this

period, together with the opportunities provided by the Public

Utility Regulatory Policies Act of 1978 (PURPA) (discussed

infra), also prompted some industrial customers to bypass

utilities by constructing their own generation facilities. This

further exacerbated rate increases for remaining customers--

primarily residential and commercial customers,

Consumers responded to these "rate shocks" by exerting

pressure on regulatory bodies to investigate the prudence of

management decisions to build generating plants, especially

when construction resulted in cost overruns, excess capacity, or

© See Phillips, supra at 13. Fossil fuel-fired plants became subject to

increased regulation as a result of the Clean Air Act of 1970, and its 1977

amendments. - 42 U.S.C. 7401-7642. In 1971, nuclear plant licensing

became subject to the environmental impact statement requirements of the

National Environmental Policy Act of 1969, 42 U.S.C. 4332. Following the

1979 accident at the Three Mile Isiand nuclear plant, nuclear plants also

became subject to additional safety regulations, resulting in higher costs.

See Energy Information Administration, The Changing Structure of the

Electric Power Industry 1970-1991 (March 1993) 35. Between 1976 and

1980, most states and many localities instituted laws governing power plant

siting.

“ Based on retail prices reported in Energy Information Administration

(EIA), Monthly Energy Review, January 1995, Table 9.9 (Prices adjusted

for inflation using the GDP Deflator (1987 = 100)).

id,

FORA pic oe

ERTS NANG SRN ROO

63a

both. Between 1985 and 1992. writeoffs of nuclear power

plants totalled $22.4 billion.” These writeoffs significantly

reduced the earnings of the affected utilities.°” Delays in

obtaining rate increases to reflect the effects of inflation further

reduced investor returns, Thus. many utilities became reluctant

to Commit capital to long-term construction decisions involving

large scale generating plants."

In addition to economic changes in the industry, significant

technological changes in both generation and transmission have

occurred since 1935, Through the 1960s, bigger was cheaper

in the generation sector and the industry was able to capitalize

on economies of scale to produce power at lower per-unit costs

from larger and larger plants.” As a result, large utility

companies that could finance and manage construction projects

of larger scale had a price advantage over smaller utility

companies and customers who might otherwise have considered

building their own generating units. Scale economies

encouraged power generation by large vertically-integrated

utility companies that also transmitted and distributed power,

Beginning in the 1970s, however, additional economies of

scale in generation were no longer being achieved.’ A

Significant factor was that larger generation units were found to

need relatively greater maintenance and experience longer

downtimes.” The electric industry faced the situation "Where

" See Black & Pierce, supra at 1346 (These writeoffs were “about 17%

of the book value of total 1992 utility investment.").

“)

“te.

? " ‘ . . ° ‘ 7 '

“Id. ("The high perceived risk of future disallowances reversed utilities

incentives to overinvest, and made utilities extremely reluctant to build new

power plants."),

*2 See Preston Michie, Billing Credits for Conservation, Renewable, and

Other Electric Power Resources: an Alternative to Marginal-Cost-Based

Power Rates in the Pacific Northwest, 13 Environmental Law 963, 964-65

(1983),

“1d. at 965.

64a

the price of each incremental unit of electric power exceeded

the average cost."”* Bigger was no longer better.

Further dictating against larger generation units were

advances in technologies that allowed scale economies to be

exploited by smaller size units, thereby allowing smaller new

plants to be brought on line at costs below those of the large

plants of the 1970s and earlier. Such new technologies include

combined cycle units and conventional steam units that use

circulating fluidized bed boilers.”

The combined cycle generating plants generally use natural

gas as their primary fuel, This technology has been made

possible by the development of more efficient gas turbines,

shorter construction lead times, lower capital costs, increased

reliability, and relatively minimal environmental impacts.”’

Similarly, the circulating fluidized bed combustion boilers,

fueled by coal and other conventional fuels, provide a more

efficient and less polluting resource.

Today, "the optimum size (of generation plants) has shifted

from (more than S00 MW) (10-year lead time) to smaller units

“ Energy Information Administration, The Changing Structure of the

Electric Power Industry 1970-1991 (March 1993) 37 ("As larger units were

constructed, however, utilities discovered that downtime was as much as $

times greater for units larger than 600 megawatts than for units in the LOO-

megawatt range." )

Id.; see also George A. Perrault, Downsizing Generation: Utility Plans

tor the 1990s, Pub, Util. Fort. 15-16 (Sept. 27, 1990) ("The large base-load

generating units that form the backbone of utility systems are almost totally

absent from capacity plans for the 1990s.").

*“ "From 1982 through 1991, the average capacity of fluidized-bed units

increased rapidly to 72 megawatts for 4 units in 1991, The average capacity

for the 19 units planned to begin operating in 1992 through 1995 increases

to 83 megawatts.” Energy Information Administration, The Changing

Structure of the Electric Power Industry 1970-1991 (March 1993) 38,

~ See Charles E. Bayless, Less is More: Why Gas Turbines Will

Transform Electric Utilities, Pub. Util. Fort. (Dec. 1, 1994) 21.

er

65a

(one-year lead time) (in the 50- to 150-MW range)."”" Indeed,

smaller and more efficient gas-tired combined-cycle generation

facilities can produce power on the grid at a cost ranging from

S cents per kWh to less than 3 cents per kWh.” This is

significantly less than the costs for large plants constructed and

installed by utilities over the last decade, which were typically

in the range of 4 to 7 cents per kWh for coal plants and 9 to 15

cents for nuclear plants." Significant changes have also

occurred in the transmission sector of the industry,

Technological advances in transmission have made possible the

economic transmission of electric power over long distances at

higher voltages." This has made it technically feasible for

utilities with lower cost generation sources to reach previously

isolated systems where customers had been captive to higher

cost generation, In addition, the nature and magnitude of

coordination transactions” have changed dramatically since

“Id. at 24, See also Wallace E. Brand, Is Bigger Better? Market Power

in Bulk Power Supply: From FDR to NOPR, Pub. Util. Fort. (Feb, 15, 1996)

23 at 25 (while the optimal baseload unit size is about 500 MW for coal-

fired steam turbines, the optimal size for gas fired combined-cycle units is

about 150 to 200 MW),

” PERC staff calculations based in part on combined-cycle plant cost

data reported in 1994 FERC Form No. | for a sample of units placed in

service during 1990-94. Costs vary with regional fuel and construction

costs, among other reasons,

“ Coal and Nuclear plant cost data reported in 1994 FERC Form No, |

and the EIA report, Electric Plant Cost and Power Production Expenses

1991, 1993 DOEBIA-0455(91), for plants placed in service during 1986-94;

see also The 1994 Electric Executives’ Forum, Bakke (President and CEO

of the AES Corporation), Pub. Util. Fort. (June 1, 1994) 45 ("New

generation can be built at about 3 cents per kilowatt-hour (U.S, average).

Old generation costs about twice that * * #" ),

“\ See Black & Pierce. supra at 1345 (In the late 1960s and 1970s.

improved transmission efficiency and development of regional transmission

networks “made it possible to build power plants up to 1000 miles from

power users.”),

»> ‘ : :

™ Coordination transactions are voluntary sales or exchanges of

specialized electricity services that allow buyers to realize cost savings or

66a

enactment of the FPA, allowing increased coordinated

operations and reduced reserve margins. Substantial amounts

of electricity now move between regions, as well as between

utilities in the same region. Physically isolated systems have

become a thing of the past.

C. The Public Utility Regulatory Policies Act and the

Growth of Competition

In enacting PURPA," Congress recognized that the rising

costs and decreasing efficiencies of utility-owned generating

facilities were increasing rates and harming the economy as a

whole.” To lessen dependence on expensive foreign oil, avoid

repetition of the 1977 natural gas shortage, and control

consumer costs, Congress sought to encourage electric utilities

to conserve oil and natural gas.” In particular, Congress

sanctioned the development of alternative generation sources

designated as "qualifying facilities” (QFs) as a means of

reducing the demand for traditional fossil fuels.“ PURPA

reliability gains that are not attainable if they rely solely on their own

resources. For sellers, these transactions provide opportunities to earn

additional revenue, and to lower customer rates, from capacity that ts

temporarily excess to native load capacity requirements.

“Pub. L. No. 95-617. 92 Stat. 3117 (codified in U.S.C. sections 15. 16.

26, 30, 42, and 43).

“ See generally FERC v. Mississippi, 456 U.S. 742, 745-46 (1982).

= The Power Plant and Industrial Fuel Use Act of 1978. Pub. L. No. 95-

617, 92 Stat. 3117 (codified in U.S.C. sections 15, 16, 26, 30, 42. and 43).

“ QFs include certain cogenerators and small power producers. PURPA

also added sections 210, 211, and 212 to the FPA, providing the

Commission with authority to approve applications for interconnections and,

in limited circumstances, wheeling. However, under section 211, as enacted

in PURPA, the Commission could approve an application for wheeling only

if it found, inter alia, that the order “would reasonably preserve existing

competitive relationships.” Because of this and other limitations in sections

67a

required utilities to purchase power from QFs at a price not to

exceed the utility's avoided costs and to sell backup power to

QOFs.”

PURPA specifically set forth limitations on who, and what,

could qualify as QFs, In addition to technological and size

criteria, PURPA set limits on who could own QFs.™

Notwithstanding these limitations, QFs proliferated. In 1989,

there were 576 QF facilities. By 1993, there were more than

1,200 such facilities.” For the same time period, installed QF

capacity increased from 27,429 megawatts to 47,774

megawatts.” The rapid €xpansion and performance of the QF

industry demonstrated that traditional, vertically integrated

public utilities need not be the only sources of reliable power,

During this period, the profile of generation investment

began to change, and a market for non-traditional power supply

beyond the purchases required by PURPA began to emerge.

QFs were limited to cogenerators and small power producers."

211 and 212 as originally enacted, the Provision was Virtually ineffective.

Only one section 211 order was ever issued pursuant to the original

Provision, and it was pursuant to a settlement. See Public Service Company

of Oklahoma, 38 FERC 61.050 (1987). As discussed infra. section 211 was

subsequently revised by the Energy Policy Act of 1992,

2 456 US. at 75 ). Congress recognized that encouragement was needed

in part because utilities had been reluctant to purchase electric power from,

and sell power to, nonutility generators. Id. at 750-5.

* For example, PURPA provided that a cogeneration facility or small

power production facility could not be owned by a person primarily engaged

in the generation or sale of electric power (other than from cogeneration or

small power production facilities). See 16 U.S.C.

“Energy Information Administration, Electric Power Annual 1993

(December 1994) 124 (Table 77).

Id. EIA data for 1989 through 1991 was for, facilities of 5 megawatts

Or more and for 1992 and 1993 was for facilities of | megawatt or more. A

comparison with Table 74 on page 121 for the years 1992 and 1993 reveals

that this mixing of data bases is likely of minimal effect.

at Generally, the law has imposed an 80 MW cap on small power

68a

However, other non-traditional power producers who could

not meet the QF criteria began to build new capacity to compete

in bulk power markets, without such PURPA benefits as the

mandatory purchase requirements. These producers, known as

independent power producers (IPPs), were predominantly

single-asset generation companies that did not own any

transmission or distribution facilities. While traditional utilities

were generally reluctant at that time to invest in new generating

facilities under cost of service regulation, utilities increasingly

became interested in participating in this new generation sector.

They organized affiliated power producers (APPs), with assets

not included in utility rate base, and sought to sell power in

their own service territories and the territories of other utilities.

At the same time, power marketers arose. These entities--

owning no transmission or generation--buy and sell power.”

There were two major impediments to the development of

IPPs and APPs. First, the ownership restrictions of the Public

Utility Holding Company Act (PUHCA)" severely inhibited

these new entities from entering the generation business.”

producers. A limited exception enacted in 1990 permitted small power

facilities that could exceed 80 MW and still qualify as QFs under PURPA,

This exception was limited to certain solar, wind, waste, and geothermal

small power production facilities and only covered applications for

certification of facilities as qualifying small power production facilities that

were submitted no later than December 31, 1994 and for which construction

commences no later than December 31, 1999. See Solar, Wind, Waste, and

Geothermal Power Production Incentives Act of 1990, Pub. L. No. 101-575,

104 Stat. 2834 (1990), amended, Pub. L. No. 102-46, 105 Stat. 249 (1991),

* The first power marketer in the electric industry was Citizens Energy

Corporation. See Citizens Energy Corporation, 35 FERC 61,198 (1986).

Power marketers take title to electric energy. Power brokers, on the other

hand, do not take title and are limited to a matchmaking role.

15 U.S.C. 79 et seq.

4 As discussed intra, Congress eventually provided a means to avoid the

PUHCA restrictions by creating exempt wholesale generators (EWGs) in the

Energy Policy Act.

— = =

a ? ne (one REE en VEN REET M DE MIRAE TS eee

eae EGE Tes ee ee AY a har sii ma

69a

Second, these entities needed transmission service in order to

compete in electricity markets,

While the Commission had no authority to remove PUHCA

restrictions,’ it encouraged the development of IPPs and APPs,

as well as emerging power marketers, by authorizing market-

based rates for their power sales on a case- by-case basis and by

encouraging more widely available transmission access. From

1989 through 1993, facilities owned by IPPs and other non-

traditional generators (other than QFs) increased from 249 to

634 and their installed capacity increased from 9,216 megawatts

to 13,004 megawatts.” Indeed. “[iJn 1992, for the first time.

generating capacity added by independent producers exceeded

capacity added by utilities,""’

Market-based rates helped to develop competitive bulk

power markets, A generating utility allowed to sell its power at

market-based rates could move more quickly to take advantage

of short-term or even long-term market opportunities than those

laboring under traditional cost-of-service tariffs, which entail

procedural delays in achieving tariff approvals and changes.

In approving these market-based rates, the Commission

required, inter alia, that the seller and any of its affiliates lack

market power or mitigate any market power that they may have

possessed.“ The major concern of the Commission was

© The industry was successful to some extent in developing ownership

Structures that permitted such investment. See, e.g., Commonwealth Atlantic

Limited Partnership, 51 FERC 61,368 at 62,240 and n.20 (1990).

i Energy Information Administration, Electric Power Annual 1993

(December 1994) 124 (Table 77),

© Black & Pierce, supra at 1349 n.25.

48

See, e.g., Ocean State Power, 44 FERC 61,261 ( 1988);

Commonwealth Atlantic Limited Partnership, 51 FERC 61,368 (1990);

Citizens Power & Light Company, 48 FERC 61,210 (1989); Orange and

Rockland Utilities, Inc., 42 FERC 61,012 (1988); Doswell Limited

Partnership, 50 FERC 61,251 (1990) (Doswel); and Dartmouth Power

Associates Limited Partnership, 53 FERC 61,117 ( 1990).

70a

whether the seller or its affiliates could limit competition and

thereby drive up prices. A key inquiry became whether the

seller or its affiliates owned or controlled transmission facilities

in the relevant service area and therefore, by denying access or

imposing discriminatory terms or conditions on transmission

service, could foreclose other generators from competing.” As

we have previously explained:

The most likely route to market power in today's

electric utility industry lies through ownership or

control of transmission facilities. Usually, the

source of market power is dominant or exclusive

ownership of the facilities. However, market power

also may be gained without ownership. Contracts

can confer the same rights of control. Entities with

contractual control over transmission facilities can

withhold supply and extract monopoly prices just

as effectively as those who control facilities

through ownership.”

As entry into wholesale power generation markets increased,

the ability of customers to gain access to the transmission

services necessary to reach competing suppliers became

increasingly important.” In addition, beginning in the late

” See, e.g., Doswell, 50 FERC at 61,757.

“ Citizens Power & Light Corporation, 48 FERC 61,210 at 61,777

(1989) (emphasis in original); see also Utah Power & Light Company,

PacifiCorp and PC/UP&L Merging Corporation, 45 FERC 61,095 at 61,287-

89 (1988), order on reh'g, 47 FERC 61,209, order on reh’g, 48 FERC 61,035

(1989), remanded in part sub nom. Environmental Action, Inc. v. FERC, 939

F.2d 1057 (D.C. Cir. 1991), order on remand, 57 FERC 61,363 (1991).

! In earlier years, a few customers were able to obtain access as a result

of litigation, beginning with the Supreme Court's decision in Otter Tail

Power Company v. United States, 410 U.S. 366 (1973). Additionally, some

customers gained access by virtue of Nuclear Regulatory Commission

license conditions and voluntary preference power transmission

arrangements associated with federal power marketing agencies. See, e.g.,

Consumers Power Company, 6 NRC 887, 1036-44 (1977) and The Toledo

Edison Company and Cleveland Electric Iluminating Company, 10 NRC

Tla

1980s, in order to mitigate their market power to meet

Commission conditions, public utilities seeking Commission

approval of mergers or consolidations under section 203 of the

FPA or Commission authorization for blanket approval of

market-based rates for generation services under section 205 of

the FPA, filed "open access” transmission tariffs of general

applicability.” The Commission applied its market rate

analysis to IOUs, as well as IPPs, APPs. and marketers, and

allowed IOUs to sell at market-based rates only if they opened

their transmission systems to competitors.** The Commission

also approved proposed mergers on the condition that the

merging companies remedy anticompetitive effects potentially

caused by the merger by filing "open access" tariffs. These

early "open access” tariffs required only that the companies

provide point-to-point transmission services, which is a much

narrower requirement than that being imposed in this Rule and

did not require transmission owners to provide to others the

same quality of service that they themselves en joyed.

265, 327-34 (1979). See Florida Municipal Power Agency v. Florida Power

and Light Company, 839 F. Supp. 1563 (M.D. Fla. 1993). See also

Electricity Transmission: Realities, Theory and Policy Alternatives, The

Transmission Task Force Report to the Commission, October 1989. 197.

= See, ¢.g., Public Service Company of Colorado, 59 FERC 61,311

(1992), reh'g denied, 62 FERC 61.013 (1993); Utah Power & Light

Company, et al., Opinion No. 318, 45 FERC 61,095 (1988), order on reh'g,

Opinion No. 318-A, 47 FERC 61,209 ( 1989), order on reh'g, Opinion No.

318-B, 48 FERC 61,035 (1989), affd in relevant part sub nom.

Environmental Action Inc. v. FERC, 939 F.2d 1057 (D.C. Cir. 1991):

Northeast Utilities Service C ompany (Public Service Company of New

Hampshire), Opinion No. 364-A, 58 FERC 61,070, reh'g denied, Opinion

No. 364-B, 59 FERC 61,042, order granting motion to vacate and dismissing

request for rehearing, 59 FERC 61,089 (1992). affirmed in relevant part sub

nom. Northeast Utilities Service C ompany v. FERC, 993 F.2d 937 (Ist Cir.

1993).

* See, e.g., Public Service of Indiana, Inc., $1 FERC 61.367 (1990),

reh’g denied, 52 FERC 61,260 (1990), appeal dismissed sub nom. Northern

Indiana Public Service Company v. FERC, 954 F.2d 736 (D.C.Cir. 1992).

72a

Following PURPA, the economic and technological changes

in the transmission and generation sectors helped give impetus

to the many new entrants in the generating markets who could

sell electric energy profitably with smaller scale technology at

a lower price than many utilities selling from their existing

generation facilities at rates reflecting cost. However, it became

increasingly clear that the potential consumer benefits that

could be derived from these technological advances could be

realized only if more efficient generating plants could obtain

access to the regional transmission grids. Because many

traditional vertically integrated utilities still did not provide

open access to third parties and still favored their own

generation if and when they provided transmission access to

third parties, barriers continued to exist to cheaper, more

efficient generation sources.

D. The Energy Policy Act

In response to the competitive developments following

PURPA, and the fact that PUHCA and lack of transmission

access remained major barriers to new generators, Congress

enacted Title VII of the Energy Policy Act of 1992 (Energy

Policy Act).*’ A goal of the Energy Policy Act was to promote

greater competition in bulk power markets by encouraging new

generation entrants, known as exempt wholesale generators

(EWGs), and by expanding the Commission's authority under

sections 211 and 212 of the FPA to approve applications for

transmission services.”

An EWG is defined as

“ Pub. L. No. 102-486, 106 Stat. 2776 (1992), codified at, among other

places, 15 U.S.C. 79z-5a and 16 U.S.C. 796 (22-25), 824j-l.

* See El Paso Electric Company and Central and South West Services

Inc., 68 FERC 61,181 at 61,914 (1994) (CSW); see also Paul Kemezis,

FERC's Competitive Muscle: The Comparability Standard, Electrical World

45 (Jan. 1995) ("In EPAct, Congress made it clear that the electric-power

industry was to move toward a fully competitive market system, but left most

of the implementation to FERC.").

i

Hye MG i Sm Lan ON SE ee he RES CR OR OER!

73a

any person determined by the Federal Energy Regulatory

Commission to be engaged directly, or indirectly through

one or more affiliates as defined in [PUHCA} section

2(a)(11)(B), and exclusively in the business of Owning or

operating, or both owning and operating, all or part of one

or more eligible facilities and selling electric energy at

wholesale.”

If the Commission, upon an application, determines that a

person is an EWG, that person will be exempt from PUHCA.”’

This provision removed a Significant impediment to the

development of IPPs and APPs by allowing them to develop

projects as EWGs free from the strictures of PUHCA or the QF

PURPA limitations.

While sections 211 and 212, as enacted by PURPA, were

intended to provide greater access to the transmission grid, the

limitations placed on these sections made them unusable in

Virtually all circumstances, However, as amended by the

Energy Policy Act, these sections now give the Commission

broader authority to order transmitting utilities to provide

wholesale transmission services, upon application, to any

electric utility, Federal power marketing agency, or any other

person generating electric energy for sale for resale.

The Energy Policy Act also added section 213 to the FPA.

Section 213(a) requires a transmitting utility that does not

agree to provide wholesale transmission service in accordance

with a good faith request to provide a written explanation of its

proposed rates, terms, and conditions and its analysis of any

physical or other constraints.” Section 213(b) required the

“15 U.S.C. 792-Sa.

7 15 U.S.C. 792-5a(e).

4

“ See supra note 36.

“See Policy Statement Regarding Good Faith Requests for Transmission

Services and Responses by Transmitting Utilities Under Sections 21 I(a) and

213(a) of the Federal Power Act. as Amended and Added by the Energy

Policy Act of 1992, 58 FR 38964 (July 21, 1993), FERC Stats. & Regs.,

74a

Commission to enact a rule requiring transmitting utilities to

submit annual information concerning potentially available

transmission capacity and known constraints.”

E. The Present Competitive Environment

Following the Energy Policy Act, the Commission

established rules: (1) For certain generators to obtain EWG

status and thus an exemption from PUHCA;" and (2) that

required transmission information availability. The

Commission also pursued a number of initiatives aimed at

fostering the development of more competitive bulk power

markets, including aggressive implementation of section 211,

a new look at undue discrimination under the FPA, easing of

market entry for sellers of generation from new facilities, and

initiation of a number of industry-wide reforms. As stated by

the Commission, in recognition of the Congressional goal in the

Energy Policy Act of creating competitive bulk power markets:

Our goal is to facilitate the development of competitively

priced generation supply options, and to ensure that wholesale

Regulations Preambles 30,975 (1993) (Policy Statement Regarding Good

Faith Requests for Transmission Services).

“ See New Reporting Requirements Implementing Section 213(b) of the

Federal Power Act and Supporting Expanded Regulatory Responsibilities

Under the Energy Policy Act of 1992, and Conforming and Other Changes

to Form No. FERC-714, 58 FR 52420 (October 8, 1993), FERC Stats. &

Reys., Regulations Preambles 30,980 (Order No. 558), reh'g denied, Order

No. 558-A, 65 FERC 61,324 (1993), regulations modified, 59 FR 15333

(April 1, 1994), FERC Stats. & Regs., Regulations Preambles 30,993.

“ See Order No. 550, Filing Requirements and Ministerial Procedures

for Persons Seeking Exempt Wholesale Generator Status, 58 FR 8897

(February 18, 1993), FERC Stats. & Regs., Regulations Preambles 30,964,

order on reh'g, Order No. 550-A, 58 FR 21250 (April 20, 1993), FERC

Stats. & Regs., Regulations Preambles 30,969 (1993). As recognized by

Congress and the Commission, availability of transmission information is

critical in developing competitive markets. See supra notes 59 and 60, This

opened the “black box" of information that previously was available only to

transmission Gwners.

RS te ays sate fp

A

a alia ei .

sore " 7

PT a

PAR DAA RABE YS

75a

purchasers of electric energy can reach alternative power

suppliers and vice versa.”

Il. Use of Sections 211 and 212 to Obtain Transmission

Access

The Commission has aggressively implemented sections 21 |

and 212 of the FPA, as amended by the Energy Policy Act, in

order to promote competitive markets.’ When wheeling

requests under sections 211! and 212 have been made. the

Commission has required wheeling in almost all of the requests

it has processed. To date, the Commission has issued orders

(proposed or final) requiring wheeling in 12 of the 14 cases it

has acted on.™

As a general matter, section 211 has permitted some inroads

to be made by customers in obtaining transmission service from

public utilities that historically have declined to provide access

to their systems, or have offered service only on a

discriminatory basis. Under section 211, the Commission has

granted requests for the broader type of service that most

utilities historically have refused to provide--network service.

Although transmission owners have provided limited amounts

of unbundled point-to-point transmission service, third-party

customers have not been able to obtain the flexibility of service

that transmission owners enjoy.

= See Recovery of Stranded Costs by Public Utilities and Transmitting

Utilities, Notice of Proposed Rulemaking, 59 FR 35274 (July 11, 1994),

FERC Stats. & Regs., Proposed Regulations 32,507 at 32,866 (Stranded

Cost NOPR); American Electric Power Service Corporation, 67 FERC

61,168, clarified, 67 FERC 61.317 (1994),

“* 16 U.S.C.A. 824j-824k (West 1985 and Supp. 1994).

* See, ¢.g., final orders issued in City of Bedford, 68 FERC 61.003

(1994), reh'g denied, 73 FERC 61,322 (1995): Florida Municipal Power

Agency v. Florida Power & Light C ompany, 67 FERC 61,167 (1994), order

on reh'g, 74 FERC 61,006 (1996): Minnesota Municipal Power Agency, 68

FERC 61,060 (1994); and Tex-La Electric Cooperative of Texas, 69 FERC

61,269 (1994); see also Appendix A.

76a

In Florida Municipal, a section 211 case, the Commission

ordered "network," rather than the narrower "point-to-point,"

service.” Network service permits the applicant to fully

integrate load and resources on an instantaneous basis in a

manner similar to the transmission owner's integration of its

own load and resources. At the same time, the Commission

made the generic finding that the availability of transmission

service will enhance competition in the market for power

supplies and lead to lower costs for consumers. The

Commission explained that as long as the transmitting utility is

fully and fairly compensated and there is no unreasonable

impairment of reliability, transmission service is in the public

interest.”

As discussed infra, based on the mounting competitive

pressures in the industry and rapidly evolving markets, we have

concluded that section 211 alone is not enough to eliminate

undue discrimination. The comments received on the proposed

rules, discussed in detail infra, confirm this conclusion. The

significant time delays involved in filing an individual service

request for bilateral service under section 211 place the

customer at a severe disadvantage compared to the transmission

owner and can result in discriminatory treatment in the use of

the transmission system. It is an inadequate procedural

© See Florida Municipal Power Agency v. Florida Power & Light

Company, 65 FERC 61,125, reh'g dismissed, 65 FERC 61,372 (1993), final

order, 67 FERC 61,167 (1994), order on reh'g, 74 FERC 61,006 (1996).

The Commission has “characterized point-to-point service as involving

designated points of entry into and exit from the transmitting utility's system,

with a designated amount of transfer capability at each point.” El Paso

Electric Company v. Southwestern Public Service Company, 68 FERC

61,182 at 61,926 n.9 (1994) (citing Entergy Services, Inc., 58 FERC 61,234

at 61,768 (1993), reh'g dismissed, 68 FERC 61,399 (1994)). Network

service allows more flexibility by allowing a transmission customer to use

the entire transmission network to provide generation service for specified

resources and specified loads without having to pay multiple charges for

each resource-load pairing.

** Florida Municipal, 67 FERC at 61,477.

77a

substitute for readily available service under a filed non-

discriminatory open access tariff. As the Commission noted in

Hermiston Generating Company, "[t}he ability to spend time

and resources litigating the rates, terms and conditions of

transmission access is not equivalent to an enforceable

voluntary offer to provide comparable service under known

rates, terms and conditions."””

2. Commission's Comparability Standard

In the Spring of 1994, the Commission began to address the

problem of the disparity in transmission service that utilities

provided to third parties in comparison to their own uses of the

transmission system. In the seminal case in this area, American

Electric Power Service Corporation (AEP), the company

voluntarily proposed a tariff of general applicability that would

offer firm, point-to-point transmission service for a minimum

of one month.“ The Commission accepted the proposed

transmission tariff for filing and suspended its effectiveness for

one day, subject to refund.” Rehearing requests challenged the

Commission's summary approval of the restriction of service to

point-to-point as being discriminatory and anticompetitive.”

The rehearing requests argued that the tariff should be expanded

to include network services such as those used by the

transmission owner. On rehearing, the Commission announced

a new standard for evaluating claims of undue discrimination.

“ 69 FERC 61,035 at 61,165 (1994), reh'g denied, 72 FERC 61,071

(1995); see also Southwest Regional Transmission Association, 69 FERC

61,100 at 61,398 (1994), order on compliance filing, 73 FERC 61,147

(1995) (SWRTA).

* 64 FERC 61,279 (1993), reh'g granted, 67 FERC 61,168, clarified, 67

FERC 61.317 (1994).

@ The Commission explained that AEP could limit the service it was

offering because it was “providing the service voluntarily under a tariff of

general applicability." 64 FERC at 62,978.

2” AEP, 67 FERC at 61.489.

78a

The Commission found that a voluntarily offered, new open

access transmission tariff that did not provide for services

comparable to those that the transmission owner provided itself

was unduly discriminatory and anticompetitive.”' In reaching

that conclusion, the Commission broadened its undue

discrimination analysis (which traditionally had focused on the

rates, terms, and conditions faced by similarly situated third-

party customers) to include a focus on the rates, terms, and

conditions of a utility's own uses of the transmission system:

[A]n open access tariff that is not unduly discriminatory or

anticompetitive should offer third parties access on the same or

comparable basis, and under the same or comparable terms and

conditions, as the transmission provider's uses of its system.”

Refocusing the analysis was necessitated by the changing

conditions in the electric utility industry, including the

emergence of non-traditional suppliers and greater competition

in bulk power markets. Because a transmission provider may

use its system in different ways (e.g., to integrate load and

resources when serving retail native load, to make off-system

sales or purchases, or to serve wholesale requirements

customers), the Commission set for hearing the factual issues

associated with identifying those uses, as well as any potential

4 With respect to anticompetitive effects, the Commission explained that

it has "adhered to the Supreme Court's determination that the Commission's

‘ important and broad regulatory power * * * carries with it the responsibility

to consider, in appropriate circumstances, the anticompetitive effects of

regulated aspects of interstate utility operations pursuant to sections 202 and

203, and under like directives contained in sections 205, 206 and 207.’ Gulf

States Utilities Company v. FPC, 411 U.S. 747, 758-59 (1972)." Id. at

61,490 (footnote omitted). The Commission reaffirmed that it would

examine how best to fulfill this responsibility, as well as its responsibility to

prevent undue discrimination, in light of the changing conditions in the

electric utility industry. Id.

2 Id. at 61,490.

Ba ga i co ee

79a

impediments or consequences to providing comparable services

to third parties.”’

After AEP, the Commission applied this comparability

standard to a proposed Open access transmission tariff that was

filed by Kansas City Power & Light Company (KCP&L) in

support of a proposal to sell generation at market-based rates.”

The Commission explained that, in light of AEP. the utility's

proposed open access transmission tariff (which provided only

for point-to-point service) did not adequately mitigate its

transmission market power so as to justify allowing the

requested market-based rates. KCP&L could charge market-

based rates for sales only if it modified its proposed

transmission tariff to reflect the AEP comparability standard.

Since then, the Commission has required comparable service

in a variety of contexts, and has set for hearing the factual

issues associated with comparable service. For example, the

Commission found that market power can be adequately

mitigated only if a merged company offers transmission

services in accordance with the AEP comparability standard,”®

The Commission further held that, even if a merger does not

result in an increase in market power, the merger would not be

consistent with the public interest under section 203 of the FPA

unless the merged company offers comparable transmission

services, as defined in AEP.” The Commission therefore

annouriced a transmission comparability requirement for all

new mergers:

Given the transition of the electric utility industry as a

whole, we conclude that, absent other compelling public

interest considerations, coordination in the public interest

21d. at 61,490-91.

4 See Kansas City Power & Light Company, 67 FERC 61,183 (1994 ),

reh'g pending.

** E.g., CSW, supra, 68 FERC at 61.914,

1d,

80a

can best be secured only if merging utilities offer

comparable transmission services.”

In Heartland Energy Services, Inc.,™ the Commission

applied its comparability standard to an affiliated electric power

marketer seeking blanket authorization to sell electricity at

market-based rates. The Commission explained that

for all future cases involving blanket approval of market-

based rates an offer of comparable transmission services

will be required before the Commission will be able to find

that transmission market power has been adequately

mitigated. In the context of an affiliated power marketer,

this means that all of its affiliated utilities must have a

comparable transmission tariff on file.”

The Commission also denied a request by a company

affiliated with a transmission-owning utility seeking permission

to sell power at market-based rates to a particular customer.

The denial was without prejudice to refiling such a request in a

new section 205 proceeding, but only after the affiliated

transmission-owning utility filed a comparable transmission

service tariff." The Commission added that it will require

comparability in any situation in which a seller seeking market-

2 1d. at 61,915 (footnote omitted).

™® 68 FERC 61,223 (1994).

2 id. at 62,060. In InterCoast Power Marketing Company, 68 FERC

61,248, clarified, 68 FERC 61,324 (1994), the Commission rejected an

affiliated marketer's proposal to sell at market rates without its affiliate utility

offering comparable transmission services. The Commission stated that the

only way to ensure that InterCoast does not have transmission market power

is to require its affiliated public utility to offer comparable transmission

services. See also LG&E Power Marketing Inc., 68 PERC 61,247 at 62,120-

21 (1994), The Commission added that this

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Appendix — Enron Power Marketing, Inc. v. Northern States Power Co. · 528 U.S. 1182 | Frix