Opposition Brief — North Star Steel Co. v. MidAmerican Energy Holdings Co.
Supreme Court brief1999
Ask Donna
What actually matters in this document.
Text
No. 99-581
a
IN THE
Supreme Court of the United States
NorTH STAR STEEL COMPANY,
Petitioner,
v.
MIDAMERICAN ENERGY HOLDINGS COMPANY
and MIDAMERICAN ENERGY COMPANY,
Respondents.
On Petition for a Writ of Certiorari to the
United States Court of Appeals
for the Eighth Circuit
RESPONDENTS’ BRIEF IN OPPOSITION
J. A. BOUKNIGHT, JR.
Counsel of Record
SAMUEL T. PERKINS
STEPTOE & JOHNSON LLP
1330 Connecticut Avenue, N.W.
Washington, D.C. 20036
(202) 429-3000
Counsel for Respondents
MidAmerican Energy
Holdings Co. and
November 4, 1999 MidAmerican Energy Co.
WILSON-EPES PRINTING Co., INC. - (202) 789-0096 - WASHINGTON, D.C. 20001
QUESTIONS PRESENTED
Did the court of appeals correctly apply the “state ac-
tion” doctrine in holding MidAmerican’s alleged anti-
competitive conduct immunized from federal antitrust
claims by reason of (1) Iowa’s clearly articulated and
affirmatively expressed state policy displacing retail com-
petition with regulation in the provision of retail electric
service and (2) Iowa’s active supervision of that policy?
(i)
li
LIST OF PARTIES
All parties to the proceeding below are listed in the
caption. The lowa Utilities Board participated in the pro-
ceedings below as amicus curiae.
RULE 29.6 CORPORATE DISCLOSURE STATEMENT
Respondent MidAmerican Energy Company is a wholly
owned subsidiary of MHC, Inc. MHC, Inc. is a wholly
owned subsidiary of MidAmerican Funding, LLC, which
is in turn wholly owned by respondent MidAmerican En-
ergy Holdings Company, a publicly held company.
Respondent MidAmerican Energy Holdings Company
has no parent company. No publicly held company owns
10 percent or more of the stock of MidAmerican Energy
Holdings Company. However, on October 25, 1999, an
investor group including Berkshire Hathaway, Inc. and
other private investors announced that it had reached a
definitive agreement to acquire MidAmerican Energy
Holdings Company. The transaction is expected to be
completed by April of 2000. After the transaction, Berk-
shire Hathaway, Inc. will own approximately 75 percent
of MidAmerican Energy Holdings Company on a fully
diluted basis. See MidAmerican Energy Holdings Com-
pany, Current Press Releases, Berkshire Hathaway, Walter
Scott and David Sokol to Acquire MidAmerican Energy
Holdines (Oct. 25. 1999), accessed at <http://www.
midemerican.com ‘htinl/news industryl.shtml>.
3
'
TABLE OF CONTENTS
Page
QUESTIONS PRESENTED .0woooooooccecceccceeeeceeeee- i
I sc sseisssdndcaddcaniessininenisnicssinsachbcotéedmas ii
RULE 29.6 CORPORATE DISCLOSURE STATE-
a in cchindnvslaehtblepsdebh ii dtselchdacubesiontuigslocann ii
TABLE OF AUTHORITIES ..0..0...........ccccceccceccsecceceees- iv
RPE REOROPEEED MOMMA on. onccseceesccencscneccccsascnacaseencaceeseceaseree 1
i sa cece ivacsnaindtwe donner 2
STATUTORY PROVISIONS INVOLVED .......00000000..... 2
SLATEMENT OF THE CASE ooonn.on.n...n..cccccccccccccesees 4
REASONS FOR DENYING THE WRIT ............0........ 7
I. THE STATE OF IOWA’S REGULATION OF
RETAIL ELECTRIC SERVICE SATISFIES
BOTH PRONGS OF THE TEST FOR APPLI-
CATION OF THE “STATE ACTION” DOC-
Sau SEES COPIA BAO Aaa eae i en 7
Il. THERE IS NO REASON FOR THIS COURT
TO REVIEW THE DECISION OF THE
COURT OF APPEALS W000... 12
A. The Possibility of Future Retail Deregula-
tion Does Not Negate the Force and Effect
of Current Regulation ea 12
B. This Case Reflects No “Split” Among the
Circuits Meriting Review By This Court... 15
I ies essa asics eubincssenaididiasshvenseedelanicscs 18
APPENDIX ..................... eines ah adenine sis Geclatnene Medien oi cdates la
(iii)
iv
TABLE OF AUTHORITIES
CASES Page
California Retail Liquor Dealers Ass’n v. Midcal
Aluminum, Inc., 445 U.S. 97 (1980) 0.000000... 7
Columbia Steel Casting Co. v. Portland General
Elec. Co., 111 F.3d 1427 (9th Cir. 1997), cert.
denied, 118 8. Ct. 1688 (1998).............................. 16
FTC v. Ticor Title Ins. Co., 504 U.S. 621 (1992)... 10
Fuchs v. Rural Elec. Convenience Co-op., Inc.,
672 F. Supp. 1111 (C.D. Ill. 1987), aff’d, 858
F.2d 1210 (7th Cir. 1988), cert. denied, 490 U.S.
I A a ns rates g pea raeee Ua aa 9
Fuchs v. Rural Elec. Convenience Co-op., Inc., 85 58
F.2d 1210 (7th Cir. 1988), cert. denied, 490 U.S.
TE III Gosh decdtenk: cs bacrestateteekesuatantine nannies 10
Iowa-Illinois Gas & Elec. Co. v. Iowa State Com-
merce Comm’n, 412 N.W.2d 600 (Iowa 1987).... 9
Iowa-Illinois Gas & Elec. Co. v. Iowa State Com-
merce Comm’n, 347 N.W.2d 423 (Iowa 1984).... 9
Municipal Utils. Bd. v. Alabama Power Co., 934
F.2d 1493 (11th Cir. 1991), cert. denied, 513
U.S. 1148 (1995) ......... Siar ieee ee ae ee ares. 9, 10
Nantahala Power & Light Co. v. Thornburg, 476
Sain WO MINED Gasset ce aoe, cxsasee chee asecae eat ceases 13
North Star Steel Co. v. Iowa Utils. Ba., No.
AA3127 (Iowa Dist. Ct. Jan. 29, 1999) ....... 65
North Star Steel Co. v. MidAmerican Energy Hold-
ings Co., No. 4-97-CV-80782, 1998 U.S. Dist.
LEXIS po489 (S.D. Iowa June 23, 1998) bape 1 |
North Star Steel Co. v. MidAmerican Energy Hold- |
ings Co.. 184 F.3d 732 (8th Cir. 1999) ......... passim
Office of Consumer Advocate v. Iowa State Com-
merce Comm’n, 419 N.W.2d 373 (Iowa 1988)... 9
Parker v. Brown, 317 U.S. 341 (1943) 5
as
Patrick v. Burget, 486 U.S. 94 (1988) 0000.
Prarair, Inc. v. Florida Power & Light Co., 64
F.2d 699 (11th Cir. 1995), cert. denied, 517
Ee ee Ae RII pelisiccnsecssnces tunel ecb ote eta ts 10, 16
Southern Motor Carriers Rate Conference, Ine.
v. United States, 471 U.S. 48 (1985) ............ ee 17
v
TABLE OF AUTHORITIES—Continued
Page
Town of Massena v. Niagara Mohawk Power
Corp., 1980-2 Trade Case. (CCH) 63,526
(N.D.N.Y. Sept. 8, 1980) —.........-...------::seccceeeeeeeeees 13
AGENCY PROCEEDINGS
In re MidAmerican Energy Co., Docket No. DRU-
98-1 (I.U.B. May 29, 1998), aff'd, North Star
Steel Co. v. Iowa Utils. Bd., No AA3127 (lowa
Tilak, Cb. Fete. BD, BOR) nncenccnsccsanesacscses sdcaivicdedaatonl passim
STATUTES
Federal
{Bik 7 cae & Beenemeeminurunprapenenns mver sn pennrnnnn 4
BB OT OD iain cnesassscaicicaseennstnsecnncernnensmnanneadenatanans 4
TBs Cee & © RP penpemnmnmeierecorsn nm s van syn enna! DEA 4
Rie Tote |. peormmeevennmnenuuereesmuseray serve a minns=s 13
16 UTE: BRIS on ovcsseccctccceee ene 14
DO CBRE. OE aia ssa siiseissiicnnsinstarsssipsecssasentecnemaeaneanon 14
DB UBC. 6 TRIG) ona oes cctneerdires see 2
State
Bees Ce BT morssehscsciseassseemtaseasees ANGer ee 2,8
Tore Catlin © SFG BGG) in inciccssiincsiscscccccnsacitsnegrsenpictapeceess 2,8
Towa: Cote © GIG ASCE D ...-.----2-0csencscesercncees sea ktoan ee 2,8
Tw, Cle 6 ATG BI neces i niece cn nsascassnsnsnssssasastanctaneronsness passim
Town Cee 8 ATGAL oan nace sncsscsscenssenisncccnssnoroseseveses aan 14
Sores Cae 6 GIGI inc sivsccdicensnsatecicssimeen 4,9
Bown Codie 8 GIGI 2S) ocncivvscnccncccsinestissssaersticeneees 4,9
REGULATIONS
Iowa Admin. Code rr. 199-24.4 ..............--sssscssccccsseseeee 4,9
MISCELLANEOUS
The White House, Office of the Press Secretary,
The Clinton Administration’s Comprehensive
Electricity Competition Plan (Mar. 25, 1998),
accessed at <http://www.pub.whitehouse.gov.
uri.../oma.eop.gov.us/1998/3/26/4.text.1> ........ 14
vi
TABLE OF AUTHORITIES—Continued
Page
MidAmerican Energy Holdings Company, Current
Press Releases, Berkshire Hathaway, Walter
Scott and David Sokol to Acquire MidAmerican
Energy Holdings (Oct. 25, 1999), accessed at
<http ://www.midamerican.com/html/news-in-
Gute LES ceri sins nan ii
IN THE
Supreme Court of the United States
No. 99-581
NorTH STAR STEEL COMPANY,
Petitioner,
MIDAMERICAN ENERGY HOLDINGS COMPANY
and MipAMERICAN ENERGY COMPANY,
Respondents.
On Petition for a Writ of Certiorari to the
United States Court of Appeals
for the Eighth Circuit
RESPONDENTS’ BRIEF IN OPPOSITION
MidAmerican Energy Holdings Company and Mid-
American Energy Company (collectively, “MidAmeri-
can”) respectfully file this brief in opposition to the peti-
tion of North Star Steel Company (“North Star”) for a
writ of certiorari to review the judgment of the United
States Court of Appeals for the Eighth Circuit in this case.
OPINIONS BELOW
The opinion of the court of appeals is reported at 184
F.3d 732 (8th Cir. 1999). The opinion of the district
court can be found at No. 4-97-CV-80782, 1998 US.
Dist. LEXIS 22332 (S.D. Iowa June 23, 1998). The
opinions of the court of appeals and the district court are
set out in Appendix A and Appendix B, respectively, of
the Petition.
2
JURISDICTION
The court of appeals entered its judgment on July 7,
1999. Petitioner invokes the jurisdiction of this Court
under 28 U.S.C. § 1254(1) (1994).
STATUTORY PROVISIONS INVOLVED
In addition to the statutes listed in the Petition (“Pet.”),
the following statutory and regulatory provisions are in-
volved in the case:
Iowa Code § 476.8 provides in relevant part:
Every public utility is required to furnish reasonably
adequate service and facilities. ... The charge made
by any public utility for any heat, light, gas, energy
efficiency and renewable energy programs, water or
power produced, transmitted, delivered or furnished,
. or for any service rendered or to be rendered in
connection therewith shall be reasonable and just
Iowa Code § 476.20(1) provides in relevant part:
1. A utility shall not, except in cases of emergency,
discontinue, reduce, or impair service to a commu-
nity, or a part of a community, except for nonpay-
ment of account or violation of rules and regulations,
unless and until permission to do so is obtained from
the board.
lowa Code § 476.23(1) provides in relevant part:
1. An electric utility shall not construct or extend
facilities or furnish or offer to furnish electric service
to the existing point of delivery of any customer al-
ready receiving electric service from another electric
utility without having first filed with the board the
express written agreement of the electric utility pres-
ently serving this customer, except as otherwise pro-
vided in this section... .
3
Iowa Code § 476.25 provides in relevant part:
It is declared to be in the public interest to encour-
age the development of co-ordinated statewide elec-
tric service at retail, to eliminate or avoid unneces-
sary duplication of electric utility facilities, and to
promote economical, efficient, and adequate electric
service to the public. In order to effect that public
interest, the board may establish service arees within
which specified electric utilities shall provide electric
service to customers on an exclusive basis. Except
for good cause expressed through formal public state-
ment, the board shall establish these exclusive service
areas on or before July 1, 1979. ...
1. The service area boundaries . . . may be modified
by the board to promote the public interest, to pre-
serve existing service areas and electric utilities’
rights to serve existing customers, and to prevent
unnecessary duplication of facilities, to take account
of natural and physical barriers which would make
electric service beyond these barriers uneconomic
and impractical and those boundaries shall be modi-
fied by the board to take account of the contracts
between electric utilities which have been approved
by the board... . The board, on its own motion or
at the request of an electric utility or municipal cor-
poration, after notice and opportunity for hearing,
may modify the boundaries of an electric utility ex-
clusive service area which it has previously estab-
lished if this modification, including consideration of
the factors noted in this subsection, is found to be in
the public interest.
* * * *
3. An electric utility shall not serve or offer to serve
electric customers in an exclusive service area as-
signed to another electric utility, nor shall an electric
utility construct facilities to serve electric customers
4
in an exclusive service area assigned to another elec-
tric utility... .
Iowa Code § 476.53 provides in relevant part:
The board shall not allow a return on common equ-
ity on that portion of a public utility’s electric gen-
erating capacity which is determined to be excess
electric generating capacity. Excess electric generat-
ing capacity is that portion of the public utility’s
electric generating capacity which exceeds the
amount reasonably necessary to provide adequate
and reliable service as determined by the board.
lowa Code § 476A.2(1) provides in relevant part:
1. Commencing January 1, 1977, a person shall not
commence to construct a facility except as provided
in section 476A.9 unless a certificate for the facility
has been issued by the board... .
Iowa Administrative Code rr. 199-24 is set out in Re-
spondents’ Appendix attached to this brief.
STATEMENT OF THE CASE
The pertinent factual background is more fully set out
in the opinion of the court of appeals. (Pet. App. A 2a-
6a.)
In brief, North Star alleges that MidAmerican violated
sections | and 2 of the Sherman Act, 15 U.S.C. $$ 1 and
2 (1994), and section 3 of the Clayton Act, 15 U.S.C.
§ 14 (1994), by refusing to enter into agreements with
North Star whereby North Star could purchase electric
power for its Wilton, Iowa mill from retail suppliers other
than MidAmerican.! MidAmerican moved to dismiss the
1 North Star proposed two alternate forms that the transaction
could take: (1) North Star could “purchase directly power pro-
duced by a third party generator” and have MidAmerican distribute
the power to North Star over MidAmerican’s transmission lines; or
ee a a ee
5
complaint in the district court on the ground that Iowa’s
pervasive regulation of retail electric service immunized it
from liability for the alleged anticompetitive conduct
under the “state action” doctrine enunciated by this Court
in Parker v. Brown, 317 U.S. 341 (1943), and subse-
quent cases.
After initial argument on the motion to dismiss, Mid-
American filed a petition for declaratory ruling from the
Iowa Utilities Board (“IUB”) concerning MidAmerican’s
rights and obligations pursuant to the Iowa Code provi-
sions regarding the supply of retail electric service. (Pet.
App. A 4a.) Among other questions, MidAmerican
asked:
1. Does the Board’s assignment of an exclusive
service area to MidAmerican, pursuant to Iowa
Code §§ 476.22 through 476.26 and related sec-
tions, give MidAmerican the exclusive right and
responsibility to sell electricity to retail customers
within the assigned service area. or are Mid-
American’s rights and obligations limited to the
transmission and distribution of electricity that
may be provided competitively by other sellers to
retail customers?
(Pet. App. D 21a.) North Star filed comments in opposi-
tion to the petition, while the Office of Consumer Advo-
cate, a division of the Iowa Department of Justice, filed a
response concurring with MidAmerican’s position. (Pet.
App. D 19a-20a.)
Following a hearing, the IUB issued a Declaratory Rul-
ing in which it held that retail electric service under Iowa’s
exclusive service territory statutes includes the supply of
electricity, as well as transmission and distribution func-
(2) MidAmerican could “purchase power from a third party ex-
pressly for transmission to North Star’s mill.” (Pet. App. A 8a.)
6
tions. Jn re MidAmerican Energy Co., Docket No. DRU-
98-1 (I.U.B. May 29, 1998) (“IUB Declaratory Rul-
ing”). (Pet. App. D 23a.) The IUB further held that
MidAmerican’s obligation to provide “reasonably ade-
quate” service at “reasonable and just” rates to retail cus-
tomers within its assigned exclusive service territory, lowa
Code § 476.8, carried with it a corresponding right to
provide such service—including the supply of electricity
—on an exclusive basis. (Pet. App. D 23a-24a.) The
IUB described exclusivity of electric service as a deliberate
choice that the Iowa General Assembly had made in order
to induce the capital investment necessary for utilities to
provide reliable electric service to retail consumers. (Pet.
App. D 23a.) Accordingly, the IUB held that MidAmeri-
can’s denial of proposals such as North Star’s was proper
and expected.? (Pet. App. D 24a.)
North Star appealed the IUB Declaratory Ruling to the
Iowa state district court, which affirmed the ruling. North
Star Steel Co. v. lowa Utils. Bd... No. AA3127 (Towa
Dist. Ct. Jan. 29, 1999). North Star has in turn appealed
that ruling to the lowa Supreme Court. North Star Steel
Co. v. lowa Utils. Bd., No. 99-0342 (lowa appeal
docketed Mar. 5, 1999).
On June 23, 1998, the district court below (Wolle, J.)
granted summary judgment to MidAmerican. On appeal,
the Eighth Circuit Court of Appeals affirmed. The court
of appeals held that, under Iowa law, preclusive effect
must be given to the prior Iowa state court determination
that the assignment of exclusive service territories by the
IUB includes generation, and that utilities such as Mid-
American therefore have the exclusive right to sell elec-
2 The IU'B found that the alternate forms of transaction proposed
by North Star made no difference to these conclusions. (Pet. App.
D 25a.)
7
tricity in their assigned service areas. (Pet. App. A 8a-
10a.)
The court of appeals went on to hold that “the exclu-
sive service territory statute is explicit state authorization
for displacing competition in both the distribution and
generation of retail electric service” and that “the Board
has continued to implement the state policy of displacing
competition by assigning new customers to exclusive serv-
ice providers and determining the assigned exclusive service
provider in cases of doubt or conflict.” (Pet. App. A 11a,
12a.) Accordingly, the court of appeals held that the dis-
trict court had not erred in finding both prongs of the
state action doctrine to be satisfied and in granting sum-
mary judgment to MidAmerican. (Pet. App. A at 13a.)
REASONS FOR DENYING THE WRIT
I. THE STATE OF IOWA’S REGULATION OF RE-
TAIL ELECTRIC SERVICE SATISFIES BOTH
PRONGS OF THE TEST FOR APPLICATION OF
THE “STATE ACTION” DOCTRINE
The “state action doctrine” immunizes a private party
from liability under the federal antitrust laws if (1) the
private party acts pursuant to a “clearly articulated” and
“affirmatively expressed” state policy to displace competi-
tion, and (2) the state has “actively supervised” discre-
tionary conduct by private parties undertaken pursuant to
the clearly articulated state policy. California Retail
Liquor Dealers Ass'n v. Midcal Aluminum, Inc., 445 USS.
97, 105 (1980); Patrick v. Burget, 486 U.S. 94, 100
(1988).
The State of Iowa’s control of the provision of retail
electric service satisfies both prongs of the state action
test. In 1977, the Iowa General Assembly declared the
establishment of exclusive electric service areas to be in
8
the public interest and directed the Iowa State Commerce
Commission (predecessor to the current IUB) to establish
a system of exclusive retail electric service territories.
Iowa Code § 476.25. The same statute provides that an
electric utility cannot “serve or offer to serve electric cus-
tomers in an exclusive service area assigned to another
electric utility” or construct facilities to provide such serv-
ice. Iowa Code § 476.25(3). Likewise, the construction
of facilities or furnishing of electric service to “the exist-
ing point of delivery of any customer already receiving
electric service from another electric utility,” without the
express written consent of that utility, is forbidden. Iowa
Code § 476.23(1). These provisions constitute a clear
determination by the State of Iowa to displace competi-
tion in the provision of retail electric service with a system
of exclusive service territories.*
The structure of exclusive retail service territories, in-
cluding exclusivity in the supply of electricity, is central
to lowa’s regulation of retail electric service. For ex-
ample, Iowa Code § 476.8 requires each utility to furnish
“reasonably adequate service and facilities” at “reasonable
and just” rates. “Adequate service and facilities” include
sufficient generating capacity to supply the utility’s service
area.* However, capacity that “exceeds the amount rea-
sonably necessary to provide adequate and reliable serv-
ice” is “excess electric generating capacity”; the utility is
3As MidAmerican demonstrated before the district court and
court of appeals, this statutory system was adopted to replace a
prior system that permitted utilities to compete for customers. Pet.
App. A 38a.)
4J]d.; see also IUB Declaratory Ruling. (Pet. App. D 28a.) In
addition, lowa Code § 476.20(1) provides that no utility may aban-
don, reduce, discontinue or impair service to any community or part
of a community without prior Board approval.
9
not allowed a return on common equity on such capacity.°
The sufficiency of capacity (or the existence of excess
capacity) can only be determined in light of the utility's
retail service obligation.®
Similarly, persons seeking to construct new generation
facilities with a capacity of 25 megawatts or more must
obtain a certificate of public convenience, use and neces-
sity from the IUB. Iowa Code § 476A.2(1). The current
and projected future demand for power in the exclusive
service areas of the participants proposing to construct or
purchase power from a proposed generating facility are
key factors in the [UB's consideration of an application
for a certificate. See Iowa Admin. Code rr. 199-24.4(3)-
(4). (Respondents’ App.)
Courts have found an intent to displace competition in
even less comprehensive enactments. In Municipal Utils.
Board v. Alabama Power Co., 934 F.2d 1493 (11th Cir.
1991), cert. denied, 513 U.S. 1148 (1995), Alabama
legislation establishing exclusive service territories per-
mitted some competition for large industrial customers.
Fuchs v. Rural Elec. Convenience Co-op., Inc., 672 F.
Supp. 1111 (C.D. Ill. 1987), aff'd, 858 F.2d 1210 (7th
Cir. 1988), cert. denied, 490 U.S. 1020 (198°), involved
a statute similar to Iowa’s, except that the utilities them-
selves were authorized to determine the exclusive service
areas in the first instance by agreement (failing which,
the Illinois Commerce Commission would make the deter-
SIowa Code § 476.53. See aso Office of Consumer Advoente v.
Iowa State Commerce Comm'n, 419 N.W.2d 373, 375-76 (lown
1988); Jowa-Illinois Ges & Elee. Co. v. Iowa State Commerce
Comm’n, 412 N.W.2d 600, 604-05 (Iowa 1987); Jowa-Iinois Gas &
Elec. Co. v. lowa State Commerce Comm'n, 347 N.W.2d 422, 427-20
(lowa 1984).
6 See Consumer Advocate, 419 N.W.2d at 375-76: lowe-I!inois,
412 N.W.2d at 604-05; Jowa-Illinois, 347 N.W.2d at 427-30.
10
mination). In Praxair, Inc. v. Florida Power & Light
Co., 64 F.3d 609 (llth Cir. 1995), cert. denied, 517
U.S. 1190 (1996), exclusive service territories were vol-
untarily negotiated by the utilities concerned, not assigned
by the State of Florida. In each of these cases, the courts
found clear articulation of a state policy to displace com-
petition by means of exclusive service territories and found
the alleged anticompetitive conduct immunized by the ap-
plication of the state action doctrine. Alabama Power
Co., 934 F.2d at 1502; Fuchs v. Rural Elec. Convenience
Co-op, Inc., 858 F.2d 1210, 1216 (7th Cir. 1988), cert.
denied, 490 U.S. 1020 (1989); Praxair, 64 F.3d at 612.
Active supervision, the second prong of the state action
test, is required in order to show that the state, not pri-
vate parties, has ultimate control in implementing a policy
displacing competition. “The question is not how well
state regulation works but whether the anticompetitive
scheme is the State’s own.” FTC v. Ticor Title Ins. Co.,
S04 U.S. 621, 635 (1992). In Towa, the controlling
statutes explicitly authorize the state regulatory agency to
assign territories for exclusive retail electric service. The
Iowa State Commerce Commission, not the utilities, estab-
lished the exclusive service territories in the first instance.
(Pet. App. A 3a.) The IUB has continued to implement
the General Assembly’s policy of exclusive service areas
by assigning new customers to exclusive service providers.
modifying assigned territories, and determining the as-
signed exclusive service provider when doubt or conflict
arises. (Pet. App. A 12a.) It must review and approve
each change to those territories, whether contested or un-
contested by the utilities affected. Iowa Code § 476.25
(1).7
7 MidAmerican supplied the District Court with scores of admin-
istrative decisions in which the IUB has applied the exc!usive serv-
ice territory statutes. (JA 136-38, 140-43.)
11
In the IUB’s Declaratory Ruling (Pet. App. D), the
agency carefully analyzed the scope of Iowa’s exclusive
service territory statutes, and held that they “apply to the
provision of electricity, and the provision of electricity
includes generation, distribution, and transmission. Mid-
American has a statutory right, and an obligation, to pro-
vide electric service to retail customers located within its
exclusive service territory.” (Pet. App. D 23a). The
IUB found that a utility’s corresponding rights under the
exclusive service territory statutes were not limited to
transmission and distribution. Rather, the exclusive serv-
ice territory statutes represented a legislative balancing of
rights and obligations on the “fulcrum” of “the long-term,
heavy capital investment traditionally associated with elec-
tric utility operations.” Jd. North Star’s election of an
alternate supplier would undercut the utility’s commitment
of capital and upset that balance:
The Iowa legislature made the policy decision to dis-
place competition with the regulatory scheme found
in Chapter 476. If Iowa is to change to a competi-
tive retail electric environment to respond to changes
occurring in the electric industry, statutory change;
are required. Presumably, any changes would create
a new balance of rights and obligations for those
who provide generation, transmission, or distribution
service.
(Pet. App. A 23a-24a.)
In the decision below, the Eighth Circuit Court of Ap-
peals gave preclusive effect to the state district court rul-
ing affirming the IUB’s Declaratory Ruling that the exclu-
sive retail electric service territories under the Iowa
statutes comprised the supply of electricity as well as dis-
tribution and transmission. (Pet. App. A 8a-10a.) North
Star’s third question (Pet. i) misstates the court of ap-
peals’ action, because the court of appeals held that the
12
state court decision, not the IUB ruling, had preclusive
effect. Nowhere in the body of its Petition does North
Star suggest that the court of appeals erred in that deter-
mination, nor does it offer any reason for this Court to
review the determination. Rather, North Star appears to
attack the IUB for not having limited the term “retail
electric service” to “the distribution of electricity.” But
North Star’s assertion that “the term ‘at retail’ refers to
the distribution function” (Pet. 12) is based solely on an
argumentative affidavit submitted by one of its consult-
ants. To the contrary, as the IUB, the district court, and
the court of appeals all recognized, “retail electric service”
within the meaning of the Iowa statutes comprises the
entirety of the service that a public utility provides for its
retail customers.
Far from relying on a particular characterization of
“industry segments” in the electric industry, as North
Star’s third question suggests (Pet. 1), the TUB, the dis-
trict court, and the court of appeals simply recognized
that Iowa Code § 476.25 “expressly provides that its pur-
pose is to create exclusive service areas which have only
one supplier of electricity.” (Pet. App. A 10a-11a.)
MidAmerican is that retail supplier within its own service
territory, and its exclusivity extends to the retail supply of
electricity, whether by purchase or from its own genera-
tion.
II. There Is No Reason for This Court to Review the De-
cision of the Court of Appeals
A. The Possibility of Future Retail Deregulation Does
Not Negate the Force and Effect of Current Regula-
tion
In arguing that this case is worthy of review, North
Star asserts that “[d]Jecreased regulation of the electric
industry will increase reliance upon the antitrust laws to
13
preserve competition and it is important, therefore that
there be a clear and uniform standard governing the ap-
plicability of the ‘state action’ immunity doctrine.” (Pet.
6.) However, North Star mixes its doctrines and con-
fuses deregulation at the wholesale level with deregulation
at the retail level. Where regulation does not displace
competition in the provision of electricity, or where it no
longer does so because of deregulation, the state action
doctrine is irrelevant. However, as long as Iowa perva-
sively regulates retail electric service, including the assign-
ment of exclusive electric service areas, the doctrine will
apply precisely because deregulation has not occurred.
North Star insinuates that regulation of retail electric
service has been displaced by virtue of the deregulation
that has occurred at the wholesale level of the electric in-
dustry. (See Pet. 6-7.) That is not the case. Competi-
tion to sell power to utilities, including competition among
utilities to sell power on the wholesale level, is not the
same as competition in the provision of retail electric
service.®
Wholesale sales are subject to exclusive federal jurisdic-
tion under the Federal Power Act. 16 U.S.C. $$ 824(b),
(d), (e) (1994); see Nantahala Power & Light Co. v.
Thornburg, 476 U.S. 953, 956 (1986). North Star is a
retail electricity customer, and its electric service is sub-
ject to regulation by the State of Iowa. Significantly, the
Energy Policy Act of 1992, which North Star cites.® con-
tains an express prohibition on any Federal Energy Regu-
8 For example, Town of Massena v. Niagara Mohawk Power Corp.,
1980-2 Trade Case. (CCH) © 63,526, at 76,792 (N.D.N.Y. Sept. 8,
1980) (Pet. 6-7), dealt with a dispute between a municipality and
the utility from which it sought to obtain power for resale, not the
sale of electricity directly from a third-party provider to a retail
customer.
9 (Pet. at 7.)
14
latory Commission (“FERC”) order “which is inconsist-
ent with any State law which governs the retail marketing
areas of electric utilities” and on any FERC order requir-
ing retail wheeling of the type North Star seeks here. 16
U.S.C. $$ 824k(g),(h) (1994). Even less to the point
are North Star’s citations to the Public Utility Regulatory
Practices Act, 16 U.S.C. § 824a-3 (1994) (“PURPA”),
and Iowa Code § 476.41, each of which deals with co-
generation and similar small power production facilities,
and neither of which encourages retail wheeling of the
type sought by North Star. Indeed, PURPA expressly
bars FERC from authorizing qualifying facilities to make
retail sales.°
Retail deregulation (also referred to as retail choice)
in the electric industry presents issues of policy for state
legislatures, including the need to assure that small busi-
nesses and families will continue to have access to reliable
electric service at reasonable cost; the need to assure that
utilities that have made prudent investments in the past
to meet consumer needs will be able to recover the costs
of those investments; and the effect of deregulation on
the environment. In considering these and other issues,
states have moved toward deregulation at different speeds
and through different programs. The President has pro-
posed legislation to build on this progress, but not to dis-
rupt it or to interfere with the states’ processes."
North Star’s demands are an effort to end-run the right
of the lowa General Assembly to consider retail choice
1016 U.S.C. § 824a-3(a) (“Such [FERC] rules may not authorize
a qualifying . . . facility to make any sale for purposes other than
resale.’’).
11 See The White House, Office of the Press Secretary, The
Clinton Administration’s Comprehensive Electricity Competition
Plan (Mar. 25, 1998), accessed at <http://www.pub.whitehouse.
gov/uri-.../oma.eop.gov.us/1998/3/26/4.text.1>.
15
legislation on its own terms. North Star’s assertions about
the importance of the antitrust laws in a deregulated in-
dustry puts the cart before the horse. Should Iowa enact
retail choice, the antitrust laws will certainly become an
important tool for protecting competition. Until that time,
however, pervasive state regulation in the provision of
retail electric service remains the operative system.
B. This Case Reflects No “Split” Among the Circuits
Meriting Review By This Court
North Star also asserts that there is a “split among the
federal circuit courts” with respect to the first prong of
the state action doctrine, which requires that a state policy
displacing competition with regulation be “clearly articu-
lated” and “affirmatively expressed.” North Star character-
izes this split as one between those courts that have
adopted a “foreseeability” standard in which “inference”
of a policy is accepted, and those which still require
“clear articulation” of a policy pursuant to the Midcal
standard. (Pet. 8-12.) These claims both mischaracterize
the decision below and overstate the extent of any sup-
posed split among circuits. The “split in the circuits”
hypothesized by North Star is not presented by this case,
and is in any event overstated by North Star.
As an initial matter, the court of appeals did not rely
on an inference from ambiguous or unclear statutory lan-
guage, as North Star asserts. (Pet. 12.) Rather, the
court of appeals based its decision on the express language
of the Iowa statute, which directly displaces competition
with regulation by the establishment of exclusive retail
electric service territories, and the preclusive affect of the
state court decision affirming the IUB’s Declaratory Rul-
ing. As the court of appeals found:
The state statute expressly provides that its purpose
is to create exclusive service areas which have only
16
one supplier of electricity. See IowA CopE § 476.25
(1997). [Footnote omitted.] The policy to displace
competition in the provision of retail electric service,
including the generation of electricity, is unambigu-
ous because the statute has been interpreted to in-
clude the generation of electricity. See In re Mid-
American Energy Co., Docket No. DRU-98-1, slip
op. at 5. Thus, the exclusive service territory statute
is explicit state authorization for displacing competi-
tion in both distribution and generation of retail elec-
tric service.
(Pet. App. A at 10a-lla.) Thus, the court of appeals
applied the “clear articulation” test enunciated by this
Court, and did not rely not on an impermissible “infer-
ence,” as North Star contends (Pet. 13). North Star’s
quarrel is, as it properly should be, with the IUB and the
Iowa General Assembly, not with the federal court of
appeals.
North Star also asserts that the split is presented by the
contrast between Columbia Steel Casting Co. v. Portland
General Elec. Co., 111 F.3d 1427 (9th Cir. 1997), cer*.
denied, 118 S. Ct. 1688 (1998) and cases such as
Praxair, 64 F.3d 609. The Petitioner in Cclumbia Steel
Casting Co. raised a similar contention last Term, also
contrasting Praxair and Columbia Steel Casting Co. This
Court requested briefing by the Solicitor General, who in
turn recommended denial of the petition for certiorari,
stating that his office “perceive[d] no conflict that calls
for resolution by this Court.” '* Specifically, the Solicitor
General observed:
[Unlike petitioner (Pet. 25), we see no firm basis
for concluding that the Praxair court would have
recognized immunity on the facts of this case, or that
12 Brief for the United States as Amicus Curiae at 14, Co’umbia
Steel Casting Co. v. Portland General Elec. Co., No. 97-49, cert.
denied, 118 S. Ct. 1688 (1998).
17
the court below would have rejected a claim of im-
munity on the facts of Praxair.
Id. at 16 (footnote omitted).
The Solicitor General’s reference to “the facts of [the]
case” is a reminder that cases involving the state action
doctrine are heavily dependent on the facts and circum-
stances of each case. (See Pet. 10.) The issues to be
decided include whether the state has clearly articulated
and affirmatively expressed a policy to displace competi-
tion with regulation, whether that policy has been actively
supervised by the state, and whether it extends to im-
munize the particular conduct in question. Because such
cases are “fact-bound,” Brief for the United States as
Amicus Curiae in No. 97-49 at 8, in the absence of
significant doctrinal issues, they are not ordinarily appro-
priate for review by this Court on certiorari. See also id.
at 11 n.5. North Star has offered no rationale that justifies
a grant of certiorari in this case.
North Star’s final argument is that the IUB’s approval
of an experimental program of customer choice somehow
demonstrates that Iowa’s policy is not “clearly articulated,”
“affirmatively expressed,” or “actively supervised.” (Pet.
13-14.) However, the fact that the Board, which has au-
thority to establish exclusive service territories, may also
have authority to approve a limited experimental program
for the purpose of testing how retail competition might
work hardly suggests the absence of a clearly articulated
state policy. As this Court has made clear, the state ac-
tion doctrine should not be construed in a way that un-
necessarily reduces the “range of regulatory alternatives
available to the State.” 15 Likewise the fact that the pro-
13 Southern Motor Carriers Rate Conference, Inc. v. United States,
471 U.S. 48, 61 (1985) (rejecting argument that state policy must
“require, rather than merely permit, anticompetitive conduct” in
order for the state action doctrine to apply).
18
gram—limited in duration and extent—was subject to the
IUB’s detailed review and approval?* confirms that the
State’s policy is, in fact, closely supervised.
CONCLUSION
The petition for a writ of certiorari should be denied.
Respectfully submitted,
J. A. BOUKNIGHT, JR.
Counsel of Record
SAMUEL T. PERKINS
STEPTOE & JOHNSON LLP
1330 Connecticut Avenue, N.W.
Washington, D.C. 20036
(202) 429-3000
Counsel for Respondents
MidAmerican Energy
Holdings Co. and
November 4, 1999 MidAmerican Energy Co.
14 Sec Pet. App. E.
£ PR LF OIE OF 12
APPENDIX
PRA” -
BL AI FOTW 7 *
la
APPENDIX
IOWA ADMINISTRATIVE CODE rr. 199.24,4(3), (4)
199—24.4(476A) Application for a certificate—con-
tents. Each person or group of persons proposing to con-
Struct a facility after January 1, 1977, or a significant
alteration to a facility shall file an application for certifi-
cate of public convenience. use, and necessity with the
board, unless otherwise provided by these rules.
24.4(3) In section 3, entitled “Current system informa-
tion,” the applicant shal] include the following:
a. A specific and complete description of all Partici-
pants’ operating generating units in all Participants’ op-
erating electric power generating stations. Such descrip-
tion shall include, but shall not be limited to, installed
Senerating capacity including nameplate, net to the busbar
ratings and net to the distribution system of each unit in
megawatts, primary fuel types and sources for each unit.
the heat rate of each unit in BTU‘/kWh over the range
of operating capacity, date placed in service and pro-
jected retirement date. Applicant shall also describe all
Other sources of electricity available to serve Participants’
Service area, Description of other sources of electricity
shall include, but shall not be limited to, total kilowatts
and kilowatt hours available in each quarter of the year.
Fer this purpose, a group of several similar generating
units operated together at the same location such that
Segregated records of energy output are not available shall
be considered as a single unit.
b. For each quarter of the ten (10) years preceding
the date of application. system load level information in
the form of duration curves, load curves and integrated
energy curves. Supporting data for each curve shall be
supplied in tabular form.
POPS UN e RT ire SON te
cree nen 5, ye
2a
c. For each quarter of the ten (10) years preceding
the date of application, in each participant’s service area,
the number of customers in each customer class, the aver-
age customer consumption in each customer class and the
average price per kilowatt hour for each customer class.
Data for the largest industrial users shall be further classi-
fied according to two digit Standard Industrial Classifica-
tion (SIC) Codes. Applicant must indicate whether any
information provided under this subsection constitutes a
clearly unwarranted invasion of personal privacy or trade
secrets required to be kept confidential by the board under
the Iowa Administrative Procedure Act. Applicant shall
provide capital costs and operating and maintenance ex-
penses per kilowatt hour by generating station for each
quarter of the ten (10) years preceding the date of appli-
cation.
d. For purposes of this subsection, the period chosen
for presentation of quarterly data shall be any appropriate
three (3)-month interval, selected on the basis of the
shape of the load curve or any other load characteristics
of the installed generating capacity.
24.4(4) *In section 4, entitled “Future system projec-
tions,” the applicant shall include the following:
a.(1) A description of each participant’s projected in-
stalled generating capacity for each year from the date
of application through the proposed facility’s life. Such
description shall include but not be limited to the pri-
mary type of fuel projected to be used by each generating
unit in the system and the proportion each generating unit
is projected to contribute to total installed generating
capacity.
* Objection, see filed rules published IAC Supp. 1/9/77, 5/4/77,
7/13/77.
RE RAISES MOO ie tates
POR RS Sead aby
3a
(2) A description of other sources of electricity avail-
able or likely to be available to supply participants’ serv-
ice areas. Such description shall include, but shall not be
limited to, total kilowatts and kilowatt hours available for
each year from the date of application through the pro-
posed facility’s life. :
b. (1) Identification and description of participants’ ex-
isting and planned programs designed to conserve energy.
Such description shall include, but shall not be limited to,
estimated kilowatt hours saved for each year from the
date of application through the proposed facility’s life.
(2) An analysis of the effect construction of the facil-
ity would have on the demand for electricity. This analy-
sis shall include, but shall not be limited to, all antici-
pated changes in demand due to community developments
induced by construction of the facility.
(3) An identification of the forecast methodology used
by applicant including a discussion of the analytical tech-
niques used, the manner in which the techniques are
related to the forecast, and the confidence levels and ex-
pected range of accuracy for the components of the fore-
cast.
(4) A projection of system load levels in the form of
duration curves, load curves and integrated energy curves,
for each year from the date of application through the
proposed facility’s life. Supporting data for each curve
shall be supplied in tabular form.
c. For each participants’ service area, a projection of
the number of customers in each customer class, average
customer consumption by customer class and average
price per kilowatt hour for each year from the date of
application through the proposed facility’s life. Applicant
shal! provide projections of capital costs and operating
4a
and maintenance costs per kilowatt hour for each station
in the participants’ system and for the proposed facility
for each year from the date of application through the
proposed facility’s life. Average price per kilowatt hour
may be stated as an aggregate index of all rate classifica-
tions.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.