Brief for the United States — Banks v. United States
Supreme Court brief1998
Ask Donna
What actually matters in this document.
Text
ites
DEC 5 1997
No. 97-602 |
RK
Supreme Court, U.s.
aa, 2a
In the Supreme Court of the Giuted States
OCTOBER TERM, 1997
PARKS B, BANKS, PETITIONER
Vv.
UNITED STATES OF AMERICA
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE ELEVENTH CIRCUIT
BRIEF FOR THE UNITED STATES
SETH P. WAXMAN
Solicitor General
Lois J. SCHIFFER
Assistant Attorney General
ELLEN J. DURKEE
ELIZABETH ANN PETERSON
Attorneys
Department of Justice
Washington, D.C. 20530-0001
(202) 514-2217
QUESTIONS PRESENTED
1, Whether an action by the United States for
injunctive relief to remedy the illegal discharge of fill
materials into waters of the United States is subject
to the statute of limitations that applies to “an action,
suit or proceeding for the enforcement of any civil
fine, penalty, or forfeiture” (28 U.S.C. 2462).
2. Whether saturated lands that are hydrologically
connnected to navigable waters through groundwater
constitute wetlands within the regulatory scope of
the Clean Water Act.
(1)
TABLL OF CONTENTS
Page
RE MNO si seaicchicrcasbisuonsibic sth ipkdddabinbided: sands saadoewlsenc, 1
eI SARTRE SUED Aue DU et CPU ERE OOF eae eI 1
NE iii pirtbscad centsateacsniinhiobhckied cia ees 2
NINE Dibaba ssiacsiahhicsisdesicamsaoecse iss ciikkossecec. 8
GEER GRRE oN fee pmarol Oa SSOP REALE ORG Reg 12
TABLE OF AUTHORITIES
Cases:
Banks v. Page, 768 F. Supp. 809 (S.D. Fla. 1991),
rev'd in part, vacated in part, 963 F.2d 385 (11th
CA ARSE AN SNS RA TSly SETAE SRS Cr 5
Cope v. Anderson, 331 U.S. 461 (1947) ......cccccccceces. 8
Exxon Corp. v. Train, 554 F.2d 1310 (5th Cir.
SPEED: Gite thadntriccbbuini iscisapiniicierchcceasbwasikthdkoi chases canis: 10
Federal Election Commission v. Williams, 104 F.3d
237 (9th Cir. 1996), petition for cert. pending, No.
INE scale vue en eschceguabcammesiudeccidganmiptecniesetes uid boieisiccakss i)
Quivira Mining Co. v. United States Envtl. Protec-
tion Agency, 765 F.2d 126 (10th Cir. 1085), cert.
denied, 474 U.S. 1055 (1986) ............ccccccccossorscssseeees 10
Rogers v. Lodge, 458 U.S. 613 (1982) .0........ccccccceeee. 12
Tiffany Fine Arts, Inc. v. United States, 469 U.S.
TIE leah iinndiccd brabidideetds ubbaiibiisidie a igaedia bch anvesaanes 12
Town of Norfolk v. United States Army Corps of
Engineers, 968 F.2d 1438 (1st Cir. 1992) ................ 10
United States v. Riverside Bayview Homes, Inc.,
BP RE ee CLUE sisciets cacuicai cts busdenkbdsasnsisoveciasiais 2,11
United States v. Tilton, 705 F.2d 429 (11th Cir
UIE dibiieisnikneaiie kui iemdsitshiaabincnaensidictnadisiadion dcloanicetcee 11
Village of Oconomowoc Lake v. Dayton Hudson
Corp., 24 F.3d 967 (7th Cir.), cert. denied, 513
SEM PE CRE ich ccridicctdcmisdcaannttccuctcdsditecclaesiclasess 10
(III)
Statutes and regulations: Page
Clean Water Act, 33 U.S.C. 1251 et seq. ...........:seeeeees 2
SE UA. ERBIGD cessivesncisasisiinsninatacstecesarissasescuscasonhs 2
SO WIAA. SEERA). TG DRED) sscrsssrsissaceresvincscessienistes 2,7
SS TFB. SEGGR) CE SIGE) cciseviseviscssssenrensesevsensvsses 2,3
Be REE FIELD icasincersastetodcionnsisivenniinsereintmennes 3
BS Tass SCE vcanssecteccsdivivedinsenaicsnsssionnceriinegeniien 2
Be TE Ta: SE sinenvdaeeniiniveioarvaiicintingaiaaaniiias 6, 7, 8, 9
33 C.F.R.:
Pt. 326:
EHOCEIOR BCE) CABO) vccconcascecsotsucensceccosnentarcssicns 4
Pt. 328:
SEROE IIE TIME © secede bostcecvcadsccducccsattauctnesataucsiadees 3
POTROES TPR) cides oduicic cocitcunsavessbvereadsbooiabucsenens 8, 11
RE TAC) os vckccuussindcndedeantencuscbevacsnnensaauaaeaa’ 11, 12
Miscellaneous:
U.S. Army Corps of Engineers, Wetlands Delineation
SES CADETS pondssinnisese cnarcksbiiossoctsmasasacsunmmintrtsens 6
In the Supreme Court of the Gnited States
OCTOBER TERM, 1997
No. 97-602
PARKS B. BANKS, PETITIONER
Vv.
UNITED STATES OF AMERICA
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE ELEVENTH CIRCUIT
BRIEF FOR THE UNITED STATES
OPINIONS BELOW
The opinion of the court of appeals (Pet. App. 3-15)
is reported at 115 F.3d 916. The opinion of the district
court (Pet. App. 16-37) is reported at 873 F. Supp. 650.
JURISDICTION
The judgment of the court of appeals was entered on
June 24, 1997 (Pet. App. la-2a). On September 15,
1997, Justice Kennedy extended the time within
which to file a petition for a writ of certiorari to and
including October 2, 1997, and the petition was filed on
that date. The jurisdiction of this Court is invoked
under 28 U.S.C. 1254(1).
(1)
STATEMENT
1. The Clean Water Act, 33 U.S.C. 1251 et seq., is
designed “to restore and maintain the chemical,
physical, and biological integrity of the Nation’s
waters.” 33 U.S.C. 1251(a). The central mechanism
for meeting that objective is the prohibition against
the discharge of pollutants into navigable waters
without a permit. See 33 U.S.C. 1311(a), 1344(a). The
Act defines the term “navigable waters” compre-
hensively as “the waters of the United States.”
33 U.S.C. 1362(7). The breadth of this definition re-
flects the intention of Congress
to repudiate limits that had been placed on federal
regulation by earlier water pollution control
statutes and to exercise its powers under the
Commerce Clause to regulate at least some
waters that would not be deemed “navigable”
under the classical understanding of that term.
United States v. Riverside Bayview Homes, Inc., 474
U.S. 121, 133 (1985).
Section 404(a) of the Act authorizes the Secretary
of the Army, acting through the Corps of Engineers,
to issue permits for the discharge of “dredged or
fill material” into “waters of the United States.” 33
U.S.C. 1344(a). The regulations issued under this
statute have consistently defined the term “waters of
the United States” to encompass a broad range of
“wetlands.” The “wetlands” within the “waters of
! The term “wetlands” encompasses “areas that are inun-
dated or saturated by surface or ground water at a frequency
and duration sufficient to support, and that under normal cir-
cumstances do support, a prevalence of vegetation typically
adapted for life in saturated soil conditions[,} [which] generally
3
the United States” include (i) isolated wetlands that
may affect interstate commerce, (ii) interstate wet-
lands and (iii) wetlands that are adjacent to navigable
waters or their tributaries. See 33 C.F.R. 328.3(a).
The Corps of Engineers has authority to issue indi-
vidual permits for specific projects or general regula-
tory permits for discharges into waters of the United
States. Individual permits may be issued only after
an opportunity for public comment and only upon an
evidentiary record that discloses the nature of the
proposed discharges and their anticipated effects. See
33 U.S.C. 1344(a); 33 C.F.R. Pts. 320, 325. A “regula-
tory” or “nationwide” permit may be issued by the
Corps to provide streamlined approval for categories
of discharges that (83 U.S.C. 1344(e)(1))
will cause only minimal adverse environmental
effects when performed separately, and will have
only minimal cumulative adverse effect on the
environment.
2. Petitioner owns five tracts of land on Big Pine
Key in Monroe County, Florida. He purchased three
of the lots in 1980 and the remaining two in 1988. He
acknowledges that, beginning in 1980 and continuing
into 1983, he destroyed existing vegetation on the
three lots he then owned, placed fill on them and
planted coconut trees in the fill (Pet. App. 4-5). He
also poured a concrete slab and built his winter res-
idence on one of the lots (ibid.).
On March 30, 1982, a biologist from the Corps of
Engineers informed petitioner that portions of two of
the tracts he had filled were wetlands subject to the
include swamps, marshes, bogs, and similar areas.” 33 C.F.R.
328.3(b).
Clean Water Act and that discharges onto those areas
were unlawful in the absence of a valid permit. On
April 7, 1983, the Corps issued a cease and desist
order, stating that enforcement action would be taken
against petitioner if he continued to make unpermit-
ted discharges. The order also invited petitioner to
apply for an individual permit for filling the wetlands
areas (Pet. App. 5).
On April 16, 1983, petitioner applied for an individ-
ual permit that would have authorized his discharges
retroactively (see 33 C.F.R. 326.3(c) (1983)). Several
government agencies and interested members of the
public submitted comments opposing that request.
The U.S. Fish and Wildlife Service opposed the per-
mit because freshwater wetlands on Big Pine Key
provide scarce habitat for the endangered Key Deer,
migratory birds and other wildlife. GX 16, at 66. The
South Florida Water Management District informed
the Corps that state law prohibited the discharges
without a “Surface Water Management Permit.”
Monroe County, which had already taken enforcement
action against petitioner for filling one of his lots in
violation of a County ordinance, also opposed the
application. Jd. at 72.
On April 5, 1984, the Corps denied the application.
In doing so, the Corps stated that petitioner’s dis-
charges had “resulted in significant localized adverse
impacts to fish and wildlife resources, vegetated wet-
lands, and water quality.” GX 16, at 81. The Corps
also found that “less damaging alternatives” to the
filling of wetlands were available, such as expansion
of petitioner’s coconut tree nursery on upland areas
(ibid). The letter advised petitioner that, unless
he contacted the Corps to negotiate restoration
5
measures, an enforcement action would be commenced
(ibid.).
Petitioner therafter made no effort to arrange for
restoration of the two lots. Instead, he placed addi-
tional fill on these areas without a permit (Pet. App.
25). In addition, in March 1988, he acquired two addi-
tional lots adjacent to those for which an “after-the-
fact” permit had been sought and denied. He pro-
ceeded to clear and fill the additional lots between
1988 and 1991 (id. at 5).
In 1990, the Corps issued four cease and desist
orders to petitioner. Each order stated that peti-
tioner, with notice that his conduct was unlawful, had
discharged fill into waters of the United States
without a permit. Petitioner responded by filing suit
against the Corps. He sought a declaration that his
activities did not require a permit and an injunction
barring further enforcement actions. The district
court dismissed that suit on ripeness grounds. Banks
v. Page, 768 F. Supp. 809 (S.D. Fla. 1991), rev’d in part,
vacated in part, 963 F.2d 385 (11th Cir. 1992) (Table)
(No. 91-5632).
3. a. On December 19, 1991, the United States filed
suit against petitioner, alleging that he had unlaw-
fully discharged fill into waters of the United States.
The United States sought an order directing peti-
tioner to remove the unlawful fill and to restore the
degraded wetlands or create new wetlands for areas
that could not be restored. The government also
sought an award of civil penalties against petitioner.
Petitioner moved to dismiss the government’s ac-
tion. He asserted that his discharges were author-
ized by Nationwide Permit No. 26 (N.P. 26), a regula-
tory permit issued in 1984 to authorize discharges
into certain headwaters and isolated waters, subject
6
to various protective conditions. Petitioner also as-
serted that the United States was barred by the
statute of limitations from seeking civil penalties for
vioiations of the Clean Water Act that occurred more
than five years before the filing of this suit. The
statute -on which petitioner relies, 28 U.S.C. 2462,
provides that “an action, suit or proceeding for the
enforcement of any civil fine, penalty, or forfeiture,
pecuniary or otherwise, shall not be entertained un-
less commenced within five years from the date when
the claim first accrued” (ibid.).
The district court denied petitioner’s motion. The
court held that N.P. 26 does not authorize the filling
of “adjacent” wetlands. The court also rejected the
limitations defense under 28 U.S.C. 2462 because (i)
the United States did not seek any civil penalty for
violations that occurred more than five years before
the filing of the suit and (ii) the limitations period for
actions to enforce civil penalties does not apply to
claims by the United States for injunctive relief.
b. The district court then conducted a trial on the
merits of the government’s claims. Four scientific
experts testified that petitioner’s lots constituted
wetlands under the criteria set forth in the Wetlands
Delineation Manual issued by the Corps in 1987 (GX
24). These experts also testified that the lots are part
of a larger wetlands system, a freshwater slough that
spans Big Pine Key from Pine Channel on the west to
Bogie Channel on the east. Petitioner called one
witness, who testified that only small portions of his
lots were wetlands and that none of these areas
should be considered adjacent to Pine or Bogie
Channels (Pet. App. 23-25).
On this evidentiary record, the district court de-
termined that petitioner’s lots constituted wetlands
7
within the regulatory jurisdiction of the Clean Water
Act. The court found that, prior to petitioner’s activi-
ties, the lots had been dominated by hydrophytic vege-
tation (Pet. App. 19-21), had been inundated or satu-
rated “for at least five per cent of the growing sea-
son” (id. at 24) and were covered, over “more than
fifty per cent of [their] surfaces,” by hydric soils (id.
at 23). The court further ruled that a “meandering
wetland slough” spans Big Pine Key between Pine
and Bogie Channels, forming a “band of wetlands
[that] is continuous from [petitioner’s] Lots to the
navigable waters” (id. at 18-19). The court reasoned
that petitioner’s lots, which were a part of this
meandering wetlands slough adjacent to the channels,
were therefore also adjacent freshwater wetlands,
subject to the regulatory jurisdiction of the Clean
Water Act (id. at 25, 33-34). The district court fur-
ther determined that N.P. 26 had not authorized dis-
charges into wetlands—such as the freshwater
slough that encompasses petitioner’s lots—that are
adjacent to tidal, navigable waters (id. at 36).
Because petitioner’s actions violated Section 301(a)
of the Clean Water Act, the court enjoined him from
discharging additional fill into the lots. After a fur-
ther hearing on remedies, the district court ordered
petitioner to restore the wetlands and to pay $10,000
in civil penalties (Pet. App. 40-46).
4. The court of appeals affirmed (Pet. App. 3-15).
On the statute of limitations issue, the court held
that the plain language of 28 U.S.C. 2462 applies only
to actions to enforce “any civil fine, penalty, or for-
feiture” and thus “does not apply to equitable reme-
dies” (Pet. App. 7). The court of appeals rejected peti-
tioner’s reliance upon the “concurrent remedy rule,”
under which an equity court exercising “concurrent
8
jurisdiction” to enforce a legal obligation “will
withhold its relief * * * where the applicable statute
of limitations would bar the concurrent legal remedy”
(id. at 7-8, quoting Cope v. Anderson, 331 U.S. 461,
464 (1947)). The court of appeals stated that applica-
tion of the concurrent remedy rule to the equitable
remedies established under federal law for the United
States would be improper because, in the absence of
“a clear expression of Congress to the contrary[,] a
statute of limitation does not apply to claims brought
by the federal government in its sovereign capacity”
(Pet. App. 8).
The court of appeals upheld the judgment of the
district court on the merits. The court held (i) that
the factual determination that petitioner’s lands
“have the hydrological connection needed to qualify
as adjacent wetlands” was not clearly erroneous (Pet.
App. 13) and (ii) that petitioner had failed to establish
that his activities were permitted by N.P. 26 (id. at
13-15).
DISCUSSION
There is a conflict among the courts of appeals on
the question whether an action by the United States
for equitable relief is governed by the statute of
limitations that applies to actions “for the enforce-
ment of any civil fine, penalty, or forfeiture” (28
U.S.C. 2462). For the reasons explained in the peti-
tion filed by the government in Federal Election
Commission v. Williams, No. 97-601, review by this
Court to resolve that conflict is warranted.”
2 We are providing herewith to petitioner a copy of the
government’s petition in No. 97-601.
9
There is, however, no conflict among the circuits
on any of the remaining questions presented in this
ease. Nor do those questions concern matters of re-
curring importance. Further review of those ques-
tions is thus not warranted.
1. This case presents the same question presented
in Federal Election Commission v. Williams, No. 97-
601. In that case, the United States sought an injunc-
tion barring future violations by an individual of the
substantive prohibitions of the Federal Election Cam-
paign Act of 1971. The Ninth Circuit held in Wil-
liams that 28 U.S.C. 2462 governs claims for equita-
ble relief by the United States for violations of federal
law because, when the “claim for injunctive relief is
connected to the claim for legal relief, the statute of
limitations applies to both.” 104 F.3d 287, 240 (1996).
That holding in Williams conflicts with the conclu-
sion of the court of appeals in this case that “sec-
tion 2462 does not apply to equitable remedies” (Pet.
App. 7).
The petition in the present case should therefore be
held and disposed of as appropriate in light of the
Court’s disposition of the petition in Williams.
2. The petition in the present case raises three
additional questions that do not warrant review by
this Court. Because petitioner concedes that two of
these additional questions lack sufficient importance
to warrant further review (Pet. 18-19), we will
address only the remaining question.’ That question
’ The petition states that the third and fourth questions
presented, whether caprock limestone can be jurisdictional wet-
lands and whether N.P. 26 exempts all activities on land that is
“non-tidal” and “not part of a surface tributary system” from
regulation pursuant to the Clean Water Act (Pet. i), do not
independently warrant review, but are included “in the event
10
is whether the record of this case supports the
conclusion that the lots owned by petitioner consti-
tute wetlands subject to regulation under the Clean
Water Act.
Petitioner errs in contending (Pet. 6-14) that the
determination that the saturated lands at issue in
this case constitute wetlands because they are hydro-
logically connected to neighboring navigable waters
through groundwater conflicts with case authority
interpreting the jurisdictional reach of the Clean
Water Act. Petitioner incorrectly asserts (Pet. 7-10)
that several courts of appeals have held that ground-
water connections with navigable waters are not
sufficient to establish Clean Water Act jurisdiction
over wetlands. The cases cited by petitioner, how-
ever, do not address the delineation of adjacent wet-
lands.* Instead, these cases address the question
whether groundwater is itself subject to regulation
pursuant to the Clean Water Act. That question is
not presented in this case.
The question here is, instead, whether the exis-
tence of a groundwater connection between wetlands
and other waters of the United States is an appropri-
ate basis for a determination whether wetlands are
“adjacent” to other regulated waters (Pet. App. 12-13).
The ruling of the court of appeals in this case that the
this Court considers them important enough to be considered in
the context of the balance of the case” (Pet. 19).
4 Village of Oconomowoc Lake v. Dayton Hudson Corp., 24
F.2d 962 (7th Cir.); cert. denied, 513 U.S. 930 (1994); Town of
Norfolk v. United States Army Corps of Engineers, 968 F.2d
1438 (1st Cir. 1992); Quivira Mining Co. v. United States Envil.
Protection Agency, 765 F.2d 126 (10th Cir. 1985), cert. denied,
474 U.S. 1055 (1986); and Exxon Corp. v. Train, 554 F.2d 1310
(5th Cir. 1977).
11
filled lands are “wetlands” is consistent with the
regulatory definition of wetlands as “those areas that
are inundated or saturated by surface or ground
water at a frequency and duration sufficient to sup-
port * * * vegetation typically adapted for life in
saturated soil conditions.” 33 C.F.R. 328.3(b) (empha-
sis added). As this Court observed in United States
v. Riverside Bayview Homes, Inc., 474 U.S. 121, 129
(1985), this definition “could hardly state more clearly
that saturation by either surface or ground water is
sufficient to bring an area within the category of
wetlands.”
In a holding consistent with United States v.
Tilton, 705 F.2d 429 (11th Cir. 1983), the court of
. appeals further concluded in this case that peti-
tioner’s lands fell within the regulatory definition of
“adjacent wetlands.” That term is defined to include
“wetlands separated from other waters of the United
States by man-made dikes or barriers, natural river
berms, beach dunes and the like.” 33 C.F.R. 328.3(c).
The district court found that petitioner’s lands were
part of a continuous “meandering wetland slough”
that traverses Big Pine Key from Pine Channel to
Bogie Channel (Pet. App. 18-19). Evidence in the rec-
ord supported the finding that this slough, consisting
of lands saturated and connected by groundwater,
falls within the regulatory definition of “adjacent
wetlands” due to its proximity and connection to both
channels (id. at 25, 33-34). The court of appeals
correctly concluded that neither the location of
petitioner’s lands at a point within the slough that is
one-half mile distant from the channels nor the
separation of those lands from the remainder of the
wetlands by Watson Boulevard affects the determina-
tion that the lands are “adjacent wetlands” as defined
12
by 33 C.F.R. 328.3(c)—for all of the lands within the
slough are hydrologically connected with navigable,
tidal waters (Pet. App. 12-13). Further review of the
factual determinations “concurred in by two lower
courts” (Rogers v. Lodge, 458 U.S. 613, 623 (1982)) is
not warranted. Tiffany Fine Arts, Inc. v. United
States, 469 U.S. 310, 317-318 n.5 (1985).
CONCLUSION
With respect to the statute of limitations question,
the petition for a writ of certiorari should be held and
disposed of in light of the disposition of the petition in
Federal Election Commission v. Williams, No. 97-
601. With respect to the remaining questions, the
petition should be denied.
Respectfully submitted.
SETH P. WAXMAN
Solicitor General
LoIs J. SCHIFFER
Assistant Attorney General
ELLEN J. DURKEE
ELIZABETH ANN PETERSON
Attorneys
DECEMBER 1997