Opposition Brief — McClellan Ecological Seepage Situation v. Perry
Supreme Court brief1995
Ask Donna
What actually matters in this document.
Text
FILED
aad JUN 29 1995
“niebordadeeuee se
OCTOBER TERM, 1994
MCCLELLAN ECOLOGICAL SEEPAGE SITUATION,
MARY FISHER, AND CHARLES YARBROUGH,
PETITIONERS
Vv.
WILLIAM J. PERRY, SECRETARY OF DEFENSE
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
BRIEF FOR THE RESPONDENT IN OPPOSITION
Drew S. Days, III
Solicitor General
Lois J. SCHIFFER
Assistant Attorney General
DAVID C, SHILTON
ELLEN J. DURKEE
Attorneys
Department of Justice
Washington, D.C. 20530
(202) 514-2217
Ser atecummas - wo -- -—=- ----
‘BEST AVAILABLE COPY e
PEE OEE OR EOE cae eee: =)
is Asean Cmgahesac ieee iat, Ap Se os oe path oe
Pee 6S So TTR oh Nien cath 8 MRE Peay ame Ani Me ee ee GER’ aad) Sean, pe
Sp asta ee ae oe we Ne Fo Re Baer x
emg oh Gers bas Ya. par gt FRETS Sees ts Pema pins ess en 4,
Fae Tig, Bae TRS pt
hee
aie ay
ahs
ey Ae
Se pee
Gy) A tame
Ake y ee:
Reps on es
edt ak et eae
4 4
Pee a ene a
Te Boe
WEAR oe
BA ag ig
QUESTION PRESENTED
Whether the court of appeals correctly concluded
that Section 113(h) of the Comprehensive Environ-
mental Response, Compensation, and Liability Act
(CERCLA), 42 U.S.C. 9613(h), deprives federal courts
of jurisdiction over an environmental citizen suit that
challenges ongoing government cleanup activities at
a CERCLA site.
TABLE OF CONTENTS
Page
eS iibanbeinennsbbneineseceee 1
a samsiinsevccpeoscocess 1
Nee ice sis cua sciuwanpanancnubnsenoneeneens 2
a ss enaneetnvennececere 7
i, sss aswessounpoecovencs 15
TABLE OF AUTHORITIES
Cases:
Alabama v. EPA, 871 F.2d 1548 (11th Cir.),
cert. denied, 493 U.S. 991 (1989) ...........................000e00. 9
Arkansas Peace Center v. Arkansas Dep’t of Pollution
Control & Ecology, 999 F.2d 1212 (8th Cir. 1993),
cert. denied, 114 S. Ct. 1397 (1994) oes 7, 12, 13
Boarhead Corp. v. Erickson, 923 F.2d 1011
ee os cdanbsusesanetccesvaceses 8, 13
Chateaugay Corp., In re, 944 F.2d 997 (2d Cir. 1991) ..... 12, 13
Goodman v. Lukens Steel Co., 482 U.S. 656 (1987) ....... 14
Metropolitan Stevedore Co. v. Rambo, No. 94-820
nc wubsibedusneceveveccese 12
North Shore Gas Co. v. EPA, 930 F.2d 1239
ia acnnabasebonsenseensessens 7-8, 13
Reardon v. United States, 947 F.2d 1509
aaa cruciccechcddbuceecoocescsee 12
Schalk v. Reilly, 900 F.2d 1091 (7th Cir.), cert. denied,
sub nom. Frey v. Reilly, 498 U.S. 981 (1990) .............. 8, 9, 13
United States v. Akzo Coatings of America, Inc.,
| EE 10
United States v. Colorado, 990 F.2d 1565 (10th Cir.
1993), cert. denied, 114 S. Ct. 922 (1994) .........00.00... 10, 11-12
Statutes and regulations:
Clean Water Act, 33 U.S.C. 1251 et seq. ...............000seeeees 2
(III)
IV
Statutes and regulations—Continued:
Comprehensive Environmental Response, Compensation,
and Liability Act, 42 U.S.C. 9601 et seq. ............:cceceeee
104, 42 U.S.C. 9604 (Supp. V 1993) .............ceeeeeeees
105, 42 U.S.C. 9605 (Supp. V 1993) .................cc000
DEBT, SE UAL. FRR) cescennssarccnsaccresesvessenceees
113(hX4), 42 U.S.C. DEIBLANES) .....00002..00..ccccrcesseees
115, 42 U.S.C. 9615 (Supp. V 1993) ....................0
120, 42 U.S.C. 9620 (Supp. V 1993) ...................008.
§ 120-121, 4B UBC. SURO GERI on... cccescscccccssceceeses
120(e(2), 42 U.S.C. 9620(e)(2Z) ............-rereseseccceoees
121(d), 42 U.S.C. 9621(d) (1988 & Supp. V 1993)...
121(d)-(f), 42 U.S.C. 9621(d)-(f ) (1988 & Supp.
WF... Re: Acciictcnpancenaenninnenibciaciassenssatbinidebciemspestiitebansecs
© EERe), GR WA, BEBO) ow esscnicesrcvestndstrsostcscsceoccsens
Resource Conservation and Recovery Act of 1976,
EU Bahn Meee Oe OU inks es etd ste ener
Superfund Amendments and Reauthorization Act
of 1986, Pub. L. No. 99-499, 100 Stat. 1613 ....... ee.
Exec. Order No. 12,316, 3 C.F.R. 170 (1981 Comp.) ........
Exec. Order No. 12,580, 3 C.F.R. 195 (1987 Comp.) ........
40 C.F.R. (1994):
PR a SG UP csaiecaaintibcccnounreuiandsavascanpenadiantoaannetecaivaeton
IE TIMRID sitcicisncicnvsuncsdpmssisnsipbicintecinsstauinlticenss
Miscellaneous:
132 Cong. Rec. (1986):
Sh: te a RIEU wetrvnncesdnnncnenceachndnnnibhimeenaneranissoniabeliants
Si, SI eicctassitdiiaiéa dv bsssaan bsasiniiemabbeyshshiaahimapinienenaieaaaieias
ST PGI xr uiinisnindennvsavessninicheteuschinvanaphansdansaaisin
52 Fed. Reg. (1987):
Si, TE TEE ccotncdinnadades duniniantanioavnjenssaniepeaiielsmanasinalnbaseuniaias
i, TEP IEE siclsidsiniepid ceeleeadensonsaphacinanhactvontesiebanaanmninaiiis
CPO Or Or OOO oO
ww
9
Jn the Supreme Court of the Anited States
OCTOBER TERM, 1994
No. 94-1807
McCLELLAN ECOLOGICAL SEEPAGE SITUATION,
MARY FISHER, AND CHARLES YARBROUGH,
PETITIONERS
Vv.
WILLIAM J. PERRY, SECRETARY OF DEFENSE
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
BRIEF FOR THE RESPONDENT IN OPPOSITION
OPINIONS BELOW
The opinion of the court of appeals (Pet. App. 1-19)
is reported at 47 F.3d 325. The October 28, 1993, order
of the district court (Pet. App. 169-196) is unreported.
The district court has resolved other matters in this
case through opinions reported at 655 F. Supp. 601
(Pet. App. 20-28), 707 F. Supp. 1182 (Pet. App. 29-82),
and 763 F. Supp. 431 (Pet. App. 83-118), and through
two unreported opinions (Pet. App. 119-155, 156-165).
JURISDICTION
The judgment of the court of appeals was entered on
January 30, 1995. The petition for a writ of certiorari
(1)
was filed on May 1, 1995 (a Monday). The jurisdiction
of this Court is invoked under 28 U.S.C. 1254(1).
STATEMENT
Petitioners seek review of a decision dismissing
their claims that the Department of Defense has
violated the Clean Water Act (CWA), 33 U.S.C. 1251
et seqg., and the Resource Conservation and Recovery
Act of 1976 (RCRA), 42 U.S.C. 6901 et seq., in re-
sponding to hazards at inactive waste sites at the
McClellan Air Force Base in Sacramento, California.
The government is currently conducting a cleanup
of those waste sites under the Comprehensive En-
vironmental Response, Compensation, and Liability
Act (CERCLA), 42 U.S.C. 9601 et seg. The court of
appeals ruled that Section 113(h) of CERCLA,
42 U.S.C. 9613(h), deprived the district court of
jurisdiction to entertain petitioners’ claims chal-
lenging the ongoing CERCLA cleanup.
1. Since its establishment in 1936, McClellan Air
Force Base (McClellan) has primarily served as an
aircraft maintenance and repair depot. McClellan
used toxic and hazardous materials in its operations
and consequently generated toxic and hazardous
waste. McClellan disposed of most of the waste
through burial in earthen pits on the Base, but it
phased out and ceased that practice by the late 1970s.
In 1979, McClellan voluntarily initiated an investi-
gation to study those past disposal practices and
associated groundwater contamination. In 1980,
McClellan began implementing a cleanup program
under Section 104 of CERCLA, 42 U.S.C. 9604 (1988
& Supp. V 1993), and Executive Order No. 12,316, 3
C.F.R. 168 (1981 Comp.). See Pet. App. 7-8.!
Congress amended CERCLA through the Super-
fund Amendments and Reauthorization Act of 1986
(SARA), Pub. L. No. 99-499, 100 Stat. 1613, which
included detailed provisions respecting government
cleanups at federal facilities. See CERCLA § 120, 42
U.S.C. 9620. The Environmental Protection Agency
(EPA) listed McClellan on the National Priority List
(NPL), which identifies the Nation’s most serious
hazardous waste sites. See CERCLA § 105, 42 U.S.C.
9605 (1988 & Supp. V 1993); 40 C.F.R. Pt. 300, App. B;
52 Fed. Reg. 27,620, 27,641 (1987). At the same time,
the cleanup process at McClellan was reshaped to
conform to the requirements of Section 120 of
CERCLA. Pet. App. 8.
EPA, the Air Force, and the State of California
entered into an Interagency Agreement pursuant to
Section 120(e)(2) of CERCLA to accomplish a unified
and complete cleanup of contamination at McClellan.
The parties signed the agreement on July 21, 1989,
' Congress has empowered the President to administer
CERCLA and to delegate his response authority to subordinate
officials. See CERCLA § 115, 42 U.S.C. 9615 (1988 & Supp. V
1993). The President has authorized the Secretary of Defense
to select removal or remedial actions at Department of Defense
facilities. Exec. Order No. 12,316, § 2(c), 3 C.F.R. 170 (1981
Comp.). Until 1986, the Department of Defense satisfied
its CERCLA duties and conducted its Section 104 remedial
activities under a program known as the Installation Re-
storation Program.
2 After Congress amended CERCLA in 1986, the President
directed the Secretary of Defense to exercise response au-
thority consistent with CERCLA’s amended provisions. See
Exec. Order No. 12,580, § 2(d), 3 C.F.R. 195 (1987 Comp.).
and it became effective on May 2, 1990. The Agree-
ment establishes a process for investigation of site
hazards, assessment of remedial alternatives, and
remediation of contamination at the Base. The
Agreement requires McClellan to incorporate all
applicable legislative requirements into its cleanup
through a Management Action Plan. Pet. App. 8.
The Plan divides the site into 11 operable units
(OUs), ranks the OUs in order of cleanup priority,
and sets milestones for accomplishing remedial
investigations, feasibility studies, and cleanup ac-
tivities. Groundwater remediation plays a central
role in the response action. The groundwater beneath
the Base is extracted and cleansed through a
treatment plant that became operational in 1987.
Numerous other response and remedial actions
addressing soil contamination and other hazards have
been implemented or are planned. See Pet. App. 8,
175-179.
The Interagency Agreement specifies that the
activities covered by the Agreement will satisfy
CERCLA, RCRA, CWA, and applicable state laws and
regulations apart from the environmental permitting
regimes that govern non-CERCLA activities. Sec-
tion 17 of the Agreement, entitled “Statutory Com-
pliance/RCRA-CERCLA Integration,” integrates
the Air Force’s CERCLA response obligations and
RCRA requirements. Section 19 of the Agreement
additionally states:
The Parties recognize that under section 121(d)
and 121(e)(1) of CERCLA/SARA, 42 U.S.C.
§ 9621(d) and 9621(e)(1), and the [National Con-
tingency Plan], portions of the response actions
called for by this Agreement and conducted
entirely on-site are exempted from the procedural
requirement to obtain a federal, State, or local
permit but must satisfy all the applicable or
relevant and appropriate federal and State stand-
ards, requirements, criteria, or limitations which
would have been included in any such permit.
The Agreement also specifies a dispute resolution
mechanism to resolve disagreements among the
signatories. Pet. App. 179-181.
2. In 1986, petitioners brought this action against
the Secretary of Defense, alleging violations of the
CWA, RCRA, and related state laws. In relevant
part, petitioners sought to subject the inactive
McClellan waste sites, which are currently being
addressed through Section 120 of CERCLA and the
Interagency Agreement, to RCRA’s reporting and
permitting requirements and to the CWA’s per-
mitting requirements. In a series of opinions, the
district court ruled against petitioners on the merits
of their claims. Pet. App. 20-28; id. at 29-82; id. at 83-
118; id. at 119-155; id. at 156-165.
Petitioners appealed. After hearing oral argument,
the court of appeals remanded the case to the district
court to augment the record with respect to the
progress and scope of the CERCLA cleanup at
McClellan and to decide whether the district court’s
jurisdiction over petitioners’ claims was barred by
Section 113(h) of CERCLA. Pet. App. 166-168. Sec-
tion 113(h) provides in pertinent part as follows:
No Federal court shall have jurisdiction under
Federal law other than under section 1332 of title
28 (relating to diversity of citizenship jurisdic-
tion) * * * to review any challenges to removal
or remedial action selected under section 9604 of
6
this title * * * in any action except [certain
prescribed CERCLA proceedings].
42 U.S.C. 9613(h).
On remand, the district court concluded that
petitioners’ claims directed at sites undergoing
cleanup activities constituted challenges to CERCLA
remedial and removal actions and were therefore
barred by Section 113(h). Pet. App. 169-196. The
court specifically ruled that “a comprehensive
CERCLA cleanup is_ presently underway at
([McClellan],” that petitioners’ “claims for relief
under RCRA and the CWA with respect to con-
tamination sites now undergoing cleanup represent
challenges to such removal-and remedial cleanup
activities,” and that “the court accordingly lacks
jurisdiction over such claims.” Jd. at 195.
The court of appeals agreed with the district
court’s analysis. Pet. App. 1-20. The court rejected
petitioners’ contention that Section 113(h) of
CERCLA is limited to claims alleging violation of
CERCLA, ruling that Section 113(h) withholds
federal jurisdiction to review any claims, including
those under other statutes, that are found to
constitute “challenges” to ongoing CERCLA cleanup
actions. Pet. App. 10-11. The court of appeals con-
cluded that all of petitioners’ claims for relief
connected with McClellan’s inactive sites were
challenges to the CERCLA cleanup because peti-
tioners sought “to improve on the CERCLA cleanup
as embodied in the Interagency Agreement” and
because the injunctive and declaratory relief sought
by petitioners would interfere with that cleanup. /d.
at 14-15.
ARGUMENT
Section 113(h) of CERCLA, 42 U.S.C. 9613(h),
imposes a jurisdictional limit on the manner and
timing of federal district court challenges to
CERCLA response actions. That Section provides
that no federal court shall have jurisdiction to review
“any challenges to removal or remedial action”
selected under CERCLA except through five specific
avenues, none of which is involved in this case. The
court of appeals properly concluded that Section
113(h) bars petitioners’ claims under the CWA and
RCRA, because those claims pose “challenges to
removal or remedial action” selected under CERCLA
for the cleanup of inactive waste sites at McClellan.
That ruling does not warrant further review.
1. CERCLA provides a specific framework for
cleaning up hazardous wastes at federal facilities and
for incorporating existing environmental standards
in the remedy selection process. See CERCLA § 120,
42 U.S.C. 9620 (1988 & Supp. V 1993). It also limits
judicial challenges to ongoing CERCLA cleanups
that would interfere or overlap with the remedial
activities. The CERCLA provision that accomplishes
that result, Section 118(h), generally postpones
judicial involverment until the cleanup has been
completed. See CERCLA § 113(h)(4), 42 U.S.C.
9613(h)(4) (allowing a citizen suit once the response
action has been “taken” or “secured”). It thereby
ensures that an authorized cleanup can be completed
without protracted litigation. See Pet. App. 10-11,
186-189; accord Arkansas Peace Center v. Arkansas
Dep't of Pollution Control & Ecology, 999 F.2d 1212,
1218 (8th Cir. 1993), cert. denied, 114 S. Ct. 1397
(1994); North Shore Gas Co. v. EPA, 930 F.2d 1239,
1244 (7th Cir. 1991); Boarhead Corp. v. Erickson, 923
F.2d 1011, 1018-1023 (8d Cir. 1991); Schalk v. Reilly,
900 F.2d 1091, 1095-1097 (7th Cir.), cert. denied sub
nom. Frey v. Reilly, 498 U.S. 981 (1990).
Petitioners object to the court of appeals’ inter-
pretation of Section 113(h) as a “blunt withdrawal of
federal jurisdiction.” Pet. App. 10. They argue that
the court’s application of that provision would “pre-
empt” or “repeal” other environmental laws. Pet. 16-
17. Petitioners overlook that CERCLA incorporates
existing federal and state environmental standards in
cleanup plans. See, eg., CERCLA §§ 120-121, 42
U.S.C 9620-9621 (1988 & Supp. V 1993). As the court
of appeals explained (Pet. App. 12), the Interagency
Agreement in this case provides the CERCLA
mechanism for enforcing substantive requirements
under the CWA and RCRA. That Agreement
requires McClellan to comply with the substantive
standards and prescribes a process for the governing
regulatory authorities—EPA and the State of
California—to coordinate compliance. Hence, Section
113(h)’s limitation on judicial jurisdiction does not
preempt or repeal the CWA or RCRA standards; it
restricts only judicial involvement at CERCLA
sites.
Petitioners argue (Pet. 19-20) that if Congress had
intended to limit judicial challenges under the CWA
and RCRA pending completion of CERCLA remedial
action, Congress would have said so in the CWA or
RCRA. But Congress intended to insulate ongoing
CERCLA cleanups not only from CWA and RCRA
suits, but from other legal challenges. It therefore
expressed that intent in CERCLA itself. Petitioners
also suggest (Pet. 21-24) that Section 113(h) should
apply only to potentially responsible parties. But
9
Section 113(h) makes no distinction between respon-
sible parties and citizen group plaintiffs. See 42
U.S.C. 9613(h). CERCLA’s legislative history con-
firms that Section 113(h) applies to all persons and all
challenges.’
Petitioners err in contending (Pet. 24-27) that the
court of appeals’ decision is contrary to EPA’s under-
standing of CERCLA. The EPA sources that peti-
tioners cite (Pet. 25-26) do not state that a citizen suit
seeking RCRA compliance may proceed without
regard to Section 113(h) at federal facility sites that
are undergoing a CERCLA cleanup. Those sources
indicate, instead, that potential overlap between
RCRA and CERCLA at a federal facility should be
resolved through the Interagency Agreement for the
facility. See, ¢.g., 55 Fed. Reg. 8698 (1990); Pet. App.
201-202. In this instance, the Interagency Agree-
ment specifically addresses the integration of RCRA
and CERCLA and dispenses with the need for RCR*
permits at inactive CERCLA sites. See pp. 4-5,
supra.
3 See, eg., 132 Cong. Ree. 28,410-28,411 (1986) (Sen.
Thurmond); id. at 29,735-29,736 (Rep. Glickman); id. at
29,735 (Rep. Lent); Schalk, 900 F.2d at 1096; Alabama v. EPA,
871 F.2d 1548, 1557 (11th Cir.), cert. denied, 493 U.S. 991
(1989).
* Petitioners’ reliance (Pet. 26) on an EPA memorandum +o
the Department of Energy (Pet. App. 197-206) is misplaced.
That memorandum addressed the specific situation in which a
federal facility included a number of RCRA-permitted units
that had received hazardous waste after the effective date for
RCRA permit and notice compliance. Id. at 198. The areas in
question in this case were inactive when RCRA became
effective and have been subject to CERCLA removal and
remedial action since 1981. ies
10
2. Petitioners also argue (Pet. 9-14) that the court
of appeals’ decision in this case conflicts with
decisions of other courts of appeals. Petitioners rely
most heavily on United States v. Colorado, 990 F.2d
1565 (10th Cir. 1993), cert. denied, 114 S. Ct. 922 (1994)
(No. 93-786), which held that the State of Colorado
could enforce its hazardous waste disposal laws at the
Rocky Mountain Arsenal while that site was
undergoing a CERCLA cleanup. The United States
unsuccessfully petitioned for a writ of certiorari to
address whether Colorado could dictate hazardous
substance response activities at that site through
state law. Although the Colorado decision conflicts
in principle with the court of appeals’ decision here,
that inconsistency does not warrant this Court’s
review. .
The United States petitioned for certiorari in
Colorado primarily because the Tenth Circuit de-
cided an important issue of federal-state relations in
conflict with the Sixth Circuit’s decision in United
States v. Akzo Coatings of America, Inc., 949 F.2d
1409 (1991). U.S. Pet. at 16-18, No. 93-786. We noted
that the Tenth Circuit’s decision in Colorado was “at
odds” with other appellate decisions, such as
Boarhead and Schalk, supra, which had interpreted
Section 113(h) to preclude judicial involvement while
a CERCLA cleanup was underway. U.S. Pet. at 18,
No. 93-786. But we explained that the clash between
Colorado and Akzo Coatings presented the conflict of
“greatest practical significance.” Ibid.
The Colorado and Akzo Coatings decisions
diverged on the question whether a State could
bypass CERCLA’s so-called “ARARs” process and
apply its environmental standards independently of
ees ere
11
CERCLA. U.S. Pet. at 18-20, No. 93-786.5 That
important question is not presented here. Unlike
Colorado, which refused to join in an Interagency
Agreement at the Rocky Mountain Arsenal, “the
State of California is a full party to the [Interagency
Agreement] and is satisfied that the [Interagency
Agreement] is the appropriate mechanism to accom-
plish the environmental cleanup at [McClellan].” Pet.
App. 191. That distinction renders this case far less
worthy than Colorado of this Court’s review.°
5 The “ARARs” process derives from Section 121(d) of
CERCLA, which requires that a remedy achieve the level of
cleanup specified pursuant to “applicable” or “relevant and
appropriate” requirements under federal or state environ-
mental law. 42 U.S.C 9621(d) (1988 & Supp. V 1993). The
ARARs process gives the States an extensive role in the
development, selection, and enforcement of the CERCLA
remedy. See 42 U.S.C. 9621(d)-(f) (1988 & Supp. V 1993). To
the extent practicable, “[f]und-financed removal actions under
CERCLA section 104 and removal actions pursuant to
CERCLA section 106 shall * * * attain [compliance with
ARARs].” 40 C.F.R. 300.415(i).
® The Colorado decision also differs significantly from this
case in important factual respects. The hazardous waste
impoundment basin at issue in Colorado had received wastes as
late as 1982, and the federal authorities had sought a RCRA
permit for that basin four years before they had addressed the
basin under CERCLA authority. The Tenth Circuit
considered those facts significant. The court acknowledged
that requiring the Army to obtain the state equivalent of a
RCRA permit for the basin would appear to conflict with
Section 121(e) of CERCLA, 42 U.S.C. 9621(e), which provides
that no permits shall be required for on-site removal or
remedial action. 990 F.2d at 1582. The court reasoned,
however, that because the Army had already obtained a RCRA
permit for the basin before CERCLA authority over that area
had attached, Section 121(e) was not violated. See 990 F.2d at
12
Moreover, other courts of appeals have treated the
Colorado decision’s interpretation of Section 113(h)
as an anomaly that is limited by the facts presented in
that case. The Eighth Circuit noted that “(t]he
Tenth Circuit limited its holding to an action brought
by a state, and distinguished Schalk on the ground
that Schalk was a citizen action,” adding that a
citizen plaintiff could not overcome “the plain
wording of section 113(h).” Arkansas Peace Center,
999 F.2d at 1218. In this case, the court of appeals did
not advert to Colorado, but similarly concluded that
Section 113(h)’s language was “clear and unequiv-
ocal.” Pet. App. 10, 11 n.4.’
Petitioners are wrong in contending (Pet. 10-12)
that the court of appeals’ decision conflicts with
Reardon v. United States, 947 F.2d 1509 (1st Cir.
1991), and In re Chateaugay Corp., 944 F.2d 997 (2d
Cir. 1991). The factual situations presented in those
cases differ markedly from that here. In Reardon,
the First Circuit addressed whether a CERCLA lien
provision violated due process, 947 F.2d at 1514-1515,
while in Chateaugay, the Second Circuit addressed
whether certain CERCLA response costs were dis-
1582. Here, the sites in question had ceased receiving waste
before RCRA became effective. See also note 4, supra.
7 Petitioners cite (Pet. 13) language from Colorado, 990
F.2d at 1577, indicating that the Tenth Circuit would not reach
a different outcome in a citizen suit. But that dictum was not
necessary to the court’s holding. Colorado acted pursuant to its
own state statutes, and the Tenth Circuit expressly declined
to decide whether the State could enforce its claims under
the RCRA citizen suit provision. 990 F.2d at 1578. Cf.
Metropolitan Stevedore Co. v. Rambo, No. 94-820 (June 12,
1995), slip op. 9 (“Breath spent repeating dicta does not infuse
it with life.”).
13
chargeable in bankruptcy, 944 F.2d at 1005-1006.
Neither of those legal claims amounted to a challenge
to any particular removal or remedial action at a
CERCLA site. Here, by contrast, petitioners seek
relief that “would clearly interfere with the
[CERCLA] cleanup.” Pet. App. 15, 194.
As petitioners acknowledge (Pet. 9), the court of
appeals’ decision here is consistent with the decisions
of other courts of appeals that have addressed the
issue. In this case, as in those cases, the court of
appeals determined that Section 113(h) barred env-
ironmental challenges that would interfere with an
ongoing CERCLA cleanup. Compare Pet. App. 14-17
with Arkansas Peace Center, 999 F.2d at 1216-1218
(challenge under RCRA barred by Section 113(h));
North Shore Gas, 930 F.2d at 1244 (challenge under
RCRA and the National Environmental Policy Act
(NEPA) barred by Section 113(h)); Boarhead Corp.,
923 F.2d at 1018-1023 (challenge under the National
Historic Preservation Act barred by Section 113(h));
Schalk, 900 F.2d at 1095-1097 (challenge under NEPA
barred by Section 113(h)). The petition in this case,
like similar petitions in prior cases, does not present
a question warranting this Court’s review. See
Arkansas Peace Center v. Arkansas Dep’t of Pollu-
tion Control & Ecology, cert. denied, 114 S. Ct. 1397
(1994); Frey v. Reilly, cert. denied, 498 U.S. 981
(1990).
3. Petitioners also dispute (Pet. 27-30) the court of
appeals’ specific determination that their CWA and
RCRA challenges would interfere with the CERCLA
cleanup. The court of appeals carefully examined the
facts of this particular case and concluded (like the
district court) that petitioners “seek[] to improve on
the CERCLA cleanup as embodied in the Interagency
14
Agreement” and that their claims “would clearly
interfere with” and “slow” the ongoing response
actions at McClellan’s inactive waste sites. Pet. App.
14-18. The court of appeals and the district court
agreed that petitioners’ claims are aimed at altering
the CERCLA cleanup and, therefore, are the precise
type of “challenges” that are deferred by Section
113(h) until the cleanup is completed. Petitioners
disagree with that finding, but there is no reason
for this Court to review petitioners’ case-specific,
factual disagreements with concurrent determina-
tions reached by two lower courts. See Goodman v.
Lukens Steel Co., 482 U.S. 656, 665 (1987).
4. Finally, we note that the substance of peti-
tioners’ CWA and RCRA claims is insubstantial. The
district court correctly found that the permit and
notice requirements of those statutes did not apply to
the hazardous waste sites that were the subject of the
court of appeals’ dismissal order. The district court
concluded that petitioners’ RCRA claims are not
meritorious because that statute does not apply to
McClellan sites that were abandoned before RCRA
permit and notice requirements became effective. See
Pet. App. 86-98. The court concluded that peti-
tioners’ CWA claims are inapposite because the
relevant provisions do not apply to the leaching of
contaminants into groundwater under McClellan in
the circumstances presented here. Jd. at 93-98, 156-
165. Petitioners have provided no reason to doubt
those conclusions.
15
CONCLUSION
The petition for a writ of certiorari should be
denied.
Respectfully submitted.
DREw S. Days, III
Solicitor General
Lois J. SCHIFFER
Assistant Attorney General
DAVID C. SHILTON
ELLEN J. DURKEE
Attorneys
JUNE 1995