Opposition Brief — Kelley v. Selin
Supreme Court brief1995
Ask Donna
What actually matters in this document.
Text
we
No. 94-1702 ie
;
-
In the Supreme Court of the United States
OCTOBER TERM, 1994
FRANK J. KELLEY, ATTORNEY GENERAL
OF MICHIGAN, ET AL., PETITIONERS
Vv.
IVAN SELIN, ET AL.
ON PETITION FOR A WRIT OF CERTIORARI
VO THE UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
BRIEF FOR THE RESPONDENTS IN OPPOSITION
Drew S. Days, IIT
Solicitor General
Lots J. SCHIFFER
Assistant Attorney General
JOHN F. CORDES ALBERT M. FERLO, JR.
Solicitor Attorney
E. LEO SLAGGIE Department of Justice
Deputy Solicitor Washington, D.C. 20530
PETER G. CRANE (202) 514-2217
Attorney
U.S. Nuclear Regulatory Commission
Washington, D.C. 20555
"BEST AVAILABLE COPY
{
,
QUESTIONS PRESENTED
The Nuclear Waste Policy Act of 1982 (NWPA),
42 U.S.C. 10198(a), required the Nuclear Re gulatory
Commission (NRC) to establish procedures for the
generic approval of storage containers for spent
nuclear fuel “without, to the maximum extent
practicable, the need for additional site-specific ap-
provals.” Pursuant to the NWPA, the NRC deter-
mined that it was practicable ge nerically to approve
certain rugged and durable spent fuel storage casks
for use at any plant site alt the need for site-
specific approvals. The NRC thus promulgated a
final rule in 1990 generically approving four cask
designs, issuing a general license for their use at any
licensed power reactor site, and establishing proce-
dures for future generic approval of additional de-
signs. In 1993, the NRC promulgated a rule adding
a new cask design to the list of those it had ven-
erically approved. The questions presented are:
1. Whether, notwithstanding the Hobbs Act’s 60-
day limitation pericd, petitioners’ 1993 challenge to
the 1990 NRC rule was timely because the NRC
relied on that rule to approve a new cask design in
19938
2. Whether site-specific adjudicatory hearings are
required under the Atomic Energy Act of 1954. 42
U.S.C. 2289(a)(1)(A) (Supp. V 1998). and site-
specific environmental impact statements are required
under the National Environmental Policy Act of
1969, 42 U.S.C. 4321 et seq., before a utility may use
casks generically licensed for use at any facility
without site-specific approvals.
(1)
en
SE er
TABLE OF CONTENTS
Page
ESE RR Penne ee nee Oe eo |
ERNE RM re Re On cee a a a iia 1
i ERE ka ee Sa oO ee nee a 1
RESIS RR eaten ne ener aden ii led elite asa alee 9
6 eae PO See oR I OP A LO 17
TABLE OF AUTHORITIES
Cases:
Baltimore Gas & Elec. Co. v. Natural Resources
Defense Council, Inc., 462 U.S. 87 (1983)........ 16, 17
Edison Elec. Inst. v. United States EPA, 996 F.2d
SU ee ss simmgtigbbiiedsimaucnee, 13, 14
Limerick Ecology Action, Inc. v. United States
NRC, 869 F.2d 719 (3d Cir. 1989) _.......0... 16
Lujan V. National Wildlife Fed’n, 497 U.S. 871
(1990) . ands aa 8, 11,12
Nuclear Information Resouree Servi ice V. DM "RC, 969
P.2a 1568 (*.C. Cir. 1992) ................... 15
Public Citizen v. NRC, 901 F.2d 147 (D.C. Cir.),
cert. denied, 498 U.S. 992 (1990)... 13
Reno Vv. Catholic Social Services, Inc., 113 S. Ct.
AE eee aaa a 8, 11,12
State of Ohio Vv. United States EPA, 838 F.2d 1325
I 13
Union of Concerned Scientists v. United States
Regulatory Comm’n, 920 F.2d 50 (D.C. Cir.
UE te | EAA SLOT RTO READ es Soles 6
Statutes and regulations:
Atomic Energy Act, 42 U.S.C. 2239 et seq.:
§ 189(a), 42 U.S.C. 2239(a) . pape ea 10
§ 189(a), 42 U.S.C. 2239 (a) (1) (A) ...5, 6, 9, 14
BS FOO CD), SE UT. SEO) one vccccccccccccceccceess- 10
(IIT)
IV
Statutes and regulations—Continued: Page
National Environmental Policy Act, 42 U.S.C. 4321
| | Se AREA TOL EOS EE Tre ON OEM AOR lS P Pa 1
S 102, 42 U.S.C. 46322) (> ..................-...... 6, 7
Nuclear Waste Policy Act of 1982, 42 U.S.C. 10101
et seq.:
BD Ue mie ROTBETOEAG. .....<.ccccecccnceccacceese--- joo 2
42 US.C. 10189 {c) ................. pian 10
42 U.S.C. 10151-10157 ..... eee hae 2
42 U.S.C. 10153 ote ras eee 2
42 U.S.C. 10198 (a) ... aie a 5 _.2, 6, 14
28 U.S.C. 2342(4) ...... mite ' 9, 10
SAR. Se.” | EME ND TPT RL EE Ta 10
10 C.F.R.:
Section 2.206 NS Roe a MSE REF 13
Re 3
rt. Ta:
SUR noe ; an 3
Section 72.210 3
Section 72.212 oe 3
Section 72.214 EIN PEER 2 3
Subpt. L ......... mes oo 3
55 Fed. Reg. (1990):
t p. 29,181
p. 29,183
p. 29,186
L. 29,187
pp. 29,191-29,193
pp. 29,193-29,194
QF *)
Pp. Ose x4
7 + . 25 eH Fe
en ee ee eee ee
56 Fed. Keg. 41,870 (1991) 4,13
57 Fed. Reg. 28,645-28,647 (1992) 5, 14
58 Fed. Reg. (1993):
p. 17,950 Sars Cae | 5
pp. 17,950-17,951 14
In the Supreme Court of the United States
OCTOBER TERM, 1994
No. 94-1702
FRANK J. KELLEY, ATTORNEY GENERAL
OF MICHIGAN, ET AL., PETITIONERS
v.
IVAN SELIN, ET AL.
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
BRIEF FOR THE RESPONDENTS IN OPPOSITION
OPINIONS BELOW
The opinion of the court of appeals (Pet. App.
la-40a) is reported at 42 F.3d 1501. The opinion of
the district court (Pet. App. 41a-51la) is unreported.
JURISDICTION
The judgment of the court of appeals was entered
on January 11, 1995. The petition for a writ of cer-
tiorari was filed on April 11, 1995. The jurisdiction
of this Court is invoked under 28 U.S.C. 1254(1).
STATEMENT
Congress enacted the Nuclear Waste Policy Act
of 1982 (NWPA), 42 U.S.C. 10101 eft seq., in re-
(1)
te)
— ———
)
sponse to growing concerns that the nation lacked
facilities for the permanent disposal of high-level
nuclear waste, including spent fuel from nuclear
power plants licensed by the Nuclear Regulatory
Commission (NRC). Without a means for perma-
nent disposal of accumulating spent fuel, utilities
stored it at nuclear plant sites in pools designed
only for temporary storage of limited amounts of
spent fuel. Congress recognized that the spent fuel
pools at several nuclear power plants were filling up,
creating a risk of premature shutdown of those
plants. See Pet. App. 39a.
The NWPA set a schedule for the siting, construe-
tion, and operation of permanent federal repositories
for the disposal of high-level nuclear waste. 42
U.S.C. 10131-10145. That Act also addressed the
immediate need for additional spent fuel storage
capacity by speeding the development, approval, and
deployment of interim on-site storage technologies.
See generally 42 U.S.C. 10151-10157. In that regard,
the NWPA directed the Secretary of Energy to es-
tablish a demonstration program for the dry storage
of spent fuel at existing nuclear plants in “‘fuel stor-
age casks, caissons, or silos.” 42 U.S.C. 10198(a).
The objective of the demonstration program was to
establish “fone or more technologies that the [ Nuclear
regulatory} Commission may, by rule, approve for
use at the sites of civilian nuclear power reactors
without, to the maximum extent practicable, the need
for additional site-specific approvals by the Commis-
sion.” Ibid. The NWPA further provided that the
“Commission shall, by rule, establish procedures for
the licensing of any technology approved by the Com-
mission under [42 U.S.C. 10198(a)] for use at the
site of any civilian nuclear power reactor.” 42 U.S.C.
10158.
tod
The NRC found that it is practicable to construct
casks sufficiently durable and resistant to extreme
environmental conditions as to be usable for interim
spent fuel storage at any reactor site. 55 Fed. Reg.
29,185 (1990). Thus, in 1990, the NRC implemented
NWPA’s statutory directive by prom made a rule
referred to as Subpart K. 10 C.F.R. Pt. 72 Subpt.
K. That rule granted generic approval of four spent
fuel storage cask designs, 55 Fed Reg. 29,191-29,193:
10 C.F.R. 72.214 (1991), and generally licenses
utilities to use any approved cask at any licensed
1uclear power plant for a period of up to 20 years,
provided that the utility meets certain detailed condi-
tions, 10 C.F.R. 72.210, 72.212. At the same time
the NRC promalgated Subpart L, which established
regulatory procedures for adding cask designs to
the approval list. 10 C.F.R. Pt. 72 Subpt. L. See
9) Fed. Reg. 29,181, 29,193-29,194 (1990).
The NRC determined that Environmental Impact
Statements (EIS) were not required for storage of
spent fuel in NRC-approved casks at reactor sites.
and that only an overall Environmental Assessment
(EA) was required. 55 Fed. Reg. 29,187 (1990):
see 10 C.F.R. 51.23. The NRC explained that “free-
standing casks, being very strong and massive struc-
tures, are independent of the effects of site-specific
natural phenomena.” 55 Fed. Reg. 29,186 (1990)
(quoted in Pet. App. 23a). The NRC thus published
an EA with the 1990 rule. The EA reviewed more
than 30 years of experience in the United States and
abroad with dry storage of spent fuel, and pound
that on-site use of casks meeting the rule’s rigorou
criteria would have insignificant environmental im-
pacts. C.A. App. 464-482; see Gov’t. C.A. Br. 7-8
a ee
4
When the NRC promulgated its final rule in 1990,
it had under consideration an application by the
Consumers Power Company (Consumers) for a li-
cense amendment to allow Consumers to construct
and use dry casks at the Palisades Nuclear Plant in
Van Buren County, Michigan (Palisades). Pet. App.
4a-5a. The NRC had issued a notice of opportunity
for hearing on the proposed license amendment, and
had received a number of responses. On August 17,
1990, when the new rule became effective, however,
Consumers withdrew its application on the ground
that “the need for a site-specific proceeding is mooted
by adoption of the new rule.” Consumers’ Opp. App.
2-3. Consumers’ withdrawal letter to the NRC ex-
plained that “the Company * * * intends to utilize
the general license granted in new Subpart K when
it is able to satisfy the conditions of the general
license,” and stated that it was sending copies of its
letter to all those who petitioned for a hearing on
its proposed license amendment. Jbid.; see also 55
Fed. Reg. 35,384 (1990) (noting availability of letter
for public inspection). Despite the public notice of
Consumers’ intent to construct storage casks at
-alisades under Subpart K without further site-
specific approval, neither petitioners nor any other
persons then sought review of Subpart K.
In April, 1991, the manufacturer of a cask design
referred to as VSC-24 applied to the NRC to add
that design to the list of cask designs the NRC had
generically approved. The manufacturer also then
requested an exemption from NRC regulations to
permit construction of VSC-24 casks at the Palisades
site before NRC’s generic approval of the cask.
Notice of that exemption request was published in
the Federal Register, 56 Fed. Reg. 41,870 (1991),
5
and the NRC received no objections to the proposed
exemption.
In June, 1992, the NRC issued a notice of proposed
rule, stating its intent to grant generic approval for
the VSC-24 cask. 57 Fed. Reg. 28,645-28,647 (1992).
In December, 1992, petitioner Frank J. Kelley, Attor-
ney General of Michigan, wrote to the NRC Chair-
man, respondent Ivan Selin, to express his concerns
about the proposed use of VSC-24 casks at Palisades.
Corrected Index of Record No. 273 Attach. Kelley
acknowledged that “the NRC is not required to hold
a public hearing,” but asked that the NRC nonethe-
less exercise its discretion to hold an adjudicatory
hearing. Ibid. The NRC declined to do so, but did
conduct an informal public meeting at which peti-
tioner Kelley and others presented their views and
NRC officials responded to questions. See 58 Fed.
Reg. 17,950 (1993). On April 7, 1993, the NRC
published its final rule adding the VSC-24 cask to
the list of approved designs.
2. On May 4, 1993, three days before the effective
date of the rule adding the VSC-24 to the list of
generically approved casks, petitioners filed a com-
plaint in district court seeking an injunction and a
temporary restraining order prohibiting Consumers
from loading fuel into VSC-24 casks. The district
court dismissed the action on May 10, 1993. for lack
of jurisdiction (Pet. App. 41a-52a). and transferred
the case to the court of appeals (id. at 58a-54a).
3. In the court of appeals, petitioners contended
that the NRC’s failure to hold an adjudicatory hear-
ing on Consumers’ proposed use of VSC-24 casks vio-
lated Section 189(a) of the Atomic Energy Act of
1954 (AEA), 42 U.S.C. 2239(a)(1)(A) (Supp. V
1993), and that the Commission’s failure to issue a
site-specific environmental impact statement violated
6
the National Environmental Policy Act of 1969
(NEPA), 42 U.S.C. 4882(2) (C).
The court of appeals denied petitioners’ claims.
The court held that no adjudicatory hearing regard-
ing the proposed use of VSC-24 casks at Palisades
was required. The generic approval of designs for
spent fuel storage casks was, the court held, “exactly
the type of NRC decision which may be the subject
of generic rulemaking” under the NWPA, 42 U.S.C.
10198(a). Pet. App. 22a. In any event, the Atomic
Energy Act, upon which petitioners relied, “nowhere
describes the content of a hearing or prescribes the
manner in which this ‘hearing’ is to be run.” Pet.
App. 17a (quoting Union of Concerned Scientists v.
United States Nuclear Regulatory Comm'n, 920 F.2d
50, 53 (D.C. Cir. 1990) ); see also Pet. App. 21a-22¢
(“nothing in the applicable statutes or the relevant
precedents compels the NRC to hold a formal adjudi-
catory hearing’’).’ The court pointed out that, “[a]!-
though the NRC denied petitioners’ request for an
adjudicatory hearing concerning the use of the VSC-
24 casks at Palisades, the NRC did hold a ‘hearing’
at which Michigan citizens were able to comment.”
‘Section 189(a) of the Atomic Energy Act, 42 U.S.C.
2239(a) (1) (A) (Supp. V 1993), provides:
In any proceeding under this chapter, for the granting,
suspending, revoking, or amending of any license or
construction permit, or application to transfer control,
and in any proceeding for the issuance or modification
of rules and regulations dealing with the activities of
licensees, * * the [Nuclear Regulatory] Commission
shall grant a hearing upon the request of any person
whose interest may be affected by the proceeding, and
shall admit any such person as a_ party to such
proceeding.
7
Pet. App. 2la. The court of appeals also observed
that, even insofar as site-specific issues are con-
cerned, hearing rights under the AEA are limited to
issues “material to [a] licensing decision,” and that
“[t]here [wa]s no licensing decision being made
here,” where no greater operating capacity was
granted, and no safety requirements or other rules
were changed. Jd. at 25a-26a.
The court of appeals also upheld the NRC’s deci-
sion to issue only a generic Envionmental Assessment
on the environmental impact of dry cask storage.
Pet. App. 32a-39a. The court held that the NRC
had sufficient grounds for its conclusion that the
19953 rule approving the VSC-24 cask was not a
“major Federal action significantly affecting the
quality of the human environment” and that an en-
vironmental impact statement was therefore not re-
quired under the National Environmental Policy Act,
12 U.S.C. 4332(2)(C). Pet. App. 32a. The court
concluded that, in its EA, “the NRC did take a ‘hard
look’ at the environmental consequences of its action,
as required by NEPA.” /d. at 39a. The court re-
jected petitioners’ NEPA claim as “essentially an
attack on the policy choice made by Congress, and
embodied in the NWPA,” to empower the NRC to
promulgate rules generically authorizing on-site spent
nuclear fuel storage. bid.
- Section 102 of the National Environmental Policy Act, 42
U.S.C. 4332(2)(C), requires federal agencies to include an
Environmental Impact Statement in every recommendation
or report on “major Federal actions significantly affecting
the quality of the human environment.”
*The court of appeals also observed that petitioners
acknowledged the propriety of a generic environmental as-
To the extent that petitioners’ claims required in-
validation of the procedures for generic approvals
established by the NRC’s 1990 rule, the court of
appeals held that they were barred by the Hobbs
Act’s 60-day period of limitation. Pet. App. 26a-27a
n.d. The court of appeals rejected the argument that,
under Reno v. Catholic Social Services, Ine., 113
S. Ct. 2485 (1993), and Lujan v. National Wildlife
Fed’n, 497 U.S. 871 (1990), petitioners could not
have challenged the 1990 rule until 1993, when the
NRC granted generic approval for the particular
cask design Consumers proposed to use at Palisades.
The court stated:
In this case, the NRC’s 1990 rule had an im-
mediate impact. After promulgation of the rule,
the very procedures about which petitioners now
complain were in place, and any civilian reactor
in the nation, including Palisades, was free to
use the approved storage systems.
Pet. App. 27a n.3. The court also rejected petition-
ers’ contention that the NRC “reopened” the 1990
rule (and thereby again subjected it to review) by
promulgating the 1993 rule. The court held that the
NRC in its 1993 rule merely added a new form of
storage cask to the list of approved systems, and did
not thereby “reconsider[] the propriety of its grant
of a general license” or “restructurf[e] its earlier
rules.” /bid.
(
Pam)
sessment “regarding truly generic issues posed by the VSC-24
sks.” Pet. App. 32a (quoting Pet. C.A. Br. 43). Other
than a “conclusory statement in their brief on appeal,” how-
ever, the court noted that “petitioners have not identified,
much less established, any factor requiring a site-specific
analysis before the VSC-24 cask could be added to the list of
approved casks.” Pet. App. 37a.
9
ARGUMENT
The NRC’s generic rather than site-specific proce-
dures for approving dry storage casks for interim
spent fuel storage properly implemented the mandate
of the Nuclear Waste Policy Act. That procedural
approach is consistent with the NRC’s obligations
under the Atomic Energy Act and National Environ-
mental Policy Act, and no court of appeals has held
to the contrary. To the extent that petitioners sought
in 1993 to challenge the NRC’s 1990 final rule adopt-
ing a generic approach to cask design approvals, the
court of appeals correctly held that their claims are
time-barred. No further review is warranted.
l.a. The court of appeals correctly concluded that
petitioners untimely challenged, and thus are bound
by, the procedural framework the NRC established
in its 1990 rule providing for generic approval of
spent fuel storage casks. It was only when Con-
sumers Power Company in 1993 began to use casks
the NRC had generically approved that petitioners
sought site-specific consideration. To the extent that
petitioners’ asserted harm flows from the 1990 rule,
their challenge comes too late.
Challenges to NRC rules ordinarily must be filed
within 60 days of their issuance. Appellate jurisdic-
tion to review “any proceeding for the issuance or
modification of rules and regulations dealing with
the activities of [NRC] licensees” is governed by the
Hobbs Act. 28 U.S.C. 2342(4); 42 U.S.C. 2239
(a)(1)(A) (Supp. V 1993). The Hobbs Act pro-
‘The Hobbs Act grants the courts of appeals ‘exclusive
jurisdiction to enjoin, set aside, suspend (in whole or in
part), or to determine the validity of” all “final orders of
the [Nuciear Regulatory] Commission made reviewable by
10
vides that ‘“[a]ny party aggrieved by the final order
may, Within 60 days after its entry, file a petition to
review the order.”” 28 U.S.C. 2344."
As petitioners acknowledged, Consumers gave no-
tice, in a letter to the NRC dated August 17, 1990,
of its withdrawal of its site-specific application. See
Pet. C.A. Br. 11-12. That same letter explicitly
stated Consumers’ intent to utilize the general license
granted in new Subpart K. Thus, contrary to peti-
tioners’ claim that Consumers in 1990 “apparently
abandoned” its plan to use dry storage casks at
Palisades (Pet. 5), Consumers in fact then gave
notice that it was withdrawing its site-specific ap-
plication only because the new rule had rendered
that procedure unnecessary. At that time, the Hobbs
Act’s 60-day period had not yet run. Petitioners
could have, but did not, request that the NRC re-
consider the 1990 rule at that time. If such a request
had been denied, petitioners would have had a timely
opportunity to challenge the rule in federal court.
Petitioners assert that the 60-day limitations per-
iod ran not from the promulgation of the 1990 rule,
but from the date in 1998 when the NRC added the
section 2239 of title 42.” 28 U.S.C. 2342(4). The Atomic
Energy Act, 42 U.S.C. 2239(b) (Supp. V 1998), defines such
reviewable orders to include “[a]ny final order entered in
any proceeding of the kind specified in [42 U.S.C. 22359 (a) ],”
which in turn refers to “any proceeding for the issuance or
modification of rules and regulations dealing with the activi-
ties of [NRC] licensees.”
* Even if the 1990 NRC rule were subject not to the Hobbs
Act’s 60-day time limit, but to the 180-day limit established
by the Nuclear Waste Policy Act (NWPA), 42 U.S.C.
10139(c), the time in which to seek review had lone since
expired when petitioners challenged that rule in 1993.
’
1]
VSC-24 cask design to the list of those it had gen-
erically approved. Relying on Reno v. Catholic Social
Services, Inc., 113 S. Ct. 2485 (1993), and Lujan vy.
National Wildlife Fed’n, 497 U.S. 871 (1990), peti-
tioners reason that before 1993, they had no ripe
claim against the 1990 rule because it had not yet
had a concrete effect on them. They thus contend
that their opportunity to challenge the 1990 rule
should be deemed to have first arisen in 1993. The
court of appeals correctly rejected that contention.
This Court in Catholic Social Services considered
claims raised by a class of aliens challenging Immi-
gration and Naturalization Service (INS) regula-
tions that potentially deprived them of the ability to
obtain temporary residence status. The Court held
the aliens’ claims unripe because temporary residence
Status is not “automatically bestowed on eligible
aliens”; rather, each alien desiring temporary resi-
dence is required to “take further affirmative steps,
and to satisfy criteria beyond those addressed by the
disputed regulations.” 113 S. Ct. at 2496. Here, in
contrast, “the NRC’s 1990 rule had an immediate
impact.” Pet. App. 26a n.3. The 1990 rule granted
a general license for use of approved casks without
regard to site-specific considerations, and established
the generic procedures by which the NRC added the
VSC-24 cask to the list of approved casks without a
site-specific hearing or environmental review. Peti-
tioners’ situation is thus precisely the converse of
that of the aliens in Catholic Social Services. Peti-
tioners’ claims were not unripe due to an unmet re-
quirement of “further affirmative steps”; rather,
their claims address the agency’s failure to require
any further steps before Consumers availed itself of
12
the benefits of the 1990 rule.” When no further
steps are required to trigger a regulation’s challenged
effect, the regulation is subject to immediate review.
This Court’s decision in Lujan is also not to the
contrary. The Court there rejected an amorphous
challenge to the Bureau of Land Management’s
(BLM) land withdrawal review program because, in
seeking to challenge that “program,” petitioners did
not “refer to a single BLM order or regulation, or
even to a completed universe of particular BLM
orders and regulations.” 497 U.S. at 890. The time-
barred claims in this case, in contrast, addressed the
clearly identifiable 1990 NRC rule.‘ Moreover, the
Court in Lujan observed that, unlike the Administra-
tive Procedure Act that governed there, “[s]ome
statutes permit broad regulations to serve as the
‘agency action,’ and thus to be the object of judicial
review directly, even before the concrete effects nor-
mally required for APA review are felt.” 497 U.S.
at 891. As the court of appeals here recognized, the
Hobbs Act amounts to just such specific statutory
authorization of challenges to NRC regulations. Pet.
* Petitioners’ challenges to such categorical approval are
thus more closely analogous to claims that this Court in
Catholic Social Services recognized might well have been ripe
—those of aliens subject to a categorical ‘“front-desking”’
policy of prefiling rejection of applications of aliens whom
INS personnel forecast would be ineligible under the chal-
lenged regulations. 113 S. Ct. at 2497-2499.
‘The Lujan Court acknowledged that the claim of a mem-
ber of one of the petitioner organizations would “no doubt”
be ripe for review once a mining permit application she iden-
tified as pending was granted. 497 U.S. at 892 n.3. Under
that logic, petitioners’ claims in this case were ripe as of
1990, because no site-specific application was required.
13
App. 26a n.3. Lujan is therefore inapplicable by its
own. terms.
Even if petitioners were correct that some action
in addition to the 1990 rule’s generic approval and
general licensing was required before their claims
would be wipe, such action took place in 1991. The
manufacturer of the VSC-24 casks then sought gen-
eric approval of the cask design and, in an action
announced by the NRC in a Federal Register notice,
asked the NRC for an exemption allowing immediate
construction of VSC-24 casks at the Palisades site
pending final approval by NRC of the cask design.
56 Fed. Reg. 41,870 (1991). Under their own timeli-
ness theory, petitioners could at that juncture have
objected to an exemption, requested reconsideration
of the 1990 rule, and/or filed a petition under 10
C.F.R. 2.206 protesting application of the generic
approach of the 1990 rule to the Palisades site. They
took no such steps.
b. The court of appeals correctly held that the
NRC’s 1993 rule did not restart the period for seek-
ing judicial review of the 1990 rule under the “re-
opener doctrine” set forth in Edison Elec. Inst. v.
United States EPA, 996 F.2d 326, 331-332 (D.C.
Cir. 1993); see also Public Citizen v. NRC, 901 F.2d
147, 150-153 (D.C. Cir.), cert. denied, 498 U.S. 992
(1990) ; State of Ohio v. United States EPA, 838 F.2d
1325, 1328-1329 (D.C. Cir. 1988). In its 1993 rule,
the NRC did not reconsider the propriety of the 1990
rule, but “merely add[ed] a new form of storage
cask to its list of approved systems.” Pet. App. 26¢
n.d. In proposing the 1993 rule, the NRC referred
to the 1990 rule as setting the established procedural
framework for generic approval of new casks; the
NRC did not indicate any intent to reconsider the
14
yeneric-approval approach as such. 57 Fed. Reg.
28,645-28,647 (1992). In responding to public com-
ments, the NRC expressly noted that commenters
“discussed topics that were not the subject of this
rulemaking,” including whether “[a] formal hearing
should be required at each site using dry casks.”’ 58
Fed. Reg. 17,950-17,951 (1993). In Edison, by con-
trast, the D.C. Circuit found that the agency reopened
consideration of an existing rule by soliciting addi-
tional comments on it and by advancing a possible
“alternative approach” to that rule. 996 F.2d at 329-
330, 332. Each of the other cases upon which peti-
tioners rely (Pet. 18-20) similarly besed its timeli-
ness decision on findings that the agency had indi-
cated its intent to reconsider an existing rule. Given
the absence of any such indication here, the reopener
doctrine does not apply.
2.a. The court of appeals correctly held that peti-
tioners were not entitled to a site-specific licensing
hearing under the Atomic Energy Act, 42 U.S.C.
2239(a)(1)(A) (Supp. V 1993). The Nuclear
Waste Policy Act directed the NRC to determine
whether it was technologically feasible to construct
dry storage containers for spent nuclear fuel that
would be sufficiently strong and durable to withstand
any environmental conditions at existing commercial
nuclear plants, thereby obviating the need for site-
specific evaluations before the containers could be
used for interim storage. The NWPA thus called
upon the NRC to establish procedures for the generic
approval of standardized spent fuel storage technolo-
gies ‘without, to the maximum extent practicable,
the need for additional site-specific approvals.” 42
U.S.C. 10198(a). The NRC determined that devel-
15
opment of such containers was indeed feasible, and
implemented the NWPA by issuing a general license
for four cask designs specifying the detailed condi-
tions under which the casks can appropriately be
used at any commercial nuclear plant site. To the
extent that such generic approval overrides site-
specific hearings otherwise available under the
Atomic Energy Act, Congress clearly intended that
result. Pet. App. 22a.
The court of appeals correctly held that the AEA
did not, in any event, require an adjudicatory hear-
ing under these circumstances, and no court of ap-
peals has held to the contrary. There was no site-
specific licensing decision at issue. Pet. App. 25a-
26a. Moreover, the NRC provided an opportunity
for petitioners to be heard in the rulemaking regard-
ing the proposed use of VSC-24 casks at Palisades.
Id. at 21a. Nothing in the AEA specifies that an
informal hearing is inadequate in such circumstances,
or that the kind of formal adjudicatory hearing peti-
tioners seek is required.*
* Petitioners’ reliance on Nuclear Information Resource
Service v. NRC, 969 F.2d 1169, 1173 (D.C. Cir. 1992) (en
banc), depends on their untenable assertion that the installa-
tion of spent fuel storage casks is “just like the issuance of a
construction permit, expansion of a wet pool, or licensing of
a new reactor.” Pet. 25. In the NWPA, however, Congress
treated deployment of dry storage technology quite differ-
ently from the construction or expansion of nuclear reactors,
and did so for good reason. The premise of Congress’s au-
thorization of generic, non-site-specific licensing of dry
storage casks was that such casks might be manufactured so
as to be secure at any existing reactor site. Construction and
licensing of nuclear reactors themselves, and expansion of
wet pools for storage of spent fuel, in contrast, generally
present site-specific issues not amenable to fully generic reg-
ulatory treatment.
16
b. The court of appeals also correctly decided that
the National Environmental Policy Act does not re-
quire an Environmental Impact Statement here.
There is no basis for petitioners’ contention (Pet.
26-29) that the decision below conflicts with Kalti-
more Gas & Elec. Co. vy. Natural Resources Defense
Council, Inc., 462 U.S. 87 (1983), and Limerick
Ecology Action, Inc. v. United States NRC, 869 F.2d
719 (3d Cir. 1989). This Court in Baltimore Gas
upheld a generic NRC rule directing licensing boards
to assume, for purposes of the consideration and
disclosure of environmental impacts under NEPA,
that permanent storage of certain nuclear wastes
would have no significant environmental impact.
The Court’s deference to NRC expertise in that case,
and its recognition of the appropriateness in certain
circumstances of a generic approach to disclosure of
environmental impacts under NEPA, support the
result here.
Relying on Limerick, petitioners assert that the
salttmore Gas approach is appropriate only where
the issues are indeed generic, and that “where there
is a legitimate question of site-specific linkage, the
generic approach will not suffice.” Pet. 28. In peti-
tioners’ view, “‘the placement of the VSC-24 casks at
Palisades has serious site-specific implications.” Jbid.
The generic approach embodied in the NRC’s 1990
rule, however, represents the Commission’s consid-
ered view to the contrary. The premise of that rule
is the NRC’s finding that casks for dry storage of
nuclear waste can be deployed under a general license
without significant site-specific environmental impli-
cations. As the court of appeals noted, “this type of
technical decision by the NRC, operating at the
frontiers of science, is entitled to great deference by
,
the courts.” Pet. App. 38a (citing Baltimore Gas
462 U.S. at 103).
,
CONCLUSION
The petition for a writ of certiorari should be
denied.
Respectfully submitted.
DREW S. Days, III
Solicitor Ge ne ral
Lois J. SCHIFFER
. issistant A ttorne y ts He ral
ALBERT M. FERLO, JR.
A ttorne y
JOHN F. CORDES
Solicitor
E. LEO SLAGGIE
Deputy Solicitor
PETER G. CRANE
Attorney
U.S. Nuclear Regulatory Commission
JUNE 1995
' Petitioners seek to bolster their NEPA claim by reference
to extra-record documents, including a December 1993 let-
ter from an official of the Environmental] Protection Agency
and a February 1994 memorandum from an NRC staff mem-
ber. Pet. 29. The court of appeals denied petitioners’ motion
to supplement the record with those documents. however, and
petitioners do not challenge that ruling here.
GOVERNMENT PRINTING OFFICE. 199° 387147
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.