IN THE
Siywene Court of the United States
OCTOBER TERM, 1992
ARCADIA, OHIO, et al.,
Petitioners,
Vv.
OHIO POWER COMPANY, et al.,
Respondents.
On Petition for a Writ of Certiorari to the
United States Court of Appeals
for the District of Columbia Circuit
PETITION FOR A WRIT OF CERTIORARI
C. EMERSON DUNCAN, II Rex E,. LEE
GREGG D. OTTINGER * CARTER G. PHILLIPS
JOHN P. WILLIAMS JOSEPH R. GUERRA
DUNCAN & ALLEN SIDLEY & AUSTIN
1575 Eye Street, N.W. 1722 Eye Street, N.W.
Suite 300 Washington, D.C. 20006
Washington, D.C. 20005 (202) 736-8000
(202) 289-8400
* Counsel of Record
August 10, 1992
WILSON - EPes PRINTING Co., INC. - 789-0096 - WASHINGTON, D.C. 20001
=e
ad
QUESTIONS PRESENTED
1, Whether §13(b) of the Public Utility Holding
Company Act, 15 U.S.C. § 79m(b), which authorizes the
Securities and Exchange Commission (SEC) to authorize
certain contracts among associate companies of registered
public utility holding companies, ousts the Federal Energy
Regulatory Commission (FERC) of its core authority to
determine the justness and reasonableness of fuel charges
an electric utility can include in wholesale rates solely
because the utility purchases its fuel through affiliate con-
tracts subject to SEC jurisdiction.
2. Whether the court of appeals erred by failing to
defer to FERC’s reasonable and consistently applied in-
terpretation of its own regulation and by instead con-
struing the regulation in a manner that divests the FERC
of any discretion to examine the justness or reasonable-
ness of fuel costs that are “subject to the jurisdiction of
[another] regulatory body.”
(i)
TABLE OF CONTENTS
QUESTIONS PRESENTED
TABLE OF AUTHORITIES
OPINIONS BELOW
JURISDICTION
PAGE eee I BES UES Y GOOD oo. cc ceccsciccicassnceccneseegsiecnsees
tele dicuedsydecmentuinicnbocedans chcajuaccuunncceas
REASONS FOR GRANTING THE PETITION
CONCLUSION
(iii)
iv
TABLE OF AUTHORITIES
CASES Page
Arcadia Vv. Ohio Power Co., 111 S. Ct. 415 (1990) ..passim
Arkansas Vv. Oklahoma, 112 S. Ct. 1046 (1992) _.. 23
Brimm Vv. Cacke Valley Banking Co., 269 P.2d 859
CRPOM ROD gies is cicccicisccickssonsetas vocdanseemecenstueatiaeatacs 21
D&B Coal Co. v. Farmer, 618 S.W.2d 853 (Ky.
| ASEAN elettan seems Rey rc Ree SPP NONE Many Neale ee 21
Dameron V. Brodnead, 345 U.S. 322 (1953) ........... 21
Gulf States Utiis. Co. v. FPC, 411 U.S. 747
fh . : Rae REE Re NEM re Ay CR Re RIE eT OOO 12,18
Hardy v. Lomenzo, 349 F. Supp. 617 (S.D.N.Y.
IE ic ss :ciccin cinta teidtedeecniaanaionaiaideliaalcgaines es 21
Lavine Vv. Milne, 424 U.S. 577 (1976) ........000.0000.2.. 21
Miller v. Commonwealth, 2 S.E.2d 343 (Va.
RRA i EMEP IT Ree aS R ON OTE ete OEM 21
Mississippi Power & Light Co. Vv. Mississippi ex
rel. Moore, 487 U.S. 354 (1988) ..........00020.. 19
Nantahala Power & Light Co. v. FERC, 727 F.2d
REE I ING TRIED Scviccvsessavccsutsicdnagizaccsmmniedeneonties 23
Nantahala Power & Light Co. v. Thornburg, 476
Sc ME MR ieee cnseithdcecciep acide iinabeschadethenkstsCanpiiioe 19
Ohio Power Co. Vv. FERC, 880 F.2d 1400 (D.C.
Cir. 1989), rev’d and remanded sub nom.
Arcadia Vv. Ohio Power Co., 111 S. Ct. 415
§) . » SREARAPEIERDerate teeeee RR ASL eR RO eT a Re LT passim
ADMINISTRATIVE OPINIONS
American Elec. Power Co., 46 S.E.C. 1299 (1978)... 13
Arkansas Power & Light Co., 45 S.E.C. 567
tI ROATTE RA er Pinion eRe Wertay Be 13
Carolina Power & Light Co., 17 F.E.R.C. 7 61,118
| SPREE Eaten BORE Se PPR ats ed Dr 22
Delmarva Power & Light Co., 24 F.E.R.C. J 61,199
REE Sa oa SER Stn Ree oe) SRE Oa 22
Electric Coops. of Kansas, 14 F.E.R.C. 61,176
(2) RES RRC or SBE a FEI ee Soe 22
Illinois Power Co., 52 FERC § 61,162 (1990)_.......... 22
In re Louisiana Power & Light Co., 26 S.E.C.
Docket 1257 (1982) .......... aaa cata aegis eA Ate 13
Vv
TABLE OF AUTHORITIES—Continued
Page
McDowell County Consumers Council, Ine. V.
American Elec. Power Co., 54 F.P.C. 361
2. | PENT ee ORE SORA TC TEM Lea 22
In re New England Elec. Sys., 24 8.E.C. Docket
SE ID hiss siicnag.scawstitae taeeanicsdaanmnad coiled ciabatta 13
In re Ohio Power Co., 14 S.E.C. Docket 928
E , | SERS CME ARM Loe Ie ney ts FERRERS. mT 3
Portland Gen. Exch., ‘Inc., 51 F.E.R.C. § 61,108
t__, HE ie eee roe heen AC Se PPI OT 23
Public Serv. Co. of New Hampshire, 6 F.E.R.C.
Ne PUD icecnietsnccaicccciccsssauamaiidinenencinamieens 22
Public Serv. Co. of New Mexico, 17. F.E.R.C.
7 61,123 (1981), aff'd sub nom. Public Serv.
Co. Vv. FERC, 832 F.2d 1201 (10th Cir. 1987) .... 4
Sea Robin Pipeline Co., 49 F.E.R.C. § 61,351
CP ena at ee eee 23
In re Southern Ohio Coal Co., 17 S.E.C. Docket
+. GE S| SERRSRR Se rareitary nits BF Me RACIMN Ween ctae ee arts 3
In re Southern Ohio Coal Co., 19 S.E.C. Docket
A) SRE tre) aa eatorner acne Benen REPS 3
STATUTES AND REGULATIONS
Federal Power Act, ch. 285, 41 Stat. 1063 (1935)
(codified as amended at 16 U.S.C. § 79la et
OS oi alec ateten tet eae ins OREO SITE passim
Section 205, 16 U.S.C. § 824d. ...:-...00002 si. 4,14
Section 201 (f), 16 U.S.C. § 824d (f) —...........-..... 22
Section 206,.16:U.S.C. § 8266 _....-...200...-2.-..cc.00c8. 4,13
Section 318, 16 U.S.C. § 8251 (b) -.....:-.-0..20 4.2.22... 12, 25
Section 318, 16 U.S.C. § 825q ............ eta es) 2,5
Public Utility Holding Company Act, ch. 687, 49
Stat. 803 (1935) (codified as amended at 15
TS Te We Oe ID aise cess patent passim
Section 1(c), 15 U.S.C. § 79a (c) .00002 eee 13
Section 18(b), 15 U.S.C. § 79m (b) .............---.-..- 2
has fot EF ” 1 5) TRAE eee Seen Kaen nenr mena: 2,17
18 C.F.R. § 85.14(a) (7) (1992) ......2.....2 oe. 2, 8, 20, 22
vi
TABLE OF AUTHORITIES—Continued
OTHER AUTHORITIES Page
Electrical World, Directory of Electric Utilities
I I 13
Federal Energy Regulatory Commission, FERC
Form 1, Annual Reports of Major Electric Utili-
ties, Licensees and Others (1990) ...........0....00000-... 13
IN THE
Supreme Cot of the United States
OCTOBER TERM, 1992
No. ——
ARCADIA, OHIO, et al.,
. Petitioners,
OHIO POWER COMPANY, ¢ di.,
Respondents.
On Petition for a Writ of Certiorari to the
United States Court of Appeals
for the District ef Columbia Circuit
PETITION FOR A WRIT OF CERTIORARI
Petitioners hereby petition for a writ of certiorari to
review the judgment of the United States Court of Ap-
peals for the District of Columbia Circuit in this case.
OPINIONS BELOW
The opinion of the court of appeals (App., infra, la-
15a) is reported at 954 F.2d 779 (D.C. Cir. 1992). The
court of appeals denied rehearing on April 14, 1992
(App., infra, 16a-17a). The decision of the Federal
Energy Regulatory Commission (FERC) (App., infra,
18a-54a) is reported at 39 F.E.R.C. 761,098 (1987).
The decision of the FERC denying rehearing (App.,
infra, 55a-60a) is reported at 43 F.E.R.C. {| 61,046
(1988).
2
JURISDICTION
The court of appeals rendered its judgment on Febru-
ary 4, 1992. Rehearing was denied on April 14, 1992.
By order dated July 6, 1992, the Chief Justice extended
the time for filing a petition for a writ of certiorari to
and including August 12, 1992. This Court has jurisdic-
tion under 28 U.S.C. § 1254(1).
AUTHORITIES INVOLVED
The relevant statutory and regulatory authorities are
Section 13(b) of the Public Utility Holding Company Act,
15 U.S.C. § 79m(b) (App., infra, 61a), Section 318 of
the Federal Power Act, 16 U.S.C. § 825q (App., infra,
6la), and Section 35.14(a) (7) of FERC’s regulations,
18 C.F.R. § 35.14(a) (7) (1992) (App., infra, 62a).
STATEMENT -
1. Petitioners are fifteen small Ohio villages and cities
that purchase wholesale electric power from respondent
Ohio Power Company for resale to their residents.! Ohio
Power is an operating public utility subsidiary of the
American Electric Power Company (AEP), which also
owns seven other electric utilities operating as an inter-
connected system in a seven-state area. Because AEP is
a registered public utility holding company, Ohio Power
is subject to Titles I and II of the Public Utility Act of
1935, ch. 687, 49 Stat. 803.
Title I of that‘ Act created the Public Utility Holding
Company Act of 1935 (PUHCA), 15 U.S.C. § 79 et seq.,
which subjects public utility holding companies and their
affiliates to regulation by the Securities and Exchange
1 Petitioners include the Villages of Arcadia, Bloomdale, Carey,
Cygnet, Deshler, Greenwich, Ohio City, Plymouth, Republic, Shiloh,
Sycamore and Wharton, and the Cities of Bryan, St. Clairsville and
Wapakoneta. Petitioners have populations ranging from. approxi-
mately 300 to 8500.
3
Commission (SEC). Title II of the Act enacted Part 2
of the Federal Power Act (FPA), 16 U.S.C. § 824 et
seq., which authorized the Federal Power Commission,
now FERC, to regulate the transmission and sale of elec-
tric energy by public utilities.
Ohio Power purchases coal for generating electricity
from the Southern Ohio Coal Company (SOCCO), a
wholly owned subsidiary it capitalized in 1971. Under
PUHCA, Ohio Power was required to obtain the SEC’s
approval to finance some of SOCCO’s operations. As the
court of appeals observed in its initial decision in this
case, the SEC conducted no hearings and made no specific
findings prior to approving Ohio Power’s investment in
SOCCO. Ohio Power Co. v. FERC, 880 F.2d 1400, 1404
(D.C. Cir. 1989), rev’d and remanded sub nom. Arcadia
v. Ohio Power Co., 111 S. Ct. 415 (1990). In the course
of its brief order approving the capitalization, the SEC
staff simply “noted that, under the proposal before it,
SOCCO’s charges to [Ohio Power] would be ‘based on’
its actual costs plus a rate of return.” Jd.
Between 1978 and 1980, the SEC staff approved three
additional transactions between SOCCO and Ohio Power
authorizing further financing for SOCCO’s mining opera- °
tions.* In each of these orders, the SEC staff “adverted
briefly to the contractual relation between the associates,”
id., noting in each that the price at which SOCCO’s coal
would be sold to Ohio Power “will not exceed the cost”
to SOCCO. Id. (quotation omittéd). Consistent with its
cursory examination of Ohio Power’s relationship with
SOCCO, “[n]one of the [Commission staff’s four orders
cites section 13 [of PUHCA], nor mentions expressly
whatever purchase agreement exists between SOCCO and
{Ohio Power], nor describes any element of costs other
2See In re Ohio Power Co., 14 S.E.C. Docket 928 (1978);
In re Southern Ohio Coal Co., 17 S.E.C. Docket 310 (1979); Ju re
Southern Ohio Coal Co., 19 S.E.C. Docket 1309 (1980).
is |
1
than the cost of capital.” Jd. at 1408.° None, moreover,
specifically approved the contract by which Ohio Power
purchases coal from SOCCO and none required Ohio
Power to purchase any SOCCO coal.
2. In 1982, FERC responded to Ohio Power’s filing of
a wholesale rate increase by initiating proceedings under
Sections 205 and 206 of the FPA, 16 U.S.C. § 824d & 824e,
to determine whether the proposed rates were just and
reasonable. Acting under its mandate to protect rate-
payers from excessive charges, FERC disallowed that por-
tion of Ohio Power’s SOCCO coal costs‘ that did not
satisfy the agency’s “comparable market test.”
Under the comparable market test, first announced in
Public Serv. Co. of New Mexico, 17 F.E.R.C. { 61,123
(1981), aff'd in relevant part sub nom. Public Serv.
Co. v. FERC, 832 F.2d 1201 (10th Cir. 1987), utilities
purchasing coal from affiliates may “recover no more
from their ratepayers than the price that would have
been incurred if a comparable coal supply contract had
been made with a non-affiliated supplier.” Jd. at 61,246.
As FERC explained in disallowing Ohio Power’s ex-
cessive coal costs, the comparable market test serves two
important purposes: First, it “provides the best incen-
tive for utilities to develop the least costly sources of
fuel.” App., infra, 29a-30a. Second, it protects consumers
from the risks of “self-dealing’” and “rate manipula-
tion” that “arise[] in transactions between affiliates.”
Id. at 30a. In this case, FERC found that Ohio Power
had paid approximately 50 percent more than the market
price for coal in 1980, approximately 94 percent more
8 Section 18(b) of PUHCA is set forth, in relevant part, infra
p. 17.
4 Coal costs are the dominant component in the total cost of the
power petitioners purchase from Ohio Power, accounting for nearly
half of Ohio Power’s revenues from its sales to petitioners. See
Ohio Power Co., Revised Compliance Filing, Docket No. ER82-553-
004 (FERC Apr. 24, 1989).
5
than the market price in 1981, and, following FERC’s
commencement of rate proceedings, approximately 24 to
33 percent more than market price from 1983 to 1986.
App., infra, 45a & n.87.
Ohio Power contended that Section 318 of the FPA
placed the coal charges it passes on to its consumers en-
tirely beyond FERC’s jurisdiction. Entitled “Conflicts of
Jurisdiction,” Section 318 provides that
li]f, with respect to the issue, sale, or guaranty of a
security, . . . or the acquisition or disposition of any
security, capital assets, facilities, or any other subject
matter, any person is subject both to a requirement of
[the FPA] .. . and to a requirement of [the
PUHCA], the requirement of [the PUHCA] shall
apply to such person, and such person shall not be
subject to the requirement of [the FPA] .. . with
respect to the same subject matter.
16 U.S.C. § 825g. According to Ohio Power, Section 13 (b)
of PUHCA and relevant SEC regulations required it to
pay SOCCO the “costs” of producing coal, including
salaries and a return on investment, even if those costs
were considerably higher than comparable market prices.
Thus, Ohio Power argued, notwithstanding FERC’s statu-
tory mandate to ensure that wholesale rates are just
and reasonable, SEC regulation of Ohio Power’s coal
contracts precluded FERC from regulating the coal costs
the utility includes in its wholesale rates.
FERC rejected this construction of Section 318. It
observed that the SEC’s jurisdiction under PUHCA does
not extend to setting rates, as the SEC itself has repeat-
edly acknowledged. App., infra, 25a-27a. For purposes
of Section 318, FERC ruled, the relevant “subject mat-
ter” of SEC regulation under PUHCA is the transfer
price of coal between SOCCO and Ohio Power, not the
“fuel costs Ohio Power may collect from its wholesale
customers.” App., infra, 24a-25a. FERC concluded that,
because “setting the intra-corporate price and setting rates
are not the same subject matter” for purposes of Section
6 “
318, there was no conflict between its regulatory efforts
and those of the SEC and, hence, Section 318 did not oust
it of jurisdiction. /d. FERC therefore ordered Ohio
Power to establish rates that recover from its customers
no more than the comparable market price of coal, and
to refund prior overcharges that ultimately totaled ap-
proximately $10 million (App., infra, 58a), which Ohio
Power subsequently did.
3. A divided court of appeals reversed. The court did
not question the propriety of FERC’s comparable market
test or dispute the Commission’s finding that, between
1980 and 1986, Ohio Power had passed on to its cus-
tomers the excessive coal prices paid to its subsidiary.
Nor did the court dispute that the SEC lacks ratemaking
authority, does not regulate the fuel charges that utilities
subject to PUHCA may pass on to their consumers, and
did not specifically approve the contract by which Ohio
Power purchased its coal from SOCCO. Rather, the panel
majority concluded that Section 318 completely ousts
FERC of jurisdiction to regulate the fuel charges a
utility may include in its wholesale rates whenever the
SEC has any jurisdiction over the contracts under which
the utility purchases such fuel.
In so ruling, the panel majority employed a broad
“field preemption” analysis with respect to the jurisdic-
tional overlaps arising under PUHCA and the FPA. The
majority presumed that Congress “had conferred on the
SEC jurisdiction over some non-enumerated matters that -
otherwise would fall within the jurisdiction of FERC,
and . . . therefore included the residuary phrase [i.e.,
“any other subject matter”] to govern those conflicts.”
Ohio Power Co. v. FERC, 880 F.2d at 1406. “The price
term of sales contracts between associated companies. . .
subject to SEC jurisdiction under PUHCA,” the majority
held, is such a non-enumerated “subject matter” under
Section 318. Jd. Because, in the majority’s view, “FERC
has in effect set by order a different price term for such a
contract by determining that it will not allow the contract
7
price as a cost in [Ohio Power’s| rate[s,] ... [t]he con-
clusion that the same subject matter is implicated is
inescapable.” Jd. The majority ruled, moreover, that Sec-
tion 318 divests FERC of its otherwise exclusive juris-
diction over wholesale rates even if the FERC order and
the SEC regulation pose no actual conflict. Jd. at 1408.°
4. This Court granted a petition for certiorari filed by
the Ohio municipalities and reversed. In a unanimous
opinion, the Court rejected the court of appeals’ determina-
ton that Section 318 serves as a “general conflicts provi-
sion, policing the entire regulatory border between the
[SEC and FERC].” Aracadia v. Ohio Power Co., 111 S.
Ct. 415, 421 (1990). Rather, the Court read Section 318
to oust FERC of its jurisdiction only where “the ‘same
subject matter’ as to which the duplicative [FERC and
SEC] requirements exist [is] one of those specifically
enumerated” in Section 318. Jd.
So interpreted, the Court concluded, Section 318 does
not divest FERC of its jurisdiction. “The combination of
SEC requirements with respect to the acquisition of
SOCCO [or its coal] and FERC requirements with re-
spect to the disposition of electric power,” the Court
explained, “would not bring § 318 into play.” Jd. at 422.
Even assuming FERC’s rate order is a requirement fall-
ing within one of the four enumerated areas specified by
Section 318, “it is still a requirement with respect to a
different subject matter from (and not, as § 318 requires,
‘with respect to the same subject matter’ as)” the SEC
orders concerning the acquisition of SOCCO or its coal.
Id. The Court remanded the case for a determination
5 Judge Mikva dissented from this part of the majority’s opinion.
He argued that Section 318 does not grant the SEC exclusive juris-
diction over all costs arising from a contract subject to PUHCA.
He concurred in the decision to set aside FERC’s order on the
ground that, notwithstanding FERC’s contrary interpretation, Rule
35.14(a)(7) of FERC’s own rules precludes FERC from disallowing
any costs approved by the SEC.
ee
8
whether, as Judge Mikva had concluded, FERC had
violated its own regulation, or whether the FERC-pre-
scribed rate is not just and reasonable within the mean-
ing of the FPA because it might “trap” costs. Id.
Concurring in the Court’s interpretation, Justice Ste-
vens, joined by Justice Marshall, wrote separately to
explain that there was no actual conflict between the two
agencies’ orders. Moreover, Justice Stevens noted, “the
Court of Appeals’ reading of § 318 would create a gap in
the regulatory scheme that Congress could not have in-
tended.” Jd. at 423. In this case “Ohio Power would be
allowed to buy coal at prices that would be higher than
those paid by any utility not owned by a holding company,
and then pass those higher costs along to its customers”
without any scrutiny by the agency whose “principal
goalf{] is to ensure that the rates customers pay for their
electricity are ‘just and reasonable.’” Jd. This arrange-
ment is completely inconsistent with Congress’ intent that
PUHCA “supplement not supplant the FPA” (id.) and
that utilities owned by holding companies “be subject to
the regulation of both the SEC and FERC as much as
practical.” Id. at 424.
5. On remand, the court of appeals once again invali-
dated FERC’s order. The Court concluded that FERC’s
own regulation, § 35.14(a) (7), precludes the Commission
from examining the propriety of costs included in whole-
sale rates where those costs are subject to SEC approval.
Section 35.14(a) (7) provides that fuel costs “which [are]
subject to the jurisdiction of a regulatory body .. . shall
be deemed to be reasonable and includable in the [fuel]
adjustment clause” without prior FERC review or ap-
proval. 18 C.F.R. § 35.14(a) (7) (1992). The FERC had
ruled that this language merely “creates a presumption
of reasonableness, not a conclusive finding of reasonable-
ness.” App., infra, 28a (emphasis added). Relying on
interpretations of unrelated statutes, the court of appeals
9
concluded that the term “deemed” must be read to create
a conclusive presumption and that FERC’s contrary in-
terpretation was therefore entitled to no deference. App.,
infra, 8a-9a. Brushing aside FERC’s prior interpreta-
tions, the court found that the plain language of the regu-
lation “requires FERC to include in Ohio Power’s whole-
sale rate the SEC-approved cost-based price for SOCCO
coal.” App., infra, 9a.
Although its interpretation of Section 35.14(a) (7) pro-
vided Ohio Power “with some succor from the overlapping
regulatory jurisdiction of both the SEC and of FERC,”
App., infra, 10a, the court recognized that FERC could
readily revise its regulation. App., infra, 9a. It there-
fore decided whether the regulatory efforts of the SEC and
FERC created an irreconcilable conflict and, if so, which
agency’s authority is paramount. The lower court an-
swered the first of these questions affirmatively, reason-
ing that, by disallowing a portion of Ohio Power’s coal
price from. its wholesale rate, FERC was “undeniably
affecting the economic relationship between Ohio Power
and SOCCO” that the SEC had approved. App., infra,
lla. The resolution of this “conflict,” the court ruled,
depends upon the plain language of Section 13(b) of
PUHCA, which empowers the SEC “to approve the price
of inter-associate sales of goods, such as coal, and directs
the SEC. to price these goods ‘at cost, fairly and equita-
bly allocated among [associated] companies.’” Jd. In-
voking the canon of construction that specific statutory
provisions take precedence over more general provisions,
the court concluded that “the SEC’s specific statutory
mandate to establish a cost-based price” necessarily trumps
FERC’s “general charge to establish ‘just and reasonable’
wholesale electric rates.” Jd. The court thus held that
Section 13(b) of PUHCA affirmatively ‘“constrain[s]
FERC from altering [an SEC-approved] price under its
‘just and reasonable’ rate-setting authority.” App., infra,
12a.
10
The court rejected FERC’s contention that, as Justice
Stevens had concluded, the two agency orders could co-
exist because the SEC order simply set at most a ceiling
on the amount Ohio Power could pay for SOCCO coal.
The court also ignored its earlier recognition that the SEC
had not been “particularly mindful of its statutory
powers and obligations under section 13(b)” when issu-
ing its orders and had not “describe[d] any element of
[SOCCO’s] costs other than the cost of capital.” Ohio
Power Co. V. FERC, 880 F.2d at 1408. Accordingly, the
court concluded that, because “Congress’s use of the term
‘at cost’ indicates that cost serves as a ceiling and a floor,”
App., infra, 13a, the SEC staff orders “are better read”
as requiring Ohio Power to pay no more or less than
cost to SOCCO for its coal. App., infra, 14a. Thus, the
fact that FERC’s market-based price may not have ex-
ceeded SOCCO’s cost was, in the court’s view, irrelevant:
“To the extent there is downward flexibility in a cost-
based price, . . . Congress did not make room for anyone
other than the SEC to exercise this flexibility.” App.,
infra, 18a-14a.
Finally, the court suggested that its holding was not
inconsistent with Congress’ intent in passing PUHCA
and the FPA. FERC was not powerless to affect SEC-
approved prices; the Commission, like any private citizen,
could “comment” on any proposed inter-affiliate transac-
tion published in the Federal Register. App., infra, 14a.
Moreover, the court observed, FERC could “conceivably
ask the SEC to investigate whether the cost-based price
for SOCCO coal violated” any PUHCA regulations. /d.
11
REASONS FOR GRANTING THE PETITION
The decision of the court of appeals recreates the “regu-
latory gap” that this Court intended to and did close in
Arcadia. Like its interpretation of Section 318 of the
FPA, the lower court’s decision to clothe Section 13(b)
of PUHCA with preemptive force will permit—indeed
encourage—electric utilities to gouge their customers by
manipulating the prices utilities pay for goods and services
provided by their affiliates. What is worse, while the
earlier decision disarmed the FERC from protecting con-
sumers, the new ruling creates an even larger gap by
precluding both federal and state regulators from disallow-
ing costs in either wholesale or retail rates, no matter how
much those costs exceed the market prices charged in com-
parable transactions by unaffiliated companies. As a re-
sult, the decision below will not only have a dramatic and
immediate impact on the electric rates paid by petitioners’
customers, but will affect nearly 50 million industrial,
commercial and residential consumers across the country.
These untoward consequences, which justified certiorari
to review the previous decision, are in no way compelled
by Section 13(b) of PUHCA. Indeed, the lower court’s
interpretation of that provision is fundamentally incon-
sistent with, and in fact renders nugatory, this Court’s
interpretation of Section 318 of the FPA. Properly con-
strued, Section 13(b) of PUHCA provides that SEC ap-
proval simply saves an affiliate transaction from con-
demnation as per se illegal; it does not immunize such
transactions from all other regulatory scrutiny. The deci-
sion below adds an unenumerated area of SEC preeminence
to those specifically identified in Section 318 of the FPA.
Nor does the alternative basis for the decision below—
that FERC violated its own regulation—in any way de-
tract from the need for this Court to review the court of
appeals’ interpretation of Section 13(b). By virtue of the
court’s interpretation of Section 18(b), FERC cannot
12
amend its regulation and thereby re-assert its authority to
regulate SEC-approved fuel costs. Moreover, the lower
court’s unjustified refusal to defer to FERC’s reasonable
and consistent interpretation of its own regulation is itself
an independent reason to review the decision below.
1. a. The Public Utility Act of 1935 had “two primary
and related purposes: to curb abusive practices of public
utility companies by bringing them under effective control,
and to provide effective federal regulation of the expand-
ing business of transmitting and selling electric power in
interstate comerce.” Gulf States Utils. Co. v. FPC, 411
U.S. 747, 758 (1973). As Justice Stevens explained, Title
I of the Act, PUHCA, entrusted the first of these goals
to the SEC, “the agency with the expertise in financial
transactions and corporate finance. ... The SEC carries
out its duties essentially by monitoring inter-affiliate finan-
cial transactions and eliminating potential conflicts of in-
terest.” Arcadia, 111 S. Ct. at 423 (Stevens, J., concur-
ring). Title II of the Act, the FPA, placed responsibility
for the second of these broad statutory objectives on the
FPC, now FERC. Unlike the SEC, FERC has the author-
ity and possesses the technical expertise to regulate the
transmission and sale of electric energy.
The decision below held that, under Section 13(b) of
PUHCA, SEC jurisdiction over any inter-affiliate trans-
action involving the sale of goods or services completely
insulates all aspects of that transaction from future
ratemaking review by FERC, no matter what effect the
transaction has on wholesale electric rates. Because any
challenge to a FERC rate order can be brought in the
D.C. Circuit see 16 U.S.C. § 8251 (b), the court of appeals’
decision will effectively eliminate FERC jurisdiction over
the rate consequences of all such transactions. As a result,
the decision below strips FERC of its ability to protect
the nearly 50 million ratepayers across the country that
receive electricity directly or indirectly from PUHCA-
13
regulated utilities * from potential self-dealing, unneces-
sary “gold plating” of plant and equipment, and rate
manipulation arising from transactions between electric
utilities and their affiliates.7 The decision, moreover,
creates a strong incentive for electric utilities to adopt the
holding company form, and for new and existing holding
companies te create new subsidiaries to provide every
conceivable good and service needed for the generation,
transmission and distribution of electricity—incentives
that contravene PUHCA’s explicitly stated goals of sim-
plifying and, as soon as practicable, eliminating public
utility holding companies. 15 U.S.C. § 79a(c).
The SEC lacks the expertise, authority and adminis-
trative apparatus to protect ratepayers against these
harmful consequences. As the SEC itself has repeatedly
acknowledged, it has “no power over the[] dealings lof
electric utilities regulated under PUHCA] with their
customers, retail or wholesale.” American Elec. Power
Co., 46 S.E.C. 1299, 1823 (1978). Nor, as a conse-
quence, does it have any expertise in setting or assessing
wholesale electric rates. Unlike FERC, moreover, the
SEC has no statutory or administrative procedures by
which a customer can initiate a complaint, cf. FPA § 206
16 U.S.C. § 824e; and it has no clear authority to order
®See Federal Energy Regulatory Commission, FERC Form 1,
Annual Reports of Major Electric Utilities, Licensees and Others
(1990) ; Electrical World, Directory of Electric Utilities (100th ed.
1992).
7 The potential for rate manipulation is readily demonstrated by
the suspiciously malleable “cost” of SOCCO’s coal. The cost of that
coal was nearly twice the market price before FERC initiated rate
review proceedings, yet shortly thereafter fell to just 24 percent
above market price. See supra pp. 4-5.
8 Accord In re Louisiana Power & Light Co., 26 S.E.C. Docket
1257. 1263 (1982); In re New England Elec. Sys., 24 S.E.C. Docket
229, 235 (1981); Arkansas Power & Light Co., 45 S.E.C. 567, 574
(1974).
14
refunds for overcharges if a utility is found to have
violated the SEC’s regulatory requirements. Cf. FPA
§ 205(e), 16 U.S.C. § 824d. The decision below, therefore,
creates a serious gap in the regulation of electric utilities
subject to PUHCA, one that Congress, in seeking to curb
holding company abuses, could not have intended to create,
and one that the SEC is wholly unprepared to fill.
The magnitude of this gap, and its impact on rate-
payers, is illustrated by this very case. In the initial order
approving the capitalization of SOCCO, the SEC staff
conducted no hearings whatever and made no specific find-
ings with respect to any aspect of the prices SOCCO might
charge for coal it might sell to Ohio Power. Ohio Power
Co. v. FERC, 880 F.2d .at 1404. In its three subsequent
orders, the staff simply ‘“adverted briefly to the con-
tractual relation between the associates.” Jd. In none
of the four orders did the SEC staff cite Section 13(b)
of PUHCA or describe any element of SOCCO’s proposed
costs other than the cost of capital, nor did it specifically
approve any contract by which Ohio Power purchases coal
from SOCCO. Certainly, no order of the SEC required
Ohio Power to purchase its coal from a high-cost affiliate.
Indeed, so cursory are these orders that the court below
could only speculate, primarily on the basis of Congress’
use of the phrase “at cost,” as to whether the SEC staff
had established cost as both a ceiling and a floor for
SOCCO’s coal prices. Yet, these orders, are now construed
to strip the FERC of its authority to discharge one of its
central statutory duties—determining the justness and
reasonableness of wholesale electric rates.°
The effect this regulatory gap has on ratepayers is
apparent. The prices Ohio Power paid its subsidiary- for
®* Contrary to the lower court’s suggestion, FERC plainly cannot
protect ratepayers by commenting on proposed inter-affiliate trans-
actions published in the Federal Register. In this very case, for
instance, FERC could not have anticipated in 1971 the extent to
which Ohio Power would continue to purchase coal from SOCCO
when its costs greatly exceeded the market price.
15
coal exceeded market prices by 24 percent to 94 percent
from 1981 to 1986. App., infra, 45a & n.87. Because coal
costs represent approximately half the costs of generating
electricity from Ohio Power’s coal-fired generators (supra
n.4), the rates paid by petitioners (and, therefore, their
residents) between 1981 and 1986 were 12 to 47 percent
higher than they would have been if the coal cost com-
ponent of those rates had been constrained by the market.
Thus, the decision below will not only require petitioners
(and their residents) to repay to Ohio Power the approx-
imately $5 million in overcharges that FERC ordered
refunded to petitioners, but also is likely to lead to sub-
stantial increases in the future as well. Indeed, a great
many of the nearly 50 million households and businesses
that receive electricity directly or indirectly from utilities
subject to PUHCA can reasonably expect similar increases
as a result of the decision below, increases in both whole-
sale and retail rates that they would not face if their
electric utilities were not subject to PUHCA.
b. The decision below has spawned at least as wide
a regulatory gap as the one this Court closed in Arcadia
and has rendered the Court’s prior ruling essentially a
nullity. In Arcadia, this Court held that SEC approval
of Ohio Power’s dealings with SOCCO did not preempt
FERC’s ratemaking authority because the two agencies
1 Although the holding of the court of appeals applies directly
to the ratemaking function of the FERC, its logic clearly preempts
all state regulation as well. Thus, even though Ohio Power’s coal
costs may significantly increase the retail price of electricity in
ways the state commissions would find impermissible, the state
public utility commissions will be required to pass through those
costs. The “regulatory gap” created by the court of appeals on
remand, therefore, is in fact wider than the one it created with its
first opinion. Moreover, the inability of the states to regulate these
rates under the court’s interpretation of Section 13(b) further
undermines any argument that the lower court’s alternative holding
on the regulation minimizes the need for this Court to resolve the
statutory issue. See infra pp. 24-25.
16
were regulating “different subject matter[s].” 111 S. Ct.
at 422 (emphasis in original). The SEC, the Court con-
cluded, was regulating “Ohio Power’s acquisition of coal,”
while FERC regulated Ohio Power’s “disposition of elec-
tric power.” Jd. at 422 n.3 (first emphasis added).
The court of appeals, however, determined that FERC
was effectively regulating “the economic relationship be-
tween Ohio Power and SOCCO” by refusing to allow Ohio
Power to pass through the full price it paid SOCCO for
coal. App., mfra, lla. In that court’s view, Section
13(b) of PUHCA, without even mentioning FERC, com-
mits that subject to the SEC’s exclusive jurisdiction. The
lower court’s interpretation of Section 13(b), therefore,
has given preemptive force to the very SEC orders that
this Court concluded did not oust FERC of its ratemak-
ing authority. Its interpretation, moreover, gives rise
to the very dangers of regulatory disjunction that this
Court’s earlier decision should have eliminated.
Not only is the ruling below inconsistent in result with
this Court’s previous holding, it is fundamentally at odds
with the reasoning underlying this Court’s decision. In
Arcadia, the Court rejected the notion that the phrase
“or any other subject matter” in Section 318 ousted FERC
of jurisdiction with respect to any matter over which the
SEC possessed authority. Rather, the Court held, Section
318 preempts FERC’s authority only where the two agen-
cies both attempt to regulate a subject matter falling
within one of four specifically enumerated “areas of plainly
parallel authority granted both to the SEC, under PUHCA,
and to the FPC (FERC), under the FPA.” 111 S. Ct.
at 419.
It necessarily follows from this holding that the SEC’s
authority is paramount only with respect to those con-
flicts expressly identified by Section 318, ed that, to the
extent other unidentified conflicts arise, FERC is not
divested of its authority. The court below, however, held
that a conflict that this Court concluded was outside the
17
scope of Section 318 nevertheless results in preemption
of FERC authority. By giving such preemptive force to
Section 13(b) of PUHCA—which is not among the
PUHCA provisions this Court identified as the sources
of the SEC’s four areas of paramount authority, see id.
at 419-20-—the lower court has reinstated its interpreta-
tion of Section 318 in another guise. Its earlier ruling ren-
dered Section 318’s list of covered conflicts non-exclusive
by adding a “catch all” phrase “or anything else”; its
latest ruling effects the same result by finding preemp-
tion outside the conflicts of jurisdiction provision. The
inconsistency with this Court’s interpretation of Section
318 is the same in both cases and warrants review by
this Court.
ec. The inconsistency with this Court’s prior holding
is in no way compelled by the language of Section 13(b).
In concluding that Section 18(b) preempted FERC of its
authority to judge the propriety of costs included in
wholesale rates, the court below relied on the fact that
Section 13(b) directs the SEC to insure that inter-
affiliate contracts are performed “economically and effi-
ciently for the benefit of such associate companies at cost,
fairly and equitably allocated among such companies.”
15 U.S.C. § 79m(b) (emphasis added). The lower court,
however, completely ignored the context in which the
bby
phrase “at cost” appears.
Section 13(b) begins by providing that
it shall be welawful for any subsidiary company of
any registered holding company .. . to enter into .
any service for] sales . . . contract by which such
company undertakes to perform services [for] .. . or
sell goods to, any associate company thereof except in
accordance with such terms and conditions . . . as the
Commission by rules and regulations or order shall
prescribe.
Id. (emphasis added). This introductory language makes
clear that any SEC prescription that inter-affiliate sales
18
be made “at cost’? simply saves such sales from automatic
condemnation under Section 13(b) itself. The lower
court, however, converted the statute’s savings clause into
a grant of statutory immunity. Under the lower court’s
interpretation, contracts that would be per se unlawful
but for their compliance with an SEC-prescribed cost
standard are shielded from ali regulatory review, and
presumably all other legal challenge as well.'' The lan-
guage of the statute not only fails to support, but posi-
tively militates against, such a result.
The lower court’s myopic focus on the phrase “at cost”
led it astray in yet another critical respect. The court
concluded, based solely on the phrase “at cost,” that Sec-
tion 13(b) is more “specific” than Sections 205 and 206
of the I‘PA, and that this greater specificity gives the
former preeminence over the latter. This Court, how-
ever, did not remand this case for the court of appeals to
fashion a new conflicts rule; it remanded the case for a
determination whether “the FERC-prescribed rate is not
‘just and reasonable’ because it ‘traps’ costs which the
government itself has approved.” Arcadia, 111 S. Ct. at
422 (emphasis added).
With respect to any inquiry into the equitable nature
—i.e., the “justness and reasonableness’—of FERC-
prescribed rates, Sections 205 and 206 of the FPA are
plainly more specific provisions than Section 13(b) of
PUHCA. Section 18(b) does not even mention “rates”
let alone a utility’s electric wholesale rates; Sections 205
and 206, by contrast, speak directly to the “equities” of
11 Jt follows from the lower court’s holding that, if SEC-approved
costs cannot even be adjudged “unreasonable,” they certainly cannot
be found illegal. Thus, the reasoning of the decision below compels
the conclusion, for example, that inter-affiliate prices are immune
from scrutiny under the antitrust laws. Such a result simply under-
scores the error in the lower court’s interpretation of Section 13(b),
which is part of a statute designed, in part, to prevent anticompeti-
tive practices. Gulf States Utila. Co. v. FPC, 411 U.S. 747, 758
(1973).
Ser ERTS
19
a utility’s wholesale rates by directing FERC to approve
only those rates that are “just and reasonable.” * Thus,
even assuming, as the lower court did, that the SEC and
FERC requirements are irreconcilable, and that one must
therefore take precedence over the other, the statutory
provisions that most specifically address the question pre-
sented by this case are Sections 205 and 206 of the FPA.
In fact, however, because the agencies regulate dif-
ferent subjects—the SEC regulates the SOCCO-Ohio
Power relationship (i.e., “costs’) and FERC regulates
the Ohio Power-customer relationship (i.e., “rates” )—
and because the requirements of each do not conflict (7.e.,
there is no.“trapping” of costs), the lower court’s deter-
mination concerning which statutory provision is more
“specific” was not only mistaken but unnecessary. This
Court’s decisions in Nantahala Power & Light Co. V.
Thornburg, 476 U.S. 953 (1986) and Mississippi Power
& Light Co. v. Mississippi ex rel. Moore, 487 U.S. 354
(1988), make clear that cost “trapping” arises where one
agency requires a utility to incur specific costs and a
second agency sets a price that ignores the utility’s obli-
gations. See Mississippi Power, 487 U.S. at 374 (“it ob-
viously cannot be unreasonable for [a utility] to procure
the particular quantity of high-priced . . . power that
FERC has ordered it to pay for’) (emphasis added).
Here, by contrast, nothing in the SEC’s orders requires
Ohio Power to purchase any SOCCO coal at all. Because
12 In fact, FERC considered Ohio Power’s equitable claims in its
order and disallowed refunds petitioners sought for 1980, 1981 and
virtually all of 1982. The refunds FERC ordered applied only to
rates Ohio Power collected after it was on notice that its rates were
subject to review and potential refund under the comparable market
test. App., infra, 52a. Moreover, FERC did not limit Ohio Power
to collecting the lesser of SOCCO’s “at cost” price or market price.
Rather, FERC allowed the utility to recover the market price even
if the actual cost of SOCCO’s coal was lower. Thus, FERC simply
provided Ohio Power’s affiliate with an incentive to produce coal
efficiently. Indeed, Ohio Power has claimed to have purchased
SOCCO coal at below-market prices, a fact that demonstrates that
the FERC-prescribed incentive is realistic and fair.
20
Ohio Power’s coal costs were incurred voluntarily, there
can be no “trapping” of those costs. See id. at 373-74
(“it might well be unreasonable for a utility to purchase
unnecessary quantities of high-cost power, even at FERC-
approved rates, if it had the legal right to refuse to buy
that power’). In any event, the court of appeals refused
teo-undertake any such inquiry and instead rendered a
decision entirely unresponsive to the specific remand or-
der. This departure from the Court’s mandate provides
an additional reason to review the decision below.
2. The lower court also ruled that, by promulgating Sec-
tion 35.14(a) (7), FERC unilaterally disabled itself from
exercising jurisdiction over all fuel costs subject to the SEC’s
approval. The court’s refusal te defer to FERC’s entirely
reasonable and in fact absolutely correct reading of its
own regulation, and the court’s substitution of its own
crabbed interpretation, provide independent issues for re-
view by this Court. Moreover, this “alternative” ground
for the decision below in no way minimizes the economic
or legal significance of the lower court’s statutory ruling
and plainly should not insulate that ruling from review.
a. Section 35.14(a)(7) of FERC’s regulations pro-
vides, in part, that “{wlhere [a] utility purchases fuel
from a company-owned or controlled source, the price of
which is subject to the jurisdiction of a regulatory body,
such cost shall be deemed to be reasonable and includable
in the |utility’s fuel] adjustment clause.” 18 C.F.R.
§ 35.14(a) (7) (1992). The court of appeals’ determina-
tion that this sentence has but one meaning, and can only
be understood as giving rise to a conclusive presumption
of justness and reasonableness, is demonstrably incorrect.
Even when read in isolation, the sentence upon’ which
the court of appeals chose to focus is ambiguous at best.
Had the agency wished to create a conclusive presump-
tion, it could have done so expressly, simply by using the
phrase “shall be presumed conclusively” instead of the
vague phrase “shall be deemed.” Moreover, had FERC
intended to abandon all review of fuel costs subject to the
jurisdiction of another agency, it should have provided
21
that such costs shall be presumed conclusively to be “just
and reasonable’—the terms Sections 205 and 206 of the
FPA.use to describe legal rates—and not merely “deemed
to be reasonable and includable” in ‘adjustment
clause[s].”
In holding that the regulation was unambiguous, the
court below relied on a handful of decisions involving en-
tirely different statutes in which “courts construing the
word ‘deemed’ have generally found that it establishes a
conclusive presumption.” App., infra, 8a (emphasis
added). But as the court’s own qualifying language im-
plicitly acknowledges, courts have also construed “deem”
to create only a rebuttable presumption “—a fact that
simply underscores the ambiguous nature of the word
itself and the importance of the context in which it is
used."
Here, the context makes abundantly clear that the
regulation does not give rise to a conclusive presumption.
First, such a presumption is entirely inconsistent with
the full text of the regulation, which demonstrates that
Section 35.14(a) (7)’s purpose is simply to establish which
costs a public utility may automatically include in the
fuel adjustment clause without obtaining prior FERC
approval. Thus, the final sentence of the regulation,
which the court of appeals ignored, provides that “|f]uel
charges by affiliated companies which do not appear to
be reasonable may result in the suspension of the fuel
adjustment clause or cause an investigation thereof to
13 See, e.g., Lavine Vv. Milne, 424 U.S. 577, 583 (1976) ; Brimm v.
Cache Valley Banking Co., 269 P.2d 859, 863-64 (Utah 1985) (citing
examples); Hardy v. Lomenzo, 349 F. Supp. 617, 621 (S.D.N.Y.
1972) : D&B Coal Co. v. Farmer, 613 S.W.2d 853, 854 (Ky. 1981);
Miller v. Commonwealth, 2 S.E.2d 348, 348-49 (Va. 1939).
14 In Dameron v. Brodhead, 345 U.S. 322, 326-27 (1953), a case
Judge Mikva cited in his earlier concurrence but the panel below
did not, this Court declined to interpret the word “deemed” as
creating a rebuttable presumption not because the word had a
single, unambiguous meaning, but because such an interpretation
would nullify the statute at issue.
22
be made by the Commission on its own motion under
section 206 of the Federal Power Act.” 18 C.F.R.
§$ 35.14(a) (7) (1992). Consistent with this sentence, just
eight months after the regulation was promulgated the
Commission authorized an investigation into fuel costs paid
by another AEP-held utility to an affiliate despite the
utility’s contention that SEC approval of its costs ren-
dered such an investigation improper. McDowell County
Consumers Council, Inc. Vv. American Elec. Power Co.,
54 F.P.C. 361 (1975).
Second, a conclusive presumption is squarely at odds
with FERC’s mandate, under Section 205(f) of the FPA,
to order a public utility to “cease any practice in connec-
tion with the [fuel adjustment] clause, if [such] clause
... does not result in the economical purchase and use of
fuel, electric energy, or other items, the cost of which is
included in any rate schedule under an automatic ad-
justment clause.” 16 U.S.C. § 824d(f). Plainly, FERC
cannot maintain a regulation that disavows its statutory
obligation to conduct periodic reviews of automatic fuel
adjustment clauses. That it did not do so in Section
35.14(a) (7) is apparent when the regulation, particularly
its last sentence, is read in its entirety.
Third, the conclusive presumption adopted by the court
of appeals cannot be reconciled with two regulatory prin-
ciples to which FERC has consistently adhered: 1)
expenses passed through fuel adjustment clauses are
reviewable, both retroactively and prospectively, in rate
proceedings under Sections 205 and 206 of the FPA";
© See Illinois Power Co., 52 FERC { 613162 (1990) (FERC has
authority to require refunds of costs previously collected under
a fuel cost adjustment clause); Delmarva Power & Light Co., 24
F.E.R.C. {| 61,199 (1983) (same); Carolina Power & Light Co., 17
F.E.R.C. | 61,118 (198T) (same); Electric Coops. of Kansas, 14
F.E.R.C. { 61,176 (1981) (same); Public Serv. Co. of New Hamp-
shire, 6 F.E.R.C. § 61,299 (1979) (same).
eae
ee — ee ee
23
and 2) a utility’s costs are not presumed to be prudently
incurred when they are paid to an affiliate.”
Under these circumstances, the lower court’s failure to
grant “substantial deference” to FERC’s “reasonable,
consistently held interpretation” of its own regulation
was plainly erroneous. See Arkansas v. Oklahoma, 112
S. Ct. 1046, 1059 (1992). The error in this case is par-
ticularly egregious, however, and particularly deserving
of review. In holding that “section 35.14(a) (7) estab-
lishes, as a policy matter, that if another regulatory body
has already passed on the fuel price, then FERC will
abide by that determination,” App., infra, 9a (emphasis
added), the lower court transparently substituted its
own policy judgment—one it has doggedly sought to im-
pose on FERC through its interpretation first of Section
318 of the FPA and now of Section 13(b) of PUHCA—
for the policy judgment the responsible agency chose
to make. Tellingly, the court below offered no explana-
tion for why an agency whose “principal goal[] is to en-
sure that the rates customers pay for their electricity are
‘just and reasonable,” Arcadia, 111 S. Ct. at 423
(Stevens, J., concurring), would unilaterally divest itself
of all jurisdiction to review what may often be, and in
this case was, the single largest component of wholesale
rates."7 In fact, such a disavowal of jurisdiction gives
16 See Nantahala Power & Light Co. v. FERC, 727 F.2d 1342,
1345 (4th Cir. 1984); Portland Gen. Exch., Inc., 51 F.E.R.C.
| 61,108, at 61,243-246 (1990); Sea Robin Pipeline Co., 49 F.E.R.C.
{ 61,351 (1989). This principle completely belies Ohio Power's
argument, accepted by Judge Mikva in his initial concurrence, see
Ohio Power Co. v. FERC, 880 F.2d at 1413, that reading Section
35.14(a)(7) to create only a rebuttable presumption would render
the regulation superfluous because FERC already presumes that
utility costs are prudently incurred.
17 Judge Mikva initially suggested that FERC would so disable
itself because “the purpose of section 35.14(a)(7) ... is to avoid
unreasonable fuel costs between affiliated companies” and thus, if
the SEC “has already made that determination, . . . there is no
reason for FERC to second-guess [it].” Ohio Power Co. v. FERC,
24
rise to the same regulatory gap and its attendant evils
that led FERC to conclude that Section 318 of the FPA
does not divest it of jurisdiction over such costs. Accord-
ingly, because the lower court, in interpreting FERC’s
regulation, simply forced a policy judgment on FERC
that the agency has not chosen to make, and because the
lower court’s interpretation of Section 35.14(a) (7) opens
the same regulatory gap this Court previously closed, this
Court should review the “alternative” basis for the deci-
sion below.
b. In any event, the regulatory ruling does not obviate
the need to review the lower court’s interpretation of
Section 13(b) of PUHCA. As the lower court itself rec-
ognized, while its interpretation of FERC’s regulation
provided Ohio Power with “some succor” from the over-
lapping jurisdiction of the SEC and FERC, “[i]Jf FERC
wishes to have § 35.14(a)(7) create only a rebuttable
presumption, ... it may do so explicitly.” App., infra, 9a.
To provide Ohio Power and all other registered public
utility holding companies complete relief from the “prob-
lem” of such regulatory overlap, therefore, the lower court
found it necessary to decide that Section 13(b) of PUHCA
preempted FERC’s ratemaking authority.
Not only was the statutory ruling necessary to the
holding below, it completely precludes FERC from re-
asserting jurisdiction over SEC-approved fue! costs
through repromulgation of its regulation, and likewise
bars state regulators from asserting jurisdiction over such
880 F.2d at 1414. Consistent with FERC’s statutory mandate, how-
ever, the purpose of its fuel adjustment clause regulation is not to
regulate costs -between affiliated companies, but to regulate the rates
utilities charge their customers. The SEC, of course, does not make
rate determinations. See supra p. 13 & n.8. In light of the agencies’
different statutory goals and fields of expertise, therefore, FERC
would have no reason to presume conclusively that SEC-approved
costs will always yield just and reasonable rates. Certainly, FERC
could not rationally presume that costs that are merely subject to
SEC review will always be reasonable.
ti ae Salk
i Epa Aci Sate dias Mea! 3h
Cte! coor tale
hn aaah i ida igen Dd;
25
costs. FERC is thus powerless to close the regulatory
gap or remedy the economic dislocation that the lower
court’s interpretation of Section 13(b) has caused. The
lower court’s statutory ruling, moreover, will likely escape
review altogether if it is not addressed by the Court in
this case. FERC now has no reason to alter its regula-
tion,’* and therefore, in the future, it ean be expected to
approve pass-throughs of SEC-approved fuel costs on the
basis of its unrevised (and unrevisable) regulation. Thus,
there will be no further occasion for courts to consider
whether Section 13(b) of PUHCA ousts FERC of all rate-
making authority over SEC-approved fuel costs. As a
consequence, the regulatory gap created by the statutory
ruling will go unremedied, and this Court’s ruling in
Arcadia will be completely frustrated.
CONCLUSION
The petition for a writ of certiorari should be granted.
Respectfully submitted,
C. EMERSON DUNCAN, II REX E. LEE
GREGG D. OTTINGER * CARTER G. PHILLIPS
JOHN P. WILLIAMS JOSEPH R. GUERRA
DUNCAN & ALLEN SIDLEY & AUSTIN
1575 Eye Street, N.W. 1722 Eye Street, N.W.
Suite 300 Washington, D.C. 20006
Washington, D.C. 20005 (202) 736-8000
(202) 289-8400
* Counsel of Record
August 10, 1992
18 As FERC explained in its petition for rehearing before the
court of appeals, “repromulgation [of Section 35.14(a)(7)] would
be unavailing unless this Court overturns the panel’s statutory
ruling.” Petition for Rehearing and Suggestion for Rehearing En
Bane at 13 n.7. This is particularly true inasmuch as all FERC
orders are reviewable in the District of Columbia Circuit. See
16 U.S.C. § 8251(b). Under these circumstances, FERC cannot be
expected to undertake the entirely futile gesture of repromulgating
an unenforceable regulation.
APPENDICES
™ ~ ehh ae?) ee ee ee eel) ee 8
la
APPENDIX A
UNITED STATES COURT OF APPEALS
DISTRICT OF COLUMBIA CIRCUIT
No. 88-1293
OHIO POWER COMPANY,
Petitioner,
FEDERAL ENERGY REGULATORY COMMISSION,
Respondent,
LCP CHEMICALS & PLASTICS, INC., et al.,
MUNICIPAL WHOLESALE ELECTRIC CUSTOMERS OF
OHIO POWER COMPANY,
Intervenors.
On Remand fiom the United States Supreme Court
Argued Sept. 27, 1991
Decided Feb. 4, 1992
Edward Berlin, with whom Kenneth G. Jaffe and
Edward J. Brady, Washington, D.C., were on the brief,
for petitioner. Andrew L. Lipps, Washington, D.C., also
entered an appearance for petitioner.
Joseph S. Davies, Deputy Sol., with whom William S.
Scherman, Gen. Counsel, Jerome M. Feit, Sol., and Timm
Za
Abendroth, Atty., Washington, D.C., were on the brief,
for respondent. John Estes, Joanne Leveque, and Cath-
erine C. Cook, Attys., F.E.R.C., Washington, D.C., also
entered appearances for respondent.
Gregg D. Ottinger, with whom John P. Williams, Wash-
ington, D.C., and Lee F. Feinberg, Charleston, W.V., were
on the brief, for intervenors.
James B, Liberman, Washington, D.C., was on the brief
for amici curiae Registered Holding Co. Group, urging
that the decision of the F.E.R.C. be reversed and the
matter remanded to the Com’n.
James R. Doty, Ge .. Counsel, Jacob H. Stillman, Asso-
ciate Gen. Counsel, Katherine Gresham, Asst. Gen. Coun-
sel, and Paul Gonson, Sol., S.E.C., -Washington, D.C.,
were on the brief for amicus curiae.
Before MIKVA, Chief Judge, and SILBERMAN and
SENTELLE, Circuit Judges
Opinion for the Court filed by Circuit Judge SEN-
TELLE.
SENTELLE, Circuit Judge:
Ohio Power Company, a producer of electricity, was
subjected to. the regulatory jurisdiction of two agencies
the Federal Energy Regulation Commission (“FERC”)
and the Securities and Exchange Commission (“SEC”).
Specifically, FERC determined in a wholesale rate proceed-
ing that the SEC-approved price paid by Ohio Power for
coal from its associate Southern Ohio Coal Company
(“SOCCO”) could not be included in Ohio Power’s whole-
sale rate to the extent that it was greater than the market
price for comparable coal. Ohto Power Co., 39 F.E.R.C.
61,098 (1987).
We initially granted Ohio Power’s petition to vacate the
FERC order on the ground that § 318 of the Federal Power
Act insulated SEC-approved prices from FERC alteration.
3a
Ohio Power Co. v. FERC, 880. F.2d 1400, 1410 (D.C.Cir.
1989). Ruling that § 318 did not address the conflict faced
by Ohio Power, the Supreme Court remanded the case
_ Arcadia, Ohio v. Ohio Power Co., —— 2h. nes bh
SCt 41h. 422,112 L.Ed.2d 874 (1990). We now grant
Ohio Power’s petition to vacate the FERC order for the
reasons discussed below.
BACKGROUND
I. The Statuto y Scheme
In 1935, Congress enacted grants of authority to the
SEC and FERC’s predecessor, the Federal Power Commis-
sion, under an umbrella statute entitled the Public Utility
Act. ch. 687, 49 Stat. 803 (1935). Title I, known as the
Public Utility Holding Company Act (“PUHCA”), em-
powers the SEC to curb abuses affecting investors and
consumers created by transactions between subsidiary
associates of public utility holding companies. 49 Stat.
202 (1935) (codified as amended at 15 U.S.C. §§ 79a to
797-6). The SEC discharges its responsibilities in large
part under § 13 of the PUHCA, which makes transactions
between associate companies unlawful unless they are
approved by the SEC at terms found to be “in the public
interest or for the protection of investors or consumers.”
15 U.S.C. § 79m (b).’
1 Section 13(b) of PUHCA states in pertinent part that
it shall be unlawful for any subsidiary compan) of any registered
holding company. . . to enter into or take any step in the per-
formance of eny service, sales, or construction contract by
which such company undertakes to perform services or con-
struction work for, or sell goods, to any associate company
thereof except in accordance with such terms and conditions
and subject to such limitations and prohibitions as the Com-
mission by rules and regulations or order shall prescribe as
necessary or appropriate in the public interest or for the pro
tection of investors or consumers and to insure that such con-
tracts are performed economically and efficiently for the bene-
4a
Title I], known as the Federal Power Act (“FPA”),
established the Federal Power Commission to oversee the
wholesale transmission and sale of interstate electric
power. 49 Stat. 888 (1935) (codified as amended at 16
U.S.C. §§ 791a-825r). FERC, which succeeded the now-
departed Federal Power Commission, fulfills a critical
part of its mandate by setting “just and reasonable”
wholesale electric rates under §§ 205 and 206 of the
FPA. 16 U.S.C. $$ 824d & 824e. Thus, under the FPA
and the PUHCA,
FERC-regulated electric power companies [such as
Ohio Power] that are subsidiaries or affiliates of
registered public utility holding companies are there-
for subject to SEC regulation as well.
Arcadia, 111 S.Ct. at 417; see also Ohio Power Co., 880
F.2d at 1402-04 (summarizing statutory backdrop of this
action).
Il. Factual Background
Ohio Power Company produces electricity with coal-
burning generation plants and is a subsidiary of one of
the nation’s largest public utility holding companies,
American Electric Power Company. In 1971, Ohio Power
entered into a lease with the owners of the Martinka
Mine for development of coal by Ohio Power’s subsidiary
and associate, SOCCO. Before Ohio Power could capital-
ize SOCCO’s mining operations by purchasing its stock,
$ 10 of PUHCA required the SEC to approve the proposed
transaction. 15 U.S.C. § 79j. In its order of December
2, 1971, the SEC determined that Ohio Power could ob-
tain coal from SOCCO at a price “based on an amount
equal to the actual cost” of coal production including a
reasonable rate of return on Ohio Power’s capital invest-
fit of such associate companies at cost, fairly and equitably
allocated among such companies.
15 U.S.C. § 79m(b).
oO
va
ment. Ohio Power Co., Holding Company Act Release
(“HCAR”) No. 17,383 (1971); see Arcadia, 111 S.Ct. at
417-18 (discussing history of Ohio Power's. capitalization
of SOCCO).?
This action came initially before us as a result of a
May 28, 1982, wholesale rate increase application that
Ohio Power filed with FERC pursuant to §§ 205 and
206 of the FPA. FERC eventually accepted the applica-
tion except for Ohio Power’s request to pass through
the cost-based price that it paid for SOCCO coal. Assert-
ing that comparable coal could be obtained at a cheaper
market price, FERC found the SOCCO coal price unrea-
sonable and therefore not includable in Ohio Power’s
wholesale rate. Ohio Power Co., 39 F.E.R.C. {| 61,098, at
61,275 (1987). Ohio Power insisted the SEC alone had
jurisdiction over the price that associates may charge
each other for goods,* and sought judicia! vindication.
Before this Court, Ohio Power and FERC argued that
the controversy centered on the application of the juris-
dictional conflicts provision of the Public Utility Act,
§ 318 of the FPA. Ohio Power Co., 880 F.2d at 1405-09.
The parties agreed § 318 provided that the requirements
of the PUHCA govern when a company is subject to con-
flicting PUHCA and FPA regulation “with respect to the
same subject matter.” 16 U.S.C. § 825q. FERC defended
its order on two grounds: first, by claiming there was
no conflict between the agencies because the FERC order
required Ohio Power to pay a market price that was less
than cost and the SEC orders simply required Ohio
2 As observed by the Supreme Court, Ohio Power obtained three
additional SEC approvals for various capital transactions with
SOCCO. See Ohio Power Co., HCAR No. 20,515, 14 SEC Docket
928 \1978): Southern Ohio Coal Co., HCAR No. 21,008, 17 SEC
Docket 310 (1979); and Southern Ohio Coal Co., HCAR No. 21,537,
19 SEC Docket 1309 (1980).
8 SEC regulation 17 C.F.R. § 250.80(b) defines “goods” to in-
clude coal.
ee
Ou
Power to pay no more than cost; and second, by assert-
ing that, regardless of conflict, since FERC was regulat-
ing wholesale rates and the SEC was regulating inter-
associates prices, the agencies were not regulating the
“same subject matter.” Ohio Power Co., 880 F.2d at
1405.
This Court agreed with Ohio Power that even if the
SEC orders were read to enshrine cost only as a ceiling,
Ohio Power was nevertheless subject to conflicting reg-
ulatory authorities in that FERC had “set by order a
different price term” for a contract approved by the
SEC. Jd. at 1406. Similarly, we found that the two
agencies were regulating the “same subject matter,” and
that therefore § 318 required FERC to defer to the
SEC’s approval of a cost-based price for SOCCO coal.
Id, at 1408-09. In a separate opinion, Judge, now Chief
Judge, Mikva concurred in the result, but on the alterna-
tive ground that FERC had violated one of its own reg-
ulations requiring it to “deem” reasonable and includable
prices set by other regulatory bodies (here, the SEC).
Id. at 1412-14 (construing FERC regulation 18 C.F.R.
§ 35.-14(a) (7)).
In its review, the Supreme Court adopted a reading of
§ 318 not advanced by “the parties, the interested agencies,
[or] the Court of Appeals,” Arcadia, 111 S.Ct. at 422
(Stevens, J., concurring), and found that the conflict
affecting Ohio Power was not covered by § 318. Id. at
421-22. The Arcadia Court read § 318 as applying only
to four specifically enumerated types of conflicts, and held
that, although Ohio Power was subject to “overlapping
regulatory jurisdiction of both the SEC and of FERC,”
id. at 417, § 318 was silent regarding the type of overlap
asserted by Ohio Power in this case. Jd. at 422.
Advising us that its interpretation of § 318 did not
“end review of the FERC order,” the Court remanded
with instructions to resolve whether: (1) as Judge Mikva
observed, FERC violated its own regulation; and (2) “the
Ta
FERC-prescribed rate” is unjust and unreasonable because
it “ ‘traps’ costs which the government ithe SEC] itself
has approved”. /d.
Justice Stevens wrote a concurring opinion, joined by
Justice Marshall, in which he found that even if the over
lap in authorities fell within the enumerated subjects of
< 318 there was “no risk of conflict between the require-
ments of the SEC and FERC in this ease.” Jd. at 423
(Stevens. J., concurring). Justices Stevens and Marshall,
therefore, agreed with FERC that the two agencies were
regulating different subject matters, with FERC over-
seeing “what portion of its fuel costs Ohio Power may
pass along to its customers” and the SEC placing a ceil-
ing on “the price which Ohio Power pays its [coal] sup-
plier—-SOCCO.” Id. The concurrence ended by comment-
ing that Congress’s intent would be frustrated by a
holding that would allow the SEC to hamper FERC’s
regulation of wholesale rates. Id. at 423-24.
ANALYSIS
I. FERC Regulation 18 C.F.R. § 35.14(a) (7)
As instructed by the Court, we have reviewed Part I]
of Judge Mikva’s concurring opiulon, which contended
that a remand was required on the ground that 18 C.F.R.
§35.14(a) (7) of FERC’s own rules precluded FERC
from “imposing its market-price test” in the face of a
cost-based coal price approved by the SEC. Ohio Power
Co., 880 F.2d at 1412-14. Judge Mikva concluded that
“ly|nder the regulation, because the prices of Ohio
Power’s fuel from its affiliate are subject to the jurisdic-
tion of the SEC, such costs must be conclusively pre-
sumed reasonable.” Jd. at 1414. We now adopt Judge
Mikva’s approach as reflecting the view of this panel.
Section 35.14(a) (7) addresses fuel price adjustment
clauses in filed rate schedules, and provides in pertinent
part:
8a
Where the utility purchases fuel from a company-
owned or controlled source, the price of which is sub-
ject to the jurisdiction of a regulatory body, such cost
shall be deemed to be reasonable and includable in the
adjustment clause.
18 C.F.R. § 35.14(a) (7). The dispute here focuses on the
meaning of the word “deemed,” with Ohio Power arguing
that it establishes a conclusive presumption for including
such costs, and FERC urging that it sets only a rebuttable
presumption, which in Ohio Power’s case was disproved.
Judge Mikva began by remarking that “no deference is
owed an interpretation at odds with the plain meaning of
the text.”” Ohio Power Co., 880 F.2d at 1413 (Mikva, J.,
concurring) (citing Union of Concerned Scientists v. NRC,
711 F.2d 370, 381 (D.C.Cir.1983) (“When an agency’s
interpretation flies in the face of the language of the rules
themselves, it is owed no deference.”)). He then found
that “courts construing the word ‘deemed’ have generally
found that it establishes a conclusive presumption.” Jd.
(citing, eg., H.P. Coffee Co. v. Reconstruction Finance
Corp., 215 F.2d 818, 822 (Emer.Ct.App.1954) (finding
near “unanimous judicial determination that the word
{[deemed!], when employed in statutory law, creates a con-
clusive presumption.”)). In addition to H.P. Coffee and
the other cases cited in the concurrence, we note also that
two decisions from this Circuit have construed the term
deemed and found that it created a conclusive presump-
tion. See Gaither v. Myers, 404 F.2d 216, 218 (D.C.Cir.
1968) (finding that use of term deemed in a liability
statute changed the common law rule of agency by making
agency status turn solely on the consent of an owner to
use a car, while the common law rule considered consent
one of many factors); and Forrester v. Jerman, 90 F.2d
412, 413 (D.C.Cir.1937) (interpreting same statute as in
Gaither and reaching same conclusion after finding that
deemed “is unambiguous and leaves nothing for interpre-
tation”). Given the unambiguous character of deemed,
9a
then. we find case law amply supports our finding that the
plain language of § 35.14(a) (7) requires FERC to in-
clude in Ohio Power’s wholesale rate the SEC-approved
cost-based price for SOCCO coal.
FERC attempts to cloud the clear meaning of deemed
by pointing to the complicated rulemaking history of
$ 35.14(a) (7). Brief of Respondent at 31-32. We agree
with Judge Mikva’s past disposition of this argument and
find that, if anything, the regulatory history cuts against
a rebuttable presumption interpretation of deemed, par-
ticularly when considering the evolution of the regulation
from its proposed form in 1973 to its final promulgation
in 1974. See Ohio Power Co., 880 F.2d at 1413-14. The
original version stated that “[o]nly the reasonable cost of
fuel {purchased from an associate] may be included™ in
the wholesale rate, 38 Fed.Reg. 17,253 (1973), language
consistent with the rebuttable presumption urged by
FERC. But the regulation as ultimately issued abandoned
this formulation and instead contained the “such cost shall
be deemed reasonable and includable” language that we
read as creating a conclusive presumption. 39 Fed.Reg.
28,911 (1974).
Finally, we find prior administrative pronouncements
regarding the meaning of § 35.14(a) (7) of little moment
to the extent they are not consistent with the unambigu-
ous terms of the regulation. See Union of Concerned
Scientists. 711 F.2d at 381. If FERC wishes to have
$ 35.14(a) (7) create only a rebuttable presumption, then
it may do so explicitly through the required process. As
currently written, however, we agree with Judge Mikva
that “section 35.14(a) (7) establishes, as a policy matter,
that if another regulatory body has already passed on the
fuel price, then FERC wil! abide by that determination.”
Ohio Power Co., 880 F.2d at 1414. We therefore hold that
under § 35.14(a) (7), FERC was obliged to find “reason-
able and includabe” Ohio Power’s fuel costs as approved
by the SEC, and we remand to FERC for further findings
not inconsistent with this opinion.
10a
Il. Reconcilation of the Overlapping Regulatory
Authorities
By precluding FERC from declaring an SEC-approved
price unreasonable, our interpretation of § 35.14(a) (7)
provides Ohio Power with some succor from the “over-
lapping regulatory jurisdiction of both the SEC and of
FERC” found by the Arcadia Court. 111 S.Ct. at 417.
However, we believe that more than the regulation re-
quires this result.
In Arcadia, the Supreme Court advised us that § 318
is not the mechanism by which the overlapping regulatory
jurisdiction issue may be resolved. The Court left for us,
though, the task of deciding how to reconcile the conflict,
if any, created by FERC’s attempt to allow only a market-
based price for SOCCO coal when calculating wholesale
rates and the SEC’s orders requiring Ohio Power to pay
- either cost or no more than cost for SOCCO coal.
To begin, we do find that the overlapping authorities
have resulted in unavoidable conflicting requirements for
Ohio Power. Justice Stevens in his Arcadia concurrence
noted that the “market price for coal during the time
relevant to this proceeding has been less than SOCCOQ’s
costs.” Arcadia, 111 S.Ct. at 423. From this, he reasoned
that no conflict existed since the SEC orders did no more
than “establish a ceiling requiring that the price SOCCO
charges its affiliates for coal remain at or below its costs.”
Id.
However, Ohio Power represents that the “market price,
calculated according to FERC’s methodology, has exceeded
the cost of mining Martinka coal in some months.” Brief
of Petitioner Ohio Power at 24 & n. 15. FERC does not
contest this representation. Moreover, if one interprets
the SEC orders as establishing cost as both a floor and a
ceiling, then Ohio Power will suffer regulatory dissonance
whenever the market price deviates from cost.
lla
We are also unpersuaded by the argument that no con-
flict exists because FERC is simply regulating how much
Ohio Power can charge for power, not how much Ohio
Power pays for SOCCO coal. By declaring a portion of
the SOCCO coal price unreasonable and therefore not in-
cludable in Ohio Power’s wholesale rate, FERC is un-
deniably affecting the economic relationship between Ohio
Power and SOCCO, a relationship approved by, and under
the jurisdiction of, the SEC. Cf. Nantahala Power &
Light v. Thornburg, 476 U.S. 953, 971, 106 S.Ct. 2349,
2359, 90 L.Ed.2d 943 (1986) (overturning action of a
state regulatory body that, by its orders establishing retail
rates, required the regulated entity to “pretend that it is
paying less for the power it receives ... , under agree-
ments not subject to [the state’s] jurisdiction, than is in
fact the case.’’).
We find the resolution of this conflict in the plain lan-
guage of the statute authorizing the SEC to regulate sales
contracts of associate companies. Section 13(b) of the
PUHCA empowers the SEC to approve the price of inter-
associate sales of goods, such as coal, and directs the SEC
to price these goods “at cost, fairly and equitably allocated
among [associate] companies.” 15 U.S.C. § 79m(b).
Here, the SEC did just that with its four orders approv-
ing Ohio Power’s relationship with SOCCO, which re-
flected § 13(b)’s mandate to price SOCCO’s coal “at cost.” *
In contrast to the SEC’s specific statutory mandate to
establish a cost-based price for sales of goods between
associates, FERC can point to no equivalent authority
besides its general charge to establish “just and reason-
able’ wholesale electric rates. 16 U.S.C. §§ 824d & 824e.
Of course, it is black letter law that when a conflict arises
between specific and general provisions of the same legis-
lation, the courts should give voice to Congress’s specific
articulation of its policies and preferences. 2A NORMAN
J. SINGER, SUTHERLAND STATUTORY CONSTRUCTION § 46.05,
4 See supra note 1 and accompanying text.
12a
at 105 n. 19 (5th ed. 1992). Accordingly, we hold that
Congress in § 13(b) of the PUHCA authorized the SEC
to set the price of SOCCO coal “at cost,’ and in so
doing constrained FERC from altering that price under
its ‘‘just and reasonable” rate-setting authority.
In support of its order, FERC advances the argument
that the SEC orders “do not appear to mandate the cost-
based price where a market price could be. lower, rather
they permit a price up to a cost-based price.” Ohio Power
Co., 39 F.E.R.C. 7 61,098, at 61,276 (1987), quoted in
Brief of Respondent at 26. Citing SEC Rule 92, 17
C.F.R. § 250.92, the Commission found that “not only
does the SEC not require a cost-based price for the sub-
sidiary coal, the SEC may require a market-vased price
for subsidiary coal if the market price is lower than
cost.” Jd. (emphasis added).
Without addressing whether the SEC does in fact have
the authority to establish a lower-than-cost market price,°
even FERC concedes that Rule 92 empowers the SEC
alone to set such a price. FERC does not cite, and we
can not find, any indication in the orders that the SEC
was exercising its authority to establish a below-cost
market price for SOCCO coal. The orders do not men-
tion market price as a limit to price, nor do they require
Ohio Power to show that comparable coal was unavail-
able before paying cost for SOCCO coal.®
° The SEC does have express statutory authority under § 13(b)
to deviate from the “at cost” standard when a transaction “in-
volve[s] special or unusual circumstances.” 15 U.S.C. § 79m(b).
However, no one has suggested that the SEC invoked this source
of authority in the orders concerning Ohio Power.
® According to its brief, the SEC “has long recognized” that a
lower-of-cost-or-market interpretation would effectively eliminate
affiliate transactions by preventing investors from keeping profits
when cost is below market (to offset losses when cost is above
market). Brief of Amicus SEC at 4. See also Ohio Power Co.,
880 F.2d at 1410 (observing that FERC interpretation of SEC
orders places Ohio Power in a “tails-we-lose’
’
situation).
13a
Instead, the orders appear to embrace the cost-based
price principles required by SEC Rules 90 and 91. 17
C.F.R. §§ 250.90 & 250.91. Consistent with §13(b) of
PUHCA, SEC Rule 90(a) prohibits associates from sell-
ing goods to each other at “more than cost,” 17 C.F.R.
§ 250.90(a), and Rule 91(a) defines “more than cost”
as “not exceed{ing] a fair and equitable allocation of
expenses.” 17 C.F.R. § 250.91 (a).’ The SEC orders har-
moniously track this language. For example, the 1971
order states that the “charges for coal by [SOCCO] will
be based on an amount equal to the actual cost,” Ohio
Power Co.. HCAR No. 17,383 (1971), and the 1978 order
states that the “price at which [SOCCO] coal is sold to
[Ohio Power] will not exceed the cost thereof to the seller.”
Ohio Power Co.. HCAR No. 20,515, 14 S.E.C. Docket
928 (1978): see also Southern Ohio Coal Co., HCAR
No. 21.537, 19 S.E.C. Docket 1309 (1980) (stating that
the price of SOCCO coal “will not exceed the cost thereof
to the seller.”’).
That the 1978 and the 1980 orders, as well as SEC
Rules 90 and 91, place more emphasis on cost as a ceil-
ing rather than a floor is not surprising given the eco-
nomie incentive of associate companies to pass through
inflated costs for goods and services. See 15 U.S.C. § 79a
(b) (2) (describing the following as one of the evils that
make SEC regulation of associates necessary: “subsid-
iary public-utility companies are subjected to excessive
charges for services, construction work, equipment, and
materials”). But this concern with excessive charges does
not diminish the exclusive role cost plays in establishing
associate prices—Congress’s use of the term “at cost”
indicates that cost serves as a ceiling and a floor. To
the extent there is downward flexibility in a cost-based
7SEC Rule 90(d) does provide that the price of goods “need
not be limited to cost,” and then references the market-price cap
discussed in Rule 92; but, as stated above, this provision was not
relied upon by the SEC in this case.
l4a
price, we find that Congress did not make room for any-
one other than the SEC to exercise this flexibility. We
therefore find that the orders are better read as requir-
ing Ohio Power to pay a price ‘“‘equal to cost” for SOCCO
coal, as prescribed by §13(b) and the 1971 SEC order,
and we reject FERC’s attempt to clothe itself with the
SEC’s purported authority under Rule 92 to establish
a market-based cap.*®
In response to the congressional intent concerns ex-
pressed in Justice Stevens’s concurrence, we do not mean
to say that FERC is powerless to affect the SEC’s price-
approval process. When the SEC receives for approval
an associate transaction and the suggested prices at
which goods will be sold, SEC Rule 28 requires notice in
the Federal Register and an opportunity for comment on
the proposal. 17 C.F.R. § 250.23. Such notice was pro-
vided as part of Ohio Power’s applications-to the SEC.
Additionally, FERC could conceivably ask the SEC to
investigate whether the cost-based price for SOCCO coal
violated “any rule or regulation” of the PUHCA. See 15
U.S.C. § 79r(a). Thus, FERC may attempt to affect
the price-approval process, but Congress has granted the
SEC alone the authority to establish prices charged by
associates for goods.
Therefore, regardless of whether FERC may under
other circumstances set prices that trap costs created by
orders of other governmental entities, we hold that FERC
may not set a cost-trapping rate level where that effect
is occasioned by a recovery calculation inconsistent with
an SEC determination governing an inter-associate trans-
fer subject to § 13(b) of the PUHCA.
8 Although we grant the SEC’s views no deference, we note that
our interpretation of the SEC’s orders is consistent with their
submission in this case. See Brief of Amicus SEC at 5.
15a
CONCLUSION
In conclusion, we hold that 18 C.F.R. § 35.14(a) (7)
prevents FERC from finding the coal price approved by
the SEC not includable in determining Ohio Power’s
wholesale rate. As a separate ground for remand, we
hold that the SEC properly discharged its authority
under $13(b) of the PUHCA by setting the price of
coal sold by SOCCO to its associate Ohio Power ‘“‘at cost,”
and that FERC must respect this specific grant of au-
thority to the SEC. For the reasons given above, there-
fore. we allow the petition for review, and vacate and
remand the order of FERC for further proceedings not
inconsistent with this opinion.
|
l6a
APPENDIX B
UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
No. 88-1293
OHIO POWER COMPANY,
Petitioner
Veo
FEDERAL ENERGY REGULATORY COMMISSION,
Respondent
Before: Mikva, Chief Judge; Silberman and Sentelle,
Circuit Judges
ORDER
[Filed Apr. 14, 1992]
Upon consideration of the Petitions for Rehearing of
respondent and intervenor it is
ORDERED, by the Court, that the petitions are denied.
Per Curiam
FOR THE COURT:
CONSTANCE L. DUPRE
Clerk
By: /s/ Robert A. Bonner
ROBERT A. BONNER
Deputy Clerk
17a
UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
No. 88-1293
OHIO POWER COMPANY,
Petitioner
FEDERAL ENERGY REGULATORY COMMISSION,
Respond nt
Before: Mikva. Chief Judge; Wald, Edwards, Ruth B.
Ginsburg, Silberman, Buckley, Williams, D. H.
Ginsburg, Sentelle, Henderson, and Randolph,
Circuit Judges
ORDER
[Filed Apr. 14, 1992 |
The Suggestions For Rehearing En Banc of respondent
and intervenor have been circulated to the full Court. No
member of the Court requested the taking of a vote
thereon. Upon consideration of the foregoing it is
ORDERED, by the Court en banc, that the suggestions
are denied.
Per Curiam
FOR THE COURT
CONSTANCE L. DUPRE
Clerk
By: /s/ Robert A. Bonner
RoBERT A. BONNER
Deputy Clerk
ye ‘
'
2
18a
APPENDIX C
FEDERAL ENERGY REGULATORY COMMISSION
Docket Nos. ER82-553-000 and ER&2-554-000
OHIO POWER COMPANY
Opinion No, 272; Opinion and Order on Recovery of the
Cost of Coal Purchased From an Affiliate
(Issued April 30, 1987)
Before Commissioners: Martha O. Hesse, Chairman:
Anthony G. Sousa, Charles G. Stalon, Charles A. Tra-
bandt and C. M. Naeve.
|Note: Initial Decision of the presiding administra-
tive law judge, issued December 14, 19838, appears at 25
FERC © 63,060. |
Appearances
Edward J. Brady, Marvin I. Resnick, Alan Kessler,
and William EF. Olson for Ohio Power Company
William H, Roberts and Richard Hitt for Public Serv-
ice Commission of West Virginia
Paul Nordstrom, Glen L. Ortman, Kenneth E. Natale,
Denald R. Allen, David P. Yaffe, and Gregg D. Ottinger
for the Municipal Wholesale Electric Customers of Ohio
Power Company
Phillip Nelson and O.C. Hall for Wheeling Electric
Company
19a
James D. Kauffelt for Linden Chemicals and Plastic,
Inc., Mobay Chemical Corporation, and PPG Industrials,
Ine.
Melvin Berger, Arthur Hays Butler, Lawrence R.
Greenfield, Michael Small, James E. Rogers, Jr., Marilyn
L. Doria, Harvey L. Reiter and Daniel Watkiss for the
staff of the Federal Energy Regulatory Commission
[Opinion No. 272 Text}
I. Introduction and Summary
On May 28, 1982, the Ohio Power Company (Ohio
Power) filed rate increases for its wholesale service to
fifteen municipalities in the State of Ohio (Docket No.
ER2-553-000) and to its affiliate in West Virginia, the
Wheeling Electric Company (Docket No. ER82-554-000).
The Commission accepted settlements dealing with all as-
pects of the proposed rates except what was called the
captive coal issue which involves a challenge to the rea-
sonableness of the fuel costs recovered from Ohio Power’s
wholesale customers for the coal it purchased from the
Martinka mine.’
The Martinka mine is owned and operated by the
Southern Ohio Coal Company, a wholly owned subsidiary
of Ohio Power. Ohio Power is owned by the American
Electrie Power Company (AEP). AEP owns seven other
electric utilities that operate as a coordinated system in
a seven-state area. AEP is subject to regulation by the
Securities and Exchange Commission (SEC) under the
Public Utility Holding Company Act of 19385 (PUHCA).’
An initial decision on the reasonableness of Ohio
Power’s coal costs was issued on December 14, 198%
In the initial decision the presiding judge found that:
1See Ohio Power Company, 23 FERC 761,286 (1983) and 24
FERC § 61,017 (1983).
215 U.S.C. § 79a (1982).
395 FERC { 63,060 (1983).
20a
(1) section 318 of the Federal Power Act does
not preclude the Commission from determining
whether it is just and reasonable for Ohio Power to
recover the full cost of its purchases from the Mar-
tinka mine from its wholesale ratepayers;
(2) the Commission’s fuel adjustment clause reg-
ulation * creates only a presumption which does not
preclude the Commission from considering the rea-
sonableness of Ohio Power’s fuel costs;
(3) Ohio Power’s coal costs are subject to a com-
parable market price test as adopted in Opinion No.
133° to determine the reasonableness of those costs;
and
(4) the comparable market price evidence pre-
sented to show that Ohio Power’s costs were not rea-
sonable was not credible.
The judge concluded that the prices paid by Ohio Power
for Martinka coal were reasonable.
Briefs on exceptions to the initial decision and briefs
opposing exceptions were filed by Ohio Power, Commis-
sion trial staff (staff), and the Municipal Wholesale
Electric Consumers of Ohio Power (the municipals).*
Ohio Power excepts to the judge’s ruling on the pre-
emptive effect of section 318 of the Federal Power Act
#18 C.F.R. § 35.14(a)(7) (1986).
5 Public Service Company of New Mexico (New Mexico), 17
FERC { 61,123 (1981), appeal pending sub nom. Public Service
Company of New Mexico v. F.E.R.C., Nos. 82-1148, 84-1624 and
84-1677 (10th Cir., filed Feb. 3, 1982).
®On May 15, 1986, New England Power Company (NEP) filed
a motion with the Commission for permission to file an amicus
curiae brief in this proceeding; our staff, the municipals, the Town
of Norwood, Massachusetts, the Attorney General of Rhode Island,
and the Rhode Island Division of Public Utilities and Carriers op-
pose NEP’s motion. Because of the lateness of the filing without
good cause the Commission shall deny the motion.
|
2la
and section 35.14(a) (7) of the Commission’s regulations
on the Commission’s review of Ohio Power’s coal costs.
Ohio Power argues that the Commission can change its
regulations only prospectively. Ohio Power also objects
to the imposition of a comparable market price test on a
utility subject to PUHCA asserting that the result would
be a lower of cost or market price test, a result which
Ohio Power asserts would be confiscatory. Ohio Power
further urges that as a factual matter Ohio Power’s
ownership of affiliate mines serves the purpose of deliver-
ing the lowest priced electricity possible. Staff and the
municipals except to the judge’s rejection of staff’s evi-
dence as a reliable determinant of comparable market
prices.
We affirm the judge’s rulings and reasoning regarding
the Commission’s authority, pursuant to the Federal
Power Act and our regulations, to determine the reason-
ableness of coal costs Ohio Power recovers from its
wholesale customers. We disagree, however, with the
judge’s finding that those costs were reasonable. We f find
the costs Ohio Power has recovered for its purchases of
Martinka coal are unreasonable when compared with
market prices and that Ohio Power therefore must re-
fund amounts collected since the effective date of the
rates in this proceeding that exceed the comparabl
market price.
II. Discussion
A. Commission Jurisdiction to Review Ohio Power’s Coal
Costs
1. Section 318 of the Federal Power Act
Ohio Power urges that under PUHCA and section 318
of the Federal Power Act, the SEC has exclusive juris-
diction over the pricing of the affiliate Martinka coal.’
The presiding judge concluded that section 318 of the
7 Ohio Power brief on exceptions at 17-36.
22a
Federal Power Act* does not preclude this Commission
from determining whether it is just and reasonable for
Ohio Power to recover from its wholesale customers, in
its rates, the full cost of its purchases from the Martinka
mine.’
The source of the SEC’s authority to regulate the price
at which Ohio Power purchases coal from its subsidiary
is section 18 of PUHCA."® Ohio Power contends that sec-
tion 13(b) of PUHCA mandates that it purchase coal
from its subsidiary at cost."’ Ohio Power contends that
if the Commission orders that Ohio Power may recover
in rates only a market-based amount for the Martinka
coal, that Ohio Power will face conflicting regulation by
the SEC and the Commission which is prohibited by sec-
tion 318 of the Federal Power Act. Section 318 provides:
If, with respect to the issue, sale, or guaranty of a
security... , or any other subject matter, any per-
son is subject both to a requirement of the Public
Utility Holding Company Act of 1935 ...and toa
816 U.S.C. § 825q (1982).
®25 FERC at p. 65,183.
1015 U.S.C. § 79m (1982).
11 The relevant portions of section 13(b) of PUHCA, 15 U.S.C.
§ 79m(b) (1982), provide:
{I]t shall be unlawful for any subsidiary company of any
registered holding company or for any mutual service company
. .. to enter into or take any step in the performance of any
service, sales, or construction contract by which such company
undertakes to perform services or construction work for, or
sell goods to, any associate company thereof except in accord-
ance with such terms and conditions and subject to such limita-
tions and prohibitions as the [Securities and Exchange] Com-
mission by rules and regulations or order shall prescribe as
necessary or appropriate in the public interest or for the pro-
tection of investors or consumers and to insure that such con-
tracts are performed economically and efficiently for the benefit
of such associate companies at cost, fairly and equitably allo-
cated among such companies.
23a
requirement of this Act . . . the requirement of the
Public Utility Holding Company Act of 1935 shall
apply to such person, and such person shall not be
subject to the requirement of this Act ... with re-
spect to the same subject matter, unless the Securi-
ties and Exchange Commission has exempted such
person from such requirement of the Public Utility
Holding Company Act. of 1935, in which case the re-
quirements of this Act shall apply to such person.
(Emphasis supplied. )
The judge concluded that, assuming the SEC set the
price at which Ohio Power may purchase its subsidiary’s
coal, there was no conflict of jurisdiction because the
SEC regulates the intra-corporate price of coal between
Ohio Power and its subsidiary, while this Commission
sets rates." The judge concluded that the same subject
matter is not subject to the requirements of both PUHCA
and the Federal Power Act.’* We agree with the judge.
First, it is not clear that the SEC requires Ohio Power
to purchase coal from its subsidiary at cost, rather than
at market price. The SEC orders which Ohio Power cites
for this proposition state that the charges for the coal
“ill be based on actual cost,” and “will not exceed the
cost thereof to seller.” ’® These orders authorized financ-
ing for the coal.mining subsidiary. They do not appear
to mandate the cost-based price where a market price
would be lower, rather they permit a price up to a cost-
based price.
The SEC’s Rule 92 implements in part section 13 of
PUHCA. The rule prohibits a subsidiary of a registered
holding company from selling
1295 FERC at p. 65,183.
13 Jd.
14 SEC 1935 Act Release No. 17383, Dec. 2, 1971.
15 SEC 1935 Act Release No. 21537, April 25, 1980.
24a
any goods produced by it to any associate company
thereof, or enter into any contract to do so, at a
price which exceeds the price at which the purchas-
ers might reasonably be expected to obtain compar-
able goods elsewhere, or to finish them itself, giving
due regard to quality, quantity, regularity of supply,
and other factors entering into the calculation of a
fair price.'®
Thus it appears that not only does the SEC not require
a cost-based price for the subsidiary coal, the SEC may
require a market-based price for subsidiary coal if the
market price is lower than cost.’*
More importantly, assuming that the SEC has actually
affirmatively set the price which Ohio Power must pay
its subsidiary for the Martinka coal, setting the intra-
corporate price and setting rates are not the same sub-
ject matter which would bring section 318 into play. We
have taken full account of the fact that the SEC has
jurisdiction, under PUHCA, to regulate the price of coal
purchased by Ohio Power from the Martinka mine. The
1617 C.F.R. § 250.92 (1986).
17 The SEC can, pursuant to section 13(b), authorize a market-
based price for a transaction between a subsidiary and parent even
when that market-based price exceeds cost. See, New England Elec-
tric System, 1935 Act Release No. 22309, 24 SEC Docket (1981),
where the SEC, pursuant to the provisions of section 13(b), ex-
empted a contract from the cost limitation of 13(b) so that a market-
based approach could be used. Thus Ohio Power could apply to the
SEC for approval of a market-based pricing mechanism for its
affiliate coal if it so desired. See also, “Comment of the Division
of Corporate Regulation of the Securities and Exchange Commission
on the Federal Energy Regulatory Commission Staff Preliminary
Report of Investigation in FERC Docket No. E-9206 dated July 31,
1978” filed in Docket No. E-9206, on October 27, 1978, at 3. There-
fore as a factual matter, it does not appear that Ohio Power is
accurate in stating that a company subject to SEC jurisdiction pur-
suant to PUHCA is required always to sell its products to an
affiliate at cost-based prices.
25a
SEC’s jurisdiction, however, does not extend to setting
rates and determining what fuel costs Ohio Power may
collect from its wholesale customers. There is thus no
conflict in-the regulation by the SEC and the regulation
by this Commission."®
The SEC’s Division of Corporate Regulation submitted
comments in another Commission case involving AEP
affiliate coal purchases in which staff of the SEC explained
its view of the effect of SEC orders approving the financ-
ing of coal mining subsidiaries under PUHCA.” These
comments demonstrate that the SEC recognizes that it
does not set rates:
The orders of the SEC under the 1935 Act do not set
rates for operating utility companies. There is no
conflict with FERC jurisdiction. In setting rates,
FERC is legally bound to give due consideration to
cost of service, which certainly includes cost of fuel
burned, but there are a number of intermediary
steps between our order authorizing an affiliate to
acquire and mine coal reserves and the rate deter-
mination....
18 See Mississippi Industries v. F.E.R.C., 808 F.2d 1525, 1550-51
(D.C. Cir. 1987). Appalachian Power Company, another AEP owned
utility, raised the same contention regarding SEC regulation in
McDowell County Consumers Council, Inc. v. American Electric
Power (McDowell County), Docket No. E-9206. The Commission,
in setting AEP’s coal purchasing practices for investigation, re-
sponded that its investigation was “instituted for the purpose of
fulfilling this Commission’s statutory obligation as expressed in
Sections 202. 205, 206, 301, 306, 307 and 309 of the Federal Power
Act which are in no way repugnant to the exercise of any authority
which the SEC may choose to assert under its statute.” See 54
FPC 361, 363 (1975).
19 “Comment of the Division of Corporate Regulation of the Secu-
rities and Exchange Commission on the Federal Energy Regulatory
Commission Staff Preliminary Report of Investigation in FERC
Docket No. E-9206, dated July 31, 1978.”
26a
The SEC pricing orders are final orders directed, in
conjunction with the 1985 Act and the pertinent
rules, to fixing a pricing formula until further order
of the Commission. It is the rate making authority,
not the SEC, that has jurisdiction to try issues, both
of fact and of interpretation, in applying such
orders, insofar as material, to a particular rate case.
Moreover, the SEC itself, as opposed to its staff, has
recognized that its regulation of fuel-related costs, pur-
suant to section 13(b), is not in conflict with and does
not preclude this Commission setting rates. In New Eng-
land Electric System the SEC authorized a joint venture
in which a registered holding company and two of its
subsidiaries would participate in building a _ coal-fired
collier. The SEC, pursuant to section 13(b), exempted
the transaction from the cost limitations of 13(b), so
that the transportation approved by the SEC was at a
market-based price which was expected to exceed cost.
The SEC commented on the relationship of its regulation
under section 13(b) of PUHCA and this Commission’s
rate regulation:
We cannot assess now, when the vessel is under con-
struction, the extent to which the price to be deter-
mined under the charter will exceed cost under Sec-
tion 13(b). Nor are we inclined to reserve jurisdic-
tion over the adjustments and redefinitions under
the charter as they develop over the next quarter
century. The charter with NEPCO has other regu-
latory effects, not under the Act we administer, that
in this case better serve the purposes and allay our
concern.
NEPCO is engaged in the production, transmission
and sale, at wholesale, of electric energy, essentially
to the utility associate companies in the NEES sys-
tem. It is a public-utility as defined in section 201(e)
of the Federal Power Act and its rates are subject
27a
to FERC jurisdiction under section 206 thereof. The
rates allowed to NEPCO include, as a cost of service,
its cost of fuel, which as allowed to NEPCO may in-
clude either the entire cost of transportation under
the joint venture’s charter to NEPCO, if FERC
should determine that it is just and reasonable, or
some other amount.
Our grant of the exemption does not affect FERC’s
authority over rates; and the bilateral arrangement
under the charter following upon the exemption does
not prescribe what should be allowed to NEPCO in
revenues from its wholesale power customers for
transportation costs, either in allowed rates or under
the fuel adjustment clause. These adjusting effects
provide us sufficient assurance to determine that the
exemption from cost remains consistent with the
policy of section 13(b). In relying on this ratemak-
ing process we do not cede any of our statutory
responsibilities to another agency.”°
We believe that-the SEC’s analysis that its determina-
tion pursuant to section 13(b) of PUHCA does not af-
fect our authority to make rate determinations is in
accord with the presiding judge’s conclusion that the
SEC’s regulation pursuant to section 13(b) of PUHCA
does not preclude this Commission from determining the
reasonableness of Ohio Power’s coal costs during the
ratemaking process. We shall affirm the judge’s determi-
nation on this issue.
2. Section 35.14(a)(7) of the Commission’s Regula-
tions
Ohio Power contends that section 35.14(a)(7) of our
regulations *' precludes this Commission from looking at
the price of the Martinka coal because that coal is sub-
2024 SEC Docket at 307-08.
27118 C.F.R. § 35.14(a)(7) (1986).
28a
ject to SEC and Ohio PUC regulation. Section 35.14
(a) (7) provides in part that “where a utility purchases
fuel from a company-owned or controlled source, the
price of which is subject to the jurisdiction of a regula-
tory body, such cost shall be deemed to be reasonable and
includable in the adjustment clause.”’ Ohio Power argues
that we cannot change the regulation without notice to
those affected.
The judge concluded that section 35.14(a)(7) creates
a rebuttable presumption of reasonableness.** We agree.
As the judge noted, in 1975, six months after promulga-
tion of section 35.14(a) (7), the Chairman of the Federal
Power Commission submitted a letter to the Senate Sub-
committee on Reports, Accounting and Management, stat-
ing that section 35.14(a) (7) creates a presumption of
reasonableness, not a conclusive finding of reasonable-
ness. There is thus no retroactive change of a regulation
involved in this case.**
22 Ohio Power brief on exceptions at 57.
2325 FERC at p. 65,184.
24 ABP, and its affiliates, had actual notice of the Commission’s
belief that section 35.14(a)(7) of its regulations does not preclude
a comparable market-price investigation into its affiliate coal pur-
chases. The same issue was involved in McDowell County. Eight
months after promulgation of section 35.14(a) (7), the Commission
instituted an investigation of AEP’s coal purchasing practices, in-
cluding its purchases from affiliate coal companies which were sub-
ject to SEC regulation. 54 FPC 361 (1975). The Commission
ordered that the investigation “include all coal contracts whether
or not required to be submitted pursuant to Commission Order No.
517, 52 FPC 1304,” the order promulgating section 35.14(a)(7).
The Commission later ordered hearings on the coal cost issue pur-
suant to sections 205 and 206 of the Federal Power Act. 15 FERC
| 61,257, at p. 61,592-93 (1981).
Moreover, the SEC had made its determination before this pro-
ceeding was set fer hearing at this Commission. Had the Com-
mission considered the SEC determination to be conclusive, as Ohio
Power contends, the issue of Ohio Power’s coal costs would not
have been set for hearing.
29a
B. Determining the Reasonableness of Ohio Power's
Affiliate Fuel Purchases
Prior to Opinion No. 133 the reasonableness of affiliate
coal purchases were determined on a cost-of-service basis.
Under the Commission’s regulation at section 35.14(a) (7),
affiliate coal purchases which were subject to the regula-
tion of another agency were deemed to be reasonable.
If the affiliate transactions were not subject to the regu-
lation of another agency, the utility was required to jus-
tify the reasonableness of the cost of the affiliate coal.
In Opinion No. 1383, the Commission tested the reason-
ablenes of prices of affiliate coal purchases by comparing
them to prices available from non-affiliated suppliers in
a competitive market. The Commission found that “the
interests of consumers will best be protected by permit-
ting utilities that purchase coal from affiliates to recover
no more from their ratepayers than the price that would
have been incurred if a comparable coal supply contract
had been made with a non-affiliated supplier.” *5
Although the Federal Power Act does not mandate a
market-price test to determine the reasonableness of af-
filiate transactions, there is no legal impediment to the
use of such a test,*° and there are a number of reasons
arguing for its use. The Commission noted in Opinion
No. 133 that companies that are subject to the competi-
tive market are more efficient and innovative than those
assured of a recovery of costs and a reasonable return, and
that a market-price limitation on fuel expense recovery
from affiliated suppliers provides the best incentive for
“217 FERC at p. 61,246.
26 It is noteworthy that the Natural Gas Policy Act, 15 U.S.C.
$§ 3311-3432 (1982) establishes the comparable market price as
the ceiling for a just and reasonable amount a pipeline may pay an
affiliated producer for gas. See section 601(b)(1)(E), 15 U.S.C.
§ 3431(b)(1)(E) (1982).
30a
utilities to develop the least costly sources of fuel.*? In
addition to the economic efficiency prompted by a market-
price test, it provides protection from the prospect of
self-dealing that arises in transactions between affiliates.
What the Commission noted in stating the purpose of
the comparable market-price test required by the Natural
Gas Policy Act, for transactions between pipeline affili-
ates, is equally applicable to purchases from affiliates by
electric utilities: “At the heart of section 601(b) (1) (E)
is the simple notion that a pipeline may not grant a price
preference to its affiliate.”** In a New Mexico proceed-
ing subsequent to Opinion No. 133, the Commission char-
acterized the comparable market-price test as “an objec-
tive test” that prevents rate manipulation.*® It provides
a substitute for the arms-length negotiations that provide
objectivity and fair dealing in non-affiliate transactions.
The Commission has not deviated from its continued
support for a market-price test. As recently as 1985 the
Commission reaffirmed its departure from a_ cost-based
test of reasonableness for affiliate transactions. The
enunciation of the market-pricé test in Opinion No. 133
was given by the Commission as its reason for terminat-
ing a 1979 rulemaking that had proposed to amend section
35.14(a) (7) to delete the provision deeming reasonable
coal costs that were subject to the jurisdiction of another
regulatory agency and to require that utilities file affiliate
coal contracts regardless of jurisdiction by another
agency.*° The Commission, noting that the amendment
2717 FERC at p. 61,246.
28 El Paso Natural Gas Company, 23 FERC { 61,216, at p. 61,449
(1983).
29 Opinion No. 164, 23 FERC { 61,218, at p. 61,457 (1983).
30 Termination of Rulemaking Dockets, 50 Fed. Reg. 24,779 (June
13, 1985), FERC Statutes and Regulations, Proposed Regulations
1977-1981 § 32,409, at p. 33,169; Revision of Fuel Cost Adjustment
Clause Regulations Relating to Fuel Purchases from Company-
3la
to its regulations was proposed to effect the cost-based
policy in effect when the proposal was issued, found that
the filing of contracts was no longer necessary because
of the departure from that policy and the adoption of a
market-price test.*!
Under a market-price test, the question in this pro-
ceeding is whether the price at which Ohio Power pur-
chased Martinka coal from its affiliate is reasonable when
compared with prices in the market for alternative sup-
plies.
1. Establishing Comparable Market Prices
To establish a benchmark market price, staff identified
other coal-fired electric generating plants within 50-, 75-
and 100-mile radiuses of the Mitchell plant that use coal
with sulfur content and Btu heat content comparable to
that used at Mitchell,** and calculated the weighted aver-
age prices of contract coal delivered to those plants. The
prices were taken from FERC Form 423 and were ‘in-
creased by 3.1%.*
Owned or Company-Controlled Sources, 44 Fed. Reg. 28,683 (May
16, 1979), FERC Statutes and Regulations, Proposed Regulations
1977-81 -{ 32,022.
31 FERC Statutes and Regulations, Proposed Regulations 1977-
1981 § 32,409, at p. 33,169.
32 See, e.g., Ex. 13, Ex. 15 at 13-22, Tr. at 992-93. There is a high
concentration of coal-fired electric plants in the vicinity of the
Mitchell plant.
33 Form 423 was designed to collect data on the cost and quality
of fuel used for generating electricity. Among other things, the
data facilitates comparison of the costs of captive and non-captive
coal. See Change in Public Availability of FPC Form 423—Data on
Cost and Quality of Fuels for Electric Plants, Docket No. RM77-2,
44 Fed. Reg. 21,596 (April 10, 1979), 6 FERC { 61,208, at p. 61,520
(1979). The increase of 3.1% from the prices reported in Form
423 is based on a one-month audit by the Energy Information Ad-
ministration of the Department of Energy which found that report-
ing utilities had understated their costs by this percentage.
32a
The prices compared are the delivered prices, thus in-
cluding the costs of transportation. Staff’s study shows
that there are no significant differences between the
weighted average cost of comparable coal delivered within
50 miles of Mitchell and the cost of such coal delivered
within the 75- and 100-mile radiuses. Staff ultimately
relied, therefore, on prices within the 50-mile radius to
establish the comparable market price. Within that
radius, there were 13 plants which burned coal with a
sulfur content of 1-4%, the range of sulfur content in
the coal burned at Mitchell (including Martinka coal
and other coal).
The average prices of the coal at the 13 plants in
staff’s study and the prices Ohio Power paid for Martinka
coal are as follows:
Comparable Coal Martinka Percentage
(1-4% sulfur)* Coal Difference
1980 123.2MMBtu 184.9¢/MMBtu 50%
1981 138.4 268.7 94%
1982 155.4 206.8 33%
* Adjusted up by 3.1% from Form 423 data.
(a) Characteristics of Comparable Coal
A comparable market price is the price of coal that is
suitable for use at the plant in question, even if it is not
identical to the coal from the affiliated supplier. If a
certain characteristic of coal renders it unsuitable for
use at a particular plant, it may nevertheless be suitable
for purposes of price comparison, if the characteristic in
question does not affect prices in the marketplace.
Staff limited its analysis of coal contracts to those for
coal with heat content and sulfur content similar to that
of coal now burned at the Mitchell plant because these
are the two characteristics of coal that most significantly
affect prices in the marketplace.** Ohio Power has estab-
34 Ex. 18 at 12.
33a
lished that coal with a high ash-fusion temperature is
essential to the efficient operation of Mitchell Unit No.
2.°° Martinka coal has such a characteristic.** However,
Ohio has not established that ash-fusion temperature
of Martinka coal commands a premium in the market-
place over coal with lower ash-fusion temperatures. It is
therefore irrelevant for purposes of establishing compa-
rable prices that the precise ash-fusion temperature of the
coal included in staff’s set of comparable contracts is un-
known. We note however, that staff’s evidence indicates
that coal burned at neighboring plants with dry bottom
boilers, such as Mitchell’s, which generally require coal
of higher ash-fusion temperature, does not command a
price premium over coals burned at neighboring plants
with wet bottom boilers.*?
On the other hand, the captive coal may have character-
istics that increase its price in the marketplace, but. are
not required for the boiler. The Mitchell plant was de-
signed to burn coal with more than 4% sulfur content.
and meet the emission standards of the Environmental
Protection Agency.** Martinka coal has a sulfur content
of approximately 1.5%.*” The record in this case is clear
that Ohio Power switched to Martinka coal in Mitchell
Unit No. 2 because of its higher ash-fusion temperature,
not because of its lower sulfur content.*® Some of Ohio
Power’s witnesses suggest that the low sulfur content of
35 25 FERC at p. 63,060, Ex. 4 at 17.
38 ld.
** We also note that it is clear from the record that coal with
ash-fusion temperatures that met Ohio Power's bid specifications
was available at prices lower than Ohio Power paid for the Martinka
coal. See Section I1.B.1(e) of this Opinion.
38 25 FERC at p. 65,189, Ex. 8, at 10, Ex. 15 at 13.
3° See, e.g., 25 FERC at pp. 65,182, 65,189, Ex. 15kk at 12, Ex. 3
at 22, Ex. 15 at 6.
# See, e.g., 25 FERC at p. 65,181, Ex. 4 at 17.
34a
Martinka coal renders it more desirable for environ-
mental reasons than the non-affiliate coals with higher
sulfur content also burned at Mitchell.*! However, there
is no evidence that it is required. Ohio Power’s use of low
sulfur coal at Mitchell appears to be fortuitous.
As described above, staff developed its benchmark price
based on coals with 1-4% sulfur content from 13 plants.
Of the 18 plants, eight plants used coal with a range of
1-2% sulfur content, comparable to the 1.59% sulfur con-
tent of Martinka coal.** If it were clear that there were
no benefits from the use of low sulfur coal at the Mitchell
plant, a proper sample would exclude coals with 1-2%
sulfur content. It appears there are no appreciable bene-
fits in terms of the efficiency of the boiler’s operation.
However, while the low sulfur coal is not required to
meet environmental standards, there may be environ-
mental benefits from its use. We find that the use of
coals with 1-4% sulfur content is a reasonable com-
promise.
(b) Characteristics of Comparable Contracts
Ohio Power objects that the prices used by staff are
derived from contracts that were executed at different
times than the date of its contract with its affiliate mine.
Furthermore, the contracts are of different lengths of
41 See, e.g., Ex. 4 at 15-21.
42 Staff calculated a comparable market price based on the coal
from the eight plants which used the 1-2% sulfur coal. As can be
seen, the coal at these plants was also less costly than Martinka
coal:
Comparable Coal ; Percentage
(1-2% sulfur)* Martinka Coal Difference
1980 141.0¢/MMBtu 184.9¢/MMBtu 31%
1981 152.9 268.7 76%
1982 176.0 206.8 18%
* Adjusted up by 3.1% from Form 423 data.
35a
time than the term of the contract with its affiliate. In
Opinion No. 133, the Commission recognized that the
long-term reliability of a contract with an affiliate, and
the market conditions at the time a long-term contract
is negotiated, are circumstances that might justify dif-
ferences in the prices of coal that otherwise has com-
parable characteristics.* In a competitive market, prices
fluctuate in response to supply and demand, and to
changes in the purchasing power of the dollar. There-
fore, spot prices today may not be comparable to the
prices derived from a 35-year contract executed 10 years
ago.** Long-term contracts executed in a soft market,
i.e, When supply is greater than demand and prices are
depressed, would likely yield lower prices than contracts
entered during a period of tight supply and high de-
mand, even though the coal involved is identical in price-
affecting characteristics.
Ohio Power argues that the contracts in staff’s study
were inappropriate in terms of contract vintage. Ohio
Power asserts that, to establish a market price, the Com-
mission should look only at contracts entered into at the
same time as its Martinka contract. Seventy-five per-
cent of the contracts in staff’s study were entered into
after the Martinka contract.** The 1970s were a period
of almost continuous inflation. Contracts made later in
the decade, after the Martinka contract, would likely re-
flect higher prices. Staff therefore argues that its use of
later-vintaged contracts tended to produce average prices
above the level that would be truly comparable to the
Martinka contract.*’
4317 FERC at p. 61,246.
44 Ohio Power’s contract for Martinka coal was executed in 1972
for a term of 35 years.
* Ohio Power brief opposing exception at 53-54.
#6 25 FERC at p. 65,197; Ex. 15 at 15, Ex. 15RR at 5.
47 Staff brief on exceptions at 60 n.30.
36a
Ohio Power’s witness, Mr. Renton, testified that the
coal market was “soft” from late 1971 until early 1973.
Supply exceeded demand and prices were low. Ohio
Power’s contract for Martinka coal was dated October 1,
1972, in the midst of the soft market. The Arab oil em-
bargo and sharp increases in the world price of crude oil
in 1973 apparently caused a “tight” coal market, and
prices moved higher.*® Mr. Renton characterized the
market as soft from late 1974 through early 1979, fol-
lowed by a tight market for a brief period in 1979
through the first part of 1980.°° This testimony does not
indicate any circumstances in the coal market when the
Martinka coal contract was made that would justify un-
usually high prices. Nor does it indicate that prices de-
rived from later-vintaged contracts are likely to be lower
than prices reflecting the 1972 market conditions.
Staff utilized a statistical analysis technique to at-
tempt to discern a correlation between the prices paid
under its set of comparable contracts and the vintages of
those contracts. Its analysis failed to show any consis-
tent, discernible correlation.*' The judge ultimately con-
cluded that vintages could affect the prices, and should
be looked .at carefully.°° We agree. The parties have
adequately considered the possible effects of vintage on
the prices derived from staff’s set of comparable con-
tracts. The only conclusion we can draw is that staff’s
benchmark prices may be higher, i.e., skewed in favor
of Ohio Power, than if only contracts of the Martinka
vintage were used for comparison.
48 Tr. 639-41.
49 Tr. 641.
50 Tr. 642-43.
5125 FERC at p. 65,187, Ex. 13G at 15.
52 25 FERC at p. 65,199.
37a
Ohio Power presented evidence of correlations between
higher prices and larger quantities of coal delivered un-
der a contract, and between higher prices and contracts
of longer duration. The reliability of the data used to
show these correlations and the validity of the conclu-
sions drawn were contested by staff. The judge declined
to draw any conclusions from the welter of conflicting
testimony on these contentions. Staff points out that
Ohio Power failed to quantify what adjustments to staff’s
benchmark prices would be warranted if Ohio Power’s
alleged correlations were accepted.” We are likewise un-
able to conclude on the basis of the record evidence that
the asserted correlations exist, or if so, what adjustments
to the benchmark prices they would warrant.
(c) Other Measures of Comparability
(1) Mine-mouth plants
Ohio Power argued that mine-mouth plants should be
excluded from the set of contracts used by staff in devel-
oping the benchmark prices because the delivered prices
of coal to such plants would not include any significant
transportation costs, while the delivered prices to the
Mitchell plant include such costs.** In order to test Ohio
Power’s claim, staff excluded mine-mouth plants burning
1-4% sulfur coal within 50 miles of Mitchell and found
that the average price was slightly lower in 1980 {—2.7¢
MMBtu or 2.3% lower), and slightly higher in 1981
(--O.le or 0.1° higher) and 1982 (--8.0¢ or 2.0%
higher). Staff’s analysis shows that the delivered prices
of coal to mine-mouth plants are not significantly differ-
ent from delivered prices to the other plants in the
53 25 FERC at p. 65,199, Ex. 9H at 9-15.
5425 FERC at p. 65,199.
55 See, e.g., Staff brief on exceptions at 61-62, n.80, 73-74.
56 Ex. 9F, see also Ohio Power brief opposing exceptions at 49.
38a
region.*” Therefore, we find staff’s inclusion of mine-
mouth plants in its set of comparable contracts acceptable.
(ti) Transportation costs
Ohio Power questioned staff’s reliance on delivered
prices to plants other than Mitchell without considering
the possible effects of differing costs of transportation.
Ohio argued that the delivered price of some alternative
coal supply might be higher (or lower), if delivered to
the Mitchell plant rather than some other plant in the
region, if the transportation costs are different.°* How-
ever, the marginal differences in the costs of transporting
coal to any point within a 50-mile radius are likely to be
small, and there is no reason to anticipate that the aver-
age of any such differing costs to other plants would be
lower than the transportation costs of shipping coal to
the Mitchell plant.*
(iti) Geographical area
Ohio Power argues that if staff’s 100-mile radius were
slightly extended it would then include three more plants
whose coal prices would significantly increase the aver-
+ ages and that “a natural break in the chain of substitu-
tion’ occurs just beyond the extended radius.© Staff
points out that two of the plants Ohio Power wants to in-
clude in the sample burn coal with less than 1.0% sulfur
and would thus be outside the range of comparable coal.
The coal prices at the other plant are only slightly higher
than the average of those within the 100-mile radius.*!
57 See, e.g., Ex. 186 at 17-18, Ex. 15QQ at 3.
58 Ohio Power brief opposing exceptions at 50.
59 Differing transportation costs would have to be considered if
benchmark prices were derived from only one or two comparable
contracts.
6 Ohio Power brief opposing exceptions at 48.
$1 Ex. 15QQ at 1-3.
|
39a
Drawing a line at 50 miles or 100 miles obviously in-
volves an element of discretion. If a 100-mile radius is
reasonable, it is unlikely that a 105-mile radius would
be unreasonable. But once the line has been drawn, and
there are reasonable arguments to support where it is
drawn, the burden is on a challenger to demonstrate con-
vineingly that the line should be drawn elsewhere. Ohio
Power’s proposal to include one more plant using coal
with comparable sulfur content does not carry that
burden.
We find that the presence of 13 plants within 50 miles
that burn coal with price-affecting characteristics suit-
able for use at Mitchell provides an adequate sample of
the relevant market by which to compare Martinka
prices.
(iv) Price premium for affiliate supply
Ohio Power claimed that, in comparing affiliate coal
prices with market prices, affiliate coal prices should be
adjusted to reflect a price premium warranted by the
security and reliability of an affiliate coal supply.*? Ohio
Power, however, makes no attempt at quantifying this
price premium. In fact, the evidence indicates that, at
least during the 1981 coal strike, the supply of Martinka
coal was not as reliable as Ohio Power alleges it to be.
We have considered the reliability premium argument
raised by Ohio Power, but find that the company failed
to meet its burden of demonstrating that such a premium
is warranted.
(v) Mine type
Finally, Ohio Power argues that staff’s inclusion of
stripmine coal in its sample tends to produce a lower
average price than if only coal from underground mines
were considered. Ohio Power asserts that coal from un-
62 Ohio Power brief opposing exceptions at 60-62.
40a
derground mines is generally more expensive than other-
wise comparable coal from strip mines.“ However, staff’s
evidence shows that the strip-mine coal in its sample
was more costly than the coal from underground mines.“
Even if Ohio Power’s assertion is generally true, there is
nothing in the record to justify paying a premium for
coal from an underground mine if suitable coal is avail-
able at less cost from a strip mine.
(d) Average Price versus Range of Prices
Ohio Power argues that when a set of contracts are
identified as comparable, the prices under these contracts
should be viewed as establishing a range of reasonable
prices. If prices under the affiliate contract fall within
the range, they should be deemed reasonable. If they are
above the highest prices in the range, refunds should be
required to bring the affiliate contract prices down to the
highest prices in the range, but no lower.® The effect of
Ohio Power’s approach would be to make the contract
with the highest prices the benchmark, and to disregard
prices under the other contracts. However, we cannot ig-
nore the other contracts in the group unless the similari-
ties between the affiliate contract and the contract with
the highest prices are so striking, and the dissimiliarities
of the other contracts in the group so significant that the
highest-paid contract should clearly serve as the bench-
mark. Ohie Power did not argue that its Martinka con-
tract was strikingly similar to the highest priced compar-
able contract.
Moreover, the use of a weighted average price is a con-
vention frequently employed to establish a reasonable
midpoint. It-is more appropriate than relying on the
highest-priced coai under any reasonably comparable con-
83 Ohio Power brief opposing exceptions at 61.
64 Ex. 15QQ at 3-5, Ex. 15RR at 6-7.
85 Ohio Power brief opposing exceptions at 4, 13-17.
86 See Tennessee Gas Pipeline Co., 38 FERC { 61,306 (1987).
4la
tract to set the market standard and effectively ignoring
all other lower prices under other reasonably comparable
contracts.
(e) Ohio Power’s Market Price Evidence
Ohio Power submitted evidence of its bid solicitations
in 1980 and 1981 for Martinka-quality coal and the re-
sponses from independent coal suppliers.’ Current bids
are not likely to reflect the same factors affecting prices
under the contract for Martinka coal, signed 10 years
earlier, and original bids are likely to be higher than
finally negotiated contracts. Nevertheless, we agree with
the judge that evidence of current bids is relevant to dis-
cerning current market prices.
Staff notes that the average delivered price of the six
lowest bidders in 1980 was roughly $1.42/MMBtu.®
This compares to the $1.41 adjusted benchmark price
that staff derived from its set of comparable transactions
(for 1-2% sulfur content coal) while Ohio Power paid
$1.85/MMBtu for Martinka Coal.* The 1981 solicitation
identified seven suppliers who bid to supply low sulfur
coal (comparable to Martinka), with ash-fusion tempera-
tures and other characteristics that met Ohio Power’s
bid specifications, at an average delivered price of
roughly $1.54 per MMBtu.” This compares to staff’s
conclusion that the comparable market price for low sul-
fur coal (1-2%) that year-was $1.53, while Ohio Power
paid $2.69 for Martinka coal.*! Thus, Ohio Power’s bid
67 Ex. 15DD.
88 Staff brief on exceptions at 42.
89 See n.42, supra.
*© Staff brief on exceptions at 43, Ex. 15LL at Sch. 6.
71 See n.42, supra. The judge noted that the Martinka mine was
closed during part of 1981 because of a strike and other operating
difficulties. 25 FERC at p. 65,182. Because Ohio Power’s contract
42a
evidence can be viewed as supporting staff’s position on
comparable market prices.
The judge said that the 1980 and 1981 bid solicitations
lead to the conclusion that Martinka-quality coal could
have been obtained at a cheaper price than was paid
by Ohio Power."? However, he found this conclusion to
be tempered by the fact that the market may have been
soft in those years.** The average price of 22 offers made
in 1980 ($1.58/MMBtu) compares to staff’s adjusted
weighted average price of $1.41/MMBtu for low-sulfur
coal used within a 50-mile radius. In 1981, Ohio Power’s
average of 20 offers ($1.76/MMBtu) compares to staff’s
comparable benchmark price of $1.53/MMBtu. However,
the judge’s ultimate conclusion that Martinka prices “are
not too bad” was based on his comparisons of the $40
per ton (converted from cents per MMBtu) average of
the 1980 bids to the $44.10 per ton paid for Martinka
coal and the $45 per ton average of the 1981 bids to
the $48 per ton paid for Martinka coal in 1982 (sub-
stituting 1982 Martinka prices for 1981 prices to avoid
the distortions caused by the strike) .™
We think the prices from the lower bids are more in-
dicative of market prices. Bids are indicative of market
prices to the extent they are likely to be accepted and
form the prices for transactions. Actual transactions are
more likely to develop from among the range of lowest
bids. Consequently, we believe staff’s average of the
lower bids is more indicative of current market prices
obligates it to pay the Martinka mine’s fixed costs regardless of the
amount of production, Tr. 734, the unit cost of Martinka’s coal was
abnormally high in 1981. Therefore, the bid prices averaging $1.54
might be more properly compared to the $2.07 paid for Martinka
coal in 1982.
72.25 FERC at p. 61,195.
73 Jd.
74 Jd.
iniieiaeniammeatineemmasciiniiiiaiiiaiaaaaiiiiiaiiaiaiiiel
43a
than the average of all bids used by the judge as the
basis for his conclusions.
Ohio Power also identified four coal seams owned by
independent coal suppliers, within a 75-mile radius of the
Mitchell plant, that could provide Martinka-quality coal.”
Ohio_Power compared the weighted average prices of coal
from this sample of mines to show that Martinka coal
was $6.89 per ton more expensive ‘in 1980, and $17.82
more expensive in 1981 (the abnormal year), but $6.08
per ton less expensive in 1982.76
Ohio Power’s study was offered to show the reasonable-
ness of the cost of Martinka coal but not to serve as the
basis for repricing the coal.” However, even if it had
been offered for the purpose of establishing a comparative
market price, we would not find it adequate. There is
substantial evidence that the relevant geographic market
based on the location of mines rather than proximate
coal-fired plants would approximate the geographic
boundary of the Department of the Interior Bureau of
Mines Districts Nos. 1-8, a much larger area than a
75-mile radius. The coal burned in other plants near
Mitchell comes from those districts.78 Ohio Power’s bid
solicitations went to companies with mines in those dis-
tricts.” Ohio Power argues that coal from beyond 75
miles is usually not competitively priced because of the
transportation costs. However, several suppliers from
well beyond 75 miles (and within District Nos. 1-8) were
among the bidders with the lowest delivered prices.*°
Ohio Power’s study focused on prices of relatively small
5 Exhibit 4 at 33-39,
"6 Exhibit 4K.
"7 Ex. 4 at 37.
‘8 Ex. 15 at 15, 15BB, Ex. 15CC.
9 Ex. 13 at 15.
80 Ex. 15LL at Sch. 6.
44a
quantities of coal, and there are several other aspects of
the study, as the judge noted,*' that preclude us from
according it weight as an indicator of comparable market
prices. |
2. Burden of Proof
Under section 205(e) of the Federal Power Act and
§ 35.13(e) (3) of the Commission’s regulations,** the
utility bears the ultimate burden of proving that its rates
are just and reasonable. Application of the burden of
proof is described in Minnesota Power & Light Co.
|U]tilities seeking a rate increase are not required
to demonstrate in their cases-in-chief that all ex-
penditures were prudent .... However, where some
other participant in the proceeding creates a serious
doubt as to the prudence of an expenditure, then the
applicant has the burden of dispelling these doubts
and proving the questioned expenditure to have been
prudent.**
The judge in this proceeding found that staff’s evidence
created a serious doubt as to whether the price paid for
Martinka coal was prudent. He stated that Ohio Power
“convincingly erased that doubt but did this primarily
by attacking the staff’s presentation rather than by an
affirmative showing of prudence.” ** The judge then found
that Ohio Power had satisfied “whatever legal require-
ment is involved in meeting its burden.” ** We disagree.
Ohio Power did not dispel the doubts raised by the staff’s
evidence and did not prove affirmatively that its fuel
costs were reasonable.
8125 FERC at p. 65,2038.
8216 U.S.C. § 824d(e) (1982); 18 C.F.R. § 35.13(e) (3) (1986).
8311 FERC { 61,312, at p. 61,645 (1980). See also, Anaheim v.
F.E.R.C., 669 F.2d 799, 809 (D.C. Cir., 1981)
8425 FERC at p. 65,202.
85 Id.
45a
Staff has shown that Ohio Power paid in excess of the
market price for the Martinka coal, and Ohio Power did
not rebut this showing. Moreover, Ohio Power failed to
come forward with evidence that its affiliate coal costs
were reasonable in comparison to market prices. As de-
scribed above, all Ohio Power sought to do was cast
doubt on different elements of staff’s case. Ohio Power
never attempted to show what the market price of coal
was and therefore failed to show affirmatively that the
prices it paid for the Martinka coal were reasonable.
Ohio Power also failed to show that staff’s evidence did
not establish a market price with which to compare the
cost of Martinka coal. We therefore shall reverse the
judge’s conclusion that Ohio Power met. its burden of
establishing that its costs were reasonable.
3. Conclusion
Our review of the record leads us to conclude that
staff’s market study, identifying plants within 50 miles
of Mitchell that burn coal of comparable Btu content to
that of Martinka coal and with suitable sulfur content
(within a one to four percent range), provides a reliable
calculation of comparable market prices by which to judge
the reasonableness of Ohio Power’s Martinka coal costs.
The comparison * demonstrates that Ohio Power’s costs
of Martinka coal were 50% above market in 1980, 94%
in 1981, and 33% in 1982. We have already considered
proposed adjustments to the prices of comparable trans-
actions to account for differences between the Martinka
coal and that of comparable or suitable coal. We have
considered differences in vintage, quantity, and duration
of the contracts, and all other factors that the parties
have suggested may justify higher prices for Martinka
coal. Ohio Power has not justified disparities of the
magnitude noted above.*?
86 See chart in section II.B.1. of this Opinion.
87 We note that Ohio Power’s Martinka coal costs have continued
to exceed significantly the market price derived from the plants in-
46a
Ohio power suggests that there are many reasons for
it to enter into affiliate coal contracts. Among these rea-
sons are the effect of having affiliate coal mines on Ohio
Power’s ability to negotiate favorable coal contracts with
independent coal suppliers. Ohio Power argues that the
effectiveness of its coal purchases program is shown by
the fact that its electric rates are low in comparison to
neighboring utilities’ rates. The relative level of Ohio
Power's rates, however, is not evidence that its affiliate
coal purchases are reasonable. There are a variety of
reasons, totally unrelated to coal costs, that a neighbor-
ing utility might have differing rates. We therefore are
left with a comparison of the Martinka coal prices with
market price.
In view of the significance of the deviation between
Ohio Power costs for Martinka coal and comparable mar-
ket prices, we cannot conclude that Ohio Power’s pur-
chases of Martinka coal for its Mitchell plant are reason-
able costs for its ratepayers to bear. Ohio Power has not
submitted evidence which indicates otherwise. We there-
fore find that Ohio’s rates based on those costs are not
just and reasonable.
cluded in staff’s study. According to data from FERC Form 423,
Martinka’s prices have exceeded market by 24.2% to 33.4% in the
years 1983 through September 1986. The comparisons are charted
below:
Comparable Coal Percentage
(1-4% sulfur)* Mertinka Coal Difference
1983 157.0¢ MMBtu 195.1¢ MMBtu 24.3%
1984 153.4 199.5 30.1
1985 53.9 191.1 24.2
1986** 149.1 _ 198.9 33.4
* Adjusted by 3.1% for comparison purposes with staff's
1980-82 figures. We have no evidence that the underreporting
noted in EIA’s one-month audit, and on which staff relied in
its calculations, continues to occur.
** Through September.
47a
C. Establishing a Just and Reasonable Fuel Charge
Having determined that Ohio Power’s rates are not
just and reasonable, the Commission must establish a
fuel charge that will result in a just ‘and reasonable rate.
This proceeding is distinguishable in this respect from
the proceeding in Opinion No. 133. In that case, the
Commission affirmed the judge’s finding that the price of
affiliate coal was reasonable under the market-price fest,
and it was, therefore, unnecessary for the Commission
to establish an allowable price.
In this instance, the Commission believes it is reason-
able to use a market price as the benchmark for Ohio
Power’s future fuel charges for Martinka coal and from
which to calculate refunds for overcollections. For the
same reasons that a market-price test is approved for
determining the reasonableness of the company’s proposed
charges, it is appropriate to use the market-price to cal-
culate the just and reasonable rate when the company’s
charges are found unreasonable, particularly in this case
where the parameters for determining a comparable mar-
ket price have been adequately developed in the market
price analysis presented by staff.
Ohio Power posed arguments on and opposing excep-
tions to the initial decision regarding the adverse effects
that would result if this Commission reprices its coal at
a market price. For instance, Ohio Power argues that
if this Commission reprices its fuel according to market
price, while the SEC applies a cost-of-service require-
ment, it will be “whipsawed” by the two commissions.*®
Ohio Power argues that its investment in the Martinka
coal mine should not be judged by focusing on a short-
term comparison with prices from alternative non-
affiliated suppliers. Even if its prices during the early
years of the mine’s production may be above the market,
that relation may not continue. Ohio Power argues that
88 See, e.g., Ohio Power brief on exceptions at 35, 62.
48a
the payments for Martinka coal, based on costs, may. be
eventually less than the comparable market prices.“
Ohio Power states that what may look like a “bad deal”
in the short run may prove to be a “good deal’ in: the
long run. However, Ohio Power argues if its charges to
its wholesale ratepayers are limited to the market price
during the early years of the contract, it will lose money
on the transactions if, in the later years when market
prices may exceed the cost of producing the captive coal,
the SEC limits the affiliate transfer price to costs. There-
fore, Ohio Power suggests that it would have no oppor-
tunity to recoup the losses it may have incurred in the
early years.”
Ohio Power argues that the practical effect of having
this Commission régulate the transaction with Ohio
Power’s ratepayers by one standard, while the SEC regu-
lates the transaction with its affiliate by another stand-
ard is to limit it to recovery under the lowere@f the two
standards.”"' Ohio argues that this amounts to a partial
confiscation of its investment in Martinka, and is unfair
and perhaps unconstitutional.” It is also detrimental to
public policy, Ohio Power argues, because utilities faced
with the SEC FERC “whipsaw” will forego the advan-
tages of captive coal mines.”*
8? The costs which Ohio Power seeks to recover are the equivalent
of rate-based regulated costs. Prices under rate-base regulation
may be high during the early years of the inclusion of new plant
in rate base. As depreciation expense is recovered, the rate base
dwindles and the return on the diminished rate base likewise
dwindles (if the rate of return is constant). This phenomenon is
called the “front-end load effect” of rate-base pricing.
“Ohio Power brief on exceptions at 25, 63, 65.
91 See, e.g., Ohio Power brief on exceptions at 17, 52.
2 Ohio Power brief on exceptions at 25, 33, 56. Ohio Power brief
opposing exceptions at 70.
%3 Ohio Power brief on exceptions at 63.
49a
Ohio Power’s argument is misplaced. As noted above,
we agree with the presiding judge’s conclusion that this
Commission regulates rates while the SEC regulates the
intra-corporate price of coal and that section 318 of the
Federal Power Act does not preclude the Commission
from determining the just and reasonable charge for
Ohio Power to recover from its wholesale customers for
its purchases from the Martinka mine.”
The amount that the SEC allows as the transfer price
of coal between Ohio Power and the Southern Ohio Coal
Company does not dictate the amount that Ohio Power
may recover in rates to its customers for fuel costs. This
Opinion orders the company to charge ratepayers, at
most, the comparable market price for Martinka coal.
Although the SEC may limit the affiliate transfer price
to costs even when market prices are higher than costs,”
for electric rate purposes Ohio Power will have the option
to charge its wholesale customers up to the market price
for that affiliate coal. Consequently, Ohio Power is not,
at it alleges, required to limit its rate recovery of Mar-
tinka coal costs to the lower of the two standards.
Allowing Ohio Power to collect the market price, even
when the market price exceeds costs, is consistent with
our holding in Opinion No. 133 where we stated that
“the interests of the consumers will best be protected by
permitting utilities that purchase coal from affiliates to
recover no more from their ratepayers than the price tha
would have been incurred if a comparable coal supply
contract had been made with a non-affiliated supplier.” *”
When market prices are lower than costs, tying fuel
charges to the comparable market price assures that rate-
payers will pay for affiliate coal no more than they would
have paid for non-affiliate coal. On the other hand, when
*% 25 FERC at p. 65,183.
% But see n.17, supra.
617 FERC at p. 61,246.
50a
the market price exceeds costs, ratepayers will still be
paying no more than what they would pay for non-
affiliate coal, and will not be harmed by the affiliate re-
lationship.
Establishing the comparable market price as the allow-
able fuel charge for affiliate coal supplies in this case
will provide an incentive to Ohio Power to ensure that
its subsidiary coal company is as innovative and operates
as efficiently as possible.*7 The lower the affiliated con--
pany’s costs, the higher Ohio Power’s potential return on
investment. ,
By allowing the collection of the comparable market
price, regardless of whether the price is higher or lower
than costs, Ohio Power will not be limited to collecting
market price only when costs may be higher, which would
preclude it from recouping high start-up costs as the
costs of mining drop relative to market price. Establish-
ing the reasonable cost of the affiliate coal supply by a
comparison with the competitive market allows Ohio
Power the same chance to earn a return on investment
in its affiliate coal mine as an independent supplier of
coal. It is Commission policy that a regulated company
should not receive less revenue for its sales due solely to
the mere affiliation between supplier and purchaser.*®
Whether or not Ohio Power’s commitment to Martinka
coal proves to be “a good deal” over the long run will
depend on Ohio Power’s ability to recover its investment
in the mine, plus a reasonable return, without charging
its ratepayers for fuel costs in excess of comparable mar-
ket prices. However, this consideration is irrelevant when
a comparable market price is established as a just and
reasonable rate. Under the rational of tying affiliate coal
costs to the comparable market price, not only must cost
%7 Jd.
98 Columbia Gulf Transmission Company, Opinion No. 47, 8
FERC 61,002 (1979), reh’g denied, 9 FERC 61,355 (1979).
5la
recovery be limited to the market price when actual costs
exceed market price, but fuel charges must be allowed
up to the market price, even if actual costs are less.
Therefore, if, as Ohio Power argues in this case, its in-
vestment in the Martinka coal mine will prove to be a
good deal in the long run, it will benefit by recouping
losses that result from the refunds of excessive fuel costs
required by this Opinion and order.
D). Calculation of Coal Cost Recovery and Refund
The benchmark price mechanism approved and ordered
in this Opinion will establish, for Ohio Power’s Mar-
tinka coal, the market price, which will be the just and rea-
sonable fuel adjustment charge under the Federal Power
Act. The Commission will change the benchmark price
mechanism only prospectively, if it can be shown that it
no longer serves as a valid tool for determining compar-
able market prices. As ordgred below, Ohio Power must
calculate refunds and future fuel adjustment clause col-
lections based on the benchmark price mechanism ap-
proved in this Opinion. The benchmark price will be
based on data from FERC Form 423 and will be derived
from the weighted average delivered price of contract
coal to plants within 50 miles of the Mitchell plant and
having a sulfur content of 1-4% and a Btu content of not
less than 11,500 Btus per pound.”
Refunds for excessive coal costs collected through the
fuel adjustment clause prior to the filed rates in this
proceeding are not mandatory. Staff recommends refunds
only from the dates that Ohio Power’s proposed rates
in this proceeding became effective subject to refund—
July 29, 1982 for the Wheeling Electric Company, and
December 28, 1982 for the municipals.'”
*° The Mitchell plant’s boilers require Goal of not less than 11,500
Btus per pound. Ex. 15 at 13, Ex. 3 at 36.
100 The suspension order in these proceedings established these
dates. 20 FERC © 61,081 (1982).
The municipals, on the other hand, seek refunds for
all of 1980, 1981 and 1982, in addition to excesive fuel
costs collected since December 28, 1982. The municipals
point out that we have authority to require refunds of
any costs previously collected under a fuel adjustment
clause, if such costs are found to be imprudent, unjust
or unreasonable, regardless of whether such costs were
recovered through rates collected subject to refund.'”
We must determine whether, and if so to what extent,
refunds of historical coal costs are warranted in light of
the interests of the customer andthe utility." For the
reasons stated below, we will require refunds for Ohio
Power’s collections of its Martinka coal costs only after
the effective date of the rate increases under these pro-
ceedings.
The Commission did not adopt the comparable market-
price test for the reasonableness of affiliated coal costs
until the issuance of Public Service Company of New
Mexico, Opinion No. 133, on November 9, 1981. Prior to
that date Ohio Power would not necessarily have antici-
pated that fuel charges within the cost-based limits im-
posed by the SEC might not be acceptable under this
Commission’s regulation. No one challenged the reason-
ableness of these affiliate coal costs until the instant pro-
ceeding. As such, no-refunds will be ordered for exces-
sive costs collected prior to the effective date of supersed-
ing rates in this proceeding.
01 Public Service Company of New Hampshire, Opinion No. 37,
6 FERC § 61,299 (1979) ; Electric Cooperatives of Kansas, 14 FERC
{61,176 (1981); Carolina Power & Light Company, 17 FERC
{61,118 (1981); and Delmorva Power and Light Company, 24
FERC 61,199, at p. 61,461 (1983).
102 Second Taxing District of the City of Norwalk v. F.E.R.C.,
683 F.2d 477, 490 (D.C. Cir. 1982).
53a
The Commission orders:
(A) The initial decision is affirmed and adopted to the
extent it is not-inconsistent with this Opinion and order.
Eixceptions to the initial decision not granted in this
Opinion are denied.
(B) Ohio Power shall file revised rates in accordance
with this Opinion and order, and refund the difference
between amounts collected subject to refund and amounts
payable under the revised rates. Refunds shall be made
with interest, in accordance with 18 C.F.R. > 35.19 (a)
(1986),
(C) Ohio Power shall file, within 30 days of the date
of issuance of this Opinion and order, an amendment to
its fuel adjustment clause. This amendment shall specify
the method, consistent with paragraph (D), for estimat-
ing monthly fuel charges for billing purposes (unless a
lagged fuel adjustment is used) and any true-up proce-
dures to adjust for actual data as it becomes available.
(D) Ohio Power shall calculate the comparable market
prices for its purchases of Martinka coal for delivery
to. its Mitchell plant in accordance with the following
method and on the basis of data filed with the Commis-
sion on FERC Form 423, and may include up to the
comparable market price of Martinka coal in calculating
that portion of its monthly fuel charge related to fuel
costs associated with genération from the Mitchell plant.
The comparable market price shall be the weighted aver-
age delivered price of contract coal, having a sulfur con-
tent of 1-4% and a Btu content of not less than 11.500
Btus per pound, to plants within 50 miles of the Mitchell
plant. To the extent Ohio Power calculates the compa-
‘able market price on the basis of estimates, for fuel
clause purposes it shall adjust its fuel charge on the
basis of the data filed with the Commission on FERC
Form 423 within six months of calculating any compa-
rable market price on the basis of estimates. Ohio Power
54a
must also revise its demand rates to reflect benchmark
prices for Martinka coal used at its Mitchell plant in its
Period II working capital estimates.
(E) Ohio Power shall make refunds in accordance
with paragraph (B) and implement the procedures re-
quired by paragraphs (C) and (D) within 75 days of the
date of issuance of this Opinion and order. However, if
an application for rehearing is pending at the end of the
75-day period, the refunds shall be made, and the proce-
dures implemented, within 30 days of the date such
application is disposed of by the Commission.
(F) The May 15, 1986 motion of New England Power
Company to file an amicus curiae brief in this proceeding
is denied.
(G) Subdocket 000 of Docket Nos. ER82-553 and
ER82-554 are hereby terminated. New subdockets will
be assigned to Ohio Power’s compliance filings required
by this order.
55a
APPENDIX D
FEDERAL ENERGY REGULATORY COMMISSION
Commission Opinions, Orders and Notices
Docket Nos. ER82-553-002. ER82-553-003,
IE R82-554,002, and ER82-554-003
OHIO POWER COMPANY
_
Opinion No. 272-A; Opinion and Order Denying Requests
for Rehearing, and Denying Request for Stay
(Issued April 7, 1988)
Before Commissioners: Martha O. Hesse, Chairman;
Anthony G. Sousa, Charles G. Stalon, Charles A. Tra-
bandt and C. M. Naeve.
[Note: Opinion No. 272 on recovery of the cost of coal
purchased from an affiliate issued April 30, 1987, ap-
pears at 39 FERC P61,098. |
[Opinion No. 272-A Text]
On April 30, 1987, the Commission issued Opinion No.
272 in this proceeding.’ The Commission affirmed the
presiding administrative law judge’s conclusion in the
initial decision? that the Commission is not precluded by
either statute * or regulation ‘ from determining whether
1 Ohio Power Company, Opinion No. 272, 39 FERC P61,098
(1987).
2 Ohio Power Company, 25 FERC P63.060 (1983).
% Section 318 of the Federal Power Act, 16 U.S.C. § 825q (1982).
*18 C.F.R. § 35.41(a)(7) (1987).
56a
it is just and reasonable for Ohio Power Company (Ohio
Power) to recover the full costs of its purchase from the
Martinka mine from its wholesale rate payers, and that
Ohio Power’s affiliate coal costs are subject to the com-
parable market price test, adopted in Public Service Com-
pany of New Mexico, Opinion No. 133,° to determine the
reasonableness of those costs. The Commission, however,
reversed the initial decision by concluding that the costs
Ohio Power had recovered for its purchases of Martinka
coal were unreasonable when compared with the market
price for comparable coal. The Commission ordered Ohio
Power to refund amounts collected, as of the effective
dates of the rates in these proceedings, to the extent that
they reflect a price exceeding the market price for com-
parable coal.
Ohio Power has filed a request for rehearing. The
Utility argues that section 318 of the Federal Power Act
and section 35.14(a) (7) of our regulations preclude the
Commission from considering the reasonableness of Ohio
Power’s affiliate coal costs. Ohio Power also urges that
the Commission’s decision was not based on substantial
evidence. Ohio Power believes. the Commission should
have analyzed its coal purchases using a prudence stand-
ard which, it contends, would have resulted in the Com-
mission’s approving the utility’s affiliate coal costs. Ohio
Power further contends: that the comparable market
price test in this case is inconsistent with the standard
used in Tennessee Gas Pipeline Co.;* that the Commis-
sion should look at Ohio Power’s total coal proeurement
and utilization program; and that the record shows that
Ohio Power’s rates are relatively low. Therefore, the
Commission should allegedly not be concerned with the
reasonableness of Ohio Power’s coal costs because it is
517 FERC P61,123 (1981), reh’g denied, 18 FERC P61,036
(1982), aff'd, Public Service Company of New Mexico v. FERC,
832 F.2d 1201 (10th Cir. 1987).
® Opinion No. 269, 38 FERC P61,306 (1987).
57a
the rate and not isolated expense components that must
meet the “just and reasonable” test. Ohio Power urges
that the Commission should have not ordered refunds be-
cause the Commission adopted a novel interpretation of
its fuel adjustment clause regulation, extending the mar-
ket price test of Opinion No. 133 to a utility with above
market price coal costs, and because the Commission
waited more than three years to reverse the judge’s deci-
sion that Martinka coal costs were not unreasonable, Ohio
Power requests that if the Commission denies rehearing,
our refund order should be stayed pending judicial review.
Finally, Ohio Power argues that our order has the effect
of revising the company’s demand rates. The company
alleges this is impermissible since those rates were settled
earlier in this proceeding.
On June 1, 1987, the Municipal Wholesale Electric
Customers of Ohio. Power (Municipals) filed a request
for rehearing of Opinon No, 272. The Municipals claim
that the Commission should have ordered refunds for the
period 1980-1982 as well as from the effective date of
the rates, December 28 1982. [pn addition, they request
that the Commission clarify whether refunds are to be
base! on a market price determined with a 3.1% upward
adjustment.’
Discussion
The requests for rehearing raise no arguments which
warrant changing our decision in these proceedings. We
7 As indicated in Opinion No. 272, the 3.1% adjustment was made
to compensate for a potential error in the historical data, for pur-
poses of determining whether Martinka coal costs have been exces-
sive. This adjustment was made out of an abundance of caution in
assessing the reasonableness of Ohio Power's coal costs. However,
in ordering refunds, we directed the utility to caleulate refunds
using actual data from FERC Form 123 without making any
adjustment. 39 FERC at p. 61,289. No further clarification is
necessary.
58a
shall, however, address several points raised in the plead-
ings.
Ohio’ Power contends that we must conduct a “pru-
dence” analysis in order to assess the reasonableness of
its Martinka coal costs. The Commission has already
determined in Opinion No. 133 that, as a matter of
policy, affiliate coal purchases should be judged by a
market price standard, 17 FERC at p. 61,246, and our
decision has been affirmed on appeal. 832 F.2d at 1212-14.
The utility’s argument that we must conduct a “pru-
dence’ analysis in the circumstances of this case is with-
out merit.
Ohio Power also argues that our market price test is
inconsistent with that used by the Commission in Ten-
nessee Gas. In Tennessee Gas, we held that in determin-
ing the reasonableness of natural gas prices paid to affili-
ate producers by pipelines, it was appropriate to compare
the weighted average price of all affiliate natural gas with
prices paid to nonaffiliates by the pipeline and third
parties. In this case, we. have focused solely on the price
paid by Ohio Power for coal from the Martinka mine. The
decision in Tennessee Gas is inapposite to this case. As
Ohio Power admits in its request for rehearing, all pipe-
line natural gas is fungible, whereas all coal is not. In
addition, the question of, whether prices paid to affiliated
coal suppliers should be averaged, where more than one
affiliate relationship is questioned in a particular case,
is not present in this proceeding. In any event, Ohio
Power has not presented any evidence in support of a
determination of market price under the test used in
Tennessee Gas, and, thus, failed, even under that stand-
ard, to dispel the doubts raised by Staff’s evidence as to
the reasonableness of the price paid by it for coal from
the Martinka mine.
.
Ohio Power’s argument that we erred by revising its
demand rates is also misplaced. In approving an earlier
settlement in this proceeding, we stated that it would
®
59a
become effective December 28, 1982, not subject to refund
as to any issue except to the extent an adjustment is
required as a result of the Commission’s determination of
the captive coal issue. 23 FERC P61,236 (1983). Be-
cause the value of Martinka coal as ‘aleulated under the
market price test affects the amount of fuel stock and
working cash included in rate base which, in turn, affects
the level of Ohio Power’s unit demand charge, our re-
quirement that Ohio Power revise its demand char