Petition for Writ of Certiorari — Brace v. United States, 81 Fed. Cl. 1658 (2008) (No. 07-916)
Supreme Court brief2008
Ask Donna
What actually matters in this document.
Text
Supreme Court, U.S.
@ FILED
wv — 07-916JAN 7- 2008
INTHE OFFICE OF THE CLERK
Supreme Court of the United
States
ROBERT BRACE,
Petitioner
Vv.
THE UNITED STATES,
Respondent
On Petition For Writ of Certioran
To The United States Court of Appeals for the
Federal Circuit
PETITION FOR WRIT OF CERTIORARI
RICHARD A. LANZILLO, ESQ.
Counsel of Record
NEAL R. DEVLIN, ESQ.
KNOX, MCLAUGHLIN,
GORNALL, & SENNETT, P.C.
120 West Tenth Street
Ene, PA 16501
(814) 459-2800
BRIEF INTRODUCTORY STATEMENT
On June 25, 1996, after losing an enforcement
action brought by the Government and exhausting
all avenues of appeal, Robert Brace acquiesced to the
Government’s demands to “restore” his property
entered into a Consent Order. The terms of that
Consent Order required that Brace, among other
acts, place fill and structures on his property for the
purpose of “restoring” that property to the condition
that existed in 1984 — a point in time when Brace’s
property was dry. After complying with the Consent
Order, Brace’s previously dry property began to flood
to the point where, at the time of trial, a large pond
was consistently present.
QUESTIONS PRESENTED FOR REVIEW
1. Whether the Court of Appeals erred in
concluding that the Consent Order to which
Robert Brace acquiesced could not, regardless of
its effect on Brace’s property, cause a Fifth
Amendment taking.
2. Whether the Court of Appeals erred in
concluding that the Government’s forced
placement of a check dam and fill on Brace’s
property did not constitute a physical taking.
3. Whether the Court of Appeals erred in
concluding that two legally and factually distinct
parcels constituted the relevant parcel for the
regulatory takings analysis when, during earlier
enforcement proceedings, the Government.
successfully argued that Brace was not entitled
to consider both parcels in applying the
exceptions to the Clean Water Act.
(i)
LIST OF PARTIES
Petitioner:
Robert Brace
Respondent:
United States of America
(ii)
TABLE OF CONTENTS
Brief Introductory Statement.......00.000000....000..ccccceceeeeee i
Questions Presented for Review ..................0000..000cccee. i
Be ee i sicnccecndcicnaetuasasestavensacesieeea aeuiganandieee il
ee Res basghceesoccecsesinscraniececuntetnceenonanel ill
Appendix Table of Contents .........................ccseseeceees iv
Table of Authorities ........ Gado sepasuuapeomnadenapdararasammiociatn Vv
Citations to Opinions and Orders Entered
ee I i sscctetnigrnic tanta erences eer vii
Concise Statement of the Basis for
PT LT Ae Le La eT I Tat viii
Constitutional Provisions Involved........................... 1x
Concise Statement of the Case....................00ccecccce sees 1
I ss cc utes oceania ana 10
A. The Consent Decree was the Result of
Required Acquiescence and, Therefore,
can Support a Taking. .........0....0....00..000. ..10
B. The Lower Courts’ Decision Conflicts
with this Court’s Precedent in Finding
that the Government’s Physical
Occupation of Brace’s Property did not
Constitute a Compensable Taking............. 17
(1i1)
C. The Court of Appeals’ Decision did not
Follow this Court’s Precedent in Defining
the Relevant Parcel for the Regulatory
Te oii le Sauce ccnwhivann 24
APPENDIX TABLE OF CONTENTS
Order from the United States Court of Appeals
For the Federal Circuit (Dated October 10, 2007) ...1
Opinion and Order of the United States Court of
Federal Claims (Dated August 4, 2006)...................4
Opinion of the US Court of Appeals for the Third
Circuit in the Enforcement Action
(Dated November 22, 1994).................cc ccc cc eeee eee 78
(iv)
TABLE OF AUTHORITIES
Federal Cases
Brace v. United States,
BT Wes ee at CE Pa OEE} ovis ccc ccncccccsscescncsncons vil
Brace v. United States,
Fae Br CE viv neciecececaccseccatanecsceaccsecesssecs Vii
Brown v. Legal Found. of Washington,
OO a, I EE ci ccssncncccacasanasadavascoenendsnsnavecas 17
FCC v. Florida Power Corp.,
MD Ee. IE cin cacsnisicdccpncedccdacccanosssasaces 10, 11
Hendler v. United States,
952 F.2d 1364 (Fed. Cir. 1991).................... passim
Kaiser Aetna v. United States,
RO rk Be I vikvncitinnaca cbc denn uncsncsdoncvasedisauens 19
Keystone Bitumimous Coal Ass'n v.
DeBenedictis, 480 U.S. 470 (1987).............00.0008. 26
Loretto v. Teleprompter Manhattan CATV
Corp., 458 U.S. 419 (1982) ........4....0....0000000. passim
Loveladies Harbor, Inc. v. United States,
SRF Sa 2471 Cred. Car. FOOD... 5 ccccccccccccccccccss 26
Lucas v. South Carolina Coastal Council,
ee I a es oN alee 26
Palm Beach Isle Associates v. United
States, 208 F.3d 1374 (Fed. Cir. 2000)............... 27
Pennsylvania Coal Co. v. Mahon,
SIN EF, Fe CD vo iancisicankennacendacesacscuses 25, 26, 27
Ridgeline, Inc. v. United States,
SOG FO WE FOr CI ai vivcaiccssesscicccccccceicenes 19
(v)
Scogin v. United States,
33 Fed.Cl. 568 (Fed. Cl. 1995)................. 14, 15, 16
United States v. Brace,
41 F.3d 117 (3d Cir. 1994), cert. denied,
ee I III escnacdes.cencsonccsnccacsanseccssasonnans 28
Walcek v. United States,
I i NT IE Bo vcsisasenscnccccscsnnssscrensassnaccmuese 25
Federal Statutes
28 U.S.C . § 1254(1)............ sesauameetuaen: ae Vili
I I 25s ce nadsnbedantonsnacseneseneasenen Vili
IE Io 5 sn cscadaskbngabewndennebheenen Vili
Se eas ae STE BOE Ri ssiccconccnecaseucsesccdsnnvecscodseucuees 27
Other Authorities
U.S. Const. amend. V...... eabddpusscansuvaaemunanaananeenninn ix, 17
(v1)
CITATIONS TO OPINIONS AND ORDERS
ENTERED IN THIS CASE
Opinion and Order of the United States Court of
Federal Claims:
Brace v. United States, 72 Fed. Cl. 337 (2006).
Opinion and Order of the United States Court of
Appeals for the Federal Circuit:
Brace v. United States, 2007 WL 2947319 (C.A.Fed.)
(vii)
CONCISE STATEMENT OF THE BASIS FOR
JURISDICTION
This Court has jurisdiction over the decision of
the October 10, 2007 Order of the United States
Court of Appeals for the Federal Circuit (the “Court
of Appeals”) pursuant to 28 U.S.C . § 1254(1). The
Court of Appeals had jurisdiction over the August 4,
2006 final order of the United States Court of
Federal Claims (the “Trial Court”) pursuant to 28
U.S.C. § 1295.. The Trial Court had jurisdiction over
this takings claim pursuant to 28 U.S.C. § 1491.
CONSTITUTIONAL PROVISIONS INVOLVED
“(Nlor shall private property be taken for public use,
without just compensation.” U.S. Const. amend. V
(ix)
CONCISE STATEMENT OF THE CASE
Robert Brace (“Brace”) commenced this action
in 1998 after a previous legal dispute between Brace
and the United States of America (the “United
States”), acting through the Environmental
Protection Agency (“EPA”). The action concluded
with the entry of a consent decree mandating the
placement of certain materials and structures on a
58-acre farm Brace had purchased in 1975 (the
“Murphy Farm”).
Brace’s Purchase and Use of the Murphy Farm
Prior to the 1940s, the Murphy Farm was
owned by individuals unrelated to Brace’s family.
(Fed. Cir. App. 150'). During the 1940s, Brace’s
father purchased the farm and began using it as
pastureland for his dairy cattle. (Fed. Cir. App. 153).
The Brace family had been farmers in Erie County,
Pennsylvania since at least the 1930s. (Fed. Cir.
App. 23). Prior to his purchase of the Murphy Farm,
Brace’s father had owned what is referred to as the
Homestead Farm. (Fed. Cir. App. 149, 152). The
Homestead Farm is the farm on which Brace was
raised and was used by Brace’s father for crop
farming. (Fed. Cir. App. 153). Brace’s father owned
this farm at all relevant times, both before and after
his purchase of the Murphy Farm, except for a brief
period during the Great Depression. (Fed. Cir. App.
149, 152). The Homestead and Murphy Farms are
1“Fed. Cir. App.” refers to Brace’s appendix submitted
to the Court of Appeals for the Federal Circuit. Brace is citing
to and relying on this Appendix pursuant to Sup. “+ R. 12(7)
legally distinct parcels, separated by a township
road, that have been used by both Brace and his
father for distinct farming purposes.
In 1975, Brace’s parents concluded that they
could no longer operate their dairy farming operation
on the Murphy Farm in a sufficiently profitable
manner. (Fed. Cir App. 153). As a result, they
decided to sell both the Homestead and Murphy
Farms. (Fed. Cir. App. 150, 153). Brace did not
want the Homestead Farm to be sold outside his
family. (Fed. Cir. App. 153). While dairy farming on
the Murphy Farm and crop farming on the
Homestead Farm was not profitable, Brace believed
he could make the Murphy Farm profitable if he
used it for row crops. (Fed. Cir. App. 159). With
these as his personal and business goals, Brace
purchased the Murphy and Homestead Farms from
his parents for a total price of $170,000. (Fed. Cir.
App. 150, 153, 176-177). This was the value at which
Brace’s parents had the two farms appraised. (Fed.
Cir. App. 153-154).
Brace’s Operation of the Murphy Farm and the
Government’s Assistance in Constructing
Necessary Drainage on the Farm.
Shortly after purchasing the Murphy Farm,
Brace began the process of converting the farm from
pastureland to land appropriate for growing row
crops. (Fed. Cir. App. 159). Like almost every other
farmer in Erie County, Brace had to construct a
drainage system on the Murphy Farm in order to use
it for row crop farming. (Fed. Cir-App. 101). At the
time Brace purchased the farm, he was aware that a
more substantial drainage system would be required
to make the farm productive. (Fed. Cir. App. 157-
160).
Brace was also aware that his father had
begun the process of utilizing government assistance
in constructing a drainage system on the Murphy
Farm. (Fed. Cir. App. 23, 798-820). In or around
1961, the Agricuitural Stabilization and
Conservation Service (“ASCS”) and the Soil
Conservation Service (“SCS”), both agencies within
the United States Department of Agriculture,
developed a drainage plan that involved the
placement of underground drainage tile on the
Murphy Farm and surrounding land. (Fed. Cir. App.
105-107, 787-797). Brace’s father had begun
implementing this plan, and Brace continued it after
purchasing the Murphy Farm. (Id.; Fed. Cir. App.
23) Working with his local ASCS office and the SCS,
Brace continued the construction of the drainage
system developed by the ASCS and SCS in order to
convert the Murphy Farm into an “effective and
productive farming business.” (Fed. Cir. App. 23).
Between 1977 and 1984, Brace engaged in four
separate projects to provide drainage to the Murphy
Farm. (Fed. Cir. App. 787-820; 106-109, 119-124,
163-164). Each of these projects was either initiated
by or done in coordination with the ASCS and SCS.
(Id.) All tolled, Brace laid over 11,000 feet of pipe,
tile and waterways. (Id.)
Murphy Farm’s Condition by 1979
By 1979, Brace’s work on the drainage system
resulted in the Murphy Farm being dry, except for
times of excessive rainfall. (Fed. Cir. App. 23-24).
By 1986, Brace’s drainage work was complete and he
began growing crops on the Murphy Farm. (Fed. Cir.
App. 24). The drainage system that led to this
condition on the Murphy Farm was installed by
Brace in concert with and with assistance from the
ASCS and SCS. (Fed. Cir. App. 787-820). Brace
received thousands of dollars of financial assistance
from these agencies to lay the necessary
underground tile and worked with both agencies,
specifically the technically sophisticated SCS, in
designing and constructing the drainage system to
achieve the dry condition that was present on the
Murphy Farm in 1979. (id.) At trial, the former
head of the ASCS’s Erie office, Joseph Burawa,
testified that he personally worked with Brace on
this drainage project. (Fed. Cir. App. 106-108). He
also testified that these types of drainage systems
were common in Erie County. (Fed. Cir. App. 101).
The ASCS’s program that provided financial and
technical assistance to farms to plan and construct
such systems was, according to Burawa, the ASCS’s
most popular program in the 1970s and 1980s. (Id.)
The EPA’s Notice of Violations
Between 1987 and 1988, the EPA issued three
administrative orders and an administrative
complaint (collectively, the “1988 Administrative
Complaint”) in which it notified Brace of its position
that his activities associated with constructing and
using the drainage system on the Murphy Farm
violated the Clean Water Act. (Fed. Cir. App. 24).
At trial, Brace offered unrebutted testimony that this
was the first notice he received that his farming of
the Murphy Farm and the drainage system he
installed with the assistance and guidance of the
ASCS and SCS might violate the CWA. (Fed. Cir.
App. 164-165).
In fact, between 1975 and 1987, the
applicability of the CWA to drainage systems
installed on farms was far from clear. The ASCS and
SCS took the position, until 1984, that the
construction and operation of drainage systems, like
the system installed on the Murphy Farm, did not
violate the CWA. (Fed. Cir. App. 76-77). In addition
to Burawa’s testimony on this point, this fact is also
established by the ASCS’s request, in 1984, that
Brace conduct maintenance on a portion of the
drainage system located on the Murphy Farm. (Fed.
Cir. App. 124, 275, 307-308, and 817-820.
The Enforcement Action
In 1990, the United States filed suit against
Brace in an attempt to assess civil penalties against
him and force him to “restore” the wetlands on the
Murphy Farm that it believed had been adversely
affected by his drainage system (the “Enforcement
Action”). (Fed. Cir. App. 888-892). Brace
successfully defended that action before the United
States District Court for the Western District of
Pennsylvania. (App. 822). However, that court’s
decision was reversed by the United States Court of
Appeals for the Third Circuit (the “Third Circuit”),
which found that certain exceptions to the Clean
Water Act’s (*CWA’s”) regulations did not apply and,
therefore, Brace’s maintenance and operation of the
2“App.” refers to Brace’s Appendix submitted with this
Petition.
drainage system in 1987 and 1988 constituted a
violation of the CWA. (App. 108). Specifically, the
Third Circuit held that, in determining whether
Brace’s drainage activities between 1985 and 1987
qualified under the CWA’s normal farming
operations exemption, the only area that could be
considered was the 30-acre regulated site. Therefore,
the Third Circuit would not consider the on-going
farming activities that occurred on the Homestead
Farm and the upland portions of the Murphy Farm
in applying the “established farming operation”
exemption. (App. 94-97). The Third Circuit
remanded this case to the district court to
enter judgment in favor of the United
States and to assess upon further
proceedings appropriate penalties for
defendants’ violations of the permit
requirements, and to assess what, if
any, penalties are appropriate for
violations of the EPA administrative
orders. address the remedial measures
necessary to correct the violation.
(App. 108).
The United States Supreme Court denied Brace’s
petition for a writ of certiorari.
The Consent Decree
On remand, the EPA provided Brace with a
proposed consent decree (the “Consent Decree”) that
would resolve the Enforcement Action. Realizing
that the Third Circuit’s opinion would require him to
engage in significant remedial measures regarding
the Murphy Farm and subject him to the possibility
of substantial civil penalties, on June 25, 1996, Brace
acquiesced to the terms submitted by the EPA and
the United States District Court for the Western
District of Pennsylvania entered the Consent Decree
as an order of court. (Fed. Cir. App. 168). Under the
terms of the Consent Decree, Brace was required to
engage in the following relevant actions:
1. refrain from “discharging any pollutants
(including dredged or fill material) into the
approximately 30 acre wetland site [on the
Murphy Farm] .. ., unless such discharge
is in compliance with the CWA;
2. “perform restoration in accordance with the
wetlands restoration plan”
3. “record this Consent Decree in the
applicable land records office.”
(Fed. Cir. App. 893-900).
The Consent Decree was expressly designed to
restore the Murphy Farm to the condition that
existed in 1984. (Fed. Cir. App. 616). The facts are
clear and unrebutted that, beginning in 1979 and
continuing through the execution of the Consent
Decree, a period of time that includes 1984, the
Murphy Farm was consistently dry, except for
periods of excessive rainfall.
In order to comply with the Consent Decree,
Brace proceeded to remove miles of tile and
disassemble the drainage system that he, in
coordination with the ASCS and SCS, had
constructed over a period of twenty years. (Fed. Cir.
App. 168-169). Removal of this drainage system
resulted in the Murphy Farm becoming unsuitable
for farming. (Fed. Cir. App. 121, 291-296). The
“restoration” actions that Brace was required to
undertake included the construction of a “check dam”
on the Murphy Farm. (Fed. Cir. App. 893-900). The
check dam, together with the removal of literally
miles of drainage tile and waterways, resulted in
regular flooding of the Murphy Farm, a condition
that had not occurred since at least 1979. (Fed. Cir.
App. 171, 291-293). By the time the Trial Court
conducted a view of the property, the “the water
table on [Brace’s] property ha[d] risen, indeed, so
much, as to create a large pond on the lower half of
the property.” (App. 17).
Further, the “upland” portions of the Murphy
Farm that were not part of the 30-acre site referred
to in the Consent Decree were rendered unusable by
the Decree. Brace is not permitted to engage in any
action that would cause the discharge of any
pollutant, including fill, into the wetlands on the
Murphy Farm. The unrebutted testimony at trial
established that once the drainage system was
removed, the upland portions of the farm became
highly errodible. (Fed. Cir. App. 301-302). Asa
result, Brace cannot farm these areas without
exposing himself to substantial risk that, either
through erosion or other migration of soils or water,
pollutants associated with raising farm crops could
enter the 30-acre site. (Id.; Fed. Cir. App. 529-532,
543-547, 596, 636, 730-731). If that were to occur,
Brace would be subject to possible injunctive action
and civil penalties and contempt under the Consent
Decree. (Fed. Cir. App. 893-900).
ARGUMENT
A. The Consent Decree was the Result of
Required Acquiescence and, Therefore,
can Support a Taking.
The Trial Court and Court of Appeals® failed
to properly apply this Court’s previous holdings
regarding the type of government conduct that can
result in a taking. The misapplication of this law led
those Lower Courts to conclude that that the
Consent Decree, by its very nature and regardless of
the effect it had on Brace’s property, could not cause
a compensable taking.
This Court has clearly held that the
touchstone of whether a given action or requirement
can constitute a taking is whether that action was
the result of “required acquiescence.” FCC v. Florida
Power Corp., 480 U.S. 245, 252 (1987). “This
element of required acquiescence is at the heart of
the concept of occupation.” Id. Based on this
straight-forward rule, this Court has held that a
state law requiring landowners to permit cable
television companies to install cable television
equipment on their property constitutes a taking
Loretto v. Teleprompter Manhattan CATV Corp., 458
U.S. 419, 440 (1982). However, a taking has not
°Because the Court of Appeals affirmed the Trial
Court’s judgment based on the Trial Court’s opinion, both the
Trial Court and Court of Appeals will be referred to as the
“Lower Courts”, when referring to their analysis and reasoning
and the substance of the opinion upon which both of their
decisions was based.
occurred when a landowner invites a commercial
tenant to rent space on the landowner’s property
and, by extending this invitation, subjects itself to
federal statutes that regulated the rent the
landowner can charge. Florida Power Corp., 480
U.S. at 252-53. It is this distinction between the
invited commercial tenant and the “interloper with a
government license” that exemplifies the required
acquiescence standard. Id.
Brace did not choose to engage in any action
that subjected him to heightened government
regulation -- the CWA applies to the Murphy Farm
regardless of the use to which Brace puts that farm.
Further, Brace did not invite the EPA to place fill
and structures on his property. Instead, the EPA
took the position that, as applied to Brace’s property,
the CWA required Brace to take certain remedial]
actions to comply with the CWA. Based on this
position, the EPA issued the 1988 Administrative
Complaint and sought to require Brace to change the
physical layout of his property, remove drainage tile,
add fill and install a check dam. Brace disagreed
with the EPA’s legal position and resisted its
attempt to force him to engage in this conduct on his
property.
As a result of Brace’s resistance, the EPA
began the Enforcement Action in an attempt to force
Brace to comply with its demands. Brace mounted a
vigorous defense to this action; won at the trial level;
lost before the Third Circuit; and was denied review
by this Court. At that procedural stage, Brace was
left to face a remand to the district court for the sole
purpose of determining the appropriate penalties —
the Third Circuit had concluded that he violated the
11
CWA and had directed the district court to enter
judgment in favor of the United States. (App. 108).
Thus, Brace had lost this legal battle, with no
avenues for review. At this point, and only at this
point, did Brace acquiesce to the EPA’s remedial
demands and agreed to engage in the “restoration”
activities the EPA presented.
While paying lip service to the required
acquiescence standard applied by this Court, the
Lower Courts concluded that “it would be hard to
fathom how a consent decree could meet the
requirements for a taking.” (App. 58). The Lower
Courts did not rely on the specific facts of this case,
nor did they properly consider the compulsion that
Brace faced after losing before the Third Circuit and
having no avenue of appeal or reconsideration.
Instead, the Lower Court’s simply concluded that,
because consent orders are, by definition, part
agreement, they are too voluntary to constitute a
taking.
This holding is not a proper application of
concept of required acquiescence. This can be seen
by assuming that Brace had not resisted the EPA’s
enforcement efforts but, instead, immediately
acquiesced in the restoration efforts they requested.
Had that occurred, no enforcement action would have
been filed and no consent decree would exist. In such
a situation, Brace would have engaged in the
restoration actions proposed by the EPA and had
been left with his property in the precise situation in
which it exists today.
Factually, this hypothetical circumstance
would be indistinguishable to the facts addressed by
12
this Court in Loretto. In Loretto, the property owner
did not resist the placement of cable television
equipment on her building and, instead, brought suit
seeking damages and injunctive relief based on that
physical occupation. Loretto, 458 U.S. at 424. In
Loretto, this Court concluded that the placement of
the cable television equipment on the plaintiffs
property pursuant to statutory authority was the
result of required acquiescence and could constitute
a taking. Applying this precedent to Brace’s
situation leads to the unavoidable conclusion that
had he simply acquiesced prior to the Enforcement
Action a taking would have occurred. Like the
plaintiff in Loretto, Brace was required to place
physical structures (i.e. the check dam and fill) on
his property pursuant to statutory authority (i.e. the
CWA).
Thus, it is only because of Brace’s resistance to
the EPA’s attempt to force a physical intrusion on
this property that the Consent Decree came into
existence. The Lower Courts’ concluded that this
resistance on Brace’s part, and the subsequent
Consent Decree, made the physical intrusion
voluntary. This conclusion results in Brace being
deprived of his just compensation because he resisted
the Government’s intrusion on his property; a result
that turns the required acquiescence standard on its
head. Brace, far more that the plaintiff in Loretto
was “required” to engage in the actions he took. He
was required by the EPA and, eventually, by the
Third Circuit through its direction to the district
court to enter judgment in favor of the EPA. Brace,
unlike many property owners, fought the
Governments attempt to take his property. The
Lower Courts’ conclusion that, through this fight
Brace lost his Fifth Amendment right to just
compensation is antithical to this Court’s precedent.
While this Court has never addressed the
issue of whether a consent order can cause a
compensable taking, at least one district court ca se
has properly applied the required acquiescence
standard to this type of situation. In Scogin v.
United States, 33 Fed.Cl. 568, 570-71 (Fed. Cl. 1995),
the EPA sought access to the plaintiffs land under
the authority granted by CERCLA. Between 1988
and August 1990, the plaintiff entered into multiple
agreements with the EPA to allow the EPA access to
his land to conduct certain monitoring and other
activities on his property. Id. After August 1990,
however, the plaintiff was unwilling to allow the
EPA any additional access to his property. Id.
Consequently, on June 18, 1991, the EPA issued an
administrative order requiring the plaintiff to grant
the EPA access to his property. Id. at 571. The
plaintiff did not comply with this order and, instead,
sought to fight it in court. Id. The EPA then filed an
enforcement action and, on December 17, 1992, the
district court ordered the plaintiff to allow the EPA
access to his property or face civil penalties (the
“1992 Access Order”). Id. at 572. After the district
court issued this order, the plaintiff entered into a
lease with the EPA’s primary contractor under which
the plaintiff agreed to allow the contractor access to
his property in exchange for a rental payment of
$2,000 per month. Id. at 573-74. The plaintiff then
sued the Government, arguing, in part, that the
EPA’s access of his property after the 1992 Access
Order constituted a taking. Id. at 574.
Taking a position identical to its argument in
this case, the Government in Scogin argued,
[That plaintiff was not obligated by the
district court’s access order to enter into
a lease agreement with a government
contractor. According to defendant,
having chosen to enter into the lease,
and having negotiated the terms of the
lease, including the compensation to be
paid, plaintiff cannot now be heard
complaining that the Government has
worked a taking by physically occupying
his land.
Id. at 579.
The claims court did not agree, finding that
consideration of the 1992 Access Order was essential
to properly understanding the effect of the post-1992
Access Order lease. “Although plaintiffs decision to
enter into the lease was voluntary, the lease does not
represent plaintiffs consent to the use and
occupation of his property, because the access order
already had deprived plaintiff of the power to
consent.” Id. Proceeding in this analysis in a
manner directly on point with the present case, the
court stated, “A material distinction exists between a
consent form freely entered into and a lease
agreement entered into that contemplates activities
on plaintiffs property which, but for the district
court’s access order, plaintiff would not have
allowed.” id. (emphasis added). The Court
concluded that, consistent with Supreme Court
precedent, required acquiescence was the key to
determining whether an agreement could form the
15
basis of a taking. Based on the 1992 Access Order,
the court held, “In this case the district court order
authorized a mandatory physical occupation of
plaintiffs property. Government compulsion was
present.” Id.
The facts of Scogin are indistinguishable from
the facts in the present case. Like the plaintiff in
Scogin, Brace attempted to resist the EPA’s efforts to
physically occupy his property. Like the plaintiff in
Scogin, Brace failed in this effort and was then
subject to a court order finding that EPA occupation
was required. To address this order, Brace took the
same approach the plaintiff in Scogin took — he
struck the best deal he could under the
circumstances. For Brace, that deal took the form of
the Consent Decree. It is beyond dispute that, but
for the Third Circuit’s decision, Brace would not have
allowed the EPA to force the several “restoration”
activities mandated by the Consent Decree. As in
Scogin, government compulsion was present and led
directly to the Consent Decree. Because of this, the
Consent Decree was the result of required
acquiescence.
It is necessary that this Court correct the
Lower Courts’ incorrect application of this Court’s
prior precedent regarding required acquiescence.
Allowing that precedent to remain will deprive those
individuals who choose to resist government
intrusions on their property, only to lose in those
efforts, of their constitutional right to just
compensation for the takings that result.
B. The Lower Courts’ Decision Conflicts
with this Court’s Precedent in Finding
that the Government’s Physical
Occupation of Brace’s Property did not
Constitute a Compensable Taking.
The Government’s physical occupation of the
Murphy Farm constitutes a taking for which just
compensation is due under the Fifth Amendment.
Specifically, under the authority of the CWA, the
Government required that Brace: (1) install a “check
dam” to cause the land to flood; (2) place substantial
amounts of fill in existing or created ditches; and (3)
execute and record an instrument binding all future
owners to maintain the physical intrusion required
by the Consent Decree. (Fed. Cir. App. 893-900)
The unambiguous language of the Fifth
Amendment provides: “{[Nlor shall private property
be taken for public use, without just compensation.”
U.S. Const. amend. V. When the Government,
exercising its supreme power of eminent domain,
physically takes land, the Constitution guarantees
payment of just compensation for the land taken.
Brown v. Legal Found. of Washington, 538 U.S. 216,
233-34 (2003).
In Loretto, this Court addressed a case where
government action required the owner of a private
apartment building to allow the installation of cable
television cables and boxes on the roof of his
building. 458 U.S. at 426. The Court held this
permanent, physical occupation of a portion of the
plaintiffs roof constituted a physical taking. Id. at
438. Regardless of the reasons for placement, or the
degree to which placement interfered with the
17
plaintiffs use of his property, the act of permanently
affixing an object to the plaintiffs roof “took” the
rights he previously had in his property to “possess,
use and dispose of it.” Id. at 435. This Court
explained:
[tlo the extent that the government
permanently occupies physical property,
it effectively destroys each of these
rights. First, the owner has no right to
possess the occupied space himself, and
also has no power to exclude the
occupier from possession and use of the
space .. . Second, the permanent
physical occupation of property forever
denies the owner any power to control
the use of the property; he not only
cannot exclude others, but can make no
nonpossessory use of the property . . .
Finally, even though the owner may
retain bare legal right to dispose of the
occupied space by transfer or sale, the
permanent occupation of that space by a
stranger will ordinarily empty the nght
of any value, since the purchaser will
also be unable to make any use of the
property.
Id. at 435-36.
The Court concluded that the placement of the
cable television cables and boxes on the plaintiffs
roof destroyed each of these property rights and,
therefore, constituted a physical taking. Id. at 438.
18
Relying on this Court’s clear precedent, other
courts have similarly held that any permanent,
physical occupation on land constitutes a physical
taking. “It is well established that the government
may not take an easement without just
compensation.” Ridgeline, Inc. v. United States, 346
F.3d at 1352 (2003). See also Kaiser Aetna v. United
States, 444 U.S. 164, 179-80 (1979) (“even if the
Government physically invades only an easement in
property, it must nonetheless pay just
compensation”). In Hendler v. United States, 952
F.2d 1364, 1374-75 (Fed. Cir. 1991), property owners
brought action against the EPA alleging that EPA’s
entry onto their land, installation of groundwater
wells and monitoring activities were a “taking” of
property under the Fifth Amendment. Hendler, 952
F.2d at 1374-75. The Federal Circuit overruled the
denial of the plaintiffs’ motion for summary
judgment on the issue of a physical taking. The court
held that the EPA’s installation of monitoring wells
constituted a physical taking stating, “There is
nothing temporary about the wells the Government
installed on the plaintiffs property... these
surveillance wells are at least as ‘permanent’ in this
sense as the CATV equipment in Loretto, which
comprised only a few cables attached by screws and
nails and a box attached by bolts.” Id. (citing Loretto,
458 U.S. 419 (1982)). In reaching this conclusion, the
court “emphasize[d] that the issue is not whether
the Government had the right to impose itself
and its activities on the plaintiffs” and stated “[a]
physical occupation of private property by the
government which is adjudged to be of a permanent
nature is a taking, and that is true without
regard to whether the action achieves an
19
important public benefit or has only a minimal
economic impact on the owner.” Id. (emphasis
added).
1. Brace has Suffered a Physical
Taking Identical to the Takings in
Loretto and Hendler I and the
Lower Courts’ Decision to the
Contrary Conflicts with These
Decisions
By means of the Consent Decree, the
Government ordered Brace to excavate trenches,
destroy drainage tile, fill two drainage ditches and
install a check dam. These actions resulted in the
creation of a pond on the Murphy Farm. This pond
had never before existed on the property. This action
constitutes a classic physical invasion of property
that is legally indistinguishable from the physical
invasions of the plaintiffs’ properties in Hendler ]
and Loretto. In Hendler I, the Government
physically took the plaintiffs property by installing
wells on the property. In Loretto, the Government’s
physical invasion sufficient to constitute a taking
was the placement of cable television boxes and
cables on the roof of an apartment complex. In both
cases, and clearly identified in Loretto, the Courts
looked to whether the Government’s action (1)
prevented the plaintiff from physically occupying
portions of his property, or barred others from
occupying those portions; (2) denied the plaintiff the
authority to control the occupied space; and (3)
essentially eviscerated the plaintiffs ability to
dispose of or sell his property to another without the
burden of the government’s forced occupancy.
20
Here, the Government required Brace to place
substantial amounts of fill in existing and newly
created ditches, and to install a check dam in
“unnamed Tributary A.” The Government required
these actions to change the hydrologic regime of the
30-acre wetlands site on the property. These actions
created a pond on the property. These changes were
not temporary in nature. They were required to be
completed with the utmost urgency (within 90 days if
possible) and to remain indefinitely. (Fed. Cir. App.
893-900). These requirements, in and of themselves,
constituted a physical taking for which Brace is
entitled to just compensation. They (1) deprived him
of occupancy of the entire 30-acre parcel and, ata
minimum, of the former ditches that the Government
required Brace to fill with soil and the area upon
which the Government required Brace to construct
the check dam; (2) denied Brace the authority to
contro] these areas; and (3) placed a permanent, and
recorded cloud over Brace’s ownership of the Murphy
Farm by requiring any future owner of that property
to maintain these physical intrusions.
These several physical invasions also resulted
in another physical occupation -- the permanent
invasion of the Murphy Farm by both ground and
surface water. (Fed. Cir. App. 170, 392-94). The
express purpose of the Consent Decree is to “restore
the hydrologic regime to the U-shaped,
approximately 30-acre wetlands adjacent to Elk
Creek.” (Fed. Cir. App. 899). To do this, the
Government required not only the removal of a
drainage system that took a decade to construct and
incorporated miles of various drainage mechanisms,
it also required the installation of a check dam. The
21
check dam was not something that existed on the
Murphy Farm prior to Brace’s purchase. It wasa
physical structure measuring 1 % feet high, 4 feet
long and equal in width to the “tributary bottom.”
Its purpose was to trap water on the Murphy Farm
that otherwise would flow over the Murphy Farm
and into Elk Creek. (Fed. Cir. App. 899-900).
The Lower Courts concluded that these
various physical invasions did not constitute physical
takings but, rather, were subject only to analysis as
potential regulatory takings. While the Consent
Decree also constitutes a regulatory taking, the
Lower Courts’ conclusion on this point is incorrect for
at least two reasons. First, Loretto and Hendler I
make no mention of whether a physical occupation
was caused by the enforcement of a regulation or
some other government action. Instead, those cases
clearly establish that any permanent physical
occupation by the Government of private property is
a taking. Loretto, 458 U.S. at 435-36. This is such a
case, with the Government forcing Brace to place
physical structures and material on his property and
keep them there indefinitely.
Second, the Government is not simply
regulating how Brace may use his property.
Through the Consent Decree, the Government has
ordered Brace to install physical structures
previously not present on the Murphy Farm and, in
so doing, to create a pond that previously did not
exist. This portion of the Consent Decree is not a
regulation of use, it is a mandatory command to
place tangible objects on Brace’s property for the
benefit of the public as a whole. This is a
paradigmatic physical taking. The fact that it was
22
ordered by the EPA and affected farm land does not
undermine its physical nature.
The Lower Courts’ discussion of the “non-
sequiter” of treating the denial of a permit and
restoration requirements differently is an incorrect
analysis under Loretto and an incorrect application
of the CWA as it relates to this case. As to Loretto, it
does not include any element addressing why the
physical occupation occurred. The Federal Circuit
has been clear in its position that such issues are
irrelevant when analyzing a physical taking. “A
physical occupation of private property by the
government which is adjudged to be of a permanent
nature is a taking, and that is true without
regard to whether the action achieves an
important public benefit or has only a minimal
economic impact on the owner.” Hendler, 952 F.2d
1374-75 (emphasis added). Thus, the Lower Courts’
analysis on this point is simply not relevant to the
question of whether the Government’s action
constituted a physical taking.
Further, the Lower Courts’ argument flows
from a misapplication of the CWA and a lack of
regard for what the Government achieved under the
Consent Decree. Between 1975 and 1984, when
Brace installed the drainage system at issue, the
CWA did not require that Brace seek any permits.
(Fed. Cir. App. 76-77). In fact, the ASCS and SCS
assisted Brace in constructing and paying for the
drainage system. The ASCS and SCS never
intimated or believed that Brace required any permit
under the CWA to engage in this activity. Thus, for
the Lower Courts to analyze Brace’s situation as a
permitting case is simply not accurate. Further, the
23
Consent Decree did not “restore” the property to its
condition in 1984, as an EPA representative testified
was the intent of the Consent Decree. It did not
restore the property in any way. The Consent Decree
mandated the placement of fill and structures on the
Murphy Farm that were never before seen and
certainly not present in 1984. These mandated
actions resulted in the creation of a pond that, based
on the unrebutted evidence at trial, did not
previously exist on the Murphy Farm.
Like the wells in Hendler I and the CATV
equipment in Loretto, the check dam and fill
material used to plug surface ditches constituted
physical takings, and the flooding these changes
created also resulted in an additional, permanent
invasion that constitutes a physical taking. As this
Court has made clear, even a minor physical
alteration of property constitutes a physical invasion
sufficient to give rise to a claim for just
compensation. See Loretto, 458 U.S. at 435. The
Lower Courts’ decision conflicts with this well-
established legal principle and with Hendler I.
Based on these conflicts, which are premised on the
Lower Courts’ misapplication of this Court’s physical
takings analysis, this Court should exercise its
discretion to review this case.
C. The Court of Appeals’ Decision did not
Follow this Court’s Precedent in Defining
the Relevant Parcel for the Regulatory
Takings Analysis.
The linchpin in each of the Government’s
categorical and regulatory takings arguments at
trial, and the foundation upon which the Lower
24
Courts’ analysis on these points is built, is the
definition of the “parcel as a whole.” This analysis,
however, engages in the precise type of manipulation
that the “parcel as a whole” inquiry is designed to
prevent. This case presents a striking example of
the relevant parcel question being manipulated by
the Government to, in the first instance, be able to
take the property interest it sought and then, after
achieving this taking, avoid having to pay just
compensation for that interest.
The concept of a “parcel as a whole” in takings
cases developed to address attempts to circumscribe
total parcels of property to make their “relevant”
portions co-terminus with the reach of the
government regulation. This so-called “denominator”
question was intended to prevent an artificial
alteration in the size of the parcel at issue to serve
either side in litigation. See e.g., Walcek v. United
States, 49 Fed. Cl. 248, 259 (2001).
While clear that the parcel as a whole question
is designed to avoid artificially defining the relevant
parcel in takings cases, this Court’s precedent has
been inconsistent on the application of that test to
different factual situations. For instance, in
Pennsylvania Coal Co. v. Mahon, 260 U.S. 393, 414
(1922), this Court struck down a statute because it
made it “commercially impracticable to mine certain
coal.” The Court did not look to whether other coal
on the plaintiffs property could be mined. Instead, it
focused on the coal that was affected by the
reguiation and found that regulation to violate the
Takings Clause because it had the same effect of
“appropriating or destroying” the affected coal.
Sixty-five years later, this Court faced a similar
25
question in Keystone Bitumimous Coal Ass’n v.
DeBenedictis, 480 U.S. 470, 496-97 (1987). There,
the Court had to determine whether a regulation
affecting the plaintiffs ability to mine coal
constituted a taking. Despite relying on Mahon, and
specifically reaffirming that decision, the Court
looked to other coal on the property that remained
available to mine and found that sufficient economic
value remained to avoid a regulatory taking. Id. at
497-98.
While these decisions have left this important
law unsettled, later Supreme Court cases have
provided additional support for the approach taken
in Mahon. In Lucas v. South Carolina Coastal
Council, 505 U.S. 1003, 1016 n.7 (1993), the Court
indicated that the proper focus in defining the
relevant parcel is to look at “to what degree the
State’s law has accorded legal recognition and
protection to the particular interest in land with
respect to which the takings claimant alleges a
diminution in (or elimination of) value.”
The principal case from this Federal Circuit
has also supported defining the relevant parce] based
on the portion of land that has been regulated. In
Loveladies Harbor, Inc. v. United States, 28 F.3d
1171, 1180 (Fed. Cir. 1994), this Court had to
determine what portion of a developer’s holdings
were the relevant parcel. The developer had
originally purchased 250 acres of property. In 1982,
it sold 199 acres, and continued to own 51 acres. On
May 5, 1982, the Army Corps of Engineers denied
the plaintiffs request for a fill permit under the
CWA, which the developer needed to develop 12.5 of
their remaining 51 acres. Addressing the
26
denominator question, the Court held that the 12.5
acres of affected land constituted the relevant parcel.
See also Palm Beach Isle Associates v. United States,
208 F.3d 1374 (Fed. Cir. 2000).
The holdings in these cases, defining the
relevant parcel as the regulated land, are consistent
with Mahon and represent the most reasonable and
equitable approach to the denominator problem. By
defining the relevant parcel as that land which has
been regulated, the Court avoids any manipulation
by the government or the claimant in an attempt to
change the “denominator” to affect the overall
economic impact of the regulation. Further, the
result of this analysis focuses on what has been
taken from the claimants. This is particularly true
in this case.
The question of what is the relevant parcel in
this case was a key question in both the Enforcement
Action and this present suit. In the Enforcement
Action, Brace argued, and the district court accepted,
that his actions on the Murphy Farm were exempt
from regulation under the CWA because they were
part of an “established (i.e. on-going) farming
operation.” 33 C.F.R. § 323.4(a)(1)(i). However, on
appeal, the Third Circuit disagreed with this
conclusion and found that Brace’s activities on the
Murphy Farm did not qualify for this exemption.
Importantly, in analyzing this point, the Third
Circuit held that the district court misinterpreted
the meaning of the “established farming operation”
requirement because it examined the rejationship of
the site in question to the rest of the land owned by
Brace, including other land on the Murphy Farm and
the Homestead Farm, in determining whether land
27
was being brought into farming use. The Court
stated:
We cannot agree with this interpretation of
the statute’s requirement. The regulations
provide that, ‘activities which bring an
area into farming .. . use are not part of an
established operation.’ The regulations do
not specify the precise area to which we
should look in determining whether there
is an established farming operation. There
are no minimum limits placed on the “area”
being brought into farming use. Thus, we
read the regulations to provide that an
exemption is available only to activities
that are part of an ‘established farming
operation’ at the site. A proper ‘contextual
review of its total activities’ only requires
us to analyze whether such activities are
‘established and continuing’ on the thirty-
acre wetland site itself.
United States v. Brace, 41 F.3d 117 (3d Cir. 1994),
cert. denied, 515 U.S. 1158 (1995) (internal citations
omitted) (App. 96). By taking this position, the
Government and Third Circuit did not allow Brace to
reap the benefits of including the other acreage on
the Murphy Farm or the Homestead Farm in this
analysis.
In this action, however, the Government has
thus far successfully argued that both the Murphy
and Homestead Farms must be included as the
relevant parcel. This argument is a perfect
illustration of the gaming of the relevant parcel
analysis that can occur when it is defined as
28
anything other than the regulated parcel. While
Brace was not able to consider his activities on the
Homestead Farm or upland portions of the Murphy
Farm for purposes of determining whether he
qualified for an exemption under the CWA, he has
been required to included the economic benefit of
those activities, and the land on which they are
performed, to determine whether the Government’s
conduct constitutes a regulatory or categorical
taking. This analysis is nothing more than a “bait
and switch” game being engaged in by the
Government to avoid its constitutional obligation to
pay Brace just compensation for the property
interest it has taken. By allowing the Government to
successfully engage in this gaming of the analysis,
the Lower Courts have misapplied this Court’s
precedent, violated precedent from the court of
appeals for the federal circuit, and exploited the
ability to manipulate the multi-factored approach
this Court has taken to this question. This Court
should grant review of this case to correct this result
in this case, properly define the relevant parcel as
the 30 acre regulated parcel, and announce a bright
line test defining the relevant parcel for takings
analysis as a the parcel being regulated.
RICHARD A. LANZILLO, ESQ.
Counsel of Record
NEAL R. DEVLIN, ESQ.
KNOX, MCLAUGHLIN, GORNALL, & SENNETT, P.C.
120 West Tenth Street
Erie, PA 16501
(814) 459-2800
29