Brief for the Appellant — United States v. Arizona

Supreme Court brief1935

Ask Donna

What actually matters in this document.

Text

INDEX

Page

PU Rtecccccoceccoses lncucucceboccsnosqusesouseosses 1

Gestion Sevstttes cccccccccceqocccqoceseseoccceseseseses 1.

Constitution, treaties, and statutes involved. ..............-- 2

SE a 3

ASD GF GRMMNBE Bc ccccccccccccescoceoceseesscess seose 6

Argument:

Part I. On the motion to Dismiss:

I. The. United States has Constitutional

power to construct Parker Dam in aid

of navigation and flood control......... 10

II. The United -States has Constitutional

power to construct Parker Dam ‘for the

reclamation of the Colorado River Indian

Reservation and public lands-.---..-..-. 16

III. If the consent of Arizona were otherwise

necessary for the construction of Parker

Dam in aid of reclamation of Indian and

public lands, that consent has been

irrevocably given.............-.-.---- 22

IV. The Secretary of thé Interior has adequate

statutory authority for the construction *

of Parker Dam, and the contract of Feb-

ruary 10, 1933, with the Metropolitan

Water District is a valid exercise of that

QUAI -ccccccccccpecccccccegcerese 29

Part II. On.the Application for a Temporary Restraining

Order:

I. The bill of complaint states a cause of

action. entitling the United States to a

permanent injunction...............-.. 43

Il. The United States will suffer irreparable

injury if the State of Arizona is permitted

to continue its forcible prevention of con-

struction pending final determination of

‘ GP Einewosecocsvcesscosecoseesoned 43

DT... cscssusdesacdsdbwesousdedneeeasosnesseedenns 46

BEMBEBccccccccccccccccescesccesodcecsssosesscososeesee 47

113359—35——1 (I)

CITATIONS

Cases: Page

Alsos v. Kendall, 111 Ore. 359............ 2... -. ee 28

Arizona v. California, 242 U. 8. 36@.................... 22

Arizona v. California, 283 U. 8. 423... ...... 2-2-2222 0.. 3, 10,

12, 13, 14, 15, 30, 33, 36, 37, 45

Arizona v. California, 292 U. 8. 341... .....--- eee 3

Bavacy ¢. Rashulh; 06 G. ©. Bb. ccccccccécccccccccccece 27

Boyd v. Thayer, 143 U. 8. 135...........-..-2--- 2 24

Brewer Elliott Oil & Gas Co. v. United States, 260 U. 8. 77... 26, 28

Brown v. United States, 263 U. 8. 78.................... 34

Camfield v. United States, 167 U. 8. 518, ...........- eee 15

Central R. R. Co. v. Jersey City, 209 U.8.473(70N.J.81).. 27

Conrad Inv. Co. v. United States, 161 Fed. 829............ 19

Coyle v. Oklahoma, 221 U. 8. 559. ................-.-+.. 24

Cubbins v. Mississippi River Comm., 241 U. 8. 351........ 15

Donnelly v. United States, 228 U.S. 243... .......2.-... 28

PUguseD ©. Geek, GES Te Fo Gcacccco<ccccececescccess 27

For River Paper Co. v. Railroad Camm., 274 U. 8. 661..... 27

Gibson v. United States, 166 U. 8. 269_...............-.. 12, 15

Gilman v. Philadelphia, 3 Wall. 713..................... 15

Gulterres v. Albuquerque Land Co., 188 U. 8. 545... ...... 37

Hairston v. Danville & Western Railway, 208 U. 8. 598-___- 35

See Ge GER, GEO Ge Ge Dee ccoceccoccocccececcosecs 18

Massachusetts v. New York, 271 U. 8. 65.....2.........- 27

Mobile Transportation Co. v. Mobile, 187 U. 8. 479........ 27

New Jersey v. Sargent, 269 U. 8. 328...................- 12, 15

People v. Central R. R. of New Jersey, 42 N. Y. 283.......- 27

Philadelphia Co. v. Stimson, 223 U. 8. 605..............- 15

Scranton v. Wheeler, 179 U. 8. 141...............-..--.- 12

OQ 17, 19, 27

South Carolina v. Georgia, 93 U. 8. 4...........-...-----. 30

ee 136

State v. Cunningham, 59 So. 76......... Seccaccesgevesee 28

Stearns v. Minnesota, 179 U. 8. 223..........-.. goecccces 24, 25

Tempel v. United States, 248 U.S. 121...................- 33

United States v. Alford, 274 U. 8. 264... ..............-- 15, 30

United States v. Chandler-Dunbar Co., 229 U. 8. 53; 209

We lb Gil cecccsccceceseccecsecsocosesecosesecesescs 12, 36

United States v. Holt State Bank, 270 U. 8. 49............ 26

United States v. Morrison, 203 Fed. 364... .............. 19

United States v. Rio Grande Dam &.Irr. Co., 174 U. 8. 690. 22, 28, 37

- | United States_v. Winans, 198 U. 8. 371__.....-.- 15, 19, 22, 26, 27

Utah Power & Light Co. v. United States, 243 U. 8. 389... _ .. 37, 45

| Ward v. ON 27

S|” | Winters v. United States, 207 U. 8. 564....-.------ 18, 19, 26, 37

Wisconsin v. Duluth, 96 U. 8. 379... ..............-.-.--

Statutes: ss Page

Act of March 3, 1865 (c. 127, 13 Stat. ee 3, 38

Act of March 2, 1867 (c. 175, 14 Stat. — SE 3

Act of July 27, 1868 (c. 248, 15 Stat. 198)....... 3

Act of March 3, 1899 (c. 425, 30 Stat. 1151)........__. 3, 16, 41

Act of June 17, 1902 (c. 1093, 32 Stat. 388)...... 3, 36

Act of April 21, 1904 (c. 1402, 33 Stat. 189)........ 3, 21,

26, 29, 33, 36, 38

Act of April 4, 1910 (ec. 140, 36 Stat. atimavevessancne 3, 36

Act of June 20, 1910 (c. 310, 36 Stat. 567, 570)... 3, 22, 39

Act of June 25, 1910 (c. 407, 36 Stat. 836)... ss 3, 38, 40

Act of February 21, 1911 (c. 141, 36 Stat. 926)... _. 3, 32, 33, 40

Act of March 4, 1921 (c. 161, 41 Stat. 1367, 1404)... 3, 31, 33, 40

Act of December 5, 1924 (43 Stat. 701)........ 3, 34, 37

' Act of January 21, 1927 (o. 47, 44 Stat. 1010, 1021)______. 14

Act of December 21, 1928 (c. 42, 45 Stat. 1057).....__- 3, 13, 38

Act of June 16, 1933 (c. 90, 48 Stat. 195)...... 3, 38

Constitutions:

Constitution of the United States:

Art. III, Sec. 2, Clauses land2......... | geeceee 2

Art. IV, Sec. 3, Clause 1.......................__. 24

Constitution of Arizona, Article 20.............. 3

Executive Order:

Executive Order No. 6252, August 16, 1933..........___. 3, 39

Treaty: ;

Treaty of Guadelupe Hidalgo, February 2, 1848 (9 Stat.

Ge sctheadipesuddomammneustbndidemisune: Recequeccoccbeoo 3

The Colorado River Compact (Nov. 24,1922)... __ wee 3

MisceHaneous:

Boulder Canyon Project; cooperative contract for con- .

struction and operation of Parker Dam............____ 47

Recommendation of Parker Dam and appurtenant Works

under National Industrial Recovery Act...........____ 66

Appropriation Acts for flood control on Colorado River

below site of Parker Dam.........................___ 68

regarding ‘contributed funds”....................___ 71

Statement of Contributed Funds Act of March 4, 1921_.___- 72

Colorado Rfver Indian Reservation, Arizona and Cali-

fornia; Acts appropriating funds.______. peeeuenssouews 65

Sen. Doc. No. 142, 67th Cong., 2d Sess., p. 56.........___ 14

U. 8. Geological Survey Water Supply Paper 734, p. 88... 14

Inthe Sagreme Court of the Wnited vue

OctoBER TERM; 1934

No. 18, Ortaiwan

THE UNITED STaTeEs or AMERICA, PhpAINTIFF

/

v.

THE StTaTeE oF Arnizona

}

BRIEF OF THE PLAINTIFF IN SUPPORT OF APPLICATION

FOR A RESTRAINING ORDER, AND IN OPPOSITION TO

THE DEFENDANT'S MOTION TO DISMISS THE BILL OF

COMPLAINT

JURISDICTION

This is an original action by the United States

against.a State, brought under Article ITT, Section

2, clauses 1 and 2 of the Constitution of the United

States. .

QUESTIONS PRESENTED

Two motions are before the Court:

(a) The plaintiff has applied for an order re-

straining all interference by the defendant, the

State of Arizona, its officers, agents, and employees,

with the construction of Parker Dam pending the

final determination of this action. The following

questions are presented by this application:

(1)

2

(1) Does the complaint state a cause of action?

(2) Is-there such a prospect of irreparable in-

jury that a temporary restraining order should is-

sue pending final determination of the action? |

(b) ‘The defendant has moved to dismiss the bill

of complaint. The following questions are pre-

sented by this motion:

(t) Does the United States have ecusiitations!

authority to construct Parker Dam in the Colorado

River for inyrovement of navigation, protection

of federal property from floods, reregulation of

water discharged from Boulder Dam, and reclama-

_ tion of Indian and public lands, without fhe con-

_ sent of the State of Arizona, within which State

the eastern abutment of the dam will rest? —

(2) If the consent of the State were necessary,

do the provisions in the Arizona ‘Enabling ‘Act

validly give such consent?

(3) Do the Secretary of tlie Interior and the

Federal Emergency Administrator of, Public

Works possess adequate statutory authority to

construct Parker Dam, and, in aid of such con-

struction by the Government, to contract with the

Metropolitan Water District of Southern Cali-

fornia for cooperation by that District in | financing

the project? ¥

CONSTITUTION, TREATIES, AND STATUTES INVOLVED

Constitution of the United States, Article ITI,

Section 2, Clauses 1, 2; Article IV, Section 3,

Clause

rr Eee

3 .

Constitution of Arizona, Article XX.

Treaty of Guadelupe Hidalgo, Feb. 2, 1848 (9

Stat. 922). BAS

Act of March 4, 1865 (¢.\127, 13 Stat. 541, 559).

Act of March 2) 1867 (¢. 175, 14 Stat. 492, 514).

Act of July 27, 1868 (c. 248,\15 Stat. 198, 232),

Act of March 3, 1899 (30 Stat. 1151).

Aet of June 17, 1902 (¢. 1093, 32 Stat. 388).

Act of April 21, 1904 (4. 1402, 33 Stat. 189, 224),

Act of April 4, 1910 (¢. 140, 36 Stat. 269, 273).

Act of June 25, 1910 (¢,407, 36 Stat. 836).

Act of June 20, 1910.(é 310, 36 Stat. 567, 570).

Act of Feb. 21, 1914 (c. 141, 36 Stat>926).

Act of March 4,1921 (c. 161, 41 Stat. 1367, 1404). . |

Act of Dee. 5, 1924 (43 Stat. 701-2, 3). . od

Act of Dee. 21, 1928 (e¢. 42, 45 Stat. 1057). {

The Colorado River Compact (November 24,

1922). e

Act of June 16, 1933 (e. 90, 48 Stat. 195).

Executive Order No. 6252, dated August 16, 1933,

STATEMENT

This ease britigs before the Court for the third .

time a phasé of the Colorado River controversy

(Arizona v. California, 283 U. §S. 423; Arizona Vv.

California, 292 U. 8. 341). ®

The bill of complaint was filed on January 14,

1935. Process issued on-that date, returnable April

* 1, 1935. On January 18, 1935, the United States

applied to the Court for ain order to show cause why

4

a temporary restraining order should not issue.

The order issued on January 2T, 1935, returnable

February 4, 1935. On February 2, 1935,. the de-

fendant filed a return to the order to show cause

and a motion to dismiss the bill of complaint.

The bill of complaint, in brief, alleges that on

November 7, 1934, the United States was engaged

in the construction of Parker Dam, in the Colorado

River on the Arizona-California boundary, for the

purposes ‘of improvement of navigation, flood con-

trol, re-regulation of water discharge from Boul-

der Dam, and reclamation of, lands ‘within the Colo-

rado River Indian Reservation and publie lands,

pursuant to the Reclamation Act (¢. 1093, 32 Stat.

388), and acts amendatory thereto, and the Na-

tional Industrial Recovery Act (¢. 90, 48 Stat.

195) ; that thereupon the defendant State of Ari-

zona, by the proclamation of martial law and the

threat of armed force, stopped construction and

has continued to prevent work on thé dam. It is

alleged that the dam must be constructed during»

the limited time while the flow of the Colorado

River is being impounded during the filling of

Boulder Dam reservoir.

The bill prays the issuance of a permanent in-

junction, and other remedies.

The application for a restraining order alleges

that the United States will suffer irreparable in-

jury if construction of Parker Dam is delayed.

The application is supported by affidavits of the

5

Commissioner of Reclamation and the Secretary

of the Interior, stating the necessity for immediate

resumption of construction, and the irreparable

character of the injury which will be sustained if

' the conditions now temporarily existing by virtue

: of the filling of Boulder Dam reservoir, and which

can never be restored, are not availed of for con-

struction of Parker Dam. ,

Arizona’s return to the order to show catse is ac-

companied by a motion to dismiss the bill of ecom-

plaint, and, in‘support both of the return to the

rule and of the motion to dismiss, by an affidavit 6f

Governor B. B. Moeur of that State and by a brief.

There are, consequently, two matters now before

the Court: The plaintiff’s application for a re-.

straining order, and the defendant’s motion to dis-

miss the bill of complaint. The: issues upon the —

motion to dismiss the bill of complaint,*are, of

course, restricted to the face of-the bill; the motion

necessarily admits all properly pleaded allegations.

The affidavit of the Governor contradicting the al-

legations of the bill of complaint and alleging

affirmative matter; such as the contents of ' tele-

grams which he has received from a United States

‘Senator concerning this case, is therefore not

properly before the Court on any issue raised by

the motion to dismiss, although the defendant’s

brief in support of that motion relies on the state-

ments in the Governor’s affidavit. These state-

ments, if they constitute defenses to this action,

a 6

may be raised hereafter by way of answer in a

proper pleading. The Court may pass upon the

application for a restraining order and the motion

‘to dismiss separately, and at different times.

Accordingly, this brief is divided into two parts:

Part I deals with the motion to dismiss, and

Part II with the application for a restraining

order.

‘SUMMARY OF ARGUMENT

Part I. The defendant’s Motion to Dismiss the

Bill of Complaint should be denied.

‘ (1) The United States has constitutional power

to construct Parker Dam in aid of navigation and .

flood control. The bill alleges, and its allegations

must be taken as admitted by the motion to dismiss,

that Parker Dam will reregulate and equate, in aid

of navigation and flood control, the waters dis-

charged at Boulder Dam, and jvill impound and

control the floods of the Bill Williams River and

other waters entering the Colorado River between

Parker Dam and Boulder Dam which now imperil

navigation and cause damage to the Colorado

River Indian Reservation and other federal prop-

erty. The consent of the State of Arizona is not

necessary to the exercise of these Federal powers.

- (2) The United States has constitutional power

to construct Parker Dam for the reclamation of

Indian and public lands. The bill of complaint

alleges, and the allegations must be deemed admit-

ted by the motion to dismiss, that the Colorado

7

River Indian Reservation contains about 150,000

acres of irrigable land, which, however, require _

pumping or diversion of waters of the Colorado

River for the reclamation thereof, and that Parker

Dam is so, designed and will be so constructed as

to enable the reclamation of all lands within the

reservation by means of puniping with electric

energy to be generated at Parker Dam, or by means

of diversion of water at the dam, or both. The -

. consent of the State of Arizona is not necessary

for the exercise of the federal power to reclaim and

irrigate lands within an Indian Reservation and

public lands, and to erect structures necessary for

the furnishing of water fer such purposes,

(3) If the consent of the State of Arizona were

otherwise necessary, the provisions of the Enabling

Act under which the State was admitted to the

Union specifically consent to the erection of works

for reclamation purposes. The stipulation in the

Enabling Act is a valid provision for the protection

of interests of the United States’ in Indian and

publie lands.

(4) The Secretary of the Interior and the Publie

Works Administrator have adequate statutory au-

thority for the construction of Parker Dam. The

Secretary is authorized by the Act of April 21,

1904 (e¢. 1402, 33 Stat. 189, 224), to divert waters

of the Colorado River and to reclaim-lands within

the Colorado River Indian Reservation therewith.

He is authorized by the act of March 4, 1921 (ce. 161,

’

~

8

41 Stat. 1367, 1404), te accept funds furnished by

other parties and to expend them under the Ree-

lamation Act as though specifically appropriated

by Congress. The contract of February 10, 1933,

between the United States and the Metropolitan '

Water District of Southern California is an advan-

tageous and proper exercise of that authorization.

The United States will build, own, and control

Parker Dam, and the fact that the District will

receive bénefits by its construction and will pay

‘for those benefits, does not diminish the Federal

interest.

Independently, the Federal Emergency Admin-

istrator of Public Works is authorized by the Na-

tional Industrial Recove: y Act (¢. 90, 48 Stat. 195,

Title IL) to construct or aid in the construction or

financing of conservation and river improvement

works, and to utilize other governmental officers

and agencies in so doing, including necessarily the

Secretary of the Interior. It is immaterial that

the National Industrial Recovery Act was enacted

afier the execution of the contract of February 10,

1933, between the United States and the Metro-

politan Water District; the Recovery Act was in

force When the construction of Parker Dam was

commenced, and the projeet had been duly included

in the “‘comprehensive program of publie works”

prior thereto. The existence or nonexistence of

the contract of February 10, 1933, did not affect the

validity of the authority exercised under the Re-

9

covery Act, as distinguished from the independent ~

bases of authority existing prior to passage of that

- act.

As to the action of the Chief of Engineers: First,

the ‘‘recommendation” of a project under the In-

dustrial Recovery Act (ec. 90; 48 Stat. 195, Title

IT), unlike the “approval” of a project under the

Act of March 3, 1899 (30 Stat. 1151), and its sup-

plements, is recognized by Congress as an author-

ization independently of concurrence by the State.

Second, the 1899 Statute relates solely to construc-

tion by: private parties, not to projects constructed

by the United States,

Part II. The plaintiff’s application for a tempo-

rary restraining order should be granted :

(1) The bill states a cause of action entitling the

United States to a permanent injunction. -The

“argument upon this point has. been presented in

relation to the motion to dismiss the bil] of

complaint. |

(2) The United States will suffer irreparable

injury if the, State of Arizona is permitted to con-

tinue its forcible prevention of construction pend-

ing final determination of this suit. First, the

continued use, or threat of use, of troops to prevent

action by the Federal Government in lieu of re-

course by Arizona to this Court, should not be

sanctioned, and whatever the final decision in this

case may be, this method of obstruction should be

restrained pending the orderly consideration by

10

this Court of the motion to dismiss and of the fur-

ther proceedings that may be had in the case. Sec-

ond, the statements in the Government’s affidavits

that successful completion of Parker Dam requires

immediate resumption of construction, in order to

take advantage of the temporary impounding of

the flow of the river at Boulder Dam, are not de-

nied by the defendant’s response to the order to

show cause or by its affidavit. The defendant

specifically admits that ‘‘enormous advantages’’

accrue to the United States through construction

of Parker Dam, and these advantages will be lost, ~

without benefit to the defendant, if work is further

prevented.

. ARGUMENT

Part I. On THE Motion To Dismiss

I

THE UNITED STATES HAS CONSTITUTIONAL POWER TO

CONSTRUCT PARKER DAM IN AID OF NAVIGATION .AND

FLOOD CONTROL .

In Arizona v. California, 283 U. 8. 423, 457, this

Court said, referring to.Boulder Dam:

Since the grant of authority to build the

dam and reservoir is valid as an exercise of

the constitutional power to improve naviga-

tion, we have no occasion to decide whether

the authority to construct the dam and reser-

voir might not also have been constitution-

ally conferred for the specified purpose of

irrigating public lands of the United States.

.

SO em ee Be wy pores fone o e *» . ——— ar

11

Compare United States v. Rio Grande Dam

& Irrig. Co., 174 U. S. 690, 703; United .

States v. Alford, 274 U. 8. 264. Or for the

specified purpose of regulating the flow and

preventing floods in this interstate river. Or

as a means of conserving and apportioning

its waters among the states equitably en-

titled thereto. Or for the purpose of per-

forming international obligations. <Com-

pare Missouri v. Holland, 252 U. 8. 416.

The present controversy presents certain of those

issues mentioned but not decided in that case, as

well as the issue of improvement of navigation com- -

mon to both cases.

Navigation.—The bill of complaint (p. 5) al-

leges, and the motion to. dismiss necessarily admits,

that: - :

Parker Dam and Reservoir are so located

and designed both as to reservoir capacity

and outlet works as to be operated by syn-

chronization with Boulder Dam so that -

Parker Dam will: :

1. Re-regulate and equate, in aid of navi-

gation and river regulation, the waters dis-

charged at Boulder Dam in response to re-

quirerfénts of flood control and fluctuating

power and irrigation demands;

2. Permit the discharge of water for gen-

eration of power at Boulder Dam which

otherwise would be required to be retained

in storage for river regulation, improve-

ment of navigation, flood control, irrigation,

and domestic uses ;

12

3. Permit the conservation for irrigation

and domestic uses and satisfaction of pres-

ent perfected rights. of waters required to

be discharged at Goulder Dam for improve-

ment of navigation, river and flood control,

‘ud power generation.

These allegations being conceded, it is imma-.

terial whether Arizona owns the bed of the river,

as the defendant’s brief contends (p. 11). Such

title as the State may have is a ‘‘qualified title’’,

subject to the ‘servitude in respect to navigation’”’

created in the Federal Government by the Consti-

tution. Arizona v. California, 283 U. 8. 423; New

Jersey Vv. Sargent, 269 U. 8S. 328, 337, 340; United

States v. Chaudler-Dunbar Co., 229 U. 8. 63, 72;

Scranton v. Wheeler, 179 U. 8. 141, 163; Gibson v.

United States, 166 U.S. 269, 272. ‘The Federal au-

thority is not impaired by ‘‘the fact that purposes

other than naviation will also be served.?’ Arizona

v. California, 283 U.S. 423, 456. The regulation of

a river-so as to obtain a more nearly constant flow is .

certainiy a means ‘‘not unrelated to the control of

navigation’; United States y. Chandler-Dunbar

Co., supra. Boulder Dam, located 150 miles above

Parker Dam, is a structure erected for improve-

ment of navigation and other purposes, those other

purposes including the generation of power and the

storage and release of water for irrigation and

flood-control requirements. Arizona v. California,

supra. Manifestly the reregulation of water dis-

charged at Boulder Dam in response 'to flood con-

13

_ trol, irrigation, and power requirements, and thus

discharged in fluctuating quantities, is in aid of

navigation. The bill alleges that Parker Dam will

provide a reservoir capacity of 717,000 acre-feet:

_ Arizona argued in Arizona vy. California, 283

U.S. 423, that Boulder Dam Was an obstacle, rather

than‘'an aid, to navigation. That argument is re-

peated here. Since the bill alleges, and the motion

to dismiss admits, that the dam will aid navigation

by reregulating the flow of the river below it, it seems

unnecessary that the bill should allege that locks

or other means of passage will be installed at

Parker Dam for the further assistance of naviga-

tion when traffie warrants the expenditure. The

contract between the United States and the Metro-

pohtan Water District, pursuant to which the dam

is being constructed, specifically makes provision

for financing the costs of ‘‘ such facilities for navi-

gation as the Secretary may find necessary ” ( Arti-

cle 10). This contract appears in the Appendix.

No provision for locks has been made at Boulder

Dam, and the Boulder Canyon Project’ Act (e. 42,

45 Stat. 1057) does not provide for locks at Laguna

Dam or any other dam referred to in that statute.

Floed Control.—The bill alleges that Parker

Dam will protect Indian and publie lands from

damage by the floods of the Colorado River and

the Bill Williams River. The flow of the latter

river, which enters the Colorado immediately above

the dam site, has varied between 9 eubic feet per

113359-—-35——2

2a nr rr

14

second and 50,000 cubic feet per second within a

period as short as two weeks. These floods are of

short duratioa, but of heavy volume, constituting a

constant menace to the Colorado River Indian Res-

ervation and public lands of the United States in

Arizona and California, as well as to the naviga-

tion of the Colorado River below the site of Parker —

Dam. For data on the destructive character of a

50,000-second-foot flood at these points, see United:

States Geological Survey Water Supply Paper

734, p. 88, and Senate Document 142, 67th Cong.,

2d Session, p. 56. The United States has hereto-

fore expended $2,462,000 for flood control of the

Colorado River below the site of Parker Dam, and

the Act of Congress of January 21, 1927 (c. 47,

44 Stat. 1010, 1021), authorized annual appropria-

tions of $100,000 for defraying the cost of Colorado

River front work. The Appropriation Acts are

cited in the Appendix.

This Court has not-directly passed upon the

‘power of the Federal Government to construct

works for flood control, independent of navigation

improvements. See, however, references to the

question in Arizona v. California, 283 U. 8. 423,

458, particularly footnote No. 9. Where the, land

to be protected by flood control is the property of

the United States, the Federal Government un-

doubtedly has power to regulate the flow of the

stream. We suggest that the qualified interest of

the State in the bed of a navigable stream is subject

15

to a servitude in respect to Federal flood-control,

comparable to the “‘ servitude in respect to naviga-

tion ’’, to which flood control is related. Compare

Gilman v, Philadelphia, 3 Wall. 113, 725; Philadel-

phia Co. v. Stimson, 223 U. 8. 605; Gibson v. United

States, 166 U. S. 269; New Jersey v. Sargent,

supra; Cubbins v, Mississippi. River Commission, .

241 U. S. 351: The power of the United States

to deal with the bed of a navigable stream without

the consent of the State is not limited to purposes

of navigation and commerce, provided that the pur-

pose be Federal. Such a restriction was urged and

specifically denied in United States v. Winans, 198

U. S.371, 382. And, if protection of Federal prop-

“erty is the purpose. of the work, it is not fatal to

the exercise of the power that the act of protection

must be done on lands in which the State or private

parties have an interest. United States v. Alford,

274 U.S. 264; Camfield v. United States, 167 U. 8.

518.

Consent of the State to Navigation and Flood

Control Improvements.—If the United States has

the constitutional power to erect Parker Dam for

the purposes alleged in the bill of complaint, the °

exercise of that power is not subject to contrel by

the State, Arizona v. California, 283 U. 8. 423, 451.

The cases cited by Arizona (Defendant's brief, p.

13 et seq.), in support of the contention that the

concurrent consent of Congress and of the State is

required for erection of structures in a navigable

16

stream are all cases involving construction by pri-

. vate parties, not by the United States. The de-

fendant’s references, to the Act of March 3, 1899

(30 Stat. 1151) and its amendments are likewise

not in point; this statute relates to construction by

private parties, “a

II

THE UNITED STATES HAS CONSTITUTIONAL POWER. TO

CONSTRUCT PARKER DAM FOR THE RECLAMATION OF

THE COLORADO RIVER INDIAN RESERVATION AND

PUBLIC LANDS .

The bill of complaint alleges (par. 14) that, be-

ginning in 1865, Congress has carried forward an

irrigation program for the Reservation at a.cost

to date of $1,359,000 for the ultimate reclamation.

of 150,000 acres within the Colorado River Indian

- Reservation; that this area is irrigable, but that

pumping of waters of the Colorado River, or diver-

sion of waters of the River by a dam and canal, is

necessary for such reclamation. It alleges that

. the construgtion of Parker Dam will enable the

reclamation of all lands in the Reservation at a cost

‘ Jess than is feasible by any other method; that.

Parker Dam will furnish hydroelectric energy for

pumping, as well as provide diversion works. It

_ also alleges that several hundred thousand ackes of

public lands lie along and near the Colorado River

below Parker Dam, and that those lands are ir-

rigable in like manner.

17

The Government may, for an appropriate pub-

lic ‘purpose, establish an interest in a navigable

stream bed prior to the admission of a State, and

that interest will survive the admission of thé

new State. Shively v. Bowlby, 152 U.S. 1, 47:

Notwithstanding the dicta contained in

some of the opinions of;this court, already

quoted, to the effect that Congress has no

power to grant any land helow high-water

mark of navigable waters in a Territory of

the United States, it is evident that this is

not strictly true, * ada

By the Constitution, as is now well set-

tled, the United States, having rightfully

acquired the Territories, and being the only

government which can fimpose laws upon

them, have the entire/dominion and sov-

ereignty, national ay municipal, Federal

and state, over alVthe Territories, so long

as they remait in a_ territorial eondi-

wna * * 3

We cannot doubt, therefore, that Con-

gress has the power to make grants of lands

below high-water mark of navigable waters

in any Territory of the United States, when-

ever it becomes necessary to do so in order

to perform international obligations, or to

effect the improvement of such lands for the

promotion and convenience of commerce

with foreign nations and among the several

States, or to carry out other publie purposes

appropriate to the objects for which the

United States hold the Territory. ‘

18

The protection of the interests of an Indian

. Tribes constitutes an appropriate public purpose.

McGilvra v. Ross, 215 U. 8. 70.

Thus the United States may, by the creation of

an Indian reservation prior to statehood arid by leg-

islation for the protection of the water rights of

that reservation, create an interest in the Indians’

favor which will not be impaired by later inclusion

of these lands within the boundaries of a new State.

In Winters vy. United States, 207 U. 8S. 564, the

United States sued’ successfully to restrain the

erection of reservoirs which would have impounded

waters of the Milk River flowing down to the Fort

Belknap Indian Reservation. The land on which

the dams would have been built had originally been

in the possession of the Indians, but had been ceded

to the United States. After the cession, and before

ratification of a second treaty, the new State of

Montana, within whose borders all of the land lay,

was admitted to the Union. The defendants’ res-

ervoirs had been licensed by the State. The Court

held (p.. 577) : .

Another contention of appellants is that

- if. it be conceded that there was a reserva-

tion of the waters of Milk River by the

agreement of 1888, yet the reservation was

repealed by the admission of Montana into

the Union, February 22, 1889, ¢. 180, 25 Stat.

676, ‘upon an equal footing with the origi-

nal States.’’ The language of counsel is

that ‘‘any reservation in the agreement with

19

the Indians, expressed or implied, whereby

the waters of Milk River were not to be sub-

ject ef appropriation by the citizens and in-

habitants of said State, was repealed by the

act of admission.’’ But to establish the re-

peal counsel rely substantially upon the same

argument that they advance against the in-

tention of the agreement to reserve the

waters. The power of the Government to

reserve the waters and exempt them from

appropriation under the state laws is’ not

denied. and could not be. The United States

v. The Rio-Grande Ditch & Irrigation Co.,

174 U. 8. 690, 702; United States v. Winans,

198' U. 8. 371. That the Government did

reserve them we have decided, and for a

use Which would be necessarily continued

through years. * * *

For cases in the lower courts following the

Winters case, see Conrad Inv. Co. v. United States,

161 Fed. 829; United States vy. Morrison, 203 Fed.

364, 365,

The Winters case involved, a -nonnavigable

stream. But the Government’s power to continue

the development and protection of Indian rights

in a stream which were established prior to

statehood is not curtailed by the admission of a

State, even though the use of the bed of a navigable

stream is involved. In United States v. Winans,

198 U, 8. 371, the Court, citing Shively v. Bowlby,

supra, upheld thé right of the Yakima Indians to

take fish from the Columbia River at ‘‘all usual and

|

:

accustomed places.”” The right was claimed

under the provisions of a treaty between the

United States and the Indians, made in 1859, prior*

to the admission of the State of Washington. The

. right was contested by certain owners of riparian |

lands under patents from the United States, who

* held fishing wheel licenses from the State of Wash-

ington. The Court, at pages 382-384, stated:

It is further contended that the rights

conferred upon the Indians are subordinate

to the powers acquired by the State upon its

admission into the Union. In other words,

it is contended that the State acquired, by

its admission into fhe Union ‘upon an

equal footing with the original States’’, the

power. to grant rights in or to dispose of

the shore lands upon navigable streams, and

such power is subject only to the paramount

authority of Congress with regard to pub-

lie navigation and commerce. The United

States, therefore, it is contended, could

neither grant nor retain rights in the shore

or to the lands under water,

The elements of .this contention and the

answer to it are expressed in Shively Vv.

Boulby, 152 U. 8.1. It is unnecessary, and

it would be difficult, to add anything to the

reasoning of that case. The power and

rights of the States in and over shore lands

were carefully defined, but the power of the

United States, while it held the country as

‘a Territory, to create rights which would be

binding on the States was also announced,

opposing the. dicta seattered through tlie -

i 21

°

eases, which seemed to assert a contrary

view. . * *

. The extinguishment of the Indian title,

opening the land for settlement.and prepar-

ing the way for future States, were ap-

propriate to the objects for which the United

States held the Territory. And surely it

was within the competency of the Nation to

secure to the Indians such a remnant of the

great rights they possessed as ‘‘taking fish

at all usual and accustomed places.’’ Nor

does it restrain the State unreasonably, if at

all, in the regulation of the right. Jt only

fixes in the land such easements as enables

the right to be exercised, (Italies supplied. )

The project for itrigating the Colorado River

Indian Reservation had been definitely initiated

prior to the statehood of Arizona, beginning in

1865, and continued by the appropriation of many

thousands of dollars, as shown by the appropria-

tion acts cited in the Appendix. The diversion of

water (and inferentially, the construction of diver-

sion works) was specifically authorized by the Act

of April 21, 1904 (¢. 1462, 33 Stat. 189, 224), which

authorized the Secretary of the Interior to divert

the waters of the Colorado River and to reclaim,

utilize, and dispose of any land in the Colorado

River Indian Reservation which might be made

irrigable by works constructed under the Reclama-

tion Act.

As to the Reservation, therefore, the preexist-

ing power to construct reclamation works would

—$

-

22

clearly have not been curtailed by admission of

Arizona to the Union, whether or not the State con- -

sented to the continuatce of those powers. But

the State did affirmatively consent, in a form

which, to quote United States v. Winans, 198 U.S.

371, 384, “fixes in the land such easements as en-

“ables the rights to be exercised." That agreement —

is discussed under heading III.

As to public lands, The federal authority to con-

struct reclamation works for publi¢ lands is to be

distingnished from the power to regulate the use

of water.. Arizona v. California, 243 U. 8S. 389.

The United States is certainly free of the police

regulations of a State in exercising the first fune-

tion (United States v. Rio Grande Dam & Irriga-

tion Co., 174 U. 8. 690, 703), which is all that is

involved in the controversy in its present stage.

Il

IF THE CONSENT OF ARIZONA WERE OTHERWISE NECES-

SARY FOR THE CONSTRUCTION OF PARKR DAM IN AID

OF RECLAMATION OF INDIAN AND PUBLIC LANDS,

THAT CONSENT HAS BEEN IRREVOCABLY GIVEN

The Enabling Act, under which Arizona was ad-

mitted to the Union (Act of June 20, 1910, e. 310,

36 Stat. 557, 570) contains the following stipula-

tion: ;

Seventh. That there be and are reserved

to the United States, with full acquiescence

of the State, all rights and powers for ‘the ©

23

carrying out of the provisions by the United

States of the Act of Congress entitled ‘‘ An

Act appropriating the receipts from the sale

and disposal of public lands in certain States

and Territories to the construction or irriga-

tion works for the reclamation of arid

lands’’, approved June seventeenth, nineteen

hundred and two, and Acts amendatory

thereof or supplementary thereto, to the

same extent as if said State had remained-a

territory.

The stipulation was included in the constitution

of Arizona (Article XX), and remained there until

repealed on June 7, 1927. The attempted repeal

was ineffective if the original stipulation was valid,

inasmuch as it constituted a part of a compact

whieh in terms was irrevocable, and the United

States has not consented to its amendment.

Arizona contends (defendant’ 8 brief, p. 22) that

the United States can assert no rights under the

Enabling Act reservation, which she says is in

derogation of her sovereignty and therefore void.

To the contrary, it appears that the stipulation was

for the protection of the right of use and develop-

ment of Federal property. If so, on the authority

of the cases cited below, it was a valid provision.

Arizona’s brief itself assumes (p. 21) that ‘in re-

claiming public or Indian lands the United States

“tacts in the capacity of a proprietor of its own

lands and as a guardian or trustee of Indian

lands.”’

24

The Federal Constitution, Article IV, Section 3,

Clause 1, provides:

New States may be admitted by the Con-

gress into this Union; but no new State shall

be formed or erected within the Jurisdiction

of any other State; nor any State be formed

by the Junction of two or more States, or

Parts of States, without the Consent of the

Legislatures of the States concerned as well

‘as of the Congress. .

As originally reported to the Constitutional Con-

vention, this section contained the following addi-

tional language: .

If the admission be consented to, the new

State shall be admitted on the same terms

as the original ones. “But the Legislature

may make conditions’ with the new States

concerning the publie debt which shall be

then subsisting.

The additional chhuse was stricken out, ‘‘upon

the view that a wide latitude ought to be given to

the Congress, and the denial of any attempt to

impede the growth of the western country.”’ Boyd

v. Thayer, 143 U.S. 135, 163. @

The leading cases on thiseclause are Coyle vy.

_ Oklahoma, 221 U. 8. 559, and Stearns v. Minnesota,

179 U.S. 223. The former case held unconstitu-

tional a stipulation in the Oklahoma Enabling Act

prohibiting the removal of the State capital from

the City of Guthrie for a specified period of years.

Si

~-

25

Coyle v. Oklahoma, supra, classified enabling act

stipulations in three groups: It distinguished (p.

568) —

first, between provisions which are fulfilled

by the admission of the State; second, be-

tween compacts or affirmative legislation in-

tended to operate in futuro, which are with-

in the scope of the conceded powers of Con-

gress over the subject; and third, compacts

or affirmative legislation which operates to

restrict the powers of such new States in re-

spect of matters which would otherwise be

exclusively within the sphere of state power.

‘Stearns v. Minnesota, supra, drew this distine-

tion between void and valid enabling act stipula-

tions (p. 244);

* * * In an inquiry as to the validity

of such .2.compact this distinction must at

“the outset be noticed. There may be agree-

ments or compacts attempted to be entered

into between two States, or between a State

‘and the nation, in reference to- political

rights and obligations, and there may be

those solely in reference to property belong-

ing to one or the other. That different con-

siderations may underlie the question as to

‘the validity of these two kinds of compacts

or agreements is obvious. It has often been

said that a State admitted into the Union en-

ters therein in full equality with all the

others, and such equality may forbid any

agreement or compact limiting or qualifying

political rights and obligations ; whereas, on

the other hand, a mere agreement in refer-

ence to property involves no question of

equality of status, but only of the power of a

State té deal with the nation or with any

other State in reference to. reeane prop-

erty. * * *

We believe that the compact contained in the

Arizona Enabling Act was an ‘‘agreement in refer-

ence to property.” The property involved was a

large area of Indian and public land, worthless

unless the Government’s right to’irrigate this area _

was preserved. United States v. Winans, supra, ,

established that an Indian right to the use of the

bed of a navigable river, initiated before statehood,

constituted a right which the advent of statehood

could not impair. The 1904 Statute, authorizing a

diversion of water (c. 1402, 33 Stat. 189, 224), if

_ not the appropriation statutes between 1865 and

1910 cited in the Appendix, had specifically initiated

an Indian water Mght which the enabling act stipu-

lations were competent to protect. Winters v

United States, 207 U. 8S. 564, has shown that such

an Indian right, initiated even without specific

legislative protection, survives stateliood. :

In our view, the Arizona Enabling Act was an

‘affirmative declaration’’ by the United States of

in-the dream and stream bed previously

initiated on behalf of Federal reclamation projects

and of its Indian wards. Compare United States

v. Holt State Bank, 270 U. 8. 49, and Brewer El-

27

liott Oil and Gas Co. v. United States, 260 U. 8. 77.

It was an-“‘expression of the intention of Congress

to continue the burdens in question in the State.”’

Compare Ward v. Race Horse, 163 U. 8. 504. It

“fixes in the land such easements as enables the

right to be exercised.”’ United States v. Winans,

198 U. 8. 371, 382.

The enabling act compact would have been valid

whether the lands intended to be protected were

riparian or not. But. the bill alleges that the

United States is owner of large riparian -areas

below Parker Dam, and at the dam site and the

reservoir site, the enabling act clauses may

derive sig appr from that fact.

A State may4alidly recognize an interest in the

bed of a navigable stream in favor of a riparian

landowner. Shively v. Bowlby, 152 U. 8. 1. **Thus,

if the State chooses to resign to the riparian pro-

prietor sovereign rights over navigable rivers

which it, acquired on assuming statehood, it is not

' for others t6é raise objections.” Fox River Paper

Co. v. Railroad Comm., 274 U. 8. 651,655. See also

Barney v. Keokuk, 94 U. 8, 324; Mobile Transpor-

tation Co. v. Mobile, 187 U. 8. 479. o~

. Or a State may validly agree to recognize the

interest of another State, either proprietary or sov-

ereign, or both; Central R. R. Co. ‘v..Jersey City,

209 U. 8. 473 (70 N. J. 81). Compare People v.

Central R. R. of New Jersey, 42 N. Y. 283 ; Fergu-

son V. Ross, 126 N. Y. 459; Massachusetts v. New

»?

‘

’ >.

”*

28

York, 271 U. 8, 65; Alsos v. Kéndall, 111 Ore. 359;

State v. Cunningham, 59 So. 76, 79.

And a State may validly yield such an interest to

the United States itself. In Donnelly v. United

States, 228 U. 8. 243, the defendant had been in-

dicted by the United States for murder committed

upon the stream bed adjoining a riparian Indian

reservation. While the Court held that the river

was not navigable and that the Federal title to the

reservation embraced the bed of the stream, it fur-

ther held that if the stream were navigable (as the

local law of California: had held it to be), that the

law of California conferred upon the riparian

_ owner the title to the stream bed to the thread of

the river, and that such title would have ‘been an

adequate basis for Federal juriediction. The Court

said (p. 262):

Thus the State of Califernia, if she sees fit,

. may confer upon the riparian owners the

title to the bed of any navigable stream

within her borders.

And see the dicta in Brewer Elliott Oil and Gas

Co. v. United States, supra, as to the recognition by

a State of Indian riparian rights to a streambed. |

In United States v. Rio Grande Irrigation Co, “

supra, p. 703, ‘this Court said:

* * *. in the absence of specific au-

‘thority from Congress a State cannot by

its legislation destroy the right of the United

States, as the owner.oZ lands bordering on a

29

stream, to the continued flow of its water;

so far at least.as may be necessary for the

beneficial uses of the government property.

An agreement specifically preserving such a right -

a ppears valid.

TV

|, THE SECRETARY OF THE INTERIOR HAS ADEQUATE STATU-

; TORY AUTHORITY FOR THE CONSTRUCTION, OF PARKER

DAM, AND THE CONTRACT OF FEBRUARY 10, 1933, d

WITH THE METROPOLITAN WATER DISTRICT IS A

VALID EXERCISE OF THAT AUTHORITY | ' ,

The défendant’s brief contends that both the Sge-

retary of the Interior and the FederaP Emergency

Administrator of Public Works lack statutory au-

thority to construct Parker Dam.

<

The Authority of the Secretary of the Interior to Construct the Dam

Section 25 of the 4ct of April 21, 1904 (ce. 1402,

33 Stat. 189, 224), which has been cited on a pee-

vious page, provides in substance : ‘

* * * that in carrying out any irrigation

enterprise which may. be undertaken under

the provisions of the reclamation act

*.* * and which may make possible and

» provide for, in connéction with the reclama-

tion of other lands, the rectamation of all or -

any portion of the irrigtble lands on the

Yuma and Colorado River Indian reserva-

¢ tion in California and Arizona, the Secre-

tary of the Interior is hereby authorized to

divert the waters of the Colorado River and

to reclaim, utilize and dispose of any lands

115.859—35—--3

30

in said reservations which may be irrigable -

by such works in like manner as though’

the same were a part’ of the public

domain. * * *.

Proceeding under this authority the ‘Seeretary,

in 1905, constructed Laguna Dam (near Yuma) for

the benefit, in part, of the: Yuma Reservation

( which includes lands at the eastern end of Laguna .

Dam) but at the cost of the Yuma Project..

The statutory authority for the erection of works

in a navigdble river by an officer of the United

States need not be specific, and is not invalid be-

cause it leaves to his discretion how and where the

works shall be .built.. Cf. South ‘Carolina v.

Georgia, 93 U. S. 4, 13. In the Boulder Canyon

project Att the site of ‘the dam authorized ‘to be

built was not fixed by the Act, but the determina-

tion of that question was left to the discretion of

the Secretary of the Interior. The Act provided

that the dam should be built at Black Canyon or at

Boulder Canyon. The Secretary decided upon the

site at Black Canyon and it is there that the

Boulder Dam is built.

If the use of Parker Dam site, and the genera-

tion of power there for pumpir® water to the Colo-

rado River Imian Reservation is, in the Secre-

tary’s opinion, the most feasible way to carry out

the “‘diversion of water’’ authorized by the 4904

statute, it is immaterial that the site itself is not

within the limits of the-reservation. .Cf. United

States Vv. ‘Alford, supra. In the Winans Case,

31°

supra, as here, the disputed location was outside

the limits, of the reservation.

The Secretary's authority to finance construction by means of the

contract of February 10, 1933, with the Metropolitan Woter:

District

The bill recites that on February 10, 1933 the

Secretary entered into a contract with the Metro-

politan QWVater District of Southern California

whereby the District agreed to prepay the cost of

Parker Dam in return for certain benefits, inelud-

ing use of one-half of the power privilege; the

. United States, nevertheless, to own and contrél the

structure and, without contribution by: the Gev- -

ernment to the cost of the dam, to utilize the reser-

voir capacity for river regulation and improve-

ment of navigation, flood control and irrigation, di-

version of water, reclamation of Colorado River

Indian Reservation and public lands; and to utilize

one-half of the power priyilege for reclamation of

those areas. .

Arizona’s brief contends (p. 26 et seq.) that the

Secretary was without authority to make that con-

tract, and that in carrying it out the Interior De-

partment is building Parker Dam for the Metro-

politan Water District. :

The Act of Mareh 4, , 1921 (41 Stat. 1404) pro-

vides:

All moneys hereafter received from any

state, municipality, corporation, association, .

firm, district, or individual for investiga-

tions, surveys, construction work, or any.

4

+ : ‘ 32

other development incident thereto involv-

ing operations similar to those provided for

by the reclamation law shall be covered into

the reclamation fund and shall be available

for expenditure for the purposes for which

contributed in like manner as if said sums

hagl been specifically appropriated for said

purposes.

‘Section 2 of the Act of February 21, 1911 (36

Stat. 926) ‘authorizes the Secretary, upon such

' terms as may be agreed upon, to cooperate with

irrigation ¢Cistricts, water users’ associations, cor-

porations, entrymen, or water users €or the con-

struction: or use of such reservoirs, canals, or

ditches as may be adv antageously used by the Gov-

ernment and irrigation districts, etc., for impourid-

ing, delivering, and carrying water for irrigation

purposes.

The brief of the defendant admits that ‘‘enor-

mous advantages accrue to the United States”

under its’ contract with the Metropolitan Water .

District (pp. 26, 27), including a power privilege

which the brief estimates to be worth from $12,-

000,000 to $17,000,000 (p. 28). It argues that the

District would not have yielded such a valuable

right unless it anticipated ‘‘very valuable consid-

erations which are not expressed in the contract.”’

If this argument is relevant, it demonstrates two

things: First, that the Secretary made a provident

contract, whereby, withoyt cost to the taxpayers of

the United States, the objective of the Act of April

-

33

~ |

21, 1904 (¢. 1402, 33 Stat. 189, 224) to provide water

for the Indians, as well as the objectives of navi-

gation improvement and flood control, could” be

» accomplished; second, that since the District ob-

tained, in addition to othtr benefits, a power privi-

lege exactly equal to the Government’s, and thus

worth, on Arizona's statement, from $12,000,000 to

$17,000,000, the District received full value for its

$13,000,000 payment. Such an arrangement ap-

pears well within the authority of the Act of March

4, 1921 (ce. 161, 41 Stat. 1367, 1404) and February

21, 1911 (36 Stat. 926). That authority has been

frequently exercised in the construction of other

' projects,-as shown by the annual reports of the See-

retary of the Interior eited in the Appendix. The

Court may take judicial notice of those reports.

Arizona V, California, 283 U.S. 423, 457, Note 8;

Tempel v. United States, 248 U.S. 121.

It is immaterial whether the District could or

éould not have built the dam without Arizona’s

consent. :

The Federal title, control, and use of Parker

Dam are not lessened by the fact that the District

is advancing its cost in payment for a limited right ;

. to its benefits. The dam is designed by the Bureau

Bai Reclamation engineers, the specifications are

* written by them, bids are taken by the Government,.

the construction contract is niade by the United

States, and the contractor afd. materialmen are

paid by Treasury vouchers. The difference be-

‘

‘

. p4:

tween this project and those like it—such as Amer-

ican Falls and Jackson Lake, on the one hand, and

projects such as. the All American Canal, on the

other—is in one respect only: in the first, the Gov-

- _ ernment is placed in funds in advance, and in the

second, it must recoup its expenditures after con-

_ Struction. In both cases the Government is made

whole by a funding contract with an‘entity which

- will, benefit by the expenditure. Generally the .

whole henefit goes te that entity—that is, all of

the water impounded, and.all of, the proceeds of ©

.power. See the “Fact Finders’ Act” (Act of Dee.

5; 1924, 43 Stat. 701, 703), subsection ‘‘J’’, pro-

viding for credit of ‘‘total accumulated net prof-

its’’ to the repayment contract on transfer: of op-

eration and maintenance to the water users. Here

the Government retain’-half the power privilege,

and ruris no risk on its investment. The authority

of the United States to. exercise eminent domain in

: aid of a “cuntributed funds” project (American

Falls, Idaho) was sustained in Brown Vv. United

States, 263 U.S. 78.

The claim of Arizona that, notwithstanding the .

indi¢ia of Federal interest in the Parker Dam

Project, the United States is in fact acting on be-'

_ half of the Metropolitan Water District, and as

its agent, is similar to the objection which has been

raised and answered in a number of emiment do-—

main cases, in which the power of eminent domain

was resisted on the ground that while nominally it

.

35

was exercised in behalf of a qualified entity, as, for

instance, a common carrier, that the real bene- °

ficiary was unqualified as, for instance,.a particular

shipper. Cf. Hairston v. Danville & W. Ry., 208

U. 8. 598, 607.. A case resembling the Parker Dam.

matter is Wisconsin v. Duluth, 96 U. 8: 379, an

original action in which the State of Wisconsin

_ Sued to enjoin the City of Duluth, Minnesota, from

cutting a new outlet for the St. Louis River, a

navigable stream emptying into Lake Superior in

Wisconsin. It was claimed that the new works in-

juriously affected Wisconsin's sovereign interests.

‘The city defended on the grounds, a#mong others,

that although this canal had béen begun by it, the

Tirited States had taken it over and was in fact

do...g the work under Federal appropriations of

Senile The Court sustained the defense, saying

(p. 386) : a

| We do not feel ealled upon to make an

argument to prove that these statutes of the

Congress of the United States, and these “

acts of the Exeeutive Department in carry-

ing these statutes into effect, constitute an

adoption of the canal and harbor improve-

ment started by the City of Duluth, and a

taking exclusive charge and control of it.

That they amount to the declaration of the

Federal government, that we here inter-

pose and assert our power. We take upon

ourselves the burden of this improvement,

which properly belongs to us, and that here-

after this work for the public good is in our

hands and subjevt to our control.

36

See also South Carolina v. Georgia, 93 U. 8s.

4, 13.

If the Government has authorit? to build the

dam, that authority is not lessened by the incidep-

tal use of the reservoir thereby created for genera-

tion of power. Arizona has no interest in the

Government’s disposition of the power. United

States v. Chandler-Dunbar Co.~209 U.S. 447, 229

U. 8. 53; Arizona v. California, 283 U. 8. 423.

The defendant has referred to certain statutes

which it contends limit the Secretary’s authority.

* The Indian Appropriation Act of April 4,°1910

(36 Stat. 269, 270) (not cited by the seen

provides that |

hereafter no new project to cost in the ag-

gregate to exceed thirty-five thousand dol-

lars shall be undertaken on any Indian

reservation or allotment without specific

authority of Congress. . : '

However, the Act of April 21, 1904 (33 Stat. 189,

224), constituted specific authority, and reenact-

ment of it was not required: The Appropriation

Act containing the quoted proviso contains also an

appropriation of $50,000 toward securing an appro-

priation of water for the Colorado River Indian

_Reservation, negativing any abandonment of the

1904 program (36 Stat. at 273).

Section 8 of the Reclamation Act (Act of June

17, 1902, 32 Stat. 388), provides that nothing in

that Act shall he construed as interfering with the

laws of any State relating to the control, appro-

“«-

37

priation, ete., of water used in irrigation, and that |

the Secretary of the Interior shall proceed in con-

formity with such laws in carrying out the Act.

But this provision was intended to protect water —

rights, not to control the erection of works for

Federal purposes. Arizona y. California, supra;

‘Utah Power & Light Co. v. United States, 263°

U. .S. 389, 410. For the history of this language

see Gutierres v. Albuquerque Land Co., 188 U. 8.

545. The Federal Governfhent’s power to permit

third parties to use the water stored by Parker —

Dam for irrigation might be affected by this stat-

ute, Lut not its power to build the dam for Federal

purposes, as for example, the protection and recla-

mation of Indian lands (ef. Winters v.\ United

States, supra), public lands (United States v. Rio

Grande Irrigation @o., supra) or other Federal

objects (Arizona. v. California, supra). °

Subsection B of the Act of December 5, 1924

(43 Stat. 701, 702), requires certain findings of:

feasibility before construction of a new project or,

division of a project. If this statute applies to.

projects previously authorized, such as the Colo-

rado River Indian Reservation, the requisite find-

ing is recited in Articles 4 and 5 of the contract

betaveen the Secretary and the Metropolitan Water

District, printed in the Appendix, and is supported

by reports on file in the Bureau of Reclamation.

made under:the direction of Section 11 of the

Boulder Canyon — Act (45 Stat. 1057, 1063).

38

The defendant’s brief cites Section 4 of the Act

of June 25, 1910 (ce. 407, 36 Stat. 836), which h pro-

vides in part that:

hereafter no irrigation project contemplated _

by said Act of June seventeenth, nineteen

hundred and two, shall be begun unless and

until the same shall have been recommended

by the Secretary of the Interior and ap-.

proved by the direct order of the President

. of the United States. -

This statute applies to future projects initiaged

. subsequent to its date. The irrigation of the lands

of the Colorado River Indian Reservation was

initiated _March 2, 1867 (14 Stat: 514), when

Congress appropriated $50,000 for that oo

purpose.

But if this statute is comtrued as applying to p

projects previously authorized by Congress, such

as the diversion of water for the Colorado River In-

dian Reservation authorized by the Act of April

21, 1904 (c. 1402, 33 Stat. 189, 224), the require-

ment appears to have been met by the proceedings

had under the National Industrial Recovery: Act

(48 Stat. 19@), outlined infra.

}

As to the Wuthority of the Federal Emergency

Admisistratohy of Public Works.—Section 202 of |

the National }Industrial Recovery Act (48 Stat.

195) authorizg@s the President, through an Admin-

istrator, to “prepare a comprehensive program of

including

,

publie work

' 39 .

conservation and development of natural

resources, including control, utilization; and-

purification of waters * .* * develop-

ment of water power, transmission of elec-

trical energy, and constriction of river and

_ harbor improvements and flood control

* * * Provided, that no river or harbor .

7 ~

improvements shall be carried -out unless

they shat] have heretofore or hereafter been

adopted by the Cengress or are recom-

mended by the Chief of Engineers of the

United States Army * "* *,

Section. 203 authorizes the-Rresident’ _ .

through the Administrator or through Such

* other agency as. he may designate or create,

(1) to construct, finance, or aid in the. con-

struction or financing of any public-works

project included in the program prepared

pursuant to Section 202. |

Executive Order No. 6252, August 16, 1933,

delegated. authority, to the Federal Emergenéy

Administrator of Public Wotks,in sibstguttially E

the language of ‘See, 203, i. é., ‘‘to> construct,

finance, or aid. in the construction or finane-

ing of any public-works project included in the

program prepared’’, ete. The bill alleges that in

the exercise of that authority the Administrator

included Parker Dam in the comprehensive pro-

gram. The same executive order (Sec, A 1) au-

thorizes the Administrator “to utilize such Fed-

eral officers and employees * * * as he ntay

|

find necessary * *-*.’’ The Secretary of the

Interior, in building Parker Dam, is thus construct-

ing-a project the authorization for which is derived

from the 1933 Industrial Recovery Act as well as

the Act of Apgil 21, 1904, supra, and is an officer

awhom the Administrator is authorized to designate

as the construction agen¢y, independently of the

autherity the Secretary derived from the 1921

‘**Contributed Funds”’ statute (Act of Mar. 4, 1921,

41-Stat. 1404) and the Act of February 21, 1911

(36 Stat, 926).

Section 201 of the Recovery Act authorizes the

President to perform all functions under Title II

thereof through the Administrator. The Admin-

istrator was thereby authorized to give the “direct

order’’. referred to in section 4 ‘of the Act of June

25, 1910 (c. 407, 36 Stat. hand if that order was

required here.

The brief of the defendant (p. 35) -lays stress

on the fact that Parker Dam was not included in

the “‘comprehensive program’’ until December 28,

1933, ten months after execution of the céntract -

with the Metropolitan Water District. This has

no bearing on the authority of the Administrator.

He is authorized to construct works for which no * |

financing agreement whatever has been made. He

* is authorized to utilize other Government agencies,

sich as the Secretary of the Interior, in so doing.

. From the bill it appears that construction was not

started until after Congress had conferred this

41

authority. Its scope-is not impaired by the fact

_ that foF ten months previously a financing agree-

ment with the Distrigt, whieh was not essential

to the Administrator’s authority, had remained

executory.

As to the Chief of Engineers.—Parker Dam,

under the allegations of the bill, falls within sev-

eral of the categories of projects authorized by

Section 202 of the National Industrial Recovery

Act, supra; that is, (1) control, utilization, and

purification of waters; (2) development of water

power; (3) construction of river and harbor im-

provements; (4) flood control. As to one of these,

the construction of river and harbor improvements,

a proviso requires that *‘no river or harbor im-

provements shall be carried out unless they shall

have heretofore or hereafter been adopted by the

Congress or are recommended by the Chief of En-

gineers of the United States Army.’’ Both of

these alternatives have been complied with: the

Act of April 21, 1904, supra, constitutes an

“adoption by the Congress’’ of a program for di-

verting water for the Colorado River Indian Res-

ervation, and the bill alleges that the Project, has

been recommended by the Chief of Engineers. “His

recommendation appears in the Appendix.

The defendant’s brief (p. 17) apparently con-

fuses the functions of the Chief of Engineers under

" the Act of March 3, 1899 (30 Stat. 1151 ), and under

the National Industrial Recovery Act, supra. The

42

former prohibits the erection of structures in nav-

igable waters without the approval of the Chief of -

Engineers and the Secretary of War. It applies

‘only to private parties, not to.the United States,

‘and is consequently not involved _in this case.

Under the Recovery Act the ‘‘recommendation”’ of

the Chief of Engineers is not the mere negative

finding required under the 1899 Act; it is a new

_and affirmative basis for the inclusion of a project

in a Federal construction program, having* the

same effect under the recognition given to it by that

statute as the designation of that particular project

by an Act of Congress. The cases cited by the de-

fendant as to the limited effect of the ‘‘appreval’’

of a project by the Chief of Engineers under the

1899 statute are not in | point ; he is proceeding here

- under a much broader delegation of -power, and:

with regard to a Federal, not a-private, project.

The defendant’s brief states that the Chief of

Engineers’ action was taken shortly before this suit

was filed, and in contemplation of it. While the

recommendation of thé Chief of Engineers is not

required to bring this project within the compre-—

hensive program of Public Works as a project for

“eontrol, utilization and purification of water’’, it

is recognized that the Court, in considering the

dam’s relation to reclamation and flood control,

must necessarily consider its effect on navigation,

and to that end-the procedure necessary to bring

that phase of the matter before the Court has been

complied with.

43

Part II. ON tHe APPLICATION FOR A TEMPORARY

RESTRAINING ORDER

1° |

THE BILL OF COMPLAINT STATES A CAUSE OF ACTION

ENTITLING THE UNITED STATES TO A PERMANENT ©

INJUNCTION

The argument pon this point has been presented

in relation to the motion to D Cente the bill of com-.

plaint. -

II

THE UNITED STATES WILL SUFFER IRREPARABLE INJURY’

IF THE STATE OF ARIZONA IS PERMITTED TO CONTINUE

ITS FORCIBLE PREVENTION OF (CONSTRUCTION PEND-

ING FINAL DETERMINATION OF THIS SUIT

First. The use of militia by a State to prevent

procedure by a Federal agency, in lieu of resort by

the State to the process of the Court, should not.

be sanctioned. Whatever the final outcome of this -

case may be, this method of obstruction should be

restrained pending the orderly consideration by

this Court of the defendant’s motion to dismiss the

bill of complaint and of the, further proceedings |

that. may be had in this ease. The defendant's

brief (p. 9) itself states; )

Likewise, it might well be said that Ari-

zona has at all times had: available its rem-

edy in the ordinary and orderly course of

judicial proceedings and it was not neces-

sary for it to forcibly stop construction,

whatever it might have thought of the wis-

dom of such a course or of its rights in the

premises.

—

at ieee oe ee

—

wpe ree TE

——— ee

z

SSE

44

Second.—The showing of irreparable injury

made by’ the Government’s bill of complaint and

the affidavits of the Secretary of the Interior and

the Commissioner of Reclamation is not rebutted

and is scarcely denied. It is not denied that the

construction of Parker Dam requires the excava-

tion of the river bed to a depth of .more than 240

feet; that this operation involves great hazard;

. that it can De successfully carried out only by com-

plete control of the flow of the Colorado River;

that for only a limited time the whole flow of the:

river (except releases for irrigation requirements)

will be impounded by Boulder Dam; that Arizona’s

use of force has already cost two and one-half

months (now three months): of this.limited con-'

struction time; and that the/successful completion

of the work requires immediate resumption.. The

defendant’s brief (pp. 27,. 28) specifically admits

that ‘‘enormous:-advantages accrue to the United

States’’ by the construction of Parker Dam, and

fails to deny that the whole project must be carried

forward without further delay if it is to be success-

fully completed, and that the favorable conditions

now existing because of the filling of Boulder pum

reservoir can never be duplicated.

Instead of traversing these statements, the de-

fendant recounts in detail its controversy with

other States and with the United States over the

use of Colorado River water, and particularly its

opposition to the Metropolitan Water District.

45

No question of water rights is involved in this

application for a restraining order. Construction

of Parker Dam: does not of itself interfere with

such appropriations of water as may lawfully be

made in Arizona. A determination of the Govern-

ment’s right to build the dam would not of neces-

sity include a determination of whatever right of

diversion may be held by the District or by Ari-

zona, nor would an adjudication upon diversion

rights necessarily include a decision on the Fed-

eral power to construct the dam. The Supreme

Court settled in Arizona v. California, 283 U. 8.

423, that the question of whether the Government

has authority to erect a dam has nothing to do

_ with relative rights to appropriate water. The

United States may build Parker Dam even if the

District may not divert water. Of. Utah Power &

' Light Co. v. United States, 243.U. 8. 389, 410, 411.

Whatever interest Arizona may have in the opera-

tion of Parker Dam after its construction may be

submitted. to the Court later. As this Court ‘said

in Arizona v. California, 283 U, S. 423, 463:

= If by operations at the dam any then per-

fected right of Arizona, or those claiming

under it, should hereafter be interfered with,

appropriate remedies will be available.

And (283 U. 8. 423, 463) :

There is no occasion for determining now

Arizona’s rights to interstate or local waters

which have not yet been, and which may

~, never be, appropriated.

113350— 35——4

46

A further and additional reason why a restrain-

ing order should issue forthwith is that the forcible

interference by the defendant with the construction

of the dam is an interference with the exere/se by

the Government of a power, conferred upon it by

the Constitution. Any such interference should be

restrained whenever or by whomsoever attempted»

If the existence of the power is determined and the:

fact of the forcible resistancof its exercise is not _

denied, the power is entitled to immediate protec-

tion by this Court. Whatever May be the further.

_ eourse of this case or its ultimate determination,

Arizona should be temporarily restrained pending

final determination of the case.

CONCLUSION

The defendant’s Motion to Dismiss the Bill of

Complaint should be denied. :

_ The plaintiff’s application for an order restrain-

ing all interference by the defendant, the State of

Arizona, its officers, agents, and employees, with

' the construction of Parker Dam pending final de-

termination of this action, should be granted.

Respectfully submitted.

| / J. CRAWFORD Bicas,

Solicitor General.

-/ Harry W. Buair,

Assistant Attorney General.

J/ Davin B. Hempsteap,

Special Assistant to the Attorney General.

Fesruary 1935.

s

APPENDIX

UNITED States DEPARTMENT

OF THE INTERIOR, .

Bureau oF RECLAMATION.:

- BouLpER CANYON PROJECT

’

COOPERATIVE CONTRACT FOR CONSTRUCTION AND

OPERATION OF PARKER DAM

1. This contract, made this 10th day of Febru-

ary, 1933, pursuant to the act of Congress ap-

proved June 17, 1902 (32 Stat. 388), and acts

e amendatory thereof or supplementary thereto, all

of which acts are commonly known and referred to

as the Reclamation Law, and particularly pursu-

ant to the act of Congress approved March 4, 1921

(41 Stat. 1367, 1404), section 25 of the act of Con-

gress approved April 21, 1904 (33 Stat. 189, 224),

and the act of Congrese approved December 21,

- 1928 (45 Stat..1057), designated the Boulder Can-

yon Project Act, and the **Metropolitan Water

District Act’’ of the Legislature of the State of

California (Stats. 1927, Chap. 429), as amended,

particularly section 5, subduivision (9) thereof, be-

tween THE UNITED States or America, hereinafter

referred to as the United States, acting for that

purpose by Ray Lyman Wilbur, Secretary of the

Interior, hereinafter styled the Secretary, and Tue

METROPOLITAN Water District or SouTHERN C ALI-

(47)

' 48

FORNIA, a public corporation, hereinafter referred

to as the District, organized and existing under

and by virtue of the laws of the State of California:

WITNESSETH : ,

EXPLANATORY RECITALS

. 2. WHEREAS, these parties have “heretofore on-

April 24, 1930, and September 28, 1931, entered

inte two contracts entitled respectively ‘‘Contract

for Delivery of Water,’’ and “Supplementary

Contract for. Delivery of Water,’’ which said con-

tracts provide, among other things, for the delivery

by the United States to the District each year from

the . Boulder Canyon Reservoir of quantities of

water «ta point in the Colorado River immediately

above the District’s point of diversion (at or in

the vicinity of the proposed Parker Dani herein-

after referred to), and have also entered into two

contracts (dated April 26, 1930, and May 31,1930),

for the purchase by the District from the United

* States of certain quantities of electrical energy to

be generated at Hoover Dam, for the pumping of. |

said water into and in an aqueduct to be con-

structed by-the District ; and

3. WHEREAS, the said point of delivery =a ‘the

proposed Parker Dam ‘are approximately ten (10)

miles above the boundaries of the Colorado River

Indian Reservation, as designated by the act of

Congress approved Marcli 3, 1865 (13 Stat. 559),

and there are now being irrigated, by pumping,

approximately 6000 acres of land within said reser-

vation, and water has been reserved and appropri-

ated, pursuant to said act as amended or supple-

mented and particularly by the act of April 4,

. a) .

°s

|| 49..

1910 (36 Stat. 273), for additional lands within.

_ said r@servation susceptible of irrigation from the’.

Colorado River, the reclamation of which will re- \

quire diversion from the River by construction of a

dam, or by puinping or both, and will require

drainage of said lands by pumping, for all of which

electrical energy is needed; and

4. WHEREAS, there are also in Arizona additional

public and other lands i in the v icinity of said reser-

_ vation and also in the Gila Valkey, susceptible of

irrig ration from the Colorado River, but requiring

pumping for such purposes, for. whjch electrical

energy will be needed, and'the United States has

now under way an invastigation of possible recla-

mation of such areas as authorized by section fif-

teen (15) of the said Boufder Cany on } F’vegect Act; .

and

5. WHEREAS, the reclamation of said Indign and

public amd other lands -will be rendered more feas=>

ible by the availability of stored’water and electri-

cal energy at the proposed Parker Dam, and the.

floods of the tributaries of the Colorado River be-

tweeti Hoover Dam and Parker Dam will be con-

trolled, and eaten improved, by said dam;

and

6. WHEREAS, the Sestein if authorized by said

act of April 21, 1904 (33 Stat. 224); to build the

proposed Parker Dam for the re¢lamation of all

or any portion of the irrigablelands on the Yuma _

and Colorado River Indian Reservations in Cali-

fornia and Arizona; and stich authority has been

reserved in the Arisona Enabling Act (act of ? une

20, 1910, 36 Stat..570, 575), and

-7. Wuereas, the District is engaged in a project

involving the construetion of an aqueduct for the

purpose of diverting and couveying water from the

Colorado River to the metropolitan area of South-

- ern California for domestic, municipal, and other

useful purposes, aud as a means of such diversion,

desires storage in the main stream of the Colorado

River at the site of the proposed Parker Dam, for

the purpose, among others, of desilting water, re-

ducing pimp lift, and developing incidental elec-

trical energy for pumping water into and in said

aqueduct and other uses subordinate to the said

aqueduct project, and the District desires to utilize

the proposed Parker Dam. in. common with the

United States andgis willing to pay to the United

States the entire capital cost of construction of

said dam, as hereinafter set forth, and is further

willing that one-half of the power privilege created

by said dam shall be reserved to the United States ©

for the purposes of irrigation and drainage of

lands in Arizona within the Colcrado River Indian

Reservation, as now constituted, and the Gila or

Gila-Parker Project without contribution by the

United States to the capital cost of the proposed

dam, as hereinafter set forth, and is. also willing

that the dam be utilized by the United States for

the storage and diversion of water for the require-

ments of Indian, public and other lands in Arizona;

aud

8. WHEREAS, the Secretary is authorized by the

act of Congress approved March 4, 1921, to receive

moneys from the District as aforesaid and to effect

_ therewith the construction of the proposed works:

as though said moneys were specifically appropri-

ated for.said purposes ; and

51.

9. Whereas funds are not otherwise available

for the construction by the United States of said

-dam and the provision of storage and diversion fa-

cilities and of appurtenant works for the irriga-

tion and drainage of said Indian, public, and other

lands in Arizona and the cooperative construction

of the said dam and works, as herein provided, will

be mutually advantageous to the parties hereto,

and the cost of said dam and appurtenant works

will be materially less if constructed during the

period of completion of the-Hoover Dam now under

construction than would otherwise be the case;

Now, THEREFORE, in gotisideration of the mutual

covenants herein contained, the parties hereto

agree as follows, to wit:

CONSTRUCTION BY THE UNITED STATES

10. The United States will, with funds advanced

by the District as hereinafter ‘provided, and for

the purposes: stated in this contract, ¢éonstruct in

the main stream of the Colorado River at a point.

in the vicinity of Parker, Arizona, shown onthe

map attached hereto and described: herein as Ex-

hibit ‘‘A’’, a dam, referred to herein as the Parker |

Dam, creating thereby a storage reservoir having

a maximum water surface elevation of approxi-

mately four hundred fifty (450) feet above sea level

(U. S. Geological Survey datum). Upon like con-

ditions the United States will also construct outlet

works, pressure tunnels, penstocks, and other ap-

purtenant structures to the extent that such strue-

tures may be necessary and/or economically desir-’

able as parts of the original installation, and such —

facilities for navigation as the Secretary may find

' 52

necessary. All buildings intended solely for the

use of either party hereto shall be constructed at

the sole expense of the party for whom such facil-

ities shall be provided. The dam and appurtenant -

structures shall be so constructed that subsequent

installation of diversion or ontlet works shall be

possible in the most feasible manner for canal con-

nections with lands within the Colorado River In-

dian Reservation and with public and other lands

in Arizona now or hereafter included in projects

constructed under the Reclamation Law and sup-

plementary legislation, or otherwise, subject to the

consent and approval of the Secretary, and if either

party hereto requires it, so that one-half of the tofal

installed capacity of electrical generating equip-

ment may be located upon the Arizona side of the

river and one-half on the California side. Outlet

works, pressure tunnels, penstocks, connections for

canals, and appurtenant structures not required by

the District shall be completed under this contract

only to the extent necessary to permit their subse-

quent completion and use without risk of damage

to the remainder of the work.

In carrying out the proposed work hereunder

and in acquiring supplies, materials, and equip-

ment therefor, the United States may proceed di-

rectly under the method commonly referred to as

force account, or may proceed by construction con-_

tract. In the event that such contract or contracts

shall be let with reference to the construction of

said dam, or the acquisition of supplies, materials,

or equipment therefor, the letting of such contracts

shall be governed by the provisions of Section

3709, United States Revised Statutes.

FUNDS TO BE PROVIDED BY THE DISTRICT

11. The District will advance to the United

States, not to exceed the sum of Thirteen Million

Dollars ($13,000,000), or so much thereof as may

be (a) the cost of preparation of plans and speci-

fications described in Article 13 hereof; (b) the

actual cost of the said dam, including acquisition

of lands and rights-of-way for reservoir and other

incidental purpases, outlet works, pressure tun-

nels, and penstocks, to be constructed hereunder,

and of the District’s proportionate share as deter-

mined_by the Secretary, of such power-plant build-

ings and generating, transforming, and high-volt-

age switching equipment as may be installed for

the joint use of the United States and the District,

and (¢) required to meet any overhead and gen

eral expense incurred by the United States in car-

rying out this contract.

Said funds will be furnished to the United States

by payment from time to time to the Secretary or

such fiseal agent as he may designate in advance of

expenditure thereof by the United States. The

Secretary will submit estimates of the monthly’ an-

ticipated expenditures not less than sixty (60) days

in advance, and the District will then advance the

amount not less than thirty (30) days prior to the

month in which such funds shall be estimated to be

required. If the United States effects such con-

striction by contract, such contract shall recite that

the United States shall not be liable for any loss

occasioned by the failure of the District to advance

funds as herein provided. The District agrees to

hold the United States harmless from all claims

whatsoever arising from any such failure. If the

54

funds provided by the District are at any time in-

sufficient, the United States will stop work (if pro-

ceeding under force accounts), when the funds so

advanced are exhausted, or give notice to the con-

struction contractor to stop work (if proceeding by

construction contract), when the funds so provided

are about to be exhausted, and will not resume or

give notice to resume work until additional and

sufficient funds are provided by the District; and,

in any event, the United States shall not be obli-

gated by this agreement beyond the expenditure of

the amount actually provided by the District,

whether the proposed works are completed or not.

The failure of the District to provide funds shall

not impose any liability on the District other than

to hold the United States harmless from the conse-

quences thereof, but the United States may be re-

lieved, at its option, of any obligation under this

contract, if such failure continues for twelve (12)

successive months, after submission of estimate

therefor, by the Secretary’s giving the District

written notice of the termination of any further

obligation of the United States hereunder. |

The cost of the proposed works shall embrace

all expense of whatever kind growing out of or re- -

sulting from said works, including, any overhead

and general expense (as conclusively estimated by

the Secretary) incurred by the United States in

carrying out this contract. Nothing contained in

this article is to be construed as obligating the

United States to expend or Congress to appropriate

money for any share of (a) said power-plant build-

ings or (b) said generating, transforming, and

high-voltage switching equipment intended for the .

joint use of the parties hereto.

, 55

NO OBLIGATION BY THE UNITED STATES TO PAY FOR WORKS

CONSTRUCTED

12. The United States shall not be under any

obligation to repay to the District, or otherwise

contribute toward, the cost of any works built with

funds provided by the District. !

PREPARATION OF PLANS AND SPECIFICATIONS

13. The designs and specifications for all con-

struction or other work under this contract (includ-

ing exploratory and preparatory work) shall be

prepared by the United States with the cooperation —

of and at the cost of the District, and shall be ap-

proved in writing ‘by the General Manager and

Chief Enginéer of the District, or such other officer

‘as the Directors thereof may designate, prior to

orien e thereof o or the letting of contracts for

such work.

DURATION OF CONTRACT

14. Upon written notice from the Distriet to the

Secretary that funds will be available to carry out

the work to be constructed hereunder, the United

States agrees | to submit within thirty (30) days

following such notice its first estimate of funds re-

quired during the first thirty (30) days of work

hereunder and to proceed thereafter with reason-

able diligence. It is ‘contemplated that as far as

practicable, the proposed works shall be constructed

coincidentally with the construction of Hoover

- Dam and the filling of: the reservoir thereby cre-

ated, and that any contract let by the United States

for the erection of Parker Dam shall so provide;

but neither the United States nor the District shall

incur liability to the other through the noneomple-

sn

tion of said works within said period. This con-

tract shall terminate on December 31, 1945, unless

prior thereto the District shall have advanced suffi-

cient funds for all .works to be construeted by the

United States hereunder, and in the event of such

termination, all rights of the District under this

contract shall cease, and the uncompleted works,

together with the rights to the use thereof, shall

vest in the United States.

POWER AND OTHER PRIVILEGES

15. (1) The interests of both parties require,

and it is agreed, that the water surface of the res-

ervoir to be created by Parker Dam shall be main-

tained as nearly as possible at a level of 450 feet

above sea level (U.S. Geological Survey datum) at

the dam. |

II. It is agreed that the United States shall have

and may exercise the following rights and such in-

cidental authority as may be necessary to make

them effective : |

(a) The right to control all water passing the

dam ; provided, however, that the water level stated

in Article 15 (1) hereof shall not be arbitrarily

reduced but may be temporarily reduced from time

to time to a minimum élevation of 440 feet above

sea level, and the water level shall not be reduced

below said minimum level except in cases of emer-

gency affecting the safety of the said dam and

appurtenant works.

(b) The right, without contribution to the cost

of the dam built under this contract, to one-half

the power privilege created thereby for use in the

irrigation and drainage of lands in Arizona within .

the Colorado River Indian Reservation as now

57

constituted and the Gila or Parker-Gila Project, °

as determined by fhe Secretary, and for other pur-

poses incidental to said Célorado River Indian Res-

ervation and Gila or Parker-Gila Project; that is

to say, the right to pass through such generating

equipment as it may install one-half the total avail-—

able flow at the dam at any given time, after deduec-

tions for diversions being made above the dam for

the District’s aqueduct and for the irrigation of

(1) the Colorado River Indian Reservation, as now

constituted, and (2) public and other lands in Ari-

zona now or hereafter included in projects con-

structed under the Reclamation Law and supple-

mentary legislation, or otherwise, subject to the

consent and approval of the Secretary, and the

right to so utilize such portion.of the balance of the

power privilege as aforesaid as may not be used

by the District for the time being. _

(ce) The right to connect with such transmission

system as the District may construct for the pur-

pose of utilizing any power transmission capacity

in excess of the District’s requirements, for the

transmission of power from Hoover Dam to

Parker Dam for general use within the Colorado

River Indian Reservation, as now constituted, and

Gila or Parker-Gila Project, as determined by the

Secretary ; provided that such excess capacity shall

be subject to reasonable operating conditions fixed

by the District, and that the United States shall

pay to the District the cost of transmission of such

power as may be transmitted by use of such excess

capacity hereunder ;

(d) The right to connect with the Parker Dam

and/or the reservoir created thereby: by means of a

canal (including such outlet and diversion features

58

at Parker Dam as may be necessary or advisable) |

with lands within the Colorado River Indian Res-

ervation, as now constituted, and with public and

other lands in Arizona or California, now or here-

after included in projects constructed under the

Reclamation Law and supplementary legislation,

or otherwise, subject to the consent and approval of

the Secretary, and the right to thereby divert such

quantities of water as may be consistent with the

- Colorado River Compact and the Boulder Canyon

Projeet Act.

- ILL. It is agreed that the District shall have

‘and may exercise the following rights and such.

‘incidental authority as may be riecessary to make

them effective:

(a) The right to one-half of the power privilege

created by the proposed Parker Dam for the pur-

pose of developing electrical energy for pumping

water into and in the said aqueduct and other uses

incidental to said aqueduct project in California;

that is to say, the right to pass through such gen-

erating equipment as it may install, one-half the

total available flow at the dam at any given time,

after deductions for diversions being made above

_ the dam for the District’s aqueduct and for the

irrigation of (1) the Colorado River Indian Reser-

vation, as now constituted, and (2) public and

other lands in Arizona, now or hereafter included

in projects constructed under the Reclamation Law

and supplementary legislation, or otherwise, sub-

ject to the consent and approval of the Secretary,

_ and the right to utilize for said purpose such por-

tion of the balance of the power privilege as afore-

5Y

said as may not be used by the United States for

the time being.

(b) The right to divert water from the said

Parker Dam and/or the reservoir created thereby;

by means of an aqueduct, canal, or other appro-

priate works (including such outlet and diversion

features at Parker Dam as may be necessary or ad-

visable) for domestic, municipal, and other benefi-

cial use within the area of the District, as now or

hereafter constituted, in California, and to thereby

divert such quantities of water as may be con-

. sistent with the Boulder Canyon Project Act, the

Colorado River Compact, and she said contracts

heretofore entered into’ betwee e United States

and the District and deseribed And referred to in

Article 2 hereof.

INSTALLATION OF MAGHINERY

16. Machinery and’ equipment for generating,

transforming, and high-voltage switching of energy

for the sole use of the District shail be installed,

owned, and operated’ by the District at its own ex-

pense. The District shall not be liable for the cost

of generating or other electrical equipment in-

‘stalled for the sole use of the United States.

OPERATION AND BASHSSRANCS OF RESERVOIR, DAM, AND OUTLET

WORKS ’

17. The United States will operate and maintain

the reservoir, dam, and outlet works, to, but not in-

cluding, shut-off valves, and reserves the right to

direct the control of all water passing the dam for

any and all purposes; provided that contracts now

60

in force between the parties hereto shall not be °

thereby impaired. So long as the United States

shall make no use of the reservoir, the cost of oper-

ation and maintenance (which shall include repairs

and replacements and a reasonable amount, as de-

termined by the Secretary, for general expenses

and overhead, but excluding contingent liabilities

_ and/or damages) shall be paid monthly in advance

by the District to the United States within sixty

' (60) days of submission of estimates therefor. If

and when the United States shall use or authorize

the use of said reservoir for diversion of water

. and/or development of power, the annual cost of

maintenance and operation of the reservoir and

dam (as hereinabove in this paragraph limited and

defined) shall be pro-rated upon the basis of the

diversions by each party into their respective aque-

duets, canals, and power plants, and shall be paid

in direct proportion to the uses so. made by the

District and the United States.

OPERATION AND MAINTENANCE OF POWER PLANT AND POWER

PLANT BUILDINGS

18. The District will operate and maintain at

its own cost all buildings and equipment used solely

by it for the generation of electrigal energy, from

and including shut-off valves. e United States

will operate and maintain at its own cost all build-

ings and equipment used solely by the United

States for the generation of electrical energy, sub-

ject to the availability of appropriations therefor

by Congress, and said operation and maintenance

shall be effected by the United States through such

agency as the Secretary shall designate.

a , 61

TITLE

19. Title to the dam and all other structures

erected by the United States, whether utilized by

it or by the District, or by both, shall remain in

the United States.

UNITED STATES TO BE HELD HARMLESS

20. District agrees to save the United States,

its offigérs, agents, and employees harmless ‘from

all claims whatsoever arising out of the construc-

tion and maintenance of said dam, and from all

claims whatsoever arising out of such operation

thereof as may be necessitated by the requirements

of the District. The District agrees to pay all

damages resulting from the flooding of lands, and,

to the extent thatiands within the Chimehuevi In-

dian Reservation are damaged, payment therefor

will be madé to the United States for the benefit of

said Reservation.

ACCESS TO WORK AND TO BOOKS AND RECORDS

21. Aceredited officers of the District shall have

the right of ingress to and egress from all work

done under this contract, both in progress and after

completion, and the right at all reasonable hours

to examine and make copies of any books, records,

drawings, or specifications thereof; and the United

States shall have a like right as to all pertinent

books, records, drawings, and specifications of the .

District. Upon demand and at not less than thirty-

day intervals, the United States will furnish to the

_ District detailed statement of all costs and expend-.

itureg in connection with and/or chargeable against

the proposed Parker Dam Project.

113359— 35——_5

a _

62 s

’ EXISTING CQNTRACTS BETWEEN THE UNITED STATES AND THE

DISTRICT o— oAPFECTED

22. Existing contracts between the United States

and the District shall remain in full force and ef-

fect and unaltered by the provisions of this agree-

ment.

TRANSFER OF INTEREST IN CONTRACT

23. No voluntary transfer of this contract, or

of the rights hereunder, shall be made without the

written approval of the Secretary; and any suc-

cessor or assign of the .rights of the District,

whether by voluntary transfert, or otherwise, shall

be subject to all the conditions of the Reclamation

Law and supplementary legislation, and also sub-

ject to all the provisions and conditions of this

contract, to the same extent as though such suc-

_ cessor or assign were the original contractor

: hereunder.

RULES AND REGULATIONS

24. This contract is subject to such rules and :

regulations, conforming to the Reclamation Law

aud supplementary legislation and other statutes

cited ‘in this contract, as the Secretary may from

time to time promulgate ; Provided, however, that.

no right of the District hereunder shall be impaired

or obligation of the District hereunder shall be ex-

tended thereby ; and Provided further, that oppor-

tunity for hearing shall be afforded the District by

the Secretary prior to promulgation or modifica-

tion of any such rules and regulations,

- 63

AGREEMENT SUBJECT TO COLORADO RIVER COMPACT

25. This contract is made upon the express con-

dition and with the express understanding that all

rights hereunder shall be subject to and controlled

by the Colorado River Compact, being the compact

or agreement signed at Santa Fe, New Mexico, No-

vember 24, 1922, pursuant to the Act of Congress

approved August 19, 1921 (42 Stat. 171), entitled

“‘An Act to permit a compact or agreement be-

tween the States of Arizona, California, Colorado,

Nevada, New Mexico, Utah, and Wyoming, respect-

ing the disposition and apportionment of the

waters of the Colorado River, and for other pur-

poses,’’ which Compact was approved in Section

13 (a) of the Boulder Canyon Project Act.

DISPUTES AND DISAGREEMENTS

26. “Whenever a controversy arises out of this

. contract, and if the disputants then agree to submit

the matter to arbitration, the District shall name

one arbitrator and the Secretary shall name one’

arbitrator, and the two arbitrators thus chosen shall

elect three other arbitrators, but in the event of

their failure to name all or any of the three arbi-

trators within five (5) days after their first meet-

ing, such arbitrators, not so elected, shall be named

by the Senior Judge of the United States Circuit

Court of Appeals for the Ninth Circuit. The de-

cision of any three of such arbitrators shall be a

valid and binding award of the arbitrators.

64

MEMBER OF CONGRESS CLAUSE

27. No Member of or Delegate to Congress or

Resident Commissioner, shall be admitted to any

share or part of this contract, or to any benefit that

-may arise therefrom. Nothing, however, herein

‘contained shall be construed to extend to this con-

tract if made with a corporation for its general

. benefit.

IN WITNESS WHEREOF, the parties hereto have

caused this contract to be executed the day and

year first above written.

THe Unirep STATES OF

AMERICA, |

By Ray LyMan Wiusur,”

' Secretary of the Interior.

THE METROPOLITAN WATER

“District oF SovuTHERN

ea

[SEAL] By W. P. Wuirsert, \

Chairman of the Board of Directors.

Attest:

Norrucutr ELy.

Approved as to Form:

‘By James H. Howarp,

General Counsel.

Attest :

A. L. Gram,

Secretary of the Board

of Directors.

65

Cororano River Inptan Reservation, Arizona anp CALI-

rornraA, Acts Aprropriatinc Funps THEREFOR

Date of Act Statute Reference Amount

Hen Gh Seliececennstoeeceenaeeonsoccuns 0 nee $50, 000

Sl Gis Bebe cencscewnsyessuesousercene GPG, Giipocccecevsesnevcecocccesses 50, 900

BENG BD, WNB....0.2000--ccccre-cccececee: (17 Stat. 198) ...........-..--------0--- 20, 000

CE eee eee 18, 000

RR Sh Sreteraswssumeennennen US 35, 000

ES Se sneimbeeenl Gh cmupeeenenenseansnoeid 25, 000

AS Toanewmnas we GD GREE. Gi pe ecccccrvccceuseccovewenst 15, 000

Se i ict tinterietisiiaiiaicaaicantaie biel I I sninictceeheneimmniiiiiaiabantetebipanl 15, 000

SEED. G, GER. nccccegecerocers ee 15, 000

EE AEA SPs SE evenepeebenssensecenqences 70, 000

eres OU ae 188, 000

a Cy Ee 86, 000

8 EE Veen eee Ck 86, 000

gk ISS eee eee Eee 65, 000

Aen St, RENEE an ne eee 65, 000°

a Gay Gl a~esncressnneusesonnnweid 55, 000

EE Mee ees GP EE ecwessonerepensseurenunes 2, 000

ff 8 EE, Le 0 EE 15, 000

ee GE ccnccerrecnsrinstnenewess 10, 000

Ee eae GEA BEE.. Fi cowccvececs grcoceoeeeeeeee 5, 000

Bilas. 6, BER..n.cvcccceeee geovebesvenaes GBD GUB. WTD..w.ccceececocccccccccees 18, 000

Ere 287 See Gl acunncccnmenceseounsenened 25, 000

8 Res ee IS Oe 8, 000

Nk SAE es SS se 7, 00

Se, Te Ge eceverusetumnscsinteeeenes Cf Oe 2, 000

(47 Stat.

RECOMMENDATION OF PARKER DAM AND APPURTE-

‘NANT Works UNpbER NATIONAL INDUSTRIAL RE-

_ COVERY AcT

Wuereas The Secretary of the Interior and the

- Federal ‘Emergency Administrator of Public

Works have made provision for the construction of

a dam and appurtenant works in the main stream

of the Colorado River, to be known as Parker Dam

and to be located about one-half mile below the

confluence of the Bill Williams River and the Colo-

rado River, for the following puppeses, among

others:

1. Reregulation of waters discharged at Boulder

_Dam in power operations and in response to irriga-

tion demands, in order, by such reregulation, to

equate the flow of the Colorado River in aid of

navigation and flood control, and to conserve said

- waters for other beneficial uses;

2. Control of fleods of the Bill Williams River

(the flow of which ranges from a minimum of 9

cubic feet per second to a maximum of more than

50,000 cubic feet per second) in aid of navigation

- and protection of federal property from Gamage

by floods ;

3. Control of scouring action of the clear waters

released at Boulder Dam on the bed of the Colo-

rado River, and prevention of injury to navigation

by disturbance of normal low water levels thereby ;

4. Other purposes in‘aid of the reclamation and

use of property of the United States.

(66)

67

Anp WHEREAS, The Secretary of the Interior and

the Federal Emergency Administrator of Public

Works. have submitted for examination and. ap-

proval plans, specifications, drawings, and maps of

location of said structure and certain appurtenant

works; copies of which are hereto attached ;

Now THereroreE, Pursuant to the authority con-

ferred by Section 202 of Title Il of the National

Industrial Recovery Act, this is to certify that the

said project, constituting Parker Dam, reservoir

and appurtenant works is duly recommended by the

Chief of Engineers of the United States Army and

the inclusion thereof in the comprehensive program.

of Public Works referred to in said Title is ap-

proved; and said recommendation is approved by

the Secretary of War.

Wirvess my hand this 4th day of January 1935.

| E. M. MarKHAM,

_ Major General,

Chief of Engineers.

(illegible initials. )

Wirness my hand this 5th day of January 1935.

Geo. H. Dern, _

Secretary of War. —

APPROPRIATION Acts For FLoop ConTROL on CoLo-

RADO RIVER BeLow Sire or PaRKER Dam

The Act of Congress of March 3, 1925 (43 Stat.

1186), authorizes an appropriation of $650,000 for

Colorado River front work to protect the Yuma

Federal Reclamation project.* An appropriation

in accordance ‘with this authority is made in the

Act of July 3, 1926 (44 Stat. 841, 857). The Act

of. Congress of January 21, 1927 (44 Stat. 1010,

1021), amends the Act of 1925, supra, and author-

-izes annual appropriations of $100,000 or so much

thereof as may be necessary, for defraying the cost

of Colorado River front work.

The Act of Congress of May 10, 1926 (44 Stat.

485), made $35,000 available for the Colorado -

River front work and levee system for the protec-

tion of the Yuma reclamation project. This pro-

vision was carried over in the Act of January 12, .

1927 (44 Stat. 961).

_ The Act of Congress of February 14, 1931 (46

Stat. 1146), makes an appropriation of $100,000 to

defray the cost of the Colorado River front work

and levee system adjacent to the Yuma Federal ir-

rigation project.

The Act of Congress of March 3, 1915 (38 Stat.

861), appropriates $100,000 for Colorado River

front work.

The Act -of Congress of January 12, 1927 (44

Stat. 961 ), appropriates $35,000 for Colorado River

front work.

(68)

69

»The Act of Congress of March 7, 1928 (45 Stat.

231), appropriates $100,000 for Colorado River.

front work.

The Act of Congress of May 29, 1928 (45 Stat.

903), appropriates $72,640 for Colorado River’

front work.

The Act of Congress of March 4, 1929 (45 Stat.

1593), appropriates $100,000 for Colorado River

- front work.

The Act of Congress of May 14, 1930 (46 Stat.

310), appropriates $100,000 for Colorade River

front work.

The Act of Congress of February 14, 1931 (46

Stat. 1146), appropriates $100,000 for Colorado

River front work.

. The Act of Congress of April 22, 1932 (47 Stat.

118), authorizes expenditures of unexpended bal-

ances for Colorado River front work.

' The Act of Congress of February 17, 1933 (47

Stat. 845), authorizes an appropriation of $48,000

for Colorado River front work.

The Act of Congress of March 2, 1934 (48 Stat.

362), authorizes the expenditure of the unexpended

balance on Colorado River front work.

In 1906 there was a disastrous break in the banks

of the Colorado River, and the River was pouring

into the Imperial Valley, threatening to make a

lake of this area. The Southern Pacific Company

elosed the break. In the Act of Congress of May

26, 1924 (43 Stat. 171), the Company was author-

ized to sue the United States in the Court of

Claims for the work so done. A judgment of

$1,012,665.57 was recovered (68 Court of Claims

223).

70

The Act of Congress of July 13, 1892 (37 Stat.

108), appropriates $10,000 for ‘‘Improving Colo-

rado River by construction of a levee on the Gila -

River near its junction with the Colorado River at

Yuma, Arizona, so as to confine the waters to the

channel of said rivers.’’

REFERENCES IN PRINTED REPORTS OF THE SECRETARY

OF THE INTERIOR RELATIVE TO THE OPERATIONS OF

THE Bureau or RECLAMATION ReaarpIna ‘‘Con-

TRIBUTED FuNDSs”’

The following references are found in the Sec-

_retary’s printed Annual Reports in regard to con-

tributed funds: —

24th An. Rep., 1924-1925, page 127, under ‘‘ Ap-

pendix, Consolidated Financial Data, Construction

Account, Contributed Funds, $1,023,597.64.”’

Under the same heading and on page 105 of the

25th An. Rep., 1920-1988, “Contributed Funds,

$1,024,073.13.”

Under the same we and on page 35 of the

26th An. Rep., 1926-1927, “‘Contributed Funds,

$1,174,306.49.”’

Under the same heading and on page 31 of the

27th An. Rep., 1927-1928, “‘Contributed Funds,

- $1,248,813.73.”

Under the same heading and on page 37 of the

28th An. Rep, +» 1928-1929, ‘‘Contributed Funds,

$1,320,870.80.”’

Under the same heading and on page 53 of the

29th An. Rep. 1929-1930, “Contributed Funds,

$1,428,906.38,””

Under the same heading and on page 60 of the

30th An. Rep. 1930-1931, “Contributed Funds,

$1,457,959.63.”’

(71)

72

_ Under the‘same heading and on page 77 of the . .

Bist An. Rep. 1931-1932, “Contributed Funds,

$1,614,552.76.”’

Under the same heading and on page 37 of the

32nd An., Rep. 1932-1933, “Contributed Funds,

$1,733,552.76.””

Under the same heading and on page 47 of the

33rd An. Rep. 1933-1934, ‘‘Contributed Funds,

$1,783,013.08,”

DEPARTMENT OF THE INTERIOR,

BuREAU OF RECLAMATION.

Srarement or Conrrrsvrep Funvs Act or Marcu 4, 1921

Cc

om Pret =

BRED rccceccccecevececsessscecesesors VEER sccccvesceveusecsocegsocoses $101, 113. 80

Ge ewesscccescesccaceyesseusssesd QUBG. ccoscssccscsvesesvesssocecs 1, 00,00

QB Dwecewscscsescscecscssscssscens GG 210, 500. 00

GED ccccescecevecesvenceoussveuseeus BD wescccccccsescececevccsessses 3, 865. 68

WO ccessesecccscssceresssangeseares i KG IE 8, 025. 66

Epi ecensseceusessunscepreunsseuseus SE Pececccccevsrcovecscsvess 856, 778. 08

Bi ecscccscsncesenscemeesenssteeens Minidoka-Gooding................ 1,00. 00

SER essceusesecovevsensscussesaess Eee 717. 64

WR ccecuncceranscncscceverspausesed GD Bi ccscccevecccsecsccessees ‘1. 47

(sd TE | EES 33, 782. 28

Be edcccecesseccsusseseeserescssess OL 1, 458. 05

Se Se esesssnascseceuuecnasesed OEE 7, 080. 06

ee a 370, 925. 00

OE — OE a 5, 000. 00

ee Oe 4, 34. 61

a _ 5,000.00

iiiietipecinnssentenaietinadiaaial i ncinimesnmebennieeenetil 1, 000. 00

ee Belle Pourche..................... 4, 960. 32

Ne intaminaitliaanneaiimemeid 3 EE SS 4,756.77

— a Strawberry Valley. ............... 417

WEED scescsessssvssctescesesscns VYokima.......... 63, 74. 90

eee Shoshone....:... 0. ©

RD ccsccqeenpesumscsesassest Guu Gari cccccccceescescseves * @. @

ee

WURR cesmcsnsccuscecerssuscsess sas eeneeremmnens sus®escessseses 1, 733, 013. 8

73

DEPARTMENT.OF THE INTERIOR,

BUREAU OF RECLAMATION.

”

AMERICAN FALLS RESERVOIR—IDAHO (COOPERATIVE

FINANCING)

(In the account books of the Bureau of Reclama-

tion the amounts contributed by individual con-

tractors for American Falls Reservoir were not

carried as contributed funds.)

© S GOVERN@ENT PRleTinG OFFICE term

16

SUPREME COURT OF THE UNITED STATES.

No. 18, Original. —Ocrtoser Term, 1934.

The United States of America, Plaintiff,

vs.

The State of Arizona, Defendant.

[April 29, 1935.}

Mr. Justice Burier delivered the opinion of the Court.

September 10, 1934, the United States, acting through Harold

L. Ickes, Secretary of the Interior and Federal Emergency Ad-

ministrator of Public Works, caused to be commenced the con-

struction of the Parker Dam in the main stream of the Colorado

River, the thread of which for a distance of about 237 miles is

the boundary between Arizona and California. The site is 150

miles below the Boulder Dam, half a mile below the place where

the Williams River flows into the Colorado and 10 miles north of

the Colorado River Indian Reservation. Its ends rest on public

lands of the United States‘ in Arizona and California. Arizona

objects to the construction of the dam, asserts that it may not law.

fully be built without her consent and threatens the use of military

force to stop the work. January 14, 1935, the United States filed

its bill in equity perpetually to enjoin interference by the State.

On plaiutiff’s motion this court directed defendant to show cause

why a restraining order should net issue pending the final deter-

mination of the suit. Arizona filed a return consisting of an affi-

davit of the governor setting forth the grounds on which the State

claims the right to prevent the construction of the dam in the part

of the river bed that is easterly of the thread of the stream, a

motion to dismiss the bill and a supporting brief. We heard

counsel on plaintiff’s application for a temporary injunction and

defendant's motion to dismiss. ,

We come first to the question whether the complaint alleges facts

sufficient to warrant an injunction against the State. The allega-

tions will be bétter understood after brief reference to the Colo-

rado River Compact' and the Boulder Canyon Project Act, 45

Stat. 1057.

1Printed in California Statutes, 1929, ¢. 1, § 1.

,

-2 United States vs. State of Arizona.

The Compact was made by California, Colorado, Nevada, New

Mexico, Utah and Wyoming. Arizona was not a party. It was —

made to provide an equitable apportionment of the waters of the

Colorado River system among the interested States, establish rela-

tive importance of different beneficial yses and secure the develop-

ment of the Colorado River basin, the storage of its waters and pro-

tection against floods. After apportionment between defined basins

lying above and below Lee Ferry and a declaration that the Colo-

rado has ceased to be navigable for commerce and that the use of -

its waters for purposes of navigation should be subservient to uses

for domestic, agricultural and power purposes, the Compact author-

izes the waters of the system to be impounded and used for the

generation of power and declares that use subservient to uses for

agricultural and domestic purposes. It was approved by § 13 (a)

of the Boulder Canyon Project Act and, by presidential proclama-

tion, it took effect June 25, 1929. 46 Stat. 3000. The Act author-

izes the Secretary of the Interior to construct a dam and incidental

works in the Colorado at Boulder Canyon adequate to create a

reservoir having a capacity of not less than 20,000,000 acre feet

‘‘and a main canal and appurtenant structures located entirely

within the United States connecting the Laguna Dam, or other

suitable diversion dam, which the Secretary .. . is hereby

authorized to construct if deemed necessary or advisable by him

upon engineering or economic considerati with the Imperial

and Coachella Valleys in California’. § 1.2 In a suit in this Court

against the Secretary of the Interior and the States which were

parties, Arizona unsuccessfully sought to have ratification of the

Compact decreed to be unconstitutional and to enjoin construction

of the Boulder Dam and the doing of anything under color of that

Aet. Arizona v. California, 283 U. 8. 423.

The bill alleges that February 10, 1933, the United States, acting

through the Secretary of the Interior, entered into a contract with

the Metropolitan Water District of Southern California. The Dis-

trict agrees to pay to the United States the entire cost of the dam,

assumed not to exceed $13,000,000. By the use of this money the

United States agrees that, under the Reclamation Act, June 17,

2By $$ 12 and 14 of the Boulder Canyon Project Act, the Reclamation Law

is defined to mean the Act of June 17, 1902, 32 Stat. 388, and Acts amenda-

" tory thereof and supplemental thereto, including the Boulder Canyon Project

Act.. :

United States vs. State of Arizona. g

1902, 32 Stat. 388, and supplemental Acts, particularly those of

_ April Zi, 1904, 33 Stat. 224, March 4, 1921, 41 Stat. 1404, and De-

. cember 21, 1928 (The Boulder Canyon Project Act)* it will con-

struct the Parker Dam. The District is to have one-half the power

privilege and the right to divert specified quantities of water. The

“United States is to have the right to the rest of the power, to divert

‘ water, to transmit power at cost over the District’s lines from

Boulder to Parker, and, by means of canals, to connect Parker

Dam with lands in the Colorado River Indian Reservation in Ari-

zona and with other lands in that State and in California.

Parker Dam will intercept waters discharged at Boulder Dam

and the. inflow of tributaries of the Colorado below that dam;

raise the river level 72 feet and create a reservoir about 20 miles

long, having capacity of 717,000 acre feet, and permit generation

of approximately 85,000 horsepower of electricity. Operated with

Boulder Dam, it will ‘‘reregulate and equate, in aid of navigation

and river regulation,’’ the waters discharged at Boulder Dam for

flood control, power generation .and irrigation; allow, for genera-

tion of power, the discharge at Boulder Dam of water which other-

wise would have to be retained there in storage, and also conserve

the waters there discharged. .

The bill ‘also alleges that, heavy flash floods of the Williams

River are a menace to the Colorado River Indian Reservation, to

United States public lands and to navigation below Parker. The

dam is designed to promote reclamation of the reservation lands

and of public lands of the United States. The power privilege

reserved by the United States is for the purpose of pumping water

for irrigation of these lands.

‘To disclose grounds on which the United States claims the

right to construct the dam, the bill sets out that at various times

Congress has made appropriations amounting in all to more than

$1,359,000 for construction of irrigation and diversion works for

*Other-amendatory and suppplemental acts are: Acts of February 25, 1905,

33 Stat. 814; March 3, 1905, 33 Stat. 1032; April 16, 1906, 34 Stat. 116;

June 12, 1906, 34 Stat. 259; June 27, 1906, 34 t. 619; June 11, 1910, 36

Stat. 465; June 25, 1910, 36 Stat. 835; February 21, 1911, 36 Stat. 925;

February 24, 1911, 36 Stat. 930; August 13, 1914, 38 Stat. 686; June 12,

1917, 40 Stat: 149; October 2, 1917, § 10, 40 Stat. 300; 25, 1920,

§ 35, 41 Stat. 450; May 20, 1920, 41 Stat. 605; June 10, 1920, $17, 41 Stat.

1072; December 5, 1924, § 4, 43 Stat. 701, June 6, 1930, 46 Stat. 522.

4 _ United States vs. State of Arizona.

the reservation ;* that the above mentoned Act of April 21, 1904,

authorized the Secretary of the Interior to divert the waters of the

Colorado and io reclaim, utilize and dispose of land in the reserva-

tion which might be made irrigable by works constructed under the

Reclamation Act, and that the Boulder Canyon Project Act appro-

priated moneys for surveys of the Parker-Gila reclamation project

which, it is said, embraces the Indian reservation and certain pub-

lie lands of the United States. And it is asserted that the Parker

Dam project has been included by the Administrator in the com-

prehénsive program of public works authorized by § 202, National

Industrial Recovery Act, 48 Stat. 201; that, pursuant to that Act,

the Chief of Engineers of the United States Army has recom-

mended the construction and his recommendation has received the

approval of the Secretary of War.

1. The bill alleges that the stretch of the Colorado between Ari-

zona and California is navigable, and the motion to dismiss is dealt

with on that basis. Arizona owns the part of the river bed that is

east of the thread of the stream. New Jersey v. Delaware, 291

U. 8. 361, 379 et seq. Her jurisdiction in respect of the appro-

priation, use and distribution of an equitable share of the waters

flowing therein is unaffected by the Compact or federal reclama-

’ tion law. But the title of the State is held subject to the power

granted to Congress by the commerce clause, United States v.

Holt Bank, 270 U. 8. 49, 54-55, and under that clause Congress

has power to cause to be built a dam across the river in aid

of navigation. The Boulder Canyon Project Act is an example

United States va. State of Arizona. 5

we have no concern, § 9 of the Act of March 3, 1899, forbids the

construction of any bridge, dam, dike or causeway over or in any

port, roadstead, haven, harbor, canal, navigable river or other

navigable water of the United States until the consent of Con-

gress shall have been obtained and until the plans shall have

been submitted to and approved by the Chief of Engineers and by

the Secretary of War. 33 U. 8S. C., §401. And § 12 makes vio-

lations of § 9 punishable by fine or imprisonment or both and pro-

vides for the removai of unauthorized structures. 33 U. 8. C.,

§ 406. These provisions unmistakably disclose definite intention

on the part of Congress effectively to safeguard rivers and other

navigable waters against the unauthorized erection therein of

dams or other structures for any purpose whatsoever. The plain-

tiff maintains that the restrictions so imposed apply only to

work undertaken by private parties. But no such intention is

expressed, and we are of opinion that none is implied. The meas-

ures adopted for the enforcement of the prescribed rule are in

general terms and purport to be applicable to all. No valid

reason has beén or can be suggested why they should apply to

private persons and not to federal and state officers. There is no

presumption that regulatory and disciplinary measures do not

extend to such Officers. Taken at face value the language indicates

the purpose of Congress to govern conduct of its own officers and

employees as well as that of others. Donnelley v. United States,

276 U. 8S. 505, 516. If still in force, §9 unquestionably makes

‘‘eonsent of Congress’’ essential to the valid authorization of the |

Parker Dam. There has been no express repeal of that section and,

as will presently appear, it is not inconsistent with subsequent

legislation on which plaintiff relies.

2. Plaintiff, unable to cite any statute specifically authorizing

the Secretary to construct the dam, turns to § 25 of the Act of

April 21, 1904, 33 Stat. 224. That section is a part of the reclama-

tion laws which are enacted—not under the commerce clause, Art.

1, § 8, el. 3, but in the exertion of power granted by Art. IV, § 3, el.

2: ‘*The Congres shall have Power to dispose of and make all need-

ful Rules and Regulations respecting the Territory or other Prop-

. erty belonging to the United States’’. United States v. Hanson,

167 Fed. 881, 883. Kansas y. Colorado, 206 U. 8. 46, 88, et seq.

The part of § 25 relied on follows: ‘‘That in carrying out any irri-

6 s United States vs. State of Arizona. °

gation enterprise which may be undertaken under the provisions

of the reclamation Act . . . and which may make possible and

provide for, in connection with the reclamation of other lands, the

reclamation of all or any: portion of the irrigable lands on the

“Yuma and Colorado River Indian reservations in California and

Arizona, the Secretary of the Interior is hereby authorized to

divert the waters of the Colorado River and to reclaim, utilize, and

dispose of any lands in said reservations which may be irrigable by

such works in like manner as though the same were a part of the ©

public domain’’. The immediate question is whether the italicized

clause can reasonably be construed as adequate to carry the bur-

den that plaintiff would have us lay upon it. The purpose was

not to prescribe or regulate the means to be employed to divert

_ water from the Colorado but to extend the reclamation law to the

Indian. reservations named. . It was merely to empower the Secre-

tary, if the circumstances stated should arise, to reclaim lands in

these reservations by use of water to be taken from that river.

The authority granted was no more than permission to appropri-

' ate them for the purpose specified. No dam is shown to have been .

necessary. Water is frequently taken from streams for the pur-

poses Of irrigation without putting dams across them. Failure

specifically to authorize a dam or ‘even approximately to fix loca-

tion or to require use calculated to aid navigation makes strongly

against the plaintiff. .

In support of the construction for which it contends, plaintiff

asserts that it was under this Act that the Secretary of the Interior

built the Lagupa Dam across the Colorado. But it does not ap-

pear that either riparian State objected or that the validity of his

authority has ever been drawn in question. Congress has made

appropriations for the benefit of the project of which it is a part’

and so recognized and approved the building of the dam.. Wiscon-

sin v. Duluth, 96 U. 8. 379, 386. There has been cited no other

instance of the constructig@n, without the consent of the Congress,

of a dam across a navigalje interstate river. Indeed, it is not cer-

tain that that part of the Colorado was then deemed to be nav-

igable.° We find no merit in the contention that § 25 of the Act

ood Jen "sens, 00 Oe. Baa 39 Stat. 304; ome SS Fg Nall Bae

4, making appropriations for uma ject,

ornia, which includes the Laguna Dam. See «. g., Reclamation

Service Report 13, p. 73, et seq.; 15, p. 68, et seq.

*See Art. IV (a), Colorado River pact.

United States vs. State of Arizona. ade

of April 21, 1904, is the ‘‘consent of Congress’’ required by § 9

of the Act of March 3, 1899. And plainly without force is the sug-

gestion that by making appropriations for irrigation of lands in

Indian reservations Congress authorized this dam.

3. The clause of §1 of the Boulder Canyon Project Act em-

powering the Secretary to construct a main canal connecting the

Laguna Dam ‘‘or other suitable diversion dam’’ with the Imperial

and Coachella Valleys does not authorize the building or in any

respect apply to the proposed Parker Dam. The latter is about

70 miles upstream from the Laguna and the canal proposed to

be. built to bring water to the valleys named." The contract

alleged té have been made by the United States arf the Metropoli-

tan Water District, a copy of which is “attached to plaintiff's brief,

shows that the purpose immediately to be served by the Parker

Dam is to enable the United States in fulfillment of earlier con-

tracts to deliver waters at that place into the aqueduct of the Dis-

trict. And while that instrument specifies ‘other uses to which the

United States may put the waters by means of the dam, transmis-

sion by canal to either of these valleys is not mentioned. Indeed,

the plaintiff does not, and it could not reasonably, claim that § 1 of

the Boulder Canyon Project Act authorizes the construction of this

dam. Nor does it make any contention in respect of the allegation

of the bill that § 11 of the Act authorizes surveys of the Parker-

Gila reclamation project.

4. Parker Dam was not approved by the President as required

by §4 Of the Act of June 25, 1910, 43 U. S. C., § 413. That section

declares that no irrigation project contemplated by the Reclama-

tion Act ‘‘shall be begun unless and until the same shall have

been recommended by the Secretary of the Interior and approved

‘by the direct order of the President of the United 8 " The

project in question rightly may be deemed to have been begun on

the date, February 10, 1933, of the contract made by the United

States and the Water District for the construction of the dam.

There is no allegation that any project including the dam was ever

.*recommended, submitted to or in any manner approved by the

President. But plaintiff maintains that the approval required in

the section has been given through executive action under the Na-

TWilbur and Ely, The Hoover Dam Contracts, United States Department

of the Interior, 1933, pp. II, 71, 325.

Z

(ae ee Lee

& United States vs. State of Arizona.

tional Industrial Recovery Act. It relies on §§ 201 a, 202 and 203

of the Act and Executive Order No. 6252. The first of these

authorizes the President to delegate any of his powers under title

Il of the Act to such agents as he may designate. Section 202

by the Chief of Engineers . . .”. Section 203 authorizes the —

President “‘through the Administrato®.. . . to construct

. « «+ fay publie-works project included in the program pre-

pared pursuant f section 202’’. The Executive Order delegates

‘ authority to the Administrator ‘‘to construct . . . any public.

works project included in the program.’’ The contract here in-

volyed was made more than four months before the passage of that

Act. Plaintiff asserts that the project was included in the com-

-prehensive program, that the Administrator commenced construe-~—

tion about September 10, 1934, and that on November 10 follow-

ing, Arizona interfered forcibly to prevent plaintiff from doing the

work. The alleged recommendation by the Chief of Engineers and

approval by the Secretary of War were not made until January 5,

1935,*° nine days before plaintiff bill. These facts do not

constitute approval ‘‘ by direct order of the President’’ as required

by §4. Plaintiff does ‘not allege or claim that the President has

directly authorized the dam or specifically empowered the Adminis-

trator to include it in the comprehensive program. We find nothing

in the Reeovery Act that reasonably may be held to repea) the re-

-quirement of that section. It follows that the construction of the

dam has noteen authorized as required by the Reclamation Law. :

5. Plaintiff's contention that the dam is being built under au-

thority of the Recovery Act is without force. 24

The chronology just given, when taken in connection with the

citations in the contract of the Acts relied on, shows the claim to

United States vs. State of Arizona.

be an afterthought born of the controversy disclosed by the com-

plaint and about to be here submitted. Section 25 of the Act of

April 21, 1904, does not authorize this dam. Plaintiff doe#’ not °

assert that it was otherwise adopted by Congress. It therefore re-

mains only to consider whether-the dam was recommended by the

Chief’ of Engineers within the meaning of the proviso of § 202.

When the Recovery Act was passed, the phrases ‘‘adopted by the

and ‘‘reeommended by the Chief of Engineers’’, when

used im “Acts of Congress relating to river and harbor improve-

ments, had well-understood and definite technical meanings. The

statutes, at least in the 40 years next preceding the passage of the

Recovery Act, disclose: It has been thé general, if not indeed the

uniform, practice of Congress specifically to authorize all river

and harbor improvements carried out by the United States,’ and

to base its action pon the recommendation of the Chief of Engi-

neers."° That officer makes such recommendation only after pre-

liminary examinations followed by surveys.** ee ae

a

;

k

STF

put :

ua 53°

oie HL

Hi i

iis

3 .

3

fae

:

Hi

-

23

a s

chy

3

‘.

hs

i; fa Tit

pela ke

Hist

uh

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.