Opposition Brief — W.R. Grace & Co. v. United States (No. 05-1363)
Supreme Court brief2006
Ask Donna
What actually matters in this document.
Text
( a) AUG 3 0 2006
No. 05-1363 OFFICE OF THE CLERK |
In the Supreme Court of the Anited States
W.R. GRACE & CO., ET AL., PETITIONERS
Vv.
UNITED STATES OF AMERICA
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
BRIEF FOR THE UNITED STATES IN OPPOSITION
PAUL D. CLEMENT
Solicitor General
Counsel of Record
SUE ELLEN WOOLDRIDGE
Assistant Attorney General
GREER S. GOLDMAN
JAMES D. FREEMAN
JOHN T. STAHR
Attorneys
Department of Justice
Washington, D.C. 20530-0001
(202) 514-2217
QUESTION PRESENTED
The Comprehensive Environmental Response,
Compensation, and Liability Act of 1980, 42 U.S.C. 9601
et seq., authorizes the President to respond to the
release of hazardous substances through “removal” or
“remedial” actions and sets out criteria for conducting
and recovering the costs of those two types of response.
The question presented is whether the Environmental
Protection Agency has properly characterized its re-
sponse action at the Libby Asbestos Site in Libby,
Montana as a “removal” action.
(I)
TABLE OF CONTENTS
Page
SONA TRIE. go yon oy Sc cack se meae ees Seen aes 1
BT SORE EE Renticks Reh pecped ee aan pe PEERS pe Ene Se Gee ore. oe a 1
PUN a in We gies be Ree 2
pS Sapa operons o mrmer ear SU Ee Per cnt re Ek 12
RMON. os cba dawn aca eh doe ea be eek eI GR Sees 19
TABLE OF AUTHORITIES
Cases:
Alaska Dep't of Envtl. Conservation v. EPA,
560 tS 467 GOO 2 a ee ek 11,13
Chevron U.S.A. Inc. v. NRDC, 467 U.S. 837 (1984) ..... 18
Cooper Indus., Inc. v. Aviall Servs., Inc., 543 U.S. 157
RE Bee Raa ea eet ego Cats Oe gre A ae em a ees 3
Key Tronic Corp. v. United States, 511 U.S. 809
ie 5 Sa 4 oho wd we a eee eee 2,3
Minnesota v. Kalman W. Abrams Metals, Inc.,
155 F.3d 1019 (8th Cir. 1998) ...............20. 16, 17
Pennsylvania v. Union Gas Co., 491 U.S. 1 (1989) .... 2,3
Public Serv. Co. v. Gates Rubber Co., 175 F.3d 1177
CRE Cr SOOO) ck ese ha eae 16, 18
Seminole Tribe v. Florida, 517 U.S. 44 (1996) .......... Z
United States v. Bestfoods, 524 U.S. 51 (1998) ........ 2,3
United States v. Chapman, 146 F.3d 1166 (9th Cir.
WE a isc bop ioc guage cena en eis Caminesaceskaweess 4
United States v. Hardage, 982 F.2d 1436 (10th Cir.
1992), cert. denied, 510 U.S. 913 (1998) .............. 4
United States v. Mead Corp., 583 U.S. 218 (2001) ...... 18
(IIT)
Statutes and regulations: Page
Comprehensive Environmental Response, Compen-
sation, and Liability Act of 1980, 42 U.S.C. 9601
| RPO aT SA Reg i ee ae oa ETN Pe ee re 2
. S102 SOUS. OOO) ... ek 4,5,12
§ 101(24), 42 U.S.C. 960124) ............cee ee 4,6
$ 1010), @ USC. SOI) oo ue ksi seas 4
§ 104, 42 U.S.C. 9604 (2000 & Supp. ITI 2003) ..... 3
§ 104(c)(1), 42 U.S.C. 9604(c)(1) ......... 5, 6, 10, 12
§ 104(c)(1)(A), 42 U.S.C. 9604(c)(1)(A) .......... 8,9
§ 104(c)(1)(C), 42 U.S.C. 9604(e)(1(C) ............ 9
§ 105, 42 U.S.C. 9605(2000 & Supp. III 2003) ...... 3
§ 105(a)(8)(B), 42 U.S.C. 9605(a)(8)(B) ........... 10
O 10Ge) SUB. FOGUR) oc on Sine peebiaws 3, 8
P1GT@), USC: SOGRa) oo ee 3
§ 107(a)(1)-(4)(A), 42 U.S.C. 9607(a)(1)-(4)(A) ... 3, 10
S115), 42. UBC. SOIBGNE) oes vases 4,17
SG ie Fe I ow his us 5 heec he euRo eee wretweres 3
CNN E51 RRR etearye aie aera paren aN Pree S Oe Sein 5
EI DELO) viva c Swoewapwkeeeaeue a 11, 17, 18
SUPER EGR) cc soo cc Koos ea bee keke eee 5
eee BO AON) ko kins daw vboemeetesawes 5,17
tas REO) os bk sc cass ve bce cbweeacarws 5, 6
Pte, IIE Sh ov kk on wa ee een ewe Rea 6
CRIS DUNE 5 aos oa is Boe RRR SE 6
Section S00.490G ING) wo oo ccs e inde venceaneess 6
Exec. Order No. 12,580, 3 C.F.R. 193 (1988) ............ 3
Miscellaneous: Page
tO. Meee. Ga OlT GOO)) a. a a eee eS 10
In the Supreme Court of the Gnited States
No. 05-1363
W.R. GRACE & CO., ET AL., PETITIONERS
v.
UNITED STATES OF AMERICA
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
BRIEF FOR THE UNITED STATES IN OPPOSITION
OPINIONS BELOW
The opinion of the court of appeals (Pet. App. 1a-50a)
is reported at 429 F.3d 1224. The order of the district
court granting partial summary judgment (Pet. App.
51a-70a) is reported at 280 F’. Supp. 2d 1135. The order
of the district court awarding response costs (Pet. App.
71a-138a) is reported at 280 F. Supp. 2d 1149.
JURISDICTION
The judgment of the court of appeals was entered on
December 1, 2005. On February 15, 2006, Justice Ken-
nedy extended the time within which to file a petition for
a writ of certiorari to and including April 28, 2006, and
the petition was filed on April 27, 2006. The jurisdiction
of this Court is invoked under 28 U.S.C. 1254(1).
(1)
STATEMENT
The United States sued petitioners W.R. Grace &
Co., Kootenai Development Corporation, and W.R.
Grace & Co.-Conn. (collectively Grace) to recover the
government’s ongoing costs of responding to the im-
proper disposal of hazardous substances under the Com-
prehensive Environmental Response, Compensation,
and Liability Act of 1980 (CERCLA), 42 U.S.C. 9601 et
seq., at the Libby Asbestos Site in Libby, Montana. The
United States District Court for the District of Montana
ruled that Grace is liable under CERCLA for govern-
ment response costs at the site, Pet. App. 69a-70a, and
awarded the government $54.5 million and other relief,
id. at 136a-138a. The court of appeals affirmed, ruling,
among other things, that the government properly char-
acterized its response as a “removal” action. See 2d. at
la-50a.
1. Congress enacted CERCLA “in response to the
serious environmental and health risks posed by indus-
trial pollution.” United States v. Bestfoods, 524 U.S. 51,
55 (1998). That Act “grants the President broad power
to command government agencies and private parties
to clean up hazardous waste sites.” Key Tronic Corp.
v. United States, 511 U.S. 809, 814 (1994). It “both pro-
vides a mechanism for cleaning up hazardous-waste
sites, and imposes the costs of the cleanup on those
responsible for the contamination.” Pennsylvania v.
Union Gas Co., 491 U.S. 1, 7 (1989) (citations omitted),
overruled on other grounds, Seminole Tribe v. Florida,
517 U.S. 44 (1996). “The remedy that Congress felt it
needed in CERCLA is sweeping: everyone who is poten-
tially responsible for hazardous-waste contamination
may be forced to contribute to the costs of cleanup.”
3
Bestfoods, 524 U.S. at 56 n.1 (quoting Pennsylvania v.
Union Gas Co., 491 U.S. at 21).
CERCLA provides the President, acting primarily
through the Environmental Protection Agency (EPA),
with several alternatives for cleaning up sites contami-
nated with hazardous substances.’ As one alternative,
EPA can itself undertake response actions, using the
Hazardous Substances Superfund. See CERCLA § 104,
42 U.S.C. 9604 (2000 & Supp. III 2003); Cooper Indus.,
Inc. v. Aviall Servs., Inc., 543 U.S. 157, 161 (2004). The
United States can then recover EPA’s response costs
from responsible parties through a cost recovery action.
See CERCLA § 107(a), 42 U.S.C. 9607(a); Cooper
Indus., 548 U.S. at 161.
Section 107 of CERCLA “sets forth the scope of the
liabilities that may be imposed on private parties and
the defenses that they may assert.” Key Tronic, 511
U.S. at 814. Under Section 107(a)(1)-(4)(A), responsible
parties are liable for “all costs” of response incurred by
the United States that are “not inconsistent with the
national contingency plan.” 42 U.S.C. 9607(a)(1)-(4)(A);
see Cooper Indus., 543 U.S. at 161. The national contin-
gency plan (NCP), promulgated as a regulation pursuant
to Section 105 of CERCLA, 42 U.S.C. 9605 (2000 &
Supp. III 2003), prescribes requirements for selection
and implementation of removal and remedial actions. 40
C.F.R. Pt. 300.
’ CERCLA grants authority to the President, who has delegated
various powers to EPA. See Exec. Order No. 12,580, 3 C.F.R. 193
(1988).
As another alternative, EPA can seek to require the responsible
parties to undertake cleanup response actions, through an administra-
tive order or judicial injunctive relief. CERCLA § 106(a), 42 U.S.C.
9606(a). :
4
When the United States seeks to recover its response
costs, “consistency with the NCP is presumed,” and
“(t]he potentially responsible party has the burden of
proving inconsistency with the NCP.” United States v.
Chapman, 146 F.3d 1166, 1170-1171 (9th Cir. 1998);
see United States v. Hardage, 982 F.2d 1436, 1442 (10th
Cir. 1992), cert. denied, 510 U.S. 913 (1993). Section
113(j)(2) of CERCLA provides that courts “shall uphold
[EPA’s] decision in selecting the response action unless
the objecting party can demonstrate, on the administra-
tive record, that the decision was arbitrary and capri-
cious or otherwise not in accordance with law.” 42
U.S.C. 9613(j)(2).
2. Grace’s challenge in this case focuses on the
meaning and significance of CERCLA’s nomenclature
for cleanup actions. CERCLA designates cleanup ac-
tions as either “removal” actions or “remedial” actions,
and it designates either type of cleanup as a “response”
action. CERCLA § 101(23), (24) and (25), 42 U.S.C. 9601
(23), (24) and (25).
a. Section 101(23) of CERCLA defines the terms
“remove” and “removal” to include, among other things:
the cleanup or removal of released hazardous sub-
stances from the environment, such actions as may
be necessary taken in the event of the threat of re-
lease of hazardous substances into the environment,
such actions as may be necessary to monitor, assess,
and evaluate the release or threat of release of haz-
ardous substances, the disposal of removed material,
or the taking of such other actions as may be neces-
sary to prevent, minimize, or mitigate damage to the
public health or welfare or to the environment, which
may otherwise result from a release or threat of re-
lease.
42 U.S.C. 9601(23). The NCP requirements for selecting
and conducting a removal action are set forth at 40
C.F.R. 300.415.
The NCP requires that EPA consider eight factors
in determining the appropriateness of a removal action,
including, among other things, the actual or potential
exposure to nearby human populations, actual or poten-
tial contamination of drinking water supplies, and high
levels of hazardous substances in soils at or near the
surface that may migrate. 40 C.F.R. 300.415(b)(2). If
EPA determines, based on those factors, that there is a
threat to the public health, it “may take any appropriate
removal action to abate, prevent, minimize, stabilize,
mitigate, or eliminate the release or the threat of re-
lease.” 40 C.F.R. 300.415(b)(1).
Section 104(c)(1) of CERCLA provides generally that
removal actions “shall not continue after $2,000,000 has
been obligated for response actions or 12 months has
elapsed from the date of initial response to a release or
threatened release of hazardous substances.” 42 U.S.C.
9604(c)(1); see 40 C.F.R. 300.415(b)(5). But Section
104(c)(1) and the NCP provide that those general limits
may be exceeded if:
(A) [EPA] finds that (i) continued response actions
are immediately required to prevent, limit, or miti-
gate an emergency, (ii) there is an immediate risk to
public health or welfare or the environment, and (iii)
such assistance will not otherwise be provided on a
timely basis, or (B) [EPA] has determined the appro-
priate remedial actions pursuant to paragraph (2) of
this subsection * * * or (C) continued response ac-
6
tion is otherwise appropriate and consistent with the
remedial action to be taken.
42 U.S.C. 9604(c)(1); see 40 C.F.R. 300.415(b)(5).
b. Section 101(24) of CERCLA defines the terms
“remedy” and “remedial action” to include, among other
things:
those actions consistent with permanent remedy
taken instead of or in addition to removal actions in
the event of a release or threatened release of a haz-
ardous substance into the environment, to prevent or
minimize the release of hazardous substances so that
they do not migrate to cause substantial danger to
present or future public health or welfare or the en-
vironment.
42 U.S.C. 9601(24) (footnote omitted). The NCP re-
quirements for conducting remedial actions are gener-
ally set forth at 40 C.F.R. 300.430. The NCP prescribes
additional and more detailed requirements for remedial
actions in comparison to removal actions. Only those
sites included on EPA’s National Priorities List (NPL)
are eligible for Superfund-financed remedial actions. 40
C.F.R. 300.425(b)(1). Each remedial action selected
shall be cost-effective, as determined by balancing long-
term effectiveness and permanence, reduction of toxic-
ity, mobility, or volume through treatment, and short-
term effectiveness. 40 C.F.R. 300.430(f)(1)(ii)(D).
3. This action arises from a governmental response
action that EPA initiated to address a “truly extraordi-
nary” situation in Libby, Montana, where a population
of some 12,000 people has faced “ongoing, pervasive ex-
posure to asbestos particles being released through doc-
umented exposure pathways.” Pet. App. 4a. That expo-
sure has created a substantial public health threat, docu-
7
mented by high rates of asbestos-related abnormalities
and the fact that “people are sick and dying as a result
of this continuing exposure.” Jbid.
From the 1920s until 1990, Grace and its predeces-
sors commercially mined and processed vermiculite ore
located in the mountains about seven miles northeast of
Libby. Those deposits include tremolite, a form of as-
bestos in the amphibole family. Grace trucked the pro-
cessed ore to its Screening Plant and Export Plant, from
which it was distributed nationwide. Grace also made
asbestos-contaminated vermiculite available to employ-
ees and to local residents to take home for personal use
in their homes, yards, and gardens. Pet. App. 8a-9a.
EPA’s initial investigation of the Libby site in No-
vember 1999 documented a large number of current and
historic cases of asbestos-related diseases around Libby
and a high likelihood that significant amounts of asbes-
tos remained. Pet. App. 9a-10a. EPA quickly broadened
its investigation through extensive sampling and analy-
sis, ultimately authorizing a removal action through a
series of three action memoranda progressively broad-
ening the scope of the removal. Jd. at lla.
a. On May 23, 2000, EPA issued an action memoran-
dum which approved a removal for two areas known as
the Screening Plant and the Export Plant. EPA deter-
mined that the “large concentrations of asbestos found”
at the plants “in all media: soil, dust and airborne,
clearly indicate that the human exposure pathway is
complete.” E.R. 211. EPA determined that surface soils
at both plants contain high measured levels of asbestos
scattered widely over the surface that can easily be
tracked offsite and then, “through normal activities,
such as vacuuming or other air disturbance, become re-
spirable dust.” E.R. 212. EPA found that rainfall and
oo“)
8
snow melt can wash fibers “onto neighboring parcels, or
into the Kootenai River,” and that hot dry-weather con-
ditions typical in Libby’s summer months lead to soil
migration, where Libby’s “persistent inversion pat-
terns” keep airborne contaminants “in the area for lon-
ger periods of time.” E.R. 212-213.
EPA also determined, in accordance with Section
104(c)(1)(A) of CERCLA, that the conditions presented
“an immediate threat to the local population” warrant-
ing a removal action exceeding $2 million in expendi-
tures and 12 months in duration. Pet. App. lla. EPA
projected completing the action by the spring or sum-
mer of 2001, at a cost of no more than $5.8 million. Jbid.*
b. On July 20, 2001, EPA issued an action memoran-
dum amendment, based on new information respecting
the scope of contamination, expanding the removal ac-
tion to address “newly identified risks” involving “high
levels of amphibole asbestos” at six additional locations,
including residential properties and three schools. Pet.
App. 12a; E.R. 410. EPA determined that the “asbestos
related deaths in Libby over the last two decades num-
ber in the hundreds,” and there are “currently hundreds
more who suffer from asbestos related illnesses.” E.R.
426. EPA relied on medical screening conducted by the
Agency for Toxic Substances and Disease Registry
(ATSDR), which showed that “more than a thousand
people will have asbestos related scarring in their lungs,
or the pleural lining of their lungs,” placing those people
“at a much higher risk for developing lung cancer, meso-
thelioma, and/or fibrosis.” /bid. The ATSDR screening
* Grace, with EPA’s oversight, primarily conducted the work
associated with the Export Plant under a unilateral administrative
order that EPA issued in accordance with Section 106(a) of CERCLA.
See Pet. App. lla n.8.
9
“showed the widespread occurrence of lung abnormali-
ties, not only among former Grace employees, but
among their families, and the population at large in
Libby.” E.R. 414. EPA concluded that the “sheer mag-
nitude of the medical impact in Libby dictates the need
for an expedient and thorough response” and that the
“direct and immediate steps should be taken to elimi-
nate to the extent possible the exposure of people to this
material.” E.R. 426.
EPA also determined, under Section 104(c)(1)(A) of:
CERCLA, that there was an immediate threat warrant-
ing a removal exceeding $2 million in expenditures and
12 months in duration for the six additional properties
and for completion of the Plant removal. EPA autho-
rized a total removal ceiling of $20.1 million, with an
estimated completion for most work by the winter of
2001-2002. Pet. App. 12a-13a.
ce. On May 2, 2002, based again on new information
respecting the extent of contamination, EPA issued an-
other action memorandum amendment expanding the
removal action to address contamination at hundreds of
additional homes and businesses. Pet. App. 13a; E.R.
503, 511. EPA sampling detected amphibole asbestos in
interior dust in 25% of the homes tested in Libby
and asbestos in soils at 52% of the properties sampled.
E.R. 511-512. At some homes, “vermiculite insulation is
literally falling out into the living space from gaps
around light fixtures and electrical switches.” E.R. 511.
EPA also found, again in accordance with Section
104(c)(1)(A), that the urgency of the threat warranted a
removal beyond $2 million in expenditures and 12
months in duration. In addition, because the Libby site
had been proposed for listing on the NPL, EPA found,
under Section 104(c)(1)(C) of CERCLA, 42 U.S.C.
10
9604(c)(1)(C), that a removal beyond $2 million in expen-
ditures and 12 months was appropriate and “consistent
with a planned future remedial action.” Pet. App. 13a &
n.11.4 EPA raised the ceiling for total project expendi-
tures to approximately $55.6 million, and it estimated
that the work would take some two to three construction
seasons. [bid.
4. While EPA’s removal action was underway, the
United States filed this action under Section 107(a)(1)-
(4)(A) of CERCLA to recover its response costs, and the
district court granted the United States partial sum-
mary judgment. See Pet. App. 5la-70a. The court ruled
that EPA’s determination to conduct a removal action
complied with the governing NCP standards. Jd. at 59a-
60a. The court also ruled that EPA did not act arbi-
trarily or capriciously in invoking Section 104(c)(1)’s
exemption from limits on the cost and duration of the
removal action. /d. at 59a-62a. The court held that
Grace was liable for certain documented costs, but con-
cluded that, as to other costs, issues of material fact re-
mained. Jd. at 64a-65a.
The district court held a three-day bench trial on
remaining cost issues. Pet. App. 14a. Grace stipulated
as to the adequacy of documentation for $32,972,126 in
removal costs, but contested other costs. The district
* On October 24, 2002, EPA listed the Libby site on the National
Priorities List, based on Montana’s designation of the site as the State’s
“top priority” pursuant to Section 105(a)(8)(B) of CERCLA, 42 U.S.C.
9605(a)(8)(B). See 67 Fed. Reg. 65,317 (2002). That listing makes the
site eligible for Superfund-financed remedial action. EPA continues to
conduct a remedial investigation to determine the full extent of the
contamination for the entire site, and it will then conduct a feasibility
study to assess remedial alternatives and ultimately select a final
remedial action.
11
court ultimately ruled that Grace was liable for all re-
quested removal costs through December 31, 2001, total-
ing $54,527,081. Jd. at 136a-137a. The court also
granted a declaratory judgment as to liability for future
costs. Id. at 1387a-138a.
5. The court of appeals affirmed the district court’s
judgment. See Pet. App. la-50a. The court of appeals
held that EPA did not act arbitrarily or capriciously in
authorizing a removal action under 40 C.F.R. 300.415(b),
see Pet. App. 17a, and that EPA’s response action at the
Libby site readily “falls within the bounds of a removal
action.” Jd. at 41a.
The court of appeals noted that the relevant provi-
sions of CERCLA governing the characterization of re-
sponse actions are not clear in all respects, and the court
considered whether EPA’s characterizations of its ac-
tions were entitled to some measure of deference. See
Pet. App. 18a-24a. The court concluded that EPA’s con-
struction of the statutory term “removal” was entitled,
“at a minimum,” to “a modified deference standard af-
fording respect to the EPA’s informal interpretations
here.” Jd. at 21a (citing Alaska Dep’t of Envtl. Conser-
vation v. EPA, 540 U.S. 461, 487-488 (2004)). Applying
that standard, the court concluded that “EPA’s cleanup
activities in Libby are properly categorized as a removal
action.” Jbid.
The court of appeals explained that EPA’s “informal
interpretations combined with the descriptions in the
[NCP] provide a persuasive interpretation that removal
actions encompass interim, partial time-sensitive re-
sponses taken to counter serious threats to public
health.” Pet. App. 37a-38a. The court also observed
that “EPA’s scientific basis for finding an immediate
threat to the public health is thoroughly documented
12
over thousands of pages.” Jd. at 39a. The court ruled
that EPA did not act arbitrarily or capriciously, in light
of the “daunting realities” posed by the “widespread and
pervasive asbestos contamination and the potential for
further migration of asbestos fibers,” to invoke Section
104(c)(1)’s exemptions to the generally applicable limita-
tions on the cost and duration of removal actions. Jd. at
43a, 46a. The court explained that EPA’s need to invoke
those exemptions in this case was “not surprising given
the urgency, magnitude, and long-standing nature of the
problem.” /d. at 45a.
ARGUMENT
In light of the “unique” and “truly extraordinary”
public health threat posed by the Libby Absestos Site
(Pet. App. 4a, 14a-15a), the court of appeals properly
affirmed the district court’s judgment that the United
States is entitled to recover its costs of responding to
the hazardous conditions at that site. Contrary to
Grace’s contentions, the court of appeals’ decision does
not conflict with any decision of this Court or of another
court of appeals. That decision presents no recurring
issue of national importance warranting this Court’s
review.
1. Grace contends (Pet. 13) that the court of appeals
erred in concluding that all of EPA’s abatement activi-
ties at issue in this case qualify as a removal action
within the meaning of Section 101(23) of CERCLA, 42
U.S.C. 9601(23). Grace “does not deny that CERCLA
authorizes the EPA to conduct removal actions to con-
tain or abate immediate environmental hazards” (Pet.
15): Rather, in Grace’s own words (Pet. 16):
All Grace is saying here, thus, is that it is entitled
to its day in court to try to prove that particular ele-
13
ments of the $54 million requested by the Govern-
ment * * * were not necessary to contain or abate
an immediate environmental hazard, and thus not
recoverable as “removal” costs under CERCLA.
But Grace has had “its day in court.” Grace’s petition,
which simply seeks review of the court of appeals’ appli-
cation of context-dependent legal vrinciples to the par-
ticular—and unusual—facts in this case, presents no
issue warranting this Court’s review.
Grace acknowledges that CERCLA subjects parties
that are responsible for hazardous substance contamina-
tion to liability for the costs of “removal” and “remedial”
actions, but imposes different procedural requirements
for implementing and recovering the costs of those two
types of response actions. See Pet. App. 8a, 14a-15a.
The sole issue here is whether EPA’s specific response
activities at the Libby Asbestos Site “fall within the stat-
utory limits of a removal action.” Jd. at 16a.
The court of appeals recognized—and Grace does
not dispute—that Congress defined both “removal” and
“remedial” actions in “sweeping” and “overlap[ping]”
terms. Pet App. 24a-27a. The court concluded that the
“normal tools of statutory interpretation” do not yield a
categorical standard for distinguishing between removal
and remedial actions, but instead require the exercise of
judgment based on the facts of a particular case. Jd. at
30a. The court of appeals also recognized that Congress
gave EPA a central role in conducting response actions
and applying those terms. The court correctly con-
cluded, in accordance with this Court’s decisions, e.g.,
Alaska Dep't of Envtl. Conservation, 540 U.S. at 485-
488, that EPA’s “rational[{} * * * construction” of those
particular terms “deserves our respect.” Pet. App. 31a.
14
The court of appeals examined the particular cireum-
stances that EPA faced in addressing the Libby site,
including the “need of immediate action,” Pet. App. 33a,
the “sequence of activities,” 2bid., and EPA’s explana-
tion of its actions, id. at 34a-39a, which involved “ex-
ceedingly complex” issues respecting risk assessment,
testing methodology, and data analysis, zd. at 39a. The
court found that EPA had “thoroughly documented” the
“scientific basis for finding an immediate threat to the
public health. /bid. Indeed, EPA’s memoranda explain-
ing its actions are based on an extensive administrative
record that includes, among many other things, “com-
prehensive” toxicology reports “explaining the imminent
and substantial endangerment to public health in
Libby,” EPA’s “extensive responses” to Grace’s “com-
ments on the cleanup,” and “lengthy findings” respect-
ing medical testing of Libby residents. /bid.; see 2d. at
39a-4la. The administrative record “also documents the
concrete steps” that EPA undertook to abate those
threats. Jd. at 41a. :
In light of CERCLA’s “sweeping language” defining
a removal, the “significant” deference due to EPA’s ex-
pertise in administering the statute, and “the scope of
the interim cleanup,” the court of appeals properly
“hfe]ld that the EPA’s cleanup in Libby falls within the
bounds of a removal action.” Pet. App. 41a. The court
of appeals correctly concluded that, in light of the wide-
spread public health risk in.this case, “EPA had no
choice but to undertake an aggressive removal action of
an expansive scope.” /d. at 42a. The unanimous court of
appeals’ fact-based affirmance of the district court’s
judgment involves nothing more than the application of
largely uncontroverted general principles to a “unique”
public health threat that, while of vital importance to the
15
Libby residents, poses no legal issue of recurring impor-
tance warranting this Court’s review.
While Grace cannot seriously controvert the public
health risks created by its actions, it insists (Pet. 17)
that the court of appeals erred because it treated the
government’s comprehensive attempt to abate the most
immediate threats as a single removal action. See Pet.
23-25. Grace’s view of what is properly included as part
of the removal action is mistaken, and the court of ap-
peals properly declined Grace’s invitation to divide
“EPA’s single cohesive removal action into a myriad of
fractured parts.” Pet. App. 23a; see 2d. at 1la n.9, 24a,
42a. But more fundamentally for present purposes, the
question of what activities in this case are properly part
of the removal action is a factbound matter-.of no conse-
quence beyond the confines of this particular cost recov-
ery suit. Indeed, as Judge Bea noted in his concurrence,
even if the specific activities that Grace challenges are
evaluated separately, they would still properly consti-
tute a part of the removal action at issue in this case.
See zd. at 48a-50a.
Grace engages in hyperbole in suggesting (Pet. 27)
that the court of appeals has given EPA “carte blanche”
to extend its removal powers beyond statutory bounds.
To the contrary, the court of appeals emphasized the
limited reach of its holding. It expressly stated that
“there must be outer limits to removal actions” but that
“EPA did not exceed these limits in this case.” Pet.
App. 42a. The court of appeals made clear that it under-
stood its judicial obligation to determine whether
16
“EPA’s characterization of a given response action ac-
cords with CERCLA, as we so determine here.” Jbid.®
2. Grace mistakenly asserts (Pet. 17-21) that the
court of appeals’ decision conflicts with decisions of the
Eighth and Tenth Circuits. Grace specifically contends
(Pet. 20) that the conflict arises from the court of ap-
peals’ determination to address the Libby response as a
single removal action rather than on an item-by-item
basis, which, in Grace’s view, “cannot possibly be
squared” with Minnesota v. Kalman W. Abrams Metals,
Inc., 155 F.3d 1019 (8th Cir. 1998), and Public Service
Co. v. Gates Rubber Co., 175 F.3d 1177 (10th Cir. 1999).
Those decisions, however, address no such issue and
present distinctly different circumstances.
In Abrams Metals, Minnesota appealed from a sum-
mary judgment that its cleanup actions under CERCLA
constituted a remedial action rather than a removal ac-
tion. The Eighth Circuit rejected Minnesota’s request
for a vacatur and remand to allow further factual devel-
opment. 155 F.3d at 1024. The court of appeals did
not hold that the response action should be divided, as
Grace advocates here, into a line-item determination of
whether each separate activity constitutes a removal or
remedial action. Rather, the court held that the entire
response action constituted a remedial action. bid. As
Grace correctly notes (Pet. 18), the Eighth Circuit did
remand to give the defendants in that case the opportu-
* Grace’s mantra that it has been denied its “day in court” (Pet. 16,
20, 22, 23 n.3) cannot be reconciled with the extensive opportunities it
has already had to convince the district court and the court of appeals
that EPA’s response activities did not constitute a removal action.
Grace was free to contest any aspect of the record on summary judg-
ment. The district court and the court of appeals carefully considered
the arguments that Grace made and properly rejected them.
17
nity to demonstrate that particular costs were inconsis-
tent with the NCP. 155 F.3d at 1026. But that remand
addressed only whether particular costs were inconsis-
tent with the NCP’s remedial action requirements, and
not whether particular costs should be considered as
being for removal or remedial actions. /bid. (defendants
may prove that inconsistency with the NCP “caused the
State to incur unreasonable or unnecessary response
costs in implementing even an appropriate remedial ac-
tion”).
Furthermore, even as to the Eighth Circuit’s holding
that the response was a remedial action, the factual cir-
cumstances differ substantially. In Abrams, the State
had never even “made the determination required by
§ 300.415(b) of the NCP” to approve a removal action.
155 F.3d at 1024.° The Eighth Circuit also noted the
“leisurely manner” in which the State proceeded, allow-
ing some four years to pass from the site assessment
revealing hazardous lead concentrations until initiating
the response action. /bid. Here, by contrast, EPA ap-
proved a removal action under 40 C.F.R. 300.415(b) in
“extensively documented” findings, the court of appeals
held that this decision was not arbitrary and capricious,
and petitioners do not seek further review of that hold-
ing. See Pet. App. 16a-17a (citing 42 U.S.C. 9613(j)(2)).
EPA also acted quickly to address the extraordinary
contamination in Libby, conducting an initial site visit in
November 1999, initiating a larger rapid-scale investiga-
tion from December 1999 through April 2000 in which it
* The NCP, as discussed (p. 5, supra), provides, with respect to the
approval of removal actions, that the government “may take any
appropriate removal action” when it determines based on the eight
factors set forth in 40 C.F.R. 300.415(b)(2) that there is a threat to the
public health and welfare.
18
collected over 2000 samples, and issuing its first ac-
tion memorandum on May 23, 2000, authorizing a re-
moval action. See id. at 9a-1la, 58a. In turn, as newly
discovered health risks became known, EPA acted
quickly to expand the removal action to address human
exposure pathways at numerous other locations. See pp.
7-9, supra.
Similarly, in Gates Rubber Co., the Tenth Circuit
held only that the relevant response action in that case
was a remedial action. 175 F.3d at 1184. The court did
not rule that an item-by-item analysis should be con-
ducted in distinguishing between removal and remedial
actions. In addition, the action in Gates Rubber Co. was
brought by a private landowner who had conducted the
response action, and there was no determination by
EPA or the State of Colorado to conduct a removal ac-
tion under 40 C.F.R. 300.415(b). Rather, the land-
owner’s consultant prepared a report entitled “Proposal
for Remedial Action,” the landowner studied the site
over a two-year period before taking action, and the
landowner “intended to remediate the site and sell it and
recoup its cleanup costs.” 175 F.3d at 1184. Thus, Gates
Rubber Co. also presents no conflict and no basis for
further review.
3. Petitioner’s assertion (Pet. 27) that furti:er review
is justified because the court of appeals purportedly ex-
pressed “open confusion” as to this Court’s deference
standards is unpersuasive. The court of appeals cor-
rectly recognized that this Court has not definitively
resolved the scope of deference to be accorded to differ-
ing forms of informal agency interpretation. See Pet.
App. 19a-21a (discussing the “interplay” between Chev-
ron U.S.A. Inc. v. NRDC, 467 U.S. 837 (1984), United
States v. Mead Corp., 533 U.S. 218 (2001), and other de-
19
cisions of this Court). But this case does not present a
useful vehicle for exploring that issue, because the de-
gree of deference does not have controlling significance
here. As the court of appeals expressly stated, under
either “modified deference or full Chevron deference,
the result would be the same: The EPA’s cleanup activi-
ties in Libby are properly characterized as a removal
action.” Jd. at 2la. Indeed, the same result would ob-
tain if the agency received no deference at all. EPA’s
characterization of the Libby response as a removal “is
amply supported by the administrative record.” Jd. at
42a.
CONCLUSION
The petition for a writ of certiorari should be denied.
Respectfully submitted.
PAUL D. CLEMENT
Solicitor General
SUE ELLEN WOOLDRIDGE
Assistant Attorney General
GREER S. GOLDMAN
JAMES D. FREEMAN
JOHN T. STAHR
Attorneys
AUGUST 2006
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.