Petition for Writ of Certiorari — Stajano v. United Technologies Corp.
Supreme Court brief2005
Ask Donna
What actually matters in this document.
Text
,
i
No an 299 MAR 25 2005
OPFICE OF Thi: ¢:
INTHE es CLAN
Supreme Court of the United States
JULIO CESAR WILSON STAJANO, ET AL.,
PETITIONERS
UNITED TECHNOLOGIES CORPORATION, ETAL.
PETITION FOR A WRIT OF CERTIORARI
TO THE SUPREME COURT OF THE STATE
OF NEW YORK, APPELLATE DIVISION,
FIRST DEPARTMENT
PETITION FOR WRIT OF CERTIORARI
PAUL C. MATTHEWS
Counsel of Record
54 Stone Street
New York, NY 10004
(212) 344-1936
Attorney for Petitioners
ata acim aeciaaeniale
CURRY & TAYLOR @ WASH O.C. @ (202) 223-3160 ¢ USSCINFO.COM
ee een: ere
i
QUESTIONS PRESENTED
1. Whether a military contractor defense bars, as a-
matter of law, claims for defective design without
meaningful participation by the government in the
design, manufacture or acceptance of the accident
helicopter’s component parts which are the subject of the
litigation?
2. Whether a military contractor defense bars, as a
matter of law, claims for defective design and failure to
warn, in the absence of government input or control over
the flight manuals produced by Defendants or evidence
that that the government was provided with warnings
but chose not to include them in the flight manuals?
3. Whether the military contractor defense bars, as a
matter of law, claims for defective design of the
component parts of a civilian-designed helicopter, where
the manufacturer failed to provide notice of available ©
safety components incorporated into other helicopters on
the same assembly line at the same time for sale to
another government?
4. Whether the military contractor defense bars, as a
matter of law, claims for defective design of the
component parts of a civilian-designed helicopter, where
the manufacturer failed to provide alternative safety
components available under the state of the art at the
time of design, and requested by the Government?
il
INTERESTED PARTIES
The following parties and entities were parties
below and have an interest in the outcome of this
consolidated case:
1.
Plaintiffs - Julio Cesar Wilson Stajano and Ana
Maria Delgatte de Stajano (individually, and as
parents and natural guardians of infant Plaintiff
Chantal Delgatte); Alberto Anibal Lopez
(individually and as parent and natural guardians
of infant Miguel Angel Lopez); Chantal Stajano:
Moina Jack Secco Scorza; and Robert B.
Tchodjuklian.
Defendants - United Technologies Corporation, of
New York, United Technologies Corporation and
Sikorsky Aircraft, Inc.
*
eS
ill
TABLE OF CONTENTS
QUESTIONS PREGINT ED ..2...:.0scscscscescscsccscscesccesceseccenecsscssocssvesenes i
I PRIN eicccsstinsenasaneichtensentveentnnnsnnsccsnstenenecstenatnnnenn ii
ee CN eeiaciestiicnnevintecsiinanniisiistnidnitaiiianinpeinianemesicinesn iii
Bs CO cccesetccncecsnsesnnnssniensntasesecsinetnennnnniemnentensnn vi
gE eee 1
CTD I cctccctinetncissccsstivinennnnsnandicnntisenanicnnesnennastenenenenennanees l
STATEMENT OF JURISDICTION ......... speanbhebeneitiiaisiepiidmenmainsad 3
aE, Te TIVE I cccececnssctcncssesnssinnessnsentmnnsntsenininene 3
| fe cnnnee 5
4g, es sociintainaiaiiatileaiaiadionadahininibiiindda 9
REASONS FOR GRANTING THE WRIT..............sccccsscsssescesssesees 13
I icici betaaintaidadnlinacinsiiien 27
APPENDIX
DECISION AND ORDER OF THE COURT OF
APPEALS OF NEW YORK, DENYING LEAVE TO
APPEAL, ENTERED OCTOBER 26, 2004, STAJANO
V. UNITED TECHNOLOGIES CORPORATION, 3
N.Y.3D 736, — N.E.2D —, ...........ccc.ccscossees povasenseniptibtentacneeeten la
DECISION AND ORDER OF THE SUPREME
COURT OF THE STATE OF NEW YORK,
APPELLATE DIVISION, FIRST DEPARTMENT,
DENYING PLAINTIFFS’ MOTION FOR
REARGUMENT OR IN THE ALTERNATIVE,
iv
LEAVE TO APPEAL TO THE COURT OF
APPEALS, ENTERED JULY 1, 2004................................ 2a
DECISION AND ORDER OF THE SUPREME
COURT OF THE STATE OF NEW YORK,
APPELLATE DIVISION, FIRST DEPT.,
AFFIRMING DISMISSAL, ENTERED MARCH 23,
2004, 5 A.D.3D 260, 774 N.Y.S.2D 409 (IST DEPT.
=the
DECISION AND ORDER OF THE SUPREME
COURT OF THE STATE OF NEW YORK, COUNTY
OF NEW YORK (KORNREICH, J.S.C.), DENYING
PLAINTIFFS’ MOTION TO RENEW, REARGUE
AND/OR VACATE OCTOBER 22, 2002 DECISION,
ORDER AND JUDGMENT, MARCH 13, 2008 .............0000 5a
nam.
ec
DECISION, ORDER AND JUDGMENT OF THE
SUPREME COURT OF THE STATE OF NEW
YORK, COUNTY OF NEW YORK, GRANTING
SUMMARY JUDGMENT DISMISSING
COMPLAINTS, ENTERED OCTOBER 22, 2002 .............. 7a
retain. teen i
DECISION AND ORDER OF THE SUPREME
COURT OF THE STATE OF NEW YORK,
APPELLATE DIVISION, FIRST DEPARTMENT,
AFFIRMING DENIAL OF DEFENDANT'S MOTION
FOR SUMMARY JUDGMENT, ENTEREDJUNE 27,
2000, 273 A.D.2D 162, 711 N.Y.S.2D 718 (1ST DEPT.
DECISION AND ORDER OF THE SUPREME
COURT OF THE STATE OF NEW YORK, COUNTY
OF NEW YORK, DENYING DEFENDANTS’
MOTION FOR SUMMARY JUDGMENT, ENTERED
DIRTIEST 0g SHOT veinhcciesilsssibiicscintanibasiiensittiaaiiannaieanenjinaaadaaiiiiinins 39a
AUGUST 26, 1958 LETTER/REPORT OF US.
NAVAL AIR MINE DEFENSE DEVELOPMENT
Vv
HEARING AND DEPOSITION OF WALDEMAR
RAMON PERDOMO, MONTEVIDEO, URUGUAY,
APRIL 5, 1972 .........sssccssscscssesseseeeseeessssecssscssssssneeeesesssssssenoes 55a
EXTERIOR CARGO HOOK, POSITIVE
DISCONNECT EXPLOSIVE BOLT AND
EMERGENCY MECHANICAL PROPOSED CO-
PILOT RELEAS .........ccssscsssssseseeeseesnseserssnsnrsescesenesenssneseanes 59a
vi
TABLE OF CITATIONS
CASES
BOYLE V. UNITED TECHNOLOGIES CORP., 487 U.S.
500, 108 S. CT. 2510 (1988). passim
DENSBERGER V. UNITED TECHNOLOGIES CORP., 297
F.3D 66 (2D CIR. 2002), CERT. DENIED, 537 U.S.
ROOT, BBB GCP. Be G ccccnscssscszessesssessassnescensenenscsnttanssonsvennbenens 19, 25
HARDUVEL V. GENERAL DYNAMICS CORP. [878 F.2D
1311, 1316 (11TH CIR. 1989), CERT. DENIED, 494
U.S. 1030, 110 S.CT. 1479, 108 L.ED.2D 615 (19990).............. 24
MILLER V. UNITED TECHNOLOGIES CORP., 233
CONN. 732, 660 A.20) 810 (1995) ........csesecsereseueres 20, 21, 22, 23
TIMBERLINE AIR SERVICE, INC. V. BELL
HELICOPTER-TEXTRON, INC., 125 WASH.2D 305
CESBENIEN BADRIC) nncoccscescsesescrscescscessessnsssestensssessssescessecsssesessesss 25
TREVINO V. GENERAL DYNAMICS CORP., 865 F.2D
1474, 1486(5TH CIR.), REH. DENIED EN BANC, 876
F.2D 1154, CERT. DENIED, 493 U.S. 935, 110 S.CT.
$27, 107 L.ED.2D 317 (1969) ..............cc.csscsceccscssescssececsesscesceces 23
MISCELLANEOUS
BB US.C. SIRS HA IGG) cceccescescscesscssesesssnsssncsnsensanssssensensussaneouenees 3
BB U B.C. SEBEBID) accercssescscsnssccnssesnsnnssnsssssastnnrsnsasncsensenanenenstenssessss 4
BB U S.C. SRBRGA) .crcccesescevsscnsescsscscnscesnsnessessasenssnnenssnensetssoanenenstess 4
awesome
l
PRELIMINARY STATEMENT
Petitioners, Plaintiffs who suffered severe personal
injuries resulting from a crash of Defendants’ helicopter
as spectators of an air show on the beach in Pocitos,
Montevideo, Uruguay on November 14, i971, Petition for
a Writ of Certiorari to review the Memorandum Decision
and Order of the New York State Supreme Court,
Appellate Division, First Department, affirming dismissal
of their complaints on summary judgment, entered March
23, 2004.(3a-4a).
The dismissal of Petitioners’ complaints was based
solely upon the military contractor defense enunciated in
Boyle v. United Technologies Corp., 487 U.S. 500, 108 S.
Ct. 2510 (1988).
As a result of the Tupamaro Insurrection (Marxist
Leninist Guerillas from Argentina) that captured,
tortured and killed CIA Employee Daniel Mitrioni,
formerly Police Chief Terra Haute, Indiana, in support of
Uruguay’s attempts to quell guerillas, U.S. Government
transferred to Uruguay in Military, two counter-
insurgency helicopters ostensibly equipped for air sea
rescue in 1981.
OPINIONS BELOW
The Order of the New York State Court of
Appeals, denying discretionary review is reported at 3
N.Y.3d 736, -- N.E.2d -—- (October 26, 2004) and is
reprinted at App. P. la.
2
The July 1, 2004 Decision and Order of the
Supreme Court of the State of New York, Appellate
Division, First Department, denying Plaintiffs’ motion for -
reargument or in the alternative, leave to appeal to the
Court of Appeals, is unreported and is reprinted at App.
P. 2a.
The March 23, 2004 Decision and Order of the
Supreme Court of the State of New York, Appellate
Division, First Department, affirming dismissal of
Petitioners’ complaints, is reported at 5 A.D.3d 260, 774
N.Y.S.2d 409 )(1st Dept. 2004) and is reprinted at App. p.
3a-4a.
The February 28, 2003 Decision and Order of the
Supreme Court of the State of New York, County of New
York, denying Plaintiffs’ motion to renew, reargue or
vacate the October 22, 2002 Decision, Order and
Judgment of the Supreme Court, New York County is
unreported and is reprinted at App. p. 5a-6a.
The October 22, 2002 Decision, Order and
Judgment of the Supreme Court of the State of New
York, County of New York, granting summary judgment
dismissing Petitioners’ complaints is unreported and is
reprinted at App. P. 7a-36a.
The June 27, 2000 Decision and Order of the
Supreme Court of the State of New York, Appellate
Division, First Department, affirming denial of
Defendant’s motion for summary judgment, is reported at
273 A.D.2d 162, 711 N.Y.S.2d 718 (1st Dept. 2000) and is
reprinted at App. p. 37a-38a
3
The June 7, 2000 Decision and Order of the
Supreme Court of the State of New York, County of New
York, denying summary judgment to dismiss Petitioners’
complaints, is unreported and is reprinted at App. p. 39a-
48a.
STATEMENT OF JURISDICTION
The decision and Order of the New York State
Supreme Court, Appellate Division, First Department
was entered March 23, 2004, affirming dismissal of
Plaintiffs’ complaints. App. p. 3a-4a.
Petitioners’ motion to reargue or for leave to
appeal to the Court of Appeals was denied by the
Appellate Division, First Department Order entered July
1, 2004. App. p. 2a.
Petitioner’s motion for leave to appeal was denied
by the New York State Court of Appeals by Order
entered on October 26, 2004. App. p. la.
Granting a prior motion to enlarge time to file a
Petition for a Writ of Certiorari, this Court extended the
time to file until March 25, 2005. Jurisdiction is invoked
pursuant to 28 U.S.C. §1257(a)(1970).
FEDERAL ISSUES INVOLVED
The instant case was dismissed on the authority
and precedent of Boyle v. United Technologies Corp., 487
U.S. 500, 108 S. Ct. 2510 (1988), wherein this Court
fashioned the federal common law to provide a defense for
4
a government (military) contractor supplying helicopters
to the United States, based upon, inter alia, a “uniquely
federal interest”. Jd., at 507, 108 S.Ct., at 2516.
The Boyle common law rule protecting a military
contractor is stated as follows:
Liability for design defects in military
equipment cannot be imposed, pursuant to
state law, when (1) the United States
approved reasonably precise specifications;
(2) the equipment conformed to those
specifications; and (3) the supplier warned
the United States about the dangers in the
use of the equipment that were known to
the supplier but not to the United States.
Id., at 512, 108 S.Ct., at 2519.
This Court has also recognized the Federal Tort
Claims Act, 28 U.S.C. §1346(b), as suggesting a
“significant conflict” between federal law and state law
with respect to Government procurement involving
discretionary decision-making, which provides a liability
exemption for:
—,
[aJny claim ... based upon the exercise or
performance or the failure to exercise or
perform a discretionary function or duty on
the part of a federal agency or an employee
of the Government, whether or not the
discretion involved be abused. 28 U.S.C.
§2680(a). Boyle, supra, at 511, 108 S.Ct, at
2518.
———— OC ——
+)
This case was dismissed, on summary judgment,
based upon the “uniquely federal interest” enunciated on
Boyle, supra, and the federal common law enunciated
therein, developing the military contractor’s defense.
STATEMENT OF THE FACTS
In or about December 1957, Defendants, doing
business as Sikorsky Aircraft, Inc., manufactured two
naval helicopters with civilian designation S-58, Army
designation H-34A, Air Force designation H-34, Navy
designation HSS-1, and Marines designation HUS-1. The
two S-58 helicopters’ serial numbers were 143934 and
143941, and were built for the United States Navy, under
Navy designation HSS-1. Although each naval helicopter
was initially intended for anti-submarine warfare and
provided with sonar equipment, these naval helicopters
were also specially designated and equipped for use as
air-sea rescue naval aircraft, with a factory-installed 600
lb. air-sea rescue hoist.
THE CARGO HOOK INSTALLED ABOARD THE
ACCIDENT NAVAL HELICOPTER
Although initially denied by the Defendants, it was
later discovered that Sikorsky intentionally strengthened
both of the naval aircrafts’ hulls, so that each naval
helicopter would be capable of lifting 5,000 lbs, with the
use of a cargo hook, to be subsequently installed. It was
also discovered that in conjunction with the
reinforcement of the subject naval helicopters’ hulls,
Sikorsky also factory-installed all of the internal release
equipment used by the crew of the naval aircraft to
release any load carried by the external cargo hook. This
6
equipment included safety release mechanisms, both
electrical and mechanical, that would, inter alia, be called
upon by the pilot and/or co-pilot in the event of an
emergency situation, where the cargo would have to be
dropped in order to protect the aircraft and crew.
The release equipment aboard the-aforementioned
naval aircraft consisted of electronic cargo release buttons
on the pilot and co-pilot flight control sticks. A master
“arming” switch was also installed in the naval aircraft,
which prevented the flow of electricity to the button on
the flight control sticks. There was also a single
mechanical release located on the floor of the cabin,
accessible only to the pilot, using his right foot.
According to Robert Nokes, the Plaintiff's expert witness
and a person well familiar with Sikorsky’s manufacturing
and installation procedures, all of the release mechanisms,
which consisted of both a single manual mechanical
system and a separate electrical system (including
switches, electric wiring, wiring harnesses and housings)
inside of the navai helicopter involved in the release of
cargo from a cargo hook were installed by Sikorsky prior
to delivery to the United States Navy.
Mr. Nokes, in reading the specifications for the
subject accident naval helicopter, which was not provided
by the Defendants until October 7, 1998, noted that the
“aircraft is to have ‘PROVISION FOR CARGO.” Thus,
the naval helicopter’s hull was “strengthened and
provided with a means to attach an external cargo hook
with a capacity of 4,000 lb. or subsequently 5,000 Ib.” Mr.
Nokes also read and translated the definition of the term
“PROVISION FOR” in the document to indicate that “all
mechanical and electrical systems associated with the
———— — cargo hook were installed by Sikorsky at the time of
Se Se ee ee NN Se eee ee me ee, ee!
7
aircraft manufacture (December, 1957) and prior to
delivery to the United States Government. Said <argo
hook to be attached at a later date by the Government, at
its option.”
The recently obtained information concerning
Sikorsky’s installation of the operating and release
systems for the cargo hook installations was significant,
inasmuch as the Plaintiffs have persistently maintained
that the external cargo hook system was defective.
Moreover, Defendants persistently denied that Sikorsky
had anything to do with the cargo hook assembly.
Subsequently, a Sikorsky Model SP4070 cargo
hook, was, in fact, installed on the subject naval
helicopter. Consistent with certain Sikorsky parts, the
subject cargo hook was manufactured by another
company, Eastern Rotorcraft, but the hook was designed,
tested, approved and sold by Sikorsky for use on the
subject naval aircraft, assigned a part number (SP4070),
and a control drawing number of S1650-62195. Mr. Nokes
identified the hook from photographs taken just prior to
the subject accident.
THE ACCIDENT IN URUGUAY
In March, 1971, both aforementioned naval
helicopters were sold to the Uruguayan Navy, along with
installed cargo hook assemblies, and designated
description Numbers A-061 an A-062.
The naval aircraft were employed by the
Uruguayan Navy in a naval air show demonstration
adjacent to the beach in Pocitos, Montevideo, Uruguay on
8
November 14, 1971. It was Sunday, and the newspapers
estimate that between 5,000 and 10,000 spectators were
present to witness the air show.
Both naval helicopters were parked with their
lifting blades rotating slowly on a promontory of land
jetting out into the Mar del Plata, a large bay which
serves as the southern border for Uruguay and the
northern frontier for Argentina. Alongside the naval
helicopters was an ice-cream vendor’s building. Located
on this promontory was one of the two naval helicopters
bearing Uruguayan Navy identification number A-061,
under the command of Captain Waldmar Perdomo.
This naval helicopter (A-061) lifted off the ground
and swung over a jeep in order to hook its external cargo
hook to the vehicle, through the use of a four-legged sling,
which was secured to the four quarters of the jeep, and
known as a “four-legged bridle.”
The four-corner hook-up of the vehicle, after being
completed, allowed the naval helicopter to rise into the air
thereby lifting the jeep from its resting position into the
air and over the ocean.
While the jeep was being flown over the ocean, one
corner of the bridle became loose, causing the front of the
jeep to tilt downward which in turn destabilized the naval
helicopter’s flight condition. Captain Perdomo was
unable to sever the cargo. App. p 55a. Unable to sever
the cargo, the naval helicopter swung into shore with its
forward section pointing downward, attempting to land
the Jeep near the site where the flight originated.
ver eS
9
The destabilized naval aircraft lost altitude
returning to shore and appeared to be pulled down from
the sky by its unbalanced cargo, when the jeep struck the
supporting rocks below the embankment.
The jeep, striking the embankment, became an
anchor, which pulled the naval helicopter to the ground,
where it collided with a second naval helicopter causing a
horrendous fire, explosions, and flying debris field.
The accident caused the immediate death of eight
people and multiple injuries to some 40 to 100 spectators,
including the five infants who brought the present
lawsuit.
CASE HISTORY
This action and the actions of many other injured
Uruguayan citizens arising from the same occurrence
were commenced in New York in 1978 and 1980. The
instant plaintiffs were infants at the time of the
occurrence. After the commencement of these actions,
defendants moved to dismiss on the grounds of forum non
conveniens. The Supreme Court, New York County
(Fraiman, J.) conditionally granted the defendants’
motion on January 10, 1980, and directed defendants to
provide a general appearance in an action to be
commenced in Uruguay, and further directed the
defendants not to raise a Statute of Limitations defense
other than as the Statute of Limitations may have been
applicable on March 23, 1978, the date the first of these
related actions was commenced.
10
Defendants appealed the January 10, 1980 order to
Appellate Division, First Department, which modified
said order by holding that the actions could be
commenced in Connecticut as well as Uruguay, but
otherwise affirmed. 97 A.D.2d 593, 433 N.Y.S.2d 807 (1st
Dept. 1980)
On July 2, 1980, the Supreme Court (Fraiman, J.)
granted defendants motion to dismiss upon the ground of
Statute of Limitations, but the trial court specifically
exempted all actions brought by plaintiffs who were
infants on the date of the accident, if such actions were
not time barred under New York law by reason of the
infant tolling provision of CPLR §208. This order was
also appealed and affirmed.
Thereafter, actions were commenced in the United
States District Court for the District of Connecticut, on
behalf of all plaintiffs who were infants on November 14,
1971. In clear violation of two separate Orders of the
Supreme Court of the State of New York, both of which
were affirmed on appeal, the defendants moved to dismiss
the complaints based upon a Statute of Limitations
defense. Inasmuch as Connecticut has no infant tolling
provision the plaintiffs’ actions were dismissed on
November 6, 1985 (two (2) actions) and January 29, 1987
(the remaining three (3) actions).
_ On February 13, 1990, the Supreme Court, New
York County (Greenfield, J.) granted plaintiffs’
application to restore the five infant cases to the calendar.
148 Misc.2d 918, 562 N.Y.S.2d 903 (1990). Defendants
again appealed, but the restorations were affirmed on
May 28, 1991. 173 A.D.2d 394, 570 N.Y.S.2d 25 (1st Dept.
1991).
————_—_a
11
PLEADINGS
Defendants’ September 8, 1991 motion to amend
their answer to add the government contractor’s defense
was granted on May 24, 1992 by the Supreme Court, New
York County (Greenfield, J.). However, Defendants did
not assert a military contractor defense to the accident
aircraft, as subsequently modified, or specifically for the
internal and external components of the cargo carrying
and release systems at issue.
Instead, Defendants made material
misrepresentations about their involvement in the
internal and external cargo carrying and release systems
to the Court and plaintiffs’ counsel. As the trial Court
noted:
THE COURT: Right now, as I understand
it, Mr. Cook is saying we never had
anything to do with cargo slings, hooks or
release mechanisms...
Plaintiffs maintain that a fail safe shear pin would
have severed the jeep, rather than permitting the cargo
to act as a anchor, dragging the naval helicopter to the
ground upon impact with the supporting rocks ashore.
Moreover, a guillotine device, or explosive bolt, would
have permitted another member of the crew to drop the
load when trouble was discovered.
Strikingly, an August 26, 1958 Letter/Report of
U.S. Naval Air Mine Defense Development Unit
requested “that an explosive bolt attaching device be
installed at the tow boom attachment point to assure
release of the tow should the manual and electrical
12
systems fail.” See, App. p. 49a.' The recommendations of
August 26, 1958 (App. p. 49a) by the U.S. Government to
improve repair and _render positive disconnecting
external cargo are the two items proposed co-pilot release
and positive disconnect explosive bolt integrated into
hook. App. p. 59a.
SUMMARY JUDGMENT GRANTED ON NEWLY
AMENDED MILITARY CONTRACTOR DEFENSE
With at least five (5) prior motions pending before
Justice Schoenfeld, many of which demanded outstanding
discovery requested by Plaintiffs and/or sought to punish
Defendants for long-standing discovery abuses, acting
Supreme Court Justice Kornreich ignored the motions,
and, after the close of discovery, permitted Defendants to
amend their answer, denied Plaintiffs further discovery
on newly added military contractor defenses, and
simultaneously, granted Defendants summary judgment.
However, Defendants were not entitled to
summary judgment, inasmuch as Defendants failed to
prove that the component parts in issue were designed
and manufactured in conformance with reasonably precise
specifications, and that Defendants warned the
Government about known dangers.
. The August 26, 1958 Letter/Report of U.S. Naval Air Mine
Defense Development Unit reported that the “manual hook release
system has never worked under any condition of tension.” The
document also states that the “electrical hook release system has
failed twice.” The document notes a “tow tension of between 2500
and 3000 pounds is the maximum that can be obtained.”
13
Tellingly, Defendants presented no proof the
component parts in issue were ever ‘signed off’, either in
design or receipt, by the Government, that the
Defendants addressed a request for an explosive bolt to
sever the load, or that the Defendants offered dual
mechanical releases (one for the pilot and one for the co-
pilot), similar to releases installed aboard the same
helicopters sold to Germany, which were a few production
numbers from the accident helicopters.
REASONS FOR GRANTING THE WRIT
Recently, apart from military action there have
been multiple disasters involving various Black Hawk
models:
See VFW Magazine, March 1, 2003 by Tim Dyhouse:
1. Black hawk crash kills four in Afghanistan -
Security - US military helicopter crash.
A USS. helicopter crashed during a
training exercise Jan. 30 in Afghanistan
killing four soldiers. The incident occurred
about six miles east of Bagram Air Base in
an area known as the East Training Range.
A spokesman for U.S. Central Command in
Tampa, Fla., said the crash, which involved
an MH-60L Black Hawk carrying two pilots
and two crew members, was an accident.
See VF W Magazine, September 1, 2003 by Tim Dyhouse:
14
2. Navy helicopter crash kills four - Security:
See VF W Magazine, May 1, 2003:
3. 11 Killed in Fort Drum crash - Security -
helicopter crash under investigation:
A Black Hawk helicopter crashed
during a March 11 training mission at Fort
Drum, N.Y., killing 11 soldiers and injuring
two. At press time, the Army was still
investigating the cause.
4. Afghanistan crash kills six - Security - helicopter
h:
cras
An Air Force Pave Hawk helicopter
erasned March 23 in Afghanistan killing all
six on board. The crew was conducting a
medical evacuation mission when it crashed
some 81 miles north of Ghazni. US.
Central Command stated the helicopter
was not shot down and was investigating
the cause at press time.
See VF W Magazine, April, 2003 by Tim Dyhouse:
5. Kuwait black hawk crash kills four - Security:
Four U.S. Army soldiers were killed
Feb. 25 when their Black Hawk helicopter
crashed during a training exercise in
Kuwait. A Pentagon spokesman said there
was no indication that hostile fire caused
the crash.
15
An investigation from a Stratford Program on July
2003, revealed the following:
The Black Hawk helicopter’s troubled
history (Stratford-WTNH, Apr. 29, 2003
6:00 PM) - They are a work horse of the US
military but there are questions about
what’s going into the Connecticut built
Black Hawk. They're used all over the
military and made here in Connecticut. A
Team 8 investigation has uncovered
questions about the Black Hawk and how
it’s made.
The move follows a Team 8 investigation
showing defective parts are sometimes
slipping through the company’s quality
inspection process, and that the Defense
Department has cited Sikorsky for 19
quality control problems.
This month, a company which processed
parts for a Sikorsky supplier was indicted.
in California. Reporter John Donnelly
investigated the case for Defense Week
magazine and says Sikorsky was unaware
one of its sub-contractors was doing
business with a firm making faulty parts.
“Sikorsky and other manufacturers failed in
their oversight of their sub contractors to
detect this flaw,” Donnelly said.
It’s one thing for bad parts to show up on
the production line, but is there any
16
evidence of defective parts getting to
aircraft at military bases? The answer
Team 8 has learned is yes.
According to a Sikorsky document obtained
by News Channel 8, 8-months after the
Defense Department ordered Sikorsky to
fix it’s quality control problems, the
commanding officers at two military bases
“complained” bolts on replacement engine
mounts supplied by Sikorsky wouldn’t fit
the holes they were suppose to go through.
“The AFT engine mount,” explained Allen
Haggerty.
“An important part?”
“Certainly.”
It’s not the only example we found. In
April, leaks were discovered in a gear box
on a Black Hawk helicopter. Sikorsky
engineers noting in the past “the supplier
had not been following the correct bonding
procedure.” .
In the meantime, the Army says it appears
four recent fatal crashes of the Black Hawk
were due to either human or environment
factors, not mechanical problems.
However, the Army says three other recent
Black Hawk accidents were due to
mechanical failures.
17
The Defense Department tells News
Channel 8 Sikorsky “has terminated its
business relationships with several vendors
which do not meet their standards.”
The cumulative history of helicopter accidents,
resulting from defective civilian design, defective
manufacture and defective construction have only begun
resulting in aircraft catastrophes mostly involving the
passengers and crew of said helicopters.
Now as the production and use of helicopters
increases along with concomitant defective construction
and design, the quantity of injuries will dramatically
increase for the operators and passengers of said
helicopters.
The increase in helicopter disasters will affect
innocent bystanders on the ground, and identical to the
instant litigation commenced by the innocent spectators
in Uruguay, those innocent victims on the ground will
have their action for injuries or death shunted aside,
blunted or denied due process by being dismissed under
an overbroad military contractor defense.
18
NEW YORK STATE COURTS MISUNDERSTAND
THE SHOWING REQUIRED TO INVOKE THE
MILITARY CONTRACTOR DEFENSE ENUNCIATED
IN BOYLE, SUPRA, AND DEPRIVED PETITIONERS
OF THEIR DAY IN COURT BASED UPON AN
UNRESTRAINED APPLICATION OF THIS COURT’S
JUDICIALLY CREATED DEFENSE.
The Appellate Division, First Department,
affirmed the trial court’s summary deprivation of
Petitioners’ day in Court based upon Boyle, supra. The
dismissal occurred in the absence of evidence that the
internal and external components of the cargo carrying
and release systems at issue in the instant helicopter
disaster were approved, at all, by the Government. In
fact, the Defendants even disputed the type of hook
identified by Petitioners’ expert witness. No
Government-supplied specifications or approval for the
Sikorsky hook and component parts identified by
Petitioners were ever exhibited by the Defendants.
This case is a prime example of the dangers
inherent in a “rubber stamp” application of the military
contractor defense. As a result, and as foreseen in Justice
Brennan’s dissenting opinion in Boyle, innocent
bystanders injured by a helicopter initially designed for
civilian use have been “rubber stamp(ed]” out of Court for
severe injuries resulting from design defects and failures
to warn which were plainly avoidable.
19
IN DISMISSING PETITIONERS’ FAILURE TO WARN
CLAIMS BASED UPON’ THE MILITARY
CONTRACTOR DEFENSE, THIS CASE STANDS IN
STARK CONTRAST TO BOYLE PROGENY.
The state courts paid little, if any, attention to
Densberger v. United Technologies Corp., 297 F.3d 66 (2d
Cir. 2002), cert. denied, 537 U.S. 1147, 123:S.Ct. 876 which
applied the three prong of Boyle, supra, to the military
contractor defense in failure to warn cases.
Certiorari is sought not only to reverse the
dismissal of five severely injured citizens of Uruguay, but
also to correct and assist application of the federal
common law by the Courts of the State of New York, and
protect our servicemen and people across the world, the
latest being survivors of the tsunamis in Asia, from a
perfunctory application of Boyle, supra and erroneous
release of manufacturers from liability pursuant to the
military contractor defense.
The ease at which the Appellate Division affirmed
the Supreme Court’s deprivation of Petitioners’ rights on
summary judgment should not pass unnoticed. The
instant record before the state courts contained literally
dozens of disputed issues of material facts. Nevertheless,
despite a dispute as to the actual component parts
involved in the accident, and Defendants’ failure to
present evidence that the actual component parts in issue
complied with any specifications, the manufacturer was
relieved of liability. |
Finally, the Court of Appeal’s refusal to grant
discretionary review of such an enormous violation of
Petitioners’ rights, and the fundamental tenet that
20
entities be held accountable for their wrongful conduct,
warrants review by this Court to ensure that the military
contractor defense enunciated in Boyle, supra, does not
become a “rubber stamp” justification to deprive injured
parties a claim against defective engineering which was
not required by our Government.
POINT I
THE COURTS’ SUMMARY DISMISSAL OF
PETITIONER’S CLAIMS PURSUANT TO THE
MILITARY CONTRACTOR DEFENSE -IS- AN
ERRONEOUS AND DANGEROUS PRECEDENT
THAT WARRANTS INTERVENTION BY THIS
COURT.
It is well-known that “summary judgment is not
well suited to the disposal of complex cases.” Miller v.
United Technologies Corp., 233 Conn. 732, 660 A.2d 810
(1995)(design/manufacture and failure to warn respecting
component in F-16B fighter aircraft). This is particularly
true, where, as here, the “case presents an extraordinary
technical and multifarious factual labyrinth.” /d.
Moreover,
[f]ederal common law provides support for
the proposition that this case should not be
disposed by summary judgment. It is well
established that whether a contractor is
shielded from liability by the government
contractor defense may be either a question
of law or a question of fact. 3 L. Frumer &
M. Friedman, Product Liability (1994)
§3.40[1]. This was clearly set forth in
Boyle, which, applying federal law, stated
21
that whether the facts establish the
conditions for the government_contract
defense is a jury question [emphasis added].
Boyle v. United Technologies Corp., supra,
487 U.S. 500, 108 S. Ct. 2510. Only if “no
reasonable jury could find . . . on the basis
of the evidence presented, that the
Government contractor defense was
inapplicable” is a defendant entitled to
judgment as a matter of law. Id., at 514, 108
S.Ct. at 2519-20. Miller, supra, at 775, 660
A.2d 810, 833, n. 28.
The Miller Court further held:
Finally, a summary determination that the
plaintiff had failed to prove a
manufacturing defect was an inappropriate
basis for summary judgment on this issue.
First, the defendants must satisfy
the three elements of Boyle before the
burden shifts to the plaintiffs to present
evidence of a manufacturing defect
[emphasis added]. Bailey v. McDonnell
Douglas Corp., supra, 989 F.2d at 802. “To
say that a product failed to conform to
specifications is just another way of saying
that it was defectively manufactured.”
Harduvel v. General Dynamics Corp.,
supra, 878 F.2d at 1321.
Thus, the trial court must first
analyze, according to the elements of Boyle,
the plaintiffs various claims that the fuel
22
pump did not conform to specifications.
Only if the trial court determines that the
defendant has satisfied i..e three elements
of Boyle for each of the alleged
specifications must the court consider the
plaintiff's proof of a manufacturing defect
[emphasis added]. Jd. In Bailey, the court
determined that “[b]ecause [the defendant]
did not present evidence that the three
Boyle conditions were satisfied with
respect to the [specification at issue], upon
which Bailey’s manufacturing defect claim
was based, it did not meet its burden of
proof with respect to that claim; and,
therefore, the burden did not shift to Bailey
to present evidence to support her claim.”
Bailey v. McDonnell Douglas Corp., supra,
at 802. As we have previously stated, in
this case, the trial court failed properly to
engage in the initial Boyle analysis. For
these reasons, we conclude that the trial
court improperly granted summary
judgment for Pratt & Whitney and
Chandler- Evans. Miller, supra, at 779, 660
A.2d 810, 834.
In the case at bar, Defendants failed to
demonstrate any precise specifications proscribed by the
government for its external cargo carrying system or
internal component parts at all. Defendants likewise
failed to demonstrate that the external cargo carrying
system and internal components for the accident
helicopter complied with these absent specifications. The
DD-250, a conditional acceptance form by the government
was signed in 1957, seven years prior to the insallation of
23
the external cargo hook and the connection of the internal
parts for the cargo carrying system. Obviously, the DD-
250 in 1957 did not approve the external cargo carrying
system later installed.
More importantly, Defendants never offered any
DD-250 for the particular Sikorsky external cargo
carrying system, the cargo hook or the internal
components (all of which components are at issue in this
action) which were installed aboard the accident
helicopter. Nor did Defendants provide admissible proof
by witness with actual knowledge that the particular
external cargo carrying system, the cargo hook and the
internal components involved in the subject accident
conformed to any specifications at all.
It bears emphasis that the DD-250 provided by
Defendants related to the delivery of the accident aircraft
prior to the time that Sikorsky’s component parts
involved in the subject accident were installed in the
aircraft. Moreover, the state courts disregarded
Defendants’ own approved publications which admit that
the civilian S-58 helicopter was designed prior to
production for military use.
Even if the U.S. Navy made a subsequent rubber
stamp approval (which it did not) of the component parts
in issue, this clearly would not afford Defendants the
benefits of a military contractors defense as to the
external cargo carrying system and its components.
Miller, supra, at 760, 660 A.2d 810, 825-26 (“The approval
must constitute more than a mere ‘rubber stamp’ by the
government. Trevino v. General Dynamics Corp., 865
F.2d 1474, 1486 (5th Cir.), reh. denied en banc, 876 F.2d
1154, cert. denied, 493 U.S. 935, 110 S.Ct. 327, 107
24
L.Ed.2d 317 (1989). Rather, it must be the result of a
‘continuous back and forth’ between the contractors and
the government. Harduvel v. General Dynamics Corp.
[878 F.2d 1811, 1816 (11th Cir. 1989), cert. denied, 494
U.S. 1030, 110 S.Ct. 1479, 108 L.Ed.2d 615 (1990)].”)
Defendants offered absolutely no evidence to
establish any ‘continuous back and forth,’ any testing or
any negotiation with the government in the design and
manufacture of the external cargo carrying system at all.
It bears emphasis that the drawings of the cargo hook and
other components were completely devoid of any
government acceptance. Moreover, other than a general
desired capacity of the external cargo carrying system,
Defendants offer no “reasonably precise specifications”
concerning the design of the external cargo carrying
system.
To the contrary, the August 26, 1958
Letter/Report of U.S. Naval Air Mine Defense
Development Unit clearly gave Defendants notice that
the cargo hook was defective, and failed to release.
Defendants did not explain any response to the
Government’s request for an explosive bolt to sever the
load in the event of emergency. Moreover, explosive
bolts, of the type used at the time on the rescue hoist for
the accident helicopter, were clearly state of the art at the
time of design of the aircraft, having been employed on
the 600 lb. rescue hoist.
The state courts’ refusal to permit a jury to
determine clearly disputed issues of fact surrounding
Defendants’ military contractor defense requires
guidance from this Court.
25
POINT II
THE STATE COURT’S’' DISMISSAL OF
PETITIONERS’ FAILURE TO WARN CAUSE OF
ACTION VIOLATES BOYLE PROGENY.
In Densberger v. United Technologies Corporation,
297 F.3d 66 (2d Cir. 2002), The Second Circuit enunciated
three requirements of the Boyle test for failure-to-warn
cases: (1) ‘government control over the nature of the
warnings’; (2) ‘compliance with the Government’s
directions’; and (3) ‘communication to the Government of
all product dangers known to it but not the Government.’
Id., at 75, n. 11. See also, Timberline Air Service, Inc. v.
Bell Helicopter-Textron, Inc., 125 Wash.2d 305 (1994)(en
banc)(military contractor defense to claims for failure to
warn, independently subject to requirements of Boyle).
Densberger, in discussing the third prong, recognized:
A defendant, for example, might well be
unreasonable in failing to warn about
information already known to the purchaser
if the defendant was unaware that the
purchaser had the information. The
instruction is also wrong with respect to the
causation issue, because it is possible that if
the Army had been warned of the danger of
which it already knew, it might have
warned the pilots, and would have done so
even if, absent a warning, it had failed to
caution them. Thus, UTC’s warning might
have led the army to say, “Gee, if this
danger (of which we’re already aware) is
important enough so that UTC decided to
warn us of it, we’d better let the pilots
Cone ee
26
know about it too.” UTC’s proposed charge
ignores this, as well as other, similar,
possibilities. /d., at 73.
In the complete absence of any proof that
Defendants were prohibited by the U.S. Navy from
providing warnings of the failures and defects of the
external cargo carrying system, or from providing
procedures for emergency release or safe flight during an
emergency, Defendants clearly were not entitled to
summary judgment on their military contractors defense
as against Plaintiffs’ claims for failure to warn.
It bears emphasis that Petitioners’ witnesses
included a former helicopter pilot and long-term Sikorsky
employee who confirmed that, despite Defendants’
unsupported claims to the contrary, Sikorsky wrote the
flight training manual for the Government.
The New York State Courts’ departure from the
mandates of this Court’s decisional law, and the decisions
of the United States Court of Appeals for the Second
Circuit, not only permit and encourage the appellate
jurisdiction of this Court, but necessitate such corrective
action.
errr errr
27
CONCLUSION
It is respectfully requested that this Petition for a
Writ of Certiorari be granted and that this Court exercise
its jurisdiction.
Respectfully submitted,
Paul C. Matthews, Esq.
Counsel of Record
54 Stone Street
New York, New York 10004
(212) 344-1936
Attorney for Petitioners
la
(Any footnotes trail end of each document)
State of New York, Court of Appeals
Julio Cesar Wilson Stajano, et al.,
Appellants,
Vv.
United Technologies Corporation, et al.,
Respondents.
3 N.Y.3d 736, --- N.E.2d ---
October 26, 2004
A motion for leave to appeal to the Court of Appeals in
the above cause having heretofore been made upon the
part of the appellants herein and papers having been
submitted thereon and due deliberation having been
thereupon had, it is
ORDERED, that said motion, insofar as it seeks leave
to appeal from that part of the March 2004 Appellate
Division order that affirmed the dismissal of appellants’
complaint, be and the same hereby is denied; and it is
ORDERED, that the said motion, insofar as it seeks
leave to appeal from the remainder of that order and
from the July 2004 Appellate Division order denying
reargument or, in the alternative, leave to appeal to
this Court, be and the same hereby is dismissed upon
the ground that the remainder of the March 2004
Appellate Division order and the July 2004 order o not
finally determine the action within the meaning of the
Constitution.
2a
Supreme Court of the State of New York,
Appellate Division,
First Judicial Department
Julio Cesar Wilson Stajano, et al.,
Plaintiffs-Appellants,
V.
United Technologies Corporation, et al.,
Defendants-Respondents.
July 1, 2004
Plaintiffs-appellants having moved, by separate
motions, for reargument (M-1886) of or, in the
alternative, for leave to appeal to the Court of Appeals
(M-1977) from the decision and order of this Court
entered on March 23, 2004 (Appeal Nos. 3205, 3206,
3207 & 3208),
Now, upon reading and filing the papers with respect to
the motions, and due deliberation having been had
thereon,
It is ordered that the motions are denied.
——— ON
3a
Supreme Court of the State of New York,
Appellate Division,
First Department
Julio Cesar Wilson Stajano et al.,
Plaintiffs-Appellants
Te
United Technologies Corporation et al.,
Defendants-Respondents.
March 23, 2004
5 A.D.3d 260, 774 N.Y.S.2d 490
Order, Supreme Court, New York County (Shirley
Werner Kornreich, J.), entered on or about October 22,
2002, which, in granting defendants leave to amend
their answers, nunc pro tunc, to include government-
contractor defenses, further granted defendants’
motion for summary judgment dismissing the action in
its entirety, and denied, as academic, all pending
motions and cross motions, and order, same court and
Justice, entered March 13, 2003, which, to the extent
appealable, denied plaintiffs’ motion for renewal,
unanimously affirmed, without costs. Appeal from
order, same court and Justice, dated August 22, 2002,
which denied, with leave to renew, plaintiffs’ motion for
an order granting open commissions to depose
defendants’ former employees, and failed to dispose of
defendants’ cross motion to strike extraneous matter
from the record, and their motion to amend and for
summary judgment, unanimously dismissed, without
costs.
4a
A prior motion for summary judgment was premature,
given that disclosure had not yet been completed (see
273 A.D.2d 162 [2000]). Having now obtained the
materials necessary to resolve previously open
questions of fact, defendants’ motion for summary
judgment, based on a more detailed government-
contractor defense, was appropriate.
Plaintiffs were not prejudiced by the grant of leave for
defendants to amend their answer, inasmuch as the
former has been on notice, for more than 10 years, that
leave was previously granted to assert a more
particularized affirmative defense on whether the
helicopters in question conformed to government
specifications and whether modification or alterations
had been made in the systems employed. The newly
amended affirmative defenses satisfied the three-
pronged test of government approval of reasonably
precise specifications, conformity to those
specifications, and a warning to the government about
dangers known to the contractor in the use of the
equipment (Boyle v United Tech. Corp., 487 US 500,
512 [1988]). Summary judgment was thus properly
granted.
We have considered plaintiffs’ remaining contentions
and find them to be without merit.
Concur--Buckley, P.J., Tom, Andrias and Gonzalez, JJ.
~ Sree RR I pre mite Se.
ta he
5a
Supreme Court of the State of New York,
First Judicial Department
Julio Cesar Wilson Stajano et al.,
Plaintiffs,
V.
United Technologies Corporation, et al.,
Defendants.
February 28, 2003
Upon the foregoing papers, it is ordered that this
motion by plaintiffs to renew and/or reargue a prior
motion, by defendants for, inter alia, summary
judgment, and for vacatur of this Court’s Order thereon
dated October 8, 2002, pursuant to CPLR 2221,
5015(a)(2) and 5015(a)(3), is denied.
Plaintiffs have not established that the Court
overlooked or misapprehended either the facts or the
law in determining the prior motion. CPLR 2221(d)(2),
(f). See Pro Brokerage, Inc. v. Home Ins. Co., 99 A.D.2d
971 (1984). Accordingly that branch of their motion
which seeks reargument is denied.
Renewal is also denied, as the allegedly new material
submitted on the instant application would not have
changed the prior determination. CPLR 2221(e)(2), (f);
CPLR 5015(a)(2). Plaintiffs additionally fail to establish
that the allegedly “newly discovered” evidence was not
in fact available to them on the original application; and
they do not proffer a satisfactory excuse for not having
submitted the “new” facts sooner. See Guerrero v.
6a
Dublin Up Corp. Of New York, 260 A.D.2d 435 (2nd
Dept. 1999); Lee v. Ogden Allied Maintenance Corp.,
226 A.D.2d 226, 227 (1st Dept. 1996), appeal dismissed
89 N.Y.2d 916 (1996). Notably, plaintiffs submit an
Affidavit, dated December 2, 2002, from one George J.
Munkenbeck, Jr., who claims -- on the basis of ill-
defined expertise derived from an equally ill-defined
professional connection with the U.S. Coast Guard -- to
have interpreted a number of government documents
from the 1950’s -- allegedly only recently de-classified --
to mean, inter alia, that defendants’ dat and witness es
on their prior application were either mistaken or else
were downright fraudulent. CPLR 5015(e). The Court
finds neither Mr. Munkenbeck’s credentials nor his
representations to be convincing.
Shirley Werner Kornreich, J.S.C
Ta
Index No. 003052/1980
SUPREME COURT OF THE STATE OF NEW
YORK
COUNTY OF NEW YORK: IAS PART 28
JULIO CESAR WILSON STAJANO and ANA
MARIA DELGATTE de STAJAN O, as parents and
natural Guardians of infant Plaintiff CHANTAL
DELGATTE STAJANO, and JULIO CESAR WISON
STAJANO and ANA MARAI DELGATTE de
STAJANO, individually,
Plaintiffs,
-against-
UNITED TECHNOLOGY CORPORATION OF NEW
YORK CITY nad UNITED TECHNOLOGIES
CORPORATION and SIKORSKY AIRCRAFT, INC.,
Defendants.
DECISION, ORDER and JUDGMENT
KORNREICH, !:
Motion sequence numbers 35, 37 and 38 are herewith
consolidated for disposition. fn1
I. BACKGROUND:
In five consolidated actions, plaintiffs Alberto Lopez,
Miguel Lopez, Julio Stajano, Robert Tochodjuklian, and
Teresa Aparicio fn2 alleged that on November 14, 1971,
they were injured when a helicopter - which had been
manufactured by the Sikorsky Aircraft division of
8a
defendants United Technologies Corporation of New
York City and United Technologies Corporation --
crashed at a waterside air show in Pocitos, Montevideo,
Uruguay. The Lopez plaintiffs originally commenced
their actions for strict products liability (e.g., defective
design, negligent manufacture, and failure to warn) in
1978, and the others in 1980. After many years of
pretrial procedural wrangling, the cases were
transferred to another jurisdiction. However, Justice
Edward Greenfield of the Supreme Court, New York
County reinstated them in this Court on February 13,
1990. fn3 Throughout their long history, the actions
have been plagued by protracted delays followed by
periods of frenetic motion practice -- e.g., applications
to strike or amend pleadings, quarrels over discovery,
and motions to dismiss or for summary judgment. By
November of 1997, all of the cases save the instant
Stajano action were resolved. Currently before the
Court are: (a) a motion by defendants seeking leave to
serve and file a Second Amended Answer (#85); (b)
defendants’ motion for summary judgment (#35); and
(c) a number of discovery-related requests made by
plaintiffs (#37 and #38).
A. The Accident:
According to a contemporaneous account of the event
published by the local Uruguayan newspaper E] Dia, on
which plaintiffs rely, the accident came about as
follows: Some 5,000 - 10,000 spectators had assembled
on a bluff and beach in Pocitos, Montevideo, Uruguay
on the afternoon of Sunday, November 14, 1971, to
witness an air show being put on by the Uruguayan
military. At approximately 5:25 p.m., Uruguayan Navy
Captain Waldemar Ferdomo as Pilot, assisted by
a"
9a
Amilear Gonzalez as Co-Pilot, got into a helicopter
(“Helicopter A’), which was parked on the bluff some
seven meters above the beach and waters of the Mar
del Plata, Beside Helicopter “A” was parked a second
helicopter of the same basic design (“Helicopter B”).
Both aircraft had been purchased by Uruguay from the
U.S. government in 1971. fn4
Perdomo and Gonzalez undertook to demonstrate that
Helicopter A could transport a jeep across the water.
“For this,” the translated El Dia article explains, the
pilots’ “land helpers placed strong belts to the vehicles
sic forming a mooring. This was hung at one of the
aircraft’s flanks by means of a small crane.” For reasons
that are not explained, the operation did not run
smoothly, and “the pilot had to make several attempts
to haul the vehicle up.” At length, the “land helpers”
managed to secure the “belts” around the jeep in such a
way that the helicopter could lift into the air with the
jeep “hanging beneath it”. fn5
The helicopter with its dangling jeep flew out over the
ocean. However, suddenly one of the “belts” booked to
the front of the jeep came “unfastened,” and the
released corner of the vehicle Sagged sharply
downward. When the jeep became unbalanced, the
helicopter’s center of gravity shifted and the aircraft
began to lose altitude. The pilot headed back to shore,
intending, apparently, to land the helicopter near where
the flight had originated. However, as Helicopter A,
progressively losing altitude, approached the bluff
where Helicopter B was still idling, the jeep slammed
into the side of the cliff. The impact yanked the
helicopter forward and down, causing it to crash onto
the top of the still-parked Helicopter B -- with great
10a
force and with its propeller still rotating. The fuel tanks
of both aircraft exploded. In the ensuing conflagration,
metal projectiles -- e.g., shards of rotor blades, and
bullets from the machine Bans that had been inside the
two cockpits -- erupted in all directions, dismembering
and killing eight people instantly, and injuring 40-100
others. Miraculously, the crew of both aircraft,
including Pilot Waldemar Ferdomo and Co-Pilot
Amilcar Gonzalez, managed to escape with their lives.
B. Plaintiffs’ Theoryof Defendants’ Liability:
Plaintiffs, who were children at the -time of this
accident, were among the injured. To date, they have
not been successfully deposed or medically examined by
the defendants. fn6 In addition, plaintiffs’ counsel has
apparently never interviewed Pilot Perdomo, Co-Pilot
Gonzalez, other passengers on Helicopter A (if any), the
‘and helpers” who fastened the jeep to the aircraft,
personnel on Helicopter B, or any of the spectators --
save one -- at the air show. The sole version of the
foregoing events that has been supplied to the
defendants and to this Court by plaintiffs is contained
in newspaper articles such as the El Dia item
summarized above, and in an affidavit from one air
show witness, Carlos Tochodjuklian, dated March 1999.
Tochodjuklian’s account contains no description of how
the jeep was attached to the helicopter. His narrative
regarding the how the collision came about tracks that
of the El Dia journalist, except for the addition of the
following sentence at the end of Tochodjuklian’s
affidavit: “The carrying hook connected to the bottom
of the lifting helicopter never opened from the time the
helicopter was over the water until the time the jeep
struck the rocks.”
lla
Plaintiffs’ original expert, Robert N okes, is a retired
pilot and yendor of Sikorsky helicopter parts. Nokes
drafted several affidavits between December 1998 and
May 2002, during the course of which plaintiffs’ theory
of the accident may be said to have evolved. Briefly,
Nokes suggests that the electrical “cargo release”
switch on the pilot’s and co-pilot’s cyclic control sticks
“must have” malfunctioned (“manufacturing defect #1”);
that the back-up mechanical cargo release pedal on the
cockpit floor next to the pilot’s right foot “must have”
failed as well (“manufacturing defect #2”), and that the
design of the aircraft was defective because there was
no redundant “foot pedal” close to the co-pilot by means
of which the jeep could have been jettisoned (“design
defect #1”). A comprehensive exposition of plaintiffs’
basic theory of defendants’ liability is supplied by
Nokes on (unnumbered) pages 3-4 of his Affidavit dated
March 29, 1999, as follows:
Helicopter pilots receive a great deal of instruction in
carrying external loads. Part of this instruction includes
the drumming into them that if anything goes wrong
while carrying an external load, the first thing they are
to do is to release the load. This is called ‘pickle the
load.’ Instructors emphasize the fact that no load is
worth endangering the aircraft.
If one of the straps holding the Jeep came loose, as it
appears in the photographs, this instability would
immediately be noticed by the pilot. He would feel a
Jerk’ throughout the aircraft when the strap carne
loose. The photos I examined clearly show the load
tilting downward. The pilot, by reflex, would
immediately attempt to ‘pickle’ (release) the load by
means of the electrical release button located on his
12a
control stick. Upon realization this action did not in fact
release the load, he would have to have the co-pilot take
control of the pedals, while he attempted to
mechanically release the load utilizing the emergency
load release pedal located on the floor to his right. In
order to accomplish this maneuver, he must take his
feet off the control pedals. The emergency release is a
vertically operated, spring loaded device. located on the
right side of the cockpit floor and must be activated by
the pilot’s right foot.
It is logical to assume that the electrical and mechanical
release mechanisms failed on this aircraft.
Both pilot and co-pilot have electrical release capability
so both would automatically use their reflex actions to
attempt to release the load. However, in this model
helicopter only one emergency mechanical release is
available. This is located on the floor to the right of the
pilot. The co-pilot cannot avail himself of this release
mechanism. He is completely blocked from using it by
the center console.
One can conclude that this equipment failed to function
by reason of a manufacturing defect, a design defect, or at
both. This model helicopter is designed without a dual |
[mechanical] emergency release system There is no
other emergency or fail-safe method of opening the |
cargo book under the conditions described (emphases
supplied).
C. Discovery regarding inter alia, the helicopter’
design:
After twice having had their Note of Issue stricken for
aici
13a
failure to complete discovery, on February 16, 2000,
plaintiffs filed a third Note of Issue, in accordance with
an oral Order of Justice Schoenfeld, issued in chambers
on February 9, 2000, allowing discovery to continue
while the case remained on the trial calendar.
Defendants again moved to strike and for assorted
other relief, while plaintiffs cross-moved to preclude, to
compel defendants to produce a witness with
knowledge for deposition, and for depositions of certain
out-of-state witnesses * among other things.
In his 28-page Order dated January 11, 2001, Justice
Schoenfeld formally allowed discovery to continue
while the case remained on the trial calendar. The
Court did direct, however, that all discovery had to be
concluded by March 9, 2001, including, inter alia ,
depositions and physical examinations of the plaintiffs
in New York City; Mr. Heller’s depositions of two out-
of-state witnesses who were allegedly knowledgeable
about defendants’ helicopters (depositions which in fact
the Court had already authorized in a prior Order dated
January 4, 2000, but which Mr. Heller had never set
up); and a deposition of a party witness for defendants -
to the extent possible, a person “with knowledge” “of
the HSS-1’s design, manufacture, maintenance, sales,
servicing, repair and alteration to cargo lifting
capabilities.”
Mr. Heller once again failed to make the necessary
arrangements to depose the two out-of-state witnesses.
The fiasco attending the depositions and medical
examinations of the plaintiffs in March-May 2001 has
already been described in footnote 6, above. Finally,
defendant’s witness -- retired Professional Engineer
Leon Jacobson, who had worked for Sikorsky between
l4a
1953 and 1990, as, inter alia, its Director of Aircraft
Design - was produced for deposition on January 25 and
26, 2001. When the deposition broke off at 4:50 p.m. on
the second day, Mr. Heller announced that he did not
consider the EBT of Jacobson to be concluded.
Nevertheless, Mr. Heller did not thereafter schedule its
resumption; and he did not respond to defendants’
counsel’s letter of February 7, 2001 offering to produce
Mr. Jacobson to complete his deposition before the
Court’s March 9, 2001 deadline.
Defendants have now supplied a comprehensive dossier
of printed materials, documenting the evolution of the
subject helicopter’s design. As a guide to these
materials, Leon Jacobson has presented a 30-page
Affidavit, dated July 18, 2001. Plaintiffs in the
meantime have also retained an engineering expert,
one Robert J. Waldron, Ph.D., a metallurgist who
specializes in the investigation of aircraft accidents --
particularly ones involving helicopters. Dr. Waldron
has submitted a $-page affidavit, dated November 16,
2001, in which he basically subscribes to Mr. Nokes’s
theory of the case -- viz., that both the electrical and
mechanical cargo release systems “must have”
malfunctioned in Ferdomo’s helicopter, and that the
release system in the aircraft had been badly designed,
inter alia, for failing to have a redundant foot pedal on
the co-pilot’s side of the cockpit.
Mr. Jacobson and Dr. Waldron are in agreement
regarding the evolution of the subject helicopter, which
Dr. Waldron characterizes as “the military helicopter
identified as BUNO 143941.” The prototype,
denominated XHSS-1, was conceived by Sikorsky
Aircraft in or around 1952 as a military aircraft
l5a
designed to assist in anti-submarine warfare. During
the 1959s and thereafter, the U.S. Navy operated a
Bureau of Naval Weapons Office (“BNWO”) on the
Connecticut premises of Sikorsky Aircraft, under the
supervision of a civilian engineer named Leo Miller.
Miller and ten other BNWO engineers worked closely
with Sikorsky Aircraft engineers to ensure that the
company’s helicopter configurations conformed with the
government’s various aircraft detail specifications. This
was necessary, inter alia, because the XHSS-1 family of
helicopters was intended to be launched from Navy
cruisers and carriers, for the purpose of, inter alia,
seeking out and/or attacking enemy submarines.
Among the “offspring” of the XHSS-1 were the HUS-1
and the HSS-1. The HUS-1 model came equipped with
an external cargo carrying sling, a sling installation, a
cargo hook with an automatic load release (i.e., that
would release the cargo when it touched the ground),
and normal and emergency release controls inside the
cockpit. The U.S. Navy Detail Specifications that
Sikorsky was to follow in creating the Model HUS-1
helicopter fill 150 pages.
The HSS-1 model at issue here, however, was a variant
of the HUS-1. It was designed to carry two pilots and
two sonar operators if sent out on a “search,” or two
crewmen and two MK 43 torpedoes if dispatched to
“attack.” Unlike the HUS-1, the HSS-1 did not have an
external cargo-carrying sling. Rather, with respect to
the HSS-1, the U.S. Navy’s Detail Specifications
required only that “strength” would be provided in the
fuselage in order to permit the possible future
installation of a cargo sling. To quote plaintiffs’
engineering expert, Dr. Waldron:
16a
The accident helicopter (BUNO 143941) was delivered
to the U S. Navy as a Model HSS-1 helicopter. The first
HSS-1 helicopter was delivered to the U.S. Navy in
March 1955. BUNO 143941 was delivered on December
9, 1957. The primary mission of the Model HSS-1 was as
-an anti-submarine search and-attack., helicopter.
The HSS-1 model (including BUNO 143941) was not
delivered to the U.S. Navy equipped with an external
sling assembly. However, the design requirement
specification . . . did include [that] ... ‘[s]trength shall be
provided in the fuselage structure for the possible
future installation of a cargo sling capable of carrying
4000 pounds external load [later upgraded to 5000
pounds] ....fn7
When, on December 9, 1957, Sikorsky Aircraft
delivered the instant HSS; 1 BUNO 143941 to the
Navy, the U.S. Navy inspector accepting shipment
signed a document (“Form DD 250”) certifying that the
aircraft conformed to the government’s contract
specifications (ie., the design dictated in “U.S.N. Detail
Spec. SD-493-1-1 dated 26 April 1956”). See Exhibit 6 to
Jacobson Affidavit. Before the government received
the instant HSS-1, it had already taken delivery of 184
similar HSS- |’s produced by Sikorsky Aircraft, and
would subsequently take delivery of an additional 30.
It is not disputed that after the BUNO 143941 was
delivered by defendants to the U.S.Navy on December
9, 1957, it was never returned to any Sikorsky Aircraft
plant for any reason at any time. Rather, BUNO 143941
remained in the service of the U.S. Navy for the next 13
years, during which period the Navy modified and
renamed BUNO-143941 several times before retiring it
17a
in 1970.
Of relevance to this lawsuit is the 1964-1966 conversion
of the BUNO 143941 into an external cargo-carrying
UH-34J. In the words of plaintiffs’ expert, Dr. Waldron:
“On December 5, 1964, BUNO 143941 was designated
as a Model UH-34J. Conversion to a Model UH-34J
included installation of an external cargo sling assembly
which the HSS-1 was originally designed to
accommodate.” The modification was performed by
Navy engineers, using Sikorsky-supplied drawings and
parts which had previously been approved by the U.S.
Navy for use in the Sikorsky HUS-1. The conversion
included the U.S. Navy’s own “Cargo Hooks Parts Kit,”
consisting of, inter alia, a “Cargo Release Hook”
manufactured by Eastern Rotorcraft Corp. of Willow
Grove, Pennsylvania. Defendants admit that Sikorsky
had supplied the original drawing on which Eastern
Rotorcraft cargo release hook was based. However,
BNWO.had approved all of Sikorsky’s drawings, and
had similarly approved Eastern Rotorcraft’s execution
of the Sikorsky design. Indeed, the documentary
evidence reflects that the Navy was aware of an
alternative design which would have provided for a
“dual” mechanical cargo release on the co-pilot’s side of
the cockpit, but expressly rejected it.
The BUNO 143941 was retired from Navy service in
1970 and sold to the Uruguayan govemment in 1971. By
1975, 830 Sikorsky helicopters were in the air around
the world and, according to Mr. Jacobson’s researches,
not one of them had occasioned any report or complaint
regarding “any incident or accident caused by the
failure of any external cargo load from any helicopter.”
18a
II. DISCUSSION:
A. Defendants’ Motion or Leave to Amend their
Answer:
In Motion #35, defendants seek an order granting them
leave to serve and file a Second Amended Answer
adding two new “federal government contractor” anc
“contract specification” defenses, and granting them
summary judgment dismissing plaintiffs’ design defect,
manufacturing defect and failure to warn claims.
Plaintiffs have “cross-moved” to deny defendants’
application, and for an order dismissing all of
defendants’ “military contractor defenses.”
Defendants originally moved in 1992 to add as an eighth ©
affirmative defense a claim that plaintiffs’ action was
barred by “the government contractor defense.” In its
Order dated March 24, 1992, the Court granted
defendants’ motion- although it instructed them to
more specifically elaborate the new defense in their
Amended answer, in light of the fact that plaintiffs’
current theory of liability was that “the lifting
mechanism with which the helicopters were equipped
was [somehow] defective.” Accordingly, the eighth
Affirmative Defense in defendants’ Amended
Complaint, served on September 15, 1992, recited that
the BUNO 143941 that Sikorsky had delivered to the
U.S. Navy on December 9, 1957 conformed in all
respects to the Navy’s specifications, and was certified
to be in compliance by the government official who had
accepted delivery of the aircraft. Affirmative Defense
#8 went on to allege that at no time subsequent to
delivery did Sikorsky make any modifications to the
aircraft; that at no time was it aware of any dangers
19a
attending its use that were unknown to the U.S. Navy;
and that plaintiffs’ lawsuits were barred in
consequence.
In proposed Affirmative Defense #9, defendants
underscore that they are similarly not liable for the
U.S. Navy’s 19641966 conversion of the BUNO from a
non-cargo-carrying SH-34J helicopter into a cargo-
carrying UH-341 model, because the conversion was
accomplished by the Navy in accordance with
government specifications. Moreover, in Proposed
Affirmative Defense #10, defendants contend that to
the extent that the original design and subsequent
conversion were accomplished using Sikorsky drawings
and/or equipment, Sikorsky is without liability because
all such “drawings and/or equipment are [similarly]
covered by the federal government contractor defense
and the contract specification defense.”
It is well established that “{a] party may amend his
pleading ... at any time by leave of court ... Leave shall
be freely given upon such terms as may be just ....”
CPLR 3025. While “lateness” can pose an impediment
to amendment, to defeat amendment the “lateness”
must cause “significant prejudice” to the opposing
party. See Abdelnabi v. New York City Transit
Authority, 273 A.D.2d 114 (1st Dept. 2000); Prote
Contracting Co.. Inc. v. Board of Education of the City
of New York, 249 A.D.2d 178 (1st Dept. 1998).
Plaintiffs complain of the passage of more than 30 years
since the happening of the within accident. However,
the Court notes that the majority of the delays in the
instant litigation are attributable to plaintiffs’ counsel’s
tactics. For example, it was not until 1998 that plaintiffs
20a
began to narrow their theory of the case to “something
wrong with the cargo release system,” with the result
that defendants were perforce delayed in articulating
the details of their defense. In addition, the basic
general “federal government contractor” defense was
interposed in 1992, so that plaintiffs have been aware of
the theory for ten years. The amendments proposed
here merely amplify this original “contract specification
defense,” extending to the helicopter’s subsequent
modification the basic principle that when the
government or a private person retains control over a
product’s final design and manufacture, then the
contractor is not responsible to third parties for the
purchaser’s choices - unless the plans and specifications
are so apparently defective that a contractor of
ordinary prudence would be put on notice that they
were likely to cause injury. See, e.g., Boyle v. United
Technologies Corp., 487 U.S. 500 (1988).
Since plaintiffs have not demonstrated how they are
prejudiced or surprised by the proposed amendments,
defendants’ motion is granted to the extent that their
answer is deemed to interpose Affirmative Defenses #9
and #10, nunc pro tunc.
Also granted is defendants’ application to correct
paragraph 2 of their answer. As is apparent from
documentation served upon the plaintiffs in 1998, the
BUNO 143941 that defendants delivered to the U.S.
Navy on December 9, 1957 was a model HSS-1, not an
H-34.
B. Defendants’ Motion for Summary Judgment.
1) Threshold issues:
2la
Plaintiffs protest that defendants’ summary judgment
motion should be denied because it was served more
than 120 days after they filed their (third) Note of Issue
on February 16, 2000. CPLR 3212(a).
As a threshold matter, the 120-day limit was enacted to
discourage “the practice of ‘eleventh hour’ summary
judgment motions” made on the eve of trial. Gonzalez
v. 98 Mag Leasing Corp., 95 N.Y.2d 124, 128-129 (2000);
Cibener v. City of New York, 268 A.D.2d 334 (1st Dept.
2000). Here, a trial is not imminent, as “discovery” has
been continuing notwithstanding the filing of a Note of
Issue. See Gonzalez v. Mag Leasing Corp., supra
Accordingly, the policy that prompted the enactment of
the 120-day time limitation is not at issue.
Moreover, the Court has authority to permit a party to
serve a motion for summary judgment more than 120
days after the filing of a Note of Issue when “good
cause” is shown for tardiness in bringing the motion.
See, Luciano v. Apple Maintenance Services Inc.,
289 A.D.2d 90 (1st Dept. 2001); CPLR 3212 (a). The
court’s discretion in determining adequate cause is
broad, and it may extend the time period to permit a
belated but meritorious motion in the interest of
judicial economy where the opposing party has not
manifested any prejudice. McKay v. Ciani, 280 A.D.2d
808, 809 (8rd Dept. 2001), leave denied 96 N.Y.2d 713
(2001). As has been repeatedly emphasized, a motion for
summary judgment should not be denied on technical
grounds without regard to the merits of the application.
See Milne v. Cheema, 270 A.D.2d 165 (1” Dept. 2000).
As will be discussed below, defendants’ application is
meritorious, and plaintiffs have failed to present any
evidence raising a triable issue of fact as to their
22a
entitlement to judgment as a matter of law. Furthier,
plaintiffs have not indicated how they are prejudiced by
the delay. Accordingly, the Court rules, in an exercis*
of its discretion, that the instant summary judgmest
motion is not “too late” even though served more that.
120 days after plaintiffs’ filing of a Note of Issue.
Nor is defendants’ motion “premature” because of
“incomplete discovery” - _ plaintiffs’ alternative
argument. The Court notes that according to Justice
Schoenfeld’s Order of January 11, 2001, all discovery
was required to be concluded by March 9, 2001. The
record currently before the Court is now complete with
regard to: (a) the details of BUNO 143941’s design, pans
and equipment when Sikorsky Aircraft delivered it to
the U.S. Navy in 1957 as an HSS-1; (b) the subsequent
U.S. Navy operational and modification history of
BUNO 143941; and (c) the origin, character, design and
components of the exterior cargo carrying system and
hook installed in the subject aircraft in 1964-1966.
Plaintiffs, in contrast, have failed to adhere to Justice
Schoenfeld’s discovery schedule, have failed to adduce
any cognizable evidence supporting their design defect,
manufacturing defect or failure to warn claims, and
have failed even to identify what outstanding
“discovery” would, at this late date, aid them in
refuting defendants’ case.
Additionally, defendants are not barred from moving
for summary judgment on the ground that they have
made a prior unsuccessful motion for this relief.
Voluminous materials have been submitted on the
instant motion which satisfactorily resolve a number of
factual questions that remained unsettled at the time of
defendants’ prior application. See Sansol Indus., Ince. v.
a ac
23a
345 East 56th Street Owners, Inc.,276 A.D.2d 370 (1”
Dept. 2000); Freeze Right Refrigeration and Air
Conditioning Services, Inc, v. City of New York, 101
A.D.2d 175 (1st Dept. 1984). For example, when it
affirmed the denial of defendants’ prior motion. for
summary judgment in June of 2000, the First
Department noted that “disclosure on the issues of
design[, installation] and manufacture [of the
helicopter’s external cargo carrying system] is
incomplete” Stajano v. United Technologies Corp. of
New York, 273 A.Md 162 (1st Dept. 2000). The record is
now replete with evidence as to how the accident
helicopter and its external cargo carrier were designed,
manufactured and_ installed. Finally, the instant
summary judgment application is based on a legal
theory (“contract specification defense”) different from
the one advanced on the prior summary judgment
motion (“causation”). See Santini v. Alexander Grant,
Inc., 272 AD.2d 271 (1st Dept. 2000).
2) Substantive issues:
In Boyle v. United Technologies Corp., supra, the U.S.
Supreme Court held that a court could not impose tort
liability on a U.S. government contractor for design
defects in military equipment pursuant to state law
where (1) the United States had approved reasonably
precise specifications for the equipment; (2) the
equipment conformed to those specifications; and (3)
the contractor warned the United States about the
dangers in the use of the equipment that were known to
the supplier but not to the United States. The
“government contractor immunity” defense is derived
from the government’s immunity from suit where the
performance of a discretionary function is at issue.
24a
Boyle, supra at 511. The selection of an appropriate
design for military equipment for use by the Armed
Forces has been identified as a quintessentially
discretionary function.
Boyle Prong #1: “Reasonably precise specifications
approved by the government” (plaintiffs’ “design
defect” theory):
The government need not itself have prepared the
challenged equipment’s specifications to be considered
to have approved them. See Trevino v. General
Dynamics, 865 F.2d 1474, 1480 (5th Cir. 1989), cert.
denied 493 U.S. 935 (1989) (“substantive review” of
technology by government sufficient to trigger
defense). In this case, however, it is clear from
defendants’ submissions -- and, indeed, it is equally
clear from plaintiffs’ submissions -- that the U.S. Navy
approved reasonably precise specifications for the
original BUNO 143941 helicopter that it accepted in
1957, and that it was the U.S. Navy which decided upon
the design of the external cargo sling and hook
assembly that was installed in 1964-1966.
That the government did not merely “review,” but
rather actively participated in the original design and
construction of the aircraft as a whole is evidenced by
the existence of elaborate Navy Detail Specification
manuals that the contractor was obliged to follow in
creating its series of submarine-tracking helicopters
during the 1950’s. Government participation in the
design phase of the aircraft’s engineering also is
apparent from the active, on-site involvement of
engineers like Leo Miller of the Navy’s Bureau of Naval
Weapons Office during the early years of the
25a
helicopter’s development. See In Re Air Disaster a
Ramstein Air Base Germany on August 29, 19 , 81 F.3d
570 (5th Cir. 1996), cert. denied 519 U.S. 1028 (1996).
Defendants have thus demonstrated that this is not
merely a case where the U.S. government simply and
without more “rubber stamped” a drawing submitted to
it by the contractor. Cf. Snell v. Bell Helicopter Inc.,
107 F.3d 744 (9th Cir. 1997); Trevino v. General
Dynamics, supra, cert.denied 493 U.S. (1989).
Plaintiffs’ counsel’s objection that the basic design was
Sikorsky’s, and that components of the helicopter still
bear Sikorsky decals or “proprietary certificates,”
overlooks the fact that military hardware does not
suddenly spring into being from initial design and
procurement specifications, but evolves through
drawings, blueprints and mockups agreed upon by the
parties. The ultimate design of the product is
determined not only by the original procurement and
contract specifications, but also by specific quantitative
engineering analysis developed during the actual
production process. *** The N avy reserved the right to
reject drawings and to require revisions and
modifications. Tbese working drawings, and not simply
the general qualitative specifications from the
procurement stage, comprise ‘the reasonably precise
specifications’ contemplated by Boyle...
Kleeman v. McDonnell Douglas Corp., 890 F.2d 698 (4th
Cir. 1.989). In other words, a design may have both
started out and ended up with a “Sikorsky” proprietary
designation, but may have undergone numerous
modifications dictated by N avy engineers along the
way.
26a
The Boyle Court expressly rejected another, related
_theory relied ca by plaintiffs, namely, that liability
“might attach depending on how much of a design was
ultimately traceable to the contractor versus how much
was dictated by the government. Id. at 513. Rather,
according to Boyle, a contractor will be completely
immunized in all instances where the government
actually participated in discretionary design decisions
affecting the choice of technology either by designing
the product itself, or by approving the specifications
prepared by the contractor. See also Harduvel v.
General Dynamics Corp., 878 F.2d 1311, 1315 (11th Cir.
1989), cert. denied 494 U.S. 1030 (1990; cf. Shaw v.
Gruman Aerospace Corp., 778 F.2d 736 (11th Cir. 1985),
cert. denied 487 U.S. 1233 (1988), overruled by Boyle,
supra.
In an alternative argument, plaintiffs’ counsel devotes
many pages of his attorney’s affirmation in support of
his clients’ “cross-motion” to an exposition of the
theory, apparently of his own devising, that the BUNO
143941 is “descended” from an original “civilian’ S-58
helicopter dating from 1952, with the result that the
“government contractor” defense is inapplicable. Aside
from the fact that there is no expert affirmation
supporting this contention, it appears from, inter alia,
the “helicopter genealogy” that counsel appends to his
“cross-motion” papers (the authenticity of which is
unclear) that “S-58” was originally the generic
designation of a whole family of (mostly military)
helicopters, including the HSS-l. The “genealogy” :
reflects that a specific cargo-carrying “S-58,” which
might or might not be a civilian aircraft, was a cousin
and not a direct progenitor of the XHSS-1. The XHSS-1
was the father or grandfather of the HSS-1 at issue
27a
here. See Plaintiffs’ Exhibit 11. It is worthy of note that
nowhere in the Report of plaintiffs’ engineering expert,
Dr. Waldron, is such a theory supported. Instead, Dr.
Waldron expressly refers to the subject BUNO 143941
throughout his discussion of it as a “military
helicopter.” Indeed, Dr. Waldron relates on page 3 of
his November 16, 2001 “Report” that
U.S. Federal Aviation Administration (FAA)
documents verify that the models HSS-1 and UH-34J
are the same basic helicopter. Surplus military
helicopters such as the HSS-I can be certified by the
FAA and enter the commercial market. The FAA
Helicopter Specification No. 1H11 ... includes a list of
military models which are eligible for certification as a
civil model. Both the HSS-1 (original delivery
configuration of BUNO 143941) and the UH-34J (final
‘modified’ configuration) are eligible to be certified as
the same civil. model, i.e., the S-58B.
In any event, even if it were true that the subject
military helicopter had evolved from an earlier civilian
prototype, this would not alter the fact that, after years
of engineering “give and take” with the Navy,
Sikorsky’s final product incorporated Navy
specifications.
Accordingly, it is clear from all of the evidence
summarized above that defendants have satisfied prong
#1 of the Boyle test, in that they have demonstrated
that the government promulgated “reasonably precise
specifications” for the design of the subject aircraft as
well as for the later-installed external cargo harness
and hook, both by actively engaging in the development
process and in “substantively reviewing” the finished
product.
Boyle prong #2: “The equipment conformed to the
specifications” plan manufacturing defect” theory):
As was held in Kerstetter, supra, a plaintiff claiming
injury due to a product’s nonconformance with a
government specification must allege more than that
the ultimate design feature does not achieve its
intended goal. The complained-of “manufacturing
defect” must exist independently of the design itself,
and must result from a deviation from the required
military specifications. Extensive government
involvement in the design, review, development and
testing of a product, as well as extensive acceptance
and use of the product following production, is evidence
that the product line generally conformed with the
government-approved specifications. See In Re Air
Disaster at Ramstein Air Base. Germany, on August
29. 1990, supra.
The Navy’s issuance to Sikorsky of its DD 250 form
officially accepting the original aircraft on December 9,
1957 constitutes evidence that the BUNO 14291
conformed to the government’s specifications. See
Harduvel v. General Dynamics Com, supra; Hendrix v.
Bell Helicopter Textron, Inc., 634 F.Supp. 1551 (N.D.
Tex. 1986) (issuance by government of DD250
acceptance “conclusively established” that helicopter
conformed to contract specifications). Moreover, the
fact that the U.S. government operated HSS-1 aircraft,
as well as HUS-1 and UH- 34J equipment -- all of which
were essentially identical to the BUNO 143941 at issue
here -- for more than a decade before the happening of
this accident serves to establish, without more, that the
29a
Sikorsky equipment conformed to specifications, and
that the government was as aware of any difficulties
with the aircraft as Sikorsky was. See Smith v. Xerox
Corp., 866 F.2d 135 (5th Cir. 1989) (government’s
acceptance and extended use vf product establishes
product’s conformity with government specifications).
Finally, as indicated, in 1964-1966 U.S. Navy engineers
selected the external cargo sling assembly design for
the: subject BUNO 143941, installed it themselves, and
operated the modified aircraft in the field for many
years before the happening of this accident. The
defendants therefore have satisfied the second prong of
the Boyle test, in that all of the evidence in the record
supports the conclusion that the helicopter, as modified,
conformed to government specifications.
In a case like this one, where a “federal government
contract” defense is legitimately raised, Prong #2 of the
Boyle inquiry replaces conventional State. law product
liability analysis usually applied to “manufacturing
defect” claims. However, the reasoning is analogous.
Indeed, even if State law were to be applied, plaintiffs
have failed to articulate any facts or submit any
evidence tending to prove that BUNO 143941 suffered
from any manufacturing defects attributable to
defendants. In other words, there has been no proof
that Sikorsky failed to manufacture its helicopter in
conformity with its approved design, or that its
subsequentlyinstalled external cargo components were
irregular -- in the absence of which there can be no
claim of a manufacturing defect, even under State law.
See Lombard v. Centrico, Inc., 161 A.D.2d 1071 (3rd
Dept. 1990); Shelden v. Hample Equip., Co., 89 A.D.2d
766 (3rd Dept. 1982), aff'd 59 N.Y.2d 618 (1983) (“since
there was no direct proof of any defect ia the [appliance
30a
that injured plaintiff], plaintiff was required to exclude
all causes of the. accident not attributable to
defendants”). A manufacturing defect cannot be
inferred where the evidence is equally consistent with
nonliability as with liability. Sheldon, supra.
Boyle prong #3; “Contractors duty to warn
government about dangers not known to the
government (plaintiffs’ “failure to warn” theory):
As Boyle makes clear, a military contractor is obliged to
warn only the U.S. government about those equipment
dangers that are known to the contractor but not to the
- government. See Kerstetter v. Pacific Scientific Co.,
210 F.3d 431 (5th Cir., 2000), cert. denied 531 U.S. 919
(2000); Tate v. Boeing Helicopters, 140 F.3d 654 (6th
Cir. 1998) (“Tate II”); Tate v. Boeing Helicopters, 55
F.3d 1150 (6th Cir. 1995) (“Tate I”); Trevino v. General
Dynamics Corp., supra. Such a contractor has no
obligation to “warn” remote, third-party users.
In addition, a contractor can satisfy prong #3 of the
Boyle test if it shows that it had no “actual” knowledge
of the alleged design defect that purportedly caused an
accident. That is, a contractor is immunized from state
tort liability even in cases where it did not warn of a
latent defect that neither it nor the government
considered at all during the design and manufacturing
process. Kerstetter v. Pacific Scientific Co., supra.
Here, defendants have produced uncontradicted
evidence that Sikorsky had no record of any complaints
about the cargo-releasing mechanism at issue, and so
had no knowledge of any peril about which it should
have alerted the U.S. Navy.
3la
Plaintiffs argue that defendants fail to satisfy prong #3
of the Boyle test in that Sikorsky knew or had reason to
know that the failure to incorporate a redundant
mechanical cargo release at the co-pilot’s foot would
prove dangerous when the crew needed to jettison
external cargo during an emergency, when the pilot
would foreseeably be preoccupied with more pressing
matters. It is plaintiffs’ contention that the omission of
this second foot pedal constitutes a “design defect,” and
that Sikorsky’s failure to bring it to the U.S. Navy’s
attention amounts to concealment of a danger known to
the supplier but not to the United States. However, as
related above, when the Navy undertook to install an
external cargo sling assembly on the BUNO 143941 in
1964-1966, it expressly rejected a design that would
have included a co-pilot’s-side foot-pedal cargo-release.
Had the absence of this co-pilot’s side foot pedal posed
an actual danger, it is reasonable to assume that the
Navy would have become aware of it during the several
years that it used the modified helicopter before
retiring it. See In Re Air Disaster at Ramstein Air
Base. Germany, on August 29. 1990, supra; Zinck v. ITT
Corp., 690 F.Supp. 1331 (S.D.N.Y. 1988). Plaintiffs have
accordingly failed to show that the helicopter or its
cargo-releasing mechanism suffered from any “actual”
problems that were known to the manufacturer but not
to the United States.
Conclusion:
Defendants are entitled to dismissal of all of plaintiffs’
design defect claims, since they have demonstrated
without serious opposition that they manufactured and
delivered a product that was designed in accordance
with “reasonably precise” government specifications.
32a
They are also entitled to dismissal of plaintiffs’
“manufacturing defect” claims, because the U.S. Navy
certified that the product met with its requirements
upon accepting it, and the Navy thereafter modified the
helicopter in accordance with its own plans and designs.
Finally, defendants have demonstrated their
entitlement to dismissal of plaintiffs’ “failure to :varn”
claims, by showing that the contractor did not fail to
alert the United States about dangers in the design
and/or use of the equipment that were known to it but
not to the United States. See Beckles v. General
Electric Co., 248 A.D.2d 575 (2nd Dept. 1998), leave
denied 92 N.Y.2d 805 (1998). fn8
Accordingly, it is
ORDERED that that branch of defendants’ motion
which seeks leave to amend their answers herein is
granted, and the amended answers in the proposed
form annexed to the moving papers shall be deemed
served nunc pro vunc upon service of a copy of this
order with notice of entry; and it is further
ORDERED that that branch of defendants’ motion
which seeks summary judgment on the basis of their
government contractor defenses is granted, and the
complaints are dismissed in their entirety, with costs
and disbursements to defendants as taxed by the Clerk
of the Court upon submission of an appropriate bill of
costs; and it is further
ORDERED that all other motions and cross-motions
pending before the Court in these actions are denied as
academic fn9; and it is further
33a
ORDERED that the Clerk is directed to enter
judgment accordingly.
Dated: October 8, 2002
New York, New York
SHIRLEY WERNER KORNREICH
Footnotes
fnl Motion sequence numbers 28, 29, 30, 32 and 33 are
not addressed herein. Those motions are still pending
before Justice Martin Schoenfeld, the Judge previously
assigned to these cases.
fn2 By order dated August 20, 1997, the following
actions were consolidated: 7469/78 (Alberto Lopez);
7473/78 (Miguel Lopez); 3052/80 (Stajano); 3051/80
(Tochodjuklian); and 3595/80 (Aparicio).
fn3 The early procedural history of these cases can be
gleaned from Cappellini v. United Technology of New.
York, 79 A.D.2d 593 (ist Dept. 1980) (conditionally
dismissing actions and allowing them to be instituted in
Uruguay or Connecticut) and Cesa. v. United
Technology of of New York, 148 Misc.2d 918 (Sup. Ct.,
N.Y. County 1990), aff'd 173 A.D.2d 394 (1st Dept.1991)
(reinstating the actions in New York).
fn4 The two helicopters have numerous model and
serial numbers, based on who is doing the designating.
Both ae considered Model S-58 by civilian authorities;
H-34A by the United States Army; H-34 by the U‘S.
Air Force; HSS-1 by the U.S. Navy; and HUS-1 by the
U.S. Marines. One has, at a minimum, serial numbers
34a
143934 and 58698, while the other has, at a minimum,
serial numbers 143941 and 58722. The Uruguayan Navy
apparently designated the two craft as A-061 and A-
062, respectively. The evolution of the helicopter design
at issue here will be discussed in greater detail later in
this Decision.
fn5 Plaintiffs’ counsel volunteers in an Affirmation
dated May 11, 1999 that these “belts” created a species
of conventional harness for transporting jeeps over
water, which counsel calls a “four-legged type of sling”
or a “four-legged bridle.” According to counsel, one belt
would have been secured to each of the jeep’s four
quarters, and all four belts would have met for
fastening at the “external cargo hook” protruding from
the belly of the aircraft. However, aside from plaintiffs’
counsel’s say-so, and in light of the crew’s difficulties in
fastening the jeep to the helicopter, there is nothing in
the record to support Mr. Heller’s conclusion that the
operation was a routine securing of a “four-legged
bridle” to an “external cargo hook.”
fn6 The record reflects that in March-May 2001, several
of the plaintiffs traveled to New York to be deposed
and to undergo independent physical/psychiatric
examinations. However, because of the disruptive
behavior of plaintiffs’ counsel, Mr. Heller, during these
examinations, Justice Schoenfeld appointed Mr. Leslie
Lowenstein as a Special Referee to supervise the
proceedings. Mr. Lowenstein subsequently submitted a
report in which he castigated Mr. Heller for the
deliberate campaign of disruption that he had mounted
during the examinations of his clients. Mr. Lowenstein
related that Mr. Heller relentlessly caviled at
questions, interrupted, objected, argued, and threw
35a
temper tantrums, thereby effectively destroying the
examiners’ ability to conduct their inquiries. In the end,
Mr. Lowenstein recommended that Mr. Heller be held
in contempt and be sanctioned for, inter alia,
“shred[ding] the very fabric of the legal system in
which he practices.”
fn7 Aside from Mr. Nokes’ conjecture in an Affidavit
dated November 21, 2001 that “a jeep” usually weighs
“approximately 2,200-2,300 pounds,” there is no
admissible evidence in the record of the actual weight
of the jeep involved in the within accident. The jeep and
both helicopters were completely destroyed in the
accident.
fn8 Parenthetically, it is worthy of note that even
without the government contractor defense, plaintiffs
have no case. Plaintiffs’ entire theory of this case is
based upon the unfounded assumption that when one of
the “belts” securing the jeep to the helicopter snapped
open, the pilot and the co-pilot instinctively resorted to
their electrical releases to no avail, and that the pilot
then stomped on the mechanical release pedal near his
right foot, also without result. On this record, plaintiffs’
theory is pure speculation. There is no evidence that
the pilot or co-pilot ever attempted to release the jeep
and that the “release” systems failed. In fact, there are
any number of possibilities for how this accident
happened. For example, the Uruguayan pilots might
have been poorly trained, might not have known of the
existence of the releases, or might have panicked and
bailed out of the aircraft before trying them. It is
equally possible that the jeep was overweight, or that it
was incorrectly secured to the cargo hook, such that no
amount of pushing on the “releases” would have
36a
jettisoned the vehicle. Perhaps, too, the helicopter had
been poorly maintained during the roughly one year
that it was in the possession of the Uruguayan
government, so that the “release” and other systems
were in disrepair. Finally, even assuming that the
release systems malfunctioned, the plaintiffs do not
explain how or why the co-pilot’s footpedal, had one
existed, would have survived the _ shut-down.
Accordingly, plaintiffs’ theory that a second foot-pedal
near the co-pilot’s seat would somehow have saved the
day, and that its absence constituted an “inherently
dangerous” design defect, is little more than fanciful
conjecture.
The lack of evidence on these critical issues is entirely
attributable to plaintiffs. That is, plaintiffs’ counsel has
over all these years failed to, inter alia, obtain
statements regarding what went on in the cockpit from
the Pilot and the Co-Pilot- both of whom survived the
crash; failed to obtain from them, or indeed from
anybody, a precise descripton of the arrangement of.
switches and dials in the cockpit, which Mr. Heller
conclusorily insists was “confusing” and therefore
“defective”; failed to interview the “ground crew” who
fastened the jeep to the helicopter; failed to provide
evidence of the pilot’s and co-pilot’s training; and failed
to unearth witnesses to the weight of the jeep and the
maintenance of the aircraft.
fn9 The Court has considered but declines to address,
as moot, the remaining arguments raised by plaintiffs
on these motions.
37a
Supreme Court of the State of New York,
Appellate Division,
First Judicial Department
Julio Cesar Wilson Stajano et al.,
Plaintiffs-Respondents-Appellants,
Lr
United Technologies Corporation, et al.,
Defendants-Appellants-Respondents.
June 27, 2000
273 A.D.2d 162, 711 N.Y.S.2d 718
Order, Supreme Court, New York County (Martin
Schoenfeld, J.), entered on or about January 7, 2000,
which, in an action for personal injuries allegedly
caused by defects in a helicopter designed and
manufactured by defendants, inter alia, denied the
parties’ respective motions for summary judgment,
unanimously affirmed, without costs.
Defendants’ motion for summary judgment was
properly denied since they failed to come forward with
evidence of causation eliminating the possibility that
the accident was caused by a design or manufacturing
defect in the helicopter’s external cargo carrying
system (see, Winegrad v New York Univ. Medical
Center, 64 N.Y.2d 851, 853). We would also note that
disclosure on the issues of design and manufacture is
incomplete. With respect to plaintiffs, cross motion for
summary judgment, numerous issues of fact remain
unresolved, including, most significantly, whether
38a
defendants designed, manufactured and installed the
allegedly defective cargo carrying system. On the issue
of the applicability of general maritime law, previously
left unresolved by this Court (258 A.D.2d 424), while
plaintiffs have submitted additional competent and
undisputed evidence that the accident began over
water, they still have not established 2 “maritime
nexus” sufficiently to warrant a ruling. Factual issues
continue to exist as to whether the subject helicopter
was designed to perform, and in fact at the time of the
accident was performing, an activity traditionally
performed by waterborne vessels (see, O’Hara v
Bayliner, 89 N.Y.2d 636, 641-644, cert denied 522 U.S.
822). We have considered plaintiffs, other arguments
and find them to be unavailing.
Rosenberger, J.P., Nardelli, Mazzarelli, Wallach,
Lerner, JJ., concur.
39a
Supreme Court of the State of New York,
First Judicial Department
Julio Cesar Wilson Stajano et al.,
Plaintiffs,
We
United Technologies Corporation of
New York City, et al., Defendants.
January 4, 2000
MARTIN SCHOENFELD, J.::
The motions designated by sequence numbers 23, 24,
and 25 are consolidated and disposed of as follows:
In these consolidated actions plaintiffs Alberto Lopez,
Miguel Lopez, Julio Stajano, Robert Tochodjuklian, and
Teresa Aparicio fnl1 allege that on November 14, 1971,
they were injured when two helicopters fn2
manufactured by the Sikorsky Aircraft division of
defendants United Technologies Corporation of New
York City and United Technnologies Corporation
collided and exploded at a waterside air show in
Pocitos, Montevideo, Uruguay.
Plaintiffs originally commenced their actions for
negligence, breach of warranty, and strict products
liability in 1978 (the Lopez plaintiffs) and 1980 (the
others). After a decade of pretrial procedural
wrangling, Justice Edward Greenfield reinstated the
actions on February 13, 1990. fn3 Innumerable
requests for disclosure and responses thereto have
40a
resulted in at least five court conferences and
significant motion practice. Both sides claim that they
are entitled to much but have been given little.
Motion 23
The Motion. By Motion 23 defendants move, pursuant
to CPLR 3126, to preclude plaintiffs or, alternatively,
pursuant to CPLR 3212, for summary judgment.
Much of the factual background of the cases is not in
dispute. Sikorsky built the helicopters in or about 1957
for the United States Navy. According to plaintiffs, at
the time of delivery the helicopters had all of the
‘“fnternal” equipment of cargo lift mechanisms,
including two cargo release mechanisms: an electric
one, which could be activated by either the pilot or the
co-pilot by pressing a button on their respective “flight
control sticks”; and a mechanical one, that the pilot
could activate by pressing his right foot on a pedal on
the cabin floor. Plaintiffs note that the pilot would have
to remove his right foot from the rudder control pedal
to activate the cargo release pedal, and that the co-pilot
would find it difficult or impossible to activate it.
Plaintiff claims that either at the time of delivery or in
1971, when the Navy overhauled the helicopters at its
Pensacola (Florida) Naval Air Station, an external
cargo hook manufactured by a supplier named Eastern
Rotocraft was installed, and that in either event
Sikorsky personnel supervised the hook installation.
Later in 1971 the United States sold the helicopters,
including the cargo mechanisms, to the Uruguayan
Navy.
Ai Tat ani w
Jabal awe
4la
On the date in question, A-061, commanded by Captain
Waldmar Perdomo, hovered over a jeep parked on or
near a crowded beach, while a “four-legged bridle”,
attached to the four corners of the jeep, was connected
to the helicopter’s cargo hook. The helicopter ascended
and flew out over the ocean, with the jeep horizontal,
whereupon one corner of the bridle loosened, causing
the jeep to tilt forward and the helicopter to destabilize.
The helicopter, nose now tilted somewhat downward,
attempted to return to where the jeep had been
hoisted. However, due to the destabilization and the
weight of the jeep, the helicopter lost altitude, the jeep
hit rocks along the beach, and the helicopter was
dragged towards the ground, where it crashed into A-
062 and exploded, injuring the infant-plaintiff-
spectators. -
Plaintiff has submitted (Opposition Exhibit 11) the
Affidavit of Carlos Tochodjuklian, dated March 2, 1999,
stating, in full, as follows:
On November 14, 1971 I was standing on the beach at
Pocitos, Montevideo, Uruguay viewing the air show
demonstration of a helicopter lifting and carrying a jeep
over the ocean.
While the helicopter was over the ocean, one corner of
the carrying sling came off a front corner of the jeep.
The forward part of the jeep dipped downward so it
was no longer on a level plane.
The helicopter immediately also dipped downward and
flew lower and lower. It appeared to be pulled
downward by the downward angle of the jeep fn4, it
turned shorewards where the other helicopter was
42a
parked near [an] ice cream stand and as it approached
the shore it attempted to land near the other helicopter.
The jeep hanging below the helicopter struck a pile of
rocks supporting the roadway under the parked
helicopter. The lifting helicopter fell on the parked one.
Everything seemed to explode.
The carrying hook connected to the bottom of the lifting
helicopter never opened from the time the helicopter
was over the water until the time the jeep struck the
rocks.
Plaintiffs expert, Robert Nokes, states (Opposition
Exhibit 10) that helicopter flight instructors drum into
pilots that “if anything goes wrong while carrying an
external load,” the pilot should immediately release (in
colorful pilot lingo, “pickle”) the load. Nokes opines
(third unnumbered page) that when the jeep tilted
forward, destabilizing the helicopter, the pilot and co-
pilot would have tried to release the load, and that “[iJt
is logical to assume that the electrical and mechanical
release mechanisms filed on this aircraft” due to “a
manufacturing defect, a design defect [not giving the
co-pilot a mechanical pedal release, or providing a ‘fail-
safe’ automatic release, such as a ‘guillotine’ or ‘shear
pin’ that would sever the load at a certain level of
impact, or by not providing adequate safety warnings]
or both.”
Defendants reply that plaintiff cannot prevail on a
theory of negligent manufacture and/or design of the
cargo release mechanisms absent evidence that the
pilot and/or co-pilot, who have not submitted affidavits
and who may be dead and whose whereabouts
apparently are unknown, attempted to activate them.
43a
Defendants point out that Nokes has not laid a
foundation for knowledge as to the training of
Uruguayan helicopter pilots in general or this
particular pilot and co-pilot in particular.
How »ver, if an automobile crashes, killing the driver,
and subsequent investigation reveals that the brakes
were not working, would a plaintiff have to
demonstrate that the driver stepped on the brake
pedal? Would a plaintiff have to demonstrate what was
taught at the drivers “Driver Education School”?
Defendants’ argument proves too much. While the
matter is not entirely free from doubt, after careful
consideration this Court finds that plaintiffs have
demonstrated entitlement to present their claims to a
jury (at which point the trial judge can always entertain
a motion for a directed verdict).
To grant summary judgment it must clearly appear
that no material issue of fact is presented. This drastic
remedy should not be granted where there is any doubt
as to the existence of such issues, or where the issue is
“arguable”; issue-finding, rather than _ issue-
determination, is the key to the procedure.
Sillman v. Twentieth Century-Fox Film Corp., 3 NY2d
395, 404, 165 NYS2d 498 (1957) (citations omitted).
The alternative request, to preclude, is denied without
prejudice and with the direction that counsel appear for
a compliance (and possible settlement) conference
before the Court’s law clerk, in Room 517, 60 Centre
St., on January 19, 2000, at 10:00 a.m.
The Cross-Motion. Plaintiffs cross-move “for Partial
44a
Summary Judgment on their claim that this case arises
under the general maritime law”; for summary
judgment on _ plaintiffs’ strict products liability,
negligent design and/or manufacture, failure to warn,
and breach of implied warranties of fitness and
merchantability claims; to strike defendants’ answers;
or, alternatively, to preclude defendants from
introducing evidence denying that they designed and/or
installed the helicopter external cargo carrying system
at issue.
According to plaintiffs (Cross-Moving Affidavit of May
22, 1999 at 3-4), citing numerous cases, admiralty
jurisdiction in tort exists when the wrong took place on
(or over) navigable waters and bears a significant
relationship to traditional maritime activity. This latter
criterion depends upon the functions and roles of the
parties; the types of vehicles and instrumentalities
involved; the causation and the type of injury; and
“traditional concepts of admiralty law.” Plaintiffs claim
that the action arises under “general maritime law”
because the United States and Uruguayan Navies
operated the helicopters; the helicopters were built for
“anti-submarine and air-sea rescue” work; the accident
occurred because of a failure to perform the task of
carrying cargo over navigable water; and the accident
began over water, even though it culminated on land.
“The law is well settled that actions involving aircraft
engages in activities traditionally performed by
waterborne vessels fall within admiralty jurisdiction.”
Icelandic Coast Guard v. United Technologies Corp.,
722 F Supp 942 (D Conn 1989).
However, while plaintiffs have marshaled much support
45a
for their argument, the request for a declaration that
general maritime law governs the instant case (which
would entitle plaintiffs to pre-judgment interest) is
denied because of the reasons set forth in the opinion of
Justice Edward Greenfield, dated April 23, 1998, filed
May 1, 1998, which denied this request, and because
that opinion, which reserved a decision on the issue
until after “a full exploration of the facts [i.e., a trial].”,
has been affirmed and therefore is now law of the case.
Plaintiffs’ request for summary judgment on their strict
products liability, negligent design and/or manufacture,
failure to warn, and breach of implied warranties of
fitness and merchantability claims is denied because , as
noted above, at best there are issues of fact. Plaintiffs’
request to strike or preclude is denied without
prejudice and with the same direction set forth above.
Motion 24
By Motion 24 plaintiff moves to compel defendants to
disclose the whereabouts and social security numbers of
five of their former employees, to wit, John Baron,
Carroll Melton, Byron Pickering, Louis Pulver and
Joseph Vetrano, for open commissions for their
depositions, and for sanctions for failure to provide such
information previously. Defendants claim that federal
and state privacy laws prevent the disclosure of such
information. In any event, in his reply affirmation,
plaintiffs’ counsel states (page 2) that “{dJefendants
have accidentally provided what information they have
to plaintiffs.” This information includes addresses for
Melton in Texas and for Pulver in Florida. Pickering
may be deceased. Plaintiff may submit open
commissions for Melton’s and Pulver’s depositions, with
46a
any proper notice to defendants. The request for
sanctions is denied, as the court is not convinced that
defendants’ were wilful in any failure earlier to produce
the information at issue.
Motion 25
By Motion 25 plaintiff seeks to strike defendants’
Notice to Take Deposition of Plaintiffs and Demand for
Physical Examination and to compel defendants to
produce as a deposition witness “a person having
knowledge of the facts” and “compelling defendants to
produce documents pursuant to CPLR 3111.”
Plaintiffs argue that defendants are precluded from
deposing plaintiffs pursuant to CPLR 3130(1) because
defendants have already served interrogatories on
plaintiffs. However, 3130(1) only applies in cases
“predicated solely on a cause of causes of action for
negligence.” Furthermore, even if 3130 applied, this
court would grant leave to depose the five plaintiffs,
who are alleging serious injuries and whose testimony
might be important at trial.
Plaintiffs also argue that they should be deposed “on
open commission, or by written questions,” and that
they should be physically examined in Uruguay “using
a physician of their own choice” because they reside in
Uruguay and are too poor to travel to the United
States, except for shortly before trial. Plaintiffs do
indeed live in Uruguay, and were injured in Uruguay
by Uruguayan aircraft flown by Uruguayan pilots.
Defendants did not sell the helicopters in or to
Uruguay, did not own the helicopters when they were
sold to Uruguay, and have not attempted to avail
LR Seb Mita Sai
a |e
47a
themselves of the Uruguayan justice system (at least
not in this action). In its discretion, this Court finds
that defendants are entitled to depose and physically
examine plaintiffs in New York, by a physician(s) of
defendants’ choosing, and that doing so just before trial
would be impractical and/or result in a greater, rather
than lesser, expenditure of resources. Thus the
requests to strike are denied.
Defendants are hereby ordered to produce a deposition
witness who, in plaintiffs counsel’s words, has
“knowledge of the HSS-1’s design, manufacture,
maintenance, sales, servicing, repair and alteration to
cargo lifting capabilities”, deposition details to be
mutually agreed upon.
Plaintiffs state that defendants should be compelled to
“produce all documents on the accident HSS
helicopters, including their design[,] manufacture,
assembly, testing, sales, repair and outfitting.” Such a
demand is overly-broad, and is denied without
prejudice to submission of a more tailored request.
The note of issue must be filed no later than June 30,
2000.
Footnotes
fl By order dated August 20, 1997, the following
actions were consolidated: 7469/78 (Alberto Lopez);
7473/78 (Miguel Lopez); 3052/80 (Stajano); 3051/S0
(Tochodjuklian); and 3595/80 (Aparicio).
f2 The helicopters have numerous model and serial
numbers, based on who is doing the designating. Both
48a
are considered model S-58 by civilian authorities; H-
34A by the United Staes Army; H-34 by the Air force;
HSS-1 by the Navy; and HUS-1 by the Marines. One
has, at a minimum, serial numbers 143934 and 58698
and the other has, at a minimum, serial numbers 143941
and 58722. The Uruguayan Navy apparently
designated them as A-061 and A-062.
f3 The prior history of this case can be gleaned
from Cappellini v. United Technology of New York, 79
AD2d 593 (1st Dept 1980) (conditionally dismissing
actions and allowing them to be instituted in Uruguay
or Connecticut); Cesar v. United Technology of New
York, 148 Mise 2d 918 (Sup Ct,, NY County 1990)
(reinstating actions in New York because of failure of
condition); aff'd 173 AD2d 394 (1st Dept 1991).
f4 As far as this court understood and remembers
high school physics, the “angle” of the jeep would not,
per se, pull the helicopter down. However the sudden
jerk of the jeep might have pulled the helicopter off of
its more-or-less horizontal plane, causing the helicopter
to descend because the rotor blades would no longer be
revolving parallel to the earth.
he Od tee emt La A
$y AAPL DRANG SEAM AL abhi Las 2h AO he Bed
49a
U.S. NAVAL AIR MINE DEFENSE
DEVELOPMENT UNIT
PANAMA CITY, FLOR™A
26 August 1958
From: Officer in Charge
To: Chief, Bureau of Aeronautics
Subj: HSS-1 Tow configured helicopter; interim report
on evaluation of
1. The Naval Air Mine Defense Development Unit
accepted HSS-1, BuNo 139024 from bailment by
Sikorsky Aircraft Division, United Aircraft
Corporation on 1 July 1958. To date a total of twenty
one (21) evaluation flights, totaling 20.7 flight hours,
have been completed. Below are listed the comments
and recommendations of this Unit based on these
flights:
a. Magnetic and Acoustic Signatures. Both the
magnetic and acoustic signatures of the aircraft have
been measured and found to be insignificant in-so-far-as
possible mine activation is concerned.
b. Aircraft Stability.
(1) COMMENT. Upon receipt of the aircraft the
Sikorsky Aircraft Division recommended that all
towing operations be conducted with the Automatic
Stabilization Equipment (A.S.E.) in-operative. without
the A.S.E. the aircraft is extremely unstable while
towing. Controlling the aircraft requires the undivided
attention of the pilot giving him little or no time to
50a
concentrate on the actual tow mission. After two such
flights it was decided to use the A.S.E. to determine
first, if it would work in a tow attitude and second, if it
would help stabilize the aircraft. To date the A.S.E. has
worked satisfactorily up to and including 22 degrees of
fuselage inclination.
(2) RECOMMENDATION. That the HSS-1 be
declared unsuitable as a tow helicopter if the A.S.E.
cannot be utilized up to 45 degrees of fuselage
inclination.
C. Towing Ability
(1) COMMENT. To date tow operations by
NAMDDU have been conducted in winds of less than
20 knots. With the generally hot, low wind days
prevailing in this area at this time of year, it has been
found that when using normal rated power a tow
tension of between 2500 and 3000 pounds is the
maximum that can be obtained. These low tensions are
considered to be borderline acceptable in-so-far-as tow
operations are concerned.
(2) RECOMMENDATION. That should the HSS-1
be accepted as a tow helicopter, all commands must be
made aware of this marginal ability at low wind
velocities.
d. Hook and Hook Release Mechanism.
(1) COMMENT. The throat angle of the present
hook is too small to guarantee sucessful engagement of
the tow wire under rough water conditions. The
manual hook release system has never worked under
DME unk Ghar vdiesin easel:
5la
any condition of tension. When in the down position the
tow boom does not have any dampening device to
prevent excessive movement. The electrical hook
release system has failed twice.
(2) RECOMMENDATION.
(a) That the hook throat angle be increased.
(b) That the manual hook release system be
completely redesigned to guarantee positive hook
release under all tensions.
(c) That a hydraulic dampening device be installed
to prevent excessive fore and aft tow boom travel.
(d) That an explosive bolt attaching device be
installed at the tow boom attachment point to assure
release of the tow should the manual and electrical
release systems fail.
e. Visibility in Attitudes.
(1) COMMENT. Of prime important to the tow
pilot is downward and rearward visibility while towing
and during tow wire engagement. The presently
installed mirrors do not enable the pilot to see the tow
boom during engagement of the tow wire. The co-pilot
ean see the hook only if he leans far out of the cockpit.
While towing it is necessary for the pilot to crab the
aircraft and put the tow boom off center if he is to see
the hook and the tow.
(2) RECOMMENDATION. That the mirror system
be completely redesigned to accomplish the following:
52a
(a) Easy adjustment while in flight
(b) Downward visibility during tow wire pick-up.
(c) Wide angle rearward vision while towing
Tail Rotor Drive System.
(1) CQMMENT. While still under bailment the
contractor observed that higher tail rotor horsepower
conditions were being encountered while towing than
were encountered under normal flight operations. The
original estimate was that the tail rotor and
intermediate transmissions would have to be changed
after eight hours of flight time utilizing over 150 tail
rotor horsepower. The contractor changed the tail
rotor transmission and returned it to the factory for a
destruction test. Upon completion of this test the hour
limits on the tail rotor transmission system were set at
15 sours between 150 and 210 horsepower, 5 hours
between 210 and 250 horsepower, 1% hours between
250 and 310 horsepower and % hour above 310
horsepower. An elapsed time clock system was
installed to record the tail rotor horsepower used above
150 horsepower and a multiplication factor was supplied
to limit the life of the system to a total of 15 hours of
operation above 150 tail rotor horsepower. On 23 July
1958 the tail rotor gear box and rubber coupling failed
during a tow demonstration in the Gulf of Mexico. The
Tail rotor was installed on 14 June 1958 and had 23
hours of which 9 hours was tow time. The rubber
coupling had 369 hours of which 17 hours was tow time.
The pylon disconnect coupling was changed due to a
excessive amount of play on 16 August 1958 with 378
hours of which 17 hours was tow time.
53a
(2) RECOMMENDATION. That the entire tail
rotor drive system be redesigned to accommodate these
high tail rotor horsepower requirements before the
Navy accepts the HSS-1 as a tow helicopter for fleet
use.
g. Seats and Pilot Comfort.
(1) COMMENT. While towing with fuselage angles
of inclination above 20 degrees it is considered
manadatory that the pilots seats be adjustable to
prevent him from “hanging on his straps”. The present
seat design is such that it can be adjusted to only three
(3) positions and not easily, if at all, while in flight. In
an attempt to make the seat adjustable the contractor
has made only the bucket adjustable for tow attitudes
and as a result it tends to compress the normal
perpendicular seating attitude to that of a vee resulting
in severe leg cramps. The co-pilot’s feet must be brace
on the rear of the cockpit floor under his seat which is
both uncomfortable and also highly unsatisfactory
should he be required to assist the pilot in an
emergency. .
(2) RECOMMENDATION.
(a) That the seats be redesigned to accomplish:
1. Ease of adjustment.
2. Better adjustment range.
(b) That foot braces be installed on the cockpit floor
for both the pilot and co-pilot.
S/
W.R. MC INTYRE
Copy to:
BAR, E. HARTFORD
USNMDL
&
$
4
;
i
:
E
a
4
a
j
Z
&
i
z
;
4
4
¥
t
Ed
3
a
¥
3
55a
[Stamp of Military Court — illegible]
Montevideo, 5 April 1972
The hearing of today’s date is signaled at fifteen
hundred hours to permit depositions to be made by
Commander Waldemar’ Perdomo, Lieutenant
Commander Amilser Gonzalez, S/O de Carga
[Loadmaster] Ramon M. Lemos, Cho. La. Joaquin N.
Perez and Mro. La. Flores Corres.
Colonel [sgd. Silva Ledesme]
Tte. Lo. (PAM) [sgd. William Cabrera]
In Montevideo on the fifth day of the month of April,
nineteen hundred and seventy two, at fifteen thirty
hours, there being in Court Military Examining
Magistrate of the 3rd Session, Colonel Federico Silva
Ledesme, assisted by the undersigned Secretary, there
appeared the person named first who, having promised
to tell the truth and having been advised of the
provisions of Art. 180 of th C.P.O, the Judge moved to
the questioning of the im as follows:
Q. - Asked for his name, nationality, marital status, age,
profession and address.
A. - Waldemar Ramon Perdomo Beltran, Uruguayan,
divorced, 43 years, Naval Officer, Medanos S/N [..
Illegible..] Eduardo Perez, el Pinar.
Q. - If he knew or believed he knew why he ad been
called to make a deposition.
56a
A. - Yes, I think it is because of the accident with the
helicopters.
Q. - Tell us, in detail, what hay pened.
A. - On 14 November 1971, at approximately 17:30
hours he was [...Jat? [illegible| laya Pocitos in order to
perform a demonstration of the transport of a load as
the pilot of the helicopter [... illegible ...] the time
specified he took off, transporting a jeep, and
immediately after take-off (start of the flight) he
experienced a marked loss of power and initiated the
action to abort the take-off. An immediate attempt was
made to release the load which could not be achieved
for reasons he does not know. During this procedure,
the helicopter continued to lose height slewly and
turned towards the right, ending its flight close to
helicopter A-061, which was in motion close to the take-
off point of the undersigned. That although the landing
was relatively smooth, the rotor blades of the two
helicopters collided, stated a fire in helicopter A-061.
That immediately after landing, the undersigned
carried out the procedure to switch off the ignition, etc.,
in accordance with the procedures in force, abandoning
the aircraft and subsequently checking the condition of
his crew and also of the crew of the other helicopter,
checking that their members were safe. That he
subsequently helped civilian personnel in carrying
somebody who had been injured to a vehicle but that he
could not continue with this action as he felt mentally
unable to do so. He remembers that some time later he
was put into a Naval vehicle and taken to Estacién
Trouville [Trouville Station], which comes under the
Prefectura General Maritima.
57a
Q. - To what did he attribute the significant loss of
power stated.
A. - That he does not know to what to attribute it, but
that it was a sudden reduction of 400 - 450 rotations.
Q. - Whether the helicopter was in good flying order.
A. - Yes. That the routine tests had been carried out
prior to take-off from Laguna del Sauce as also prior to
take-off for the maneuver which he was about to
perform.
Q. - Whether he was qualified on this type of
equipment.
A. - Yes. That he had received training in the United
States.
Q. - Whether he had previously carried out this type of
maneuver of lifting a load.
A. - Yes. In training and as a demonstration.
Q. - If he knew who had prepared the safety device /
arrangement and of what it consisted.
A. - That he does not know. That on arrival he saw an
ambulance in place in the area and that when the
emergency occurred his major concern was for the
public as he could see people on the flight path who he
had not seen at first.
Q. - Did he have anything else to add, take away or
amend to what he had said.
58a
A.- No. That he had nothing to add or to take away.
Q. - The reason for his statements.
A. - He had been summoned to make a statement and
that this was the truth.
At this point the Judge ordered the deposition to be
terminated; it was read by the person making the
deposition who ratified it and signed it after the Judge
and before me to which I certify .... Let it be recorded.
[Signatures ]
bi ate TS Moka KR
a ssn SO A NG nD ES SSE A ERRORS EC
z
.
#
g
*
cx TERR CAREC
Hook
EXPLOSIVE »
CesT $ 50,20
ae
q
Fauate BY PRESSING Dow
A Sy Va
«
aA HARD
EMERGEMCY
ME CHAM ICAL
PRoPosEDd
Co-Piét REEME
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.