Opposition Brief — Bylinski v. City of Allen Park
Supreme Court brief1999
Ask Donna
What actually matters in this document.
Text
i des:
| Supreme Court, U8 '
G3 eS See
a,
QS j
No. 98-1734
In the |
Supreme Court of the United Steles——
October Term, 1998
GLORIA BYLINSKI, GLORIA BELLMAN, ALLAN COLLINS, DENNIS
COATES, DOUGLAS HAMMAR, ROBIN HAMMAR, SANDRA
HOLIDAY, STEVEN HOLIDAY, ROBERT JARRELL, ANISE PIERCE,
RICHARD PRESSEY, JIMMY SEACRIST, and MOLLY SEACRIST, and
all other persons similarly situated,
Petitioners,
CITY OF ALLEN PARK, a Michigan municipal corporation, CHARTER
TOWNSHIP OF BROWNSTOWN, a Michigan municipal corporation,
CITY OF ECORSE, a Michigan municipal corporation, CITY OF LINCOLN
PARK, a Michigan municipal corporation, CITY OF RIVER ROUGE, a
Michigan municipal corporation, CITY OF ROMULUS, a Michigan
municipal corporation, CITY OF SOUTHGATE, a Michigan municipal!
corporation, CITY OF TAYLOR, a Michigan municipal corporation,
Respondents
On Petition for Writ of Certiorari to the United States
Court of Appeals for the Sixth Circuit
BRIEF IN OPPOSITION TO
PETITION FOR WRIT OF CERTIORARI
R. Craig Hupp
Counsel of Record
Bodman, Longley & Dahling
34th Floor
100 Renaissance Center
Detroit, Michigan 48243
(313) 259-7777
TABLE OF CONTENTS
Page
RU RINE. «<n iwhs hws. cieed <cbdinainhs cdnewna tact i
Be EAR ar Lert ita oe Pm ee ae iii
an pranane te popin one apis Seether ti |
A. The Underlying Clean Water Act
Enforcement Suit Resulted in Specific Court
TN III in ccadiores bade java tcdensissscss l
B. Petitioners’ Complaint Requested the State
Circuit Court Enjoin the Respondents’
Assessors’ Compliance with the Final
Judgment’s Order That Real Property in a
Respondent’s Community Be Assessed If
Respondent Failed to Pay Voluntarily its Share
BP UME PT, naicid's vecwva cp vawdewdsacecccs 10
Sa. INE MUNN GUL C ceubualirdescauvevsesceess 11
D. Petitioners Have Mischaracterized Their
Posture on Appeal to Obtain Favorable Action
Be EE ok na Chin bd waksere eee hele Cokes bos bvbat 12
Reasons for Denying the Writ ..................0ceeeee: 13
I. THIS COURT SHOULD DENY THE
PETITION BECAUSE THERE IS NO
CONFLICT BETWEEN THE SIXTH AND
SEVENTH CIRCUITS REGARDING THE
APPLICATION OF THE ALL WRITS ACT,
28 U.S.C. § 1651, TO PROTECT THE
INTEGRITY OF A DISTRICT COURT
FOE «50 p40bNUSa AED adap dw U ORD D ON Sd Co dekebeS) 13
il
A. In This Case The Court Found Violations
Of Federal Law And The Necessity To Take
Certain Actions To Comply, While In
Winnebago County, No Violation Of Federal
Law Had Been Established. ..............00:eeee0: 15
B. This Case Involves a State Court
Proceeding Intended To Enjoin Compliance
With An Express Federal Court Order .............. 19
ll. THIS COURT SHOULD DENY THE
PETITION BECAUSE THE DISTRICT
COURT ALSO HAD AUTHORITY TO
REMOVE THE CASE PURSUANT TO ITS
RETENTION OF CONTINUING
JURISDICTION IN UNITED STATES v.
WAYNE COPUINET: (ibau isivisassccacccgn haquuanene We
Cosalesion .. .iccccadinsetses sk eis eee
Appendix
1994 Financing Plan & Final Judgment, United
States v. Wayne Coumty .......cccccccccccnsscceneesess lb
1994 Consent Decree, United States v Wayne
COURY occ cccusvccvassudceetes ehennp OvegiherNeuenD dies 21b
Class Action Complaint and Jury Deman, Bylinski
v Allon Pas& oiccivicie sudcdunced beeevestecnddesseiavestes 77b
Judgment Levy Act, Mich. Comp. L. § 600.6093 ...... 85b
Order Bond Act, Mich. Comp. L. ........ eee cece ees 88b
Mich Const. 1963, Art. 9, § 6 (as amended by
"Headice Amendment") ....scccvcscscrescssvevaessuves 90b
Mich Const. 1963, Art. 9, § 31 (as amended by
"Heading Am) 6uc sc acoicsnctctauechbiessdevesee 92b
TABLE OF AUTHORITIES
Page
Cases
American Axle & Mfg., Inc. v. City of
Hamtramck, 227 Mich. App. 135, 575
N. W.2d 296 (1997) ......cccccccrccccceeeceecseeseeeeess 7)
American Axle & Mfg., Inc. v. City of
Hamtramck, leave to appeal granted,
459 Mich. 939, 590 N.W.2d 65 (1999)... . 6c cceeeee eens 9
Bailey v. Muskegon Cty. Bd. of
Comm'rs, 122 Mich. App. 808, 333
N.W.2d 144 (1983) .....cc cc ceceeceeeeceeewereeneeeneeees 8
Bylinski v. City of Allen Park, 8 F.
Supp. 2d 965 (E.D. Mich. 1998) .....------++: ioe¥en 12, 24
City of Detroit v. City of Highland
Park, 878 F. Supp. 87 (E.D. Mich.
DEED ba binsduceecaepbevevevecesgsoveose bacco tas edeeanas §
Dunn y. Carey, 808 F.2d 555 (7th Cir
BN | o. ccvcvepedduvntecssebveblecsdorcdercvccscceveeucs 18
Garden City Osteopathic Hosp. v. HBE
Corp., 55 F.3d 1126, 1130 (6th Cir.
GODS) cnvcccccccsstecevecocscsccceccocetccccesessecoess 9
In re Application of County Collector of
Winnebago County, Illinois, 96 F.3d
890 (7th Cir. 1996) .... ccc cc cece eect eee ereeeeeenee passim
In re VMS Securities Litigation, 103
F.3d 1317 (7th Cir. 1996) ........- cece cece eee eeeees 14, 20
Martin v. Wilks, 490 U.S. 755 (1989) «2... ec cee ee eee eens 23
Missouri v. Jenkins, 495 U.S. 33 (1990) ......6.cceeeeees 18
iv
People Who Care, 961 F.2d 1335, 1338
(Fils Che POSE) sinc cccevescccccsdtongedescsacesscccceesses 17
Roosevelt Park v. Norton Twp., 330
Mich. 270, 47 N.W.2d 605 (1951) ..... cc cceeee eee eeeeees 7
Sable v. General Motors Corp., 90 F.3d
B7E CGB CAR, FOE. vc ds cnteccnkersssecusessonvvaveces ese 14
Smith v. Scio Twp., 173 Mich. App.
381, 433 N.W.2d 855 (1988) ........cccceee eee eeeeeeeeees 8
Striff v. Mason, 849 F.2d 240 (6th Cir.
RODE is <ovpicces vices cabeadbanbbeibenaeseneeeccaese 14, 23
Taxpayers United v. City of Detroit,
196 Mich. App. 463, 493 N.W.2d 463
(TGSE) dv ci cdcdccavseverdactbsssudeneresscescccesconenees 8
United States v. City of New York, 972
F.2d 464 (26 Cor, 1992) occvccccvcscvccccccsesesacees 14, 21
United States v. Wayne County, No.
SF Pen 6 dweedc tn sudeds ceenecabendzewscssnsane passim
Vanguards of Cleveland v. City of
Cleveland, 23 F.3d 1013 (6th Cir. 1995) ..........00 eee 23
White v. National Football League, 41
F.3d 402 (8th Cir. 1994), cert. denied,
SIS EIS SLAP ER TOD dvlesentveaetbawkenkahcned canes 14, 21
Yonkers Racing Corp. v. City of
Yonkers, 858 F.2d 855 (2d Cir. 1988),
cert. denied, 489 U.S. 1077 (1989) ..........c cece eee eees 21
Constitutional Provisions
Ast. D Boek, SORE SE .acccpcakliinvhe ccd detusveavesecvess 8
Statutes
ZB UBC. STSST cccccccccssencccccscccssesvceccososctes 13
V
SE UBC. BGG Aiken Fen eet ie edie VE 12, 13
a a iad EE hi OC OES” cad aadosdeset dines shana sande 4
SS RR i CA OO. 0. vaasddgcensebaes hanwebieks 1,4
DO Ailes. OAR earls onc cetenecee coved bkaveneotaveceess 2
Fe Ee FONT elives cbduscbescveVewks obanesectsdert 2,3
BE MA ERED aus) varnes hea semindtknth stad ani 2,17
Matias: Ut ROMEED lat kare ond Genccisidinn ct vitae bh sabe ake 17
FF a CRO Fis ET RAINE an eet 17
Mich. Comp. L. §§ 324.3101, ef seg. 2.2.2... 6. cc ceeeeceeee l
Mich. Comp. L. § 324.3115 ............ ie caeas cheat y
DERE LOGUE. 1. BS WOIEE Wick cccndactecwticnnesicdveds 8
eee. COMED. Te. BGG cccccovvonvdsVecccubevaees 7,8
STATEMENT OF THE CASE
Although Petitioners assert that the facts of this case
are “simple” and “undisputed,” their Statement of the Case
omits material facts and includes a mischaracterizations of
Petitioners’ legal posture in this Court. Further, a proper
understanding of the decisions in the courts below depends
upon understanding the nature and purpose of two orders
issued by the federal district court in a related underlying
case. Consequently, Respondents will add the necessary
factual context omitted in the Petition.
Petitioners reside in the communities governed by
Respondents in Wayne County, which is located in
southeastern Michigan. Respondents own and operate
sewage and storm drainage systems and have a contract with
the government of Wayne County under which Wayne
County's operates a wastewater treatment plant to process the
sewage and storm drainage from Respondents and other
communities and units of local government.
A. The Underlying Clean Water Act Enforcement Suit
Resulted in Specific Court Orders to Respondents
In 1987, in the United States District Court for the
Eastern District of Michigan, the United States
Environmental Protection Agency (USEPA) and the
Michigan Department of Natural Resources (MDNR) sued
Wayne County, Respondents, and the other units of
government who owned, operated or used the wastewater
treatment plant, alleging that the defendants violated the
Clean Water Act, 33 U.S.C. §§ 1301, ef seg., and Michigan
environmental law, Mich. Comp. L. §§ 324.3101, ef seq.
(known as “Act 245"), by discharging pollutants into a
2
navigable stream known as Ecorse Creek, either as direct
discharges or as untreated overflows from the treatment plant.
The case, captioned United States v. Wayne County, No.
87-CV-70992, was assigned to the Honorable John Feikens.
The Clean Water Act prohibits discharges to
navigable waters of the United States without a National
Pollutant Discharge Elimination System Permit (NPDES
Permit). 33 U.S.C. §1311. The United States may bring an
enforcement action against those who discharge without a
permit and seek civil and criminal penalties against negligent
and intentional discharges. 33 U.S.C. §1319. The Clean
Water Act also provides that the district court “shall have
jurisdiction to restrain such violations and to require
compliance.” 33 U.S.C. §1319(b). Michigan environmental
law includes similar provisions. Mich. Comp. L. § 324.3115.
In particular, the plaintiffs in United States v. Wayne
County alleged that the defendants had discharged pollutants
in excess of the limits imposed by an NPDES Permit issued
to Wayne County. USEPA and MDNR also alleged that the
operation of the wastewater treatment plant violated state law
and that individual community's sewer systems occasionally
discharged into Ecorse Creek without an NPDES Permit.
The defendants to United States v. Way.ie County did
not dispute that the plant violated its NPDES Permit or that
there were unpermitted sewer and stormwater discharges on
occasion into Ecorse Creek. Under the supervision of the
district court, they engaged in a process to study, plan, design,
construct, and finance sewer and drainage system
improvements that would bring the plant, as well as the sewer
systems that it served into compliance with federal and state
law. As part of this process, in 1993, an environmental
3
consultant filed a report and plan with the district court (1993
Project Plan). That plan specifically identified sources of
illegal discharges and documented violations of the plant’s
NPDES Permit. It created a plan and a construction schedule
to bring the plant and its associated sewer systems into
compliance with federal and state law. The parties and the
district court accepted the factual findings made in the 1993
Project Plan, thereby conceding all of the requisite elements
for violations of 33 U.S.C. § 1319, and Mich. Comp. L. §
324.3115.
In February 1994, the district court lodged a Consent
Decree (entered in May, 1994), Resp. App., p. 21b, which
required that the parties adopt the 1993 Project Plan, set
pollution limits for the discharge of effluents during the
interim when the treatment plant and sewer improvement
projects (Improvements) were under construction, and
established penalties for failure to comply with the
construction schedule to achieve full compliance with federal
and state law. The Consent Decree ordered Respondents and
the other defendants to carry out the 1993 Project Plan.
Although, as in the case of all consent decrees, the
parties “voluntarily” executed the agreement, to describe the
Consent Decree as “voluntary” or a private contractual
undertaking, is not consistent with the facts of United States
v. Wayne County. The defendants, including Respondents,
engaged in years of litigation, eventually admitting facts
supporting criminal and civil sanctions under the Clean
Water Act. The Consent Decree, at § 26, Resp. App., p. 56b,
imposed a $413,000 civil penalty. Throughout this long
period of litigation, the district court was deeply involved in
forcing the parties through the complex process of achieving
compliance with federal law. The Consent Decree was not a
i See erence re |
4
device for avoiding a judicial process that would lead to
findings of liability for violating federal law; it was the
culmination of a judicial process determining that federal and
state law had been violated.
In March 1994, the district court entered a Financing
Plan and Final Judgment (Final Judgment). Resp. App., p.
lb. The Final Judgment, Resp. App., p.3b, found that:
"* * * it is immediately necessary and
imperative for the public health and welfare of
the present and future residents of Wayne and
the Downriver Communities that the
improvements for the [wastewater treatment]
System required by the Consent Decree and
the Project Plan (the ‘Improvements'’) be
planned, designed, acquired, constructed and
financed to service the #Downriver
Communities, as a part of the System * * *."
The Final Judgment, Resp. App., p. 13b, also stated:
"9. Need for the improvements.
"This Court specifically finds, based on its
review of the applicable law and the Project
Plan, that (i) the Improvements are needed to
comply with the Federal Water Pollution
Control Act' and Act 245; and (ii) the
installation, construction, a!teration,
The Clean Water Act amended the Federal Water Pollution
Control Act, 33 U.S.C. § 1251, et seq., by adding sections which
are codified at 33 U.S.C. §§ 1301, et seg
5
improvement and operation of the Downriver
Sewage Disposal System, as described with
the Improvements, have been ordered in
accordance with the Consent Decree, Act 320,
Act 245 and the Federal Clean Water Act."
(Footnote added.)
Thus, in making its findings of fact in its Final Judgment, the
district court determined that Wayne County and
Respondents, among others, had violated federal and state
environmental law, although the district court did not use
language of “liability” in its order. As noted, the district
court had imposed a $413,000 penalty in the Consent Decree.
The Final Judgment ordered Wayne County to act as the
agent for Respondents to supply the planning, design,
acquisition and construction of the sewer improvements.
This was done for several reasons. Wayne County has a large
public works department capable of carrying out the $250
million project, the improvements included projects spanning
several communities, and Wayne County has access to bond
financing which the individual communities do not have.
At the time of the Final Judgment in 1994, the parties to
the Wayne County case estimated that the cost of the
improvements would be $230,000,000. According to current
estimates, the cost now is $250,000,000. On behalf of
Respondents and the other defendants/judgment debtors
under the Final Judgment, Wayne County obtains bond
financing for the improvements in the 1993 Project Plan
through the Michigan Water Pollution Control Revolving
Loan Fund, which provides opportunities for pooled bond
financing at advantageous rates, made possible by federal
subsidies. The capital costs for the improvements are paid on
iii i
6
an ongoing basis, with Wayne County issuing new bonds
each year to pay for those improvements scheduled for the
following year. The first bonds were sold in 1994.
a ee to)
The Final Judgment, § 8, Resp. App., p. 8b, provides that
"{e]ach Downriver Community is hereby ordered to pay its
portion of the local-share costs of the Improvement... ."
This payment is made though a process of annual
assessments by Wayne County to recover each Respondent's
share of annual bond payments. /d. Each Respondent pays a
different amount based on the projects constructed in its
community and the Respondent's contributions to sewer
flows and overflows. /d Each year, after Wayne County
determines the cost of upcoming improvements and
calculates the share of such cost for each Respondent,
Respondents hold public hearings at which Wayne County's
determinations are reviewed. Once the costs and construction
schedule are finalized, the district court issues a
supplementary order to the Final Judgment ordering each
community to pay its share. To date, the district court has
issued twelve supplementary orders. The improvements are
more than 85% complete.
The Final Judgment specifically provides that the
defendants are free to choose how to raise the payn.ents
which the Final Judgment requires. Final sudgment, 411,
Resp. App., p. 15b. The Final Judgment, § 8, Resp. App., p.
7b-8b, directs each community to pay its share in cash.
The Final Judgment contains an enforcement mechanism
if the voluntary payments in cash are not made. At {J 8(a) to
8(c), Resp. App., pp. 8b to 12b, the Final Judgment orders
that if a community fails to pay cash when due, an assessment
must be made against the property in community on behalf of
7
Wayne County pursuant to Mich.Comp. L. § 600.6093, Resp.
App., p. 85b, (providing that a local tax assessor must levy
taxes to the extent necessary to satisfy judgments against the
local government) (known as the Judgment Levy Act). That
statute provides the sole means under Michigan law enforce a
judgment against a municipality. Roosevelt Park v. Norton
Twp., 330 Mich. 270, 47 N.W.2d 605 (1951).
Petitioners suggest that the Final Judgment encourages
the violation of the Headlee Amendment and reflects the
district court's disregard for state law and contains an express
intent to violate Michigan tax limits. In this connection, it is
worth noting that several of the defendants in Wayne County
have paid their assessments in cash when due and a
court-ordered assessment was not required. Hence, the Final
Judgment, whatever it else it does, does not require the
judgment be paid by assessments against property. The
court-ordered assessment is thus a last resort enforcement
mechanism for the benefit of the district court, plaintiffs,
~Wayne County and the general public because it provides an
enforceable means to obtain funds to cure violations of
federal law if a defendant community fails to pay its share
voluntarily. The language cited by Petitioners which
supposedly identifies an intent to violate Michigan tax law,
Petition, p. 4, was a waiver by the defendant communities of
their right to make a separate challenge to any court-ordered
assessment and nothing more.
Enforcement of Final Judgment thus may require in some
circumstances the assessment of local property taxes, and that
enforcement mechanism has been used with regard to
Respondents here. Such property assessments may implicate
Michigan law. Under the Michigan Constitution, municipal
government has limited authority to raise property tax rates.
See sci
SR 8. Ne me RET OE see ON LON, NBA
Free ee ee eee 2, ee oe ee
8
According to Art. 9, Secs. 6 and 31 of the Michigan
Constitution as amended by the "Headlee Amendment,"
Resp. App., p. 90b, and p.92b, respectively, no municipality
may levy taxes above a specified millage limit without a vote
of the electors unless the authority to levy the tax was granted
by statute before the Headlee Amendment was enacted in
November 1978.
In ordering an assessment to enforce payment if voluntary
payment was not forthcoming, Judge Feikens relied on (in
part) two Michigan statutes passed many years before the
Headlee Amendment was adopted. Mich. Comp. L. §
324.4307 (providing that local units of government may
impose taxes beyond limits of their taxing authority as
established by statute or charter for the purpose of funding
bonds that are used to pay for court-approved improvements
to sewage systems) (known as the Court Order Bond Act,
Resp. App., p. 88b; and Mich. Comp. L. § 600.6093 (the
Judgment Levy Act discussed above).
In 1994, when the district court in United States v. Wayne
County entered its orders, every decision in federal and state
court addressing the Headlee Amendment's “grandfather”
clause had held that the clause's interpretation depended upon
its plain language: if the statute authorizing the challenged
iax predated the Headlee Amendment, the tax was not subject
to the Headlee Amendment's millage election requirement.
See, e.g., City of Detroit v. City of Highland Park, 878 F.
Supp. 87 (E.D. Mich. 1995); Taxpayers United v. City of
Detroit, 196 Mich. App. 463, 493 N.W.2d 463 (1992); Smith
v. Scio Twp., 173 Mich. App. 381, 433 N.W.2d 855 (1988);
Bailey v. Muskegon Cty. Bd. of Comm'rs, 122 Mich. App.
808, 333 N.W.2d 144 (1983). In 1997, three years after the
entry of the Final Judgment, a Michigan court made the first
9
and so far only departure from this interpretation of the
Headlee Amendment. In American Axle & Mfg., Inc. v. City
of Hamtramck, 227 Mich. App. 135, 575 N.W.2d 296 (1997),
the Michigan Court of Appeals adopted a radically different
interpretation of the Headlee Amendment, holding that the
grandfather clause in the Headlee Amendment applied to the
tax levy itself, not to the statute authorizing the tax levy.
That decision cannot be “backdated” to support Petitioners’
claims that the Final Judgment contradicted Michigan law
when it was entered. Further, Judge Feikens considered
whether American Axle was correctly decided as a matter of
Michigan law and found it was not, which finding is not
appealed here. The district court was not and is not required
to follow American Axle because a federal court is not bound
by an intermediate state court's ruling on state-law issues.
Rather, it must determine how the highest court in a state
would resolve the issue if presented with it. Garden City
Osteopathic Hosp. v. HBE Corp., 55 F.3d 1126, 1130 (6th
Cir. 1995). The Michigan Supreme Court granted
discretionary review to consider the legality of the American
Axle opirion. American Axle & Mfg., Inc. v. City of
Hamtramck, leave to appeal granted, 459 Mich. 939, 590
N.W.2d 65 (1999).
Finally, as a part of the Final Judgment, the district court
enjoined any party from conducting any kind of proceeding
that would interfere with the implementation of its orders.
That injunction has never been enforced against any person.
This suit has proceeded because neither Respondents have
moved for nor has the district court considered sua sponte,
staying this suit pursuant to the injunction on the Final
Judgment.
10
B. Petitioners’ Complaint Requested the State Circuit
Court Enjoin’ the Respondents’ Assessors’
Compliance with the Final Judgment’s Order That
Real Property in a Respondent’s Community Be
Assessed If Respondent Failed to Pay Voluntarily its
Share of the 1993 Project Plan.
On March 4, 1998, Petitioners filed this case in the
Circuit Court for Wayne County, Michigan, alleging that
Respondents had violated Michigan law by levying
assessments in compliance with the Final Judgment.
Petitioners sought a refund of all taxes paid in excess of those
limits as well an injunction preventing Respondents from
continuing to levy any assessments pursuant to the 98 (a) to
(c) of the Final Judgment. Petitioners specifically alleged the
following:
"1. This matter is necessary to ... enjoin the
imposition and further collection from
Plaintiffs by way of an illegal and
unconstitutional property tax assessment of a
March 14, 1994 judgment fi.e., the final
Judgment]... ."
**# **
maf = On March 14, 1994, Judge District
Court Judge John Feikens entered judgment
against Defendants imposing upon Defendants
a portion of the costs of [the] Improvements . .
*e*#e*
|
1]
“24. On or about 1995 Defendants began
assessing the costs of the judgment against
Plaintiffs by placing on Plaintiffs’ respective
real and personal property tax bills a tax
described as ‘EPA Judgment’... .”
Class Action Complaint and Jury Demand, {§ 1, 23 and 24,
Resp. App., pp.77b, 78b, 81b, 82b.
Petitioners did fail to mention in their pleading that the
tax objected to was specifically ordered by 498(a)- (c) of the
Final Judgment.
C. Procedural History
Respondents removed this case to the district court,
where it was assigned to Judge Feikens. Petitioners moved to
remand the case and for the recusal of Judge Feikens. The
district court denied both motions.
Thereafter, Respondents moved for summary judgment
on three grounds: that (1) as a matter of federal law, federal
district courts could, in the limited circumstances of this case,
override state law to compel compliance with federal law;
(2) as a matter of Michigan law, Respondents had not
violated the Headlee Amendment because the taxes they
levied to satisfy their obligations under the Financing Plan
and Final Judgment were authorized by both the Court Order
Bond Act and the Judgment Levy Act before the Headlee
Amendment was passed; and (3) in any event, Petitioners’ suit
was barred by laches. The district court granted the motion
and dismissed the case giving as alternative grounds all three
of Respondents’ legal arguments as grounds for dismissal.
12
Bylinski v. City of Allen Park, 8 F. Supp. 2d 965 (E.D. Mich.
1998).
Petitioners appealed the denial of their motion to remand
and the grant of summary judgment. The Sixth Circuit
affirmed the district court's rulings, holding that the district
court had removal jurisdiction by virtue of its continuing
jurisdiction in the Wayne County case and under the All
Writs Act, 28 U.S.C. §1651. With respect to the merits, it
held that Petitioners’ suit was barred by laches.
D. Petitioners Have Mischaracterized Their Posture on
Appeal to Obtain Favorable Action on Their Petition
Here Petitioners take the anomalous position of
challenging the removal of this case to federal court while
abandoning any appeal of the adverse rulings on the
substantive merits of their case. Thus Petitioners have
conceded that the Sixth Circuit was right on the merits. In
making this concession, they have also effectively conceded
that the district court was right on the merits as well,
including its holding that the subject assessment is permitted
under state law and does not violate the Headlee Amendment.
Yet, throughout their Petition, Petitioners argue that the
judgment assessment at issue was unconstitutional under
Michigan law. Although they have abandoned that argument,
they improperly urge this Court to consider that argument in
deciding to grant their Petition. The removal issue raised by
Petitioners must be decided on its own merits alone, not in
light of underlying state constitutional issues that Petitioners
abandoned.
13
REASONS FOR DENYING THE PETITION
The district court held that 28 U.S.C. § 1651 and 28
U.S.C. § 1331 were proper bases for removal. It also held
that Respondents were entitled to summary judgment
because: (1) the district court in the Wayne County case had
the authority to enter appropriate orders to effect its
judgment; (2) in complying with the Final Judgment,
Respondents had not violated the Headlee Amendment to the
Michigan Constitution; and (3) Petitioners’ claims were
barred by laches because they waited until long after the
bonds were sold to challenge the financing plan in the Final
Judgment.
The Sixth Circuit affirmed the district court's decisions
with respect to removal and laches, but did not address any
questions of Michigan law. Petitioners have challenged only
the jurisdictional ruling of the Sixth Circuit and have not
appealed the rulings on the substantive issues.
I. THIS COURT SHOULD DENY THE PETITION
BECAUSE THERE IS NO CONFLICT
BETWEEN THE SIXTH AND SEVENTH
CIRCUITS REGARDING THE APPLICATION
OF THE ALL WRITS ACT, 28 U.S.C. § 1651,
TO PROTECT THE INTEGRITY OF A
DISTRICT COURT JUDGMENT.
Petitioners argue for the grant of a writ of certiorari by
insisting that the Sixth Circuit's decision below creates a
division of opinion among the circuit courts, specifically
between the Sixth and Seventh Circuits. In fact, no circuit
split on this issue exists. The circuit courts agree that the All
Writs Act is a proper instrument by which a district court can
14
take jurisdiction of an otherwise unremovable state-court
action when doing so is necessary to protect the integrity of
its orders. See, e.g., In re VMS Securities Litigation, 103 F.3d
1317 (7th Cir. 1996); White v. National Football League, 41
F.3d 402 (8th Cir. 1994), cert. denied, 515 U.S. 1137 (1995);
United States v. City of New York, 972 F.2d 464 (2d Cir.
1992).
Petitioners can assert the existence of a conflict only by
mischaracterizing a decision of the Seventh Circuit, which is
not inconsistent with the opinion of the Sixth Circuit here. Jn
re Application of County Collector of Winnebago County,
Illinois, 96 F.3d 890 (7th Cir. 1996). In any event, to the
extent that Winnebago County, when issued, was inconsistent
with the opinion of the Sixth Circuit, it has been reframed in
the context of VMS Securities, supra.
Here, the Sixth Circuit clearly stated its position on the
question whether the All Writs Act could provide sufficient
basis for federal jurisdiction to protect the integrity of a
district court's orders. It held that the All Writs Act gives
district courts the authority to remove an otherwise
unremovable state court case for the purpose of effectuating
and preventing the frustration of orders that it had previously
issued in exercise of jurisdiction otherwise obtained. his
ruling is consistent with earlier opinions of the Sixth Circuit.
See, e.g., Striff v. Mason, 849 F.2d 240 (6th Cir. 1988); Sable
v. General Motors Corp., 90 F.3d 171 (6th Cir. 1996). There
is no question that the district court had jurisdiction of the
Clean Water Act claims in United States v. Wayne County
pursuant to that authority.
This ruling does not, as Petitioners suggest, conflict with
the ruling of the Seventh Circuit in Winnebago County,
1S
supra. To be sure, in that case the Seventh Circuit reversed a
district court's ruling that the All Writs Act could be the sole
basis for obtaining jurisdiction of a case raising only state
constitutional issues; but there are crucial procedural and
factual differences between Winnebago County and this case.
These differences eliminate any suggestion of dispute
between the Sixth and Seventh Circuits.
In Winnebago County, the taxpayers affected by the
excess levies filed objections in state court. The defendant
school district intervened in these state-court proceedings and
removed each of these cases to the district court, where it
sought the dismissal of the objections. The district court
allowed removal, citing the All Writs Act as authority.
Eventually, the district court granted relief in favor of the
school district. The tax objectors appealed that ruling to the
Seventh Circuit.
A. In This Case The Court Found Violations Of Federal
Law And The Necessity To Take Certain Actions To
Comply, While In Winnebago County, No Violation
Of Federal Law Had Been Established.
In Winnebago County, the defendant issued bonds to pay
for improvements contained in a Second Interim Order issued
by the court, and it funded the bonds by levying taxes in
excess Of state-law limits. At the time of the consent decree
and tax levy, the defendant had not admitted liability for the
alleged discrimination, and the district court had made no
findings with respect to the allegation. The Seventh Circuit
held that jurisdiction to remove the state court case depended
heavily on a finding that violations of federal law had
occurred and that the order at issue was needed to address the
a
16
violations. Lacking such findings by the district court, the
Seventh Circuit reversed that court’s decision on removal.
In reaching that decision, the Seventh Circuit reasoned as
follows.
First, the Seventh Circuit held that the All Writs Act did
not provide unlimited jurisdiction on the federal courts.
Winnebago County, 96 F.3d at 900. Rather, its purpose was
to give district courts an adaptable instrument that they could
use to protect the integrity of their orders in a variety of
situations. /d. But Seventh Circuit did hold, using negative
phrasing, that the All Writs Act does properly serve as a sole
basis for district court jurisdiction to protect the terms of a
consent decree when the relief sought in state court
implicates the authority of the district court itself. Jd. at
900-903. That is, where a the relief sought in state court does
not implicate the authority of the district court to enforce its
consent decree, the All Writs Act does not provide a
sufficient basis for the assertion of federal jurisdiction, but
the converse is also true.
The Winnebago County court then analyzed the various
types of consent decrees to answer the question whether a
state court action implicates the authority of the district court.
Some consent decrees simply validate settlement agreements
between the parties reflecting, in effect, a district court's
recognition of a private contract. The validity of such
consent decrees depends entirely upon the parties’ authority to
enter into them. /d. at 901. But other consent decrees relate
to enforcement of federal law which under most federal
Statutes is the prerogative of the federal courts. For example,
a federal Clean Water Act enforcement action with regard to
unpermitted discharges to a publicly owned treatment works
17
“shall be brought in the district court for the United States,"
33 U.S.C. § 1319(f), as must citizen suits under the Clean
Water Act, 33 U.S.C. § 1365(a). These latter consent decrees
are usually entered following a finding of liability or
"necessity" by the district court under statutes such as 33
U.S.C. §§ 1319(b) & (f).Winnebago County at 901-02.The
court defined “necessity” as “a finding by the district court
that specific terms of a consent decree are necessary to
remedy the violation of a legal wrong.” /d. at 902, n. 17.
The Winnebago County court noted that, in its prior
opinion in the underlying discrimination case:
“We posed the interesting question of whether
the finding [of liability] could be made on
abbreviated proceedings, before the
conclusion of litigation. Where a violation is
clear, ‘consent’ is ‘no more than knuckling
under to the inevitable [and] is more like an
adjudication than a contract.”
Id. at W' n.15 (citations omitted) (quoting the underlying
case, People Who Care, 961 F.2d 1335, 1338 (7th Cir. 1992).
In light of this difference between types of consent
decrees, the Seventh Circuit held that the All Writs Act did
not provide sufficient authority for the district court to
remove the state-court case as a means of protecting the
Second Interim Order. Winnebago County, 96 F.3d at 900-03.
The court went on to note that:
“Dunn and our other precedent discussing the
legal effects of consent decrees strongly
indicate that, in a case such as this where a
18
consent decree was entered without findings
of liability or ‘necessity,’ the All Writs Act
does not permit the removal of a third-party
action claiming that a party to the consent
decree acted without authority under state
law."
Id. at 901-02 (footnotes omitted) (emphasis added) (citing
Dunn vy. Carey, 808 F.2d 555 (7th Cir. 1986)).
The Seventh Circuit distinguished this situation, however,
from one in which a district court relies upon the All Writs
Act to take jurisdiction of a case that threatens the integrity of
a consent decree which is based upon a finding a liability or
necessity. Such a case would implicate the district court's
jurisdiction, and the Seventh Circuit did not dispute that All
Writs Act was designed to address such an implication. /d. at
903-04. Indeed, the Winnebago County court noted that,
while it was considering the removal of the tax objectors’ suit,
the underlying discrimination claim had proceeded and the
district court had made findings of liability for the school
district and had developed a remedial scheme. Citing this
Court's opinion in Missouri v. Jenkins, 495 U.S. 33 (1990),
the Seventh Circuit noted that state law could not stand in the
way of a remedy designed to ensure compliance with feueral
law. Winnebago County, 96 F.3d at 903-04.
In contrast, the Wayne County case presents a situation in
which the district court had made findings of liability and
necessity in its Final Judgment. See discussion supra. There
was never any question that the Respondents in this case had
violated the Clean Water Act or that the improvements to the
wastewater treatment system were necessary to bring that
system into compliance with the federal Clean Water Act.
19
The district court formalized the finding of those violations in
its Final Judgment and the holding that the Improvements
were necessary to correct these violations. The
implementation of the Consent Decreeand the Financing Plan
in the Wayne County case was pursuant to these findings of
violations of the Clean Water Act and of the necessity of the
1993 Project Plan to cure the violations.
B. This Case Involves a State Court Proceeding
Intended To Enjoin Compliance With An
Express Federal Court Order
Winnebago County arose in connection with a separate
case brought in federal district court where the plaintiffs
alleged that a school district discriminated against students on
the basis of race. The parties to the discrimination case
entered into a consent decree, which the district court
described as a "Second Interim Order" and which required the
adoption of costly remedial measures but which did not
specify the mechanism by which the school district would
fund the remedies. When the district court invoked the All
Writs Act to take jurisdiction of otherwise unremovable state
cases, it had not issued any orders that would have been
directly countermanded by granting the relief requested in the
state cases
The Seventh Circuit pointed out:
“After cerefully reviewing the terms of the
Second Interim Order, we conclude that the
order did not require the school district to levy
the taxes at issue in this case. Although the
order directed the school district to fund
remedial programs, it explicitly, left the
20
manner of funding the remedial relief
completely in the discretion of the school
district... . The district court’s observation
and conclusion as to the legality of the levies
under the Tort Immunity Act simply cannot be
read as an order compelling the schoo! district
to impose taxes under the Act.“
Winnebago County, 96 F.3d at 898-99.
Here, Judge Feikens specifically ordered Respondents to
levy the taxes if they had not otherwise complied with his
order to pay for the sewer improvements. Final Judgment,
{8(a) - (c), Resp. App., pp. 8b-12b. When Petitioners
challenged the district-court-ordered levy to finance the
improvements, they were directly challenging the district
court's authority to impose those requirements. To make that
challenge, they asked the Michigan circuit court in their
state-court complaint to enjoin Respondents’ assessors from
complying with § 8 of the Final Judgment, which orders the
assessor to impose the challenged assessment. This is clear
from the pleadings of the Class Action Complaint and Jury
Demand, {J 1, 23 and 24. Resp. App. pp. 77b ef seq.,
discussed above.
In other words, if the district court here had not removed
Petitioners' case, Respondents’ tax assessors faced the
prospect of being ordered by the federal court to assess the
tax and by the state court to not assess the tax. There can be
no more direct conflict between the orders of state and federal
courts.
In this respect the Sixth and Seventh Circuits agree, as do
other Circuit Courts of Appeal. See, eg, In re VMS
21
Securities Litigation 103 F.3d 1317 (7th Cir. 1996); White v.
National Football League, 41 F.3d 402 (8th Cir. 1994), cert.
denied, 515 U.S. 1137 (1995); United States v. Citv of New
York, 972 F.2d 464 (2d Cir. 1992); Yonkers Racing Corp. v.
City of Yonkers, 858 F.2d 855 (2d Cir. 1988), cert. denied,
489 U.S. 1077 (1989).
USEPA vy. City of New York provides a valuable parallel
to this case. The Second Circuit upheld the removal of a state
court action challenging the legality of sludge management
contracts that the defendant city entered into pursuant to a
consent decree with USEPA to resolve a Federal Ocean
Dumping Ban Act enforcement action. The plaintiffs there
had alleged that the contracts were illegal under the general
municipal law because the city had failed to submit contracts
for competitive bidding. The circuit court concluded that the
removal of the state court case was necessary to protect the
integrity of the federal consent decree.
““** A decision by a state court canceling the
contracts would jeopardize the ability of the
City to comply with the timetables contained
in the federal consent decree. The City would
be forced, on an emergency basis, to seek
alternative means of disposing of the
enormous quantities of solid waste generated
every day.”
City of New York, 972 F.2d at 469.
Here, interference by Petitioners with the
district-court-ordered financing plan using the state court as a
vehicle would have required the Respondents “on an
22
emergency basis, to seek alternative means of [raising]
enormous quantities of [cash]” to meet the payment
obligations on nearly $200 million in bonds which had been
sold. That would unquestionably have interfered with
Respondents’ abilities to construct the Improvements and
cure the Clean Water Act violations according to the schedule
in the Consent Decree!
In summary, the district court here had subject-matter
jurisdiction because of the relief sought in the state court suit
and properly denied remand of this case, as the Sixth Circuit
recognized.
I. THIS COURT SHOULD DENY THE PETITION
BECAUSE THE DISTRICT COURT ALSO
HAD AUTHORITY TO REMOVE THE CASE
PURSUANT TO ITS RETENTION OF
CONTINUING JURISDICTION IN UNITED
STATES v. WAYNE COUNTY.
Petitioners also argue that the Sixth Circuit erred in ruling
that the terms of the Consent Decree in Wayne County
provided jurisdiction for removal of Petitioners’ state court
case. In making this argument, Petitioners invoke the
principle that a court's decree can only affect the substa.tive
rights of the parties to the decree, not the substantive rights of
non-parties. Of course, as discussed extensively above, this
argument is decisively rejected by the Winnebago County
opinion, the case upon which Petitioners place almost
exclusive reliance in their arguments regarding the All Writs
Act. Respondents certainly do not question that principle as
limited by Winnebago County, but point out it has no
application here. By taking jurisdiction of Petitioners’ case,
the district court did not affect Petitioners’ substantive rights;
23
it only affected the forum in which those rights were
adjudicated. The district court in this case addressed and
resolved Petitioners’ state law claim on its merits.
On this point, Petitioners principally question the Sixth
Circuit's reliance upon Vanguards of Cleveland v. City of
Cleveland, 23 F.3d 1013 (6th Cir. 1995), to support the
proposition that a district court's authority to enforce a
consent decree provided the court with continuing
jurisdiction to adjudicate state-court suits where the relief
requested in the state-court suit would affect the consent
decree. Petitioners contend that the Sixth Circuit read
Vanguards too broadly. They argue that the holding of
Vanguards must be interpreted in light of this Court's opinion
in Martin v. Wilks, 490 U.S. 755 (1989), which disapproved
Striff v. Mason, 849 F.2d 240 (6th Cir. 1988), a case that,
inter alia, considered a district court's authority to assert
continuing jurisdiction over cases affecting its consent
decrees.
This argument fails because Martin did not reverse the
Sixth Circuit's holding in S#riff regarding continuing
jurisdiction. S*riff reached two legal conclusions: that the
district court had jurisdiction to remove the state court action
arising out of its power to oversee enforcement its order, and
that the action should be dismissed pursuant to the
"impermissible collateral attack" rule. Martin addressed only
the latter conclusion. Martin, 490 U.S. at 763 n. 3. That rule
had provided that the entry of a consent decree between two
parties could preclude third parties from bringing claims that,
if granted, would undermine the consent decree. See Martin,
supra. Thus, the impermissible collateral attack rule
effectively allowed two parties to a consent decree to prevent
non-parties from having a hearing on their substantive rights.
|
a4
The rule effectively gave res judicata effect to all consent
decrees, whether those decrees were the product of
freely-made bargains made when the question of liability was
unclear or the product of the kind of coercion imposed by the
recognition that the court has made or inevitably wil: make a
finding of liability.
In this case, the impermissible collateral attack rule has
not be used to bar Petitioners from their day in court.
Petitioners have had a hearing on their substantive rights
under the Headlee Amendment. The district court held that
the Final Judgment in Wayne County did not abridge
Petitioners’ state constitutional rights. It also ruled that
Petitioners had waived those rights by delaying their assertion
of them. Bylinski, 8 F. Supp. 2d at 971-75. Although those
state law issues could have been appealed here, Petitioners
have abandoned them
Given Petitioners’ misapplication of the holdings of Striff
and Martin, they have no basis for their argument that the
Sixth Circuit wrongly applied Vanguards to this case.
Vanguards and Striff stand for the proposition that, as an
incident of their authority to issue consent decrees, district
courts may assert continuing jurisdiction to protect the
integrity of those decrees including removing state court
actions which may interfere with the enforcement of such
decrees. This proposition was not affected by Martin's
rejection of the impermissible collateral attack rule and is
good law. The Sixth Circuit did not err in basing its ruling
upon it.
25
CONCLUSION
Petitioners contend that this Court should grant their
petition for a writ of certiorari because the district court in
this case exceeded its jurisdiction and destroyed their rights
under state law. In fact, the district court did not act outside
its authority in any way. In the Wayne County case, the
district court concluded that a massive sewer and treatment
plan construction project was essential to obtain compliance
with the Clean Water Act and entered an order as to the
financing of those improvements. A compliance plan without
enforceable financing is a nullity. The Wayne County case
was brought exactly because voluntary compliance, i.e.,
funding of improvements which were recognized to be
needed in order to come into compliance with the Clean
Water Act, had not occurred.
Only after the Improvements neared completion and
about $200 million in bonds were sold, did Petitioners
asserted rights under the Michigan constitution. They asked
the state court to enjoin the heart of the financing plan: the
imposition of an sssessment in those communities which had
failed to pay for their part of the Improvements. The district
court ruled that it should assert jurisdiction over those claims
so that if relief were appropriate, such relief could be granted
in a manner consistent with the court’s orders in the Wayne
County case. It then ruled that those claims had no merit.
These rulings correspond with all of the fundamental
principles of federalism and federal jurisdiction, principles
upon which the circuit courts are in agreement.
Consequently, this Court should deny the petition for a writ
of certiorari.
Dated: May 30, 1999
26
Respectfully submitted,
R. Craic Hupp
CHARLES N. Raimi
PauL R. BERNARD
Counsel of Record
Bodman, Longley & Dahling LLP
Attorneys for Respondents
100 Renaissance Center
34th Floor
Detroit, Michigan 48243
(313) 259-7777
lb
UNITED STATES OF AMERICA and FRANK J. KELLEY,
ATTORNEY GENERAL FOR THE STATE OF MICHIGAN,
EX REL, MICHIGAN NATURAL RESOURCES
COMMISSION, AND DIRECTOR OF THE MICHIGAN
DEPARTMENT OF NATURAL RESOURCES, Plaintiffs, -v-
WAYNE COUNTY, MICHIGAN; CITY OF ALLEN PARK;
CITY OF BELLEVILLE; TOWNSHIP OF BROWNSTOWN;:
CITY OF DEARBORN HEIGHTS; CITY OF ECORSE; CITY
OF LINCOLN PARK; CITY OF RIVER ROUGE; CITY OF
RIVERVIEW; CITY OF ROMULUS; CITY OF
SOUTHGATE; CITY OF TAYLOR; TOWNSHIP OF VAN
BUREN; CITY OF WYANDOTTE;
SOUTHGATE-WYANDOTTE RELIEF DRAINAGE
DISTRICT; AND ECORSE CREEK POLLUTION
ABATEMENT DRAIN, Defendants.
CIVIL ACTION NO. 87-70992
U'wITED STATES DISTRICT COURT FOR THE EASTERN
DISTRICT OF MICHIGAN
DOWNRIVER SEWAGE DISPOSAL SYSTEM 1994
FINANCING PLAN AND FINAL JUDGMENT
RE: 1994 COURT-ORDERED IMPROVEMENTS
WHEREAS, this, Matter having been brought on for
hearing on notice of this Court and this Court being fully
advised in the premises; and
WHEREAS, the County of Wayne, Michigan
("Wayne"), acting by and through its then Board of Supervisors
and pursuant to the authority conferred upon it by Act 185,
Public Acts of Michigan, 1957, as amended ("Act 185"), did,
by resolution duly adopted by a two-thirds (2/3) vote of the
Board of Supervisors, establish a Department of Public Works,
now known as the Department of Public Services, Division of
Public Works, in and for Wayne for the administration of the
powers conferred upon Wayne by Act 185; and
WHEREAS, Wayne is now a Charter County with all
powers provided under Act 293, Public Acts of Michigan 1966,
2b
as amended, including the powers conferred by statute and
charter on its County Executive (the "CEO"); and
WHEREAS, pursuant to Section 16 of Act 261, Public
Acts of Michigan 1966, as amended, all references to county
supervisors or county boards of supervisors in any act are
deemed to mean county commissioners and county boards of
commissioners anu, in a Charter County, a county commission;
and
WHEREAS, pursuant to Section 2(5) of Act 185 the
CEO has all authority, powers, and duties conferred by Act 185
upon a department of public works and is under the general
control of the County Commission; and
WHEREAS, Wayne, pursuant to the authority of Act
185 entered into a contract dated March 1, 1962, which contract
has been amended from time to time, (the "Downriver
Agreement"), with certain communities within Wayne County
for the purposes of establishing a Wastewater Control System
commonly known as the Downriver Sewage Disposal System
(the "System") to address the immediate public health and
welfare needs of all or a portion of the residents of those
communities, namely the cities of Allen Park, Belleville,
Dearborn Heights, Ecorse, Lincoln Park, River Rouge,
Riverview, Romulus (then a Township), Southgate, Taylor
(then a Township) and Wyandotte and the Townships of
Brownstown and Van Buren (referred to collectively as the
"Downriver Coramunities"); and
WHEREAS, in order to operate the System in
accordance with law, including sewerage systems of
Downriver Communities tributary to the System, it is necessary
to obtain a National Pollution Discharge Elimination System
Permit (an "NPDES Permit") issued pursuant to the Michigan
Water Resources Commission Act, Act 245, Public Acts of
Michigan, 1929, as amended, and the Federal Clean Water Act,
33 U.S.C. 1251, et. seq.; and
aE eee
3b
WHEREAS, additional regulations and requirements
have recently been enacted by the USEPA with respect to the
disposition and disposal of sludge, a by-product of wastewater
treatment, (the "503 Regulations") that will require additional
improvements and emission control systems be planned,
designed and installed at the System's sewage disposal
treatment plant; and
WHEREAS, this Court noticed for entry a certain
Consent Decree on February 11, 1994, (the "Consent Decree")
in this action, requiring that certain improvements to the
System be planned, designed, acquired, constructed and
financed all in accordance with a certain schedule attached as
Exhibit A and a certain Project Plan dated May 1, 1993, titled
"Wayne County Downriver Collection System," which has
been summarized in Exhibit B and a "Project Plan for Sanitary
Sewer Improvements; City of Riverview" (collectively, the
"Project Plan"). The Project Plan has been formulated by the
defendants working with the assistance of the Court-Appointed
Monitor, the Court-Appointed Expert Witness and Master and
in consultation with the USEPA and MDNR; and
WHEREAS, it is immediately necessary and imperative
for the public health and welfare of the present and future
residents of Wayne and the Downriver Communities that the
improvements for the System required by the Consent Decree
and the Project Plan (the "Improvements") be planned,
designed, acquired, constructed and financed to service the
Downriver Communities, as a part of the System: and
WHEREAS, the consulting engineers for Wayne
estimate a total cost of approximately Two Hundred Thirty
Million Dollars ($230,000,000) to plan, design, acquire,
construct and finance all of the Improvements (including the .
1994 Improvements and the Local Jurisdiction Improvements,
as hereinafter defined) and Wayne and certain of the
Downriver Communities intend to file applications with The
Michigan Water Pollution Control Revolving Loan Fund
Program (the "Revolving Loan Fund") and The Michigan
4b
Municipal Bond Authority (the "Authority") to finance
approximately Two Hundred Million Dollars ($200,000,000) of
the Improvements; and sik
WHEREAS, the consulting engineers for Wayne
estimate a total cost of approximately Thirty Million Dollars
($30,000,000) to plan, design, acquire, construct and finance
certain improvements to the System which are described in the
"Bond Amount" column and included in the "Total
Construction Costs” now on page | of Exhibit C, which
includes the cost of certain of the Local Jurisdiction
Improvements, all as required by the Consent Decree and the
Project Plan (collectively, the "1994 Improvements"), which
1994 Improvements (i) consist almost exclusively of the
preparation of engineering plans and (ii) are included within,
and not in addition to, the Improvements, of which it is
anticipated that approximately Twenty Five Million Dollars
($25,000,000) may become eligible for financing through the
Revolving Loan Fund and the Authority; and
WHEREAS, in order to meet the requirements of the
Consent Decree, the Downriver Communities and Wayne need
to plan, design, acquire and construct the 1994 Improvements
and the Downriver Communities desire to have Wayne as their
agent to supply the planning, designing, acquisition and
construction of the 1994 Improvements required for the System
and, if requested, to apply as their agent for loans from the
Revolving Loan Fund and the Authority and where necessary
receive the funds on behalf of the Downriver Communities; and
WHEREAS, in order to meet the requirements of the
Consent Decree, certain of the Downriver Communities need to
plan, design, acquire, construct and finance improvements to
local sewage systems which are under the jurisdiction and
control of each such Downriver Community (respectively, the
"Local Jurisdiction Improvements".) and in accordance with
this 1994 Financing Plan And Final Judgment Re: 1994
Court-Ordered Improvements (the "1994 Financing Plan And
Final Judgment") Wayne may contract with such Downriver
5b
Communities as their agent to supply all or part of the planning,
designing, acquisition and construction of such Downriver
Communities’ respective Local Jurisdiction Improvements and
to apply as such Downriver Communities’ agent for loans trom
the Revolving Loan Fund and the Authority; and
WHEREAS, in order to meet the requirements of this
1994 Financing Plan And Final Judgment, the City of
Wyandotte ("Wyandotte") has agreed to pay to Wayne Six
Hundred Sixty Six Thousand Three Hundred Eighty Three
Dollars ($666,383), representing Wyandotte's estimated local
share of the cost of the 1994 Improvements ("Wyandotte's
Share") to be deposited by Wayne in a Construction Fund
Subaccount (as hereinafter defined).
WHEREAS, in order to meet the requirements of the
Consent Decree, the City of Riverview has commenced certain
local improvements (the "Riverview Improvements") in
accordance with the Project Pian for Sanitary Sewer
Improvements. City of Riverview, and has issued its bonds to
pay part of the costs of the Riverview Improvements and
intends to pay further costs of the Riverview Improvements.
NOW, THEREFORE, UPON CONSENT OF THE
PARTIES HERETO, IT IS HEREBY ORDERED,
ADJUDGED AND DECREED AS FOLLOWS:
1. Approval of Project Plan for the 1994 Improvements.
As set forth in paragraph 4 of the Consent Decree, the United
States of America, acting through its Environmental Protection
Agency ("US EPA"), and the Michigan Department of Natural
Resources ("MDNR"), acting on behalf of the State of
Michigan, have conceptually approved the Project Plan and
hereby further approve (i) Wayne's proceeding with the
planning, designing, acquisition and construction of the 1994
{Improvements and (ii) the Riverview Improvements as
contemplated by the Project Plan. The Downriver
Communities approve the planning, designing, acquisition and
construction of the 1994 Improvements. Wayne approves the
6b
planning, designing, acquisition, construction and financing of
the 1994 Improvements.
2. 4 Vv ¢
The 1994 Improvements to be designed will service the
Downriver Communities and their residents and are hereby
ordered to be immediately necessary to protect and preserve the
public health.
3. Wayne's Use of Rights-Of-Way. The Downriver
Communities hereby consent to the use by Wayne of the public
streets, alleys, lands and rights-of-way in the Downriver
Communities for the purpose of constructing, operating and
maintaining the 1994 Improvements and in order to evidence
and effectuate the foregoing consent, the Downriver
Communities will execute and deliver to Wayne such grants of
easement, right of way, license, permit, consent or other
agreement as may be required by Wayne.
4. Approval of the Estimated Cost for the 1994
Improvements. Wayne and the Downriver Communities
hereby approve the estimated cost for the 1994 Improvements
as prepared by the consulting engineers and as set forth in
Exhibit C attached hereto. Such estimated costs for the 1994
Improvements may include, but are not limited to, costs for all
surveys, plans, specifications, acquisition of property for
rights-of-way, physical construction necessary to acquire and
construct the 1994 Improvements the acquisition of all
materials, machinery and necessary equipment, contingency
allowance, and engineering, engineering supervision,
administrative and legal expenses necessary in connection with
the planning., designing, acquisition and construction of the
1994 Improvements.
5. Issuance of Bonds. Wayne, acting solely by its
County Commission, shall authorize the issuance of the bonds,
in a principal amount not to exceed Thirty Million Dollars
($30,000,000), plus (i) any amount required to fund the Reserve
Fund described in Section 14 and (ii) the principal amount of
7b
any bonds to be issued by Wayne for any Local Jurisdiction
Improvements. The bonds issued hereunder shall be limited tax
general obligations of Wayne.
In addition to bonds issued in accordance with the
preceding paragraph, if the Judgment Payments (as defined in
Section 8(b) hereof) and the proceeds from tue sale of the
bonds are not sufficient to complete the 1994 Improvements,
Wayne may issue additional bonds (including any bonds sold to
the Authority) in an aggregate amount sufficient to complete
the 1994 Improvements.
6. t truct
the 1994 Improvements. Wayne will plan, design, acquire and
construct the 1994 Improvements on behalf of the Downriver
Communities and Wayne and for that purpose will take bids
and/or proposals for the planning, designing, acquisition and
construction thereof.
7 D river C ie be Beneficial
rs l n Improvement 1994
Improvements. While any bonds remain outstanding which
were issued by Wayne for any Local Jurisdiction
Improvements, each such Downriver Community shall be a
beneficial owner of its Local Jurisdiction Improvements and
each such Downriver Community shall operate, maintain and
administer its Local Jurisdiction Improvements as a part of its
local sewage disposal system and pay all costs thereof, so as to
keep all such facilities in proper repair and working order in
compliance with all applicable federal state and local
regulations, and Wayne shall have the right to inspect the Local
Jurisdiction Improvements at reasonable times to insure that
each Downriver Community's maintenance and operation is
appropriate. Each Downriver Community also shall be a
beneficial owner of the 1994 Improvements to the extent of its
allocable share of the cost of such 1994 Improvements.
8. Judgment Requiring Payment. Each Downriver
Community is hereby ordered to pay its portion of the
8b
local-share costs of the Improvements, in accordance with the
allocations as set forth in Exhibit C. Except as otherwise
provided herein, each Downriver Community is hereby ordered
to pay its local - share costs of the 1994 Improvements, if any,
in cash, or as otherwise provided in Section 8(b), on or before
the closing date on the sale of the bonds described herein. Each
Downriver Community shall pay its portion of the local - share
costs of the Improvements (other than the 1994 Improvements)
in the amounts and at the time determined by Wayne to be
necessary to comply with the Consent Decree. To the extent
that a Downriver Community does not pay its local - share
costs of the Improvements (other than the 1994 Improvements)
at the times required by Wayne, Wayne shall collect such local
- share costs in a manner similar to Sections 8(a)-(c) below.
Wyandotte is hereby ordered to deposit Wyandotte's Share with
Wayne, to be held by Wayne in a subaccount oi the
construction fund (a "Construction Fund Subaccount") to be
maintained by Wayne in connection with the construction of
the 1994 Improvements and in accordance with Section 10(g).
Wyandotte shall be deemed to have paid the Wyandotte Share
in cash for purposes of this Agreement. It is the understanding
of the parties that Wayne shall, where appropriate, adjust the
allocations to properly reflect community cost apportionments
based on data collected during the 1995 flow monitoring and
after the subsequent reports have been completed. It is also the
understanding of the parties that receipt of these allocations
does not prevent any party from raising issues between itself
and other parties as to allocations of costs related to
construction. Any adjustments to the allocations described in
this paragraph shall be computed in accordance with the Cost
Allocation Methodology attached as Exhibit D.
(a) Filing of Judgment Against Certain Downriver
Communities. With respect to any Downriver Community that
does not pay its Judgment Payments (as defined tn Section 8(b)
hereof) in cash prior to the closing date for the sale of Wayne's
bonds, a certified copy of this 1994 Financing Plan And Final
Judgment shall be filed with the assessing officer of each
Downriver Community that is a city, and with the supervisor of
NS a ee Pe a ee |
ee
9b
each Downriver Community that is a township (collectively,
the "Assessing Officer"), pursuant to Section 6093 of Act 236,
Public Acts of Michigan 1961, as amended ("Act 236"), and
this 1994 Financing Plan And Final Judgment. The Judgment
Payments shall be assessed by the Assessing Officer of each
Downriver Community upon the taxable property of the
Downriver Community in the annual amounts required to be
paid hereunder; provided. however, that such annual
assessment shall not be required (i) to the extent that the
Downriver Community has provided to Wayne the resolution
required by Section B(c)(i) and paid the applicable Judgment
Payments at least forty five(45) days prior to the Levy Date for
such year or (ii) if proceeds from the issuance of a Downriver
Community's bonds or other evidences of indebtedness are paid
to an escrow account with terms satisfactory to Wayne and
solely for purposes of paying the Judgment Payments, then to
the extent that the amount in such escrow account is verified by
independent certified public accountants satisfactory to Wayne
to be sufficient to pay succeeding annual assessments of the
Judgment Payments. then such annual assessments of the
Judgment Payments shall not be required. Judgment Payments
received by Wayne under this subparagraph shall be held by
Wayne in an interest-bearing account (subject to any
restrictions imposed by state or federal law) and applied to the
next Judgment Payments due by such Downriver Community,
with any excess being retained in such account to be applied to
the next Judgment Payments due. The treasurer or collecting
officer of each Downriver Community charged with collection
and payment of such Judgment Payments is specifically
authorized and directed to pay said sums to Wayne, to apply on
the obligations of the Downriver Community as herein set
forth. In addition to the foregoing, Wayne shall have all other
rights and remedies provided by law to enforce the obligations
of the Downriver Community to make its Judgment Payments
and other payments required hereunder in the manner and at the
times required by this 1994 Financing Plan And Final
Judgment. The Downriver Community will not take any action
to reduce the right of Wayne to receive state-returned moneys
of such Downriver Community in the event of default. It is
eR ce Re
10b
hereby ordered that the rights of plaintiffs under Section 6093
of Act 236, to require the Assessing Officer to assess such
payments on the taxable property of the Downriver Community
with respect to the Improvements, are hereby assigned to
Wayne and any such payments received by plaintiffs from the
Downriver Communities shall be paid to Wayne. Wayne
acknowledges receipt of and accepts such assignment.
(b) Judgment Payments. Each Downriver
Community is hereby ordered to make the following payments
to Wayne (the "Judgment Payments") severally, and not jointly:
(i) in the case of a Downriver Community paying its local
share (as determined in accordance with pages 1-5 of
Exhibit C) of the cost of the 1994 Improvements in cash,
such cash amount, which shall be paid to Wayne on or
before the closing date for the sale of Wayne's bonds and
deposited in a Construction Fund Subaccount, together
with such Downriver Community's local share of all other
expenses, costs and fees incurred or charged by Wayne in
connection with the 1994 Improvements, at such times as
Wayne shall determine, including without limitation
expenses of planning, designing, acquiring and constructing
the 1994 Improvements, but excluding any expenses of
financing the 1994 Improvements; or
(ii) in the case of a Downriver Community not paying its
local share of the cost of the 1994 Improvements in cash, an
amount equal to its local share of the cost of the 1994
Improvements sufficient to allow Wayne to pay the
principal of and interest when due on Wayne's bonds
(including any bonds sold to the Authority), and to maintain
the Reserve Fund described in Section 14, all at such times
as Wayne shall determine, together with such Downriver
Community's local share of all other expenses, costs and
fees incurred or charged by Wayne in connection with the
1994 Improvements, at such times as Wayne shall determine,
including without limitation expenses of planning, designing,
llb
acquiring, constructing and financing (including bond discount
and credit enhancement) the 1994 Improvements; and
(iii) in the case of each Downriver Community, in addition
to the amounts described in Section 8(b)(i) or Section 8(b)(ii)
above, if Wayne determines that the actual cost of the 1994
Improvements exceeds the estimated cost of the 1994
Improvements, an amount equal to such Downriver
Community's local share of such increased costs of the 1994
Improvements within thirty (30) days after delivery by Wayne
of notice of such increase or, in the event Wayne issues its
bonds (including any bonds sold to the Authority) for such
increased costs, in annual installments in the manner provided
in Section 8(b)(ii) above.
The Downriver Communities are hereby ordered to pay the
Judgment Payments to Wayne without regard to whether the
1994 Improvements are actually completed or placed in
operation, and such Judgment Payments shall not be reduced by
any Downriver Community for any amounts that are
attributable to other claims or offsets among the parties.
Notwithstanding the preceding sentence, Wayne shall apply the
Judgment Payments it receives, in such manner as Wayne shall
determine, to the cost of the 1994 Improvements and Wayne's
expenses, costs and fees in connection with the 1994
Improvements.
(c) Notification of Requi nt ments.
Wayne shall, simultaneously upon the sale of the bonds, deliver
to each Downriver Community described in Section 8(a) a
complete schedule of the estimated Judgment Payments due in
calendar years 1994 and 1995. Within twenty-one (21) days
after such delivery, each Downriver Community shall provide
Wayne with a resolution of its governing body satisfactory to
Wayne resolving that:
(i) it has adequate funds available that shall be reserved to
pay such Judgment Payments; and/or
ee
12b
(ii) to the extent that it does not have adequate funds
available to pay such Judgment Payments the Assessing Officer
shall assess taxes on the taxable property of the Downriver
Community on the Levy Date sufficient to pay such deficiency
and shall direct its treasurer or collecting officer to establish an
expenditure account to pay such deficiency and a revenue
account to receive taxes assessed for such Judgment Payments; ;
and |
(iii) its treasurer or collecting officer shall pay such .
Judgment Payments to Wayne as such amounts are collected.
The "Levy Date" for the Downriver Communities that
are (1) cities shall be July 1 or December | of each year, upon
Wayne's approval, and (ii) townships shall be December | of |
each year, unless otherwise changed by applicable Michigan
law. |
On March 1, 1995, and on March | of each succeeding .
year, Wayne shall deliver to each Downriver Community a ;
complete schedule of the estimated Judgment Payments due in
the following calendar year. On April 15, 1995, and on April 15
of each succeeding year, each Downriver Community shall
provide Wayne with a resolution in accordance with Sections
8(c)(1)-(i11) above.
If any arrangements due by any Downriver Comunity
hereunder are not paid when due, the amounts not so paid shall
be subject to a penalty, in addition to interest, of one percent (1
%) thereof for each month, or fraction thereof, that the same
remains unpaid after the due date. Failure of Wayne to notify
the Downriver Communities of any such Judgment Payments
shall not relieve the Downriver Communities of the obligation
to make such Judgment Payments.
(d) Surplus Proceeds. After completion of the 1994
Improvements and payment of all costs thereof, any surplus
remaining from the proceeds of sale of bonds and cash received
from any Downriver Community on or before the closing on
the sale of Wayne's bonds shali be used by Wayne pro rata on
13b
the basis of the local share allocations set forth on pages 1-5 of
Exhibit C for (i) reimbursement to those Downriver
Communities that paid cash on or before the closing on the sale
of Wayne's bonds, such amount to include such Downriver
Community's share of interest earned on such surplus or (ii)
credit to those Downriver Communities described in Section
8(a) toward the Judgment Payments next due Wayne by such
Downriver Communities.
9. Need for the Improvements. This Court
specifically finds, based on its review of applicable law and the
Project Plan, that (i) the Improvements are needed to comply
with the Federal Water Pollution Control Act and Act 245; and
(11) the installation, construction, alteration, improvement and
operation of the Downriver Sewage Disposal System , as
described with the Improvents, have been ordered in
accordance with the Consent Decree, Act 320, Act 245 and the
Federal Clean Water Act.
10. Actions to be Taken by Wayne. To provide for
the planning, designing, acquisition and construction of the
Improvements, and the financing thereof, Wayne is hereby
ordered pursuant to and in compliance with Act 320, and
solely by authority of its Board of Commission, to:
(a) Submit to the Board of Commission of
Wayne a resolution (the "Bond Resolution") providing for the
issuance of bonds in one or more series in the amount necessary
to finance the planning, designing, acquisition and
construction of the 1994 Improvements, and solely the 1994
Improvements, and to pay costs of issuance of the bonds, in the
aggregate principal amount not to exceed Thirty Million
Dollars ($30,000,000) (except as otherwise authorized pursuant
to this 1994 Financing Plan And Final Judgment). Such bonds
shall be payable and have such terms as provided in the Bond
Resolution and shall be secured as provided in this 1994
Financing Plan And Final Judgment. After due adoption of the
Bond Resolution, Wayne will take all necessary legal
procedures and steps necessary to effectuate the authorization,
14b
sale and delivery of said bonds, such legal procedures and steps
to include, without limitation, the right of Wayne to (i) file with
the Municipal Finance Division of the Michigan Department of
Treasury notices of intent to issue the bonds described herein
and to pay any related fees and to request an order, if
applicable, providing an exception for the bonds from prior
approval by the Department of Treasury and to request such
other waivers from the Department of Treasury as Wayne
deems necessary and (ii) file with the Authority such
documents as may be necessary to issue and sell Wayne's bonds
to the Authority.
(b) Take bids and/or proposals for and enter into
and execute final contracts for the planning, designing,
acquisition and construction of the Local Jurisdiction
Improvements, and the financing thereof, in accordance with
the plans and specifications therefor as approved by this 1994
Financing Plan And Final Judgment.
(c) | Upon request of a Downriver Community,
Wayne shall permit such Downriver Community to take bids
and/or proposals for and enter into and execute final contracts
for the planning, designing, acquisition and construction of the
Local Jurisdiction Improvements. and the financing thereof, in
accordance with the plans and specifications therefor as
approved by this 1994 Financing Plan And Final Judgment,
subject however, to final review and approval by Wayne.
(d) | Require and procure from the contractor or
contractors undertaking the actual construction and acquisition
of the Improvements necessary and proper bonds to guarantee
the performance of the contract or contracts and such labor and
material bonds as may be required by law, in such amount and
such forms as may be approved by Wayne.
(e) Require and procure from the contractor or
contractors undertaking the actual construction of the
Improvements insurance protecting both the Downriver .
Communities and Wayne from liability in connection with such
A eat IE RS
15b
construction. The cost of such insurance shall be considered to
be a part of the cost of the Improvements.
(f) Upon receipt of the proceeds of sale of the
bonds, comply with all provisions and requirements provided
for in the Consent Decree, the Bond Resolution and this 1994
Financing Plan And Final Judgment relative to the ,
disposition and use of the proceeds of sale of the bonds.
(g) In its discretion, temporarily invest any bond
proceeds or other funds held by it as permitted by law, and
investment income shall accrue to and follow the fund
producing such income. Neither Wayne nor the Downriver
Communities shall take any act or fail to take any act which
would make the interest on the bonds includible in gross
income for federal income tax purposes.
LI. ;
Nothing herein contained shall be construed to prevent the
Downriver Communities from using any combination of
the means and methods provided under law or other such funds
lawfully at their disposal for the purpose of providing funds to
meet their obligations under this 1994 Financing Plan And
Final Judgment.
12. Approval of Bonds: Use of Proceeds. The
Municipal Finance Division of the Michigan Department of
Treasury ("Treasury") has approved the financing of the
Improvements as contemplated by this 1994 Finencing Plan
And Final Judgment. Wayne, the Downriver Communities and
Treasury acknowledge that pursuant to Section 8(a) hereof: (i)
the Court has ordered assignments of plaintiffs’ rights under
Section 6093 of Act 236 to require the Assessing Officers of
the Downriver communities to assess the payments on the
taxable property of the Downriver Communities to Wayne and
(ii) the treasurer or collecting officer of each Downriver
Community charged with collection and payment of such
Judgment Payments is specifically authorized and directed to
pay said sums to Wayne unless the Judgment Payments are
16b
otherwise paid in accordance with Sections 8(a) or 11 hereof.
Wayne and the Down river Communities acknowledge that it is
the intent of some of the Downriver Communities to treat any
such assessments of taxes for the Judgment Payments as being
in excess of otherwise applicable charter, statutory and
constitutional limitations and have assured this Court that none
of them will hereafter object to the proposed treatment of such
Judgment Payments as being in excess of charter, statutory and
constitutional limitations. Treasury will not object to this
structure or challenge it in state or federal court. Wayne, the
Downriver Communities and Treasury will cooperate to the
extent within their power to cause the Revolving Loan Fund
and the Authority to purchase the bonds issued by Wayne and |
shall take all other actions and provide such other assistance as
may be necessary to permit Wayne to finance the
Improvements in accordance with this 1994 Financing Plan
And Final Judgment.
Wayne for itself and as agent for the Downriver
Communities, other than Wyandotte, is hereby authorized to
submit Parts I, II and III of the Application for Assistance to the
Revolving Loan Fund and the Authority with respect to the
1994 Improvements. Any proceeds received by Wayne from the
sale of bonds to the Revolving Loan Fund and the Authority
with respect to the 1994 Improvements shali (i) if permissible
under the Revolving Loan Fund, be paid to the Downriver
Communities to reimburse them for Judgment Payments made
by them to Wayne in accordance with Section 8(a)(i) and
directly related to the 1994 Improvements or (ii) be deposited
into the debt retirement fund established for the bonds
previously issued for the 1994 Improvements and used solely to
redeem, at the earliest possible opportunity, the outstanding
bonds directly related to those 1994 Improvements financed by
such subsequent bond issue. Wayne shall, within thirty (30)
days after any early redemption of bonds, furnish the
Downriver Communities with a complete schedule of the
known Judgment Payments due on the next succeeding due
date. If any Judgment Payments are not paid when due, the
Judgment Payments not so paid shall be subject to a penalty, in
17b
addition to interest, of one percent (1 %) thereof for each
month, or fraction thereof, that the same remains unpaid after
the due date. Failure of Wayne to notify the Downriver
Communities of any such Judgment Payments shall not relieve
the Downriver Communities of the obligation to make such
Judgment Payments.
Wayne and the Downriver Communities each declare
their official intent to issue bonds in the maximum principal
amount not to exceed Two Hundred Thirty Million Dollars
($230,000,000) to finance the costs of the Improvements
and each declare that they reasonably expect to be reimbursed,
without interest, for advances made by them towards the cost of
the Improvements. Wayne and the Downriver Communities, at
the present time, each have determined that there are no funds
from sources other than the bonds anticipated herein that are
reasonably expected to be reserved, allocated on a long-term
basis or otherwise set aside by them, or by any member of a
controlled group (as defined in Treasury Regulation
§1.150-1(e)) in which they are a member, if any, pursuant to
their budget or financial policies with respect to the
expenditures for the Improvements expected to be reimbursed
from the proceeds of the bonds. Notwithstanding the above,
each Downriver Community shall not be obligated to allow
Wayne to finance its share of the cost of such Improvements in
the above described manner, but may elect to pay its share of
the cost of such Improvements in cash.
13. Revenue Sharing. To the extent permitted by
law, in the event a Downriver Community described in Section
8(a) fails for any reason to pay to Wayne at the times specified
by Wayne County its Judgment Payments or any other ainounts
ordered to be paid by the provisions of this 1994 F inancing
Plan And Final Judgment (a "Default"), Wayne shall
immediately give notice of such Default and the amount
thereof, in writing, to the Treasurer of the Downriver
Community, the Treasurer of Wayne, the Treasurer of the State
of Michigan and such other officials charged with the
disbursement to the Downriver Community of funds returned
8b
by the State and now or hereafter available for pledge under
any applicable state law, as provided in this Section. If such
Default is not corrected within ten (10) days after such
notification, such official charged with disbursement to the
Downriver Community of the aforesaid funds is by these
presents specifically authorized by the Downriver Community
to withhold from the aforesaid funds the maximum amount
permitted by law and not previously pledged by such
Downriver Community as is necessary to cure said Default and
to pay said sums so withheld to Wayne to apply on the
obligations of the Downriver Community as ordered herein.
Any such moneys so withheld and paid shall be considered to
have been paid to the Downriver Community within the
meaning of the Michigan Constitution of 1963, the purpose of
this provision being solely to authorize and pledge voluntarily
the use of said funds in such amounts as may be permitted by
law owing to the Downriver Community to meet any past-due
obligations of the Downriver Community due under the
provisions of this 1994 Financing Plan And Final Judgment.
14. Reserve Fund. Wayne shall (subject to
restrictions imposed by state or federal law) maintain a reserve
fund in an amount determined by Wayne (the "Reserve Fund").
Wayne shall make the initial payment to the Reserve Fund out
of proceeds from the sale of Wayne's bonds. Future payments
to the Reserve Fund shall be made, at such times as Wayne
shall determine, by the Downriver Communities that are not
paying their Judgment Payments in cash on or before the
closing date on the sale of Wayne's bonds, so that each such
Downriver Community will have in the Reserve Fund an
amount equal to the total Reserve Fund required by the first
sentence of this Section multiplied by a fraction, the numerator
of which is such Downriver Community's share of the
outstanding Judgment Payments and the denominator of which
is the total outstanding Judgment Payments. Wayne shall
withdraw from the Reserve Fund such amounts as may be
necessary to meet the principal and interest payments due on
Wayne's bonds if the Judgment Payments received by Wayne
are insufficient to make such payments. Upon any such
19b
withdrawal from the Reserve Fund, the Reserve Fund shall be
restored by Wayne and Wayne shall be reimbursed severally,
and not jointly, by each Downriver Community responsible for
such insufficiency to the extent of its share of such
insufficiency. Notwithstanding the preceding sentence, the
Reserve Fund may be used to pay the principal and interest due
on Wayne's bonds in the final year of maturity.
15. Future Changes. It is ordered that the structure
for Wayne's bonds in this 1994 Financing Plan And Final
Judgment shall govern future financings of the Improvements,
except as otherwise ordered by this Court, and so long as any of
such bonds shall remain outstanding and unpaid, this structure
shall not be subject to any alteration or revision which would in
any manner materially adversely affect either the security of
the bonds or the prompt payment of principal or interest
thereon.
16. Entry of Judgment. Each Downriver Community
shall adopt a resolution authorizing the entry of this 1994
Financing Plan And Final Judgment.
17. Successors and Assigns. This 1994 Financing
Plan And Final Judgment shall inure to the benefit of and be
binding upon the parties hereto and their respective successors
and assigns, Except as expressly modified herein, the terms and
conditions of the Downriver Agreement shal! remain in full
force and effect.
18. iverview rovements. The City of
Riverview is ordered to construct the Riverview improvements
and to issue its bonds for that purpose.
19, ransfer of Downriver Collection and Treatment
System. Nothing contained in this 1994 Financing Plan And
Final Judgment shall be construed as a prohibition against the
transfer of the Downriver Collection and Treatment System
from Wayne to the Downriver Communities, or any other
entity, including an authority created for that purpose, for the
20b
construction, operation and maintenance of said System. Any
such transferee of such System will be a successor of
Wayne and will be fully bound as to the terms and conditions of
this 1994 Financing Plan And Final Judgment, including any
obligations issued hereunder.
20. Final Order. This 1994 Financing Plan And Final
Judgment (i) shall be contingent upon entry by the Clerk of the
Court of the Consent Decree and (ii) shall be a final order upon
which the parties may not appeal and which covers all claims
by be plaintiffs against the defendants relating to the subject
matter hereof. If there is any conflict between the terms of the
Consent Decree and this 1994 Financing Plan And Final
Judgment, the terms of the Consent Decree shall
control.
21. Continuing Jurisdiction of Court. This Court
shall retain jurisdiction with respect to any matter which may
arise which may involve the interpretation of the terms of this
1994 Financing Plan and Final Judgment or affect the rights of
any party arising out of this 1994 Financing Plan and Final
Judgment.
22 Counterparts. This 1994 Financing Plan And
Final Judgment may be executed in several counterparts.
23. MDNR is signing this 1994 Financing Plan And
Final Judgment solely ‘or purposes of effectuating the
provisions us Section 1.
24. ‘Treasury is signing this 1994 Financing Plan
And Final Judgment solely for purposes of effectuating the
provisions of Sections 12 and 15.
IN WITNESS WHEREOF, the parties hereto
have caused this instrument to be executed as of the day and
year first above written.
JOHN FEIKENS/U.S.D.J./E.D. OF MICHIGAN
21b
UNITED STATES OF AMERICA and FRANK J. KELLEY,
ATTORNEY GENERAL FOR THE STATE OF MICHI-
GAN, EX REL, MICHIGAN NATURAL RESOURCES
COMMISSION, AND DIRECTOR OF THE MICHIGAN
DEPARTMENT OF NATURAL RESOURCES, Plaintiffs,
-v- WAYNE COUNTY, MICHIGAN; CITY OF ALLEN
PARK; CITY OF BELLEVILLE; TOWNSHIP OF BROWN-
STOWN; CITY OF DEARBORN HEIGHTS; CITY OF
ECORSE; CITY OF LINCOLN PARK; CITY OF RIVER
ROUGE; CITY OF RIVERVIEW; CITY OF ROMULUS:
CITY OF SOUTHGATE; CITY OF TAYLOR; TOWNSHIP
OF VAN BUREN; CITY OF WYANDOTTE;
SOUTHGATE-WYANDOTTE RELIEF DRAINAGE DIS-
TRICT; AND ECORSE CREFK POLLUTION ABATE-
MENT DRAIN, Defendants.
CIVIL ACTION NO. 87-70992
UNITED STATES DISTRICT COURT FOR THE EAST-
ERN DISTRICT OF MICHIGAN
CONSENT DECREE
pb FBR Oe Ie 3
I JURISDICTION AND VENUE ................. 4
I] Pg. MS GRIER eS oy ae vee a 5
Il MRM oe oro 5o6 coo susks iach ss 6
IV. COMPLIANCE PROGRAM ..............cc00:. 9
V. SEIEVLATED PENALTIES .........cceccccce. 29
VI. PCR IIIRAEEE, vibe sh adisecdes (> exncde coerve BS
VI. REPORTING REQUIREMENTS .............. 37
Ps ee is cp conc cle es cacoe saves 40
IX. OE RR as pou vbsca daedacv’ 43
X. RPE ION ons cccccccvecceverccs 46
22b
XT RA ee a 47
XII. DIVISION OF RESPONSIBILITY
AMONG DEFENDANTS .............006:005 48
XII. APPROVAL AND FACILITY
COMATOTIOTION io Ci ane a 48
XIV PUMDING Sha ie ee 49
XV. OIE tccisse banechiousess cancers ane 50
XVI FAILURE OF COMPLIANCE .............6+: 50
XV NOTA PRR Ce oo ee, 50
XVIII NON-WAIVER PROVISIONS ................ 51
XIX CONTINGENT LIABILITY OF STATE OF
MICHIGAN |... s+: essa eee
XX | RESOLUTION OF COUNTERCLAIMS....... 53
XXl CORSO Ge ee
XXH MODIMICATION | ..5.06.00:3. Gla
XXII EFFECTIVE DATE AND CONTINUING
JURISDICTION OF THE COURT ............. 54
XXIV TERMINATION Aaa, 54
XXV . PUBLIC COMMENT oo 2s 56
WHEREAS, Plaintiffs, the United States of America,
on behalf of the United States Environmental Protection
Agency (“EPA”), and Frank J. Kelley, the Attorney General
for the State of Michigan, ex re!, Michigan Natural Resources
Commission et al., filed the Complaint herein on March 18,
1987, against Defendant Wayne County, Michigan (the
“County”), alleging that the County has violated the clean
Water Act, 33 U.S.C. § 1251 et seq. (the “Act”), the
23b
Michigan Water Resources Commission Act (“WRCA”),
MCL 321.1 et seq., and the terms and conditions of National
Pollutant Discharge Elimination System (“NPDES”) Permit
No. M10021156. WHEREAS, on October 26. 1988,
Plaintiffs filed the First Amended Complaint (“Complaint”),
which added claims alleging violations of the Act, 33 U.S.C.
§ 1251 et seq., the WRCA, MCL 321.1 et seq., and the terms
and conditions of NPDES Permit No. M1002] 156, against
the City of Allen Park, City of Belleville. 1 ownship of
Brownstown, City of Dearborn Heights, City of Ecorse, City
of Lincoln Park, City of River Rouge, City of Riverview, City
of Romulus, City of Southgate, City of Taylor, Township of
Van Buren, and City of Wyandotte (hereinafter referred to
collectively as the “Downriver Communities”), and against
the Southgate-Wyandotte Relief Drain Drainage District and
the Ecorse Creek Pollution Abatement Drain Drainage
District (hereinafter referred to collectively as the “Drainage
Districts’),
WHEREAS, Defendant Wayne County is a Charter
County Corporation organized and existing under the laws
and constitution of the State of Michigan.
WHEREAS, Defendant Wayne County owns and op-
crates a wastewater treatment facility located at 797 Central
Ave., in Wyandotte, Michigan known as the Wayne County-
Wyandotte Wastewater Treatment plant (the “WWTP” or the
“plant”) pursuant to a contract entered into by the Defendants
dated March 1, 1962, under Act 185. 1957.
WHEREAS, each of the other Defendants is either a
municipal corporation in Wayne County, Michigan, which
collects and delivers sewage to the plant or is a public corpo-
ration in Wayne County which collects and delivers sewage
to the plant.
24b
WHEREAS, the United States, the State of Michigan,
and all Defendants consent to the entry of this Consent De-
cree in full and final settlement of this action, without the ad-
judication of any issue or the taking of any testimony.
NOW, THEREFORE, and upon consent of the parties
hereto, it is hereby ORDERED, ADJUDGED AND DE-
CREED as follows:
I. JURISDICTION AND VENUE
|. This Court has jurisdiction over the parties and the
subject matter of this action under 28 U.S.C. SS 1331, 1345
and 1355, and Section 309 of the Act, 33 U.S.C. § 1319. The
Court has pendent jurisdiction over the State’s claims under
the WRCA, since the alleged violations of the WRCA arise
from a common nucleus of operative facts shared with the
Federal claims. The complaint states claims against the De-
fendants upon which the Court can grant relief under the Act
and the WRCA.
Il. APPLICABILITY
2. A. This Consent Decree shall apply to and be
binding upon the United States, on behalf of EPA, the State
of Michigan, on behalf of the Michigan Natural Resources
Commission and the Michigan Department of Natural Re-
sources (“MDNR”), and the Defendants and their agencies,
officers, directors, agents, servants, employees, successors
and assigns, and ali persons, firms and corporations in active
concert or participation with them.
B. Nothing contained in this Consent De-
cree shall be construed as a prohibition against transfer of the
Downriver Collection and Treatment System from the County
of Wayne to the Downriver Communities or to another entity,
ee ee a eee
=
pets ol ae
Sane aa SRR Rea AER SM RR ale gtk Nala ll ie eal ola al
Sain TUMOR esate cas CARA, Seas aed Va
25b
including an authority created for that purpose, for the con-
struction, Operation and maintenance of said System. Any
such transferee of the Downriver System will be a successor
of the County of Wayne for the purposes of this Consent De-
cree and the obligations issued thereunder.
€. Transfer by all Defendants. If the
Downriver Communities create an entity to undertake the
County’s obligations under the Decree, and the County trans-
fers its obligations under this Decree to any such new entity
or by any other method, the Downriver connunities (a/k/a
"transferrors"), as well as the transferee, must certify to plain-
tiffs that such entity or other transferee possesses the techni-
cal, managerial, and financial resources and expertise needed
to comply with the terms of this Decree. Such certifications
shall be enforceable by either Plaintiff under this Decree and
failure to provide reguired certification or failure in fact by
any transferee to comply with this Decree shall remain a vio-
lation of the Decree by the transferror(s) except the County of
Wayne which would no longer be liable under this Decree
and either Plaintiff may pursue the transferror(s) for any re-
lief, penalty, or enforcement allowed under the Decree.
D. The undersigned signatories for each Party
certify that, together, they: (1) are fully authorized to bind le-
gally such Party to the terms and conditions of this Consent
Decree, and (2) had the benefit of legal counsel in the course
of deciding to sign this Decree.
[il. DEFINITIONS
3. Unless otherwise defined herein, terms used in
this Consent Decree shall have the meanings given them in
the Clean Water Act and the Michigan Water Resources
Cormnission Act, in the regulations promulgated thereunder,
26b
and in NPDES Permit No. M10021156, including any revi-
sions, modifications and successors thereto.
For purposes of this Consent Decree the following
definitions shall apply:
A. | “Bypass” means the intentional diversion of
waste streams from any portion of a sewage collection or
treatment system, except as authorized by an applicable
NPDES Permit
B. “Complaint” means the Amended Complaint
filed in this action on October 26, 1988.
C. “Combined sewage” means a combination of
wastewater from residences, businesses, institutions and in-
dustries to which is (by design) intentionally added surface or
storm waters.
D. “Defendants” means Wayne. County and the
Downriver communities.
E. “Downriver Collection and Treatment System”
means the pipes and structures, including channels, conduits,
manholes, pumping stations and appurtenances, and treat-
ment facilities, required to collect, transport and treat domes-
tic and industrial wastes of the Downriver Communities that
are tributary to the WWTP and including the WWTP as well
as the “Local Sewer System.”
¥ “Downriver Cormnunities” means the follow-
ing thirteen communities or entities, plus the two following
drainage districts, all of which are Defendants in this action:
the City of Allen Park, City of Belleville, Township of
Brownstown, City of Dearborn Heights, City of Ecorse, City
CASH 2 WB aoeb DRA AT deca SA WASORS valiant y ab ty
27b
of Lincoln Park, City of River Rouge, city of Riververview
City of Romulus, City of Southgate, City of Taylor, Town-
ship of Van Buren, City of Wyandotte, Southgate- Wyandotte
Relief Drainage District, and Ecorse Creek Pollution Abate-
ment Drain.
.
G. “Dry weather flows” means wastewater flows
(domestic, industrial, corrunercial and institutional), includ-
ing infiltration, except those defined as wet weather flows un-
der this Decree.
H. “Enhanced primary treatment” means primary
treatment enhanced through preaeration or mechanical floc-
culation with chemical addition,
I, “Excessive”, when used in reference to infiltra-
tion and inflow, means the quantities of infiltration/inflow
which can be economically eliminated from a sewer system
by rehabilitation, as determined by a cost-effectiveness analy-
sis that compares the costs of correcting the
infiltration/inflow conditions with the total costs of transpor-
tation and treatment of the infiltration/inflow.
J. “Headworks” means wastewater treatment
plant preliminary treatment works. including pumping,
screening and grit removal.
K. “Infiltration” means the water entering a sewer
system and service connections from the ground, through
such means as, but not limited to, defective pipes, pipe joints,
connections, and manhole walls.
Li. “Intlow" means the water discharged into a
sewer system, including service connections, from such
sources as, but not limited to, roof leaders, cellars. yard and
area drains, foundation drains, cooling water discharges,
drains from springs and swampy areas, manhole covers, cross
connections from storm sewers and combined sewers. catch
basins, storm waters, surface run-off, street wash w aters, and
drainage.
28b
M. “Infiltration/Inflow” and “I/IT” mean the total
quantity of water from both infiltration and inflow.
N. “Local Sewer System” means the portion of
the Downriver collection and Treatment System including
pipes and structures, channels, conduits, manholes, pumping
stations and appurtenances, for the collection and transport of
domestic and industrial wastewaters that are tributary to the
Downriver Collection and Treatment System, but which are
owned and operated by entities other than Wayne County.
O. “NPDES Permit” means National Pollutant
Discharge Elimination System Permit No. M10021156, is-
sued to Wayne County in its own right and as agent for the
Downriver Communities, and any NPDES permit issued to
any other party Defendant to this civil action concerning
treatment or discharge of wastewater in the Downriver Col-
lection System, and all revisions, modifications and succes-
sors to any of the NPDES permits covered by this definition.
P. “operational” means the stage where construc-
tion has been completed and facilities have been put into op-
eration and are meeting their design standards and any
applicable effluent or other limitations.
Q. “overflow”, “Combined Sewer overflow”, and
“CSO”, each means the discharge of combined sewage to a
surface water, or the discharge of water from a pipe or con-
duit used for transporting combined sewage for treatment.
R. “Plaintiffs” means the United States, on behalf
of EPA, and the State of Michigan, on behalf of the Michigan
Natural Resources Commission and the Michigan Depart-
ment of Natural Resources (“MDNR")..
S. “Primary treatment” means the quiescent sedi-
mentation of wastewater with skinning, collection, and re-
moval of settled sludge, floating debris and grease.
|
.
}
-
a
;
i
4
29b
T, “SSES” means Sewer System Evaluation Sur-
vey, a report specifying the elimination of infiltration and in-
flow that is cost effective, and the sewer rehabilitation and
other improvements necessary to eliminate this infiltration
and inflow,
U, “Secondary treatment” means biochemical
treatment of wastewater after primary treatment using bacte-
ria to consume the organic waste as set forth in 40 CFR Part
133.
V. “Unpermitted”, when used in reference to by-
pass and overflow, means bypass and overflow events that
are not expressly allowed under a NPDES permit or under 40
CFR 122.4l(m).
W. “Upset” means an exceptional incident in
which there is unintentional and temporary non-compliance
with technology based permit effluent limitations because of
factors beyond the reasonable control of the permittee. An
upset does not include non-compliance to the extent caused
by operational error, improperly designed treatment facilities.
inadequate treatment facilities, lack of preventive mainte-
nance, or careless or improper operation. See 40 CFR Section
122.41(n).
X. “Wayne County” means the County of Wayne,
a Michigan charter County Corporation acting pursuant to the
authority of the Wayne County Charter and applicable State
law,
¥ “Wet weather flows” means wastewater flows
(domestic, industrial, commercial and institutional), including
infiltration and inflow, that occur as a result of a precipitation
or snow melt event. For purposes of this Decree, wet weather
flow shall include the period of time after the end of the rain-
fall event during which the system continues to transport or
treat rainfall induced flows.
30b
IV. COMPLIANCE PROGRAM
4, Completion of all Planning, Design, Construc-
tion, and Performance Activities Specified in Attachment A.
lhe facilities recommended in the multi-volume, project plan
dated May |, 1993, titled “Wayne County Downriver Collec-
tion System,” in combination with Riverview's separately-
submitted plan, entitled “Project Plan for Sanitary Sewer Im-
provements, City of Riverview” (collectively known as the
“Project Plan”), are deemed submitted to Plaintiffs and
hereby approved by Plaintiffs, and Defendants shall, as set
forth herein, take all measures necessary to assure compliance
with the Project Plan and this Consent Decree, Defendants
acknowledge that this approval does not constitute approval
for State Revolving Fund (“SRF”) loan assistance under Act
317, 1988, or approval of plans and specifications under Act
98, 1913, and Defendants acknowledge that this approval,
like all others under the Decree, is governed by paragraph no.
51 herein. Defendants shall commence and complete all ac-
tivities -- including but not limited to planning, design, reha-
bilitation, contracting, construction, and performance
certification -- listed in Attachment A hereto (a/k/a “Wayne
County Downriver Collection and Treatment System; Engi-
neering Project Schedule; December 15, 1993,”) and, except
as specified differently in the text of this Decree, Defendants
shall cormnence and complete all the activities listed in At-
tachment A by the deadlines set in Attachment A. In some in-
stances items listed in Attachment A are described in more
detail in the Consent Decree. In those instances, Defendants
shall commence and complete all activities by the deadlines
established in this Decree. If in any instance a deadline im-
posed in the text of this Decree conflicts with deadline estab-
lished by Attachment A, the date set in the text of this Decree
shall control. If in any instance Attachment A provides for
some activity not only a “start” or “finish” date but also a
“late start” or “late finish” date, the earlier date shall be
iIb
deemed the deadline imposed by the Decree, unless the text
of the Decree provides otherwise
‘, Sewer Rehabilitation and Elimination of I/
A newer System Evaluation Surveys
(SSES) and Flow Monitoring Reports. Pursuant to paragraph
no. 11 below, Plaintiffs shall review all SSES’s submitted by
Detendants, all of which have been submitted.
B. After SSES Approval. Within 180 days
after approval of the SSES's, Defendants shall submit to
Plaintiffs proposed Rehabilitation Plans and Specifications
lor Wayne County and the following Downriver Communi
ties: City of Allen Park, City of Belleville, lownship of
Brownstown, City of Dearborn Heights, ( ‘ity of Ecorse, City
of Romulus, City of Southgate, City of Taylor, and lownship
of Van Buren. The Rehabilitation Plans and Specifications
shall be consistent with the recommendations set forth in the
approved SSES Reports, and shall eliminate excessive [/I.
G On or before October 1, 1995, Defen-
dants shall complete the facilities and measures described in
the approved Rehabilitation Plans and Specifications, and
shall provide to the Plaintiffs, for each Defendant listed in
subparagraph B of this paragraph, (1) a written certification
by a Professional Engineer that all the facilities and measures
contained in the Rehabilitation Plans and Specifications have
been completed in accordance with the provisions of the
Plans and Specifications and this Consent Decree and, (2)
upon request, supporting documentation.
D), On or before April 1, 1995, Defendants
shall submit to Plaintiffs a proposed Project Certification
Flow Monitoring Program (“FMP”), including a cost estimate
32b
and schedule for implementation of the FMP. The FMP shall
be developed to measure remaining flows and provide input
to the Downriver Hydraulic Model to verify or refine the pro-
posed size of the Storage-Transport system (paragraph no. 7
below). Upon approval by Plaintiffs, Defendants shall imple-
ment the FMP.
E. On or before April 1, 1996, Defendants
shall submit to plaintiffs a Report identifying in detail the
findings of the completed FMP and making recommendations
as to the sizes necessary for the Storage-Transport System to,
at a minimum, transport all wastewater up to the design flow
of the Downriver Collection and Treatment System for treat-
ment without bypass or overflow to achieve and maintain
continuous compliance with NPDES Permits, Clean Water
Act and WRCA.
6. Upgrade of Wayne County-Wyandotte _
Treatment Plant (“WWTP”)
A. Wayne County shall, on or before Feb-
ruary 1, 1994, submit to Plaintiffs a proposed Wayne County-
Wyandotte WWTP Improvement/Expansion Program
(“WWTP Improvement/Expansion Program”) which shall set
forth how Wayne County shall achieve, among other things,
the following:
(i) Installation of improvements to
the high purity oxygen system
so as to meet final NPDES dis-
solved oxygen (DO) and phos-
phorus limits by May 1, 1994.
To accomplish this require-
ment, Wayne County shall, at a
minimum, renovate the existing
pressure swing absorption sys- |
tem by May 1, 1994.
(11)
(ili)
(iV)
(Vv)
33b
An evaluation of the new chlo-
rine flash mix eductor system
and a determination of the ef-
fectiveness of the mixer on dis-
infection and total residual
chlorine (TRC) to be completed
and submitted to Plaintiffs in a
report by January 31, 1994.
(See subparagraph 6.B below.)
At a minimum, completion of
installation of WWTP Dechlori-
nation Facilities for TRC by
June 1, 1996, and achievement
of a TRC of 0.5 mg/1 by June 1,
1996, Corrunencing June 1,
1996, the period of disinfection
specified in the final NPDES
permit limits shall be in effect.
Improvements to the chlorine
contact tank to meet final
NPDES limits for TRC by Octo-
ber 1, 1999.
Improvements to the WWTP to
increase reliability and perform-
ance of the facilities. Wayne
County shall meet final CBOD
& TSS NPDES permit effluent
limits on or before October 1.
1997,Wayne County shall
complete construction of
WWTP improvements to the ex-
isting facilities on or before Oc-
tober 1, 1997 to increase the
performance reliability of the
WWTP. These improvements
shall, at a minimum, include
mene ee oe eee
(vi)
(vii)
34b
improvements to the headworks,
solids handling facilities, and
maintenance facility.
Establish secondary treatment
capacity to provide secondary
treatment to a minimum of 100
MGD, with the goal of 115
MGD, by October 1, 1999. To
achieve this requirement, on or
before October 1, 1994, Wayne
County shall, at a minimum,
conduct a field stress test of the
secondary treatment facilities at
the WWTP for purposes of de-
termining the existing secon-
dary system capacity.
Following these tests, a basis of
design shall be prepared recom-
mending any necessary modifi-
cation to the Project Plan.
Provide WWTP facilities ex-
pansion including Chemically
Enhanced Primary Treatment
(C.E.P.T.) facilities to achieve
final NPDES limits by October
1, 1999, and an overall treat-
ment capacity for flows up to
146.5 MGD by October 1,
1999. To achieve this require-
ment, on or before October 1,
1999, Wayne County shall, at a
minimum, construct the expan-
sion to the WWTP needed to
consistently provide chemical]
enhanced primary treatment o
flows up to 146.5 MGD. Fur-
ther, by October 1, 1999, De-
fendants shall, at a minimum,
construct chemically enhanced
Pee ee matey pate
35b
treatment facilities, yard piping,
pump station renovation,
chemical feed equipment, and
an additional primary clarifier.
(viii) Provide for preliminary treat-
ment (screening, grit removal
and disinfection) of all flows
over 146.5 MGD, and meet all!
NPDES permit limits and con-
ditions, by October 1, 1999, To
achieve this requirement, on or
before October 1, 1999, Wayne
County shall, at a minimum,
construct measures to provide
such preliminary treatment and
discharge of flows in excess of
146.5 MGD. Further, Wayne
County shall, at a minimum,
construct a headworks facility,
and yard piping in accordance
with required approvals, and
make changes in plant opera-
tion so that only eine per-
mitted under its NPDES permit
occur. Wayne County shall
construct an outfall to the De-
troit River, as described in Sec-
tion Four of the Project Plan,
unless an alternative solution is
proposed by all the Defendants
and the Plaintiffs then approve
the proposed alternative
solution.
In the WWTP Improvement/Expansion Program, Wayne
County also shall include a schedule for completion of each
measure and each component within each measure. and shall
also include detailed cost estimates.
36b
B. Wayne County shall complete the chlorine re-
port referenced in paragraph 6.A (ii) above and submit it to
Plaintiffs by January 31, 1994. The report also shall include a
comparative analysis of the disinfection provided by the con-
tact in the outfall pipe, and of a sample held in the laboratory
for the similar contact period. The sampling procedures for
determining compliance with final permit limits for fecal
coliform shall be determined by Plaintiffs. In addition, in this
report Wayne County shall propose for approval by Plaintiffs
an interim total residual chlorine (TRC) limit, which Defen-
dants shall comply with commencing May 1, 1994, and con-
tinuing until the Dechlorination Facilities are completed.
c. Within thirty (30) days following the fixed
deadline for each required submission or activity as described
in the WWTP improvement/Expansion Program, Defendants
shall provide to plaintiffs (1) a written certification by a Pro-
fessional Engineer that all provisions specified in subpara-
graph nos. 6.A (i), (ii), (iii). (iv), (v), (vi), (vii), and (viii)
above herein have been completed and, (2) upon request by
Plaintiffs, supporting documentation. Written Certification
shall include the dates of completion of each requirement in
the WWTP Improvement/Expansion Program.
D. On or before October 1, 2000, Defendants shall
complete all construcuon and improvements set forth in the
WWTP Improvement/Expansion Program and provide to
Plaintiffs written. certification by a Professional Engineer of
this fact.
7. Regional Storage - Transport System
A. Defendants shall design and. build a regional
storage-transport system and various local collection system
relief sewer facilities in accordance with the approved FMP
Report and the provisions specified below. The storage-
ek eld
37b
transport system and relief facilities shall be of sufficient ca-
pacity such that the sewage will be transported for treatment
in compliance with the requirements of any applicable
NPDES permits, the Act, and the WRC A.
B. On or before October 1, 1996, Defendants shall
submit to Plaintiffs a Basis of Design for the final design of
the Wayne County Storage-Transport System Improvement
and Local Relief Program (“STP”), consistent with the ap-
proved FMP Report. The plan for the final design of the STP
shall include a cost estimate, a detailed description of each
component, and a schedule to complete each measure. The
schedule shall provide for commencement of construction on
or before October 1, 1998, and completion of construction by
no later than October 1, 2001. The STP shall be consistent
with the conclusions set forth in the FMP, including any
modifications directed by Plaintiffs, and shall identify STP
facilities to be constructed including:
(i) Storage tunnel pipe, sewers, diversion
structures from the existing collection
systems and flushing mechanisms for
solids removal;
(i1) On-line detention basins:
(iii) Local collection system relief sewers
where necessary; and
(iv) New Pump Station at the terminus of
the storage tunnel pipe.
C. Within one year after completion of
construction required under subparagraph A above, Defen-
dants shall provide to Plaintiffs written certification, by a pro-
fessional Engineer, that construction of the STP
improvements has been completed and that the collection and
38b
storage-transport systems are completely operational and per-
form as designed. Written certification shall include the dates
of completion of each requirement in the STP and any sup-
porting documentation requested by Plaintiffs.
8. Final Project Certification or CAP. On or before
October |, 2002, Defendants shall provide written certifica-
tion (reviewed and approved by a Certified Professional En-
gineer) that all construction and other improvements required
by this Consent Decree have been completed, are fully opera-
tional and that Defendants can now achieve full compliance
with the final effluent limits in the NPDES Permit, and all
other provisions of the NPDES permit, the clean Water Act
and the Water Resources Commission Act. If defendants can-
not certify such full compliance, Defendants shall, on or be-
fore October 1, 2002, propose a Corrective Action Program
(CAP) which identifies the additional facilities, equipment,
and improvements, with associated costs and an expeditious
implementation schedule, which Defendants will undertake to
achieve full compliance. In the proposed CAP Defendants
shall indicate which final effluent limits are not as yet achiev-
able and propose interim limits (if necessary) until the CAP is
completed. Upon approval of the CAP by the Plaintiffs, De-
fendants shall implement the CAP pursuant to the approved
schedule.
9. Effluent Discharge Limits
A. Interim. Commencing upon effective
date of this Decree and continuing through the deadlines for
meeting final limits as specified in paragraph no. 6, Defen-
dants shall comply with the interim effluent limits specified
in Attachment B hereto, which is incorporated herein by ref-
erence. As to any parameters listed in Attachment B but not
specifically addressed in paragraph no. 6, Defendants shall
39b
comply, upon the effective date of this Decree. with the in-
terim effluent limits specified in Attachment B.
B. Final Limits. Commencing on the dead-
lines specified in paragraph 6 for DO, phosphorus, CBOD,
[SS and TRC, and commencing October 1, 2002. for all
other parameters (or earlier or later as modified by paragraph
8), Defendants shall maintain compliance with all final efflu-
ent limits then in place under any NPDES Permit applicable
to the WWTP. In the case of NPDES permit limits that have
been appealed under any applicable provision of federal or
state law where such law allows such appeal, and where the
result of such appeal is imposition of a stay of the effluent
limit(s) by a court or administrative agency jurisdictionally
competent to issue such stay, the stayed limit(s) shall not be
considered final for purposes of this Decree until such Stay
has been lifted or otherwise dissolved. In such a situation.
Defendants shall continue to comply with the applicable in-
terim effluent limit. Pursuant to paragraph 8, the October 1,
2002, date for compliance with all other final effluent limits
(1.e., other than DO, phosphorus, CBOD, TSS and TRC) is
revised to the date when the Final Project Certification is sub-
mitted if such submission occurs prior to October 1, 2002:
the October 1, 2002, compliance date shall be extended pur-
suant to the terms of any approved CAP.
10. | Wastewater Treatment Bypasses and Their
Elimination
A. No Dry Weather Bypasses. Immedi-
ately upon lodging of this Consent Decree, Defendants are
prohibited from any and all bypassing of any aspect of the
Downriver Collection and Treatment System during dry
weather periods.
40b
B. Best Efforts to minimize interruption
of WWTP operations and any potential or resulting. bypass,
overflow, effluent exceedance or other harm, In conducting
the work required by this Decree, Defendants may from time
to time find it necessary than October 1, 2002, -- in which
case such bypass must be eliminated by that earlier date and
failure to do so shall constitute violation of this Decree. For
those bypass points allowed under this subparagraph, Defen-
dants must to the “maximum extent practicable” minimize
bypasses from these bypass points.
D. Bar on Bypasses After September 30,
2002: Commencing October 1, 2002, and at all times thereaf-
ter, Defendants shall not allow any bypass of any untreated
wastewater, except for emergency bypasses allowed pursuant
to 40 C.F.R. Section 122.41(m), or as further specified in
subparagraphs F.(i), F.(ii), or F.(iii), and subject to the condi-
tions and entitlements contained in those subparagraphs or
elsewhere in this paragraph 10. The decision to allow an
emergency bypass shall be made only by the central authority
pursuant to subparagraph G. below.
E. Duty to Remove or Seal Bypass Points.
On or before October 1, 2002, Defendants shall remove or
seal all unpermitted bypass points in the Downriver Collec-
tion and Treatment System, except those bypass points al-
lowed under the requirements, conditions, and entitlements of
subparagraph F. below.
F. Bypass Points Allowed and Conditions
for Allowance and Use After September 30, 2002, Per Sub-
paragraph 10.D. Subject to the conditions set out herein, De-
fendants may leave in place emergency bypass points on the
Downriver Collection and Treatment System. The conditions
and requirements for selection of these bypass points are set
out herein:
(1)
(ii)
(ili)
4b
Bypass Points to Protect Treatment Plant and Down-
river Collection and Treatment System. Based on
flow data and any other technically pertinent infor-
mation (either extant or developed by Defendants
for purposes of this Decree), Defendants may use as
emergency bypass points on the Downriver Collec-
tion and Treatment System the discharge points
identified as nos. 8.0 and 10.1 in Attachment C to
the Decree. These two bypass points may be used
for the exclusive purposes of saving human life,
protecting public health, or mitigating severe dam-
age to the Downriver Collection and Treatment Sys-
tem, in the event of inflows in excess of the
capacities for which the Downriver Collection and
Treatment System will be upgraded by the design
and construction provided for under paragraph num-
bers 4 through 7 of this Decree. Any bypass using
any of the bypass points specified in this subpara-
graph F.i constitutes a bypass entitling Plaintiffs to
stipulated penalties under the stipulated penalty pro-
visions set out in the Decree, including but not lim-
ited, to Paragraph 19.
Nothing in this Decree shall be construed to require
Defendants to seal any of the emergency, sanitary
equalization basin bypasses identified in Attach-
ment C to the Decree as location nos. 2.0, 3.5, 4.0.
and 9.0 su long as such bypass point has been or is
approved in the course of issuing the necessary Act
98 construction permit for the sanitary equalization
basin that contains the bypass.
The emergency relief bypass points identified in At-
tachment C to the Decree as location nos. 2.1, 3.0,
and 3.1 may be maintained and used on the terms
set forth in Paragraph 10 of the Decree, including
42b
the following: these bypass points may be used for
the exclusive purposes of saving human life, pro-
tecting public health, or mitigating severe damage
to property. Any bypass using any of the bypass
points specified in this subparagraph F iii consti-
tutes a bypass entitling plaintiffs to stipulated penal-
ties under the stipulated penalty provisions set out
in the Decree, including but not limited to Para-
graph 19.
(iv) Any emergency bypass point allowed under sub-
paragraph F must be monitored, operated, and oth-
erwise handled in compliance with subparagraph G
below.
G. | Onor before October 1, 2002, Defen-
dants shall complete and implement the following require-
ments, and submit a report detailing the achievement of these
items:
(i) Designate a (single) central authority to
make the determination to operate any
and all bypasses;
(ii) Implement real time monitoring to dis-
play the status of the Downriver Tunnel
Sewer System to the central authority;
and
(iii) Prepare an evaluation of new and inno-
vative technology which could be im-
plemented in order to eliminate or
further reduce the need for maintaining
emergency bypasses.
43b
H. Nothing in this Decree shall be con-
strued to require that Defendants seal any Combined Sewer
Overflow (“CSO”) point including those identified in Attach-
ment C to this Decree as Nos. 1.0, 1.1, 6.0, 7.3, 10.0, 10.2.
and 11.0, during any time such point is permitted under a fi-
nal, effective, and valid NPDES Permit issued to any of the
Defendants, nor shall anything in the Decree be construed to
alter any independent requirement of law, regulation, order,
or permit directed at the control, operation, use, or closure of
any CSO.
11. Review of Plans and Reports
A. Plaintiffs shall review as expeditiously
as practicable all plans submitted by Defendants and shall ap-
prove, or disapprove and recommend modifications and/or
make comments, to each. Such plans and reports to be re-
viewed, include, but are not limited to: SSES’s, to ensure that
they, inter alia, address the results of the I/I Flow Analyses
that Defendants previously submitted to the State, including
the identification of locations and sources of I/I, and the most
cost-effective means to eliminate excessive I/I; Rehabilitation
Plans and Specifications; certifications of Completion of Im-
plementation of Rehabilitation Plans; the FMP; FMP Re-
ports; the proposed WWTP Improvement/Expansion
Program; the STP Plan; and any Corrective Action Plan.
MDNR shall have lead responsibility for providing Defen-
dants with comments from the Plaintiffs on such plans, and
unless indicated otherwise by MDNR or in a separate written
response from EPA, MDNR’s response shall be construed as
reflective of the Plaintiffs’ response. After receipt of any
comments, modifications or notification of reasons for disap-
proval by plaintiffs, and except as provided in paragraph D
below, Defendants shall expeditiously submit to Plaintiffs re-
vised plans or other documents which incorporate the modifi-
cations and address the comments received from Plaintiffs.
44b
B. Defendants shall submit these revised
plans and other documents by the date set forth in Plaintiffs’
comments or notification. If Defendants believe that the
specified time frame is insufficient, they may seek from
Plaintiffs additional time, based on a showing that such addi-
tional time will provide for completion as expeditiously as
practicable under the circumstances.
When each plan is approved, Defen-
dants shall carry out each and every provision of such plan in
accordance with the schedule therein. To the extent author-
ized in writing by Plaintiffs, Defendants may complete any
portions of the plans approved by Plaintiffs prior to approval
of the full plan.
D. If Defendants object to any disapproval,
comment or recommended modification by Plaintiffs to any
plan or other document required pursuant to this Consent De-
cree, then within thirty (30) days of receipt of a Plaintiff's
comment or reconmended modification, Defendants may pro-
pose to Plaintiffs an alternative.
If Plaintiffs reject the proposed alternative, then Defendants
shall either incorporate Plaintiffs’ modification or other
change or, within twenty (20) days of such rejection, file with
the Court a petition for dispute resolution pursuant to Section
X. below to determine the appropriate revision to the plan. In
any such dispute, Defendants shall bear the burden of estab-
lishing that their proposed alternative should be adopted in-
stead of Plaintiffs’ position.
12. Operation and Maintenance
A. The Defendants shall maintain and operate the
WWTP and the Downriver Collection and Storage System to
Yee
45b
minimize equipment breakdowns. interruptions of treatment.
and bypasses and overflows.
B. The parties recognize that interruptions in the
operation of the plant may be necessary during the period
when improvements to the plant are being made. Wayne
County shall make best efforts to schedule any necessary in-
terruptions to minimize the possibility and extent of any by-
pass, overflow, exceedances of effluent limitations, and
adverse environmental impacts.
C, Not later than ninety (90) days after the award
of contracts for construction on the WWTP Improvements
under paragraph no. 6 above, the County shall submit to
Plaintiffs for their approval a Plan for Construction. That
Plan shall identify the interruptions in treatment anticipated
throughout the construction activities, and measures to mini-
mize the number and duration of any interruptions and any
adverse impact of any interruption. Defendants shall modify
the Plan to address any comments received from Plaintiffs.
D. During construction, the County shall give at
least five (5) days notice to the MDNR of all planned inter-
ruptions of plant operations, by telephone call to the MDNR
Southeast Michigan District Office at (3 13) 953-1451, or, in
the alternative, at (313) 953-024 1, or, in the event neither of
the preceding numbers effects the necessary communication,
at any alternate number specified for that purpose by the
MDNR from time to time. A written report confirming the in-
terruption shall be delivered to EPA and MDNR within ten
(10) days of any bypass or interruption.
E. Nothing in this Section, including notification
under this Section, will excuse any failure by Defendants to
comply with any requirement of this Decree.
46b
F. Defendants shall submit to Plaintiffs for their
approval proposed Operation and Maintenance (“O & M”)
Manuals in accordance with the following schedule:
(i) October 1, 1999: O & M Manual for
the Wayne County-Wyandotte WWTP;
and
(ii) July 1, 1998: O & M Manuals for the
Local Sewer System and all other por-
tions of the Downriver Collection and
Treatment System.
G. Each of the O & M Manuals shall include, but
not be limited to, the following: mandatory training, routine
inspections, replacement of parts, and operation procedures.
H. Upon approval or modification by Plaintiffs,
Defendants shall implement the O & M manuals in accor-
dance with the schedules and other provisions therein.
I. Within thirty (30) days after approval of an O
& M Manual, Defendants shall submit to Plaintiffs for their
approval O & M Work Plans. In addition, on or before Octo-
ber | of each year, Defendants shall submit to Plaintiffs for
approval updated Work Plans containing the plan for imple-
mentation of the O & M program during the following calen-
dar year.
J. The Work Plans shall include, inter alia, the
following:
(i) a schedule for the systematic and regu-
lar inspection of the Downriver Sewage
Collection and Transport System, to en-
sure that the integrity of the system is
ee ee ee EE ee a gh Re Oe
pa ater A ic I OT aR a
47b
maintained and that it is operated in op-
timal conditions;
(ii) a schedule and method for rehabilita-
tion to remove all excessive
infiltration/inflow sources found during
the inspections;
(ili) identification of the mechanism that
will be used to ensure that sufficient
funds are available at all times to cor-
rect excessive I/I sources and/or struc-
tural defects within the sewage
collection and transport system;
(iv) development of a projected annual O &
M budget for the next five years includ-
ing projected funding sources; and
(v) development of an operational p!an
which includes a system inventory, ad-
ministrative controls, system mainte-
nance, and operational control strategy.
K. Upon approval by Plaintiffs, Defendants shall
implement the O & M Work Plans in accordance with the
schedules and other provisions therein.
L. On or before October |, 1996, Defendants shall
develop and submit to Plaintiffs a proposed System Monitor-
ing Program (SMP). The purposes of the SMP include but are
not limited to:
(i) Providing means to measure individual
community flow contributions and to
monitor community flows with respect
to allocated capacities in the facilities;
48b
(ii) Providing means to measure flow and
provide input to the Downriver Hy-
draulic Model on an annual basis to
verify and ensure the effectiveness of
the sewer rehabilitation program;
(iii) Providing means to alert the WWTP
operators of levels which indicate a po-
tential for system
overflows/bypasses;
(iv) Providing means to correlate clima-
tological data and the systems’ re-
sponses to wet weather events,
including events involving an overflow
or bypass.; and
(v) Providing means to track individual
commun: iy and County flow contribu-
tions for issuance of Act 98 sewer con-
struction permits.
M. Defendants shall submit to Plaintiffs a sum-
mary report of the SMP data annually or at such other inter-
vals as the parties determine necessary. Upon completion of
the construction required under paragraph nos. 5 - 7, Defen-
dants shall submit to Fiaintiffs a summary report of the SMP
data at least once per month. If any bypass occurs, an Event
Report shall be prepared summarizing the reasons for the oc-
currence and supporting climatological and other documenta-
tion. Submittal of a report shall not excuse any bypass or
overflow in violation of any NPDES permit, this Consent De-
cree, the Clean Water Act or the Water Resources Commis-
sion Act.
V. STIPULATED PENALTIES
49b
13. Accrual, Demand, and Timing of Payment.
Within 45 days receiving a written demand from either Plain-
tiff, Wayne County shall pay stipulated penalties imposed un-
der this Decree and addressed by the written demand.
Stipulated penalties under this decree begin to accrue on the
first day of violation, and accrue regardless of whether or
when Plaintiffs demand payment, but become due only upon
written demand by either Plaintiff as specified above. Any
written demand by either Plaintiff for stipulated penalties
shall be sent to each person or office listed in attachment D to
this Decree.
14.
Interim Effluent Limits. Commencing on the
lodging of this Consent Decree for all parameters except fecal
coliform and TRC, and commencing July 1, 1996 for fecal
coliform and TRC, if defendants fail to comply with any ef-
fluent limitation set forth by this Consent Decree in Attach-
ment B hereto, Wayne County shall pay stipulated penalties
as set forth in the table below for violation of each parameter.
Violation for |5 to 25% over |26 to 99% %100 or more
each interim limit jover interim [over interim
parameter limit limit
Daily Effluent |$400 per day {$1,500 per | $2,000 per
day day
7-day average |$1,000 per [$4,000 per $5,000 per
week week week
30 day $2,000 per ($7,500 per ($10,000 per
average month month month
15. Final Effluent Limits. If Defendants fail to
comply with any final effluent limitations by the dates set
50b
forth in Paragraph 9), Wayne County shall pay stipulated pen-
alties as follows for violation of each parameter:
Violation of Each Parameter Penalty
Daily Effluent Limitation $2000 per day
7-Day Average Limit $5000 per week
30-Day Average Limit $10,000 per month
16. Deadlines Related to Paragraph 7 Regional
Storage Transport Obligations that are Subject to Stipulated
Penalties. If defendants fail to meet the deadlines set forth be-
low that relate to the obligations of paragraph 7 of this De-
cree, Wayne County shall pay stipulated penalties as follows:
A. For failure to initiate “Segment 1, Community
Sewer Rehabilitation, Certification Flow
Monitoring Program,” pursuant to paragraph 5
requirements on or before September 1, 1995,
stipulated penalties shall apply as follows for
eacn day such initiation was delayed or
untimely:
Period of Failure to Comply Penalty Per Day of
Noncompliance
Ist to 15th da $ 1500 per day per violation
16th to 30th day $ 2500 per day per violation
after 30 days $ 4000 per day per violation
B. For each day after October 1, 1998, on which
the physical, on-site construction required un-
der paragraph 7 has not commenced, stipulated
penalties shall apply as follows:
Ke
WOR ses
i Tae
Slb
Period of Failure to Comply Penalty Per Day
of Noncompliance
Ist to 15th day $ 1500 per day per
violation
5th to 30th day $ 2500 per day per
After 30 days
violation
$ 4000 per day per
violation
For each day after October 1, 2001, on which
all construction called for under paragraph 7
has not been in all respects completed, stipu-
lated penalties as follows:
Period of Failureto Comply Penalty Per Day of
Ist to 15th day Noncompliance
16th to 30th day $ 1500 per day per violation
After 30 days $ 2500 per day per violation
17.
$ 4000 per day per violation
Deadlines Related to WWTP Obligation (Para-
graph 6 of this Decree) that are Subject to Stipulated Penal-
ties. If Defendants fail to meet the deadlines set forth below,
Wayne County shall pay stipulated penalties as follows:
A.
If defendants fail to submit to plaintiffs com-
pleted, substantively adequate documents
called for under Paragraph 6.A, 6.B, or 6.C,
stipulated penalties shall apply as follows for
each day such document was submitted un-
timely or remains in an substantively inade-
quate state:
52b
Period of Failure to Comply Penalty Per Day of
Ist to 15th day pa acompliance ne
16th to 30th day 1500 per day per violation
After pe days in $ 2500 per day per violation
rian $ 4000 per day per violation
For each day after October 1, 1997, on which the
phy sical, on-site construction required by the approved
WWTP Improvement/Expansion Program has not com-
menced, stipulated penalties as follows:
Period of Failure to Comply Penalty Per Day of
Ist to 15th day Noncompliance
16th to 30th day $ 1500 per day per violation
After 30 days $ 2500 per day per violation
$ 4000 per day per violation
S For each day after October 1, 2000, on which
all construction set out in the approved WWTP
Improvement/Expansion Program has not been
completed in all aspects, stipulated penalties
shall apply as follows:
Period of Failure to Comply Penalty Per Day of
Ist to 15th day Noncompliance
16th to 30th day $ 1500 per day per violation
After 30 days $ 2500 per day per violation
$ 4000 per day per violation
18. Incomplete, Inadequate, and/or Untimely Sub-
mittal of Reports Under Paragraph No. 30. If any report or
other submittal required under paragraph 30 is improper, ei-
ther because the report or other submittal is untimely or be-
cause such submittal fails to meet the substantive
requirements of that paragraph, Wayne County shall pay
stipulated penalties for each day such submittal was untimely
or substantively incomplete or inadequate, or remained
Tt ae
ROSA teh ce 36, RNS
rs hs
wate
Rs alii BNE AS TACT NS
53b
incomplete or inadequate, pursuant to the stipulated penalty
schedule set out below:
Period of Failure to Comply Penalty Per Day of Noncompli-
ance Lither in Substance or
schedule for Submission
Ist to 15th day $ 250 per day per
violation
16th to 30th day $ 500 per day per
violation
After 30 days $ 1000 per day per
violation
19. Bypasses. If there are any bypasses in violation
of subparagraph 10.A, 10.D, 10.E, 10.F, as well as any by-
passes under subparagraph 10.F entitling Plaintiffs to stipu-
lated penalties, Wayne County shall pay stipulated penalties
as follows:
Nu.mber of Days Penalty Per Day
of Any Bypass of Noncompliance
Ist to 20th day $ 2000 per day per violation
21st to 35th day $ 4000 per day per violation
After 35th day $ 5000 per day per violation
For counting the number of days of bypass for
stipulated penalty purposes, each location
where a bypass occurs shall be considered as a
separate and distinct bypass. For counting
“days” of bypasses, twenty-four hour periods
(where the twenty-four hour period is triggered
by time at which a bypass commences at any
location) shall be used rather than calendar
days. For purposes of calculating stipulated
penalties, the number of days of all bypasses
54b
shall accumulate under one running tally for
the life of the Decree.
20. If Defendants fail to complete the certification re-
quirement set forth in paragraph a or to submit a completed,
substantively adequate Corrective Action Plan by October 1,
2002, Wayne County shall pay a stipulated penalty of $1,500
per day until such time that the obligation is fully satisfied.
r 4H Within thirty (30) days after any violation or po-
tential violation for which stipulated penalties accrue or may
accrue under this Decree (regardless of whether Defendants
believe that no stipulated penalty is due), Defendants shall
provide Plaintiffs written notification of the violation or po-
tential violation, and the stipulated penalties accrued or po-
tentially accrued (including a citation to the Decree paragraph
violated or potentially violated). Written notification under
this paragraph shall be independent of and in addition to any
other reporting requirement under this Decree.
22. All stipulated penalties due and payable under
this Consent Decree shall be paid by cashier’s or certified
check, or by electronic fund transfer in accordance with the
procedures set out paragraph 29 below. Of the payment, fifty
percent shall be paid to the State of Michigan, and fifty per-
cent to the United States.
23. Payments to the State shall be in the manner set
forth in paragraph no. 27, but provided that no installment or
time payment options apply to payment of stipulated penal-
ties and any untimely payment of stipulated penalties shall
accrue interest under 28 U.S.C. section 1961 for period from
the date the penalties were due until the time of actual
payment.
55b
24. Payments to the United States shall be payable
in the manner set forth in paragraph 27 below, but provided
that no installment or time payment options apply to payment
of stipulated penalties and any untimely payment of stipulated
penalties shall accrue interest under 28 U.S.C. Section 1961
for period from the date the penalties were due until the time
of actual payment.
25. The stipulated penalties provided for in this
Decree shall be in addition to any other remedies or sanctions
available to Plaintiffs by reason of Defendants’ failure to
comply with the requirements of this Decree, any applicable
NPDES Permit, the Clean Water Act, the WRCA, or the
regulations promulgated under the Act or the WRCA. The
United States and the State each reserve, without limitation,
their rights to seek monetary and injunctive relief pursuant to
the Act, the WRCA, or the contempt powers of the Court.
However, in any instance where the United States has de-
manded and timely received payment of stipulated penalties
so demanded, the United States will not then seek additional
civil penalty for that same violation under the civil penalty
provision of the federal Clean Water Act. Similarly, in any
instance where the State of Michigan has demanded and
timely received payment of stipulated penalties so demanded,
the State will not then seek additional civil penalty for that
same violation under the civil penalty provision of the
WRCA or the federal Clean Water Act. Prior to either Plain-
tiff's issuing a written demand for stipuiated penalties, that
Plaintiff considering issuing such a demand shall first consult
with its Co-Plaintiff to decide whether such stipulated penalty
demand should be issued. Neither Plaintiff shall issue such a
demand unless Plaintiffs decide that it shall be issued on be-
half of both.
VI. CIVIL PENALTY
56b
26. Wayne County shall pay a civil penalty of
$413,000.00, in resolution of the Plaintiffs’ civil judicial.
claims for penalties as alleged in the Complaint. The civil
penalty shall be paid in one of the two options set forth in the
following Subparagraphs 28.A and 28.B, and Defendants are
deemed to elect between them by their actions.
27. Split of Payment Between Plaintiffs. Payment
of fifty percent of the civil penalty (either of each installment
or of a one-time payoff) shall be to the United States, by
cashier’s or certified check (except as otherwise specified in
Section VI of this Decree) made payable to the “Treasurer of
the United States of America,” and tendered to the Office of
the United States Attorney for the Eastern District of Michi-
gan, 231 West Lafayette St., Detroit, Michigan 48226. The
check shall bear a notation to the civil docket number of this
action. Corcurrently with sending the check, a copy of the
check shall be sent to the EPA Region V Water Division, and
to the United States Department of Justice, at the addresses
specified in Section VIII of this Consent Decree. Payment of
fifty percent of the civil penalty (either of each installment or
of one-time payoff) shall be to the State of Michigan, by
cashier’s or certified check made payable to the “State of
Michigan,” and tendered to the Assistant-in-Charge, Environ-
mental! Protection Division, Office of the Attorney General,
P.O. Box 39212, Lansing, Michigan 48909. The check shall
bear a notation to the civil docket number of this action. Con-
currently with sending the check, a copy of the check shall be
sent to the Michigan Department of Natural Resources, Sur-
face Water Quality Division, compliance and Enforcement
Section, at the address specified in section VIII.
28. Options for Payment. Defendants must pay the
civil penalty by either one or the other of the options speci-
fied in this paragraph.
57b
A. Payment Option One. Defendants may
pay the civil penalty ($413,000) to Plaintiffs in lump
sum (fifty percent of the lump sum to each Plaintiff)
within sixty days of the entry of the Decree, and if De-
fendants make such payment within that time period,
where “making payment” means receipt of the checks
by Plaintiffs and / or confirmation of electronic fund
transfer, then Defendants are not obligated to pay any
interest on the civil penalty. If Defendants do not
make payment within the time described in this Sub-
paragraph 28.A, then they shall be deemed to have se-
lected Payment Option Two, below, including all
terms and conditions of Payment Option Two, includ-
ing but not limited to payment of interest.
B. Payment Option Two. Consistent with the in-
stallment schedule and acceleration provision set out
in this Subparayraph 28.B, Defendants shall have
through December 31, 1995 to pay the total civil! pen-
alty, with interest running on any and all unpaid bal-
ances that exist after January 1, 1994, and interest
shall accrue at the rate set out in 28 U.S.C. Section
1961. Defendants may pay any or all penalty amounts
in advance of the schedule set out herein without suf-
fering any additional penalty as a result of such early
payment. The schedule for installment payments is as
follows: one-half of the civil penalty, with any and all
accrued interest, shall be paid on or before December
31, 1994; and one-half of the civil penalty, with any
and all accrued interest, shall be paid on or before De-
cember 31, 1995. If any installment payment is not re-
ceived by Plaintiffs within 21 calendar days after its
due date (as set by the installment payment dates es-
tablished in this subparagraph), all remaining civil
penalty installments (including any and all interest)
58b
shall be immediately due, owing, and paid to
plaintiffs.
29. If Defendants elect to pay by electronic fund
transfer any portion of the civil penalty owed to the United
States or the State of Michigan, Defendants may do so. Upon
request, the United States and the State will supply Wayne
County with any coding or address information needed by
Defendants to effect an electronic fund transfer.
Vil. REPORTING REQUIREMENTS
30. Reporting on Compliance Activities:
A. Beginning with the first full calendar quarter
after entry of this Consent Decree, and for every calendar
quarter thereafter until termination of this Consent Decree in
accordance with Section XXIV. below, Defendants shall sub-
mit to Plaintiffs a written progress report. Each quarterly re-
port shall be submitted no later than the last day of the month
following the close of the quarterly reporting period. Each re-
port shall contain the following information for that quarter:
i. the status and progress of the prepara-
tion of plans and construction of im-
provements required under Section IV
above;
ii. a projection of the work to be per-
formed under Section IV during the
next two calendar quarter; and
iil. identification of any items that might
affect timely completion of require-
ments under Section IV above.
ee ee
* ae ee, i+
RS aera Baa ein we cad ag eRe
59b
Notification pursuant to this paragraph shall not excuse any
failure to timely perform any requirement of this Decree.
B. Within ten (10) days following the deadline for
any requirement under Section IV of this Consent Decree,
Defendants shall submit to Plaintiffs written notice that the
action has been taken or completed, as required. If the action
has not been taken or completed as required, Defendants shall
submit written notice to Plaintiffs stating the reasons for any
failure to timely complete a requirements and the probability
of meeting the next deadline in the schedule. The notice shall
also describe the actions to be taken or that are being taken to
return the program to schedule. Notification pursuant to this
paragraph shall not excuse any failure to timely perform any
requirement of this Consent Decree.
31. Reporting on Discharges
A. Defendants shall submit to Plaintiffs, post-
marked on or before the tenth day of each month, a Daily
Discharge Monitoring Report (“Daily Report”) for the plant
containing analytical test results obtained during the previous
monthly monitoring period, and Discharge Monitoring Re-
ports (“DMR”) for that period, as required in the NPDES Per-
mit. The Reports shall be in the format required by MDNR,
and shall contain data on the analysis of samples taken at the
frequency and location specified in the NPDES Permit.
B. In accordance with 40 C.F.R. Section
122.41(m), Defendants shall immediately notify the State and
EPA-Region V1 in writing, whenever a bypass of the WWTP
collection system, the storage-transport system, or the WWTP
occurs, including the requirement to submit, within five (5)
days after any such incident, a written report describing the
duration, volume and exact location of the incident, an
60b
explanation of conditions which resulted in the bypass, steps
taken to stop it, measures taken to eliminate further occur-
rence, and the results of any sampling and monitoring re-
quirements undertaken in response to the incident.
o Requirements concerning bypass incident re-
porting set forth in the preceding paragraph do not affect and
shall not serve as a justification for not complying with re-
quirements concerning bypass incidents as set forth in the
NPDES Permit.
D. Nothing in this Consent Decree affects the re-
porting requirements set forth in the NPDES Permit. Defen-
dants’ compliance with reporting requirements set forth in
this Consent Decree shall not serve as a justification for not
complying with any reporting requirement set forth in the
NPDES Permit.
Vill. SUBMITTALS
32. Reports, plans, notices, approvals, modifica-
tions and comments required pursuant to this Consent Decree
shall be submitted to the following persons at the addresses
below:
For Plaintiff the United States:
U.S. Environmental Protection Agency,
Region V
Water Division
Compliance Section SWCC-155
77 West Jackson Blvd.
Chicago, Illinois 60604,
U.S. Department of Justice
Ee
61b
Environment and Natural Resources
Division
Environmental Enforcement Section
P.O. Box 7611, Ben Franklin Station
Washington, D.C. 20044
DJ # 90-——5—1—-1—-2766;
For Plaintiff State of Michigan:
Michigan Department of Natural
Resources
District Supervisor, Surface Water
Quality Division
Southeast Michigan District Headquar-
ters 39000 Seven Mile Road
Livonia, Michigan 48152,
with a copy of the cover letter to
Assistant in charge
Natura! Resources Division
Office of the Attorney General
Stevens T. Mason Building, 8th Floor
P.O. Box 30028
Lansing, Michigan 48909,
and submittals under paragraph nos. 23, 27, 30, & 31 to
Michigan Department of Natural Resources
Surface Water Quality Division
Compliance and Enforcement Section
P.O. Box 30273
Lansing, Michigan 48909, and
Assistant-in-Charge
62b
at address above;
For the Defendants:
County of Wayne
Department of Corporation Counsel
415 Clifford
Detroit, MI 48226;
William J. DiBiasi, Esq.
Attorney for Brownstown Township
24825 Eureka Road
Taylor, MI 48180-5159;
Daniel J. Misteravich, Esq.
Attorney for Lincoln Park
2933 Fort Street
Lincoln Park, MI 48146;
Charles Brian James, Esq.
Attorney for Southgate
8623 N. Wayne Road, Suite 200
Westland, MI 48185-1137;
Allen J. Kovinsky, Esq.
Attorney for City of Taylor
2000 Town Center (Suite 900)
Southfield, MI 48076—1 100;
Randall A. Pentiuk
Attorney for City of Riverview
230 Superior Place (Suite 320)
20300 Superior Road
63b
Taylor, MI 48180; and
Randy L. Kalmbach
Attorney for Wyandotte
2241 Oak Street
Wyandotte, MI 48192-5317.
To substitute a recipient or change address information set
out in this paragraph, a party must serve on all parties and file
with the Court the name and address of the person or office to
be removed from this paragraph, as well as the name and ad-
dress of the person or office that is to be added to this para-
graph. Such changes shall be effective thirty days after
service to all parties and filing of proof of service with the
Clerk of the Court.
33. | Unless otherwise specified in this Consent De-
cree, reports, approvals, modifications, comments and notices
shall be given in writing, and shall be considered delivered on
the day postmarked by the U.S. Mail, with proper postage af-
fixed. If another means is used to deliver a report or notice, it
shall be considered delivered upon the date received at the
MDNR or EPA office or at the above addresses for
defendants.
34. All requirements in plans, reports and other
submittals that have been approved by Plaintiffs, including
schedules therein, shall be enforceable requirements of this
Consent Decree, except to the extent the performance of such
requirement is delayed by a finding of force majeure under
Section [X of the Decree or altered by agreement of the par-
ties or judicially under Section X (Dispute Resolution) of the
Decree, in which case the revised provisions will become en-
forceable requirements of the Decree.
64b
35. Appointment of Technical Coordinators.
Within 21 days after the entry of this Consent Decree, each of
the following shall appoint a Technical Coordinator: Wayne
County, MDNR, U.S. EPA, and one coordinator for all other
defendants. All parties shall advise all Technical Coordina-
tors of any matter any party believes to involve a technical
resolution or problem, and all Technical Coordinators desig-
nated under this paragraph shall be invited to participate in
any technical discussion commenced by any party to this De-
cree. The sole purpose of this paragraph is to encourage early,
coordinated participation of all parties on all technical mat-
ters. Nothing in this paragraph is intended to or shall be inter-
preted as delegations of settlement or approval authority by
any party or as a deviation of the rights or obligations other-
wise established for the parties by applicable law or this Con-
sent Decree. As counsel for any party deems appropriate,
such counsel may attend any meeting involving the Technical
Coordinators. If any party changes its Technical Coordinator,
it shall promptly notify all of the other parties.
IX. FORCE MAJEURE
36. A “force majeure” event for purposes of this
Consent Decree is any event that is caused by circumstances
beyond the reasonable control of the Defendants that delays
or prevents the Defendants from complying with the terms of
this Decree in a timely fashion including completing any
studies, programs plans, designs or failure to timely construct
the facilities as scheduled. Such events could include by way
of illustration and not limitation delays due to fires, strikes,
labor disputes, unforeseeable delays in transportation, unusu-
ally adverse weather conditions or unanticipated changed site
conditions encountered in the course of construction also de-
lays caused by the failure of the Plaintiffs to respond
promptly and comment on submittals made by the
65b
Defendants as required by the terms of this Consent Decree.
To the extent any such noncompliance with the terms of this
Consent Decree is due to a force majeure event, the Defen-
dants shall not be liable for any stipulated penalties set forth
in this Decree and the time for performance or compliance
with. the terms of this Decree shall be extended by the Plain-
tiffs to the extent appropriate. An extension of one (1) com-
pliance date due to a particular force majeure event will not
necessarily result in an extension of a subsequent compliance
date or other unrelated compliance date or dates.
37. Nothing in this section is intended to relieve
Defendants of their duty to use all due diligence to complete
the requirements of this Consent Decree in a timely matter.
Further, unanticipated or increased costs or expenses associ-
ated with compliance of this Consent Decree including
change in financial circumstances on behalf of the Defen-
dants shall not constitute a force majeure event; provided fur-
ther, however, that nothing in this paragraph is otherwise
intended to preclude Defendants from applying to the Court
for a specific enlargement of time under the provisions of
Sections IX, X and/or XXII of this Decree —— to the extent
the allegations and proofs supporting Defendants’ application
to the Court for the specific enlargement of time are relevant
to the provisions of Section IX, X, and/or XXII -- so long as:
(a) Defendants first requested the United States and the State
for the specific enlargement of time (and provided therewith
the allegations and proofs supporting the request) and (b)
Plaintiffs had rejected Defendants’ request.
66b
38. It shall be the duty of the Defendants to
promptly notify the Plaintiffs of any occurrence or circum-
stance which could result in noncompliance with the terms of
this Consent Decree as a result of a force majeure event
which under the circumstances is beyond the Defendants’
reasonable control and which could not be overcome by due
diligence. Such notification shall be in writing to the Plaintiff
s and shall describe the terms of this Decree that may be af-
fected by the occurrence, the nature of the noncompliance
that could result from the occurrence, the reasons for such oc-
currence and possible noncompliance that may, in the Opinion
of the Defendants, cause a violation of the terms of this De-
cree or result in any upset condition involving the terms of
any applicable NPDES permit.
39. If the Defendants and the Plaintiffs cannot
agree that the occurrence at issue is a force majeure event or
cannot agree on the terms of an appropriate extension of time
or other solution, the dispute shall be subject to the dispute
resolution procedures of section X, infra.
40. Further, without respect to whether or not a
given set of circumstance entitles the Defendants to certain
protection and relief related to the force majeure event, the
Defendant shall comply with the terms of this Consent De-
cree that are unaffected by the force majeure event, and the
Plaintiffs. shall retain the right to enforce the terms and. obli-
gations of this Decree that are unaffected by the force ma-
jeure occurrence.
X. DISPUTE RESOLUTION
oo an a
ee
eked .<
67b
41. — If in the opinion of any party there is a dispute
between Plaintiffs and Defendants with respect to the inter-
pretation of or compliance with this Consent Decree, such
dispute shall in the first instance be the subject of informal
negotiation between the Defendants and the Plaintiffs. That
party shall send a written notice to the other parties which
outlines the nature of the dispute and requests informal nego-
tiation to resolve the dispute. Such period of informal nego-
tiations shall not extend beyond thirty (30) days from the date
when the notice was sent, unless the parties agree otherwise.
In an emergency, either party may seek relief directly from
the Court prior to expiration of the informal negotiation pe-
riod, with the party moving for such relief bearing the burden
of proving that an emergency exists and that the position ad-
vocated by that party should be adopted under the terms