APPENDIX A
UNITED STATES COURT OF APPEALS
THIRD CIRCUIT
No. 92-5636
TRANSTECH INDUSTRIES, INC., a Delaware Corporation;
KIN-BUC, INC., a Jersey Corporation; and FILCREST REALTY,
INC., a New Jersey Corporation,
Plaintiffs-Appellees,
V.
A&Z SEPTIC CLEAN; AAA TANK; A ALFANTE; ABM
DISPOSAL SERVICE; AM ENVIRONMENTAL; A. E. STANLEY
MANUFACTURING COMPANY; ABSOLUTE FIRE
PROTECTION, INC.; ACCURATE FORMING; ACTIVE OIL
SERVICE; ADCHEM CORP.; ADRON, INC.; AERO
NUTRONICS FORD; AETNA CHEMICAL CORPORATION; AIR
PRODUCTS & CHEMICALS, INC.; AKZO CHEMICALS, INC-.;
ALCAN ALUMINUM CORPORATION; ALCOLAC INC.; ALL
COUNTY SEPTIC; ALL COUNTY SERVICE CORP.;
ALLIED-SIGNAL INC.; ALPHA METALS, INC.; AMER. BOOK
STRATFORD; AMERADA HESS- CORP.; AMERICAN
CYANAMID CO.; AMERICAN PRODUCTS CO., INC;
AMERICAN STANDARD INC.; AMERICAN TRAILER;
ANCHOR MOTOR FREIGHT; ANDY FIORE & SONS; ARCO
PETROLEUM PRODUCTS; ASARCO, INC.; ASHLAND OIL
INC.; ASSOCIATED MARBLE CO.; ASTRO PAK
2a
CORPORATION; AT&T TECHNOLOGIES, INC.; ATI, INC.;
ATLAS PAINTS; AUTOMATIC CONNECTOR, INC.; AVANTE
PRODUCTS CORP.; AXTON-CROSS CO., INC; B&L
INDUSTRIAL SERVICE; BAD PALLET CO.; BARCLAY
CLEANING CO.; BARON BLAKESLEE; BAROUH EATON
ALLEN CORP.; BASF CORP.; BATES MANUF. CO.; BAXTER
HEALTHCARE CORP.; BARONNE BARR. & DRUM; BEACON
FAST FREIGHT CO., INC.; BECTON, DICKINSON AND CO.;
BENDIX CORP.; BENJAMIN MOORE & CO.; BERGEN
MACHINE & TOOL; BERKELEY CHEM. CO.; BEST DISP. &
DRUM SERV.; BEST DISPOSAL; BEST FOODS RESEARCH
CNTR.; BFT; BIDDLE SAWYER CORP.; BIG 3 TRUCK PLAZA;
BIOCRAFT LAB. INC.; BOC GROUP INC.; BORDEN, INC.;
BORG-WARNER CHEMICALS, INC.; BOROUGH OF
WALLINGTON; BOSTITCH INC.; BROOKDALE SHOP-RITE;
BROWN STONE INN; BROWNING-FERRIS IND. OF ELIZ. NJ;
C&R TRUCKING, CO.; CPS CHEMICAL CO.; CJR CHEMICAL
CO.; CPC INTER’L, INC.; CADBURY CO.; CAN MEG CO.;
CARBOLINE CO.; CARPENTER TECH. CORP.; CECOS
INTERN’L, INC.; CENTRAL JERSEY ASSOC.; CENTRAL
JERSEY DISPOSAL; CESCO COMPANY; CHAS PETZER INC.;
CHEM CLEANING SERV.; CHEM TROL POLLUTION;
CHEMICAL CONTROL CO.; CHEMICAL LEAMAN TANK
LINES, INC.; CHEMLINE CORP.; CHEMQUID DISPOSAL INC.;
CHESEBROUGH-PONDS; CHEVRON CHEMICAL CO.:
CHEVRON U. S.A. INC.; CIBA-GEIGY CORP.; CITY SERV.
OIL CO.; CLAIROL, INC.; CLARK HAULERS; CLEAN WATER,
INC.; CLEVELAND WRECKING; COASTAL SERVICES, INC.;
COASTAL TANK LINES; COCA-COLA FOODS;
COLGATE-PALMOLIVE CO.; COLONY FURNITURE CO.;
COLUMBIA CORRUGATED; COLUMBIAN RIBBON;
S |
3a
CON-LUX COATINGS, INC.; CONTINENTAL CAN CO., INC.:
CONTINENTAL CHEM CO.; CONTINENTAL OIL; COOPER
INDUSTRIES, INC.; COVINO’S INDUSTRIAL DISP. SERV..,
INC.; CRANE & CO. IN; CURTIS NUCLEAR:
CURTISS-WRIGHT CORP.; CUSTOM BUILDERS; CUSTOM
DISPOSAL; D&C CONTRACTING; DART INDUSTRIES:
DARWORTH CO.; DATA GENERAL CORP.; DELCO REMY;
DELEET MERCHANDISING CORP.; DELMARVA IND. CORP.:;
DIBELLA SANITATION; DOCK WATCH QUARRY; DONADIA
BROTHERS; DONALD HARTMAN; THE DOW CHEMICAL
CO.; DREW CHEM CORP.; DUANE MARINE CORP.; DUBOIS
CHEMICALS, INC.; DURO-TEST CORP.; EJ GAISSER INC.; E.1.
DUPONT DE NEMOURS AND CO., INC.; E.R. SQUIBB &
SONS, INC.; EASTCOAST POLLUTION CONTROL, INC::
EASTERN IND. CORP.; EASTERN INDUSTRIES; ECOLAB,
INC.; EDAL INDUSTRIES, INC.; EGYPTIAN LACQUER:
ELIZABETH DISPOSAL; ELMWOOD TANK & PIPING CORP.:
ENVIRONMENTAL RECOVERY; EQUADORIAN LINE, INC:
EXXON CORP.; FETTE FORD, INC.; FISHER SCIENTIFIC CO.:
FLEXTRAP; FLINTKOTE CORP.; FLOCK INDUSTRIES:
FLORENCE IND. RECONTO; FLUID PACKAGING CO., INC.:
FMC CORP.; FORD MOTOR CO.; FRANK FOGLIA JR.; FRANK
MUGGID BUILDER; FREEHOLD CARTAGE; FRISCH & CO.:
FRITSZCHE D&D; FYN PAINT & LACQUER; GAESS
ENVIRONMENTAL SER.; GAF CORP.; GALAXY CHEMICAL;
GANES CHEMICALS, INC.; GATX TERMINALS CORP.:
GENERAL CABLE CORP.; GENERAL CERAMICS INC:
GENERAL ELECTRIC CO.; GENERAL MOTORS CORP.
GENERAL SEWER SERVICE; GENERAL WAREHOUSE:
GLENWALI; GM ASSEMBLY DIV.; GOODALL RUBBER CO.:
GOODYEAR TIRE & RUBBER CO.; GOULD, INC:
4a
GREYHOUND CORP.; GUARD ALL CHEMICAL CO., INC.;
GUARDIAN, INC.; GULTON INDUSTRIES, INC.; H&F
CHEMICAL CO.; H&S CHEMICAL CO.; HARDMAN INC;
HATCO CHEMICAL DIVISION; HATFIELD WIRE & CABLE;
HAVEN CHEM.; HENKEL INC.; HERCULES, INC.; HEXCEL
CORP.; HI-PURE CHEMICALS, INC.; HIGH VOLTAGE ENGIN.
CORP.; HIGHWAY DISPOSAL; HOECHST CELANESE CORP. ;
HOFFMANN-LA ROCHE INC.; HOLIDAY INN REST.;
HOWARD FUEL CO.; HOWMEDICA; HPH CONSTRUCTION;
HYDROCARBON RESEARCH, INC.; IBM CORP.; ICI
AMERICAS INC.; ICI UNITED STATES; ILFORD PHOTO
CORP.; IMPERIAL OIL CO., INC.; IMPORTICO, INC.; IND
SURPLUS CHEMICAL INC.; INDUSTRIAL SILVER CO.;
INMONT CHEMICAL; INMONT CORP.; INSFLEX CO.; INSTEL
CORP.; INTER’L FLAVORS AND FRAG., INC.; INTERDATA
CORP.; INTERSTATE CHEM. CO.; IRON OXIDE CORP.; ITT
CORP.; J BASS & CO., INC.; J. FILTRESTO SANIT.; J.M.
HUBER CORP.,; J.T. BAKER, INC.; JAMECO CORP.; JAMECO
INDUSTRIES; JAMES P. HORAN, INC.; JERSEY SANITATION;
JOHN DUSENBERY CO., INC.; JOHN ERRICO DISPOSAL CO.;
JOHN H. COONEY, INC.; JOHNSON & JOHNSON; JOHNSON
MATTHEY, INC.; KAY-FRIES, INC.; KERRY TIRE; KEUFFEL
& ESSER CO.; KEY OIL CO.; KNOLL FINE CHEMICAL;
KOPPERS CO., INC.; KRAFT CONTAINER; KTK CORP.; L&J
DRUM CO.; L.E. CARPENTER & CO.; LAWRENCE
MCFADDEN CO.; LAWSON PRODUCTS, INC.; LEHAND
SALES; LEHIGHTON ELEC., INC.; LEKSI, INC.; LELAND
INDUSTRIES; LELAND TUBE CO.; LEVER BROTHERS CO..;
LINCOLN METALS PRODUCTS; LINDEN MOTOR FRGHT
CO., INC.; LIQUID REMOVAL SER.; LUCAS INDUSTRIES,
INC.; LUMAS CO.; M&F CHEMICAL CO.; M&T CHEMICALS,
Sa
INC.; MAAS & WALDSTEIN; MACARTHUR PETROLEUM:
MADISON TOWNSHIP; MAKAR TRUCKING INC.; MALLA
INC.; MALLINCKRODT CHEM.; MANNON EXCAV. &
PAVING CO., INC.; MARBUN DIVISION; MARISOL, INC.:
MARPAK ASSOC.; MARVIN JONAS INC.; MAYCO OIL &
CHEMICAL; MCGILLON EXCAVATING; MCKAYS
TRUCKING; THE MEARL CORP.; MERCER RUBBER; MERCK
& CO., INC; METRO CONTAINER CO.; METROL OIL &
CHEM. CORP.; METROL PETRO CHEM. CO.; MICHAELS
INDUSTRIAL DISPOSAL; MIDDLESEX CONTAINER:
MIDLAND PROC., INC.; MIDWEST EMERY; MILLMASTER:
MOBILE OIL CORP.; MONARCH CHEMICAL; MONMOUTH
MEDICAL CTR; MONROE CHEMICAL CORP.; MONSANTO
CO.; MONTVAL LABS; MORTON THIOKOL INC.; MUTPIE
TRUCKING; N&N TRUCKING; N. AMER. METAL & CHEM.:
NATIONAL CONVERTERS; NATIONAL GYPSUM CO.:
NATIONAL STARCH & CHEM. CORP.; NEPERA, INC::
NIAGARA SANITATION CO., INC.; NL INDUSTRIES, INC.:
NORTON & SON, INC.; NUTEX CORP.; THE NUTRASWEET
CO.; OAKITE PRODUCTS, INC.; OCCIDENTAL CHEMICAL
CORP.; THE OKONITE CO.; OLIN CORP.; ORGANON, INC.:
THE ORMAND SHOPS, INC.; ORTHO DIAGNOSTICS:
PAMARCO, INC.; PAQUET ONEIDA, INC.; PENN CENTRAL
COR?.; PERK CHEMICAL CO., INC.; PERSONAL PROD. CO.:
PFIZER, INC.; PHARMAC. LABS INC.; PHELPS DODGE
CORP.; PHILIP A. HUNT CHEM.; PIONEER ROOFING CO.:
PISCATAWAY DISPOSAL; PITNEY BOWES, INC.; POINT
PLEASANT HOSPITAL; POLAROID CORP.; POLYMER
MATERIALS, INC.; POPE CHEMICAL CO.; PORTFOLIO ONE,
INC.; PQ CORPORATION; PRINCETON NURSERIES:
PROCEDYNE CORP.; PROCTER & GAMBLE MANF. CO.:
6a
PUBLIC SERV. ELEC. & GAS CO.; PVO INTERNATIONAL,
INC.; QUAKER CHEMICAL CORP.; QUALITY CONTAINER;
R&R SANITATION; R. W. EAKEN, INC.; RADIAC RESEARCH
CORP.; RAY GUYS TRAILER; RCA CORP.; REAGENT
CHEMICAL & RESEARCH; REICHHOLD CHEMICALS, INC.;
REITER DRUM & BARREL; REVERE COOPER & BRASS.
INC.; REYNOLDS METALS CO.; REHEEM MANUFACTURING
CO.; RICHARDS TRUCKING; RIVERVIEW HOSPITAL;
ROLLINS ENV. SERV. (NJ), INC.; RUPACO PAPER CORP.;
RUSSELL REID CORP.; RUSSELL REID CO.;
RUSSELL-STANLEY CORP.; RUTGERS-THE STATE
UNIVERSITY; RYCOLINE PRODUCTS, INC; S&W
TRUCKING; SAM TRUCKING CO.; SB PENICK COMPANY;
SSS CONSTRUCTION; SAB NIFE, INC.; SAFETY LIGHT
CORP.; SAFETY-KLEEN ENVIROSYSTEMS CO.; SAMSON
TANK CLEANING; SANDOZ CHEMICALS CORP.; SANTY;
SCHERING CORP.; SCIENTIFIC CHEM. PROC.; SCOTT PAPER
CO.; SEALAND ENVRNMTL.; SEALED AIR CORP.;
SEN-DURE PRODUCTS, INC.; SEQUA CORP.; SETON HALL
UNIVERSITY; SHELL CHEMICAL CO.; SHULTON INC.
CONSUMER; SIEGERIED CHEMICAL; SIKA CORP.;
SINCLAIR VALENTINE; SMITH KLINE BECKMAN CORP.;
SOLVENTS DISTILLERS; SOLVENTS RECOV. SERV. OF NJ,
INC.; SOUTHERN CALIF. CHEM. CO., INC.; SPECTRSERV..,
INC.; ST. BARNABAS ME. CNTR.; ST. JOE PAPER CO.,; ST.
THOMAS AQUINAS CL.; STALEY CHEMICAL CO.;
STANDARD TANK CLEAN; STANDARD TOOL & MFG. CO.:;
STANLEY CHEMICAL CO.; THE STANLEY WORKS; STARCH
CONTAINER CO.; STARLIGHT TRADING; STAUFFER
MANAGEMENT CO.; STEPAN COMPANY; SUN RISE
FASHION INC.; SYBRON TRANSITION CORP.; TAPPAN
st hie tie ee ee ee -
7a
TANKER; TAU LABORATORIES; TENNECO RESINS, INC.:
TEXACO BUTADIENE CO.; TEXACO, INC.; TEXTRON, INC.:
TIME--DC; TIZON CHEMICAL CORP.; TOMS RIVER CHEM.
CORP.; TUCK INDUSTRIES, INC.; U. S. METALS REFINING:
UNION CAMP RESEARCH; UNION CARBIDE CORP.; UNION
TEXTILE; UNIROYAL CHEM. CO., INC.; UNISYS CORP.:
UNITED CARTING; UNITED STATES LINES; UNITED
STATES METALS REFINING CO.; UNITED TECHNOLOGIES
CORP.; UNIVERSAL SANIT.; UOP CHEM.; THE UPJOHN CO.:
US SAMICA CORP.; VAMP CHEM; VANGUARD VENTRON
CHEMICAL; VILLAGE CESSPOOL; VINELAND CHEM. CO..,
INC.; W. W. ANDRESS CO.; WALL TRENDS INC.; WALTER
KIDDE; ‘WALTZ ENTERPRISES; WESTERN UNION:
WESTINGHOUSE ELECTRIC CORP.; WESTON CHEMICAL:
WESTRON CHEMICAL CO.; WHITE CHEMICAL CORP..
WHITE ROSE TEA; WHITMOYER LABS; WINCHESTER
WESTRON; WITCO CHEMICAL CO.; WOODSTEIN &
KLURMAN; Z&W ENTERPRISES, INC.; JOHN DOE (1-500)
STANDARD SPILL; ALUMINUM BILLETS; MACARTHUR
PETROLEUM & SOLVENT CO. INC.; CENTRAL JERSEY
CLNRS; CLEAN SPRAY; JAMES E. MCNULTY; LCP
CHEMICAL & PLAST; LESTER SUMMERS; SAND
GRAVEL-STONE CO.; MEADOWS FACILITY POST 0:
TENNECO CHEM; WESTERN CHEMICAL CO.; GERMAN
SHEPARD; Z & W MAZDA; SYBRON CHEMICALS; UNITED
STATES METAL REFINING CO.; GENERAL SEWER SERVICE
Mayco Oil & Chemical Company; Astro Pak; AT&T Technologies
Inc., by its successor American Telephone and Telegraph Company,
Inc.; Biocraft Laboratories, Inc.; Chesebrough-Pond’s USA Co.:
CPC International, Inc., including Best Foods division and Penick
Corporation successor to $.B. Penick Company; Fluid Packaging
8a
Co., Inc.; FMC Corporation; Ganes Chemicals, Inc.; General
Electric Company; Hexcel Corporation; Huls America Inc.; IBM
Corporation; John H. Cooney, Inc.; J. T. Baker, Inc.; Lever
Brothers Co.; Marisol, Inc.; Mobil Oil Corp.; Occidental Chemical
Corporation; Phelps Dodge Corporation; Procedyne Corporation;
Procter & Gamble Manufacturing Company; Reynolds Metals
Company; Russell Reid Company; Safety-Kleen Envirosystems
Company; Saft Nife, Inc. (sued as SAB Nife Inc.); Sequa
Corporation (formerly Sun Chemical Corporation); Siegfried
Chemicals; Smithkline Beecham Corporation; Spectraserv, Inc.
(formerly Modem Transportation Co.); Stroh Brewery Company;
Sybron Transition Corp.; Sybron Chemicals, Inc., including as trade
names Gamlen Chemical and Tanatex; and Witco Corporation
(collectively “Settlor-Defendant Appellants”) Appellants
[Filed September 17, 1993}
PRIOR HISTORY:
APPEAL FROM THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF NEW JERSEY;
(D.C. Civ. No. 90-02578).
COUNSEL: George M. Newcombe, Esquire, David B. Smallman,
Esquire, Elizabeth A. Fuerstman, Esquire, Simpson,
Thacher & Bartlett, 425 Lexington Avenue, New
York, New York 10017 Steven L. Lapidus, Esquire,
Robinson, St. John & Wayne, One Gateway Center,
Newark, New Jersey 07102, Attomeys for Mayco
Oil & Chemical Company, Appellant. Henry B.
Fitzpatrick, Esquire, Stephen P. Chawaga, Esquire,
9a
Fitzpatrick & Tanker, One Logan Square, Suite
3001, Philadelphia, PA 19103, Attomeys for Astro
Pak, Appellant. Joseph J. Strelkoff, Esquire, 131
Mormistown Road, Basking Ridge, New Jersey
07920-1650, Attomey for AT&T Technologies, Inc.
by its successor American Telephone and Telegraph
Company, Inc. Appellant. Stephen P. Kramer,
Esquire, Proskauer, Rose, Goetz & Mendelsohn,
1585 Broadway, New York, New York 10036,
Attomeys for Biocraft Laboratories, Inc., Appellant.
Daniel M. Steinway, Esquire, Catherine J. Serafin,
Esquire, Carl A. Salisbury, Esquire, Anderson, Kill,
Olick & Oshinsky, 2000 Pennsylvania Avenue,
N.W., Suite 7500, Washington, D. C. 20006,
Attomeys for Chesebrough-Pond’s USA Company
and Lever Brothers Co., Appellants. Steven A.
Kunzman, Esquire, Bivona, Cohen, Kunzman, Coley,
Yospin, Bemstein & DiFrancesco, 15 Mountain
Boulevard, Warren, New Jersey 07059-6327,
Attomeys for CPC International, Inc. including Best
Foods division and Penick Corporation successor to
S. B. Penick Company, Appellant. Steven J.
Eisenstein, Esquire, Lum, Hoens, Conant, Danzis &
Kleinberg, 103 Eisenhower Parkway, Roseland, New
Jersey 07068-1049, Attomeys for Fluid Packaging
Co. Inc., Appellant. John F. Stillmun, Esquire, FMC
Corporation, 1735 Market Street, Philadelphia, PA
19103, Attomey for FMC Corporation, Appellant.
Tod W. Read, Esquire, Edward A. Kurent, Esquire,
Gilberg & Kurent, 1250 Eye Street, N.W., Suite 600,
Washington, D.C. 20005, Attomeys for Ganes
10a
Chemicals, Inc. and Siegfried Chemicals, Appellants.
Langley R. Shook, Esquire, Sidley & Austin, 1722
Eye Street, N.W., Washington, D.C. 20006,
Attomeys for General Electric Company, Appellant.
David B. Graham, Esquire, John W. Kampman,
Esquire, Steven L. Leifer, Esquire, Howrey &
Simon, 1299 Pennsylvania Avenue, N.W..,
Washington, D.C. 20004-2402, Attomeys for Hexcel
Corporation, Appellant. George S. Flint, Esquire,
Jackson & Nash, 330 Madison Avenue, New York.
New York 10017-5096, Attomeys for Huls America,
Inc., Appellant. Ezra D. Rosenberg, Esquire, Fox,
Rothschild, O’Brien & Frankel, Princeton Pike
Corporate Center, 997 Lenox Drive, Building #3,
Lawrenceville, New Jersey 08648-2311, James K.
Guerin, Esquire, Senior Counsel, IBM Corporation,
208 Harbor Drive, Stamford, Connecticut
06904-2501, Attiomeys for IBM Corporation,
Appellant. John A. Boyd, Esquire, Harns, Dickson,
Buermann, Camp, Ashenfelter, Slous & Boyd, 250
Bellvue Avenue, Upper Montclair, New Jersey
07043, Attomeys for John H. Cooney, Inc..,
Appellant. Nan Bernardo, Esquire, Shanley & Fisher,
131 Madison Avenue, Morristown, New Jersey
07962-1979, Attomeys for J. T. Baker, Inc.; Marisol,
Inc.; and Procter & Gamble Manufacturing Co..,
Appellants. Thomas Richichi, Esquire, Beveridge &
Diamond, P.C. 1350 I Street, N.W., Suite 700,
Washington, D.C. 20005, Attomeys for Mobil Oil
Corporation, Appellant. Michael M. Gordon,
Esquire, Cadwalader, Wickersham & Taft, 100
ES
lla
Maiden Lane, New York, New York 10038,
Attomeys for Occidental Chemical Corporation and
Safety-Kleen Envirosystems Company Appellants.
John S. Agar, Esquire, Skadden, Arps, Slate,
Meagher & Flom, 1440 New York Avenue, N.W..,
Washington, D.C. 20005, Attomeys for Phelps
Dodge Corporation, Appellant. James Bickford.
Esquire, 172 Sayre Drive, P.O. Box 7081, Princeton,
New Jersey 08543, Attomey for Procedyne
Corporation, Appellant. Renata M. Manzo, Esquire,
Reynolds Metals Company, 6601 West Broad Street,
Richmond, Virginia 23230, Attomey for Reynolds
Metals Company, Appellant. Lila Wynne Williams,
Esquire, Slimm, Dash & Goldberg, 216 Haddon
Avenue, P.O. Box 2222, Westmont, New Jersey
08108-2886, Attorneys for Russell Reid Company,
Appellant. William F. Paquin, Esquire, Haronian,
Paquin, Bramley & Harrington, Inc., 190 Commerce
Drive, Warwick, Rhode Island 02886, Attorneys for
Saft Nife, Inc. (sued as SAB Nife, Inc.), Appellant.
Richard J. Kagan, Esquire, Leonard & Butler, 300
Lanidex Center, Parsippany, New Jersey 07054,
Attomeys for Sequa Corporation (formerly Sun
Chemical Corporation), Appellant. Patricia A.
Barald, Esquire, Covington & Burling, 1201
Pennsylvania Avenue, N.W., P.O. Box 7566,
Washington, D.C. 20044, Attomeys for Smithkline
Beecham Corporation, Appellant. Max Spinrad,
Esquire, Miele, Cooper, Spinrad & Kronberg, 90
Millbum Avenue, Milibum, New Jersey 07041,
Attomeys for Spectraserv, Inc. (formerly Modem
i2a
Transportation Company), Appellant. Leonard R.
Charla, Esquire, Diane B. Carley, Esquire, Butzel
Long, 150 W. Jefferson, Suite 900, Detroit,
Michigan 48226-4430, Attomeys for Stroh Brewery
Company (successor in interest to Jos. Schlitz
Brewery Co.) and/or Stroh Container Co improperly
named as Starch Container, Appellant. Donald K.
Joseph, Esquire, Wolf, Block, Schorr & Solis-Cohen,
Packard Building, 12th Floor, Philadelphia, PA
19102, Attomeys for Sybron Transition Corporation
and Sybron Chemicals, Inc. including as trade names
Gamlen Chemical and Tanatex, Appellants. Edmund
R. Papazian, Esquire, Witco Corporation, Legal
Department, 12th Floor, 520 Madison Avenue, New
York, New York 10022-4236, Samuel D. Bornstein,
Esquire, The Atrium, 80 Route 4 East, Paramus,
New Jersey 07652, Attorneys for Witco Corporation,
Appellant.
Dante J. Romanini, Esquire, Richard M. Cohen,
Esquire, Kozlov, Seaton, Romanini & Brooks, P.C..,
1940 Route 70 East, Suite 200, Cherry Hill, New
Jersey 08003, Attomeys for Transtech Industries,
Inc.; Kin-Buc, Inc.; and Filcrest Realty, Inc.,
Appellees.
Myles E. Flint, Esquire, Acting Assistant Attomey
General, Anne S. Almy, Esquire, Catherine R.
McCabe, Esquire, United States Department of
Justice, Environmental Enforcement Section, Ben
Franklin Station, P.O. Box 7611, Washington, D.C.
13a
20044, Attorneys for United States of America,
Amicus-appeilee.
JUDGES: Before: SCIRICA, NYGAARD, and WEIS, Circuit
Judges.
OPINION BY: WEIS
OPINION: OPINION OF THE COURT
Weis, Circuit Judge.
In this case brought under the Comprehensive Environmental
Response, Compensation, and Liability Act (CERCLA), the district
court rejected appellants’ contention that, having entered into a
settlement with the Environmental Protection Agency, they were
relieved of responsibility for cleanup expenses incurred by the
owners of a landfill. We conclude that the district court's denial of
summary judgment and refusal to enforce a settlement is a collateral
order not appealable under the Cohen exception. Accordingly, we
will dismiss the appeal.
The owners and operators of the Kin-Buc Landfill in New
Jersey brought this suit in 1990 seeking contribution for costs
incurred in cleaning up that hazardous waste site. The 445 named
defendants are generators, transporters, or haulers of hazardous
waste who are alleged to be potentially responsible parties liable to
plaintiffs for past expenses incurred at the site, as well as for
anticipated future costs.
Approximately 200 of the defendants (‘‘settlor-defendants’’)
moved for summary judgment asserting that, as a result of a
settlement agreement with the Environmental Protection Agency
embodied in a 1988 consent decree, they were not liable to
plaintiffs. The district court denied the motion concluding that the
l4a
consent decree covered only costs incurred by the United States and
did not purport to absolve the settlor-defendants from liability for
contribution to plaintiffs for their separate expenditures.
Under CERCLA, parties who have “resolved [their] liability to
the United States... ina[] .. . judicially approved settlement
shall not be liable for claims for contribution regarding matters
addressed in the settlement.”
42 U.S.C. § 9613(f)(2). The court concluded, however, that the
application of that statutory provision was limited by the terms of
the settlement agreement and that “in no way was the govemment
absolving defendants from all liability to any other party for the
ongoing problems at the site.’ The court then denied
settlor-defendants’ request for certification of a controlling question
of law under 28 U. S. C. §§ 1292(b). Approximately 35 of the
settlor-defendants have appealed.
Settlor-defendants contend that this Court has jurisdiction
under the “collateral order” doctrine articulated in Cohen vy.
Beneficial Indus. Loan Corp., 337 U.S. 541, 545-47, 93 L. Ed.
1528, 69 S. Ct. 1221 (1949). In that case, the Court defined an
exception to the final judgment requirement of 28 U. S. C. § 1291
as a “small class [of decisions] which finally determine claims of
right separable from, and collateral to, mghts asserted in the action,
too important to be denied review and too independent of the cause
itself to require that appellate consideration be deferred until the
whole case is adjudicated.” Id. at 546.
In Coupers & Lybrand y. Livesay, 437 U.S. 463, 57 L. Ed. 2d
351, 98 S. Ct. 2454 (1978), the Court listed three criteria that must
be present for an interlocutory order to come within Cohen’s
narrow exception to the final-judgment rule. The order must (1)
1Sa
conclusively determine the disputed question; (2) resolve an
important issue completely separable from the merits of the action:
and (3) be effectively unreviewable on appeal from a final
judgment. Id. at 468.
The Supreme Court has been chary of expanding the Cohen
exception any further. In Lauro Lines s.r.l. v. Chasser, 490 U.S.
495, 498, 104 L. Ed. 2d 548, 109 S. Ct. 1976 (1989), the Court
found that an interlocutory order denying enforcement of a
contractual forum-selection clause did not satisfy the third
requirement of the collateral order doctrine. The Court reiterated its
“general rule” that an order is “effectively unreviewable” only if it
“involves an asserted right the legal and practical value of which
would be destroyed if it were not vindicated before trial.” 490 U.S.
495 at 498-99 (internal quotations omitted). That an erroneous
ruling may result in additional litigation expense “‘is not sufficient
to set aside the finality requirement imposed by Congress’ [in
section 1291].” Id. at 499 (quoting Richardson-Merrell Inc. vy.
Koller, 472 U.S. 424, 436, 86 L. Ed. 2d 340, 105 S. Ct. 2757
(1985))
An immunity to Civil suit itself is a right that can be lost if not
enforced before trial. Consequently, an order rejecting official
immunity is immediately appealable, Mitchell v. Forsyth, 472 U.S.
S11, 525, 86 L. Ed. 2d 411, 105 S. Ct. 2806 (1985), as is one
denying effect to the protection of the “Speech or Debate Clause,”
Helstoski v. Meanor, 442 U.S. 500, 506-08, 61 L. Ed. 2d 30, 99 S.
Ct. 2445 (1979). See also Abney v. United States, 431 U.S: 651.
662, 52 L. Ed. 2d 651, 97 S. Ct. 2034 (1977) (order denying night
not to stand trial on double jeopardy grounds is appealable before
final judgment).
l6a
' Although an order denying immunity to suit falls within the narrow
confines of the “collateral order” doctrine, that exception may not
be allowed to swallow the rule. In Van Cauwenberghe vy. Biard, 486
U.S. 517, 100 L. Ed. 2d 517, 108 S. Ct. 1945 (1988), the Coun
remarked that “in some sense, all litigants who have a mentorious
pretnal claim for dismissal can reasonably claim a right not to stand
trial.” Id. at 524. The Court further reasoned:
“Because of the important interests furthered by the
final-judgment rule . . . and the ease with which certain
pretrial claims for dismissal may be alleged to entail the
right not to stand trial, we should examine the nature of
the night asserted with special care to determine whether
an essential aspect of the claim is the night to be free of
the burdens of a trial.”
Id. at 524-25.
In Van Cauwenberghe, the Court assumed the validity of
defendant's contention that he was immune from service of process,
but held, nonetheless, that the district court’s denial of his motion
to dismiss was not immediately appealable. Id. at 524. ‘“‘Because the
right not to be subject to a binding judgment may be effectively
vindicated following final judgment, we have held that the denial
of a claim of lack of jurisdiction is not an immediately appealable
collateral order.” Id. at 527.
We have followed the Supreme Court's admonition and “have
consistently construed the Cohen exception narrowly rather than
expansively.”’ Lusardi v. Xerox Corp., 747 F.2d 174, 176-77 (3d
Cir. 1984); see also Praxis Properties, Inc. v. Colonial Say. Bank,
s.e.a., 947 F.2d 49, 54 (3d Cir. 1991). Demenus v. Tinton 35 Inc.,
17a
873 F.2d 50, 53 (3d Cir. 1989). We considered the problem in
Borden Co. v. Sylk, 410 F.2d 843 (3d Cir. 1969), observing:
“We have detected what appears to be an irresistible
impulse on the part of appellants to invoke the ‘collateral
order’ doctrine whenever the question of appealability
arises. Were we to accept even a small percentage of
these sometime exotic invocations, this court would
undoubtedly find itself reviewing more ‘collateral’ than
‘final’ orders.”
Id. at 845-46. For a comprehensive review of the collateral order
doctrine, see ISA Charles A. Wright et al., Federal Practice and
Procedure § 3911 to 3911.5 (1992),
Tuming then to the issues presented in the case before us, we
first consider the factors set out in C oopers & Lybrand, 437 US.
at 468. We may assume that the district court's order is final
because there is no indication that it was tentative or less than the
last word on the settlor-defendants’ construction of the consent
decree. We have substantial doubts, however, that the issues
settlor-defendants raised in defense of appellate jurisdiction under
the collateral order doctrine are distinct from the underlying merits
of the lawsuit. We need not linger long on this point, however,
because it is quite clear that the settlor-defendants’ contentions can
be raised on direct appeal after final judgment. Therefore, the
interlocutory order fails to meet all of the requirements needed to
fall within Cohen's narrow exception to the final-judgment rule.
Recognizing that deficiency, settlor-defendants assert that the
consent decree grants them immunity from suit, relying on a line of
cases holding that interlocutory orders denying enforcement of
settlement or release agreements are immediately appealable. See
18a
Forbus v. Sears, Roebuck & Co., 958 F.2d 1036, 1039-40 (11th
Cir. 1992); Grillet v. Sears, Roebuck & Co., 927 F.2d 217, 219-20
(Sth Cir. 1991); Janneh v. GAF Corp., 887 F.2d 432, 436 (2d Cir.
1989); Towers Hotel Corp. v. Rimmel, 871 F.2d 766, 769-70 (8th
Cir. 1989); cf. Chaput v. Unisys Corp., 964 F.2d 1299, 1301 (2d
Cir. 1992). Those cases are factually distinguishable from the case
before us in that they involved disputes over settlement agreements
between plaintiffs and defendants. Here, however, the settlement
agreement was between settlor-defendants and the EPA -- an entity
that is not a party to this case. Plaintiffs are not alleged to have
reached any agreement with the settlor-defendants on the claim
incorporated in the complaint.
More significant, however, is our disagreement with the
decisions in Forbus, Grillet, Janneh and Towers. We believe that
they undermine the final-judgment rule and expand the immunity
concept beyond that which the Supreme Court has approved. In our
view, Desktop Direct, Inc. v. Digital Equip. Corp., 993 F.2d 755
(10th Cir. 1993), more closely conforms to the Supreme Court's
teaching.
In Midland Asphalt Corp. v. United States, 489 U.S. 794, 103
L. Ed. 2d 879, 109 S. Ct. 1494 (1989), the Supreme Court
cautioned that one should not “play word games with the concept
of a ‘nght not to be tried.’” Id. at 801. The Court went or to
explain that [a] right not to be tried in the sense relevant to the
Cohen exception rests upon an explicit statutory or constitutional
guarantee that trial will not occur... .” Id.
Cases involving claims of official immunity have listed
interests that justify permitting freedom from suit, such as “‘the
general costs of subjecting officials to the risks of trial -- distraction
of officials from their govemmental duties, inhibition of
19a
discretionary action, and deterrence of able people from public
service.” Mitchell, 472 U.S. at 526 (quoting Harlow v. Fitzgerald,
457 U.S. 800, 816, 73 L. Ed. 2d 396, 102 S. Ct. 2727 (1982)). No
such public policy considerations are present in the case at hand.
In Desktop Direct, the United States Court of Appeals for the
Tenth Circuit declined to review an order vacating a settlement
between plaintiff and defendant. The Court concluded that the
Cohen doctrine should “not be expanded without compelling
justification. A claimed right to avoid litigation based on a private
contract to that effect does not meet this standard.” Id. at 760. The
Court also observed that it did not “see how a private settlement
contract is significantly different from the contracted forum
selection clause the Supreme Court refused to enforce through
interlocutory appeal in Lauro Lines.” Id.
Settlor-defendants seek some support from CERCLA, but we
are not convinced. Indeed, we note that the language of section
9613 (f)(2) supplies another basis for our conclusion that
settlor-defendants have no immunity from suit. That section
provides that parties settling with the United States “shall not be
liable for claims for contribution regarding matters addressed in the
settlement.” 42 U.S. C. § 9613(f)(2). We believe it is significant
that the statute does not include the word “immunity,” but merely
refers to a party’s “liability.”
In Brown v. Grabowski, 922 F.2d 1097, 1109 (3d Cir. 1990),
we refused to review an interlocutory order rejecting claims of
official immunity based on state law. Although state law conferred
immunity from liability, we found no authority that granted
immunity from suit as well. Id. at 1108.
20a
As the Court pointed out in Van Cauwenberghe, undoubtedly
there is value to the litigant ‘in thumphing before trial, rather than
after it.’ 486 U. S. at 524 (quoting United States v. MacDonald,
435 U.S. 850, 860, & n.7, 56 L. Ed. 2d 18, 98 S. Ct. 1547 (1978)).
Ordinarily, however, the benefits of the final-judgment rule,
including discouragement of piecemeal appeals, efficient utilization
of judicial resources, and prevention of delay and ultimate
disposition, take precedence. Id. at 521 n.3, 524-25. If
settlor-defendants had a right to an appeal, it would be difficult to
deny one to other litigants who can assert the benefit of such
affirmative and dispositive defenses as claim or issue preclusion,
Statute of limitations, lack of subject matter jurisdiction, and the
like. In Powers v. Southland Corp., 4 F.3d 223 (3d Cir. 1993), we
held that an order joining a party despite the lapse of the statute of
limitations was not appealable as a collateral order. We observed:
‘While it could be argued that a statute of limitations entails a nght
not to be sued after the expiration of the limitations period, that
contention was rejected by this court in connection with a cnminal
statute of limitations.” Powers, No. 92-1562, slip op. at 18 (citing
United States v. Levine, 658 F.2d 113, 124-29 (3d Cir. 1981)).
Levine presented an even stronger case tor construing the lapse
of the statute of limitations as an immunity from prosecution and
(rial, but, nevertheless, this Court held that the Cohen exception did
not apply. Levine, 658 F.2d at 129.
We are persuaded that orders denying summary judgments on
claims of immunity from trial based on releases or settlements are
not appealable as Cohen collateral orders. Consequently, we lack
jurisdiction and will dismiss this appeal.
2la
Settlor-defendants have requested us to consider their appeal, in the
alternative, as a petition for mandamus. We do so. but deny the
petition for failure to assert a cognizable basis for relief.
The appeal will be dismissed without prejudice. The petition for
mandamus will be denied.
22a
APPENDIX B
TRANSTECH INDUSTRIES, :
INC., et. al.
Civil Action No. 90-2578
Plaintiffs (Harold A. Ackerman)
Vv. OPINION
A & Z SEPTIC CLEAN,
et. al.
Defendants.
Plaintiffs in this action are owners and/or operators of a
hazardous waste site. Having spent approximately $13 million to
clean up the site, plaintiffs seek through this action contribution
costs from the 440 users of the site. Over two-hundred of the 440
defendants had previously settled a claim for clean-up costs brought
by the federal goverment. Accordingly, these defendants, citing a
federal statutory provision, filed a motion to dismiss the complaint
for a failure on the part of the plaintiffs to allege a set of facts upon
which relief can be granted. The motion is opposed by plaintiffs
and by the other, non-settling, defendants. Additionally, defendant
Clairol (one of the settling defendants) moves to strike the
plaintiffs’ complaint, and, in the altemative, for summary judgment
pursuant to Rule 56. I will address each motion separately.
23a
SETTLOR DEFENDANTS MOTION
1. Standard for Summary Judgment
As an initial matter, Federal Rule of Civil Procedure 12(b)
States that
If, on a motion asserting the defense . . . to dismiss for failure
of the pleading to state a claim upon which relief can be
granted, matters outside the pleading are presented to and not
excluded by the court, the motion shall be treated as one for
summary judgment and disposed of as provided in Rule 56,
and all parties shall be given reasonable Opportunity to present
all material made pertinent to such a motion by Rule 56.
In their motion papers, defendants rely heavily on language of
a consent decree they entered into with the United States
government, a document that was not a part of the pleadings.'
Thus, parties were notified that I am treating their motion as a Rule
56 motion for summary judgment. All parties were given an
Opportunity to submit additional relevant materials under Rule 56.
Construing this motion as one for summary judgment, | note
that summary judgment may be granted only if the pleadings,
supporting papers, affidavits, and admissions on file, when viewed
with all inferences in favor of the nonmoving party, demonstrate
that tiere is rio genuine issue of material fact and that the movant
is entitled to judgment as a matter of law. See Todaro y. Bowman.
872 F.2d 43, 46 (3rd Cir. 1989); Chippolini v. Spencer Gifts, Inc..,
814 F.2d 893, 896 (3rd Cir.), cert. dism’d,-483 U.S. 1052 (1987).
Put differently, “summary judgment may be granted if the movant
shows that there exists no genuine issues of material fact that would
permit a reasonable jury to find for the nonmoving party.”’ Miller
1. The consent decree was approved in United States vy. Absolute Fire
Protection Co., Inc., No. 88-207 (ALJ) (D.N.J. Aug. 1, 1988).)
24a
v. Indiana Hospital, 843 F.2d 139, 143 (3rd Cir. 1988), cert.
denied, 488 U.S. 870 (1988). An issue is “genuine” if a reasonable
jury could possibly hold in the nonmovant's favor with regard to
that issue. See Anderson vy. Liberty Lobby, Inc., 477 U.S. 242,
247-48 (1986). A fact is material if it influences the outcome under
the governing law. Id. at 248.
Within the framework set out above, the moving pary
essentially bears two burdens: First, there is the burden of
production, of making a prima facie showing that it is entitled to
summary judgment. This may be done either by demonstrating there
is no genuine issue of fact and that as a matter of law, the moving
party must prevail or by demonstrating the nonmoving party has not
shown facts relating to an essential element of the issue for which
it bears the burden. Once either showing is made, this burden shifts
to the nonmoving party who must demonstrate facts supporting
each element for which it bears the Durden as well as establish the
existence of genuine issues of material fact. Second, there is the
burden of persuasion. This burden is a stringent one which always
remains with the moving party. If there remains any doubt as to
whether a trial is necessary, summary judgment should not be
granted. See Celotex Corp. v. Catrett, 477 U.S. 317, 330-33;
Adickes v. S.H. Kress & Co., 398 U.S. 144, 157-61 (1970);
Advisory Committee's Notes on Fed. Rule of Civ. Pro. 56(e), 1963
Amendment; see generally C. Wright, A. Miller, & M. Kane,
Federal Practice and Procedure §2727 (2nd ed. 1983).
With this standard in mind, I tum to the facts surrounding this
motion.
Il. Background
This case tums on an interpretation of the Comprehensive
Environmental Response, Liability and Compensation Act
(CERCLA), a complex piece of federal legislation passed in 1980,
significantly amended in 1986, and designed to effectuate quick
cleanups of hazardous waste sites. At issue here is a site known as
Kin-Buc (the “Site”), which has been a trash disposal site in New
Jersey since 1947. During 1968, the Site began operating as a
State-approved landfill for hazardous waste disposal, and continued
as such until 1976, when the state of New Jersey revoked
Kin-Buc’s operating permit and enjoined any further hazardous
waste disposal.
Following the Site’s closure to hazardous waste, the
Environmental Protection Agency (“EPA”) began pursuing statutory
remedies to make the Site safer and cleaner. Specifically, the EPA
filed an action against the owners and operators of the Site (which
included plaintiffs in the instant action), which was designed to
force those responsible ‘or the Site's situation to engage in clean-up
operations. The action was settled on January 30, 1980, when the
owner/operators (again, including plaintiffs) agreed to perform and
bear the costs of a number of actions designed to limit pollution at
the Site. Shortly thereafter, in 1980, the EPA determined that the
pollution was still occurring, and instituted its own Cleanup. It
treated and disposed of leachate at a pool at the Site, and removed
numerous toxic drums. At some point in the next two years, the
EPA also prepared a Remedial Investigation and Feasibility Study
(“RI/FS”) to determine the nature and extent of hazardous
Substances at the site. When plaintiffs assumed the remedial
activities pursuant to a 1982 agreement with the EPA, the EPA
ceased its own clean-up operations.
26a
In 1981, the rules governing such cleanups changed, and the
EPA gained a new point of leverage: CERCLA. CERCLA allocated
1.6 billion for cleanups of hazardous waste sites for which no
responsible party could be found. It also authorized the EPA to
institute broad measures to force owners, users, or operators of sites
to clean up their sites or reimburse the EPA for any of its unilateral
actions in cleaning up sites. These owners/operators/users of
hazardous waste sites were referred to in CERCLA as “potentially
responsible parties” (“PRPs”).
In 1983, the EPA determined that the owners and operators of
Kin-Buc were PRPs for the pollution, and hence were potentially
liable to the EPA for EPA expenditures in its clean-up programs.
on September 23, (983, the EPA issued a unilateral administrative
order pursuant to CERCLA Section 106 (the “106 Order’) requiring
all owners and operators of the Site, which included plaintiffs in
this action, to continue the response actions they were performing
since 1982, perform its own RI/FS, and operate, maintain and
monitor systems to eliminate the release or threat of release of
hazardous substances.’ In May 1984, the owners and operators of
the Site submitted proposed remediation plans to the EPA. The
EPA selected a plan that included a variety of remedial! actions for
the owners and operators to undertake.’
2. In March, 1986, the EPA issued another 106 Order, incorporating all the
measures of the previous order and setting a deadline for completion by
Plaintiffs of certain response actions.
3. These actions included: installing a slurry wal! to bedrock around the
Landfill; installing and maintaining !andfill capping; collecting and
treating leachate; and operating, maintaining and monitoring the remedial!
measures implemented at the Site.
27a
In 1984, the EPA sought to collect restitution for its expenses
at the Site. It wrote letters to about 360 PRP, demanding
reimbursement for $4,980,398. This amount constituted the EPA’s
expenses regarding: 1) the leaching costs at the pool between
February, 1980 and October, 1982; 2) personnel, analytical and
administrative costs; 3) engineering plans for effectuating the
cessation of releases at the Site; and 4) preparation of its initial
Remedial Investigation and Feasibility Study.’
Shortly after the EPA instituted the action for response costs,
a number of operators began negotiating a settlement with the EPA.
Eventually, in the summer of 1988, 226 defendants joined in the
settlement, agreeing to pay the EPA a total of $4.9 million. Though
they were given notice of the settlement, as was required by
statute,* plaintiffs did not join in the settlement agreement.
On August 16, 1990, plaintiffs brought this CERCLA action
against 441 users and operators of the Site, to recoup their share of
the expenses. This action flows out of the work piaintiffs have
undertaken pursuant to the EPA’s 106 Order. Plaintiffs estimate
their costs to date for the work they had undertaken pursuant to the
3. These costs involved not only the actual costs expended by the EPA in
its Own actions cleaning up the Site, but also its expenses in determining
what remedial actions would be appropriate for plaintiff to undertake.
4. In this decision approving the consent decree, Judge Lechner specifically
noted that the United States had complied with the required statutory
notice provisions. Judge Lechner further declined to allow some parties,
who had missed statutory deadlines for joining the settlement, to join
late. See United States v. AFP Co_, Inc., No. 88-2087, transcript op. at
4 (D.N.J. 1990). The non-settling defendants challenge the
constitutionality of the notice given them, claiming that one publication
in the Federal Register is insufficient. For the reasons detailed in this
opinion, I do not need to reach this question.
alec
28a
EPA’s Order to be $12 million, and that future remedial work will
exceed $100 million.” The settler-defendants,° relying on a
different provision of CERCLA, contend that the consent decree
they entered into with the EPA absolved them of all liability to any
other PRP connected with the Site for disposal of hazardous wastes
at the Site. They thus make this motion for dismissal. I will now
tum to a discussion of these issues.
III. Discussion
A. CERCLA
In 1980, Congress became convinced that deposits of
hazardous substances and wastes at vanous dump sites throughout
the country pused sericus problems to public health and
necessitated prompt clean-up operations. See, e.g, Dedham Water
Col. v. Cumberland Farms Dairy, Inc., 805 F.2d 1074, 1081 (1st
Cir. 1986). In response, it enacted an exceedingly complex piece of
legislation called the Comprehensive Environmental Responses,
Compensation, and Liability Act, 42 U.S.C. § 9601 et seq., which
authorized funds for an enormous clean-up program and presented
statutory authority to hold operators of and contributors to
hazardous waste sites strictly liable for the clean-up costs of
remedying the situation. 42 U.S.C. § 9607. Under the statute,
persons who owned or operated a hazardous waste facility, disposed
hazardous substances at such facility, arranged for disposal at a
facility, or who accepted hazardous substances for transport to
disposal or treatment facilities could be held liable for “‘all costs of
5. These figures were supplied by plaintiff in response to this Court's
request for supporting materials pursuant to Rule 12(b).
6. The settler defendant group consists of over 200 of the defendants.
29a
removal or remedial action incurred by the United States
Govermment or a State . . . [and for] any other necessary costs of
response incurred by any other person consistent with the national
contingency plan.” Id.
Once a site was identified as necessitating immediate cleanup,
the statute explicitly provided the EPA with several remedies. It
could issue an administrative order directing the responsible parties
to implement response actions. 42 U.S.C. § 9606. It could apply to
a district court for an injunction to compel responsible parties to
abate releases of hazardous substances from the site. Finally, it
could undertake remedial action itself, using funds frorn the
Superfund provided by the statute, and then sue the resp sible
parties for reimbursement. 42 U.S.C. §§ 9604, 9607. see, €.2.,
United States v. Rohm & Haas Co., 669 F. Supp. 672, 674 (D.N.J.
1987). Section 107 confined defenses to liability to those
enumerated in Section 107(b).’
7. Section 107(b) lists only the following defenses:
“(1) an act of God;
“(2) an act of war;
“(3) an act or omission of a third party other than an employee or
agent of the defendant, or than one whose act or omission occurs in
connection with a contractual relationship, existing directly or indirectly,
with the defendant (except where the sole contractual arrangement arises
from a published tariff and acceptance for carriage by a common carrier
by rail), if the defendant establishes by a preponderance of the evidence
that (a) he exercised due care with respect to the hazardous substance
concermed, taking into consideration the characteristics of such hazardous
substance, in light of all relevant facts and circumstances, and (b) he
took precautions against foreseeable acts or omissions of any such third
party and the consequences that could foreseeably result from such acts
Or Omissions; or
“(4) any combination of the foregoing paragraphs.”
30a
While CERCLA provided the EPA with clear authority to sue
owners of and coniributors to hazardous waste sites, the ability of
those sued by the EPA to seek contribution costs from other
potentially responsible contributors was in doubt. This was true
despite the fact that Section 107 provided that PRPs can be liable
to private parties that engage in clean-up operations. See, e.g.
Burlington Northern R. Co. v. Time Oil Co., 738 F. Supp. 1339
(W.D. Wash. 1990); see also United States v. New Castle County,
642 F. Supp. 1258, 1263 (D. Del. 1986) (noting that other statutes
expressly created rights to contribution, but CERCLA did not). But
by 1986, Congress realized that if cleanups are going to be
effectuated quickly, it not only had to provide incentives for
settlements with the govemment but also had to assure that liable
parties could seek restitution from other potentially liable parties.
Accordingly, Congress adopted a series of amendments to
CERCLA, designed to further these two policy objectives. The first
CERCLA amendment stated that ‘“any person may seek contnbution
from any other person who is liable or potentially liable under
section 107(a)... .”’42 U.S.C. § 9613(f)(1). Allocation of costs are
to be governed by “such equitable factors as the court determines
are appropriate.” 42 U.S.C. § 9613(f)(1). By adding this provision,
Congress clarified its intent to have the costs of hazardous waste
cleanups shared by all responsible parties. The second provision
provides that parties who have “resolved [their] liability to the
United States . . . in an administrative or judicially approved
settlement shall not be liable for claims for contribution regarding
matters addressed in the settlement.” 42 U.S.C. § 9613(f)(2). The
purpose here is to encourage parties to settle with the goverment,
which, in tum, served to quickly effectuate urgent clean-up
operations.
3la
Plaintiffs argue that they have a right to response costs under
Section 107(b), or, alternatively, to contribution costs under Section
1 13(f)(1). Defendants, through this motion, contend that such claims
are barred by 113(f)(2) because their settlement with the
government encompassed all liability arising out of hazardous waste
disposal at the Site.
B. Section 107(A)
While plaintiffs allege causes of action under both Section
107(a) and Section 107(b), in response to defendants’ motion,
plaintiffs initially contend that this suit is brought under Section
107(a) and, therefore, the available defenses are strictly limited as
a matter of law to those enumerated in Section 107(b). Section
107(a) of CERCLA states that any owners and users of hazardous
waste sites are liable for “any other necessary costs of response
incurred by any . . . person consistent with the national contingency
plan; .. .” 42 U.S.C. § 9607(a)(4)(B). Section 107 further states
that liability is “subject only to the defenses set forth in subsection
(b) of this section.”* Thus, plaintiffs contend that since the
defendants’ grounds for their motion are articulated in section
113(f)(2) rather than in section 107(b), the motion must fai! as a
matter of basic statutory interpretation.
More specifically, plaintiffs argue that the statutory scheme
divides causes of action between privately initiated cleanups and
cleanups initiated under threat by the EPA. Under plaintiffs’ theory,
claims of the former type constitute claims for response costs under
§ 107, while claims of the latter type are contribution claims under
§ 113(f(1). Unlike response cost claims, Section 113(f)(1)
8. The defenses under section (b) are: acts of God, acts of war, or
unforeseeable acts or omissions of third parties.
32a
contemplated ordinary tort principles of contribution, which require
a finding of joint and several liability. Section 107(a), on the other
hand, is purely a statutory-created, cost-recovery remedy, with
limited defenses. Plaintiffs then contend that since they voluntarily
began their clean-up operation, theirs is a cost recovery action
under Section 107. See also Key Tronic Corp. v. United States, No.
C-89-694-JLQ, slip op. at 15 (E.D. Wa. Aug. 9, 1990) (CERCLA
does not bar actions “to recover privately incurred initial response
costs from a settlor PRP who has obtained contribution protection
from the EPA for the final clean-up costs.”’)
I disagree. Prior to the 1986 amendments to CERCLA, “it was
unclear whether a private nght of action existed for contribution to
defendants from other potentially liable parties.” Burlington
Northern R. Co. v. Time Oil. Co., 738 F. Supp. 1339, 1341 (W.D.
Wash. 1990). Congress enacted section 113(f)(1), which provides
that “[a]ny person may seek contribution from any other person
who is liable or potentially liable under section 9607(a) of this title,
during or following any civil action under section 9606 of this title
or under section 9607(a) of this title,” see 42 U.S.C. § 9613(f(1),
to provide for faimess in situations where one party was bearing the
cost of a major hazardous waste site simply because the EPA
targeted it first. The clear import of this language is to allow
persons situated like plaintiffs in this case to gain reimbursement
for their clean-up expenditures from other PRPs -the point of
Section 113(f)(1) is to share the costs among the blameworthy
parties. Without this statutory language -- which plaintiffs seem to
write away with their argument -- it is unclear whether they would
have a CERCLA cause of action at all.
Further, plainuffs’ argument in this regard defies the meaning
of “contribution.” Plaintiffs contend that since there never was a
33a
judgment issued against them, there was never legal liability to seek
contnbution for, and therefore its claim is not a claim for
contribution. Under general legal principles, a claim for contribution
is one in which one liable party attempts to recover from another
potentially liable party for its share of the cost. See, e.g. Northwest
Airlines, Inc. v. Transport Workers Union of America, 451 U.S. 77,
87-88 (1981); In Re Agent Orange Product Liability Litigation, 818
F.2d 201, 207 (2nd Cir. 1987). Absent a statutory provision to the
contrary, a claim against one liable party by a party who voluntary
agreed to perform certain actions pursuant to a settlement agreement
is still a claim for contribution.’ Plaintiffs present no reason why
this flexible understanding of contribution should be any different
under CERCLA. Amoco Oil Co. v. Borden, Inc., 889 F.2d 664, 672
(Sth Cir. 1989) (when one liable party sues another PRP for its
share of response costs incurred by the former, the claim is one of
9. In Huggins v. Graves, 337 F.2d 486 (6th Cir. 1964), the Court of
Appeals stated the reasons for this broad view of contribution:
“(T]he principle of contribution is founded . . . upon the
principles of equity and natural justice, which require that
those who are under a common obligation or burden shall
bear it in equal proportions and one party shall not be subject
to bear mere than his just share to the advantage of his co-
obligor. . . . [WJhile a judgment is conclusive on this issue
it is not necessary that it be proved in that way. If a
judgment has not been rendered, the validity of the claim
against both of the parties can be determined by the Court in
the action seeking contnbution.”
Id. at 489. Ironically, the argument that a claim is not one for
contribution in the absence of a legal judgment ordinarily is made by the
defendants, who claim that they took no part in the settlement and may
have opposed it yet still have to share it. See Prosser and Keeton on the
Law of Torts at 339 (Lawyer’s Ed. 1984). Here, the defendants not only
are not making this argument, they are emphatically contending that
plaintiff's claim is one for contribution.
34a
contnbution.) In other words, plaintiff's 107(a) action against
defendants is authorized by section 113(f)(I)’s contribution
provisions, for precisely the reasons that plaintiffs articulate the
need for this action. In fact, when properly construed, the two
sections work together, one goveming liability and the other
goveming contribution from those found liable. First, the plaintiff
must show that the defendant has incurred section 107(a) liability.
Then, it can sue for contribution under section 1|13(f)(1). Amoco
Oil, 889 F.2d at 672.
Moreover, even if I accepted plaintiff's distinction between
response costs and contribution costs, I find that plaintiffs are being
facetious at best in their argument that it acted voluntarily,
privately, and in keeping with the goals of CERCLA, and not as a
result of government threats. Their argument, if accepted, would
drain the words “voluntary” and “contribution” of any meaning
whatsoever. In 1983, the EPA issued a unilateral administrative
order pursuant to CERCLA section 106 directing plaintiffs and
others to continue remedial measures to clean up the Site and
ordering them to design, implement, maintain and monitor for thirty
years the final long-term remedial action selected by the EPA for
the landfill. These actions by plaintiff clearly are the result of civil
actions by the government. If plaintiff failed to comply with the
agreements it made with the government, they would be directly
liable in the form of civil fines or additional injunctive orders.
Acuon under such threats is hardly “voluntary.”’ (Contrast with Key
Tronic, slip op. at 2 (“Key Tronic alleges that it incurred, at its own
initiative, expenses totaling $1,271,511.10 . . . .”) (emphasis
added.))
Even if I was, however, to treat plaintiff's suit against
defendants as purely a section 107 action, and even if I accepted
35a
their claim that they acted voluntary, the Third Circuit has explicitly
rejected the argument that the defenses enumerated in section
107(b) are exclusive. Smith Land & Imp. Corp. v. Celotex C orp..,
851 F.2d 86, 89 (3rd Cir. 1988). In Smith Land, a present owner of
a landfill sued a former owner for contribution. The Third Circuit
recognized that section 107 is inexorably linked with section 113,
and hence found that the defenses enumerated in section 107(b) are
not exclusive, but extend to include § 113(f)(2). The holding is not
only controlling; it is persuasive -- CERCLA, including the original
statute and the amendments, must be read in its entirety, as a single
Congressional response to the problem of hazardous waste and a
program for remedying the current situation. A section 107 claim
by a party liable to the govemment for contribution from other
PRPs can only be understood in light of ali the relevant statutory
provisions.
Thus, plaintiff fails in its argument that since its claim is
authorized by Section 107, it is not subject to a Section 113(f)(2)
defense.
This by no means ends the inquiry; rather it changes the focus
to whether section 113(f)(2) merits dismissal of the claims against
the settler-defendants. And defendants next claim that section
113(f)(2) provides immunity from liability for all matters covered
by the consent decree.
C. Section 113(f)(2)
Defendants argue that they have an absolute defense to
plaintiffs’ claim for contribution, under 1 13(f)(2). Section 113(f)(2)
States that a “person who has resolved its liability to the United
States or a State in an administrative or judicially approved
settlement shall not be liable for claims for contribution regarding
36a
matters addressed in the settlement.” 42 U.S.C. § 9613(f)(2). By its
very language, Congress enunciated a strong desire for settlements
as the best means to effectuate the goals of CERCLA, concluding
that immunity from contribution liability would be the proverbial
“carrot” to coax parties into settling. See, e.g., United States v.
Rohm & Haas, 721 F. Supp. 666, 677 (D.N.J. 1989) (“By enacting
section 113(f)(2) . . . Congress has plainly indicated that
non-settling defendants’ contribution claims will be barred.”’); Smith
Land, 851 F.2d 86, 89 (3d Cir. 1988) (section 113(f)(2) absolves
settling parties from claims of contribution.) Defendants argue that
a primary policy behind the 1986 amendments to CERCLA was to
encourage settlements by forcing non-settling parties to risk bearing
an inequitable share for the cost of cleanup as a consequence of
their unwillingness to settle with the govemment. Accordingly, they
contend that to encourage them to settle, the EPA granted them the
“carrot” of absolution from any further responsibility to clean up
the Site. Plaintiffs, though, they contend, are paying for their
unwillingness to join the settling defendants.
To evaluate the defendants’ motion to dismiss, I must evaluate
the terms of the consent decree itself.'° If a material fact about the
scope of the consent decree is in dispute, the motion must be
denied. Todaro v. Bowman, 872 F.2d 43, 46 (3d Cir.), cert. dism'd
483 U.S. 1052 (1987).
The Consent Decree states its purpose to be “the recovery of
all response costs that have been incurred by the United States in
response to alleged releases and threatened releases of hazardous
10. See Allied Corp. v. Frola, 730 F. Supp 626, 638 (Section 113(f)(2)
provides immunity from suits for contribution regarding all -zatters
addressed in the consent decree.)
37a
substances from the Kin-Buc Landfill.’ Consent Decree at 8. In
retum for the settling parties agreement to pay the past response
costs, the Decree provided that:
Con.
Con.
the United states is agreeable to their so doing in full
satisfaction of all claims of the United States with regard to
Past Response Costs and Past Response Actions [and] to
covenant to limit civil suit and administrative process against
the Settling Parties for any Future Response Actions and any
Future Response Costs which may be incurred by the United
States in connection with the Kin-Buc Landfill. as
Dec. at 12-13. Particularly, the document worked to
extinguish the United States’ claims for Past Response Costs
and Past Response Actions and shall be full and complete
satisfaction of the Settling Parties’ liabilities under CERCLA,
or under any other statute or common law, with respect to Past
Response Costs and Past Response Actions and for any
administrative costs and civil penalties which may have
accrued prior to April 30, 1987, and for interest on such sums
which may have accrued prior to September 22, 1987, with
regard to the Kin-Buc Landfill.
Dec. at 16. Defendants point out that the aforementioned
language is extremely broad. Therefore, they argue, it extends
beyond the bounds of the govemment’s suit and absolves them of
other response costs. Yet this language must be read in light of the
action taken by the United States, the complex situation of this
case, the policies behind CERCLA, and, most importantly, the
matters the decree settles. In light of these factors, the defendants’
claim is untenable, for defendants’ argument conflicts with the
language of the consent decree itself, the reasonable expectations of
the parties entering into the consent decree, the inierpretation of the
38a
consent decree by the judge who authorized it, and the policies
behind the relevant federal statutes.
1. Language of and expectations of agreement
First, the agreement states that “the United States intends and
expects that the Kin-Buc 106 Orders shall remain in full force and
effect against the Owners/Operators and that said Orders shall result
in the abatement of release and threat of release into the
environment of hazardous substances at the KinBuc Landfill.” In
other words, the agreement itself acknowledges the separateness of
the prior arrangements with plaintiffs. If defendants’ arguments
were correct, the government could not reasonably expect those
agreements to remain in force, since the plaintiffs, who were the
parties to that agreement, could have joined the consent decree and
thereby extinguished those agreements. (See supra.)
Second, the agreement clearly states that it covers “incurrence
of costs through Apnil, 30 1987, and interest on such costs through
September 22, 1987, by the United States totalling $4,980,398.” It
is in regard to these actual costs, incurred by the United States, that
the United States agreed to find the settling defendants “in full
satisfaction of all claims of the United Siates.” The consent decree
thus covers the actual costs of $4.9 million and absolves defendants
of liability for other remedial costs determined by the United States
to have arisen from the relevant time period.
Third, the “covenant to limit civil suit and administrative
process against the Settling Parties for any Future Response Actions
and any Future Response Costs which may be incurred by the
United States in connection with the Kin-Buc Landfill . . . only
means that “the United States shall not take such action against the
settling parties until after having made all reasonable efforts to
39a
compel non-settling PRPs to implement future response actions.”
AFP Co., Inc., at 6. In no way was the govemment absolving
defendants from all liability te any other party for the ongoing
problems at the Site.
In light of these facts, it would be unreasonable for defendants,
who are responsible for a large percentage of the problems at the
Site, to have expected the agreement to completely absolve them of
a problem that is far from over.
2. Judge Lechner’s opinion
Further, defendants’ interpretation of the consent decree is at
odds with statements of the judge who approved the decree. In that
opinion, Judge Lechner noted that “[(t)he settling parties’ agreement
to pay the United States almost five million dollars implements the
underlying cost recovery scheme of CERCLA by replenishing the
Superfund promptly.” AFP Co., Inc. at 9. This can oniy be
interpreted to mean the consent decree covers the expenditures at
the Site incurred by the EPA. Moreover, in response to a concem
by a non-settling party, Judge Lechner held that “as long as [a
non-settling party] complies with its legal obligations . . . (it] may
seek contributions from the settling parties.” /d. at /7. A judge
approving a consent decree in a CERCLA case is mandated to take
into account the equities of the situation. He or she cannot approve
a consent decree that is simply unjust or unfair. Given Judge
Lechner’s own equitable interpretation of the decree he approved,
it would be illogical for this court to hold that as a matter of law,
a contrary, inequitable interpretation, govems.
40a
3. Policies of CERCLA
Finally, defendants’ argument that a broad reading of the
consent decree best comports with the policies behind CERCLA
and its accompanying amendments is simply wrong. Defendants
argue that since CERCLA contemplates punishing responsible
parties for refusing to settle with the government, reading the
consent decree to absolve defendant from any other contribution
costs for cieaning up the Site accomplishes this. To take the
defendants’ arguments to their logical conclusion, let us imagine the
result if the plaintiffs had agreed to settle:
In this case, the government's claim is for past response costs
totalling $4.9 million, for the money it spent cleaning up the Site.
This occurred alongside agreements between the EPA and plaintiffs
for the plaintiffe <. spend their own money to engage in various
other clean-up activities, at past and future costs totalling over $30
million. According to defendants’ argument, if plaintiffs joined the
consent decree and settled the claims, then as a matter of law, the
plaintiffs would be free of the requirements of prior agreements
they had entered into for engaging in remedial actions to clean up
the Site. In other words, by agreeing to pay a portion of $4.9
million to the government, the plaintiffs would have been able to
extinguish their responsibility to engage in clean-up activities
costing over $100 million. Such a result is at adds with the policies
behind CERCLA of making the responsible parties pay for the
clean up of hazardous waste sites. Settlement payments of $4.9
million for clean-up costs exceeding $100 million would do little
to further the goal of allocating responsibility among parties who
were in fact responsibie, and of allocating responsibility equitably
and proportional to the amount of harm done by each party. Such
an agreement would not meet Congress's goal of expediting
4la
“effective remedial action and minimiz[ing] litigation.” 42 U.S.C.
§9622(a); United States v. Rohm & Haas, 721 F. Supp. 666, 677
(D.N.J. 1989). Moreover, to interpret the agreement to absolve
defendants of responsibility for additional clean-up actions costing
ten times more than that amount, defies the goal of encouraging
parties to unilaterally engage in cleanup operations. As one court
has noted, “[i]f fair apportionment of the expense is not assured, it
is unlikely that one party will undertake remedial action promptly
when it could simply delay, awaiting a legal ruling on the
contribution liability of other responsible parties.” Smith Land, 851
F.2d 86, 90 (3rd Cir. 1988)."!
Defendants correctly point out that one of the risks that
non-settling parties take is the possibility of winding up shouldering
11. In support of their argument, though, defendants rely on U.S. v. Rohm
& Haas Co., 721 F. Supp. 666 (D.N.J. 1989) and United States v. Bell
Petroleus,. Services, Inc., 1990 U.S. Dist. Lexis 14066 (W.D.T. 1990).
In Rohm & Haas, the defendants settled claims for actual EPA
expenditures, which plaintiffs argued prevented them from obtaining
contribution for those very expenditures and thereby violated equitable
principles because the proportion of costs shared was inequitable.
Specifically, EPA had expended approximately $65,270,000 in its
clean-up efforts. Id. at 671. The government entered into a consent
decree with ten de minimis defendants (defendants who were each
responsible for less than 1% of the damage to the site) and found them
liable in total for $3,034,807. Id. at 672. The case only held that those
defendants could not subsequently be held liable for any additional
proportion of the $65,270,000 -- they were immune from any additional
contribution liability.
In Bell Petroleum, the court approved a consent decree absolving the
settling parties for contribution liability. However, the court was
primarily moved by the fact that settling defendants were on the verge
ot bankruptcy, and that if the court did not approve the consent decree
“it is unlikely the Government would receive any amount of money from
{defendants] Bell or Regal in the end.” Bell Petroleum at S.
42a
a disproportionate share of the clean-up costs. See, e.g., In Re
Acushnet River & New Bedford Harbor, 712 F. Supp. 1019, 1027
(D. Mass. 1989). But this is only with respect to the claims
specifically addressed in the consent decree, not to every possible
claim arising out of the same site. In other words, Section 113(f)(2)
prevents parties from having to pay twice for the same cleanups.
Thus, defendant is immune from further liability for the response
costs incurred by the United States during the time period covered
by the consent decree; defendants are not to pay twice for these
response costs, even if the government later determines that it
underreported those actual costs. Paying twice for the claim sued
upon would in essence penalize the defendants for settling and
reward the plaintiff for holding out. This would directly violate the
policies behind the amendments to CERCLA. But in this case,
defendants, even if they lose. paid only once for the costs incurred
by the EPA.
This holding in no way inhibits Congress’s policy of
encouraging settlements -- there is still strong incentive for settling
for a much lesser amount than what the govemment is suing for.
Thus, in the instant case, if defendants settled for $i million, even
though the suit was for $5 million, and even if they actually were
responsible for a much greater share of the damage, plaintiffs could
not gain contribution for any other portion of the $5 million. Their
unwillingness to settle would have cost them that loss. Such are the
Situations in the cases defendants rely upon. It is not the situation
in this case.
The defendants’ motion for summary judgment must therefore
fail because as a matter of law, the consent decree entered into by
defendants only covers the past response costs and past response
actions incurred by the United States. The problems at Kin-*szc are
43a
enormous and expensive, and defendants cannot escape
responsibility for a potential $100 million by settling with the
government for $4.9 million.
44a
DEFENDANT CLAIROL’S MOTION
In a related action, defendant Clairol moves to strike the plaintiff's
claims against it’* for the following reasons: 1) plaintiffs’ amended
complaint violates Rule 8(e) by failing to be clear and concise; 2)
plaintiffs did not comply with specific nexus information requested
by Magistrate Chesler, by Order of December 19, 1990, thus
warranting a dismissal of plaintiff's pleading pursuant to Rule 16(f);
3) plaintiffs, pleading violates Rule 11 because they have no
objective good faith basis to believe Clairol is liable. Altematively,
Clairol moves for summary judgment under rule 56(b). I will now
tum to each of its arguments.
I. Rule &(e)
First, defendants claim that plaintiff's complaint violates Rule
8(e), which reads that “[eJach averment of a pleading shall be
simple, concise, and direct.’ Fed. R. Civ. P. 7. Defendants rely on
Gordon v. Green, 602 F.2d 743 (Sth Cir. 1979), and Martin y.
Hunt, 29 F.R.D. 14 (D.Ma. 1961) for their contention that the
complaint must be stricken.
Defendants ignore a wealth of case law. including the
principles articulated in the cases they rely on, interpreting Rule &
very liberally. Rule & is intended to “eliminate prolixity in pleading
and to achieve brevity, simplicity, and cianty.”” 602 F.2d at 746
(citing Knox v. First Security Bank of Utah, 196 F.2d 112, 117
(10th Cir. 1952), in other words, to ensure that complaints are
understandable, fair and amenable to response. Only complaints that
2. The relevant portion of plaintiffs’ amended complaint reads: “The
defendants named are each PRPs as generators and/or transporters and/or
haulers of various chemical substances, including hazardous substances,
to the Kin-Buc Landfill Site...”
45a
clearly violate this standard should be stricken. In Gordon itself, the
violative complaint was so garbled, wordy and confused that Chief
Judge Brown titled the first section of his opinion “The Pleadings:
Gobbledygook.”” 602 F.2d at 744. The various complaints and
amendments totalled over 4,000 pages, contained sentences running
full legal pages and was, as the Court put it, “verbose and
scandalous.”” Id. at 745. Judge Brown was quick to point out,
though, that “we do not recede even one inch from the position
expressed by this Court. . . and a host of other cases sounding an
approach of liberality .. . .” Id. at 746. Similarly, the court in
Martin v. Hunt, 29 F.R.D. 14 (D. Mass. 1961), also relied on by
defendants, described the complaint as containing “scandalous and
vituperative’ material. In other words, the case law consistently
holds that in order to warrant dismissal of a case as a violation of
Rule &(¢), the complaint must reach a level of outrageousness that
far exceeds what is alleged here. While arguably lacking in detail,
the complaint is clear and concise enough for defendants to
understand the nature of the complaint and be able to respond and
defend itself.
Il. Rule 16(f)
Next, defendants argue that plaintiffs violated magistrate
Chesler’s Case Management Order No. | of December 19, 1990.
The Order demanded that plaintiffs to provide:
a good faith effort, by way of preliminary presentation,
without obligation to perform definitive or exhaustive review
of matenal, and without prejudice, a detailed description of the
hazardous substance(s) . . . which such defendant allegedly
transported or generated to the Kin-Buc Landfill site.
46a
Rule 16(f) states that “if a party . . . fails to obey a scheduling
or pretrial order . . . the judge, upon motion . . . may make such
orders with regard thereto as are just . . . “* Cases that have been
dismissed for violating this Rule universally have involved
complete disregard of Court orders. For example, in Goforth y.
Owens, 766 F.2d 1533 (1985), relied on by defendants, the plaintiff
did not submit to the court a medical statement that he was ordered
to submit. Id. at 1534. As the court said, “the (distnict] court could
have used the sanction of dismissal to punish counsel for his
disregard of the court’s orders to submit (the statement.|”” Id. at
1535. See also Titus v. Mercedes Benz of North America, 96 F.R.D.
404, 405 (1982) (dismissing complaint for willful violation of court
order); Lockhart v. Patel, 115 F.R.D. 44 (E.D.Ky. 1987) (striking
pleadings of the defendant for “deliberately (refusing] to obey the
order of the court’).
In this case, the plaintiffs responded point by point to the
Nexus order, alleging that Clairol was “(i) a generator; who (ii)
supplied Waste Water, Processed Water Waste, Ink and Dye Waste,
and Water Wash & Detergent... .” By clear implication, plaintiffs
are alleging that Waste Water, Processed Waste Water, Ink and Dye
Waste, and Water Wash and Detergent are hazardous substances. At
this point in the case, when the same Case Management order
limited the ability of plaintiffs to discover defendants’ records, it is
not unreasonable to respond as did plaintiffs. They did not
flagrantly violate or ignore the order, they cannot be held liable
“for conduct which unreasonably delays or otherwise interferes with
the expeditious management of trial preparation.” Id. at 1535. See
also In re Baker, 744 F.2d 1438, 1441 (10th Cir. 1984).
47a
Ill. Rule 11
Next, defendant contends that the pleading violates Rule 11's
good faith requirement. Under Rule 11, an attomey must certify
“that to the best of his knowledge, information and belief formed
after reasonable inquiry, the claim is well grounded .. . in fact and
in law.” The test is reasonableness: By signing the complaint,
attomeys for plaintiff are stating their belief that the complaint is
grounded in fact and warranted by existing law or a good faith
argument for the extension, modification, or reversal of existing
law, and that it is not interposed for an improper purpose, such as
to harass or to cause unnecessary delay or needless increase in the
cost of litigation.” F.R.Civ. P. 11. Defendant simply has not
presented evidence that plaintiff's allegations violate this standard.
Plaintiffs’ relied upon the following facts: 1) Clairol settled a claim
by the EPA for contribution for government clean-up expenditures
at the Site’'’; 2) the wastes alleged by plaintiffs to be hazardous
were in fact deposited at the Site. While defendants contend that the
claim it settled with the EPA was simply a payment of “nuisance
money,” that contention is simply not enough to show a violation
of Rule 11.
IV. Summary Judgment Motion
In the alternative, defendants move for summary judgment,
under Rule 56(b). I have outlined the standard for summary
judgment above. Clairol has not met its burden of showing that
there is no issue of material fact in dispute.
13. Clairol claims this settlement was a nuisance money; at this stage, this
is by no means self-evident.
48a
In this case, Clairol essentially claims that it has not deposited
hazardous waste products at the Site and that there is no evidence
on the plaintiff's part to contest this. It points out that in several
past cases, Clairol has been accused and subsequently acquitted of
disposing hazardous waste at sites, and that the same waste
products are at issue here. But even relying solely on Clairol’s own
accompanying affidavits, material issues of fact remain as to
whether Clairol has deposited hazardous waste products at the Site.
Exhibit B of an affidavit by Mohamed H. Tanifi, a Clairol
employee, lists a series of compounds that “May be Present in
Clairol Concentrate Waste.” Among these are “ammonia” and
“Ethyl, Lauryl, & Other Ethers.” As plaintiffs correctly point out,
both of these are listed by the E.P.A. as hazardous substances under
CERCLA. 40 C.F.R. § 302.4. In its reply brief, Clairol dismissively
states that “as any simple textbook analysis would disclose,
ammonia very rapidly becomes neutralized and tums into a
harmless salt.’ The claim is that ammonia cannot “possibly generate
response costs,”” but the fact is that the EPA has listed ammonia as
a hazardous substance’*.
Even if this contention about ammonia was persuasive,
Clairol’s argument about ethyl ether is clearly disingenuous. It
contends that the item “Ethyl and Other Ethers” in Appendix B
refers only to the chemical prefix “ether’’ and not to Ethyl Ether,
the compound contained in the EPA’s list. Yet the only reasonable
interpretation of the language “Ethyl, Lauryl, & Other Ethers” is
14. See U.S. v. Alcan Corp. 1992 U.S.App. Lexis 10366 at 22 (3rd Cir. May
14, 1992) (To be hazardous under CERCLA, “the substance under
consideration must simply fall within one of the designated
categories.”’).
49a
that the items referred to are Ethyl Ether, Lauryl Ether and Other
Ethers. In another affidavit, Clairol nonetheless claims that its
products contain no ethyl ether, but the contradictory statements in
its supporting materials create enough questions to deny a motion
for summary judgment. The opposing party to a motion for
summary judgment bears the burden of responding “only after the
moving party has met its burden of coming forward with proof of
the absence of any genuine issues of material fact.” Celotex Corp.
v. Catrett, 477 U.S. 317, 321 (1986) (quoting Catrett v.
Johns-Manville Sales Corp., 756 F.2d 181, 183, n. 3 (D.C. Cir.
1985). Defendants have not met this burden.
Moreover, summary judgment generally should not be granted
before an opportunity for discovery. See, e.g. Celotex Corp. v.
Catrett, 477 U.S. 317, 322 (1986). In a complex case such as this,
in which much of the evidentiary material is in the depositors
hands, discovery is all the more imperative. See, e.g., United States
v. Price, 577 F.Supp. 1103, 1115 (1983) (“Most courts are reluctant
to grant summary judgment prior to the termination of discovery .
.. . [In situations . . . where a plaintiff must obtain a good deal of
information from the opposing party, judgment should be withheld
unti! the discovery process has been completed.’’) Therefore, the
motion for summary judgment is denied.
CONCLUSION
For the foregoing reasons, the settler-defendant’s motion to
dismiss and defendant Clairol’s motion to strike the complaint, or
in the altemative for summary judgment, are denied.
S$0a
UNITED STATES DISTRICT COURT
DISTRICT OF NEW JERSEY
TRANSTECH INDUSTRIES, :
INC., et. al.
Plaintiffs Civil Action No. 90-2578
V. ORDER
A & Z SEPTIC CLEAN,
et. al.
Defendants.
Ackerman, D.J.
This matter having come before the court on by a
class of settling defendants for partial summary judgment pursuant
to Fed. R. Civ. P. 56(b), and a motion by defendant Clairol to strike
the complaint or in the altemative, for summary judgment pursuant
to Rule 56(b); and this court having fully considered the submitted
Sla
briefs and the record before it; and for the reasons expressed in my
opinion issued this same day: and for good cause shown;
IT IS ON THIS 30th day of July, 1992
ORDERED that the settling defendants’ motion for summary
judgment is denied; and it is further
ORDERED that defendant Clairol’s motion to strike the
complaint is denied; and it is further
ORDERED that defendant Clairol’s motion for summary
judgment pursuant to Rule 56(b) is denied.
/s/ Harold A. Ackerman
Harold A. Ackerman,
United States District Judge
52a
APPENDIX C
NOT FOR PUBLICATION
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF NEW JERSEY
TRANSTECH INDUSTRIES, :
INC., et. al.
Plaintiffs Civ. No. 90-2578 (HAA)
v. OPINION
A & Z SEPTIC CLEAN,
et. al.
Defendants.
ACKERMAN, District Judge:
This action comes before the court upon a motion by the
“settor-defendants” (“defendants or “settlor-defendants”) for
reargument of Section III(c) of this Court’s July 40 Opinion
denying the settlor-defendants’ motion for summary judgment, or,
in the altemative, to certify the matter for an interlocutory appeal
to the Third Circuit.
For the reasons outlined below, both motions are denied.
53a
I. Background
For the past several years, plaintiffs have been under orders
from the Environmental Protection Agency to clean up the Kin-Buc
toxic waste site in New Jersey. In 1990, plaintiffs sued hundreds of
defendants for contribution costs pursuant to the Comprehensive
Environmental Response Control and Liability Act (“CERCLA”).
About 200 of the defendants then moved to dismiss the Complaint
against them because, they contended, they previously had resolved
their liability to the Government for all clean-up costs related to the
Site, and therefore they were immune from contribution liability
pursuant to CERCLA Section 113(f)(2). Section 113(f)(2) provides
immunity from contribution liability for all parties that settle with
the Government, for all the matters covered in the Consent Decree.
Because the parties relied on documents other than those in the
pleadings, I elected to treat the motion as one for summary
judgment, and the parties were asked to submit appropriate papers.
On July 30, 1992, I issued a ruling denying the settlor--
defendants’ motion for summary judgment, on the grounds that the
Consent Decree entered into with the Govemment by the settlor--
defendants did not cover the contribution costs sought by plaintiffs.
The settlor-defendants now move for reargument of that decision,
or in the alternative, to certify the issue for interlocutory appeal. |
address these motions in tum.
II. Discussion
A. Motion for Reconsideration
Local Rule 12(1) provides that reargument may be granted
“when there is some dispositive decision or principal of law which
has been overlooked, or when there has been a misapprehension of
material facts.’ Reargument should not be granted when a party
disagrees -- however vehemently -- with the Court’s decision, and
should not be granted when the moving party simply rehashes
arguments made before the Court upon the original motion.
In this case, the settlor-defendants claim that (1) this Cour
misapprehended material facts about the nature of the Govemment’s
lawsuit that resulted inthe Settlkement Agreement and about the
costs at the Site; (2) this Court overlooked a controlling principle
of law in reaching its decision. Because the “facts” allegedly
overlooked are not “material” and because the “controlling principle
of law” allegedly overlooked involves not an oversight by the Court
but simply a disagreement between the Court and _ the
settlor-defendants about what was covered in the consent decree, |
am prepared to deny the motion outnght. But the
Settlor-Defendants, in their moving papers, essentially accuse the
Count of engaging in result-oriented decision-making in its decision
on defendants’ motion. This accusation is totally devoid of merit.
Nevertheless, in the interest of justice, I will address defendants
arguments in tum.
First, defendants contend that this court misapprehended the
breadth of the govemment’s suit. They assert that the Government
sued for all past and future response costs at the site. However, in
its Opinion on this case, this court found that when tracing the
history of the Site, the Governmment’s suit was based on the costs it
incurred at the Site and any future costs the Government may 6CCur
t
5Sa
related to its expenses at the Site. Prior to seeking restitution from
defendants in May 1984, the EPA issued an administrative order
pursuant to CERCLA § 106 (the “106 Order”), requiring plaintiffs
to clean up the Site. Once plaintiffs assumed responsibility for
future clean-up of the: Site, the EPA ceased its clean-up activities.
Its only concem then was to acquire restitution for its past costs --
the bulk of the ‘york at the Site was already to be taken care of by
plaintiffs. In fact, the Consent Decree entered by the Goverment
and the Settlor-Defendants states that “the United States intends and
expects that the Kin-Buc 106 Orders shall remain in full force and
effect against the Owners/Operators [plaintiffs] and that said Orders
shall result in the abatement of reiease and threat of release into the
environment of hazardous substances at the Kin-Buc Landfall.”
Thus, recognizing the separateness of the plaintiff's duty to clean
up the Site, the EPA sought from defendants restitution and
declaratory relief for any future costs it may incur related to its
expenses at the Site. The Government was not seeking in any way
to determine the settlor-defendants’ liability for remediation costs
to be incurred by other private partics. Any other costs besides the
$4.9 million were purely hypothetical at the time of the
Govemment’s suit -- despite the fact that plaintiffs were responsible
for actual clean-up costs, though of an unknown amount. This
should at any rate, be clear since the Govemment provided in the
consent decree that the approximately $4.9 million received from
the Settlor-Defendants was in satisfaction of its prior expenses by
the Site, and that the Settlement covered any further such costs the
Govemment may incur. It seems beyond logic that the Government
-- suing for and receiving the identical amount of its own clean-up
costs--would gratuitously exonerate defendants from any further
liability for all clean-up costs at the Site.
S6a
At any rate, even if the moving defendants were correct on
that point, the scope of Settlor-Defendants immunity is govemed by
the Consent Decree, not the lawsuit. 42 U.S.C. § 9613(f)(2) (“a
person who has resolved its liability to the United States or a State
in an administrative or judicially approved settlement shall not be
liable for claims for contribution regarding matters addressed in the
settlement.” (emphasis added)). As I explained in my earlier
Opinion, the text of the Consent Decree itself, the interpretation of
the judge who approved the settlement, and the policies behind
CERCLA all favor this court's interpretation of the settlement.
Second, the defendants argue that the court overlooked the fact
that when a party resolves its liability to the Govemment, it also
resolves its liability to all other relevant parties. However,
defendants ignore the language of section 113(f)(2), which clearly
allows immunity only for matters addressed in the settlement. This
court found that the Consent decree covered costs incurred at a
particular point in time and_ future’ hypothetical
Govemment-incurred costs. Defendants’ reliance on language in
Smith Land Improvement Corp. v. Celotex Corp., 851 F.2d 86, 89
(3d Cir. 1988), cert. denied, 488 U.S. 1029 (1989) (“A party which
has resolved its liabilities to the government is not liable for
contnbution . . . .”) is misplaced. The Court of Appeals’ statement
was made in the context of a suit for restitution of costs of a
completed clean-u7, no discussion of left-over clean-up matters was
necessary. Therefore, the Third Circuit, while certainly aware of the
limiting language in Section 113(f)(2) -- that immunity is provided
only for matters addressed in the Settlement Agreement --
obviously saw no need to quote that part of the statute. In this case,
if the United States engaged in more on-site clean-ups, and obtained
contribution from other parties, the settlor-defendants would be
immune from contribution suits by those other parties. Under
S7a
defendants’ interpretation of Smith Land, the Government would
never be able to sue solely for particular expenses related to the
unfinished clean-up of a Site. Therefore defendants’ contention that
this Court overlooked controlling law amounts to nothing more than
a strident allegation that this Court disagreed with defendants’
argument.
Third, the defendants argue that this court misapprehended
Judge Lechner’s opinion approving the Settlement Agreement
between the Settlor-Defendants and the Government -- particularly
this Court’s finding that Judge Lechner held that the Setuement
Agreement allowed private contribution actions. Defendants’
arguments here amount only to a rehash of their prior arguments,
which were rejected by this court in its interpretation of Judge
Lechner’s opinion, and are not proper on 4a motion for
reconsideration, see Above the Belt, Inc. v. Mel Bohannan Roofing,
Inc. 99 F.R.D. 99, 101 (E.D. Va. 1983). However, since
defendants’ accuse this Court of “distorting” a passage in Judge
Lechner’s Opinion to reach the result it wanted, I will address their
main argument. The passage in question, quoted in its entirety,
reads as follows:
Thus, as long as Earthline (a non-settling party] complies with
its legal obligations and no action is brought against it by the
United States, paragraph 8(c) [which requires the Government
to Oppose an attempt to join the Settlor-Defendants to an
action commenced by the Government against the plaintiffs]
will not apply and Earthline may seek contributions from the
settling parties without opposition from the Government.
Defendants argue that the language “does not state or even imply
that any such attempt would be free from a challenge by the Settlor-
Defendants as being precluded by operation of Section 113(f)(2).”
58a
(emphasis in original). Defendants’ argument, then, is that Judge
Lechner simply said that Earthline could theoretically seek
contribution, but would fail if they tried. I find that interpretation
difficult to believe. Judge Lechner clearly -- even when quoted at
length -- interpreted the Consent Decree to allow private
contribution suits. According to Judge Lechner, as long as Earthline
was meeting its burdens of clean-up under the law, it could sue for
contribution costs. (Defendants’ counsel makes its argument here by
quoting Judge Lechner’s allegedly misrepresented statement in
CAPITALIZED BOLD letters. This not-too-subtle attempt to accuse
this Court of misstating the record is a sad commentary on
counsel's perception of its professional responsibilities. If one
wanted to be cynical, one might draw the conclusion that
defendants’ counsel was engaging in intimidatory behavior. This
Court would prefer to believe that counsel's warped desire to win
its argument at any cost has merely clouded its judgment.)
Defendants next argue that the court exceeded its authority by
reexamining the faimess of the Settlement Agreement. Specifically,
defendants point to the Court's basing part of its argument on
plaintiffs’ current estimate of its costs in cleaning up the Site.
Indeed, in the Opinion, | noted that “defendants cannot escape
responsibility for a potential $100 million by settling with the
government for $4.9 million.” In fact, defendants argue, the
estimate at the time of the consent decree was about $41.5 million.
The point, however, was that plaintiffs’ burden in cleaning up the
Site was potentially enormous -- conceivably ever-growing and at
any rate much more than costs bome by the Government in its
limited actions at the Site. The $100 million figure was simply
evidence to support this court’s interpretation of the Consent
Decree, the document that essentially govems the outcome of the
59a
Summary Judgment motion; this court engaged in no reexamination
of the settlement’s faimess.
Finally, defendants argue that shortly before the decision came
down, the Settlor-Defendants received a document from the EPA
that put the entire remediation costs at Kin-Buc at $36.6 million,
rather than $100 million. The point is well taken, but ultimately not
dispositive of the motion. First, plaintiffs dispute this fact,
contending in its brief in response to defendants motion that the
Settlement Decree covered only 5% of the costs of remediation at
the Site. Second, the unfairness argument was but one prong of a
multi-layered analysis of why the language of the Consent Decree,
Judge Lechner’s interpretation of the Consent Decree, the statutory
provisions, and the policies behind CERCLA and its amendments
all point to interpreting the Decree in the way that this court did.
Finally, all that this shows is that plaintiff's cosis are
indeterminable at this time.
Defendants motion for reconsideration is denied, and this
Court's prior Order is affirmed and its prior Opinion affirmed and
clarified in accordance with this opinion.
I now tum to Defendants motion to certify the question for
interlocutory appeal.
B. Certification for Interlocutory Appeal
An issue may be certified for interlocutory appeal when it (1)
involves a controlling question of law for which; (2) there is
substantial ground for difference of opinion; and (3) an immediate
appeal may materially advance the ultimate termination of the
litigation. Only when all three of these factors are present may a
district court certify a question for interlocutory appeal. Karz v.
Carte Blanche Corp., 496 F.2d 747, 754 (3d Cir. en banc); cert
60a
denied, 419 U.S. 885 (1974). As plaintiffs point out, certification is
the exception and not the rule, and should be granted sparingly.
Defendants propose, as examples, the following issues for
appeal:
(1) Whether a judicially approved consent decree resolving the
settling parties’ liability to the Govemment in an action
commenced by the Govemment seeking the full clean-up costs
at a site that releases the settling party from any liability for
past response costs and provides a covenant by the
Govemment not to sue or commence any administrative action
against the settling parties for future clean-up cosis at the site
addresses both past and future clean-up costs within the
meaning of 42 U.S.C. §9613(f)(2); and
(2) Whether a judicially approved consent decree settling an
action commenced by the Government for the full clean-up
costs at a site that resolves the settling parties’ liability to the
Goverment by releasing the settling parties from any liability
for the Government's past cleanup costs and providing a
covenant by the Govemment not to sue or commence any
administrative action against such settling parties for any
future clean-up costs at the site so long as the Government is
able to obtain the same from non-settling parties (which the
Goverment has been and continues to be able to do) provides
contribution protection to settling parties under 42 U.S.C.
§9613(f)(2) against claims by non-settling parties for clean-up
costs at the Site.
While defendants are correct in their argument that if this
Court's decision was reversed by the Third Circuit, this litigation
would be cut short with respect to the moving parties, and while at
a very general level the issues here involve the application of
CERCLA Section 1 13(f)(2), the crucial part of this Court’s decision
on the settlor-defendants’ motion involved a question of fact.
6la
Actually, despite defendants’ hostile briefs, the Court and the
defendants are generally in agreement on the controlling law. The
only remaining issue is the scope of the consent decree. I found in
the original opinion that the language of the consent decree, the
interpretation of the Consent Decree by Judge Lechner, and my
close reading of the Consent Decree in light of the policies behind
CERCLA and the factual scenario behind the Kin-Buc Site, clearly
show that the Consent Decree was not intended to cover this
contribution suit by plaintiffs. I frankly believe that it would defeat
the purpose of the narrow rules for certification to certify such an
issue for immediate appeal. An interpretation of the scope of a
consent decree -- a task that any court interpreting Section 113(f)(2)
must undertake -- is simply not such an exceptional condition to
warrant certification.
CONCLUSION
For the foregoing reasons, the settlor-defendants’ motion for
reconsideration and for certification for an interlocutory appeal are
both denied.
62a
NOT FOR PUBLICATION
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF NEW JERSEY
TRANSTECH INDUSTRIES, :
INC., et. al.
Plaintiffs Civ. No. 90-2578 (HAA)
v. ORDER
A & Z SEPTIC CLEAN,
et. al.
Defendants.
ACKERMAN, District Judge:
This matter having come before the Court upon a motion by
the Settlor-Defendants for reconsideration of this Court’s July 30
decision denying the settlor-defendants’ motion for summary
judgment, or in the altemative, for Certification for an Interlocutory
Appeal, and this Court, having fully considered the submitted briefs
and the record before it, and for the reasons expressed in an
Opinion issued this same day; and for good cause shown,
IT IS ON THIS 7th day of October, 1992;
ORDERED that the _ Settlor-Defendants, motion for
reconsideration is denied; and it is further
63a
ORDERED that the Settlor-Defendants motion for Certification
for an Interlocutory Appeal is denied
s/ Harold A. Ackerman
Harold A. Ackerman,
United States Distnct Judge
64a
APPENDIX D
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF NEW JERSEY
CIVIL ACTION No. 90-2578
TRANSTECH IND. INC.,
Plaintiff, TRANSCRIPT
OF PROCEEDINGS
-vs-
MOTION
A & Z SEPTIC CLEAN, et al,
Defendants.
Newark, New Jersey
December 13, 1993
BEFORE:
THE HONORABLE HAROLD A. ACKERMAN, U:S.D.J.
APPEARANCES:
KOZLOV, SEATON, ROMANINI & BROOKS
BY: DANTE J. ROMANINI, ESQ.
Attomeys for the Plaintiffs
SIMPSON THACHER & BARTLETT
BY: ROBERT A. BOURQUE, ESQ. and
DAVID B. SMALLMAN, ESQ.
Attomeys for Defendant Mayco Oil & Chemical Co.
65a
THE COURT: May I have the appearances, please.
MR. BOURQUE: Robert Bourque, Simpson, Thacher &
Bartlett, representing Mayco Oil and Chemical, one of the
defendants in this action.
And on behalf of the 15 other defendants.
THE COURT: Robert?
MR. BOURQUE: B. O. U. R. Q. U. E., Bourque.
MR. ROMANINI: Dante Romanini, from the firm of Kozlov,
Seaton, Romanini & Brooks. I represent the plaintiffs.
THE COURT: Mr. Bourque, you've been admitted before pro
hac vice?
MR. BOURQUE: Yes, I have.
THE COURT: You've been admitted before pro hac vice in
this case?
MR. BOURQUE: In this case, yes, | am.
THE COURT: I've read your papers, sir.
MR. BOURQUE: We're seeking a stay —
THE COURT: A stay until—have you filed your writ of
certiorari yet?
MR. BOURQUE: We have not. It’s due the 17th. We intend
to file it on or before the 17th.
THE COURT: I read your papers, anything you want to add
to your papers?
66a
MR. BOURQUE: It is entirely in our papers, you Honor. I'd
be glad to amplify anything that you'd be interest in, but | think
our papers fully set forth our position.
I might note one thing, your Honor, that I'm not sure that has
come up recently. There is a conference before Magistrate Chesier
that's scheduled for January 14th in which further discovery will be
discussed. Included expressly on the agenda is scheduling of
depositions in this matter of all parties.
THE COURT: Mr. Romanini, is that the correct way to
pronounce your name?
MR. ROMANINI: Yes, it is. your Honor.
THE COURT: | read your papers as well.
MR. ROMANINI: I really don’t have anything to add as well.
| think having gone through this once all ready we pretty much
know what each side is going to do.
THE COURT: Let me say at the outset, I'm going to grant
the stay. I'm going to grant the stay because, first of all, I'm aware
of the fact that the Third Circuit did not feel this was an appealable
order within the collateral order doctrine rule. As such, as the
movants have pointed out here, and the court itself, they were
disagreeing with opinions rendered by, what is it, three or four
other circuits?
MR. BOURQUE: Four circuits, your Honor.
THE COURT: Four circuits. Since then the Supreme Cour of
the United States in a matter in which it is not precisely the same
but there are certain principals of law which mirror each other. The
Supreme Court in the Desk Top case—both counsel know what
67a
case I'm talking about-—has granted certiorari. Counsel for—how
many defendants are there, 17?
MR. BOURQUE: 16, your Honor.
THE COURT: 16. All right. I'm up-to-date. 16 defendants
have indicated—are they all going to apply for certioran?
MR. BOURQUE: Yes, they are.
THE COURT: They're going to apply for certiorari. And I've
given it a good deal of thought, I feel since they have represented
they will do so, today is the 13th, so we're four days away, until
that Court makes a determination as [o whether it will grant
certiorari in their case, or not, a Stay should be given.
Would you draw an order?
MR. BOURQUE: We will, your Honor.
MR. ROMANINI: Thank you, your Honor.
MR. BOURQUE: We did submit an order with our papers.
your Honor. But we'd be happy to give you another.
THE COURT: I haven't seen it. I'm sure it must be in the
file.
My clerk assures me it’s in the file. We'll sign it and get it off.
Thank you.
MR. ROMANINI: Your Honor, the stay is only as to the 17
parties that have applied”?
THE COURT: That is correct. Only as to the !7 parties.
And counsel will notify me one way or the other as to what
the Supreme Court of the United States does.
68a
MR. BOURQUE: We'll do that, your Honor
THE COURT: Thank you.