Transcript of Record — Maryland Steel Co. of Baltimore Cty. v. United States
Supreme Court brief1915
Ask Donna
What actually matters in this document.
Text
TRANSCRIPT OF RECORD,
Se RR E Gi |
SUPREME COURT OF THE UNITED STATES,
OCTOBER TERM, 1am 1914
No. @® 104
‘
A SEIS Sen
(23,513)
SUPREME COURT OF THK UNITED STATES
OCTOBER TERM, 1913.
No. 435.
MARYLAND STEFI. COMPANY Of BALTIMORE COUNTY,
APPELLANT.
v8.
THE UNITED STATES.
secant
APPEAL FROM THE COURT OF CLAIMS.
REE
INDEX.
Original. Print
Be ee tesa iarincosiny Semeesngeiie 1 1
Agreement of tations Bose Rare 4 4
‘AOietetenape mee ee ae 2 12
Answer and baie ele tahctecarsar CET EST eet OR ae 81 81
Claimant's replication and Fe OR es ich ler ies. 85 83
Argument and I as sigs veakin eter 87 83
Wiadings of fact.................. Lh Re eK we Awe Rete EEE 88 84
oni niscwcunr succeed 90 .
aba a ON can aie gs 90 86
psig eee ECC oee Cree ter nee tonne 9 90
Application for and allowance of PON i cae nnedaslnaacece ck 6 91
BF I cin anne ccaesistuac ee ne 97 91
be
Jupp & DETWEILER ( INc.), PRINTERS, WASHINGTON, D. C., Aprin 16, 1914,
a LR ARR ONE ESSE CARY CATS IR ea
In the Court of Claims
No. 31281.
Marytanp STEEL Company or BALTIMORE County,
Claimant,
v.
UNITED STATES OF AMERICA, Defendant.
(Petition filed December 20, 1911.)
To the Court of Claims of the United States:
The Maryland Steel Company of Baltimore County re-
spectfully states as follows:
1. The Maryland Steel Company of Baltimore County
is a corporation duly organized under the laws of the State
of Maryland, and makes and files this petition in its own
right.
2. Heretofore, to wit, on the 24th day of February, in
the year 1908, the claimant entered into a written contract
with the defendant in and by which it was covenanted
and agreed that in accordance with the advertisement and
Specifications attached to said written contract the claim-
— ss Sees
ant should furnish all the necessary labor and material
to build and should build one steel hull, twin screw, suc-
tion dredge, furnish and install in the dredge the propell-
ing machinery, pumping machinery, and electric light
plant, and all other machinery and other parts required to
be installed; all work to be prosecuted faithfully and dili-
gently and the dredge when complete in every respect
should be delivered to the defendant at Sparrow’s Point,
in the State of Maryland.
3. And in and by said contract the defendant cove-
nanted and agreed with the claimant that said defendant
would pay to the claimant in full payment for said above
described work completed and accepted by the defendant
after the final trial provided by said specifications the sum
of three hundred and fifty-seven thousand and five hun-
dred dollars.
4. A copy of said contract is hereto attached, together
with the advertisement and specifications therein referred
to, and prayed to be taken as part hereof as if the same
had been fully at large set forth herein.
5. The claimant did furnish the necessary labor and ma-
terial, and did build, furnish and install said hull and ma-
chinery and plant, and do all the claimant had agreed to
do under the terms and as required by said contract, all
of which labor, material, work and construction were duly
accepted by the defendant on the 6th day of January in the
year 1909, and thereupon the claimant became and was
entitled to receive the money due therefor. The defend-
ant from time to time paid the claimant as required by the
terms of said contract with the exception of four thousand
seven hundred and fifty dollars, which amount is now just-
ly due and owing to the claimant from and by the defend-
ant, exclusive of all set-offs and just grounds of defense,
oan
With interest thereon from the 4th day of November in
the year 1908.
6. There has been no action on the above set forth claim
by the Congress, but it has been disallowed by the Auditor
for the War Department. The claimant is the sole owner
of said claim, and solely interested therein: no assign-
ment or transfer of said claim or any part thereof or in-
terest therein has been made: said claimant is justly en-
titled to the amount therein claimed from the United
States, after allowing all just credits and off-sets: the
claimant, a corporation duly organized under the laws of
the State of Maryland, has at all times borne true alle-
giance to the United States. and has not in any way volun-
tarily aided or abetted or given encouragement to rebel-
lion against the said Government: and the facts stated
in the above petition are true.
MARYLAND STEEL ComMPANy oF
BALTIMorE County,
By F. W. Woop, Prest.
3
ALEXANDER PRESTON,
Wa tterR D. Davince,
Attorneys for Claimant.
City and County of Baltimore.
State of Maryland, } =
I do solemnly swear that I am the agent and Attorney
in fact of the Maryland Steel Company of Baltimore Coun-
ty, the claimant in the above petition, that I have read the
said petition and the facts therein stated are true.
F. W. Woop, Prest.
Subscribed and sworn to before me this llth day of
November, 1911.
Joun H. K. SHannanan, Jr.,
(Notarial Seal) Notary Public.
a
~~
ay
vie
Se
Frese
ae
Ss
‘
:
FORM 19.*
*(To be used when the specifications call for liquidated
damages. )
1. This Agreement entered into this Twenty-fourth day
of February, nineteen hundred and eight, between Major
J. C. Sanford, Corps of Engineers, United States Army,
of the first part, and Maryland Steel Company of Balti-
more County, of Sparrow's Point, in the County of Bal-
timore, State of Maryland, of the second part, WITNEsS-
ETH, that, in conformity with the advertisement and
specifications hereunto attached, which form a part of this
contract, the said Major J. C. Sanford, for and in behalf
of the United States of America, and the said Maryland
Steel Company of Baltimore County, do covenant and
agree, to and with each other, as follows:
In accordance with its written proposal dated February
10th, 1908, the said Maryland Steel Company of Baltimore
County shall furnish all the necessary labor and material,
except as specified in the specifications to be furnished by
the United States, and build one steel hull twin-screw suc-
tion dredge, furnish and install in the dredge the propel-
ling machinery, pumping machinery, and electric light
plant, and all other machinery and other parts required
to be installed, all work to be prosecuted faithfully and
diligently, and the dredge when complete in every respect
shall be delivered to the United States at Sparrow's Point,
Maryland; all in strict accordance with the conditions and
requirements of the specifications hereunto attached.
The said Maryland Steel Company of Baltimore County
shall receive in full payment for the above described work
completed and accepted on the part of the United States,
after the final trial of the inachinery required by para-
graph 236 of the specifications, the sum of Three Hundred
5
Fifty-Seven Thousand, Five Hundred Dollars ($357,500),
in accordance with this agreement.
2. All materials furnished and work done under this
contract shall, before being accepted, be subject to a rigid
inspection by an inspector appointed on the part of the
Government, and such as do not conform to the specifica-
tions set forth in this contract shall be rejected. The de-
cision of the engineer officer in charge as to quality and
quantity shall be final.
3. The said party of the second part shall commence
the work herein contracted for within ten (10) days after
date of notification of approval of the contract by the Chief
of Engineers, U. S. Army, and shall complete the same
within nine (9) months from the date of notification of
approval of contract, including time necessary for trials
as described in said specifications, except final trial of ma-
chinery.
4. If the party of the second part shall delay or fail to
commence with the delivery of the material or the per-
fermance of the work as specified herein. or shall, in the
judgment of the engineer in charge, fail to prosecute faith-
fully and diligently the work in accordance with the speci-
fications and requirements of this contract, then, in either
case, the party of the first part, or his successor legally ap-
pointed, shall have power, with the sanction of the Chief
of Engineers, to annul this contract by giving notice in
writing to that effect to the party of the second part, and
upon the giving of such notice all payments to the party of
the second part under this contract shall cease, and all
money or reserved percentage due or to become due the
said party of the second part, by reason of this contract,
shall be retained by the party of the first part until the
final completion and acceptance of the work herein stipu-
lated to be done; and the United States shall have the right
WI RRR ane ce Saari SN RAD aa Rae gh seers
a
a
A
¥
ne
a
a
Pe
%
a
‘i
e
By |
iva
if
=
=
Wi hala Diath Hd Mb RES
6
to recover from the party of the second part whatever
sums may be expended by the party of the first part in
completing the said contract in excess of the price herein
stipulated to be paid the party of the second part for com-
pleting the same; and the party of the first part may de-
duct all the above-mentioned sums out of or from the
money or reserved percentage retained as aforesaid; and
upon the giving of the said notice of the party of the first
part shall be authorized, if an immediate performance of
the work or delivery of the materials be in his opinion re-
quired by the public exigency, to proceed to provide for
the same by open purchase or contract, as prescribed in
Section 3709 of the Revised Statutes of the United States.
5. It is further expressly understood and agreed that
time shall be considered as an essential feature of this con-
tract, and that in case of the failure upon the part of the
party of the second part to complete this contract within
the time as specified and agreed upon that the party of the
first part will be damaged thereby, and the amount of said
damages being difficult, if not impossible of definite ascer-
tainment and proof, it is hereby agreed that the amount of
said damages shall be estimated, agreed upon, liquidated,
and fixed in advance, and they are hereby agreed upon,
liquidated, and fixed at the sum of seventy-five (75) dol-
lars for each and every day the party of the second part
shall delay in the completion of this contract, and the party
of the second part hereby agrees to pay to the United
States as liquidated damages, and not by way of penalty,
the sum of seventy-five (75) dollars for each and every
day the party of the second part shall delay in the comple-
tion of this contract, said delay not being the fault of the
party of the first part.
It is further understood and agreed that the United
7
States shall also have the right to recover from the party
of the second part all costs of inspection and superintend-
ence incurred by the United States during the period of
delay, and also a reasonable value of any labor and ma-
terials which may be furnished by the party of the first
part to the party of the second part during the time the lat-
ter is proceeding under this contract. And the party of
the first part may deduct or retain ‘all of the above-men-
tioned sums out of or from any money or reserved per-
centages that may be due or become due the party of the
second part under this agreement.
Provided, however, that if the party of the second part
shall by strikes, epidemics, local or State quarantine re-
strictions, or by abnormal force or violence of the elements,
be actually prevented from completing the work or deliy-
ering the materials at the time agreed upon in this con-
tract, and such delay is without contributory negligence on
his or their part, such additional time may, with the prior
sanction of the Chief of Engineers, be allowed him or
them, in writing, for such completion as, in the judgment
of the party of the first part, or his successor, shall be just
and reasonable; but such allowance or extension shall in
no manner affect the rights or obligations of the parties
under the contract, but the same shall subsist, take effect.
and be enforceable precisely as if the new date for such
commencement or completion had been the date originally
herein agreed upon.
6. If, at any time during the prosecution of the work, it
be found advantageous or necessary to make any change
or modification in the project, and this change or modifica-
tion should involve such change in the specifications as to
character and quantity, whether of labor or material, as
would either increase or diminish the cost of the work,
8
then such change or modification must be agreed upon in
writing by the contracting parties, the agreement setting
forth fully the reasons for such change, and giving clearly
the quantities and prices of both material and labor thus
substituted for those named in the original contract, and
before taking effect must be approved by the Secretary of
War: Provided, thet no payments shall be made unless
such supplemental or modified agreement was signed and
approved before the obligation arising from such modifi-
cation was in d.
7. No claim whatever shall at any time be made upon
the United States oy the party of the second part for or
on account of any extra work or material performed or
furnished, or alleged to have been performed or furnished
under or by virtue of this contract, and not expressly bar-
gained for and specifically included therein, unless such ex-
tra work or materials shall have been expressly required
in writing by the party of the first part or his successor, the
prices and quantities thereof having been first agreed upon
by the contracting parties and approved by the Chief of
Engineers.
8. The party of the second part shall be responsible for
and pay all liabilities incurred in the prosecution of the
work for labor and material. |
9. It is further agreed by and between the parties hereto
that until final inspection and acceptance of, and payment
for, all of the material and work herein provided for, no
prior inspection, payment, or act is to be construed as a
waiver of the right of the party of the first part to reject
any defective work or material or to require the fulfill-
ment of any of the terms of the contract.
10. The party of the second part further agrees to hold -
= (APE REPO ERY
and save the United States harmless from and against all
and every demand, or demands, of any nature or kind for,
or on account of, the use of any patented invention, arti-
cle, or process included in the materials hereby agreed to
be furnished and work to be done under this contract.
11. Payments shall be made to the said party of the
second part as prescribed in paragraph .... of the speci-
fications hereto attached and forming part of this agree-
ment.
12. Neither this contract nor any interest therein shall
be transferred to any other party or parties, and in case
of such transfer the United States may refuse to carry
out this contract either with the transferor or the trans-
feree, but all rights of action for any breach of this con-
tract by said party of the second part are reserved to the
United States.
13. No Member of or Delegate to Congress, nor any
person belonging to, or employed in, the military service
of the United States, is or shall be admitted to any share
or part of this contract, or to any benefit which may arise
herefrom.*
But this stipulation, so far as it relates to members of
or Delegates to Congress, is not to be construed to extend
to this contract.
14. This contract shall be subject to approval of the
Chief of Engineers, U.S. A.
*Note.—Here add to any contract made with an incor-
porated company for its general benefit the following
words, viz: “But this stipulation, so far as it relates to
Member of or Delegates to Congress, is not to be construed
to extend to this contract.” —See Sec. 3740, Revised Stat-
utes.
10
In witness whereof the parties aforesaid have hereunto
placed their hands the date first hereinbefore written.
WITNESSES :
(Signed) J. M. Hoopner as to (Signed) J. C. SANForD,
Major, Corps of Engineers, U. S. Army.
Attest: As to MaryYLanp STEEL COMPANY OF
BALTIMORE COUNTY,
by F. W. Woop, President.
(Signed) FRANK TENNEY, Secretary.
(Executed in triplicate.)
Approved: March 21st, 1908.
(Signed) A. MACKENZIE,
Brig. Gen., Chief of Engineers, U. S. Army.
AA ga abe he ie
pb Uae S
7I do solemnly swear that the copy of contract hereto
annexed is an exact copy of a contract made by me per-
a er Te eer eere CTT eT eee ee ee
fT ee PLO ERLE CEES CLEP ROLELOLE CEL ; that I
made the same fairly, without any benefit or advantage to
myself, or allowing any such benefit or advantage cor-
ee | eee rk ere re
er Ur ee ea ee eer eee Gee ee ee or any other
person; and that the papers accompanying include all those
relating to the said contract as required by the statute in
such case made and provided.
SESS SSE SRE SAH AS SCRE SEE EARSD EEE EO RE HOES
DEL eDUNLA NA Neh as S64 WA S84 8 Corps of Engineers.
Subscribed and sworn to before me this..............
Ee one Sree ey ee , 190
te. ea eee SOS SEA EERE AARARE RSE HOHE 86D Se 8
a ole ee Oe Oe Oa SS CCE S SOO EERE ASA DH OS OES
+NotE.—This affidavit is required only on the quin-
tuplicate copy of contract intended for the Returns Office,
Department of the Interior.—A. R. 561.
11
tI certify that the award of the foregoing contract was
made to the lowest responsible bidder for the best and most
suitable articles and service, on proposals received in re-
sponse to advertisement hereto attached, which was pub-
MENGE o, . . . eg dustan OO Tag Oye ha
and that further advertisement was impracticable.
aa ee eRe ROR SERS ES HS OEE ES 6:0 o kag vn
Corps of Engineers, C ontracting Officer.
—_———
tNore.—Certificate to be given by the contracting offi-
cer on the copies of the contract for the Chief of En-
gineers and the Auditor for the War Department.
§ Nore.—Insert “Newspaper” or “Poster and circular
letter,” etc., as the case may be.
Nore.—The copy of contract for the Bureau must be
accompanied with an abstract of the bids, and copy of
each bid and advertisement, unless previously furnished.—
A. R. 547,
Note.—The name of the principal intended to be bound
as party of the second part, whether an individual, a
partnership, or a corporation, should be inserted in and
signed to the contract. An officer of a corporation, a part-
ner, or an agent signing for the principal should add his
name and designation after the word “by” and under the
name of the principal; and an agent of the principal or an
officer, if the principal be a corporation, should file evi-
dence of his authority.
PAVE PES IS Ot
12
Form 19.
Authorized April 30, 1896.
With Amendments to June 12, 1905.
ARTICLES OF AGREEMENT
tered WRG. kc hve ko oA ok os HERS EROS TSR ON ee
So nn eee ee eT Tere ey ee eh
ja kha SGA GSC CA RORKNS EO RRS SEE wS ERD of the one part,
| Perr Teter eT Ter rT re Tre rT aT re Te re rey
Pe oT Tee Pe ee Te ett yy a of the other part,
GO sunken escdcdcdwheskakoussneeleks deengaseeeaen
Set &SDSB CR DEAS SDA BALE TEND EAS BEASCEAARS SAAD AAABEASE TEASE 2S
523.62 HEA DSO GREDTE SAREE EA CAGD4 6948S 66H SEEDERS EAEASS
IMPROVING GALVESTON HARBOR, TEXAS.
Sea-Goinc Suction DREDGE FOR GALVESTON HARBOR.
Advertisement.
U. S. Encrneer Orrice, 815 Witherspoon Building.
PHILADELPHIA, Pa., Jan. 15, 1908.
Sealed proposals for constructing one steel, twin-screw
suction dredge for Galveston Harbor, Texas, will be re-
ceived here until 2.30 P. M., Feb. 14, 1908, and then pub-
licly opened. Information furnished on application.
J. C. SANForD,
Major, Engrs.
GENERAL SPECIFICATIONS.
1. No proposal will be considered unless accompanied
by a guaranty, which should be in manner and form as di-
rected. At the option of bidders certified checks for the
amount of the guaranty required may be furnished in
place of the guaranty.
2. All bids and guaranties must be made in duplicate
upon printed forms to be obtained at this office.
13
3. Each guarantor will justify in the sum of forty thou-
sand (40,000) dollars. The liability of the guarantors
and bidder is determined by the act of March 3, 1883, 22
Statutes, 487, Chap. 120, and is expressed in the guaranty
attached to the bid.
4. The bidder to whom award is made will be required
to enter into written contract with the United States, with
good and approved security, in an amount of one hundred
twenty-five thousand (125,000) dollars within ten (10)
days after being notified of the acceptance of his proposal.
The contract which the bidder and guarantors promise to
enter into shall be, in its general provisions, in the form
adopted and in general use by the Engineer Department
of the Army, blank forms of which can be inspected at this
office, and will be furnished, if desired, to parties proposing
to put in bids. Parties making bids are to be understood
as accepting the terms and conditions contained in such
form of contract, which will provide for liquidated dam-
ages in an amount of seventy-five (75) dollars per day for
any period of delay beyond the time agreed upon for com-
pletion.
5. The proposals and guaranties must be placed in a
sealed envelope marked “Proposals for constructing
dredge, to be opened Feb. 14, 1908,” and inclosed in an-
other sealed envelope addressed to Major J. C. Sanford,
Corps of Engineers, U. S. A., 815 Witherspoon Building,
Philadelphia, Pa., but otherwise unmarked. It is suggested
that the inner envelope be sealed with sealing wax.
6. Whenever the term “Engineer” is used in the specifi-
cations it is understood to refer to the officer of the Corps
of Engineers, U. S. Army, in charge of the work. He
will be represented on the work by as many assistants as
may be necessary. Whenever the term “contractor” is
used it is understood to refer to the second party to the
contract. Subcontractors, as such, will not be recognized.
7. It is understood and agreed that the quantities given
14
in these specifications are approximate only, and that no
claim shall be made against the United States on account
of any excess or deficiency, absolute or relative, in the
same. No allowance will be made for the failure of a
bidder or of the contractor to estimate correctly the diffi-
culties attending the execution of the work.
8. The contractor will not be allowed to take advantage
of any error or omission in these specifications, as full in-
structions will always be given should such error or omis-
sion be discovered.
9. It is understood and agreed that the contractor as-
sumes full responsibility for the safety of his employees,
plant, and materials, and for any damage or injury done
by or to them from any source or cause.
10. In the prosecution of the work herein specified, the
employment of persons undergoing sentences of impris-
onment at hard labor which have been imposed by courts
of the several States, Territories, or municipalities having
criminal jurisdiction is prohibited.
11. The contractor will be required to discharge any
employee who, in the opinion of the Engineer, is objec-
tionable or incompetent. Such discharge shall not be made
the basis of any claim for compensation or damages
against the United States or any of its officers or agents.
12. The contractor must at all times either be personally
present upon the work or be represented thereon by a re-
sponsible agent, who shall be clothed with full authority
to act for him in all cases and to carry out any instructions
relative to the work which may be given by the Engineer,
either personally or through an authorized representative.
13. No work shall be done on Sunday or legal National
holidays, except in cases of extraordinary emergency.
14. The contractor will be required to commence work
under the contract within ten (10) days after the date of
notification of approval of the contract by the Chief of
Engineers, U. S. Army, to prosecute the said work with
15
faithfulness and energy, and to complete it within the
times stated in his proposal.
15. The decision of the Engineer as to quality and quan-
tity shall be final.
16. Payments will be made as provided in paragraph
239.
SPECIAL CONDITIONS.
Hutt.
The hull of the dredge, as well as the bins, shall be of
Steel.
17. Dimensions.—Length over all .......... 304 feet.
Length between perpen-
sega Sa ae ee 290 feet.
Moulded beam .......... 51 feet.
Moulded depth .......... 27 feet.
18. Material—The hull shall be constructed to conform
in every respect with the rules and regulations of the
American Bureau of Shipping for vessels of the first class
unless otherwise specified; and all material used shall with-
stand successfully the test prescribed by said rules. The
expense of testing the material, except salary and travel-
ing expenses of inspector, will be paid by contractor. In
gauging the thickness of plates, measurements will be made
at each corner and throughout the area. <A variation of
more than 214 per cent, in any one of these measurements
below the specified thickness will cause the plate to be re-
jected. All wood entering into the construction of houses
and fittings shall be of the hest quality, live, sound and
free from any defects that would render it unserviceable
for the purpose intended. All wood to be thoroughly
Seasoned. Forgings shall be subjected to the same tests
prescribed for forgings under propelling machinery (Par.
114). Tensile strength 60,000 pounds per square inch. In
all cases where weights of steel is stated in pounds, it shall
mean per lineal foot for angles and shapes, and per square
foot for plates.
16
19. Frames—The frames shall be of bulb angle 8
inches by 3% inches, 23.9 pounds from frame 28 to frame
121 and 19.1 pounds at ends. They shall be spaced 24
inches from center to center except at gate openings and
shall be in one piece from midship line to main deck. The
spacing at gate openings shall be 30 inches as shown.
These frames shall be properly beveled to give a good con-
nection to shell plating. At the upper end where frames
connect to brackets and deck beams all rivet holes may be
punched in either beam or frame and one hole in the other
member for connection. The remaining holes in this mem-
ber shall be drilled in place after erection.
20. Reverse Frames.—There shall be an angle bar 3%
inches by 4 inches by 11.9 pounds on every floor plate.
From frame 55 to frame 94 these shall be double.
21. Floor Plates—These shall be 27 inches and 36
inches deep at center line. Those under engine and boiler
rooms shall be 25 pounds, the remainder from frame 28
to frame 121 22% pounds and the end ones 18 pounds.
22. Vertical Keel.—This shall be continuous, 57 inches
wide and 25 pounds. It shall be secured to each floor by
double angle clips 3% inches by 3% inches by 11.1 pounds.
There shall be a continuous floor stringer on each side of
this plate 20 inches wide by 25 pounds between points 5
feet forward of forward bin and the same distance aft of
after bin. At the ends this plate shall be 20 pounds. On
each side of this vertical keel plate there shall be three 6-
inch by 4-inch by 20-pound angles, one at the lower edge
for attaching to the flat keel, one at the top and one be-
tween these for attaching to the floor stringer. On the
upper angles put a stringer plate about 13 inches wide by
25 pounds to points past the bins and 20 pounds at ends.
23. Side Keelson.—This shall be intercostal and shall
consist of 25-pound plates, flanged on the bottom edge,
tos SERRE
' a ' : : ea a
PEERS SY
17
extending above the floors 6 inches. It shall be secured
to the floors by angle clips 3!4 inches by 3% inches by
11.1 pounds. Riveted to the tops of these plates and the
reverse frames there shall be two angles 6 inches by 4
inches by 20 pounds. Where reverse frames are single a
3M%-inch by 34-inch angle clip 11.1 pounds, 12 inches
long, shall be riveted to top of floors.
24. Bilge Keelson.—This shall
consist of two 6-inch by
4-inch by 20-pound angles rivete
d to the reverse frames.
Where reverse frames are single a 34-inch by 34-inch
angle clip, 11.1 pounds, 12 inches long, shall be riveted
to top of floors.
25. Upper Bilge Stringer—This shall consist of a 25-
pound plate, the width of the web fra
two 4-inch by 6-inch by 20-pound angles. The outer edges
of the plates shall be connected to the shell plating by angle
clips 314 inches by 31% inches by 11.1 pounds, Clips 12
inches long of the same size angle shall be riveted to the
back of the bulb angle frame to rivet the inner angle to.
The stringer plate shall be intercostal between web frames,
and at these frames shall have riveted on clips of 31-inch
by 34-inch by 11.1-pound angle. Connection between
stringer and web frames shall be made by means of dia-
mond plates about 24 inches square by 20 pounds, and
double angle clips 31% inches by 31% inches by 11.1 pounds
at each end. The ends of all stringers, where practicable,
shall terminate in tie plates and breast hooks. AJ] keelsons
and stringers may be reduced at ends in accordance with
the rules of the American Bureau of Shipping.
26. Side Stringers.—These shall be in all respects sim-
ilar to the upper bilge stringer except that the lower side
stringer has four and the upper three longitudinal angles
4 inches by 6 inches by 20 pounds. Clips, diamond plates,
etc., shall be as specified in the preceding paragraph.
mes, 27 inches, with
18
27. Deck Beams.—These for the main deck shall be of
bulb angle 10 inches by 35.2 pounds on every frame from
four frames forward of forward bin to four frames aft
of after bin. The remaining frames at ends shall be 10-
inch by 26.2-pound bulb angle. The midship beams shall
have a crown of 6 inches ia the span. Two lower deck
beams each end of each bin shall be 10-inch by 35.2-pound
bulb angle. The remaining lower deck beams, except at
bulkheads where angles may be needed, shall be 10-inch
by 26.2-pound bulb angle. Where angles are required at
bulkheads they shall be of strength and stiffness equivalent
to the bulb angle beams specified. The lower deck beams
shall have no crown.
28. Web Frames.—These shall be located as shown, and
shall consist of a 25-pound plate 27 inches wide reinforced
on the inner edge by two angles of the same size as the
reverse frames.
29. Stem.—This shall be in two pieces. The upper por-
tion shall consist of a steel bar 10 inches by 234 inches
scarfed to the lower casting. The lower part shall be a
steel casting of the same size as the forged stem at top
and scarfed to it. The lower portion shall be V-shaped
to connect to plating and shall extend far enough aft to
make a secure connection to the flat and vertical keels.
30. Stern Post.—This shall be a steel casting as shown
extending at bottom far enough forward to make a secure
connection to the flat and vertical keel. This post shall
have cast on it lugs for rudder stops and pintle bearings,
these latter being bushed with lignum vitae. The top of
this post shall extend under and forward of transom floors,
and shall be attached thereto by heavy angle clips.
31. Stanchions.—These shall be installed as required by -
the Rules of the American Bureau of Shipping. Addi-
tional stanchions shall be installed under the pumping plat-
form and electric light plant and as may be required.
19
32. Rudder.—This shall be of steel of the single plate
type, the plate being 1 inch thick, and the stock and pintles
conforming to the requirements of the American Bureau
of Shipping for a steamer whose second numeral is 40,000.
The arms supporting the plate shall be forged. It shall be
provided with pintle lugs to correspond with those on the
stern post. A bearing shall be provided on lower deck to
take the weight of the rudder. A loose, flat bronze ring
shall be placed between the collar on rudder and bearing
plate, riveted to deck. Means for oiling shall be provided.
A suitable stuffing box shall be provided at the point where
the rudder head passes through the stern plating. There
shall also be a bearing at upper deck for rudder head. All
rudder pintles shall be fitted with brass sleeves. Rudder
stops shall be forged on. The contractors. if they so de-
sire, may submit for consideration a cast steel rudder, of
the size and shape shown, and equal in strength to that
above described.
33. Quadrant.—This shall be of steel, forging, casting
or combination, shall have double grooves for chain, and
shall be fitted to rudder head with two keys and clamping
bolts. This quadrant shall be placed above the deck as
shown.
34. Stern.—This, from transom floor aft, shall be
framed with angles 6 inches by 4 inches by 20 pounds.
35. Flat Kecl—This shall be of the flat plate type in
two thicknesses from frame 24 to frame 12] inclusive.
The inner course shall be 32 inches wide by 25 pounds,
and the outer course 44 inches wide by 36 pounds to four
feet beyond the end of the inner keel at each end. The
remaining lengths at ends may be 25 pounds.
36. Plating.—This shall be of the weights shown on the
midship section, the heavier weights running from frame
27 to frame 122 with lighter weights at ends. All outside
en eats ERE eT Aha ° : PA Re Keo POR A
20
plates shall have doubling plates at bulkheads, and shall be
reinforced at openings, the total strengili at these places
being at least equal to the original plate. Transverse or
vertical joints below the light water line may be lapped, all
other vertical joints shall be butted with single straps. All
plating shall be worked “in and out” in longitudinal
strakes. Longitudinal laps to be double riveted, and all
vertical laps and butts to be treble riveted. The plating
shall be double riveted to stem and stern posts. The inner
strake of all plating shall be worked up close to the frames.
No liners will be allowed except for the outside strakes,
and in such places where they become a necessity from
causes other than bad fit. All edges and butts shall be
planed. All plates shall be thoroughly cleaned of dirt,
rust, etc., before being fitted.
37. Riveting.—All rivet holes in hull plating shall be
countersunk on the outside. After assembling all holes
shall be reamed; the use of a drift pin to bring holes in
line will not be allowed. Rivets must be so heated that
they are of an equal temperature throughout. The size
of the rivets shall be as specified by the rules of the Ameri-
can Bureau of Shipping. All outside rivets above the light
water line shall be finished flush with plating; all rivets
below this line and all rivets in bins shall be finished con-
vex projecting about '¢-inch beyond the plating.
38. Staples —aAll staples for making watertight connec-
tion between beams, plates, etc., shall be forged from an-
gles, well fitted to place and caulked. :
39. Deck Stringers —The main deck stringer plate shall
be 60 inches wide by 25 pounds to 20 pounds at ends. It
shall be butted, double riveted to straps and connected to
sheer strake by an angle 6 inches by 6 inches by 24 pounds.
Where scuppers occur the strength of the angle shall be
maintained by reinforcing it. In the way of the coaling
21
hatches and at all corners of bins, the stringer shall be
doubled. The lower deck stringer shall consist of a 25-
pound plate in way of bins and a 20-pound plate between
and fore and aft of these.
40. Deck Plating.—The deck plating shall be 14 Ibs. to
12 Ibs. at ends. Plating under windlass and capstan to be
Ya-inch thick. Plating on lower deck to be 12 pounds. All
rivets shall be countersunk on the upper side. On the fore
and after ends of both bins at the main deck put a trans-
verse stringer about 28 inches wide by 20 pounds, and at
lower deck as shown. All decks under wood floors shall
have a coat of pitch with cement on top.
41. Bulkheads—There shall be a watertight bulkhead
on frames Nos. 12, 46 and 131, These shall extend only
to lower deck. There shall also be a water tight bulkhead
on frame No. 76, separating the boiler from the engine
room. This shall extend to main deck. Plates of bulk-
heads to be 16 to 12 pounds and stiffeners of bulb angle 6
inches by 3 inches by 1334 pounds vertical on one side
spaced 24 inches centre to centre and horizontal on the
other, spaced 48 inches centre to centre. Attachment of
ends of stiffeners and all other details to be as required by
the Rules of the American Bureau of Shipping. Put a
watertight door in bulkheads 76 and 46 to be operated
from either side. The spaces forward of bulkhead 12 and
aft of bulkhead 131 will be used as Water tanks, and both
bulkheads shall be stiffened and tested by filling the spaces
with water before launching, to the level of the lower deck,
under an additional head of 6 feet. The other two bulk-
heads to be tested by a stream from a fire hose. Sluice
valves to be placed in all bulkheads. Where keelsons or
other members pass through bulkheads, collars shall be
fitted around same, riveted and caulked watertight.
42. Scuppers.—Twelve Scuppers 6 inches diameter shall
r PW icy SY YE oes
be placed on main deck where directed. The two central
ones will not be located until after the vessel is launched
and the trim determined. These shall all be provided with
removable composition gratings, and the discharge be car-
ried by pipes to points below the sheer strake, where it
shall be discharged outboard.
43. Bunkers—These shall be built on each side of the
ship where shown and be adapted for carrying coal or oil,
and the construction and riveting on the bunkers shall be
“oil tight.” The hatches on deck shall be provided with
oil-tight covers, and also gratings fol use with coal. Where
shown on midship section put in an intercostal longitudinal
the length of the bunkers, on each side, making oil-tight
connections to plating, floors, ete. This is to form one
side of a space for collecting any oil drippings, and this
space will be connected to a special bilge pump. From the
top of the bunkers carry a 6-inch vent pipe about 6 feet
above the deck, put on a return bend and cover the opening
with heavy galvanized wire net. Each of the three bunkers
shall have a slat door into the boiler room and also remov-
able oil-tight doors to close openings. The side of the
bunkers in the boiler room shall be covered with 2 inches
of 85 per cent. magnesia, properly secured and protected
with a galvanized iron cover.
44. Foundation for Engine and Thrust Bearings.—The
foundation for the main engine will be built up from and
form a part of the framing of the vessel. The founda-
tion for the thrust bearing will be similar to, and form a
continuation of, the engine foundation. Both will be
stiffened in a fore and aft direction by intercostals. The
top of both foundations will be formed of 34-inch steel
plates, secured together at joint by butt straps flush riveted.
45. Limber Holes——Limber holes, 3 inches by 5 inches,
properly located, shall be made in all floor plates and
23
frames, except those forming watertight bulkheads, and
where directed.
46. Bitts—There shall be 12 heavy cast-iron bitts, se-
curely fastened with 1-inch bolts. Place wood pad under
bitts.
47. Chocks.—There shall be 12 heavy cast-iron closed
chocks and two heavy open roller chocks all securely fas-
tened to foundation on deck and sheer strake.
48. Haiches and Skylights—These shall be located
where shown and the tops of all skylights shall be operated
from the room below by suitable fixtures. The wood used
shall be Michigan pine, and the glass, the best quality of
skylight glass ribbed. Glass to have guards of 3¢-inch gal-
vanized iron rods. Put in round hatches where shown, 18
inches diameter. On the main deck forward put a hatch
with trunk for entering hold. This is to have a water-
tight cover.
49. Eye Bolts, etc—AN the necessary eye bolts, ring
bolts, ete., for handling pipes, chains, boats, coal, cargo,
provisions, ete., shall be provided and fitted in place on the
dredge. The location of these will be determined during
the construction of the dredge. Put a 1-inch eye bolt
aft and forward of forward hatch.
50. Hawser Pipes—There shall be two cast-iron hawser
pipes, to take stockless anchors, fitted in place.
51. Chain Lockers—There shall be two chainlockers in
the fore peak, to be built of angles, 5 inches by 3 inches,
12.8 pounds, spaced 24 inches center to center, and covered
with plate \%-inch thick, riveted to angles. Attach two
heavy rings in each locker for securing chain.
52. Companion HWays.—There shall be one companion
Way, constructed of angles, 3 inches by 3 inches, 7.2
pounds, and '4-inch steel. Doors with lock and proper
attachments to be placed as directed.
Le eas
—_ ale oD es aa ' ‘ SRE oa
re Rte
24
53. Hose Racks.—There shall be four hose racks, built
of oak and placed where directed, each being of such size
that it will hold a coil of 50 feet of 21-inch double-jacket
fire hose.
54. Ladders.—Steel pipe and wood ladders shall be
placed where shown and necessary. All fittings for hold-
ing ladders in place shall be furnished. Furnish rope and
Jacobs ladders.
55. Ventilators—There shall be one 20-inch ventilator
between frames 3 and 4; two 36-inch vents on frame 66
to boiler room; four 20-inch vents over main engine room
and four 20-inch vents on after house. The cowls to all
these shall turn easily and those in the engine and boiler
rooms shall be operated from these rooms. The ventila-
tors leading to the fire room shall be provided with ash
hoist gear lined with angle iron and have doors at main
deck. All cowls and exposed parts of these ventilators
shall be made of heavy galvanized iron. There shall also
be placed four 12-inch mushroom ventilators over rooms
of after house and three on pilot house. These shall be
opened and closed from within the rooms. All parts of
the mushroom ventilators within the quarters aft, of brass.
Put 6-inch goose neck ventilators where shown, and make
them 2 feet above the deck at crown. Put in two ventila-
tors for lower toilets aft—as shown. The two exhaust
ventilators on main deck forward shall be supplied with
electric exhaust fans, 24 inches diameter, General Electric
Company make, or equal.
56. Railing—There shall be a_ polished machinery
steel railing, 114 inches in diameter, around the propelling
and pumping engines. The railing will be secured to 1%-
inch diameter steel stanchions spaced 3 feet apart. In the .
pilot house there shall be a brass railing 1% inches in
diameter, around front of pilot house, also across the par-
25
tition between the pilot house and captain’s room. On the
outside of pilot house, at the doors, there shall be two (one
at each outside door) grab rails of brass 1% inches in
diameter, and two feet long. The railing in the pilot house,
and the grab rails outside of the pilot house doors, shall be
fastened to brass stanchions about 6 inches long; stan-
chions to be secured to woodwork by brass screws. Put
grab rail each side of door to passage.
57. Winch.—Place on foundation over after bin a steam
winch, Lidgerwood or equal. This shall have double 8-
inch by 10-inch cylinders, non-reversible, and shall have
two large gipsey heads, operated independently of each
other, with positive clutches and friction bands. Fur-
nish canvas cover for winch. Steam shall be reduced to
about 90 pounds for this.
58. W’indlass.—There shall be one No. & Hyde Com-
bination Steam and Hand windlass, Lidgerwood or other
equally good, with reverse lever. Cylinders 10 inches by
10 inches, or of equivalent dimensions. Wild cats for
17-inch stud link chain, regulation size, winch ends me-
dium size. A canvas cover shall be furnished for windlass,
Steam pipe to this to be supplied with a suitable reducing
valve to give a pressure of about 90 pounds per square
inch. Set on pine pad.
59. Steam Capstan.—There shall be one No. 3 Hyde
Steam Capstan, Lidgerwood or other equally good, with
double cylinders, 7 inches by 8 inches, or equivalent dimen-
sions. The throttle for operating capstan to be on deck.
Put reducing valve on steam pipe as specified under wind-
lass.
60. Flag Poles.—There shall be two pine flag poles; one
forward 15 feet long, 5 inches in diameter; one aft, 18
feet long, 5 inches in diameter, both to have gilt ball, 4
inches in diameter, with sheave for flag halyards.
"a ay oe
26
61. Main Railing —The main railing shall be as shown,
having 1!4-inch diameter, wrought-iron stanchions, 3 feet
high, riveted to sheer strake. There shall be three rows of
galvanized-iron pipe through these stanchions. There shall
be two gangways for coaling and two gangways for lad-
ders. The top rail shall be of 11-inch pipe, the other two
of 1-inch.
62. Side Lights—There shall be 60 side lights, 12
inches in diameter, clear opening, with composition frames,
and provided with rubber gaskets, eye bolts, and hooks.
They shall be made water tight. Eight lights at stem to
be fitted with guards. Each light to be secured by three
bolts with wing nuts—composition.
63. Mast.—There shall be one mast of Oregon pine, 20
inches in diameter at the deck, 14 inches at the hounds,
and 6 inches at the head. It shall be 54 feet from main
deck to mast heads. It shall be fitted with all the necessary
iron work and rig. Mast head to have gilt ball 8 inches
in diameter, with two sheaves for signal halyards. Two
derricks shall be fitted of Oregon pine, 10 and 6 inches
in diameter and 28 and 16 feet long, to be fitted with lifts,
double blocks, with double falls, guys, etc. All ropes for
falls and guys to be fitted and furnished by the contractor.
Chain plates shall be riveted to sheer strakes. All iron
work of masts and derricks shall be galvanized.
64. Derrick Masts—There shall be two derrick masts
placed as shown. These shall be 20 inches diameter at
the deck, 14 inches at the top and 40 feet high above the
deck. To each of these masts there shall be attached one
boom 40 feet long and 14 inches diameter. These masts
shall be well tied together and to the vessel, all iron work
extra heavy and galvanized, and all designed for lifting .
8,000 Ibs. with one boom at a radius of 30 feet from the
center of the mast. Furnish the necessary blocks and steel
27
wire rope falls for handling. Leads for hoisting and rais-
ing boom to be taken to winch over after bin.
65. Water Tanks—From frame No. 76 to frame No.
93, shall be made water tight, as shown on section.
Lightening holes, 14 inches by 29 inches, shall be cut in
floor plates from frame No. 77 to frame No. 92, to allow
for cleaning, painting and for circulation of water. The
center keelson shall have two 3-inch holes drilled in it be-
tween each floor space from frame No. 77 to frame No.
92. Two tanks, 1,500 gallons capacity each, with filling
pipe, splash plates, man hole, drain pipe, and vent. Tanks
to connect to pump in galley and as specified. Tanks to
be placed aft of after bin and cemented inside, and to have
three coats of paint outside. Two filling plugs for tanks
placed where directed on deck. Engine room tank to have
valve for draining into bilge.
66.. Steam Steering Engine —There shall be one Will-
iamson or equal steam and hand steering engine, cylinders
6 inches by 8 inches, diameter of wheel 5 feet, brass col-
umn and shaft in pilot house, with bell attachment. The
engine shall be fitted with adjustable thrust bearing and
double worm. It shall be provided with a Leslie, or equal,
reducing valve.
67. Rigging.—There shall be six shrouds to mast, three
on each side and one fore stay. The shrouds and stays
shall be of 7-inch galvanized steel wire rope served their
entire length. They shall be set up to chain plates with
1¥2-inch galvanized-iron tutnbuckles. The shrouds shall
have iron ratlines.
68. Name.—The name shall be on the stern in 10-inch
cast brass letters. All lettering to be polished.
69. Draft Figures—Draft figures shall be cut each side
on stem and stern post and amidship for indicating draft
of water.
7 rae
ESS SH Se
RSS ere BASE AACE WRT
28
70. Guard Sponson.—There shall be two long and two
short guard sponsons built of angle bars 6 inches by 4
inches by 16.2 lbs., and 2-inch wrought-iron braces as per
drawing. There shall be 4 oak guards, 8 inches by 10
inches, fastened to a 10-inch by 31-inch channel, channel
to be riveted to shell plating, at forward end. The guards
shall be covered on the outside with 4-inch by ™%-inch
wrought-iron, fastened with %-inch by 5-inch round
spikes, heads of spikes to be countersunk. Two of these
guards shall connect to the two long sponsons.
71. Waste Lockers.—There shall be two waste lockers,
placed where directed, built of '%-inch steel, fitted with
locks. Each shall have a capacity of 250 pounds of waste.
72. Bins—There shall be two sand bins, built as shown
on the drawings. The top of the forward bin shall start
on frame No. 30 and extend to frame No. 55. The top of
the after bin shall start on frame No. 94 and extend to
frame No. 119. The bin studs shall be of bulb angle 6
inches by 3 inches by 13.8 pounds, spaced 24 inches center
to center. The sides of the bins shall be braced as shown.
On the top of the floors on each side of the gate openings,
there shall be a 20-pound stringer plate extending at least
one frame space fore and aft of bins. Stiffening at lower
deck shall be as shown. Studs on ends of bins shall be
connected at top and bottom as shown; and be supported
between these points by two transverse girders. These
shall connect to side stringers as shown. Bins shall be
thoroughly caulked.
73. Hips in Bins.—The hips shall extend fore and aft
and across the bottom of bins as per plan. The studs of
hips shall be angle bars 4 inches by 3 inches, 11.1 pounds;
they shall connect at the top by a 1714-pound gusset plate. >
At the bottom there shall be two 17!4-pound gusset plates
riveted to studs, one on each stud. At the bottom the gus-
LING WELT SL PONTE DEE
29
set plate shall rivet to the floor plate stringers. The fram-
ing and plating for the central transverse hip shall extend
from side to side of bin for Strength. The longitudinal
hip shall member to this and the bin ends, and the fore and
aft transverse hips of each bin shall member to the longi-
tudinal hip and the bin sides. There shall be & gate open-
ings in each bin. Where the frames and floor plates are
cut for gate openings the 5é-inch intercostal plate shall
rivet to floor plates with angle clips 34% inches by 314
inches, 11.1 pounds, and also rivet to stringer plate and
shell plating with 34-inch by 34-inch, 11.1 pound angle
clips. At each side of the gate openings there shall be a
20-pound plate, long enough to reach between the stringer
plate running fore and aft each side of the gate openings.
This shall be riveted to angle bars on floor plates. In-
ierior of all gate openings to be lined with plates ¥g-inch
thick, with angles in corners and staple angles on lower
edge.
74. Casting for Gate Frames.—There shall be 16 steel
castings for gate frames, as per plan. The casting shall
be made in accordance with the detail drawing. Each
casting shall be riveted to stringer plates. The surface of
contact between gate frames and gates shal? be faced.
Lugs for gate hinges shall be cast on one side. The pat-
terns for the gate frames, as well as for the gates, shall
become the property of the United States.
75. Gates—There shall be 16 cast-steel gates as per
drawing. Lugs shall be cast on each gate for hinges.
There shall also be cast near the center of each gate a lug
to connect to the rod used to close and open the gates.
On all wearing edges of gates rivet a steel bar as shown,
making close joints at corners. .
76. Bin Plating.—The plating in the bins shall be as
shown on section. The top of hips shall be covered with
No ay eat thS BAY, Ad
a 2 ERMA INN Se APE SARE TAY
30
a 4-inch by 4-inch by %-inch angle, riveted to hip plating.
There shall be at each corner of each bin a 4-inch by 4-inch
by '%-inch angle riveted to bin plating.
77. Riveting in Bins and Hips.—All rivets entering into
the construction of the bins shall be of 34-inch diameter,
with countersunk heads in bins, convex.
78. Foundation for Sand Pumps.—The foundation for
sand pumps shall be constructed as shown on plate No. 2.
Under the center of each crank of the pumping engine
there shall be a solid wrought-iron stanchion, 3 inches in
diameter, riveted to beam and floor plates. The beams
shall be covered with a %-inch plate, riveted to beams, and
to bulkhead by angle bar 4 inches by 3 inches, 11.1 pounds.
Put in other stanchions as may be required.
79. Gate Mechanism.—The gate mechanism for opening
and closing the gates shall consist of two plates connect-
ing to lug on gates, and to a wrought iron rod 3 inches
in diameter. The exact length of the plates and rods will
be determined during the construction of the ship. A guide
shall be placed over the center of each gate opening. The
guide shall consist of steel casting with cap holding the
5-inch pipe encasing rod firmly. The 3-inch diameter rod
shall have at the top a '%4-inch square faced thread 1-inch
pitch. This shall pass through a large cast iron nut, which
nut shall form the hub of an operating wheel made of 1%4-
inch and 34-inch gas pipe. The casting in which this nut
revolves shall be of cast iron, and be in halves bolted to a
34-inch plate. There shall be girders, as shown on the
drawing, riveted to deck beams and coaming by angle bars
4 inches by 3 inches by 11.1 pounds. On the hub there
shall be mounted a worm wheel, engaging a worm on a
side shaft as shown. This shaft shall be operated by a re--
versible engine with double 8-inch by 8-inch cylinders.
There shall be one engine for each bin arranged to oper-
ate all the gates or those on either side.
Se as: Ee aie a ee eter POT SFr Sone cos . oP PY - -< LeEey
vidio ms , PENETRANCE RG LIES LY
31
80. Overflows.—These shall be constructed as per draw-
ing. They shall be built of 3¢-inch steel, and shall be con-
nected to bin and shell plating by angle bars 4 inches by 3
inches, 11.1 pounds. The connections shall be made water
tight. The hull plating at the overflows shall be reinforced
by a plate at least 4 feet by 4 feet, 22 pounds.
81. Gates for Overflows.—There shall be eight gates
provided for lower overflows. These gates shall be held
in position by two plates forming a groove. The operating
mechanism of these gates shall be similar to that of the
sand bin gates, except no steam gear, and shall be made as
shown by the drawing.
82. Coaming Around Bins.—There shall be a coaming
around the bins, consisting of a 3g-inch plate, about 30
inches high, riveted to main deck stringer plate on sides
and to steel deck across ends by 4-inch by 3-inch, 11.1
pound angle. The top of coaming shall be finished with a
3-inch angle. Sheath house at forward end of after bin
with 5-pound plate to under side of windows. and make
watertight.
83. Cementing.—The entire inside bottom of the dredge
to the top of the floors, the inside of the engine room tank,
fore and after peak tanks and surfaces of the chain lockers
shall have a coating of Bitumastic solution and a coat of
Bitumastic enamel, or other preparation of equal value ap-
proved by the Engineer.
84. Painting —All surfaces of steel inside of the vessel,
not cemented, and outside of the hull above the light water-
line shall receive four coats of paint, the last coat tinted
as directed; this coat shall be put on after the trial of the
dredge (See Par. 234). Red lead for the first two coats,
white for the last two. All houses, masts. ventilators,
derricks, windlass, capstan, rails, skylights and canvas cov-
ers on top of houses, shall receive three coats of lead,
Hee ar Awe
SERENE IES MEET ONT ST ES aS
32
tinted as directed. Inside of houses shall be finished with
one coat of shellac, and two coats best spar composition.
Ceilings in all rooms to be finished in white, three coats.
In the quarters on lower deck, the sides and deck overhead
shall be covered with granulated cork. This shall receive
three coats of white lead. Draft figures to be colored as
directed.
85. Below Water Painting —All the exposed surface of
the vessel and appurtenances below the light water shall
receive four coats of red lead paint. The last being put on
after the hull is dry and in dry dock. Each coat shall dry
24 hours before the next is applied on the vessel put in
water.
86. Pilot House, Captain’s and Inspector's Rooms.—
These shall be built as per plan. Sills shall be of pine, 4
inches by 5 inches; studs, spruce, 3 inches by 4 inches;
carlins, pine, 3 inches by 4 inches; plate, pine, 4 inches by
6 inches. Outside sheathing to be of Michigan pine, 3
inches wide 76-inch thick; to run fore and aft below belt
rail, above belt rail up and down, decking 3 inches wide
%-inch thick Michigan pine; water batten 2 inches by 5
inches of pine; drip plate of pine, 134 inches by 6 inches.
Inside sheathing of oak, 1% inches by 7-inch. Floors to
be of oak. Inside sheathing, outside sheathing, decking
and floors to be T and G. There shall be at least ten hold-
ing-down bolts, 34-inch. Overhang of this house to be 18
inches. Floor of pilot house to be covered with a remov-
able oak grating. All nails and bolts in pilot house to be
of brass.
87. Upper Boiler Room.—The upper boiler room shall
be built as per plan. Sills shall be of Georgia pine, 6
inches by 9 inches; studs of spruce, 4 inches by 5 inches;
carlins of Oregon pine, 3 inches by 5 inches; plate of pine,
4 inches by 6 inches; decking, Michigan pine, 3 inches by
33
%-inch ; water batten 2 inches by 6 inches pine, drip plate,
134 inches by 6 inches, pine. Inside sneathing to be of cy-
press or Oregon pine, 3 inches wide, 78-inch thick. Outside
sheathing to be of Michigan pine, 3 inches wide by %-inch
thick. Decking, inside and outside sheathing shall be T.
and G. Boiler room to be covered at deck with wrought-
iron grating. Vise bench, store rooms, shelves and lockers
to be placed as shown. 34-inch holding-down bolts in this
house to be placed where directed.
88. Bolt Shelf and Lockers.—The bolt shelf shall be
placed where shown. It shall be of pine 6 feet long, and
shall extend from top of house to within 36 inches of
floor. It shall be 12 inches deep and fastened to battens.
The shelf shall be divided into one-foot square places, to
hold the different size bolts. Each division shall be 34-inch
thick and 1 foot long. There shall be one locker, built,
fitted with doors, having locks. This shall be built of cy-
press or pine, and extend from top of house to deck, and
shall be 6 feet wide and 12 inches deep. The locker shall
have 5 shelves of 34-inch cypress. Across the front of the
shelves there shall be a batten to prevent tools from falling
out.
89. After House—This shall be built as per plan. The
sills shall be of Georgia pine, 6 inches by 9 inches; studs,
spruce, 4 inches by 5 inches; plate, pine, 4 inches by 6
inches; carlins, pine, 3 inches by 5 inches; decking, Mich-
igan pine, 3 inches by 7é-inch thick: water batten, pine, 2
inches by 6 inches: drip plate, 134 inches by 6 inches ; out-
side sheathing, Michigan pine, 3 inches wide, 7-inch thick;
inside sheathing, oak, 11% inches wide, 74-inch thick. All
inside and outside sheathing of houses to have chamfer.
Decking, inside and outside sheathing, also floors, shall be
T and G. Carlins in this house to extend to main rail,
and shall be supported by iron stanchions, 114 inches diam-
—_— ve ; WS aE aes ; CSR hag
oo ay a ae ce Sa aca
34
eter, from rail to carlins, placed where directed. There
shall be 34-inch diameter holding-down bolts, as required.
90. Galley—A dumb waiter, about 18 inches by 24
inches, shall be built in the galley; also all the necessary
shelves, racks and dressers shall be placed in the galley and
store rooms, all as hereinafter described. One porcelain-
lined sink, 18 inches by 24 inches, by 10 inches deep, with
pump connecting to fresh water tank, shall be placed in the
galley. This sink shall not be enclosed. The bulkhead
back of the sink shall be covered with sheet copper from
the deck to a point 2 feet above the sink, and 1 foot longer
than the sink and drip board. Put in brass steam pipe for
heating the water, noiseless discharge end. Dumb waiter
to be hung on braided sash cord, over brass pulleys to
counterweight. Put in Born or equal 8 hole range, com-
plete with coal hod, tools, etc., for burning soft coal.
91. Dish Racks.—In the galley there shall be a dish rack
located as directed. It shall be constructed of oak. There
shall be 15 divisions in it of dimensions to accommodate
the different size plates, platters, saucers, cups, mugs, vege-
table dishes, etc. The sides and bottom of the rack shall
be 72-inch thick, the shelves and partitions, 5¢-inch thick.
There shall be a neat moulding of oak around all the open-
ings for dishes.
92. State Rooms.—All state rooms shall be provided
with one or two berths, as per plan, with 4 drawers under
lower berths, one enameled washstand, not inclosed, with
basin, 12 inches in diameter. Drips from basins in state
room, bath room, and from sink in galley, also scuppers in
toilet rooms, shall run overboard each side of ship. All
lockers in state rooms shall have one shelf with 6 heavy
brass hooks. All keys to doors shall have brass tags.
93. Doors.—All outside doors shall be of Michigan pine
134 inches thick, with four raised panels. Outside doors
35
shall have 3 heavy brass strap hinges each, 1 heavy brass
lock, drop handle outside, knobs inside. Inside doors shall
be of the same material as the finish in the room, and shall
have raised panels. Al! inside doors shall have brass butts
and brass locks of an approved pattern. All doors shall be
fitted with brass buttons, catches and hooks where neces-
sary. All drawers and locker doors shall have brass locks.
Drawer pulls shall be of polished brass. Screen doors, cop-
per wire, same finish as room, shall be placed in all state
rooms, galley and mess rooms. ‘These doors shall be pro-
vided with spring hinges, buttons, catches and hooks, all of
brass. Door sills shall be covered with sheet brass. Fire
room door sills shall be covered with No. 18 galvanized
iron, also jamb of doors 3 feet high. Doors to have rub-
ber-tipped stops.
94. Windows.—-\Vindows in pilot house shall have sash
Of hard wood, finest quality of double-thick glass, fitted
with weights and pulleys. All other windows shall be of
same finish as room, glass finest quality double thick, 18
inches by 24 inches. Windows to drop into pockets. All
windows shall be fitted with catches and lifts of brass.
Screen windows shall be furnished for all state rooms and
mess rooms and galley; sash, Michigan pine; screen, cop-
per wire 18 mesh. Windows to be fitted with buttons and
catches of brass. |
95. Blinds.—All state rooms, mess rooms. galley and
officers’ bath room, shall be furnished with inside blinds,
of same finish as room. They shall slide up and down,
and shall be fitted with buttons and catches of brass.
96. Cushions.—Red corduroy cushions of durable, first-
class, approved quality shall be furnished for seats in pilot
house.
97. Covering.—All houses shall be covered with No. 3
cotton duck canvas, fastened with 34-inch copper tacks;
canvas to have 3 coats of paint, and be laid in paint.
ae RUC size
36
98. Scuppers—The after house shall have six 12-
inch scuppers leading from top of house to deck. The mid-
ship house shall have sixteen 12-inch scuppers leading
irom top of house to deck. The pilot house shall have
two 14-inch scuppers leading from top of house to top of
captain's room. House after pilot house shall have two
14-inch scuppers leading from top of house to top of
house below. The upper part of scupper to be of lead,
and be continued to the deck by. galvanized-iron pipe same
size. There shall be eight scuppers on the bridges with
pipe leading to deck.
99. Bridges —There shall be four bridges built as
shown, supported by forged stanchions.
100. Railing around Houses —There shall be a galvan-
ized-iron rail around amidship and after houses and bridges.
The stanchions of wrought iron 3 feet high, spaced about
4-foot centers, with 3 rows of galvanized-iron pipe running
through them. They shall be fastened to water batten with
four lag screws in each foot.
101. Heaters.—All sleeping rooms, mess rooms, toilets
and bath rooms, shall have approved iron heaters. The
pilot house shall have a brass heater. Drips from all heat-
ers to run into trap, trap to overflower into filter box. All
iron heaters to be covered with aluminum paint.
102. Tables—All tables in the mess room shall be of
oak, they shall be secured to the deck and the tops have
a batten around outer edges.
103. Firemen’s and Sailors’ Quarters —These shall be
located aft on the lower deck as shown and shall be reached
by a companion way entrance in after house. Floors for
toilet and bath rooms raised as shown. The berths to be
two in height, have pipe standees and rails, wire bottoms
and all finished in white enamel.
104. Petty Officers’ Quarters.—These shall be arranged
37
on the lower deck forward as shown. Berth shall be simi-
lar to those specified, for the firemen and sailors with lock-
ers as indicated. Basins to be about 12 inches diameter,
enameled iron, to drain outboard. Bath tub to be 4 feet
6 inches long, roll rim, enameled iron. Water closets to
be cast-iron hopper, enameled inside, with oak rim at-
tached. The closets, bath tub and basins shall have inde-
pendent discharges through the ship side. On the dis-
charges from the tubs and closets put quick opening gate
valves inside the hull, operated by suitable and easily ac-
cessible levers. On the discharge of each basin above the
deck put a gate valve. All to be so arranged that if de-
sired the ingress of water from the outside can be pre-
vented. The discharge from the basins to unite below deck
into one discharge pipe.
105. Satlors’ and Firemen’s Toilets.—These shall have
‘closets as above specified. The bath room shall have an
overhead spray, and the walls of the bath room shall be
lined with copper. The closets and bath shall discharge
overboard, and on each discharge there shall be placed, in-
side the hull, a quick opening gate valve operated by an
easily accessible lever. All toilets and bath rooms shall
have a scupper in the floor with gate valve and pipe leading
outboard—for washing out.
106. Officers’ Bath and Toilet-—The toilet shall be of
earthen ware, J. L. Mott, Pl. 709 Y or equal, with double
oak seat, with water connection for flushing; bath tub, 5
feet long, roll rim enameled: both to discharge overboard
below the sheer strake. Both the officers and petty officers’
bath to be supplied with cold water and a steam water
heater.
107. Hardware.—Al hardware shall be extra heavy,
of brass polished and shall be approved before putting up;
doors shall have rim locks with knobs inside and drop
VOPR, FS RALES ET ee > dad 7 .
38
handle outside, hook to hold door open, and heavy strap
hinges. Panels of screen doors shall be fitted with bronze
wire cloth 18-mesh. These doors shall be fitted with spring
hinges, catches and hooks, screen windows to be held in
place by brass buttons. Sash to have brass lifts, and in-
side blinds to have lifts and catches working on a cast-
brass rack on frame holding blind at any height. All
drawers to desks shall have brass locks, flat keys.
108. Chafing Plates—At joints of the suction pipe
where shown, put 5¢-inch chafing plates, 24 inches wide,
located so as to protect the hull from wear. Build guard
of channel to keep drag from side of ship.
109, Dry Docking. —After the preliminary trials and
just before completion, the dredge shall be placed in dry
dock, when, after cleaning, the last coat of paint above the
light water line and one coat below this line shall be put on.
110. Refrigerating Room.—This room shall be built as
shown. The insulation on all sides, top and bottom, shall
be made as shown. In one portion of this room there shall
be constructed an ice box capable of holding 800 pounds of
ice. The door to this box to open into entry. In the re-
frigerating room put up 6 heavy meat rods with two hooks
on rollers on each, and shelves as directed. In this room
also put two 20-gallon tanks of sheet zine with covers.
These are to hold drinking water. A pipe from one of
these tanks shall lead to the officers’ mess room and ter-
minate in a faucet. A pipe from the other shall lead to
the petty officers mess room and terminate in a faucet.
These pipes, where they are outside of the refrigerating
room, shall be thoroughly insulated.
BOARS HLA Sh ok rigs ———
TON PPS EPI ES Ee Rat cies OF EOP ee TS pa KRM Rg a 2 —
Me \ece eee RES CLM SHIN AEN ORE NTR iD
39
PROPELLING MACHINERY.
TEsts oF MATERIALS.
111. Test for Cast-iron—From each heat of cast iron
a tensile piece shall be cast in the presence of the inspector.
A test coupon will be attached to each of the larger cast-
ings. The test pieces for cylinders, valve chest linings,
packing rings and main guides shall show a tensile strength
of at least 25,000 pounds per square inch. All other cast-
ings will show a tensile strength of 20,000 pounds per
square inch,
112. Test for Cast-stecl—One test coupon will be re-
quired from all steel castings. The tensile strength of all
castings shall be at least 60,000 pounds per square inch,
with an elongation of at least 24 per cent in 2 inches for
all castings for moving parts of the machinery, and 20 per
‘cent in 2 inches for other castings. The sectional area of
test specimens shall be at least '4-inch. The elastic limit
shall be one-half of the ultimate strength.
113. Bending Tests for Cast-steel—From each large
steel casting or from each heat of smaller castings, a bend-
ing bar, l-inch square, shall bend cold without showing
cracks or flaws, through an angle of 120 degrees for mov-
ing parts of machinery and 90 degrees for other castings,
over an inside radius not greater than 1! inches.
114. Tests for Shafting, Stcel Columns and Reverse
Shaft—These shall be made of open-hearth steel. A ten-
sile test specimen shall be taken from each. They will
have a length of 2 inches between measuring points, and
a section area of at least %-inch. Each of these test
pieces shall show a tensile strength of 60,000 pounds per
square inch and an elongation of 28 per cent in 2 inches,
with elastic limit one-half the tensile strength.
115. Quenching and Bending Tests for Shafting, Col-
40
umns, etc—A bar %-inch thick and from ™% to 1-inch in
width will be taken from each forging and must stand bend-
ing double over an inside diameter of 1 inch after quench-
ing in water at 82 degrees F. from a dark cherry red
heat in daylight, witheut showing cracks or flaws.
116. Tests for Piston, Connecting and Eccentric Rods,
Valve Stems, Crossheads, and Main Links——These shall
be of open-hearth steel. All test specimens shall be cut from
the forging and shall have a length of two inches between
measuring points. Each of these specimens shall show a
tensile strength of 80,000 pounds per square inch and an
elongation of 24 per cent in two inches. The sectional
area of specimen shall be at least Y%-inch. Elastic limit
one-half the tensile strength.
117. Bending Tests for Piston, Connecting and Eccen-
tric Rods, Valve Stems, Crossheads, and Main Links.—
One bar %-inch thick, cut from the upper end of each
forging, must stand bending double when cold to an in-
ner diameter of 1 inch without showing cracks or flaws.
118. Miscellaneous Forgings.—The connecting rod bolts,
main bearing bolts, eccentric rod bolts and studs, and link
and valve stem bolts, shall be subjected to the same tests as
those specified for piston rods. Other miscellaneous steel
forging for machinery shall be subjected to the same tests
as those specified for shafting. Coupons shall be cut from
the end of forgings, midway between center and outside.
This applies to all forgings, shafting, rods, etc.
GENERAL DESCRIPTION.
119. There shall be two vertical, inverted, direct acting,
open frame, surface condensing, fore and aft compound -
engines, with cylinders 22 inches and 46 inches in diameter,
and a common stroke of 30 inches, driving four-bladed
41
cast-iron propellers 8 feet 6 inches in diameter, and 14 feet
pitch. Engines to exhaust into condenser and also have at-
mospheric exhaust. Template to which the propellers are
bored shall be furnished. Column and bed plate castings
shall be smooth and free from surface defects.
120. Cylinders.—The high pressure will be 22 inches
diameter, made of hard, close-grained cast-iron. All the
necessary lugs and flanges are to be cast on for required at-
tachments. The low pressure cylinder will be cast separate
from the high pressure cylinder, and will be 46 inches in
diameter. The internal parts of the cylinders and valve
chests shall be pickled to remove scale and sand. The H.
P. cylinders of main and pumping engines shall be tested
by internal water pressure of 200 pounds per square inch,
and the L. P. cylinders by a pressure of 100 pounds.
121. Counter Bore-—The counter bore of each cylinder
‘will be 44-inch larger than the diameter of the cylinder,
and of sufficient length, top and bottom.
122. Clearance—There will be not less than \4-inch
clearance from top of piston to bottom of cylinder cover,
and not less than 5¢-inch clearance from bottom of piston
to bottom of cylinder.
123. Cylinder Relief Valves.—On each high pressure
cylinder shall be two adjustable spring relief valves 1%
inches in diameter. On each low pressure cylinder there
shall be two adjustable relief valves 3 inches in diameter.
They shall be of composition, finished all over.
124. Covering.—Cylinders and valve chest to be cov-
ered with magnesia blocks and laged with the best quality
of Russia iron, neatly finished with brass bands and round
headed brass screws.
125. Cylinder and Chest Covers.—Covers to be made
of proper depth, strongly rabbed and filled with magnesia.
A cast-iron covering plate to be securely fastened to each
CSG RAGES SETS HAY SCE ee
42
cover. Covers with turned grooves to be polished and free
from all imperfections, eye bolts to be fitted for lifting.
126. Balance Cylinder—The low pressure steam chest
shall have a balance cylinder cast on cover with a bore of
about 8 inches in diameter. Cylinder to be polished. All
necessary brass piping from balance cylinder to condenser
to be fitted in place.
127. Stuffing Boxes.—The stuffing boxes of each cylin-
der will be cast separate, and packed with approved metallic
packing. The stuffing boxes are to be provided with com-
position bushings, and secured by a sufficient number of
studs to make a steam tight joint. The glands shall be of
composition.
128. Piston Valve—The high pressure piston valves
will be of cast iron, made with approved packing rings.
The followers of the valves will be secured in place by steel
stud bolts with wrought-iron nuts and brass split pins.
The packing rings will be of hard cast-iron, turned and
fitted in an approved manner.
129. Low Pressure Slide Valve-—The low pressure
valve will be a double ported slide valve of the usual form,
and will be made of cast iron. The face of the valve will
be finished to a plane, all edges to be finished.
130. Pistons.—Pistons shall be of the best quality of
cast-steel, for L. P. cast iron for H. P., conical. Packing
rings to be of hard cast-iron set out by steel springs of ap-
proved pattern. The followers to be secured to pistons
by shoulder studs of mild steel, with case hardened nuts,
brass split pins to be used on every stud as a locking de--
vice. A suitable number of eye bolts to be furnished for
lifting followers.
131. Piston Rods.—Piston rods to be made of forged
steel, 454 inches in diameter. [Each end will have a shoul-
der, and taper fit into piston and crosshead block, and will
sect Nc a eA eee en Oe
43
be securely fastened by nuts about 4 inches deep, pins to
be used as a locking device.
132. Crosshead Blocks and Guides.—Crosshead blocks
to be made of forged steel, in one piece. The blocks to be
about 8 inches square, finished all over. Crosshead will be
be made of cast steel and securely fitted to block by four
through bolts. The ahead and backing sides to be filled
with strips of Parson’s white brass, or equal, not less than
7/16-inch thick. Area of contact to be such that ‘pressure
does not exceed 70 pounds per square inch.
133. Crosshead Guide—There shall be a crosshead
guide of cast iron fitted to each column of engines, and de-
signed for water circulation.
134. Connecting Rods.—Connecting rods to be of forged
steel, with fork at crosshead and a tee at crank pin end.
There shall be furnished at each end a complete set of
‘brasses, butt end to be fitted with Parson’s white brass, or
equal, and securely fitted with bolts. Bolts to be of forged
steel. They shall be fitted with stops to prevent them from
turning while being set up. The nuts for these bolts shall
have a collar turned on them, and fit into recesses on rods,
which will have set screws so arranged as to hold nuts in
place when set. Rods to be finished all over.
135. Valve Stems and Guides.—Valve stems to be of
forged steel, not less than 2'4 inches in diameter in body
and 234 inches in guide, with tee heads forged on their
lower ends and fitted complete with bolts and nuts of steel,
for taking up wear on link block pin. Valve stem guides
shall be of the yoke type, securely bolted to pads under
each cylinder, and provided with suitable brasses and liners
for taking up the transverse wear. All connections to be
of marine type.
136. Links and Link Blocks.—The links will be of the
Stevenson double bar type, about 4 inches wide and 1%
2 ea > = topes = ate See
I EE A I SE ee oe ee SEs
oS
44
inches thick, and made of forged steel. Link blocks to be
of forged steel, with separate composition gib fitted on
each side of each link. Links and blocks to be polished all
over.
137. Eccentric Rods, Sheaves and Straps—The eccen-
tric rods will be made of forged steel, finished all over.
The lower end will be secured to the strap, and will have
a tee forged on to receive two steel stud bolts, which are to
be tapped into strap. The upper end of the rods will be
forked and have composition brasses, marine type, securely
bolted as shown. Eccentric sheaves for high pressure en-
gine shall be cast solid and bored out to fit shaft. The
sheaves for low pressure engine will be cast in halves and
securely bolted when in position. Eccentric straps will be
lined with Parson’s white brass, or equal. Sheaves to be
made of best grade of cast iron; straps of cast-steel.
138. Suspension Links, Reverse Shaft and Brackets —
The suspension links shall be made of forged steel. Re-
verse shaft to be 4 inches in diameter, of forged steel, and
polished all over. Brackets to be bolted on back columns
for reverse shaft. Bearings for reverse shaft to be lined
with Parson’s white brass or equal.
139. Back Columns.—The back columns will be of cast
iron. Necessary flanges and lugs will be attached for fit-
ting cylinders and guides to same by a sufficient number of
fitted bolts.
140. Front Columns.—The cylinders will be supported
on one side by 3 forged steel columns, 4% inches in di-
ameter, with heavy flanges on top and bottom. Columns
to be polished and secured to cylinders and bed plate by
fitted bolts.
141. Bed Platcs—These shall be made of cast-iron.
each in one casting, with four main bearings, of tough com-
position, filled with Parson’s white brass, or equal, and so
i a a id =m Sage greens —— *aate reer ae
45
arranged that the lower half of the box can be rolled up-
ward from under the shaft and removed when necessary.
They are to be held in position fore and aft by suitable
flanges. Bearing caps to be made of cast-steel, with open-
ing in top for feeling and oiling journals. The main bear-
ing bolts shall be of forged steel. All necessary eye bolts
for removing parts shall be furnished. The engine bed-
plate will be secured to the foundation by holding down
bolts 1'¢ inches in diameter body bound and spaced 10 to
12 inches between centers.
142. Reverse Cylinders—A steam reversing engine,
having a cylinder 9 inches in diameter by 14-inch stroke,
with suitable flanges shall be securely bolted to engines.
The working parts will be protected from shock by an
approved cushion arrangement. Provide also a hand re-
versing gear. The steam cylinder shall have a_ valve,
' worked by a hand lever ona notched quadrant at the work-
ing platform, in conjunction with a floating lever. The
arrangement will be such that the reversing piston shall
follow the motion of the hand lever, and be firmly held
when stopped. Fit drain pipes to the cylinders.
143. Throttle—Throttle valves to be of the balance
type, and will be fitted to steam chest with all of the neces-
sary connections leading to the quadrant. The amount of
opening will be regulated, or the valve firmly closed, by
means of hand wheels and screws working in yokes on the
valve bonnets.
144. Turning Gear. —\Worm wheels for turning the
shafts shall be provided with ratchet and lever of approved
design.
145. Telltales—Carry telitales from each engine to top
of house to show revolutions.
146. Starting and Reversing Gear.—Suitable gear from
throttle valve drain and reversing engine will be furnished.
Re a SYVr oR CMe eee
46
Operating levers, quadrant, spring catches, and pull rods,
shall be polished. Throitles of engines to be operated from
top of house, as well as engine room. Engine room throttle
to have locomotive latch.
147. Drain Gear.—Cylinder, chests and pumps will be
provided with asbestos packed cocks, securely attached and
led to condenser. All recesses in stop valves, fittings, cast-
ings, etc., shall be drained. Suitable drain levers and all
attachments shall be furnished and located near starting
| and reversing levers.
148. Clearance ——After the engine is set up in place,
adjusted and connected, the volume of clearance at each
end of each cylinder shall be carefully measured, and the
result plainly marked on some conspicuous part of the cyl-
inders. Marks will also be made on the crosshead guides
showing the positions of the pistons when the clearances
were measured, and also showing the striking points. This
applies to propelling and pumping engines.
149. Indicator Gear—The cylinders will be furnished
with the necessary rigging, piping, angle valves, three-way
cocks, etc., and all required attachments for taking indi-
cator cards.
150. Crank Shaft—The crank shaft shall be forged in
one piece, and made of the best quality of steel, 10%
inches in diameter. The crank pins will be 10 inches in
diameter by about 11 inches long. Couplings to be forged
on shaft. Tapered bolts of proper size fitted to couplings.
Crank shaft to be finished all over. Chamfer on crank
webs to be turned on.
151. Thrust Shaft—The thrust shaft to be of forged
steel, finished all over, 10'4 inches in diameter, and provid-
ed with six thrust collars forged on. Coupling bolts will .
be the same as specified for crank shaft.
152. Thrust Bearing —The thrust bearing will consist
RI EL NE EE LON LIE LLCO SIPEG IE I BO EE BIS
47
of a cast-iron pedestal, which will be securely bolted to the
main engine foundation plate by steel bolts in reamed holes.
The forward end of this pedestal will be continued so as
to bolt to lugs on main engine bed plate. The thrust will
be taken by cast-steel horseshoe collars, lined with white
metal and mounted on two Tobin bronze rods, upon which
they will be kept from endwise motion by steel nuts screwed
on the rods. The base of these bearings shall form a
receptacle for oil and shall be cast with recess for water
circulation, and connected to water piping. Put half stuff-
ing boxes at each end to retain oil and galvanized covers
over bearings.
153. Intermediate Shaft.—The intermediate shaft shall
be of forged steel, finished all over, 10 inches in diameter,
with flangs forged on, and coupling bolts as specified for
crank shaft. Faces of couplings to be made male and fe-
male.
154. Tail Shaft—The tail shaft shall be in one piece,
finished all over, 1014 inches in diameter, length to be taken
from work. Coupling on this shaft to be of cast-iron. The
after end of this shaft shall be 11 inches diameter.
155. Spring Bearings.—They will be of cast-iron with
faced flanges secured to the foundation by forged steel
bolts. The brasses shall be fitted so that they can be easily
removed and renewed. The bearing surfaces shall be ac-
curately bored, and faced with white metal strips, dove-
tailed, and hammered in place. The bearings will be sup-
ported on an approved and suitable foundation, built up
of plates and angles from the floor plates.
156. Stern Pipes for Shafts —The after floors through
which stern pipe passes shall be properly bored to receive
the stern pipe. The pipe shall be of cast iron turned at
the bearings, and with faced joints pipe to be thoroughly
fastened in place. At fore and after ends of these pipes
ER PS RE ETS I FE IE Be ER Ree
48
insert a composition sleeve lined with white metal. On the
inside and end put double stuffing box.
157. Shaft Struts—The shaft struts shall be placed
where shown of cast-steel or a cast-steel hub with forged
arms. These arms shall be egg-shaped in section. The
shaft between the strut and stern tube shall be enclosed in
a pipe made in halves. These halves shall fit closely to-
gether and to the castings at the ends and be made tight
by gaskets.
158. Oiling.—At a convenient place in the after hold
put two oil or grease cups for each stern tube. The cylin-
ders of these cups to have a capacity of about 2 quarts.
Carry a galvanized-iron pipe from the cups to the stern
tube and bearing as shown. Put valves in, these pipes just
below the pumps. Carry a small air pipe from near
the forward end of the stern tube to near the cups, and put
a cock on the end. Where these pipes pass through the
flats, the junction shall be made watertight. Cups to have
screw and piston.
159. Lubrication —tTo the high and low pressure cylin-
ders there shall be fitted one brass multiple feed oiler, equal
in every respect to the “Michigan.” These oil reservoirs
will have a capacity of not less than two quarts each, and
will be provided with a filler at their tops. Pipes will lead
from connections on reservoirs to all moving parts
of the engine. Each steam chest will be fitted with
an approved hand oil pump. Each main crank will be
oiled by cups carried on the crosshead, taking oil from
overhead. Each main crosshead journal will take oil from
an overhead wick cup. Each crosshead guide will be oiled
by dragglers taking oil from a cup at the bottom. Ap-
proved composition oil cups with screw tops will be fitted
for oiling main links. The main bearings, thrust bearings,
and spring bearings will each be provided with compres-
ROT Ses te . ee
BES PeH SOE SEN tee SMR Oost CL OIIN TEER ITA AS PG RSLS IRS
49
sion grease cups of an approved design and of '%4-pint
capacity. The main bearings will also have connections to
the lubricators. There will be approved means of oiling
pistons and valve stem rods. The eccentrics will also be
provided with efficient means of oiling. All the working
parts for which oil cups are not specified shall be provided
with oiling gear of an approved design.
160. Trolleys.—Overhead trolleys shall be provided for
main engines, pumping engines, sand pumps and condenser
heads.
161. Water Service.—There shall be brass water service
pipes for each engine, main guides, main bearings, thrust
bearings, crank pins, spring bearings.
162. Oil Drips —Oil drips of sheet brass shall be fitted
where oil can accumulate, and to have drain cocks. Drip
pans shall be placed under all pumping, propelling and
auxiliary machinery where oil can accumulate or drip.
163, Bypass.—Fit bypass to low pressure cylinders tak-
ing steam from main steam pipe.
164. Air Pump—One twin-cylinder, beam air pump,
12-inch diameter steam cylinder, 25-inch diameter air
cylinder by 18-inch stroke, or of dimensions giving equal
efficiency. Piston rods and buckets to be of composition.
Air pump valves to be of brass. Pump to be Blake, Worth-
ington, Davidson or other equally good. Pump to have
head valves.
165. Condenser.—Surface condenser of approved type.
Solid drawn brass tubes, tinned inside and out. Brass
ferrules with shoulder. Tube sheets of brass. Heads,
cast-iron; shell, steel; central supporting plate of brass.
To have not less than 4,500 feet cooling surface. Dis-
charge pipe of copper, with valve at ship’s side. Clean-
ing doors top and bottom. Condenser shall be covered with
magnesia and galvanized irom. Condenser shall be placed
a ee eR sc
50
higher than the air pump. Place on the condenser a soda
cock and copper tank of 2-gallon capacity, and on the
air pump suction pipe a 1l-inch nozzle for boiling out. Con-
nect the tube plates by 3 tie-rods in brass tubes. Put
large ‘perforated baffle plate over tubes. Before erecting in
dredge, condenser shall be subjected to an internal hydro-
static test of 20 pounds per square inch.
166. Circulating Pump.—The circulating pump to be of
centrifugal type with brass shaft and runners and operated
by an independent engine. Pump discharge to be 10-inch
and of sufficient capacity. To have suction to sea and bilge,
with independent discharge overboard; suttion to be of
copper, with copper strainer, located well forward of bin
overflows.
167. Auxiliaries—The circulating pump, and electric
light generators shall be capable of exhausting into the con-
denser, heater or atmosphere, all the other auxiliaries shall
exhaust into either the atmosphere or heater. All auxiliary
machinery shall be mounted on yellow pine pads 2 inches
thick; pads to rest on the steel foundations,
168. Ladders.—These will be fitted wherever necessary
or directed for reaching the engine or fire room from deck
and for reaching the various platforms, passages, and
parts of machinery.
169. Boiler and Bilge Pumps.—There shall be two ver-
tical, duplex, brass lined pumps, of Blake, Worthington,
Davidson, or other equally good type, 9 inches by 5%
inches by 10 inches, or of equivalent dimensions. To draw
from filter, sea, bilge, or either water tank, and to dis-
charge into boiler, overboard, or through hose at sides of
houses, or into either tank. Pumps to be so connected that
one can work in mm: water while the other is working in ,
fresh water.
170. Heater.—There shall be one multi, vertical,
RESET HER! AN ROE RRR gE CORR —
51
feed water heater, 32 inches diameter, with proper connec-
tions. Coils to be of copper pipe. Heater shall be cov-
ered with magnesia and Russia iron. To be tested to 50
pounds per square inch, internal hydrostatic pressure.
171. Service Pump.—There shall be one brass lined du-
plex pump, steam cylinder 4!4 inches diameter, water cylin-
der 5% inches and stroke 4!4 inches or equivalent dimen-
sions. This shall draw from the tanks or sea, and dis-
charge into pipe leading to the various toilet fixtures.
172. Pressure Pump—A pump similar to that above
described shall be installed, drawing from the tanks or
sea, and discharging into the water service to the engines
and pumps.
173. Filter —There shall be one filter about 10 feet
long, 2 feet 6 inches square, with four partitions and
cover.
174. Syphons.—Six 2%-inch syphons shall be furnished
and fitted in place.
175. Hand Pump.—There shall be an approved hand
pump, located in lower engine room where directed, fitted
complete to draw from the sea, tanks, or bilge or boilers,
and discharging into the auxiliary feed pipe or overboard,
provided with all necessary pipes, valves, etc. It shall have
a detachable hand lever, which shall be stowed in brackets
at a convenient place. This is not to pump against boiler
pressure.
176. Injectors-—Two Korting injectors, of ample size
or other equally good, shall be furnished, with connection
for hose for washing down.
177. Centrifugal Bilge Pump—This shall have a cast-
iron shell with brass pump shaft and runner, 4-inch suc-
tion and discharge pipe, and be connected to an engine of
proper size. This pump shall discharge out board and shall
have 8 suctions to bilge, each protected by a strainer, and
52
so placed that any portion of the hull can be drained. This
suction pipe shall be independent of that for the other
pumps. The pump shall have sufficient power to discharge
the bilge water when the dredge is deep loaded.
178. Fire Pump.—One brass lined fire pump, 14 inches
by 7 inches by 10 inches, or of equivalent dimensions ; ver-
tical, Blake, Worthington, Davidson, or any other equally
good. This pump shall have a suction to the bilge; an in-
dependent valve at the ship’s side; it shall discharge over-
board or through fire hose at side of house; and to draw
from sea, bilge or tanks, six 2'%-inch fire plugs shall be
located on main deck as directed. Furnish two reducers
for l-inch hose on deck.
179. Relief Valves.—Relief valves shall be attached to
the discharge of all pumps, discharging into the suction
pipe.
180. Boilers—There shall be four boilers, Scotch re-
turn tubular type 14.5 feet diameter and 12 feet long. To
have three 42-inch corrugated furnaces each, 3%4-inch
tubes, well rolled in tube sheet and ends beaded over.
Boilers to have butt straps inside and out, and to conform
in every respect with the requirements of the United States
Inspectors of Steam Vessels, for a working pressure of
140 and 160 pounds for the furnaces. Dry pipes shall be
placed in each boiler, 8 inches in diameter, and to have two
hundred (200) 34-inch holes or slots of equivalent area.
Uptakes of all boilers to come together, and to have one
stack of nine feet inside diameter. There shall be an air
space of 3 inches and an outer stack provided 9 feet 6
inches in diameter. Both stacks to extend above top of
house as shown and to have six wire guys 5-inch in di-
ameter, each to be set up with lanyards and dead eyes. A
damper shall be fitted. Air space over uptakes covered with
asbestos. Covering on uptakes 1% inches thick, on boiler 2
53
inches thick, of asbestos and magnesia; this shall be cov-
ered with No. 24 galvanized iron. Bucket racks of iron
around stacks to take twelve buckets. Spring pop safety
valves for each boiler. Bottom and surface blow; stand
pipe with gauge glass; one l-inch drain cock; three try
cocks, and a common drain for all cocks to bilge for each
boiler. Furnace bars, bridge walls, lazy bars, fitted in place.
Four extra sets of grate bars, and four sets of fire tools
with hooks to hang same on. Four steam gauges in boiler
room. Ash pans to be fitted to all furnaces. Sheet-iron
baffle plate in front of boilers to keep ashes out of bilges.
Saddles to be of steel 22!4 pounds, and fastened to hull.
Braces from boiler to hull shall be furnished and fitted.
Fire room floor to extend back to steel bulkhead. Steal
floor plates. Four heavy ash buckets. Sixteen wrought-
iron baskets suspended from braces, with zinc, shall be
furnished. Wrought-iron gratings shall cover boiler hatch
at main deck. All necessary hand and grab rails shall be
furnished and placed where directed. Escape pipe to be
placed inside of stack. Make such connections to one of
the pumps that circulation can be maintained in any boiler
when raising steam. Feed pipes to discharge between the
curtains. Boilers shall be equipped for burning either oil or
coal and so arranged that the change from one to the other
can be easily made. The furnaces shall be provided with
extension fronts and the burners and general system shall
be the “Kirkwood” or other system approved by the En-
gineer. All necessary pumps, blower, heater, etc., shall be
supplied, using air to atomize the oil.
181. Donkey Boiler—Place where shown a donkey
boiler about 4 feet diameter and 8 feet high equipped for
burning coal. The stack from this shall lead into the main
stack ; the boiler shall be built for 140 pounds pressure, and
be supplied with all necessary gages, cocks, fire tools, etc.
- a _— *
54
This boiler to be so connected that it can be used for oper-
ating the various pumps, heating system and the oil heater
and burners until the main boilers are in operation.
182. Asi Ejector—Two approved 6-inch hydropneu-
matic ash ejectors, shall be furnished and set up complete,
ready for use. At the discharge end put in a removable
wearing piece and at all bends in the discharge pipe thicken
the outside portion and make it removable. Furnish pat-
tern of removable piece and bends.
183. Tanks.—There shall be four 105-gallon tanks, with
lock faucets with 4 keys, drip pan, and filling pipes from
deck. Fastened in place where directed.
184. Whistle——One 10-inch single chime whistle, with
double pull to pilot house shall be put in.
185. Tools.—Install in engine room a tool board fitted
with 3 monkey wrenches, 3 Stillson pipe wrenches, 3
screw drivers, and 8 epen-end wrenches, hammer and pliers
all finished, held in place with brass buttons. Wrenches,
in racks at convenient places, shall be furnished for all
nuts around engines and pumps. Set on brackets four small
oil tanks of copper, 10-gallon capacity each with faucets.
Furnish 12 steel oil cans, 8-ounce, six long and six short
spouts, and two brass oil sets on tray five pieces each.
186. Bells and Speaking Tubes ——There shall be one 20-
inch and one 12-inch gong in the propelling engine room,
and two jingle bells, with pulls in pilot house and on oper-
ating deck leading to gongs and jingle; also a 14-inch brass
speaking tube from pilot house to engine room, with whistle
at each end and a 1'%4-inch sounding tube of brass. Pul-
leys shall be used for all bell pulls. Put in also a 1%4-inch
speaking tube from the pilot house to the operating deck
aft of the stack with whistle at each end. Pulls to star--
board engine to have open handles, those to port closed.
Wire to be of brass.
&, bs a SS Carel
WHOS See
55
187. Electric Bells—There shall be electric bells from
captain and inspector’s rooms to engineer’s, mate’s, stew-
ard’s, and quartermaster’s rooms; also from each state
room to galley, with indicator. The contractor shall fur-
nish dry battery for these.
188. Steam Piping.—There shall be five distinct lines of
steam piping with separate stop valves near boiler; two for
propelling engines, one for each pumping engine, and one
for the auxiliary engines. They shall be of copper, to
stand a working pressure of 160 pounds of steam, and con-
form to the rules and regulations of the United States In-
spector of Steam Vessels. There shall be a bleeder pipe
from main steam pipe to condenser. Small pipes leading
from auxiliary steam pipe shall be of sufficient size to supply
all small pumps and auxiliary machinery. Steam and waste
pipes to heaters in all rooms except pilot house, shall be of
iron, galvanized. All iron pipe shall be galvanized.
189. Steam Separator.—There shall be placed on the
steam pipe to each main engine an approved centrifugal
steam separator of ample size. This shall be supplied with
gauge glass and drain to filter tank. \
190. Valves and Cocks.—All valves shall be Lunkenhei-
mer’s or equal. All steam and suction valves to be brass,
mounted; all pump, discharge, and exhaust valves to be
gate valves. There shall be a combined stop and check
valve close to suction and discharge of feed and fire
pumps; outboard valves, iron bodies, brass mounted, brass
strainers, shall be fitted to all suctions. Sea cocks and
throttle valves shall be furnished by the contractor. All
valves 2% inches and under shall be entirely of brass.
191. Filling Plugs—All tanks and oil cans shall have
filling plugs on deck with screw caps and the necessary
piping.
192. Ash Chutes——The contractor shall furnish 3 ash
chutes with brackets to fit rail.
= PP ae {Mite fea
56
193. Injection Valve Seats.—These shall all be located
forward of the forward overflow of the forward bin to
avoid taking sand. The plating at all openings shall be re-
inforced. The openings shall be covered with composition
strainers with area of opening at least twice that of the
valve openings. Strainers to be attached to the injection
seat castings, and provided with renewable zinc protecting
strips. All to be flush with plating. The valve boxes shall
be provided with facings for connection of flanged steam
pipe for clearing them of ice.
194. Labels——All valves and cocks, except such as may
be otherwise directed, shall have attached brass plates show-
ing their use and the direction of opening, and all hand
levers, quadrants, speaking tubes, electric bells and annun-
ciators shall be similarly marked. Marks shall be deep and
filled with black cement.
195. Pipe Coverings.—All steam and exhaust pipes shall
be covered with magnesia. Number 6 cotton canvas shall
be sewed on over the magnesia.
196. Thermometers.—Furnish 4 mercurial thermome-
ters, Hohmann & Maurer or equal, one on suction and dis-
charge of condenser and two on heater.
197. Lower Engine Room Floor.—The lower floor of
the propelling engine room shall be covered with checkered
steel floor plates, 44-inch thick. At the sea and bilge valves
the plates shall be removable.
198. Painting—The engines, tanks, pumps, and boilers
shall have 3 coats of white lead. All pipe covering shall be
treated in the same manner.
199. Steam Heating.—Carry steam pipe to all heaters,
putting reducing valve on line.
200. Toilet Supply.—All basins, closets, and baths are
to be supplied with water from the place in which the
dredge is working. The intake for this water shall be lo-
cated well forward of the overflows of the forward bin.
57
201. Refrigerating Plant.—This shall be an approved
direct expansion, automatic, anhydrous ammonia plant op-
erated by an electric motor. The plant shall be of such
size and have such a length of pipe in the refrigerating
room that it will keep the temperature of the latter at 34
degrees F. when the outside air is 96 degrees in covered
places, operating not more than 12 hours per day. When
delivered the plant shall be fully charged with ammonia
and two spare drums shall be furnished. This refrigerating
plant shall be mounted on an approved steel platform in the
lower hold aft of the after bin. From near the compressor
carry a 12-inch galvanized-iron ventilator up through the
after house and on top put a ventilating top. In the bot-
tom end of this ventilator put an exhaust fan operated by
an electric motor. The switch for controlling this motor’
shall be located in the engine room. The plant shall be
supplied with all necessary gages, instruments, tools, etc.
202. Gage Board.—In the engine room mount a gage
board containing one 8-day clock, chronometer lever, steam
receiver and vacuum gages for propelling engines. Clocks
and gages to have polished cast-brass cases, with dials about
8 inches diameter for the propelling machinery and 6 inches
for the pumping machinery.
PUMPING MACHINERY.
203. Finish and Tests of Material_—The finish and tests
of material shall be the same as is prescribed for the pro-
pelling machinery.
204. Pumping Engines —The pumping engines shall be
two in number, directly connected to the 20-inch sand
pumps. Bed plates of pump and engine to be bolted to-
gether. Type of engine, vertical, inverted, compound, con-
densing, with cylinders, 17 inches and 36 inches, stroke
Be i : PoE
PTO ‘ “ CSS fae
58
18 inches. To be provided with piston valves for high-
pressure cylinder, double ported, slide valve for low pres-
sure. Both cylinders to be fitted with relief valves, top and
bottom. Crossheads to be of the flat slipper guide pattern.
Crank pin brasses lined with best babbitt metal. A multiple
collar thrust bearing shall be attached. Collars for thrust
bearing shall be turned on shaft. Engine to be fitted com-
plete with automatic sight feed oil service to all bearings.
Oil tank brass 2-quart capacity with wick feed shall be
provided, to which all sight feeds shall be attached. A
complete water service shall be furnished. All places where
oil can accumulate shall be lined with lead and have drain
cocks. Brass fenders, edges wired, shall be placed where
directed to prevent the throw of oil from cranks. Cylin-
ders to be covered with non-conducting material, and neat-
ly lagged with Russia iron held by brass bands. Metallic
packing shall be used for piston rods, United States or
other equally good. All cylinders to have indicator rigs.
including one three-way cock to each cylinder. Engines to
exhaust into condenser and also to have atmospheric ex-
haust, and have an approved shaft governor.
205. Bells —There shall be two 10-inch brass gongs, lo-
cated where directed, with pulls located on the bridges as
directed; gongs shall be of distinctly different tone, and
different from that of the propelling engines.
206. Dredging Pumps——To be 20-inch, of centrifugal
type, and extra heavy construction of cast-steel, especially
adapted for dredging, as shown on the accompanying draw-
ings. The interior of back head of pumps are to be fitted
with renewable lining plates of steel. Pump runner to
be secured to shaft by taper fit, with key and nut. Pumps
to be fitted with approved air exhausters on Y-pipe.
Pumps and engines shall be set as per drawing. The num-
ber of revolutions of the discs of these pumps shall be be-
tween 180 and 200 per minute while dredging. Overhead
59
trolleys for handling heads. Template to which pump
runners are bored shall be delivered with the pumps.
207. Y-Pipe.—Shall be made of cast-steel as shown on
drawing. This valve shall be operated from top of house,
and main deck.
208. Suction and Discharge Pipes—The United States
will furnish at a railroad station or wharf convenient to
the works of the contractor, the steel suction pipe, drags
and flexible joints. These will be drilled and finished. The
contractor shall pay the freight charges for delivery at his
works, and install them on the dredge, furnishing the chain
slings and bands shown. Blocks from which suction pipes
are suspended shall have 30-inch cast-iron sheaves with
bushing and all made to swivel. Number of sheaves in
blocks to be as shown. The suction elbow, swivel joint,
Y-pipe and connections to pump and casting at ends of
‘discharge pipe shall be of cast-steel. The discharge pipe
between the Y-pipe and end castings shall be of lapwelded
steel pipe 3g-inch thick, 21!4 inches inside diameter, with
flanges riveted on, the bends being formed by bending a
piece of pipe. The pieces of this pipe shall be in uniform
lengths, the necessary adjustment to the ship being made
by small cast-iron space pieces.
209. Steam Hoisters——There shall be two steam hoist-
ers, Lidgerwood, or other equally good. They shall have
double cylinders, and be built to reverse with links. Each
engine shall have two drums for hoisting and lowering the
suction pipes; drums to be turned; if the two drums are
on the same shaft, the ratio of diameters to be such as to-
cause little bending in the flexible joint; if gearing is used,
the same ratio to be maintained by different rates of revo-
lutions. Cylinders to be 10-inch diameter by 12-inch
stroke. Engines to be right and left handed. Throttles
and brake to be operated from top of house. Put rollers
and pans under leads as directed.
60
210. Piping.—The steam, exhaust, also water service
pipes, to be of copper and brass; exhaust pipes from aux-
iliary to connect to heater. There shall be a valve in each
exhaust pipe, between engine and heater. Auxiliary ma-
chinery shall also be provided with atmospheric exhaust.
211. Tools—There shall be a complete set of wrenches
for engines, pumps and 12 for suction pipes.
212. Cover to Discharge Pipes—Where the discharge
pipes come through the deck the opening around pipes
shall be made tight.
213. Chutes——There shall be chutes built for the dis-
charge pipes, of 14-inch steel at sides and top, %-inch on
bottom, with gates as per drawing. These chutes shall
have distributing doors in the sides and bottom as shown,
and shall be covered with steel.
214. Wire Falls—There shall be 8 pliable plow steel
wire falls furnished. Four of these to be 34-inch diame-
ter, and four to be 5g-inch diameter. These shall be long
enough to successfully operate the suction pipes in 45
feet of water, when the ship is light.
215. Painting.—The contractor shall paint all engines,
suction and discharge pipes, pumps, and chutes three coats
of white lead paint; last coat to be applied after the trial,
prescribed in Par. 234.
216. Gage Board.—On gage boards near the pumping
engines shall be mounted steam and receiver gages for
each engine, a vacuum gage and a gage on discharge of
each pump.
217. Hoisting Davits—These shall be constructed as
shown with braces and guys. The springs on the davit
heads shall be of the construction shown, 3 on each head.
Each spring shall be wound from such a size of wire that
the coils shall not close up metal to metal under a load of
less than 10,000 pounds for each coil.
61
ELECTRIC LIGHT PLANT.
218. General Description—This shall consist of two
engines and generators of 15 kilowatts, capacity 110 volts
each, 6 pole. Each set shall be secured on a common bed
plate, have a solid shaft, and be securely mounted in the
engine room. The bed plates shall rest in metal pans,
with edges turned up 2 inches, to catch waste oil and water;
the pans shall rest on and be secured to wooden bases
not less than 2 inches in thickness, to deaden vibration.
All parts must be accessible for examination, adjustment
and repairs. Oil guards shall be provided where neces-
sary. ‘The sets must be thoroughly balanced, run true, and
must be able to run under full loads for long periods, with-
out undue heating or wear. The generating sets shall be
provided with durable water proof coverings and all nec-
_essary tools, together with wrenches and tool board. The
driving shafts shall be fitted with collars, which will pre-
vent a movement of the shaft in the direction of its length.
This shall be of the General Electric Company’s type or
equal. Put reducing valve on steam lines. The generator
shall operate either singly or in parallel.
219. Switch Board.—There shall be one large 2-panel
switchboard. This shall be of slate, 1'4-inch thick, fin-
ished with paraffine and supported on angle iron frame
where directed. It shall be provided with a suitable water-
proof covering, and shall contain switches for each dynamo
and on it shall be mounted:
Independent switches for each circuit.
2 round pattern Weston voltmeters, reading to 150 volts.
1 round pattern ammeter, reading to 150 amperes.
2 shunt rheostats to regulate voltage from 10 volts below
normal to 10 volts above.
2 two-point voltmeter switches.
1 two-light ground detector.
62
1 two-point ammeter switch.
2 150-ampere double-pole, double-throw knife switches,
with 150 ampere fuses.
2 110-volt pilot lamps on goose-neck brackets.
2 approved circuit breakers.
And there shall also be furnished :
1 magneto bell with 25-foot leads.
1 15 to 150-volt portable voltmeter with 25-foot leads. |
220. Circuits—Six separate circuits shall be run, one
for the projector, one for the engine room and boiler room,
one for crew's quarters forward, one for midship deck
house, one for after deck house and crew’s quarters, and
one for refrigerating plant and ventilator. Suitable resist-
ance coils, mounted on non-combustible frames, shall be
supplied as a dead resistance for projector mains ; terminals
shall be furnished and located for the following lights:
221. Lamps Required.—16 c. p.
13 in pilot house and room aft.
8 in petty officers’ quarters forward.
2 in chain locker water tight.
3 in lower hold forward.
8 in sides forward bin.
8 in room over boilers.
4 over discharge chutes, hooded.
6 lower boiler room.
10 upper engine room.
16 lower engine room.
8 sides after bins.
32 officers’ quarters aft.
24 lower quarters aft.
12 lower hold aft.
16 on sides of houses.
20 additional to be located later.
12 portable light plugs with 50-foot leads.
8 W. T. plug receptacles on sides of houses.
All to be supplied with key switches.
50 c. p. lamps.
2 lamps for side lights.
1 lamp for mast head.
4c. p. lamps.
2 lamps in binnacle in pilot house.
(Binnacle to be supplied by United States.) :
222. Seachlight—An approved searchlight of 35 am-
peres capacity, and equipped with pilot house attachments,
shall be erected on said pilot house, and controlled from
within. It shall be automatically regulated without the
use of springs, with silvered reflectors 18 inches in diame-
ter. The searchlight circuit shall lead from the switch-
board to the pedestal furnished for the searchlight having
no connection with the incandescent circuits. The area
of the cross section of the conductors shall not be less than
200 circular mills per ampere at full joad. A suitable re-
sistance coil on non-combustible frame shall be supplied
and fitted in dyamo room or at a controlling stand as a
dead resistance for searchlight mains. Furnish an extra
set of glass strips for front, canvas cover, tools and 25
pairs of carbons. This shall be of the General Electric
Company’s make or equal.
223. Lamps—The lamps shall be designed for the
110-volt system of 3.5 to 4 watts efficiency. They shall
have water-tight base connections and be interchangeable
in their sockets. The filaments must not drop when the
lamps are placed horizontally. The lamps must be of the
best quality and finish, and all those of the same candle
power shall be uniform in size. All leading-in wires and
64
anchors must be fused in glass; all anchors must be made
of metal. Each lamp must be marked on the inside of the
bulk with the date of manufacture, and shall have its
rated candle power, the voltage necessary to give this can-
dle power, and the name of the manufacturer, conspicu-
ously labeled on the outside of the bulb. The material
used for connecting the base to the bulb must be so treated
as to insure against danger of short-circuiting the lamp
when exposed to moisture. The c itractor will be re-
quired to guarantee that all lamps shall have an average
iife with full candle power of 600 hours. Twenty-five ad-
ditional 16 ¢. p. lamps, with three 50 c. p. lamps, shall be
furnished by the contractor. The side lights and head-
light lamps shall be keyless; they shall be properly set and
wired; the lights to be controlled by two switches with
fuses placed in the pilot house. Furnish 4 additional 4 c¢. p.
lamps.
224. Running Light Telltale Board—There shall be
one running light telltale board located in the pilot house,
such as is manufactured by the General Electric Co.. page
43 of their 1900 catalogue, or equal.
225. Wiring.—The wiring through the ship shall be of
the Greenfield Lead covered Flexible Steel Armored Con-
ductors, or other equally good. All junction boxes to be
made water tight.
226. Safety Fuses—Except for single lamp circuit,
safety fuses shall be provided for all switches, and at the
beginning of all branches which are of smaller sizes than
the leads from which they are derived. Each fuse must
carry the current for which designed and open the circuit
when this current exceeds the normal current by one-third.
A 200 per cent. extra supply of fuses shall be furnished.
These shall be of the water-tight type.
227. Design and Fixtures—The following standard
65
electric fittings shall be furnished and fitted as herein spec-
ified: Fixtures in galleys, Plate No. 23, No. 601. Cap-
tain’s room, spare room, engineer's room, mate’s room, in-
spector’s room, Plate No. 10, No. 521; in the above-men-
tioned rooms there shall be two-light ceiling fixtures, Plate
No. 21, No. 649. Bath rooms, captain’s spare rooms, in-
spector’s room, shall have one fxture each, Plate No. 15,
No. 551. Officers’ mess room, two ceiling fixtures, Plate
No. 23, No. 601. Petty Officers’ mess room aft, two ceil-
ing fixtures, Plate No. 23, No. 601. The balance of the
fixtures shall be from Plate No. 22, No. 321. Portable
hand lamps, Plate No. 1414, No. 5. Fire room fixtures,
Plate 141%, No. 674. Side lights, Plate 84, No. 678.
Mast head light, Plate 8%, No. 682. Two anchor lights,
Plate 8%, No. 681. The above side mast head and anchor
lights shall be fitted for oil as well as electricity. The
above fixtures are taken from Page Brothers & Co., 347
Cambridge Street, Boston, Mass.; Catalogue No. 12.
Those furnished, if not the same as above, shall be equally
good, of a similar design, and of the same finish. All the
above fixtures shall have an oxidized bronze finish.
GENERAL PROVISIONS.
228. The purpose and spirit of these specifications are
that the contractor is to provide and deliver a staunch
dredge hull and first-class machinery complete in every re-
spect; and any parts or appurtenances essential thereto, al-
though not specifically mentioned in these specifications,
shall be provided by the contractor without additional cost
te the United States. The successful bidder must guaran-
tee the materials and workmanship to be first-class in every
respect.
229. Reputation of Bidders —The reputation of the
Sli YY
RR SPLLTYS
66
bidder as a builder of sea-going ships, and the adequacy of
his resources and facilities for doing the work bid on
within the time stated in his proposal, will be considered
in making award. Each bidder will state, in his proposal,
what ships, intended to be habitually used at sea, he has
built, giving character and gross tonnage of each and
length of time, after date of contract order, occupied in
building.
230. Proposals —The right is reserved to make such
award as, taking into consideration all questions affecting
the total cost, shall be deemed most advantageous to the
United States.
231. Time of Completion—Each bidder must. state
length of time, after notification of approval of contract
within which he will agree to complete the work bid on.
The time for completion is important and will be consid-
ered in making award.
232. Storage for Outfit——The contractor shall furnish
a safe, dry and suitable place approved by the Engineer,
for storage of removable outfit furnished by the United
States for the dredge, and shall be responsible for all dam-
ages to this outfit by fire or water while it is in the storage
place. The outfit will be supplied by the Government and
delivered at such time in advance of the completion of the
contract as may be convenient to the Government. All nec-
essary hauling from the railroad to the store-room and
from the store-room to the dredge, and the labor for put-
ting on board shall be furnished by the contractor. All the
above shall be furnished by the contractor without addi-
tional cost to the United States.
233. Office for Inspector —A _ suitable office, properly
furnished with suitable desks, tables, chairs, water cooler,
wash stand, wash bowl, pitcher, soap and towels, heated
and lighted, shall be provided by the contractor for the use
67
of the inspector and his assistants, if any, and if hull and
machinery are built at two or more different points, two
or more such offices, if found necessary, shall be provided.
All the above shall be furnished by the contractor without
additional cost to the United States.
234. Trials—Upon the completion of the dredge, with
all parts and appurtenances pertaining thereto, as required
by these specifications, except cleaning, painting, etc., below
indicated, the vessel and all machinery and parts thereof
shall be given a sea trial, extending over as many days
as may be necessary, under conditions, as nearly as may
be, analogous to those under which she is expected to work
in actual practice. This shall be made at a point as near as
practicable to the place of construction, satisfactory to the
Engineer and where proper material at proper depths can
be found. Three days of actual dredging work will be re-
‘quired in this test, the time of going and returning being
dependent upon the locality of construction. A full-speed
run of four consecutive hours will also be required. These
trials shall be made under the direction of the Engineer
and at the expense of the contractor. Should defects de-
velop during this test, due to defective workmanship or
material, or to plans furnished by the contractor and proved
to be unsuitable, even though they had been preliminarily
approved, they shall be made good by the contractor, after
which the dredge will be again tested as above, for such
length of time, not exceeding three days, as may be nec-
essary. If the second test still shows the existence of de-
fects, correction will be made, and the dredge tested again,
and if necessary, this process shall be repeated until the
dredge is found satisfactory in all respects. The dredge
shall then be cleaned thoroughly and put in first-class shape,
dry docked, and painted before being turned over to the
United States. The contractor shall furnish without cost
OSS aS
68
to the United States a convenient berth at which she may
lie during the time necessary, after completion of painting,
for putting aboard her outfit. Inclining experiments to
locate metacenter shall also be made once when directed.
When the dredge is ready for final trial and the tenth pay-
ment is made (paragraph 239) the dredge shall be regarded
as completed within the meaning of paragraph 4 of these
specifications, so far as the liquidated damages are con-
cerned.
235. Delivery.—The contractor shall deliver the dredge
complete at the point where either the hull is constructed
or the machinery is installed, as indicated by him in his
proposal.
236. Final Trial of Machinery.—After completion of
the dredge as specified in Par. 234, and before acceptance,
she will be given a trial of 30 working days, and all parts
of the machinery which give out or show undue wear dur-
ing this time, shall be replaced at the expense of the con-
tractor, provided the defects are due to defective work-
manship or material, or to plans furnished by the contractor
and proved to be unsuitable, even though they had been
preliminarily approved. Delay caused by such failure and
replacing shall not be counted as part of the 30-days’ trial.
This 30-days’ trial will be made by the United States by the
regular crew of the dredge after she has arrived at Galves-
ton Harbor, or other point selected by the Engineer. When
practicable and when it appears that no additional cost to
the United States will probably be incurred by the delay
caused by notifying the contractor, he will be so notified
and directed to replace defective or broken parts; other-
wise the defective or broken parts will be replaced by the
United States. On receiving such notice, the contractor .
shall at once proceed to replace the defective or broken
parts in as short a time as the United States could replace
% Oe DO ea ae
Sore — - & KES Sat
3
69
them, counting said time from the date of receiving the
above notification. If the contractor refuses to replace
said defective or broken parts, or delays in doing so, the
United States will replace them, charging the cost of re-
placing to the contractor, as well as any actual loss due to
the delay in replacing.
237. Spare Parts—There shall be furnished as spare
parts:
1 suction elbow.
1 swivel joint and stuffing box for suction pipe, com-
plete.
1 distance piece for dredging pump.
1 suction head for dredging pump, including inner and
outer rings.
1 dredging pump periphery, bottom half.
1 dredging pump periphery, top half.
1 dredging pump back head liner.
1 dredging pump Y-Pipe complete.
All the above shall be so made that they can be used on
either pump.
There shall also be furnished:
2 dredging pump back heads, 1 port and 1 starboard.
2 dredging pump runners, 1 port and 1 starboard.
2 dredging pump shafts with nuts, 1 port and 1 star-
board.
All the above, together with the other castings used in
the construction of the pumps and pipe lines, shall be
drilled to template and the templates (of steel) furnished
with the dredge. All shall be of the material previously
specified for these parts.
There shall also be furnished, two complete sets of bolts
for the entire pump and suction system, one-fourth of a
set of follower bolts and nuts for each steam piston of
main and pumping engines, one-fourth of a set of springs
70
for each piston, one crown and one butt brass for crank pin
of main and pumping engines, one set of cross-head journal
brasses of one main and one pumping engine, one com-
plete set of metallic packing for each stuffing box, one set
of water valves for each pump, one set of brasses for valve
gear for one cylinder of main and one cylinder of pumping
engine, twelve shaft-coupling bolts for main shaft, six bolts
for pumping engine shaft, twenty-five condenser tubes, fifty
tube glands, with tool for setting up, and twelve patent
boiler tube-stoppers ; also two approved steam tube-cleaners
with the necessary lengths of steam hose and connections.
238. Patterns.—There shall be furnished a complete set
of patterns of all the cast spare parts, called for and
pattern for the end castings on discharge pipe. These pat-
terns shall be well and substantially made so that at least
12 moulds can be made from each in the future. Full pat-
terns will be required for all parts except pump shell and
runner. The patterns shall be well boxed and crated, the
patterns for no two different articles being in the same
crate or box, and the package plainly marked with the con-
tents. These boxes or crates shall be put together with
screws so that they can be used several times. These pat-
terns shall be delivered either on board the dredge or at a
railroad station or steamer wharf, as may be desired by the
Engineer. The cost of the above requirements as to spare
parts and patterns should be included in the price bid for
the dredge. Patterns for worm and wheel of gate mech-
anism also to be furnished.
239. Payments.—Provided the requirements of these
specifications are complied with, and funds are available
therefor, nine payments, each of 10 per cent. of the total
consideration of the contract, will be made, based on the -
report of the inspector; the first when the dredge as a
whole is 10 per cent. completed; the second when 20 per
a
71
cent. is completed, and so on, the ninth such payment be-
ing made when the dredge is ready for the trials prescribed
in Par. 234. From each of these payments 10 per cent.
will be reserved. After being turned over to the United
States as provided in Par. 236, the tenth payment of 7
per cent. will be made, and all reserved percentages paid
to the contractor. The eleventh and final payment of 3
per cent. will be made after the successful completion of
the final trial of machinery described in Par. 236, and de-
livery of the dredge to the United States. Payments will
be made by check on the United States Assistant Treasurer
at New York. In making up percentages of completion,
material and accessories specially ordered for this work
and unsuited for stock or for other work will be counted ;
provided, they are first delivered at the shipyard and satis-
factory evidence presented that they have been fully paid
- for.
240. Ownership.—All parts paid for under the system
of partial payments above specified shall become thereby
the sole property of the United States, but this provision
shall not be interpreted as relieving the contractor from
the sole responsibility for the proper care and protection
of said parts prior to the delivery of the dredge of the
United States, or from any other of the provisions of these
specifications.
The successful bidder will be required to enter into con-
tract, authorizing the United States, in case of default or
failure upon the part of the contractor to go forward with
the work and make satisfactory progress toward its com-
pletion, to annul the contract as provided in the form of
contract to be entered into, and take possession of the con-
tractor’s plant and yard, as well as all machinery, tools,
and appliances appertaining thereto necessary to be used in
finishing the dredge, and any material on hand intended to
72
be used in its construction, or to remove the dredge and
material to other plants or yards, as the Engineer may de-
termine, the title to said dredge and material to vest in the
United States forthwith upon said annulment of the con-
tract. In such event the contractor shall be liable for any
excess of cost of the construction of the dredge over the
price named in the contract.
241. Insurance.—It is expressly understood and agreed
that, preceding each payment, the contractor is to have
the dredge insured against fire and marine risk at his own
cost for and in behalf of the United States, in the name
of the Engineer who will enter into contract for building
the dredge, to at least tle amount of said partial payment,
and is thereafter to keep the said property insured to at
least the full aggregate of the payments made upon it by
the United States, until final acceptance.
242. Blue Prints—The contractor shall furnish this
office with two complete sets of blue prints and one set of
tracings, of all drawings used in the construction of the
hull and machinery, including piping and electric wiring;
and will also furnish one complete set of the prints to the
inspector. No work shall be started on any part of the
machinery or dredge until drawings have been approved.
This applies to all parts of hull and machinery, except
such parts of the auxiliary machinery of which it is im-
practicable to furnish tracings. Of these, blue prints will
be accepted.
243. Orders—Two copies of all orders shall be fur-
nished the inspector as soon as issued and immediate no-
tice given of the receipt of all material or appliances for
the dredge, and detailed list of same.
244. IVeights—The contractors shall furnish the in-.
spector daily with the finished weights of all material, ma-
chinery, or fixtures that may be taken to the ship.
245. Plate Index.
Plate 1. Lines.
Plate 2. Midship section.
Plate 3. Inboard profile.
Plate 4. Outboard profile.
Plate 5. Deck plans.
Plate 6. Sections of bins.
Plate 7. Miscellaneous details.
Plate 8. Dredging pump.
Plate 9. Engines.
Plate 10. Boilers.
PROPOSAL FOR SEA-GOING SUCTION DREDGE.
To Mayor J. C. Sanrorp,
Corps of Engineers, U. S. Army,
815 Witherspoon Building, Philadelphia, Pa.
Mayor:
In accordance with your advertisement of January 15,
1908, inviting proposals for constructing one sea-going
Suction dredge, and subject to all the conditions and re-
quirements thereof and of your specifications dated Jan-
uary 15, 1908, we (or) I propose to furnish all the neces-
sary labor and material except as specified to be furnished
by the United States and to build the dredge complete
in every respect and to deliver said eet Oh ss
RENAME R RDO MK BNR OS S4R 6 oe ee bk ewan cg EEE TEE Ee
RN, UN Foc cal eu, sxc days from the date
of notification of approval of contract. including time nec-
essary for trials as described in said specifications, except
the final trials of machinery described in Par. 236 for the
weep art ee LEE ES OT OE OE Po a ee dollars and
74
We (or) I have built the following vessels intended for
habitual service at sea, within the time stated for each,
counting from date of contract or order. [Bidders who
are not shipbuilders must state what shipbuilder is pro-
posed as builder of the hulls, and must fill out on this form
the building record of said shipbuilder. ]
Name of Gross Time Occupied
Character Tonnage in Construction
We (or) I make this proposal with a full knowledge of
the kind, quantity and quality of the articles required, and,
if it is accepted, will, after receiving written notice of such
acceptance, enter into contract within the time designated
in the specifications, with good and sufficient sureties for
the faithful performance thereof.
ps en ree re ee ee tee
PIED iio vive cd akan a teed AO eAD DAS Sane eNO we 4 .
PED ii eva scsavesssevbepeneses stan sae
po enn eo ree ere eer er Pee ot ee
SIGNED IN DUPLICATE.
[To be used oNLy when Guarantor is a Corporation. |
GUARANTY.
1908, for
CONSTRUCTING A SEa-GoING Suction DrepcE
petite cone Rei Sk MW A STL Bt weg hw ee oe he oD
De ce eee ee Oe NUS A a «a eee ete ere mine eee ane ae
rep Nas ae eae ot ME Sr tae ace Ale a Ws ie to ey eH ae ek ey eee
eRe Tt ie ee ae 2 8 iO RAID EAN WS ee wale wie ante cele ele age tL eet
ERRELA EH SE WakOde Seta we will within ten (10) days
after notice of such acceptance, enter into a contract with
the proper officer of the United States to furnish such
articles of supplies and materials and such services of
those proposed to be furnished by said bid as shall be ac-
cepted, at the prices offered by said bid and in accordance
with the terms and conditions of the advertisement invit-
ing said proposals, and will give bond with good and suf-
ficient surety or sureties, as may be required, for the faith-
ful and proper fulfillment of such contract. And said
corporation hereby binds itself and its successors to pay
to the United States, in case the said bidder shall fail to
OMALD EAE
76
enter into such contract or give such bond within (10)
days after said notice of acceptance, the difference in
money between the amount of the bid of said bidder on
the articles or services so accepted and the amount for
which the proper officer of the United States may contract
with another party to furnish said articles and services, if
the latter amount be in excess of the former.
In Witness Whereof, The name and corporate seal of
said corporation has been hereto affixed this...........
OF OR a aek sucka eee eee ea eae emaks , 1908, and these
presents duly signed by ‘its... 2.2.0. cs cece wceecens pur-
ee ee ee a ee ee es ae
Se | eet er eet Seer eRe ee eer ay ee day of
irate W NIAC RCO K oe be wc Gee we A. D. 190, a copy of
the record of which is on file in the War Department.
Attest:
kes ee. Oh oe £6 oS 6 20 Oe & SS S.O 84.68 Se CER Oe DEL Oe B.S SS Sy
‘The president or officer authorized to sign for the cor-
poration.
?The board of directors or other governing body of the
corporation. :
*Here affix the corporate seal.
77
Y
[To be used oNLY when Guarantors are Individuals. ]
GUARANTY.
UE MN > ini. oa wae ice a Cee ROR eK ETO. On ele
ee OR MR Sater te alee ie wane caw ct eee P
i Re SO ME Acie Cine hu Ce wns oan eee Ce oe Rs
Se Ete ey on 06a a Gare ae baw EN oma es. CPEE KG eens
hereby undertake that if the bid of....................
See BELEN ee EET TEE herewith accompanying,
I ar anh ence ase Ra Ome eye kien ee , 1908, for
CONSTRUCTING A SEA-GOING SucTION DREDGE
hh ee ee ee oe a ee ee eh ee he ee ee ee we a kh a ee ee ea Ww ay at te
ee ee ee a A ee ee a es a ee i Ae i ow ee ke i i i ee
ee a ea oe ee i ee ee ee oo ee ie ie i ee me A os oe ho a i ae te
be accepted as to any or all of the items and supplies, mate-
rials and services proposed to be furnished thereby, or as
to any portion of the same, within sixty days from the date
of the opening of proposals therefor, the said bidder.....
Ci KAUR REL CRIES Od hae Rieke eee aoe will within ten days
after notice of such acceptance, enter into a contract with
the proper officer of the United States to furnish such ar-
ticles of supplies and materials and such services of those
proposed to be furnished by said bid as shall be accepted,
at the prices offered by said bid and in accordance with the
terms and conditions of the advertisement inviting said pro-
posals, and will give bond with good and sufficient surety
or sureties as may be required for the faithful and proper
fulfillment of such contract. And we bind ourselves, our
< tA CER
=
78
heirs, executors, and administrators, jointly and severally,
to pay to the United States, in case the said bidder shall
fail to enter into such contract or give such bonds within
ten days after said notice of acceptance, the difference in
money between the amount of the bid of said bidder on
the articles or services so accepted and the amount for
which the proper officer of the United States may contract
with another party to furnish said articles and services, if
the latter amount be in excess of the former.
Given under our hands and seals this.................
nineteen
hundred and eight.
In presence of
*If executed in Maine, Massachusetts, or New Hamp--
shire affix adhesive seal.
79
JUSTIFICATION OF THE GUARANTORS (IN-
DIVIDUALS.)
SNE GCS cw iva wensneenechcnes anes foes
SOU OE inns che acukhie ee kiae ceete cc.
Bee wt Rackah ovvtols asta nece hoe hikes , one of
the guarantors named in the foregoing guaranty, do swear
that I am pecuniarily worth the sum of forty thousand
(40,000) dollars, over and above all my debts and liabil-
ities,
TRASCSA ESSERE KEES BEEEAEAD 4:96 b O.4 44 4214 '5'6 OS 8 OS
Subscribed and sworn to before me this..............
We Oiics oh engensacebanakens ask ce rceroniaveal 1908
| ere Cee hare er re ene a ae
. *“. 3
ON ina c cs kwas as cuncceteseadcek ’ 2
of EET CST Oe eo ‘taal
Be heb 6444506 basi ok TES ORE Lea nae , one of
the guarantors named in the foregoing guaranty, do swear
that I am pecuniarily worth the sum of forty thousand
(40,000) dollars, over and above all my debts and liabil-
ities.
ee ee ee ee oe ee ee a ee Se ee ee ae er ee
"The oath to be taken before a notary public or some
other officer having general authority to administer oaths.
If the office has an official seal it must be affixed, otherwise
the proper certificate as to his official character must be
furnished.
antor above named,
personally known to me, and that, to the best of my iene ‘
edge and belief, * is pecunilarily worth,
over and above all his debts and liabilities, the sum stated
in the accompanying affidavit subscribed by him.
ST er rnen ree Ter ere Serer ee eee
the guarantor above named, is personally known to me,
and that to the best of my knowledge and belief, he is
pecuniarily worth, over and above all his debts and liabili-
ties, the sum stated in the accompanying affidavit subscribed
by him.
oe Seiko Soe ee oe ek Oe BS ye Rhee e.N e ee eS
*This certificate to be by a judge or clerk of a United
States court, a United States district attorney, United
States commissioner, or a judge or clerk of a State court
of record with the seal of said court attached. If the offi-
cial can make the certificates as to both sureties, it will not ~
be necessary to fill out the next form below.
*He or each.
5
MARYLAND STEEL CO. OF BALTIMORE COUNTY VS, UNITED STATES. 81
81 In the Court of Claims of the United States.
No. 31281.
MaryLanpb Street Company or BALTIMORE, MARYLAND,
v.
Tue UNrrep States.
II, Defendants’ Answer and Cross Petition.
Filed Feb’y 15, 1912.
Come now the defendants, above named, by their Attorney Gen-
eral, and for answer to the claimant's petition and for cross petition
on their own behalf allege:
I.
They admit that a contract existed between the claimant and the
defendants, as set out in claimant's petition, and that from the full
amount otherwise due the claimant upon said contract there was de-
ducted the sum of $4,750, because of the facts set out in the cross
petition herein contained, But the defendants deny that there is
anything due the claimant under and by virtue ef the contract set
out in claimant’s petition.
Il.
The defendants, for a cross petition, hereby claim a set-off in the
said sum of $4,750 so retained by the defendants from the amounts
otherwise due the claimant under the contract herein sued
82 upon. The defendants allege the facts in regard to said set-
off to be as follows:
That heretofore a written contract was entered into by and be-
tween the Maryland Steel Company, the claimant herein, and the
United States, for the construction of a single-screw steamer to be
known as the General Joseph EB. Johnston, That by the terms of
said contract the said steamer was to be delivered to the Govern-
ment on the 9th day of December, 19083, but that the Maryland Steel
Company, the claimant herein, failed to complete and deliver said
steamer until April 1, 1904, being ninety-tive days after the ex-
piration of the contract period, exclusive of Sundays and holidays.
That the contract for the construction and delivery of said steamer
contained the following provision as to liquidated damages:
Article 2. That the Maryland Steel Company shall complete the
construction and equipment of the said steamer and deliver same to
the party of the first part in New York Harbor, or as directed by
him, in one hundred forty (140) days, exclusive of Sundays and
legal holidays, from the date of this contract. And it is hereby
agreed that in case the party of the second part fails to complete in
all respects and deliver the said steamer within the time herein
specified, the loss resulting to the United States from such failure is
1—435
eS
82 MARYLAND STEEL CO. OF BALTIMORE COUNTY VS.
hereby fixed at the rate of fifty ($50) dollars per day for each and
every day, exclusive of Sundays and legal Be ase com-
83 pletion and delivery of the vessel is delayed beyond the
period hereinbefore specified, an it is hereby stipulated that
the party of the first part may withhold such amount as liquidated
damages from any money due and payable to the party of the second
part by the United States for work done under this contract. In the
event of the act of God, war, fire, or strikes and lockouts of work-
men affecting the working of this contract, the date of completion
of the steamer may be extended for such period as may be deemed
just and reasonable by the party of the first part, to cover the time
lost from any of the above-mentioned causes.
That the Maryland Steel Company failed to deliver said steamer
until ninety-five days beyond the contract date, which delay was
wholly the fault of the Maryland Steel Company, and was to no
extent whatever the fault of the Government. That by virtue of said
delay on the part of the claimant there was justly due the Govern-
ment $50.00 as agreed liquidated damages for each of the ninety-
five days beyond said contract date, amounting in all to the sum of
$4,750. That inadvertently and by mistake of fact the officers of the
Government having direct charge of said payment paid the whole
amount of the contract price for the construction and delivery of said
steamer to the claimant, and failed to deduct therefrom the said sum
of $4,750, so fixed as liquidated damages in said contract. That
the said overpayment was due wholly to the mistake on the part
of the officer paying the same, and was not binding upon the
S4 United States, and that the said sum of $4,750, so inadvert-
ently, improperly, and illegally paid by the Government to
the Maryland Steel Company, ever since said payment was and now
is due from said company to the Government. That demand has
been made upon said Maryland Steel Company for the repayment of
said sum, which demand was refused, and the Maryland Steel Com-
pany has failed, neglected, and refused to return the same to the
Government.
The defendants now claim, as a set-off to the amount otherwise
due on the contract sued on by the claimant in this case, that said
amount of $4,750, so improperly, inadvertently, and illegally paid
the Maryland Steel Company under the contract for the steamer
~
Joseph FE. Johnston, should be set off and allowed as against the
payment of said $4,750 so retained by the officers of the Government
under the contract sued on in said claimant’s petition.
The defendants therefore demand judgment in favor of them upon
this cross petition for the said sum of $4,750, and that the same be
set off as against th® amount otherwise due the claimant under the
contract herein sued on by the claimant in its petition, and that judg-
ment therefor be rencered in favor of the defendants.
JOHN Q. THOMPSON,
Assistant Attorney General.
Ss. Ss. ASHBAUGH,
Assistant Attorney.
THE UNITED STATES. 83
85 In the Court of Claims of the United States.
No. 31281.
MARYLAND STEEL CoMPANY OF BALTIMORE County, Claimant,
v.
UNITED STATES.
III. Claimant's Replication and Answer to Defendants’ Set-off.
Filed April 15, 1912.
For answer to the defendants’ set-off herein filed the claimant says
there was such a contract, an extract of which is set out in the plea
of set-off, but that before the expiration of the time as provided
in said contract for the delivery of the vessel therein pro-
86 vided for and agreed to be built and, to wit, on the first day
of December in the year, 1903, the proper officer and agent
of the defendants under that contract, the Quartermaster-General
of the Army, waived the limit of time within which said vessel was
to be completed ;
That the vessel was subsequently completed and the contract price
paid therefor.
FREDERICK W. WOOD, President.
County or BALTIMORE,
State of Maryland, ss:
F. W. Wood, being duly sworn says that he is the President of the
Maryland Steel Company of Baltimore County and the Agent
thereof, that he has read the foregoing answer and that the facts
therein stated are true.
Subseribed and sworn to before me this 9th day of April, 1912.
| SEAL. | JOHN H. K. SHANNAHAN, Jr,
Notary Public.
W. D. DAVIDGE,
Atty for Claimant.
87 IV. Argument and Submission of Case.
On the 28th day of May, 1912, this case came on to be heard.
Mr. Walter D. Davidge was heard for the claimant; Mr. 8S. 8. Ash-
baugh was heard in opposition, and the case was submitted.
84 MARYLAND STEEL-CO. OF BALTIMORE COUNTY Ys.
88 V. Findings of Fact, Conclusion of Law, and Opinion of the
Court.
Filed December 2, 1912.
MARYLAND STEEL CoMPANY OF BALTIMORE County
Vv.
Tue Unrrep Srares or AMERICA.
This case having been heard by the Court of Claims, the court, on
the evidence, makes the following
Findings of Facts.
z
The claimant herein is a corporation organized under the laws of
the State of Maryland.
Il.
On June 24, 1903, the claimant as shown by the evidence entered
into a written contract with the United States through D. D. Wheeler,
Assistant Quartermaster General, United States Army, for the con-
struction and equipment of a single-serew steamer for harbor ser:
of the Quartermaster’s Department and submarine cable service, in
accordance with the specifications made a part of the contract, for the
consideration of $88,000, to be paid in various amounts as the work
progressed, less 10 per cent thereof withheld te make good any defects
that might be due to inferior material ov bad workmanship, in the
absence of such defects said retained percentage to be paid within 60
days after the delivery and acceptance of said steamer. and the vessel
to be completed within 140 days, exclusive of Sundays and legal
holidays, or by December 9, 1903.
Said contract was subject to the approval of the Quartermaster
General, United States Army, and was by him approved June 29,
1903.
III.
By the terms of said contract it was provided that if the claimant
should fail to complete and deliver said steamer within the
89 stipulated time it should pay to the United States the sum of
$50 per day as liquidated damages for each and every day
so delayed, exclusive of Sundays and legal holidays, which amount
it was provided might be withheld from any money due to the
claimant under said contract, about which there is no controversy.
IV.
On December 1, 1903, before the time stipulated for completion
had expired, and at the request of the claimant company, owing
to unavoidable delays in procuring the necessary material, the
THE UNITED STATES. 85
Quartermaster General, United States Army, within his discretion
under the contract, orally waived the time limit in said contract
for constructing and equipping said steamer, and subsequently on
April 2, 1904, by letter to the Quartermaster General, confirmed
such waiver, about which there is no controversy.
V.
The steamer so contracted for was completed, delivered, and ac-
cepted by the United States on April 1, 1904, or 95 days, exclusive of
Sundays and legal holidays, after the time fixed in the contract
therefor and on April 13, 1904, the Quartermaster General of the
Army directed the depot quartermaster at New York to make final
payment for said steamer, retaining, however, the 10 per cent to
— good any defects there might be in the material or workman-
ship.
Thereafter, July 13, 1904, the entire sum stipulated to be paid by
the defendants was paid without any deduction whatever,
Whether the claimant unreasonably delaved the work after the
waiver of the time limit as aforesaid does not appear,
VI.
It is not shown that the United States suffered any actual pecuni-
ary loss or damage by reason of the delay of the claimant in the
completion and delivery of the steamer.
VIL.
Thereafter, February 24, 1908. the claimant entered into another
contract with the United States, made a part of the petition herein,
by the terms of which the claimant agreed to build one steel hull
twin screw suction dredge and furnish and install therein the pro-
pelling machinery, pumping machinery, electric light plant, and all
other machinery and other Juurts required to be installed for the con
sideration of $357,500, said work when completed to be delivered to
the defendants at Sparrows Point. in the State of Marvland, which
work was completed and accepted by the United States on January
6, 1909, and the claimant was paid therefor the stipulated contract
price, less $4,750, which the defendants claim was the amount aris-
ing as liquidated damages for the 95 days’ delay of the claimant in
the completion of the steamer under the first contract hereinbefore
referred to and which amount the defendants further claim was in-
advertently and under mistake of fact paid to the claimant company,
90 VIII.
Counterclaim.
The Government sets up by way of counterclaim the like sum of
$4,750, which, it claims, was due as liquidated damages for the 95
days’ delay of the claimant in the execution of the first contract
a = , . rey
86 MARYLAND STEEL CO. OF BALTIMORE COUNTY VS.
hereinbefore referred to, which sum, it is claimed, was inadvertently,
improperly, and illegally paid by the officers of the Government to
the claimant, and defendants ask that, if any amount is recovered by
the claimant under said second contract, the amount of said pay-
ment should be offset against the same.
Conclusion of Law.
Upon the foregoing findings of fact the court decides, as a con-
clusion of law, that the petition be dismissed.
Opinion.
PEELLE, Chief Justice, delivered the opinion of the court:
The claimant seeks recovery for a balance claimed to be due on a
contract which was performed according to its terms and full pay-
ment therefor made except as to the sum of $4.750, which the Gov-
ernment by its set-off in the nature of a cross petition alleges should
have been deducted as liquidated damages under a prior contract for
the failure of the claimant te complete the work thereunder within
the contract time, notwithstanding the time limit had been waived
and the claimant permitted te proceed with the work to completion
and full payment therefor was made.
The claimant for replication admits that there was such a contract.
but says that before the expiration of the time fixed therein for the
completion of the work the Quartermaster General waived the time
limit.
No reference is made in the petition to this prior contract. but the
Government by its cross petition alleges that the amount deducted
under the contract sued on was inadvertently and contrary to law
paid to the claimant under said prior contract.
Said first contract provided for the construction. equipment, and
delivery in New York to the Government of a single-screw steamer
for harbor purposes, article 2 of which provided as follows:
“Article 2. That the Maryland Steel Company shall complete the
construction and equipment of the said steamer and deliver same to
the party of the first part in New York Harbor. or as directed by
him, in one hundred forty (140) days. exclusive of Sundays and
legal holidays, from the date of this contract. And it is hereby
agreed that in case the party of the second part fails to complete
in all respects and deliver the said steamer within the time herein
specified, the loss resulting to the United States from such failure is
hereby fixed at the rate of fifty ($50) dollars per day for each and
every day. exclusive of Sundays and legal holidays, completion and
‘delivery of the vessel is delaved beyond the period herein-
91 before specified. and it is hereby stipulated that the party
of the first part may withhold such amount as liquidated
damages from any money due and payable to the party of the second
part by the United States for work done under this contract. In the
THE UNITED STATES. 87
event of the act of God, war, fire, or strikes and lockouts of work-
men affecting the working of this contract, the date of completion
of the steamer may be extended for such period as may be deemed
just and reasonable by the party of the first part, to cover the time
lost from any of the above-mentioned causes.” ‘
It will be noted that time was of the essence of the contract and a
breach thereof would have given the opposite party the option of
treating the contract as discharged. Slater v. Emerson, 19 How.,
224. On the other hand, had the contractor failed to perform within
the specified time, the Government's permission for it to continue
performance ‘vould have operated as a waiver of the breach. Jeffrey
Mfg. Co. v. Iron Co., 93 Fed. R.. 408; Davis v. Roberts, 89 Ala.,
402; Barnard v. McLeod, 114 Mich., 73.
In the present case the time limit within which to complete the
work was orally waived by the Quartermaster General before the
expiration of the time fixed in the contract therefor, and accord-
ingly the claimant proceeded therewith and thereafter on April 1,
1904, completed the work. On the day succeeding the completion
of the work, to wit, April 2. 1904, the Quartermaster General. United
States Army, in writing, confirmed the waiver of the time limit as
aforesaid. following which, by order of said Quartermaster General,
the depot quartermaster at New York made final payment to the
claimant for the steamer so completed under said first contract, less
10-per cent retained by way of indemnity for any defects that might
appear in either the material or workmanship.
Thereafter, July 15, 1904, the percentage so retained was paid
over to the claimant company. Thus the transaction under the first
contract, it would seem. was closed,
Nearly four vears thereafter. to wit, February 24, 1908, the claim-
ant entered into a written contract, made part of the petition herein,
whereby the claimant. for the consideration of $357,500, agreed to
furnish all the necessary labor and material therefor and to build one
steel hull twin-screw suction dredge. and to furnish and install
therein the propelling and necessary machinery, electric-light plant,
ete., and to deliver the work at Sparrows Point, in the State of Mary-
land, which work was completed on January 4. 1909, and the claim-
ant was fully paid therefor, less 84.750. which was withheld as due
under the first contract as liquidated damages for the 95 days’ delay
of the claimant in the completion of the steamer thereunder, not-
withstanding the waiver of the time limit by the Quartermaster
General and payment of said amount as aforesaid,
The verbal waiver of the stipulated time within which to perform
work under a contract notwithstanding the act of 1862, 12 Stat., 411.
requiring contracts to be in writing, finds support in the case of
Salomon v. United States. 19 Wall.. 17, 19; 7 C. Cls., 482. wherein
Justice Miller, reversing this court. said:
“Whether we regard the delivery made in October as made under
a verbal extension of the time stipulated in the original contract, or
consider it as a new transaction in which the Government
92 received and took possession of the corn, and used part of it
and permitted the remainder to be injured in its hands, we
think the claimant is equally entitled to be paid for it.
{ Ooo
88 MARYLAND STEEL CO, OF BALTIMORE COUNTY Vs.
“The act of 1862, requiring contracts for military supplies to be
in writing, is not infringed by the proper officer having charge of
such matter accepting delivery of such supplies after the day stipu-
lated, nor is a verbal agreement to extend the time of performance
invalid. :
“And if this were not so, when the quartermaster in charge re-
ceives of a person corn for the Government, gives a receipt and
voucher for the amount and the price, and the Government uses
such part of it as it waits and suffers the remainder to decay by
exposure and neglect, there is an implied contract to pay the value
of such corn, which value may, in the absence of other testimony,
be presumed to be the price fixed in the voucher by the quarter-
master.”
In the case of District of Columbia v. Camden Iron Works, 181
U. S., 455, 461, involving the construction of a similar statute. re-
quiring c
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.