Brief for the Respondent in Opposition — Sullivan v. Brinegar
Supreme Court brief1973
Ask Donna
What actually matters in this document.
Text
“TL.
AUG 23 1973
en
MICHAEL RODAK, JR.C
—
sc No. 73-49
IN THE
SUPREME COURT OF THE UNITED STATES
RAYMOND R. SULLIVAN and JAMES T.
MARSH, on behalf of themselves and all others
similarly situated,
Petitioners,
vs.
JOHN A. VOLPE, ex rel.,
Respondents.
CITY OF SACRAMENTO,
a municipal corporation,
Intervenor,
GRANITE CONSTRUCTION COMPANY,
a corporation, and
A. TEICHERT & SON, INC., a corporation,
Respondents in Intervention.
8 a ee ~ et Hat ga be —— xe ‘
Lom PEESSLA RS PRL et RE ERE IRE BIEN Bueentune yy to AeA at leks pet
oo . TS > et Se eg « ae there Pras tf eee BE MPI BOSE at fe 3h ok
Poe Sie @
a
Respondents’ Brief in Opposition to Petition for a
Writ of Certiorari
HARRY S. FENTON, Chief Counsel
KINGSLEY T. HOEGSTEDT, Assistant Chief Counsel
1120 N Street, Sacramento, California 95814
Attroneys, Respondent
State of California
ELIAS D. BARDIS
Attorney for California Department of Public Works
Of Counsel
printed im CALIFORNIA OFFICE OF STATE PRINTING
INDEX
Page
RR ae ET 1
STATUTES AND REGULATIONS _____-----__--______-_ 1
IP I scene adbiaioumbuci 2
I oar atstcs ts enacebintadakiod cons cab tails toes hamiacbagaamiaiae 2
I a PRR 3
SI sai ivealacoaas irda ccciontnibeaionsintncedinsb-asias shares apes meatniaatediaibiecinennehoetiak 5
ET Ee ee A AER SR eT aw ee Te Hae EON 7
I, The Respondents Complied with NEPA and Its
Implementing Regulations _-._._..._-_-__.-------____ 7
II. There Is No Conflict of Decisions on the Issue of Laches
and the District Court Properly Applied This Doctrine 12
III scssiishesiacdscanbinsisaedceihineccidotins 16
APPENDIX 1 Council on Environmental Quality—
Guidelines (Sections 3, 11, and 12)_._-.____- 19
APPENDIX 2 Federal Highway Administration—Interim
Guidelines (Section 4)_......-...---______- 23
APPENDIX 3 District Court’s Findings of Fact and
| eee 27
.
3
3
s
3
:
3
}
x
|
Ptoben thal Baad. tik,
Se ee we
een tinicitees:
t., ee
TABLE OF AUTHORITIES
FEDERAL CASES
Arlington Coalition on Transportation v. Volpe, 458
F.2d 1323 (C.A. 4th Cir. 1972)
Burnett v. New York Central Railroad Company, 380
U.S. 424, 85 S.Ct. 1050 (1965)_----- a
Clark v. Volpe, 342 F.Supp. 1324, 1329, 1330 (D.C.
ED. La. 1972)
Ehlert v. U.S., 402 U.S. 99, 91 S. Ct. 1319 (1971) -----
Environmental Law Fund v. Volpe, 340 F.Supp. 1328,
1331, 1332 (D.C.N.D. Cal. 1972) __
Pewer Reactivator Development Co. v. International
Union of Electric Radio and Machine Workers, 367
U.S. 396, 408, 81 S.Ct. 1529 (1961) an
Udall v. Tallman 380 U.S. 1, 85 S. Ct. 792 (1965) ----
FEDERAL REGULATIONS
36 Federal Register 7724 (1971) Sections 3, 11, and 12_-
FEDERAL MISCELLANEOUS
Federal Highway Administration Memorandum,
Beste © cececnnciennninentncmndndimmae
sc No. 73-49
IN THE
SUPREME COURT OF THE UNITED STATES
RAYMOND R. SULLIVAN and JAMES T.
MARSH, on behalf of themselves and all others
similarly situated,
Petitioners,
vs.
JOHN A. VOLPE, ex rel.,
Respondents.
CITY OF SACRAMENTO,
a municipal corporation,
Intervenor,
GRANITE CONSTRUCTION COMPANY,
a corporation, and
A. TEICHERT & SON, INC., a corporation,
Respondents in Intervention.
Respondents’ Brief in Opposition to Petition for a
Writ of Certiorari
QUESTION PRESENTED
Did the District Court properly find, after a trial on
the merits, that the respondents complied with NEPA
and the plaintiffs are barred by laches?
STATUTES AND REGULATIONS
This appeal involves the National Environmental
Policy Act of 1969 (hereinafter referred to as NEPA)
a
and the regulations promulgated thereunder. The
Council on Environmental Quality (hereinafter re.
ferred to as CEQ) issued GUIDELINES FOR FEp.-
ERAL AGENCIES UNDER THE NATIONAL
ENVIRONMENTAL POLICY ACT (Appendix 1)
(36 Fed. Reg. 7724 [1971]), and the pertinent regula-
tions involved in this writ are:
(1) Section 3;
(2) Section 11;
(3) Section 12.
The Federal Highway Administration issued its
draft interim memorandum entitled Implementation
of Section 102(2)(C) of the National Environmentd
Policy Act of 1969 (now Policy and Procedural
Memorandum 90-1). The pertinent section of said
memorandum is Section 4 (Appendix 2).
STATEMENT OF CASE
Introduction
In order to simplify the response to petitioners’
petition for writ of certiorari, respondents in in-
tervention Granite Construction Company and A.
Teichert & Son, Inc., as well as respondents, file the
instant brief on behalf of all respondents.
The highway project involved in this matter is
Interstate 5. The termini of this interstate project are
the Canadian and the Mexican borders. It traverses
the States of Washington, Oregon, and California for
a distance of approximately 1,382 miles. All but 40
miles of Interstate 5 in California is complete, except
— yon
minor alterations from Redding, California, to Oregon
(Appendix 3, Findings of Fact and Conclusions of
Law, page 28).
The portion of Interstate 5 involved in this litigation
is a 19-mile segment of highway and, for the con-
venience of this Court, will be referred to as Inter-
state 5.
Interstate 5 is located in Sacramento, California,
and was jointly and independently studied by the
State of California, County of Sacramento, and the
City of Sacramento. Public hearings were held on
the location of this project. These hearings were well
attended by the public, and received a great amount
of exposure in the local press (Appendix 3, Findings
of Fact and Conclusions of Law, page 32).
After these public hearings, Interstate 5 received
location approval, design approval, and right of way
authorization from the Federal Highway Administra-
tion (Appendix 3, Findings of Fact and Conclusions
of Law, page 32).
State respondents commenced right of way acquisi-
tion, which involved the displacement of approxi-
mately 500 individuals (Appendix 3, Findings of Fact
and Conclusions of Law, page 33). All the right of way
has been acquired, individuals displaced, and the
project is now under construction.
Trial on the Merits
Interstate 5 was an “‘ongoing”’ project when NEPA
was enacted. State respondents had received location
_ —_—_
—
— cm
approval, design approval, and right of way authori-
zation prior to its effective date, January 1, 1970,
After the enactment of NEPA, the Federal and State
respondents reassessed this project pursuant to the
CEQ’s Guidelines, Section 11, and the Federal High-
way Administration Interim Guidelines, Section 4,
This reassessment oceurred on February 17, 1971
(Appendix 3, Findings of Fact and Conclusions of
Law, pages 35, 36). Said respondents concluded that it
was not practical to alter the basic course of action on
Interstate 5, and that this project was developed in
such a manner as to minimize adverse environmental
consequences (Appendix 3, Findings of Fact and
Conclusions of Law, page 36).
Environmental fact sheets were prepared by State
respondents and submitted to the Federal Highway
Administration. Said environmental fact sheets con-
tained detailed discussions of some, but not all, of
the factors considered by the respondents in the re-
assessment of this project (Appendix 3, Findings of
Fact and Conclusions of Law, page 36). The Federal
Highway Administration approved the environmental
fact sheets, and concluded that an environmental im-
pact statement was not required on the project (Ap-
pendix 3, Findings of Fact and Conclusions of Law,
pages 36, 37).
i At the trial of this action, the parties presented
expert testimony on the impact this project would
have on the quality of human environment. The re-
spondents presented evidence on each of the alleged
i dell Nae e
rue ees pees eee IE
Lee CN oy Ne Oe ey Oe. ee ee ey
— on
impacts as contained in the complaint, and established
to the satisfaction of the Court that these factors
were adequately considered by the respondents in the
development of this project (Appendix 3, Findings of
Fact and Conclusions of Law, pages 41, 42).
Additionally, the respondents modified the project
so as to minimize its impact on the quality of human
environment. One such modification was the addition
of sound barriers, in order to protect development
that existed at the time of route adoption (Appendix
3, Findings of Fact and Conclusions of Law, page 42).
After the trial of this action, which encompassed
five days, the District Court held that the respondents
had complied with NEPA and its implementing regu-
lations. The District Court concluded that the guide-
lines gave proper effect to the provisions of NEPA
as to ‘‘ongoing’’ projects. The District Court further
concluded that the respondents did not abuse their dis-
cretion in determining that it was not practical to
alter the basic course of action on this project (Ap-
pendix 3, Findings of Fact and Conclusions of Law,
page 43).
Laches
Petitioner Sullivan resides approximately three-
fourths mile from the nearest point at which Inter-
state 5 passes. Petitioner Marsh resides approximately
600 feet from Interstate 5, and has resided in this
dwelling since 1964. He has known of the plans for
this project since that time (Appendix 3, Findings of
Fact and Conclusions of Law, pages 28, 29).
4b abc 1.
eres
Ce ee eee LON ae OE Gn a ee See ee eS ena
Sa ath eon oe See ee
a eo
Both petitioners were aware of the proposed con-
struction of Interstate 5 for several years prior to the
start of actual construction. They undertook no in-
vestigation to determine if an environmental impact
statement had been prepared. Petitioner Sullivan con-
tacted the Environmental Defense Fund concerning
this project in early July, 1972, prior to the award
of any construction contracts (Appendix 3, Findings
of Fact and Conclusions of Law, page 41). This suit
was not filed until November 2, 1972, after:
(1) right of way acquisition at a cost of $12,347-
195.00 (Appendix 3, Findings of Fact and
Conclusions of Law, page 33),
(2) displacement of 500 individuals (Appendix 3,
Findings of Fact and Conclusions of Lav,
page 33),
(3) substantial right of way clearance (Appendix
3, Findings of Fact and Conclusions of Lav,
page 33),
(4) utilities relocated at a cost of $1,405,196.58
(Appendix 3, Findings of Fact and Conelu- —
sions of Law, page 33),
(5) plans and engineering completed at a eost of
$3,500,000.00 (Appendix 3, Findings of Fact
and Conelusions of Law, page 40),
(6) award of construction contracts in the amount
of $18,524,050.00 (Appendix 3, Findings of
Fact and Conclusions of Law, pages 37, 38),
and
—
(7) payments to the contractors in the amount of
$2,500,000.00 (Appendix 3, Findings of Fact
and Conclusions of Law, page 40).
The District Court concluded that petitioners un-
reasonably delayed bringing this action, and by reason
of their delay the respondents would be unjustly
harmed by the issuance of an injunction.
ARGUMENT
|. The Respondents complied with NEPA and its imple-
menting regulations.
There was a five-day trial on the merits of the
action. The District Court received evidence on the
alleged adverse impact this project would have upon
the quality of human environment, the respondents’
consideration of the environment in the development
of this project, the investigation and studies made by
the respondents on each of the alleged impacts, the
respondents’ compliance with NEPA, and the factual
background on the issue of laches.
At the conclusion of the trial, the District Court
denied petitioners’ request for injunctive relief on two
independent grounds:
(1) the respondents complied with NEPA, and
(2) the petitioners are barred by laches.
Petitioners apparently have confused the District
Court decision and seem to assert that NEPA was not
complied with because an environmental impact state-
ment was not prepared. An environmental impact
statement is not always synonymous with NEPA. It
prt DBA Es eels ee oekdins SRy
halon
:
ig
4
is
3
3
3
j
B
—
is a part of, and a very important part of, NEPA,
However, the implementing regulations prescribe
under what circumstances a project complies with
NEPA. Therefore, one must examine these imple.
menting regulations to determine if NEPA has beep
complied with by the respondents in the development
of this project.
In enacting NEPA, Congress was aware of the fact
that highway projects take from five to ten or fifteen
years from conception to completion. Congress did not
intend that NEPA should stop all pending public
projects and start them anew. Otherwise, Congres
would have expressly provided for the retroactive
application of NEPA. This it did not do.
The CEQ, the agency charged with the duty of in-
plementing and enforcing NEPA, promulgated regu-
lations. The regulations directed Federal agencies
to establish procedures for compliance with NEPA
consistent with the guidelines. (Appendix 1, Council
on Environmental Quality, Guidelines, Sections 3
and 12.)
The CEQ was concerned with ‘‘ongoing”’ projects
that is, projects that were initiated prior to the effee-
tive date of NEPA. Interstate 5 is such a project.
Section 11 of the CEQ Guidelines addresses itself te
this issue and provides:
“11. Application of Section 102(2)(C) procedur
to existing projects and programs. To the max
mum extent practicable the Section 102(2)(()
procedure should be applied to further major
cay ean
federal actions having a significant effect upon the
environment even though they arise from projects
or programs initiated prior to the enactment of
the Act on January 1, 1970. Where it is not prac-
ticable to reassess the basic course of action, it is
still important that further incremental federal
actions be shaped so as to minimize adverse en-
vironmental consequences. It is also important in
further action that account be taken of environ-
mental consequences not fully evaluated at the out-
: set of the project or program.’’ (emphasis added)
In Environmental Law Fund v. Volpe, 340 F. Supp. -
1328 (D.C.N.D. Cal. 1972), the court discusses the
application of NEPA to ongoing projects and states
on pages 1331 and 1332:
“The CEQ Guidelines make a clear distinction
between projects initiated before January 1, 1970
and projects initiated after January 1, 1970. For
the latter an environmental impact statement is
required ‘to the fullest extent possible’ but for
the former a statement is required only ‘to the
maximum extent practicable’. This distinction is in
concert with the legislative history and the general
principles against retroactive application of stat-
utes.” Plaintiffs contend that the NEPA should
apply in toto to ongoing projects but fail to cite
any persuasive authority that this was the intent
of Congress. The court agrees with the reasoning
in Elliot v. Volpe, 328 F.Supp. 831 (D. Mass.
1971) that one must distinguish between projects
initiated before January 1, 1970 and projects ini-
tiated after January 1, 1970.”’
——
a ed
Pursuant to the mandate of the CEQ, the Federal
Highway Administration issued its memorandum to
implement NEPA (Appendix 2). Seetion 4(b) of
said memorandum addresses itself to ongoing proj-
ects, and provides in part:
**4, APPLICATION
3 ‘*b. The provisions of this memorandum do not
apply to projects that received or receive design |
approval before February 1, 1971... .”’ |
Although Interstate 5 received design approval
F prior to February 1, 1971, it is on a new location. For
; projects on a new location, Section 4(e) is con-
j trolling, and provides in part:
‘‘e, However, the following two types of proj-
ects must be reevaluated by the SHD [State High-
way Department] even though such projects re-
ceived design approval before February 1, 1971:
‘**(1) projects on new location, .. .
8 * & &
; “The SHD’s reassessment, which shall be done
in consultation with the division engineer, shall
: be made to determine if such projects were de-
i veloped in such a manner as to minimize adverse
environmental consequences. Such projects, to
the extent practicable, should be modified to in-
corporate additional elements of features iden-
’ tified and considered prudent to minimize harm.
> No environmental statement need be submitted,
however, unless requested by the division engi-
neer.”’
— Pe
The District Court found that the above guidelines
gave proper effect to the provisions of NEPA as to
ongoing projects. This finding is consistent with the
basic and fundamental principle of administrative law
as set forth in the ease of Udall v. Tallman, 380
U. S. 1, 85 S.Ct. 792 (1965).
In said ease, this Court addresses itself to the issue
of administrative interpretation of statutes and held
on page 16:
‘“When faced with a problem of statutory con-
struction this court shows great deference to the
interpretations given the statute by the offices or
agency charged with its administration .. . When
the construction of an administrative regulation
rather than a statute is in issue the deference is
even more in order.’’
Again, in Ehlert v. U. S., 402 U. 8. 99, 91 S.Ct. 1319
(1971), this Court holds on page 105:
6
°
. we are obligated to regard as controlling
a reasonable, consistently applied administrative
interpretation .. .”’
It is evident that the deference given to an admin-
istrative agency is great, particularly when it “. ..
involves a contemporaneous construction of a statute
by the man charged with the responsibility for setting
its machinery in motion...’ Power Reactivator
Development Co. v. International Union of Electric
Radio and Machine Workers, 367 U. 8. 396 at 408,
81 S.Ct. 1529 (1961).
Phy Pato sen canary
Megs ee be weRBan asl eee eGR
rt ee eS See ieee Oe eat =o = bale zt AY ¥ er
SRR LG AE AP WPL BEALS MOC EES ETN RITE BERS IED PND IDS ES
caeee: Me
After the trial on the merits, in which the District
Court received evidence on the history of this project,
its present status, its effeet upon the environment, and
the reassessment by the respondents, the District
Court concluded that the respondents did not abuse
their discretion in making the threshold decision that
it was not practical to reassess the basic course of
action.
There is no evidence that the respondent admin-
istrators abused their discretion in making this
threshold decision. On the contrary, the evidence
establishes that of the 135 ongoing major highway
projects planned in this highway district, the re-
spondent administrators concluded that 133 would
require environmental impact statements. It was also
determined that it was not practicable to reassess the
basie course of action on the other two projects. The
project involved in this action is one of those other
two projects (Appendix 3, Findings of Fact and
Conclusions of Law, page 36).
ll. There is no conflict of decisions on the issue of laches
and the District Court properly applied this doctrine.
It is respondents’ contention, and the District Court
so found, that the respondents complied with NEPA
and that the guidelines authorize certain ongoing
projects to be completed without a Section 102(2) (C)
statement of NEPA.
Petitioners repeatedly contended that Section
102(2)(C) of NEPA should be retroactively applied
= oe
to this project and that laches should not bar this
action. They cited Arlington Coalition on Transporta-
tion v. Volpe, 458 F.2d 1323 (C.A. 4th Cir. 1972), in
support of this contention. Arlington Coalition on
Transportation v. Volpe, supra, and the other cases
cited by petitioners in support of this contention, in-
yolve the basic question of whether or not a project is
subject to NEPA. In each of these cases, the defend-
ants contend that NEPA was not applicable. That was
the basic issue in each of these cases. No case cited by
petitioners involved the reassessment procedure au-
thorized by Section 11 of the Council on Environ-
mental Quality Guidelines and Section 4(c) of the
Federal Highway Administration’s memorandum for
ongoing projects. Interstate 5 was processed under
this reassessment procedure. Therefore, the issue be-
fore this Court is not the retroactive application of
NEPA, but did respondents comply with Section 11
of the Council on Environmental Quality Guidelines
and Section 4(¢e) of the Federal Highway Adminis-
tration’s memorandum.
By interweaving cases involving the retroactive ap-
plication of NEPA with the principle of laches, one
might conelude that there is a conflict in decisional
ease law. However, if these unrelated issues are prop-
erly separated, it is erystal clear that the case law
decisions are not in conflict. On the contrary, these
decisions uniformly apply the doctrine of laches to
the facts of the ease.
- o Vahl deca.
te ha ae Us A ae eee.
Oe ee oS eee ee OP ewer) See ee ee ae
anes 5
NAV RNLLA rh back hata Se asd) Madar viol Rae Malet
—
ae ee
In the instant case, the District Court applied the
standard test for laches that this Court established jy
Burnett v. New York Central Railroad Company, 380
U. S. 424, 435; 85 S.Ct. 1050 ( 1965) :
*** Whether laches bars an action in a given ease
depends upon the circumstances of that case and
‘is a question primarily addressed to the dis-
cretion of the trial court” [citation omitted].’”
The District Court received evidence on the dle-
velopment of the project, the money expended, the
people displaced, the clearance of the right of way,
the award of construction contracts, and the extent of
actual construction. In addition, evidence was pre-
sented concerning petitioners’ knowledge of the his-
tory of this project and their failure to take any
positive action until suit was filed. Based on this evi-
dence, the District Court concluded that laches was
applicable.
The case of Clark vy. Volpe, 342 F.Supp. 1324
(D.C.E.D. La. 1972) involved a similar factual situ-
ation, except for the fact that there was no attempt
to comply with NEPA. The court held that laches
was applicable and states on pages 1329 and 1330:
**. . . It is inconceivable that plaintiffs, charged
with knowledge of approximately fifteen years of
publicity concerning the highway, were not on
notice as of May 25, 1971 that actual construction
would soon proceed unless legal action was
promptly initiated. Nevertheless, plaintiffs stood
idly by during the remaining months as bulldozers
and chain saws stripped and leveled the land and
as vast sums of public money were expended on
an ee
highway construction. Finally, after the area had
been laid barren of trees or grass, and after sev-
eral million dollars had been spent for highway
development, plaintiffs, on February 24, 1972, be-
latedly filed suit to halt construction. The Court
holds that, under the circumstances of this par-
ticular case, plaintiffs’ delay in filing suit, during
which delay the very acts of which they complain
were being performed, was unreasonable, and de-
fendants and intervenors would be substantially
prejudiced if plaintiffs were allowed injunctive
relief.
“In ruling as it does, the Court is keenly aware
of the importance of preservation and protection
of our parklands in particular and of the environ-
ment in general. . . . In the Court’s opinion, it
is logical to conclude that the Congress did not
intend that plaintiffs should delay until after sub-
stantial alteration of the environment to demand
studies as to the consequences of that alteration.
Conversely, the statutes are designed te promote
inquiry as to ecological impact before an area of
natural beauty is affected. Had plaintiffs not pro-
erastinated while bulldozers desolated a strip of
land through the park and while vast sums of
public money were expended, then they might
have proceeded without prejudice to anyone. The
Court is of the opinion that, unfortunately, plain-
tiffs did not take action until it was too late. The
Court is compelled, therefore, to dismiss the action
by application of the doctrine of laches.”
i
on
CONCLUSION
This action was filed on November 2, 1972. Peti-
tioners requested a temporary restraining order. The
Court denied this request, but set the matter for trial
on December 15, 1972, pursuant to Rule 65(a) (2) of
the Federal Rules of Civil Procedure.
After a long and involved trial on the merits, the
District Court found that the respondents complied
with NEPA and that laches was applicable to the
action.
Petitioners petitioned the District Court of Appeal
for a stay pending appeal. The record on appeal con-
tained the file of this action together with the peti-
tioners’ petition and our reply. The Appellate Court
denied the stay.
We are now before this Court with the same issues
and facts. Two lower courts have ruled on these
matters adverse to petitioners. There are no new
issues or facts that would justify a hearing on this
matter. There is no conflict in decisional law.
>
Po 7 a ee eS eee ee
Tee ee oe
— po
Wherefore, Respondents respectfully pray that the
Petition for a Writ of Certiorari to the Supreme
Court of the United States be denied.
Dated: August 20, 1973
Respectfully submitted,
HARRY S. FENTON
Chief Counsel
KINGSLEY T. HOEGSTEDT
Assistant Chief Counsel
Attorneys, Respondent
California Department of
Public Works
Of Counsel
ELIAS D. BARDIS
— pe
APPENDIX 1
GUIDELINES FOR FEDERAL AGENCIES UNDER THE
NATIONAL ENVIRONMENTAL POLICY ACT
(Issued by the Council on Environmental Quality
April 23, 1971)
STATEMENTS ON PROPOSED FEDERAL ACTIONS
AFFECTING THE ENVIRONMENT
3. Agency and OMB procedures. (a) Pursuant to
section 2(f) of Executive Order 11514, the heads of
Federal agencies have been directed to proceed with
measures required by section 102(2)(C) of the Act.
Consequently, each agency will establish, in consulta-
tion with the Council on Environmental Quality, not
later than June 1, 1970 (and, by July 1, 1971, with
respect to requirements imposed by revisions in these
guidelines, which will apply to draft environmental
statements circulated after June 30, 1971), its own
formal procedures for (1) identifying those agency
actions requiring environmental statements, the ap-
propriate time prior to decision for the consultations
required by section 102(2)(C), and the agency review
process for which environmental statements are to
be available, (2) obtaining information required in
their preparation, (3) designating the officials who
are to be responsible for the statements, (4) con-
sulting with and taking account of the comments of
appropriate Federal, State, and local agencies, in-
cluding obtaining the comment of the Administrator
of the Environmental Protection Agency, whether or
not an environmental statement is prepared, when
required under section 309 of the Clean Air Act, as
amended, and section 8 of these guidelines, and (5)
meeting the requirements of section 2(b) of Execu-
tive Order 11514 for providing timely public infor-
a
= a
mation on Federal plans and programs with environ-
mental impact including procedures responsive to
section 10 of these guidelines. These procedures should
be consonant with the guidelines contained herein,
Each agency should file seven (7) copies of all such
procedures vith the Council on Environmental Qual-
ity, which vill provide advice to agencies in the
preparation of their procedures and guidance on the
application and interpretation of the Council’s guide-
lines. The Environmental Protection Agency will
assist in resolving any question relating to section 309
of the Clean Air Act, as amended.
(b) Each Federal agency should consult, with the
assistance of the Council on Environmental Quality
and the Office of Management and Budget if desired,
with other aopropriate Federal agencies in the de-
velopment of the above procedures so as to achieve
consistency ia dealing with similar activities and to
assure effective coordination among agencies in their
review of pryposed activities.
(ec) State ind local review of agency procedures,
regulations, ind policies for the administration of
Federal programs of assistance to State and local
governments yill be conducted pursuant to procedures
established by the Office of Management and Budget
Circular No. 4-85. For agency procedures subject to
OMB Circula No. A-85 a 30-day extension in the
July 1, 1971, deadline set in section 3(a) is granted.
ES Pe eee + MEDA FPS R tee 39
ie
(d) It is imperative that existing mechanisms for
obtaining the views of Federal, State, and local agen-
cies on proposed Federal actions be utilized to the
extent practicable in dealing with environmental mat-
ters. The Office of Management and Budget will issue
instructions, as necessary, to take full advantage of
existing mechanisms (relating to procedures for han-
dling legislation, preparation of budgetary materials,
new procedures, water resource and other projects,
ete.).
11. Application of section 102(2)(C ) procedure to
existing projects and programs. To the maximum
extent practicable the section 102(2)(C) procedure
should be applied to further major Federal actions
having a significant effect on the environment even
though they arise from projects or programs initiated
prior to enactment of the Act on January 1, 1970.
Where it is not practicable to reassess the basie
course of action, it is still important that further in-
cremental major actions be shaped so as to minimize
adverse environmental consequences. It is also im-
portant in further action that account be taken of
environmental consequences not fully evaluated at
the outset of the project or program.
12. Supplementary guidelines, evaluation of pro-
cedures. (a) The Council on Environmental Quality
after examining environmental statements and agency
procedures with respect to such statements will issue
such supplements to these guidelines as are necessary.
OS
—
(b) Agencies will continue to assess their experience
in the implementation of the section 102(2)(C) pro-
visions of the Act and in conforming with these guide-
lines and report thereon to the Council on Environ-
mental Quality by December 1, 1971. Such reports
should include an identification of the problem areas
and suggestions for revision or clarification of these
guidelines to achieve effective coordination of views
on environmental aspects (and alternatives, where ap-
propriate) of proposed actions without imposing un-
productive administrative procedures.
RUSSELL E. Train,
Chairman.
Sia ai 282 a ita EA Se i i a ag ah a
Re Ot tre Den wt
CS ee
a yee
APPENDIX 2
SUBJECT: Interim Guidelines for Implementation of Section
102(2)(C) of the National Environmental Policy Act of
1969
4, APPLICATION
a. The State highway department (SHD)' shall
evaluate the environmental consequences of all
direct Federal, Federal-aid, Public Lands, Re-
gional Development including Appalachia, De-
fense Access, Forest Highway, planning, re-
search, and demonstration projects except those
cited in paragraph 4b and make a determination
in consultation with the division engineer (1)
that a negative declaration is applicable because
the project will have no significant affect upon
the quality of human environment, or (2) that
an environmental statement is necessary because
the project will have or is likely to have a sig-
nificant affect upon the quality of human en-
vironment.
b. The provisions of this memorandum do not ap-
ply to projects that received or receive design
approval before February 1, 1971. Design ap-
proval may be established and documented in one
of the following three ways, depending on when
such design approvals were or are given. (1)
prior to issuance of revised PPM 20-8 in Janu-
ary of 1969, procedures of the Bureau of Public
Roads (BPR) did not require a SHD to receive
design approval from the BPR before under-
taking preparation of the plans, specifications
1The term State highway department means the agency with pri-
mary responsibility for initiating and carrying forward the
planning and construction of the project.
RIUM Tey Seta ee
> ia
PE bea ASR
—
and estimate (PS&E). Therefore, design ap-
proval was that action or series of actions by the
BPR which indicated to the SHD that the es-
sential elements of the highway (paragraph 10
of PPM 20-8) were satisfactory or acceptable
for preparation of the PS&E. Such actions may
have consisted of review and comments upon
preliminary plans, schematic drawings, design
studies, layouts, or reports. The SHD shall iden-
tify those projects (both Federal-aid and non
Federal-aid) in the above catagory which it
anticipates Federal-aid funds will be requested
for a subsequent stage and furnish the division
engineer for his concurrence a letter similar to
Appendix D of this memorandum citing the
document(s) which constitute the design ap-
proval. The division engineer’s coneurrence in
the State’s determination will serve as verifica-
tion of previous design approval. (2) Written
approval by the BPR of the design study report
submitted in accordance with paragraph 10 of
PPM 20-8 revised January 14, 1969. (3) For
those projects which the SHD is presently pre-
paring the construction PS&E and there is not
documentary evidence that the BPR indicated
its acceptance of the essential design elements
prior to the SHD undertaking preparation of
the PS&E, the SHD may furnish the FHWA
copies of drawings, plans, or other material
showing the present status of the plan prepara-
tion. The SHD shall submit such material and
the FHWA division engineer shall advise the
State in writing, prior to February 1, 1971, that
the design for a project or for a proposal is
approved if he determines that the present
—— won
status of the design or plan preparation meets
the requirements for design approval outlined
in paragraph 10 of PPM 20-8.
However, the following two types of projects
must be reevaluated by the SHD even though
such projects received design approval before
February 1, 1971:
(1) projects on new locations, and
(2) major reconstruction projects which will
require additional right-of-way over at
least 50 percent or more of its length.
The SHD’s reassessment, which shall be done in
consultation with the division engineer, shall be
made to determine if such projects were de-
veloped in such a manner as to minimize adverse
environmental consequences. Such projects, to
the extent practicable, should be modified to in-
corporate additional elements of features iden-
tified and considered prudent to minimize harm.
No environmental statement need be submitted,
however, unless requested by the division en-
gineer.
. Statements may be prepared for planing and
research projects on the basis of the annual work
program.
. The provisions of this memorandum shall not
apply to projects or programs of projects where
the Federal Highway Administrator has made
a formal determination that the project is ur-
gently needed because of a national emergency,
a natural disaster, a catastrophic failure, or for
similar reasons of great urgeney.
Po ——
a ee
4 f. In those instances where a highway is being
Fl jointly planned by two or more agencies, or is one
3 element of a jointly planned undertaking, only
a single environmental determination and/or
statement shall be made. The highway proposal
submitted to the FHWA for approval (location,
design, ete.) shall include a copy of the statement
shat,
Pre
i prepared and processed by another Federal
4 agency or reference to such a statement pre-
4 viously furnished to FHWA. Highway projects
: in this category could include forest highways
i (where forest service handles the Environmental
: Policy Act requirements), defense access roads
: planned in conjunction with a defense installa-
: tion and similar joint efforts.
RESORTS aR Ac a ay Ree nites ee aS
BAe Te ty pase eae
a gee
APPENDIX 3
UNITED STATES DISTRICT COURT FOR THE
EASTERN DISTRICT OF CALIFORNIA
RAYMOND R. SULLIVAN, et al.,
Plaintiffs,
v.
JOHN A. VOLPE, et al.,
Defendants.
CIVIL NO. S-2609
CITY OF SACRAMENTO, a municipal
corporation, FINDINGS OF FACT
Plaintiff in Intervention, | AND CONCLUSIONS
OF LAW
GRANITE CONSTRUCTION COMPANY, a cor-
portion, and A. TEICHERT & SON, INC., a
corporation,
Defendants in Intervention.
The above-entitled cause came on regularly for hear-
ing on December 14, 1972, in the courtroom of the
Honorable Philip C. Wilkins, United States District
Judge. Plaintiffs appeared by and through their at-
torney Angus G. MacDonell, Esq. Plaintiff in Inter-
vention appeared by and through its attorney James
P. Jackson, City Attorney, by Richard H. Hyde and
G. Richard Brown, Deputy City Attorneys. Defend-
ants John A. Volpe, Sheridan E. Farin, and Donald
Trull appeared by and through their attorney Dwayne
Keyes, United States Attorney, by Richard W. Nichols,
Assistant United States Attorney. Defendants Cali-
fornia Department of Publie Works, James A. Moe,
and Robert Datel appeared by and through their at-
torney Harry S. Fenton, Chief Counsel of the Cali-
fornia Department of Publie Works, by Elias D.
” ° , plies ECE MT re tt poe, Pn el
ee, nT Da Side ee ae ce ee LY We eC) ae Ee Gio ee ee
wn ited abi sleet
en
=—
Bardis and Daniel E. Wilcoxen, Attorneys for the
California Department of Publie Works. Defendant
in Intervention Granite Construction Company, a
corporation, appeared by and through its attorneys
Grunsky, Pybrum, Skemp & Ebey, by Elmer Pybrun,
Esq. Defendant A. Teichert & Son, Ine., a corporation,
appeared by and through its attorneys MeDonough,
Holland, Schwartz, Allen & Wahrhaftig, by V. Barlow
Goff, Esq., and Richard E. Brandt, Esq. Trial of the
matter continued from December 14, 1972, through
December 21, 1972. Evidence, by way of testimony,
affidavits, documents, photographs, and other exhibits,
was introduced. The matter having been argued by
the parties, and the Court having taken the matter
under submission for decision, and the Court being
fully apprised in the premises, and good cause ap-
pearing therefor, the Court does now hereby make
the following:
FINDINGS OF FACT
1. Interstate Highway 5 is part of the National
System of Interstate and Defense Highways System,
in which the United States of America is participat-
ing by supplying 90 percent of the cost of said high-
way. The terminals of Interstate 5 are the Canadian
and Mexican borders. Interstate 5, which is 1,382
miles long, passes through the states of Washington,
Oregon and California of which 797 miles is located
in the State of California. All but 40 miles of Inter-
state 5 in California is completed except for minor
alterations from Redding north to Oregon.
2. Plaintiff Raymond R. Sullivan resides at 3631
East Lincoln Way, Sacramento, California. This resi-
dence is approximately three-quarters of a mile from
the nearest point at which the Interstate 5 passes.
=
Said residence is located within 1,000 feet of Freeport
Boulevard, a main thoroughfare and State highway
passing through the southern portion of the City of
Sacramento. Land Park Drive, another main thor-
oughfare passing through the southern portion of the
City of Sacramento, is located approximately half-
way between Sullivan’s residence and the Interstate 5
construction involved in this case.
3. Plaintiff James T. Marsh resides at 1109 Silver
Lake Drive, Sacramento, California. This residence is
approximately 600 feet from the nearest Interstate 5
construction involved in this ease. Plaintiff Marsh has
lived in said house since March 1964, and purchased it
in January 1970. During all of the time he lived in
said house, Marsh knew of the plans for the proposed
routing of Interstate 5, as more specifically described
hereinafter in these findings.
4. Plaintiff in Intervention City of Sacramento is a
municipal corporation through which a portion of the
Interstate 5 will pass. Said plaintiff in intervention
has taken no steps to control land usage in areas abutt-
ing and adjoining the proposed freeway, since the rout-
ing of said freeway was adopted.
5. Defendant John A. Volpe is the Secretary of
Transportation of the United States of America, and
has the overall authority and responsibility for ap-
proval and supervision of programs conducted by the
Federal Highway Administration (hereinafter re-
ferred to as FHWA), an agency within the Depart-
ment of Transportation. Defendant Sheridan A. Farin
is the Administrator for Region 9 of the FHWA, and
is responsible for approval and supervision of pro-
grams conducted by FHWA within said Region, within
which the instant construction of Interstate 5 is pend-
pw eer ee eR ee Pore) ae AD ila tei atin thease
a.
ing. Defendant Donald E. Trull is the Division
Engineer of the FHW in the State of California, and
is responsible for approval of federal-aid highway pro-
grams within the State of California, including por-
tions of the interstate highway system in California,
Said defendants are hereinafter referred to collectively
as the ‘‘federal defendants”’.
6. Defendant California Department of Public
Works is an agency of the State of California, author-
ized and directed to provide for the construction of
all State highways, including those which are part of
the interstate system of federal-aid highways, on loea-
tions designated by the California Highway Commis-
sion. Defendant James A. Moe is the Director of the
California Department of Public Works, and is
charged with the overall control and supervision of
the activities of said Department. Defendant Robert
Datel is the State Highway Engineer and Chief of the
Division of Highways, a subagency within the Depart-
ment of Public Works, and said defendant is charged
with the overall control and supervision of the actiy-
ities of said Division. Said defendants are hereinafter
referred to collectively as the ‘‘state defendants”.
7. Defendant in Intervention Granite Construction
Company, a corporation, is a corporation which has
contracted with defendant California Department of
Public Works for the construction of the Segment A—
Granite portion of Interstate 5, as more specifically
hereinafter described. Said construction is presently
proceeding. Defendant in Intervention A. Teichert &
Son, Inc., a corporation, is a corporation which has
contracted with defendant California Department of
Public Works for the construction of the Segment A—
Teichert portion of Interstate 5, as more specifically
i ee el ee =
=
hereinafter described. Said construction is presently
proceeding.
8. The portions of Interstate 5 at issue in this case
are as follows: Broadway (Vallejo Way) south to
43rd Avenue (described herein as ‘‘Segment A—
Granite’’), 43rd Avenue south to Pocket Road (de-
seribed herein as ‘‘Segment A—Teichert’’), Pocket
Road south to Beach Lake (described herein as ‘‘Seg-
ment B’’), and Beach Lake south to Lambert Road
(described herein as ‘‘Segment C’’). Construction has
already commenced on Segment A—Granite, and on
Segment A—Teichert. There has been location and
design approval as to Segments B and C, and bids are
to be advertised as to said segments shortly.
9. Interstate 5 (as located in the City and County
of Sacramento) was initially planned in the mid-
1950s. The State of California, the County of Sacra-
mento, and the City of Sacramento, jointly and in-
dividually, studied the various route alternatives of
Interstate 5 as it was to pass through Sacramento
County. The proposed routing of Interstate 5, as it
is presently under construction, was known to and
incorporated by the City of Sacramento in its 1958
general plan.
10. Public hearings were held by the California
Highway Commission in connection with the adoption
of the present route of Interstate 5. On April 21, 1960,
a public hearing was held by said Commission involv-
ing route location of Segment C and most of Segment
B of Interstate 5. The said route location was adopted,
after said hearing, on April 13, 1961. On January 30,
1962, and again on May 17, 1962, public hearings
were held involving route location of the remaining
portion of Segment B, and all of Segment A. The said
—_—___a
a
—=
route location was adopted by the Commission, after
said hearings, on June 26, 1962. These hearings were
well attended by the public and received a great deal of
exposure in the local newspapers. Interstate 5 in
Sacramento County was, in general, a cause celebre
during the 1960s, with much public discussion.
11. The FHWA granted location approval of Seg-
ment C and most of Segment B on May 9, 1961, and
granted location approval of the remainder of Seg-
ment B and all of Segment A on June 29, 1962.
FHWA granted basic design approval of Segment ©
: and most of Segment B on September 20, 1961, and
granted basic design approval of the remainder of
Segment B and all of Segment A on August 16, 1962,
Subsequent minor revisions of said design approvals
occurred thereafter, the last of which occurred on
July 30, 1968.
12. The State of California entered into freeway
agreements with the County of Sacramento on October
9, 1961, and with the City of Sacramento on June 13,
1963. Said agreements, in accordance with state law,
detailed such basic design features as rearrangement
of local roads and streets and location of interchanges.
These freeway agreements were subsequently modified,
the final modification having occurred on September 8,
1969.
13. The State of California received authorization
from FHWA to procure right-of-way, and the right-
of-way acquisition program was funded for Segment A
during the fiscal year 1962-1963. The right-of-way ac-
quisition program was funded for Segments B and C
during the fiscal year 1963-1964. The State of Califor-
nia has acquired title to all the right-of-way involved
in the construction of these portions of Interstate 5, by
i Ae i Ah dan
Be as i i eit Les
(eB aad A ene eee ae
RUE ESPN PD, RYTON SHON aL LO Sek EARS SE ee OP aes 7
—
acquiring 361 parcels directly from the property
owners and instituting condemnation proceedings on
the remaining 28 parcels. The State of California has
expended $12,347,195.00 on right-of-way acquisition,
and has removed the improvements that existed on the
right-of-way. The State of California has also displaced
approximately 500 persons in connection with said
right-of-way acquisition.
14. Since the right-of-way acquisition authorization,
the State of California has been involved in utility re-
location in connection with and preparation for the
construction of those portions of Interstate 5 involved
in this action. This relocation has involved gas, tele-
phone, power, drainage, sewer and water lines. The
sum of $1,405,196.58 has been expended by the State of
California on such relocation, involving 41 various
utility agreements. The remaining utility relocation
will cost the State of California an estimated $153,-
110.21.
15. The community of Sacramento has developed on
the basis of the proposed routing of Interstate 5. City
and County general development plans and other area
general development plans have been predicated on the
construction of Interstate 5. Subdivisions have de-
veloped adjacent to the proposed right-of-way line.
Streets, sewers, water mains, and power facilities have
been planned and constructed on the assumption that
Interstate 5 would be constructed as planned.
16. In their planning relating to the construction of
Interstate 5, the state and federal defendants have
taken into consideration, among other things and with-
out limitation by the following list, factors involving
the effect of Interstate 5 upon flora and fauna, arche-
ological studies, aesthetic considerations, noise control,
Sa igtie: “ = =
> I
a dh a Se Rt a i ag ae Osa eh aN
ee
ED ON ee |
a oe
air pollution control, preservation of community ip-
tegrity and street continuity, utility planning and de-
sign, recreational improvements, levee control, and
community dependence upon the planned freeway
over a substantial period of time. In these considera-
tions the state and federal defendants have beep
abundantly cautious to preserve environmental con-
siderations to the maximum practicable extent.
17. NEPA became effective on J anuary 1, 1970,
Section 102(2)(C) of NEPA directed that there be
prepared in connection with major federal actions
significantly affecting the quality of the human en-
vironment a detailed statement by the responsible
official, relating to the environmental impact of the
proposed action, unavoidable adverse environmental
effects therefrom, alternatives thereto, short-term and
long-term goals, and irreversible commitments of re-
sources. Provision was made in said section for ap-
propriate consultation. Pursuant to NEPA, the Coun-
cil on Environmental Quality (hereinafter referred to
as CEQ) promulgated interim guidelines on April 30,
1970. Said guidelines were finalized on April 23, 1971,
and published at Volume 36, Page 7724 of the Federal
Register. Section 11 of said final guidelines provides
as follows:
“11. Application of section 102(2)(C) procedure
to existing projects and programs. To the maxi-
mum extent practicable the section 102(2)(C) pro-
cedure should be applied to further major Federal
actions having a significant effect on the environ-
ment even though they arise from projects or pro-
grams initiated prior to enactment of the Act on
January 1, 1970. Where it is not practicable to
reassess the basic course of action, it is still im-
ETE NaS LEYS LE! NATION PRAISE SG ERR EMS SEES SATE LOLI, | PO NETS :
om Bias,
portant that further incremental major actions be
shaped so as to minimize adverse environmental
consequences. It is also important in further action
that account be taken of environmental conse-
quencies not fully evaluated at the outset of the
project or program.”’
18. Pursuant to the directives of NEPA and the
CEQ, the FHWA issued its interim guidelines on
November 24, 1970. Provision was made in section 4
thereof for the reassessment of ongoing projects
which were on new location. Said FHWA interim
guidelines provided that ‘‘The State highway depart-
ment (SHD) shall evaluate the environmental con-
sequences of all... Federal-aid . . . planning, re-
search and demonstration projects . . . .”” Said guide-
lines further provided that:
‘*The SHD’s reassessment, which shall be done in
consultation with the [FHWA] division engineer,
shall be made to determine if such projects were
developed in such a manner as to minimize adverse
environmental consequences. Such projects, to the
extent practicable, should be modified to incorpo-
rate additional elements of features identified and
considered prudent to minimize harm. No environ-
mental statement need be submitted, however, un-
less requested by the division engineer.”’ (emphasis
in original).
The FHWA interim guidelines have subsequently been
finalized, without substantive change in this area, in
the FHWA’s Policy and Procedure Memorandum
(PPM) 90-1.
19. Pursuant to the provisions of § 11 of the CEQ
guidelines, and § 4 of the FHWA interim guidelines,
officials of the FHWA and defendant California De-
ris att
RSP Bae A ec te
DiS AESE RS ei ritaseain
i tea alk Sis enc R ah Cais
— sn
partment of Public Works, Division of Highways,
met together in Marysville, California, on February
17, 1971, to reassess the planning and development
involved in the proposed construction of Interstate 5,
At said time, the state and federal defendants con-
cluded, in consultation with each other, that the Inter.
state 5 project had been developed in such a manner
as to minimize adverse environmental consequenees,
Accordingly, they concluded that an environmental
impact statement, such as described in Section 109
(2)(C) of NEPA, was not required. There are 135
major highway projects planned in this District of the
Division of Highways. Federal and state defendants
determined that 133 of these projects would be proe-
essed with environmental impact statements. Because
of the advanced stage of the other two projects, it was
determined that it was impractical to alter their basic
course of action and they were processed by environ.
mental fact sheets. This Interstate 5 project was one
of the two such projects.
20. Subsequent to said reassessment, the California
Division of Highways submitted an ‘environmental
fact sheet’’ dated March 10, 1971, relating to Segment
A, to the FHWA. Said environmental fact sheet con-
tained a detailed discussion of some but not all of the
factors considered by the state and federal defendants
in their reassessment. Said fact sheet was not required
under the procedure set forth in §11 of the CEQ
guidelines and §4 of the FHWA interim guidelines,
The cover letter to said fact sheet recited that an en-
vironmental impact statement as to said portion of
Interstate 5 would not be prepared. Said fact sheet
was approved by defendant Trull of the FHWA on
April 30, 1971. On May 25, 1971, the California Di-
oa ea
vision of Highways submitted an ‘‘environmental fact
sheet’’ of said date relating to Segments B and C of
Interstate 5, to the FHWA. Said environmental fact
sheet contained a detailed discussion of some but not
all of the factors considered by the state and federal
defendants in their reassessment. Said fact sheet was
not required under the procedure set forth in § 11 of
the CEQ guidelines and §4 of the FHWA interim
guidelines. The cover letter to said fact sheet recited
that an environmental impact statement would not be
prepared. Said fact sheet was approved by defendant
Trull of the FHWA on June 14, 1971.
91. On May 30, 1972, the California Division of
Highways was authorized to advertise, and did ad-
vertise, for receipt of bids for construction of a por-
tion of Segment A. Bids as to said segment were
opened on July 26, 1972, and the FHWA concurred
in the award of the contract for construction of said
segment to Granite Construction Company on August
9, 1972, in the sum of $12,180,302.00. Said contract was
awarded to Granite Construction Company on August
15, 1972. On-site work under said contract actually
started on September 15, 1972, although considerable
preparatory work on said project had been under-
taken by Granite prior to the on-site work. The ad-
vertising of this construction project was covered by
the local newspapers. On May 31, 1972, both the Sac-
ramento Bee and the Sacramento Union contained
articles indicating that the state and federal defend-
ants were presently advertising this project for con-
struction. The Sacramento Bee carried notices of
advertising on July 12 and July 19, 1972. The Saere-
mento Union announced the bid opening on July 27,
1972.
a
— 38 —
22. On June 28, 1972, the California Division of
Highways was authorized to advertise, and did ad-
vertise, for receipt of bids for construction of the
other portion Segment A. Bids as to said segment
were opened on September 6, 1972, and on September
27, 1972, the FHWA concurred in the award of the
contract for construction of said segment to A. Teich-
ert & Son, Inc., in the sum of $6,343,748.00. Said con-
tract was awarded to A. Teichert & Son, Ine., and
on-site work under said contract actually started on
October 2, 1972, although considerable preparatory
work on said project had been undertaken by Teichert
prior to the on-site work. The advertising of this con-
struction project was covered by the local newspapers.
On July 26, 1972, the Sacramento Bee and on July
27, 1972, the Sacramento Union contained articles
indicating that the state and federal defendants were
presently advertising this project for construction.
The Sacramento Union carried notice of advertising
on August 23 and August 30, 1972. The Sacramento
Union announced the bid opening on September 8,
1972. :
23. As of December 19, 1972, construction under
the Granite contract was approximately 12 percent
completed, and Granite had earned for work com-
pleted approximately $1,600,000.00. Granite is em-
ploying sixty-eight (68) employees on said job, with
an average weekly payroll of $28,000.00. Granite has
forty-six (46) pieces of major equipment on the job
site, with an aggregate value of $1,800,500.00, and a
monthly rental value of $88,900.00. Granite has nego-
tiated twenty-five (25) subcontracts with an aggregate
price of $4,440,000.00, and those subcontractors em-
ploy eighty-six (86) employees with a weekly payroll
of approximately $34,400.00. Those subcontractors
ee ee a
BAP rns chai Sa BE Ra Bb Tei eG FRIESE AERTS th i en wo SC
— 39 —
have seventy-five (75) pieces of major equipment on
the job site, with an aggregate value of $1,500,000.00,
and a monthly rental value of $96,000.00. Granite has
thirteen (13) outstanding purchase orders in con-
nection with said project, with an aggregate price of
$1,012,000.00. An injunction prohibiting Granite from
continuing with its work in performance of said con-
tract would cause a monthly loss to the community
and to Granite Construction Company of not less
than $448,600.00 as follows: (a) $233,000.00 lost
wages from employee lay-offs, (b) $88,900.00 loss of
use of equipment of Granite, (¢) $62,500.00 admin-
istrative costs in connection with the job, (d) $24,-
900.00 for erosion control, street maintenance, drain-
age maintenance and public safety, and (e) $40,000.00
loss of profits. Additionally, Granite would be faced
with problems resulting from its existing purchase
orders ($1,012,000.00), tied-up bonding capacity ($12,-
000,000.00), delays in the completion of the work caus-
ing costs to increase, recruitment of new personnel
upon resumption of work, repair of deterioration oc-
curring during the delay, and inconvenience to the
public by reason oi the necessity for reduced speeds
through the project site
24. As of December 20, 1972, construction under the
Teichert contract was approximately 5 percent com-
pleted, and Teichert had earned for work completed
approximately $300,000.00. There are approximately
one hundred (100) workmen employed on the Teichert
job, with an average monthly payroll of $150,000.00.
Construction of the Gloria Drive sewer line is ap-
proximately 50 percent completed, clearing on the
project is 100 percent completed, and fencing is 25
percent completed. An injunction prohibiting Teichert
from continuing with its work in performance of said
Re rerun prea seter ac peaaton in rennet nace teR cnet ata rea neess terrae
. a i a ES
salen i cas
contract would cause a loss to Teichert and to the
community as follows: (a) $87,000.00 under agreement
for sale of imported borrow, which must be removed
on or before August 15, 1973, (b) purchase orders for
materials on the project in the sum of $480,000.00,
(ce) twelve subcontracts in the aggregate sum of
$1,726,428.00, (d) inerease in job overhead presently
estimated at $8,000.00 per month and general overhead
attributable to the project presently estimated at $15,-
000.00 per month, (e) move-in and move-out costs, and
(f) other costs of a general nature similar to those
described as accruing to Granite in paragraph 23 of
these findings of fact. Teichert has incurred costs of
$3,500,000.00, or more than half of the total contract
price.
25. The State of California has incurred costs of
and expended, the sum of approximately $19,500,-
000.00 to date on these portions of Interstate D, as
follows: (a) $3,500,000.00 for engineering, (b) $12,-
000,000.00 for right-of-way, (e¢) $1,500,000.00 for
utility relocation, and (d) $2,500,000.00 to the con-
tractors.
26. The environmental fact sheets described in para-
graph 20 of these findings of fact are publie doeu-
ments, and are available to the public on request. They
were in fact referred to at a public hearing conducted
by the County of Sacramento in February 1972 con-
cerning the proposed addition of an interchange on
this project. State officials also testified at said hear-
ing that an environmental impact statement was not
prepared on this project, and that the project was
proceeding under the environmental fact sheets.
27. Plaintiffs Sullivan and Marsh were aware of
the proposed construction of Interstate 5 for several
on
years prior to the start of actual construction. They
undertook no investigation to determine if an environ-
mental impact statement had been prepared, although
they are both intelligent individuals capable of ascer-
taining this fact with a minimum of effort. Plaintiff
Sullivan contacted the Environmental Defense Fund
concerning this project in early July 1972, prior to
the award of the Granite and Teichert contracts, but
this suit was not brought until November 2, 1972,
after substantial construction had already occurred
and the right-of-way had been substantially cleared
in Segments A—Granite and A—Teichert.
28. Plaintiff in Intervention City of Sacramento is
charged with knowledge of the provisions of NEPA,
the CEQ guidelines, and the FHWA guidelines, as
they apply to ongoing projects. The City of Sacra-
mento could not reasonably rely upon the assumption
that the construction of these portions of Interstate 5
would be processed with an environmental impact
statement, and the City was under a duty to ascertain
the true facts, a duty it failed to perform.
29. Plaintiffs allege various factors that were not
adequately considered by the federal and state de-
fendants in the development of this project. Among
the factors alleged are air pollution, lack of consider-
ation for land use plans, disruption of municipal
services, noise pollution, depletion of land in urban
areas and trees, aesthetics, and ecological spectrum of
streams, marshlands and other areas along the route.
Plaintiff offered little evidence at the trial of this
action of the above factors, with the exception of noise
pollution. Federal and state defendants testified to
each of the above factors, indicating extensive investi-
gation and research into each of the factors and es-
a
—
j tablished to the satisfaction of the Court that these
; factors were, indeed, considered by federal and state
defendants in the development of this project.
With respect to sound pollution, state and federal
defendants conducted extensive studies and investiga-
tion concerning this problem, and as part of this
project are providing sound barriers in order to pro-
tect development that existed at the time of route
adoption. These barriers will cost $700,000.00, and
are consistent with, or exceed, existing state and fed-
eral standards relating to sound impact.
And from the foregoing Findings of Fact the
Court does hereby make the following:
Pere ee ee
Div ate ik ( heehee)
CONCLUSIONS OF LAW
1. Plaintiffs Raymond R. Sullivan and J ames T.
Marsh are barred from any relief in this action by
reason of laches and unreasonable delay, in that they
failed to bring this action, seeking injunctive relief,
until November 2, 1972, although they had actual
knowledge of the planned construction of this portion
of Interstate 5 for a substantial period of time prior
to said date. By reason of their delay, defendants and
defendants in intervention would be unjustly harmed
by the issuance of an injunction in this action.
2. Plaintiff in intervention City of Sacramento is
barred from any relief in this action by reason of
laches and unreasonable delay, in that it failed to
bring this action until December 11, 1972, although
it had constructive knowledge of the planned con-
struction of this portion of Interstate 5 without the
issuance of an environmental impact statement since
April 30, 1971 (as to Segment A) and since June 14,
1971 (as to that portion of Segment B located within
the City of Sacramento).
ee ee ty heer ye) et
ol.
S ee
ee eee ke ee eee rs
a
3. All members of plaintiffs’ purported class are
barred from relief in this cause for the same reasons
that plaintiffs Sullivan and Marsh are so barred. To
the extent that there may be persons not so barred,
they are not members of a class of persons of whom
plaintiffs are typical, and are therefore not members
of the class of persons purported to be represented by
plaintiffs.
4. The state and federal defendants acted, with re-
spect to the portions of Interstate 5 involved in this
action, in full compliance with the requirements im-
posed upon them by NEPA, Section 11 of the CEQ
guidelines, and Section 4 of the FHWA interim guide-
lines. Said guidelines give proper effect to the provi-
sions of NEPA as to ongoing projects, as applied to
the facts of this case. Accordingly, plaintiffs, members
of their purported class, and plaintiff in intervention,
are all precluded from relief.
5. The state and federal defendants did not abuse
their discretion in determining that it was not practi-
eable to alter the basic course of action of the portions
of Interstate 5 involved in this action. In this con-
nection the state and federal defendants could prop-
erly have concluded, and this Court concludes, that
(a) there has been massive participation of the local
community in the planning of this project, (b) the
state and federal defendants have been extremely
sensitive to the impact this project will have on the
environment and have taken environmental factors
into account in their planning of this project, (c)
the likelihood of harm to the environment from this
project is minimal, especially in contrast to the pres-
ent status of cleared right-of-way and partially com-
pleted construction, and also in consideration of the
PT ee ee ee
AK Mindat t,t R NEE elt
ne Aatas 3 abe
Boalt Sed eae”
iret ti sin tcrninerecsintecrtisnedioe Webs Ain ahi Sy Cellos «Side
=
heavy reliance of the Sacramento community in plan.
ning the development of said community upon the
proposed freeway, (d) the cost to the state and federal
defendants, and to the defendants in intervention, of
halting construction while an environmental im
statement is prepared is immense, and (e) that to the
extent practicable, this project was modified to in-
corporate additional features to minimize its impact,
By reason of each of the foregoing Findings of
Fact and Conelusions of Law, plaintiffs and plaintiff
in intervention are not entitled to a preliminary in-
junction, a permanent injunction, or any other relief
as prayed for in the complaint. Let judgment be en-
tered in favor of defendants and defendants in inter-
vention accordingly.
Dated this/4____ day of lekcuary, 1973.
UNITED STATES DISTRICT JUDGE
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.