Petition for Writ of Certiorari — Boeing Co. v. Renegotiation Board
Supreme Court brief1964
Ask Donna
What actually matters in this document.
Text
3
a
4
.
ee
ku tye Suge Cou ot ie
oe uiied Siates ~
“\- Ocrosex ‘Team, 1963
~
o 3) Petitioner,
- VS.
‘Tue RENEGOTIATION BOARD OF a
Tue UNITED STATES OF AMERICA,
-
"PETITION FOR-A WRIT OF CER’ r [ORARI
st . 1O THE \
UNITED STATES COURT OF APPEALS —
FOR THE NINTH CIRCUIT, ~
t——
-Davip E. WaGONER
Attorney of Record for Petitioner”
___ 4 900-Washington Building
— ; : ‘Seattle, Washington 98101
tom: - 6.
F :
a
_ ANDREW M. WILLIAMS 2 | :
1900 Washington Buifting ee
Seattle, ee 9810)
—
THE BOEING Company, a 2 \
formeriy Boeing Airplane~C ompany, | ‘
. INDEX
CITATIONS TO OPINIONS BELOW «0.0.02... 4
SURFSDICTION heron NG pot Ae ci ah 2.
QUESTION PRESENTED - aay Saas 2
STATUTES INVOLVED Seti in dg una alma OR
of
REASONS FOR GRANTING THE WRIT .......... 3
— ff ;
CURA ee 9
: ‘ L se ¥ ‘s Fe ; x
APPENDIX A. perv nwerrntintmennnnntnn 11
‘yp
- APPENDIX C te ene ier ae
APPENDIX D .ccscseceo PRATT OE OM
ZS
®
8 °
en \ ee ee Se Ce
. ‘ 4 P
° ae . 7.
y,
7 \. i : = 2
TABLE OF CASES :
‘Cohen v. Secretary of War, fori Pe SA la
iT¢ aes 1011 (1946) send eeeeeeeeee ‘heen kage 8
Cole v. Young, a eal eee, =
351 aot aia 557 (1956) phen eetae cous Fen weyed i
Dusenberg, Inc: v. “Commissioner of Sniervial ‘ive,
84 F.2d 921 (7th Cir. .1936) ..... png Seaatnn ae
’ Estep v. United’ States, - Sadi ees ieee
» 327US. 114, 120-123.(1946) . naan ca ees feeedeees « 6
Harmon ¥.. Brucker . 2 Vets ous
2, aciaud 579 od) eee terry: ff: 6
Lichter v. United States, | : i.
234 US. 742, 754 (1948) een reee che Rigas ioe 9
National Labor. Relations Board-v. Carlton Wood Prod. Co.,
201 F.2d wk 866 (9th Cir. 1953) «...... eskhenew “-6
Norih American “Aviation, Inc. v. Renegotiation Board, 3
39 T.C. No.. eee bavnoewaeeis eee eeeeeeees 7
_ St. Joseph Stockyards Co. v. United States, ,
298 USS. 38, 84 (1936) see eee mete e eee reeneeeee eres.
_ United States v. California Eastern Line, Inc. : es
348 US: 351 (1955) .......... 2c eeeee t.- quay --- 34
United States v. Shaughnessey, :
. 336 U.S. 806, 869 (1949) ° SP oy EVE trite. oe 6
United States v. Williams, ie a
. . 278 US. 255, 257- 258 CUED ne niles diss erence we’ 7s}
bg et
-@ Pi
STATUTES —
Page
aL UuLC nS io ses evans a vake oes nks = 43
50 U.S.C. ‘Apr: «eee ee ee
50 USC. ‘App. ON eae) e
$0 USC. App. 1213(f) . 1... ceeeeedeeeeee. ae
50 U.S.C. App. oR SRRE SY SE ~
50 USC. App. 1218(a): ei ee aa
Séetion Ne sy
Section 103(e)(6) sae ates ren oie tied ae
Geodon: HOB). isco ceeeteneer es Bogeeee
Sittin 108°....-.! co ; er Ne et 2, 3,4
26 USC § 7482 ie ork one Liat
2B USC. § 125401) coos elev tence ee joe oe
. MISCELLANEOUS |
: Page
Sen. Rep. 1669, 87th Cong., 2nd-Sess.. p.5...-:........ 8 5
Hearing on Department of Defjertse Appropriations for
1963 before. ‘a Subcommittee of House. of Repre o~
sentatives -Committee on Appréptations. 87th
i 2nd Sess., ee Are eee Pee ae ee
a
far
/
: Sosy »
No. :
4 .” the ichianir. Court of the
Hnifed States |
OCTOBER TERM, 1963°
THE BoEING COMPANY, iS
formerly Boeing Airplane Company, OR
ok ASS ane Petitioner,
vs. i ; ”,
THE RENEGOTIATION BOARD OF. .
THE UNITED STATES OF AMERICA, |
. Respondent.
rey
~e4
- PETITION FOR A WRIT OF CERTIORARI
. TO: “THE 3
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
"The Boeing Company, forinerly Boeing ‘Airplane Com-.
"pany, prays that.a writ of certiorari issue to review the
_ judgment of the United States Court of Appeals for the
Ninth Circum® entered in the above-entitled case on. De-
cember 12, 1963.
CITATIONS TO OPINIONS BELOW
The memorandum -opinien of the Tax Court of the
United States (R. Vol. II, 139-200), printed in Appendix
A hereto, infra, pp. 11-68, is reported in 37 T.C. 613, °
The opinion of the ‘Circuit Court of Appeals, printed.
1
u
9
. . . , .
in Appendix B hereto, infra, pp. 69-71 has not yet been
reported. .
6
JURISDICTION
The judgment of the Circuit Court of Appgals was .en-
tered on December 12, 1963 (R. Vol. XI). The jurisdic-
tion of this Court is invoked under 28 U.S.C, § 1254(1).
‘QUESTION PRESENTED
Section 108 of the. Renegotiation Act of 1951 confers
upon the Tax Court “exclusive jurisdiction, by order, to
* finally determine the amount, if any, of such excessive
_ profits received or .accrued byythe contractor or subcon- «
tractor,” and provides that “such determination ae
’ be reviewed or redetermined by any court or agency
question presented is whether, in a case arising under the.
.
Renegotiation Act, the ‘Circuit Court of Appeals sis pre- -
cluded by Section 108 from reviewing errors of law and
_arbitrary and capricious findings of fact made or com-
‘mitted by the Tax Court which are of such a nature that
they could be reviewed by the, Circuit Court of ‘Appeals.
without its ever reaching the question of “the amount, if”
any, of such ‘excessive profits,” but which do not involve
constitutional issues or issues relating to the jurisdiction of
ihe Tax Court. .
STATUTES | INVOLVED |
The statutory, provisions involved are Sections 103(e)
‘and (f) and 108 of the Renegotiation Act of 1951 as
amended: 50 U.S.C. App. 1213(e) and ’(f) and 1218.
They are.printed in Appendix C, infra, pp. 73-76.
a ‘
STATEMENT |
-
The Renegotiation Board, by unjlateral order dated De-
cember 5; 1955, determined that petitioner had Tealized
eee
—— =
3
excessive profits of $10, 000,000 from its renegotiable busi-
ness during the calendar year 1952 (R. Vol. I, 10, 53).
Pursuant, to Section 108 of the Renegotiation Act, peti-
tioner appealed to the Tax Court which, on January 8,
. 1962, entered a decision that petitioner had realized ex-
cessive profits of $13,000,000 for 1952 (R. Vol. II, 202).
Petitioner appealed to tha United States Court of —*
_ for the Ninth Circuit. 26 U.S.C. § 7482.
On appeal, petitioner contended that. the Tax Court
(1) erred in deciding that-expenditures on a research and
x development program involving a protdtype aircraft were
to no extent. allowable as a cost of renegotiable business;
(2) erred in failing to accord to petitioner the de novo
hearing required by Section 108 of the Renegotiation Act; _
(3) exceeded the limits of its statutory authority by ap-
plying a criterion of excessive profits not authorized by
Section 103 of the Renegotiation Act; (4) committed
-prejudicial errors of law in its analysis of incentive-t}pe
contracts: (5). made important factual findings that were ~
wholly unsupported -by the record; and (6) through. an
accumulation of egregious errors exceeded the bounds of
arbitrary action, thereby depriving petitioner of procedural
and substantive due process. The Court of Appeals dis-
missed the appeal for want: of jurisdiction. It held that the
.. Scope of appellate review was limited to constitutional and
jurisdictional issues, that a particularization of issues did
not amount to a deprivation df due process, andythat the
other errors assigned by petitioner could not be considered.
a
REASONS. FOR GRANTING THE WRIT
1. Whether the scope of appellate review in a renego-
tiation case is limited to constitutional and jurisdictional
issues is an important: question of renegotiation law not
yet resolved by this Court. In United States v. California
Eastern Line, Inc., 348 US. 351 (1955), the Court re-
* Bp
4
Pe
viewed a decision of the District of Columbia Circuit which
lield that a question concerning the coverage of the Re-
negotiation Act could not be reviewed, since under prior
rulings in that circuit the scope of appellate review was
_ limited to constitutional and jurisdictional questions. The
Court concurred with the Circuit Court’s decision that,
within limitations imposed by Section. 108 of the Renego-
tiation Act, Tax Court’ decisions in renegotiation cases
were reviewable under 26 U.S.C. § 7482 (then 26 U.S.C.
1411), notwithstanding that the statute spoke in terms of
“tax cases. The Court reversed the Circuit Court on the
scope of review and, it is submitted, rejected the Circuit
Court’s limitation of review to constitutional and jurisdic-
tional issues. Instead, it created a “separate but- interre-
lated” test; The Court recognized that the statute pre-
cluded review of the ultimate ‘question of the “amount, if~
any, of excessive profits”; but in deciding a renegotiation
case the. Tax Court must decide “at least” one other .
separate ‘but interrelated question-wwhether a renegoti-
‘able contract is involved. The Court held that such an
e
. issue was reviewable—it could be decided without ever
reaching the question of excessive profits. 348 JJ.S. 355.
The clear inference is that other questions Wkich are
separate from and can be decided without reaching the ull-
timate question of excessive profits—such as, for example,
whether a particular expenditure is a current expense of
reriegotiable business or a capital outlay—may be reviewed
by the Circuit Courts. ; ,
2., Subsequent to United States v. California Eastern
Line, Inc., S@pra, Congress amended the “Renegotiation
Act to define specifically the scope of appellate review. of
renegotiation cases filed in the Tax Court after -July 3,
1962. The amendment authorizes appellate review “to the
same extent as decisions of the District Courts in civil ac-
_ tions tried without a jury” except that there is to be no re-
°
OS *
view of the “existence” or “extent” of excessive profits and
findings of fact.are conclusive unless “arbitrary or capri-
cious.” 50 U.S.C. App. § 1218(a). The Senate Report in-
dicated that existing law was fraught with “problems, and
uncertainties” and that the interpretation of the scope of
review in the District of Columbia was “unduly restricted.”
Sen. Rep. 1669, 87th Cong., 2nd Sess., p. 5. The Minority .
Report asserted that the amendment was unnecessary be-
cause it would “merely eodify the existing law as declared
_. by the Supreme Court. * Id. at p. 8.
This case is the’first opportunity for the. Court to re-
examine lower court construction. of the statute prior to
the amendment to avoid the perpetuation of an unduly -re-
strictive interpretation that has been repudiated by:Con-
gress. It is within the permissible bounds of statutory con-
‘struction to allow appellate review under the old statute
substantially similar to that which would be accorded under
the 1962 amendment.
3. Petitioner may well be entitled to the broader sad —— a
_ Cial-_review-as a-matter Of constitutional right... Due-regard
for the “supremacy of the-law” (St. Joseph Stockyards Co.
v. United States, 298 U.S. 38, 84 (1936) (Brandeis, J.,.
concurring ) ) and the “Serious constitutional implications
of limited appellate review require a narrow reading of the
statutory provision giving ‘finality to Tax Court decisions
in- ‘renegotiation cases. This and other courts have fre-
: quently held that statutory and other provisions purporting
~ to give finality to administrative action are not a bar to re-
view of errors giving. rise to manifest injustice: ;
(a) Whether the decision was “wholly without « evi-
dential support or wholly dependent upon a question
of law or clearly arbitrary of capricious .. .” United
_ States v. Williams, 278 U.S. 255, 257- 258 (1929);
(b) Whether the * ‘standard” prescribed by an Ex-
GC
eo
ie
i.
ecptive Order and applied by an agency head was in
conformity with the applicable statute. Cole v.
, Young, 351 US. 536, 557 (1956);
(c) Whether the board’s decision “conformed to
the statuteahd regulations and . . . was, made after a
fair hearing .. .” United States v. ~ Shaughnessey, 336 ©
US. 806, 809 (1949):
(d) Whether the Secretary of the) Army had ex-
ceeded his powers under the relevant (Statutes. Har-
“mon v. Brucker, 355 U. S. 579 (958);
( e) Whether a draft board exceeded its jurifdic- '
tion by acting in disregard of the law or without evi-
dence to support its findings. Estep v. United States. .
327 US. 114, 120-123 (1946);
_ « (f) Whether a determination of the Regional Di.
rector of the NLRB was.“arbitrary or capricious, or
not in.conformity with the policies of the Board and
the requirements of the Act. . .” National Labor Re- ©
lations Board v. Carlton Wood Prod. Co., 201 F. 2d
863. 866 (9th Cir. 1953). :
- 4. There ate. now pending in the Tax Court ean
from orders of the Renegotiatton Board.taken by members
of ihe aircraft industry involving’a total dollar amednt of
almost $100,000,000 (see Appendix D). The instant case _
was the first of these cases to be heard and decided by the
Tax Court and the first to be appealed to a Circuit Court
of Appeals. The Tax Court proceeding and decision ‘in
the instant case and the extent to which appellate review
thereof is permitted wilt have a profound effect as a prece-
dent for these other cases. All of these appeals were filed
- before the 1962 amendment to the Renegotiation Act, and
the scope of judicial review of Tax Court decisions in these
~ cases will be unduly limited by the decision below if it re-
.
4
-
&
mains. unmodified. In addition, the petitioners in all these
cases, including the petitioner here, being members of the
‘same defense industry, operate in much the same cgntext
of Government procurement, and the errors committed by
the Tax Court in the instant case, particularly as regards
its treatment of incentive-type contracts, may be perpetu- ..
ated in the other cases if not reviewed and corrected. De-
fense Secretary McNamara’ has stated to Congress that if
the Tax Court decision in the instant case stands without ~
modification, it could “und&rmine our entire program
place increasing emphasis upon_cost-reduiction by. providing
incentives and penalties to contractors in relation to the
extent they do or\do not meet our objectives.” Hearing on
Department of Defense Appropriations for 1963 before a
Subcommittee’ of House of Representatives Committee on
er ae
; “Appropriations, 87th C —_- 2nd Sess., p. 234. -
» The Tax Court. in North American Aviation, Inc.
v. Renegotiation Board, 39 T.C. No. 19, appears to have
disavowed the basis for the decision in the instant case. In
' the instant case the Tax Court» repriced individual con- __
ge in ‘disregard of law and applicable regulations (R.-*
Vol. Il, 195, 200); in contrast, in North. American the
Court aggregatéd profits under all renegotiable contracts
‘before determining whether any were excessive. In the in-
stant case the Tax Court emphasized the amount of esti-
mated costs (R. Vol. II, 195, 199): in North American
the Court observed that .it was dealing only -with actual
cost figures.. In the instant ‘cas@ibeavy reliance was placed
on: Sectiof.103(e)(6) (R. VOT, 196), discussed infra:
in North American this section was not mentioned. The
entire Tax Court joined in the decision of North American,
with the exception that the single judge who decided the
instant case concurred in the result. Thus, there appears
to be a conflict in the Tax Court itself on fundamental
; sae
° 7y-
—
& / o jf c : ae
issues at the core of renegotiation law which should be re- *
_ solved by an appellate court,
6. Some of - the a serious errors committed fae the—
Tax Court, which are separate from though interrelated
with the determination of excessive profits and can be re-
viewed! without ever — that ultimate anaes are*
the following:
i
(a) The Tax Court held that eendinaien on a
~ research and development program involving a pro- -
totype aircraft were to no extent er" as a cost
: renegotiable business (R. Vol. II, 151). Under .
Renegotiation Act these aia were allow-
, t as a cost if they were properly allowable as a.
"current deduction for federal income tax purposes. .
50 U.S.C. App. § 1213(f). By specific ruling the
Copmmissioner of Internal Revenue permitted the ex-
penses to be deducted currently (R. Vol. IT, 145) and
this ruling*is in accord with decisions of other courts.
See, e.g., Dusenberg. Inc. v. ‘Commissioner. of Internal
Revenue, 84 F.2d 921 (7th Cir. 1936). There is-thus
presented on appeal a question of law as to which |
there is a conflict between these authorities and the
Tax Court. :
(b) The -Renegotiation Board determined ‘ that:
Boeing had excessive profits of $10,000,000 and the
Tax Court increased this determination to $13,000.-
0OU. Under Tax Court ruies and cases the burden
was on respondent to prove that the determination.
should be increased beyond: $10,000,000. Cohen v.”
Secretary of War. 7 TC. 1002, 1011 (1946). The
‘Tax Court in the instant case refused to follow this —..
settled principle, the only discussion of burden of |
proof in its opinion indicating that the entire burden.
was upon petitioner (R. Vol. Ii, 175).
~e
_ (c) In reaching its ultimate determination, the Tax
Court placed principal reliance-on Section 103(e) (6)
of the Renégotiation Act, which provides .for consid-
-eration of such’ additional tests. or criteria for the de-
termination of excessive profits js may be adopted by
Renegotiation Board Regulation (R. Vol. II, 196).
50 U.S.G. App. § 1213(e)(6). No such other factors
’ having’ever been adopted by the Renegotiation Board,
the Tax Court exceeded the limits: of: its statutory ©
‘thereto.
This’ Court. has emphasized that in a renegotiation case
“the governmental action authorized, although resting’ on
‘valid constitutional grounds, is capable of gross abuse,”
and that “resulting injustices can and should be carefully
examined and as far as possible relieved.” Lichter v. United
States, 334 U.S. 742. 754 (1948).
Grave injustice has resulted to petitioner because of the
refusal of the Court below to reach the merits of the appeal.
ie i : °
"es CONCL USION
For the foregoing reasons, Bosal petition for a writ of
certiorari should be granted.
Respectfully submitted,
DAVID E..WAGONER
. Attorney of Record for Petitioner
1900. Washington Building
o- | Seattle. Washington 9810]
‘Of Counsel: rivet ;
~ ANDREW M.:- Wieiams
1900 Washington Building
- Seattle. Washington 98101
authority, in giving, special consideration and ox soma ;
__. Docket No. 935-R
11° Ttaarae ee
_ APPENDIX A. | 7
37 T.C. No. 64.
TAX CQURT OF THE UNITED STATES
BOEING AIRPLANE COMPANY, Petitioner, *
Vv.
THE RENEGOTIATION BOARD. OF THE UNITED
STATES OF AMERICA, Respondent. -
Filed January 10, 1962.
1. Expenditures made by petitiner for certain adver-
tising and other overhead expense held- not allocable to
the petitioner's renegotiable business in 1952.
2. Cost of work performed with respect to the design, *
_ development, and construction of a prototype airplane not
in pursuance of any contract with the United- States Gov-
ernment held not allocable to petitioner's renegotiable
business.
a Amount of excessive profits made by petitioner from
its renegotiable business in 1952 determined. ~
-Lowell P. Mickelwait, Esq., Andrew M. Williams, Esq.,
and David -E. Wagoner, Esq., for the petitioner. :
‘James H. Prentice, Esq., David L. Rose, Esq., and Har-
land F. Leathers, Esq., for the respondent.
WITHEY. Judge: On December 5, 1955, the re-
spondent issued its unilateral order determining that for
the year 1952 petifioner had received excessive profits in
' the amount of $9.822,340 upon renegotiable business-with
the United States Air Force. At the close of the proofs
- herein, respondent, by an amendment of its answer to con-
form to such proof, now claims total excessive profits for —
sd
1952 in. the amount of $20,000.000. The disposition of |
two preliminary issues is necessary in order 6 arrive at
the total amount of petitioner's renegotiable profit for 1952.-
"These isues are (1) whether certain advertising and other
overhead expense is properly allocable to petitioner’s te-
—:- a,
negotiable business-and (2) whether the cost of work per-
formed with respect to the design, development, and con-
.Struction of a prototype airplane not in pursuance of any
_ “contract with the United States Government was properly
~~ allo ble to renegotiable business. Depending upon the dis-
position of those ‘issues, the parties have stipulated the
amount of petitioner’s renegotiable profits for, 1952.
_’ Preliminary Issues | ay be
‘s FINDINGS OF FACT ~
All of the extensive stipulations: of fact hereig? with re-
"spect to all issues are’found as stipulated. .
It has been stipulated and is accordingly found that
during 1952 petitioner paid. or incurred for overhead ex-
pense. $581,530.93 which was properly chargeable as re-_
negoitable cost for that year. This amtount. included
amounts paid or incurred for advertisement in trade publi-
‘cations for the dissemination. of technical information to
_ the airframe industry, for catalogues and technical pamph-
~ . lets designed to aid users, of petitioner’s products, for publi-.
«cations to aid in ‘its personnel relationships and help
' wanted advertisement. ;
_ In addition to the above, petitioner paid or incurred dur-
. ing 1952 further total overhead expense in the amount of’
$629,755 of which it ‘has on’ its books allocated to rene-
_gotiable cost the amount of $627,704. Of the amount of
$629,755 so’ paid or incurred, $238,758 was for what
“ petitioner designates: “institutional” advertising, $80,000"
was for entertainment expense, and approximately
~~ $311 .000 was for selling expense. , ‘
" Petitioner's method of bookkeeping, regularly employed
. and. in accordance with which it prepared its Federal in-
come tax .returns, provided for an “overhead pool” where
such items of overhead expense 4s could not be. charged
to a specific contract or work in progress were accumu-
pee -
ye
i} ¢t
—————
a} 3 =
ig = sy | a ‘ -
‘lated. At the close of its: fiscal year the experfse items com-
prising the pool were ailucated between: renegotiable and
_nonrénegotiable business in direct proportion to the direct
labor man-hours expended with respect to each,
a
‘mary objective the’ ceping: of the Boeing name before the 2:
“Instititional” advertising is typified. by a newspaper
advertisement of petitioner extolling the uses and virtues_
of an analog computer which Boeing is there claimed . 10
have designed and developed. - The advertisement is di-
rected primarily fo Io such aig of analog com-
puters. Also typical of such adv ing is a newspaper ,
advertisement depicting a line of B47 aircraft at. Boeing's |
Wichita, Kansas, ae The advertisement has‘ as its pri-
- public and the instilling in-the public mind of the fact that.
_ craft. Likewise typical of, such advertisement is a news- .
- production basis by “ei
craft. Later than 1948, but priof to 1952, it also developed
. t tanker aircraft designated the hall wT, which (was pro-.,
it was an efficient producer of an unusually complex air-
paper advertisement depicting a Boeing Stratocr@iser in
flight over. the’ city of Paris, France. The primary objective
of this advertisement is the kéeping «of the Boeing name
before the public as producer of ‘commeréial aircraft.
The entertainment expense was.in part related to the
prémotion of employee ayfd community relationship and in
part the purchase of meals and general entertainment of .
visitors and business ‘associates. 3
Selling expenses -were incurred’ or paid principally i in con-
nection with: Boeing’stommercial business.
No part of. the above-mentioned’ $629,755 represents
expenditures properly chargeable against the petitioner's
renegotiable. business for 1952. oe
In 1948 petitioner contracted to furnish the United
States Air Force with B-47 jet bombers capable of altitude
and speeds at that time fever before ‘accomplished on a
er bombardment or fighter air-
14
peller-driven, with internal combustion engines, and single ++
low-wing design which was equipped with a refueling mech-
anism which also ‘had been designed and developed by
petitioner.« The KC-97 had pérformance capability suf-
ficient to refuel adequately in the air the most advanced
_ bombers then used by thé) Air Force, the’ B-29 .and ag
B-5€ which’was the improved B-29. When it became ap-
parent to petitioner that the Air Force was to acquire and
use the B-47 bomber as its primary deterrent weapon, ‘it
also became apparent that the KC-97 was not of sufficient-
ly high performance to refuel adequately the B-47 in the
_air although it was true that by stowing the B-47’s speed |
sufficiently, it was possible (to mfake contact with a KC-97
and for the refueling process to take place. Refueling a
B-47 at such low speeds and low altitudes posed undesir-
able milftaryssituations. Both aircraft while in the, refuel-
ing process were traveling at ‘such low speeds and -low
altitudes that’they were: dangerously susceptible’ to.enemy -
action. Boeing knew, upon the advent of the, B-47 that
the Air Force had contracted for its construction largely .
because the-basic design thereof contained hitherto un-.
* known growth possibilities. The basic, design of the B-47.
for instance. permitted a range of approximately 1,500 °.
miles. Béfore the completion of work under Contract
21407 by the use of newly developed: engines, rocket as-
sistg¢d take-offs, and refueling in the air, this range had
~ been extended to about 5,000 miles. It was reasonable for
Petitioner to conclude in L952 that thé B-47 had even
greater growth potentiality. were it to be refueled by a
tanker with performance characteristi¢s more nearly cqm-
parable to its own. Petitioner knew also that the Ait-Feree -” »
intended to make full use of the. growth potentialities of
the B-47... ° : ;
Petitioner atso believed. and it was <* consensus of
opinion of airframe manufacturers in this country, that jet- +
Be)
les
a
\
powered commercial sibtiner would be in demand. within
a reasonably foreseeable future. Petitioner attempted on
several occasions prior to 1952 to obtain a contract from
the Air Force for the construction of a jet-powered tanker,
Representatives of the Air Force, although interested in
such a tanker, merge they had no congressional ap-
pfopriation therefor, no program therefor, and’as a result
refused to contract. In 1952 petitioner's management was
sufficiently certain of an eventual Air Force contract for
such tankers and of a prospective commercial market for
'jet-powered transport aircraft that- without a military or
commercial contract therefor they proceeded to design, de-
/ velop. and partially construct what was designated on its -
books the Model 367-80 prototype. During 1952 petitioner .
expended $1,734,302 in this process. This work occurred
in a. walled-off area of the’ Government’s plant at Renton,
Washington. for which petitioner was charged and paid
rental. On its books the amount so expended was charged
_ as an expense to profit and loss during 1952. The prelim. ©
inary engineering and development work began in April of '
that year and construction of the prototype began in the
latter) part of that year. About 83 percent of the amount
expended in 1952 was for engineering-and development -
_ Work sand the remaining; 17 percent was for tooling and
production. In producing the’ prototype, petitioner's
management instructed its employees that where problems
arose as between the commercial.or militae¥’ concept of thé
prototype, the militaty concept was to prevail. The airplane
was constructed and first flown in 1954 and was still fly-
-ing and in use by petitioner as: a “test bed” as of the date
of the trial hereof. in October 1958. The prototype was
used to try out and test new ideas developed by petitioner
and to demonstrate its commercial and military possibilities
‘to prospective customers. It is.still in use for that purpose.
-The airplane was the prototype of Boeing Models 707
2
Ou -
4
+16
and 720-B jet aircraft and.the Model KC-135 jet tanker _
subsequently sold in substantial numbers to the commercial ©
' air lines and the Air Force of the United States, respectively.
Boeing's construction of the prototype was without a con;
. tract with the Air-Force or any commercial customer jand ;
no part of its expenses in the construction therefor was paid
for by either. All such expenses were defrayed from Boe-
ing’s funds. Boeing’s determination to construct the proto-
type in’ 1952 with its own funds and without contract re-
sulted in the availability of the KC-135 tanker to the Stra-
tegic Air Command of this country 2 years prior to the time
it would’ have been available had Boeing awaited an Air
Force contract. The ‘availability of the KC-135 constituted
and effectuated a significant advance. in the. military utility
of the B-47:and B-52 bombers of the Strategic Air Com-
mand. ~ ‘
. Upon three prior occasions petitioner had constructed
ay prototype aircraft without Government or other contract
therefor and had upon each occasion treated them _— its
books as capital assets.
In July 1952,"in response to a request by petitioner, the
Deputy Commissioner of Internal. Revenue, by. letter.
granted petitioner permission to change its accounting
method with respect to prototype 367-80 so that the cost
tuereof might be expensed by petitioner rather than. cap-
- italized as had been its method prior thereto. The request °
was made upon the grounds, as petitioner stated, of its un-
‘certainty whether income would ever be realized from the
prototype and that it had no certainty of an utlimate pur-
_ chaser or of a future market or demand for the model air-
plane of which 367-80 was a prototype. The permission
granting the right was ‘based upon the same grounds.’
The Model 367-80 prototype when constructed had a
useful life of 25 years and a. , Value of not less than
$4,000, —
17.
The expenditu.e of $1;734,302 by petitioner in 1952 -
with respect to the engineering, development, and construc-
tion of the Model 367-80: prototype was for the creation
of a capital asset. Such axpenses do not constitute réim-
bursable costs pans a to the renegotiable sales and
profits of petitione 952.0 |
> OPINION ar.
Petitioner, in claiming allocability of the advertising, en-
’ tertainment, and selling expenses set forth in our findings,
relies almost entirely upon the general provisions of sec-
tion 103(f) of the Renegotiation Act of 1951 and the regu-
lations of the respondent thereunder dealing generally with
the allocability of costs. Both that section of the Actsand
section 1459.1 of respondent’s regulations provide gener-
ally that where the contractor maintains a cost accounting
system which properly reflects renegotiable costs, the costs.
there shown’ will be allocated in accordance with that
method to renegotiable receipts. However, with respect to.
"Selling and advertising expense. the former of which would
include the entertainment expense involved herein, section
1459.7 of the regulations is specific. Subsection (a)(1)
thereof is as follows: | at tne, | |
(a) Selling—(1) Selling expense will be allo-
cated to renegotiable business only to the extent that
(i) it relates in major part,to technical, consulting and
other services performed in connection with the ap-
. plication agd adaptation of products comprising the
renegotiable business to the uses’ and requirements
of the Government or other contractors: or (ii) it re-
lates to the maintenance ‘of offices or agencies en-
gaged in the servicing of products comprising the re-
negotiable business: or (iii) it relates to the sale of
products or services comprising the renegotiable busi-
ness which are of the type ordinarily sold or rendered
by the contractor and which are sold or rendered
18
through the distribution system normally used by the
‘contractor; or (iv) “it is a commission of the type al-
lowed in section 1459.2(c). .
Subsection (b) (1) is as follows:
(b) Advertising —(1) Itenis of advertising ex-
" pense comprising “hélp wanted” advertising, advertis-
ing in trade publications which are primarily directed
to the dissemination of technical information within -
the contractor’s industry, catalogues and technical
pamphlets designed to aid users of the contractor’s
products. and house organs and other publications di- ©
rected to labor and personnel management and rela-
tions, are recognized as costs allocable to renegotiable
business. The aggregate of such costs will be allocated
‘’ in accordance with the. method of.accounting found
by the Board to be acceptable under section 1459.1(by
of this subchapter.
~ Subsection (b) (2) (ii) thereof is as follows:
(b) Advertising — * * *
(2) Other advertising expense is allocable to a
tiable business as follows:
“2 ££ & 2: ¢. &, or
. (ii) An cases in which it can be demonstrated that
a prime contractor or subcontractor engaged in rene-
gotiable business to the detriment of its normal com-_
mercial business in the year under review, and thereby
incurred the risk of loss of its competitive ‘position in
the industry concerned, the Board will allocate to re-
negotiable business that portion of the prime con- _
tractor’s or subcontractor’s normal advertising expense
which thé Board deems properly attributable to the
effort by the prime contractor or subcontractor to-
forestall such loss. of competitive position. .
We are unable to find from this record that petitioner's
‘disputed advertising expense falls within, any of the cate--
19
gories.of such expense set forth in subsection (b) above
quoted and have found as a fact that it was here paid or .
incurred with respect to its commercial business or to main-
tain its name before the public as a producer of commercial
aircraft. No evidence has been introduced -to establish that
. any of such advertising had the effect of recruiting employ-
ees, raising or maintaining the morale of its employees or of
recruiting: suppliers. It is apparent that under the stipula-
tion of the parties petitioner. has- received adequate. allow- .
ance. of such expense as renegotiable cost.
We are likewise unable to find from the record ‘that the .
disputed selling expense falls within the provisions of sub- |
section (a)(1) above quoted and have found as a fact that
svch expense related to. petitioner’s commercial business.
As inthe advertising issue. we note that adequate allowance
has been made.in the stipulation for such expense as a
charge against renegotiable receipts. .
On this #ssue we find for the respondent.
Relying on section 103(f) of the Renegotiation Act and
the provisions of sections. 1459.1(b)(3) and 1459.8(e)(3)
of the respondent's regulations under the Act. the petitioner
-ontends that its expenditures of $1.734.302 during 1952
with respect to the 367-80 prototype airplane constitute
experimental and. developmental costs incurred and. paid —
by it during that year in the operation of its experimental
and development division and as such the allocable por-
tion thereof based upon a comparison of direct labor hours
ex ended on renegotiable and nonrenegotiable business. or
$1 731.283. is chargeable as renegotiable cost herein. The
pet tioner makes this contention despite the fact that the
exp2nditures were not made in the performance of a.con-
trac with any agency of the United States Government.
®
Respondent contends. or the contrary, that the expendi-
tures do not constitute experimental or developmental ex-
ly a
Y A"
20 R
penses within the meaning of either the portion of the Re-
negotiation Act or the provisions of the respondent’ Ss regu-
lations thereunder relied on by petitioner but are’in reality
- expenditures for the acquisition of a capital asset which is _
ms not chargeable, Fenegotiable:cost.—-.--—— - —--: -..
' The portion of the Renegotiation Act and the: provisions
of the respondent's regulations . relied on by. petitioner in.
support of its position are not here applicable, and no part
of the expenditures is allocable to renegotiable- business if
“the expenditures, were made for the =" of a id
_ asset.
-In support of its contention petisiones Jikens the ex-
penditures here involved to those which are ingurred in the
operation of an experimental laboratory. Inasmuch as pe-
titioner’s president in his testimony herei ip-repeatedly stated
that the prototype was a “test bed.” we think the simile is
proper but in a different respect. While it is clear that lab-
oratory expenses for fuel. expendable test tubes. chemicals.
salaries and wages. and genétal overhead are properly to be
-. regarded as the expense of operation of an experimental |
laboratory. no one could properly claim that the cost of
construction of the laboratory itself is overhead expense.
The laboratory has a utility beyond a single year: it has a
‘49 g determinable value and may be put to use in other fields
of business than that of its owner. We not only liken the
prototyre here involved to an experimental laboratory but
to one-of the tools of a laboratory such as one owned by
petitioner, i.e.. its wind tunnel. There is no évidence here
that petitioner has attempted to reduce its 1952 receipts °
by amounts expended for the construction of its wind tun-
nel. The wind tunnel like the prototype is an experimental
tool or test part, with a useful! life caine than one year
and value of its own.
We are not impressed either with petitioner’ s.contention
that there was no certainty when the prototype’ § construc-
+. Me..
s
Wren 5.
Pike
o
21
- tion was begun in 1952 that it would ever be completed or -
_, that it would ever derive. income as a result of ‘its use or
that there was a market for the model of which it was a -
prototype: . The word * “certainty” as petitioner uses it has a
‘ broad philosophical connotation and, of course, in that
~~" ""—~senge.there, is considerable authority for the philosophical
: proposition that literally nothing is certain except
. and taxes. As.used by this and other courts, however, fn the
context hereof the word means reasonably certain from a
~ business standpoint, that is, an assurance baséd:upon exist-
ing factors which lead in the normal! course of business to
an expected result. Hart-Bartlett-Sturtevant Grain Co., 12
T.C. 760. In view of its loss with respect to a prior proto-
type, we do not believe that petitioner would have so en-
dangered its comparatively small net worth as to enter
upon the construction of a multimillion dollar prototype
airplane without reasonable business assurance that the
prototype would be completed and that there would be a
reasonably assured and profitable future market for the
models 6f jwhich it was a prototype. We are convinced that
' from a business standpoint petitioner, took .#-calculated
risk with respect to a future market but that such risk was
no more than that which is to be expected in the ordinary
conduct of any business. The prototype has all of the at-
tributes of a capital asset. and we find. that it was one and
that the costs pertinent to its engineering. designing, and
construction incurred and paid by petitioner during 1952-
cannot therefore be properly allocated to renegotiable
business.
In accordance with the stipulation of the parties we
therefore find thai petitioner's renegotiable profit for 1952
was $56,734.119.
Reasonablesne-- or Excessivenes+ of Profit
FINDINGS OF FACTS .
Petitioner is a Delaware corporation, organized in 1934.
‘and at all times material herein had its headquarters and
principal place of business in Seatle, Washington. With
few exceptions its business has always been the- manufac-
ture of airframes. To and through the year 1952 about 99
percent of its production has been that of airframes for ‘the’
military services of this country. Airframes consist of the
fusilage. wings, landing gear, anc control surfaces of an
airplane. All of its Government production has been per- -
formed under contract with one or another of, the military
services. Toa large degrée such contracts ‘have. resulted
from demonstrations of petitioner’s products arid designs in ©
competition with those of other members of the airframe
industry. Generally, the airframe industry is marked by un-
usually intense competition due largely to the fact ‘that it
is compas itively new and, since the close of World War II.
_.has experienced an extremely rapid advancement and
growth in the-art of the design ef aircraft. Throughout its
existence petitioner has never exferienced normal business
as that term is generally undegstood. When performing
under Government contracts, 4 has consistently produced |
an article of high unit cost, if volume being low int com-
parison to manufacturers generally. Its profits have been.
in one form or another. based upon its. cost of production
and have been correspondingly high in amount. However. -
the contratts have aiways contained a provision that they
might be terminated by the Government without notice. In
petitioner's experience such contracts. have upon occasion
been so terminated leaving petitioner's plants. equipment.
and personnel suddenly idle. In fact, whether petitioner was
working to capacity of completely idle has been almost en-
tirely governed by the exigencies of international politics
and the safety or danger to the United States engendered
thereby. Its business has always been characterized by peaks .
and valleys and abnormality rather than normalcy. Com-
pared to the total sums involved in petitioner's production
.
23
' under Government contracts. its invéstment in fixed busi-
ness assets has been and was in 1952 small. Its successes
in obtaining contracts with the Government have been pri- -
marily due to the experience, know-how, and skill of its
employees both direct labor and general administrative,
supervisory, and especially its design engineering staff. Its
" attempt, prior to 1952. to break into the civilian aircraft
field was at financial loss but. was nevertheless undertaken
_for the purpose of maintaining in its employ a core of ex- ~
perienced and skilled personne! so that the integrity of its
over-all know-how would remain intact: This attempt was ~
‘the result of the sudden termination of lagge Government
contracts subsequent to the close of hostilities at the: close
of World Warll. :
During and subsequent to World War II petitioner manu-
factured’ B-29 heavy -bombardment aircraft under. contract
with the United States Air Force. During World: War II, as
the result of winning a design competition i on under
Air Force auspices, its design was chosen as that which was
to be the medium bombardment aircraft for the use of the
Strategic Air Command. and petitioner was chosen as the
design prime contractor for the manufacture thereof, The *
bomber so chosen was designated the B-47.
The B-47 was chosen by the Air Force partly because of —
the “great advancement it represented in the art of bomber
‘design but largely because of the growth possibilities inher-
ent therein. It was the first swept- wing, jet-powered bomber
ever constructed. Its performance was far superior to the
best performing bombardment aircraft theretofore manu-
factured. its service altitude being 45,000 feet as compared
to the previous limit of 35,000 feet and its speed. exceeding ug
600 miles per hour. represented an advancement over for-
mer bombér speeds of about 300 miles per hour and alti-
‘tudes of 10,000 feet. Its wing-type. although having been
'. used by the Germans in World wa IT in fighter aircraft.in
4
bes)
- 24
_ comparatively crude form, was an innovation in the con-
struction of bombing aircraft. The wings were swept-back,
very thin for the weight of the B-47, with a high aspect
ratio, and contained six jet engines in pods protruding for-
ward and below the leading edge of the wing. Whereas the
wing covering of previous bombers, although metal, was
not designed to carry much, if any, of the wing-loading.
that of thee B-47 was of metal and was designed to bear a
substantial part of that weight. The wing covering tapered
_.consistently from a thickness of five-cighths inch at the root
‘to three-sixteenths inch at the tip. As manufactured by’pe- °
_ titioner the plane was equipped with its landing wheels
placed in tandem rather than side-by-side and at the nose.
To aid in’ reducing its approach speed and its. landing run,
_ it contained a “drogue” parachute in-a tail compartment
which could be opened by the crew while in flight. Al-
_ though the B-47 as experimentally constructed, was
equipped with conventional ailerons, these were found to -
_ reverse their function at very high speed due to the bending
"and twisting upwards of the outer portion of each wing up-
_ on which they were located. To cortect this effect, petitioner
installed spoilers upon, each wing which made it possible
to counteract the reversing effect by interference with the
smooth flow of air over the wing, thus causing that wing to -
lose its lift and lower. The bending and twisting effect was
also-counteracted by the placement of the engines as above
described. The plane, due to its radical wing design, as ex-
. perimentally built, was deficient in its lateral control at ap-
proach and landing speeds. As manufactured. petitioner
designed and installed wing flaps at the inner portion of
each wing. These could be extended from the trailing edge
of the wing to increase its lift at low’speed and could ‘be’
used as supplements to the ‘ailerons to increase low speed
lateral control. The wings also contained the plumbing for
the injection of water into its engines. To aid in its take-off.
eo 3
25 =
the B-47 \ was cuihaels with: rocket-type thrust i in the fo
of multiple “Jato Bottles.”
As finally manufactured in 1952, the B-47 was the den-
sest bombardment aircraft ever produced. Density i is the de- -
gree of insidé space: which is occupied by the. equipment
necessary to its operation as an airplane and as a weapon.
As experimentally designed and built, when accepted by the.
Air Force, the gross weight of the B-47 was 120,000
pounds. In 1952 its gross weight had advanced to 220,000
pounds. Gross weight is the number of pounds of weight
represented by the aircrafe itself, its fuel load, its crew,
bombs, and weapons which it is capable of lifting on take-
off: Gross weight has a direct bearing upon its value as a
weapon in that the more fuel lifted along with its full load
of bombs the greater its range of operation.
In 1952 the B-47, in accordance with — ipsiliiaty
tions, was to have installed, fogether with water injection,
a bomb-navigation system necessary | forthe successful de- |
livery of its bomb load and a system of defensive’ armament
control. Each of these systems was of such advanced design
that .the subcontractors who manufactured and designed
them had not. during 1952, completely developed them.
Each of them was equipment. the furnishing of which was
the Tesponsibility of the Air-Force. Because of the aie de-
velopment and delivery to petitioner of these systems, they
or one of them were not installed in some of the B-47’s
delivered by petitioner and accepted by the Air Force in
1952. Such B-47's were fistéd as “deficient.”
Because there is a limit to the fuel load which an airplane
can lift. its range. as before stated. is thereby limited. The
Air Force in 1946 réquested petitioner. to design a mechan-
ism which would permit the rapid transfer of fuel from-a
tanker plane to a bomber while in flight. Petitioner designed
_and constructed such a mechanism and installed it in a C-97
cargo plane which thereby, after being equipped with the ~
°
‘
° . : /
ad . a”
- .
a 263° Ae
necessary tank EOPTS became the KC.97 tanker airplane
after its acceptance by the Air Force. These planes were ' -
“propeller-driven and had sufficient speed so that fuel could
be transferred from them to a B-47 provi latter re-
duced iis speed and altitude to conform to that of the former.
. A B-52 is a bombardment aircraft of the same basic con-
figuration’ as the B-47 with. the exception that it is consider-
ably larger.- Its gross weight is more than double that at-
_ tainéd by the B-47. Its performance capabilities exceed
_ those of a B-47 to about the same degree as the B-47 ex-
ceeded those of its predecessor, -the B-50 propeller-driven
bomber. The Air Force in 1947 naa is the peti-
_ fioner for the design and construction of two experimental
models .of the B-52. In 1952 it successfully designed and |
p built two such aircraft. Because of petitioner's experience
_with the B-47, it was discovered thaf metal wing surfacing
er design to permit the full attainment of the B-52’s per-
formance and growth capabilities. To correct this, peti-
"with the consistent taper used on the B-47 was not of prop--
tioner, through its design engineering, accomplishell ‘one |
of the few innovations in airframe construction which has —
Metal wing sut/ace with an incgnsistent taper. from-.root.
occurred in late yefts. This “np of the designing of a
to. tip to a de ree of tolerance theretofore unknown in air-
frame manufacture. When constructed, the wing appears /)
to be slightly concave. In addition; petitioner designed or
both the B-47 and B-52 a method of rolling the wing sur-
face metal with the proper taper .whereas theretofore it
would have been necessary to machine it to the cesired.
thickness tolerances.
The B-50 bomber is a propeller-driven aircraft which is
an.advanced B-29, which latter bomber -was the bomber
used by the Air Force in the Pacific theater of operation
during World War II. Petitioner, under contract with the
Air Force, manufactured 22 B-50 bombers during 1952.
*
Sy goa
‘ 4
The contract called" for the manufacture and delivery of
_36 B-50's.
The Bomarc: is. an intercontinental ballistic anti-missile -
missile. It represents the entry of the United States into the -
anti-missile field. It consists of an airfrarne in\which is con-
. tained a war-head, fuel-carrying capacity, and the plumbing
necessary to its delivery to combustion chambers, a stable
' platform upon which is installed électronic equipment. for
ground control and for its self-guidance to a target, and.
-gimbal-type combustion chambers for steering and stabiliz-
ing purposes. Petitioner, under Air Force contract, designed
and constructed two such experimental missfles in’ 1952.
Upon the opening of hostilities in Korea in 1950, the
Air Force had determined that the B-47 bomber repre-
¢ sented its chief deterrent weapon with res ‘to threatened
attack on the United States by, an ene “éountry. It there-
upon expanded’ its order for B-478-" It adopted a policy ©
which required that ‘they be manufactured not only by
- Boeing in Wichita, Kansas, but by Lockheed Aircraft Cor-
poration and Douglas Aircraft Company in their factories
situated elsewhere than Seattle or Wichita. To expedite the
advent of the latter two companies into the manufactpre of
B-47’s and to act 4s a clearinghouse for the problems which
would thereby arise, the Air Force. in July of. 1951, estab-
lished the B-47 Joint Production Committee made upvof
representatives of the three manufacturers and the: Air
Force. with an Air Force officer as chairman. As design
prime contractor of the B-47. petitioner :was required by
* «the Committee to furnish Lockheed and Douglas. competi-
' tors of .petitioner. with master tooling gauges which it had
developed for production of the B-47. to furnish them with .
designs and drawings. to teach Lockheed and Douglas en-.
gineers and employées Boeing’s production methods, and
generally to make available to them its’ manufacturing
know-how. Boeing actually ferntehed them 18% complete
”
.
ot
28
sets of B-47 components and over 18,000 miscellaneous
—~ - vos
Under Contract 22413, which was a cost-plus-a-fixed-fee
@ arrangement entered into on October 31, 1949, petitioner
manufactured and delivered to the Air Force in 1952, 36
B-47’'s. This type of contract is customarily used for the pro-
curement of airframes ‘in their experimental and develop
mental stage. In this instance, it provided for the’ reimburse-
ment to petitioner of all costs of prodyction, together with.
a fixed profit of 6 percent of such costs in addition thereto.
For B-47’s delivered undér this contact, petitioner in 1952
received cost reimbursement of $10, 646,214 and a profit
of $1,730,607. -
. &
"Under Contract 21407, which was a fixed price in-
centive type contract entered into on May 10. -1952,
petitioner, in 1952, manufactured anddelivered to: the
‘Air Force 263 B-47’s. This contract provided ‘for the
reimbursement to petitioner of all cost of production,
plus a fixed fee of 7¥2 percent of estimated costs, which
estimated costs, “as was .the case with respect ta each
incentive contract here involved, were first negotiated
‘between petitioner and the Air Force prior to the execution
- of the contyact and were thereafter renegotiated as a “firm:
~ target” estimate of cost tq apply. retroactively and prospec-
tively from delivery of the 100th bomber throughout the
_ life of the.contract. For its cooperation in the activities of
the B-47 Committee and its aid in getting Lockheed and
Douglas into the’ production of B-47’s, the fixed fee was
' raised 12 of 1 percent so that petitioner's total fixed fee
under this contract was 8 percent of the firm negotiated
target cost estimate. The cost estimates as negotiated were
-based upon an 80 percent improvement fate. This rate of
improvement is the average rate of the airframe industry
upon the date of the execution of this contract. It means -
a
SO
° 29
that each time the number of airframes produced is doubled,
the latter half is produced for 80 percent of the cost of the
former. The cost formula is represented. in graph form in
the industry by an 80 percent improvement.curve. The in-
centive provision of this contract provides that in case
petitioner .in actuality underruns the firm oe cost esti- -
mate, it will receive as profit, in addition to the 8 .percent
fixed fee, 20 percent of such underrun.. In case of an over-.
"run, petitioner must stand 20. percent of the overrun and
the United States 80 percent provided the overrun does not
exceed 125 percent of the firm target cost as negotiated.
Petitioner must defray all cost overruns in excess of that
percentage’. At the termination of the contract the parties
were to: ss with Fespect to and finally agree upon .
e actual alloWable costs incurred with ‘respect to per-
(tormance of this contract. For B-47’s delivered under this
contract, petitioner? in 1952, received reimbursement of
cost in the amount of $347,365,355, a profit of $33, 440, -
\590 of which the incentive profit was-$4,903/340.
The following is a list by number designation of the
comracts in force between the Air. Force and petitioner
and \apder which petitioner received renegotiable profits in.
1952 and-ageneral description of the goods manufactured
‘and services performed thereunder:
Type of Contract, and
Contract Designation or ;
Contracting Party . Preduct or Subject Matter
- Cost-Plus-A-Fixed-Fee
21096. Model B-52 Aiplanes and Spare Parts
19589 + Research and Development Bomarc
Pilotless Aircraft Missile -
22413 Model B-47 Airplanes and Spare Parts
6993 | “Tucson Modification of Model B-47
Airplanes
- 7 °
Model XB-52 and YB-52 Airplanes
~ Model RB-47 Mock-up
' Modification of Model B-50 Airplanes
- Modification of Model B-50 Airplanes -
Bombing and Navigation Systems
Flying Boom Modification Program |
Phase I—Design of Airplane
Modification of Model B-47 hibits
Model B-29 and Model B-50 Airplanes
“Bombing System |
Modification of Model B-47 Airplanes
Prototype Installation on Model B-50
Airplane
Electric Power Sets
_Gas Turbine Power Unit
Modification of Model B-29 Airplanes -
Engine Studies :
Modification of Model B-47 Airplanes
Model B-47 Producibility Study:
Model 502-2C Turboprop Development
Installation of Photographic Equipment
_ on Model YC-97 Airplanes
Modification of Model B-50 Airplanes
Model 502-2 Gas Turbine :
Storage and Services
Model B-50 and Model C-97 Airplane
Tool Storage
Model 502-12 Gas Turbine ©
Model: B-47 Airplane Studies
(Continued ),
14764
14809
5097.
19823
"9825
5805
5065
31
Product or Subject Matter
. Flying Boom Developmental and
-- Modification Program —
“GAPA” Guided Missile Program
__ Modification of Model B-47 Airplanes
Modei B-47. Airplanes and Spare Parts
‘Model KC-97 Airplanes and Spare Parts
odel TB-50 Airplanes and Spare Parts
re Parts -
“Model B-50 Airplanes and Spare. Pains:
Model C-97 Airplanes and Spare’ Parts
* Model KC-97 Airplanes and aie Parts ©
Spare Parts
Spare Parts
Magnetic Minesweeping Equipment
Spare Parts
Model B-29 and Model B-50Kits+ —*
Model C-97 Airplanes and Spare Parts
Modification of Model B-50 Airplane
Power Packages -
Spare Parts at |
Model B-50 Airplanes and Spare Parts
Spare Parts
Spare Parts
Bomb Lifts
(Continued)
32 x» ™
Type of Contract, and :
Contract Designation or
Contracting Party Product or Subject. Matter
Price Redetermination
(Continued)
28882 , Spare Parts | :
3783 Seryices in Connection with Govern-
, ment-Furnished Property
25898 Sling Assemblies ;
13013 Model B-50 Airplanes and ard Parts !
21763 - Spare Parts
Miscellaneous Minor Contracts ;
Prime Contracts —
22009 Services of Technical Representatives
3699 Repair of Government-Furnished ,
Property :
7610 — Suspension Line Clamps
3700 Repair of Government-Furnished
| _ Property
20383 Technical Data
20578 - Spare Parts
_ 25932" Sling Assemblies |
53975 Model 502-2 Gas Turbine -
17803 Sling Assemblies
9853 Lock Assemblies
4529A Analog Computers
70106 . Maintenance Parts .
6481 Modification Kits for Jack Assemblies,
20756 Special Tools
Miscellaneous Minor Contracts
Douglas Aircraft Material, Parts. Trailer Compressor
Company, Inc. Unit
Lockheed Aircraft. Material, Parts, Analog Computer
Corporation re
. (Continued)
Contract Designation or
Contracting Party Product or Subject Mutter
Subcontracts :
(Continwed) =
_ Curtiss-Wright Spare Parts
_- Aeronautical
Corporation ©
Briggs Manufac- _ Spare Parts
turing Company
Grand Central Air- Bomb Rack Assemblies and Spare
craft Company Parts
General Electric Parts and Engineering Laboratory
Company’ Vork
National Rivet & Material, Parts
Mfg. Company , .
Consclidated = Pump Assemblies
Vultee Aircraft
Corporation
. ~. Miscellaneous Minor Subcontracts
21378 Special Facilities
22291 Special Facilities _
2862 Special Facilities
Petitioner produced B-47’s in Government - furnished
manufacturing facilities in Wichita, B-50’s, Bomarc mis-
siles, and B-52’s. at its plants in Seattle, and C-97’s and °
- KC-97’s in a Government-furnished facility at Renton, a
_ suburb of Seattle. “Except to the extent petitioner used
Government facilities: for nonrenegotiable business, such —
facilities were furnished without charge to petitioner.
-During World War II petitioner had used the Wichita
plant for production of aircraft for the Air Force and had
there employed over 20,000 persons in doing so. Wpon
34
termination of the World War II contracts, virtually all of
this labor force had been discharged except for a skeleton.
crew of about 1,200. Because of the Air Force's insistence
upon the manufacture of B-47’s at Wichita, rather than
Seattle and Renton where petitioner had an adequate. .
trained labor force, it was necessary for petitioner t6 recruit
a new and untrained labor force again and of approxi-
mately-the size there employed during World War il. Be-
' fore 1952 the problem involved in recruiting such a labor
force was that, in doing so, petitioner was in competition
for labor with commercial manufacturers due to. the “guns
‘and butter economy” which then: existed. In 1952 the
problem so involved was that which necessarily arose in
the fabrication and assembly of a new. complex, and ex-
tremely dense airframe represented by the B-47 with a new
and inexperienced labor force which had to be trained.
In addition, it was necessarv for petitioner to train engineers
and employees of Lockheed and Douglas in both Wichita
and Seattle.
During its production of B-47's prior to 1952 and until
April of that year. petitioner did not deliver i in accordance
with the contract delivery schedules. By April of 1952, it
had attained the monthly rate of delivery required by. the -
contracts and for the entire year produced and delivered
the required number. Its delivery slippage was primarily
due to its inexperienced and untrained labor force, but was
secondarily due to. the.fact that its corporate executive and .
managerial organization was that of an essentially one-
plant manufacturer. By January 1. 1952. petitioner had be-
gun to make changes in its executive and managerial or-
ganization in accordance with recommendations made ‘by
a competent managerial consultant which it had employed
prior to 1952 for the purpose of identifying and defining
faults in its corporate set-up and its operation which had the
tendency to cause its cost of production to be high. The
35 «
consultant, who had theretofore been without experience-
‘in the appraisal of an airframe manufacturer but who had
‘much experience with automobile and other manufac- .
turers, determined that petitioner's lack of direct labor
standards was one of the prime factors leading to high
production costs. He recommended the-establishment and
use of complete. factory-wide labor standards but estimated
that.such a procedure would require 3 years to complete.
Although petitioner was using direct labor standards*to a
degree. it established a committee. which existed in 1952,
for the purpose of studying the feasibility of establishing
' and using such standards in the production of an airplane
- such as the B-47. Over 60 per cent.of petitioner’s labor
force was employed in its assembly area. and it did establish ~
and use additional labor standards in connection therewith.
- That portion of direct labor used in the fabrication of parts
it determinéd was not amenable to such standards, how-
ever, and didnot apply them to the same degree as to its |
assembly workers. Petitioner determined. after study pf the
problem. that’to the degree it-had not followed the recom-.
mendation of the managment consultant, such. proposed
_ changes would cost more than they would save in —
tion cost.
Although automobile manufacturers had successfully
used direct labor standards in the production of B-}7's and
B-29’s during World War II. these aircraft were’so much
less dense and presented such comparatively simple pro-
duction’ problems that their comparison from a production
standpoint with that of B-47's and B-52’s is not significant.
While an automobile manufacturer fixes his design at the
inception’ of each new mode' and makes few if any design’
or other changes. Boeirig. producirg an airplane the design
complexity of which. as originally accepted by the Air
Force, was without parallel. was forced to incorporate about
8,000 design and other changes therein while producing
36
510 B-57’s. About 2,000 such changes were ordered by ~-
the Air Force in 1952.-The Air Force had adopted a policy |
that speed of production was more desirable than absolute
conformance with contract specifications and to that end
accepted certain B-47’s which did not entirely so conform,
reduced petitioner’s profits according to such specification
shortages, and established a modification center at Tucson,
Arizona, wherein to bring such planes to specification. This
a or eee
of aircraft. |
Under Contract 6993 entered into in December of 1951
petitioner agreed to complete these modifications which
in addition to bringing each plane to. the specifications
existing at the time of its construction also in some cases
consisted of the incorporation therein of changes ordered .
as a result of the growth of the B-47. For 1952 petitioner
was reimbursed for costs incurred in such modification in
the amount of $11,661,257 and received a — in addi-
‘tion. thereto of $240, 341.
The Air Force directed that the modification work be
: subcontracted. and -when it appeared in 1951 that the
subcontractor was performing in an unsatisfactory manner
and petitioner suggested to the Air Force that it (Boeing)
perform. the work, the Under Secretary of the Air Force |
’ refused co permit the change. In order to make it possible.
for the subcontractor to perform adequatelv the required
modifications, it was therefore necessary .J1 petitioner to
assign many of its top grade personnel to the subcontractor's
plant in order to trains its employees As, of October 2.
1952, 178 of Boeing's finest shop, planning, inspection, and
methods personnel were so assigned. Whatever the defi-
ciencies were with respect to performance under this con-
tract during 1952, they are.not properly laid at ‘petitioner's
door. Its performance of this contract, in the light of the
above circumstances, was reasonably efficient. 7
es
37
.
As before stated, the basic B-47 is susceptible - -to great
growth possibilities. Changes ordered by the Air Force
emanated alike from it and petitioner. As the growth of the
bomber advanced the Air Force concept of its military use
altered and this alone accounted for many changes. It
was contemplated by both parties to these contracts at *
their inception that the B-47 would present novel procuc-
_ tion problems; that the speed of its production was a para-
mount necessity taking priority over comfiplete compliance
with contract specifications; that the later bombers pro-
duced, although like those first produced in basic conforma-
tion, would be radically changed ia many ways throughout
the performance of the contracts. and that time-consuming
testing would be required with respect to such changes.
In fact, both parties came to realize, as was the fact, that
the B-47 and the changes made therein represented such
an advance in the state of the art that the design of elec-
tronic, and other eqhipment. such as the bomb-navigation.
system arid jet engines, to be furnished by the Government.
had not sufficiently kept pace so as to permit petitioner's
incorporation of such equipment during production in.some.
‘instances. Nevertheless such variances from contract spe-
cifications were listed as shortages and deficiencies at the
- time of delivery of aircraft which for. such reasons did not
conform to contract specifications.
Certain deficiencies in design engineering were disclosed
upon testing of the B-47's. Typical of such deficiencies were”
_ the “Dutch-roll” and bomb-bay buffeting. Both were con-
ditions which became evident upon operation of the bomber :
_ atspeeds never before attained by bombardment aircraft.
The first has been described hereinbefore in connection
with the reversal of lateral controls. The latter was caused “
by the action of air currents entering the bomb-bay when
its doors were opened while the plane was operating at
extremely high-speed. This air action had an adverse effect _
38
+.
upon the accuracy with which bombs could be delivered.
Neither condition could have been reasonably anticipated
prior to the high-speed testing of the B-47. Another de-
ficiency in design engineering was disclosed by testing.
This was damage to the trailing edges of wings caused by
. high-frequency vibration of a part of the fuel injection
plumbing contained in the wings where, at certain speeds,
such vibrgtion would conform to and be accentuated by
engine vibration. Each of these deficiencies was corrected
by petitioner within reasonable times after their discovery:
No airplane in the procurement experience of the Air Force
was ever delivered without deficiencies and shortages. -
The term “combat-capable” or “combat-ready” was in
the. minds of both parties to B-47 contracts descriptive of \
the condition of B-47’s which were to be delivered by peti- ©
tioner although that term is not used nor*the thought other-
wise expressed in the contracts. The specifications and-the -
changes as ordered from time to time, though, do sum up
to the Air Force’s concept of those terms. Throughout the
performance of the B-47 contracts the concept of combat
capability, although basically unchanged, nevertheless al-
tered. with change orders brought about as the growth fac-
tor of the plane developed. From time to time B-47’s were
delivered to and accepted by the Air Force which therefore
were not “combat-capable.” Had the need arisen. however,
- #,.0,use-such planes in case of attack upon the United States,
they could and would have been used to deliver bombs to
an enemy target. In fact, in 1952, the B-47 was the chief
. deterrent weapon possessed by the United States. Although _.
some such “deficient” planes. were delivered, their mere
présence at air bases around the world had a deterrent
effect upon the enemies of this country.
_ The Air Force had adopted a policy of wide subcontract-
ing for a twofold purpose. It desired the manufacture, of
‘nomically depressed manufacturing areas. of ‘the country.
Petitioner, as prime design contractor therefor, in addition
to its own production commitments, became responsible.
for the production of B-47 parts in the plartts, of about 200
subcoptractors and ‘Parts suppliers throughou: the United
States. Some of them, principally those which had been
automobile or automobile parts manufacturers, not previ-
ously having had experience with the extremely close toler-
ances required for B-47 construction. had difficulty in the
performance of their subcontracts and fell behind delivery
schedules: It was necessary in those instances for top man-
agement personnel, much needed in petitioner's own plants:
to be sent to the plants of such subcontractors to instruct
them in production methods and procedures. Upon some
Occasions it was necessary for petitioner to cancel subcon-
tracts with such subcontractors. Petitioner fulfilled its obli-
gations. with respect to subcontractors with ordinary - effi-
ciency. . | Se
During 1952 delivery schedules were altered by the Air a
Force largely for the purpose of allowing sufficient time for
petitioner's incorporation in the B-47 of the numerous
changes ordered therein, the increased amount of testing
required thereby. and additional time for the arrival at its
plant of necessary Government-furnished equipment. such
as the bomb-naVigation system. For) that year petitioner
delivered and the Air Force accepted. B-47’s in accordance
with the contract schedules.
Petitioner's total investment in machinery, equipment,
property, and plant.-at Wichita during 1952 averaged
Na |
40!
_ $2,397,866. Government-furnished facilities of the same
kind: at Wichita averaged during that year $34,875,128.
- About 88 per cent of the plant floor space used by petitioner
in 1952 in Wichita in its production of B-47’s was Govern-
ment-owned and furnished to petitioner without charge.
In’ addition to the land, plant, miachinery, and equip- . -
ment referred to above, the Government paid for the spe-
cial (or contract) tooling, including jigs, dies, fixtures,
molds, patterns, and special gauges, usable on the B-47
_ airframe only. Machinery and equipment are usable in
the production of several types of airplanes or in manufac-
‘turing generally, while special tooling is usable only in the
production of one model or type of airplane, The special
tooling was included in the supplies called fOr in the con- *
tract, so that petitioner not only was reimbursed for the °
cost of procuring the special ee but received an ele-
ment of profit thereon.
_ .Under B-47 Contract 22413, as ‘under its other i oie
a-fixed-fee cay pao was reimbursed “currently” -
for costs incurred in the performance of the contiact, in
| weekly payments upon the payroll sheets, invoices, and“
other evidences of costs to petitioner. In addition, petitioner
received 90 percent of its fixed. fee in monthly installments
based upon estimates of the percentage of completion of
_ the work. Any unpaid balance of the fee was to be paid to
petitioner upon completion of the work,
Under B-47 Contract 21407, as under the o her incentive
contracts in force in 1952, petitioner received partial pay-
ments of 90 per cent of the lower of the.cost to petitioner
of the property acquired or produced in the performance of
the contract, or of the total contract price for articles still °
to be delivered: The remainder of the price was paid to peti-
tioner upon the delivery of the aspiane or other articles
' ~~ ¢alled for.
Se
41 7
In the inception of the cost-plus-a-fixed-fee and incentive
contracts under which B-47's and C:97/KC-97's wete
manufactured, arm’s lergth negotiations took place with
respect to each aspect thereof. “The same type of negotia-
tion took. place with respect to periodic’ change orders and
particularly. with respect to the fixing of a firm {arget cost.
The latter event took~place in the case of B-47 Contract
41047 in November 1952. The negotiators were highily
skilled and of more than ordinary competence on each side
‘ofthe bargaining table. The negotiators had available to
them experience in airframe procurement extending over »
Many years and including the more recent procurement
during World War II. They considered and gave what they
corisidered to be proper effect to petitioner's net worth as
applied to its prospective earnings. the fact that Govern-
ment facilities were furnished petitioner free of change. the
rates of profit prevailing in the airframe industry, the -
amount and source of publit and private capital to be em-—
: ployed: by petitioner iri performing the contracts, petitioners —
contribution to the, defense of the country. and, 4n fixing
firm target costs, to the “de* iciencies” of already delivered
irframes.- The. firm target costs thus arrived at were in
excess of $30,000,000 below. the proposals submitted. by
petitioner: Considering the complexity of design and the
great growth potentiality of the B-47 with the unknown or
unforeseeable changes which were to result therefrom. the
negotiators arrived at reasonably accurate cost estimates.
Contract 21407 provided that for the purpose of negotl-
ating a firm target cost petitioner was to furnish the Air
Force its proposed firm target cost estimates and -data-in
support thereof immediately upon completion of the 100th. —
B-47. which evert took place in June of.1952. Negotiations
immediately commenced after petitioner's compliance with
this provision. but due to the desire of the negotiators to _
obiain as much dctual current cost data as possible, peti-|
-. &
oe ae ae aoe
tioner was required to furnish such data currently as nego-
tiation continued. Largely because of this procedure the\—
firm target cost was not — upon until November of
: ee
Boeing's corporate existence to and including 1952 has |
been marked from its beginning by a state of abnormalcy
‘in the sense that it has not experienced any period where.
except for jong-lived Government contracts, its business has
become stable. Its sole customer for: all intents and pur-.
poses has been the United States. The exigencies of inter-
national politics have to a great extent constituted the
catalyzing factor which has precipitated contracts from
that customer. Whether those charged with the defense of
this country felt the imminence of danger and. the degree |
thereof determined the size of those contracts. _The-con-
tracts could and upon. occasion were terminated with little
or no notice by the United States. This resulted in petitioner
being forced to discharge nearly all its direct labor force
and all but key people in its engineering staff. When a
new contract was forthcoming it then became necessary to
re-employ labor and engineering personnel and train them -
in petitioner’s manufacturing techniques, a time-consuming:
and costly process. The extent of employment was depen-
dent upon the size of each contract and the extent of neces-
sary training depended upon the nature of the product to
' be produced thereunder. and the past experience of nev.
employees.
' Petitioner's price per pound of production i in the case of
’ the C-97: KC-97 decreased from $35.89 in 1946 to $15.15
in 1952 and its profits per pound decreased accordingly. In
the case of the B-47 its price per eis decreased from
$47.10 in 1949 to $22.53 in 1952.
‘The petitioner's cenegotiable profit for 1952, $56,.734.-
‘119, is 98- percent of the amount of its book net worth.
ee
43
$57,794,057, as of the beginning of that year. Adjusting its
book net worth at the beginning of the year to its average
book net worth for 1952 arid for the value of its design.
engineering, and over-all manufacturing know-how, we find
its percentage of profit to net worth was approximately 50
percent in 1952. Its volume of sales was among the 50
leading American jAdustrial concerns measured by the vol-
ume of sales. Of the 50 leading concerns, with the excep-
tion of petitioner; the average percentage of profit to net
worth during 1952 was 26.9 percent.
During 1952 petitioner's labor costs and those for ma-
terials, with the exception of direct labor jn the case of
C-97 /KC-97, production, were influenced: by a rising mar-
ket and were higher than in the immediately preceding years.
- At the same time its total average cost per airplane pro-
duced based upon a reasonably adjusted. statement of work
performed, in the case of B-47 production, decreased from
$1.781,000 for those produced under Contract 22413 to
$861,000 for those produced under Contract 21407 and
its cost per plane in the case of C-97/KC-97's produced
under Contracts 12450. 18821, 9825. and 14764 de-
creased respectively as follows: $1,286,000, $635.000.
$597,000, and $438,000.
/
Due largely to a rising general economy petitioner's pro
duction overhead costs at Wichita rose from $2.14 per hour
in 1951 to $2.82 per hour in 1952. :
Petitioner’s compensation to itscorporate officers was
low in 1952 in comparison to industry generally. Its divi-
dend policy was conservative based on the same compari-
son. It paid bonuses to its employces under an “incentive
compensation plan” of $2.500.000. The payment of
bonuses was based upon the profits of the company and the
plan was implemented at least partly as an incentive to
lower the over-all cost of production. oe
at
Petitioner's products under the contracts here involved,
with the exception of the C-97, bear little similarity to its
peacetime products. The only similarity is that in each case
the product is an airplane. The C-97 is the military counter-
part of the Stratocruiser commercial airliner which was pro-
duced for a short time by petitioner at the close of World
- War II. Its production of Stratocruisers resulted in substan-
tial financial loss. It, gs fact, has never prior to 1952 suc-
cessfully engaged in Business on’ a commercial basis. Its
construction of Stratocruisers for the commercial market
was primarily for the purpose of maintaining in its employ
a core of experienced engineers and production personnel.
’ In its history petitioner has had no peacetime experience’
which is reasonably comparable to its wartime experience.
Its history discloses no period’ of normal operation which is
reasonably comparable to its performance under the con-
-tracts at issue. E
Petitioner subcontracted, in terms of direct labor-hours
27 percent of its production of B-52’s, 32 percent of B-47
production, and 25 percent of KC-97 production. Its
production of B-47’s and KC-97's ir 1952 was almost en-
tirely by the use of Government-furnished facilities.
_ - Its 1952 profits, compared to industry as a whole, were
high.
- The petitioner's profits of $56,734,119 for 1952 are
urreasonable and excessive in the amount of $13,000,000.
» OPINION :
_ ° The burden of proof in these de novo proceedings: rests .
upon the petitioner to establish by a preponderance of the
evidence that its renegotiable profits during the year ended
December 31. 1952, of $56,734,119 were reasonable. In
determining the reasonableness of those profits. we are
guided by the provisions oi the Renegotiation Act of 1951
and aided by the rules’ and regulations of the respondent
45
and the decisions of this Court. The phrase “profits de-
rived from contracts’ with the Departments and subcen-
tracts” as used in section 103(e) of the Act is defined in
section 103(f) therevf as “the excess of the amount re-
ceived or accrued under such contracts and subcontracts
over the costs paid or incurred with respect thereto and de-
termined to be allocable thereto.” .
In its pleadings and on brief respondent takes issue with
petitioner's right to favorable consideration with respect
to every criterion for decision provided by applicable law
and its own regulations. Even so. however, its primary
_ contention is that petitioner's profits constitute an unrea-
sonable return upon its invested net worth during 1952.
Petitioner: recognizes that its return on its ‘book net worth
during,that year is abnormally high but contends first that .
its book net worth is an: unreliable. inaccurate. and unfair
picture of its true net worth and, lastly, that any use of the
net worth factor in this particular case is unwarranted and
of no, value in determining-the reasonableness of its profits:
that. in lieu therecf. we should measure its profits by a
comparative ratio of its profits to its sales.
We cannot agree with either contention. The contract-
‘tor’s return ch its invested net worth must be given consid-
' eration but in the light of and in conjunction with the other
_ statutory. factors. While. it is true that petitioner's return
of profit upon its book net worth indicates an unusually
high profit. its books do not accou,:: for the value of its
design engineering and manufacturing know-how. Al-
though the record does not show the specific value thereof.
when considered as a whole.” it .does~indicate that these
categories of know-how in the highly competitive airframe
industry constitute an asset which is of great value which
should be added to its book net worth in applying the net
worth factor. See Aycraft Screw Products Co., 80 T.C.
1037. a
.
46
The petitioner obtained the contracts here involved by
virtue-of the application of this asset in competition with
.its competitors. In order to remain competitive in the
industry, it is necessary that the design engineering staff of |
a member not only keep pace with the rapidly advancing
art of airframe design, but be capable of leading the ad-
vancement. This we think has occurred here with respect to
the B-47 and B-52 designs. It is reasonable to conclude
that this asset in petitioner’s case was of’at least the value
of all its book assets combined. So viewed petitioner’s re-
. turn on its whole net worth is approximately 50 percent.
Respondent contends ‘that, petitioner was inefficient in
its performance of each contract here at issue but empha-
sized on trial and on brief only those involving B-47, C97 ’
KC-97, B-52, Bomarc, and B-50 production in that order.
We here follow this lead. We have found as a‘fact that
petitioner. under the conditions prevailing in 1952. per-
formed ‘under the contracts in a reasonably efficient man-
ner. Over 61 percent of its profits for 1952-was derived
from Contracts 22413 and 21407 under which it manu-
factured B-47 airframes, Respondent. in contending that
petitioner was inefficient, completely disregards the true
conditions: under which these contracts were performed.
The B-47 was. of a character with which neither the Air
Force nor any manufacturer had theretofore acquired more
than meager manufacturing experience. It is true that the
basic .principle that an airplane must consist of ,fusilage.
wings, control surfaces, landing gear, and a means of mo-
tive power was ancient. It is even true that the swept-back
design of a'wing and a tandem or bicycle landing gear did -
not emanate from petitioner. The. fact is, however. that
the uSe of 2 thin, swept-back wing of: high aspect ratio
on a hombardment type aircraft was unique in 1952 and
prior thereto. The B-47 was designed to perform and did.
perform at speeds and altitudes never before attained. It
4)
contained equipment of a nature never before used in
bombing aircraft. The nature of such equipment, its fit-
tings, wiring, and placement created manufacturing prob- »
lems for which there was little if any precedent. The B-47
was the “densest” bombardment aircraft ever produced.
The-B-47 design as accepted by the Air Force during World
War II was so accepted substantially because of its unusual
growth potentiality. Both parties to the contract anticipated?
as was the fact. the exploitation of these possibilities. Be-
cause of this ‘factor over 8,000 change orders were
issued by the Air Force during the life of Contracts 22413
and 21407, 2,000 of them occurring in the year 1952.
These changes in many .instances required an alteration in
the design of the B-47 and many of such changes required .
exhaustive testing after their incorporation. The extent
of such testing and problems which arose from the changes
and were disclosed by the testing we are convinced could |
not reasonably have been foreseen by petitioner.
Another circumstance which is disregarded by respon-
dent is the effect of the Air Force's changing concept of
combat suitability or combat readiness. Neither of these
terms was used in the B-47 contracts, but it “is clear to us
that both parties knew and contemplated that the airplanes
were not manufactured in accordance with contract specifi-
cations unless they were capable of delivering their bomb
load accurately upon an enemy target while providing a
degree of safety for the crew and the capability of return
to base. However, combat suitability was a variable term
in this instance. As exploitation of the B-47 growth poten-
_ tial progressed. more and better performance was expected
by the Air Force in order for the plane to fulfill its concent
of combat capability. Some of the B-47’s delivered to and
accepted by the Air Force in 1952 were not, by this meas-
ure, combat-suitable. In many instances this was so because
Government-furnished equipment. such as parts of the
48
watei injection system, jet engines, bomb-navigation sys-
tem, and electronic defensive armament, ‘had not been
available to. petitioner at the date of delivery. In most cases
their. nonavailability was caused by the fact that their ~
manufacturers ‘had not kept pace with the advancement in
the art of airframe design exemplified by the B-47.
Respondent complains that the B-47's in some cases
evidenced faulty and inefficient design engineering. Typical
of such cases is the “Dutch-roil,” cracking of trailing wing.
edges caus sonic vibration of water injection plumbin;,
installed i¢ the wires, cracking of and difficulty in jettison-
ing the copkpit canopy, and bomb-bay buffeting caused by
the air ts entering the bomb-bay when its doors were
: . Each of these difficulties became eviderit only
upon the high-specd testing of the airplane and could not in
our opinion have been. by the use of design engineering effi-
ciency, foreseen prior to actual testing ‘These defects, along
with others pointed to by respondent. were corrected as
speedily as was reasonably possible by petitioner. We note
too that the Air Force in ali its procurement experience had -
‘never known of an instance where an airplane had been
delivered without deficiencies and it is in fact ‘clear from
this record that it viewed thie B-47 procurement with such
deficiencies in mind. It adopted a policy upon the advent
of the Korean hostilities of accepting B-47's as rapidly as
- possible whether or not they were in every respect combat:
suitable and. under contract with petitioner. ‘set up a reha-
~ bilitation center at Tucson. Arizona. wherein to bring such ~
planes to a state of combat suitability.
Respondent complains too that deliveries of B-47's fell
behind contract delivery schedules. While it is true that
the required monthly rate of delivery was not being met
during the first part of 1952, that rate was me‘ by April
of that year and its deliveries for the entife year were in .
*
49
accordance with contract delivery requirements. Under the
circumstances we are unable to conclude that petitioner
was inefficient in its design engineering or the quality of
B-47’s produced or its compliance with delivery schedules
in its production of B-47's.
Respondent, in contending ‘that petitioner was ineffi-
cient, points to petitioner's failure to adopt and use time
and motion man-hour standards in its B-47 production at
Wichita. In doing so, it implies that petitioner should have
more closely complied: in that respect with the recommen-
dations of a management consulting firm which petitioner
had employed in 1951 ‘0 make a management survey for
the purpose of identifying management problems in its
corporate organization and management operations which
tended to result in high cost of operation. That petitioner
obtained the consultant's. report and recommendations
tends. it seems to us. to evidence an intention and effort to
lower its cost of operation. That petitioner did not during
1952 adopt and put into effect completely the ‘onsultant’s
recommendations is: understandable and not inconsistent
with the efficiency of its operation. The consultant, al-
though widely experienced in the operation of manufactur-
ers generally, had never theretofore surveyed and made
recommendations for the improvement of operation of an
airframe manufacturer. An examination of his report and
review of his testimony leads us to believe that he was
‘preoccunied in his opinions with the use of direct labor
standards in the automobile industry and particularly with
respect to such standards used by that industry in the pro-
duction of B-29 bombers during Wofld “Var II. We do
not find that the operation of an automobile plant to con-
struct either automobiles or B-29’s was sufficiently akin to
petitioner's production of B-47’s*to warrant a conclusion
that universal company-wide use of direct labor standards
would necessarily have resulted in greater efficiency and |
.
resulting lower cost of production. The underlying differ-
“ence lies in the nature of the asticles being manufactured
and the manufacturing policy relating theteto An auto-
‘mobile is mass-produced 1 in numbers far greater than those
involved in -petitioner’s production of B-47’s. Mass-pro-
- duction machine tools are there usable to a much greater -
extent because of the auto-manufacturer’s policy of adopt-
ing a fixed and virtually unchanged design for each model,
production of which is much greater in -number, while
petitioner was here required in the year 1952 alone to
adopt and adapt into its manufacturing operations about
2,000 changes, many of them being so basic as to require
a change in design while producing comparatively few-
_ B-47’s. To a lesser degree. the same may be said with
respect to the manufacture of B-29’s. Compared to the
B-47, its design was relatively simple and it was much less
- dense in that more internal space was available for the
assembly operation. Petitioner employed only about 60
percent of its direct labor if the assembly area of its plant.
. while the remaining 40 percent was employed in the fabri-
cation areas thereof. After detailed and conscientious study
of the recommended adoption of complete labor standards.
_ petitioner, in the use of reasonable management judgment.* -
determined to use such standards in its assembly function
and to use them to a lesser degree in its fabrication function.
It had employeu such standards in its assembly. areas prior
to the report of the consultant and continued to do so. in~
195Z. In-the consultant's opinion a period of-3 years
would have been required to insta]l complete labor stand-
ards in petitioner's plant. Petitioner judged it to be doubt-
ful that the cost of installing such standards over that period
of time would actually lessen its cost of production. We
think petitioner's use and nonuse of direct labor standards |.
@ was justified under the above circumstances and did not
s result i in inefficient performance leading to high produc-
51
Respondent contends too that defects in petitioner’s cor-
porate executive line of authority aad responsibility tended
to inefficient management and resulted in high production
costs. It is true that prior to January 1. 1951, nearly all
of petitioner's executive authority and the responsibility
for its over-all supervision and management resided in its -
president. Its character was that of a-one-plant, single-site
manufacturer. In essence, when petitioner was not manu-
"facturing under contracts with the Government, it was a
one-plant operation centered in and about Seattle. When in
.1952 the Air Force greatly expanded its demand for
B-47’s and still required that they be manufactured in the
Government plant at Wichita, Kansas. the resulting decgn-
tralization of petitioner's @peration would have lace a
nearly impossible burden upon its president had petitioner
_ failed to alter its executive function. The management con-
sultant, above referred to; had pointed to the foregoing situ-
ation asa defect in petitioner's corporate organization -
which would lead to high-cost production and had, in 1951.
_ recommended rather sweeping changes therein. Among
such recommended changes-was the delegation by the pres-
ident to executive vice presidents of a portion of his execu-
tive authority and responsibility. As of January 1, 1952.
petitioner had transferred such authority ‘to an executive
_ vice president who was made responsible, for petitioner's |
Wichita operation, and he remained in that. capacity
throughout 1952 -and theréafter. In our view whatever
high production cost tendencies existed prior to 1982 which
were caused by the c.1c-plant. one-site charact ‘of petition-
er’s corporaté organization were with reasonable prompt-
mess corrected or.in the process of being corrected by:
January | of 1952. ,
Respondent also contends that petitioner was inefficient
‘and negligent in its compliance with the directives of the
B-47 Committee. referred to in our findings. The chiei
52
complaint is with respect to petitioner’s alleged failure to
furnish Lockheed and Douglas timely with master gauges
cand design information which would permit those com-
panies to begin the production of B-47’s earlier. Although
the record does indicate some delay in the early stages of
the operation of the B-47 Committee with respect to peti-
tioner’s furnishing of master gauges. it also shows clearly
that because of petitioner's cooperation and attention to
the directives of the Committee,; Lockyged and Douglas
were able to begin full ‘production of B-47’s earlier than
had been expected by the Committee or the Air Force. We
.think respondent's complaint in this respect is not well
grounded. — : = 3
~ We have carefully examined the record with respect to .
the alleged inefficiency of petitidher in thé supervision of its
many subconfractors and suppliers and cannot conclude
that, under the circumstances, petitioner was less than
ordinarily efficient in this regard. The policy of the Air.
Force with respect to subcontracting was that it be carried
out on as wide a base as reasonably possible; that the plant
facilities and labor force of economically depressed areas of
the country be employed wherever possible. This resulted
in petitioner, which as prime contractor was responsible for
the perfarmance of subcontractors, having to provide the.
necessary supervisory and other personnel to supervise
about 200 subcontractors and suppliers with respect to
the B-47 production alone. A» has been before stated. the
tolerances necessary and allowable for B-47 production
were theretofore virtually unknown in the manufacturing
industry in this country, particularly in the manufacture of
automobiles. Automobile ffanufacturers comprised a sub-
stantial proportion of the subcontractors used in the pro-
duction of B-47’s. Even though petitioner needed its ex-
_ perienced and trained personnel ‘in its own proc uction of
B-47’s, it was forced to assign substantial numbers thereof
b
‘33
to, the subcontractors’ plants for varying periods in order to
train sufficiently the subcontractors and in some cases assist
in the lay-out of machinery in their plants to permit them to
perform adequately under their subcontracts. In some cases
it was necessary that subcontracts be canceled because of
the inability of certain subcontractors to produce to such
close tolerances. It must be borne in mind too that-peti-
tioner’s supply of experienced and trained personnel was
limited in- 1952. No subcontractor could be employed or
discharged by petitioner without the authorization of the
Air Force or the B-47 Committee. Even so, respondent com-
plains that pétitioner did not furnish sufficient supervisory
help and. in those cases where it was necessary to discharge
subcontracto- did not discover their inadequacies and —
discharge them soon enough. We think respondent is un-
reasonable in this complaint and that petitioner was reason-
ably efficient in its relations with subcontractors.
Petitioner’s performance under the B-47 contracts is
graphically illustrated by its cost underrun of the 80 per-
cent improvement curve which represents the average cost
of production improvement in the airframe industry in this
‘county. Its performance was on a 65 per cent improve-
ment curve. Respondent contends that. this illustration is
misleading and not significant ‘because such an improve-
ment curve. prior to the setting of a firm target cost. incor-
porates costs which were incurred only once and which are
nonrepetitive. We are unable to follow this line of reason-
ing as the very nature of an improvement curve seems to us
to require the inclusion of all costs repetitive or nonrepeti-
tive, and it is obvious that, nonrecurring expense being in-
cluded in both curves. the cost underrun is valid and signifi
cant. The inclusion of nonrepetitive costs. which might be
expected in the early stages of production of an article as
complex and unique in its manufacturing problems as a
B-47, would be the very factor which would impart the
&
os ’
>
. (se ®
\ 2?
rapid reduction in cost evident n n improvement wk
of these percentages. Because pe itioner’s production costs:, ..
underran the industry average, $5,826,656 profit accrued
to petitioner in 1952 ufder the incentive pfevisions of its
contfacts, over $4, 000,000 of which is attributable to Con- —
tract 21407. | me
!
€
# The record is clefig’t that in 1952 petitioner's ‘deliveiies of
. s wére on schedule and that the B-47 which it pro-
uced was of*food quality and exceeded in performance the -
“expectations of the Air Force. If any portion of petitioner's :
profits for 1952 was unreasonably high, it did not result.
om any ineffici@Acy in its manufatture of B-47 bombard-
ent aircrafte . eee.
In 1952 petitioner was under contract to manufacture ©
* B-47’s in Wichita, B-52's and Bomarc missiles in Seattle. |
and KC-97’'s in Renton. In addition it was the prime con-
.tractor responsible for the performance Of:about 200 sub-
cc.stractors and many parts suppliers and also was Apecenl ?
to do all things necessary to the’advent of two of its com-
petitors into the manufacture of B-4XKs in addition to func-*
tioning as a member of the B-47 Joint Production Commit-
tee and overseeing and being responsible for the perform- :
~ * ance of, a subcontractor located in Tucson, _Atizona, who —
wi
arged with the bringing, = all: “deficient” ‘B-47’s |
to. Mate of “combat capability” or “readiness.” Generally,
- with respect to each of its inlets a different person or-
officer, responsible to the Ait Force, was charged path over- |
seeing pétitioner’s performance in respect thereto“¥n each
case: such individuals were-understand&ly primarily: inter-
“ ésted in only that function each.was to oversee. The ten-
dency of such soverseers was to consider as performance
defects any emphasis placed by petitioner Upons@ne or the
other ‘of its contractual obligations which was at.all detri-
: mental to another such obligation.” We think this record is _
‘
aa ~
a)
55
o
>
replete with such instances which -accouhht largely for_re-
spondent’s contention that petitioner lacked ee
the performance: of these contracts. .
Complicating the picture still further i is the fact that ae
manufacturing problems incident to the B-47’s were in
many respects unprecedented and had to be solved as pro-
duction proceeded and this while petitioner was incorporat-—
ing some 2,000 changes ‘in the product being manufactured,
many of which changes involved changes in or new design.
The tooling problems with. respect to gaan for pro-
-dyction of B-52’s were so se edented that -
l
" they ‘constituted the most difficult
. groping'in the dark With respect to the costs involved. The .
perienced aeronautical engineer dad ever encountered.
The Bomarc misile prototype construction and testing
represented the first effort of the United States to enter the
anti-missile missile field and also necessarily presented
theretofore unknown problems. With respect to B-52 and
Bomarc contracts both parties thereto were more or less
’ statutory criteria for decision aré jn. jarge part unhelpful
_ tracts leaves someth
with respect to the latter contracts bécause of the nature of
the “work being performed | and the eecnait ——
thereunder. ,
g to be desired in the way of design
engineering efficiendy. This aitplane is a tanker. the pur-
pose of which is to refuel B-47% in flight. Important in their
equipment is tankage for aircraft fuel, In 1952 it developed
that-such tanks had been designed. by. petitioner and pro-
duced by a “subcontractor with: the metal comprising the
ends thereof of insufficient gauge to withstand the stresses.
of changes of altitude so that some of them collapsed in use.
Although this defect: was -promptly corrected after its dis-.
Petitioner's at ides te C-97 /KC-97 --con-
‘covery, we think petioner, by the use of ordinary effi-
ch pioblems an ex-
é
-
<
=.
%
ee fy NL a: ®
ciency, could and should interes the problem and de- .
signed to avoid it thus reducihg jts cost of production. Other.
_ deficiencies in the KC-97 plant $0 by respondent do not
- appear to have been foreseeable or discoverable short of |
actual testing, and they appear to be the defects-which
~ would normally: appear, in the development of anew oduct. |
- Petitioner's performance of its B-50 contracts was not —
impeded by the factors above noted with, respect to per-
formance where’a new product was iavolved. The B-50
is @n improved version of the B-29 borftber with respect to -
which petitioner had, during and before 1952, much manu-
facturing experience. [ts Contract 14809 called for the de-
livery of 36 B-50's in 1952, It actually. delivered only 22
of them. The record contains no adequate. explanation or
excuse for _Boeing’s failure'to deliver B-50's in. accordance
‘ with contract delivery schedules. Petitioner’s cost reim-.
| bursement. under these contracts was $22,557,860 and its —
profits $1,852,366. It was.clearly inefficient in its ae?
of B- 50's in 1952.
Because of the assurance of return of all costs expended
or incurred by petitioner with respect to its performance
of the contracts here involved and the periodic payment
of profits which are based upon negotiated estimated costs,
'_we find petitioner incurred no risk of loss thereunder with-
‘in the meaning of the Renegotiation ct by reason of any
failure to meet. delivery schedules or faNure or inability to
"meet quality specifications. The only possible risk inherent
in any of these contracts is exemplified by the B-47 incen-
tive contract where petitioner would receive no profit but —
instead would experience a loss im case its cost of produc-
tion overran the firm target cost estimate by: 125 percent. .
Under the facts we do not think this risk was at all signifi-
cant. It is clear from the record, however, that petitioner
did incur considerable risk of another sort.
‘commercial airline use were voluntarily relinquished in its
e e ~~
cAs we have found, the airframe industry is extremely.
competitive and has experienced increasingly’ rapid ad-
vancement in the art of airframe design. ‘This condition.
has, in fact, led us to conclude that petitioner’s design en-
gineering staff and manGfacturing know-how are to,be
considered a part of its net worth in considering the statu-
tory net worth factor. Because of the decision of the Air
Force to have B-47'§ manufactured by two of petitioner's
competitors and petitioner's ¢ ration with that decision,
these competitors were ied ih possession of master
“gauges and designs develéped -by petitioner and their engi-
neering and labor personnel trained in petitioner's manu-
facturing technique and procedures. In short, the competi- ~
tors were given petitioner's manufacturing know-how with
respect to the manufacture of an airplane’which was clear-
-ly a prototype for future commercial airline use. Petitioner
believed at the time that a potential commercial market
existed for such airframes. After events have borne this
out. The benefits petitioner would normally have expectéd —
to reap because of its position as the designer and developer —
of the first swept-wing jet-powered airplane suitable for
cooperation with the B-47 Committee. That it was paid for
its part in making it possible for Douglas and Lockheed to
manufacture B-47’s does not in our view detract from the .°
risk it incurred. nor adequately compensate it for this type
*. of risk.
Because in this case we lack most of the statutory cri-
teria for determining the comparative reasonableness: or
* excessiveness of petitioner's 1952 profits, we have used
the net werth factor to a large degree in determining she
eae or excessiveness of petitioner’s-profits as a
‘comparison to other. business. In doing so, we have ad-
’ justed petitioner's book net worth to include what we have
concluded is a fair value for its design, engineering, and -
——.
58
»
; manufacturing know-how and have used an average 1952
book nef worth as distinguished from its beginning 1952
book net worth. We have not adjusted the book net worth
> reflect current market vatue of its assets because there
is no comparative criteria in the record based upon such
‘an adjustment to net worth. We have ‘considered the fact
that, whatever petitioner’ s adjusted book nef worth may
be, it.was to some extent invested in ifs work in progress
during 1952 for a period beginning years prior to 1952
with its first efforts in the design and development of ‘the
B-47.,We have by this method arrived-at a ratié of profit to
net worth of about 50 percent, The ratio of profit to aver-
‘age book net worth for aff mamufacturers in 1952 was
22.1, per cent and when limited to the six manufacturers .
‘of airplanes and parts, shaving no long term debt, before °
renegotiation of their profits the ratio is about 44 per cent.
This sentence is as revised by orders at Vol. -II, 201, , 260.
Prior thereto, the sentence read (Vol: II, 190): .
o “The-ratio- of profit to average book net worth for
‘all manufacturers in: 1952 was 11°87 percent and,
when limited to the manufacturers of airplanes and
parts, the ratio is 16.83 percent.”
Petitioner urges | that in lieu of the net worth factor we
‘should use as a more meaningful factor the comparative
ratio of profit to’sales. We have not done so herg for the
reason that such a factor does not take into consideration
one of ,the important differences (so. far as the record
shows) which may exist during 1952° between. petitioner
and other manufacturers ‘including those engaged only in
airplane manufacture. That difference may. be the great
preponderance in petitiorier’s case of Government-furnished
. facilities and production equipment over that furnished by
petitioner. The record is’ silent in this respect with regar
_ to others engaged in the manufacture of airplanes d
° . . \
59°
= other. manufacturers generally. We think, as the respon-
dent contends, that petitioner's profits cannot be viewed in
the same light as those of.a mantfacturer which in perform.
ing a Government contract furnishes all or a major pro-
rtion_of, the manufacturing facilities’ used. It seems clear
to us that, regardless of petitioner's efficiency, its comiri-
bution to the defense effort, the risk it assumed under the
>
- B-47 contract, and’ the complexity’ of the. manufacturing
techniques required in its performance of the contracts at
issue,-its function with respect to the production of B-47's
and C-97 /KC-97 airframes was, as respondent contends, to
some extent that of a manager and not a manufacturer. That
is not to say, however, that in the light of the-other.statutory
factors, petitioner's profits can be limited by this fact alone.
Clearly in producing’ a new and complex product as
rapidly and of the quality represented by the B-47, begin-
- ning with a virtually unmanned facility (the Wichita plant)
and at the same.time making it possible for its two chief.”
competitors (Lockheed and Douglas). to manufacture them
_. and supervising the dutput of highly complex par by ‘many
inexperienced subcontractors ant supptiers-conselutes: tigre aasan
formance of these contracts which is deserving of higher
compensation than would be indicated by the sole criterion
of the percentage of contractor-owned facilities employed
in the manufacture of B-47'’s and C-97/KC-97’s. Particu-
larly is this true when the importance of the B-47, the BS2.
and the. Bomarc missile to this Nation’s defense is con-
sidered. | a
We have therefore concluded that on a comparative basis
‘petitioner's 1952 aggregate profits are unreasonable and
excessive to an amount less than that contended for by
/
respondent. ee. >
The contribution¢made by petitioner ‘to the defense of
the United States myst be viewed with respect‘to its 1952
-@¢
60
experienice alone, Brsicalty its desig <'ths 8-47 ‘and the
KC-97, together with its in-flight refueling equipment, and
its design of the B-52 were accomplished prior to 1952 and
cannot be considered a contribution in that year. The cop-
notation vf.the tion” as used in the ‘Renego-
tiation Act i is, in our view, broader than its dictionary mean-
ing. It iste notconly services performed without com- -
- pensation, but the cooperative and enthusiastic performance
* of that work and, in addition, the importance of th® product
produced and the services rendered, even though paid for,
_ tothe defense of thiscountry.
There can be no doubt here that those charged with this
country’s defense in 1952 believed the country to be under
imminent peril of attack by an enemy or enemies; that they
had fixed upon the B-47 bomber as our chief deterrent to
such attack’ and were so determined to obtain B-47’s as
rapidly as possible that a policy was adopted whereby: they”
would be accepted by the Air Force with deficiencies in
ness at our Strategic Air Command bases around the world.
session of this country:and were in that year superior in
quality and performance to any bomber or interceptor air-
_. plane then in existence as an operational weapon.
. for its function was to extend the range and rns
. The KC.97 tanker airplane and its in-flight -refueling
equipment were likewise of great importance to our defense
capacity of the B-47. i ¥
- _combat capahility i in order to have them in apparent readi- -
<t
4
The development of the Bomarc anti-missile interconlt
nental ballistic mfssile was the initial phase of this country’s
effort to counteract ‘the threat of nuclear~attack from
this country’s defense is self-evident.
: :
abroad, and we think its importance as a contribution to’
ae
They constituted, in 1952, the best air weapon in the i > @
AT a atin Oe Mi Seay
a
61
We take judicial ‘notice of the fact that the creation of .
each new and increasingly efficient and potent weapon
throughout history has been accompatiied or closely’ fol-
. lowed bythe creation of corresponding defenses thereto.
. For that reason the designing and construction of tooling for
- the two experimental B-52’s were likewise of vital i
“ance to the defense of this country. The B-52 represented
an advance over the B-47 as great or greater thani the latter's
_\
advance over the B-29 of World War II fame. It has now
become the chief deterrent ‘weapon ‘of the Strategic Air
Command and as such, together .with our missile strength
and the continued use of B-47’s, constitutes a-major defense
weapon. Petitioner’s cooperation with the B47 Joint Pro-
duction Committee arid with its incidental delivery to its
cémpetitors of not only designs and master gauges devei-
oped for manufacturé.of the B-47, but its delivery to them
_ Of and the actual training, of their personnel with respect
to its manufacturing and procedural know-how constitute, a
we find, an important, and substantial contribution to this ~~
-country’s defense. in 1952.
Prior to 1952 petitioner’ s corporate character was essen-
" tially that of a centralized, one-plant manufacturer._Upon
the acceptarice by the Air Force of its B-47 design with the
resulting contracts for its manufacture at Wichita, Kansas,
and .the contract for the manufacture of C-97/KC-97’s at
' Renton, Washington, petitioner was forced to reassess the — .
capability of its corporate and-managerial organiz organization in
_4 ae light thereof. At least partly at the suggestion of the
Air Force, it employed the services: of a competent man-
agement consulting firm for the purpose of identifying and -
making suggestions with respect to the correction of such
’ corporate organizational defects.as would tend to cause in-
efficient, high-cost operation. It, thereafter, beginning in
January of 1952, began to alter its corporate organization
so as to delegate its executive managerial function to execu-
a
62
tive officers who were placed in immediate charge of and —
mage responsible for the nee of each of its manufac-
turing divisions. :
. The source and nature of menetiale used by petitioner ‘do
not appear to be‘ of material significance here. The com-
"plexity of petitioner's manufacturing techniques was con-
- reference not to a parts and materials supply but to the item
troHed by the complexity of design of the B-47 and B-52
airplanes which we find to be unprecedented in the air-
frame industry and with which we have dealt more in detail
elsewhere herein. The bulk .of the subcontracting, its-na- -
ture, and petitioner’s problems in connection therewith
have also been dealt with above. )
The statutory use of the phrase “inventory turnover” ‘has
of property to be sold. In this case it consists of work: in
progress, i.e., airframe at varying stages of completion.
- We do not find the inventory. turnover factor. to be. of sig.
}:
nificance here for the reason that the. evidence before us
indicates that various methods of ‘computation, all of them
justified to some extent, produce turnover rates for peti-
tioner of from 20 times to 2'times per year. Six inventory _
Aurnovers was. the average-in 1952 for the 49 other leading
; American industrial concerns heretofore mentioned.
Of ‘greater significance we think is the fact that peti-
tioner’s operations were largely financed by the United
States through. early reimbursement.of costs and payments
OF profit through progress payments and the furnishing of
: generally have'been given due consideration in the negotiat- °
Government-owned manufacturing facilities. Petitioner |
contends that the latter factor particularly and the former
ing of the rates of profit negotiated with respect to the B-47
and C-97/KC-97 contracts. Respondent contends, on ‘the
other hand, that whatever those rates were ‘they are unrea-
;
sonable in ‘view of the fact, as it contends, tHat with respect
$-
aga
Fan.
Sy : 63
to these two products petitioner acted only as a manager
_ and not as a manufacturer and that the negotiated rates are
premised upon the proposition that petitioner was to bear
__ the same risks as one who finances hiniself in these respects.
- Petitioner’s rate of profit on thé B-47 contract was: 7/2
percent of al§wable costs. On the C-97/KC-97. contract it
was 9 per cent of such costs with respect to deliveries under -
Contract 9825 and 8 percent under Contract 14764. Inas-
much as these rates are roughly in the same rapge with -
rates for products produced and services rendered in facili-
_ ties wholly-owned by ag we are unable to-agree
-- with petitioner’s contentign. -In this connection we note
that the negotiated es compare favorably, so far
as this record. is concerned, with. other“ airframe manufac: |
turers’ rates of profit where, so far aS is shown here, such
other manufacturers’ have furnislted their own production.
facilities. Et follows, we think, ‘that petitioner’ s rates of profit
on the B-47 and KC-97 contracts weré to some extent. un-
‘reasonably high and clearly so’ when applied to estimated
as ee: from actual cost of ‘production.
It is with respect j6)the application of subsection 103( e):
\C 6): that it most strongly appears titioner’s 1952: profits
ob over $56, 009,600 are to an ext t unreasonable.
Eighty and eight-tenths percent-of the profit here under
consideration was derived from performance under what - ~
‘ are here: termed incentive contracts.. Such contracts are .
based’ —— cost ‘of production: They are exem-
plified by ract 21407 whereunder petitioner re-
_ &eived a fixed» and unchangeable percentage fee applied |
to a firm target cost negotiated and agreed to subsequent ~
to the delivery of the? 100th B-47 ‘and. 20’ percent of the
* difference between the firm target cost and actual costs as
negotiated and agreed upon at the termination of the B-47
contracts, but only in case attual cost underran the target
cost. In case. petitioner had overrun the target cost its profit _
- :would have been 8 percerit of target cost less 20 percent
of such overrun. Should the overrun’ have exceeded the -
target cost by 125 percent, petitioner was ‘required to pay
~ all costs above that percentage and in:casé the overrun ex-
-. ceeded about 121. percent, petitioner would have ceased
+ wealizing a profit. “Such contracts shad been put in use
. in Air Force procurement in order that an‘ incentive for
the lowering of production costs be made available to con-
’ tractors. Contracts 21407 for the production of B-47’s and
_ 14764 “for the production of KC-97’s, togethet with the
. other incentive contracts under which-petitioner received.
‘ renegotiable profits in 1952, did not carry out the Jaa
of tending to lower production costs.
Boeing in 1951 was an inadetjuately financed and
equipped airframe manufacturer as compared to its aggre-
. gate obligations under fhcentive contracts then in force and
contracts which were of that type executed-in 1952. It is
reasonable. to conclude from this record that this condition
was one of the ‘prime factors leading to the use of such
contracts in ¢his instance Boeing” was the designer of and
_ had the only production know-how with respect. to’ B-47's,
'. the refueling equipment of KC-97’s. and B-52’s. The Air
Force, due tc what it considered to. be an imminent threat
of attack upon the United States, required the manufacture
and — f B-47’s as rapidly as possible. It was there-
fore ‘that Boeing be maintained in a healthy finan-
cial condition: and that no time or effort should be lost in
_ its self-financing, To that end, some basis for such financing
' was sought and weekly progress payments based upon ac-
tual costs and monthly payments of a portion of Boeing’ s
profit were agreed upon. In order that Boeing might main-
P tain its operating- capital position, it was agreed that its
: _pbasic profit payments would be unalterably fixed at.a per-
centage of the cost of production which it and the Air Force _
é
iS aa © 65
could agree upon prospectively as an estimate, taking into
. . account all known and foreseeable elements of cost. In the —
instance of the B-47 ahd-R-52, due.to their great advance
"in ‘the art, their manufacture was bound to ptesent unex-
pected design and production problems, which contingen- —
cies constituted an undesirable risk to petitioner’ S operating |
cash position, alike undesirable to both h parties. T two
aspects of ‘the incentive céntracts. before us were clearly
ie adopted as a substitute for bank financing.“That this is true
is further demonstrated by the fact that although the Gov: :
ernment agreed to take title to work in progress, as pay-
q ment ‘therefor was: made, it was at the same time agreed
‘ _ that petitioner would not thereby, be relieved of risk. We
3 “view these payments’ regardless of their labels as in the —
nature of loans. Actual profits and costs in thei entirety
could not be dnd’ were not; under these contracts, rmin-
‘ able until the contracts had been fully performed in a year
| subsequent to 1952. This is true because, although by far
the greater portion of petitioner’ s profit was based upon «.
. estimated cost, a substantial portion represented by incen-
tive profit could be determined only after agreement upon
_ actual allocable costs at that time. In view of its inadequate
financing Boeing, literally could not await the completion —
of these contracts for its: profit and remain in business. The
B-47 procurement was, when initiated, the largest single~
procurement evér to that time made by the military serv-
‘ ices of this country. Both the Air. Force and petitioner
_negc~iated the estimated cost thereof in its. incéption and
". at the time of the cost-reset in good faith, with highly quali-
fied negotrators, with mitch past experience in airframe
_. procurement and with full knowledge of all available in-
formation on the subject. In setting the rate of profit on the
estimated “cost, they considered and gave what they con-
sidered to be proper credit to the Government for its facil-
ities furnished me —* without charge. In connection )
pie ae
». & =
‘ Caw —s .
Leet He Ht at OR RR
e .
-, 56
therewith they considered and gave effect to the relation-
ship of petitioner’ s net worth to its anticipated profits. They . *.
considered and gave ‘effect to the source and amount of
‘petitioner's invested capital. They could)not. however, for
lack of. precedent, foresee and give effect to the problems
which arose because of the complexity of design of the
B-47 and because of its great grewth potentiality. That
_ the latter factors were unknown strengthens our belief that
- - neither party envisaged | “the progress payments as other
than Government financing of petitioner. -
Because petitioner’s real profit was not detefminable —
until the incentive contracts had been fully performed, it . :
follows that under those contracts such profits were fin-
ally fixed when actua! costs were known. Actual cost be- — -
ing determinable when final profits weré computed we see _
‘no justification for the payment to petitioner of more profit
than that which would accrue to it by application of a—
reasonable percentage profit rate to actual as distinguished
from estimated costs. Otherwise, with that rate applied te
estimated firm target costs the very purpose of this type
of contract is vitiated. With the rate factor so applied it is’.
obvious it will produce profits in direct ratio to the esti-
mated cost, thereby creating a high estimated cost incen-
tive rather than the contrary. Coupled with the 20 percent:
a of underruns of cost, the high estimated cost
tendency is enhanced. Only provided the profit rate factor 7
is applied to actual cost and.the firm target cost estimate
ased as a measure for under- or overruns does the ef- *
fect of the contract provide any incentive to lessen actual
cost. Even so applied, however, such contracts are iden-
‘tical with cost-plus-a-percentage-of-cost contracts. in that
they contain an obvious incentive to increase actual
cost. This is offset only by the necessity to lower actual
cost in order for thé-contractor to share in the underrun
on a 20 percent basis. Simple arithmetic demonstrates .
_
She RE
. R 67-_
_that the 8 percent profit factor.is of more importance
dollar-wise than the 20 percent factor until cost under-
"runs approach 40 percent at which point the two factors -
take on equal weight. It is enly at this point, which we
think is unrealistic, where real incentive to produce at low
cost begins to’exist under such contracts. There is io such ee
cost underrun here. saa ; ;
, In our view, even in the light of petitioner's over-all ef-
ficiency in ‘the’ performance of the contracts before us and -
the favorable consideration to be given it with respect: to
the application of the risk, contribution, and character of
business factors, its rates are not commensurate with its ,
- ‘performance of the B-47 and KC-97 contracts by the use
v/
of- largely Government-furnished facilities, and the use of
those rates in the incentive contracts under which by- far
its greatest profits were collected constitutes an unconscion--
able exploitation of the ‘United States in its procurement of
military necessities. — .
After consideration of the record as a whole. we have.
>.
found as a fact that petitioner's profits for’ 1952 ‘in the
amount of $56, 734,119 are unreasonable in-the amount
of $13, 000. 000, which latter amount is to be eliminated.
me “An | eee will be entered
; in Accordance herewith.
= ~
4
69
APPENDIX B
UNIT ED SFATES COURT OF APPEALS
FOR THE NINTH CERCUIT
“a
tHe BoEING ComPANY, formerly rt
rplane Company,
me
— No: 18 276
. Dec, 12, 1963
VS.
Tir RENEGOTIATION BOARD OF THE
iy UNITED. STATES OF AMERICA, - ‘e
Respondent.
On Review ieee the Tax Court
_ - of the United States
e-
224
Before: POPE, HAMLEY and | DUNIWAY; ‘Circuit Judges .
_ DUNIWAY, Circuit Judge:
This case arises under the Renegotiation Act of 1951.
‘50 U.S.C., App. §1211, ff. Involved is the amount of ex-
-cess profits received by the petitioner during the calendar
* year 1952. The Tax Court determined that petitioner had
received excess profits in the sum of $13,000,000. Jurisdic-
' tion of the Tax Court is ca@ferred by stction 108 of the
Renegotiation Act, 50 U.S.C., App. §1218. Petitioner says
that we have jurisdiction u under section 7482 of the Internal ©
_Revenue Code of 1954, 26 U.S.C. §7482. The Renegotia-
proceeding must be dismissed.
Section 108 of the Renegotiation Act: (50 U. s. C., App.
. $1218) provides in part as follows: |
_ tion Board asks us to dismiss for want of jurisdiction. We :
_ conclude that the Board’s position is correct and that this
70 eae
: “Upon wits filing such court [the Tax Court] shall
have exclusive jurisdiction, by order, to finally deter-
mine the amount, if any, of, such excéssive. profits
received or accrued by the ontractpr or.subcontrac-
tor, and such determination shall not be reviewed or
redetermined by any court or agency. " (Emphasis -
added)’.
> The history of the judicial interpretation of the language
emphasized is reviewed in an opinion by Judge (now Mr. °
Justice) Stewart in Ebco. Mfg. .Co. v. Secretary of Com- —
merce, 6 Cir., 1955, 221 F.2d 902, and we do not repeat
that review here. We agree with the views there expressed,
. that the Supreme Court in United States VW California East-
‘ern Line, Inc., 1955, 348 U.S. 351, approved the construc-
tion given to-the statute by the Court of Appeals for the”
District of Columbia Circuit: That court had held in a
series of decisions, cited in the Ebco case, that thé Court
of A Peals has jurisdiction to review the Tax Court in
“renegotiation cases on ‘constitutional or jurisdictional
grounds, but that the limitation contained in the statute
prevents a review of the Tax Court’s determination of the ~
amount of excess profits, sr questions of both law
and fact in such determination.”
All of the questions presented i in Boeing’s petition are, in’
our judgment, questions of law and fact entering into the
determination of the amount. of its excessive profits. It
claims that the Tax Court: erred in deciding that certain
expenditures on a prototype aircraft were not to .any extent
allowable as a cost of re negotiable business. It asserts that |
‘In 1962 (Pub. L. 87-520, 87 Cong., 76 Stat. 134) this pro-
vision was modified by the addition of section 108A, and a cor-
responding amendment of section 108 (see U.S.C. Supp. IV,
50 U.S.C., App. §§ 1218, 1218A). The amendment is not ap-
plicable here: 2 .
o .
ee |
the Tax Court misapplied certain of the statutory factors
to be taken into account under section 103(e) of the
#Renegotiation Act (50 _,U.S.C.,, App? §1213(e)). It ob- -
jects to the Tax Court’s analysis of incentive type contracts.
Clearly, all of these are questions of both fact and law
entering into the determination of the amount in question.
_It also asserts that it did not get a de noyo hearing before-
thé Tax Court, primarily because the Tax Court placed the
burden of proof upon it. This is certainly neither a juris-
dictional nor a constitutional question. (See Golbert v.
Renegotiation Board, 2 Cir.; 1958, 254 F.2d 416). Finatly,
Boeing asserts that the various errors of which it complains
are so egregious when taken together as to have deprived
it of. due process of law, thus attempting to raise a con-
stitutional issue. We_agree pig” the view of the 4th Circuit
in Grannis & Sloan, Inc. v. Renegotiation Board, 1961,
285 F.2d 908 sais. “parsioabanieation of the issue does not
make it jurisdictional,” nor in this case does it make it
constitutional. In its petition Boeing states: “Boeing is
aware that mere error or mistake on the part of the trial
court does not necessarily deprive an unsuccessful litigant
of property without due process of law.” We agree, and we
think this is.an accurate description of Boeing’s coritentions -
under this heading.
Dismissed.: 8
(Endorsed) Opinion Filed Dec. 12, 1963°
Frank H. Schinid, Clerk.
°
APPENDIX C
"\ RENEGOTIATION ACT OF 1951, As AMENDED
SEC. 103. DEFINITIONS.
For the purposes of this title— |
* 7 * * - Re. ss
(e) EXCEssivE. PROFITS.—The term “excessive profits” |
means the portion of the profits derived from contracts ‘with
‘the Departments and subcontracts which is determined in
accordance with this title to be. excessive. ‘In determining
excessive. profits favorable recognition must be given to
the efficiency of the contractor or subcontractor, with
particular regard. to attainment of quantity and quality
-production, reduction of costs, and economy in the use of
materials,’facilities, and manpower; and in addition, there
shall be taken into consideration the following factors:
(1) Reasonableness of costs. and profits, with par-—
ticular regard to volume of production, normal earn-
ings, and comparison © of war and and peacetime products;
(2) The net worth, with particular regard to the
amount and source of public ; and private capital em-
ployed; a
eee 2 Extent of risk shinai. including the risk.in-
cident to reasonabie pricing policies;
(4) Nature and extent of contribution to the i
- fense effort, including inventive and developmentai
contribution and cooperation with the Government
and other contractors in supplying technical assist-
ance, ‘ : :
(5) Character of business, including source and
-nature of materials, complexity of manufacturing
technique, character and extent of -subcontracting,
and rate of turn-over;
%
| A ‘
me 4
RENEGOTIATION Act OF 1951, AS AMENDED
(6) Such other factors the consideration of which
-the: public interest and fair: and equitable « dealing may
require, ‘which factors shall be published ‘in the regu-
lations of the Board from time to time as adopted. —
(f) PRorits DERIVED From CONTRACTS WITH THE
DEPARTMENTS AND SUBCONTRACTS.—The term “profits
derived from contracts with the Departments and subcon-
tracts” means the excess of the amount received or accrued
pees such contracts and subcontracts: over the costs paid
rred ‘With thereto and determined to be
allocable théreto. All items estimated to be allowed as —
deductions and exclusions under chapter 1 of the Internal
Revenue Code (excluding taxes measured by income)
shall, to the extent allocable to such contracts: and’ sub-
contracts, be allowed as items of cost, except that no amount
“shall be allowed-as an item of cost by reason of the appli-
cation of a carry-over or carry-back. * * * * Costs
shall be determined in accordance with the method of ac-
counting regularly employed by the contractor or sub-
contractor in keeping his records, but, if no such method
of accounting has-been employed, or if the method so.em-
ployed does not, in the opinion of the Board, or upo ‘re-
’ determination, in the opinion of the Tax Court of the ;
%
V4
_ United States, properly reflect such costs, such costs shall be
determined jn accordance with such method ws in the
“opinion of the Board or; upon redetermination, in the
opinion of the Tax Court of the United States, cos prop-
/ etly reflect such costs.
‘SEC... 108 REVIEW BY THE .TAX COURT.
-Any contractor or subcontractor aggri¢ved by an order
of the. Board determining the amount of excessive profits
. received or accrued by such contractor or subcontractor
—
~
,
{ >
.
°
75
‘Rasseoniarion ACT OF 1951, AS AMENDED
(a) if the case was conducted ‘ initially by the
Board itself—waiihin ninety days’ (not counting Sun-—
' day or a Jegal holiday in the District of Columbia as
the last day) after the mailing undér _—n. 105 (a)
en ee or
“'(b) if the case was not conducted initially _ the |
Board itself—within ninety days {not counting Sun-
day or a legal holiday in the Districfaf Columbia as. -~
the last day) after the mailing under section 107 (e) | .
of the notice of the decision of the Board not to re- .
view the case or the Notice of the order of the Board
determining the amount of excessive profits,
file a petition with the tax court of the United States for
a redeterthination thereof. Upon such filing such court —
shall have exclusive jurisdiction, by order. to finally de-,
» termine the amount, if any, of such excessive profits re-
-.ceived or accrued by the contractor or subtontractor, and
such determination shall not be reviewed or cedetermined
by any court or agency. The court. may determine as the
‘amount of excessive profits an amount either less than. —
equal t0, or greater than thay determined by the Board: A
‘ proceeding before the Tax Court to finally determine the -
amount, if ariy. of excessive profits shall not be treated as
a proceeding to review the determination of the Board. but
shall be treated as .a proceeding de novo. For the purposes
of this section the court shall have the sate powers and
duties, insofar as applicabie in respect of(t hie contractor.
the subcontractor. the Board. and the Secretary. and, in
respect of the atfendance of witnesses and the production
of papers. notice’ of hearings. hearings before divisions.
review by the Tax Court of decisions of divisions, steno
graphic reporting. and reports of proceedings. as such
court has under sections 1110, 1111. 1143, 1114, 1115
=
76
? @
. RENEGOTIATION ACT OF 1951, as AMENDED
(a), 1116, 1117 (a), 1448, 1120, and “1121 of the In-
ternal Revenue Code in the case of a proceeding to redeter-
mine a deficiency. In the case of any witness for the Board,
the fees and mi , and the, expenses of taking any depo-
sition shall be paid out of appropriations of the Board
_ available for that purpose, Se ee
witnesses shall be paid, subject to rules prescribed by the
court, by the party at whose instance the witness appears
or the deposition is taken. The filing of a petition under
. this section shall operate to stay the execution of the order
of the Board_under subsecyon (b) of section 105 only
if within ten ‘Rays after the filing of the petition the peti- ©
_. tioner files with the Tax Court a good and sufficient bond,
approved by such court, in such amount as may be fixed
by the court. amount collected by the United States .
under an-order of the Board if-excess of the amount found
to be due under a determination of excessive profits by the
Tax Court shall be refiindéd to the contractor or subcon- »
tractor with interest thereon at the rate of 4 per centum
per annum from the date of collection by the United States
to the date of refund. . -
77
-Boeing Airplane Company |
* @
ar
Sa eas ae
_Temco Aircraft Corporation 929-R
-Temco Aircraft Corporation 963-R
Fairchild Engine and — ve
. Corporation ' 957-R
_ Douglas Aircraft Ciaiipeny, Inc. 958-R
- Douglas Aircraft Company, Inc. § 979-R
Douglas Aireraft-Company, Inc. - 1000-R
/The Martin Compary . 964-R
The Martin Company 992-R
The Martin Company * 1002-R
The Martin Company 1015-R
‘Lockheed Aircraft Corporation _-—«-_:-965-R
Lockheed Aircraft Corporation 993-R
Lockheed Aircraft Corporation 1001-R
‘Lockheed Aircraft Corporation 1011-R
. Boeing Airplane Company 959-R
_ Boeing Airplane Company > 978-R
998-R -
Amount -
- $ 750,000
- 3,500,000
_-2,000,000
6,000,000
6,000,000
7,500,000
3,500,000
6,250,000
_ 3,500,000
4,796,101
6,000,000
6,000,000
3,500,000
- 4,079,227
7,500,000
10,000,000
6,784,165