Petition for Writ of Certiorari — Board of County Commissioners v. L. Robert Kimball & Associates
Supreme Court brief1990
Ask Donna
What actually matters in this document.
Text
lc |
No. jose"
IN THE
SUPREME COURT OF THE UNITED STATES
OCTOBER TERM 1989
BOARD OF COUNTY COMMISSIONERS
OF LAWRENCE COUNTY, OHIO
Petitioner
V.
L. ROBERT KIMBALL & ASSOCIATES
Respondent
PETITION FOR A WRIT OF CERTIORARI
an Supge ive Court, vs |
| cae Coe i b
JAN 29 1990
TO THE UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
Robert J. Hollingsworth*
Terrell B. Snyder
Katharine C. Saunders
Cors & Bassett
1700 Carew Tower
Cincinnati, Ohio 45202
(513) 381-0312
*Counsel of Record
QUESTIONS PRESENTED
1. Should a court defer to a commercial
arbitration award that disposes of rights
asserted under statutory law and public policy
in the absence of any explanation by the
arbitrator of the basis for the decision or the
issues decided?
2. Should a court defer to a commercial
arbitration award where the underlying contract
as well as the award is challenged as violating
statutory law and public policy?
3. Whether a decision of a state's highest
court coupled with an appellate court decision
and a state statute are sufficient to establish
a "well-defined and dominant public policy"?
iii
TABLE OF CONTENTS
Page
Es i
TED ccc ccc ccs oeeeeece v-vi
re 1
EEE EES ee 1
eeeeureeee Pe? PREGUGATIONS 2... ccccccccccccs 1-2
BASIS OF FEDERAL JURISDICTION ............ 2
Es 2
A.
COURSE OF PROCEEDINGS AND
DISPOSITION IN COURT BELOW ......... 2
B.
I PD on tcc ce cee cee sees 5
REASONS FOR GRANTING WRIT ..........eceee% a
-
A REVIEWING COURT SHOULD NOT
DEFER TO AN ARBITRATION AWARD WHERE
(1) THE UNDERLYING CONTRACT IS
CHALLENGED AS VIOLATING
STATUTORY LAW AND PUBLIC POLICY
AND (2) THE ARBITRATORS GIVE
Ee S| 9
II.
THE ARBITRATION AWARD IS NOT
ENTITLED TO ANY DEFERENCE WHERE
THE UNDERLYING CONTRACTS VIOLATE
Ser UE EGE cc pecccevcccecs 18
4a e
THE COURT OF APPEALS
REFUSED TO RECOGNIZE A WELL-
ESTABLISHED PUBLIC POLICY OF THE
ee Uhh ice Ose eb es ees 20
je cere here sents seenscececccese 29
-iv
TABLE OF CONTENTS
(Continued)
APPENDIX A
(Opinion of the United States Court
of Appeals for the Sixth Circuit) ........
APPENDIX B
(Decision of the United States Court
of Appeals for the Sixth Circuit) ........
APPENDIX C
(Opinion of the United States District
Court for the Southern District of
ORic, Western DIVISION) «.cccsccsssccvccns
APPENDIX D
(Order and Judgment Entry of the United
States District Court for the Southern
District of Ohio, Western Division ) .....
APPENDIX E
(Federal Arbitration Act, 9 U.S.C.
Se Be Sep BAP CdS veveseceevens beweeee beeen
APPENDIX F
(40 C.F.R. 35.917-1) ..ccccccccccccccccces
APPENDIX G
(40 C.F.R. 35.937-2, 35.937-3,
I Sn ee ee Cee
APPENDIX H
(40 C.F.R. Part 35, Subpart E,
ft arr rere ary ee ee Cee CET ee eee
APPENDIX I
(Ohio Revised Code §6117.01) ......ccceevee
TABLE OF AUTHORITIES
CASES
Page
Alexander v. Gardner-Denver,
415 U.S. 36 (1974) keer Ss ££ oe S 2 oo ©. 2 a. ee ee 16-17
18
Barrentine v. Arkansas - Best Freight
System, Inc.,
ke Pe ee) te ree eee ee ere eee 17
Board of Commissioners v. Ranck,
9 Ohio C.C. 301 (Franklin Cty. 1895)...... 24
Hubbard v. Hiltz,
31 Ohio Law Abs. 538 (Allen Cty. 1940)....26
Hurd v. Hodge,
Soe Wee BE CRPOEE 66 cs dees avatenesetnsanen 20
McDonald v. City of West Branch,
SOO Walks Se CRE! Fes a cnkeneeseFeccecees 17,18
Mitsubishi Motors Corp. v. Soler-
Chrysler Plymouth, Inc.,
Te. Wee EEE SEE EA Sh cde e den eeseceecres 13,14
Muschany v. United States,
eS ee Be | per rer errr TTT ee 27
Prima Paint Corp. v. Flood & Conklin Mfg.,
i 8 Fe ee Be rr rrr errr & 20
Shearson/American Express, Inc. v. McMahon,
SEG Wiles Bae CAPT 64464 6 eee es qe eeccces 13,14
vi
Page
State ex rel. Allen v. Lutz,
145 N.E. 483 (Oh1O 1924) ...ccccccccccceee 22,23
24
United Paperworkers v. Misco,
BBS UE. 29 (LFET) cecccnccesesecesesesecs 19,27
United Steelworkers v. Enterprise Wheel
& Car Corp.,
eee. ems Se CESEO) ccccvccevecesceneseees 16,18
Wilko v. Swan,
WE Rests SAF CAGSS) cc cece cevcsccesssscenes 15
W.R. Grace & Co. v. Local 759,
461 U.S. 757 (1983) ...ceees SS 19,20
27
STATUTES AND REGULATIONS
Federal Arbitration Act, 9 U.S.C. §9...... E-1
Federal Arbitration Act, 9 U.S.C. §10..... E-2
Federal Arbitration Act, 9 U.S.C. §ll..... E-4
Pe Mean SEMA © Acncvceseceessesecesses ll
De Meek ose SOu OS! — Bevececvvecssesessecnes 12
Be Gaskin SOe Sel 7 Zecccccvecccvvesecsesecs 12
SO CuP.R. BS.9ST — Gavcecvescesvsesessvsces 12
40 C.F.R. Part 35, Subpart E, Section 5...12
Ohio Revised Code §6117.01...............- 22
OPINIONS BELOW
The opinion of the United States Court of
Appeals for the Sixth Circuit is reported at
860 F.2d 683 (6th Cir. 1988) and is reproduced
herein as Appendix A. The subsequent decision
ef the Sixth Circuit denying the petition for a
rehearing was entered on October 31, 1989 and
is reproduced herein as Appendix B.
JURISDICTION
The judgment of the United States Court
of Appeals for the Sixth Circuit was entered on
November 3, 1988. A petition for rehearing was
filed on December 1, 1988 and denied on October
31, 1989. This Court's jurisdiction is invoked
pursuant to 28 U.S.C. §1254(1).
STATUTES AND REGULATIONS
The following statutory and regulatory
o2—
provisions are set forth in Appendices E,F,G,H,
and I, respectively:
Federal Arbitration Act, 9 U.S.C. §§9,
10, 11
40 C.F.R. 35.917-1
40 C.F.R. 35.937-2, 35.937-3, 35.937-4
40 C.F.R. Part 35, Subpart E, Section 5
Ohio Revised Code §6117.01
BASIS OF FEDERAL JURISDICTION
The United States Court of Appeals for
the Sixth Circuit had jurisdiction over this
case by virtue of 28 U.S.C. §1291.
STATEMENT OF THE CASE
A. Course of proceedings and
disposition in court below.
On February 22, 1985, petitioner, the
Board of County Commissioners of Lawrence
County, Ohio ("the County") filed a complaint
in the Common Pleas Court of Lawrence County,
Ohio, alleging a violation of the Ohio
antitrust laws by L. Robert Kimball = and
Associates ("Kimball"). On March 5, 1987,
Kimball removed the case, on the basis of
-3-
diversity jurisdiction, to the United States
District Court for the Southern District of
Ohio, Western Division. Kimball filed a
counterclaim, demanding that the District Court
compel arbitration of Kimball's breach of
contract claims against the County. The
District Court, in an Opinion and Order of May
30, 1985, compelled the parties to arbitrate
the breach of contract claims. On March 20,
1986, an arbitration panel awarded $137,531.00,
over $130,009 of which was lost future profits,
to Kimball based on Kimball's’ breach of
contract claims against the County. The panel
did not set forth the basis of its award, nor
explain its decision in writing.
Thereafter, petitioner filed its Second
Amended Complaint and moved the District Court
to vacate the arbitration award on _ public
policy grounds. The District Court, in an
Opinion and Order of March 18, 1987 and a
Judgment Entry of June 9, 1987, vacated the
~4-
arbitration award’on the ground that the award
and the underlying contracts between Kimball
and the County violated the well-established
public policy of the State of Ohio against a
county entering into indefinite term contracts,
and also were invalid under certain federal
laws and regulations governing federally funded
projects. The Opinion and Order and the
Judgment Entry are reproduced herein as
Appendices C and D, respectively.
The Summary Judgment Order of March 18,
1987 was certified by the District Court on
June 9, 1987 pursuant to F.R.C.P. 54(b) as a
final judgment with no just reason for delay of
appeal. Kimball appealed, and the United
States Court of Appeals for the Sixth Circuit
reversed the judgment and remanded the case for
enforcement of the award on November 3, 1988.
(860 F. 2d 683). On December 1, 1988, the
County petitioned the Sixth Circuit for a
rehearing, which petition was denied on October
31, 1989.
—
-5-
B. Statement of Facts
Kimball is an engineering firm based in
Ebensburg, Pennsylvania, with a branch office
in Huntington, West Virginia, which is directly
across the Ohio River from Lawrence County,
Ohio. Kimball entered into two contracts with
the County in 1971, under which Kimball was to
perform certain engineering services for the
County, including preparation of two
preliminary engineering reports, additional
consulting work, and assistance to the County
in obtaining grants for a proposed county-wide
sewer system. A “life-of-the-project" clause
in both contracts provided that, while the
County was not obligated to pay for the
preliminary reports until funding for the
project was obtained, Kimball was guaranteed
all subsequent engineering services whenever
the County went forward with the sewer
project. /l/
/1/ Section I, B. 6 of each contract reads as
-Continued-
-6-
The 1971 contracts had no term
provisions, and bound the County and future
boards of Commissioners beyond the terms of
office of the Commissioners holding office in
1971. Kimball prepared one preliminary
engineering report in 1971 and a second one in
1972, but after 1973 there was no activity of
any kind on Kimball's part regarding these
reports or any sewer project, nor were the
reports ever the basis for any government
funding. 7
Kimball had no contact with the County
whatsoever withiregard to these contracts from
1973 until 1984, when Kimball learned that the
County was to receive federal funding for a
-~Continued-
follows: "In the event that any or all of the
recommended sewer district Projects proceed
beyond the Preliminary Engineering Report
Phase, the Owner agrees to engage the
Engineer to perform all other phases of the
work of each sewer district in accordance with
this Agreement.”
~
county-wide sewage system. Kimball then sent a
demand letter to the County, insisting that the
County award Kimball the engineering work for
the project pursuant to the 1971 contracts.
Between 1973 and 1984, changes in federal
laws and regulations rendered Kimball's
preliminary engineering reports inadequate as a
basis to obtain federal funding for any sewer
project. In 1972, the Federal Water Pollution
Control Act, 33 U.S.C. § 1251 et seg., was
amended, changing the funding requirements for
sewer projects. Under the new regulations that
became effective on February 11, 1974, the
County was required to produce a much more
comprehensive document, known as a facilities
plan, in order to obtain goverment funding. 40
C.F.R 35.917-1. In February 1976 the Army
Corps of Engineers volunteered to prepare such
a plan, which was later to become the basis for
a government grant for a sewerage project.
-§-
In 1978, in anticipation of imminent
federal funding, the County hired another
engineering firm, Burgess & Niple, Ltd., to do
the design work for the project. In fact,
before the project could be funded,’ the
facilities plan required several revisions,
which Burgess & Niple performed for the County
under a separate contract. In 1984, more than
10 years after Kimball's last work under its
1971 contracts, when the EPA finally declared
the sewer project proposed in the revised
facilities plan to be- fundable, Kimball
re-emerged and demanded that its 1971 contracts
be honored. -
In 1984, when the County refused to award
the engineering work to Kimball or to repudiate
the County's 1978 contract with Burgess & .
Niple, Kimball demanded arbitration of its
breach of contract claims against the County
before the American Arktitration Association, as
provided in the 1971 contracts. Kimball
imate ia iii.
-9-
asserted that the County had breached the 1971
contracts when it hired Burgess & Niple in
1978. The arbitration panel awarded over
$130,000 in lost future profits to Kimball on
March 20, 1986. The panel issued no written
decision to explain the basis of its award, or
to indicate in any way whether the panel even
considered the issue of the validity of the
contracts under state and federal law, or
whether the panel was mereiy interpreting the
contracts.
REASONS FOR GRANTING WRIT
he
A REVIEWING COURT SHOULD NOT DEFER
TO AN ARBITRATION AWARD WHERE (1)
THE UNDERLYING CONTRACT IS
CHALLENGED AS VIOLATING STATUTORY
LAW AND PUBLIC POLICY AND (2)
THE ARBITRATORS GIVE NO BASIS
FOR THE AWARD.
In spite of the County's challenges to
the validity of the Kimball contracts, the
Court of Appeals refused to make an independent
-10-
determination whether or not the Kimball
contracts violated federal law, even though the
arbitration panel made its award without any
explanation. Despite the absence of a written
opinion by the arbitrators, the Sixth Circuit
was willing to "assume" that the arbitrators
had actually considered and decided important-
issues of law:
Although they issued no- written
opinion, one must of necessity assume
that the arbitrators in order to rule
for Kimball, determined that the
contracts were valid, enforceable
contracts between the parties - that
they were neither ultra vires nor
inconsistent with federal statutes
and regulations - and that Lawrence
County had breached the contracts.
860 F.2d at 686. After making this assumption,
the Court was then somehow able to determine
which legal issues had been decided and which
had not:
The arbitrators did not decide
whether the contracts were against
public policy, but rather, inter-
preted and applied the contracts to
determine whether they were
consistent with federal law and
regulations.... Id. at 688.
ne |
-ll-
Finally, the Court deferred to the
"assumed" decision by the arbitrators on the
contracts' validity, concluding that there was
no “manifest disregard" of the law, since "the
contracts could be interpreted in a manner
consistent with federal statutes and
regulations...." Id. (Emphasis added.)
Without explaining this possible
interpretation, the Court of Appeals rejected
the District Court's detailed analysis which
pancintied that the contracts violated federal
law. The District Court, on pages 8 and 9 of
its Opinion and Order of March 18, 1987,
reviewed the changes in federal reguiations
under the 1972 amendments to_- the water
Pollution Control Act, 33 U.S.C. §1251 et seq.
As the District Court pointed out, under these
regulations, a preliminary engineering report
such as the one done by Kimball was no longer
adequate to secure a government grant (40
C.F.R. §§35.917 et seq.). New hiring
-12-
regulations effective in 1976 (40 C.F.R. Part
35 Subpart E) required that certain terms be
included in the contract with the engineers,
including the right of the owner to terminate
for its convenience and the prohibition of any
recovery of lost anticipated profits by the
terminated engineer for work not performed;
these terms were not included in Kimball's
contract, but were included in Burgess &
Niple's contract in 1978.
The District Court also noted the
requirements of competitive negotiation,
evaluation of competing firms, and evaluation
of proposals, under 40 C.F.R. §35.937-2,-3, and
-4, which would have made the Kimball contracts
invalid, since they were not competitively
negotiated. Based upon its recognition of
these changes in federal law, the District
Court concluded that Kimball's contracts were
invalid under applicable federal law _ and
regulations, and that the County would in any
ail
-13-
event have been free to terminate Kimball for
its convenience, with no claim for lost
profits.
The District Court's independent analysis
of these statutory duties is necessitated by
the Supreme Court's recent expansion of the
scope of arbitrable matters. See, Shearson/
American Express, Inc. v. McMahon, 482 U.S. 220
(1987) (claims under RICO and the Securities
Exchange Act); Mitsubishi Motors Corp. vv.
Soler-Chrysler Plymouth, Inc., 473 U.S. 614
(1985) (antitrust claims). Aithough’ the
Supreme Court has not specifically decided what
procedural safeguards will be necessary before
a court will defer to an arbitration award that
touches upon such issues, the Court has
indicated that with this expansion of the
arbitral authority, the courts will have a
corresponding duty to scrutinize arbitration
awards “to ensure that arbitrators comply with
the requirements of the statute" applicable to
-14-
the claim. Shearson/American Express, supra,
482 U.S. at 232.
Where arbitration awards involve issues
of statutory law (in contrast to issues of pure
contract interpretation), the Court has at
least indicated that a written explanation by
the arbitrator will be required. For example,
in Mitsubishi Motors, supra, the Court
emphasized that a reviewing court must be able
to determine, at a minimum, that the statutory
claims were "actually decided" by the
arbitrator. 473 U.S. at 638. The Court further
emphasized that, in the case before it, which
involved antitrust claims and an arbitration
conducted pursuant to the Rules of the Japan
Commercial Arbitration Association, a reviewing
Court would be able to scrutinize a written
decision of the arbitrators, since the
applicable arbitration rules required "a
statement of reasons for the award...." 473
U.S. at 638 n.20.
-15-
Similarly, in Shearson/American Express,
the Court noted that one of the prior
objections to arbitrating matters of statutory
lew had been that "an arbitration award may be
made without explanation of [the arbitrator's]
reasons...", 482 U.S. 220 at 231, [citing Wilko
v. Swan, 346 U.S. 427 at 436 (1953)]. The Court
in Shearson concluded, regarding the
arbitration of claims under the securities
laws, that such objections "do not hold true
today for arbitration procedures subject to the
SEC's oversight authority." 482 U.S. at 232.
Indeed, the code of arbitration developed by
the SEC requires a statement by the arbitrators
of the issues they have resolved. NASD Code of
Arbitration Procedure, §4l(e).
Although courts have certainly been
willing to defer to arbitration awards that
merely interpreted contracts, without requiring
the arbitrators to state the grounds for their
opinions, petitioner can find no reported cases
-16-
where a court deferred to an_ unexplained
arbitration award on questions of external law
that challenged the validity of the underlying
contract. In United Steelworkers v. Enterprise
Wheel & Car Corp., 363 U.S. 593, 599 (1960) the
Court indicated that an arbitrator has no
obligation to give his reasons for an award and
the award was not subject to court review where
"the arbitrator's decision concerns construc-
tion of the contract...." (Emphasis added.)
No such deference has been_- shown,
however, where an arbitrator disposes of
statutory claims. In the context of claims
under Title VII of the Civil Rights Act of
1964, 42 U.S.C §1983, and under the Fair Labor
Standards Act, this Court has not only refused
to allow such claims to be disposed of by
arbitration, but has refused to give any weight
to the arbitration award unless it "gives full
consideration" to and actually "“decide[s]" the
statutory claim. Alexander v. Gardner-Denver
a) F-
Co., 415 U.S. 36, 60 n. 21 (1974); McDonald v.
City of West Branch, 466 U.S. 284, 292 n. 13
(1984); Barrentine v. Arkansas-Best Freight
System, Inc., 450 U.S. 728, 743 n. 22 (1981).
In the absence of a written opinion by
the arbitrators, a court cannot assume that the
arbitrators decided or even considered legal
issues relating to the validity of the
contracts. In fact, an arbitrator may assume
that he lacks jurisdiction to invalidate the
underlying contract based upon external law.
This assumption would reflect the well-
established principle that "[t]he arbitrator...
has no general authority to invoke public laws
that conflict with the bargain between the
parties.... If an arbitral decision is based
‘solely upon the arbitrator's view of the
requirement of enacted legistation', rather
than on an interpretation of the collective-
bargaining agreement, the arbitrator has
‘exceeded the scope of the submission', and
-18-
and the award will not be enforced." McDonald,
supra, 466 U.S. at 290- 291, quoting
Gardner-Denver Co., supra, 415 U.S. at 53,
quoting Enterprise Wheel & Car Corp., supra,
363 U.S. at 597.
In the present case, there is no way to
know whether the arbitrators considered or
decided the issue of whether the contracts
violated federal law. The arbitrators could
have been guided by the _ long-established
principle that they have “no general authority
to invoke public laws that conflict” with the
contract. In the absence of a written opinion,
a reviewing court must independently consider
and decide these issues.
Il.
THE ARBITRATION AWARD IS NOT
ENTITLED TO ANY DEFERENCE WHERE
THE UNDERLYING CONTRACTS VIOLATE
LAW AND PUBLIC POLICY
The Court has repeatedly declared that an
arbitration award may be vacated on public
-19-
policy grounds, relying upon the common law
doctrine "that a court may refuse to enforce
contracts that violate law or public policy.”
United Paperworkers v. Misco, 484 U.S. 29, 42
(1987); W.R. Grace & Co. v. Local 759, 461 U.S.
757, 766 (1983). Although the Court in Misco
did not “sanction a broad judicial power to set
aside arbitration awards as against public
policy,” 484 U.S. at 43, the Court also did not
determine, as Justice Blackmun pointed out in
his concurring opinion, “in what way, if any, a
court's authority to set aside an arbitration
award on public policy grounds differs from its
authority, outside the collective - bargaining
context, to refuse to enforce a contract on
public policy grounds. Those issues are left
for another day.” 484 U.S. at 46 (J. Blackmun,
concurring opinicn.)
The present case involves exactly those
issues. The County challenged both the
contracts and the arbitration award as
-20-
violating both statutory law and public policy.
In such @ case, a court must thoroughly
consider such issues, without deferring to the
arbitration award, particularly an award that
included no explanation of the decison. See
W.R. Grace, supra, 461 U.S. at 766; Hurd v.
Hodge, 334 U.S. 24, 34-35 (1948). /2/ Anything
less would represent a wholesale delegation of
judicial authority to arbitrators, empowering
them to decide important issues of law and
public policy, with no- responsibility to
explain the basis of their decision.
Iil.
THE COURT OF APPEALS REFUSED
TO RECOGNIZE A WELL-ESTABLISHED
PUBLIC POLICY OF THE STATE OF OHIO
/2/ The issue of the illegality of a contract's
terms should be contrasted with a common legal
defense to a contract's enforcement, such as
fraud in the inducement, which can be decided
by an arbitrator. See Prima Paint Corp. v.
Flood & Conklin Mfg., 388 U.S. 395 (1967).
-2l1-
The Court of Appeals ultimately concluded
that the State of Ohio lacked "any clear legal
precedent which establishes a well-defined and
dominant public policy” against indefinite term
contracts signed by a board of county com-
missioners. 860 F.2d at 688. This conclusion
flies in the face of an Ohio Supreme Court
decision, a state court of appeals decision and
a statute, all of which hold or have been
interpreted to hold that indefinite term
contracts, which extend beyond the term of a
board of county commissioners, violate public
policy unless the public good requires such
contracts to be made. The conclusion of the
Court of Appeals also placed an unreasonable
burden on the County to demonstrate the
existence of a public policy to a degree of
absolute clarity and precision never suggested
Or required by any prior decision of the United
States Supreme Court.
-22-
The Supreme Court of Ohio, in State ex
rel. Allen v. Lutz, 145 N.E. 483 (Ohio 1924),
interpreted the predecessor version of Section
6117.01 of the Ohio Revised Code to require
that a county's contract with an engineer have
a specific term. /3/
While the statute, Section 6602-1,
General Code, under which this
employment was made, authorized the
county commissioners to employ a
Sanitary engineer "for such time or
times and on such terms as they
deem best," yet the contract of
employment is silent as to any
fixed time... Not only must the
contract be upon “such terms” as
the commissioners deem best, but it
is equally mandatory as to_ such
"time or times" as they deem best.
In order to bind a subsequent board
of county commissioners and future
Legislatures, the right and power
to do so must clearly appear, and
not be left to inference alone from
the nature of the contract and the
kind of work affected thereby.
x kk
/3/ The operative language of the former
statute that the Court in Lutz focused on is
virtually identical to that of the present
statute, O.R.C. § 6117.01, which requires that
such contracts may be for "such time and on
such terms as it [the board] deems best.”
-23-
(T]his contract ignored the
statutory requirement as to “time
or times," and was so indefinite in
that regard that it transcended the
spirit as well as the letter of the
statute.... Terms of contract
should not be left to inference
when one is contracting with a
public board whose powers” are
prescribed by statute. 145 N.E. at
484-485. (Emphasis added.)
Since the contract in Lutz lacked a
specific term, in violation of the statute, the
Ohio Supreme Court concluded that the contract
was not protected by the state's constitutional
guarantee against impairment of contract
obligations. Ohio Constitution, Art. II, §28.
The Court further determined that such
indefinite term contracts are generally
invalid.
[T]he general rule is that such
contracts, extending beyond the term
of the existing board,... thus tying
the hands of a succeeding board, are
not looked upon with favor unless
the necessity or some special cir-
cumstances show that the public good
requires such contracts to be made.
Id. /4/
/4/ The public policy against long-term contracts
-Continued-
-%4x
Implicitly finding that the engineering
contract was not required for the public good,
the Court held that the contract was
retroactively modified by a later statute that
limited the compensation payable by a county to
an engineer.
Despite the clear reasoning of Lutz that
the engineering contract was void ab initio
and therefore not subject to constitutional
protection, the Sixth Circuit somehow
interpreted Lutz as holding that there was
some validity to the engineering contract,
",.. since [the Ohio Supreme Court] allowed
the [contract] before it to stand, to the
-Continued-
was well established in Ohio prior to Lutz. In
a case involving a one-year contract with a
janitor that would bind a succeeding board, the
Franklin County Circuit Court, in Board of
Commissioners v. Ranck, 9 Ohio C.C. 301, 308
(1895) held that the contract was “against
public policy, and void... in the absence of
some necessity or special circumstances showing
that the public good required it...."
~ 25.
extent that compensation was limited by
statute”. 860 F. 2d at 687. This inter-
pretation not only ignores the Supreme
Court's reasoning that the contract was
invalid ab initio, but also ignores the fact
the County in Lutz was not seeking recovery of
the payments made to the engineer which were
below the amount of the statutory limitation.
It is therefore not suprising that the Ohio
Supreme Court did not suggest that the
engineer return the prior payments, which did
not exceed the statutory limitation.
In contrast to the District Court which
could “surmise no reason why the public good
requires indefinite contracts such as the one
at issue here" (Opinion and Order of March 19,
1987, at p. 8), the Court of Appeals used its
misreading of Lutz to avoid analyzing whether
any public good required the Kimball
contracts. The Court of Appeals concluded
that "“[b]ecause we are unable to discern any
~3E-
telling differences . . . between the contract
for engineering services in Lutz, and the one
entered into by Lawrence County's Board of
Commissioners, we may confidently conclude that
Ohio courts would deem the latter to involve
“necessity or some special circumstances.'"
860 F.2d at 687. The Circuit Court's inability
"to discern any telling differences" in the
several contracts is remarkable since’ the
engineer in Lutz actually performed the work
for which he sought and was denied
compensation, in contrast to Kimball's demand
for lost future profits for work never
performed.
The Court of Appeals then proceeded to
distinguish a state appellate court decision,
Hubbard v. Hiltz, 31 Ohio Law Abs. 538 (Allen
Cty. 1940), on the ground that the language of
Hiltz that indefinite term contracts are
invalid as a matter of law was dicta and was
inconsistent with the Sixth Circuit's analysis
a2%e
of Lutz. The requirement that a statement of
law be a holding and not dicta for a public
policy to exist has never been suggested by
the Supreme Court. The Sixth Circuit's view
that Hiltz is inconsistent with Lutz is based
on the Circuit Court's own erroneous
interpretation of Lutz.
The Court of Appeals' ultimate
conclusion that Ohio lacks a well-defined and
dominant public policy ignores the
overwhelming authority in Ohio demonstrating
such a public policy, as shown in its statutes
and in the pronouncements of its highest
courts. The Court of Appeals failed to follow
the principle articulated in Misco and W. R.
Grace, supra, that the public policy is "to be
ascertained ‘by reference to the laws and
legal precedents and not. from general
considerations of supposed public interests.'"
484 U.S. at 43, 461 U.S. at 766. In
Muschany v. United States, 324 U.S. 49 (1945),
-28-
upon which Misco and W.R. Grace relied, the
Supreme Court only required that there be
"definite indications in the law of the
sovereignty" or a "plain indication" of the
public policy. Id. at 66.
In summary, the Circuit Court refused to
make an analysis of whether Kimball had proven
an exception to the general rule that such
indefinite term contracts are invalid. There
was no evidence, as found by the District
Court, that any public good required Lawrence
County to enter into a contract that forever
bound the County to award the engineering
contract to Kimball if the County ever went
forward with a sewer project. Neither Kimball
nor any one else has suggested a reason why the
public good would require such an onerous and
oppressive contract, one that would deprive
subsequent boards of any discretion to select
an engineer for a multimillion dollar sewer
project. The fact that Ohio law requires a
~29-
court to consider whether there is a public
necessity which would justify an exception te
the public policy prohibiting indefinite term
contracts does not render this public policy
less well-defined. In this case, the District
Court, unlike the Court of Appeals, made a
thorough anaiysis of the contracts and properly
concluded that they were not required for the
public good.
CONCLUSION
For the reasons stated herein, a Writ of
Certiorari should issue to the Court of Appeals
for the Sixth Circuit to review its judgment
herein.
Respectfully submitted,
ROBERT J. HOLLINGSWORTH*
TERRELL B. SNYDER
KATHARINE C. SAUNDERS
CORS & BASSETT
1700 Carew Tower
Cincinnati, Ohio 45202
(513) 381-0312
*Counsel of Record
IN THE
SUPREME COURT OF THE UNITED STATES
€ OCTOBER TERM 1989
BOARD OF COUNTY COMMISSIONERS
OF LAWRENCE COUNTY, OHIO
Petitioner
V «
IL. ROBERT KIMBALL & ASSOCIATES
Respondent
APPENDIX TO PETITION FOR A WRIT OF
CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE SIXTH
CIRCUIT
Robert J. Hollingsworth”
Terrell B. Snyder
Katharine C. Saunders
oe : Cors & Bassett
1700 Carew Tower
Cincinnati, Ohio 45202
(513) 381-0312
*Counsel of Record
-Al-
No. 87-3635
UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
BOARD OF COUNTY
COMMISSIONERS OF
LAWRENCE COUNTY, OHIO,
: ON APPEAL from
Plaintiff-Appellee, : the United States
: District Court
V. : for the Southern
: District of Ohio.
L. ROBERT KIMBALL
AND ASSOCIATES,
Defendant-Appellant.
Decided and Filed November 3, 1988
Before: WELLFORD and NORRIS, Circuit
Judges; and COOK District Judge.*
*The Honorable Julian A. Cook, Jr.,
Judge, United States District Court for the
Eastern District of Michigan, Sitting by
designation.
-A2-
ALAN E. NORRIS, Circuit Judge. L. Robert
Kimball and Associates ("Kimball") appeals the
district court's having granted summary
judgment to the Board of County Commissioners
of Lawrence County, Ohio. The court reasoned
that contracts relied upon by Kimball in its
claim against the county are unenforceable as a
matter of public policy.
-A3-
During 1971, Kimball, an engineering
firm, entered into two contracts with Lawrence
County to provide it with preliminary
engineering services for a proposed county-wide
sewage treatment system and for improvements to
an existing treatment plant. These preliminary
services included Kimball's acting as the
county's representative in the development
phases of the project and producing a
preliminary engineering report to be used in
obtaining government’ funding. Under’ the
contracts, if the project proceeded beyond the
preliminary stage, the county was to compensate
Kimball for the preliminary services and to
hire the company to perform the subsequent
engineering work. The contracts also provided
for arbitration "of all questions in dispute
under this Agreement. . . in accordance with
the rules of the American Arbitration
Association."
|
-A4-
From 1971 until 1973, Kimball acted as
the county's representative in dealing with
health and water authorities and pollution
control agencies, and prepared preliminary q
reports on the proposed system and = on
improvements to the existing system. According
to Kimball, the firm became less involved in
the project in 1973 due to the increasing
involvement of the Army Corps of Engineers, and
the passage of amendments to the Federal Water
Pollution Control Act. After 1973, and until
1984, there was no contact between the county
and Kimball on the projects. However, during
this period there were changes in federal laws
concerning funding and plan requirements; the
Corps of Engineers researched and completed a
facilities plan which was accepted by the
county; and in 1978, the county hired another q
engineering firm to do the engineering work as
contemplated by the Corps plan. The plan was
revised several times, both by the Corps and
=
the new engineering’ firm. It received
tentative approval by the Environmental
Protection Agency in early February 1984.
In April 1984, when Kimball learned that
the sewage project was being funded and was
going forward with new project engineers, it
demanded compensation for the work it completed
in 1971 and 1972, and insisted that it be
retained to perform final design work. When
the county refused, Kimbali demanded
arbitration. Although an arbitration hearing
was scheduled, the county filed a complaint in
the state court of common pleas, asserting a
state law claim for damages and seeking an
injunction against the arbitration proceedings.
On Kimball's motion, the state court
proceedings were removed to district court,
where Kimball filed a counterclaim requesting
a stay of the proceedings pending arbitration
under the provisions of the United States
Arbitration Act.
-A6-
In May 1985, the district court issued
an order granting Kimball's motion for a
preliminary injunction and requiring the county
to arbitrate. Basing its decision on Prima
Paint Corp. v. Flood & Conklin Mfg. Co., 388
U.S. 395 (1967), the district court concluded
that the county's claim that the contracts were
ultra vires because they were for an indefinite
term was a legal defense to the enforceability
of the contract which properly should be
referred to arbitration.
The claims were arbitrated before a
three-member panel appointed under the rules of
the American Arbitration Association, and the
panel entered an award for Kimball.
The county then sought to vacate the
arbitration award, and moved for summary
judgment. Kimball counterclaimed seeking
confirmation of the award, and also moved for
summary judgment. The district court granted
the county's motion for summary judgment and
-A7-
vacated the arbitration award, saying it had
reevaluated its previous order to arbitrate and
concluded that, under AT&T Technologies, Inc. v
Communications Workers, 475 U.S. 643 (1986), it
had the power to determine that the contract
dispute was not subject to arbitration. The
court then addressed the merits of the parties'
claims and declared the contracts invalid as a
matter of public policy, since they contained
no definite term and could extend beyond the
"life" of the board of county commissioners
which agreed to the contract. The court also
concluded that the contracts were contrary to
public policy because they conflicted with
federal law enacted after the contracts were
entered into. The court did not address the
county's state law claims. Its order was
certified pursuant to Fed. R. Civ. P. 54(b),
and this appeal followed.
We conclude that the district court's
initial decision, that the contract dispute and
-A8-
the county's defense that the contract was
ultra vires should be arbitrated, was correct,
and that public policy does not require that
the arbitration award be overturned.
In Prima Paint, the plaintiff's claim
that the contract, which contained an agreement
to arbitrate, was fraudulently induced was held
to have been properly referred to arbitration
for resolution. The Supreme Court determined
that, under the provisions of the United States
Arbitration Act, a federal court is to order
arbitration if the making and performance of
the agreement to arbitrate itself is not in
dispute. 388 U.S. at 403-04. The plaintiff in
Prima Paint did not claim that the agreement to
arbitrate was fraudulently induced, and there
was no indication that the broad language of
the arbitration agreement was not intended to
cover legal issues such as fraudulent
inducement of a contract.
-A9-
Similarly, the question before’ the
district court was not whether the dispute was
subject to arbitration. Instead, the question
involved the validity of contracts which
happened to include provisions for arbitration.
Under Prima Paint, resolution of that question
was for the arbitrators. The county's claim
that the contracts were ultra vires is a legal
defense to the enforceability of the contracts.
Rather than contending that it had not agreed
to the broad arbitration clause in the
contracts, the county instead questioned the
enforceability of the entire contract. Had it
contended that its dispute with Kimball over
reimbursement and hiring was not subject to
arbitration, we would be faced with a different
question, since "[iJt [is] for the court, not
the arbitrator, to decide in the first instance
whether the dispute [is] to be resolved through
arbitration." AT&T Technolségies, Inc., 475 U.S.
at 651.
-A10-
Once it is determined that a dispute
should be referred to arbitration, questions of
contract interpretation are within the province
of the arbitrator. Courts play_only a limited
role in reviewing an arbitration decision.
"The courts are not authorized to reconsider
the merits of an award even though the parties
may allege that the award rests on errors of
fact or on miSinterpretation of the contract."
United Paperworkers Int'l Union v. Misco, 108
S.Ct. 364, 370 (1987).
The county's claims that the contracts
were ultra vires and were inconsistent with
- federal statutes and regulations were presented
and argued to the arbitrators. Aithough they
issued no written opinion, one must of
necessity assume that the arbitrators, in order
to rule for Kimball, determined that’ the
contracts were valid, enforceable contracts
between the parties -- that they were neither
ultra vires nor inconsistent with federal
“Ai i~
statutes and regulations -- and that Lawrence
County had breached the contracts.
The district court also held that,
because the contracts were for an indefinite
term, they violated Ohio's public’ policy
against such contracts, and that the contracts
also violated public policy because they were
inconsistent with subsequently enacted federal
law and regulations.
Whether an arbitration award violates
public policy is a question for the court. W.R.
Grace & Co. v. Local Union 759, Int'l Union of
Rubber Workers, 461 U.S. 757, 766 (1983).
However, a court's refusal to enforce "an
arbitrator's interpretation of such contracts
is limited to situations where the contract as
interpreted would violate 'some explicit public
policy' that is eet defined and dominant, and
is to be ascertained "by reference to the laws
and legal precedents and not from general con-
Siderations of supposed public interests."'"
-Al2-
Misco, 108 S.Ct. at 373 (quoting W.R. Grace,
461 U.S. at 766). A court may refuse to
enforce an award when specific terms in the
contract would violate public policy, but there 4
is no broad power to set aside an arbitration
award against public policy. Id.
The county argues that a different
standard of review applies to a court's review
of an arbitration award challenged on public
policy grounds, than to the court's review of
an arbitration award under the Arbitration Act.
It cites Iowa Elec. Light & Power Co. v. Local
Union 204 of the Int'l Bhd. of Elec. Workers,
834 F.2d 1424 (8th Cir. 1987), for the
proposition that the court should engage in a
de novo review of an arbitration award whenever
@ question of public policy is raised.
Iowa Electric dealt with the question
of whether an arbitration award, which
reinstated an employee who had violated nuclear
safety regulations and whose actions could have
-Al3-
jeopardized the public health and safety, was
against national public policy concerning
strict compliance with safety regulations at
% nuclear facilities. Id., 834 F.2d at 1426.
Here, the contract itself is asserted to be
against public policy, and the arbitration
award is challenged because it is said that it
would enforce an ultra vires contract.
Moreover, properly speaking, the review
given an arbitration award when it is
challenged on public policy grounds is not de
novo. When a court reviews an issue under a de
novo standard of review, the court is
determining questions of fact and law as though
the reviewing court was the original trial
court (or the arbitration panel). An
arbitration award is not to be based on public
% policy considerations, since public. policy
questions are for the court, not the
arbitrator. An arbitrator who bases an award
on sublic licy considerations exceeds his
Pp Y
-Al4-
powers. Accordingly, when an arbitration award
is challenged on public policy grounds, the
court must determine whether the arbitrator's
interpretation of the contract jeopardizes a
well-defined and dominant public policy, taking
the facts as found by the arbitrator.
In addressing the question of whether
the contracts as interpreted by the arbitrators
were contrary to public policy because they
were for an indefinite term, the district court
correctly looked to Ohio law to determine
whether there was a well-defined and dominant
public policy against such contracts. In
concluding that Ohio has such a policy, the
district court relied upon State ex rel. Allen
v. Lutz, 111 Ohio St. 333, 145 N.E. 483 (1924),
and State ex rel. Hubbard v. Hilty, 31 Ohio Law
Abs. 538 (Ct. App. 1940). We are unable to
agree with the district court’s reading of
these cases.
The Ohio Supreme Court's opinion in Lutz
“AiS-
includes this language:
In order to bind a subsequent board of
county commissioners. . . , the right
and power to do so must clearly appear,
and not be left to inference alone from
the nature of the contract and the kind
of work affected thereby.
The policy of the law is rather
against the power of one board of
county commissioners to make contracts
so indefinite in time that the same may
extend beyond the life of the board,
and thus bind another or future board,
although in some cases such a contract
may be valid and binding even though
the performance of some part may be
impossible until after the expiration
of the term of the majority of the
board as it existed when the contract
was made. Yet the general rule is that
such contracts, extending beyond the
term of the existing board, and
employment of agents or servants of the
county for such period, thus tying the
hands of a succeeding board, are not
looked upon with favor unless’ the
necessity or some special circumstances
show that the public good requires such
contracts to be made.
145 N.E. at 484-85, 111 Ohio St. at 338-39.
In Lutz, a sanitary engineer contracted
with the county to provide planning’ and
supervisory services in exchange for
compensation to be based upon a percentage of
-Al6-
the cost of the public works with which he was
involved. After the contract was entered into,
the state legislature enacted a statute which
limited the compensation paid to a sanitary
engineer to no more than that received by the
county auditor. The engineer filed a mandamus
action to require the county to pay
compensation he had earned under the contract
in excess of the county auditor's salary. The
Ohio Supreme Court, after noting that a statute
specifically authorized county commissioners to
contract with a sanitary engineer "for such
time . . . as they deem best,” so long as the
length of the term was specified, held that,
Since the contract before it was for an
indefinite term, it did not come within the
protection of the state's constitutional
guarantee against impairment of contract, and
its compensation provision would not _ be
enforceable beyond the statutory limitation.
Id. at 483, 111 Ohio St. at 338-39.
-Al7-
Because the rule of law the district
court drew from the opinion's quoted language
does not appear in the Ohio Supreme Court's
official syllabus to its opinion, under the
unique Ohio rule, the quoted language does not
state the point of law decided in that case.
Ohio Supreme Court Rules for the Reporting of
Opinions, Rule 1(B) (eff. Mar. 1, 1983). But,
even putting the syllabus rule aside, the Ohio
Supreme Court’ did not say that county
commissioners are without the power to enter
into any contracts extending beyond the current
terms of incumbent commissioners, not did it
say that all such contracts are contrary to
public policy. What the court pointed out in
the quoted language was that some contracts of
this nature may be ultra vires, and that, as a
matter of public policy, they are not looked
upon with favor in the absence of "necessity or
some special circumstances.”
-A18-
The Ohio Supreme Court did not leave us
with any specific guidance as to what Ohio
courts should view as "necessity or some
special circumstances.” However, we may at
least be certain that the Ohio Supreme Court
viewed some contracts for engineering services
which extend beyond the elected terms of county
commissioners as involving “necessity or some
special circumstances," since it allowed the
one before it to stand, to the extent that
compensation was limited by statute. Because
we are unable to discern any telling
differences in that regard between the contract
for engineering services in Lutz, and the one
entered into by Lawrence County's Board of
Commissioners, we may confidently conclude that
Ohio courts would deem the latter to involve
"necessity or some special circumstances.”
Nor do we think the opinion of the Ohio
Court of Appeals in Hubbard Vv. Hilty
establishes a well-defined and dominant public
-A19-
policy. In that case, pursuant to an informal
arrangement with a local women's club, county
commissioners had employed a female attendant
for a courthouse ladiés' restroom, after the
club had provided furnishings for the room.
Some years later, citing economic reasons, the
commissioners abolished the position. In an
opinion holding that the attendant's civil
service status was no protection where a
position was abolished, the court of appeals
included this dicta about the arrangement:
[I]f it reached the dignity of an
agreement, [it] had no binding force in
law, as a Board of County Commissioners
is inhibited by law from making any
agreement which has the effect of
restraining it or its successors in
office from exercising any of the
discretionary powers vested in it, or
performing any of the duties imposed
upon it by law.
Hilty, 31 Ohio Law Abs. at 540. We are in no
position to say that the court's gratuitous use
of this broad language, without reconciling it
with the Ohio Supreme Court's opinion in Lutz,
~A20-
can serve as the basis for concluding that Ohio
has a well-defined and dominant public policy
against contracts for an indefinite term.
In the absence of any statute
prohibiting county commissioners from entering
into contracts which may extend beyond the term
of the contracting board, and in the absence of
any clear legal precedent which establishes a
well-defined and dominant public policy, we
conclude that the arbitration award is not
against public policy and must be enforced.
The district court also held that the
contracts violated public policy because they
were inconsistent with the federal law and
regulations. As we pointed out earlier, the
question of inconsistency was presented to and
decided by the arbitrators. The arbitrators
did not decide whether the contracts were
against public policy, but rather, interpreted
and applied the contracts to determine whether
they were consistent with federal law and
-Azli-
regulations, which was an integral part of
resolving the dispute between the parties.
Courts normally must enforce an arbitrator's
resolution of these issues even if there is an
erroneous finding of fact or misinterpretation
of law, and an arbitrator's conclusions on
legal issues are entitled to deference.
Northrop Corp. v. Triad Int'l Mktg. S.A., 81l
F.2d 1265, 1269 (9th Cir.), cert. denied, 108
S.Ct. Be. Ca9er) Deference is not due to the
arbitrator's award if there is a “manifest
disregard" of the law, see, e.g., Wilko v.
Swan, 346 U.S. 427, 436-37 (1953), but that
does not appear to be the case here. Because
we conclude that the contracts could. be
interpreted in a manner consistent with federal
statutes and regulations, the district court
erred in holding that the arbitration award
should be vacated as being contract to public
policy.
-AZ2~
Accordingly, the judgment appealed from
is reversed and this cause is remanded to the
district court for enforcement of the arbitra-
tion award, and for other proceedings consis-
tent with this opinion and according to law.
APPENDIX B
Decision of the United States
Court of Appeals for the
Sixth Circuit
-Bl-
No. 87-3635
UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
ORDER
BOARD OF COUNTY COMMISSIONERS OF
LAWRENCE COUNTY, OHIO,
Plaintiff - Appellee,
Vv.
L. ROBERT KIMBALL and ASSOCIATES,
Defendant - Appellant
BEFORE: WELLFORD and NORRIS, Circuit Judges;
and COOK, District Judge.*
Upon consideration of the petition for
rehearing filed by the appellee, the court
concludes that the issues’ raised therein
were fully considered upon the original oral
argument decision of this case.
-B2-
[t is therefore ORDERED that the
petition for rehearing be and it hereby is
DENIED.
ENTERED BY ORDER OF THE COURT
Leonard Green, Clerk
*The Honorable Julian A. Cook, | oe
Judge, United States District Court for the
Fastern District of Michigan, sitting by
designation.
-Cl-
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF OHIO
WESTERN DIVISION
BOARD OF COUNTY
COMMISSIONERS OF No: C-1-85-0667
LAWRENCE COUNTY, OHIO,
Plaintiff, OPINION AND ORDER
GRANTING SUMMARY
vs. JUDGMENT TO PLAINTIFF
ON COUNT III AND
L. ROBERT KIMBALL DENYING CROSS-MOTION
AND ASSOCIATES, FOR SUMMARY JUDGMENT
ON COUNT III AND THE
Defendant. COUNTERCLAIM TO COUNT
III BY DEFENDANT
This matter is before the Court on
plaintiff's motion for summary judgment of
Count III of the second amended complaint (doc.
32), defendant's c¢ross-motion for summary
judgment on Count III and the counterclaim to
Count III (doc. 36) and plaintiff's reply in
Support of its motion for summary judgment on
Count III (doc. 38).
Defendant characterizes this as_ an
action based upon the efforts of defendant to
-C2-
enforce its rights under certain agreements
between it and the Board of County
Commissioners of Lawrence County, Ohio, which
were executed on June 19 and June 25, 1971.
Under the agreements, L. Robert Kimball and
Associates (hereinafter "Kimball") saves to
provide certain preliminary engineering services
tc Lawrence County in connection with the
preliminary studies of a proposed county-wide
sewage treatment system. Lawrence County
agreed to compensate Kimball for these
preliminary services if the sewage project
proceeded beyond the preliminary engineering
report phase, and also agreed to hire Kimball
to perform engineering work for subsequent
stages of the project.
Defendant points out that during 1984 it
became aware that funding for the county-wide
sewage project of Lawrence County had been
received, that the project was to proceed, and
that the county had hired another engineering
-C3-
firm to perform engineering services for the
project. Kimball made a demand for arbitration
under the American Arbitration Association
Construction Industry Arbitration Rules in
accordance with the arbitration clause
contained in the 1971 agreements providing for
binding arbitration of all questions in
dispute.
Previously, this Court issued an Opinion
and Order requiring plaintiff to arbitrate the
contractual issues (see doc. 15)? We entered
our Order in spite of our misgivings that the
1971 agreements may be ultra vires and against
public policy because there were no _ term
provisions in the agreements. Obviously, such
agreements extended beyond the terms of office
of the County Commissioners holding office in
1971.7
This Court concluded that we were
obligated to order arbitration under’ the
authority of Prima Paint Corp. v. Flood &
Conklin Manufacturing Co., 388 U.S. 395 (1967).
-C4 -
We now reconsider our decision in light of AT&T
Technologies, Inc. v. Communication Workers of
America, Inc., 54 U.S.L.W. 4339 (April 7,
1986), in which the Court held that it is for
the Court, in the first instance, to determine
whether a dispute is subject to arbitration.
Admittedly, AT&T Technologies, Inc., is
a labor case, but the reasoning is equally
appropriate in the commercial context. In the
instant case, and in AT&T Technologies, Inc.,
the district court referred to the arbitrator
the issue of whether the dispute was arbitrable
because one of the party's interpretation of
the agreement was at least arguable. The
Supreme Court has now held that even in such
Situation, the issue of whether a dispute is
subject to arbitration is for the Court to
decide in the first instance. Indeed, in
deciding whether the parties have agreed to
submit a particular grievance, or in this case,
a particular agreement to arbitration, a court
-C5-
is not to rule on the potential merits of the
underlying claim. Id. The sole issue resolved
in our previous ruling was that of
arbitrability. We now endeavor to address the
merits of the parties' claims and the issue of
public policy, in light of the arbitrator's
decision, holding that the contracts’ in
question are enforceable.
We recognize the narrow scope of review
that this Court has in limited instances in
which it may vacate an arbitration award under
9 U.S.C. §9. The statute provides in pertinent
part that an award may be vacated only "[w]here
the arbitrators were guilty of misconduct.
in refusing to hear evidence pertinent and
material to the controversy; or of any other
misbehavior by which the rights of any party
have been prejudiced"; or [w] here the
arbitrators exceeded their powers, or_ so
imperfectly executed them that a material,
final, and definite award upon the subject
-C6-
matter was not made: 9 U.S.C. §10(c), (d).
Generally, an arbitrator's decision is entitled
to great deference and should be upheld absent
irrationality oor | disregard of plain-= and
unambiguous language in the agreement. See
National Post Office v. U.S. Postal Service,
751 F.2d 834 (6th Cir. 1985). However, a court
may not enforce a contract that is contrary to
public policy. See Hurd v. Hodge, 334 U.S. 24,
34-35 (1948). Moreover, a claim arising out of
an illegal contract is not a legitimate subject
of arbitration, and an award based thereon is
void and unenforceable. See 5 Am. Jur. 2d 560,
Arbitration and Award. The question of public
policy is ultimately one for resolution by the
courts. W.R. Grace & Co. v. Local Union 759,
461 U.S. 757, 766 (1982). When public policy
is asserted as the basis for vacating an
arbitration award, the court is required to
make its own, independent evaluation.
Transmarine Corporation v. Marc Rich & Co., 480
wf'F x
F.Supp. 352, 358 (S.D. N.Y. 1979). If the
contract violates some explicit public policy,
the Court is obliged to refrain from enforcing
it. The fact that an invalid contract has been
arbitrated does not validate it. "Such a
public policy, however, must be well éetined
and dominant, and is to be ascertained 'by
reference to the: laws and legal precedents and
not from general considerations of supposed
public interests.'" W.R. Grace & Co., 461 U.S.
at 766 (quoting Muschany v. United States, 324
U.S. 49, 66 (1945)).
When we reviewed this case originally,
we were troubled because of the hiatus which
existed between 1971 when the parties made
their agreement in which Kimball was to perform
certain engineering services and was to act as
the County's professional representative in all
phases of the proposed. county-wide sanitary
sewage system and 1984, when Kimball came
forward to assert its rights under the
-C8-
contracts. Kimball originally agreed to defer
payment by the County for the preliminary
engineering report until "completion of
financing arrangements prior to the beginning
of the final design. . ." See Ex. A, doc. 31,
copies of contract attached to second amended
complaint, Section V, A. The contracts
provided the following clause:
In the event that any or all of the
recommended sewer district projects
proceed beyond the Preliminary
Engineering Report Phase, the Owner
agrees to engage the Engineer to
perform all other phases of the work
of each sewer district in accordance
with this Agreement.
See Ex. A., doc. 31, contract, Section I, A.
In the latter part of 1971 and 1972,
Kimball prepared a Preliminary Engineering
Report regarding a proposed county-wide sewer
system and the proposed improvements of a.
treatment plant in West Chesapeake, Ohio.
However, after 1973, there was no
correspondence, discussion, contact, Or
-C9-
activity of any kind on the part of Kimball
regarding these reports, and although the
reports were to be used as the basis for
application for state and federal construction
grant loans, no such applications were filed.
Nor were the reports a basis for any government
funding. In addition, Kimball never attempted
to revise or update the reports despite their
alleged inadequacies. The hiatus existed from
1973 until 1984 when Kimball sent a demand
letter to the county, after reading about the
hiring of another firm in the newspaper.
During this period there were changes in
the federal laws and regulations concerning the
funding of such sewer projects. The Army Corps
of Engineers were involved with the County in
the preparation of the facilities plan required
by the new federal law and in 1978 the County
hired an engineering firm, Burgess and Niple,
Ltd., to perform the necessary engineering work
required of the project, after having
“€¢i0-
interviewed several] engineering firms in
October 1977. Plaintiff points out that there
was considerable publicity about the
activities, including the hiring of the new %
consultant in 1978 and about activities with
the Corps of Engineers regarding the sewer
project for Eastern Lawrence County. Yet
Kimball did not contact plaintiff until 1984.
For the following reasons, we conclude
that the agreements entered into by Lawrence
County with Kimball in 1971 are ultra vires and
contrary to public policy under Ohio law,
because they were so indefinite in time that
they extend beyond the life of the Board of
~ County Commissioners.
We reach our conclusion based on the
authority of State ex rel Allen v. Lutz, 111
Ohio St. 333 (1924). In this remarkably
Similar case, the Supreme Court noted:
The policy of the law is~ rather
against the power of one board of
county commissioners to make
~—si-
contracts so indefinite in time that
the same may extend beyond the life
of the board, and thus bind another
or future board, although in some
cases such a contract may be valid
and binding even though the
performance of some part may _ be
impossible until after the expiration
of the term of the majority of the
Board as it existed when the contract
was made. Yet the general rule is
that such contracts, extending beyond
the term of the existing board, and
employment of agents or servants of
the County for such period, thus
tying the hands of a_= succeeding
board, are not looked upon with favor
unless the necessity or some special
Circumstances show that the public
good requires such contracts to be
made.
In Lutz, Id. at 338-39, the Supreme
Court refused to issue a writ of mandamus to
require the Board of County Commissioners to
make the payment to the sanitary engineer
provided for in the contract. Likewise, the
Court of Appeals in State ex. Hubbard v. Hilty,
31 Ohio L. Abs. 538, 540 (Allan County 1940)
emphasized that contracts are invalid which
restrain future commissions from exercisinc
their discretionary power or "performing any of
,
ry
>
‘ 4
‘ 2%
~
4
ror
,
’
roe
Cc
rr
, ‘
ror
/
m6
mar
,
me
‘ ‘
4
;
/
;
tract a
, J J
“* ot (\
y ;
a). / ——
; ‘ re
vit
, i A
; ¥ ‘ :
or
3¢ ‘ ,* ‘
* >} ; :
‘ reqer z
/ ‘
. . ; & ;
. , ee ‘
44 c ad
, » s
‘ 4
" ’ mre
4\4 i. ¢ : :
;
y ne
; 4‘
‘ 4
T;
. “?
" ; cr .rv\e
. : | .
" ’ , |
4 « ’ . 4 ’
fimt<s y* ’
Aa y ;
c f{ante« 4
ior ;
iV J
‘ ’ ’
4 ; b<
‘4 ners
re, 4 :
ve
ad
-Cl4-
termination by the owner based on default or
“for its convenience” and the prohibition of
any recovery of lost anticipated profits by the
terminated engineer for work not performed.
These regulations, as pointed out by plaintiff,
reflect the policy of the federal government
since World War I, that a public agency should
not be exposed to lost future profit claims.
See G.L. Christian & Associates
United
States, 312 F.2d 418, 426 (Court of Claims,
1963). In addition, the new federal reg-
ulations require a competitive negotiation
process consisting of public notice of the
requirement for engineering services, 40 C.F.R.
§35.937-2, evaluation of qualifications of the
interested engineering firms, 40 C.F.R.
§35.937-3, and the solicitation and evaluation
of proposals, 40 C.F.R. 535.937-4. Therefore,
it appears that the contract which i1s_ the
subject of this litigation would not have
passed muster under applicable federal law and
-Ci5-
reaulations because there was no competitive
negotiation process before awarding the
contract to Kimball, the life of the project
clause was invalid as a matter of federal law,
and, even if the County had awarded a contract
to Kimball in 1978, it would have had the right
to terminate Kimball for defadlt or for its
convenience. Furthermore, upon termination,
Kimball could not have asserted a claim for
lost profits, as it has done in this
proceeding.
For the foregoing reasons, plaintiff's
motion for summary judgment on Count III of the
second amended complaint (doc. 32) is granted,
the contracts are declared invalid as a matter
of public policy, and the arbitration award is
hereby vacated. Defendant's cross-motion for
summary judgment on Count III (doc. 36) is
denied. A status conference is scheduled for
May 27, 1987, at 10:00 a.m., to discuss any
remaining issues in the case.
-C1l6-
SO ORDERED.
S. Arthur Spiegel ©
United States District Judge
LAL though our Opinion and Order (doc.
15) was entered in response to defendant's
motion for a preliminary injunction, the Court
treated the motion as if it were styled as 4
motion to compel arbitration under 9 U.S.C. $4.
Therefore, we never addressed or analyzed this
case in terms of the defendant's success on the
merits, which is one of the traditional four
factors that determine whether injunctive relief
ought to be granted. See e.g., Warner v.
Central Trust Co., 715 F.2d Ligi, ike2s (6th
Cir. 1983).
“county Commissioners in Ohio are
elected to serve four year terms. Ohio Rev.
Code §305.0l(c). As the disputed contract
contains no term provision, on its face, the
agreement presents an issue regarding whether
the members who executed the agreement in 1971,
did so in such a manner as to bind successor
boards of county commissioners.
3we recognize that in some
circumstances, the Ohio courts have enforced
contracts which exceed the term of office of
the county commissioners who executed certain
contracts if there were special circumstances
and performance was within 4a reasonable time.
However, in this case, there was a hiatus of
almost ten years while the county was making
arrangements with the federal government and
-C17-
others to put in the sewer system and the
Original contracting party did nothing to
protect or assert its rights. Moreover, we
find the cases cited by Kimball inapposite. In
Moor v. United States, 243 F.2d 913 (6th Cir.
1957), the county did not raise the ultra vires
defense in its pleadings. In Rowt Linger _ v. City
of Cincinnati, 49 O.App. 42 (1934), the issue
was whether the consideration under a lease
agreement was adequate. The lease agreement
was for a period of five years and, therefore,
was for a definite time, unlike the contract in
this case. From our reading of the case, the
public good requirement was never discussed.
em
the
APPENDIX D
Order and Judgment Entry of
United States District Court for
the Southern District-of
Ohio, Western Division
-pl-
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF OHIO
WESTERN DIVISION
BOARD OF COUNTY :
COMMISSIONERS OF : No. C-1-85-667
LAWRENCE COUNTY, OHIO
Plaintiff, >: ORDER CERTIFYING
>: THAT SUMMARY
vs. : JUDGMENT ORDER OF
>: MARCH 18, 1987 IS
L. ROBERT KIMBALL >: FINAL AND THERE IS
& ASSOCIATES, : NO JUST REASON FOR
DELAY OF APPEAL
Defendant.
This matter came on for consideration of
defendant L. Robert Kimball & Associates'
Motion (doc. 41) for certification by this
Court that its summary judgment order of March
18, 1987 is final and that there is no just
reason for delay of appeal. We conclude that
defendant's motion is well-taken.
Certification of Rule 54(b), Fed. R. Civ.
P. of this Court's summary judgment order of
March 18, 1987 will advance the interests of
sound judicial administration and justice to
-D2-
the litigants in this case. We find that the
claims decided as final and on the merits by
the summary judgment motion are separate from
the remaining claims in the case and an
immediate appeal of the order would not cause
plaintiff to suffer significant hardships,
economic or otherwise and may well facilitate
the resolution of the remaining claims in this
case thereby offsetting any costs incurred by
plaintiff's participation in the appeal.
Accordingly, pursuant to Rule 54(b), Fed. R.
Civ. P. we hereby direct the entry oft final
judgment on the summary judgment order entered
March 18, 1987 in favor of plaintiff on count 3
of its second amended complaint and against the
defendant on defendant's cross-motion for
Summary judgment on its counterclaim to count
Bs Said entry of final judgment in favor of
plaintiff aforesaid in count 3 of the second
amended complaint and on defendant's
counterclaim thereto being made on the express
-D3-
determination by the Court that there is no
just reason for delay of appeal of said
judgment mn favor of plaintiff on count 3 of
the second amended complaint and on defendant's
counterclaim thereto.
SO ORDERED.
S. Arthur Spiegel
United States District Judge
-D4-
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF OHIO
WESTERN DIVISION
BOARD OF COUNTY :
COMMISSIONERS OF ; CASE NO. C-1-85-667
LAWRENCE COUNTY, OHIO
Vv. |
JUDGMENT IN A
L. ROBERT KIMBALL ; CIVIL CASE
& ASSOCIATES :
Jury Verdict. This action came before
the Court for a trial by jury. - The
issues have been tried and the jury has
rendered its verdict.
X Decision by Court. This action came to
trial or hearing before the Court. The
issues have been tried or heard and a
decision has been rendered.
IT 4S ORDERED AND ADJUDGED
ORDER entered by Judge Spiegel that
Accordingly, we hereby direct the entry of
final judgment on the summary judgment order
entered March 18, 1987 in favor of plaintiff on
count 3 of its second amended complaint and
against the defendant on defendant's
cross-motion for summary judgment on its
counterclaim to count 3. Said entry of final
judgment in favor of plaintiff aforesaid in
count 3 of the second amended complaint and on
defendant's counterclaim thereto being made on
the express determination by the Court that
there 1S no just reason for delay of appeal of
ETE DEBS BEG oh OE oe are
-D5-
said judgment in favor of plaintiff on count 3
of the second amended complaint and on
defendant's counterclaim thereto.
June 9, 1987 Kenneth J. Murphy
Date Clerk
Arthur W. Hill
(By) Deputy Clerk
Federal]
APPENDIX E
Arbitration Act, 9 U.S.C.
-Fl-
9 U.S.C §9. AWARD OF ARBITRATORS;
CONFIRMATION; JURISDICTION; PROCEDURE
If the parties in their agreement have
agreed that a judgment of the court shall be
entered upon the award made pursuant to the
arbitration, and shall specify the court, then
at any time within one year after the award is
made any party to the arbitration may apply to
the court so specified for an order confirming
the award, and thereupon the court must grant
such an order unless the award is vacated,
modified, Or corrected as_- prescribed in
sections 10 and 11 of this title [9 U.S.C.S.
§§10,11]). If no court is specified in the
agreement of the parties, then such application
may be made to the United States court in and
for the district within which such award was
made. Notice of the application shall be
served upon the adverse party, and thereupon
the court shall have jurisdiction of such party
as though he had appeared generally in the
-F2- _
proceeding. If the adverse party is a resident
of the district within which the award was
made, such service snall be made upon the
adverse party or his attorney as prescribed by
law for service of notice of motion in an
action in the same court. If the adverse party
shall be a nonresident, then the notice of the
application shall be served by the marshall of
any district within which the adverse party may
be found in like manner as other process cf the
court.
(July 30, 1947, ch 392 §1, 61 Stat. 672.)
9 U.S.C. §10. SAME; VACATION;
GROUNDS; REHEARING
In either of the following cases the
Unitec States court in and for the district
wherein the award was made may make an order
vacating the award upon the application of any
party to the arbitration --
-F3-
(a) Where the award was procured by
corruption, fraud, or undue = ?2ans.
(b) Where there was evident partiality
Or corruption in the arbitrators, or
either of them.
(c) Where the arbitrators were guilty
of misconduct in refusing to postpone
the hearing, upon sufficient cause
shown, or in refusing to hear evidence
pertinent and material to the
controversy; or of any other misbehavior
by which the rights of any party have
been prejudiced.
(d) Where the arbitrators exceeded
their powers, or so imperfectly executed
them that a mutual, final, and definite
award upon the subject matter submitted
was not made.
(e) Where an award is vacated and the
time within which the agreement required
the award to be made has not expired the
-F4-
court may, in its discretion, direct a
rehearing by the arbitrators.
(July 30, 1947 ch 392, §1, 61 Stat. 672).
9 U.S.C. §11. SAME; MODIFICATION OR
CORRECTION; GROUNDS; ORDER
In either of the following cases the
United States court in and for the district
wherein the award was made may make an order
modifying or correcting the award upon the
application of any party to the arbitration --
(a) Where there was an evident material
miscalculation of figures or an evident
material mistake in the description of
any person, thing, or property referred
to in the award.
(b) Where the arbitrators have awarded
upon a matter not submitted to them,
unless it is a matter not affecting the
merits of the decision upon the matter
submitted.
award,
-E5S-
(c) Where the award is imperfect in
matter of form not affecting the merits
of the controversy.
The order may modify and correct the
so as to effect the intent thereof and
promote justice between the parties.
(July 30, 1947, ch 392, §1, 61 Stat. 673.)
-Fli-
40 C.F.R. §$35.917-1
CONTENT OF FACILITIES PLAN
Facilities planning must address each of
the following to the extent considered
appropriate by the Regional Administrator:
(a) A description of the treatment works |
for which construction drawings and
specifications are to be prepared. This
description shall include preliminary
engineering data, cost estimates for design and
construction of the treatment works, and a
schedule for completion of design and
construction. The preliminary engineering data
may include, to the extent appropriate,
information such as a schematic flow diagram,
unit processes, design data regarding detention
times, flow rates, sizing of units, etc.
(b) A description of the selected
complete waste treatment system(s) of which the
proposed treatment works iS a part. The
description shall cover all elements of the
-F2-
system, from the service area and collection
sewers, through treatment, to the ultimate
discharge of treated wastewaters and management
and disposal of sludge. Planning area maps
must include major components of existing and
propesed treatment works. For individual
systems, planning area maps must include those
individual systems which are proposed for
funding under §35.918.
(c) Infiltration/inflow documentation in
accordance with §35.927 et seq.
(d) A cost-effectiveness analysis of
alternatives for the treatment works and for
the complete waste treatment system(s) of which
the treatment works is a part. The selection
of the system(s) and the choice of the
treatment works for which construction drawings
and specifications are to be prepared shall be
based on the results of the cost-effectiveness
analysis. (See Appendix A to this subpart.)
This analysis shall include:
-F3-
(1) The relationship of the size
and capacity of alternative works io the needs
to be served, including reserve capacity;
(2) An evaluation of alternative
flow and waste reduction measures, including
nonstructural methods;
(3) An evaluation of improved
effluent quality attainable by upgrading the
operation and maintenance and efficiency of
existing facilities as an alternative or
Supplement to construction of new facilities;
(4) An evaluation of the capability
of each alternative to meet applicable effluent
limitations. (All step 2, step 3, or step 2 + 3
projects shall be based on application of best
practicable waste treatment technology (BPWTT),
aS a minimum. Where application of BPWTT would
not meet water quality standards, the facilities
plan shall provide for attaining such standards.
Such provision shall consider the alternative of
treating combined sewer overflows. );
-F4-
(5) An identification of, and
provision for, applying BPWTT as defined by the
Administrator, based on an evaluation of
technologies included under each of the
following waste treatment management
techniques;
(i) Biological or physical-
chemical treatment and discharge to receiving
waters;
wert Systems employing the
reuse of wastewater and recycling of
pollutants;
. (iii) Land application’ tech-
niques;
(iv) Systems including revenue
generating applications; and
(v) Onsite and nonconven-
tional systems;
(6) An evaluation of the alter-
native methods for the ultimate disposal of
treated wastewater and sludge materials re-
-FS-
sulting from the treatment process, and a
justification for the method(s) chosen;
(7) An adequate assessment of the
expected environmental impact of alternatives
(including sites) under Part 6 of this chapter.
This assessment shall be revised as necessary
to include information developed during
subsequent project steps;
(8) For facilities planning begun
after September 30, 1978, whether or not
prepared under a step 1 grant, an analysis of
innovative and alternative treatment processes
and techniques that reclaim and reuse water,
productively recycle wastewater constituents,
eliminate the discharge of pollutants, recover
energy or otherwise achieve the benefits
described in Appendix E. The provisions of
this paragraph are encouraged in all cases.
They are required in facilities planning for
new treatment works and for treatment works
which are being acquired, altered, modified,
-F6-
improved, or extended either to handle a
Significant increase in the volume of treated
waste or to reduce significantly the pollutant
discharges from the system. Where certain
categories of alternative technologies may not
be generally applicable because of prevailing
climatic or geological conditions, a detailed
analysis of these categories of alternative
technologies is not required. However, the
reason for such a rejection must be fully
substantiated in the facilities plan;
\.9) For facilities planning begun
after September 30, 1978, whether or not
prepared under a step 1 grant, an analysis of
the primary energy requirements (operational
energy inputs) for each system considered. The
alternative selected shall propose adoption of
measures to reduce energy consumption or to
increase recovery as long as such measures are
cost-effective. Where processes or techniques
are claimed to be innovative technology on the
“¥7-
basis of energy reduction criterion contained
in paragraph 6e(2) of Appendix 3 to this
subpart, a detailed energy analysis shall be
included to substantiate the claim to _ the
satisfaction of the Regional Administrator.
(e) An identification of effluent
discharge limitations or, where a permit has
been issued, the NPDES permit number, and a
brief description of how the proposed
project(s) will result in compliance with the
enforceable requirements of the Act.
(f£) Required comments or approvals of
relevant State, interstate, regional, and local
agencies (see §30.305-8). =
(g) A final responsiveness summary,
consistent with 40 CFR 25.8 and §35.917-5.
(nh) A brief statement demonstrating that
the authorities who will be implementing the
plan have the necessary iegal, financial,
institutional, and managerial resources
available to “ensure the construction,
-F8-
operation, and maintenance of the proposed
treatment works.
(i) A statement specifying that the
requirements of the Civil Rights Act of 1964
and of Part 7 of this chapter have been met.
(j) For facilities planning begun after
September 30, 1978, whether or not prepared
under a step 1 grant, a description of
potential opportunities for recreation, open
space, and access to bodies of water analyzed
in planning the proposed treatment works and
the recommended actions. The facilities plan
shall also describe measures taken to
coordinate with Federal, State, and _ local
recreational programs and the recreational
elements of applicable approved areawide WOM
plans.
(kK) A municipal pretreatment program in
accordance with §35.907.
(1) An estimate of total project costs
and charges to customers, in accordance with
guidance issued by the Administrator.
-F9-
(m) A statement concerning the
availability and estimated cost of proposed
Sites.
[43 FR 44049, Sept. 27, 1978, as amended at 44
FR 10302, Feb. 16, 1979].
APPENDIX G
-Gl-
40 C.F.R. §35.937-2 PUBLIC NOTICE
(a) Requirement. Adequate public notice
as paragraph (a)(1) or (2) of this section
provide, must be given of the requirement for
architectural or engineering services for all
subagreements with an anticipated price in
excess of $25,000 except as paragraph (b) of
this section provides. In providing public
notice under paragraphs (a)(1) and (2) of this
section, grantees must comply with the policies
in $$35.936-2(c), 35.936-3, @nG@ 33.920" 7.
ae Public announcement. A notice
of request for qualifications should be
published in professional journals, newspapers,
Or publications of general circulation over a
reasonable area and, in addition, if desired,
through posted public notices oor _ written
notification directed to interested person,
firms, or professional organizations inviting
the submission of statements of qualifications.
The announcement must clearly state the
deadline and place for submission
paragraph (b) of this section, the grantee may
secure or maintain 4 list +) gualified
5 , +
~ vane. +o rj ~ M 4 — -
Canqadidqaates. LNne LiSt must:
> ) Ré¢ ‘el= c Amon - 5 r Ky ] -
s a — ~ ¥ .. i € . vv — -
lOrice nNrocend a =~ ac ,r ry - Cc ~~} { =
notice f edures as paragrapl a | of
+hHaiec ~ + °
tcnhis sec 1Oon
~ 5 c
, } rmcyt } 1-2 gdetae rt r lati
A ru. = 4 A - —/ I = = i A
| + 4 mM.
Updating; and
111i) Be naintained t the
Grantee or secured from the State r from a
Pe
®
rs
2
O
C
—t
2)
m
$))
o
O
W)
O
a
i aa =
Ty
*
QD
D
Ae)
ict
-
~
W)
-
D
Ze)
Cc
'@)
{
=
cT
requirement of this section and the related
requirements of §§3
applicable, but may be followed, in the cases
described in paragraphs (b)(1) through (3) of
-G3-
this section. All other appropriate provisions
of this section, including cost review and
negotiation of price, apply:
(1) Where the population of the
grantee municipality is 25,000 or less
according to the latest U.S. census.
(2) For step 2 or step 3 of a
(1) the grantee is satisfied
with the qualifications and performance of an
engineer who performed all or any part of the
step 1 or step 2 work;
: (11) The engineer has the
Capacity to perform the subsequent steps; and
(111) The grantee desires the
same engineer to provide architectural or
engineering services for the subsequent steps.
(3) For subsequent segments of
design work under one grant if:
(1) A single treatment works
is segmented into two or more step 3 projects;
-G5S-
with technical skills).
(c) Criteria which should be considered
in the evaluation of candidates for submission
of proposals should include:
(1) Specialized experience and
technical competence of the candidate Or firm
and its personnel (including a joint venture,
association or professional subcontract),
considering the type of services required and
the complexity of the project;
(2) Past record of performance on
contracts with the grantee, other government
agencies or public bodies, and with private
industry, including such factors as contro] of
costs, quality of work, and ability to meet
schedules;
(3) The candidate's capacity to
perform the work (including any specialized
services) within the time limitations,
considering the firm's current and planned
workload;
_-G6-
(4) The candidate's familiarity
with types of problems applicable to the
project; and
(5) Avoidance of personal and
organizational conflicts of interest prohibited
under State and local law and §35.936 16.
40 C.F.R. §35.937-4 SOLICITATION AND
EVALUATION OF PROPOSALS
(a) Requests for professional services
proposals must be sent to no fewer than three
candidates who either responded to the
announcement or who were selected from the
prequalified list. If, after good faith effort
to solicit qualifications in accordance with
§35.937-2, fewer than three qualified
candidates respond, all qualified candidates
must be provided requests for proposals.
. (b) Requests for professional services
proposals must be in writing and must contain
the information necessary to enable a
«GF
prospective offeror to prepare a_e proposal
properly. The request for proposals must
include the solicitation statement in
§35.937-9(a) and must inform offerors of the
evaluation criteria, including all those in
paragraph (c) of this section, and of the
relative importance attached to each criterion
(a numerical weighted formula need not be
utilized).
(c) All proposals submitted in response
to the request for professional services pro-
posals must be uniformly evaluated. Evaluation
criteria shall _ include, as a minimum, all
criteria stated in §35.937-3(c) of this
subpart. The grantee shall also evaluate the
candidate's proposed method to accomplish the
work required, including, where appropriate,
demonstrated capability to explore and develop
innovative or advanced techniques and designs.
The grantee's evaluation shall comply with
§$35.936-7.
-G8-
(d) Proposals shall be evaluated through
an objective process (e.g., the appointment of
a board or committee which, to the extent
practicable, should include persons with
technical skills. Oral (including telephone)
or written interviews should be conducted with
top rated proposers, and information derived
therefrom shall be treated on a confidential
basis, except as required to be disclosed under
State or local law or to EPA under §35.937-6.
(e) At no point during the procurement
process shali information be conveyed to any
candidate which would’ provide an_ unfair
competitive advantage.
APPENDIX H
40 C.F.R. Part 35, Subpart E, Section 5
-Hl-
40 C.F.R. Part 35 Subpart E,
Section 5
TERMINATION
(a) Either party may terminate’ this
agreement, in whole or in part, in writing, if
the other party substantially fails to fulfill
its obligations under this agreement through no
fault of the terminating party. However, no
such termination may be effected unless the
other party is given (1) not less than ten (10)
calendar days written notice (delivered by
certified mail, return receipt requested) of
intent to terminate, and (2) an opportunity for
consultation with the terminating party before
termination.
(b) The owner may terminate this
agreement, in whole or in part, in writing for
its convenience if the termination is for good
cause (such as for legal or financial reasons,
major changes in the work or program
requirements, initiation of a new step) and the
-H2-
engineer is given (1) not less than ten (10)
calendar days written notice (delivered by
certified mail, return receipt requested) of
intent to terminate, and (2) an opportunity for
consultation with the terminating party before
termination.
(c) If the owner terminates for default,
an equitable adjustment in the price provided
for in this agreement shall be made, but (1) no
amount shall be allowed for anticipated profit
on unperformed services or other work, and (2)
any payment due to the engineer at the time of
termination may be adjusted to the extent of
any additional costs the owner incurs because
of the engineer's default. If the engineer
terminates for default or if the owner
terminates for convenience, the equitable
adjustment shall include a reasonable profit
for services or other work performed. The
equitable adjustment for any termination shall
provide for payment to the engineer’ for
-H3-
services rendered and expenses incurred before
the termination, in addition to termination
settlement costs the engineer reasonably incurs
relating to commitments which had become firm
before the termination.
(d) Upon receipt of a termination action
under paragraphs (a) or (b) above, the engineer
Shall (1) promptly discontinue all services
affected (unless the notice directs otherwise),
and (2) deliver or otherwise make available to
the owner all data, drawings, specifications,
reports, estimates, summaries, and such other
information and materials as the engineer may
have accumulated in performing this agreement,
whether completed or in process.
(e) Upon termination under paragraphs (a)
or (b) above, the owner may take over the work
and prosecute the same to completion by
agreement with another party or otherwise. Any
work the owner takes over for completion will
be completed at the owner's risk, and the owner
—-H4-
will hold harmless the engineer from all claims
and damages arising out of improper use of the
engineer's work.
(f) If, after termination for failure of
the engineer to fulfill contractual
obligations, it is determined that the engineer
had not sc failed, the termination shall be
deemed to have been effected for the
convenience of the owner. In such event,
adjustment of the price provided for in this
agreement shall be made as paragraph (c) that
this clause provides.
APPENDIX I
Ohio Revised Code §6117.01
-[l-
O.R.C. §6117.01 SEWER DISTRICTS.
For the purpose of preserving and
promoting the public health and welfare, boards
of county commissioners may by resolution lay
out, establish and maintain one or more sewer
districts within their respective counties,
outside of municipal corporations, and may have
a registered professional engineer make such
SurveyS aS are necessary for the determination
of the proper boundaries of such district.
Fach district shail be designated by an
appropriate name or number. Any board may
acquire, construct, maintain, and operate such
main, branch, intercepting, or local sever, or
ditch, channel, Or interceptor for the
temporary retention of storm water, within any
Such district, and such outlet sewer and sewage
treatment or disposal works within or without
such district, as are necessary to care for and
conduct the sewage or surface water from any
part of such district to a proper outlet, so as
to properly treat or dispose of same. Any such
board may employ ae registered professional
engineer to employ necessary assistants upon
such terms as are fixed by said board. The
board may create and maintain a= sanitary
engineering department, to be under its
Supervision and in charge of a registered
professional engineer, to be appointed by such
board, for the purpose of aiding it in the
performance of its duties under section 6117.01
to 6117.45 of the Revised Code, or its other
duties regarding sanitation provided by law.
Said board shall provide suitable rooms for the
use of such department and shall provide for
and pay the compensation of such registered
professional engineer and all necessary
expenses of such registered professional
engineer and department which are authorized by
such board. Any such registered professional
engineer in charge of such department, with the
approval of the board, may appoint necessary
16,
rY
~[4-
Sanitary engineer. Any person, firm, or
corporation proposing or constructing’ such
improvements shall pay to the county all
expenses incurred by the board in “connection
therewith. The county sanitary engineer may
enter upon any public or private property for
the purpose of making surveys or examinations
necessary for the laying out of sewer districts
or designing sewers or treatment works, and may
make such surveys and examinations. No person,
firm or corporation shall forbid or interfere
with the county sanitary engineer or his
authorized assistants entering upon such
property for such purpose or [of] making such
surveys or examinations. If actual damage is
done to property by the making of such surveys
and examinations, the board shall pay the
reasonable value of such damage to the owner of
the property damaged, and such cost shall be
included in the assessment upon the property
benefited by the improvement for which such
surveys and examinations are made.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.