Petition for Writ of Certiorari — Miners Advocacy Council, Inc. v. Alaska Department of Environmental Conservation
Supreme Court brief1990
Ask Donna
What actually matters in this document.
Text
\
(1)
$Y i 0 U 3 a | Supreme Guurt, U.S,
FILED
No. 89-__ EC 14 RS
JOSEPH F. SPANIOL, JR.
In The EK
Supreme Court of the United States
October Term, 1989
,%
4
MINERS ADVOCACY COUNCIL, INC.,
Petitioner,
THE STATE OF ALASKA, DEPARTMENT OF
ENVIRONMENTAL CONSERVATION; DENNIS D.
KELSO, COMMISSIONER OF THE
DEPARTMENT OF ENVIRONMENTAL
CONSERVATION; TRUSTEES FOR
ALASKA; and NORTHERN ALASKA
ENVIRONMENTAL CENTER,
Respondents.
-%
4
PETITION FOR WRIT OF CERTIORARI
TO THE SUPREME COURT OF ALASKA
,%
—
Rosert JOHN # .
WILLIAM R. SATTERBERG, JR. *
Law Orrices OF WILLIAM R.
SATTERBERG, JR.
709 Fourth Avenue
Fairbanks, Alaska 99701
(907) 452-4454
#Of Counsel
*Counsel of Record
COCKLE LAW BRIEF PRINTING CO,, (800) 225-6964
OR CALL COLLECT (402) 342-2831
QUESTIONS PRESENTED FOR REVIEW
(1) May the State of Alaska, through the National
Pollution Discharge Elimination System (NPDES) permit
certification process, simultaneously insert the same
water quality based effluent limitation in several hundred
permits, or must the State instead certify NPDES permits
and insert water quality based effluent limitations on an
individual, case-by-case basis?
(2) Did the State of Alaska waive its right to certify
by failing to certify within the 60-day period prescribed
by law?
(3) When the United States Environmental Protec-
tion Agency (EPA) proposes to modify particular terms of
an NPDES permit, may the State of Alaska via the certi-
fication process modify different NPDES permit terms
which the EPA-proposed permit modification did not
even purport to affect?
(4) Did the State of Alaska’s certification of the
same water quality based effluent limitation for several!
hundred permits, in disregard of whether such a strin-
gent limitation is necessary to meet State water quality
standards in individual cases, effect a taking of property
in violation of the Fifth and Fourteenth Amendments?
il
TABLE OF CONTENTS
Page
QUESTIONS PRESENTED FOR REVIEW...........
TABLE OF CONTIN... ii
TASLE OF AUTHGRTEe....os. as V
OPINION MRLAWW ios. tee 1
JURISDICTION OF THE COURT................... 1
CONSTITUTIONAL PROVISIONS, STATUTES, AND
REGULATIONS INVOLVED .................005. 1
STATEMENT OF THE CAGE? nse ees 2
REASONS FOR GRANTING THE WRIT ........... 13
I. THE STATE MUST CERTIFY WATER QUAL-
ITY BASED EFFLUENT LIMITATIONS ON
AN INDIVIDUAL, CASE-BY-CASE BASIS.. 14
II. BY FAILING TO CERTIFY WITHIN THE 60-
DAY PERIOD PRESCRIBED BY LAW, THE
STATE WAIVED ANY RIGHT TO CERTIFY
THE NPURES PRRMIIED «once ccecnaticsscss: 18
Ill. THE STATE ILLEGALLY INSERTED THE
0.2ML/L SETTLEABLE SOLIDS EFFLUENT
LIMITATION IN THE 446 NPDES PERMITS
WHICH EPA PROPOSED TO MODIFY
ONLY WITH RESPECT TO TURBIDITY
AND) ARINC 6 os00655sn5cuue eee ee 21
be on Re On eh ct MOE palidoes
ili
TABLE OF CONTENTS - Continued
Page
IV. THE STATE EFFECTED A TAKING OF PRI-
VATE PROPERTY IN VIOLATION OF THE
FIFTH AND FOURTEENTH AMENDMENTS
BY CERTIFYING THE SAME WATER QUAL-
ITY BASED EFFLUENT LIMITATION FOR
SEVERAL HUNDRED PERMITS WITHOUT
DEMONSTRATING THAT SUCH A STRIN-
GENT LIMITATION IS NECESSARY TO
MEET STATE WATER QUALITY STAN-
DARDS IN EACH INDIVIDUAL CASE .... 22
eas is ok wa xs Givens hs <tnce sen ieee 28
APPENDIX A - Opinion of the Alaska Supreme
RNG E CU5a 64 4 00%s 440s 4500 App. 1
APPENDIX B - Memorandum Decision of the
Alaska Superior Court...... App. 32
APPENDIX C - Decision of the Deciding
Officer, Alaska Department of
Environmental Conservation
cet vacrec\enwaeks App. 45
APPENDIX D - Order Denying Rehearing in
ee ery ee App. 68
APPENDIX E - Order Denying Rehearing in
a ee a App. 70
APPENDIX F - Petition for Rehearing
ih 5S 0'p +5540 60 00% App. 72
APPENDIX G - Letter from EPA to State
DEC Initiating Certification Peri-
Ree LS. ce cae a as App.
89
iv
TABLE OF CONTENTS - Continued
APPENDIX H - Draft Permit with EPA-
Proposed NPDES Permit Mod-
ifications for Turbidity and
Se rep eer
APPENDIX I - Fact Sheet Giving Notice of
Proposed NPDES Permit Mod-
ifications for Turbidity and Arse-
on, ELT ES PT eee oe
APPENDIX J - Letter from EPA to Placer Miners
Concerning Proposed NPDES
Permit Modifications for Turbi-
. 101
dity and Arsenic...........
APPENDIX K - Letter from State DEC to
APPENDIX L - State DEC Certification/
Certificate of Reasonable Assur-
APPENDIX M - _ Documents Filed in the State
POOUM ios asdseee eee
APPENDIX N -_ Transcript of State DEC Adjudi-
Page
App. 91
>
catory Hearing (Excerpt).. App. 147
APPENDIX O - Constitutional Provisions,
Statutes, and Regulations
App. 148
RL a ke oo, cee
TABLE OF AUTHORITIES
Cases
Armstrong v. United States, 364 U.S. 40 (1960)........ 23
Best v. Humboldt Mining Co., 371 U.S. 334 (1963)..... 22
Costle v. Pacific Legal Foundation, 445 U.S. 198
(1980), rehearing denied, 446 U.S. 947 (1980)........ 21
Dobbins v. City of Los Angeles, 195 U.S. 223 (1904) .... 27
Environmental Defense Fund v. Alexander, 501
F.Supp. 742 (N.D. Miss. 1980), affirmed in part,
reversed in part on other grounds, 651 F.2d 983
(5th Cir. 1981), on remand, 554 F.Supp. 451 (N.D.
PE Sas FR es Woewanetes poke eeveda Nea Shc 19
E.P.A. v. California ex rel. State Water Resources
Control Board, 426 U.S. 200 (1976)................. 16
Hallstrom v. Tillamook County, ___ U.S. ___, 58 US.
a nat oe ae he ere ee Ca 20
Homestake Mining Co. v. United States Envtl. Protec-
tion Agency, 477 F.Supp. 1279 (D.S.D. 1979)........ 10
].E.D. Associates, Inc. v. Atkinson, 121 N.H. 581, 432
ee gnc lvicn ccc nek maka eaee er eees 26
Lake Erie Alliance v. U.S. Corps of Engineers, 526
F.Supp. 1063 (W.D.Pa. 1981), affirmed 707 F.2d
1392 (3rd Cir. 1983), cert. denied., 464 U.S. 915
SUING Wiad s Spckace Nn bo eee cn ee es ORE PET OLAS 12
Lawten ©. Stecke, 132 US. 133 (IGP)... os ess was. 28
Leo Sheep Co. v. United States, 440 U.S. 668 (1979) .... 18
Marathon Oil Co. v. E.P.A., 830 F.2d 1346 (5th Cir.
Ds nu vbe cx ha kes cee we ca ese ee 12, 14, 16, 20, 27
vi
TABLE OF AUTHORITIES - Continued
Natural Resources Defense Council v. E.P.A., 273
U.S.App. D.C. 240, 859 F.2d 156 (1988).........
Nollan v. California Coastal Commission, 483 US.
MN RE rere re roe 24,
Penn Central Transportation Co. v. City of New York,
COD UE re Re ons o's cadveasenauseseseets-
Pennell v. City of San Jose, __ U.S. __, 108 S.Ct.
SOD, FS RBA FT CGI aos a icles vaccssscnses
Pennsylvania Coal Co. v. Mahon, 260 U.S. 393 (1922) ..
Roosevelt Campobello International Park Commission
v. E.P.A., 684 F.2d 1041 (1st Cir. 1982)..........
Seacoast Anti-Pollution League v. Costle, 527 F.2d
872 (1st Cir. 1978), cert. denied, 439 U.S. 824
(IGF ED oc cc ccccctacasbUiieseks sesh eeeeeteeRnernis
Town of Sutton v. Water Supply and Pollution Control
Commission, 116 N.H. 154, 355 A.2d 867 (1976)...
Trustees for Alaska v. E.P.A., 749 F.2d 549 (9th Cir.
BOE). on vccibnce cnet biseees SesencuePeeeee ces
Union Oil Co. v. Smith, 249 U.S. 337 (1919).......
United States v. Coleman, 390 U.S. 599 (1968)......
‘United States v. Florida East Coast Railway Co., 410
UG. 208 CET «5 cvnnedhuesditasnisakeceses tees
United States v. Locke, 471 U.S. 84 (1985) .........
United States v. Riverside Bayview Homes, Inc., 474
SS. “SSE - CRO oan inc sewiscusdayeceieeassavent
26, 27
ee
cae
eS ee ae OR, -
Vii
TABLE OF AUTHORITIES - Continued
Page
CONSTITUTIONAL PROVISIONS
The United States Constitution, Amendment V....1, 22
The United States Constitution, Amendment XIV,
ERG shaw seek cheek ebNs- te. Ebina eee che oh ee keccl 1, 22
STATUTES AND REGULATIONS
United States Code
ee os 5 cance uéake snaped es kame pe as 1
sd. 4 6 o4.ece wwenes sanemm ae 26
ee ao Stace ewe vuaseudaceWeeeen 3
BF Wie MEEPS ow sv onc cn cccsccucnsnseeacns 1, 17
on 0 04 no040s sense keene ean 13
EA a i ain 5 5 50-4 wd aka 0 84s wed 6 aoe bee 1
er NN IE os coc cksnnscctecoeesescies 3, 4, 19
ee a nn cn andcccaseacaedesnedswoaw ae 4
ee IID 50s csc canseccvewusecccctccunee 3
EE ere a eer 2,3
RE Sn Ce rT ro 13
Code of Federal Regulations
pot ek | ree 2, 8, 14
Co renee ys
ee KE | errr a
Sp Gee, ee CUPEE 6 5 ov S vee secececaecees 3. 19
viii
TABLE OF AUTHORITIES - Continued
Page
SD CRE, Be Be hia ha ieee see es cee es 4, 19
40 C.F.R. §124.53(eX2) (1985)... 2.2.2... eee eee ee. 4
40 C.F.R. §124.53(e)(3) (1985)............ 4, 9, 14, 15, 26
CD Ce SD GUND ove dciccssscuccsnesieces re
RULES
Supreme Court Rule 17.1(b)-(c) .................-45. 13
RE GE GD EO 665 co ce dcnsinsestcewess 1
Lecistative History
House Report No. 92-911 (March 11, 1972)...18, 19, 20
FEDERAL REGISTER
Oe Fee I I wis hands ce ead w eee iwcuceecnanecen 19
OP Pe EN, IES oso nccacnuecwscessscbenetunen 15, 19
OPINION BELOW
The decision of the Alaska Supreme Court is offi-
cially reported beginning at 778 P.2d 1126. A copy of the
opinion is set forth in Appendix A. (App. 1-31)
|
JURISDICTION OF THE COURT
The Alaska Supreme Court rendered its decision in
this case on July 28, 1989. Petitioner Miners Advocacy
Council, Inc. (MAC) filed a timely petition for rehearing
(App. 72-88), which was denied in part on September 7,
1989, and in final on September 15, 1989. (App. 68-71)
Since Petitioner claimed and asserted rights under
the Constitution and statutes of the United States, this
Court has jurisdiction under 28 U.S.C. § 1257(a) to review
by writ of certiorari the decision of the Alaska Supreme
Court.
,
_
CONSTITUTIONAL PROVISIONS, STATUTES, AND
REGULATIONS INVOLVED
This case involves the following constitutional provi-
sions, statutes, and regulations. Since the provisions are
lengthy, pursuant to Supreme Court Rule 21.1(f), their
pertinent text is set forth in Appendix O (App. 148-65):
The United States Constitution, Amendment V;
The United States Constitution, Amendment
XIV, § 1;
33 U.S.C. § 1311(b)(1)(c);
33 U.S.C. § 1341;
33 U.S.C. § 1342(a)-(c);
40 C.F.R. § 121.2(a)(2)-(3) (1985);
40 C.RR. § 122.62 (1985);
40 C.ER. § 124.53 (1985);
40 C.RR. § 124.55(b) (1985).
sa
-
STATEMENT OF THE CASE
This case concerns the fate and livelihood of several
hundred gold miners in Alaska. While their gold mining
operations come in all shapes and sizes, the vast majority
of these miners are individuals or families, some of whom
trace their pursuit of this honest occupation back_to the
turn of the century. Since the imposition of the stringent
conditions at issue in this case, these souls have seen
their numbers decrease dramatically. 778 P.2d at 1130 n.7.
(App. 6-7)
Placer mining in essence involves the labor of gather-
ing from the earth small particles of that precious metal
known as gold. This is accomplished through placing
gold-bearing material, called “pay dirt,” in a channeled-
box known as a “sluice.” By then running water through
the sluice, the miner, through the force of gravity, gathers
the heavier particles, including gold, which collect in the
sluice on small underwater barriers known as “riffles.”
What goes in must come out, and after the pay dirt is
sluiced, it is discharged and captured by the miner, usu-
ally in a self-built settling pond. (App. 19) It is post-
capture discharge or “effluent” which subjects a miner to
the terms of the Clean Water Act.
wont
ne ee ae a
Oe ee
Both the land and the waters of Alaska are such that
they frequently contain naturally high levels of inert,
undissolved arsenic. Accordingly, when the earth is
washed through the miner’s sluice, it is natural for the
level in the receiving water to be increased somewhat by
the effluent. The same holds true for settleable solids,
which are heavier, quickly-settling sediments, and for
turbidity, which is not a pollutant but merely a measure-
ment of the cloudiness of the water. (App. 135-36)
Under Clean Water Act (CWA), 33 U.S.C.
§§ 1251-1387, any person wishing to discharge pollutants
into the waters of the United States must secure an
NPDES permit from either EPA or the source State,
depending on whether EPA has retained or delegated to
the State the permitting authority. 33 U.S.C. § 1342(a)-(c).
EPA has not delegated NPDES permitting authority to the
State of Alaska. Accordingly, while EPA is thus respons-
ible for issuing NPDES permits in Alaska, before EPA
may issue a permit, EPA must provide the State with an
opportunity to review the proposed permit to determine
whether the permit’s terms will meet the State’s water
quality standards. 33 U.S.C. § 1341(a)-(b). This process is
known as “certification.” Id.
Once a State has been presented with a certification
opportunity, the State has three options. The State may
deny certification of an NPDES permit, thus precluding
EPA from issuing the permit. 33 U.S.C. § 1341(a)(1). In
addition, the State may waive certification, either
expressly or by failing to render its certification decision
within the 60-day period prescribed by law. Id.; 40 C.F.R.
§ 124.53(c)(3), (d) (1985).! Third, the State may elect to
certify the NPDES permit. 33 U.S.C. § 1341(a)(1).
If the State does certify an NPDES permit, the State
may specify conditions more stringent than those in the
draft permit which are necessary to meet State water
quality standards, and must include for each such condi-
tion the CWA or State law reference upon which that
condition is based. 33 U.S.C. § 1341(a)(2); 40 C.F.R.
§ 124.53(e)(2). On the other hand, a certifying State is also
required to provide a “statement of the extent to which
each condition of the draft permit can be made less
stringent without violating the requirements of State law,
including water quality standards.” 40 C.F.R.
§ 124.53(e)(3). With the above background in mind, Peti-
tioner will turn to the facts of this case.
In 1984, EPA provided the State of Alaska Depart-
ment of Environmental Conservation (DEC) with the
opportunity to certify 446 NPDES permits to be issued to
placer gold miners in Alaska. At the time, DEC expressly
waived any right to certify the 446 permits. (App. 53, 55)
Accordingly, the 446 placer miners received their NPDES
permits which included, inter alia, a 0.7ml/1 monthly
average and 1.5ml/1 instantaneous maximum e.{luent
limitation for settleable solids. (App. 81, 91, 95)
Subsequent to the State’s waiver of certification and
the issuance of the 1984 permits, the United States Court
of Appeals rendered its decision in Trustees for Alaska v.
E.P.A., 749 F.2d 549 (9th Cir. 1984). This decision held that
' Unless specified otherwise, all future references to the
Code of Federal Regulations will refer to the 1985 C.F.R. as in
effect during the State’s 1985 certification. The relevant 1985
C.F.R. provisions have remained the same through their 1989
codification.
— ee
water quality standards, which are goals that must be met
for a given body of water, are not themselves proper
NPDES permit terms; rather, such water quality stan-
dards need to be translated into particular effluent limita-
tions applicable to an individual discharger. Id. at 556-57.
Thus, the Ninth Circuit held that EPA erred by not requir-
ing an effluent limitation for turbidity and not providing
a public hearing on the question of effluent limitations
for arsenic and mercury. Id. at 557, 561. The court then
remanded the case to the EPA to determine what, if any,
effluent limitations were necessary to meet the State
water quality standards for turbidity, arsenic, and mer-
cury. Id.
In response to the Ninth Circuit’s decision, EPA on
January 31, 1985, gave notice to the 446 permittees that
EPA was proposing to modify their 1984 NPDES permits
to include effluent limitations for turbidity and arsenic.
(App. 101-06) On the same date, EPA notified the State of
Alaska DEC of the proposed modifications. EPA also
provided DEC with copies of the draft permit with its
proposed modifications and informed DEC that the 60-
day period for State certification action was thereby com-
mencing and that the “State will be deemed to have
waived its right unless that right is exercised within 60
days of receipt of this letter.” (App. 89-94) The various
notices of the proposed modification nowhere indicated
that the settleable solids limitation was subject to mod-
ification, and consistent with EPA’s notice that it pro-
posed to modify the 446 permits with respect to turbidity
and arsenic, the proposed modifications which EPA sent
to DEC for certification did not alter the settleable solids
limitation, which remained at the 0.7/1.5 level. (App. 91)
With respect to State certification, the proposed modifica-
tion referred exclusively to limitations for turbidity and
arsenic. (App. 100)
Pursuant to the notice sent out by EPA, EPA and the
State DEC held joint hearings on the proposed modifica-
tion of the 446 existing NPDES permits and to issue 93
new permits for placer mining operations in the State, a
total of 539 individual NPDES permits. (App. 46) Based
on the notification that turbidity and arsenic were the
only conditions being modified, Petitioner MAC mem-
bers submitted comments only in regards to those and
not any other permit conditions. (App. 81) Only after EPA
and DEC held their two public hearings on the permits,
did DEC publicly announce that it intended to modify the
settleable solids limitation in the 446 permits and certify a
settleable solids limitation of 0.2m1/1. (App. 47)
The 60-day period in which the State was to have
certified came and went. Finally, on April 29, 1985, 88
days after EPA initiated the certification, DEC certified en
masse the 539 NPDES permits and inserted in each and
every one of the permits a settleable solids effluent lim-
itation of 0.2ml1/1. (App. 115-16) As authority for certify-
ing a settleable solids effluent of 0.2ml/I, the State
referred to a State water quality standard which did not
even provide for settleable solids until nearly two months
after the State certified the settleable solids effluent.
(App. 58-59, 73-74, 77-79, 82-83, 108) Moreover, the certi-
fication failed to indicate the degree to which the settle-
able solids limitation or any other limitations could be
made less stringent and still comply with State water
quality standards. (App. 115-16) In retrospect, this is not
surprising since, “DEC readily admits that it neither per-
formed site-specific evaluations nor considered informa-
tion contained within individual NPDES applications in
its certification process.” 778 P.2d at 1131 (footnote omit-
ted). (App. 8)
On May 6, 1985, Petitioner MAC, an association of
numerous placer miners who have been directly affected
by the actions of the State in certifying en masse the 539
NPDES permits, filed suit in the Alaska Superior Court,
seeking injunctive relief on several grounds. 778 P.2d at
1130. (App. 6, 37) Among these grounds were: that the
State had illegally conducted a mass certification instead
of certifying on an individual, case-by-case basis as
required by law; that the State had waived any right to
certify the permits by failing to certify within the 60-day
period prescribed by law; that the inclusion of the 0.2m1/1
settleable solids effluent in each of the 539 permits was
done without proper notice and hearing and violated the
procedural due process rights of the permittees; and that
the 0.2m1/1 solids effluent is overly stringent and arbi-
trary so as to effect a taking of property in violation of the
Fifth and Fourteenth Amendments.
Also subsequent to the State’s certification, a number
of parties, including Petitioner and several individual
miners, filed timely requests with DEC for an administra-
tive adjudication of the certification. These requests were
granted and the matters were consolidated. In addition,
Respondents Trustees for Alaska (TFA) and Northern
Alaska Environmental Center (NAEC) intervened in Peti-
tioner’s superior court suit. The superior court continued
its proceedings and retained jurisdiction pending a ruling
by the DEC Deciding Officer. 778 P.2d at 1130. (App. 6)
During the administrative hearing, Petitioner
renewed the arguments made in support of its complaint
for injunctive relief. (App. 117-19) At the adjudicatory
hearing itself, many miners were afraid to or prohibited
from testifying due to pending or threatened EPA
enforcement actions. (App. 147) After the hearing, the
Deciding Officer upheld DEC’s certification. In short, the
Deciding Officer ruled that DEC was not required to
certify on a site-specific, case-by-case basis and could
legally certify on a mass basis; that while the State did
indeed certify in an untimely manner, well outside the 60-
day limit, arguments as to the State’s waiver of any right
to certify should be made to EPA and not in the State
adjudicatory system; that DEC gave proper public notice
and held proper public hearings so as to allow DEC to
certify the 0.2m1/1 settleable solids effluent limitation in
each of the 539 NPDES permits; and that the 0.2m1/1
limitation was not overly stringent and arbitrary. (App.
52-62)
Petitioner appealed the administrative decision to the
superior court, raising again the issues presented in this
Petition. (App. 120-23) The superior court in essence
echoed the Deciding Officer’s conclusions and affirmed
the administrative decision. (App. 37-43) Petitioner then
appealed to the Alaska Supreme Court on August 28,
1987. (App. 124-25) After a lengthy period, the Alaska
Supreme Court rendered its decision.
With respect to Petitioner’s contention that the State
is required to certify NPDES permits on an individual,
site-specific basis rather than en masse, the Alaska
Supreme Court first examined the various regulations
governing State certification of federal licenses and per-
mits. The court took particular note of 40 C.F.R.
Puerco
§ 121.2(a)(2) which requires the certifying agency to pro-
vide a statement that the agency has either examined the
permittee’s application made to the federal permitting
agency and bases its certification upon water quality
related information contained in the application, or has
examined other information furnished by the permittee
so as to allow the certifying agency to state with reason-
able assurance that the permit’s terms will comply with
State water quality standards. 778 P.2d at 1132. (App.
10-11) In addition, the court took note of 40 C.FR.
§ 124.53(e)(3) which requires that the State’s certification
of an NPDES permit be in writing and include a “state-
ment of the extent to which each condition of the draft
permit can be made less stringent without violating the
requirements of State law, including water quality stan-
dards.” See 778 P.2d at 1132. (App. 11-12) Despite the
above C.F.R. provisions, the court concluded that the
Clean Water Act does not require States to certify NPDES
permits on an individual, case-by-case basis:
These provisions, particularly the require-
ments of 40 C.FR. § 121.2(a)(2), indicate that
site-specific matters may be important consider-
ations in the certification process. However, we
do not believe that the federal regulations
implementing the Clean Water Act can be read
to require states to certify draft NPDES permits
on a case-by-case basis.
Id. (App. 12) Beyond providing for reasonable assurance
that individual permittees will comply with State water
quality standards, the regulations were viewed by the
court as being “virtually silent as to what procedures
states should employ in certifying draft NPDES permits.”
Id. at 1132-33. (App. 12)
10
The Alaska Supreme Court also considered, but dis-
missed summarily, the observation of a federal district
court that water quality based effluent limitations must
be based upon site-specific examination of the pertinent
water body:
No reported cases have considered whether
states must certify NPDES permits on an indi-
vidual rather than a group basis, although a
federal district court has noted in dictum that
“effluent limitations are established by individ-
ual examination of the waterway.” Homestake
Mining Co. v. United States Envtl. Protection
Agency, 477 F.Supp. 1279, 1286 (D.S.D. 1979)
(court paraphrasing an EPA General Counsel’s
decision).
778 P.2d at 1133. (App. 13) The Homestake court’s observa-
tion was discussed no further. Yet, consistent with the
Homestake decision, the Alaska Supreme Court added that
“Alaska water quality standards apply to individual dis-
chargers, not to industries or groups considered as a
whole.” 778 P.2d at 1133 n.11 (emphasis added).
(App. 14)
In the end, the Alaska Supreme Court based its con-
clusion upon general statements contained in the legisla-
tive history of the Clean Water Act. The court reasoned
that since the legislative history of the Act suggests that
States are to play a large role in regulating potential
polluters and since (in the court’s view) “the Clean Water
Act and its implementing regulations[] lack . . . specific
requirements governing states’ NPDES certification pro-
cedures,” the Alaska DEC was not required to certify the
NPDES permits on an individual, case-by-case basis and
could instead certify the permits on a group basis. 778
11
P.2d at 1133-34. (App. 14-15) The court added that the
mass certification was thus reasonable since it might be
difficult for DEC to conduct the requisite site-specific
evaluations. 778 P.2d at 1134 n.11. (App. 15)
With respect to Petitioner’s argument that by failing
to certify within the 60-day period prescribed by law, the
State had waived any right it had to certify (App. 129-32),
the Alaska Supreme Court did little more than take note
of the fact that the State could waive its right to certify, in
which case “the NPDES permits are issued as originally
proposed by EPA.” 778 P.2d at 1129, 1135 (citing the 60-
day waiver requirement). (App. 3, 17-18) Petitioner’s
waiver argument was then disposed of by the court at the
end of its opinion. “We have reviewed all of the remain-
ing specifications of errors which have been advanced by
TFA, NAEC, and MAC and have concluded that they are
without merit.” 778 P.2d at 1140. (App. 31) Petitioner’s
argument that the State had modified the settleable solids
effluent in the 446 NPDES permits without the notice and
hearing required by law (App. 127-28, 132), suffered a
similar fate.
With respect to Petitioner’s argument that the
0.2m1/1 settleable solids effluent was overly stringent and
arbitrary so as to effect a taking of property (App.
133-36), the Alaska Supreme Court noted Petitioner’s
contention. 778 P.2d at 1135. (App. 19) The court, how-
ever, gave the argument short shrift and concluded that
in view of the facts and circumstances, the 0.2m1/1 limita-
tion was a reasonable exercise of the State’s regulatory
power. 778 P.2d at 1135-37. (App. 18-23)
12
As pointed out to the Alaska Supreme Court on
petition for rehearing, in the aftermath of the mass certi-
fication, Petitioner MAC members and other miners have
endured a host of problems, both administratively and in
the court system. (App. 74-75, 81-82, 84-88) Since EPA is
but an “interested observer” of the certification process,
Marathon Oil Co. v. E.P.A., 830 F.2d 1346, 1351 (Sth Cir.
1987), and since absent the required State statements, EPA
has no authority to determine whether the limitations
certified by the State are more stringent than required to
meet State water quality standards, Roosevelt Campobello
International Park Commission v. E.P.A., 684 F.2d 1041, 1056
(1st Cir. 1982); Lake Erie Alliance v. U.S. Corps of Engineers,
526 FSupp. 1063, 1074 (W.D.Pa. 1981), affirmed 707 F.2d
1392 (3rd Cir. 1983), cert. denied, 464 U.S. 915 (1983), when
miners have attempted to obtain EPA evidentiary hear-
ings on the extent to which their effluent limits could be
relaxed as to settleable solids, turbidity, and arsenic, the
miners have struck a brick wall. (App. 142-43) These
ongoing evidentiary hearings are presently pending
before EPA (App. 82, 85-88), and their result is directly
contingent upon the validity or invalidity of the State’s
certification. 40 C.F.R. § 124.55(b). Moreover, the State’s
mass certification practice shows no signs of stopping.
778 P.2d at 1130 n.7. (App. 6-7)
As noted, the State’s mass certification has also
resulted in numerous miners being brought before the
federal district court. (App. 81-82, 84-85) In one suit in
particular, EPA has charged one miner and her husband,
who have mined together for nearly 30 years, with
numerous violations of their 1985 NPDES permit, all but
one of which relates to the 0.2m1/1 settleable solids efflu-
ent limitation incorporated into their modified permit as
a result of State certification. (App. 81-82)
13
As such, the two (both MAC members), and other miners
as well, face the exaction of severe penalties, civil, crimi-
nal and administrative, as a result of the State’s illegal
certification. See 33 U.S.C. §§ 1319, 1365.
sé.
7
REASONS FOR GRANTING THE WRIT
Petitioner submits that the Alaska Supreme Court
has decided significant federal questions in a way which
is in direct conflict not only with the decisions of various
federal courts of appeal, but also with applicable deci-
sions of this Court. Even if these conflicts did not exist,
the Alaska Supreme Court has decided important ques-
tions of federal law concerning the scope and administra-
tion of a major environmental statute and the relation
between the statute and the property and liberty rights of
individuals. Given the broad applicability of the Clean
Water Act, with tens of thousands of NPDES permits
being issued nationwide, if Alaska remains unchecked in
its error, the practice of mass certification and the inclu-
sion of overly-stringent water quality based effluent lim-
itations in NPDES permits is bound to work its way
south, if it has not already. Moreover, in the wake of the
State’s certification, the number of miners in Alaska has
decreased dramatically. The potential for such economic
dislocations spreading elsewhere in the Nation militates
strongly in favor of this Court’s checking the State’s
practice in its incipient stage. Under Supreme Court Rule
17.1(b)-(c), these special and important reasons well war-
rant this Court’s granting review via writ of certiorari.
Petitioner will address these reasons concisely below.
14
I.
THE STATE MUST CERTIFY WATER QUAL-
ITY BASED EFFLUENT LIMITATIONS ON
AN INDIVIDUAL, CASE-BY-CASE BASIS.
Initially, Petitioner submits that the Alaska Supreme
Court is simply wrong in its conclusion that the Clean
Water Act and its implementing regulations do not
require individual, case-by-case consideration when the
State is certifying an NPDES permit. 40 C.F.R.
§ 121.2(a)(2) specifically requires individual, site-specific
consideration of an NPDES permittee’s application. Fur-
thermore, it is difficult to imagine how the State can
provide the statement required by 40 C.F.R. § 124.53(e)(3),
a “statement of the extent to which each condition of the
draft permit can be made less stringent without violating
the requirements of State law, including water quality
standards,” without giving individual consideration to a
permittee’s application.
In Marathon Oil, supra, the Fifth Circuit specifically
criticized the Alaska DEC’s misunderstanding of 40
C.F.R. § 124.53(e)(3), and pointed out DEC’s error. In that
case DEC, oddly enough, certified an NPDES permit indi-
vidually, on a very site-specific basis. See 830 F.2d at
1349-53. During the course of its opinion, the Court of
Appeals on several occasions noted that DEC labored
under the erroneous view that it could not specify condi-
tions less stringent than those contained in the draft
permit. Jd. at 1351 & n.26, 1352 & n.35, 1353. Yet, in a
schizophrenic burst DEC did include in its certification a
boiler plate § 124.53(e)(3) statement that the draft permit
“cannot be made less stringent without violating the require-
ments of Alaska state law and regulations including Alaska
15
water quality standards.” 830 F.2d at 1353 (quoting DEC’s
cover letter accompanying its Certificate of Reasonable
Assurance) (emphasis supplied by the court).
When EPA promulgated 40 C.FR. § 124.53(e)(3), the
Administrator explained the purpose of the provision
and that it does indeed mean what it says:
Some problems have resulted from the prac-
tice of certifying draft permits, which practice
has arisen from the practical difficulties of certi-
fying applications. In particular, certifications
have not always clearly stated exactly what con-
ditions are necessary to comply with State law
and whether less stringent conditions would
also satisfy State law. The final regulations rem-
edy these problems by requiring States to set
forth in all cases the minimum terms and condi-
tions which will be necessary to comply with
applicable law. For example, if a State certifies a
permit with an effluent limitation imposing a
daily maximum BOD of 25mg/I, it will be
required to identify also a ceiling representing
the minimum level of contrel, such as 30mg/1 or
40mg/1, which the State finds necessary to com-
ply with State law.
44 Fed. Reg. 32880 (emphasis added). EPA recognized the
burden this procedure places upon States, but found any
alternative to be unacceptable. /d.
The State of Alaska’s mass certification of NPDES
permits is directly contrary to the Clean Water Act’s
conception of the NPDES permitting process as one
involving individual, adjudicatory determinations. In Sea-
coast Anti-Pollution League v. Costle, 527 F.2d 872 (1st Cir.
1978), cert. denied, 439 U.S. 824 (1978), the Court of
Appeals explained that the NPDES permitting process is
16
by nature an adjudicatory one; its purpose is to determine
facts in particular cases, not to promulgate policy-type
rules or standards. 572 F.2d at 876. In Marathon Oil Co. v.
E.P.A., 564 F.2d 1253 (9th Cir. 1977), that Court of Appeals
made similar observations. In contrast to other proceed-
ings under the Clean Water Act, which provide for the
promulgating of technology based effluent limitations, the
NPDES permitting process itself focuses on the adjudica-
tory application of particular effluent limitations to indi-
vidual permittees; it is not designed for the promulgating
of policy-type rules or standards. 564 F.2d at 1262. In
opposition, the State has turned the permitting process
on its head by failing to certify on an individual basis,
and instead improperly promulgating a policy-type rule,
a 0.2ml1/1 settleable solids limitation which it inserted in
each and every one of the 539 NPDES permits.
The State’s failure to certify on an individual basis is
particularly noteworthy since it involves the imposition
of a water quality based effluent limitation, as opposed to
a technology based one. In E.P.A. v. California ex rel. State
Water Resources Control Board, 426 U.S. 200 (1976), Justice
White clearly explained that while technology based
effluent limitations may be imposed on an industry-wide
or group basis, water quality based effluent limitations
must be the result of individualized consideration of the
receiving waters and the situation of the permittee:
Congress contemplated that there may be
some States, which would elect not to develop
an NPDES program but would nonetheless
determine — as § 510 permits - to adopt water
quality standards or other limitations stricter
than those EPA itself has promulgated and
would otherwise apply. This being the case,
17
Congress must have contemplated that the EPA
was capable of issuing permits in that State
. . . and of enforcing those stricter standards.
Some of those standards - in fact all but those
pegged to the quality of the receiving waters — could
be translated into permit conditions for each
discharger without coordinating the conditions
in the other permits, because the effluent limita-
tions in the Amendments are technology based
and the timetable by which compliance is to be
achieved is not made to depend on the perfor-
mance of other dischargers. Other standards, pri-
marily those involving water quality standards,
would require coordination among the permit condi-
tions of numerous pollutors . . . and it is evident that
Congress contemplated that the EPA was capable of
carrying out this function as well.
426 U.S. at 219-20 (emphasis added).
The clear wording of the relevant provision of the
Act is that water quality based effluent limitations must
be “necessary to meet water quality standards.” 33 U.S.C.
§ 1311(b)(1)(c) (emphasis added). The use of the words
“necessary” and “meet” in this context requires an indi-
vidual, site-specific determination of the necessity for a
given water quality based effluent limitation. As such, the
Act does not provide broad license to regulate in the
name of water quality. The power to impose a water
quality based effluent limitation is circumscribed by the
necessity for the limitation being as stringent as it is. Cf.
Natural Resources Defense Council v. E.P.A., 273 U.S. App.
D.C. 240, 859 F.2d 156, 208 (1988).
In sum, the State’s mass certification practice contra-
venes the NPDES permitting process as envisioned in the
Clean Water Act and its implementing regulations. The
Alaska Supreme Court’s decision in this respect is in
18
direct conflict with the provisions of the Act as construed
by this Court and federal courts of appeal. Given the
thousands of NPDES permit certifications which have
occurred under the Clean Water Act, this case stands
alone as the sole reported decision involving a mass
certification. As the Chief Justice observed in another
context, the unprecedented nature of the State’s mass
certification attests not to its correctness but to its error.
Leo Sheep Co. v. United States, 440 U.S. 668, 686 (1979). “It
is some testament to common sense that the present case
is virtually unprecedented.” Id.
Il.
BY FAILING TO CERTIFY WITHIN THE 60-
DAY PERIOD PRESCRIBED BY LAW, THE
STATE WAIVED ANY RIGHT TO CERTIFY
THE NPDES PERMITS.
,
The purpose behind the time requirement in the cer-
tification process is to protect the permittee so that his
application is not frustrated by State delay. House Report
No. 92-911 at 122 (March 11, 1972) (1972 House Report).
When EPA promulgated 40 C.F.R. § 124.53, the Adminis-
trator accordingly explained:
Many commenters objected to the delays
caused by the State certification process in the
NPDES program. Specifically they thought that
the provision in the proposal for potentially
allowing a State one year to certify was uncon-
scionable. In response to those comments the
regulations have been modified so that the right
to certify will be deemed waived unless exer-
cised within a specified reasonable time which
shall not exceed 60 days unless the Regional
19
Administrator finds that unusual circumstances
require a longer time.
44 Fed. Reg. 32880 (emphasis in original).
Under 40 C.FR. § 124.53(c)(3), EPA may, of course,
advise the State that it will have less than 60 days in
which to certify. 42 Fed. Reg. 37115. For the State to
exceed the 60 days, however, the State must first notify
EPA in writing that more time is needed for evaluating the
permit. Id. EPA is not required to grant such a request. /d.
In this case there is no evidence whatsoever that the
State requested by any means, much less in writing, an
extension of the certification period or that EPA granted
this imaginary request. Where, as here, the State fails to
certify within the prescribed period, “then the certifica-
tion requirement is waived.” 1972 House Report at 122
(emphasis added). In the words of the Act, “[iJf the
State . . . refuses to act on a request for certification
within [the prescribed] period of time . . . after receipt of
such request, the certification requirements of this sub-
section shall be waived with respect to such federal appli-
cation.” 33 U.S.C. § 1341(a)(1) (emphasis added); see 40
C.F.R. § 124.53(d). If the State fails to certify within a
required time, waiver is automatic. Environmental Defense
Fund v. Alexander, 501 F.Supp. 742, 771 (N.D.Miss. 1980),
affirmed in part, reversed in part on other grounds, 651 F.2d
983 (5th Cir. 1981), on remand, 554 F.Supp. 451 (N.D.Miss.
1981).
During the case, the State’s arguments have boiled
down to asserting that since EPA accepted the State’s
untimely certification, any challenge to the timeliness of
the State’s certification must be brought before EPA.
<i i,
What the State’s position ignores is that the 1972 CWA
Amendments were crafted to give EPA no authority to
review the propriety of the State’s certification. 1972
House Report at 124. As to certification, EPA can do no
more than perform services of a technical nature, and
even then only upon the State’s request. Id. Therefore,
“EPA has no authority to ignore the State certification,”
Roosevelt Campobello, supra, 684 F.2d at 1056, and cannot
“look behind” the certification, “beyond the bare inquiry
as to whether the certification is affixed to the permit.”
Town of Sutton v. Water Supply and Pollution Control Com-
mission, 116 N.H. 154, 355 A.2d 867, 870 (1976). As noted
previously, EPA is merely an “interested observer” of the
certification process. Marathon Oil, supra, 830 E.2d at 1351.
Very recently, this Court considered another 60-day
requirement in an environmental statute. Hallstrom v.
Tillamook County, __ U.S. __, 58 U.S.L.W. 4007 (1989).
This Court affirmed that absent a strong reason for giving
such a time requirement a flexible or pragmatic construc-
tion, the requirement should be enforced according to its
literal meaning. 58 U.S.L.W. at 4009-10. Here there can be
no strong reason for disregarding the 60-day requirement
and allowing the State’s 88-day certification to stand; the
purpose of the time requirement itself is to protect the permit-
tee. 1972 House Report at 122; 44 Fed. Reg. 32880. As
Justice O’Connor observed, “[t]he language of this provi-
sion could not be clearer.” Hallstrom, 58 U.S.L.W. at 4009.
The requirement is not “may” but mandatory. Once the
60-day period lapsed, the State was without jurisdiction
to certify the NPDES permits.
21
Ill.
THE STATE ILLEGALLY INSERTED THE
0.2ML/L SETTLEABLE SOLIDS EFFLUENT
LIMITATION IN THE 446 NPDES PERMITS
WHICH EPA PROPOSED TO MODIFY ONLY
WITH RESPECT TO TURBIDITY AND
ARSENIC.
40 C.F.R. § 122.62 provides in relevant part as fol-
lows: “When a permit is modified, only the conditions
subject to modification are reopened.” Concerning the
apparent predecessor to 40 C.F.R. § 122.62, this Court in
Costle v. Pacific Legal Foundation, 445 U.S. 198 (1980),
rehearing denied, 446 U.S. 947 (1980), unanimously
concluded:
We agree with the position advanced by
petitioner that respondents may not reopen con-
sideration of substantive conditions contained
within the 1975 permit through hearing requests
relating to a proposed permit modification that
did not even purport to affect those conditions.
445 U.S. at 217. Contrary to this Court’s conclusion in
Costle, the State, after expressly waiving in 1984 any right
to certify a more stringent settleable solids effluent lim-
itation in the 446 permits, seized upon its opportunity to
certify the EPA-proposed modifications for turbidity and
arsenic as a means to reopen the 1984 permits with
respect to the settleable solids effluent limitation, which
was not among the substantive conditions of the permit
which the proposed modification purported to affect.
Moreover, as a matter of due process, the individual
permittees were entitled to know specifically that the
State was intending to modify the permits with respect to
settleable solids and to be heard individually in response
ia ii
to the proposed modification. United States v. Florida East
Coast Railway Co., 410 U.S. 224, 242-43 (1973). As it was,
miners went to the two public hearings on the proposed
modifications with no idea that the State was intending to
modify their permits with respect to settleable solids, and
accordingly did not submit comments or testify in regard
to a more stringent settleable solids limitation. (App. 81)
The State’s announcement to certain members of the pub-
lic, after the two hearings were history, that the State
intended to certify a 0.2ml/1 settleable solids effluent
limitation for each of the 446 permits (App. 47), does not
suffice to satisfy the central constitutional safeguard of
due process.
IV.
THE STATE EFFECTED A TAKING OF PRI-
VATE PROPERTY IN VIOLATION OF THE
FIFTH AND FOURTEENTH AMENDMENTS
BY CERTIFYING THE SAME WATER QUAL-
ITY BASED EFFLUENT LIMITATION FOR
SEVERAL HUNDRED PERMITS WITHOUT
DEMONSTRATING THAT SUCH A STRIN-
GENT LIMITATION IS NECESSARY TO
MEET STATE WATER QUALITY STAN-
DARDS IN EACH INDIVIDUAL CASE.
The mining claims and mineral interests which the
NPDES permits purport to regulate are, of course, prop-
erty rights in the full sense, and thus within the protec-
tion of the Fifth and Fourteenth Amendments’
prohibition against the taking of private property for
public use without just compensation. Best v. Humboldt
Mining Co., 371 U.S. 334, 335 (1963); Union Oil Co. v.
Smith, 249 U.S. 337, 349 (1919). As such, regulation under
23
the Clean Water Act can effect a taking of a miner’s
property in violation of the Constitution. United States v.
Riverside Bayview Homes, Inc., 474 U.S. 121, 126-27 (1985).
The essential attribute of the right to mine gold is the
ability to exercise that right profitably and subject only to
reasonable government regulation that does not go too
far. Pennsylvania Coal Co. v. Mahon, 260 U.S. 393, 414-15
(1922). So unique is the property right to mine gold that
where a gold miner, as most do, has a claim for mining
purposes only, if the result of government regulation of
his property is such so as to make it economically unfeas-
ible to mine, his claim is effectively taken from him,
extinguished, and he is left with nothing at all, United
States v. Coleman, 390 U.S. 599, 602-03 (1968), except his
right to just compensation. Pennsylvania Coal, 260 U.S. at
416; see Armstrong v. United States, 364 U.S. 40, 44-48
(1960). Prior to the overly-stringent regulation, however,
his mining claim is by definition a reasonable investment-
backed expectation. Coleman, 390 U.S. at 602-03.
As Justice Brennan explained in Penn Central Trans-
portation Co. v. City of New York, 438 U.S. 104 (1978), one
measure of a violation of the Takings Clause is whether
the government regulation frustrates distinct investment-
backed expectations. Id. at 124-25, 127. In this case, with
respect to the 446 NPDES permittees in particular, they
had every reasonable expectation that their settleable
solids effluent limitation would be the 0.7/1.5 figure, and
had structured their operations accordingly. When the
State then in late April, a few weeks before the short
northern mining season begins, surprised them with the
“unnoticed” settleable solids modification, their distinct
and reasonable investment-backed expectations vanished.
24
Regardless of the reasonableness of the 0.2m1/1 limitation
itself, the miners were at the very least entitled to fulfill
their distinct, reasonable expectations and to be given
more sufficient time, until the next mining season, to
comply with the surprise limitation. United States v. Locke,
471 U.S. 84, 108 (1985).
Where, as here, a State is conditioning the issuance of
a permit upon compliance with certain restrictions, the
Takings Clause further requires that the restrictions con-
tained in the permit must substantially advance a legiti-
mate State interest and must not single out the permittee,
individually or as part of a distinct group, to bear the
burden of remedying or preventing a problem beyond his
own proportionate causal responsibility. Nollan v. Califor-
nia Coastal Commission, 483 U.S. 825, 834-35 & n.4 (1987);
Pennell v. City of San Jose, ___ U.S. ___, __-__, 108 S.Ct.
849, 861-64, 99 L.Ed.2d 1, 19-22 (1988) (Scalia, J., dissent-
ing). To comply with this constitutional safeguard, the
State must establish a close nexus between the permit
term and any evil the term purports te address. Nollan,
483 U.S. at 837. As Justice Scalia explained in his Pennell
dissent, the burden is on the State to demonstrate the
“cause-and-effect relationship” between the evil which
the permit term seeks to remedy or prevent and the
particular permittee’s property use restricted by the regu-
lation. 108 S.Ct. at 862-63, 99 L.Ed. 2d at 19-21 (Scalia, J.,
dissenting). This burden the State of Alaska did not begin
to meet.
While the evidence was necessarily limited by gov-
ernment intimidation of individual miners through pend-
ing or threatened enforcement actions and by the State’s
failure to conduct the requisite site-specific, case-by-case
certification, the Deciding Officer did make pertinent
findings of fact which were affirmed by the Alaska
25
Supreme Court. The nature of Alaska’s rivers is such that
they tend naturally to be heavily silted; yet, even the
most heavily silted Alaska rivers, with a few exceptions,
do not have measurable settleable solids. 778 P.2d at 1138.
(App. 26-27) The “no measurable increase,” minimum
detectable limit for settleable solids is 0.1ml/1. 778 P.2d at
1136, 1138. (App. 19, 27) While the 0.2m1/1 settleable
solids effluent limitation applies to the point of effluent
discharge, prior to entry into and dilution by the receiving
water, the 0.1ml/1 water quality standard involves a mea-
surement at a point downstream after the effluent has
been diluted in a mixing zone. 778 P.2d at 1138. (App. 27)
Thus, since dilution ratios of effluent to receiving water
ranging from 1:1 to 1:9 were found to exist at various
sites, and taking such dilution reasonably into account,
the 0.2ml1/1 settleable solids effluent was found, after
dilution, to meet the State water quality standards in such
cases. 778 P.2d at 1135-36, 1138-39. (App. 20-22, 26-27)
That the 0.2ml1/I1 settleable solids effluent will meet
the 0.1m1/1 State water quality standard regardless of the
site specifics, however, is precisely why the 0.2m1/1 per-
mit condition effects a taking of property. On a stream
which has virtually no settleable solids to begin with, the
low-end dilution ratio of 1:1 results in the 0.2m1/1 efflu-
ent being diluted down to the 0.1m1/1 water quality stan-
dard at the point of measurement. In layman’s terms, this
is as if one glass of effluent at 0.2m1/l were mixed with a
glass of river water and thus diluted in half to 0.1ml/1.
Therefore, on a similar stream where the dilution ratio is
instead 1:9, the 0.2m1/1 effluent limitation is severely
over-stringent. Again, in layman’s terms, this is compara-
ble to mixing one glass of effluent with nine glasses from
26
the river and diluting the effluent accordingly. On such a
stream, a settleable solids effluent of 1.0m1/1 would suf-
fice, after dilution, to meet the State water quality
standard.
The unique facet of the certification process, and of
40 C.F.R. § 124.53(e)(3) in particular, is that it serves as a
prophylactic against just such a Takings Clause violation.
By requiring the State to indicate the necessary nexus, the
cause-and-effect relationship between the pertinent State
water quality standards and the stringency of any water
quality based effluent limitations, 40 C.F.R. § 124.53(e)(3)
(if properly complied with) works to curtail the violation
of constitutional rights. To the contrary, the State of
Alaska’s mass certification practice fails to produce the
necessary nexus between water quality standards and
individual permit conditions, and by producing instead
the 0.2m1/1 settleable solids effluent limitation and other
overly-stringent permit conditions, the State’s practice
amounts to no more than “an out-and-out plan of extor-
tion.” Nollan, 483 U.S. at 837 (quoting J.E.D. Associates,
Inc. v. Atkinson, 121 N.H. 581, 584, 432 A.2d 12, 14-15
(1981)).
The failure of the State’s mass certification practice to
establish the necessary nexus between water quality stan-
dard and effluent limitation “positively militates against
the practice” of mass certification.? Nollan, 483 U.S. at 837
2 If the Act be interpreted differently than Petitioner sug-
gests, supra, at 14-18, so as to allow for mass certification, then
the Act itself suffers from a constitutional deficiency. As such,
if reasonably possible, the Act should be construed narrowly
so as to avoid future taking difficulties. Riverside Bayview
Homes, supra, 474 U.S. at 128 & n.5. In view of this point, 28
U.S.C. § 2403(a) may be applicable.
27
n.5. In effect, the State’s mass certification of NPDES
permits threatens to lead to a lesser realization of the
State’s purported water quality goals, and encourages
and suggests an impermissible, closed-door accommoda-
tion to benefit a particular interest group. Id.; Pennell, 108
S.Ct. at 863-64, 99 L.Ed. 2d at 21-22 (Scalia, J., dissenting).
(App. 119, 136-37) The Clause, in contrast, serves to
ensure an open, reasoned decision-making process, as a
Constitutional Open Meetings Act of sorts. Pennell, 108
S.Ct. at 863-64, 99 L.Ed. 2d at 21-22 (Scalia, J., dissenting).
Last, the illegality of the State’s certification is fur-
ther borne out by its certifying certain NPDES permits on
an individual, site-specific basis — including stating to
which extent to which permit conditions could be made
less stringent and still comply with State water quality
standards, see Marathon Oil, supra, 830 F.2d at 1352-53 -
while where miners are concerned, singling them out by
lumping them into a pile and certifying their NPDES
permits arbitrarily on a mass basis. See Nollan, 483 U.S. at
835 n.4; cf. Dobbins v. City of Los Angeles, 195 U.S. 223,
239-40 (1904). This practice of mass certification is by its
very nature closed door so as to shut out the individual
permittee from the exact process whereby the conditions
of his existence are being determined.
In short, the burden was on the State to establish the
necessity for the 0.2m1/1 settleable solids effluent limita-
tion in each individual permit; it was not incumbent on a
miner to come forward and prove the contrary. If the
State is then unable to utilize its vast resources (App.
143-46), to meet its burden by performing the requisite
site-specific, case-by-case certification, it must exercise its
option and (as it did in 1984) waive its right to certify
28
rather than arbitrarily imposing a burden on the individ-
ual permittees. This is but a modern-day application of an
age-old principle. The State “may not, under the guise of
protecting the public interests, arbitrarily interfere with
private business, or impose unusual and unnecessary
restrictions upon lawful occupations.” Lawton v. Steele,
152 U.S. 133, 137 (1894).
.
4
CONCLUSION
Within the past year, the wreck of the Exxon Valdez
has focused the eyes of the Nation on Alaska and has
brought environmental concerns to the forefront. Peti-
tioner does not dispute the importance of the environ-
ment to all Americans, but instead submits that when
State and Federal environmental authorities are exercis-
ing the power to regulate persons in their lives and
occupations, those authorities must do so subject to the
precious safeguards embodied in the Constitution and
laws of our Nation. Whatever the necessity, ours remains
a Nation governed by the rule of law, not of men.
For the reasons stated, Petitioner Miners Advocacy
Council prays that the Court grant the petition for writ of
certiorari.
29
DATED this 14th day of December, 1989, at Fair-
banks, Alaska.
Respectfully submitted,
ROBERT JOHN *
WILLIAM R. SATTERBERG, JR.”
Law Orrices oF WILLIAM R.
SATTERBERG, JR.
709 Fourth Avenue
Fairbanks, Alaska 99701
(907) 452-4454
# Of Counsel
*Counsel of Record for Petitioner
App. 1
APPENDIX A
THE SUPREME COURT OF THE STATE OF ALASKA
MINERS ADVOCACY COUNCIL,
INC.,
Appellant,
v.
STATE OF ALASKA, DEPARTMENT
OF ENVIRONMENTAL
CONSERVATION; TRUSTEES
FOR ALASKA; and NORTHERN
ALASKA ENVIRONMENTAL
CENTER,
Appellees.
TRUSTEES FOR ALASKA and
NORTHERN ALASKA
ENVIRONMENTAL CENTER,
Appellants,
Vv
STATE OF ALASKA, DEPARTMENT
OF ENVIRONMENTAL
CONSERVATION; DENNIS D.
KELSO, Commissioner of the
Department of
Environmental Conservation;
and MINERS ADVOCACY
COUNCIL, INC.,
Appellees.
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
Supreme Court
No. S-2369
4FA-85-1690
Civil
OPINION
Supreme Court
No. $-2370
4FA-86-1556
Civil
(No. 3473 - July
28, 1989]
Appeal from the Superior Court of the State of
Alaska, Fourth Judicial District, Fairbanks,
Jay Hodges, Judge.
July 28, 1989.
App. 2
Rehearing Denied Sept. 18, 1989.
William R. Satterberg, Jr., Fairbanks, for Miners
Advocacy Council, Inc.
Patti J. Saunders, Anchorage, and Robert W. Adler,
Washington, D.C., for Trustees for Alaska and Northern
Alaska Environmental Center.
John A. McDonagh, Asst. Atty. Gen., Fairbanks,
Grace Berg Schaible, Atty. Gen., Juneau, for State, Dept.
of Environmental Conservation, and Dennis D. Kelso.
Before MATTHEWS, C.J., and RABINOWITZ,
BURKE, COMPTON and MOORE, JJ.
OPINION
RABINOWITZ, Justice. -
These consolidated appeals raise procedural as well
as substantive challenges to the Alaska Department of
Environmental Conservation’s (DEC) certification of
National Pollution Discharge Elimination System
(NPDES) permits issued to placer gold miners in Alaska
by the United States Environmental Protection Agency
(EPA).
I. BACKGROUND AND PRIOR PROCEEDINGS.
To comply with the federal Clean Water Act,! a per-
son wishing to discharge pollutants into waters of the
' The statute commonly referred to as the Clean Water Act
was originally enacted as the Federal Water Pollution Control
Act Amendments of 1972, Pub.L. No. 92-500, § 2, 86 Stat. 816
(codified as amended at 33 U.S.C. §§ 1251-1387).
App. 3
United States must secure an NPDES permit from EPA.?
EPA may not issue an NPDES permit unless the resulting
discharge will comply with state water quality standards.
33 U.S.C. §§ 1311(b)(1)(C), 1342. Before EPA may issue a
permit, it must also provide the state in which the dis-
charge originates with an opportunity to review the draft
NPDES permit to determine whether the permit’s terms
ensure compliance with the state’s water quality stan-
dards. 33 U.S.C. § 1341(a), (d). A state then has three
options. It may deny certification of the NPDES permit,
thereby precluding EPA from issuing the permit. 33
U.S.C. § 1341(a)(1). The state may waive certification,
thereby removing itself from the permitting process. Id.
Finally, the state may certify the draft permit, and may
include in its certification any conditions more stringent
than those in the draft permit which the state determines
are necessary to comply with state or federal water qual-
ity standards. 33 U.S.C. § 1341(a)(2). EPA must incorpo-
rate more stringent conditions suggested by a state into
the final NPDES permit. Id.
In 1985, EPA notified the State of Alaska that EPA
intended to modify 446 existing NPDES permits issued to
placer gold miners, and to issue 93 new permits for placer
mining operations in the state. The EPA notices clearly
specified that the agency was proposing to issue 539
2 The Clean Water Act prohibits the discharge of any
pollutant. 33 U.S.C. § 1311(a). Notwithstanding this prohibi-
tion, EPA may issue permits to discharge pollutants if the
applicant meets certain specified conditions. See 33 U.S.C.
§ 1342.
App. 4
individual NPDES permits. However, EPA did not pre-
pare and send to the state 446 draft permits and 93 new
draft permits. Instead, EPA sent DEC one draft NPDES
permit to review because EPA intended to grant 539
identical individual permits.* The model draft permit
proposed by EPA contained a settleable solids* effluent
limit® of 1.5 milliliters per liter (ml/1) as an instantaneous
maximum and 0.7 ml/l monthly average. Since EPA
planned to grant identical NPDES permits to every placer
miner who applied for a permit, these settleable solids
standards would have applied to each applicant.
The agency charged with carrying out the NPDES
certification process for the State of Alaska, DEC, also
3 EPA eventually issued 539 individual NPDES permits
identical in all respects except for more lenient turbidity limits
contained in 72 permits, based on site-specific information EPA
received from individual miners.
4 Introduction of settleable solids into streams occurs
when placer miners remove and process overburden in order
to reach gold-bearing gravels. When fine sediment settles to
stream bottoms, it can adversely affect fish spawning areas,
alter water chemistry, and generally reduce the biological pro-
ductivity of the streams. High sediment loads can also adver-
sely affect streams’ value for recreational and subsistence uses.
A 1984 report issued by DEC termed pollution from placer
mining “the largest environmental pollution problem in Alaska
today.” Alaska Dep’t of Envtl. Conservation (Div. of Envtl.
Quality, Water Quality Mgmt. Section), Water Management in
Alaska: 1984 Update 12 (June 1984).
5 An effluent limit sets maximum limits for pollutant con-
centrations in discharges from mining operations. Pollutant
concentrations may be diluted when waste water from mining
operations enters a stream.
App. 5
treated the 539 draft permits for placer mines as a group.
Federal regulations require a state certifying agency to
include in its certification of a draft NPDES permit “[a]
statement that there is a reasonable assurance that the
activity will be conducted in a manner which will not
violate applicable water quality standards.” 40 C.FR.
§ 121.2(a)(3). When it certified the draft NPDES permits,
DEC provided EPA with one such statement applicable to
all 539 permits. However, DEC conditioned its blanket
certification on adoption of a more stringent settleable
solids standard of 0.2 ml/1l, which DEC determined was
necessary to ensure that placer mining operations could
meet state water quality standards. The Alaska water
quality standard for settleable solids is “[n]o increase in
concentrations of sediment, including settleable solids,
above natural conditions.” 18 AAC 70.020. DEC interprets
this standard to mean no measurable increase above nat-
ural conditions. Since standard measuring techniques can
detect settleable solids concentrations down to approx-
imately 0.1 ml/1, a concentration above the natural level
of almost all Alaskan streams, DEC interprets 0.1 ml/1 as
the state water quality standard for settleable solids.
Appellants do not challenge this interpretation.
Given the fact that DEC issued one certification and
statement of reasonable assurance applicable to all 539
draft permits, the 0.2 ml/I limit for settleable solids
applied to every draft permit. In accordance with the
requirements of the Clean Water Act, EPA incorporated
this limit into the final individual NPDES permits the
agency issued to Alaskan placer miners. After EPA issued
the final permits, a number of parties, including the
parties to this appeal and several individual miners, filed
App. 6
timely requests for an administrative adjudication of
DEC’s certification of the draft NPDES permits pursuant
to 18 AAC 15.200. These requests were granted and the
matters consolidated. In addition, Miners Advocacy
Council, Inc. (MAC), filed suit against DEC in superior
court challenging the certification. Trustees for Alaska
(TFA) and Northern Alaska Environmental Center
(NAEC) intervened in the suit. The superior court contin-
ued its proceedings and retained jurisdiction pending a
ruling by the DEC Deciding Officer. After an adjudicatory
hearing, the Deciding Officer upheld DEC’s certification.
TFA, NAEC, and MAC appealed this decision to the
superior court, which affirmed the Deciding Officer’s
conclusions. These consolidated appeals followed.’
6 This section of the Alaska Administrative Code allows
any person to request an adjudicatory hearing pertaining to
DEC decisions concerning NPDES certifications, as well as
other decisions on water quality related permits and variances.
7 Federal regulations implementing the Clean Water Act
require EPA to issue NPDES permits for a fixed time period not
to exceed five years. 40 C.F.R. § 122.46(a). The 539 NPDES
permits at issue in this case, which EPA issued in 1985, expired
on December 31, 1986.
In 1986, EPA issued an additional 104 NPDES permits to
placer miners. These permits also expired on December 31,
1986. DEC certified these permits as a group, just as it did with
the permits involved in the instant litigation. The permits
issued in 1986 differed in one significant respect from those
issued in 1985. When EPA submitted the 1985 permits in draft
form to DEC for certification, the permits contained a settleable
solids effluent limit of 1.5 ml/Il as an instantaneous maximum
and 0.7 ml/l as a monthly average. EPA reduced this limit to
0.2 ml/l in the final permits because DEC made the reduction a
(Continued on following page)
i“
Sl eine Deed Cie a ek
App. 7
(Continued from previous page)
condition of its certification. However, when EPA sent draft
permits to DEC for certification in 1986, the permits already
contained a settleable solids effluent limit of 0.2 ml/Il. DEC
therefore certified the permits without conditioning its certi-
fication on adoption of more stringent limits on settleable
solids.
In 1987 and 1988, EPA issued a total of 367 NPDES permits
to placer miners in three separate groups. These permits all
expired on December 31, 1988. Like the 1986 permits, those
issued in 1987 and 1988 already contained a 0.2 ml/1 effluent
limit on settleable solids when EPA sent the permits in draft
form to DEC for certification. DEC certified the three groups of
permits with three blanket certifications.
Under the series of events described above, we are of the
view that the primary issue raised in this appeal by TFA and
NAEC is not moot. These appellants argue that DEC’s certifica-
tion of the disputed NPDES permits was unlawful because the
0.2 ml/I settleable solids effluent limit contained within the
permits does not ensure compliance with Alaska water quality
standards. Since DEC has continued to certify NPDES permits
containing a 0.2 ml/1 settleable solids effluent limit, whether
this limit ensures compliance with state standards remains an
issue in controversy. It is irrelevant whether the 0.2 ml/I limit
was set by DEC, as occurred with the 1985 permits, or whether
EPA set the limit, as has happened since 1985. Regardless of
which agency actually sets the final effluent limit, both federal
and DEC regulations require that DEC certify only those draft
NPDES permits which ensure that the permitted activities will
not violate state water quality standards. Federal regulations
require a state to include with its certification a statement that
there is reasonable assurance that the permitted activity will
not violate state water quality standards. 40 C.F.R.
§ 121.2(a)(3). DEC regulations, which prohibit activities which
would vioiate state water quality standards, implicitly require
DEC to certify only those permits which insure compliance
with state standards. See 18 AAC 70.010.
App. 8
II. MAY DEC CERTIFY DRAFT NPDES PERMITS FOR
PLACER MINES AS A GROUP RATHER THAN
INDIVIDUALLY?
We must first decide whether DEC may certify all 539
draft NPDES permits for placer mining activities as a
group rather than on a case-by-case basis. DEC readily
admits that it neither performed site-specific evaluations
nor considered information contained in individual
NPDES permit applications® in its certification process.
DEC argues that case-by-case certification of all 539
placer mining NPDES permits is economically and
administratively infeasible, and would provide less
assurance of compliance with state water quality stan-
dards than the agency’s group certification approach.
TFA and NAEC concede that the state’s blanket certifica-
tion is valid as long as it ensures that no individual
permit holder will violate state water quality standards.?
8 In a hearing before the Deciding Officer, DEC Water Quality
Section Chief Randolph Bayliss admitted that, to his knowledge,
DEC did not review information provided by individual applicants
“during the certification period for [the] purpose of certification.”
DEC maintains that virtually all information submitted by individ-
ual miners applying for NPDES permits is insufficient and unreli-
able, and is therefore useless.
9 In their brief, TFA and NAEC state the following:
Nor is DEC prohibited from issuing a blanket, state-
wide certification, based on considerations of admin-
istrative feasibility, as long as the result is
compliance with water quality standards at all loca-
tions, which would require an effluent limit of 0.1
ml/1 for settleable solids. [Emphasis in original.]
This concession vitiates TFA and NAEC’s argument that
DEC is required by law to certify NPDES permits on a case-by-
case basis.
App. 9
MAC, on the other hand, contends that both federal law
and DEC regulations require site-specific certification on
a case-by-case basis. In a related claim, MAC argues that
DEC’s group certification is invalid because the 0.2 ml/1
settleable solids effluent limit incorporated into every
NPDES permit as a result of the certification constitutes a
regulation which was not adopted according to the
requirements of Alaska’s Administrative Procedure Act.
At the administrative adjudication hearing, the DEC
Deciding Officer expressly refused to decide whether
DEC’s group certification was “correct in its approach.”
The superior court, however, held that “[iJn light of eco-
nomic and practical considerations, there is a reasonable
basis to have a blanket certification for all 539 permits
since any interested party may come in on a site-by-site
basis and request a review.” Both the Deciding Officer
and the superior court concluded that DEC’s imposition
of the 0.2 ml/I settleable solids effluent limit on all
NPDES permit applicants by means of the agency’s blan-
ket certification did not constitute a regulation.
We must first determine what standard of review to
apply to this question. While DEC’s knowledge and expe-
rience may be important factors in deciding as a practical
matter whether to carry out NPDES permit certifications
on a group or site-specific basis, the agency’s expertise is
irrelevant to the question of whether blanket certification
is legally permissible. Whether the federal Clean Water
Act and DEC regulations require the state to certify
NPDES permits on an individual, site-specific basis or
allow the state to issue a blanket certification covering
many individual permits without performing site-specific
evaluations is a question of law, which this court reviews
App. 10
under the “substitution of judgment” standard. See Earth
Resources Co. of Alaska v. State, Dep't of Revenue, 665 P.2d
960, 965 (Alaska 1983) (citing Kelly v. Zamarello, 486 P.2d
906, 916 (Alaska 1971)).
This brings us to consideration of MAC’s contention
that federal law requires DEC to certify NPDES permits
individually using site-specific information. The Clean
Water Act itself is silent as to this issue. The federal
statute simply provides that “any applicant” for a permit
must obtain certification from the state in which the
discharge originates or will originate that, inter alia, the
discharge will comply with state water quality standards.
See 33 U.S.C. §§ 1313, 1341(a)(1). The Act also requires
that state certifications “set forth [conditions] . . . and
monitoring requirements necessary to assure that any
applicant for a Federal license or permit will comply with
any applicable effluent limitations and other limitations.”
33 U.S.C. § 1341(d). While these provisions unam-
biguously require states certifying draft permits to pro-
vide assurance that every NPDES permit applicant will
meet state water quality standards, they do not preclude
certification of several permits as a group.
Similarly, federal regulations implementing the Clean
Water Act do not specifically address whether states may
issue one blanket certification for a number of NPDES
permits. Regulations governing state certification of fed-
eral licenses and permits to conduct any activity which
may result in discharges into waters of the United States
require state certifications to include the following:
A statement that the certifying agency has
either (i) examined the application made by the
applicant to the licensing or permitting agency
App. 11
(specifically identifying the number or code
affixed to such application) and bases its certi-
fication upon an evaluation of the information
contained in such application which is relevant
to water quality considerations, or (ii) examined
other information furnished by the applicant
sufficient to permit the certifying agency to
make the statement [of reasonable assurance of
compliance with state standards] described in
paragraph (a)(3) of this section.
40 C.F.R. § 121.2(a)(2). Additionally, regulations dealing
specifically with state certification of NPDES permits
require such certifications to be in writing and include:
(1) Conditions which are necessary to
assure compliance with the applicable provi-
sions of CWA [Clean Water Act] sections 208(e),
301, 302, 303, 306, and 307 and with appropriate
requirements of State law;
(2) When the State certifies a draft permit
instead of a permit application, any conditions
more stringent than those in the draft permit
which the State finds necessary to meet the
requirements listed in paragraph (e)(1) of this
section. For each more stringent condition, the
certifying State agency shall cite the CWA or
State law references upon which that condition
is based. Failure to provide such a citation
waives the right to certify with respect to that
condition; and
(3) A statement of the extent to which each
condition of the draft permit can be made less
stringent without violating the requirements of
State law, including water quality standards.
Failure to provide this statement for any condi-
tion waives the right to certify or object to any
less stringent condition which may be estab-
lished during the EPA permit issuance process.
App. 12
40 C.FR. § 124.53(e). These provisions, particularly the
requirements of 40 C.F.R. § 121.2(a)(2), indicate that site-
specific matters may be important considerations in the
certification process. However, we do not believe that the
federal regulations implementing the Clean Water Act
can be read to require states to certify draft NPDES
permits on a case-by-case basis. Like the statute itself, the
primary thrust of the regulations appears to be to ensure
that states certify only those draft permits which provide
assurance that individual permittees will comply with
state water quality standards. Beyond that, the federal
regulations are virtually silent as to what procedures
states should employ in certifying draft NPDES permits.
Regulations promulgated by DEC governing its
NPDES permit certification procedure also do not specifi-
cally address whether the agency must consider each
draft NPDES permit separately. The regulations (i) simply
require NPDES permit applicants to furnish the agency
with copies of applications and supplementary informa-
tion which applicants must submit to EPA, and (ii) autho-
rize DEC to request further information.!°©
10 Department of Environmental Conservation regulations
provide:
NPDES CERTIFICATION PROCEDURE (a) Contem-
poraneous with the filing of an application for an
NPDES permit, or for a modification or reissuance of
an NPDES permit, with EPA, a copy of the applica-
tion and all supporting information, together with a
cover letter requesting certification, must be served
on the central office of the department. If the certi-
fication request involves a modification to an NPDES
(Continued on following page)
App. 13
No reported cases have considered whether states must
certify NPDES permits on an individual rather than a group
basis, although a federal district court has noted in dictum
that “effluent liznitations are established by individual exam-
ination of the waterway.” Homestake Mining Co. v. United
States Envtl. Protection Agency, 477 F.Supp. 1279, 1286
(D.S.D.1979) (court paraphrasing an EPA General Counsel's
decision).
(Continued from previous page)
permit which does not involve application, for which
EPA does not intend to issue public notice, the
department will require a copy of the proposed mod-
ification at least 60 days before any deadline estab-
lished by EPA for certification action on the
modification, or 60 days before the proposed effec-
tive date of the modification, whichever is the
sooner. All supplementary forms or other informa-
tion pertaining to the application must be served on
the central office of the department at the time of
their filing with EPA.
(b) Within 30 days after receipt of an applica-
tion for certification, the department will, if neces-
sary, serve notice upon the applicant that additional
information is necessary in order for the department
to determine whether the discharge will comply with
the applicable provisions of secs. 301, 302, 303, 306
and 307 of the FWPCA [Federal Water Pollution
Control Act], and that the additional information
must be served upon the department within 30 days
after receipt of the request. If the information is not
served upon the department within the time period
specified, certification will be denied.
18 AAC 15.130. In addition, DEC regulations also provide for
public notice and hearings on NPDES permit certifications, as
well as specify the timetable and required form for the final
certification decision. See 18 AAC 15.140-.170.
App. 14
In the absence of any statutory or regulatory require-
ment that DEC certify draft NPDES permits on an indi-
vidual basis, we conclude that DEC may issue a blanket
certification for draft NPDES permits covering a number
of permittees, provided the certification ensures that
Alaska water quality standards will be met.'! The Legis-
lative history of the Clear. Water Act, which reveals that
Congress intended to give states broad power and discre-
tion in the fight against water pollution, bolsters the
conclusion that states have discretion to certify NPDES
permits on a group basis if they choose to do so. For
example, the Senate Report accompanying the 1972
amendments to the Clean Water Act provides that “(t]he
States shall lead the national effort to prevent, control
and abate water pollution. As a corollary, the Federal role
has been limited to support of, and assistance to, the
States.” S.Rep. No. 414, 92d Cong., 2d Sess., reprinted in
1972 U.S.Code Cong. & Admin.News 3668, 3669. Specifi-
cally discussing the NPDES certification process, the fed-
eral district court in Mobil Oil Corp. v. Kelley, 426 F.Supp.
230 (S.D.Ala. 1976), noted:
A review of the legislative history of the [Clean
Water Act] reinforces the plain meaning of the
Act itself to the effect that Congress intended
the states to play a paramount role in the certi-
fication of potential polluters.
'! Alaska water quality standards apply to individual dis-
chargers, not to industries or groups considered as a whole; 18
AAC 70.010(a) provides that “[n]o person may conduct an
operation that causes or contributes to a violation of the water
quality standards set by this chapter.”
Di iaaietaesetatneeenaiteierataiienas mace tinaiiaiimanaaanesiiiiil
App. 15
Id. at 234. Additionally, the Clean Water Act and its
implementing regulations’ lack of specific requirements
governing states’ NPDES certification procedures pro-
vides further evidence that Congress and the federal
executive branch intended to leave these procedures to
the states’ discretion. Since DEC regulations also do not
explicitly mandate case-by-case certification, we reject
MAC’s contention that DEC is legally obligated to certify
draft NPDES permits on an individual rather than group
basis. 12
III. DOES DEC’S IMPOSITION OF A 0.2 ML/L EFFLU-
ENT LIMIT FOR SETTLEABLE SOLIDS ON ALL
PLACER MINING OPERATIONS THROUGH DEC’S
BLANKET NPDES PERMIT CERTIFICATION CON-
STITUTE AN IMPROPERLY PROMULGATED
REGULATION?
MAC specifies as error the rejection of its contention
that the 0.2 ml/1 effluent limit for settleable solids which
was certified by the State of Alaska for the 1985 NPDES
12 In its resolution of this issue the superior court con-
cluded that
there is a reasonable basis for DEC’s determination
that .2 ml/I will comply with state water quality
standards. It was reasonable for DEC to make a
blanket determination in light of the economic and
practical considerations of making a site-by-site
determination. As stated above, if an interest group
feels that a specific location will not meet water
quality standards with a .2 ml/I effluent limitation,
they have the opportunity to present evidence at a
hearing and persuade DEC to change the effluent
limitation at a particular site. -
App. 16
placer mining permits constitutes an illegally promul-
gated regulation. MAC’s contention is that if the 0.2 ml/1
effluent limit is a regulation, then it is invalid because the
State of Alaska did not comply with the statutory require-
ments for enactment of a regulation when it adopted this
standard.'%
In our opinion, events since the issuance of the 1985
NPDES permits have rendered this issue moot. As noted
earlier in this opinion, see supra note 7, the 539 NPDES
permits at issue in this case expired on December 31,
13 The DEC Deciding Officer concluded that the 0.2 ml/1
effluent limit for settleable solids which was certified by the
State of Alaska was not a regulation. The Deciding Officer
reasoned in part that the State had not promulgated a standard
of general application. “Rather, the State was involved in a
permitting action which pertained to particular 1985 permits
for particular miners.” The Deciding Officer further stated in
his decision that to require certification actions by the State to
comply with the time-consuming procedures for enactment of
a regulation would render the certification actions incapable of
being performed in a time-frame even approaching that set
forth in the EPA and State regulations.
On appeal, the superior court rejected MAC’s illegally-
promulgated-regulation argument, reasoning in part as
follows:
Here as in State v. Northern Bus Co., Inc., 693 P.2d 319,
323 (Alaska 1984), there is a sufficient regulatory
scheme to permit DEC to adjudicate all the permits.
The .2 ml/I effluent limit is an adjudication rather
than legislation. Although the .2 ml/! effluent limit
applies to a number of permits, it is an adjudication;
an interpretation of existing regulations rather than
promulgation of a regulation. Therefore, the Decid-
ing Officer’s ruling that the .2 ml/1 effluent limit is
not a regulation is AFFIRMED.
|
App. 17
1986. All of the NPDES permits which the EPA issued in
1986, 1987, and 1988 already contained a 0.2 ml/] effluent
limit on settleable solids at the time EPA sent the permits
in draft form to DEC for certification. DEC certified the
three groups of permits with three blanket certifications.
As to the NPDES permits which were issued in 1986,
1987, and 1988, DEC simply certified the NPDES permits
as proposed by EPA without imposing more stringent
conditions than those set out in the draft permits. These
certifications by DEC did not constitute the promulgation
of de facto regulations.
In regard to the 1985 group certification by DEC, it
was DEC, not EPA, which imposed the 0.2 ml/1 settleable
solids effluent limit on placer miners through its certifica-
tion of the NPDES permits. DEC made its 1985 NPDES
certification contingent on imposition of a more stringent
effluent limit on settleable solids than the limit originally
proposed by EPA. The Clean Water Act required EPA to
incorporate the stricter limits cited by DEC into its final
NPDES permits. See 33 U.S.C. § 1341(d). Therefore, the 0.2
ml/1 limit was attributable to action by DEC, and this
action was arguably regulatory in nature.
In contrast to the 1985 NPDES permits, the 0.2 ml/1
effluent limit on settleable solids in subsequent permits is
attributable to action by EPA. After 1985, the 0.2 ml/1
limit was already contained in draft NPDES permits
when EPA sent the permits to DEC for certification. States
are powerless to alter draft NPDES permits during the
certification process, except to make permit conditions
more stringent. See 33 U.S.C. § 1341(d); 40 C.F.R.
§ 124.55(c). If a state does nothing, it waives certification,
and the NPDES permits are issued as originally proposed
App. 18
by EPA. See 40 C.F.R. § 124.53(c)(3). Therefore, DEC effec-
tively had nothing to do with imposing the 0.2 ml/1 limit
on placer mining operations after its 1985 certification,
even though it continued to certify NPDES permits con-
taining the 0.2 ml/1 limit on a group basis. MAC’s claim
that DEC violated Alaska’s Administrative Procedure
Act, AS 44.62.010-44.62.650, when it adopted a de facto
regulation by imposing the 0.2 ml/1 limit on placer min-
ers is thus moot; while the 0.2 ml/1 limit currently
remains in effect, the agency responsible for this limit is
now EPA rather than DEC. EPA is not subject to the
requirements of Alaska’s Administrative Procedure Act.
IV. DO THE CONDITIONS OF DEC’S CERTIFICATION
ASSURE COMPLIANCE WITH ALASKA’S WATER
QUALITY STANDARD FOR SETTLEABLE SOLIDS?
As noted previously, Alaska’s in-stream settleable
solids water quality standard requires no measureable
increase in settleable solids above natural background
conditions.'4 The record establishes that standard mea-
suring techniques can detect settleable solids concentra-
tions down to approximately 0.1 ml/I.
TFA and NAEC argue that DEC violated federal and
state law by certifying the 539 draft NPDES permits for
placer mines when some of the mines will violate state
water quality standards even assuming they strictly com-
ply with all the conditions and limitations of the permits.
1418 AAC 70.020(b) (Water Quality Parameter (7)) (“[n]o
increase in concentration of sediment, including settleable
solids, above natural conditions”).
App. 19
Specifically, TFA and NAEC maintain that the 0.2 ml/]
effluent limit for settleable solids incorporated into each
permit as a result of the certification process does not in
all cases ensure that placer mine operations “will com-
ply” with Alaska water quality standards.'5 The state
disagrees; it maintains that the 0.2 ml/1 limit provides
“reasonable assurance” of compliance. MAC, on the other
hand, argues that the 0.2 ml/1 effluent limit is too strin-
gent a standard.’
In regard to this issue, the Deciding Officer made the
following relevant findings of fact:
17. The minimum detectable level for set-
tleable solids using the Imhoff cone test is
approximately .1 ml/1.
18. Virtually all placer miners who treat
their effluent utilize settling ponds as the main
treatment method.
19. To meet the permit’s instantaneous
maximum settleable solids effluent limitation of
.2 ml/l, miners must, at a minimum, use prop-
erly designed, constructed and maintained set-
tling ponds.
15 TFA not only seeks invalidation of the 0.2 ml/I effluent
limit, but also requests this court to order DEC to modify its
certification, with prompt notice of the modification to EPA
and all 536 miners, to incorporate an effluent limitation of 0.1
ml/1 for settleable solids.
16 In part, MAC asks this court to void the 0.2 ml/I efflu-
ent limit for settleable solids and to hold that the original
0.7/1.5 ml/I effluent limit for settleable solids shall remain the
enforceable figure until such time as DEC obtains the requisite
information and properly certifies further NPDES permits.
App. 20
20. Properly designed, constructed and
maintained settling ponds will generally pro-
duce effluent with settleable solids concentra-
tions of less than or equal to .1 ml/1. Properly
designed, constructed and maintained settling
ponds will result in in-stream settleable solids
concentrations of less than .1 ml/I.
21. Placer miners who meet the instan-
taneous maximum of .2 ml/I! settleable solids
effluent limit will have in-stream settleable
solids levels of less than .1 ml/1.
22. The draft permit’s excess water bypass
and out-of-stream settling pond requirements
result in reduced water usage, increased treat-
ment efficiency and increased amount of fresh
water available for in-stream dilution, thereby
increasing the assurance that the mining opera-
tion will meet state water quality standards.
23. The instantaneous maximum of .2 ml/1
settleable solids effluent limit is close to the
minimum detectable level for settleable solids. If
one takes into account that this is an instan-
taneous maximum and if one makes an
allowance for stream water dilution and infiltra-
tion dilution, the resultant in-stream settleable
solids increase will be below the .1 ml/1 mini-
mum detectable limit.
24. Dilution ratios of effluent to receiving
water of 1:1 to 1:9 are typical for Alaska placer
mining operations.
25. It is reasonable to assume that there
will be fresh water surface infiltration and fresh
water subsurface infiltration prior to the dis-
charge of the effluent from a settling pond into a
stream.
App. 21
In his conclusions of law pertaining to this issue of
the reasonableness of the 0.2 ml/1 effluent limit on settle-
able solids, the Deciding Officer stated:
An argument has been made that an efflu-
ent limitation of .2 ml/1 for settleable solids will
not provide reasonable assurance of compliance
with water quality standards. The Deciding
Officer does not think that any requestor has
sustained its burden of proof on this issue, and
consequently this argument is rejected.
The evidence indicates that, to meet the per-
mit’s .2 ml/1 limit, a miner must use a properly
designed, constructed and maintained settling
pond. The evidence also indicates that such a
settling pond will produce effluent with settle-
able solids concentrations of .1 ml/I or less.
Furthermore, a placer miner who meets the .2
ml/1 settleable solids effluent limit will have in-
stream settleable solids levels of less than .1
ml/l, which is the minimum detectable limit.
Such a level of settleable solids clearly satisfies
the state water quality standard of “no measur-
able increase.”
The .2 ml/1 effluent limitation is very close
to the minimum detectable level for settleable
solids. If one takes into account the excess water
bypass provision in the draft permit as well as
the out-of-stream settling pond requirement, the
.2 ml/1 limitation is a reasonable limitation. If
one further takes into account in-stream dilution
and increased treatment efficiency, the .2 ml/1
limitation becomes even more reasonable as a
limitation which will assure compliance with
water quality standards.
One can make additional observations
about the appropriateness of the .2 ml/1 limita-
tion. There will be some infiltration dilution in
piacer mining operations. Furthermore, the .2
App. 22
ml/1 limitation is an instantaneous maximum.
That is, the effluent can never exceed .2 ml/] at
any time during the operation of a mining site.
It is reasonable to assume that the effluent qual-
ity for settleable solids will generally be below
-2 ml/1 rather than right at .2 ml/1.
When these assumptions are made, and the
evidence presented at the hearing indicates that
these assumptions are in fact reasonable ones,
the .2 ml/1 effluent limitation for settleable
solids clearly is a reasonable one. The evidence
indicates that DEC is able to say with confidence
that such a limitation will reasonably assure
compliance with water quality standards.
TFA has argued that if one does not do a
site-specific verification for settleable solids in
effluent, then only an effluent limit of .1 ml/1
will assure compliance with water quality stan-
dards. The assumptions underlying such an
approach are not reasonable. While .1 ml/1 will
by definition assure that in every case there is
no measurable increase in settleable solids con-
centrations above natural background, it is not
necessary for the limitation to be that low to
reasonably assure no measurable increase. TFA’s
argument assumes a worst case scenario in
every case and ignores some reasonable
assumptions about dilution, pond performance,
and instantaneous maximums. The evidence
presented at the hearing indicates that TFA’s
argument is not correct when applied to the real
world and actual mining sites.
Dilution, instantaneous maximum consider-
ations, actual performance of settling ponds — all
these factors help to insure that the .2 ml/1
limitation will assure compliance with the water
quality standards. TFA has argued that if the
effluent limitation is not at .1 ml/1 or lower, then
it is possible under some circumstances that
App. 23
there will be a violation of water quality stan-
dards. The Deciding Officer does not interpret
the CRA [Certificate of Reasonable Assurance]
to mean that DEC has assured that there will
never be an incident where a discharge from a
placer mining site in the state increases the set-
tleable solids concentrations in a stream. The
CRA must be more reasonably interpreted. Can
DEC certify that a limitation reasonably assures
compliance with state water quality standards?
If so, then the test is met. The evidence pre-
sented in this case indicates that DEC can satisfy
this test with the .2 ml/1 limitation.!7
17 On appeal the superior court resolved the issue in the
following manner:
The court concludes that there was a reasonable
basis for the administrative decision to include .2 ml/1
settleable solid effluent limitation and therefore the
Deciding Officer’s decision upholding the .2 ml/I limita-
tion should be upheld. .
As pointed out by DEC, practically and economi-
cally it would be impossible in any realistic way to
conduct a site-by-site evaluation of each of the 539
placer miners requesting permits. Instead the agency
determined that in all cases the .2 ml/I settleable solid
effluent limitation would comply with the requirement
that there would be no increase in concentrations above
natural conditions of settleable solids.
Either or both a permit applicant or an interested
group such as TFA may request a hearing on an individ-
ual permit and present evidence to persuade DEC that
the .2 ml/I limitation is either too restrictive or not
restrictive enough. Therefore, any interested party may
have a site-specific review of any of the permits so
certified.
In light of economic and practical considerations,
there is a reasonable basis to have a blanket certification
for all 539 permits since any interested party may come
in on a site-by-site basis and request a review.
App. 24
A. Applicable Standards of Review.
TFA and NAEC maintain that this court should apply
the “substantial evidence” standard to determine
whether the record supports DEC’s finding that a 0.2
ml/I1 standard for settleable solids will lead to compliance
with the state water quality standard. On the other hand,
DEC argues that this case involves mixed issues of law
and fact, and thus this court should defer to DEC’s deter-
mination unless it lacks a reasonable basis.
Since the portion of DEC’s decision construing stat-
utes and regulations governing water pollution is clearly
separable from its factual finding as to whether a 0.2 ml/1
settleable solids effluent limit will lead to compliance
with Alaska water quality standards, both standards of
review are applicable. See Pan Am. Petroleum Corp. v. Shell
Oil Co., 455 P.2d 12, 20-23 (Alaska 1969).
In the instant case, the parties also disagree over the
standard of certainty required of DEC’S NPDES certifica-
tion under the Clean Water Act and federal and state
regulations. This is essentially a legal question of statu-
tory and regulatory interpretation. On such questions, we
apply the deferential reasonable basis test. See id.; Rose v.
Commercial Fisheries Entry Comm'n, 647 P.2d 154, 161
(Alaska 1982). The parties also dispute whether the 0.2
ml/1 standard for settleable solids will lead to compliance
with state water quality standards. We review such fac-
tual questions under the “substantial evidence” test. See
Storrs v. State Medical Bd., 664 P.2d 547, 555 (Alaska), cert.
denied, 464 U.S. 937, 104 S.Ct. 346, 78 L.Ed.2d 312 (1983).
ee Se ae Pe ee ON ee ee ee EIT LP St ey
App. 25
B. Does DEC’s Interpretation of the Standard of Cer-
tainty Required of Its Draft NPDES Permit Certifica-
tion Have a Reasonable Basis?
After reviewing the draft NPDES permit EPA
intended to issue individually to 539 placer miners, DEC
certified the permits (on condition that the limit for set-
tleable solids be set at 0.2 ml/1) based on its conclusion
that there was “reasonable assurance” that discharges
resulting from the permitted activities would comply
with, inter alia, Alaska water quality standards. TFA and
NAEC take issue with the “reasonable assurance” stan-
dard, arguing that under the Clean Water Act and DEC
regulations, DEC may not certify draft NPDES permits
unless the agency assures “strict compliance” with state
standards in all cases and at all discharge points.
Exactly how the standard of certainty advocated by
TFA and NAEC differs from that employed by DEC is
unclear. DEC does not argue that state standards may be
exceeded under certain circumstances or at certain dis-
charge points. Apparently, therefore, TFA and NAEC sim-
ply argue that DEC must provide something more than
“reasonable assurance” of compliance with state water
quality standards in its certification.
Under the “reasonable basis” test, this court will not
lightly interfere with an administrative agency’s inter-
pretation of statutes and regulations which bear on dis-
cretionary determinations within the agency’s area of
expertise. See, e.g., Rose, 647 P.2d at 161. Here, DEC has
authority to certify draft NPDES permits if it determines
that the permits meet statutory and regulatory
requirements.
App. 26
We conclude that DEC’s interpretation of the degree
of certainty required of its certification under the Clean
Water Act, as well as under federal and state regulations,
has a reasonable basis. TFA and NAEC emphasize lan-
guage in the Clean Water Act which requires states to
certify that NPDES permittees “will comply” with state
standards, as well as a DEC regulation which prohibits
violations of Alaska water quality standards. See 33
U.S.C. § 1341(a)(1); 18 AAC 70.010(a). These provisions,
however, do not necessarily require DEC to provide abso-
lute certainty that permittees will never violate state stan-
dards, assuming this sort of guarantee is even possible.
Moreover, DEC applied a “reasonable assurance” stan-
dard in accord with federal regulations implementing the
Clean Water Act, which provide that states must include
within a draft NPDES certification “[a] statement that
there is a reasonable assurance that the activity will be
conducted in a manner which will not violate applicable
water quality standards.” 40 C.F.R. § 121.2(a)(3)
(emphasis added).
C. Does the Record Contain Substantial Evidence to
Support DEC’s Finding That a Settleable Solids
Effluent Limit of 0.2 ml/l Provides Reasonable Assur-
ance That All Permittees Will Comply with State
Water Quality Standards?
Randolph Bayliss, chief of DEC’s Water Quality Man-
agement Section, described in an affidavit how DEC
arrived at the 0.2 ml/I effluent limit for settleable solids
applicable to placer mining operations:
i
App. 27
The certified permit condition (in this case,
0.2 ml/1 settleable solids) applies to the dis-
charge of placer mining waste prior to entry into
and dilution by the receiving waters. The Water
Quality Standard (in this case, no measurable
increase in sediment) applies in the receiving
waters after dilution in a mixing zone. The
enforcement procedure would go like this: mea-
sure the settleable solids in the receiving waters
upstream of a placer mining discharge, then
measure the settleable solids a reasonable dis-
tance downstream of the placer mine discharge,
say 500 feet. If there is a measurable increase,
there would be a violation of the Water Quality
Standards. This applies only to manmade
increases above natural conditions, but in even
the most heavily naturally silted rivers of
Alaska, there are few with measurable settleable
solids.
Therefore,
1. with 0.1 ml/1 being the lowest detectable
gradation in the testing procedure, and
2. with a reasonable amount of dilution, there
is a reasonable assurance that 0.2 ml/1 in the
discharge would not be measurable after
mixing in the receiving waters, and, with
that added condition, the permits could be
certified as being in compliance for the
Water Quality Standards for sediment.
(Emphasis and parentheticals in original.)
To support the 0.2 ml/I settleable solids limit, DEC
maintains in its brief that “[i]f one makes some reason-
able allowance for in-stream dilution of the .2 ml/1 efflu-
ent prior to the in-stream measurement, the resultant
water quality will . . . approach, if not fall below, the .1
App. 28
ml/l minimum detectable settleable solids level.” DEC
asserts that this holds true regardless of any site-specific
differences. The agency also argues that in order to con-
sistently meet the 0.2 ml/I effluent limit for settleable
solids, placer miners must install settling ponds. It fur-
ther contends that properly constructed settling ponds
will usually produce effluent which will contain settle-
able solid concentrations at or below 0.1 ml/I, even
before dilution by the receiving stream. Finally, DEC
asserts that “infiltration dilution” by groundwater, and
requirements within the NPDES permits for excess water
bypasses and out-of-stream settling ponds, provide fur-
ther assurance that placer mining operations will not
violate the state standard for settleable solids.
When reviewing an agency’s factual findings, we
review the whole record to determine whether the
agency’s findings “are supported by substantial evidence,
i.e., such relevant evidence as a reasonable mind might
accept as adequate to support a conclusion.” Galt v. Stan-
ton, 591 P.2d 960, 963 (Alaska 1979) (quoting Keiner v. City
of Anchorage, 378 P.2d 406, 411 (Alaska 1963)). In this case,
we hold that the record does not support DEC’s finding
that the 0.2 ml/1 effluent limit for settleable solids pro-
vides reasonable assurance that all 539 NPDES permittees
will meet state water quality standards.
DEC’s finding that the 0.2 ml/1 settleable solids limit
will lead to compliance with water quality standards is
largely predicated on an assumption that effluent from
placer mines will undergo “a reasonable amount of
App. 29
dilution” by receiving streams.’* However, DEC Water
Quality Section Chief Bayliss testified that an unspecified
number of the permittees covered by DEC’s blanket certi-
fication utilize most or all of the flow of a stream in their
operations.'9 If a miner uses most or all of the stream in
his or her operations, the record indicates that the water
quality of effluent from the mine will very closely
approximate the water quality of the stream below the
mine because the effluent and the stream are essentially
the same.?° Therefore, if a mine’s effluent contains 0.2
18 In its brief, TFA alludes to the fact that “[bjoth EPA and
DEC regulations allow some consideration of stream mixing in
determining whether a discharge from a particular site results
in violations of water quality standards.” See 18 AAC 70.032; 40
C.F.R. § 131.13. TFA also states in its brief: “While not conced-
ing that the use of mixing zones is legal, we do not raise this
argument here.”
As TFA analyzes this issue, the question to be answered is
whether all streams that receive placer mining discharges have
sufficient flow to enable compliance with water quality
standards.
19 Bayliss also testified that using the entire stream in
placer mining operations was “not typical,” although he did
not know how many permittees used the entire stream.
20 TFA argues that “[i]f a miner uses all of a stream for his
mining operation, then the quality downstream will equal the
quality of the discharge.”
DEC asserts that the use of well-maintained settling ponds
installed according to DEC guidelines will ensure that permit-
tees will comply with the settleable solids effluent limits. How-
ever, the draft NPDES permits as certified do not require
permittees to use settling ponds; rather, the permits simply
prohibit a permittee who decides to construct a settling pond
from constructing it within a stream. Nor are the DEC settling
pond guidelines (contained in a DEC publication entitled
Placer Mining Settling Pond Design Handbook (1983)) mandatory.
App. 30
ml/l of settleable solids, the maximum concentration
allowed by the NPDES permits as certified by DEC, the
stream below the mine will also contain roughly 0.2 ml/1
of this pollutant. This substantially exceeds the water
quality standard for settleable solids. The record there-
fore does not contain substantial evidence to support
DEC’s finding that reasonable dilution of placer mine
effluent will enable all permittees to comply with the
state water quality standard for settleable solids when the
effluent limit is 0.2 ml/l On the contrary, the record
indicates that an undetermined number of miners will
likely violate Alaska’s settleable solids standard, even if
they fully comply with the 0.2 ml/I effluent limit.
In short, TFA has met its burden of production and
persuasion as to those permit holders who utilize most or
all of the flow of the streams in which their mining
operations take place. See 18 AAC 15.270(c) (burden on
party requesting hearing). As to such a permit holder,
DEC’s certification is invalid since it will not assure com-
pliance with Alaska’s water quality standards.?!
On the other hand, as to those permit holders whose
placer mining operations do not utilize most or all of the
flow of the streams used in their mining operations, we
21 Our task here is to ascertain whether the NPDES per-
mits as certified meet state water quality standards for settle-
able solids. The foundation of our ruling is that the NPDES
permit holders in question use most or the entire water flow,
and that under-the permits as certified there is no requirement
that permittees use well-designed and properly constructed (in
accordance with DEC guidelines) settling ponds in their
operations.
App. 31
hold that the record contains substantial evidence to sup-
port the Deciding Officer’s thorough findings and conclu-
sions that reasonable dilution and other relevant factors
affecting the placer mines’ effluent will assure compli-
ance by permittees with Alaska’s water quality standard
of 0.2 ml/1 for settleable solids.?2
V. CONCLUSION.
The superior court’s affirmance of the Deciding Offi-
cer’s decision sustaining DEC’s certification is
AFFIRMED in part, REVERSED in part, and REMANDED
for further proceedings consistent with this opinion.
Upon remand DEC shall take steps to identify those
permit holders, if any, whose placer mining operations
utilize most or all of a stream’s flow in the course of their
respective mining operations. As to any such permit
holders, DEC shall take appropriate steps to withdraw its
certification and vacate the permit.
22 We have reviewed all of the remaining specifications of
errors which have been advanced by TFA, NAEC, and MAC
and have concluded that they are without merit.
App. 32
APPENDIX B
IN THE SUPERIOR COURT
FOR THE STATE OF ALASKA
FOURTH JUDICIAL DISTRICT
TRUSTEES FOR ALASKA;
NORTHERN ALASKA
ENVIRONMENTAL CENTER,
Appellant, peated
= 86-1556 Civ.
STATE OF ALASKA,
DEPARTMENT OF
ENVIRONMENTAL
CONSERVATION, AND
WILLIAM ROSS,
Commissioner of the
Department of
Environmental
Conservation,
Appellee.
MINERS ADVOCACY
COUNCIL, INC.,
Appellant, No. 4FA-85-
7 1690 Civ.
STATE OF ALASKA, 7
DEPARTMENT OF
ENVIRONMENTAL
CONSERVATION, et al.,
Appellee.
(Filed
JUL 31 1987)
ee ee ee ee ee a a
'
App. 33
MEMORANDUM DECISION
In this consolidated appeal, appellants seek relief
from a Department of Environmental Conservation (DEC)
Deciding Officer’s April 14, 1986, decision upholding a .2
ml/1 settleable solids effluent limitation.
The issues raised on appeal are:
1. Whether a reasonable basis exists for DEC’s
determination that inclusion of the .2 ml/1 settleable
solids effluent limit into the state’s Certificate of Reason-
able Assurance (CRA) is in compliance with state water
quality standards. [Appellant, Trustees for Alaska (TFA)
claims that DEC violated the federal Clean Water Act
(CWA), 33 U.S.C. 1251 et al., and state law,
(a) by issuing a water quality certification that
failed to assure that discharge from all
placer mining operations would result in
compliance with water quality standards;
(b) by failing to analysis (sic) on a site-specific
basis whether discharges from individual
placer mining operations will result in
compliance with state water quality
standards;
(c) by basing its water quality certification for
placer mining operations on factors of eco-
nomic and technical feasibility.]
2. Whether DEC’s inclusion of the .2 ml/1 settleable
solids effluent limit into the state’s (CRA) constitutes a
regulation requiring compliance with Alaska Administra-
tive Procedures Act before adoption.
3. Whether DEC’s failure to certify the Federal Draft
National Pollution Discharge Elimination System
(NPDES) permit within 60 days invalidated the state’s
certification.
App. 34
4. Whether DEC’s inclusion of the .2 ml/1 settleable
solids effluent limit into the (CRA) resulted from a collu-
sive agreement between the state and environmental
interests groups.
Factual Background
In order to discharge pollutants into waters of the
United States, a person must obtain a National Pollution
Discharge Elimination System (NPDES) permit from the
Environmental Protection Agency (EPA). (33 U.S.C. 1311)
This provision applies to placer miners in Alaska. EPA
can not issue a final NPDES permit until the state in
which the discharge originates has been given an oppor-
tunity to review the EPA draft permit to determine
whether the permit’s terms reasonably assure compliance
with the state’s water quality standards. [40 CFR Section
121.2(a)(3); Section 124.53] The state is required to made
(sic) a determination whether EPA’s draft permit terms
are adequate to assure compliance with state water qual-
ity standards. If the state determines that EPA’s draft
permit terms are not adequate, the state must include in
the Certificate of Reasonable Assurance (CRA) any condi-
tions more stringent then (sic) those in the draft permit
which the state finds necessary to meet state water qual-
ity standards. [40 CFR Section 124.53(e)(2)]
Under 40 CFR 124.55(c)
A state may not condition or deny a certification
on the grounds that state law allows a less strin-
gent permit condition. The regional administra-
tor shall disregard any such certification
conditions, and shall consider those conditions
or denials as waivers of certification.
¥
App. 35
Thus, a state may condition the issuance of a permit on
more stringent limitations than that imposed by EPA but
cannot make them less stringent.
Four hundred forty-six (446) placer miners had
NPDES permits for 1984. EPA decided to modify the 1984
permits for 1985 and by a single draft permit proposed
the modification for those permits and also proposed to
issue similar permits to 93 placer miners who had applied
for permits for 1985. On January 31, 1985, as required by
40 C.FR. 124.53(a), EPA transmitted the single draft per-
mit to DEC for review. (The draft permit was for 446
placer miners who had permits issued in 1984 and 93
additional placer miners who sought permits for 1985.)
The draft permit contained the following effluent
limitations:
a. For settleable solids —- .7 ml/1 monthly aver-
age, 1.5 ml/] instantaneous maximum;
b. Turbidity - 5 NTU instantaneous maximum;
c. Arsenic - 0.05 mg/I instantaneous
maximum.
A joint EPA/DEC public notice was mailed to the 439
1984 permit holders and 93 permit applicants for 1985, as
well as being published. The notice announced, among
other things, the state’s intent to consider certification of
the modified draft permit pursuant to Section 401 (33
U.S.C. 1341) of the Clean Water Act (CWA). Public hear-
ings were held by EPA on the draft permits in March of
1985. DEC presented testimony that the .7/1.5 ml/] settle-
able solids effluent limit was too lenient to be consistent
with state water quality standards.
App. 36
On approximately March 15, 1985, DEC notified
Appellant, Miners Advocacy Council, Inc., (MAC) and
TFA that the state was considering certification of a .2
ml/1 settleable solids effluent limitation. On March 30,
1985, at the annual mining convention in Fairbanks, DEC
Commissioner William Ross, in his formal address to the
state’s placer miners, advised that DEC intended to cer-
tify the draft permit with a .2 ml/] settleable solids efflu-
ent limitation.
DEC sent its Certificate of Reasonable Assurance
(CRA) to EPA on April 29, 1985. The CRA applied both to
the 446 placer miners who had permits for 1984 as well as
the 93 new applicants for 1985. The CRA stated that DEC
certified that there was reasonable assurance that the
proposed activity was in compliance with the require-
ments of Section 401 of the CWA which includes the
Alaska Water Quality Standards and the standards of the
_ Alaska Coastal Management Program provided that the
instantaneous maximum settleable solids effluent limita-
tion was .2 ml/I1.
EPA, after receipt of DEC’s CRA notified the permit
holders to include the .2 ml/1 limit in their permits. No
change was requested by DEC in the 5 NTU instan-
taneous maximum as an effluent limitation for turbidity
or to the 0.05 mg/1 instantaneous maximum as an effluent
limitation for arsenic. Thus, the decision as to turbidity
and arsenic is not a decision of DEC but of EPA.
After notification to include the .2 ml/I limit, a
number of parties requested an administrative adjudica-
tion pursuant to 18 AAC 15.200. The requests were con-
solidated into one prodeeding. Preliminarily MAC
App. 37
requested a stay of the .2 ml/1 limit claiming that it was a
regulation and not adopted pursuant to the Alaska
Administrative Procedures Act; TFA claimed the permits
were invalid since the certification should have been
done on a site-specific basis rather than blanketedly. Both
these request were denied by the Deciding Officer.
[On May 6, 1985, appellee, MAC, filed a complaint
against the state in this court challenging numerous
aspects of the state’s water quality enforcement scheme
including the state’s certification of the 1985 NPDES per-
mits. Appellee, TFA, intervened. On May 30, 1985, MAC
filed with DEC a demand for an administrative adjudica-
tion on the state’s NPDES'’s certification. TFA and various
individual miners filed similar demands. The demands
were consolidated for an adjudicatory hearing which was
held on February 3-6, 1986. The final decision upholding
DEC’s certification of the .2 ml/I1 settleable solids limit
was issued on April 14, 1986. Both MAC and TFA have
appealed from that decision. The appeals have been con-
solidated before this court.]
QUESTIONS ON APPEAL
I. Is the .2 ml/1 settleable solids effluent limit a
regulation?
MAC asserts that the .2 ml1/I settleable solids effluent
limit is a regulation and was not adopted pursuant to the
Alaska Administrative Procedures Act.
The Deciding Officer rejected this argument by order
dated November 6, 1985, and reaffirmed that decision in
his April 14, 1986, decision. AS 44.62.640(a)(3) defines a
regulation as:
App. 38
(3) “regulation” means every rule, regulation,
order, or standard of general application or the
amendment, supplement or revision of a rule,
regulation, order or standard adopted by a state
agency to implement, interpret, or made specific
the law enforced or administered by it, or to
govern its procedure, ... “regulation” includes
“manuals,” “policies, ” “instructions,” “guides
to enforcement,” “interpretative bulletins,”
“interpretations,” and the like, which have the
effect of rules, orders, regulations or standards
of general application, and this and similar
phraseology shall not be used to avoid or cir-
cumvent this chapter; whether a regulation,
regardless of name, is covered by-this chapter
depends in part on whether it affects the public
or is used by the agency in dealing with the
public;
The label placed on a particuiar “statement by an
administrative agency” does not determine the appli-
cability of the Adininistrative Procedures Act. The state-
ment may still be “a regulation” requiring compliance
with the Alaska Administrative Procedures Act. Kenai
Pen. Fishermen’s Coop. Ass'n v. State, 628 P.2d 897, 905
(Alaska 1981). Here as in State v. Northern Bus Co. Inc., 693
P.2d 319, 323 (Alaska 1984) there is a sufficient regulatory
scheme to permit DEC to adjudicate all the permits. The
.2 ml/l is an adjudication rather than legislation.
Although the .2 ml/1 applies to a number of permits, it is
an adjudication; an interpretation of existing regulations
rather than promulgation of a regulation. Therefore, the
Deciding Officer’s ruling that the .2 ml/1 is not a regula-
tion is AFFIRMED.
App. 39
II. Is the .2 ml/1 settleable solids effluent limit
appropriate?
The state contends that there is a reasonable basis for
DEC’s determination that the .2 ml/1 settleable solids
effluent limit gives reasonable assurance of compliance
with state water quality standards. TFA contend that the
Deciding Officer’s findings are not supported by substan-
tial evidence and that DEC violated the federal CWA and
state law by issuing a water quality certification (a) that
failed to assure that discharges from all placer mining
operations would result in compliance with water quality
standards; (b) by failing to analyze each individual per-
mit application on a site-specific basis; and (c) be basing
its decision on factors of economic and technical fea-
sibility. MAC contends that the certification process
requires a site-by-site analyze (sic) rather than a blanket
certification.
The state asserts that a reasonable basis test should
be applied in reviewing the decision to include .2 ml/]
while TFA claims a substantial evidence test is appropri-
ate. The substantial evidence test is used “to review ques-
tions of fact to determine if there is an evidentiary basis
to support an agency’s decision on the merits of an indi-
vidual case.” Galt v. Stanton, 591 p.2d 960, 966 (Alaska
1979). The reasonable basis test is used “where there are
mixed questions of fact and law involving agency exper-
tise and/or broad policy considerations.” Jager v. State,
537 P.2d 1100, 1107 (Alaska 1975)
The reasonable basis test, stated in another way, is
that the action was not unreasonable, arbitrary or an
abuse of discretion. [North Slope Borough v. LeResche, 581
App. 40
P.2d 1112 (Alaska 1978)] The Supreme Court has also
stated that the reasonable basis test is to determine that
the administrative decision was not arbitrary, capricious
or prompted by corruption. [Moore v. State, 553 P.2d 8,
p.36, n.20 (Alaska 1976)]
As pointed out in Jager v. State, 537 P.2d 1100, 1107
(Alaska 1975):
The reasonable basis standard permits the court
to consider factors of agency expertise, policy,
and efficiency in reviewing discretionary deci-
sions. It is similar to the standard of “unreason-
able, arbitrary, and capricious action” under
which actions committed to agency discretion
are traditionally reviewed. . . . (Footnotes
omitted.) :
Here, contrary to the assertion of TFA, a reasonable
basis test is appropriate since the certification decision
concerns mixed questions of fact and law involving over-
all agency expertise and policy considerations.
The court concludes that there was a reasonable basis
for the administrative decision to include .2 ml/] settle-
able solid effluent limitation and therefore the Deciding
Officer’s decision upholding the .2 ml/1 should be
upheld.
As pointed out by DEC, practically and economically
it would be impossible in any realistic way to conduct a
site-by-site evaluation of each of the 539 placer miners
requesting permits. Instead the agency determined that in
all cases the .2 ml/1 settleable solid effluent limitation
would comply with the requirement that there would be
no increase in concentrations above natural conditions of
settleable solids.
App. 41
Either or both a permit applicant or an interested
group such as TFA may request a hearing on an individ-
ual permit and present evidence to persuade DEC that
the .2 ml/I limitation is either too restrictive or not
restrictive enough. Therefore, any interested party may
have a site-specific review of any of the permits so
certified.
In light of economic and practical considerations,
there is a reasonable basis to have a blanket certification
for all 539 permits since any interested party may come in
on a site-by-site basis and request a review.
III. Did DEC inclusion of the .2 ml/1 settleable
solids effluent limit result from a collusive
agreement between the state and interested
groups?
MAC claims that the .2 ml/1 limitation was an agree-
ment between DEC and interested environmental groups,
and that the decision violated the Alaska Open Meetings
Act. The Deciding Officer rejected this argument, finding
that there was no evidence to substantiate any such
agreement. This finding by the Deciding Officer, based on
his opportunity to judge the credibility of the witnesses
and evidence presented, should only be reversed if
clearly erroneous. Kennedy Associates, Inc., v. Fischer, 667
P.2d 174, 179 (Alaska 1983); Martens v. Metzgar, 591 P.2d
541, 544 (Alaska 1979). In reviewing the record with this
in mind, the Deciding Officer’s decision regarding no
collusion is not clearly mistaken. Since the .2 ml/1 was
not the result of any agreement between DEC and envi-
ronmental groups, MAC’s assertion that the Alaska Pub-
lic_ Meetings Act-was violated is without merit.
App. 42
IV. TFA assert that the certification of .2 ml/1 for
settleable solids as an effluent limitation will
result in violations of water quality standards at
some sites.
As stated above, there is a reasonable basis for DEC’s
determination that .2 ml/1 will/comply with state water
quality standards. It was reasonable for DEC to_make a
blanket determination in light of the economic and practi-
cal considerations of making a site-by-site determination.
As stated above, if an interest group feels that a specific
location will not meet water quality standards with a .2
ml/1 effluent limitation, they have the opportunity to
present evidence at a hearing and persuade DEC to
change the effluent limitation at a particular site.
V. Does DEC’s failure to certify the Draft National
Pollution Discharge Elimination System permit
within 60 days invalidate their certification?
MAC claims that since DEC did not certify the
NPDES permit within 60 days, the certification is void. 40
CFR 125.53(c)(3) provides that the state would be deemed
to have waived its right to certify unless that right is
exercised within a specified reasonable time not to exceed
60 days from the date the draft permit is mailed to the
certifying state agency. The record shows that EPA trans-
mitted the draft NPDES permit to DEC on January 31,
1985. The certificate of reasonable assurance was for-
warded to EPA on April 29, 1985, approximately 90 days
after EPA’s submittal to the state.
App. 43
The Deciding Officer concluded that the 60 day time
limit had been exceeded but determined that the certifica-
tion was not void. He concluded that the record did not
reflect why EPA included the effluent limitation
requested by the state when it was submitted to them in
excess of 60 days. He speculated that EPA may have
decided that it was appropriate to relax the strict time
requirement in this case. Since the burden of proof is on
MAC and that the record was not developed, he con-
cluded that MAC had not met its burden and therefore
upheld the certification. The state claims that MAC did
not raise this below, nor in its points on appeal. However,
the Deciding Officer ruled on the point and although not
stated in its points on appeal, since the issue was raised
below and has been briefed by the parties, the court will
consider it.
This court agrees with the Deciding Officer that the
60 day violation does not make the inclusion of the .2 ml/
1 void. EPA saw fit to include it and apparently waived
the strict 60-day requirement. The proper entity to dis-
cuss whether or not the 60 day limitation should have
been waived is with EPA not the state. Until such time as
EPA reverses its decision, the .2 ml/1 requirement is valid
and should be included in all permits.
For the reasons stated above, the decision of the
Deciding Officer dated April 14, 1986, is AFFIRMED.
App. 44
DATED at Fairbanks, Alaska this 31st day of July,
1987.
/s/ Jay Hodges
JAY HODGES
Superior Court Judge
App. 45
APPENDIX C
BEFORE THE
ALASKA DEPARTMENT OF
ENVIRONMENTAL CONSERVATION
In Re: 1985 NPDES Placer )
Mining Permit Certification )
e )
DECISION
This case involves a challenge by seventy-three
groups and individuals to the certification by the State of
Alaska’s Department of Environmental Conservation of
the 1985 NPDES Placer Mining Permits. A hearing in this
matter was held in Fairbanks, Alaska on February 3 - 6,
1986. The decision of the Deciding Officer follows.
I.
A. Findings of Fact
1. These proceedings arise out of a certification by
the State of Alaska’s Department of Environmental Con-
servation (“DEC”) pursuant to Section 401 of the Clean
Water Act of 539 permits issued to the placer mining
industry in Alaska by the Environmental Protection
Agency (“EPA”). The permits involved are National Pol-
lution Discharge Elimination System (“NPDES”) permits,
which are issued under Section 402 of the Clean Water
Act (“CWA”).
2. In February of 1985 DEC received a single draft
NPDES permit that EPA proposed to issue as a modified
permit to each of 446 placer miners who had permits
App. 46
issued in 1984 and to each of the 93 additional placer
miners who sought permits in 1985.
3. The draft permit from EPA contained the follow-
ing effluent limitations: for settleable solds (sic), 0.7 ml/1
monthly average, 1.5 ml/1 instantaneous maximum; for
turbidity, 5 NTU instantaneous maximum; for arsenic,
0.05 mg/l instantaneous maximum.
4. A joint EPA/DEC public notice was mailed to
each of the approximately 446 1984 permittees in late
January, 1985. This notice was published beginning in
February of 1985. The notice announced among other
things, the state’s intent to consider certification of the
modified draft permit pursuant to Section 401 of the
Clean Water Act.
5. A joint EPA/DEC public notice was mailed to
each of the approximately 93 1985 permit applicants in
February, 1985. This notice announced, among other
things, the state’s intent to consider certification of the
1985 draft permit pursuant to Section 401 of the CWA.
6. Public hearings were held by EPA on the draft
permits in March of 1985. At these hearings DEC testified
that it believed that the .7/1.5 ml/1 settleable solids efflu-
ent limit in the draft permits was too lenient to be consis-
tent with state water quality standards.
7. The state water quality standard for settleable
solids is no measurable increase above natural condi-
tions. The standard for turbidity is a level not to exceed 5
NTU above natural conditions. The standard for arsenic
is a level not to exceed .05 mg/l. See 18 AAC 70.020; 18
App. 47
AAC 80.050. There is also a provision for a “mixing zone”
in the state water quality regulations. 18 AAC 70.032.
8. In a meeting on or about March 15, 1985 DEC
notified the Executive Director of the Alaska Miners
Association, Jim Jinks, and the Trustees for Alaska
(“TFA”) attorney, Eric Smith, that the state was consider-
ing certification of a .2 ml/1 settleable solids effluent
limitation.
9. On March 30, 1985 at the annual mining conven-
tion in Fairbanks, Alaska, DEC Commissioner William
Ross, in his formal address to the State’s placer miners,
stated that DEC intended to certify the draft permit at a .2
ml/1 settleable solids effluent limitation.
10. On approximately April 29, 1985 DEC sent its
Certificate of Reasonable Assurance with a cover letter to
EPA. Exhibit 23. This CRA was applicable both to the
modified permits for the 446 placer mining discharges
which were permitted in 1984 and also to the permits for
the 93 placer mining discharges which were to be permit-
ted in 1985. The CRA stated that public notice of the
application for the certification had been made in accor-
dance with 18 AAC 15.180. The CRA stated that DEC
certifiéd that there was reasonable assurance that the
proposed activity was in compliance with the require-
ments of Section 401 of the CWA which includes the
Alaska Water Quality Standards and the standards of the
Alaska Coastal Management Program provided that the
instantaneous maximum settleable solids effluent limita-
tion was .2 ml/1.
11. At the request of the Alaska Miners Association,
DEC held back delivery of the Certificate of Reasonable
App. 48
Assurance (“CRA”) to EPA in order to give the Associa-
tion additional time to comment on the .2 ml/1 effluent
limit.
12. The inclusion by DEC of the .2 ml/1 settleable
solids effluent limit in the CRA was not the result of any
agreement or collusion between DEC and any other party.
13. Following the receipt of DEC’S CRA, EPA mod-
ified the draft permits to include the .2 ml/1 limit. DEC
did not request in its CRA any change to the 5 NTU
instantaneous maximum as an effluent limitation for tur-
bidity or to the 0.05 mg/! instantaneous maximum as an
effluent limitation for arsenic.
14. A number of parties timely filed requests for
adjudication of DEC’s certification pursuant to 18 AAC
05.200. These requests were consolidated into one
proceeding. .
15. The Deciding Officer denied a motion for stay of
the .2 ml/1 limit in a decision rendered in June, 1985. The
Deciding Officer subsequently denied a motion by the
Miners Advocacy Council (“MAC”) to overturn the certi-
fication as an impermissably promulgated regulation in a
decision rendered in November, 1985. The Deciding Offi-
cer also denied a motion by TFA for partial summary
judgment in which TFA argued that DEC was required to
perform its certification on a site-specific basis.
16. An administrative hearing was held in this mat-
ter in Fairbanks on February 3-6, 1986. At this hearing the
Deciding Officer announced that he would reconsider
TFA’s motion for partial summary judgment. The Decid-
ing Officer also announced that he would treat a motion
App. 49
for summary judgment submitted by MAC on the issues
of “review of specific forms” and “agreement” as a
motion made in the context of the hearing and not as a
pre-hearing motion.
17. The minimum detectable level for settleable
solids using the Imhoff cone test is approximately .1 ml/1.
18. Virtually all placer miners who treat their efflu-
ent utilize settling ponds as the main treatment method.
19. To meet the permit’s instantaneous maximum
settleable solids effluent limitation of .2 ml/l, miners
must, at a minimum, use properly designed, constructed
and maintained settling ponds.
20. Properly designed, constructed and maintained
settling ponds will generally produce effluent with settle-
able solids concentrations of less than or equal to .1 ml/1.
Properly designed, constructed and maintained settling
ponds will result in in-stream settleable solids concentra-
tions of less than .1 ml/1.
21. Placer miners who meet the instantaneous maxi-
mum of .2 ml/1 settleable solids effluent limit will have
in-stream settleable solids levels of less than .1 ml/1.
22. The draft permit’s excess water bypass and out-
of-stream settling pond requirements result in reduced
water usage, increased treatment efficiency and increased
amount of fresh water available for in-stream dilution,
thereby increasing the assurance that the mining opera-
tion will meet state water quality standards.
23. The instantaneous maximum of .2 ml/1 settle-
able solids effluent limit is close to the minimum detect-
able level for settleable solids. If one takes into account
App. 50
that this is an instantaneous maximum and if one makes
an allowance for stream water dilution and infiltration
dilution, the resultant in-steam settleable solids increase
will be below the .1 ml/l minimum detectable limit.
24. Dilution ratios of effluent to receiving water of
1:1 to 1:9 are typical for Alaska placer mining operations.
25. It is reasonable to assume that there will be
fresh water surface infiltration and fresh water subsur-
face infiltration prior to the discharge of the effluent from
a settling pond into a stream.
26. Stream flow, soil characteristics, amount of pay-
dirt moved, effluent flow and other site characteristics
can vary greatly at a single site over time. In particular,
stream flow and effluent flow values can vary greatly
over short periods of time and throughout a mining
season.
27. The accurate measurement of such matters as
stream flow, effluent flow, turbidity, arsenic concentration
specific gravity and other water quality parameters
requires the use of complex scientific methods and equip-
ment. For such measurements to be reasonably accurate
they must be conducted by persons properly trained in
water quality analysis techniques.
28. Virtually no placer miners possess or use in-
stream flow gauges, effluent flow gauges, turbidometers
or other equipment which is needed to accurately mea-
sure stream flow, effluent flow, turbidity, and other water
quality parameters.
29. Because of the lack of expertise, training and
proper equipment, the vast majority of placer miners are
App. 51
unable to provide reliable data on almost any water qual-
ity or quantity parameter other than settleable solids. One
cannot obtain accurate stream and effluent flow data by
“eyeballing” or “guessing” the flow volume or flow ratio.
30. The NPDES permit applications, also known as
the Short Form C applications, and the Tri-Agency appli-
cations are forms filled out by the miners and these forms
do not contain sufficient information to permit proper
site-by-site certification by DEC. Both applications lack
effluent water quality information, background water
quality information and meaningful stream flow and
effluent flow information. The flow data provided by the
miners in these two applications is based upon an “eye-
ball guess” and is unreliable. The data contained in the
Short Form C applications and the Tri-Agency applica-
tions is not field checked for accuracy.
31. The 539 permitted mine sites are generally
located in remote areas of the state, and access to the sites
is often limited and expensive.
32. Virtually no verified stream flow data, effluent
flow data, pollutant concentration data, or turbidity data
exists for the numerous streams on which placer mining
activity is permitted.
33. Development by DEC of reliable site-specific
stream flow data, effluent flow data, pollutant concentra-
tion data and turbidity data would be extremely expen-
sive and time consuming.
34. DEC does not currently have the staff and the
budget to reliably certify in a timely manner 539 placer
mining permits on a site-by-site basis.
App. 52
35. Settleable solids, turbidity and arsenic constitute
different and distinct water quality parameters. For
example, settleable solids and turbidity are measured
through different tests and cause different impacts on
aquatic systems. Even if one lowers settleable solids
levels below the minimum detectable limit, one may still
have extremely high turbidity levels due to the small
particles which remain suspended in the water column.
The elimination of settleable solids altogether would still
not assure that in-stream turbidity levels would be in
compliance with state water quality standards.
II. Analysis
In this adjudication proceeding, the burden of proof
and the burden of going forward with the evidence is on
the requestors. See 18 AAC 15.270(c). For purposes of
analysis there are three main categories of argument pre-
sented by the requestors in this proceeding: (1) The argu-
ment that there were deficiencies in connection with the
public notice and other procedural items related to the
state’s certification decision in this matter; (2) the argu-
ment that the State’s certification decision was the prod-
uct of an “agreement” between the State and
environmental groups and thus void; and (3) the argu-
ment that the effluent limit of .2 ml/1 for settleable solids
was improperly arrived at and will not assure compliance
with state water quality standards. Each of these three
categories of argument is discussed below.
App. 53
A. Procedural Issues
1. Procedural requirements for a “regulation”
MAC has earlier argued in the course of these pro-
ceedings that the .2 ml/1 effluent limit for settleable
solids which was certified by the state-was really a regu-
lation. MAC has argued that, since the .2 ml/1 effluent
limit was a regulation, the limit was invalid because DEC
did not comply with the procedural requirements set
forth in the statutes for the enactment of a regulation.
In an order dated November 6, 1985 the Deciding
Officer rejected MAC’s argument and concluded that the
effluent limit was not a regulation but rather part of a
certification action by the state. That earlier order is
confirmed by the Deciding Officer.
2. Public Notice
Several requestors have argued that the State did not
give proper notice to the 1984 NPDES permittees that the
state intended to certify the 1985 modified draft permits
on anything other than the revised turbidity and arsenic
effluent limitations proposed by EPA. The requestors also
argue that the state lacked the legal authority to certify
the modified 1985 draft NPDES permits at all because the
state had earlier waived certification of the 1984 draft
NPDES permits. Alternatively, it is argued that the state
could at most certify the limitations for turbidity and
arsenic which had been modified by EPA. The Deciding
Officer rejects these arguments.
The requirements for public notice by the state in
certification actions are set forth in 18 AAC 15.140. That
App. 54
regulation provides that public notice of the certification
application will be published jointly with notice of pro-
posed action by EPA.
The joint EPA/DEC notice with regard to the 1985
modified draft permits was published and it stated as
follows:
State Certification. This notice will also serve as
Public Notice of the Intent of the State of
Alaska, Department of Environmental Conser-
vation to consider certifying that the subject
discharges will comply with the applicable pro-
visions of Sections 208(e), 301, 302, 303, 306 and
307 of the Clean Water Act. The NPDES permits
will no [sic] be issued until the certification
requirements of Section 401 have been met.
Exhibit 20, p.2. The notice also set forth a 30 day period
for comments by the public on the topic of state certifica-
tion and provided an address for the sending of such
comments.
Nothing in the public notice indicates that the state
intended to certify compliance of the discharges only
with the arsenic and turbidity water quality standards.
By its very terms the notice declares that the state
intended to conduct a CWA § 401 certification. Such a
certification means that the state must evaluate whether
or not the modified draft permits from EPA reasonably
assure that there will be compliance with all applicable
state water quality standards.
The public notice thus complied with the require-
ments of 18 AAC 15.140 and gave legal notice of the state
certification action with regard to the modified permits. It
should also be noted that there was, in addition to the
App. 55
legal notice, abundant actual notice to the mining com-
munity that the state intended to review for certification
purposes the entire modified draft permit and not just the
modified turbidity and arsenic limitations.
The requestors next argue that, even if the state com-
plied with the public notice requirements for its certifica-
tion action, the state was barred from reviewing all or
part of the modified draft permits because it had earlier
waived certification of the 1984 draft permits. The reques-
tors do not cite any supporting authority for this
argument.
The CWA states that EPA must provide the state an
opportunity to grant, waive, or deny certification of any
draft NPDES permit. There is no provision that states that
if EPA submits a modified draft permit to the state for
certification, that the state cannot review the permit if it
earlier waived certification or that it can review only the
modified portion of the draft permit for certification pur-
poses. When the state received the modified draft permits
in 1985, it was obligated to perform its certification func-
tion based on the information it had available to it in
1985. The state’s earlier action in 1984 did not constitute a
bar or a waiver to its taking such certification action in
1985.
3. Public Hearing
One requestor, Kenneth Manning, has argued that
DEC was required to have an additional public hearing.
His argument is that AS 46.03.070 requires a public hear-
ing before DEC may adopt pollution standards. Since the
effluent limitation of .2 ml/1 for settleable solids is a
App. 56
“standard”, argues Mr. Manning, DEC should have held a
public hearing on this proposed “standard.” The Decid-
ing Officer rejects this argument.
In the first place, the effluent limitation of .2 ml/1
which was certified by DEC for settleable solids was not a
“standard” as that term is used in AS 46.03.070. The .2
ml/1 effluent limitation was a limitation for these particu-
lar NPDES permits only. The limitation was not a pollu-
tion standard generally applicable to all the waters of the
state.
No special hearing was required under state or fed-
eral law to review the certification of the draft NPDES
permits by the State. There was the joint EPA/DEC public
hearing that was in part a public hearing on the state
certification issue. Once the state formulated its certifica
tion decision, however, it was not necessary that the state
then have a public hearing to discuss this formulated
decision. Such an extra layer of hearings in the event that
state makes any changes to the limitations in the EPA’s
draft permit is simply not required by law. A permittee
can provide input to the state certification process at the
joint public hearing. A permittee can also request an
adjudicatory hearing from the state after the receipt of his
permit. There is no requirement that the state afford an
additional hearing at the time that it is proposing to
certify a different effluent limit from that included by
EPA in its draft permit.
4. Timeliness of Certification
One requestor, Ron Rosander, has argued that the
state’s failure to certify the draft 1985 NPDES permits in a
App. 57
timely manner constitutes a waiver of its right to certify.
His argument is as follows. The state was given a 60 day
time period by EPA for certification. The state was told by
EPA that it would be deemed to have waived its right to
certify unless the certification right was exercised within
60 days of receipt of the EPA letter which accompanied
the draft permits. The state transmitted its Certificate of
Reasonable Assurance to EPA on or about April 29, 1985.
This date was more than 60 days after the state received
the draft permits from EPA, and so the state should be
held to have waived its certification right. The Deciding
Officer rejects this argument.
The state did in fact apparently communicate its deci-
sion to EPA about certification more than 60 days after its
receipt of the draft permits. EPA incorporated the revised
effluent limitation from the state’s certification into the
final NPDES permits for 1985. There was no testimony or
other evidence as to why EPA acted as it did in this.
matter. EPA may have decided that it was appropriate to
relax the strict time requirement in this case. The party
with the burden of proof clearly has the responsibility to
develop the record in this regard, and such development
was not done.
This argument is really one which would more
appropriately be made to the EPA than to the state. Mr.
Rosander is arguing that EPA should not have acted as it
did in agreeing to modify the permits. A challenge to the
appropriateness of EPA’s action should be brought before
that federal agency. The Deciding Officer is not in a
position to review the appropriateness of EPA's actions in
this matter, even if there were sufficient evidence on this
point in the record.
App. 58
The certificate of reasonable assurance issued by the
state is not rendered void by the timeliness argument.
5. Specific References in Certification
One requestor, Ron Rosander, has argued that the
State’s failure to cite specific CWA or state law references
in connection with its change in the effluent limitation for
settleable solids renders the state certification void. The
argument is as follows. Federal regulations require that
state certification be in writing and, where more stringent
than the conditions in the EPA draft permit, that the
certification cite the CWA or state law references upon
which that condition is based. Since the state did not cite
the CWA or state law references, argues Mr. Rosander,
the certification action by the state is void. The Deciding
Officer rejects this argument.
The Certificate of Reasonable Assurance (“CRA”)
submitted to EPA by DEC states as follows:
Having reviewed the application an (sic) com-
ments received in response to the public notice,
the Alaska Department of Environmental Con-
servation certifies that there is no reasonable
assurance that the proposed activity, as well as
any discharge which may result, is in compli-
ance with the requirements of Section 401 of the
Clean Water Act which includes the Alaska Water
Quality Standards, 18 AAC 70, and the standards of
the Alaska Coastal Management Program, 6 AAC
80, provided that the instantaneous maximum settle-
able solids effluent limitation be 0.2 milliters per
liter. (emphasis added)
The cover letter from DEC which accompanied the
CRA set forth at page 2 the citation of 18 AAC 70.020(b)
App. 59
and noted the requirement that there be “no measurable
increase in concentrations of sediment above natural con-
ditions.” See Exhibit 23. _
The Deciding Officer concludes that the state certi-
fication did cite the relevant C.W.A. or state law refer-
ences upon which the .2 ml/1 effluent limitation was
based. Moreover, this argument again is one which is
more appropriately made to EPA than to the state since it
involves an allegation that EPA should not have changed
the effluent limitation for settleable solids in the permits
upon receipt of the state’s certificate of reasonable assur-
ance. The fact is that EPA did modify the permits. If a
requestor believes that EPA acted improperly, then such
an argument should be raised before EPA.
B. The Agreement Argument
One of the requestors, MAC, has argued that DEC
entered into an agreement with various environmental
groups to certify the effluent limit for settleable solids at
.2 ml/1, and that such an agreement constitutes an abuse
of discretion and invalidates the certification decision by
the State. The Deciding Officer rejects this argument.
The evidence in this proceeding indicates that the
inclusion of the .2 ml/I settleable solids effluent limita-
tion into the CRA was not the result of any agreement
between the State and various interest groups. The
requestors have not produced credible evidence that any
such agreement existed. The testimony of Randolph
Bayliss and Randall Rodgers establishes that there was
not any such agreement.
App. 60
It is not at all clear that the effluent limitation of .2
ml/1 for settleable solids would be subject to successful
attack even if it were shown to be the product of an
agreement between the State and certain parties. There
would still seem to be the fundamental question as to
whether the limitation was an appropriate and reasonable
one. It is unnecessary for the Deciding Officer to reach
this question, however, because MAC has not sustained
its burden of proof with regard to establishing the propo-
sition that the effluent limitation for settleable solids was
reached as the result of an agreement between DEC and
environmental groups.
C. .2 ml/l As An Effluent Limitation
1. Did DEC Consider Improper Factors in Certifying the
NPDES Permits?
The argument has been made that DEC based its
certification decision on the economic and physical
attainability of the .2 ml/1 effluent limitation for settle-
able solids, and that such a basis for its decision was
improper. The Deciding Officer concludes that DEC did
not base its certification decision on the economic and
physical attainability of the effluent limit.
The testimony of Randolph Bayliss was that the eco-
nomic and physical attainability of the .2 ml/! effluent
limitation was not the basis for certification by DEC.
Transcript, Vol. 3, p. 252-253. This testimony is both cred-
ible and persuasive.
TFA has argued that the cover letter to EPA which
accompanied DEC’s CRA discussed the physical and eco-
nomic attainability of the .2 ml/1 effluent limitation, and
App. 61
that this portion of the letter gives the actual rationale for
the certification decision by DEC. This argument is not
supported by the factual evidence in the case. The evi-
dence indicates that the comments in DEC’s cover letter
which pertained to physical and economic attainability
were included as a matter of general or incidental inter-
est. The .2 ml/1 effluent limitation was, in the opinion of
DEC, needed to provide reasonable assurance of compli-
ance with water quality standards.
2. Site-Specific Analysis
A number of the requestors have argued that certi-
fication of a permit for placer mining must be made on a
site-specific basis. Since there was no site-specific anal-
ysis underlying the state’s certification in this matter, the
requestors argue that the certification is invalid. The
Deciding Officer rejected this argument when it was sub-
mitted as a motion for partial summary judgment prior to
the hearing in this case, and the Deciding Officer again
rejects the argument.
There is no requirement in either federal or state law
that DEC perform a site-by-site evaluation of each placer
mining operation in the state before any certification
takes place. While a site-by-site analysis is certainly not
precluded by law, it is not the only valid approach which
DEC could follow in the certification process.
It is relevant in evaluating the site-specific proposal
to note that such a certification process would be, in
practical terms, extremely difficult if not impossible to
perform. DEC does not possess the necessary site-specific
information, nor the staff to gather such information for
App. 62
the 539 placer mining sites in the state. It is not a viable
option to require a site-by-site analysis based on informa-
tion supplied by the individual placer miners. The Decid-
ing Officer is convinced by the evidence presented at the
hearing that such information would for the most part be
“guesses” by the individual miners and thus inherently
unreliable. To require meaningful site-specific analysis by
DEC prior to certification would mean that DEC would
either have to waive certification or obtain a lengthy
extension of time from EPA within which to make the
certification decision.
The Deciding Officer is convinced that a meaningful
certification decision can be made by DEC without a site-
specific analysis of each mining siie. If DEC can give a
reasonable assurance that an activity will be conducted in
a manner which will not violate water quality standards,
then a proper certification has been performed. Whether
the actual approach used by DEC satisfies the require-
ments of reasonable assurance is discussed infra in Sec-
tion C(4).
3. Review of NPDES Permit Applications and Tri-
Agency Forms
An argument is made by the requestors that the
failure of DEC to review the NPDES permit applications
and the state Tri-Agency forms renders DEC’s certifica-
tion decision invalid. The argument seems to be that
these forms had meaningful site-specific information
which would allow DEC to perfortn a site-by-site anal-
ysis, and that for DEC to fail to review such information
App. 63
renders its certification -decision invalid. The Deciding
Officer does not think this argument has merit.
The NPDES permit application, which is also known
as the “Short Form C”, and the Tri-Agency form do not
provide sufficient meaningful information to allow DEC
to perform a site-specific analysis. The Short Form C is
filled out by the miner and the accuracy of the informa-
tion on the form is questionable. The data is not field-
checked for accuracy, and the data does not provide
sufficient information to calculate water quality. The
information on the Tri-Agency form is no more helpful or
reiiable.
The Deciding Officer has already determined that a
site specific analysis is not required before the DEC’s
certification action. There is no valid reason why a certi-
fication decision should be invalid simply because DEC
did not review two general forms which had been sub-
mitted by the miner. Certainly, the failure to review gen-
eral forms does not by itself render a certification
decision arbitrary or capricious.
4. Reasonableness of .2 ml/las an Effluent Limitation for
Settleable Solids
An argument has been made that an effluent limita-
tion of .2 ml/I1 for settleable solids will not provide rea-
sonable assurance of compliance with water quality
standards. The Deciding Officer does not think that any
requestor has sustained its burden of proof on this issue,
and consequently this argument is rejected.
App. 64
The evidence indicates that, to meet the permit’s .2
ml/1 limit, a miner must use a properly designed, con-
structed and maintained settling pond. The evidence also
indicates that such a settling pond will produce effluent
with settleable solids concentrations of .1 ml/I or less.
Furthermore, a placer miner who meets the .2 m1/] settle-
able solids effluent limit will have in-stream settleable
solids levels of less than .1 ml/1, which is the minimum
detectable limit. Such a level of settleable solids clearly
satisfies the state water quality standard of “no measur-
able increase.”
The .2 ml/I effluent limitation is very close to the
minimum detectable level for settleable solids. If one
takes into account the excess water bypass provision in
the draft permit as well as the out-of-stream settling pond
requirement, the .2 ml/] limitation is a reasonable limita-
tion. If one further takes into account in-stream dilution
and increased treatment efficiency, the .2 ml/1 limitation
becomes even more reasonable as a limitation which will
assure compliance with water quality standards.
One can make additional observations about the
appropriateness of the .2 ml/I limitation. There will be
some infiltration dilution in placer mining operations.
Furthermore, the .2 ml/1 limitation is an instantaneous
maximum. That is, the effluent can never exceed .2 ml/]
at any time during the operation of a mining site. It is
reasonable to assume that the effluent quality for settle-
able solids will generally be below .2 ml/] rather than
right at .2 ml/1.
When these assumptions are made, and the evidence
presented at the hearing indicates that these assumptions
App. 65
are in fact reasonable ones, the .2 ml1/I effluent limitation
for settleable solids clearly is a reasonable one. The evi-
dence indicates that DEC is able to say with confidence
that such a limitation will reasonably assure compliance
with water quality standards.
TFA has argued that if one does not do a site-specific
verification for settleable solids in effluent, then only an
effluent limit of .1 ml/1 will assure compliance with water
quality standards. The assumptions underlying such an
approach are not reasonable. While .1 ml/1 will by defini-
tion assure that in every case there is no measurable
increase in settleable solids concentrations above natural
background, it is not necessary for the limitation to be
that low to reasonably assure no measurable increase.
TFA’s argument assumes a worst case scenario in every
case and ignores some reasonable assumptions about
dilution, pond performance, and instantaneous maxi-
mums. The evidence presented at the hearing indicates
that TFA’s argument is not correct when applied to the
real world and actual mining sites.
Dilution, instantaneous maximum considerations,
actual performance of settling ponds - all these factors
help to insure that the .2 ml/I limitation will assure
compliance with the water quality standards. TFA has
argued that if the effluent limitation is not at .1 ml/I or
lower, then it is possible under some circumstances tha
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.