Petition for Writ of Certiorari — Alton Packaging Corp. v. Pollution Control Board
Supreme Court brief1988
Ask Donna
What actually matters in this document.
Text
88-2590
8 8 at 2 K y Supreme Court, U.S.
REIL ED
JUL 5 1888
In The
CLERK
F. SPANTOL, JR.
Supreme Court of the United
@ctober Term, 1987
ALTON PACKAGING CORPORATION,
Petitioner,
POLLUTION CONTROL BOARD
and
ENVIRONMENTAL PROTECTION AGENCY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI
TO THE SUPREME COURT OF
THE STATE OF ILLINOIS
RICHARD J. KISSEL
JEFFREY C. Fort
(Counsel of Record)
DANIEL F.. O’CONNELL
GARDNER, CARTON & DouGLas
321 North Clark Street
Chicago, Illinois 60610-4795
(312) 644-3000
Attorneys for Petitioner
ALTON PACKAGING CORPORATION
July 6, 1988
Pandick Technologies, Inc., Chicago @ (312) 236-0200
QUESTION PRESENTED
This petition raises a question of whether the holder of
a State environmental permit is entitled to notice and an
opportunity to be heard, under the due process clause of the
Fourteenth Amendment to the United States Constitution,
before the State denies renewal of its permit.
QUEDTHON PUTT 6 66a ce ONSET Awe i
FARe Cie Ce & 6 65 0 Sh eae eae iii
TABLE OF AUTHORITIES ................... iii
OPINIONS AND DECISIONS BELOW ............ 1
Pt os re me ree ry ee are 2
STATUTES AND CONSTITUTIONAL PROVI-
es Oe VOTED 688d cw 0 ee eee een 2
STATEMENT OF THE CASE................... 4
REASONS FOR GRANTING THE WRIT .......... 8
COMNCAARIS 5 bene su el bee ee es 15
APPENDICES
A. Grant of Stay Pending Appeal by the
Supreme Court of the State of Illinois. .... a-1
B. Order of the Supreme Court of the State of
Tinela, AgeG F, Sies «6s cu ba aa es b-1
C. Opinion of The Appellate Court of Illinois,
Fifth District, September 25,1987 ........ c-1
D. Order of The Pollution Control Board, June
20, 1006 3. os iste eae eee d-1
TABLE OF CONTENTS
Decision of The Pollution Control Board,
Agel; 36, SHG oc sc ee ees e-1
li
TABLE OF AUTHORITIES
Cases: Page
Alton Packaging Corp. v. Environmental Protection
Agency, PCB 85-145 (April 24, 1986) ............ 6
Alton Packaging Corp. v. Pollution Control Board and
Environmental Protection Agency, 162 Ill. App. 3d
ee ee 7,14
American Trucking Asso. v. United States, 326 U.S.
CSU a LEN Ga 60 bk eee chester esse 14
Anniston Mfg. Co. v. Davis, 301 U.S. 337 (1937) .... 14
Armstrong v. Manzo, 380 U.S. 545 (1965) ..... 8, 9,13
Arnett v. Kennedy, 416 U.S. 134 (1974) ............ 8
Barry v. Barchi, 443 U.S. 55 (1979) .............. 8
Bell v. Burson, 402 U.S. 535 (1971) ........... 8,12
Board of Regents v. Roth, 408 U.S. 564 (1972) ...... 10
Brinkerhoff-Faris Trust & Saving Co. v. Hill, 281 U.S.
REE PO ee ee ee ee ee ae 9
Buchalter v. New York, 319 U.S. 427 (1943) ........ g
Covey v. Somers, 351 U.S. 141 (1956) ............ 12
Environmental Protection Agency v. Pollution Control
Board, 115 111.2d 65, 503 N.E.2d 343 (1986) ....... 7
Environmental Protection Agency v. Pollution Control
Board, 118 Ill. App. 3d 772, 455 N.E.2d 188
Ah iggy Sn aD So may oP oes ae rae 14
ili
Cases: Page
Environmental Protection Agency v. Pollution Control
Board and Waste Management, Inc. 138 Ill. App. 3d
550, 486 N.E.2d 293 (1986), aff’d 115 Ill.2d 65, 503
PE ee ire rei Vives 00 dca 7
Fuentes v. Shevin, 407 U.S. 67 (1972) .......... 8, 12
Galvan v. Press, 347 U.S. 522 (1954) ............. 4
Georgia Power Co. v. Decatur, 281 U.S. 505 (1930) ... 9
Goldberg v. Kelly, 397 U.S. 254 (1970) .......... 8,9
Goss v. Lopez, 419 U.S. 565 (1975) .............. 12
Hewitt v. Helms, 459 U.S. 460 (1982) ............ 11
Home Telephone and Telegraph Co. v. Los Angeles,
ee 9
In Re Estate of Levin, 135 ll. App.3d 386, 482 N.E.2d
I 8 Wil WS is Cr A kl i wads wee wake 13
Kwong Hai Chew v. Colding, 344 U.S. 590 (1953) .... 9
Lichter v. United States, 334 U.S. 742 (1948) ........ 9
Martell v. Mauzy, 511 F. Supp. 729 (1981) ...... 9,11
Mathers v. Pollution Control Board, 107 Ill. App.3d
Vay SED Ee See TED oo ct viascnccscceses 9
Mathews v. Eldridge, 424 U.S. 319 (1976) ....... 8, 10
Miller v. City of Mission, Kansas, 705 F.2d 368, 372
Ns Sen Sie te ew ate le aie ae ate x 14
Missouri ex rel Hurtwitx v. North, 271 U.S. 40
Sais 6M uh eee eae ee se ee te oe 13
iv
Cases: Page
North Alabama Express, Inc. v. United States, 585 F.
94 TEB Gite Clr. BBGT) occ ccc cc ewcccscccenn 13
Perry v. Sindermann, 408 U.S. 593 (1972) ......... - 10
Phillip Wagner, Inc. v. Leser, 239 U.S. 207 (1915) .... 9
Robinson v. Hanrahan, 409 U.S. 38 (1972) ........ 13
Roller v. Holly, 176 U.S. 398 (1900) ............. 13
Shaughnessy v. United States, 345 U.S. 206 (1953) .... 9
United States v. Storer Broadcasting Co., 351 U.S. 192
CURRED kpc ones ok 5a ses bP ee eae 18
CONSTITUTIONAL AND STATUTORY
PROVISIONS
UG Gee, Mee. ee, BE isch ccs ced asécesnes 2
Environmental Protection Act, Ill. Rev. Stat., ch. 111
E> Ff Pere ecr ee Ce eee 5, 8
Environmental Protection Act, Section 4(g), Ill. Rev.
Stat. da. 111 1B, FIGS) .. ccc cccccccssacecs 5
Environmental Protection Act, Section 31(d), fll. Rev.
Seat. da. 111 179, SIGS .. ccc ccccccces 6,13
Environmental Protection Act, Section 39, Ill. Rev.
Stat., ch. 111 1/2,§1089 ............ 3, 5, 7, 10, 11
Environmental Protection Act, Section 40, Ill. Rev.
ee Bite) & 5 rere re 4, 5, 6, 7
Environmental Protection Act, Section 41(a), Ill. Rev.
Stat... ch. 111 1/2, $1041(e) .. 2... cece cc cccens 5
Illinois Administrative Code Title 35, Section
DOR Se 6'0s.6 60464 OG 5 eee as ans
DORMS cecocccccccasssbcesbbaséaenecneds
Illinois Administrative Code Title 35, Section
DEES ccc cee de cates eeen sekes aedu beet
Iu The
Supreme Court of the Hnited States
@ctober Term, 1987
ALTON PACKAGING CORPORATION,
Petitioner,
v.
POLLUTION CONTROL BOARD
and
ENVIRONMENTAL PROTECTION AGENCY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI
TO THE SUPREME COURT OF
THE STATE OF ILLINOIS
Petitioner’ seeks a writ of certiorari to review an order
of the Supreme Court of the State of Illinois in which it
denied Alton’s Petition for Leave to Appeal from the IIli-
nois Appellate Court, Fifth District and an order of the
Dlinois Appellate Court.
OPINIONS AND DECISIONS BELOW
The Order Granting Stay Pending Appeal by the
Supreme Court of the State of Illinois is reprinted at page
‘Alton Packaging Corporation has been merged into Jefferson
cly traded corporation. Jefferson
Smurfit is affiliated with the Smurfit Group Limited and Con-
tainer Corporation of America.
1
a-1 of the Appendix. The order of the Supreme Court of
the State of Illinois denying petition for Leave to Appeal,
No. 66437, is reprinted at page b-i of the Appendix. The
opinion of the Illinois Appellate Court, Fifth District, No.
5-86-0477, affirming the decision of the Pollution Control
Board is reprinted beginning at page c-1 of the Appendix.
The opinion of the Pollution Control Board, PCB 85-145,
affirming the August 27, 1985 denial by the Environmen-
tal Protection Agency of application for renewal of an oper-
ating permit for its Alton Mill is reprinted beginning at
page e-1 of the Appendix. The order of the Ilinois Poll-
ution Control Board denying motion for reconsideration is
reprinted at page d-1 of the Appendix.
JURISDICTION
The order of the Supreme Court of the State of Illinois
dexying Alton’s motion for leave to appeal was rendered
Apr: 7, 1988. The jurisdiction of this court is invoked
under 28 U.S.C. §1257(3). This court has jurisdiction over
this matter because the petition seeks review of the final
judgment of the highest Illinois court in which relief can
be had, and because the validity of Section 40 of the Envi-
ronmental Protection Act is challenged on the basis that it
is repugnant to the Constitution of the United States.
STATUTES AND CONSTITUTIONAL
PROVISION INVOLVED
Fourteenth Amendment to the United States Constitution:
Section 1. All persons born or naturalized
in the United States, and subject to the jur‘sdic-
tion thereof, are citizens of the United States and
of the State wherein they reside. No State shall
make or enforce any law which shall abridge the
privileges or immunities of citizens of the United
States; nor shall any state deprive any person of
life, liberty, or property, without due process of
law; nor deny to any within its jurisdiction
to equal protection of laws.
2
Se
Ill. Rev. Stat., ch. 111 1/2, § 1039(a) (1987):
(a) When the Board has by regulation
required a permit for the construction, installa-
tion, or operation of any type of facility, equip-
ment, vehicle, vessel, or aircraft, the applicant
shall apply to the Agency for such permit and it
shall be the duty of the Agency to issue such a
permit upon proof by the applicant that the facil-
ity, equipment, vehicle, vessel, or aircraft will not
cause a violation of this Act or of regulations here-
under. The Agency shall adopt such procedures as
are necessary to carry out its duties under this
Section. In granting permits the Agency may
impose such conditions as may be necessary to
accomplish the purposes of this Act, and as are
not inconsistent with the regulations promulgated
by the Board hereunder. Except as otherwise pro-
vided in this Act, a bond or other security shall not
be required as a condition for the issuance of a per-
mit. If the Agency denies any permit under this
Section, the Agency shall transmit to the appli-
cant within the time limitations of this Section
specific, detailed statements as to the reasons the
permit application was denied. Such statements
shall include, but not be limited to the foliowing:
(i) the Sections of this Act which may be
violated if the permit were granted,
(ii) the provision of the regulations, pro-
mulgated under this Act, which may be violated if
the permit were granted;
(iii) the specific type of information, if any,
which the Agency deems the applicant did not pro-
vide the Agency; and
(iv) astatement of specific reasons why the
Act and the regulations might not be met if the
permit were granted.
If there is no final action by the Agency
within 90 days after the filing of the applica-
tion for permit, the applicant may deem the per-
mit issued; except that this time period shall be
extended to 180 days when (1) notice and oppor-
3
(CO OOOO ——vVvorrvcvcre
CO
,
tunity for public hearing are required by State or
federal law or regulation, or (2) the application
which was filed is for any permit to develop a
landfill subject to issuance pursuant to this sub-
section.
Ill. Rev. Stat., ch. 111 1/2, § 1040 (1987):
(a)(1) If the Agency refuses to grant or
grants with conditions a permit under Section 39
of this Act, the applicant may, within 35 days,
petition for a hearing before the Board to con-
test the decision of the Agency. The Board shall
give 21 day notice to any person in the county
where is located the facility in issue who has
requested notice of enforcement proceedings and
to each member of the General Assembly in whose
legislative district that installation or property is
located; and shall publish that 21 day notice in a
newspaper of general circulation in that county.
The Agency shall appear as respondent in such
hearing. At such hearing the rules prescribed in
Section 32 and 33(a) of this Act shall apply, and
the burden of proof shall be on the petitioner.
* * a
(d) In reviewing the denial or any condi-
tion of a permit issued by the Agency pursuant
to rules and regulations adopted under subsection
(d) or (e) of Section 9.1 of this Act, the decision of
the Board shall be based exclusively on the record
before the Agency including the record of the hear-
ing, if any, held pursuant to paragraph (f)(3) of
Section 39 unless the parties agree to supplement
the record.
STATEMENT OF THE CASE
This petition arises from the Environmental Protec-
tion Agency’s (the “Agency”) denial of an application for
renewal of the operating permit for the two main boil-
ers (the “Boilers”) used to operate the Alton Packaging
Corporation (“Alton”) Mill in Alton, Illinois. The permit
denial was subsequently affirmed by the Pollution Con-
trol Board (the “Board”) and the Illinois Appellate Court,
4
Fifth District. The petition arises from an order of the
Supreme Court of Illinois denying Alton’s petition for leave
to appeal.
The mill manufactures paperboard from recycled
paper. The mill employs over 350 people and produces in
excess of 600 tons of paperboard per day.
The Agency and the Board were established under the
Environmental Protection Act (the “Act”), Ill. Rev. Stat.,
ch. 111 1/2, $1001 et seg. (1987). Air emission sources
such as the Boilers are required to have a permit under
the regulations of the Board. Therefore, Section 39(a) of
the Act requires that Alton obtain an operating permit
from the Agency for the Boilers. Il. Rev. Stat., ch. 111
1/2, §§ 1004(g), 1039(a) (1987). Section 39(a) requires the
Agency to issue a statement of reasons in the event it
denies a permit. Section 40 provides for a Board review of
permit denials. The Board’s review must be based exclu-
sively upon the Agency record under Section 40 of the Act
as interpreted by the Illinois Courts. Il. Rev. Stat., ch. 111
1/2, § 1040 (1987). Section 41 provides for judicial review
of a Board Decision in the Illinois Appellate Court. IIl.
Rev. Stat., ch. 111 1/2, § 1041 (1987).
On January 25, 1983, Alton filed a routine application
with the Agency for renewal of the operating permit for the
Boilers. As the rules of the Board provide, this application
certified that the information supplied in previous success-
ful applications remained accurate. 35 Ill. Adm. Code,
§ 201.157.
The Agency did not rule on Alton’s application within
90 days as provided by Section 39(a) of the Act. Instead,
the parties agreed to postpone the decision on the permit.
Consequently, the Agency did not rule on the permit appli-
cation until August 27, 1985, at which time it denied the
permit. The denial was based on allegations that the Boil-
ers caused a violation of the sulfur dioxide air quality stan-
dard in Alton, linois in November, 1984.
5
Prior to the Agency’s August 27, 1985 denial of the
permit, Alton received no notice from the Agency that it
intended to act on the permit. On December 20, 1984,
the Agency completed an air quality bulletin in which the
Agency contended that Alton contributed to the alleged
November, 1984 violation. The bulletin was neither pub-
lished nor sent to nor received by Alton. An Agency study
completed in May, 1985 stated that the Boilers had been
the “likely cause” of the alleged November, 1984 violation.
On July 22, 1985, the Agency sent Alton a notice of
noncompliance regarding the alleged violations, along with
the May, 1985 study, and demanded that Alton respond
within fifteen (15) days. This notice is the first step of an
enforcement action under Section 31(d) of the Act. Ill. Rev.
Stat., ch. 111 1/2, § 1031(d) (1987). The notice did not in
any manner refer to the Agency’s intention to deny the
permit.
The Board’s Rules specifically require the Agency to
notify a permit applicant if the Agency believes an appli-
cation lacks sufficient information. 35 [1]. Adm. Code
201.158. Prior to the permit denial, however, the Agency
did not notify Alton that the Application contained insuffi-
cient information. When Alton filed its application, it
had no reason to believe that additional information was
required. In fact, Alton had no notice of the charges that
the Agency was making until it received the Agency’s
August letter denying the permit. Consequently, Alton
was provided with no opportunity to present evidence to
rebut the Agency’s charges prior to the August 27, 1985
permit denial.
Alton then filed an appeal with the Pollution Con-
trol Board pursuant to Il. Rev. Stat., ch. 111 1/2, § 1040
(1987). Alton Packaging Corp. v. Environmental Protec-
tion Agency, PCB 85-145 (April 24, 1986). In such an
appeal the applicant has the burden of proving to the Board
that its operations will not result in a violation of the Act
6
or the Board's rules. [1]. Rev. Stat., ch. 111 1/2, § 1040
(1987); Environmental Protection Agency v. Pollution Con-
trol Board, 138 Tll. App. 3d 550, 46 N.E.2d 293 (1985). Sec-
tion 40, as interpreted by the Illinois courts, requires that
the hearing in a permit appeal be based exclusively on the
record before the agency. Under this interpretation of Sec-
tion 40, Alton was given the limited opportunity to cross-
examine Agency witnesses to test the information relied
upon by the Agency, Environmental Protection Agency v.
Pollution Control Board (1986), 115 Ill. 2d 65, 503 N.E.2d
343, but was specifically denied the opportunity to present
evidence that was not part of the Agency record. Con-
sequently, Alton had no opportunity to present evidence
before the Board to refute the Agency’s charges. Since the
applicant bears the burden of proving its right to an oper-
ating permit, Ill. Rev. Stat. 1983, ch. 111 1/2, § 1039(a)
(1987), Alton was presented with the burden of proof for
an issue on which it was denied the opportunity to present
evidence. Based on the limited record, the Board affirmed
the denial.
Subsequently, Alton appealed the Board’s Decision to
the Appellate Court of Illinois, Fifth District. Alton Pac-
kaging Corp. v. Pollution Control Board and Environmen-
tal Protection Agency, 162 Ill. App. 3d 731, 561 N.E.2d 275
(1987). In its briefs and at oral argument, Alton argued
that the Board had erred in its interpretation of Section
40 and that under recent decisions a permit appeal to the
Board should not be restricted to the Agency record. The
Appellate Court rejected these arguments and held that
Section 40 restricted permit appeals solely to the record
before the Agency, even in a case such as Alton’s where
the applicant, prior to denial, had been given no notice of,
and no opportunity to rebut or respond to, the basis for the
Agency’s action. The Appellate Court affirmed the Deci-
sion of the Board, finding that Alton had failed to meet its
burden of proof before the Board.
7
After a petition for rehearing was denied by the Appel-
late Court, Alton, on January 11, 1988 petitioned the
Supreme Court of the State of Illinois for Leave to Appeal.
The petition was denied on April 7, 1988, No. 66437,
prompting this petition for a writ of certiorari.
REASONS FOR GRANTING THE WRIT
A. Introduction
The Illinois Environmental Protection Act, Il. Rev.
Stat., Ch. 111 1/2, § 1001 et seq., in its provisions for the
issuance of environmental operating permits, violates the
permit applicant’s right to due process of law as guaran-
teed by the Fourteenth Amendment to the United States
Constitution. The Act denies due process because it allows
the State to take away or to refuse to renew permits with-
out sufficient notice and without an opportunity for a fair
hearing at a meaningful time and in a meaningful man-
ner. Barry v. Barchi, 443 U.S. 55 (1979); Mathews v.
Eldridge, 424 U.S. 319 (1976); Arnett v. Kennedy, 416 U.S.
134 (1974); Fuentes v. Shevin, 407 U.S. 67 (1972); Bell v.
Burson, 402 U.S. 535 (1971); Goldberg v. Kelly, 397 U.S.
254 (1970); Armstrong v. Manzo, 380 U.S. 545 (1965).
Permit holders such as Alton have a valuable prop-
erty interest in the continuation of their operating per-
mits, to which they have a claim of entitlement. Alton
was deprived of this property interest without notice and
without opportunity for a hearing. Thus, this Court should
grant this writ in order to prevent State agencies from arbi-
trarily depriving permit holders of their valuable property
interests in permits without due process of law.
On August 27, 1985, by a letter from the Agency,
Alton was denied an operating permit for the operation of
boilers essential to the viability of the Alton mill. Alton
was not notified of the forthcoming permit denial, or of the
reasons for the denial at any time prior to the denial let-
ter. The Agency denied Alton its operating permit without
providing notice or the opportunity for a hearing.
8
Moreover, the Agency’s failure to provide Alton with
due process of law prior to refusing to renew its operating
permit was not remedied by the post-deprivation opportu-
nity for a “hearing” before the Pollution Control Board.
That proceeding, in which Alton had the burden of prov-
ing its right to the permit, was limited to the record before
the Agency. Thus Alton was deprived of the opportunity
to present evidence to challenge the Agency’s findings and
carry that burden. Consequently, Alton was never given
an opportunity to present its side of the story through the
introduction of evidence to dispute the Agency’s charges.
B. Basic Requirements of Due Process
The due process Clause of the Fourteenth Amendment
prohibits a State from depriving a person of property with-
out reasonable notice and the opportunity for a fair and
impartial hearing at a reasonable time and in a reasonable
manner. Goldberg v. Kelly, 397 U.S. 254, 268 (1970); Arm-
strong v. Manzo, 380 U.S. 545, 552 (1965). These require-
ments apply to all agencies, departments, or officials of the
state, whether legislative, judicial, or executive, Buchal-
ter v. New York, 319 U.S. 427 (1943); Brinkerhoff-F aris
Trust & Saving Co. v. Hill, 281 U.S. 673 (1930); Georgia
Power Co. v. Decatur, 281 U.S. 505 (1930); Phillip Wagn.
er, Inc. v. Leser, 239 U.S. 207 (1915); Home Telephone &
Telegraph Co. v. Los Angeles, 227 U.S. 278 (1913), and to
administrative as well as to judicial proceedings. Galvan v.
Press, 347 U.S. 522 (1954); Shaughnessy v. United States,
345 U.S. 206 (1953); Kwang Hai Chew v. Coiding, 344 U.S.
590 (1953); Lichter v. U.S., 334 U.S. 742 (1948). Thus, the
requirements of due process apply to proceedings of the
Environmental Protection Agency and Pollution Control
Board. The Illinois Appellate Court and the United States
District Court for the Northern District of Illinois have so
held. Mathers v. Pollution Control Board, 107 [ll. App. 3d
729, 438 N.E.2d 213 (1982); Martell v. Mauzy, 511 F.Supp.
729, 739 (N.D.Il. 1981).
C. Protected Interest in Operating Permit
Procedural due process requirements apply whenever
governmental decisions infringe property or liberty inter-
ests protected by the Fourteenth Amendment. Mathews v.
Eldridge, 424 U.S. 319 (1976). Alton has such a property
interest in a government benefit. For the purposes of due
process, a property interest in a government benefit must
depend on more than a unilateral expectation, abstract
need, or mere desire. Rather, a person must have a
legitimate claim of entitlement to a specific benefit before
the Fourteenth Amendment’s protections apply. Board of
Regents v. Roth, 408 U.S. 564 (1972).
Persons holding a government permit pursuant to
specific State regulations have a claim of entitlement to
continuation of those permits. In the present case, Alton
has a legitimate claim of entitlement to the operating per-
mit for the Boilers. This entitlement was created and is
defined by the existing rules of the Pollution Control Board
and Section 39(a) of the Act. Ill. Rev. Stat., ch. 111 1/2,
§ 1039 (1987). See, 35 Ill. Adm. Code § 201.160. These
provisions set out specific objective criteria which, if met,
entitle an applicant to a permit.
The guarantees of due process attach in cases of
renewals of government benefits such as permits. This
case is analogous to that in Perry v. Sindermann, 408 U.S.
593 (1972), where the defendant had, without a hearing,
refused to renew the plaintiff’s expired one-year college
teaching contract, thereby refusing to grant the plaintiff a
new benefit identical to the expired one. This Court held
that despite the lack of a formal tenure policy, the plain-
tiff was entitled to prove the existence of a protected prop-
erty interest in his employment stemming from official pol-
icy statements and guidelines which implied some form of
tenure. The plaintiff was held to have a right to a hearing
“where he could be informed of the grounds for his non-
retention and challenge their sufficiency.” 408 U.S. at 603.
10
Here, as in Perry v. Sindermann, the operating per-
mit applicant sought a “new” benefit to supercede the “ex-
piring” benefit of the old operating permit. This does not,
however, foreclose Alton’s claim of entitlement to the oper-
ating permit. For here, as the Court said in Perry:
“property” interests subject to due process pro-
tection are not limited by a few rigid, technical
forms. Rather, “property” denotes a broad range
of interests that are secured by “existing rules or
understanding.” ... A person’s interest in a benefit
is a “property” interest for due process purposes
if there are such rules or mutually explicit under-
standings that support his claim of entitlement to
the benefit and that he may invoke at a hearing.
408 U.S. at 601.
Illinois law specifically establishes a permittee’s enti-
tlement to a renewed permit. Under Illinois law, a permit-
tee is entitled to renewal of its permit if certain objective
criteria are met; that is, if operation of the source will not
cause a violation of the Act or the Board’s regulations, the
Agency has a statutorily compelled “duty” to issue a per-
mit. Ill. Rev. Stat. ch. 111 1/2, § 1039 (1987) (“[I]t shall
be the duty of the Agency to issue such permit upon proof
that [the source] will not cause a violation of the Act or
of regulations hereunder.”) This Court has held that when
an agency has a duty to issue a permit based on specified
criteria, a protected interest arises under the Constitution.
Hewitt v. Helms, 459 U.S. 460, 470-72 (1982).
The United States District Court for the Northern Dis-
trict of Illinois has specifically held that a person holding
a permit under the Illinois Act has a protected property
interest in that permit. Martell v. Mauzy, 511 F. Supp. 729,
739 (N.D.II1. 1981). In Martell, the Agency denied plaintiff
an operating permit for a waste disposal facility under Sec-
tion 39(a) of the Act based solely on unadjudicated allega-
tions. The district court found that the plaintiff had been
denied an operating permit without being afforded due pro-
11
cess of law and held that he was entitled to an operating
permit until he could be afforded a full hearing. Jd. at 744.
In much the same way, Alton was denied an operating
permit based upon unadjudicated allegations of wrongdo-
ing, 1.e., that it caused an air quality violation.
Further, the operating permit for the Boilers is cru-
cial to the continued viability of the Alton Mill. By
its dependence on the operating permit, Alton is, as the
Martell court noted, effectively a licensee who depends on
its license for its livelihood. Jd. at 739. Thus, Alton is
also analogous to a licensee whose license is “essential
in the pursuit of a livelihood.” Bell v. Burson, 402 U.S.
539 (1871). In Bell, the Court held that a driver’s license
“may not be taken away without the procedural due pro-
cess required by the Fourteenth Amendment.” Jd. Thus,
because Alton has a legitimate claim of entitlement to an
operating permit and the permit is essential to its paper-
board business, it has a protected property interest which
the State of Illinois may not take away without due process
of law.
D. Inadequate Notice Before Agency
Procedural due process requires that parties whose
rights are to be affected by governmental action are enti-
tled to be heard; and in order to enjoy that right they must
first be notified. Consequently, notice is an essential ele-
ment of due process. Goss v. Lopez, 419 U.S. 565 (1975);
Fuentes v. Shevin, 407 U.S. 67 (1972). The notice must be
reasonably calculated to apprise the interested party of the
pendency of the action and afford the party an opportunity
t» present its objections. Covey v. Somers, 351 U.S. 141
(1956).
The Agency failed to provide Alton with notice of its
impending action prior to the denial of its permit. The
Agency did not notify Alton in the summer of 1985 that it
intended to act on Alton’s 1983 permit application.
12
The August 27, 1985 letter from the Agency informing
Alton of denial of the permit was Alton’s first notice of the
Agency’s action and of the reasons for denial. The Agency’s
Air Quality Bulletin of December 20, 1984 was insufficient
as notice since it was never published or sent to or received
by Alton. Thus, the bulletin was clearly not reasonably
calculated to apprise Alton of the pendency of the action
against it. See, Robinson v. Hanrahan, 409 U.S. 38 (1972);
Armstrong v. Manzo, 380 U.S. 545 (1965).
An Agency letter of July 22, 1985 serving Alton with
notice of non-compliance was also insufficient to notify
Alton of the action pending on its permit application. The
letter stated only that non-compliance with the Board’s
regulations might result in enforcement action. This is
the first procedural step in bringing an enforcement action.
See, Ill. Rev. Stat., ch. 111-1/2, § 1031(d) (1987). It did not
indicate in any way that it was connected with Alton’s per-
mit application. Due process requires that notice of the
pendency of the action affecting a property interest be pro-
vided. In the administrative context, due process requires
that interested parties be given reasonable opportunity to
know claims of adverse parties, the: consequences which
might arise from those claims, and an opportunity to meet
them. North Alabama Express, Inc. v. United States, 585
F. 2d 783 (5th Cir. 1978); In Re Estate of Levin, 135 Ml.
App. 3d 386, 482 N.E.2d 409 (1985). Clearly, the letter
did not inform Alton of the possible consequences at stake,
that is, the denial of its permit.
Furthermore, the July 22, 1985 letter was not suffi-
cient notice because it was not timely. Procedural due
process requires that the notice must be given a sufficient
length of time prior to government action to afford oppor-
tunity to be present. Roller v. Holly, 176 U.S. 398 (1900);
Missouri ex rel. Hurtwitx v. North, 271 U.S. 40 (1926).
The amount of time required to satisfy due process is deter-
minable only from the facts and circumstances of each case.
Id.
13
a
Alton was given only fifteen (15) days to respond to
the Agency’s letter. Due process requires that one be given
notice of charges against him a reasonable time before the
government takes action on those charges. Miller v. City
of Mission, Kansas, 705 F. 2d 368, 372 (10th Cir. 1983).
Given the complexity of the air dispersion modeling stud-
ies, which Alton would have needed to conduct to respond
properly to the Agency's allegations, fifteen days consti-
tutes grossly insufficient notice. The Agency record shows
that it took the Agency more than six (6) months to prepare
its rudimentary May, 1985 study. Thus, the July 22, 1985
letter was insufficient in its timing as well as its content.
E. Inadequacy of Board Hearing
Subsequent to the Agency's denial of the operating
permit Alton appealed to the Board pursuant to Section
40 of the Act. The “hearing” before the Board failed to
remedy the lack of procedural due process accorded Alton
by the Agency. Although the Board provided Alton with
notice and the opportunity for a “hearing,” this hearing
was totally inadequate. Permit appeal hearings before the
Board are limited to the record before the Agency under
Section 40 of the Act, as interpreted below by the Illinois
Appellate Court. Alton Packaging Corp. v. Pollution Con-
trol Board and Environmental Protection Agency, No. 5-
86-0477, Ill. App., Fifth District, slip op. (September 25,
1987) at p. c-8 of the Appendix. See also, Environmen-
tal Protection Agency v. Pollution Control Board, 118 Tl.
App. 3d 772, 455 N.E.2d 188 (1983). Consequently, Alton
was prohibited from presenting relevant evidence at the
hearing before the Board to refute the Agency's charges.
An essential element to the due process right to a hearing
is the right to present evidence. United States v. Storer
Broadcasting Co., 351 U.S. 192 (1956); American Trucking
Asso. v. United States, 326 U.S. 77 (1945); Anniston Mfg.
Co. v. Davis, 301 U.S. 337 (1937). Since the hearing before
14
the Board did not allow Alton to present evidence, it did
not meet the minimum requirements of due process.
CONCLUSION
Permit holders under Illinois law are not given notice
and the opportunity to be heard at a reasonable time and
a reasonable manner before being denied a permit. In
the proceedings below, Alton was deprived of its permit
without notice and the opportunity to be heard. The Illi-
nois courts have refused to reinstate Alton’s permit. This
refusal is contrary to the holdings of this Court as discussed
above. Therefore, this Court should granted a writ, reverse
the holdings of the lower courts, and order the Agency to
reinstate Alton’s permit until Alton is given notice and an
opportunity to be heard.
Furthermore, this Court should grant a writ to resolve
| the important question of constitutional law raised in this
. proceeding, that is, whether States must give a permittee
notice and an opportunity to be heard before refusing to
renew valuable environmental permits.
Respectfully submitted,
Alton Packaging Corporation
By
One of their attorneys
RIcHARD J. KISSEL
Jerrrey C. Fort
Dante. F. O'CONNELL
GaRDNER, CaRTON & DouGLas
321 North Clark Street
Suite 3200
Chicago, Illinois 60610-4795
(312) 644-3000
15
eee
A
No. 66437
a — —---
In The
Supreme Court of Illinois
Alton Packaging Corpora- )
tion,
7, Appeal from
Petitioner sentinels
v. > Fifth District
Pollution Control Board, et AC5-86-0477
al., PCF 85145
Respondents e
ORDER
This matter has come for consideration upon the
motion of petitioner to stay the mandate of this Court pend-
ing appeal or application for certiorari in the United States
Supreme Court.
IT IS ORDERED that the mandate of this Court in
the above cause is stayed pending the filing of a notice of
appeal or an application for certiorari or the expiration of
the period within which said application or notice may be
filed. If certiorari is applied for or notice of appeal filed,
the mandate of this Court shall, upon proof of such filing
being made by affidavit filed with the clerk of this Court,
be further stayed pending resolution by the United States
Supreme Court of such application or appeal. If no such
affidavit is filed, the mandate shall without further order,
issue upon the expiration of the time within which appeal
or certiorari may be sought.
FILED
May 9 - 1988
SUPREME COURT CLERK
a-l
A’
mt
Nt eee
Bie
eae
. 2 Pasa
< 7
¥
=
°
> :
é 3
.
In The
Supreme Court of Illinois
April 7, 1988
Mr. Richard J. Kissel
Martin, Craig, Chester & Sonnenschein
55 West Monroe-S1200-Chicago, IL 60603
In re: Alton Packaging Corporation, petitioner
v. Pollution Control Board, et al., respondents.
No. 66437
Dear Sir:
The Supreme Court today DENIED the petition for
leave to appeal filed in the above cause.
Very truly yours,
Clerk of the Supreme Court
JH: jae
cc: All attorneys
of record
b-1
No. 5-86-0477
In The
Appellate Court of Illinois
Hitth District
ALTON PACKAGING COR- .
PORATION, |
Petitioner-Appellant, |
. | Appeal from
| >.
THE POLLUTION CON. 0+ al
TROL BOARD and ILLI-
NOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondents-Appellees.
Justice Lewis! delivered the opinion of the court:
Alton Packaging Corporrtion (Alton) appeals from an
order of the Pollution Control Board (Board), in which
the Board affirmed the Environmental Protection Agency’s
(Agency) denial of Alton’s application for renewal of an
operating permit at its mill in Alton, Illinois. The Agency
had denied Alton’s application for renewal of the permit
because it had found that certain boilers at Alton’s mill
had been the major contributors to a violation of the Agen-
cy’s sulfur dioxide standard for the area during 1984 and
had concluded that these boilers might cause violations in
the future. On appeal from the Board’s order affirming the
Agency’s denial, Alton contends that the Board’s findings
that there was a violation of the Agency’s sulfur dioxide
1 Justice Lewis replaced Justice Jones who retired after the
cause was taken under advisement.
c-1
standard in Alton in November 1984 and that continued
operation of the Alton mill might cause that standard to
be exceeded in the future were contrary to the manifest
weight of the evidence. We affirm.
Alton is a fully integrated company engaged in the
manufacture and sale of paper board and paper board pack-
aging products. In its manufacture of paper board prod-
ucts, Alton operates a mill located at Alton, Illinois, which
requires the use of steam produced by boilers. Two of these
boilers, Nos. 6 and 7, are pulverized, wet bottom boilers, in
which coal is pulverized to a fine powder and blown into the
boilers. Exhaust air from these boilers is eventually vented
into the atmosphere through two large stacks, which con-
tain no devices to control sulfur dioxide emissions. It is
these boilers that are the subject of this permit appeal.
On January 25, 1983, Alton filed an application with
the Agency for renewal of its operating permit for the boil-
ers in question. In a related proceeding, Alton, on April
23, 1983, filed a petition for variance and site specific relief
from the Board’s Rule 204(f) (now codified as 35 Ill. Adm.
Code §214.141), which had been revised to establish an
emission limitation for sulfur dioxide of 1.8 pounds per mil-
lion BTU (lbs/mmbtu). The Board subsequently dismissed
the variance and site specific proceeding for lack of prose-
cution, but, upon appeal to this court (see Alton Packaging
Corp. v. Pollution Control Board (1986)), 146 [ll. App. 3d
1090, 497 N.E.2d 864), the cause was reinstated and appli-
cation of the revised emission limitation to the Alton mill
was stayed pending the outcome of the variance and site
specific proceeding.
In November 1984, following Alton’s application for
renewal of its operating permit, the Agency recorded two
excursions or exceedances of the 24 hour primary ambient
air quality standard for sulfur dioxide at its monitor in
Alton, Dlinois. Pursuant the Board regulation (codified at
35 Ill. Adm. Code § 243.122), more than one excursion from
c-2
this standard of 0.14 parts per million (ppm) in a one year
period constituted a violation. The two excursions occurred
on November 6 and 7, 1984, with a 24 hour average read-
ing of 0.148 ppm, and on November 25 and 26, 1984, with a
reading of 0.159 ppm. In December 1984 the Agency issued
an air quality bulletin identifying Alton as a primary con-
tributor to these excursions, and, in May 1985, the Agency
completed a modeling study which confirmed that Alton’s
boilers had been the “likely cause” of the November 1984
violation of the air quality standard for sulfur dioxide in
the Alton area.
On August 27, 1985, the Agency denied Alton’s
request for renewal of its operating permit, setting forth
two reasons. The first reason, that the boilers in question
had an average emission rate of 4.9 lbs/mmtu, in excess
of the newly revised emission limit of 1.8 lbs/mmbtu, was
subsequently rendered inapplicable when the variance pro-
ceeding was reinstated and the applicability of the new
limit was stayed as to Alton. The second reason for denial
was stated as follows:
“2. The s ambient SO2 monitor in Alton
recorded a violation of the primary 24 hour SO2
standard during 1984. Based upon a recent study
performed by the Agency, Boilers 6 and 7 appear
to have been the major contributor to this viola-
tion. Boilers 6 and 7 thus may cause violations of
35 Ill. Adm. Code 201.141 and 243.122(a)(2).”
Alton then filed an appeal with the Board from the
Agency's denial pursuant to section 40 of the Environ-
mental Protection Act (Act) (Ill. Rev. Stat. 1985, ch. 111
1/2, par. 1040). In a hearing before the Board, Alton
called two Agency employees as adverse witnesses. John
Shrock, an environmental protection specialist with the
Agency testified that he had prepared the Agency’s May
1985 Study with regard to the alleged excursions of Novem-
ber 1984. He stated that it was not the purpose of this
report to predict future excursions but only to determine
c-3
the major contributors to the reported excursions. Upon
examination by the Agency, Shrock testified that similar
excursions may be possible in the future if Alton were
allowed to operate at the limits they were operating at dur-
ing the previous excursions, since the weather conditions
present on those dates were not unusual.
Alton further called David Kolaz, manager of the
Agency’s Ambient Air Quality Monitoring section. Kolaz
testified concerning the range of accuracy of the Agency’s
monitors, explaining the procedures and requirements for
recalibrating its monitors. Upon examination by the Agen-
cy, Kolaz described the precision and accuracy checks that
are performed on the Agency’s monitors and stated that
under United States Environmental Protection Agency
(USEPA) guidelines, the recorded values were not to be
adjusted based upon accuracy and precision checks, but
were to be reported as measured on the Agency’s monitors.
As a final witness the Agency called Patrick Dennis, a
senior analysis engineer for the Agency, who had reviewed
Alton’s permit application and recommended that it be
denied. Dennis explained the reasons given by the Agency
for the permit denial and stated that either reason alone
would have been sufficient to recommend denial. He fur-
ther stated that Alton had provided no information to the
Agency to show that operation of its boilers would not
cause future exceedances of the air quality standard for
sulfur dioxide.
Upon cross-examination by Alton, Dennis testified
that he had been aware of a modeling study prepared by
Murray and Trettel and submitted by Alton as part of the
variance proceeding but stated that this study had not been
considered in the context of the permit proceeding because
it had not been prepared according to USEPA guidelines
and because it had been part of the variance proceeding
that was dismissed by the Board. Dennis stated that he
had placed no reliance on the Murray and Trettel study,
c-4
which was not included in the Agency record in the permit
appeal, but had based his recommendation to deny Alton’s
permit request on the modeling study performed by the
Agency to determine the source of the two excursions in
November 1984, as well as information provided by Alton
as to coal usage.
Following the hearing, the Board, on April 24, 1986,
affirmed the Agency’s denial of the operating permit for
Alton’s mill. In stating the basis for its decision the Board
found, contrary to Alton’s contentions regarding the accu-
racy of the Agency’s recorded excursion on November 6 and
7, 1984, that there had been an excursion on that date and
that Alton had failed to show that the Agency’s monitor by
which the November 1984 excursions were recorded was
faulty. The Board further found that
| “based on the information received form the excur-
sion study [of May 1985], the Agency could reason-
ably conclude that Alton’s boilers may cause a vio-
lation of 35 Ill. Adm. Code 201.141 and 243.122(a)
(2).”
The Board noted that while Alton had questioned the
predictive capacity of the Agency’s excursion study, it had
| “offer{ed] no data to suggest that the Agency’s conclusions
| were unreasonable.”
: The Board continued:
“In this permit appeal, the burden is not on the
Agency to prove that a violation will occur in the
future. Rather, the burden is on Alton to prove
that a violation will not occur in the future. Alton
has not provided the Board with any information
which would enable the Board to conclude that a
violation of the primary SO2 24-hour standard will
not occur in the future. Based on the record before
the Agency, the Board finds that the information
provided by Alton to the Agency fails to demon-
strate that issuing a permit for Alton’s mill will
not cause a violation of the Act and Board regula-
tions. Therefore, the Board affirms the Agency's
ee ee
c-5
denial of a permit for Alton’s mill.”
On direct appeal to this court (see Ill. Rev. Stat. 1985,
ch. 111 1/2, par. 1041), Alton contends that the Board’s
decision affirming the Agency’s permit denial was con-
trary to the manifest weight of the evidence and should be
reversed. In particular, Alton maintains that there was an
insufficient basis for the Board to conclude that continued
operation of Alton’s mill may cause future violations of air
quality standards in view of testimony at the hearing that
the Agency’s May 1985 modeling study was no intended to
be predictive of future violations and testimony that the
alleged excursion of November 6 and 7, 1984, fell within
the margin of error of the Agency’s monitor. Alton asserts,
therefore, that the evidence failed to support the second
reason given in the permit denial and that the Agency’s
denial should be reversed.
Section 39(a) of the Act (Ill. Rev. Stat. 1983, ch. 111
1/2, par. 1039(a)), under which Alton’s permit application
was made, states in pertinent part:
When the Board has by regulation required a per-
mit for the * * * operation of nay type of facility
*** the applicant shall apply to the Agency for
such permit and it shall be the duty of the Agency
to issue such a permit upon proof by the applicant
that the facility *** will not cause a violation of
this Act or of regulations hereunder.”
(Emphasis added.)
Under section 39, Alton, as permit applicant, had the
burden of showing that issuance of a permit for operation
of its mill would not cause a violation of the Board’s air
quality standard for sulfur dioxide. Upon appeal to the
Board from the Agency’s denial of such permit, the burden
of proof was again upon Alton. Ill. Rev. Stat. 1985, ch. 111
1/2, par. 1040 (a) (1); see Environmental Protection Agency
v. Pollution Control Board (1983), 118 11l. App. 3d 772, 455
N.E.2d 188 (hereafter Alburn).
c-6
OE Cnt ce DP ete
Kult Cee Se aha &
eae cA ENORE, TE Se i Sal ii wit lala alee ata sath te
AE OR at SF ae LPO Bh AS
In the hearing to determine whether Alton had met his
burden, the Board considered testimony elicited by Alton
from the Agency’s employees regarding the accuracy of the
recorded excursions in the Alton area during November
1984. Alton, in its examination of these employees, sought
to discredit the Agency’s measuring and recording meth-
ods. The Board, however, rejected Alton’s assertions that
the recorded measurement of November 6 and 7 did not
constitute an excursion and found that there had in fact,
been an excursion. The Board thus determined that Alton
had failed to carry its burden of refuting the factual basis
for the Agency’s conclusion that there may be a violation
of Board regulations in the future. the Board further noted
that while Alton had questioned the predictive capacity of
the May 1985 modeling study, this study was an adequate
basis fo. the Agency’s conclusion that Alton was a major
contributor to the excursions in question.
Upon appeal, now, from the Board’s decision to this
court, Alton has the heavy burden of showing that the
Board’s decision affirming the Agency’s denial was con-
trary to the manifest weight of the evidence. (Ill. Rev.
Stat. 1985, ch. 111 1/2, par. 1401 (b).) While the Board
was required to determine, based upon the evidence in the
hearing before it, whether the permit should issue, this
court, in reviewing the Board’s decision, must evaluate the
evidence in the record and determine whether the Board’s
findings were contrary to the manifest weight of the evi-
dence. (Environmental Protection Agency v. Pollution Con-
trol Board (1986), 115 Ill. 2d 65, 503 N.E.2d 343 (here-
after Waste Management, Inc.) That a different conclusion
might be reasonable is insufficient; the opposite conclusion
must be evident. (See Willowbrook Motel v. Pollution Con-
trol Board (1985), 135 [1l. App. 3d 343, 481 N.E.2d 1032.)
This court, thus, must not reweigh the evidence nor sub-
stitute its judgment for that of the Board. Waste Manage-
ment, Inc.
c-7
We have so examined the record before the Board
and have concluded that there was sufficient evidence to
support the Board’s findings. Notwithstanding Alton’s
attempts to establish the unreliability of the Agency’s
recorded measurements, there was evidence that the Agen-
cy’s monitor was operating satisfactorily and that the mea-
surements were properly reported without adjustment as
required by USEPA guidelines. In light of the evidence of
Alton’s role in the violation of November 1984 and Alton’s
failure to show that no such violation would occur in the
future, the Board was justified in upholding the Agency’s
permit denial. We, accordingly, affirm the decision of the
Board.
We note in passing Alton’s alternative argument that
the Board’s decision should be reversed and remanded for
further hearing to afford Alton the opportunity to intro-
duce new evidence that was not part of the record before
the Agency. Alton maintains that the decision of Envi-
ronmental Protection Agency v. Pollution Control Board
(1985), 138 Ill. App. 3d 550, 486 N.E.2d 293, which has
since been affirmed in Waste Management, Inc. referred to
above, changed the law with respect to the requirements
of the hearing before the Board in a permit appeal so that
the parties are no longer limited to the record before the
Agency but are entitled to a hearing de novo before the
Board with the admission of new evidence. It is Alton’s
position that it should have a new hearing in which to sub-
mit evidence of its own modeling study prepared by Murray
and Trettel even though this study had not been presented
to the Agency in the permit proceeding.
We find no merit in Alton’s position, because, rather
than changing the law regarding the admission of evi-
dence in Board hearings, it appears that the Waste Man-
agement, Inc. decisions merely restated the law regarding
the standard of proof applicable in such hearings. while
both the appellate and the supreme court opinions dis-
c-8
cussed the opportunity afforded the permit applicant, dur-
ing the Board hearing, to challenge the reasons given by
the Agency for denying such permit by means of cross-
examination and the receipt of tes: imony "to test the valid-
ity of the information [relied upon by the Agency] (115 Il.
2d 65, 70, 503 N.E.2d 343, 345), the courts’ language should
not be construed to allow the supplementing of the record
with new matter not considered in the Agency’s denial
of the permit application. (Cf. Alburn: Board’s review of
Agency’s permit denial limited to consideration of material
relied upon by Agency.) We believe Alton was afforded an
adequate opportunity here to challenge the reasons given
by the Agency for its permit denial and we, accordingly,
find no basis upon which to remand the case for further
hearing.
For the reasons stated in this opinion, we affirm the
decision of the Board.
AFFIRMED.
Karns, P.J.,
and KASSERMAN, J., concur.
‘A wed
Be tata tealts
nies SN a
ILLINOIS POLLUTION
CONTROL BOARD
June 20, 1986
ALTON PACKAGING COR- ~
PORATION, |
Petitioner,
v. ,
ILLINOIS ENVIRONMEN- |
TAL PROTECTION AGE- |
NCY, |
Respondent. J
ORDER OF THE BOARD (by J. D. Dumelle):
This matter comes before the Board upon a May 29,
1986 motion for reconsideration filed on behalf of the Alton
Packaging Corporation and a June 9, 1986 response filed
on behalf of the Dlinois Environmental Protection Agency.
In its motion Alton admits that its “arguments are all set
forth in previous briefs filed with the Board in this matter.”
That being the case, and since Alton has not persuaded the
Board that it “has clearly erred in assessing what Alton
was required to demonstrate to the Agency,” the motion is
hereby denied.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution
Control Board, hereby certify that the above Order was
adopted on the _day of , 1986 by a
vote of
Dorotuy M. Gunn, Clerk
Illinois Pollution Control Board
APPENDIX E
ILLINOIS POLLUTION
CONTROL BOARD
April 24, 1986
ALTON PACKAGING COR- >
PORATION,
Petitioner, |
v. . PCB 85-145
ILLINOIS ENVIRONMEN-
TAL PROTECTION AGE.-
NCY,
Respondent. y,
MR. RICHARD KISSEL, MARTIN, CRAIG, CHESTER &
SONNENSCHEIN, APPEARED ON BEHALF OF PETI-
TIONER.
MR. WILLIAM INGERSOLL APPEARED ON BEHALF
OF RESPONDENT.
OPINION AND ORDER OF THE BOARD (by J.D.
Dumelle):
This matter comes before the Board upon a permit
appeal filed on October 1, 1985 on behalf of Alton Packa-
ging Corporation (Alton). Alton requests that the Board
reverse the August 27, 1985 decision by the Illinois Envi-
ronmental Protection Agency (Agency) denying Alton’s
application for renewal of an operating permit for its Alton
mill.
Alton is a fully integrated company in the pulp and
paper industry engaged in the manufacture and sale of
paperboard and paperboard packaging products which is
headquartered in Alton, Illinois. Alton operates a mill in
Alton, Illinois which employs about 350 people and pro-
duces approximately 600 tons of paperboard per day which
is then converted into paperboard manufacturing products
for corrugated shipping containers. In the production of
e-1
paperboard products, Alton utilizes boilers to produce the
stream required for heating and process use. Two of these
boilers, Boilers 6 & 7, are the subject of this permit appeal.
(Pet. Brief pp. 1-2).
Boilers 6 & 7 are pulverized, wet bottom boilers. Coal
is pulverized to a fine powder and blown into the boilers.
Ash is both emitted through the vented air as well as col-
lected in the wet ash pit. The exhaust air from the boil-
ers passes through mechanical collectors (multi-clones) and
then through electrostatic precipitators and then vented
to the atmosphere through two separate 192-foot stacks.
There is no control device to deal with SOg emissions.
When needed, low sulfur coal is burned to comply with
applicable emission limits for SOg. (Pet. Brief p. 2).
On January 21, 1983, Alton filed a renewal permit
application with the Agency for its Alton mill. Alton
waived the 90-day decision period until the Board issued
a final order in PCB 83-55 (site-specific rule) and PCB 83-
49 (variance). The Board dismissed these proceedings on
August 1, 1985. The Agency denied Alton’s permit appli-
cation on August 27, 1985 for the following reasons:
1. Based upon information submitted to the Agency,
Boilers 6 and 7 presently emit sulfur dioxide at the
average rate of 4.9 lbs per million Btu, an amount in
excess of Btu of 35 Ill. Adm. Code 214.141.
2. The Agency’s ambient SO2 monitor in Alton recorded
a violation of the primary 24 hour SO standard dur-
ing 1984. Based upon a recent study performed by
the Agency, Boilers 6 and 7 appear to have been the
major contributor to this violation. Boilers 6 and
7 thus may cause violations of 35 [ll. Adm. Code
201.141 and 243.122(a) (2).
The first ground for the Agency’s denial is not
presently at issue. Alton filed a petition for variance (PCB
83-49) within 20 days after the effective date of the rule
e-2
which established the 1.8 lbs/mmBtu SOg emission limita-
tion, thereby staying applicability of this emission limita-
tion pursuant to Section 38 (b) of the Environmental Pro-
tection Act. The Board subsequently dismissed the vari-
ance petition and the Agency contended that the stay was
no longer in effect. However, Alton appealed the Board’s
decision to the appellate court which granted Alton’s
motion to stay the applicability of the 1.8lbs/mmBtu SO
2 emission limitation to Alton’s mill. Therefore, the Agen-
cy’s first ground for denial is not presently applicable and
will not be considered.
Concerning the second ground for denial, the Agen-
cy’s ambient SO2 monitor in Alton recorded two excursions
from the primary SOg 24-hour standard in November 1984.
(The primary 24-hour ambient air quality standard for SOg
is 0.14 ppm). The first occurred during a 24-hour period
on November 6 and 7. During this period, the maximum
24-hour average was 0.148 ppm. The second occurred dur-
ing a 24-hour period on November 25 and 26. During this
period, the maximum 24-hour average was 0.159 ppm. A
violation of the primary SOg 24-hour standard occurs when
two excursions from the standard occur within a one-year
period. The Agency conducted an excursion study to deter-
mine the major contributor(s) to the violation. The excur-
sion study determined that Alton’s Boilers 6 and 7 appear
to have been the major contributor to the violation. Thus,
the Agency concluded that Boilers 6 and 7 may cause vio-
lations of 35 Ill. Adm. Code 201.141 and 243.122 in the
future and denied Alton’s permit request.
Alton’s position is that whether or not it was a contrib-
utor to the violation of the primary SOg 24-hour standard
is not a proper basis up on which the Agency can deny a
permit; rather, the Agency must have in the record that
this will occur in the future and the record does not con-
tain that. (R. p. 9). Alton supports its position by ques-
tioning the accuracy of the recorded excursion on Novem-
e-3
ber 6 and 7. Alton contends that the November 6 and 7
excursion was not an excursion because the range of accu-
racy of the monitored readings could range, based on a 95%
confidence interval, anywhere from 9% too low to 5% too
high. Furthermore, Alton contends that the November 6
and 7 excursion may have been lower since the precision
check of the monitor before the recorded excursion indi-
cated that the recorded sample was 5.5% higher than what
the real value was. Lastly, Alton contends that the Agen-
cy’s excursion study was not predictive of the future and,
consequently, the Agency could not determine whether the
operation of Alton’s boilers would in the future cause a
violation of the primary SOQ 24-hour standard. (Pet. Brief
pp. 7-10).
The Agency responds to these arguments by asserting
that the November 6 and 7 excursion was in fact an excur-
sion. The Agency asserts that the employee who testified
on the range of accuracy was merely expression his sta-
istical confidence level and that under USEPA guidelines
the reported data is not to be corrected. The Agency also
contends that the precision check indicating that the mon-
itor was recording slightly higher readings does not affect
the accuracy of the reported data. This just means that
the baseline reference had drifted above zero and the drift
had corrected itself before the November 6 and 7 excur-
sion. (R. p 50). Lastly, the Agency employee, based on his
expertise, concluded that future excursions were possible
if Alton were allowed to continue operations as they were
since the meteorological conditions during the excursions
were not unusual and other SOg sources which would nor-
mally be expected to impact the monitor were not operat-
ing or operating at well below allowable limits. (Ag. Brief
pp. 7-10).
The issue to be addressed by the Board in this permit
appeal is whether the information provided by Alton to
the Agency sufficiently proves that issuing a permit for
e-4
Alton’s mill will not cause a violation of the Act and Board
regulations. This issue is to be decided by the Board based
on the record before the Agency when it made its decision.
Section 40 of the Act places the burden of proof in a permit
appeal on the petitioner to show that the Agency’s decision
was wrong. For the following reasons, the Board finds that
Alton has not met this burden and affirms the Agency’s
denial of an operating permit for Alton’s mill.
Alton’s position in this permit appeal centers on the
impropriety of the Agency’s data which were used to deter-
mine that the November 6 and 7 excursion was in fact an
excursion; and that Alton’s boilers may in the future cause
a violation of 35 Il. Adm. Code 201.141 and 243.122(a) (2).
The Board is not persuaded by any of Alton’s arguments.
Specifically, the Board finds that the November 6 and 7
excursion was in fact an excursion. Mr. David Kolaz, Man-
ager of the Agency’s Ambient Air Quality Monitoring Sec-
tion, testified that USEPA guidelines specifically state that
the measured data is not to be corrected for any measure-
ments of precision or accuracy, either directly corrected or
corrected in performing evaluations to determine attain-
ment of a standard. (R. p. 33). Though a monitor that
is consistently taking faulty readings should be removed
from the State’s monitoring system, Alton has not provided
any information to the Board that would demonstrate that
the Barton School monitor which recorded the November,
1984 excursions was consistently taking faulty readings.
Alton also argues that the November 6 and 7 reading
of 0.148 ppm. was 5% too high; the actual reading being
0.141 ppm. Alton contends that such a tenuous and de
minimus number would not seem to be a proper basis on
which to deny a permit, though Alton never acknowledges
the contrary position that the November 6 and 7 read-
ing was 9% too low. Alton’s contention is seriously mis-
placed. Under the current federal and state air pollution
control scheme, an area is either designated as attainment
e-5
or non-attainment for criteria pollutants based on the best
available information. This information includes the data
obtained form the State’s ambient air quality monitors.
Once an area is designated as non-attainment, regardless
of the degree of the non-attainment, major consequences
flow. These consequences include the requirement that
all existing major sources in the area install state-of-the-
art pollution control technology, an increased demand for
state and federal resources to correct the problem and an
increased risk of having sanctions imposed on the area
which may include construction bans on new sources and
the loss of millions of dollars in federal funding. These are
hardly de minimus consequences. Lastly, the determina-
tion of attainment or non-attainment is ultimately made
by the USEPA using its guidelines. In view of these con-
sequences, the Board cannot lightly dismiss the testimony
that USEPA guidelines place the recorded values as a vio-
lation of the primary SOg 24-hour standard.
The Board also concludes that based on the informa-
tion received from the excursion study, the Agency could
reasonably conclude that Alton’s boilers may cause a vio-
lation of 35 Tl. Adm. Code 201.141 and 243.122(a) (2).
While Alton questions the predictive capacity of the Agen-
cy’s excursion study, it offers no data to suggest that the
Agency’s conclusions were unreasonable.
Alton’s position in this permit appeal is misdirected.
In this permit appeal, the burden is not on the Agency to
prove that a violation will occur in the future. Rather,
the burden is on Alton to prove that a violation will not
occur in the future. Alton has not provided the Board with
any information which would enable the Board to conclude
that a violation of the primary SOg 24-hour standard will
not occur in the future. Based on the record before the
Agency, the Board finds that the information provided by
Alton to the Agency fails to demonstrate that issuing a
permit for Alton’s mill will not cause a violation of the Act
e-6
and Board regulations. Therefore, the Board affirms the
Agency’s denial of a permit for Alton’s mill.
This Opinion constitutes the Board’s findings of fact
and conclusions of law in this matter.
ORDER
The Board hereby affirms the Agency’s denial of an
operating permit for Alton’s mill located at Alton Packa-
ging Corporation’s facility in Alton, [linois.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution
Control Board, hereby certify that the above Order was
adopted on the 24th day of April, 1986 by a vote of 7 — 0.
/s/ Dorothy M. Gunn
DorotHy M. Gunn, Clerk
Illinois Pollution Control Board
e-7
CERTIFICATE OF SERVICE
I hereby certify that, on the 6th of July, 1988, within
90 days of the April 7, 1988 Order of the Supreme Court of
the State of Illinois, as required by 28 U.S.C. § 2101(c),
copies of the attached Petition for a Writ of Certiorari
were filed with the Clerk of the United States Supreme
Court by being placed in envelopes properly addressed to
the Clerk and to all the persons entitled to notice including
the Illinois Attorney General, at the following address:
TO: James L. Morgan, Esquire
Assistant Attorney General of
the State of Illinois
Office of the Attorney General
500 South Second Street
Springfield, Illinois 62706
with proper first-class postage prepaid and deposited in a
United States mail depository in Chicago.
DANIEL F. O’CONNELL
An Attorney for Petitioner
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.