What actually matters in this document.
Text
Supreme Coutt, US,
EILED
No. 88-18 2)
IN THE
Supreme Court of the United
Ocroser TERM, 1988
CITY OF NEW HAVEN, CONNECTICUT,
Petitioner,
vs.
JOHN O. MARSH, JR., SECRETARY OF THE ARMY,
et all.,
Respondents.
On Petition For a Writ of Certiorari to The United States
Court of Appeals For the First Circuit
BRIEF FOR RESPONDENT
MALL PROPERTIES, INC. IN OPPOSITION
DANIEL RIESEL
460 Park Avenue
New York, New York 10022
(212) 421-2150
Counsel for Respondent
Mall Properties, Inc.
Of Counsel:
StveE, Pacer & RiEsEL, P.C.
Mark A. CHERTOK
KAREN E. Gross
On the Brief
p
/ +
noes
t)
*
-~
a ¥
,
‘¢ “
ne
he
j
al
QUESTIONS PRESENTED
The petition for certiorari presents
the following two questions:
1. Whether the Court of Appeals
correctly concluded that the District
Court order vacating the denial of a
permit by the U.S. Army Corps) of
Engineers and remanding the matter to the
Corps of Engineers for further
proceedings on the permit application is
not a "final decision" subject to appeal
under 28 U.S.C. §1291.
2. Whether the Court of Appeals
correctly concluded that the appeal by
the City of New Haven does not fall
within the exception for appeals by
federal defendants from remand orders
imposing a new legal standard on the
government agency because the City will
be able to obtain review from the final
determination of the Corps of Engineers,
ii
PARTIES TO THE PROCEEDING
The petitioner is the City of New Haven,
Connecticut. The federal respondents are
John O. Marsh, Jr., as Secretary of the
Army; Lt. General E.R. Heiberg, as Chief
of the United States Army Corps of
Engineers; Col. Thomas A. Rhen, as
Division Engineer, New England Division,
United States Army Corps of Engineers
and the United States Army Corps of
Engineers, Department of the Army. Mall
Properties, Inc. is also a respondent.1
1 Mall Properties, Inc. has no
parent, subsidiary, or affiliated corporations.
iii
TABLE OF CONTENTS
OPINION BELOW...... cc ccccccccccvecs
JURISDICTION....... Terererere re a
STATUTORY AND REGULATORY
PROVISIONS INVOLVED...........-.-.
STATEMENT OF THE CASE......--eeeee-
THE PETITION SHOULD BE DENIED.....
A. Standards For A Writ Of
ESS
B. The Court of Appeals
Correctly Applied The
Established General Rule
That Remand Orders Are
Not Appealable...........
C. Remand Was Required In Any
Event To Allow The Corps Of
Engineers To Comply With
Its Own Regulations......
D. The Exception For Appeals
- By Federal Defendants Does
Not Apply To New Haven...
E. The Dismissal of New Haven's
Appeal To Avoid Piecemeal
Review Does Not Prejudice
New Haven.....cccccccsccs
F. The District Court Did
Not Impose A Radical
New Standard Justifying
Immediate Review.........
0 ae
PAGE
10
15
17
23
25
29
35
iv
Re Section 10 of the RHA...
2. The Public Interest
POOELOCLONS . cc cc ccveseca
39
60
Vv
OF AUTHO 3
CASES PAGE
Animal Lovers Volunteer Association,
Inc. v. Weinberger, 765 F.2d 937
CSE. Ss SE Cy idncnsseeeuk anes 52,53
v. Weinbe , 485 F.2d
Se Ce Ga, BOTS i ou bocca nce cds 19
Bender v. Clark, 744 F.2d 1424
Fae Ges BOD cs bce cawedsce ddan 25,26
27,28
Bohms v. Gardner, 381 F.2d 283
(8th Cir. 1967), cert. denied,
Ss oe OR leer ome: 19,20
Bersani v. EPA, No. 87-6275,
87-6295 (2d Cir.
SUMO GB, {GSS} ccccccecsecsvcscsseses 54,56
- 57
Bureau of Alcohol, Tobacco and
Firearms v. Federal Labor
Relations Authority, 464 U.S. 89
[RT os cesivendcedens PL Pi ee ewan 36
Buttrey v. United States, 690 F.2d
1170 (5th Cir. 1982), cert.
denied, 461 U.S. 927 p
Ce A Gi ode aie de one Oe he hs 47
Cape May Green, Inc. v. Warren,
698 F.2d 179 (3d Cir. 1983)...... 48
Catlin v. United States,
eR Se ye Co ee eee 18
vi
CASES PAGE
Dalto v. Richardson, 434 F.2d 1018
(2a Cir. 1970), cert. denied, 401
Gh, OR: COGS x cece ieee 19
Deltona Corp. v. United States,
657 F.2d 1184 (Ct. Cl. 1981),
cert. denied, 455 U.S. 1017
Davis v. Colemen, 521 F.2d
661 (9th Cir. 1975). .cccccccccces 54,
Loki *. ;
Vv j 7
338 U.S. 507 (1950)..........20.., 29
Eluska v. Andrus, 587 F.2d 996
(SER GEE. IDTB) accccccccccosccoes 19
is Vv. is and
Jacquelin, 417 U.S.
EGE CIGTE) cccvcccccccccccoccececs 21
Farr v. Heckler, 729 F.2d 1426
(llth Cir. 1984)... ccc ewe cc ceee 18,19
Giordano v. Rudebush, 565 F.2d 1015
(GER CAF. IST7F) cccccccsecsececess 19
Howell v. Schweiker, 699 F.2d 524
(llth Cir. 1983)...............0. 18,19
in re Abdallah, 778 F.2d 75
(lst Cir. 1985), cert. denied
sub nom. Drury v. Abdallah, 476
GeBs ZARO Cae se aneee kee Wcescse 18
Jentgen v. United States, 657 F.2d
1210 (Ct. Cl. 1981), cert. denied,
455 U.S. 1017 (1982)............. 43
vii
CASES PAGE
Mall Properties, Inc. v. Marsh,
672 F.Supp. 561 (D.Mass. 1987),
aff'd, 841 F.2d 440 (1st Cir.),
’
No. 87-1827 (lst Cir.
April 7, 1988) ....cccccccccccees -DASSIB
, : -
Heckler, 769 F.2d 1043
(Sth Cir. 1985) ...cccccccccceeees 18
Met Lit Edi “oy
;
460 U.S. 766 (1983)... ceeeeees passim
v. Feldman, 722 F.2d 893
(ist Cir. 1983) cccecccccccccccces 36
; 1 citi
Better Community v.
United States, 606 F.Supp. 964
(D.Minn. 1985), aff'd, 793
F.2d 201 (8th Cir. 1986)......... 53
Pacific Northwest Bell
Telephone Co. v. Dole,
633 F. Supp. 725
ee , IE cs ce cescecccceces 52,53
Paul _v. Secretary of
Air Force, 457 F.2d
SOG Eee GEb. SOTE) a dcsccwccccess 19
Vv ite t
Postal Services, 541 F.2d
BOS Serre 54,55
56
ee
viii
CASES PAGE
Stryker Bay Neighborhood .
Council Inc. v. Karlen,
gs SS) Fl Re 48
Thornbugh v. American College of
eabakelal x. onl ;
Se ae Er Cis ies cucccce 24
United States ex rel. Greathouse
v. Dern, 289 U.S. 352 (1933)..... 37,38,
39
ited T bat ,
Vv inoi t » oP
433 F.2d 566 (7th Cir. 1970),
cert. denied, 402 U.S. 951
aevaedian ek as TEAS 9 ee 19
Zabel _v. Tabb, 430 F.2d 199
(Sth Cir. 1970), cert. denied,
402 U.8. 910 (1972) .ccccccccsces 38,39
STATUTES
26 U.B.C. § 1284(1) ..cccccccccccees 3
28 U.S.C. § 1254(2) .cccccccccccccce 24
28 U.S.C. § 1291.2 coe cscccccccccces 3,17,20
Coastal Zone Management Act of 1972,
26 U.S.C. § 1451 QF Bag. wcccceccs 44,47
Clean Water Act, 33 U.S.C. § 1251
et seg.
3S UVeBeCe § 2343(6) (2) ccccvccccce 45
OD UVeBeSn § BEEGcccccccsccceccesces 4,42
BS GeSeCe § 1LS4E (CD) ccscccscsecoceos 44,45
ix
STATUTES PAGE
33 U.S.C. § L4lLZ- cece eeveseeveees 47
Marine Protection, Research and
Sanctuaries Act of 1972,
33 U.S.C. § 1401 et SEG. «--++ees 44
National Environmental Policy
Act of 1969, 42 U.S.C. §4321
Ct SCG. cere cere cceereesceceses 5,44
42 U.S.C. § 4332(C) eee eee veevces 51
Rivers and Harbors Appropriation
Act of 1899, 33 U.S.C. §401
et seq.
ge ee Fae We; er rere ree 4
REGU ONS
40 G.9.R. 227.17 (A) (2) a scccvcsccess 46
ae ee ey!) errr rrr re 46
ee eae Pree e ree eer re TTT 46
ven Se 2!) Pewerrrrrrr ry Se 49
38 Fed. Reg. 12217 (May 10, 1973).. 43
42 Fed. Reg. 37122 (July 11, 1977). 41,43
COURT RULES
re Pr Sea 15,16
CTHER AUTHORITIES
H. Rep. No. 917, 91st Cong. 2d
Sess. 5 (1970) .ccccceeceeeesssveces 42
IN THE
SUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 1988
NO. 88-18
CITY OF NEW HAVEN, CONNECTICUT,
Petitioner,
Vv.
JOHN O. MARSH, JR., SECRETARY OF
THE ARMY, ET AL.
Respondents.
On Petition for a Writ of Certiorari to
the United States Court of Appeals
for the First Circuit
BRIEF FOR RESPONDENT
MALL PROPERTIES, INC. IN OPPOSITION
Respondent, Mall Properties, Inc.,
opposes the petition of the City of New
Haven for certiorari to the United States
Court of Appeals for the First Circuit.
2
OPINIONS BELOW
The opinion of the Court of Appeals
is reported at 841 F.2d 440 (lst Cir.
1988) (App. B at 3a-23a).2 The denial of
the petition for rehearing and suggestion
for rehearing en banc is’ unreported
decision, No. 87-1827, (ise €if.
April 7, 1988) (App. A at 1a-3a). The
memorandum and order of the District
Court is reported at 672 F. Supp. 561 (D.
Mass. 1987) (App. D at 25a-84a).
JURISDICTION
The order of the Court of Appeals
(App. B) was entered on March 11, 1988.
The petition for rehearing and suggestion
for rehearing en banc (App. A) was denied
on April 7, 1988. Petitioner apparently
2 The decisions below and other
materials are bound in an appendix
submitted by petitioner City of New
Haven. References to the appendix
are designated parenthetically as "App."
followed by the page(s) number on which
the referenced material appears.
invokes jurisdiction under 28 U.S.C.
§1254(1).
STATUTORY AND
REGULATORY PROVISIONS INVOLVED
28 U.S.C. §1291
The court of appeals (other
than the United States Court of
Appeals for the Federal
Cire wit) shall have
jurisdiction of appeals from
all final decisions of the
district courts of the United
States, the United States
District Court for the District
of the Canal Zone, the District
Court of Guam, and the District
Court of the Virgin Islands,
except where a direct review
may be had in the Supreme
Court. The jurisdiction of the
United States Court of Appeals
for the Federal Circuit shall
be limited to the jurisdiction
described in sections 1292(c)
and (da) and 1295 of this title.
Other relevant statutes and
regulations are set forth in the Addendum
to the brief of petitioner City of New
Haven.
STATEMENT OF THE CASE
Mall Properties has been attempting
Since the early 1970s to develop a
4
regional shopping mall in the
metropolitan New Haven area in order to
meet an undisputed long-standing need.
The site selected is situated in an
industrial/commercial corridor in the
Town of North Haven, parallel to the
Quinnipiac River. This site had been
extensively ravished and disturbed by
earlier strip mining and quarrying
operations, which created approximately
18 acres of low grade scrub wetlands and
small ponds. The development of the mall
would require the filling of these areas,
together with limited amounts of natural
wetlands. Consequently, the Corps of
Engineers determined that development of
the mall would necessitate a permit
pursuant to Section 404 of the Clean
Water Act ("CWA"), 33 U.S.C. §1344, and
Section 10 of the Rivers and Harbor
Appropriations Act of 1899, 33 U.S.C.
§403.
5
The Corps of Engineers'
administrative process commenced in early
1979, and included the preparation and
circulation of draft and final
environmental impact statements pursuant
to the National Environmental Policy Act
("NEPA"), 42 U.S.C. §4321 et seqg., and
the holding of public hearings.
Throughout the process, New Haven opposed
the development of the mall, claiming
that a North Haven mall would compete
with New Haven's downtown shopping area
by diverting customers and retail stores,
thus adversely affecting the City's
economy.
The Corps of Engineers issued its
Record of Decision denying Mall
Properties' permit application on
August 20, 1985. (App. H 104a-272a). The
document reflected the conclusions of the
environmental impact statement that the
proposed mall would not have significant
6
effects on the environment, including
wetlands and flooding, and that the
principal, if not sole, area of
controversy surrounding the proposed
development was its potential economic
effect upon the City of New Haven. The
Record of Decision concluded that the
mall's potential for jeopardizing New
Haven's efforts to stimulate development
in its downtown area -- principally
through an erosion of "confidence" in
such efforts -- warranted permit denial.
In reaching its determination, the Corps
relied upon its perception, gleaned from
a private meeting with the Governor of
Connecticut, that the State opposed the
development. (App. H at 258a-259a, 270a-
272a).
Mall Properties commenced this
litigation in October 1985, and moved for
summary judgment in January 1986. The
federal defendants cross-moved for
4
summary judgment, as did the City of New
Haven (which had previously been allowed
to intervene). The District Court ruled
that (i) the Corps of Engineers' denial
of permits for the proposed shopping
aki principally upon the effect of
economic competition with City of New
Haven, exceeded the agency's authority,
and (ii) the Corps had violated its
regulations and improperly relied upon
the supposed opposition of the Governor
of Connecticut to the proposal. On
September 8, 1987, the District Court
issued an order remanding the matter to
the Corps of Engineers for further
proceedings. (App. D at 25a-84a).
On September 14, 1987, the City of
New Haven filed a notice of appeal. The
Solicitor General determined not to
appeal the Order, and on November 18,
1987 the federal defendants moved to
dismiss the appeal of the City of New
SSS
8
Haven. On December 2, 1987, Mall
Properties joined in the _ federal
defendants' motion to dismiss. The Court
of Appeals granted the motion and
dismissed the appeal for lack of
jurisdiction on March 11, 1988. (App. C
at 24a).
The Court of Appeals held that the
District Court's remand order was not a
final appealable order susceptible to
immediate review. The Court rejected New
Haven's argument that the District Court
had entirely disposed of the matter
before it by remanding the proceeding.
The Court held that the order was not a
final judgment because it "does not grant
Mall ultimately what Mall wants." (App.
B at 8a). The Court found that what Mall
Properties ultimately wants is "the
proper permits themselves and, in the
event of a judicial challenge to the
permits, a judgment adjudicating Mall's
9
entitlement to the permits." (App. B at
7a). The Court concluded that’ the
District Court order "is but one interim
step in the process towards Mall's
obtaining its ultimate goal." (App. B at
8a).
The Court of Appeals recognized
that, although appeals have been allowed
in some cases from orders remanding to an
agency for further proceedings, those
cases had all involved appeals by the
government or a government agency from
the imposition of a new or unsettled
standard on the agency, which "had no
avenue for obtaining judicial review of ©
its own administrative decisions...."
(App. B at 15a). The Court found the
inability of an agency to appeal from its
own determinations crucial, and held that
this exception for immediate appeals by
agencies from the imposition of a new
legal standard was based on the fact
10
that “unless review were accorded
immediately, the agency likely would not
be able to obtain review." (App. B at
17a).
The Court concluded that the City of
New Haven did not fall within this
exception. Unlike the Corps of
Engineers, the City will be able to seek
judicial review if the permit is granted,
and if the District Court upholds the
grant, appeal to the Court of Appeals and
argue that the original permit denial was
proper. (App. B at 18a).
The City of New Haven filed a
Petition for Re-hearing and Suggestion
for Re-hearing en banc on March 24, 1988.
The Court of Appeals denied the petition
on April 7, 1988. (App. A la-2a).
THE PETITION SHOULD BE DENIED
The City of New Haven seeks a writ
of certiorari to review a determination
of the First Circuit Court of Appeals on
11
a procedural issue which is fully
consistent with established law in the
First Circuit and other circuits. Based
on the policy that piecemeal appeals are
to be avoided, it is a well-settled
general rule that remand orders are not
final decisions susceptible to immediate
appellate review. Applying this rule,
the Court below dismissed New Haven's
appeal from the District Court's remand
order for lack of jurisdiction.
The City has demonstrated no valid
ground to disturb the Court of Appeai's
well-reasoned determination. The remand
order is not a final decision, but an
intermediate step in this permit
application proceeding. The Corps of
Engineers has yet to make, in the
remanded proceeding, a determination on
Mall Properties' permit application, and
there may be further appeals from the
Corps of Engineers' decision.
12
Moreover, the District Court
remanded the proceeding on two grounds:
(i) the Corps' improper denial of the
permit based on economic factors, and
(ii) the failure of the Army Corps of
Engineers to follow its own regulations
in not giving Mall Properties an
opportunity to rebut the supposed
objections of the Governor of
Connecticut. New Haven focuses solely on
the economic issue and completely
ignores the procedural issue. As remand
to the Corps of Engineers was required in
any event to correct this procedural
error, dismissal of the appeal was
appropriate for this reason alone to
avoid piecemeal review.
New Haven argues that the District
Court order is immediately appealable by
the City under governing case law because
the order imposes a new legal standard
with respect to the economic issue on the
13
Corps of Engineers. New Haven is
incorrect. As the Court below correctly
concluded in its detailed analysis of the
decisional law, the exception to the rule
that remand orders are not immediately
appealable applies only to appeals by
federal defendants from remand orders
which impose a new or unsettled legal
standard on the government or government
agency. The reason for this exception is
that an agency has no avenue for review
of its own decisions, and would have no
later opportunity to appeal.
The City of New Haven does not fall
within this exception to the general
rule. Unlike a federal agency, the City
will have a later opportunity to obtain
review of the District Court order. If
the permit is granted in the remanded
proceeding, the City can raise the
economic issue on appeal together with
any other appealable issues arising from
a
14
the remanded proceeding. If the permit
is denied on remand, and no appeal is
taken, the disputed issue will become
moot, and an unnecessary appeal will have
been avoided. If an appeal is taken, the
City can raise the economic issue at that
time.
In any event, the District Court's
ruling that the Army Corps of Engineers
exceeded its authority in basing permit
denial on economic factors is not a new
legal standard requiring immediate
review. The District Court merely
followed this Court's decision in
Metropolitan Edison Co. v. People Against
Nuclear Energy ("Metropolitan Edison"),
460 U.S. 766 (1983) in holding that the
Corps of Engineers may not base permit
denial on economic effects unrelated to
changes in the physical environment. In
addition, the District Court's ruling
requiring the Corps to adhere to its own
il ie
15
regulations, which the City consistently
ignores, is hardly a novel one. If
appellate review were so urgent, the
federal defendants presumably would have
appealed.
Moreover, the determination of the
Court of Appeals that the administrative
proceedings on the permit application
should be completed, and all appealable
issues saved for a single appeal, does
not prejudice New Haven.
A. Standards For A Writ Of Certiorari
Pursuant to Rule 17.1 of this Court,
a review on writ of certiorari "is not a
matter of right, but ef judicial
discretion, and will be granted only when
there are special and important reasons
therefor." New Haven argues its case
with high blown rhetoric and purple prose
in an apparent effort to capture and
retain the Court's interest, but never
addresses the standards it must meet for
\
review.
Supreme Court Rule 17.1 sets forth
three categories of reasons that will be
considered in reviewing a petition on
writ of certiorari, two of which are
pertinent here:
(a) When a federal court of appeals
has rendered a decision in conflict with
the decision of another federal court of
appeals on the same matter; ... or has so
far departed from the accepted and usual
course of judicial proceedings, or so far
sanctioned such a departure by a lower
court, as to call for an exercise of this
Court's power of supervision.
= =.
(c) When ... a federal court of
appeals has decided an important question
of federal law which has not been, but
should be, settled by this Court, or has
decided a federal question in a way in
conflict with applicable decisions of
this Court.
New Haven's hyperbole concerning an
alleged conflict in the circuits and the
urgent need for review notwithstanding,
the decision of the Court below is not in
conflict with the decisional law of any
other court of appeals; nor does the
decision of the Court of Appeals involve
17
an important or unsettled issue of
federal law in need of resolution by
this Court. The Court of Appeals merely
decided the procedural issue of whether
immediate review of New Haven's appeal
from the remand order of the District
Court was permissible. Based on the
applicable law of the First Circuit and
other courts of appeal, the Court
determined that the remand order was not
a final decision susceptible to judicial
review. New Haven will have a later
opportunity for judicial review if the
permit it opposes is granted, or if the
permit is denied, and that determination
appealed.
B. The Court Of Appeals Correctly
Applied The Established General Rule
That Remand Orders Are Not Appealable
Pursuant to 28 U.S.C. §1291, the
Court of Appeals has jurisdiction to
review "all final decisions of the
Gistrict courts....* As recognized by
18
the Court below (App. B at 8a), this
Court has defined a final decision as
"one which ‘ends the litigation on the
merits and leaves nothing for the Court
to do but execute the judgment.' Catlin
v. United States, 324 U.S. 229, 233
(1945) ."
In dismissing New Haven's’9 appeal
from the District Court's remand order,
the Court of Appeals applied the well-
established general rule in the First
Circuit and other courts that an order
remanding a case to an administrative
agency or board for further proceedings
is not a "final decision" from which
appeals may be taken. | E.g., in <re@
Abdallah, 778 F.2d 75 (1st Cir. 1985),
cert. denied sub nom. Drury v. Abdallah,
476 U.S. 1116 (1986); Memorial Hospital
System _v. Heckler, 769 F.2d 1043 (5th
Cir. 1985); Farr v. Heckler, 729 F.2d
1426, 1427 (11th Cir. 1984); Howell v.
19
Schweiker, 699 F.2d 524, 526 (11th Cir.
1983); Eluska v. Andrus, 587 F.2d 996
(9th Cir. 1978); Giordano v. Roudebush,
565 F.2d 1015 (8th Cir. 1977); Barfield
v. Weinberger, 485 F.2d 696, 698 (5th
Cir. 1973); Paul v. Secretary of Air
Force, 457 F.2d 294, 297-98 (1st Cir.
1972); Dalto v. Richardson, 434 F.2d 1018
(2d Cir. 1970), cert. denied, 401 U.S.
979 (1971); United Transportation Union
v. Illinois Central R.R., 433 F.2d 566
(7th Cir. 1970), cert. denied, 402 U.S.
951 (1971).
The reason for this rule is
that a district court order remanding a
case for further proceedings "does not
terminate the litigation." Farr vv.
Heckler, 729 F.2d at 1427. In this
regard, the Court of Appeals in Bohms v.
Gardner, 381 F.2d 283, 285 (8th Cir.
1967), cert. denied, 390 U.S. 964 (1968)
observed:
20
Until the [federal defendant]
acts on the remand we have no
insight as tc what his eventual
decision will be. Thus in the
words of Catlin v. United
States the litigation had not
reached its end on the merits
and there is more for the court
to do than execute the
judgment....
The Court below succinctly stated the
same principle with respect to the
matter of Mall Properties' pending permit
application:
The litigation has not ended.
Jt simply has gone to another
forum and may well return
again.
(App. EB at 8a). The Court thus correctly
concluded that the order remanding this
matter to the Corps of Engineers for
further proceedings is not a final
decision within the meaning of 28 U.S.C.
§1291, and therefore may not be appealed
by the City of New Haven.
New Haven argues that the Court of
Appeals failed to give the requirements
a ea ee eee)
21
of finality a "practical rather than
technical construction" (quoting Eisen v.
Carlisle and Jacquelin, 417 U.S. 156,
170-71 (1974)) by treating the remand
order as non-final. (Petition at 29,
31). This assertion is unfounded. The
Court of Appeals explicitly focused on
the practical question of whether the
matter should be remanded for a
determination on the permit application,
which could moot the controversy over the
economic issue, and save all appeals
until after a final decision is made, or
permit the City an immediate appeal, even
though such appeal would be superfluous
if the Corps later denied the permit on
other grounds.
The Court of Appeals did exactly
what this Court has directed should be
done and what the City denies was done:
it looked at the actual circumstances of
the case, and balanced the particular
22
competing interests involved. It is the
City which in actuality is arguing for a
technical and not practical construction
by asserting that because the District
Court decided the economic issue, the
remand order is a final decision,
regardless of the facts and
circumstances of the case which the
Court of Appeals considered.
The fact of the matter is that New
Haven is unhappy with the results of the
Court's balancing process. However, the
City provides no particularized reason
why the Court of Appeal's balancing of
interests should be disturbed. a
“practical construction" of the finality
rule by definition must depend on the
facts and circumstances of each case.
Despite New Haven's fancy rhetoric, the
Court cZ Appeals' construction of the
finality rule, based on the practical
reality of the facts before it, does not
23
form a basis for judicial review.
C. Remand Was Required In Any Event
To Allow The Corps Of Engineers
To Comply With Its Own Regulations
In arguing that the District Court's
ruling on the economic issue was a final
decision, New Haven completely ignores
the fact that the District Court remanded
the proceeding on two grounds: not only
the Corps of Engineers' improper reliance
on economic factors unrelated to physical
impacts, but also the Corps' failure to
comply with its own regulation that Mall
Properties have an opportunity to rebut
the Governor of Connecticut's supposed
objections to the proposed project.? As
3 In view of its failure to
acknowledge the second ground for permit
denial, New Haven's contention that "all
the parties agreed" that the economic
issue was the single "legal linchpin" of
the permit denial is particularly
disingenuous. (Petition at 32). It is
also untrue, as Mall Properties raised
several other arguments for vacating the
Corps' order which the District Court
found unnecessary to address since it
(continued...)
Eero
24
New Haven acknowledges (Petition at 30
n.7) "procedural or evidentiary
deficiencies" of this type typically
trigger a remand for further proceedings
to correct the administrative error.
In Thornburgh v. American College of
Obstetricians and Gynecologists, 476 U.S.
747 (1986), for example, this Court held
that a remand order from the court of
appeals to the district court for further
development of the facts is non-final,
and not subject to appeal to the Supreme
Court pursuant to 28 U.S.C. §1254(2).
The remand order by the District Court to
permit Mall Properties to respond to the
Governor's perceived objection is also a
remand for further development of the
facts, and therefore non-final and non-
appealable.
3(...continued)
remanded on other grounds. (App. D at
34a n.3).
25
Moreover, permitting New Haven to
appeal the economic issue at this time,
when the case must be remanded to allow
Mall Properties to respond to the
Governor in any event, would result in
piecemeal review. That result is
precisely what the Court of Appeals
sought to avoid, and what New Haven seeks
to achieve.
D. The Exception For Appeals By
Federal Defendants Does
Not Apply To New Haven
New Haven argues that the Court
below has articulated a new rule of
finality in conflict with the Tenth
Circuit's rule in Bender v. Clark
("Bender") 744 F.2d 1424 (10th Cir.
1984). (Petition at 32). This argument
is incorrect, and rests on a
misapprehension of the limited holding of
Bender, which is fully consistent with
the Court of Appeals decision in this
case. The court in Bender allowed the
26
federal defendant to appeal from a remand
order imposing a different burden of
proof to be applied by the government in
the remanded proceeding because the
standard of proof issue was a serious and
unsettled one, but “most important",
because the government “had no avenue for
obtaining judicial review of its own
administrative decisions and thus well
might be foreclosed from appealing the
district court's burden of proof ruling
at a later stage of proceedings." (App.
B at 15a). The crucial element of the
decision in Bender and the other cases
cited by the City in which federal
defendants were allowed an immediate
appeal is that “unless review were
accorded immediately, the agency likely
would not be able to obtain review."4
4 The federal defendants obviously
recognized this rule when they declined
to appeal from the District Court order
(continued...)
27
(App. B at 17a).
The Court below found that the City
of New Haven does * fall within the
exception articulatec in Bender. As the
Court noted, the federal defendants have
not appealed from the District Court's
rulings that (1) the Corps may not deny
permits based on economic factors
unrelated to physical changes to the
environment and (2) the Corps violated
its own regulations in not giving Mall
Properties notice and an opportunity to
rebut the governor's supposed
opposition.»
New Haven's overblown rhetoric
notwithstanding, the exception to non-
4(... continued)
and simultaneously moved to dismiss the
appeal.
5 New Haven's musings (Petition at
50) as to why the federal defendants
determined not to appeal is_ sheer
speculation and merits no consideration
whatsoever.
28
appealability of remand orders’ for
appeals by federal defendants in certain
circumstances does not interfere with the
City's rights as an intervenor. The test
applied by the Court below, consistent
with Bender and other courts of appeals,
is not any distinction between party or
intervenor status, but the ability of the
appellant to later obtain judicial
review. A special rule has been carved
out for government and government agency
defendants because they have no means to
appeal their own decisions.
As set forth in Point E, infra, the
City is not precluded from participation
in the remanded proceeding.
Furthermore, if the permits are granted,
the City may raise the economic issue on
appeal together with any challenges to
the remanded proceeding. The policy
reasons for allowing an immediate appeal
by federal defendants simply does not
29
apply to New Haven.
E. The Dismissal of New Haven's
Appeal to Avoid Piecemeal Review
Does Not Prejudice New Haven
New Haven claims that the dismissal
of its appeal somehow constitutes a
denial of justice through delay (Petition
at 34), but fails to explain how it will
be prejudiced by further administrative
proceedings on remand, and a
determination on the permit application,
followed by judicial review of all
appealable issues in a_- single
proceeding. The City relies on
Dickinson v. Petroleum Conversion Corp.,
338 U.S. 507 =(1950). In Dickinson,
however, the Court merely noted that
questions of appealability involve the
competing considerations of "the
inconvenience and costs of piecemeal
review on the one hand and the danger of
denying justice by delay on the other."
388 U.S. at 511.
30
There is no danger that New Haven
will be denied justice by delay. The
Court below expressly held that the City
was not foreclosed from participating in
the permit proceedings on remand, and
"(p]resumably ... can urge environmental
reasons why the permit should be denied."
(App. B at 18a). If the permit is denied
on other grounds, and the denial if
appealed, is affirmed, New Haven would
have achieved its goal, and could not
rationally claim to have been harmed.
On the other hand, if after remand
the permits are granted, the City can
seek judicial review. If the District
Court upholds the permits, the City can
appeal to the Court 'of Appeals and argue
that the initial permit denial based on
New Haven's economic interests was sdhenan
and raise any other objections to the
31
remanded proceedings. (App. B at 18a).®
Thus, judicial review of the economic
issue raised by the City is not denied;
it is simply deferred so that all issues
to be appealed, if not mooted by the
Corps' determination, may be heard in a
single proceeding.
New Haven's argument that dismissal
of its appeal precludes it from bringing
a subsequent challenge to the remanded
proceedings in another jurisdiction is
without merit. (Petition at 36). The
City could have made a motion to change
the venue of the original action if it
truly believed that some other forum was
6 Although the District Court's
ruling that the Corps of Engineers
exceeded its authority could not be
raised again in an appeal to the
District Court from the Corps' decision
after remand, it may be appealed by New
Haven to the Court of Appeals. As New
Haven is a party in this action, there is
no reason why the Court of Appeals would
refuse to hear its appeal after the
proceeding is completed, and the Court
below so found. (App. B at 19a).
32
more appropriate. It did not. New
Haven's desire for forum-shopping does
not outweigh the interests of judicial
economy in avoiding piecemeal review.
The City's argument that neither
Mall Properties nor the Corps’ of
Engineers would be harmed if New Haven
were permitted to appeal is incorrect.
(Petition at 37). The piecemeal review
requested by New Haven is contrary to the
interests of both parties in the
expeditious processing of Mall
Properties' permit applications. The
Corps of Engineers has no objection to
the District Court's rulings, and in fact
moved to dismiss the _ appeal. Most
Significantly, it is the Court of Appeals
which would be harmed if New Haven's
appeal were allowed to proceed, contrary
to the policy against piecemeal review.
As the Court itself held:
Were this court now to order
33
briefing on the socio-economic
issue, decide that issue and
affirm the district court, the
case would be remanded and the
Corps once again would decide
whether to issue the permit.
Likely another appeal would
follow, necessitating another
round of briefs, another
familiarization with the
record, and another opinion.
Our decision on the socio-
economic issue might turn out
to have been superfluous were
the Corps on remand to deny the
permits on independent proper
grounds. More efficient and
quicker, in the long run, would
have been to delay review and
consider all issues at one
time.
(App. B at 20a).
The City never articulates how it
has been harmed by the Court of Appeals'
determination. Although New Haven
complains about the legal costs of
proceeding with the remanded proceeding,
the interests of its taxpayers would be
served if the permit review process
continues in the most expeditious manner,
with appeal of the economic issues saved
until after a determination on the permit
34
application is made, and if appealed,
reviewed by the District Court. If the
permit is denied in the remanded
proceeding and there is no _ appeal,
New Haven taxpayers will have been saved
unnecessary litigation costs.
Considerations of judicial efficiency
and the financial interests of the
parties thus counsel against disturbing
the dismissal of the appeal.
The Court of Appeals was cognizant
of the City's concerns. The Court
recognized that if review were granted,
and the Court concluded that the District
Court erred on both the economic issue
and the procedural issue concerning the
agency's failure to afford Mall
Properties an opportunity to rebut the
Governor's opposition, "an unnecessary
administrative proceeding could be
averted." (App. B at 21a). However, the
Court concluded that permitting review of
~ trate collie
35
interlocutory rulings would "undermine
the final judgment rule and open the door
to piecemeal litigation and its
concomitant delay, costs and burdens."
(App. B at 22a). There is no reason to
disturb the Court's careful balancing of
policy concerns.
F. The District Court Did Not Impose
A Radical New Standard Justifying
Immediate Review
New Haven argues that the District
Court established a wholly new standard
for Corps of Engineers permitting
decisions which is inconsistent with
existing law and which is in need of
urgent remediation. The urgency claimed
is non-existent; certainly no factual
basis is provided to support the City's
hyperbole. The absence of any urgency is
confirmed by the decision of the federal
defendants not to appeal. Moreover, the
City's legal arguments are without merit.
New Haven argues that the District
36
Court misapplies et oli dison,
fails to give adequate deference to
alleged past practice by the Corps in
considering economic impacts, and is
inconsistent with the Corps' public
review regulations and with the Council
on Environmental Quality (*CEOQ*)
regulations. New Haven is wrong on all
counts.
As a preliminary matter, the courts
are not bound by an agency's
interpretation of the scope of its
statutory authority where such
interpretation is contrary to
Congressional intent. See ureau oO
Alcoho obacco and Firearms v. Federa
Labor Relations Authority, 464 U.S. 89,
97 (1983); Nort eri ndustries nc.
v. Feldman, 722 F.2d 893, 898-99 (list
Cir. 1983).
1. Section 10 of the RHA
In any event, New Haven's assertion
37
that economic impacts unrelated to
physical impacts have been considered by
the Corps since 1933 is without basis.
(Petition at 41). United States ex rel.
Greathouse v. Dern ("Dern"), 289 U.S. 352
(1933), relied on by the City, does not
support its position.” The petitioners
in that case sought a writ of mandamus to
compel the Secretary of War to authorize
the construction of a wharf in the
Potomac River pursuant to Section 10 of
the RHA. The federal government had
enacted legislation authorizing the
establishment of a highway, which would
require the purchase or condemnation by
the federal government of a part of
7 New Haven argues that the Corps
acknowledged a previously accepted
practice to consider economic factors in
the District Court. (Petition at 43).
The memorandum of the federal defendants
cited by the City, however, addresses no
such practice. It only discusses the
Dern case, which does not hold that the
Corps may make permitting decisions based
on economic competition.
38
petitioners' property and destruction of
the wharf if constructed. At issue in
Dern was whether, under the circumstances
of the case, the extraordinary remedy of
mandamus was appropriate. Holding that
it had discretion to “refuse mandamus to
compel the doing of an idle act" the
Court denied the petition because the
relief sought would be burdensome to the
federal government and without any real
benefit to the petitioners. 289 U.S. at
360. Dern thus involved exceptional
circumstances where construction of the
wharf would have been futile in any
event, and a strong federal government
interest and major project was involved.
Dern does not authorize the Corps to
balance the competing economic interests
of two communities in promoting
development in its permitting process.
Zabel_v. Tabb, 430 F.2d 199 (5th
Cir. 1970), cert. denied, 401 U.S. 910
39
(1971), contrary to the City's
contention, does not give the Corps
limitless discretion to deny a permit.
In the first place, economics were not at
issue in Zabel. Rather, the Corps had
denied a permit because of the project's
undue impacts to the physical
environment. The court found that the
Corps' consideration of environmental
factors was authorized, and indeed
required, by two other statutes -- NEPA
and the Fish and Wildlife Coordination
Act. Thus, the Corps there "t[ook] heed
of", “effectuate(d]", and did "not thwart
other valid statutory governmental
policies." 430 F.2d at 209 (emphasis
supplied). Zabel did not hold that the
Corps could deny a permit for any
political or economic reason it desired.
In Zabel, the Corps’ followed
specific statutory directives in denying
the permit. In Dern, too, the Corps’
40
determination was based on statutory
directives respecting the federal
highway project. In direct contrast, the
District Court found that the Corps’
permit denial was not based on any
statutory directive, but was essentially
an exercise of unbridled discretion
without any Congressional authorization.
Moreover, the lack of statutory
authority for the cCorps' conduct was
compounded by the absence of any
relationship between the economic
interests on which the Corps based its
decision, and any physical change to the
environment.
2. The Public Interest Regulations
There is also no_ inconsistency
between the District Court's decision
and the Corps of Engineers' public review
regulations. As the regulatory history
of the public review regulations shows,
the regulations do not authorize the
41
Corps, under the guise of environmental
permitting decisions, to determine which
of two communities should be allowed to
stimulate economic development.
Until 1968, the Corps administered
Section 10 of the RHA essentially to
protect federal navigational interests. ®
In December 1968, the-.agency provided in
its regulations for additional factors to
be considered in Section 10 permit
decisions. These factors, added "in
response to a growing national concern
for environmental values and related
federal legislation . . .", included:
"fish and wildlife, conservation,
pollution, aesthetics, ecology, and the
general public interest." Deltona Corp.
v. United States, 657 F.2d 1184, 1187
(Ct. Cl. 1981), cert. denied, 455 U.S.
8 See generally “Regulatory
Programs of the Corps of Engineers", 42
Fed. Reg. 37122-23 (July 19, 1977)
("Regulatory Programs").
1017 (1982).
Congress recognized the public
interest standard and its limited scope.
The March 17, 1970 Report of the House
Committee on Government Operations
explained that:
The Corps of Engineers, which
is charged by Congress with the
duty to protect the nation's
navigable waters, should, when
considering whether to approve
applications for landfills,
dredging and other work in
navigable waters, increase its
consideration of the effects
which the proposed work will
have, not only on navigation,
but also on conservation of
natural resources, fish and
wildlife, air and water
quality, esthetics, scenic
view, historic sites, ecology,
and other public interest
aspects of the waterway.
H. Rep. No. 917, 91st Cong., 2d Sess. at
5 (1970) (emphasis supplied).
Section 404 of the CWA was enacted
as part of the Federal Water Pollution
Control Act of 1972 ("FWPCA"). In 1974,
in order to implement Section 404 as well
43
as the requirements of other recent
federal legislation, the Corps
incorporated into its permitting
regulations additional factors to be
weighed, including "economics, historic
values, flood damage prevention, land use
classification, recreation, water supply,
and water quality." Regulatory Programs
at 37123 (emphasis' supplied). See
Jentgen v. United States, 657 F.2d 1210
(Ct. Cli. 1981), cert. denied, 455 U.S.
1017 (1982).?
Although the regulations do not
define the term "economics," the Corps'
discussion preceding its 1977 regulatory
amendments makes it clear that this new
factor, like the others, was added in
response to new federal legislation.
Regulatory Programs at 37122. See also
9 The "economics" factor actually
appeared for the first time in the
interim regulations of May 10, 1973. 38
Fed. Reg. 12217 (May 10, 1973).
44
Deltona Corp. v. United States, 657 F.2d
at 1187. The new legislation included
FWPCA, the Marine Protection, Research
and Sanctuaries Act of 1972 ("MPRSA"),
the Coastal Zone Management Act of 1972,
as amended ("CZMA"), and NEPA. 42 Fed.
Reg. 37123 (July 19, 1977). Thus, the
scope of the term "economics" must be
ascertained by reference to such
legislation.
None of this new legislation,
however, anticipated or authorized the
consideration of generalized economic
factors. The FWPCA established Section
404, which provides only for an
assessment of the economic impact of
filling on the resources of a particular
disposal site.
Pursuant to Section 404, Corps'
permitting decisions are governed by
guidelines developed by the Environmental
Protection Agency ("EPA"). 33 ¥.8.C.
45
§1344 (b). These guidelines are to be
based upon criteria comparable to those
developed for ocean discharge permits
pursuant to Section 403(c) of the Clean
Water Act, 33 U.S.C. §1343(c) (1). The
economic considerations within the ocean
discharge criteria are limited to the
economic values associated with the site
to be filled (i.e. the "disposal site").
It follows that the economic criteria
permissible under Section 404 are also
those related to the disposal site.
Section 403 articulates certain
general criteria which must be reflected
in the ocean discharge guidelines. Among
them are two which refer to economics:
(C) The effect of disposal of
pollutants on esthetics,
recreation and economic values;
x «
(G) the effects on alternate uses of
oceans, such as mineral exploitation
‘and scientific study.
33 | @.uhe. See tes (3). The EPA
guidelines developed to implement’ the
46
ocean discharge criteria identify the
following "economic" considerations:
Potential for affecting the
recreational and commercial
values of living marine
resources ....
40 C.F.R. §227.17(a) (2). The factors to
be assessed in ascertaining the economic
effects include the
(a) Nature and extent of
present and potential . .
commercial use of areas which
might be affected by the
proposed dumping;
se 2 @
(h) Presence in the material of any
constituents which might
significantly effect living marine
resources of recreational or
commercial value.
40 C.F.R. §227.18. ee also 40 C.F.R.
$227.19. In short, Section 404
instructs the Corps to base permitting
decisions on certain criteria, and the
economic aspects of those criteria are
limited to effects on commercial values
and uses of the disposal site. The Act
does not authorize the Corps'
47
consideration of broader economic factors
in the permitting process. This limited
scope of economics was confirmed in
Buttrey v. United States, 690 F.2d 1170,
1180 (5th Cir. 1982), cert. denied, 461
U.S. 927 (1983).
The MPRSA provides for the Corps to
issue permits for the transportation of
dredged material for the purpose of
disposing it in ocean waters. The
governing provision, Section 103 (33
U.S.C. §1413), allows for a= permit
where, inter alia, the dumping will not
unreasonably impact the economic
potentialities of the disposal site. As
in the ocean discharge criteria, there is
no generalized economic standard. The
legislation is, of course, inapplicable
to Mall Properties' application.
Likewise, the CZMA (26 U.6.C.
§1451, et seg.) is inapplicable to the
North Haven Mall site. Finally, NEPA is
48
a procedural statute which does not
expand the Corps'! substantive
decisionmaking to incorporate general
economic effects of enhanced competition.
See Strykers Bay Neighborhood Council
ne. v. Karlen, 444 U.S. 223, 227 (1980);
Cape May Greene, Inc. v. Warren, 698 F.2d
179, 188 (3d Cir. 1983).
Consequently, the legislation which
precipitated the inclusion of the
"economics" factor in the "public
interest review" neither anticipates nor
authorized the consideration of broad
socio-economic concerns. Rather, the
economic concerns of the legislation
applicable to the Corps' decisionmaking
have consistently and uncategorically
been limited to those directly related to
the filling of the disposal site and not
to indirect secondary effects of the
ultimate development activity.
49
36 NEPA
Nor is there any inconsistency
between the CEQ regulations and the
District Court decision. The regulations
merely define "effects" to include direct
and indirect effects of a proposed
action. 40 C.F.R. §1508.8. The
regulations do not require or even
suggest, as claimed by the City, that
effects not proximately causally related
to a proposed action are to be
considered under NEPA. Nor could the CEQ
regulations be construed in such a manner
in light of the Supreme Court's decision
in Metropolitan Edison. Since the
Metropolitan Edison decision occurred
subsequent to the promulgation of the
relevant CEQ regulations, Metropolitan
Edison and the regulations must be read
in para materia; the District Court's
adherence to this Court's decision can
hardly be considered a marked departure
50
from governing law.1°
New Haven claims that Metropolitan
Edison involved only the threshold
question of whether an environmental
impact statement ("EIS") should be
prepared and that the District Court
applied Metropolitan Edison to the
impacts to be considered in an EIS "for
the first time." (Petition at 15). New
Haven also argues that subsequent courts
have limited Metropolitan Edison "to the
threshold question of whether NEPA
applies in the absence of recognized
impacts." (Petition at 45). The City's
interpretation of Metropolitan Edison and
its progeny, and its attempts’ to
distinguish these cases, is incorrect.
10 To the extent that the Corps'
public interest review regulations are
based upon NEPA, Metropolitan Edison had
the same effect; thus the District
Court's decision, as with the CEQ
regulations, hardly constitutes a radical
departure from existing standards.
51
It is clear from the Metropolitan
Edison opinion that this Court did not
intend to limit its holding to the
threshold question of whether an EIS is
required. At issue in that case was the
interpretation of Section 102 of NEPA, 42
U.S.C. §4332(C), which directs all
federal agencies to evaluate the
"environmental impact" and any
unavoidable adverse "environmental
effects" of agency action significantly
affecting the quality of the human
environment. This Court held that the
terms “environmental impact" and
environmental effects" include "a
requirement of a reasonably close causal
relationship between a change in the
physical environment and the effect at
issue." 460 U.S. at 774. There is
nothing in the opinion to suggest that
the Court's general interpretation of
this statutory provision was not intended
52
to apply to all NEPA issues, including
the types of impacts that may be
considered in an EIS.
A critical factor, which the City
has overlooked, is that the term
“environmental impact" as used in § 102
of NEPA, has the same meaning whether
applied to the threshold question of the
need for an EIS or the contents of an
EIS. The City wants to draw an
artificial distinction and assign a
different meaning to the same words
depending on the stage of the NEPA
process solely to bolster its position.
It is inconceivable, however, that
Congress could have intended such an
irrational construction of the statute.
Moreover, the City's reliance on
Animal Lovers Volunteer Association, Inc.
vy. Weinberger ("Animal Lovers"), 765 F.2d
937 (9th Cir. 1985) and Pacific Northwest
Bell _ Telephone Co. v. Dole ("Pacific
i T
53
Northwest"), 633 F. Supp. 725 (W.D. Wash.
1986) for the proposition that
Metropolitan Edison has been limited to
the threshold question of whether NEPA
applies is misplaced. (Petition at 45).
In both cases the plaintiffs challenged
the adequacy of the EIS. Animal Lovers,
765 F.2d at 938; Pacific Northwest, 633
F. Supp. at 726. Moreover, in Olmstead
Citizens For a Better Community v. United
States, 606 F. Supp. 964 (D. Minn. 1985),
aff'd, 793 F.2d 201 (8th Cir. 1986), the
district court applied Metropolitan
Edison not only to the threshold question
of the need for an EIS, but also to its
alternative holding that the document
prepared by the agency met the standards
for an EIS, and was adequate. 606
F.Supp. at 974.
These authorities demonstrate that
the courts have applied the "causally
related standard" of Metropolitan Edison
54
to both aspects of the NEPA process--
the threshold question of the need for
an EIS and the scope of an EIS. The
District Court's application of
Metropolitan Edison falls squarely within
this framework, and is fully consistent
with Metropolitan Edison and its progeny.
The District Court's reliance on
Metropolitan Edison is also fully
consistent with the Second and Ninth
Circuit cases cited by the city.}1
Rochester v. United States Postal
Service, 541 F.2d 967, 973 (2d Cir.
1976); Davis v. Coleman, 521 F.2d 661,
676-77 (9th Cir. 1975); Bersani v. EPA,
il Contrary to New Haven's
assertions, Mall Properties did take
issue with the EIS prepared by the Corps,
by giving comments and critiquing, among
others, the economic issues discussed in
the EIS. In addition, Mall Properties
argued in the District Court that the
economic effects found by the Corps were
overstated. Thus, Mall Properties did
challenge the Corps' analysis of the
economic issue.
55
Nos. 87-6275, 87-6295, (2d Cir. June 8,
1988). Rochester v. United States
Postal Service involved a decision
committed to agency discretion; e.g.,
whether to close or move aé federal
facility. There was no third party
permit applicant. In that circumstance,
unlike the instant matter, the federal
agency is not regulating the private use
of property, and the agency can consider
economic factors. The Corps of Engineers
in environmental permitting matters is,
however, not vested with such unfettered
discretion.
Davis v. Coleman involved the
proposed construction of a major highway
interchange in an agricultural area.
The Court's holding that the agency was
required to consider the environmental
effects of the development which would
result from the construction of the
interchange is consistent with the
ramen tnntieee eee
56
Metropolitan Edison standard. The impacts
of urban development are physical changes
to the environment which are at _ the
heart of NEPA and which this Court found
appropriate for consideration in an EIS,
unlike the attenuated economic interests
considered by the Corps. In addition,
there was a direct causal link between
the construction of the interchange and
the changes to the physical environment
which induced growth would bring. The
opinion does not authorize the Corps to
consider purely economic factors in its
permitting decision. Moreover, both
Rochester and Davis were deciaed prior to
Metropolitan Edison. To the extent they
differ from holding of Metropolitan
Edison, the cases are not controlling.
Bersani v. EPA, which arose under
Section 404 of the CWA, and not NEPA,
involved the issue of alternative sites
for a proposed shopping mall and the
57
relevant time period for determining
whether an alternative site is available.
The question of whether more than one
mall could survive in the market area for
purposes of alternative site analysis
(slip op. at 37063) has nothing
whatsoever to do with the scope of the
Metropolitan Edison standard or the
question of whether the Corps has
statutory authority to deny a permit
based on economic factors. Bersani
related to the practicality of
alternatives, not impacts.
The City's claim that the District
Court's decision and supposed misplaced
reliance on Metropolitan Edison has
"imposed a new legal standard" (Petition
at 43) is sheer hyperbole. The District
Court announced no such standard. The
District Court merely held that in this
particular case, the potential social and
economic effects considered dispositive
58
by the Corps lacked the requisite
proximate causal relationship to the
proposed shopping mall, and that the
Corps had thus considered unlawful
factors in its determination.
The City's assertion that’ the
District Court substituted its own
judgment concerning the factors to be
considered by the Corps, and took upon
itself the role of political decision
maker, ignores the Court's well reasoned
determination and is entitled to no
consideration. Similarly, the assertion
that dismissal of the appeal placed "the
fate of thousands of acres of wetlands
within New England" at stake without
appellate review is nonsense. (Petition
at 47.) There is nothing in the District
Court's decision to preclude
consideration of direct physical effects
on the wetlands in the remanded
proceeding. To the contrary, the
59
District Court noted that protection of
the physical environment and natural
resources should be the focal point of
the Corps decision in the remanded
proceeding. (App. D at 76a.)
We would respectfully suggest, in
any event, that the City's concerns, to
the extent that they have any validity,
are more properly addressed in the first
instance by the Corps of Engineers and
not by the Court of Appeals. The Corps
is in a better position than the Court
to determine the weight it should accord
to various factors in light of the
District Court's opinion.
60
CONCLUSION
For the foregoing reasons, the
petition for a writ of certiorari to the
United States Court of Appeals for the
First Circuit should be denied.
Respectfully submitted,
Daniel Riesel
460 Park Avenue
New York, New York 10022
212-421-2150
Counsel for Respondent
Sive, Paget & Riesel, P.C.
Attorneys for Respondent
Mark A. Chertok
Karen E. Gross
On the Brief