37-1850
No. ————
IN THE
Supreme Court of the United States
OCTOBER TERM, 1987
J.E.T.S., INC.,
Petitioner,
V.
THE UNITED STATES OF AMERICA,
Respondent.
PETITION FOR WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
Huco N. GERSTL
GERSTL & GORMAN, INC.
Attorneys at Law
33 Soledad Drive
Monterey, CA 93940
Telephone: (408) 649-0666
Attorneys for Petitioner
J.T .S., Inc.
MAY 11, 1988
WILSON - EPES PRINTING Co., INC. - 789-0096 - WASHINGTON, D.C. 20001
QUESTIONS PRESENTED FOR REVIEW
1. Did the Armed Services Board of Contract Appeals
have jurisdiction to grant summary judgment in favor
of the government, and did the United States Court of
Appeals for the Federal Circuit have jurisdiction to af-
firm that judgment?
2. Was the Petitioner denied due process in that the
Armed Services Board of Contract Appeals (and the
United States Court of Appeals for the Federal Circuit)
utilized Petitioner’s conviction in a criminal prosecution
on other matters as a ground for violation of its Fifth
Amendment property rights in the instant case?
3. Was the granting of summary judgment by the
ASBCA (as affirmed by the Court of Appeals) barred by
either:
(a) Res judicata; or
(b) Law of the case?
(i)
TABLE OF CONTENTS
Page
QUESTIONS PRESENTED FOR REVIEW ................. i
TABLE OF CONTENTS ............... NS aia la iasasuercatuancaaanes iii
ye SP De MN bey 6) 4 yt: ee Sindee A iv
PETITION FOR WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS FOR
ep eg a FN §. f°) Oy 1
OPINION BELOW ............ San test taavaauseadavanaicesealienssuiieimeabades 1
SER AE ORR ek ee 2
CONSTITUTIONAL PROVISION INVOLVED ........... 2
SrAtemens OF THE CASE..................................... om 2
REASONS FOR GRANTING THE WRIT _............ 5
I. THE BOARD HAD NO JURISDICTION TO
RELITIGATE ENTITLEMENT .............. = 5
Il. THE GRANTING—AND AFFIRMANCE—OF
SUMMARY JUDGMENT BASED ON J.E.T.S.’
PARENT’S CONVICTION CONSTITUTED
ABUSE OF DISCRETION, PREJUDICIAL
ERROR, AND DENIAL OF DUE PROCESS. 7
lil. WHETHER OR NOT THE PETITIONER WAS
A SMALL BUSINESS WAS NOT AT ISSUE... 10
a AE RR a 12
(iii)
iv
TABLE OF AUTHORITIES
CASES Page
Bond vs. Brown, 12 How. (53 U.S.) 254 (1851) -... 10
Cardwell vs. Kurtz, 765 F.2d 776 (9th Cir.1985) .. 11
De Sollar vs. Hanscome, 158 U.S. 216 (1895) ......... 10
Drum vs. Nasuti, 648 F. Supp. 888 (ED Pa. 1986),
aff'd mem., 831 F.2d 286 (3d Cir. 1987) —........... 9
Duncan vs. Atchison, T. and S.F.R. Co., 72 Fed.
es I UI esa arcven sense canenlonnecais 10
Emich Motors Corporation vs. General Motors
Corporation, 340 U.S. 558 (1951) ......................... 9
Federated Department Stores vs. Moitie, 452 U.S.
Be ie I ios scat cciesasakseiemanaieks dl centontunacietinantvdcedibias 6
Frank vs. Mangum, 237 U.S. 309 (1915) -....000... 9
Gindes vs. United States, 740 F.2d 947 (Fed. Cir.),
cert. denied, 469 U.S. 1074 (1984) ........................ 12
J.E.T.S., Inc. vs. United States, 838 F.2d 1196
A es <I ee eae ee 1
J.E.T.S., Inc., ASBCA No. 28642, 87-1 BCA (CCH)
7 19,569 (1987) ............... SNe EDN D9 te AE, 5,7
J.E.T.S., Inc., ASBCA No. 26135, 82-2 BCA (CCH)
» Syl Rel ee AES tee eee OK TOR i METD at No 3
K & R Engineering Company, Inc. vs. United
States, 616 F.2d 469 (Ct. Cl. 1980) ..................... 11
Kremer vs. Chemical Construction Corporation,
A __ aRcemieee avnr COC TRE cr 6
Lee vs. City of Peoria, 685 F.2d 196 (7th Cir.
UN aces cents asinantasiecoiseseniaotaaaciaseaahcaciieioattisaeendase 7
Migra vs. Warren City School District Board of
Education, 465 U.S. 75 (1984) ...................200....... 6
Parklane Hosiery vs. Shore, 439 U.S. 322 (1979 .. 6
Pubali Bank vs. City National Bank, 777 F.2d 1340
I ero 11
Ralston Purina Company vs. Novak, 111 F.2d 631
I RC I ee 10
Schwartz vs. N.M.S. Industries, Inc., 575 F.2d
ee eee a ee eae 11
Sealfon vs. United States, 332 U.S. 575 (1948)... 9
Sidney vs. Zah, 718 F.2d 1453 (9th Cir. 1983) ....... 7
Se ee
v
TABLE OF AUTHORITIES—Continued
Smith International, Inc. vs. Hughes Tool Company,
759 F.2d 1572 (Fed. Cir.), cert. denied, 474 U.S.
RS SE ich echt sntneanccs coceccteninslinpiieteees aan,
Town of Seabrook vs. New Hampshire, 738 F.2d
Re | ERA ee Rena FA ten
United States vs. Burnette, 800 F.2d 1558 (11th
GA TED ab cakdcenteencconecatenacdassepdnsavuonmtartasisameeetics
United States vs. Mississippi Valley Generating
Company, 364 U.S. 520 (1961) .............................
United States vs. Turtle Mountain Band of Chip-
pewa Indians, 612 F.2d 517 (Ct. Cl. 1979) .........
United States vs. Uzzell, 648 F. Supp. 1362 (D.D.C.
IIE as sciecinicssapneenchbecnmcinscbeitegelicsmactanamh teeta tad ianenteaaes,
Waggoner vs. Dalliare, 767 F.2d 589 (9th Cir.
1985), cert. denied, 475 U.S. 1064 (1986) _........
Washington Gas Light Company vs. District of
Comecmtie, DR Ci cee CD oa eeccsceccersccnees
White vs. Murtha, 377 F.2d 428 (5th Cir. 1967) ..
Page
11
11
10
IN THE
Supreme Court of the United States
OCTOBER TERM, 1987
No.
J.E.T.S., INC.,
. Petitioner,
THE UNITED STATES OF AMERICA,
Respondent.
PETITION FOR WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
The Petitioner, J.E.T.S., INC.,' respectfully prays that
a writ of certiorari issue to review the judgment of the
United States Court of Appeals for the Federal Circuit
entered on February 11, 1988.
OPINION BELOW
The decision of the Court of Appeals affirmed the de-
cision of the Armed Services Board of Contract Appeals
{A.S.B.C.A.) denying petitioner’s claim for an equitable
adjustment in contract price. A copy of the appellate
opinion is attached as Appendix “A”. The opinion is re-
ported at 838 F.2d 1196 (Fed. Cir. 1988). The court had
earlier denied petitioner’s suggestion for hearing en bane.
1 J.E.T.S., INC., is a wholly owned subsidiary of ALLIED MAN-
AGEMENT, INC. The following may be considered affiliates:
J.E.T.S. WAESCHEREI, GmbH, and OLD DOMINION INSUR-
ANCE CO.
2
JURISDICTION
On February 11, 1988, the Court of Appeals entered
judgment affirming the A.S.B.C.A.’s decision denying pe-
titioner’s claim for equitable adjustment. The jurisdic-
tion of this court is invoked under Title 28, United States
Code. Section 1254(1). No other petitioner is involved
in this petition.
CONSTITUTIONAL PROVISION INVOLVED
United States Constitution, Amendment V:
Nor shall any person . . . be deprived of life, lib-_
erty, or property, without due process of law....
STATEMENT OF THE CASE
On April 1, 1980, Petitioner, J.E.T.S., INC. ‘herein-
after “J.E.T.S.”) was awarded a full food service man-
agement contract at Vandenberg Air Force Base in Cali-
fornia. The contract was a firm, fixed price contract
which contained a “changes” clause and an “option” clause.
The contract was a 100% small business set aside con-
tract which required J.E.T.S. to certify that it was a
small business.
On March 23, 1981, respondent, THE UNITED
STATES OF AMERICA (hereinafter “government”’), at-
tempted to exercise the first year option. J.E.T.S. informed
the government that it did not feel the option had been
validly exercised and indicated that it would continue to
perform the services required, but under protest. Simul-
taneously, J.E.T.S. presented a claim against the govern-
ment under the “changes” clause. The government denied
the claim and J.E.T.S. timely appealed to the Armed
Services Board of Contract Appeals (A.S.B.C.A.), Case
Number 26135, in June, 1981.
While the appeal was pending, the government pur-
ported to exercise its second year option in January,
1982. J.E.T.S. protested again, but continued to per-
form services under threat of termination for default.
3
On August 4, 1982, the A.S.B.C.A. granted summary
judgment in favor of J.E.T.S. on the issue of entitle-
ment, holding that the government had not validly exer-
cised its option, and that J.E.T.S.’ continued performance
constituted a constructive change for which it was en-
titled to an equitable adjustment. The matter was re-
manded to the contracting officer to negotiate the amount
of such adjustment. J.E.T.S., Inc., ASBCA No. 26135,
82-2 BCA (CCH) % 15,986 (1982).
The time for appeal from the A.S.B.C.A. decision ex-
pired without any action by the government, and the
A.S.B.C.A. action became final in December, 1982.
The contracting officer failed to render a final decision
on quantum, and on July 27, 1983, J.E.T.S. timely filed a
notice of appeal and complaint limited to the issue of
the quantum of recovery to which it was entitled under
the Board’s earlier decision. This new case was docketed
as A.S.B.C.A. No. 28642.
While the second appeal was pending, on August 31,
1983, a 25 count indictment was issued against Barnette
and Gibbs, principal owners of ALLIED MANAGEMENT,
INC., which is J.E.T.S.’ parent corporation, against AL-
LIED, and against other related companies and individ-
uals.
The indictments dealt with (1) a laundry services con-
tract in the- Federal Republic of Germany; (2) a food
service contract at Ft. Lee, Virginia; (3) a food service
contract at McConnell Air Force Base, Kansas; and (4)
a laundry services contract at Ft. Lee, Virginia.
The indictment at no time mentioned or referred to the
Vandenberg contract.
In July, 1984, a jury in the United States District
Court for the Northern District of Florida returned ver-
dicts of guilty against the named defendants in the in-
dictment on various counts, none of which dealt with the
Vandenberg contract.
|
4
In early 1985, the government amended its answer in |
A.S.B.C.A. No. 28642, contending:
(1) Respondent agrees that appellant is entitled to
be paid for the reasonable value of its services
that were performed following the government’s
failure to exercise the option properly as the
Board previously ruled. However, it is respond-
ent’s position that the measure of the reasonable
value of services performed by appellant is
measured by the contract price. Appellant is
not entitled to additional costs or anticipatory
profit that it alleges.
(2) The government’s improper exercise of the op-
tion under the contract rendered the contract |
unenforceable. Notwithstanding, the contract is
valid to the extent it was performed. Therefore,
appellant is entitled only to the amount of
money agreed upon in the contract.
(3) Appellant initially entered into the contract by
falsely certifying itself as a small business when
in fact it was a large business. The contract
being a 100% small business set aside would
have precluded appellant from being awarded
the contract if it had not falsely certified itself
as a small business. Appellant has been con-
victed of numerous false claim violations con-
cerning its certificate as a small business. Ap-
pellant’s false certification renders the contract
void ab initio and entitles appellant as a matter
of law to no additional funds for any alleged
equitable adjustment.
(4) Failure to exercise an option could not be a con-
structive change under the contract since the
contract ceased to exist when the government
improperly exercised the option. However, to
the extent it was performed, the contract be-
came valid.
In April, 1985, J.E.T.S. moved for summary judgment
striking the four affirmative points raised by the govern-
5
ment. The government filed a cross-motion for summary
judgment in May, 1985.
On October 8, 1986, the United States Court of Appeals
for the Eleventh Circuit affirmed the District Court con-
viction of J.E.T.S.’ parent corporation and its owners.
United States vs. Barnette, 800 F.2d 1558 (11th Cir.
1986).
On January 21, 1987, the A.S.B.C.A. rendered its opin-
ion on the motions for summary judgment in A.S.B.C.A.
No. 28642:
1. It ruled that the government’s first, second
and fourth points mentioned above were without
merit.
2. It ruled that the contract was void ab initio
because of appellant’s false certification as a small
business.
3. It held that the government was entitled to
summary judgment and that the appellant had no
right of recovery either under the contract or under
a quantum valenbant/quantum meruit theory.
J.E.T.S., Inc., ASBCA No. 28642, 87-1 BCA (CCH)
719,569 (1987). J.E.T.S. filed an appeal to the United
States Court of Appeals for the Federal Circuit. The
matter was argued to the court on an agreed statement
in lieu of appendix, Appendix “B” appended hereto.
The Court of Appeals affirmed the action of the Board.
REASONS FOR GRANTING THE WRIT
I. THE BOARD HAD NO JURISDICTION TO RELITI-
GATE ENTITLEMENT
By its opinion granting summary judgment in
A.S.B.C.A. No. 26135, the Board specifically ruled
that the government had not exercised its option and that
therefore, either on the theory that there was no remain-
ing contract per se between the government and the ap-
pellant, or that there had been a constructive material
change to the contract, appellant was entitled to an equi-
Va
6
table adjustment and the only thing remaining to be
determined was the amount of that adjustment.
It is essential to recognize that the only issue litigated
in the earlier Board action was entitlement and, thus, if
there arose a dispute over quantum, this would (and
did) require an entirely new filing by J.E.T.S. Thus,
contrary to the finding of the Court of Appeals, Appen-
dix, page 7a, this was not a continuation of the same liti-
gation, but an entirely new action.
By its decision in A.S.B.C.A. No. 28642, the Board
reversed itself on the issue of entitlement, something it
had absolutely no jurisdiction to do because that issue was
res judicata and both the government and the Board were
precluded from relitigating that issue.
_ Res judicata and collateral estoppel serve the dual pur-
poses of protecting litigants from the burden of relitigat-
ing an identical issue with the same party or his privy
and of premeting judicial economy by preventing need-
less litigation. They prevent inconsistent decisions and
encourage reliance on adjudication. Parklane Hosiery
vs. Shore, 439 U.S. 322 (1979); Kremer vs. Chemical
Construction Corporation, 456 U.S. 461 (1982); Migra
vs. Warren City School District Board of Education, 465
U.S. 75 (1984). The Board had no jurisdiction to reliti-
gate entitlement.
Once the time for appeal has run, a final judgment is
res judicata without regard to the fact an appeal might
have been taken to a higher court. As recently stated in
Federated Department Stores vs. Moitie, 452 U.S. 394,
401 (1981):
The doctrine of res judicata serves vital public in-
terests beyond any individual judges’ ad hoe determi-
nation of the equities in a particular case. There is
simply “no principle of law or equity which sanctions
: the rejection . . . of the salutary principle of res
judicata.” The Court of Appeals’ reliance on “public
7
policy” is similarly misplaced. This Court has long
recognized that “public policy dictates that there be
an end of litigation; that those who have contested
an issue shall be bound by the result of the contest,
and that matters once tried shall be considered for-
ever settled as between the parties,’ Baldwin v.
Traveling Men’s Assn., 283 U.S. 522, 525 (19381).
The government cannot qualify for any exception to
the principle of issue preclusion under some colorable
claim that it did not know, and could not have known,
of the potential problems with J.E.T.S.’ certification that
it was “small.” In fact, as the indictment, conviction,
and appellate decision clearly point out, J.E.T.S.’ size was
challenged as early as 1979. Thus, there can be no ques-
tion that as of the date on which the Board granted
J.E.T.S.’ motion for summary judgment in August, 1982,
the government knew, or should have known, that J.E.T.S.
had been the subject of investigation and challenge as to
its size.
The government and the Board are thus bound by the
rules of res judicata and preclusion, and for the Board
to double back on itself as it did in the instant action is
legally intolerable, without any basis in law or in equity.
Sidney vs. Zah, 718 F.2d 1453, 1459 (9th Cir. 1983) ;
Town of Seabrook vs. New Hampshire, 738 F.2d 10, 11
(1st Cir. 1984); Lee vs. City of Peoria, 685 F.2d 196,
199, note 4 (7th Cir. 1982).
Il. THE GRANTING—AND AFFIRMANCE—OF SUM-
MARY JUDGMENT BASED ON J.E.T.S.”. PARENT’S
CONVICTION CONSTITUTED ABUSE OF DISCRE-
TION, PREJUDICIAL ERROR, AND DENIAL OF
DUE PROCESS
The A.S.B.C.A. opinion candidly states:
The present contract was not included in the in-
dictments and convictions.
87-1 BCA at 98,913.
8
The Court of Appeals opinion candidly states:
A major charge of the indictment was that in
obtaining four other government contracts, Allied
had falsely certified that it was a small business.
Two of those contracts were food service contracts
at other military bases and two others were laundry
service contracts at a military base and in the Fed-
eral Republic of Germany.
Appendix, pages 5a-6a.
J.E.T.S. stresses that the present contract was not
involved in the criminal case and that J.E.T.S. was
not a defendant in that case.
Although J.E.T.S. was not a party in the criminal
case, it was very much a part of the activities upon
which the criminal convictions were based. The
Court of Appeals described J.E.T.S. as “a wholly
owned subsidiary of Allied that performed govern-
ment service contracts throughout the world.”
As a wholly owned subsidiary of Allied, LETS.
appears to have functioned as Allied’s operating di-
vision and alter ego.
Appendix, pages 9a-10a.
_The criminal conviction thus would have estopped
Allied, Barnette, and Gibbs from denying before the
Board that they had misrepresented to the government
that the contractors for the four other contracts in-
volved in the criminal proceedings were small busi-
nesses, since that question had been “distinctly put in
issue and directly determined” in the criminal case.
Those four contracts were similar to the contract
in the present case. Two were food service contracts,
and two were laundry service contracts. All of them
were executed and performed at the same time as
the present contract. In all four of them, the cer-
tificates of small business qualification were false
because, in determining the size of the contractor,
the receipts of affiliates of the contractor were ig-
nored in violation of the regulation requiring those
receipts to be included.
Appendix, page 10a.
9
Apparently, neither the Board nor the Court of Ap-
peals could directly cope with the fact that Allied was
convicted in contracts other than those at Vandenberg
Air Force Base.
The Supreme Court has clearly held that a prior
conviction may work an estoppel in favor of the govern-
ment, but such estoppel extends only to questions dis-
tinetly put in issue and directly determined in the crimi-
nal prosecution. Emich Motors Corporation vs. General
Motors Corporation, 340 U.S. 558, 569-572 (1951) ;
Frank vs. Mangum, 237 U.S. 309, 334 (1915); Sealfon
vs. United States, 332 U.S. 575 (1948).
In United States vs. Uzzell, 648 F. Supp. 13862 (D.D.C.
1986), the government brought a civil action under the
False Claims Act against defendants previously convicted
of criminal conspiracy to defraud the government by false
claims. The court held that a trial court must look to
the record, the pleadings, the evidence submitted, the jury
instructions, and any opinions of the court in aid of its
determination as to whether or not the question under
consideration had been placed in issue and fairly liti-
gated in the criminal action.
In Drum vs. Nasutt, 648 F. Supp. 888, 897-898 (E.D.
Pa., 1986), aff'd. mem., 831 F.2d 286 (3d Cir. 1987),
the court further amplified the criteria necessary to raise
the collateral estoppel issue:
1. The issue decided in the prior adjudication must
be identical with the one presented in the later
action.
2. There must have been a final judgment on the
merits.
3. The party against whom the doctrine is as-
serted must have been a party or in privity with a
party to the other action.
4. The party against whom it is asserted had a
full and fair opportunity to litigate the specific issue
in question in the prior litigation, and
5. The issue decided was essential to the judgment.
10
Here, of course, neither the A.S.B.C.A. nor the Court
of Appeals reviewed the transcript of the proceedings, the
findings of the jury, or anything else of a direct nature in-
volved in the criminal action against Allied. The sole sup-
port for the position espoused by the A.S.B.C.A. and af-
firmed by the Court of Appeals were the indictment and
the Appeals Court’s per curiam opinion affirming the
criminal judgment. Since the right of appellate review
is limited to questions of law and does not extend to
matters of fact, Duncan vs. Atchison, T. and S.F.R. Co.,
72 Fed. 808 (C.A. 9th 1896); Bond vs. Brown, 12 How.
(53 U.S.) 254 (1851); Ralston Purina Company vs. Novak,
111 F.2d 631 (8th Cir. 1940), there is no conceivable
way in which the A.S.B.C.A. could have extracted facts
from the appellate decision and grafted them onto its
own opinion denying J.E.T.S. recovery.
Unless the examination of the entire record removes
all questions concerning the criteria for estoppel, there
can be no estoppel created by the criminal conviction,
De Sollar vs. Hanscome, 158 U.S. 216 (1895); Washing-
ton Gas Light Company vs. District of Columbia, 161 U.S.
316 (1896).
Ill. WHETHER OR NOT THE PETITIONER WAS A
SMALL BUSINESS WAS NOT AT ISSUE
Even assuming, without conceding, that the government
and the Board could somehow have acquired jurisdiction
despite the clear bar of res judicata in this case, the
A.S.B.C.A.’s reasoning, equating the criminal conviction
with this contract, fails on several counts:
1. There was no_ specific determination that
J.E.T.S. was “large” for this specific contract.
2. J.E.T.S. never litigated the issue of whether or
not the receipts of J.E.T.S. WAESCHEREI, GmbH,
ALLIED, or OLD DOMINION, which are sepa-
rate but related corporations, could be chargeable to
J.E.T.S., INC.
11
3. The Board made no finding of alter ego as be-
tween J.E.T.S., INC., and ALLIED, J.E.T.S. WAE-
SCHEREI, GmbH, or OLD DOMINION.
4. A statement by the Board that ALLIED, the
parent, continued to bid on small business set aside
contracts, does not furnish proof for this contract
that J.E.T.S., INC., a separate corporation, must, of
necessity, be charged with the errors of its parent.
The cases of United States vs. Mississippi Valley Gen-
erating Company, 364 U.S. 520 (1961), and K & R Engi-
neering Company, Inc. vs. United States, 616 F.2d 469
(Ct. Cl. 1980), cited by the Court of Appeals, Appendix,
page 8a, are distinguishable and irrelevant because:
1. Each of those cases dealt with direct conflict of
interest between government officials and the con-
tractors with regard to specific contracts.
2. In neither case had there been a final, binding
decision in favor of the contractor, which would re-
move the issue from the jurisdiction of the determin-
ing board.
The only issue before the A.S.B.C.A. was quantum,
since, as a matter of law which became final and re-
mained unappealed by the government, entitlement had
been determined in the earlier hearing and thus became
the law of the case, Pubali Bank vs. City National Bank,
777 F.2d 1340 (9th Cir. 1985); Waggoner vs. Dalliare,
767 F.2d 589 (9th Cir. 1985), cert. denied, 475 U.S.
1064 (1986) ; Cardwell vs. Kurtz, 765 F.2d 776 (9th Cir.
1985).
The Court of Appeals citations to United States vs.
Turtle Mountain Band of Chippewa Indians, 612 F.2d
517, 520 (Ct. Cl. 1979) ; Schwartz vs. N.M.S. Industries,
Inc., 575 F.2d 558, 554 (5th Cir. 1978); White vs.
Murtha, 377 F.2d 428, 432 (5th Cir. 1967); Smith
International, Inc. vs. Hughes Tool Company, 759 F.2d
1572, 1576 (Fed. Cir.), cert. denied, 474 U.S. 827
12
(1985), and Gindes vs. United States, 740 F.2d 947,
950 (Fed. Cir.), cert. denied, 469 U.S. 1074 (1984),
Appendix, pages 7a-8a, are misplaced. The Court of Ap-
peals erroneously concluded that the second Board appeal
was but a further step in the litigation of the same case.
It was not. It was an entirely new action. Since there
was never any attempt to set aside the initial determina-
tion of the A.S.B.C.A., it worked a denial of due process
and a concomitant deprivation of J.E.T.S., INC’s., prop-
erty to go around to the back door when the front door
had not been opened.
CONCLUSION
In conclusion, Petitioner J.E.T.S., INC., respectfully re-
quests that a Writ of Certiorari issue to review the judg-
ment of the United States Court of Appeals for the Fed-
eral Circuit.
Respectfully submitted,
HuGo N. GERSTL
GERSTL & GORMAN, INC.
Attorneys at Law
33 Soledad Drive
Monterey, CA 93940
Telephone: (408) 649-0666
Attorneys for Petitioner
J.E.T.S., Inc.
Dated: May 11, 1988
APPENDICES
la
APPENDIX A
UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
87-1269
J.E.T.S., INC.,
Appr llant,
THE UNITED STATES,
A ppt llee.
Hugo N. Gerstl, of Gerstl] & Gorman, Monterey, Cali-
fornia, argued for appellant.
J. Keith Burt. of the Commercial Litigation Branch,
Department of Justice, argued for appellee. With him
on the brief were Richard K. Willard, Assistant Attor-
ney General, David M. Cohen, Director, and Mary Mitch-
elson, Assistant Director.
Appealed from: Armed Services Board of Contract
Appeals.
Za
UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
87-1269
J.E.T.S., INC.,
Appellant,
THE UNITED STATES,
Appellee,
DECIDED: February 11, 1988
Before MARKEY, Chief Judge, FRIEDMAN, Circuit
Judge, and BALDWIN, Senior Circuit Judge.
FRIEDMAN, Circuit Judge.
This is an appeal by a government contractor from a
decision of the Armed Services Board of Contract Ap-
peals (Board: denying the contractor's claim for an
equitable adjustment in the contract price. The Board
previously had held that the contractor was entitled to
such an adjustment and remanded the case to the con-
tracting officer to determine the amount thereof. After
the contracting officer had denied any award and while
the contractor’s appeal from that ruling was pending be-
fore the Board, a corporation of which the contractor was
a wholly-owned subsidiary and the two principals of that
corporation were indicted and convicted of various of-
fenses against the government. A major element of the
criminal case was that they had falsely certified that the
coporation Was a small business, for which both the other
3a
contracts involved in the criminal case and the contract
in the present case were set aside. On the basis of the
convictions, the Board held that the contractor was not
entitled to recover. We affirm.
I
A. On April 1, 1980, the United States Air Force
entered into a contract with the appellant, J.E.T.S., Inc.,
under which J.E.T.S. would furnish all necessary per-
connel for full food service management at an air base.
The contract was for one year. The government had the
option to extend the contract for two subsequent years
at the same price by giving specified notices.
At the close of the first year of performance, the gov-
ernment. on March 31, 1981, exercised its option to ex-
tend the contract for another year at the same price.
The government's written exercise of the opt ion stated:
Funds are not presently available for this procure-
ment. The Government obligation is contingent upon
the availability of appropriated funds from which
payment for the contract purposes can be made. No
legal liability on the part of the Government for
payment of any money shall arise unless and until
funds are made available to the Contracting Officer
for this procurement and notice of such availability,
to be confirmed in writing by the Contracting Of-
ficer, is given to the contractor.
In response to J.E.T.S.’ request for an immediate rul-
ing on whether the government properly had exercised its
option, the contracting officer ruled on May 5, 1981, that
the exercise was proper. J.E.T.S. performed the contract
for the second year under protest, stating that it @x-
pected to be paid the reasonable value of its services.
The government paid it at the contract price.
ee
4a
On J.E.T.S.’ appeal from the contracting officer’s deci-
sion, the Board held that the government’s exercise of the
option was invalid. The Board stated:
It is well settled that in order for the Government to
properly exercise an option, its acceptance of the
offer must be unconditional and in exact accord with |
the terms offered. (Citations omitted.) Here the
purported execution of the option included the avail-
ability of funds clause and made the execution con-
ditional upon the subsequent availability of funds .
for performance of the contract and written notice
to appellant of such availability. It is undisputed
that funds were not available for performance dur-
ing the option period on or before the date for ac-
ceptance of the option, 15 April 1981, nor by the
date of commencement of the second year of the con-
tract, 1 May 1981.
... Appellant’s continued performance constituted
a constructive change under the contract for which
it is entitled to an equitable adjustment. The appeal
is sustained and the matter is remanded to the con-
tracting offier to negotiate the amount of such ad-
justment.
J.E.T.S., Inc., 82-2 B.C.A. (CCH) 9 15, 986, at 79,274
(1982).
While the appeal before the Board was pending, the
government exercised the option to renew the contract
for a third year at the original price. J.E.T.S. responded
that the government had not validly exercised the option
for the first extension, that accordingly the contract was
no longer in effect, and that the second option therefore
could not be exercised. J.E.T.S. continued to perform the
contract under protest through the third year, and the
government continued to pay J.E.T.S. at the contract
price.
5a
Following the decision of the Board, J.E.T.S. filed with
the contracting officer claims for an equitable adjustment
for the second and third years of the contract. When
the contracting officer failed to issue a decision within
the time specified in the Contract Disputes Act of 1978,
41 U.S.C. § 605(c) (1) (1982), J.E.T.S. filed an appeal
with the Board. (The contracting officer subsequently
denied J.E.T.S.’ claim in its entirety.)
B. Under the Small Business Act, 15 U.S.C. § 631
(1982), certain government contracts are set aside for
smail businesses. A small business is ‘one which is in-
dependently owned and operated and which is not domi-
nant in its field of operation.” Jd. § 632. Under regula-
tions of the Small Business Administration explaining
when a business is “small,” the focus for service indus-
tries is on annual receipts, and businesses with annual
receipts greater than specified_amounts are not “small.”
13 C.F.R. §§121.1-121.13 (1986). In determining
whether a service business is “small,” the average an-
nual receipts for the past three years of the company
and its affiliates will be considered. Jd. § 121.2(a)-(c).
The food service management contract that J.E.T\S.
entered into was 100 per cent set aside for small busi-
ness. Before obtaining the contract, J.E.T.S. certified to
the Air Force that it was a small business.
C. While the second appeal to .he Board was pending,
Thomas F. Gibbs, Leo J. Barnette, Allied Management
Corporation (Allied), and others were indicted for con-
spiracy to defraud the government, making false state-
ments to the government, and mail fraud. J.E.T.S. is a
wholly-owned subsidiary of Allied. Larry Barnette was
the president and principal stockholder of Allied, and
Thomas Gibbs was the vice president and minority stock-
holder.
A major charge of the indictment was that in obtain-
ing four other government contracts, Allied had falsely
6a
certified that it was a small business. Two of those con-
tracts were food service contracts at other military bases
and the two others were laundry service contracts at a
military base and in the Federal Republic of Germany.
These contracts were entered into and performed at vari-
ous times between January 1, 1977 and August 1982.
The jury convicted the defendants on various charges,
and the court of appeals affirmed. United States v. Bar-
nette, 800 F.2d 1558 (11th Cir. 1986), cert. denied, 107
S. Ct. 1578 (1987). In a section of its opinion captioned
“The Small Business Set Aside Program,” the court of
appeals heid:
[T]he government demonstrated that Allied and its
affiliates had become “large” for SBA size purposes
for most types of contracts. ...
Notwithstanding the size of the Allied conglom-
erate, Allied, through Barnette and Gibbs, continued
to submit bids on contracts set aside for small busi-
ness concerns. From 1978 through 1981, Allied
falsely certified on each bid document that it was
small, and thus eligible to bid on contracts set aside
for small businesses.
Id. at 1565.
D. Following the court of appeals affirmance of the
convictions, the government moved before the Board for
summary judgment. The Board granted the motion and
denied J.E.T.S.’ appeal. The Board stated:
[T]here is no genuine issue of material fact con-
cerning the question of appellant’s size or whether
during that period appellant was aware that it was
a large corporation and knowingly certified to the
contrary. The conviction resolved these questions.
Therefore, appellant is estopped from now denying
that it knowingly and willfully made false, fictitious
and fraudulent statements by certifying appellant
7a
was a small business when it submitted its bid for
this small business set aside contract in November
1979.
J.E.T.S., Inc., 87-1 B.C.A. (CCH) 19,569, at 98,916
(Jan. 16, 1987).
The Board concluded:
[T]he bad faith of appellant in securing the award
made the award voidable, if not void. This was not
known to the contracting officer until after comple-
tion of the contract and the option period before us.
In its pleadings and motion for summary judgment
the Government has, in effect, asserted its avoidance
of the contract. Having done so, it would pertain
not only to the contract but also to the option period
before us. We also recognize that the question before
us at this time is not entitlement to recover but the
amount which the appellant is entitled to recover.
However, to permit recovery of any further monies
under the circumstances would be an affront to the
integrity of the federal procurement process.
Id. at 98,917.
II
J.E.T.S. contends that the earlier decision of the Board
that it was entitled to an equitable adjustment because
the government had made a constructive change in the
contract was res judicata concerning its right to recovery,
that the only issue open for the Board to decide in the
second appeal was the amount of recovery, and that the
Board’s decision in the second appeal was an imper-
missible reversal of its prior decision.
Since the second appeal was but a further step in the
litigation of the same case, the governing principle for
determining what issues were open to the Board is not
res judicata, but the law of the case. United States v.
Turtle Mountain Band of Chippewa Indians, 612 F.2d 517,
re
8a
520 (Ct. Cl. 1979). “Thus, ‘once a case has been decided on
appeal, the rule adopted is to be applied, right or wrong,
absent exceptional circumstances, in the disposition of
the lawsuit.’” Id. (quoting Schwartz v. NMS Indus.,
Inc., 575 F.2d 558, 554 (Sth Cir. 1978)). There are
three “exceptional circumstances” that justify a depar-
ture from the law of the case: ‘“‘[T]he evidence on a
subsequent trial was substantially different, controlling
authority has since made a contrary decision of the law
applicable to such issues, or the decision was clearly er-
roneous and would work a manifest injustice.’” Jd. at
521 (quoting White v. Murtha, 377 F.2d 428, 432 (5th
Cir. 1967)). See also Smith Fnt’l, Inc. v. Hughes Tool
Co., 759 F.2d 1572, 1576 (Fed.Cir.), cert. denied, 474
U.S. 827 (1985); Gindes v. United States, 740 F.2d 947,
950 (Fed. Cir.), cert. denied, 469 U.S. 1074 (1984).
The Board’s decision in the first appeal was “clearly
erroneous” and to follow it “would work a manifest in-
justice.” The contract which, according to the Board’s
decision in the first case, the government constructively
had changed, was procured by and therefore permeated
with fraud. As discussed in part III below, J.E.T.S. ob-
tained this contract by knowingly falsely stating that it
was a small business. Had it stated the truth about its
size, it would not have received the contract. A govern-
ment contract thus tainted from its inception by fraud
is void ab initio, like the government contracts held void
because similarly tainted by a prohibited conflict of inter-
est in United States v. Mississippi Valley Generating
Co., 364 U.S. 520 (1961), and K & R Eng’g Co. v. United
States, 616 F.2d 469 (Ct. Cl. 1980).
If in the first appeal the Board had been aware of
J.E.T.S.’ fraud in obtaining the contract, the Board would
not have held that J.E.T.S. was entitled to an equitable
adjustment for the government’s constructive change in
the contract. The Board correctly stated in the present
appeal, “to permit recovery of any further monies under
9a
the circumstances would be an affront to the integrity of
the federal procurement process.” See Mississipp Valley,
364 U.S. at 564-65. “The protection of the integrity of
the federal procurement process from the fraudulent ac-
tivities of unscrupulous government contractors,” K & R
Eng’g, 616 F.2d at 476, fully supported—indeed, re-
quired—denial of J.E.T.S.’ claim for additional compen-
sation once J.E.T.S.’ fraud in obtaining the contract was
disclosed. This is so even though, when the fraud was not
yet known, the Board earlier had determined that
J.E.T.S. was entitled to additional money.
Moreover, since the facts concerning J.E.T.S.’ fraud
were not known at the time of the first Board decision
and became known only during the pendency of the sec-
ond appeal, the case also comes within the exception
covering the situation when “the evidence on a subsequent
trial was substantially different.” Although there was no
subsequent trial, the evidence before the Board on the
second appeal was substantially different from that be-
for it on the first appeal, since it was only on the second
appeal that the fraudulent procurement of the contract
was disclosed.
Ill
J.E.T.S. further contends that the Board improperly
relied on the criminal convictions of its corporate parent
and the two principals as a basis for concluding that the
contract was void or voidable because tainted by J.E.T.S.’
fraud in falsely representing that it was a small business.
J.E.T.S. stresses that the present contract was not in-
volved in the criminal case and that J.E.T.S. was not a
defendant in that case.
Although J.E.T.S. was not a party in the criminal case,
it was very much a part of the activities upon which the
criminal convictions were based. The court of appeals
described J.E.T.S. as “a wholly owned subsidiary of
Allied that performed government service contracts
10a
throughout the world,” 800 F.2d at 1560, and as “part of
the Allied conglomerate.” 800 F.2d at 1563. The court
referred to “Allied, doing business as J.E.T.S.” 800 F.2d
at 1564. The court noted that during the years involved,
Gibbs, who signed the present contract and certified that
J.E.T.S. was a small business, filed other false statements
on behalf of J.E.T.S. with respect to J.E.T.S.’ size. 800
F.2d at 1565. As a wholly owned subsidiary of Allied,
J.E.T.S. appears to have functioned as Allied’s operating
division and alter ego.
“It is well established that a prior criminal conviction
may work an estoppel in favor of the government in a
subsequent civil proceeding,’ but the “estoppel extends
only to questions ‘distinctly put in issue and directly de-
termined’ in the criminal prosecution.” Emich Motors
Corp. v. General Motors, 340 U.S. 558, 568-69 (1951).
The criminal conviction thus would have estopped Allied,
Barnette, and Gibbs from denying before the Board that
they had misrepresented to the government that the con-
tractors for the four other contracts involved in the crim-
inal proceedings were small businesses, since that ques-
tion had been “distinctly put in issue and directly deter-
mined” in the criminal case.
Those four contracts were similar to the contract in
the present case. Two were food service contracts, and
two were laundry service contracts. All of them were
executed and performed at the same time as the present
contract. In all four of them, the certificates of small
business qualification were false because, in determining
the size of the contractor, the receipts of affiliates of the
contractor were ignored in violation of the regulation re-
quiring those receipts to be included. The other false
statements that Gibbs filed with respect to the size of
J.E.T.S. had the same flaw of failure to include the
receipts of affiliates. The record also showed that in 1980,
Gibbs told “an employee not to refer to the German
laundry contract in another bid because if J.E.T.S. listed
lla
the laundry contract ‘in the experience section, it would
have to be included in the gross income also [sic].’” 800
F.2d at 1565.
Considering all the circumstances, we cannot say that
the Board erred in concluding that J.E.T.S. had com-
mitted fraud in obtaining this contract by knowingly
falsely certifying that it was a small business. Neither
in its response before the Board to the government’s mo-
tion for summary judgment nor in its brief before this
court did J.E.T.S. assert that it was a small business
when it obtained the contract or contend that it could
show at a hearing that it filed an accurate certification.
The Board correctly concluded that there was “no genuine
issue as to any material fact” (Rule 56(c), Federal Rules
of Civil Procedure) that precluded summary judgment
and that because the contract was fraudulently obtained,
the government was entitled to summary judgment deny-
ing J.E.T.S.’ appeal.
CONCLUSION
The decision of the Board denying J.E.T.S.’ appeal is
AFFIRMED.
12a
UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
87-1269
J.E.T.S., INC.,
Appellant,
Vv.
THE UNITED STATES,
Appellee.
JUDGMENT
On Appeal from the Armed Services Board
of Contract Appeals in Case No(s). 28642
This CAUSE having been heard and considered, it is
ORDERED and ADJUDGED: AFFIRMED
ENTERED BY ORDER OF THE COURT
s/ Francis X. Gindhart
Clerk
Dated Feb. 11, 1988
l3a
APPENDIX B
UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
87-1269
J.E.TS., INC.,
Appellant,
v.
THE UNITED STATES,
Appellee.
AGREED STATEMENT IN LIEU OF APPENDIX
Huco N. GERSTL, ESQUIRE
GERSTL & GORMAN, INC.
Attorneys at Law
33 Soledad Drive
Monterey, California 93940
Telephone: (408) 649-0666
Attorneys for Appellant
l4a
COME NOW appellant, J.E.T.S., Inc., and appellee,
United States of America, and pursuant to Rule 6 of the
United States Court of Appeals for the Federal Circuit
Procedural Handbook, stipulate that the following con-
stitutes an agreed statement of the case in lieu of the
record:
Appellant, J.E.T.S., Ine. (hereinafter called ‘“appel-
lant” or “J.E.T.S.”), is a Florida corporation with its
principal place of business in Jacksonville, Florida. The
United States of America, acting through Base Contract-
ing Division, Vandenberg Air Force Base, California
(hereinafter called “Air Force”, “government” or “appel-
lee’), awarded Contract No. F04684-80-D-0007 to appel-
lant on 1 April 1980. The contract required the appellant
to furnish all necessary supervisory, administrative and
direct personnel for full food service management at
Vandeberg AFB. The contract was a firm fixed price
contract in connection with the basic year and contained
two option years, with the government given the option
to extend the contract.
The contract contained a “change” clause and an “op-
tion” clause. The “option” clause provided:
This contract is renewable, at the option of the gov-
ernment, by the Contracting Officer giving written
notice of renewal to the contractor at least 15 days
before this contract is to expire, provided that the
Contracting Officer shall have given preliminary no-
tice of the government’s intention to renew at least
60 days before this contract is to expire. (Such
preliminary notice will not be deemed to commit the
government to renewals.) If the government exer-
cises this option for renewal, the contract as renewed
shall be deemed to include this option provision.
However, the total duration of this contract, includ-
ing the exercise of any options under this clause,
shall not exceed three years.
15a
J.E.T.S. commenced performance under the contract
on 1 May 1980, and completed performance of the basic
year on 30 April 1981.
On or about 23 March 1981, the Contracting Officer
furnished to J.E.T.S. Modification to Contract No.
P-00004 dated 27 February 1981, effective 1 May 1981,
purporting to unilaterally exercise the first year option
under the contract and demanded that J.E.T.S. perform
the contract services for an additional year for the price
set forth in the contract. The purported exercise of the
option by the government was expressly conditioned upon
the availability of appropriated funds from which pay-
ment for the contract purposes could be made. The mod-
ification further provided that:
No legal liability on the part of the government for
payment of any money shall arise unless and until
funds are made available to the Contracting Officer
for this procurement and notice of such availability,
to be confirmed in writing, by the Contracting Offi-
cer, is given to the contractor.
On April 3, 1981, J.E.T.S. acknowledged receipt of the
modification. Although J.E.T.S. agreed to continue per-
formance of the work covered by the contract, J.E.T.S.
expressly advised the Contracting Officer that it consid-
ered his directions to be unauthorized, improper, and a
constructive change in the contract; that J.E.T.S.’ con-
tinued performance under the contract would be under
protest, and that J.E.T.S. would expect to be paid for
such work the reasonable value of its services, as opposed
to the government contract price, together with general
and administrative (G & A), and a reasonable profit.
Finally, J.E.T.S. advised the Contracting Officer that it
would continue to perform the contract services as di-
rected by him under protest until resolution of the claim
as required by the disputes clause in the contract and the
provisions of the Contract Disputes Act of 1978. J.E.T.S.
requested the immediate issuance of a final decision on
l6a
the question of whether or not the Contracting Officer
properly exercised the first year option under the con-
tract.
On 5 May 1981, the Contracting Officer rendered his
final decision finding that the government had validly
exercised the option granted and contained in the con-
tract.
On 15 June 1981, J.E.T.S. appealed the final decision
of the Contracting Officer to the Armed Services Board
of Contract Appeals. On 24 June 1981 the ASBCA dock-
eted this appeal as ASBCA No. 26135. On 21 September
1981 J.E.T.S. filed an amended complaint in ASBCA No.
26135 wherein it expressly contended that the attempted
exercise by the government of the first year option was
invalid for the reason that the proposed modification was
expressly conditioned upon “the availability of appro-
priated funds from which payment for the contract pur-
poses can be made” and further provided that “no legal
liability on the part of the government for payment of
any money shall arise unless and until funds are made
available to the Contracting Officer for this procurement
and notice of such availability to be confirmed in writing
by the Contracting Officer is given to the contractor’,
thus rendering the purported “exercise” conditional and
a legal nullity.
The issue was joined by the government.
Thereupon J.E.T.S. and the government each filed mo-
tions for summary final judgment.
On 4 August 1982 the Armed Services Board of Con-
tract Appeals in ASBCA No. 26135 sustained the appeal
of J..T.S., and in its decision entitled “Opinion by Ad-
ministrative Judge Burg on Cross- motions for Summary
Judgment” held in pertinent part:
It is well settled that in order for the government
to properly exercise an option, its acceptance of the
|
17a
offer must be unconditional and in exact accord with
the terms offered. (citations omitted). Here the
purported execution of the option included the avail-
ability of funds clause and made the execution condi-
tional upon the subsequent availability of funds for
performance of the contract and written notice to
appellant of such availability. It is undisputed that
funds were not available for performance during the
option period on or before the date for acceptance
of the option, 15 April 1981, nor by the date of
commencement of the second year of the contract,
1 May 1981.
Having concluded that the option exercise was in-
valid because it was conditional and not in accord
with the exact terms of the contract, we need not
consider whether it also failed because the govern-
ment failed to give the proper preliminary notice of
its intent to exercise the option.
The government’s motion for summary judgment is
denied. The appellant’s motion for summary judg-
ment is granted. Appellant’s continued performance
constituted a constructive change under the contract
for which it is entitled to an equitable adjustment.
The appeal is substained and the matter is remanded
to the Contracting Officer to negotiate the amount
of such adjustment.
By letter dated 8 January 1982 and prior to the deci-
sion of the Board in ASBCA No. 26135, the Contracting
Officer furnished J.E.T.S. with “preliminary notice” of
the government’s intention to renew the subject contract
for the second option year covering the period from 1
May 1982 to 30 April 1983 in accordance with the option
provision contained in the contract.
By letter dated 18 January 1982 appellant acknowl-
edged receipt of the government’s “preliminary notice”
of its intent to exercise the second year option under the
contract and stated that:
) . :
18a
Essentially, it is the position of J.E.T.S., Ine. that
the government failed to timely furnish the prelimi-
nary notice of intent to exercise the first one year
option under the contract and further, thereafter,
failed to properly exercise the option in accordance
with the terms of the contract. As a result, it is
the position of J.E.T.S., Inc. that the referenced con-
tract, including the options contained therein, is no
longer in force or effect and that J.E.T.S. is entitled
to be compensated for the services it is performing
at the demand and insistence of the Contracting
Officer on the basis of the cost of those services, plus
its G & A and a reasonable profit. Accordingly,
J.E.T.S. disputes the government’s right to exercise
the option, for which you have given the preliminary
notice.
J.E.T.S., Ine. will continue to perform the services
covered by the referenced contract under protest un-
til a resolution of the dispute by the Board of Con-
tract Appeals. The continued performance by
J.E.T.S. should not be taken by you as a waiver of
the rights asserted by J.E.T.S. in its appeal.
The government thereafter purported to exercise the
second year option under the contract and directed
J.E.T.S. to perform the contract services with the prices
set forth in the contract. J.E.T.S. agreed to continue
performance of the contract services during the second
year option of the contract under protest, pending resolu-
tion of the then pending appeal, as provided in the Con-
tract Disputes Act of 1978. To do otherwise would have
subjected J.E.T.S. to the risk of a default termination.-
The ABSCA decision in 26135 held that the attempted
exercise of the first year option under the contract by
the Air Force was invalid and that J.E.T.S.’s continued
performance constituted a constructive change under the
contract for which J.E.T.S. was entitled to receive an
equitable adjustment. The Board remanded the appeal
19a
to the Contracting Officer with directions to negotiate the
amount of the contract adjustment.
As a matter of contract and as a matter of law the
right of the government to exercise the second year option
under the contract was dependent upon a finding that
the government properly and validly exercised the first
year option under the contract. Thus, when the Board
determined that the government failed to properly exer-
cise the first year option under the contract, the contract,
as such, including the option provision, was not extended
and there were no further options available for the third
year.
Nevertheless, the appeal not having been determined and
at the express direction of the Contracting Officer, J.E.T.S.
performed the contract services for the first and second
option years of the contract covering the period of 1 May
1981 to and incliding 30 April 1983 under protest and
with a complete reservation of rights to-J.E.T.S. to seek
an equitable adjustment in the contract price for such
period in accordance with the holding of the ASBCA in
number 26135.
Thereafter, the time for appealing the decision of the
Board in ASBCA No. 26135 expired and the decision
became final. Appellant, through its attorney, prepared
and filed with the Contracting Officer J.E.T.S.’ claim for
an equitable adjustment to the contract dated 21 Decem-
ber 1982 covering the period commencing 1 May 1981
through 30 November 1982. Subsequently that claim for
equitable adjustment was amended to cover the period
extending through 30 April 1983. The claim was prop-
erly certified as required by the Contract Disputes Act
of 1978.
On 27 July 1983 J.E.T.S. filed its notice of appeal ap-
pealing from the failure of the Contracting Officer to
issue a final decision within the time required by the
Contract Disputes Act. Subsequent to the filing of ap-
pellant’s notice of appeal, the Contracting Officer issued
20a
his final decision dated 28 July 1983 denying appellant’s
claim in its entirety without negotiation or discussion in
any manner or form.
The appeal was given ASBCA docket number 28642
and it was from a decision on a dispositive motion that
the instant appeal is based.
J.E.T.S. filed a complaint on 6 December 1983. The
government, after extension requests to file answer, filed
its answer on 24 January 1984.
The initial contract was a 100% small business set-
aside. J.E.T.S. certified to the United States that it was
a small business.
On August 31, 1983, tr grand jury of the United
States District Court for the Middle District of Florida,
Jacksonville Division, returned a 25 count indictment
against Larry D. Barnette, Thomas F. Gibbs, Leo J.
Barnette, Judge A. Causey, Murray Sentner, Allied
Management Corporation dba J.E.T.S., Ine. and Jets
Services, Inc. and Jets Venture Capital Corporation.
The indictment at no time mentioned the Vandenberg
contract. The indictments dealt with the following spe-
cific contract activities:
1. A laundry services contract for the Federal Re-
public of Germany;
2. A food service contract at Fort Lee, Virginia;
3. A food service contract at McConnell AFB, Kan-
sas; violations concerning its certificate as a small busi-
ness. Appellant’s false certification as a small business
in a 100% small business set-aside procurement renders
the contract void ab initio and entitles appellant as a
matter of law to no additional funds for any alleged
equitable adjustment.
4. Failure to exercise an option could not be a con-
structive change under the contract since the contract
2la
ceased to exist when the government improperly exercised
the option. However, to the extent it was performed the
contract became valid.
On 16 April 1985 appellant J.E.T.S. moved for sum-
mary judgment striking the respondent’s affirmative posi-
tion. A_copy of that motion is attached hereto, designated
Exhibit “A” and incorporated herein by reference.
On 20 May 1985 the government filed a cross-motion
for summary judgment and filed its brief. A copy of
the cross-motion is attached hereto, designated Exhibit
“B”’ and incorporated herein by reference.
The issues were well briefed by both sides.
On October 8, 1986, the United States Court of Ap-
peals for the Eleventh Circuit affirmed the judgment of
the United States District Court of Appeal. A copy of
the decision is appended hereto, designated Exhibit “C”’
and incorporated herein by reference.
The defendants in that case are still pursuing various
avenues of appeal. P
On 21 January 1987, the Armed Services Board of
Contract Appeals, the Honorable Ruth C. Burg, Admin-
istrative Judge, writing the lead opinion which was con-
curred in by the Honorable Daniel M. Arons, Admin-
istrative Judge, Acting Chairman, Armed Services Board
of Contract Appeals, and the Honorable Harris J.
Andrews, Jr., Administrative Judge, Acting Vice-
Chairman, Armed Services Board of Contract Appeals,
rendered an opinion on the government’s motion for sum-
mary judgment and appellant’s motion for Summary
judgment. A copy of that opinion is appended hereto,
designated Exhibit “D” and incorporated herein by ref-
erence.
In that decision, the Board held that the government’s
arguments pursuant to items 1, 2 and 4 are without
merit.
22a
However, the Board held that appellant’s contract was
void ab initio because of its false certification as a small
business on a 100% small business set-aside contract
and, in so doing, granted the government’s motion for
summary judgment and denied the appeal and the ap-
pellant’s motion for summary judgment.
Appellant timely filed this appeal and the matter is
now properly before this court.
IT IS STIPULATED THAT THIS DOCUMENT, IN-
CLUDING EXHIBITS “A” THROUGH “D”, INCLU-
SIVE, AND THE NOTICE OF APPEAL AND AP-
PEAL FROM DECISION OF THE ARMED SERVICES
BOARD OF CONTRACT APPEALS CONSTITUTE A
SETTLED STATEMENT OF THE FACTS OF THIS
CASE AND CONSTITUTE A SUFFICIENT RECORD
FROM WHICH A DECISION MAY BE RENDERED
BY THIS COURT.
DATED:
DAvID M. COHEN, Director
ORALLY AGREED ON
BY TELEPHONE
WiTH J. KEITH Burt
Trial/ Appellate Attorney
Commercial Litigation Branch,
Civil Division, Department of
Justice, Washington, D.C. 20530
Attorney for Appellee
THE UNITED STATES
DATED: 9/22/87
GERSTL & GORMAN, INC.
By Hugo N. Gerstl
Huco N. GERSTL
33 Soledad Drive
Monterey, California 93940-6093
Attorney for Appellant
23a
PROOF OF SERVICE BY MAIL
I am a citizen of the United States and a resident of
the County of Monterey. I am over the age of eighteen
(18) years and not a party to the within, above-entitled
action. My business address is 33 Soledad Drive, Monte-
rey, California. On 9/22, 1987, I served the within
AGREED STATEMENT IN LIEU OF APPENDIX on
the other party(s) in said action by placing a true copy
thereof enclosed in a sealed envelope with postage thereon
fully prepaid, in the United States Postal Service mail-
box at Monterey, California, addressed as follows:
Recorder
Armed Services Board of Contracts Appeals
200 Stovall Street
Alexandria, Virginia 22332-0700
Office of the Trial Counsel
Office of the Staff Judge Advocate
Air Force Logistics Command, JAB
Wright-Patterson AFB
Dayton, Ohio 45433-5000
Attention: Mark E. Landers, Esquire
David M. Cohen, Director
Commercial Litigation Branch
Civil Division
Department of Justice
Washington, D.C. 20530
Linda Maranda, Trial Counsel
Commercial Litigation Branch
550 11th Street, N.W.
Todd Building, Room 716
Washington, D.C. 20530
I, Kathleen Whitehurst, declare under penalty of per-
jury that the foregoing is true and correct. Executed on
9/22, 1987 in Monterey County, California.
/s/
KATHLEEN WHITEHURST