Opposition Brief — Consolidated Aluminum Corp. v. C. F. Bean Corp.
Supreme Court brief1988
Ask Donna
What actually matters in this document.
Text
No. 87-1656
IN THE
Supreme Court of the United States
OCTOBER TERM, 1987
CONSOLIDATED ALUMINUM CORPORATION,
Petitioner
v.
C.F. BEAN CORPORATION, BEAN DREDGING
CORPORATION, AMERICAN EMPLOYERS
INSURANCE COMPANY, OCEAN MAF INE
INDEMNITY COMPANY, LTD., ST. PAUL. 'RE
AND MARINE INSURANCE COMPA: ~ ,
HIGHLAND INSURANCE COMPANY «© .d
ARKWRIGHT-BOSTON MANUFACTUF RS
MUTUAL INSURANCE COMPANY
spondents.
Brief in Opposition to
Petition for Certiorari
by Respondents C.F. Bean Corporation,
Bean Dredging Corporation, American Employers
Insurance Company, Ocean Marine Indemnity Company, Ltd.
Comelius G. Van Dalen
Allen F. Campbell
(Counsel of Record)
Deutsch, Kerrigan & Stiles
755 Magazine Street
New Orleans, Louisiana 70130
Telephone: (504) 581-5141
Counsel for Respondents,
C.F. Bean Corporation,
Bean Dredging Corporation,
American Employers Insurance
Company, Ocean Marine
Indemnity Company, Ltd.
:
Te
i.
RESTATEMENT OF THE ISSUE PRESENTED
The court of appeals and the district judge have both
held that Respondent (Bean) could not have anticipated that
its failure to follow safe dredging practices would result in
physical damage to the equipment and work in process at
Consolidated’s (Petitioner’s) aluminum plant. The harm
suffered by Consolidated, as found by the trier of facts in
a traditional tort risk-duty context, and affirmed by the
Fifth Circuit, was not of the general sort that one would
expect to follow from failing to dredge carefully near a gas
pipeline located six and one-half miles away from Consoli-
dated’s plant.
The only issue, therefore, is: Ba
Whether Bean’s conduct created a foreseeable
risk of harm to the plaintiff. Both lower
courts held it did not.
The classic rule of non-liability for consequential damage
arising from negligent interference with the unknown con-
tract of another was transcended here by introducing the
rather bizarre element of physical damage superimposed on
pure economic loss, thus pitching this case into the more
mundane arena of traditional tort law. See Consolidated
Aluminum Corp. v. C.F. Bean Corp., 772 F.2d 1217 (Sth Cir.
1985), Pet. App. C-16, 17.
a
ii.
DISCLOSURE OF PARTIES TO THE PROCEEDINGS
Rules 21(b) and 28.1
Pursuant to Rule 21.1(b), counsel for Respondents points
out that all the parties to the proceedings below are not
contained in the caption of the petition. Parties appearing
below included Texaco, Inc. and the United States of Ameri-
ca, by and through the Corps of Engineers, neither of which
are interested in Consolidated’s petition to this Court. All
other parties are correctly named in the caption of the
petition and hereto.
Pursuant to Rule 28.1, Respondent Bean Dredging Corpor-
ation discloses that its parent is C.F. Bean Corporation, also a
party hereto, and that Bean Services Corporation and Volker
Stevin U.S. Corp. are parent and affiliated corporations.
iil.
TABLE OF CONTENTS
Page
Restatement of the Issue Presented ................... i
Disclosure of Parties to the Proceedings ............... ii
ee ane Ae aS a eee iii
ee rk ek dy week ek Oe iv
Reasons Why Petition Should be Denied .............. 2
AS a ae re 2
I. There is no Conflict Between the Fifth
Circuit’s Decision in Consolidated and the
Decisions in any Other Circuit ................ 6
Il. There is no Analytical Confusion Regarding
errr eer ere Terres 10
Ill. Consolidated’s Invitation for This Court to
Address the Standards of Legal Cause in a
Maritime Tort Action is Inappropnate ......... 13
es Bre Se On ea aie eV ere ae 15
iv.
TABLE OF AUTHORITIES
PAGES
CASES
Branti v. Finkel, 445 U.S. 507, 511-12 n.6., 100 S.Ct.
Sy I a Ge ee kid a RS Re ot ee 14
Consolidated Aluminum Corp. v. C.F. Bean Corp.,
peed oe Seige. 0 A |) er ere rrr i
Consolidated Aluminum Corp. v. C.F. Bean Corp.,
639 F.Supp. 1173 (W.D. La. 1986), aff'd 833 F.2d
Pe EE ib kate kaya ene caseunes 2,3,4, 5,6
7,10,12, 13
Dalehite v. United States, 346 U.S. 15, 42, 73 S.Ct.
FIO, SEl Se Ge PRT EEPEOD kee bs didedvdiacs 6
Petition of Kinsman Transit Co., (Kinsman I) 338
F.2d 708 (2nd Cir. 1964), cert. denied 380 U.S.
i |, ee rn ra paeee rn eUM aee 7,8,9
Layne & Bowler Corp. v. Western Well Works, Inc.,
Se ee ee ee. o-oo a ba oo + ORs eee 13
N.C.A.A. v. Bd. of Regents of Univ. of Okl. , 468 U.S.
85, 97-98, n.15, 104 S.Ct. 2948 (1984) ............ 14
Palsgraf v. Long Island R. R., 162 N.E. 99,248 N.Y.
Ri Me PR Met i a, > | 11,12
Pastore v. Taiyo Gyogyo, K.K., 571 F.2d 777 (3rd
Se ea ed fa t8 ss oe waucah man ke we records 8,9
Vv.
TABLE OF AUTHORITIES (Continued)
. PAGES
CASES
PPG Industries, Inc. v. Bean Dredging Corp., 447
BE See eae, SO ko erie haces Cesta eeen 9
Republic of France v. United States, 290 F.2d 395,
ae Ce Pe ee ea ea eeehar ae ee
Rice v. Sioux City Memorial Park Cemetery, Inc. , 349
OS. TE, Pa, Fo eek. GES ReFe avis kee oui ees 14
Watz v. Zapata Offshore Co., 431 F.2d 100 (Sth Cir.
a Rg rg a er EAL wie rb a 10
OTHER AUTHORITIES
57 Am. Jur. 2nd Negligence §33 (1971) ............. 10
Green, Proximate Cause in Texas Negligent Law, 28
Tee. 6 TG re re og ve i a eee ee Lea 6
Green, The Duty Problem in Negligence Cases, 28
Col. L. Rev. 1014 (1928) and 29 Col. L. Rev. 225
CSRSe sch ocaws eo eee Lee eee ee ee 10
Harper, The Foreseeability Factor in Law of Torts,
7 DD. Ga Be ee ES +. hoo eee e ee 6
Harper, James and Gray, The Law of Torts, Scope of
Duty in Negligence Cases §18.2 at 655 (2nd Ed.
SOD so voix ik oe eh ee ee ee ee 6
vi.
TABLE OF AUTHORITIES (Continued)
PAGE
OTHER AUTHORITIES (Continued)
F. James and R. Perry, Legal Cause, 60 Yale LJ. 761,
POO CEUOED cc ccsacteceeescese eee . 6
Malone, Ruminations on Cause-in-Fact, collected in
his Essays on Torts, p. 172 (1985), also published
}). 3% 5 fi... Ree eee 6
Prosser and Keaton on Torts, Duty §53 (Sth Ed.
SON s Oacdeséecueanehnaalnn ene 6, 10
Restatement (Second) of Torts §281(b) and com-
ment 6 CESGE) ik vwacectdacudsbenueeelT 10,11, 12
Words and Phrases, Foreseeability
No. 87-1656
IN THE
SUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 1987
CONSOLIDATED ALUMINUM CORPORATION,
Petitioner
v.
C.F. BEAN CORPORATION, BEAN DREDGING
CORPORATION, AMERICAN EMPLOYERS
INSURANCE COMPANY, OCEAN MARINE
INDEMNITY COMPANY, LTD., ST. PAUL FIRE
AND MARINE INSURANCE COMPANY,
HIGHLAND INSURANCE COMPANY and
ARKWRIGHT-BOSTON MANUFACTURERS
MUTUAL INSURANCE COMPANY.
Respondents.
Brief in Opposition to
Petition for Certiorari
by Respondents C.F. Bean Corporation,
Bean Dredging Corporation, American Employers
Insurance Company, Ocean Marine Indemnity Company, Ltd.
Respondents (Bean) respectfully request that this Court
deny the petition by Consolidated Aluminum Corporation
(Consolidated) for wnt of certiorari seeking review of the Fifth
Circuit's opinion in this case
2.
Reasons Why the Petition Should be Denied
Statement of the Case
Consolidated’s version of the facts material to this case
neither conveys nor portrays a complete picture. Therefore,
to put the matter in its proper perspective, Bean deems it
necessary to amplify briefly the statement of the case pro-
vided by Consolidated.
The pipeline struck and ruptured by Bean’s dredge crossed
beneath the Calcasieu River (Lake Charles) Ship Channel.
That pipeline, referred to as the PPG (Pittsburgh Plate
Glass) feeder, served to deliver natural gas from Texaco’s
main Evangeline supply line directly to PPG’s plant in Lake
Charles.!
The pipeline itself was identified in Bean’s dredging
contract with the Corps of Engineers as one of no less than
1. Texaco’s gas distribution system is depicted on a schematic
diagram prepared by Texaco and identified as Exh. PX-10, copy of
which is attached as an appendix hereto. Texaco’s PPG feeder was
built in 1963. Exh. PX-43. The Evangeline Pipeline, which terminates
at the eastern (southern) bank of the Calcasieu River, was built in
1952. The Evangeline line connected to a number of Texaco’s pro-
ducing fields in south Louisiana. When Texaco eventually tied in the
Evangeline line, this greatly enhanced Texaco’s ability to provide gas
in Lake Charles, providing Texaco with the opportunity to expand
its market in the area. The subsequent marketing effort by Texaco
eventually led to the gas sales agreement with Consolidated. Consoli-
dated, 639 F.Supp. 1173, 1176 (W.D. La. 1986), aff'd 833 F.2d
65 (5th Cir. 1987), also at Petitioner’s Appendix, (Pet. App.) B-3
and B-4. See also Exh. PX-10 and PX-27.
3.
twenty pipelines which crossed beneath the Calcasieu River
and within the area where Bean was to dredge. It should
be noted that nothing in the Corp of Engineers’ documents
or drawings connect that Texaco pipeline to anything or
to anyone (except Texaco). 639 F.Supp. at 1177, Pet. App.
B-5-. Neither Bean nor its employees had any knowledge
of the contract between Texaco and Consolidated. Nor
did Bean or any of its employees have any knowledge of
Consolidated or its fragile aluminum processes. 639 F.Supp.
at 1182-83, Pet. App. B-20-21. Nothing about the pipeline
suggested in any way the prospect of physical damage to an
industrial plant.
The Consolidated plant did not lie anywhere near the
limits of Bean’s dredging work as established by the Corp
of Engineers. Consolidated’s plant was situated on an entirely
different body of water, the Lake Charles Industrial Canal,
and was not even adjacent to the river or channel in issue.
If fact, no portion of Consolidated’s property adjoined the
Calcasieu River channel. Exh. PX-48, 7r. V. 12 at 635.
Consolidated’s plant was located approximately six and one-
half miles from the location of the rupture in Texaco’s PPG
feeder line. 639 F Supp. at 1183, Pet. App. B-21.
Texaco and Consolidated had entered into a Gas Sales
and Purchase Agreement in 1968. Though calling for delivery
of a minimum volume and pressure of gas each day, the
contract also contains a force majeure provision excusing
either party from any liability for “breakage or accident
to. . . lines of pipe [and] temporary failure of gas supply”’.
Exh. PX-29, p. A-17.
The actual delivery of Texaco’s gas to Consolidated
came predominantly from the Evangeline pipeline, through
“Point C”, a gathering platform in the marsh south of Lake
Charles, and then by single pipeline directly to Consolidated’s
4.
plant. With no other arrangements than these, Consolidated’s
Lake Charles plant became the only aluminum plant ever
built with no back-up or secondary source of power whatso-
ever. In that regard Consolidated’s plant was unique in the
aluminum industry; no other aluminum reduction plant is
fed with power from only one source and direction. The
arrangement for one-source gas delivery proved to be a
hopelessly inadequate situation in which to operate an
aluminum pliant. 833 F.2d at 66, Pet. App. A-3; 639 F.Supp.
at 1179, Pet. App. B-12, 13.
Consolidated’s management, however, thought Texaco’s
gas system generally reliable, they never did bother to eval-
uate the risks to the plant in the event of an interruption
at any point in Texaco’s pipeline system. 7r. V. 14 at 1024-
25, 1032-33, 1043. It was never even considered that a
rupture in any of the pipelines crossing the Calcasieu River
would result in a shutdown of the Lake Charles plant (7r.
V. 14 at 858), much less cause any of the “physical” damages
which subsequently arose.2
To effect the repairs to the line, Texaco was required to
close a block valve at Jennings, La., more than thirty miles
distant. This terminated the gas flow in the Evangeline
pipeline. Texaco had no means at the time by which to
isolate the PPG feeder. The entire distribution system to
Lake Charles, and not just PPG, was thereby affected. 639
2. If Consolidated’s management did not see the risk in shutting
down its own plant as a result of activities in the Lake Charlies Ship
Channel, it is difficult to see how Bean should have foreseen, from its
position as a dredging contractor on a different body of water (more
than six miles away), what Consolidated failed to see right in its own
back yard and in a situation immediately familiar to Consolidated.
Yet, incredibly, Consolidated appeals to this Court to find that parties
like Bean should be held liable as a matter of law.
-
F.Supp. at 1180, Pet. App. B-14, 15. Consolidated was fed
with a minimal amount of gas from Texaco’s Big Lake or
Hackberry Field, approximately 3.5 million cubic feet per
day, an amount insufficient to run Consolidated’s plant.
Exh. PX-27. Operations at Consolidated promptly ceased,
and the physical damage ensued.
Consolidated at trial introduced expert testimony on the
nature of industry in Lake Charles. Its expert, Mr. Norman
Terry, having conducted a study of how each plant obtained
its raw material and energy needs, certainly possessed unique
knowledge on the interdependency of industry in the area.
But Consolidated’s own expert, in spite of his vast knowledge
on the subject, had no idea where any of the products in
any of the pipelines went or whom they served; 7r. V. 12
at 628-31. He did know that ail industrial plants in Lake
Charles had a back-up or secondary source of power available
to them, 7r. V. 12 at 634, and the most he could say about
the effect of an interruption in any one pipeline was that
anything was possible and nothing would “‘surprise”’ him.
Tr. V. 12 at 638-40, 641.
After considering all the evidence on the matter, the
district judge held that there was nothing to even suggest
that Bean should reasonably have anticipated that a rupture
of the Texaco pipeline would cause physical harm to the
petitioner’s remotely located aluminum plant. 833 F.2d at
68, Pet. App. A-7; 639 F.Supp. at 1182-83, Pet. App. B-20,
21. On appeal, the Fifth Circuit agreed and affirmed, finding
no error in any of the factual (clearly not erroneous) or legal
3. This study was made in conjunction with the U.S. Department
of Energy’s Strategic Petroleum Reserve Project. Tr. V. 12 at 617.
Consolidated made no effort to show what a dredging contractor knew
or should have known about the remote effects of a rupture in a
pipeline.
6.
conclusions in the trial court’s opinion. 833 F.2d at 68, Pet.
App. A-8.
I. There is no conflict between the Fifth Circuit's
Decision in Consolidated and the Decisions in
any Other Circuit.
Contrary to Consolidated’s assertions, the opinion in this
case does not conflict with any other admiralty decisions.
Consolidated argues, erroneously, that the cornerstore of
the Fifth Circuit’s decision is the inability of a “reasonably
thoughtful person” to have anticipated the “precise sequence
of events” flowing from the negligent act. Consolidated’s
Petition, p. 5. But nowhere in the Fifth Circuit’s opinion
is such a requirement stated; the only requirement is that the
harm be of “a general sort” that a reasonably thoughtful
person might anticipate. 833 F.2d at 68. Pet. App. A-7.
After noting the discussions of foreseeability by eminent
commentators’, as well as the basic requirements of fore-
seeability found in a former Fifth Circuit case which relied
on a decision of this Court, the Fifth Circuit went ahead
4. 833 F.2d at 67, Pet. App. A-4-7. See, e.g. Green, Proximate Cause
in Texas Negligent Law, 28 Tex. L. Rev. 775 (1950); Prosser and
Keaton on Torts, Duty §53 (5th Ed. 1984); Harper, James and Gray,
The Law of Torts, Scope of Duty in Negligence Cases §18.2 at 655
(2nd Ed. 1986); Malone, Ruminations on Cause-in-Fact, collected in
his Essays on Torts, p. 172 (1985), 9 Stan. L. Rev. 60 (1956); F. James
and R. Perry, Legal Cause, 60 Yale L. J. 761, 786 (1951); Harper, The
Foreseeability Factor in Law of Torts, 7 N.D. Law. 468, 482 (1932).
5. Republic of France v. United States, 290 F.2d 395, 401 (5th Cir.
1961), quoting Dalehite v. United States, 346 U.S. 15, 42, 73 S.Ct.
956, 971, 97 L.Ed. 1427 (1953); as well as listing several accepted
definitions by numerous courts as found in Words and Phrases, Fore-
seeability. 833 F.2d at 67 n. 1, Pet. App. A-5.
(f
and distilled the following generalized statement regarding
the foreseeability of harm:
“We perceive a harm to be the foreseeable
consequence of an act or omission if harm of
a general sort to persons of a general class
might have been anticipated by a reasonably
thoughtful person, as a probable result of
the act or omission, considering the interplay
of natural forces and likely human interven-
tion.” 833 F.2d at 68, Pet. App. A-7.
The Fifth Circuit’s formulation, quoted above, captures
the classic tort definitions of foreseeability. It hardly differs
from the principles as espoused by legal scholars and eminent
jurists over the past hundred years.
Applying that definition to the facts in this case, the
lower courts found that Bean could not possibly have antici-
pated that its failure to follow safe dredging practices would
likely result in physical damage to an aluminum plant located
more than six miles away and on a different body of water.
That was simply not the type of general harm expected to
follow from respondent’s dredging operations. In fact, the
harm in this case was simply inconceivable; even Consolida-
ted’s own management never thought it was possible.
These considerations display, contrary to the assertions of
Consolidated, that the Fifth Circuit addressed the issue from
the standpoint of whether any harm to Consolidated was
foreseeable; and agreed with the trial judge that it was not.
By way of contrast, the cases relied upon by Consolidated
in its effort to engineer a conflict between the circuits, i.e.,
Petition of Kinsman Transit Co. (Kinsman I), 338 F.2d 708
(2nd Cir. 1964), cert. denied 380 U.S. 944 (1965), and
8.
Pastore v. Taiyo Gyogyo, K.K., 571 F.2d 777 (3rd Cir.
1978), are simply not on point. Both those cases dealt with
exact manner and extent of harm; they do not address the
question of whether any risk of harm was foreseeable or not.
They are, therefore, distinguishable. i
In Kinsman I, for example, the plaintiffs were riparian
property owners who suffered injury when a vessel broke
free from her moorings and drifted downstream. It was never
disputed that the shipowner owed a duty to the downstream
property owners to moor his vessel properly and safely.
The general type of harm meaning the risk of damage to
downstream property owners, was always present and never
questioned. Kinsman, 338 ~ 2d at 722-23, 724.
In Pastore, the Third Circuit employed a slightly different
analysis. But the Third Circuit, like the Second Circuit in
Kinsman, first decided that some general harm was reason-
ably to be anticipated. The plaintiff in Pastore was a fireman
who was injured when he fell from a ladder in one of the
vessel’s cargo holds. The ladder had been positioned on what
appeared to be part of the deck but was actually a tarpaulin
covering some frozen cargo. The crew members and the
stevedores were present when the ladder was so placed, but
no one warned the firemen when they subsequently arrived
to fight a fire in the hold. The defendants were well aware
that the cargo hold was deceptive in appearance, possibly
inviting tragedy to the unwary visitor. In that fashion, the
stevedores’ careless cigarette smoking did more than set the
stage for the fireman’s presence. “The possibility (that) the
fireman would fall because of unfamiliarity with conditions
cannot be said to be so unusual as to sustain the district
court’s ruling that there was no proximate causation as a
matter of law.” Pastore, supra, 571 F.2d at 782. The risk of
harm to someone falling from a precarious but deceptively
placed ladder is obvious. The risk of harm to a remotely
situated aluminum plant is a different matter altogether.
9.
In both Kinsman and Pastore, the harm eventually suffered
was precisely the sort of harm which might have been antici-
pated by a reasonably thoughtful person, even if the exact
method and extent of harm might not have been so easily
ascertained.
However, the facts of the instant case compel a different
result. How could the operator of a dredge working in a
navigable channel near PPG’s plant possibly have foreseen
that its unintentional severing of a gas pipeline lying beneath
the bottom of the nver would cause physical damage to
an aluminum plant more than six miles away. It stretches
imagination to the extreme to argue that respondents could
have foreseen that an interruption of a gas pipeline in Louisi-
ana would cause any harm, much less physical harm, to
Consolidated’s equipment and processes. Every judge who
considered this question decided that the risk of harm was
simply too remote or too indirect to justify the imposition
of liability on Bean.®
6. PPG’s plant also went without its supply of natural gas from
Texaco when the pipeline was severed. Suit was filed by PPG against
Bean in state court. Exceptions were granted in favor of Bean, which
decision was affirmed by the Supreme Court of Louisiana. PPG Indus-
tries, Inc. v. Bean Dredging Corp., 447 So.2d 1058 (La. 1984). In that
case, the seven justices on the Louisiana Supreme Court agreed that
the particular risk at issue here, the risk of shutting down the plaintiff’s
factory, was not encompassed by Bean’s duty of care not to damage
pipelines negligently. PPG Industries, 447 So.2d at 1059-60. The
Louisiana Court’s analysis is of interest. The Louisiana justices ex-
amined the case in light of traditional tort principles, applying a duty-
risk analysis. The court considered PPG’s losses as “indirect”, and
observed there was clearly an ease of association between the rule of
law imposing a duty not to damage property belonging to another and
the risk of injury sustained by Texaco, but that duty did not extend
to the “risk that a third-party who has contracted with the owner
of the injured property will thereby suffer economic loss.’’ PPG Indus-
tries, 447 So.2d at 1061. Consolidated’s harm was even more peculiar
10.
The decision of the trial judge is correct. The petition for
certiorari should not entertained.
II. There is no Analytical Confusion Regarding
Duty and Foreseeability
Consolidated relies on isolated and selected readings
of the Restatement (Second) of Torts to suggest that the
Fifth Circuit and the district judge were somehow confused
with the concepts of foreseeability and causation. There is
simply no support for this accusation. Nor is there a conflict
between the Restatement of Torts and the lower courts’
treatment of the case.
The Restatement also requires that the risk of some
general harm to the plaintiff be established first. In other
words, this is the establishment of a duty, the determination
of which is guided by the general priciples of tort law.
It is well established that a tortfeasor “tis accountable only
to those to whom a duty is owed”. 833 F.2d at 67. Watz v.
Zapata Offshore Co., 431 F.2d 100 (Sth Cir. 1970); 57
Am. Jur. 2nd Negligence §33 (1971). The determination
of that duty involves a number of considerations, including,
most notably, the foreseeability of the harm suffered by the
complaining party. 833 F.2d at 67. Prosser and Keaton on
Torts, Duty §53 (Sth Ed. 1984); Green, The Duty Problem
in Negligence Cases, 28 Col. L. Rev. 1014 (1928). In this
fashion, the Restatement approach is in perfect harmony
with the Fifth Circuit’s analysis. .
The Restatement (Second) of Torts §281 (b) notes that
an actor is liable to another if his conduct “‘is negligent with
6. (Continued)
and was not expected by anyone. The consequence of physical harm
to Consolidated was, at best, inconceivable.
11.
respect to the other’. The comments to this clause, partially
quoted above, explain further:
“If the actor’s conduct creates such a recog-
nizable risk of harm only to a particular class
of persons, the fact that it in fact causes harm
to a person of a different class, to whom the
actor could not reasonably have anticipated
injury, does not make the actor liable to the
person so injured.” Restatement, supra;
comment c.
Considering the principle stated above, it follows that a
breach of Bean’s duty not to damage pipelines negligently
would create a recognizable risk of harm to the pipeline
owner, but Consolidated is unquestionably of a “different
class”. Consolidated is not a pipeline owner. Consolidated
owned no property anywhere near the PPG pipeline. Consol-
idated does not even belong to the class of riparian property
owners, like PPG, located along the banks of the channel
near the Texaco PPG line.”
In these circumstances, as both the Restatement and the
courts below recognize, the fact that Bean’s conduct caused
harm to a person of a “different class”, i.e., Consolidated,
to whom Bean could not have reasonably have anticipated
injury , does not make Bean liable.
The illustrations given by the Restatement in support of
this principle are derived from Palsgraf v. Long Island R. R.,
162 N.E. 99, 248 N.Y. 339, 59 A.L.R. 1253 (N.Y. 1928).
Here, as in Palsgraf, we have the same problem of geograph-
ical remoteness. We have an _ unforeseeable plaintiff.
7. Consolidated is in a class of its own because of its reliance on
only one pipeline, with no back-up or secondary source of power
whatsoever, but that is another matter.
12.
We have unforeseeable consequences. But in this case, unlike
Palsgraf, we have Consolidated’s damage occurring only
because Texaco failed to deliver the gas as required by the
contract. It was only after the “contracted-for” gas failed
to arrive that the events at Consolidated’s plant began to
unfold. There was nothing to suggest in any way that a
rupture of Texaco’s pipeline would interrupt Consolidated’s
gas delivery and cause physical harm to a plant, located more
than six miles away, on a different body of water.
The iliustrations in the Restatement make it clear that
the question of whether or not Bean is negligent toward
Consolidated turns on whether Bean could have reasonably
anticipated the risk of harm to someone like Consolidated,
which, of course, it could not have. The evidence clearly
demonstrated that Consolidated’s peculiar harm was not
expected by anyone.
Thus, missing from this case is any factual reason for
embarking on Consolidated’s rather novel “hindsight”
approach to legal cause. The lower courts’ determinations
of whether the consequence of Bean’s negligence was foresee-
able by a reasonably thoughtful person is in line with the
Restatement and contemporary legal thought. Indeed, the
Fifth Circuit went to great lengths to consider this case in
light of prominent legal teachings. See 833 F.2d 67-68 and
authonties cited therein.
The issue of Bean’s reaponsibility was properly decided
by the district judge, and those findings and conclusions
were correctly affirmed by the Fifth Circuit. Consolidated’s
arguments to the contrary are without ment.
The petition should be denied as it fails to raise any issues
pertinent to the jurisdiction of this Court.
6 tote
13.
III. Consolidated’s Invitation for This Court to
Address the Standards of Legal Cause in a
Maritime Tort Action is Inappropniate.
Consolidated’s effort to have this court enunciate standards
to be applied in a legal cause determination is tantamount
to reinventing the wheel. The questions of duty and foresee-
ability, including causation, have been developed and applied
by state and federal courts for hundreds of years. A wealth
of knowledge and precedent exist by which the lower courts ©
sitting in admiralty can be guided. No purpose would be
served by this Court granting certiorari on the point.
Consolidated obviousiy raises this issue only insofar as it is
necessary to its own claims and arguments. In Layne & Bowl-
er v. Western Well Works, Inc., 261 U.S. 387, 393 (1920),
this Court said, “‘it is very important that we be consistent in
not granting the writ of certiorari except in cases involving
principles the settlement of which is important to the public
be]
as distinguished from that of the parties. . .”’.
The issues which Consolidated raise are inherently factual
in nature. The outcome of any tort case is fact~sensitive.
Consolidated’s invitation to set aside many of the lower
court’s findings and conclusions was rejected by the Fifth
Circuit. That court found instead “no error in any factual
finding or legal conclusion inherent in the trial court’s ruling
that the damages suffered by Consolidated were not foresee-
able and, as such, not within the reach of the duty imposed
on Bean to perform its dredging operations in a non-negligent
manner.” 833 F.2d App. at 68, Pet. App. A-8.
In view of the stated practice of according “great weight”
to findings of fact which have been made by the district
court and approved by a court of appeals, Consolidated’s
invitation for writs should be declined and its petition
14.
denied. See, e.g., N.C.A.A. v. Bd. of Regents of Univ. of Ok,
468 US. 85, 97-98, n.15, 104 S.Ct. 2948 (1984); Branti v.
Finkel, 445 U.S. 507, 511-12, n.6., 100 S.Ct. 1287 (1980).
The district judge and the Fifth Circuit, in analyzing this
case as they did, spoke as a single voice. Their treatment of
the issues was proper and in line with convincing precedent.
No showing is made that the result would be any different
in another circuit. There is no necessity for concluding,
as Consolidated suggests, that the Fifth Circuit decided
important questions of admiralty law which should be settled
by this Court. cf. Rice v. Sioux City Memorial Park Cemetery
Inc. , 349 U.S. 70, 74, 75 S.Ct. 614 (1955).
15.
Conclusion
Consolidated has had every opportunity to persuade
the trier of fact that its peculiar and remote harm was the
foreseeable result of Bean's dredging. Consolidated has
fought the good fight, but has lost.
In light of the foregoing reasons, Consolidated’s Petition
for Writ of Certiorari should be denied, and this protracted
litigation finally brought to an end.
Respectfully submitted,
7
Comelius G. Van Deen
Allen F. Campbell
(Counsel of Record)
Deutsch, Kerrigan & Stiles
755 Magazine Street
New Orleans, Louisiana 70130
Telephone: (504) 581-5141 7
Counsel for Respondents,
C.F. Bean Corporation,
Bean Dredging Corporation,
American (mployers Insurance
Company, Ocean Marine Indemnity
Company, Ltd.
APPENDIX
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.