Petition for Writ of Certiorari — Arcwel Corp. v. Southwest Marine, Inc.
Supreme Court brief1988
Ask Donna
What actually matters in this document.
Text
ts t
(1) * Supreme Court, U.S,
87 755 FILED
. OCT 2% 3887
; gOSEPH F. SPANTOL, JR. |
IN THE | Pei
SUPREME COURT OF THE UNITED
OCTOBER TERM, 1987
NO.
ARCWEL CORPORATION,
Petitioner,
versus
SOUTHWEST MARINE, INC. and
SAN DIEGO UNIFIED PORT DISTRICT,
Respondents.
PETITION FOR WRIT OF CERTIORARI
MICHAEL J. RADFORD :
PROCOPIO, CORY, HARGREAVES
AND SAVITCH
530 B Street, Suite 1900
San Diego, California 92101
Telephone: (619) 238-1900
Counsel of Record for
Petitioner Arcwel Corporation
QUESTIONS PRESENTED
Whether federal maritime law or state
law should be applied to determine the valid-
ity of a clause in a contract which limits
tort liability for the negligence of an oper-
ator of a land-based stationary dry dock?
Whether enforcement of such an excul-
patory clause in a contract for the use of a
Navy-owned and quasi-public dry dock is
barred by public policy.
(1)
LIST OF PARTIES
The parties to the proceedings below
were Arcwel Corporation, Southwest Marine,
Inc., the San Diego Unified Port District,
and Sipco Marine, Inc.
The parties before this Court are peti-
tioner, Arcwel Corporation,’ and Respondents
Southwest Marine, Inc. and the San Diego
Unified Port District.
1/ In its earlier pleadings, Petitioner
listed Superior Crane and Rigging, Inc. as an
affiliate pursuant to Supreme Court Rules,
Rule 28.1. As of this date, Arcwel is no
longer affiliated with Superior Crane and
Rigging.
(11)
TABLE OF CONTENTS
QUESTIONS PRESENTED .........--ee-- (i)
ge ge re (ii)
OPINIONS BELOW 2... ccccccccccscvce 2
JURISDICTION wccccccccccccscsccccees 2
STATEMENT OF THE CASE ....-cccccccece 3
A. Factual History ......... 3
B. Procedural History ...... 10
REASONS FOR GRANTING THE WRIT ..... 16
A. This Case Involves A
Conflict of Law
Between Federal And
State Law Which Has é
Not Been, But Should
Be, Resolved By This
COURE cseesesedveecesesssevne 16
B. The Ninth Circuit’s
Decision Conflicts
With A Decision of
California’s Highest
State Court On A
Non-federai Issue ....... 20
_ The Ninth Circuit’s
Decision Conflicts
With Decisions In
GERee CIPCULES ceiccececses 24
D. The Ninth Circuit’s
Decision Conflicts
With Decisions Of
_ 3S Be, 29
Page
CONCLUSION ..cccecccccecceeesencces 31
APPENDIX A (Opinion and Judg-
ment of Court of
Appeals, Order Deny-
ing Petition for
Rehearing, Judgment
of District Court,
Findings of Fact and
Conclusions of Law
of District Court) ... 1A
APPENDIX B (Statutes and Regulations) 1B
(iv)
TABLE OF AUTHORITIES
Page
CASES:
A & M Produce v. FMC Corp. (1982)
135 Cal.App.3d 473 wccccccccccsvees 20
Berwind-White Coal Mining Co. v.
City of New York (2d Cir. 1943)
135 F.2d 443 cccccccccseccccccccces 19
Bisso v. Inland Water Ways Corp.
i OR Xs a Se 29
D.M. Picton & Co. v. Eastes
(5th Cir. 1947) 160 F.2d 189
[cert. denied, 331 U.S. 859
ee re eee 19
Eastern Massachusetts Street Railway Co.
v. Transmarine Corp. (lst Cir. 1930)
42 F.2d SS cccccccccccccsccscscccses 19
Executive Jet Aviation v. Cleveland
(1972) 409 U.S. 249 ceccccccccscccs 19
Foremost Ins. Co. v. Richardson
(1982) 457 U.S. 668 cccccccccsccces 17
Foster Const. C.A. & Williams Bros. Co.
v. United States (1970) 435 F.2d
YE RPP rrererrrrrrerrrrrrerrrrerrierrry 25
Gardner v. Downtown Porsche Audi
(1986) 180 Cal. App.3d 713 ........ 23
Pelletier v. Alameda Yacht Harbor
(1986) 188 Cal. App.3d 1551 ....... 23
(v)
PE Ce ahinal LI set
,
Royal Ins. Co. of America v. Pier 39
Ltd. (9th Cir. 1984) 738 F2d.
1035 eeee#ee#ee#e#e#ee#e#e®# @eeeeee*eeseeesees3«eesrf7fe#e8seqeeee#ee#e®# 18
Salton Bay Marina, Inc. v. Imperial
Irrigation Dist. (1985) 172
Cal. APP.3d 914 wccccccccsccsesececs 24
Sea Land Industries, Inc. v. General
Ship Repair (D.C. Md. 1982)
530 F. Supp. 550 ccc ccc ccccccvceces 19
Tunkl v. Regents of the University
of California (1963) 60
CAL~.2G DS ceccccesccecseces esscvecse Bh, 29
United States Lines, Inc. v.
Maryland Port Administration ao
L9G1l A.M.C. BSP caevcesesevaessseee 31
West Golf Maritime Association v.
Galveston (1979) 1981:°A.M.C.
938 wcccccce ee Teer ecscscesecscececcece 31
STATUTES:
LO UneSeSe FSIOR ccccccssssesiecscecseccsees 28
a a | TS a nr 3
42 UebsGs. FSSD eee cvsscesecsssssssaves 28
SSA UsEsGe GASPS Kes sees ce cvvriiseseseae 2
Federal Acquisition Regulation
ep) ee Te a > ee ere ere 28
ee re ee eee 29
Pee ne BOL OOe 4s ea 0 bh 546 ae a aeee 30
FAM GOCTION S2.24SSL9 2c ccvcsrcscsesve 30
(vi)
NO.
IN THE
SUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 1987
ARCWEL CORPORATION,
Petitioner,
nis versus
SOUTHWEST MARINE, INC. and
SAN DIEGO UNIFIED PORT DISTRICT,
Respondents.
PETITION FOR WRIT OF CERTIORARI
Petitioner, Arcwel Corporation, 2/ res-
pectfully prays that a writ of certiorari
issue to review the judgment and opinion of
the United States Court of Appeals for the
Ninth Circuit entered in the above-entitled
proceeding on May 1, 1987, and finally
decided by an order denying Petitioner’s
petition for rehearing on June 29, 1987.
2/ Arcwel Corporation was erroneously
labeled "Arcwel Marine, Inc." in the opinion
of the Ninth Circuit. This usage is not
continued herein except in the opinion of the
Ninth Circuit contained in Appendix A.
- l-
OPINIONS BELOW
The opinion of the Court of Appeals for
the Ninth Circuit is reported at 816 F.2d
468, and reprinted in full at pages 1A-13A of
Appendix A. The order denying the Peti-
tioner’s petition for rehearing is reprinted
in Appendix A at pages 14A-15A.
The judgment and findings of fact and
conclusions of law of the United States
District Court for the Southern District of
California (Infante, Magistrate) are also
reprinted in Appendix A at pages 16A-36A.
JURISDICTION
Petitioner initiated the instant action
against respondent by way of a third-party
complaint which invoked the jurisdiction of
the United States District Court for the
Southern District of California under 42
U.S.C. $1332;
On April 15, 1986, the District Court
entered a judgment in favor of petitioner and
against respondent Southwest Marine, Inc.
See Appendix A, pages 16A.
Respondent appealed and, on May 1, 1987,
the Ninth Circuit reversed the District
Court’s judgment. See Appendix A, pages 1A-
13A. Petitioner’s petition for rehearing was
denied on June 29, 1987. Appendix A, pages
14A-15A.
On September 23, 1987, Justice O’Connor
ordered that the time for filing this peti-
tion for writ of certiorari be extended to
and including October 27, 1987. The juris-
diction of this. Court to review the judgment
and opinion of the Ninth Circuit is invoked
under 28 U.S.C. §1254(1).
STATEMENT OF THE CASE
A. Factual History.
Petitioner Arcwel Corporation (herein-
after "Arcwel") and Respondent Southwest
Marine, Inc. (hereinafter "Southwest") are
competitors. Both companies are engaged in
the business of building and repairing ships.
A great deal of the business of both compa-
nies is derived from United States Navy con-
tracts.
In April 1982, the Navy solicited bids
from San Diego ship builders to overhaul the
U.S.S. Dubuque. The bid invitation described
the work to be performed on the ship and pro-
vided prospective bidders with all pertinent
information concerning the facility at which
the work was required to be done (i.e., the
32nd Street Naval Dry Dock) .2/
In 1982, the 32nd Street Naval Dry Dock
was owned by the Navy and leased to the San
Diego Unified Port District ("Port
District"), a public corporation. One of the
purposes of the lease was to make the facil-
ity available to ship repair contractors
working on Navy ships. To accomplish this
purpose, the Port District contracted with a
3/ To aid prospective bidders in
determining their fixed bids, the bid
invitation included a description of the
services, equipment, etc. available at the
32nd Street Naval Dry Dock and an estimate of
the cost of dry dock services.
- 4-=-
private entity to operate and maintain the
32nd Street facility for use by Navy con-
tractors. The private entity responsible for
operating and maintaining the dry dock was
none other than Arcwel’s competitor,
Southwest.
Arcwel and Southwest bid against each
other on a Navy contract to overhaul the
U.S.S. Dubuque. Arcwel, as the low bidder,
was awarded the contract on July 8, 1982.
However, the work on the U.S.S. Dubuque was
not scheduled to commence until October 1982.
In preparation for the commencement of
work on the U.S.S. Dubuque, Arcwel signed an
agreement for the use of the 32nd Street
Naval Dry Dock with Southwest and the Port
District. The "User’s Agreement" -- the exe-
cution of which was required in order to
secure the use of the dry dock specified in
the Navy’s contract -- incorporated a local
dry dock tariff containing the following pro-
visions:
6.2 Disclaimer of Warranty
- 5 =-
Users should understand
that the Dry Dock is made
available on an "as is,
where is" basis without
warranty of any kind
either expressed or
implied. A User using
the Dry Dock should make
an independent inspection
and may not rely upon any
representation concerning
the condition or state of
repair of the Dry Dock or
any part hereof including
any promise to improve,
alter, adopt or repair
the Dry Dock or any part
thereof unless such rep-
resentation is made in
writing by the District.
Indemnification
Users shall defend,
indemnify, and hold harm-
less the District, the
Government, and the Dry
Dock Operator and Dock-
master and their respec-
tive officers, agents,
and employees against
causes of action, liabil-
ity, damage and expense,
including reasonable
attorney’s fees, for
judicial relief of any
kind, for damage to prop-
erty of any kind what-
soever and to whomever
belonging, including
without limitation, user
or its employees, or
injury or death of any
person or persons,
including without limita-
tion, user or its employ-
ees, resulting directly
or indirectly from the
granting and performance
of the User’s Agreement
or arising from the use
and operation of the Dry
Dock or any defect in any
part thereof or services
of the District, the
Government, the Dry Dock
Operator or the Dock-
master, or any of their
respected officers,
agents or employees.
Users shall be and remain
liable for any and all
claims, costs, expense
and loss or liability
arising from any _ act,
omission, fault or negli-
gence of its subcontrac-
tors, agents, employees,
invitees and guests and
shall defend, indemnify
and save the District,
the Government, the Dry
Dock Operator and the
Dockmaster, harmless
against all such claims,
costs, expense and loss
or liability incurred in
connection therewith,
including attorney’s
fees, for injury to or
death of persons or dam-
age or loss of property.
User also agrees to
release and hold the
District, the Government,
and the Dry Dock Operator
and Dockmaster and their
respective officers,
agents and employees,
harmless from any cost or
loss including loss of
property arising from
disruption to or delay in
User’s contract work do
to acts oor omissions
(including negligence) of
the District, the Govern-
ment, the Dry Dock Oper-
ator or Dockmaster in the
operation of the Dry Dock
so long as such parties
have acted in good faith.
The U.S.S. Dubuque was docked for refur-
bishing on October 5, 1982. Unfortunately,
during the period between bidding process and
the actual repairs, the 32nd Street Naval Dry
Dock had fallen into a state of disrepair.
Southwest -- which, in its capacity as a user
(rather than operator) of the dock, had just
finished refitting the U.S.S. Okinawa -- left
the dry dock dirty and in disrepair. The
dock was in "deplorable condition" -- "clut-
tered with trash and litter" and clogged with
sand from Southwest’s sandblasting operation
on the U.S.S. Okinawa. Appendix A, pages
23A-24A. Contrary to its obligations under
the User’s Agreement, */ Southwest had not
maintained the dry dock "so as to assure its
full availability and usefulness at all
times."
Before commencing repairs on the U.S.S.
Dubuque, Arcwel was forced to clean and
repair the dry dock. Furthermore, in order
to perform the heavy repairs required by the
Navy contract, it was necessary for Arcwel to
rent several land-based cranes to replace the
two malfunctioning gantry cranes which
(according to the bid invitation) were sup-
posed to be available at the dry dock. The
land-based cranes leased by Arcwel were, by
necessity, less efficient than the gantry
cranes. The unavailability of the gantry
cranes added to Arcwel’s labor costs and
adversely affected the work of Sipco Marine,
4/ The Operation and Maintenance Agreement
between the Port District and Southwest pro-
vided that Southwest would "maintain, protect
and repair the dry dock in accordance with
sound industrial practice and shall keep it
in good working order and operating condition
so as to assure its full availability and
usefulness at all times."
- 9Q-
Inc. (hereinafter "Sipco"), the subcontractor
hired to do the sandblasting work on the
U.S.S. Dubuque.
B. Procedural History.
On February 10, 1983, Sipco sued Arcwel
for amounts allegedly owed under the sand-
blasting subcontract. As part of that suit,
Sipco claimed that the unavailability of the
gantry cranes caused inefficiencies, slow-
downs and extra costs for the subcontracted
weet. Arcwel filed a third-party complaint
against the Port District and Southwest
alleging negligence, breach of contract under
a third-party beneficiary, and indemnity --
all based on allegations that the gantry
cranes were improperly repaired and main-
tained.
In defense, Southwest and the Port
District asserted the exculpatory provisions
of the local dry dock tariff precluded any
recovery by Arcwel. This defense was asser-
ted by Southwest and the Port District in two
- 10 -
summary judgment motions filed in December
1983. On February 3, 1984, the district
court (Nielsen, J.) granted the Port
District’s motion for summary judgment as to
all claims. Southwest’s summary judgment
motion was sustained as-to the third-party
beneficiary and indemnity counts.
On April 15, 1985, pursuant to stipula-
tion, Arcwel’s negligence claim was tried
before United States Magistrate Edward
Infante. After an eighty-day trial, the
magistrate entered judgment in favor of
Arcwel for $464,705.48, plus costs. In sup-
port of his judgment, Magistrate Infante
found (1) Southwest owed a legal duty to
Arcwel, as a user of the dry dock, to prop-
erly maintain and repair the gantry cranes in
accordance with sound industrial practice,
(2) Southwest violated this duty giving rise
to a cause of action in tort, (3) a tort
occurring on a stationary dry dock does not
invoke admiralty law, (4) under California
- ll -
law (which governed Arcwel’s tort action for
negligence), the exculpatory provisions
incorporated in the User’s Agreement were
unconscionable and therefore unenforceable.
On appeal, Arcwel challenged the dis-
trict court’s summary judgment orders on the
grounds, inter alia, that (1) the exculpatory
clauses in the User Agreement were unenforce-
able and therefore could not support summary
disposition of Arcwel’s claims -against the
Port District, (2) a question of law existed
as to whether Arcwel was an intended third-
party beneficiary of the lease agreement
between the Navy and the Port District, and
(3) the Port District was liable, under gen-
eral agency principles, for the negligence of
Southwest.
In its cross appeal, Southwest argued
that (1) California law was inapplicable to
Arcwel’s claims and, under federal maritime
law, the exculpatory clauses in the User’s
Agreement were enforceable, and (2) even if
California was applicable, the magistrate
erred in finding that the clauses were uncon-
scionable.
On May 1, 1987, the Court of Appeals for
the Ninth Circuit reversed Magistrate’s
Infante judgment against Southwest Marine and
affirmed the district court’s summary judg-
ment orders. In rendering its decision, the
Ninth Circuit side-stepped the conflicts of
law issue:
The choice of governing
law in this case presents
a close question cs
There is a split of
authority as to whether
maritime law applies to
such contracts. [Cita-
tion] Happily, we need
not resolve this diffi-
cult issue because we
reached the same conclu-
sion under either body of
law.
x rerenrrkrekk tk
Whichever law applies,
the clause shifting the
risk of loss due to
negligent maintenance to
Arcwel is enforceable,
shielding both Arcwel
[sic] and Southwest from
liability.
In analyzing California law,
Circuit reasoned as follows:
California courts have
generally upheld exculpa-
tory provisions so long
as they do not "affect
the public interest."
[Citaticn. ] However,
California courts have
emphasized that the pub-
lic interest exceptions
should not be applied to
invalidate exculpatory
clauses entered into
between commercial enti-
ties of equal bargaining
power. There is "no rea-
son" why one party, "hav-
ing determined, as a mat-
ter of business judgment,
at the price fixed justi-
fied assuming the risk of
loss, should now be
allowed to shift the risk
so assumed to [the other
party], which had neither
the Ninth
agreed to assume it nor .
been compensated for such
assumption." [Citations. ]
. »« Arcwel admits that,
when it submitted its bid
to the Navy, it was aware
that it would be [sic]
have to sign the User’s
Agreement and was famil-
iar with the terms.
Therefore, it had an
opportunity to make its
bargain based on the
entire package offered by
the Navy, including the
allocation of various
- 14 =
risks associated with the
project. If the package
as a whole was unaccept-
able, Arcwel could have
declined to bid. Or, it
could have increased its
bid price to take into
account the risk imposed
by the exculpatory
clause. We find the pub-
lic interest not seri-
ously implicated by this
provision. {[ Footnote
omitted. }
Under federal maritime law, the Ninth
Circuit found that the exculpatory clause in
this case "stands on even stronger footing."
The appellate court noted that "’absent evi-
dence of overreaching, clauses limiting lia-
bility in ship repair contracts will be
enforced.’ [Citations.]" The Ninth Circuit
did not equate the Magistrate’s findings of
adhesion with the requirement of overreach-
ing. The appellate court therefore found "no
evidence overreaching" in this case. >/
S/ Based on its conclusion that_ the
exculpatory clauses in the User’s Agreement
were valid, the Court of Appeals found that
the district court’s orders granting summary
judgment to Southwest and the Port District
"were correct."
- 15 =-
REASONS FOR GRANTING THE WRIT
The decision of the United States Court
of Appeals for the Ninth Circuit should be
reviewed by this Court for several reasons:
(1) This case involves a conflict of law
between federal and state law which has not
been, but should be, resolved by this Court,
(2) the Ninth Circuit’s decision conflicts
with a decision of California’s highest state
court on a non-federal issue, (3) the Ninth
Circuit’s decision conflicts with previous
decisions of this Court and (4) the Ninth
Circuit’s decision conflicts with the deci-
sions of other circuits concerning competi-
tive bidding in government contracts.
A. This Case Involves A Conflict
of Law Between Federal And
State Law Which Has Not Been,
But Should Be, Resolved By This
Court.
In its decision below, the Ninth Circuit
has side-stepped an important issue concer-
ning the choice of law in this case by con-
Cluding that it would reach the same result
- 16-
under either federal or state law. As dis-
cussed more fully below, petitioner submits
that there is a substantial difference
between California law and federal maritime
law concerning the enforceability of exculpa-
tory clauses such as found in this case.
Petitioner submits that a split of
authority has developed concerning whether
federal or state law applies to negligence
claims arising from the use and maintenance
of a land-based naval support facilities.
Under the criteria established by this Court
in Executive Jet Aviation v. Cleveland
(1972) 409 U.S. 249 and Foremost Ins. Co. v.
Richardson (1982) 457 U.S. 668, the proper
invocation of admiralty jurisdiction is
dependent on a number of factors including
(1) the locale of the allegedly tortious con-
duct, and (2) the nature of the activity
which is the subject of the action. In
applying this criteria to tort claims arising
from the use of land-based naval support
- 17 -
facilities, various circuit courts have come
to different conclusions.
As the Ninth Circuit noted in this case:
"There is a split of authority as to whether
maritime applies to [a contract for the use
of a dry dock]." Clearly Arcwel’s contract
with the Navy is subject to maritime law, but
its agreement with Southwest does not involve
a "traditional maritime activity," and the
application of maritime law in this case does
not "serve the interests that lie behind the
constitutional grant of admiralty jurisdic-
tion." See Royal Ins. Co. of America v. Pier
39 Ltd. (9th Cir. 1984) 738 F.2d 1035, 1037.
The application of maritime law is not
necessary to prevent Southwest, as operator
of the dry dock, from being subject to claims
leveled against it in distant foreign ports;
nor is the invocation of admiralty juris-
diction warranted based on the desirability
of a uniform approach to such contracts.
Royal Ins. Co. of America v. Pier 39 Ltd.,
- 18 -
supra at 1038. As stated by one court: A
contract for the maintenance of equipment on
a land-based pier "is no more closely con-
nected to maritime activity than would be
similar services performed on some other
fixed structure P . . ” Sea Land
Industries, Inc. v General Shop Repair (D.C.
Md. 1982) 530 F. Supp. 550, 560.
On the other hand, several courts have
held contracts relating to the construction
or maintenance of docks or wharves to be
within the federal courts’ admiralty juris-
diction. See Berwind-White Coal Mining Co.
v. City of New York (2d Cir. 1943) 135 F.2d
443; Eastern Massachusetts Street Railway Co.
v. Transmarine Corp. (lst Cir. 1930) 42 F.2d
58; and D.M. Picton & Co. v. Eastes (5th Cir.
1947) 160 F.2d 189 [cert. denied, 331 U.S.
859 (1947)]. Petitioner submits that these
cases are distinguishable on the ground that
the breach of the contracts in each case
caused a tort which clearly fell within the
- 19 =
court’s admiralty jurisdiction. Here, South-
west’s negligence is governed by California
law.
In any event, this issue has not yet
been resolved by this Court. Resolution of
the question is crucial to the determination
of the claims in this case, as well as the
claims of other litigants in pending and
future litigation.
B. The Ninth Circuit’s Decision
Conflicts With A Decision of
California’s Highest State Court
On A Non-federal Issue.
Furthermore, the Ninth Circuit’s opinion
(which concludes that the subject clause does
not offend California law) is contrary to
established precedent from the California
courts.
Under California law, contract provi-
sions which limit a party’s liability for his
own negligence are disfavored. A & M Produce
Vv. FMC Corp. (1982) 135 Cal.App.3d 473.
Where, as here, the exculpatory provision is
required on a "“take-it-or-leave-it" basis,
- 20 -
| aa
the contract will be carefully scrutinized.
Id. In a situation where the party to be
bound has no meaningful choice, California
courts have refused to recognize such con-
tractual limitations on liability. Tunkl v.
Regents of the University of California
(1963) 60 Cal.2d 92. If the exculpatory
clause goes so far as to adversely affect a
public interest, it will be held invalid.
Id.
In Tunkl, the California Supreme Court
held that an exculpatory clause should be
invalidated if it involves the transactions
that exhibit some, or all, of the following
characteristics:
It concerns a business of
a type generally thought
suitable for public regu-
lation. The party seek-
ing exculpations is
engaged in performing a
service of great impor-
tance to the _ public,
which is often a matter
of practical necessity
for some members of the
public. The party holds
himself out as willing to
perform this service for
any member of the public
- 21-
who seeks it, or at least
for any member’ coming
within certain estab-
lished standards. As a
result of the essential
nature of the service, in
the economic setting of
the transaction, the
party invoking exculpa-
tion possesses a decisive
advantage of bargaining
strength against any men-
ber of the public who
seeks his services. In
exercising a superior
bargaining power the
party confronts the pub-
lic with a standardized
adhesion contract of
exculpation and makes no
provision whereby a pur-
chaser may pay additional
reasonable fees and
obtain protection against
negligence. Finally as a
result of the trans-
action, the person or
property of the purchaser
is placed under the con-
trol of the seller, sub-
ject to the risk of care-
lessness by the seller or
his agents. Id. at 98-
101. (Footnote omitted.)
Magistrate Infante found the existence
of each of these characteristics in this
case. He concluded that the exculpatory
- 22 -
clause in the tariff was invalid under the
Tunkl standard.
The Ninth Circuit’s conclusion that
Tunkl is distinguishable because "the public
intesede [is] not seriously implicated by
[the exculpatory clauses in the User’s Agree-
mentj]" is not supported by established
California law. In Pelletier v. Alameda
Yacht Harbor (1986) 188 Cal. App.3d 1551, a
California court, applying the standards
enunciated in Tunkl, recently concluded that
a similar clause in a private mooring agree-
ment was ineffective to relieve the harbor
owner of liability for his negligence in con-
nection with the sinking of the moored vessel
during repairs. The court concluded that the
"(mooring] transaction exhibit[ed] all six of
the Tunkl characteristics." Id. at 1556; see
also Gardner v. Downtown Porsche Audi (1986)
180 Cal. App.3d 713 [clause exculpating
service station for negligence resulting in
damage to automobile during repairs found to
- 23-
be against public interest]; Salton _ Bay
Marina, Inc. v. Imperial Irrigation Dist.
(1985) 172 Cal. App.3d 914 #£x[exculpatory
clause in agreement which must, pursuant to
county ordinance, be executed by landowner
as a prerequisite to issuance of building
permit is void as against public policy].
Cc. The Ninth Circuit’s Decision
Conflicts With Decisions’ [In
Other Circuits.
The Ninth Circuit’s opinion also con-
flicts with established precedent aimed at
preserving competition in the federal pro-
curement and contracting process.
First, the opinion (which suggests that
Arcwel should have declined to bid or, in the
alternative, increased its bid price to take
into account the risk imposed by the exculpa-
tory clause) conflicts with federal procure-
ment policies aimed at keeping the cost of
government contracts down. The Ninth
Circuit’s decision is inconsistent, for
example, with federal policies which encour-
- 24 -
age government contractors to disregard con-
tingencies in a project which may increase
the ultimate cost to the parties. See Foster
Const. C.A. & Williams Bros. Co. v. United
States (1970) 435 F.2d 873, 887. By elimin-
ating the need to provide for such contin-
gencies, the Government is able to secure the
lowest possible bids from government con-
tractors. Id. In most cases, the work is
completed as anticipated at the agreed-upon
price. In the event changed circumstances
hamper the completion of the contract or sub-
stantially increase the cost to the contrac-
ting parties, an equitable adjustment proce-
dure is available to compensate the govern-
ment contractor for its additional expendi-
tures. Id. The Ninth Circuit’s decision in
this case encourages the inflation of bids on
government contracts. As such, it is con-
trary to sound federal procurement policy.
Second, the Ninth Circuit’s decision
condones the existence of an unfair competi-
- 25 -
tive advantage in the government contract
bidding process. Congress has enacted a
panoply of safeguards aimed at ensuring fair
and open competition in federal procurements.
See 10 U.S.C. §2304 and 41 U.S.C. §253
(Appendix B). These safeguards are scrupu-
lously adhered to by the Government in order
to secure a fair bargain for both parties.
Id.; see also Federal Acquisition Regulation
(FAR) section 1.101 et seq. (Appendix B).
In this case, Southwest’s position as
the operator of the 32nd Street Naval Dry
Dock gave it an unfair advantage over its
competitors in the Navy ship repair business.
Southwest was privy to information about the
condition of the dock which was unavailable
during the bidding process. Furthermore, the
evidence at trial established that South-
west’s role as the operator of the 32nd
Street Dry Dock placed it in a position to
ensure that all of the cranes were function-
ing for its work on the U.S.S. Okinawa, but
- 26 -
inoperable when its competitor, Arcwel, was
ready to commence repairs on the U.S.S.
Dubuque.
The Ninth Circuit’s opinion ignores the
competitive advantage given to Southwest in
this case, and penalizes Arcwel for circum-
stances beyond its control. In particular,
the Ninth Circuit’s decision is contrary to
federal procurement policy aimed at eliminat-
ing the competitive advantage given to con-
tractors like Southwest. This policy is
embodied in FAR section 45.102 which states:
"(Ijf contractors possess Government prop-
erty, [contracting] agencies shall .. .
[ejliminate to the maximum practical extent
any competitive advantage that might arise
from using such property." (Appendix B).
Third, the Ninth Circuit’s opinion
(which assumes that Arcwel’s bid on the
U.S.S. Dubuque contract was based on an
inspection of the dry dock and acceptance of
the facility "as is") ignores a practical
- 27 -
consideration which is present in every
government contract -- the amount of time
between the bidding process and the actual
performance of the bided work. This con-
sideration has been recognized in connection
with other public contracts requiring the use
of government-furnished property. FAR
Section 45.308, for example, permits enforce-
ment of “as is" provisions in contracts for
the use of government production and research
facilities only so far as to disclaim damages
for defects which existed at the time of the
offer of inspection during the bid solicita-
tion period. If there is any change in the
condition of the government-owned facility
between the solicitation period and the com-
mencement of work, the contractor is afforded
relief. FAR Section 52.245-19. (Appendix
B).
- 28 -
D. The Ninth Circuit’s Decision
Conflicts With Decisions Of
This Court.
Finally, the Ninth Circuit’s decision
conflicts with a prior precedent of this
Court.
The seminal case in maritime law, which
holds that a party may not contract against
liability for its own negligence, is Bisso v.
Inland Water Ways Corp. (1955) 349 U.S. 85.
Although Bisso involved a release from lia-
bility provision in a contract between a tug-
boat and its tow, the case has been cited by
many courts and the Federal Maritime Commis-
sion®/ for the proposition that indemnity
clauses in the tariffs of public dock facil-
ities are void as a matter of law. See West
Golf Maritime Association v. Galveston (1979)
1981 A.M.C. 938 and United States Lines, Inc.
v. Maryland Port Administration (1980) 1981
5/ Decisions of the Federal Maritime
Commission, as an agency with substantial
expertise in this area, have been given great
deference by the federal courts. Maryland
Port Administration v. S.S. American Legend
(D.Maryland 1978) 453 F.Supp. 584, 593
- 29 -
A.M.C. 952. Such an interpretation is con-
sistent with the opinion of this Court.
Justice Black, writing for the Court, stated:
This rule is merely a
particular application of
the towage business of a
general rule long used by
courts and legislatures
to prevent enforcement of
release from negligence
contracts in many rela-
tionships such as bailors
and bailees, employers
and employees, public
service companies and
their customers. 349
U.S. at 90-91.
In contrast, the Ninth Circuit has adop-
ted the position that a contract for the use
of a dry dock somehow differs from a towage
agreement and therefore a clause limiting
liability in connection with the use of a dry
dock is enforceable "absent evidence of over-
reaching." Petitioner submits that review of
the Ninth Circuit’s decision in this case is
necessary to avoid a misinterpretation of
this Court’s decision in Bisso.
- 30 -
CONCLUSION
For the foregoing reasons, it is
respectfully submitted that the petition for
writ of certiorari should be granted.
Respectfully submitted,
MICHAEL J. RADFORD
PROCOPIO, CORY, HARGREAVES
AND SAVITCH
Counsel of Record for
Petitioner Arcwel
Corporation
Appendix A
Be tha ey 3 sah wos HI Ay AR af Ui oie ks Se Ray ee he ale Bh an OST OGD BE 9 Mar
ee Se eee ee” ee ee ee Se ee
ae ‘ ‘
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
ARCWEL MARINE, INC, )
) Nos. 86-5882;
Third-party Plaintiff/) 86-5889
Appellee/Cross~-Appeliant, )
) D.C. No.
vs. ) CV-83-0342-N(I)
)
SOUTHWEST MARINE, INC., ) OPINION
)
Third-party Defendant/)
Appellant/Cross-Appellee )
)
and )
SAN DIEGO UNIFIED PORT )
DISTRICT, )
)
Third-party Defendant/)
Cross~Appellee. )
)
Argued and Submitted
March 4, 1987 -- Pasadena, California
Filed May 1, 1987
Before: Thomas Tang, Arthur L. Alarcon and
Alex Kozinski, Circuit Judges.
Opinion by Judge Kozinski
Appeal from the United States District Court
for the Southern District of California
Leland C. Nielsen, District Judge, and
Edward A. Infante, Magistrate, Presiding
SUMMARY
Contracts
Appeal from magistrate’s judgment and dis-
trict Court’s summary judgment orders. The
magistrate’s judgment is reversed; the dis-
trict court’s summary judgment orders are
affirmed.
This action arises from appellee Arcwel
Corporation’s contract with the United States
Navy to overheu the U.S.S. Dubuque. Pursu-
ant to that contract, Arcwel signed a User’s
Agreement with cross-appellee the San Diego
Unified Port District (District) which
included a clause exculpating the District or
appellant Southwest Marine -- which main-
tained and repaired the dry dock -- for any
losses arising from disruption, delay or
negligence. Arcwel’s subcontractor subse-
quently filed suit against Arcwel and Arcwel
in turn filed a third-party action against
the District and Southwest. The district
ee
court granted summary judgment for the Dis-
trict as to all claims and for Southwest as
to all but the negligence claim. A magis-
trate entered judgment against Southwest as
to negligence, refusing to give effect to the
exculpatory clause on the grounds of uncon-
scionability.
[1] There is split authority as_ to
whether maritime law applies to the User’s
Agreement -- a contract for the use of a dry
dock. [2] California courts have generally
upheld exculpatory provisions so long as they
do not affect public interest. [3] Arcwel
was aware when it submitted its bid that it
would have to sign the User’s Agreement and
was familiar with its terms. It could have
declined to bid, or increased its price to
take into account the risk imposed by the
exculpatory clause. Therefore, the public
interest is not seriously implicated by the
provision. [4] Under maritime law, absent
evidence of overreaching, clauses limiting
liability in ship repair contracts will be
enforced.
COUNSEL
Peter J. Ippolito, San Diego, California, for
the appellee/cross-appellant.
C. Douglas Alford, San Diego, California, for
the appellant/cross-appellee.
OPINION
KOZINSKI, Circuit Judge:
We consider whether an _ exculpatory
clause in a contract for use of a dry dock,
itself an integral part of a Navy procurement
contract package, was unenforceable’ on
grounds of unconscionability.
Facts
Arcwel Corporation ("Arcwel") was
awarded a contract by the United States Navy
to overhaul the U.S.S. Dubuque. The contract
required that the overhaul be perforned ata
Navy-owned dry dock that was under lease to
the San Diego Unified Port District ("Port
District"). The dry dock lease obligated the
Port District to maintain the leased property
and "keep it in good working order and oper-
ating condition so as to assure full avail-
ability and usefulness at all times." The
Port district in turn entered into a contract
with Southwest Marine, Inc. ("Southwest")
for the maintenance and repair of the dry
dock facility.
Pursuant to its contract with the Navy,
Arcwel signed a User’s Agrement with the Port
District. The User’s Agreement provided that
Arcwel would indemnify and hold harmless the
Port District and Southwest for any losses
arising out of the docking or undocking of
any vessel. The User’s Agreement also incor-
porates a dry dock tariff, which contains a
Clause exculpating the Port District and
Southwest for any loss arising from disrup-
tion, delay or negligence, "so long as [the]
parties have acted in good faith." The
tariff also provides that the dry dock is
made available on an "as is, where is" basis,
"without warranty of any kind either express
or implied."
The dry dock was equipped with two
gantry cranes, the Wellman and the Myerstein.
The lease listed one of these cranes as
included in the leased property; a map
attached to the lease showed both cranes; and
the Tariff provided that the Myerstein and,
at certain time, the Wellman were available
for use.
Unfortunately, when Arcwel got down to
the business of performing the overhaul it
discovered that neither crane could be used
effectively. The U.S.S. Dubuque was docked
October 5, 1982. The Wellman did not become
available until October 12 and even then did
not function properly. The Myerstein was
finally made available November 6. In the
meantime, Arcwel had to rent ¥ land-based
cranes as substitutes. Land-based cranes are
less efficient than gantry cranes, adding to
Arcwel’s labor costs. The unavailability of
the gantry cranes also adversely affected the
6-A
work of Sipco Marine, Inc. (Sipco), the sub-
contractor hired to do sandblasting work on
the U.S.S. Dubuque.
Proceedings Below
Sipco sued Arcwel for amounts allegedly
owed under the sandblasting subcontract. As
part of that suit Sipco claimed that the
unavailability of the gantry cranes caused
inefficiencies, slowdowns and extra cost for
the subcontracted work. Arcwel filed a
third-party complaint against the Port Dis-
trict and Southwest alleging negligence,
breach of contract under a third-party bene-
ficiary theory, and indemnity, all based on
allegations that the gantry cranes were
improperly repair and maintained. The dis-
trict court granted the Port District’s
motion for summary judgment as to all claims.
In addition, the district court granted
Southwest’s summary judgment motion as to the
third-party beneficiary and indemnity counts,
leaving only the negligence claim pending.
7-A
ee ee aT ae ee y
The parties proceeded trial before a
magistrate. The magistrate entered final
judgment after trial in favor of Arcwel for
$464,705.48 plus costs for the negligent
failure to maintain the gantry cranes. He
refused to give effect to the exculpatory
clause in the User’s Agreement on grounds of
unconscionability.
Southwest appeals the magistrate’s deci-
sion; Arcwel cross-appeals from the district
court’s summary judgment order.
Discussion
Southwest challenges the magistrate’s
ruling that the exculpatory clause was uncon-
scionable and therefore unenforceable under
California law. The magistrate based that
conclusion on his finding that Southwest and
the Port District were in a superior bargain-
ing position and that Arcwel had no choice
but to perform the work on the dry dock
offered. Southwest argues that the magis-
trate should have applied maritime law, not
California law, in interpreting the contract.
8-A
Southwest also claims that, whichever law
applies, the clause should be enforced. The
magistrate’s factual findings are reviewed
under the clearly erroneous standard, while
his conclusion that the clause was uncon-
scionable raises a question of law subject to
de novo review. See Co-efficient Energy
Systems v. CSL Industries, Inc. No. 86-5862,
slip op. at 4 (9th Cir. March 11, 1987). The
choice of law determination is also reviewed
de novo. Phillips v. Amoco Trinidad Oil Co.,
632 F.2d 82, 84 (9th Cir. 1980), cert.
denied, 451 U.S. 920 (1981).
[1] The choice of governing law in this
case presents a close question. The contract
between the Navy and Arcwel is one for the
repair of a vessel, traditionally subject to
maritime law. See Kossick v. United Fruit
Co., 365 U.S. 731, 735 (1961). On the other
hand, the exculpatory clause is part of the
User’s Agreement between Arcwel and the Port
District, a contract for the use of a dry
dock. There is a split of authority as to
9-A
whether maritime law applies to such con-
tracts. See, e.g., Royal Ins. Co. of America
v. Pier 39, Ltd., 738 F.2d 1035, 1037-38 (9th
Cir. 1984) (insurance policy on dry dock not
within admiralty jurisdiction, citing cases
on maintenance of docks) .2/ Happily, we need
not resolve this difficult issue because we
reach the same conclusion under either body
of law.
1. California law
[2] California courts have generally
upheld exculpatory provisions so long as they
do not “affect the public interest." Tunkl v.
Regents of the Univ. of Cal., 60 Cal.2d 92,
96, 32 Cal.Rptr. 33, 383 P.2d 441 (1963).
However, California courts have emphasized
that the public interest exception should not
be applied to invalidate exculpatory clauses
af We note that exercise of admiralty jur-
isdiction and the application of maritime law
are not necessarily coextensive. The court
may exercise diversity jurisdiction, as it
did in this case, and still apply principles
of maritime law. See, e.g., Kermarec v.
Compagnie Generale Transatlantique, 358 U.S.
625, 628 (1959).
10-A
entered into between commercial entities of
equal bargaining power. There is "no reason"
why one party, "having determined, as a mat-
ter of business judgment, that the price
fixed justified assuming the risk of loss,
should now be allowed to shift the risk so
assumed to [the other party], which had
neither agreed to assume it nor been compen-
sated for such assumption." Delta Air Lines,
Inc. v. Douglas Aircraft Co., 238 Cal.App.2d
95, 47 Cal.Rptr. 518, 524 (1965); see also
Philippine Airlines, Inc. Vv. McDonnell
Douglas Corp. 87 Daily J. D.A.R. 613, 615
(Ist Dist. Cal.App. Feb. 11, 1987).
[3] The commercial context presented by
this case raises equities far different from
those of the helpless patient entering the
hospital in Tunkl. Arcwel admits that, when
it submitted its bid to the Navy, it was
aware that it would be have to sign the
User’s Agreement and was familiar with the
terms. Therefore, it had an opportunity to
make its bargain based on the entire package
11-A
»ffered by the Navy, including the allocation
»f various risks associated with the project.
[ff the package as a whole was unacceptable,
\rcwel could have declined to bid. ge &
could have increased it bid price to take
into account the risk imposed by the exculpa-
-ory clause. We find the public interest not
seriously implicated by this provision.2/
2. Maritime law
[4] If we analyze the contract under
naritime law, the exculpatory clause stands
on even seeisidiaie footing. Clear precedent
1i0lds that, "absent evidence of overreaching,
slauses limiting liability in ship repair
contracts will be enforced." M/V American
Jueen v. San Diego Marine Const. Corp. 708
af Indeed, insofar as the public interest
is implicated here at all, it cuts against
\rcwel’s position. The User’s Agreement was
oart of a package offered by the Navy pursu-
ant to a competitive bid procedure for the
award of a public contract. All bidders sub-
nitted their proposals based on the terms set
forth in the bid documents. To allow the
successful bidder to change a key term retro-
actively would be unfair to the other bid-
jers; such post-hoc renegotiation of the con-
tract’s terms could also seriously undermine
the government’s procurement process.
12-A
',.2d 1483, 1488 (9th Cir. 1983), see also
forton v. Zidell Explorations, Inc. 695 F.2d
347, 350 (9th Cir. 1982), cert. denied, 460
JS. 1039 (1983). We find no evidence of
yverreaching here.
Conclusion
Whichever law applies, the clause shift-
ng the risk of loss due to negligent main-
-enance to Arcwel is enforceable, shielding
oth Arcwel and Southwest from liability.
siven the validity of the exculpatory clause,
-he district court’s orders granting summary
judgment to Southwest and the Port District
vere correct.
The magistrate’s judgment against
southwest Marine (No. 86-5882) is REVERSED;
the district court’s summary judgment orders
appealed by Arcwel Corp. (No. 86-5889) are
AFFIRMED.
427A
IN THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
rea kkkkkkkkeekekkekkekkeRKRKESE
.RCWEL MARINE, INC., Nos. 86-5882
86-5889
Third-party Plaintiff/
Appellee/Cross-Appellant, D.C. No.
CV-83-0342-N(I)
Ve
SOUTHWEST MARINE, INC.,
Appellant/Cross-Appellee,
and
SAN DIEGO UNIFIED PORT
JISTRICT,
Third-party Defendant/
Cross-Appellee.
SEESESEEESESE SESE EELS ES SF FS
*
*
*
*
*
*
*
*
*
*
Third-party Defendant/ * ORDER
*
*
*
*
*
*
*
*
*
*
Before: TANG, ALARCON and KOZINSKI,
Sircuit Judges.
The panel has voted to deny the petition
‘or rehearing and to reject the suggestion
“or rehearing en banc. ”
The full court has been advised of the
suggestion for en banc rehearing and no judge
»9f the court has requested a vote on the sug-
yjestion for rehearing en banc. Fed. R. App.
14-A
35(b). The petition for rehearing is
enied, and the suggestion for a rehearing en
anc is rejected.
15-A
iT
ria,
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF CALIFORNIA
RCWEL CORPORATION,
CASE NO.
Third-Party Plaintiff, 83-0342-(I1)
Vs. JUDGMENT
SUTHWEST MARINE, INC., —
Third-Party Defendant.
ee eee ee ee ee ee ee”
This action came on for trial before the
surt, United States Magistrate Edward A.
ifante Presiding, and the issues having been
ily tried and a decision having been ren-
>red,
IT IS ADJUDGED that third-party plain-
iff Arcwel Corporation recover from third-
arty defendant Southwest Marine, Inc. the
ym of $464,705.48 together with costs of
stion.
ATED: April 15, 1986
/b/ Edward A. Infante
EDWARD A. INFANTE
UNITED STATES MAGISTRATE
spy to:
ll Counsel
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF CALIFORNIA
Civil No.
83-0342-(I)
ARCWEL CORPORATION,
)
)
« Third-Party Plaintiff, )
) FINDINGS OF
vs. ) FACT AND CON-
) CLUSION OF LAW
SOUTHWEST MARINE, INC., )
)
)
)
Third-Party Defendant.
The trial of third-party plaintiff,
Arcwel Corp. ("Arcwel"), for damages against
third-party defendant, Southwest Marine, Inc.
("SWM"), came on regularly for trial without
a jury on April i5, 1985, in Courtroom A of
the above-entitled court before United States
Magistrate Edward A. [Infante sitting by
Stipulation as the trial judge pursuant to 28
U.S.C. §636(c).
Arcwel was represented by Peter J.
Ippolito and Oscar Irwin of Hillyer & Irwin.
SWM was represented by C. Douglas Alford and
Daniel B. MacLeod of Alford & MacLeod.
17-A
This Court having received evidence both
oral and documentary and heard arguments of
counsel the matter was taken under submis-
sion. Having considered the same and being
fully advised in the premises, this Court
makes the following findings of fact and con-
clusions of law:
FINDINGS OF FACT
1. Arcwel is a California corporation
engaged in the ship repair and overhaul busi-
ness with its principal place of business in
San Diego, California.
2. SWM is a California corporation
engaged in the ship repair and overhaul busi-
ness with its principal place of business in
San Diego, California.
3. On July 8, 1982, Arcwel was awarded
a fixed price Master Ship Repair Contract by
the United States Navy for the overhaul of
the USS DUBUQUE for the sum of $8,169,868.
Both Arcwel and SWM are certified by the Navy
to overhaul Navy vessels. SWM, along with
other local bidders submitted a bid to over-
18-A
haul the USS DUBUQUE. During the bidding
process for the USS DUBUQUE, SWM, as the dry
dock operator, published information to all
prospective bidders regarding the estimated
amount that it would cost the low bidder to
dry dock the USS DUBUQUE for one (1) haul day
and thirty-nine (39) lay days, as well as the
estimated cost of other dry dock services.
4. The Navy awarded the contract to
Arcwel after determining that Arcwel was the
lowest qualified bidder to perform the over-
haul work. Prior to accepting Arcwel’s bid,
the Navy asked Arcwel for verification for
the accuracy of its bid. In response to the
Navy’s request, Arcwel verified the amount of
its bid. neeninate original bid for the
entire job was a firm fixed price of
$8,169,780.
5. The Invitation for Bid issued by the
Navy in conjunction with this bid required
the overhaul to take place at the Naval
Station Graving Dock, San Diego, California.
The graving dock is a fixed stationary dry
dock owned by the Navy.
6. From July 3, 1976, to February 28,
1983, the dry dock facility with specifically
identified equipment and realty was leased by
the Navy to the San Diego Unified Port
District ("Port District") under a written
lease.
7. After the Port District was granted
a lease by the Navy to operate the dry dock
facility, the Port District contracted with
SWM on or about September 22, 1981, to oper-
ate and maintain the dry dock facility. The
Operation and Maintenance Agreement was in
effect during the period of the dry dock
evolution for the USS DUBUQUE. SWM, as oper-
ator of the dry dock, was initially notified
that the dry docking of the USS DUBUQUE was
scheduled for October 12, 1983.
8. Arcwel, as the successful low bidder
for the overhaul, was required to execute a
User’s Agreement with the Port District that
established the obligations of the parties
20-A
with regard to the use of the dry dock facil-
ity by hreust for the overhaul. This agree-
ment was a. standard form contract containing
exculpatory provisions that Arcwel was
required to sign as a condition precedent to
performing the overhaul. Thus, Arcwel was
not in a position to negotiate any of the
terms or conditions contained in the User’s
Agreement but was required to accept the
Agreement without change. Arcwel was com-
pelled to accept the User’s Agreement as a
whole or reject it in its entirety. The
exculpatory provisions contained in the
User’s Agreement is in a land-based contract,
not a contract for ship repair.
9. Initially, Arcwel was obligated to
pay $305,893 to the Port District as the dry
dock user fee. As a result of the extended
period that the USS DUBUQUE remained in dry
dock, the dry dock user fee increased an
additional $167,000.
10. The leases and agreements, when
read together, establish SWM’s' independent
21-A
obligation as the operator of the dry dock
facility to maintain the leased property in
accordance with sound industrial practice and
to keep the facility, including the gantry
cranes, in good working order so as to assure
the full availability and usefulness of the
facility at all times. SWM was required to
perform the normal maintenance program in a
timely manner pursuant to the terms of the
agreement.
11. Gantry cranes Nos. 4 and 8 are
included in Exhibit IV, Normal Maintenance
Program, and made part of the Operation and
Maintenance Agreement. One gantry crane at
the dry dock (the Meyerstein or No. 4) was
specifically included in the lease between
the Navy and the Port District. The second
gantry crane located at the dry dock (the
Wellman or No. 8) was at all times relevant
to this action the sole property of the Navy.
The Wellman is functionally identical to the
Meyerstein except that it has a slightly
greater lifting capacity.
22-A
12. Prior to Arcwel’s entry into the
User’s Agreement with the Port District for
repair of the USS DUBUQUE, SWM had executed a
User’s Agreement with the Port District to
use the dry dock to repair the USS OKINAWA.
SWM’s User’s Agreement with the Port District
required SWM to leave the dry dock in as good
a condition as when they first occupied it.
They did not.
13. SWM was first advised by the Navy
and/or Arcwel at a docking conference on
September 30, 1982, that the beginning of the
dry dock period was being advanced from
October 12, 1982, to October 5, 1982. The
Navy’s acceleration of the USS DUBUQUE dry
dock evolution cut the amount of time avail-
able between the undocking of the USS OKINAWA
and the docking of the USS DUBUQUE. The USS
DUBUQUE entered the stationary dry dock on
October 5, 1982, and was undocked on December
5, 1982.
14. When SWM turned over the dry dock
facility to Arcwel on October 5, 1982, the
23-A
facility was in deplorable condition. The
dry dock was Cluttered with trash and litter
and had not been properly cleaned in the base
of the dock or its surrounding area as
required by their written agreement with the
Port District.
15. SWM failed to properly maintain the
gantry cranes in good working condition
despite its ability to repair them. On May
10, 1982, SWM identified to the Port District
a major problem in the Wellman crane and
requested authorization to have repairs made.
SWM repeated its request for authorization to
make repairs to the Wellman crane on July 26,
1982, and advised the Port District that
repairs were necessary at a cost of approxi-
mately $1,000. Both SWM and the Port Dis-
trict knew the Wellman crane had mechanical
problems about five months before the USS
DUBUQUE was to be dry docked.
16. Pursuant to the Operation and Main-
tenance Agreement, SWM was authorized to
expend up to $90,000 per fiscal year for
24-A
maintenance, protection, and repair of the
dry dock facility without prior approval from
the Port District. SWM did not need prior
written consent for emergency repairs. The
Wellman crane had been previously repaired,
and the Port District was billed for those
repairs.
17. Prior to the docking of the USS
DUBUQUE, Arcwel had been advised that the
Myerstein gantry crane would be available for
use. However, on or about October 4, 1982,
Arcwel discovered that the Myerstein was
inoperable in that it would travel on the
track without being bump started and towed or
pushed with a forklift. It was hazardous and
contrary to sound industrial practice to use
a gantry crane in such a manner. The
Myerstein was unavailable to Arcwel from
October 5 through November 5, 1982.
18. The Wellman gantry crane which was
located on the spur track had been inoperable
Since May of 1982. Repairs were commenced on
or about October 5, 1982. On October 12,
25-A
1982, it was made available to Arcwel. How-
ever, it was in deplorable condition and
could not be operated efficiently. The
engine leaked water necessitating extraor-
dinary efforts by Arcwel to keep it operable.
The fuel lines leaked. The electrical system
was faulty with lollypop sticks propped in
the circuit breakers. Arcwel experienced
daily breakdowns and problems with the
Wellman crane.
19. The unavailability of the gantry
cranes during the dry docking of the USS
DUBUQUE was the result of the failure of SWM
to properly carry out the scheduled main-
tenance required by the Operation and Main-
tenance Agreement as specified in Exhibit A-
51. SWM failed to maintain the gantry cranes
in accordance with sound industrial practice
as to assure their availability to drydock
users.
20. As a result of the unavailability
of operable gantry cranes, Arcwel rented
land-based mobile cranes. They were supplied
26-A
by Superior Crane & Rigging Co. ("Superior
Crane") during the drydock evolution of the
USS DUBUQUE without obtaining competitive
bids from other mobile cranes. Arcwel and
Superior Crane have common ownership to some
degree; however, it is not unusual for ship
repair contractors to have an ownership
interest in crane and rigging companies.
Arcwel -acted reasonably in continuing to
lease cranes from Superior Crane because both
cranes were unavailable, unreliable, and
unsafe. Arcwel had no property interest or
ownership whatsoever in the dry dock or any
of its equipment.
21. Land-based cranes cannot perform
the dry dock evolution as efficiently as the
granty cranes; land-based cranes do not have
the capacity of gantry cranes and require
additional labor.to operate.
22. No gantry cranes were available at
all during the most critical phase of the dry
dock evolution. The unavailability of the
Wellman and Meyerstein cranes in good working
27-A
ESS
condition caused substantial delays in laying
the blocks in the dry dock; removing ship
parts for overhaul; sandblasting by subcon-
tractor, Sipco Marine, Inc.; and performing
other functions in the dry dock evolution.
This caused labor inefficiency and excessive
overtime and double time costs by Arcwel.
The government-approved billing rate estab-
lished in July of 1982 for the overhaul of
Navy vessels was $29.52 per hour.
23. The unavailability of both gantry
cranes caused Arcwel to sustain damages in
the nature of rental costs, labor ineffici-
ency and labor overtime expenses. Damages
flowing from the disruption of the overhaul
of the USS DUBUQUE are difficult to calcu-
late. Arcwel need only show its damages with
reasonable certainty, and SWM must bear the
risk of uncertainty created by its wrong.
Plaintiff’s expert Ralph Clements, has used a
reasonable method of assessing and calculat-
ing damages proximately caused by the
unavailability of gantry cranes. Mr.
28-A
ee
Clements’ calculations take into account
overruns caused by other factors.
24. The total damage to Arcwel for the
rental of additional cranes caused by the
unavailability of the gantry cranes amounted
to $129,683.
25. The total damage to Arcwel for the
labor inefficiency caused by the unavail-
ability of the gantry cranes amount to
$335,022.48 ($11,349 overrun hours x $29.52
billing rate).
26. Although Arcwel expended labor
costs for overtime during the dry dock evolu-
tion, it is not possible from the evidence to
determine what portion of the overtime costs,
if any, were caused by the unavailability of
the gantry cranes. Other problems which
occurred during dry docking, unassociated
with the cranes, caused disruption delays,
thereby impacting on overtime costs. More-
over, the evidence fails to establish that
overtime costs incurred were excessive beyond
normal expectations. Arcwel’s damage expert,
29-A
Mr. Clements, made assumptions in Schedule D
of his report (Exhibit A-49) which are unsup-
ported by an evidentiary basis. Conse-
quential damages for "excessive" overtime
costs have not been established as the proxi-
mate result of the unavailability of the
gantry cranes.
27. All findings stipulated to as con-
tained in the Amended Pretrial Order of March
18, 1985, are hereby adopted.
CONCLUSIONS OF LAW
1. The Court has ancillary jurisdiction
over this case based on the diversity juris-
diction of the original complaint, Sipco v.
Arcwel, pursuant to 28 U.S.C. §1332(a)(1).
The original action was between citizens of
different states, and the amount in contro-
versy exceeded $10,000 exclusive of interest
and costs.
2. California law governs the validity
and interpretation of the October 1, 1982,
User’s Agreement between Arcwel Corporation
and the Port District and the September 22,
30-A
1981, Operation and Maintenance Agreement
between the Port District and SWM.
3. California law governs the validity
and interpretation of the July 3, 1976, lease
agreement and all supplemental agreements
between the United States of America and the
Port District.
4. California law governs the exculpa-
tory provision contained in the User’s Agree-
ment, page 3, paragraph 5.
5. A stationary dry dock is not a ves-
sel for purposes of admiralty jurisdiction.
6. Overhauling a ship is not a tradi-
tional maritime activity.
7. A tort occurring on a stationary dry
dock does not invoke admiralty law.
8. Arcwel’s claim is not a maritime
tort barred under admiralty law.
9. California law, not admiralty law,
governs this tort action for negligence.
10. SWM owed a legal duty to Arcwel, as
a user of the dry dock, to properly maintain
and repair the gantry cranes known as the
31-A
Meyerstein and Wellman pursuant to the Opera-
tion and Maintenance Agreement between SWM
and the Port District and in accordance with
sound industrial practice.
11. Arcwel was entitled to the use of
both gantry cranes in its dry docking opera-
tion.
12. SWM was obligated to supply or
arrange tor the supplying of required equip-
ment by others when equipment was needed that
was not provided as part of the dry dock.
13. Even though there was no privity of
contract between Arcwel and SWM regarding the
use of the dry dock, SWM, as operator of the
dry dock, owed a legal duty to Arcwel under
the doctrine of J’Aire Corp. v. Gregory, 24
Cal.3d 799 (1979). The Operation and Main-
tenance Agreement between the Port District
and SWM was clearly in tended affect future
dry dock users. The harm to a dry dock user
in the overhaul of a ship occasioned by the
unavailability of inoperable gantry cranes
was clearly foreseeable. The connection
32-A
between SWM’s conduct and the injuries suf-
fered by Arcwel is established with a high
degree of certainty. SWM, as the exclusive
operator of the dry dock and as a direct com-
petitor with Arcwel, was morally responsible
in preventing harm to Arcwel. J’Aire Corp.
v. Gregory, supra; and Biakanja v. Irving, 49
Cal.2d 647 (1958).
14. The duty of care owed by SWM to
Arcwel is measured by SWM’s obligations under
the Operation and Maintenance Agreement. The
Operation and Maintenance Agreement is of
significance to this action only in creating
a legal duty in tort.
15. SWM breached its duty to Arcwel by
failing to properly maintain the Meyerstein
and Wellman gantry cranes and keep them in
proper working order for dry dock users.
16. Breach of duty by SWM caused damage
to Arcwel in that but for the breach, Arcwel
would not have incurred substitute crane
rental costs and labor inefficiency damages.
33-A
17. SWM’s conduct is a material element
and substantial factor in bringing about harm
to Arcwel and the proximate cause of Arcwel’s
loss.
18. SWM may not escape liability by
attempting to show that other causes may have
contributed to Arcwel’s damages.
19. SWM was negligent in performing its
responsibilities as dry dock operator of the
Naval Station dry dock.
20. The validity of the exculpatory
provision contained in the User’s Agreement
is not governed by admiralty law.
21. SWM and the Port District were in
superior bargaining positions at the time of
contract.
22. Arcwel was bound to perform its
work on the USS DUBUQUE in the subject dry
dock.
23. SWM and the Port District had a
“monopolistic grip on the one dry dock in San
Diego that Arcwel could use to overhaul the
USS DUBUQUE.
34-A
24. The exculpatory provision could not
be altered through negotiation.
25. The exculpatory clause and its
results are unconscionable and were uncon-
scionable at the time of contract.
26. An exculpatory clause in a contract
entered into between parties of unequal bar-
gaining power expressed in a standardized
contract written by the more powerful bar-
gainer to meet its own needs is invalid where
the public interest is affected.
27 The exculpatory provisions contained
in the User’s Agreement is unenforceable.
28. Arcwel incurred damages proximately
caused by the negligence of SWM due to labor
inefficiencies from the lack of gantry cranes
in the amount of $335,022.48 ($11,349 overrun
hours x $29.52 billing rate).
29. Arcwel incurred damages proximately
caused by the negligence of SWM due to rental
costs of substitute gantry cranes in the
amount of $129,683.
35-A
30. Arcwel need only show its damages
with reasonable certainty, and SWM must bear
the risk of uncertainty created by its wrong.
31. Consequential damages for "“exces-
sive" overtime costs have not been estab-
lished as the proximate result of the negli-
gence of SWM.
32. Arcwel is entitled to an award of
$464,705.48 ($335,022.48 plus $129,683) plus
costs.
DATED: April 15,1986
/s/ Edward A. Infants
EDWARD A. INFANTE
UNITED STATES MAGISTRATE
Copies to:
All Counsel
36-A
Appendix B
§ 253. Competition requirements
(a) Procurement through full and open compe-
tition; competitive procedures
(1) Except as provided in subsections
(b), (c), and (g) of this section and except
in the case of procurement procedures other-
wise expressly authorized by statute, an exe-
cutive agency in conducting a procurement for
property or services--
(A) shall obtain full and open
competition through the use of competitive
procedures in accordance with the require-
ments of this chapter and the modifications
to regulations promulgated pursuant to
section 2752 of the Competition in
Contracting Act of 1984; and
(B) shall us the competitive pro-
cedure or combination of competitive proce-
dures that is best suited under the circum-
stances of the procurement.
(2) In determining the competitive pro-
cedures appropriate under the circumstance,
an executive agency--
(A) shall solicit sealed bids if--
(i) time permits the solici-
tation, submission, and evaluation of sealed
bids;
(ii) the award will be made
on the basis of price and other price-related
factors;
(iii) it is not necessary to
conduct discussions with the responding
sources about their bids; and
(iv) there is a reascnable
expectation of receiving mere than one sealed
bid; and
(B) shall request competitive pro-
posals if sealed bids are not appropriate
under clause (A).
(b) Exclusion of particular source; restric-
tion of solicitation to small business con-
cerns |
(1) An executive agency may provide for
the procurement of property of property or
services covered by this section using compe-
titive procedures but excluding a particular
source in order to establish or maintain any
alternative source or sources of supply for
that property or service if the agency head
determines that to do so--
(A) would increase or maintain
computation and would likely result in
reduced overall costs for such procurement,
or for any antiuieaked procurement, of such
property or services;
(B) would be in the interest of
national defense in having a facility (or a
producer, manufacturer, or other supplier)
available for furnishing the property or ser-
vice in case of a national emergency or
industrial mobilization; or
(C) would be in the interest of
national defense in establishing or main-
taining an essential engineering, research,
or development capability to be provided by
an educational or other nonprofit institution
or a federally funded research and develop-
ment center.
(2) An executive agency may provide for
the procurement of property or services
covered by this section using competitive
procedures, but excluding other than small
business concerns in furtherance of sections
638 and 644 of Title 15.
(3) A contract awarded pursuant to the
competitive procedures referred to in para-
graphs (1) and (2) shall not be subject to
the justification and approval required by
subsection (f)(1) of this section.
(c) Use of noncompetitive procedures
An executive agency may use procedures
other than competitive procedures only when--
(1) the property or services needed by
the executive agency are available from only
one responsible source and no other type of
property or services will satisfy the needs
of the executive agency;
(2) the executive agency’s need for the
property or services is of such an unusual
and compelling urgency that the Government
would be seriously injured unless the execu-
tive agency is permitted to limit the number
of sources from which it solicits bids or
proposals;
(3) it is necessary to award the con-
tract to a particular source or sources in
order (A) to maintain a facility, producer,
manufacturer, or other supplier available for
furnishing property or services in case of a
national emergency or to achieve industrial
mobilization, or (B) to establish or maintain
an essential enginewring, research, or
development capability to be provided by an
educational or other nonprofit institution or
a federally funded research and development
center;
(4) the terms of année international
agreement or treaty between the United States
Government and a foreign government or
international organization, or the written
directions of a foreign government reim-
bursing the executive agency for the cost of
procurement of the property or services for
such government, have the effect of requiring
\
the use of procedures other than competitive
procedures;
(5) a statute expressly authorizes or
requires that the procurement be made through
another executive agency or from a specified
source, or the agency’s need is for a brand-
name commercial item for authorized resale;
(6) the disclosure of the executive
agency’s needs would compromise the national
security unless the agency is permitted to
limit the number of sources from which it
solicits bids or proposals; or
(7) the head of the executive agency--
(A) determines that it is neces-
sary in the public interest to use procedures
other than competitive procedures in the par-
ticular procurement concerned, and
(B) notifies the Congress in
writing of such determination not less than
30 days before the award of the contract.
(d) Property or services deemed available
from only one source; nondelegable authority
(1) For the purposes of applying sub-
section (c)(1) of this section--
(A) in the case of a contract for
property or services to be awarded on the
basis of acceptance of an unsolicited
research proposal, the property or services
shall be considered to be available from only
one source if the source has submitted an
unsolicited research proposal that demon-
strates a unique and innovative concept the
substance of which is not otherwise available
to the United States and does not resemble
the substance of a pending competitive pro-
curement; and
(B) in the case of a follow-on
contract for the continued development or
production of a major system or highly
specialized equipment when it is likely that
award to a source other than the original
source would result in (i). substantial dup-
lication of cost to the Government which is
not expected to be recovered through compe-
tition, or (ii) unacceptable delays in ful-
filling the executive agency’s needs, such
property may be deemed to be available only
from the original source and may be procured
through procedures other than competitive
procedures.
(2) The authority of the head of an
executive agency under subsection (c)(7) of
this section may not be delegated.
(e) Offer requests to potential sources
An executive agency using procedures
other than competitive procedures to procure
property or services by reason of the appli-
cation of subsection (c)(2) or (c)(6) of this
section shall request offers from as many
potential sources as is practicable under the
circumstances.
(f) Justification for use of noncompetitive
procedures
(1) Except as provided in paragraph
(2), an executive agency may not award a con-
tract using procedures other than competitive
procedures unless--
(A) the contracting officer for
the contract justifies the use of such pro-
cedurc : in writing and certifies the accuracy
and completeness of the justification;
(B) the justification is
approved--
(i) in the case of a contract
for an amount exceeding $100,000 (but equal
to or less than $1,000,000), by the competi-
tion advocate for the procuring activity
(without further delegation) ;
(ii) in the case of contract
for an amount exceeding $1,000,000 (but equal
to or less than $10,000,000), by the head of
the procuring activity or a delegate who, if
a member of the armed forces, is a general or
flag officer or, if a civilian; is serving in
a position in grade GS-16 or above under the
General Schedule (or in a comparable or
higher position under another schedule); or
(iii) in the case of a con-
tract for an amount exceeding $10,000,000, by
the senior procurement executive of the
agency designated pursuant to section 414(3)
of this title (without further delegation) ;
and
(C) any required notice has been
published with respect to such contract pur-
suant to section 416 of this title and all
bids or proposals received in response to
such notice have been considered by such
executive agency.
(2) In the case of a procurement per-
mitted by subsection (c)(2) of this section,
the justification and approval required by
paragraph (1) may be made after the contract
is awarded. The justification and approval
required by paragraph (1) is not required--
(A) when a statute expressly
requires that the procurement be made from a
specified source;
(B) when the agency’s need is for
a brand-name commercial item for authorized
resale;
10-B
(C) in the case of a procurement
permitted by subsection (c)(7) of this
section; or
(D) in the case of procurement
conducted under (i) the Act of June 25, 1938
(41 U.S.C. 46 et seq.), popularly referred to
as the Wagner-O’Day Act, or (ii) section
637(a) of Title 15.
(3) The justification required by para-
graph (1)(A) shall include--
(A) a description of the agency’s
needs;
(B) an identification of the sta-
tutory exception from the requirement to use
competitive procedures and a demonstration,
based on the proposed contractor’s qualifica-
tions or the nature of the procurement, of
the reasons for using that exception;
(C) a determination that the anti-
cipated cost will be fair and reasonable;
(D) a description of the market
survey conducted or a statement of the
reasons a market survey was not conducted;
11-3
(E) a listing of the sources, if
any, that expressed in writing an interest in
the procurement; and
(F) a statement of the actions, if
any, the agency may take to remove or over-
come a barrier to competition before a sub-
sequent procurement for such needs.
(4) The justification required by para-
graph (1)(A) and any related information
shall be made available for inspection by the
public consistent with the provisions of
section 552 of Title 5.
(3) -tn me case may an executive
agency-- |
(A) enter into a contract for pro-
perty or services using procedures other than
competitive procedures on the basis of the
lack of advance planning or concerns related
to the amount of funds available to the
agency for procurement functions; or
(B) procure property or services
from another executive agency unless’ such
other executive agency complies fully with
12-B
the requirements of this chapter in its pro-
curement of such property or services.
The restriction set out in clause (B) in
addition to, and not in lieu of, any other
restriction provided by law.
(g) Simplified procedures for small pur-
chases
(1) In order to promote efficiency and
economy in contracting and to avoid unneces-
sary burdens for agencies and contractors,
the regulations modified, in accordance with
section 2752 of the Competition in Con-
tracting Act of 1984, shall provide for spe-
cial simplified procedures for small pur-
chases of property and services.
(2) For the purposes of this chapter, a
small purchase is a purchase or contract for
an amount which does not exceed $25,000.
(3) A proposed purchase or contract for
an amount above $25,000 may not be divided
into several purchases or contracts for les-
ser amounts in order to use the small pur-
chase procedures required by paragraph (1).
(4) In using small purchase procedures,
an executive agency shall promote competition
to the maximum extent practicable.
§ 2304. Contracts: competition require-
ments.
(a) (1) Except as provided in subsections
(b), (c), and (g) and except in the case of
procurement procedures otherwise expressly
authorized by statute, the head of an agency
in conducting a procurement for property or
services--
(A) shall obtain full and open
competition through the use of competitive
procedures in accordance with the require-
ments of this chapter and the modifications
to regulations promulgated pursuant to
section 2752 of the Competition in Contract-
ing Act of 1984; and
(B) shall us the competitive pro-
cedure or combination of competitive proce-
dures that is best suited under the circum-
stances of the procurement.
14-B
(2) In determining the competitive pro-
cedure appropriate under the circumstances,
the head of an agency--
(A) shall solicit sealed bids if--
(i) time permits the solici-
tation, submission, and evaluation of sealed
bids;
(ii) the award will be made
on the basis of price and other price-related
factors;
(iii) it is not necessary to
conduct discussions with the responding
sources about their bids; and
(iv) there is a reasonable
expectation of receiving more than one sealed
bid; and
(B) shall request competitive pro-
posals if sealed bids are not appropriate
under clause (A).
(b) (1) The head of an agency may provide
for the procurement of property or services
covered by this chapter using competitive
procedures but excluding a particular source
15-3
in order to establish or maintain an alterna-
tive source or sources of supply for that
property or service if the head of the agency
determines that to do so--
(A) would increase or maintain
competition and would likely result in
reduced overall costs for such procurement,
or for any anticipated procurement, of pro-
perty or services;
(B) would be in the interest of
national defense in having a facility (or a
producer, manufacturer, or other supplier)
available for furnishing the property or ser-
vice in case of a national emergency or
industrial mobilization; or
(C) would be in the interest of
national defense in establishing or main-
taining an essential engineering, research,
or development capability to be provided by
an educational or other nonprofit institution
or a federally funded research and develop-
ment center.
(2) An executive agency may provide for
the procurement of property or _ services
covered by this section using competitive
procedures, but excluding other than small
business concerns in furtherance of sections
9 and 15 of the Small Business Act (15 U.S.C.
638; 644).
(3) A contract awarded pursuant to the
competitive procedures referred to in para-
graphs (1) and (2) shall not be subject to
the justification and approval required by
subsection (f) (1).
(c) The head of an agency may use procedures
other than competitive procedures only when--
(1) the property or services needed by
the agency are available from only one res-
ponsible source and no other type of property
or services will satisfy the needs of the
agency;
(2) the agency’s need for the property
or services is of such an unusual and con-
pelling urgency that the United States would
be seriously injured unless the agency is
permitted to limit the number of sources from
which it solicits bids or proposals;
(3) it is necessary to award the con-
tract to a particular source or sources in
order (A) to maintain a facility, producer,
manufacturer, or other supplier available for
furnishing property or services in case of a
national emergency or to achieve industrial
mobilization, or (B) to establish or maintain
an essential engineering, research, or
development capability to be provided by an
educational or other nonprofit institution or
a federally funded research and development
center;
(4) the terms of an international
agreement or a treaty between the United
States and a foreign government or interna-
tional organization, or the written direc-
tions of a foreign government reimbursing the
agency for the cost of the procurement of the
property or services for such government,
have the effect of requiring the use of pro-
cedures other than competitive procedures;
18-B
(5) a statute expressly authorizes or
requires that the procurement be made through
another agency or from a specified source, or
the agency’s need is for a brand-name commer-
cial item for authorized resale;
(6) the disclosure of the agency’s
needs would compromise the national security
unless the agency is permitted to limit the
number of sources from which it solicits bids
or proposals; or
(7) the head of the agency--
(A) determines that it is neces-
sary in the public interest to use procedures
other than competitive procedures in the par-
ticular procurement concerned, and
(B) notifies the ieciinidite in
writing of such determination not less than
30 days before the award of the contract.
(da) (1) For the purposes of applying sub-
section (c) (1)--
(A) in the case of a contract for
property or services to be awarded on the
basis of acceptance of an_- unsolicited
research proposal, the property or services
shall be considered to be available from only
one source if the source has submitted an
unsolicited research proposal that demon-
strates a unique and innovative concept the
substance of which is not otherwise available
to the United States and does not resemble
the substance of a pending competitive pro-
curement; and
(B) in the case of a follow-on
contract for the continued development or
production of a major system or highly spe-
cialized equipment when it is likely that
award to a source other than the original
source would result in (i) substantial dupli-
cation of cost to the United States which is
not expected to be recovered through competi-
tion, or (ii) unacceptable delays in ful-
filling the agency’s needs, such property may
be deemed to be available only from the ori-
ginal source and may be procured through pro-
cedures other than competitive procedures.
(2) The authority of the head of an
agency under subsection ((c)(7) may not be
delegated.
(e) The head of an agency using procedures
other than competitive procedures to procure
property or services by reason of the appli-
cation of subsection (c)(2) or (c)(6) shall
request offers from as many potential sources
as is practicable under the circumstances.
(f) (1) Except as provided in paragraph
(2), the head of an agency may not award a
contract using procedures other than competi-
tive procedures unless -
(A) the contracting officer for
the contract justifies the use of such pro-
cedures in writing and certifies the accuracy
and completeness of the justification;
(B) the justification is approved-
(i) in the case of a contract
for an amount exceeding $100,000 (but equal
to or less than $1,000,000), by the competi-
tion advocate for the procuring activity
(without further delegation) ;
(ii) in the case of a contract
for an amount exceeding $1,000,000 (but equal
to or less than $10,000,000), by the head of
the procuring activity or a delegate who, if
a member of the armed forces, is a general or
flag officer or, if a civilian, is serving in
a position in grade GS-16 or above under the
General Schedule (or in a comparable or
higher position under another schedule); or
(iii) in the case of a contract
for an amount exceeding $10,000,000, by the
senior procurement executive of the agency
designated pursuant to section 16(3) of the
Office of Federal Procurement Policy Act (41
U.S.C. 414(3)) (without further delegation) ;
and
(C) any required notice has been
published with respect in such contract pur-
suant to section 18 of the Office of Federal
Procurement Policy Act and all bids or pro-
posals received in response to that notice
have been considered by the head of the
agency.
22-B
ane lee) emma ne oe
(2) In the case of a procurement per-
mitted by subsection (c)(2), the justifica-
tion and approval required by paragraph (1)
may be made after the contract is awarded.
The justification and approval required by
paragraph (1) is not required-
(A) when a statute expressly
requires that the procurement be made from a
specified source;
(B) when the agency’s need is for
a brand-name commercial item for authorized
resale;
(C) in the case of a procurement
permitted by subsection (c) (7); or
(D) in the case of a procurement
conducted under (i) the Act of June 25, 1938
(4) U.S.C. 46 et seq.), popularly referred to
as the Wagner-O’Day Act, or (ii) section 8(a)
of the Small Business Act (15 U.S.C. 637(a)).
(3) The justification required by para-
graph (1)(A) shall include-
(A) a description of the agency’s
needs;
(B) an identification of the sta-
tutory exception from the requirement to use
competitive procedures and a demonstration,
based on the proposed contractor’s qualifica-
tions or the nature of the procurement of the
reasons for using that exception;
(C) a determination that the anti-
cipated cost will be fair and reasonable;
(D) a description of the market
survey conducted or ae statement of the
reasons a market survey was not conducted;
| (E) a listing of the sources, if
any, that expressed in writing an interest in
the procurement; and .
(F) a statement of the actions, if
any, the agency may take to remove or over-
come any barrier to competition before a sub-
sequent procurement for such needs.
(4) The justification required by para-
graph (1)(A) and any related information
shall be made available for inspection by the
public consistent with the provisions of
section 552 of a title 5.
24-B
(5) In no case may the head of an
agency-
(A) enter into a contract for pro-
perty or services using procedures other than
competitive procedures on the basis of the
lack of advance planning or concerns related
to the amount of funds available to the
agency for procurement functions; or
(B) procure property or services
from another agency unless such other agency
complies fully with the requirements of this
chapter in its procurement of such property
or services.
The restriction contained in clause (B)
is in addition to, and not in lieu of, any
other restriction provided by law.
(g) (1) In order to promote efficiency and
economy in contracting and to avoid unneces-
Sary burdens for agencies and contractors,
the regulations modified in accordance with
section 2752 of the Competition in
Contracting Act of 1984 shall provide for
25-B
special simplified procedures for small pur-
chases of property and services.
(2) For the purposes of this chapter, a
small purchase is a purchase or contract for
an amount which does not exceed $25,000.
(3) A proposed purchase or contract for
an amount above $25,000 may not be divided
into several purchases or contracts for les-
ser amounts in order to use the small pur-
chase procedures required by paragraph (1).
(4) In using small purchase procedures,
the head of an agency shall promote competi-
tion to the maximum extent practicable.
(h) For the purposes of the following laws,
purchase or contracts awarded after using
procedures other than sealed-bid procedures
shall be treated as if they were made with
sealed bid procedures:
(1) The Act entitled "An Act to provide
conditions for the purchase of supplies and
the making of contracts by the United States,
and for other purposes," approved June 30,
1936 (commonly referred to as the "Walsh-
Healey Act") (41 U.S.C. 35-45).
(2) The Act entitled "An Act relating
to the rate of wages for laborers and mecha-
nics employed on public buildings of the
United States and the District of Columbia by
contractors and subcontractors, and for other
purposes," approved March 3, 1931 (commonly
referred to as the "Davis-Bacon Act" (40
U.S.C. 276a-276a-5).
(i) (1) The Secretary of Defense shall pre-
scribe by regulation the manner in which the
Departuent of Defense negotiates prices for
supplies to be obtained through the use of
procedures other than competitive procedures,
as defined in section 2303(2) of this title.
(2) The regulations required by para-
graph (1) shall-
(A) specify the incurred overhead
a contractor may appropriately allocate to
supplies referred to in that paragraph; and
(B) require the contractor to
identify those supplies which it did not
27-B
manufacture or to which it did not contribute
significant value.
(3) Such regulations shall not apply to
an item of supply included in a contract or
subcontract for which the price is based on
established catalog or market prices of conm-
mercial items sold in substantial quantities
to the general public.
§ 45.102. Policy.
Contractors are ordinarily required to
furnish all property necessary to perform
Government contracts. However, if contrac-
tors possess Government property, agencies
shall-
(a) Eliminate to the maximum . practical
extent any competitive advantage that might
arise from using such property;
(b) Require contractors to use Government
property to the maximum practical extent in
performing Government contracts;
(c) Permit the property to be used only when
authorized;
28-B
"
(ad) Charge appropriate rentals when the pro-
perty is authorized for use on other than a
‘ rent-free basis;
(e) Require contractors to be responsible
and accountable for, and keep the Govern-
ment’s official records of Government pro-
perty in their possession or control (but see
45.105);
(f) Require contractors to review and pro-
vide justification for retaining Government
property not currently in use; and
(g) Ensure maximum practical reutilization
of contractor inventory (see 45.601) within
the Government.
§ 45.308. Providing Government production
and research property "as is."
(a) The contracting officer may provide
Government production and research property
on an "as is" basis for performing fixed-
price, time-and-material, and labor-hour con-
tracts. It may also be furnished under a
facilities contract, in which case the con-
tract shall state that the contractor will
not be reimbursed for transporting, install-
ing, modifying, repairing, or otherwise
making the property ready for use.
(b) When the property is provided under
other than a facilities contract, the solici-
tation shall state that-
(1) Offerors may inspect the property
before submitting offers and the conditions
under which it may be inspected;
(2) The property is offered in its cur-
rent condition, f.o.b. present location (pro-
vide specific locations) ;
(3) Offerors must satisfy themselves
the property is suitable for their use;
(4) The successful offeror shall bear
the cost of transporting, installing, modify-
ing, repairing, or otherwise making the pro-
perty suitable for use; and
(5) Evaluations will be made in accord-
ance with Subpart 45.2 to eliminate any com-
petitive advantage resulting from using the
property.
30-B
§ 52.245-19. Government Property Furnished
"As Is."
As prescribed in 45.305(c), insert the
following clause in solicitations and con-
tracts when a contract other than a consoli-
dated facilities contract, a facilities
acquisition contract, or a facilities use
contract is contemplated and Government pro-
duction and research property is to be fur-
nished "as is." (See 45.106 for additional
clauses that may be required) ;
GOVERNMENT PROPERTY FURNISHED
"AS IS" (APR 1984)
(a) The Government makes no warranty whatso-
ever with respect to Government property fur-
nished "as is," except that the property is
in the same condition when placed at the
f.o.b. point specified in the solidification
as when inspected by the Contractor pursuant
to the solicitation or, if not inspected by
the Contractor, as when last available for
inspection under the solicitation.
31-B
pres hein ss
(b) The Contractor may repair any property
made available on an "as is" basis. Such
repair will be at the Contractor’s expense
except as otherwise provided in this clause.
Such property may be modified at _ the
Contractor’s expense, but only with the writ-
ten permission of the Contracting Officer.
Any repair or modification of property fur-
nished "as is" shall not affect the title of
the Government.
(c) If there is any change in the condition
of Government property furnished "as is" from
the time inspected or last available for
inspection under the solicitation to the time
placed on board at the location specified in
the solicitation, and such change will
adversely affect the Contractor, the
Contractor shall, upon receipt of the pro-
perty, notify the Contracting Officer detail-
ing the facts and, as directed by the
Contracting Officer, either (1) return such
property at the Government’s expense or
otherwise dispose of the property or (2)
32-B
effect repairs to return the property to its
condition when inspected under the solicita-
tion or, if not inspected, last available for
inspection, under the solicitation. After
completing the directed action and upon writ-
ten request of the Contractor, the Contract-
ing Officer shall equitably adjust any con-
tractual provisions affected by the return,
disposition, or repair in accordance with the
procedures provided for in the Changes clause
of this contract. The foregoing provisions
for adjustment are the exclusive remedy
available to the Contractor, and the Govern-
ment shall not be otherwise liable for any
delivery of Government property furnished "as
is" in a condition other than that in which
it was originally offered.
(d) Except as otherwise provided in this
clause, Government property furnished "as is"
shall be governed by the Government Property
Clause of this contract.
33-B