Opposition Brief — Sprenger, Olson & Shutes, P. A. v. Burlington Northern Railroad
Supreme Court brief1987
Ask Donna
What actually matters in this document.
Text
—"
Supreme Court, U.S.
et he D
JUL 21 198!
ie]
JOSEPH F. CPANIOL, JR.
CLERK
In THE
Supreme Court of the United States
OCTOBER TERM, 1987
SPRENGER, OLSON & SHUTES P.A., and
DAVIS, MINER, BARNHILL & GALLAND,
Petitioners,
v.
BURLINGTON NORTHERN RAILROAD COMPANY,
Respondent.
On Writ of Certiorari to the United States Court of Appeals
for the Seventh Circuit
BRIEF IN OPPOSITION TO PETITION
FOR A WRIT OF CERTIORARI
Of Counsel: CHRISTOPHER T. LUTZ *
EDMUND W. BURKE STEPTOE & JOHNSON
BURLINGTON NORTHERN 1330 Connecticut Ave., N.W.
RAILROAD COMPANY Washington, D.C. 20036
3800 Continental Plaza (202) 429-3000
777 Main Street * Counsel of Record for
Fort Worth, Texas 76102 Respondent Burlington
Northern Railroad Company
Dated: July 21, 1987
(TIER RE PE A TT A LS A SL STS TE a a EET RSNA, TEL RCE EO HSS
WILSON - Epes Printinc Co., Inc. - 789-0096 - WASHINGTON, D.C. 20001
QUESTIONS PRESENTED
1. Did the court of appeals err in affirming the dis-
trict court’s conclusion that petitioners failed to prove
this was one of those “selected” cases in which an addi-
tion to the $2.18 million lodestar fees award was war-
ranted?
2. Did the court of appeals err in affirming the dis-
trict court’s conclusion that petitioners had not met their
burden of showing that the risk of contingency justified
an enhanced fees award?
3. Did the lower courts err in not accepting petition-
ers’ argument that risk enhancement is required for fees
awards in all successful contingent representations?
4. Did the court of appeals err in affirming the dis-
trict court’s finding that the settlement in this case did
not constitute “exceptional” relief and thus did not jus-
tify fees enhancement?
(i)
ii
LIST OF CORPORATE AFFILIATES
AND SUBSIDIARIES
Burlington Northern Railroad Company:
The Belt Railway Company of Chicago
Camas Prairie Railroad Company
Davenport, Rock Island and North Western
Railway Company
The Denver Union Terminal Railway Company
Galveston Terminal Railway Company
Houston Belt & Terminal Railway Company
Iowa Transfer Railway Company
Kansas City Terminal Railway Company
Keokuk Union Depot Company
The Lake Superior Terminal and Transfer
Railway Company
Longview Switching Company
The Minnesota Transfer Railroad Company
Paducah & Illinois Railway Company
Portland Terminal Railroad Company
The Saint Paul Union Depot Company
Terminal Railroad Association of St. Louis
Trailer Train Company
The Wichita Union Terminal Railway Company
Winona Bridge Railway Company
The El Paso Company:
EF] Paso Natural Gas Company:
El Paso Development Company:
Lake Country Windjammer, Inc.:
Adams Canyon Ranch
Santa Paula Farms
E] Paso Hydrocarbons Company:
Minera San Pedro Corralitos, S.A.
iii
Meridian Petroleum Holding, Inc:
Meridian Oil, Inc. (formerly Milestone
Petroleum, Inc.) :
Butte Pipe Line Company
Portal Pipe Line Company
New Mexico and Arizona Land Company:
NZ Development Corp.
NZ Properties, Inc.
TABLE OF CONTENTS
Page
Ep ye 8) tg 4°. 1. gy 5 | ae i
LIST OF CORPORATE AFFILIATES AND SUB-
I ctirnsrncetestaicnininisaibacss Ssssnslca Eda llcoeiegaentibanatiabiatabiait ii
ee Te SE viktteeeciaritiintnidiniacichedtoaslein vi
Be gee yy | 5 gece een meer aes ame na nn 1
REASONS FOR DENYING THE WRIT ....................... 6
Ge icin pibicinsiittinitirsaiieia uni scikeiiltsplanniicialpnitagcptamcadsabbitlbetcinnaions 7
I. Petitioners Mischaracterize The Record And
What The Lower Courts Did ................................ 7
II. Denial Of The Writ Is Consistent With This
Court’s Recent Delaware Valley Decision And
With Its Prior Fees Opinions ........0...00000000000000.... 9
| III. The Seventh Circuit’s Refusal To Disturb A
Finding That The Relief Here Was Not “Ex-
ceptional” Does Not Justify Review By This
I wei ssisiesssnnnisancntninenncahiceinsicacbeinestbaisnaleet iad 13
;
| CTI os eisiericicessincccmstasceeceiouaecnaencenas 14
| (v)
vi
TABLE OF AUTHORITIES
CASES: Page
Blum v. Stenson, 465 U.S. 886 (1984) .................... 13
EEOC v. Burlington Northern, Inc., 618 F. Supp.
1046 (ICD. TEL. 19GB) -nunncccccecceccnccecsccccccscsnsaseonsnses passim
Hazelwood School District v. United States, 433
it Oy, 5 none ee ae 8
In re Burlington Northern, Inc. Employment Prac-
tices Litigation, 810 F.2d 601 (7th Cir. 1986) ....passim
Pennsylvania v. Delaware Valley Citizens’ Council
for Clean Air, 106 S.Ct. 3088 (1986) .................. 13
Pennsylvania v. Delaware Valley Citizens’ Council
for Clean Air, No. 85-5 (U.S. June 26, 1987) ....6, 9, 10,
11, 12, 13
RULES:
ee Fe Fe OP BED —..cccncdccccudeccvedtatmmenbenabesicaiatbisissiint 7
SE a
IN THE
Supreme Court of the Wuited States
OCTOBER TERM, 1987
No. 86-1880
SPRENGER, OLSON & SHUTES P.A., and
DAVIS, MINER, BARNHILL & GALLAND,
¥ Petitioners,
BURLINGTON NORTHERN RAILROAD COMPANY,
Respondent.
On Writ of Certiorari to the United States Court of Appeals
for the Seventh Circuit
BRIEF IN OPPOSITION TO PETITION
FOR A WRIT OF CERTIORARI
Respondent Burlington Northern Railroad Company
(“BN”) asks this Court to deny the petition for a writ
of certiorari seeking review of the judgment of the
United States Court of Appeals for the Seventh Circuit.
COUNTERSTATEMENT
The decision below upholds the district court’s award
of $2.18 million in attorneys fees to petitioners for their
work on a Title VII class action. That award repre-
sented petitioners’ “lodestar” fees, the district court hav-
ing found after a three-day hearing that the evidence
did not show that “exceptional” success had been achieved,
and did not demonstrate that the risk of the representa-
tion justified fees enhancement.
2
The Seventh Circuit’s opinion chiefly reviews the dis-
trict court’s assessment of the evidence on risk and relief.
Petitioners, however, provide an unbalanced description
of that evidence and of what the lower courts did. A
counterstatement follows.
A. The Merits Litigation
The merits litigation in this case began in January
1978 with the filing of McBride et al. v. BN (N.D. Ill.).
It settled in November 1983. Jn re Burlington Northern,
Inc. Employment Practices Litigation,’ 810 F.2d 601, 603
(7th Cir. 1986), reprinted in Pet. App. Al, A2. Peti-
tioners, along with lawyers from the EEOC, were lead
counsel for a class of black plaintiffs who charged that
BN and its labor unions had violated Title VII. EEOC
v. Burlington Northern, Inc., 618 F. Supp. 1046, 1049
(N.D. Ill. 1985), reprinted in Pet. App. C1, C6.
In late 1978, the McBride plaintiffs moved for class
certification; at about the same time, the EEOC moved
to intervene as a plaintiff. Within months, the district
court certified a broad “across-the-board” class and per-
mitted the Commission to intervene. 618 F. Supp. at
1049, 1058; Pet. App. at C5-6; C23.
By early 1979, BN’s employment practices had become
a popular target. Eleven different lawyers or firms, rep-
resenting fourteen different black plaintiffs, ultimately
filed private Title VII suits against the company. This
forced BN to seek multi-district consolidation, which was
granted in April 1979. Various pending suits were con-
solidated with McBride in the Northern District of IIli-
nois. 618 F. Supp. at 1050, 1062; Pet. App. at C5-6; C30.
1 The petition for writ of certiorari will be cited as “Pet. ——.”
The petitioners’ appendix will be cited as “Pet. App. ——.” Plain-
tiffs’ fees hearing exhibits are cited as “PX ”, defendant’s as
“DX ——.” The transcript of the fees hearing is cited as “Tr.
——.” Other items are cited with a title, date, and page number.
3
Along with petitioners, the EEOC played a significant
role throughout the merits litigation. In fact, the Com-
mission had been investigating BN’s employment prac-
tices three and one half years before McBride was filed.
618 F. Supp. at 1048-49; Pet. App. at C4. Over the five
year course of McBride, thirteen attorneys and nine legal
assistants from the Commission participated,? and the
Commission shouldered about $675,000 in expenses. 618
F. Supp. at 1051; Pet. App. at C10. It was the EEOC
that referred William E. McBride and his colleagues as
clients to Davis, Miner, Barnhill & Galland, one of the
petitioners here. (Tr. 301)
Consistent with the case scope plaintiffs sought, dis-
covery was extensive. Most of it was conducted by the
plaintiffs. Petitioners have said that the results of this
discovery were “spectacularly useful.” * They have said
they developed “overwhelming proof of plaintiffs’ allega-
tions,” including ‘damaging admissions,” “admissions of
intentional discrimination,” “excellent results” in deposi-
tions, and company officials turning “ ‘states evidence’ ”’.*
B. Merits Settlement
According to one of petitioners’ experts, this was a
“classic case . . . in which the parties both benefit from
getting together and settling”; it offered, he said, “per-
fect questions for settlement.” (Michaelson Dep. 52-56).
Plaintiffs began the settlement process four years into
the suit, when they made their first offer, demanding $60
million and wide-ranging injunctive relief. (Tr. 275-7)
This led to extended negotiations beginning in August
1988. (Tr. 224-5) By October 1983, a week or so before
* EEOC Response to BN’s Interrogatories on Fees and Expenses,
Question 3 (July 3, 1984).
3’ Memorandum in Support of Lead Counsels’ Application for
Fees and Costs at 10 (May 25, 1984).
4 Jd. at 10, 12, 15, 17; Tr. 265-69.
4
trial, the parties had agreed on a way to resolve a sub-
stantial portion of the case. (Tr. 226-7) In early Novem-
ber 1983, the day before trial was to begin, the parties
agreed on a Consent Decree settling the entire case (Tr.
227-25).
The Decree, which received final approval in April
1984, settled all the cases consolidated in MDL 374. In
return for a release of all class members’ claims, BN
agreed to pay $10 million—between $500 and $1,000 per
class member.’ The decree also contains formulas for
what have proven to be relatively low hiring fill rates.
It includes other injunctive relief which has changed
BN’s employment practices very little.°
C. The Fees Litigation
The Decree provided that BN would pay reasonable
fees and costs for the litigation it resolved. Therefore, in
May 1984, various counsel and the EEOC filed thirteen
petitions for such awards. All were settled except peti-
tioners’. 618 F. Supp. at 1051; Pet. App. at C10. Peti-
tioners asked for $6.8 million in fees and $1 million
in expenses. They sought a 3.5 multiplier and an ef-
fective average hourly rate for lawyers of over $540.’
BN contended this fees claim was too high, because it was
based on excessive lodestar hourly rates and an unjusti-
fied multiplier. The company did not, however, contest
the hours or expenses claimed by petitioners.
5 Lead counsel estimated that there were between 10,000 and
20,000 class members. (Tr. 281-82). Actual distributions averaged
about $1,500, since only about 7,000 to 8,000 class members who
filed claims were eligible for money. Over half the class got noth-
ing. 618 F. Supp. at 1058; Pet. App. at C23; Tr. 156-58; 281-82.
6 DX-F; Tr. 388-89; Decree, 7-10; Implementing Agreement No.
2 (March 19, 1984).
7 Memorandum in Support of Lead Counsels’ Application for
Fees and Costs at 43-46 (May 25, 1984).
5
After six munths of discovery, the district court held
a three day fees hearing in November 1984. BN and peti-
tioners presented lay and expert witnesses and exhibits.
Petitioners continued to pursue a very large award,
though they did reduce the multiplier they sought from
3.5 to 2.5. 618 F. Supp. at 1053; Pet. App. at C12-13.
On September 20, 1985, the district court issued its
opinion, awarding petitioners $2.18 million in fees. De-
spite saying that “there is some merit in Burlington’s
contention that the hourly rates sought by lead counsel
are too high” (618 F. Supp. at 1054; Pet. App. at C16),
the court awarded the rates sought, which mostly ranged
between $160 and $180 per hour. They were, the court
said, “the top hourly rate [petitioners] . . . have ever
been paid by clients or awarded by a court ...,” and
were “the top they can request.” 618 F. Supp. at 1061;
Pet. App. at C29.
The district court denied petitioners’ request for a
multiplier. After recounting the parties’ positions on the
relief achieved (618 F. Supp. at 1056-57; Pet. App. at
C19-20) it concluded that, for a variety of reasons, the
result embodied in the Decree was not so “exceptional’’
as to justify fees enhancement. 618 F. Supp. at 1058-60,
1064; Pet. App. at C20-28, C35.
The district court also concluded that “lead counsel
have not met the required burden” to prove that the risk
of contingency made this a case warranting an addition
to lodestar fees. 618 F. Supp. at 1062; Pet. App. at C31.
In doing this, the district court considered, but was not
persuaded by, evidence that lawyers would abandon plain-
tiffs’ Title VII practice if enhancement were not added
to a fees award already made large by high hourly rates.
618 F. Supp. at 1061-62. Pet. App. at C29-31.
The court of appeals affirmed the district court’s denial
of a multiplier, holding that the trial judge had properly
considered evidence bearing on both relief and risk. 810
6
F.2d at 604-05; Pet. App. at A5-6. On each point, the
Seventh Circuit was unwilling to find an abuse of discre-
tion in the district court’s conclusion that the evidence
did not warrant enhancement. 810 F.2d at 607, 608;
Pet. App. at Al0-11, A-12-13. Petitioners sought en banc
rehearing, but their request was denied in February 1987.
810 F.2d at 611-12 reprinted in Pet. App. B1-3.
REASONS FOR DENYING THE WRIT
Petitioners’ claim that this case involves important legal
questions is based on an inaccurate account of the lower
courts’ decisions and on a misleadingly selective descrip-
tion of the evidence. In fact, by granting and affirming a
$2.18 million fees award, the lower courts acted in a
manner consistent with the views expressed by a major-
ity of the members ofthis-Court in Pennsylvania v. Dela-
ware Valley Citizens’ Council for Clean Air, No. 85-5
(U.S., June 26, 1987) (slip opinion) (“Delaware Valley
II’), and with this Court’s attorneys fees opinions before
Delaware Valley Il.
The district court received from both sides a mountain
of evidence on the risks of contingent representation—in
this case and generally—and on the results. It considered
arguments covering all of the issues addressed in Dela-
ware Valley II. Based on all this, the district court con-
cluded, in light of the high hourly rates it awarded, that
lodestar fees constituted a reasonable award without
additional enhancement. The Seventh Circuit was unwill-
ing to disturb the trial court’s conclusions, finding them
supported by evidence in the record. Petitioners have no
substantial legal basis for their self-professed goal of
“making a large fee larger.”* Their factual disagree-
ments with the lower courts do not warrant review by
this Court.
§ Lead Counsels’ Brief to the Seventh Circuit at 18 (January 21,
1986).
lly Ac ttl,
-
i aa
7
ARGUMENT
I. PETITIONERS MISCHARACTERIZE THE RECORD
AND WHAT THE LOWER COURTS DID
Since there must be “special and important reasons”
for this Court to grant a writ of certiorari,’ petitioners
work hard to characterize the decisions below as arbi-
trary, misguided, and wrong. In doing so, however, they
describe decisions the lower courts never made.
A few examples of petitioners’ inaccuracy will suffice.
Petitioners suggest, for instance, that the court of ap-
peals made district court rulings on risk enhancement
“unreviewable” (Pet. Br. at i, 11); in fact, the Seventh
Circuit did explicitly review the district court’s conclu-
sions on that point. 810 F.2d at 605, 608; Pet. App. at
A6-7, 11-13. Similarly, petitioners say the lower court
decisions in this case make risk enhancement unavailable
(Pet. Br. at 7, 12); in fact, the district court indi-
cated (and the Seventh Circuit did not deny) that such
compensation was available in appropriate cases," and it
described with great approval a case in which a risk
® Sup. Ct. Rule 17.1.
10 Petitioners say “The district court ... refused to apply a
multiplier as a matter of law.” Pet. Br. at 12. They also say
“The court below [the Seventh Circuit] . . . appear[s] to hold that
there is never a right to receive a multiplier as compensation for
having undertaken risk.” Jd. at 7. As the next footnote shows,
those claims are just plain wrong.
11 The district court wrote that “Of course, the size of the settle-
ment is not the only feature of this case [bearing on enhancement].
Consistent with this notion lead counsel argue that the risk they
took [justifies a multiplier)” 618 F. Supp. at 1061; Pet. App. at
C28 (emphasis added). After a lengthy discussion, the court held
that “lead counsel have not met the required burden” on this point,
618 F. Supp. at 1062; Pet. App. at C31. The Seventh Circuit
affirmed this disposition under Fed. R. Civ. Pro. 52(a); it did
not question the district court’s legal position on risk enhancement
810 F.2d at 606-609; Pet. App. at A8-14.
8
bonus was given. 618 F. Supp. at 1062-64; Pet. App.
C31-35. In these and other ways, the petition misstates
what the lower courts held, in an effort to convert peti-
tioners’ failure to meet proof burdens into supposed legal
error.
Petitioners’ one-sided account of the record has the
same apparent purpose. By mentioning only evidence
favorable to their position, petitioners create the impres-
sion that the lower courts could have only acted on er-
roneous views of the law. In fact, BN made a sub-
stantial presentation on each of the factual issues in the
case. Thus, it is not true, as petitioners claim, that the
“uncontradicted” evidence showed they had less than an
even chance of prevailing (Pet. Br. at 3, 12-13); in fact,
BN presented substantial evidence and argument that
this case was not markedly risky.” It is likewise false
for petitioners to suggest that some of their attempts to
prove the relief here “truly exceptional” were “uncon-
traverted”. Pet. Br. at 14-16, n.6. Once again, BN made
an extensive presentation on why the relief achieved,
while fair and adequate, was not “exceptional” and was
mostly a product of the class’ size.”
12 A summary of BN’s evidence on that score covers eleven pages
of the company’s brief before the Seventh Circuit. See BN’s
Seventh Circuit Brief at 26-37 (February 20, 1986).
13 See BN’s Seventh Circuit Brief at 41-44. Petitioners’ account
of the evidence is flawed in other ways. For example, petitioners
repeat the canard that a 1981 shift in Title VII proof from “gsnap-
shot” to “flow” statistics created great risk (Pet. Br. at 9), even
though BN has repeatedly pointed out that this Court endorsed
both kinds of proof in 1977, well before McBride was filed. See
Hazelwood School District v. United States, 433 U.S. 299, 308 n.13,
309-13 (1977). In addition, it is wrong to say that Professor Frank
Easterbrook’s affidavit was “completely ignored” by both lower
courts or to imply that it was unrebutted (Pet. Br. at 8, 9-10).
Similarly, it is at least misleading for petitioners to retail their
experts’ “$57.5 million” appraisal cf part of the settlement (Pet.
Br. at 4) without mentioning that the district court found that esti-
a (a tO Ym I Cold (A PST Ae Pin hs il nNOS ey
9
This Court, of course, need not resolve such factual
battles. The lower courts have done that three times.
But to evaluate whether there are legal questions war-
ranting review, it is essential to know that BN presented
persuasive evidence on risk and relief, and that the lower
courts carefully considered both sides’ evidence. Peti-
tioners lost their enhancement arguments on the facts,
not because either lower court held such enhancement un-
available as a matter of law.
II. DENIAL OF THE WRIT IS CONSISTENT WITH
THIS COURT’S RECENT DELAWARE VALLEY
DECISION AND WITH ITS PRIOR FEES OPIN-
IONS
In Pennsylvania v. Delaware Valley Citizens’ Council
for Clean Air, No. 85-5 (U.S., June 26, 1987), (“Dela-
ware Valley II’’), this Court extensively analyzed the
logical and legal implications of attorneys fees risk en-
hancement. Though the members of the Court took a
variety of paths in that case, the destination reached by
five Justices—that is, reversal of a risk multiplier award
—shows that the petition here should be denied.
In Delaware Valley II, the respondent attorneys sought
risk-based fee enhancement by offering proof that their
contingent representation had succeeded in the fact of
“new and novel issues,”"* defense intransigence, and
other “unusual difficulties.”"* This proof convinced the
district judge that a multiplier was justified, but it was
held insufficient by a majority of this Court. Five Jus-
tices concluded that, because the proof in Delaware Val-
mate to be of “very little’ value and implied that it verged on
“attorney fees puffery.” 618 F. Supp. at 1059-60; Pet. App. C26-
27. There are many other such examples in the petition.
14 Delaware Valley II, concurrence at 4, quoting the district
court’s opinion at 581 F. Supp. 1412, 1431 (E.D. Pa. 1984).
15 Delaware Valley I], concurrence at 4; see also id., plurality at
2-3.
10
ley II concerned matters unrelated to risk or adequately
compensated in a lodestar award,** the enhancement or-
dered should be reversed.
In this case, petitioners have offered much the same
evidence. They have claimed that BN “spare[d] no ex-
pense” in its defense and “sought to wear down plain-
tiffs and their counsel.” Pet. Br. at 10, 15. They have
argued that the case presented new and everchanging
issues. Id. at 8-9. And—like the respondents in Dela-
ware Valley II—they have made much of the fact that
they took what they say was a very risky case on a con-
tingent basis.
In Delaware Valley II, such arguments, even though
persuasive to the district court, did not justify risk en-
hancement—or even reconsideration of such enhance-
ment—for five members of this Court. In this case, peti-
tioners’ proof, when rebutted by BN, did not persuade
the district court. Having failed in their factual proof,
petitioners should not be more favorably treated than
were respondents in Delaware Valley II, who at least
succeeded at the trial level on the selfsame issues.
There is another way in which denial of the petition
is consistent with Delaware Valley II. Five Justices in
that case concluded that risk enhancement might be
called for “in selected cases.” Dissent at 22. Each of
the two opinions joined by those five Justices identifies
factors that might bear on whether risk enhancement
should be provided. Petitioners and BN offered evidence
on virtually all of those points, and still the district court
found enhancement unnecessary.
The concurrence in Delaware Valley II, for example,
agrees with the plurality that “no enhancement for risk
is appropriate unless the applicant can establish that
without an adjustment for risk the prevailing party
‘would have faced substantial difficulties in finding coun-
16 Jd. plurality at 18; concurrence at 4.
[Datel A i Bt at) a et tne NOE ett acne See atin rt
11
sel.’ ’’ Concurrence at 4. In this case, however, the evi-
dence showed no lack of lawyers willing to sue BN: Mr.
McBride and his colleagues were referred by the EEOC
to the Barnhill firm, which took their case (Tr. 301),
and, as the district court specifically found,
So many lawyers. . . were willing to represent com-
plaining Negro employees of the railroad and so
many suits were filed in different United States dis-
trict courts against it, that Burlington had to seek
relief from the Multi-District Litigation Panel. 618
F. Supp. at 1062; Pet. App. at C30.
The district court also received testimony from peti-
tioners’ experts*™ on what the Delaware II concurrence
called the way “the relevant market [would] compensate
[] for contingency.”"* But, after also considering BN’s
cross-examination, argument, and rebuttal, the district
court was unpersuaded by those experts’ views, and con-
cluded that rates mostly ranging between $160 and $180
per hour for every hour claimed constituted reasonable
compensation, even taking risk into account.” See 810
F.2d at 608; Pet. App. at A12-13.
Finally, the district court found that a multiplier like
that sought by lead counsel was not, as the Delaware
Valley II concurrence put it, “necessary to bring the fee
17Tr. 62-65, 62-83, 105-22 (Testimony of Thomas Sullivan) ;
Lead Counsel’s Proposed Findings of Fact and Conclusions of Law
at 36-39 (February 27, 1985).
18 Concurrence at 3. See also dissent at 21.
19 Notably, no opinion in Delaware Valley II prescribes lodestar
enhancement as the exclusive means of compensating risk. The
Justices who endorse the possibility of such compensation require
only that a district judge consider risk and fashion an award
“reasonable” in light of it. As the dissent in Delaware Valley II
seems to recognize, basic hourly rates—especially high ones—can
do that in whole or part. See dissent at 6, n.4. In that sense, what
the lower courts did here is entirely consistent with Delaware
Valley II.
12
within the range that would attract competent counsel”.
Concurrence at 3. In the words of the Seventh Circuit,
the district court was not persuaded by
the lead counsel’s evidence claiming that the risks of
Title VII litigation in general were such that multi-
pliers were necessary to attract competent counsel.
810 F.2d at 605; Pet. App. at A6.”
This Court, of course, is not a place to reargue the
evidence. Instead, the critical point is that petitioners
offered evidence on the risk related points held insuffi-
cient, and those viewed as significant, by a majority of
the Court in Delaware Valley II.7' BN offered extensive
rebutting evidence and argument. The district court con-
sidered it all, concluded that risk enhancement was not
called for, and found that a $2.18 million lodestar fees
award was “reasonable” compensation. 618 F. Supp. at
1068; Pet. App. at C44. The court of appeals affirmed
that finding because it was not an abuse of discretion.
810 F.2d at 608; Pet. App. at A12-13.
The fact of the matter is that petitioners got a full
opportunity to prove their contentions on risk, but were
unsuccessful. They were not encumbered by a narrow
20 The district court’s specific finding on this point is at 618
F. Supp. at 1061; Pet. App. at C30 (“[I]t is just not true that
unless lead counsel are given the 2.5 multiplier they request .. .
competent lawyers in Title VII cases will be discouraged from
undertaking representation of persons with such civil rights griev-
ances.” )
21The dissent in Delaware Valley II also suggests that some
factors may reduce the need for contingency enhancement. One
of those is the presence of other firms to which risk can be spread.
Dissent at 17-18. Here, there were two principal law firms and a
number of tagalong lawyers representing plaintiffs; more impor-
tant, the EEOC provided staff and financial assistance, and its very
presence reduced certain legal risks. See BN’s Seventh Circuit
Brief at 27 (February 20, 1986).
_T we] Sn Watashi
13
or erroneous view of the law.” There is nothing in this
basically factual dispute warranting review by this
Court.
III. THE SEVENTH CIRCUIT’S REFUSAL TO DIS-
TURB A FINDING THAT THE RELIEF HERE
WAS NOT “EXCEPTIONAL” DOES NOT JUSTIFY
REVIEW BY THIS COURT
Petitioners also briefly contend that there is an impor-
tant legal issue lurking in the Seventh Circuit’s affirm-
ance of the district court’s failure to be persuaded by
their arguments on the quantity of relief. Pet. Br. at
14-15. |
In fact, the court of appeals’ action on this point did
not establish new or aberrant law. The Seventh Circuit
was guided solely by the standard set out in Pennsyl-
vania v. Delaware Citizens’ Council for Clean Air, 106
S.Ct. 3088 (1986) and Blum v. Stenson, 465 U.S. 886
(1984): even excellent success does not justify enhance-
ment, but, in “rare” cases, the attainment of “excep-
tional” success may do so. See 810 F.2d at 606-08; Pet.
App. at A9-11. Under that legal standard alone, the court
of appeals affirmed. It added not a word to the law on
result based fees enhancement.
*2 The Seventh Circuit’s opinion relies on the Court’s explicit
holding in Blum v. Stenson, 465 U.S. 886 (1984) and Pennsylvania
v. Delaware Valley Citizens’ Council for Clean Air, 106 S. Ct. 3055
(1986) that lodestar fees are presumptively the reasonable award
contemplated by fees statutes, 810 F.2d at 606-08, 611; Pet. App.
at A9-11, B2. That holding is not overruled by Delaware Valley II,
and seems to represent the views of a majority of the Court
(plurality at 16; concurrence at 3-4). The continuing vitality of
the Blum/Delaware Valley I presumption underscores the fact that
petitioners’ problems are caused by failures of proof, not errors of
law.
23 The Petition asks alternatively that this case be remanded on
the question of risk enhancement (Pet. Br. at 7). That would be
inadvisable because, as shown, it would be at odds with the disposi-
tion of Delaware Valley II. In addition, as also shown, the issues
discussed in that case have already been the subject of proof,
argument, and consideration below.
14
Petitioners criticize the district court for comparing
the Consent Decree to truly exceptional outcomes in other
cases. They suggest that the Seventh Circuit’s affirmance
of that approach created an unattainable standard for
exceptional success. Pet. Br. at 14-15.
Petitioners are wrong. To begin with, it does not seem
improper to determine whether a given result is excep-
tional by judging whether it resembles outcomes that
really were. More important, the comparison petitioners
attack was not the district court’s only basis for its find-
ing on relief. The court also considered the kind of rem-
edies achieved, the average payout to class members, and
the probable impact of the Decree. 618 F. Supp. at 1056-
60, 1062-64. Pet. App. C20-28, C31-35. It could scarcely
have done more.
There are few questions more factual than whether the
result in a given case is “exceptional.” The trial judge,
especially one who has managed a case for years and
knows it intimately, is uniquely well qualified to make
that determination. Here, both lower courts thought the
outcome was commendable. They did not think, as do
petitioners, that it was “exceptional.” The difference be-
tween those two characterizations, however, does not war-
rant review by this Court.
CONCLUSION
The petition for certiorari should be denied.
Respectfully submitted,
Of Counsel: CHRISTOPHER T. LUTZ *
EDMUND W. BURKE STEPTOE & JOHNSON
BURLINGTON NORTHERN 1330 Connecticut Ave., N.W.
RAILROAD COMPANY Washington, D.C. 20036
3800 Continental Plaza (202) 429-3000
777 Main Street * Counsel of Record for
Fort Worth, Texas 76102 Respondent Burlington
Northern Railroad Company
Dated: July 21, 1987