Amicus Curiae Brief — Morgan Stanley Capital Group Inc. v. Public Util. Dist. No. 1 of Snohomish Cty.
Supreme Court brief2008
Ask Donna
What actually matters in this document.
Text
S70 77/ Co.
35 | ‘Ak i «2006
Ce OF THE SLES
34(p _ Nos. 06-1457 and 06-1462 " COUA Ne
IN THE
Supreme Court of the Anited States
MORGAN STANLEY CAPITAL GROUP INC., PETITIONER,
Vv.
PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY,
WASHINGTON, ET AL., RESPONDENTS.
CALPINE ENERGY SERVICES, L.P., ET AL., PETITIONERS,
V.
PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY,
WASHINGTON, E£7'AL., RESPONDENTS.
On Writ of Certiorari to the
United States Court of Appeals
for the Ninth Circuit
BRIEF OF THE LARGE PUBLIC POWER
COUNCIL AS AMICUS CURIAE
IN SUPPORT OF RESPONDENTS
JONATHAN D. SCHNEIDER
Counsel of Record
HARVEY L. REITER
M. DENYSE ZOSA
STINSON MORRISON HECKER LLP
1150 18th Street, N.W., 800
Washington, DC 20036
(202) 785-9100
Counsel for the Large Public Power
Council
January 14, 2008
i
QUESTION PRESENTED BY
LARGE PUBLIC POWER COUNCIL
The Federal Power Act declares that, whenever
the Federal Energy Regulatory Commission finds,
upon complaint, that “any rate, charge ... or
contract” for a sale for resale of energy in interstate
commerce is “unjust [or] unreasonable,” it must
“determine the just and reasonable rate, charge, .. .
or contract” and “fix the same by order,” id. §
824e(a). Did the Federal Energy Regulatory
Commission (“FERC” or “Commission”) err ‘in
determining that long-term market-based rate
agreements formed during a period of severe spot
market dysfunction are presumptively to be just and
reasonable under the Federal Power Act pursuant to
United Gas Pipe Line Co. v. Mobile Gas Serv. Corp.,
350 U.S. 332 (1956), and FPC v. Sierra Pacific Power
Co., 350 U.S. 348 (1956).
ll
TABLE OF CONTENTS
QUESTION PRESENTED BY LARGE PUBLIC
EE ns iantinnssciscicntounainsisiiirtiinusnnnienitonsii i
ae III sentirictecenconsnssnnpenaicernnninessiinniiesieas i
ee Br I cin vicercsscistcsetereennsonteenticis iil
TE Se? GI ectincccrnsinncssnenicesinstinnitenicsciniidi l
SUMMARY OF ARGUMENT. ............... 0. eeeeeeeeees 3
TE iicisinieesitcsniiinieniitetayiieiicn ieiiteiamaliniiideieuniitanntiindte 7
1. MARKET-BASED RATE AGREEMENTS
FORMED DURING A PERIOD OF MARKET
DYSFUNCTION CANNOT BE PRESUMED
TO BE JUST AND REASONABLE UNDER
THE MOBILE-SIERRA DOCTRINE..................... 8
A. The Ninth Circuit is Right that a
Functional Market is an Essential
Prerequisite for Application of the Mobile-
Sierra Presumption that Contract Rates
are Just and Reasonable in a Market-
Re a a OE 8
B. Market-Based Rate Contracts Formed
During a Period of Market Dysfunction
Cannot Be Presumed to be Just and
a celal 13
II.
III.
ill
PETITIONER’S CONCERN OVER THE
IMPACT OF CONTRACT
MODIFICATION ON THE INVESTMENT
CLIMATE ARE OVERSTATED AND, IN
ANY EVENT, NO BASIS FOR REFUSING
TO REMEDY UNLAWFUL RATEB................ 21
CHEVRON IS INAPPLICABLE WHERE, AS
HERE, THE AGENCY'S DECISION IS
BASED, NOT ON ITS INTERPRETATION OF
THE STATUTE IT ADMINISTERS, BUT ON
A MISTAKEN INTERPRETATION OF THIS
COURT'S PRECEDENTG..................sseseseeee 24
I itiiiccisinistcticnsiiedatictinntiapnienimidieaneniin 26
iv
TABLE OF AUTHORITIES
CASES
American Paper Inst. v. American Elec. Power,
ee ee ee csmasenesouabensoncnses 24
Atlantic City Elec. Co. v FERC,
I Oe, Oe ee Cs SD ccvevcivccscccossccrsesecses 9
California ex rel. Lockyer v. FERC,
383 F.3d 1006 (9th Cir. 2004).............. 6, 12, 16
Chevron USA v. Natural Res. Defense Council,
Ge Pe Fe I wrcicckcscccccescnccccesscscacoves 24, 25
Elizabethtown Gas Co. v. FERC,
10 F. 3d 866 (D.C. Cir. 1993) ......... 5, 11, 12, 16
Farmers Union Cent. Exch., Inc. v. FERC.
734 F.2d 1486 (D.C. Cir. 1984) 0.0000... 5, 12, 16
FPC v. Sierra Pacific Power Co.,
ee cousssevaboadidanbe i, 5
FPC v. Texaco, Inc.,
I ccsicenle 20, 24
Maine Pub. Util. Comm'n v. FERC,
454 F.3d 278 (D.C. Cir. 2006) 0.00.0... 9
Maislin Indus. US v. Primary Steel, Inc.,
re I os ccasudtansuonnooees 12, 20
MCI Telecomm. Corp. v. AT&T.
Re Br, EOD vceccncccccesececseveseressesseces 12, 20
Meyers Indus., Inc. v. Prill,
is calaiamnennainiiianintens 25
Vv
New England Motor Rate Bureau, Inc. v. Fed. Trade
Comm'n,
908 F.2d. 1064 (1%t Cir. 1990).......00 ccc eee. 25
Northeast Utils. Serv. Co. v. FERC.
55 F.3d 686 (18t Cir. 1995)........... cece eeeeeee eee 23
Phillips Petroleum Co. v. FERC,
792 F.2d 1165, (D.C. Cir. 1986) ....00... ce. 25
Potomac Elec. Power Co. v. FERC.
210 F. 3d 403, (D.C. Cir. 2000) ...........00.0cce. 9
Prill v. NLRB,
755 F.2d 941 (D.C. Cir. 1985) ........c ee 25
Sierra Pacific Power Co.v. FPC,
BD TE, BD Ge nccescossdcvccesscccccsesccesvess i, 5,13
Texaco, Inc. v FPC,
417 U.S. 380, 397-98 (1974)... 20, 24
Town of Norwood v. FERC,
587 F. 2d 1306 (D.C. Cir. 1978) 0.0.0... 9
United Gas Pipe Line Co. v. Mobile Gas Serv. Corp.,
tos Bl Ens reer i, 5, 13, 20
Verizon Communications, Inc. v. FCC,
Ie Be St I cs scinercncinshnmnmncioeunteaaiasenaale 20
ADMINISTRATIVE GRDERS
AEP Power Mktg., Inc.,
97 FERC 4 61,219 (2000) ..........0cccc eee 14
vi
Californians for Renewable Energy, Inc. v. California
Pub. Utils. Comm'n,
119 FERC 4 61,058 (2007) .................ccceceeeee. 3
Enron Power Mktg., Inc.,
106 FERC 4 61,024 (2004) ...............cccccceeeeees 15
Nevada Power Co. and Sierra Pacific Power Co. v.
Enron Power Mktg., et al.,
103 FERC 4 61,353 (2003) «00000000... 10
Northeast Utils. Serv. Co.,
66 FERC 4 61,332 (1994). oo... 9, 23
San Diego Gas & Elec. Co. v. Sellers of Energy &
Ancillary Servs.,
93 FERC 4 61,121 (2000). ..............ccccccceeeeeees 14
San Diego Gas & Elec. Co.,
96 FERC 4 61,120 (2004) .......... eee eens 15
Tenneco Oil Co.,
26 FERC 4 61,030 (194) .....................0000...... 20
ADMINISTRATIVE MATERIALS
FERC
Alternatives to Traditional Cost-of-Service
Ratemaking for Natural Gas Pipelines,
74 FERC 4 61,076 (1996) .........0000000. 16, 17
Final Report on Price Manipulation in Western
Markets (Mar. 3, 2003), available at http://
a aia anrniadcenensonensens 4
vi
STATUTES, REGULATIONS, AND RULES
§ 205(a), 16 U.S.C.A. § 824d(a).............. 7, 11, 13, 17
I scsi iacisiniictniaeneeipeiiabiiienideinesiliais 20
SI HES UII 0 cnenrienadiionondnnnidinisisninaneddibiils 1
OTHER MATERIALS
Public Power, Volume 56, No. 3, “The False Promise
of Restructuring” (May-June 2007). ............... 7
David Cay Johnston, “A New Push to Regulate
Power Costs,” N.Y. Times, Sept. 4. 2007 at C1.7
David Cay Johnston, “Competitive Priced Electricity
Costs More, Studies Show,” N.Y. Times, Nov. 6,
2007 at C4, corrected Nov. 15. 2007 ................ 7
l
INTEREST OF AMICUS!
The Large Public Power Council (“LPPC”) is an
association of twenty-four of the nation’s largest
municipal and state-owned utilities.2 LPPC members
provide reliable, low-cost electric service to most of
the more than 40 million people served by public
power. Together, LPPC members own and operate
over 75,000 megawatts of generation and
' Pursuant to Supreme Court Rule 37.6, counsel for amicus
represents that no counsel for a party authored this brief in
whole or in part, and that no counsel or party other than amicus,
its members, or its counsel, made a monetary contribution
intended to fund the preparation or submission of this brief.
Counsel discloses that another member of the law firm in which
counsel is a member represents the Nevada Attorney General,
Bureau of Consumer Protection, a Respondent herein, and that
Snohomish County Public Utility District is a member of LPPC,
although no special assessment of costs for preparation of this
brief was made to LPPC members. Pursuant to Supreme Court
Rule 37.3(a), counsel for amicus further represents that all
parties have consented to the filing of this brief. Letters
reflecting this consent have been filed with the Clerk.
2 LPPC’s members joining this brief are: Austin Energy, Clark
Public Utilities, Colorado Springs Utilities, CPS Energy (San
Antonio), IID Energy (Imperial Irrigation District), JEA
(Jacksonville, FL), Long Island Power Authority, Los Angeles
Department of Water and Power, Lower Colorado River
Authority, MEAG Power, Massachusetts Municipal Wholesale
Electric Company, Nebraska Public Power District, New York
Power Authority, Omaha Public Power District, Orlando
Utilities Commission, Platte River Power Authority, Puerto Rico
Electric Power Authority, Sacramento Municipal Utility District,
Salt River Project, South Carolina Public Service Authority
(Santee Cooper), Seattle City Light. Snohomish County Public
Utility District No. 1, and Tacoma Public Utilities. Public Utility
District No. 1 of Chelan County is an LPPC member but does not
join this brief.
2
approximately 34,000 circuit miles of transmission
line. LPPC members are governed by state and local
laws establishing that their core obligations are to
provide reliable service to native load customers at
the least possible cost.
LPPC members own distribution, transmission
and generating assets and_ generally supply
substantial portions of their load through generation
they own themselves. To supplement that supply,
LPPC members are active in purchasing electric
supply in competitive markets regulated by the
Federal Energy Regulatory Commission. LPPC
members have, accordingly, an avid interest in
ensuring that rates in these markets are just and
reasonable.
The Western energy crisis of 2000-2001 badly
shook LPPC members’ confidence in _ federally
regulated competitive markets for wholesale electric
service. While the FERC has taken certain steps to
rectify prospectively those market conditions that
FERC itself described as “dysfunctional,” the
Commission's refusal in the orders on review to
protect customers exposed to market dysfunction
serves as an ongoing warning that reliance on federal
wholesale markets may be inconsistent with LPPC
members’ core obligations to their customers to
provide least cost reliable service. LPPC’s
participation in this appeal reflects an effort to
restore confidence in the competitive wholesale
market. Consumer confidence is essential to
partic pation in, and ultimately the health of, the
marke. for competitive power.
3
SUMMARY OF ARGUMENT
By FERC’s own account, the Western energy crisis
of 2000-2001 was the “worst in the Nation’s history.”3
Just two years into the Commission’s large-scale
experiment with market-based rates, the West
experienced “unprecedented market dysfunction.”4
The Western energy crisis resulted from a
combination of regulatory misjudgment, unique
natural events, the exercise of market power and
market abuse. The Commission described events
contributing to the crisis as a confluence of “flawed
market rules; inadequate addition of generating
capacity facilities in the preceding years; a drop in
available hydropower due to drought conditions; a
rupture of a major pipeline supplying natural gas into
California; strong growth in the economy and
electricity demand; unusually high temperatures; an
increase in unplanned outages of extremely old
generating facilities; and market manipulation.”
Californians for Renewable Energy, Inc. v. California
Pub. Utils. Comm’n, 119 FERC 4 61,058 at para. 30
(2007). As the Commission further commented, these
actions and events conspired “to place California and
the entire West in an electricity crisis that had never
before been experienced.” Jd.
At the height of this crisis, in sometimes desperate
efforts to ameliorate the exposure of their customers
to these markets, wholesale customers, including
LPPC members, sought what they hoped would be the
3 Brief of the Federal Energy Regulatory Commission In
Opposition to Certiorari at 22, filed in these proceedings on
August 6, 2007 (“FERC Br.”)
4 Jd. at 13
4
relatively safe harbors of long-term electric supply
agreements. As FERC Commissioner Massey noted
in his dissent below, FERC encouraged customers to
enter into these contracts, and “assured buyers that
they would be protected from the exercise of market
power.” Further, Commissioner Massey noted that
the Commission “set a $74 Mwh benchmark” which it
said it “would expect to use in assessing any
complaints regarding the justness and reasonableness
of pricing such long-term contracts negotiated under
current market conditions.” JA 1308a (citing 93 FERC
para 91,294 at 61,982 (2000)).
Thus, it is quite clear that dysfunction in FERC-
administered spot market had a dramatic adverse
impact on prices available to these customers in long:
term forward markets. FERC’s Staff so concluded in
its “Final Report on Price Manipulation in Western
Markets,” issued on March 3, 2003 in Docket No.
PA02-2-000 (“Staff Report”). JA 209sa. And while
prices in the spot market eventually responded
favorably to the Commission's ministrations (thereby
revealing the extent of the dysfunction), prices set in
long-term agreements have continued to reflect the
impact of the dysfunctional market during the 2000-
2001 energy crisis.
In the orders on review, the Commission expressly
stated the finding that the spot market at the time
the contracts at issue were negotiated was
“dysfunctional” and that the rates for sales of power
in the short-term spot market were “unjust and
unreasonable,” as that term is understood in the
Federal Power Act (“FPA”). JA 1222a — 1299a at JA
1275a; JA 1554a. Further, the Commission
acknowledged the conclusion of its Staff Report that
spot market distortions flowed through to forward
power prices, and thus directly affected contracts
entered into for future delivery.
Nevertheless, the Commission went on to hold
that such evidence was not “relevant” under the
"public interest” standard applicable to the
agreements under the Mobile-Sierra_ doctrine.5
According to the Commission, “[a] finding that unjust
and unreasonable spot market prices caused forward
market prices to be unjust and unreasonable would be
relevant to contract modification only where there is a
‘just an reasonable’ standard of review.” JA 1275a-JA
1276a. “Under the ‘public interest standard,” FERC
held, “to justify contract modification it is not enough
to show that forward prices became unjust and
unreasonable due to the impact of spot market
dysfunctions; it must be shown that the rates, terms
and conditions are contrary to the public interest.” Jd.
Rates under the agreements were instead presumed
to be just and reasonable.
The Commission’s decision to presume under the
Mobile-Sierra doctrine that contract rates entered
into during this period of acknowledged market
dysfunction are just and reasonable is clear error.
While the courts have agreed with the Commission
that competitive forces may be relied on to achieve
just and reasonable rates,® it is axiomatic that when
5 The Mobile Sierra doctrine refers to this Court's companion
decisions in United Gas Pipe Line Co. v. Mobile Gas Service
Corp., 350 U.S. 332 (1956) (“Mobile”), and FPC v. Sierra Pacific
Power Co., 350 U.S. 348 (1956) (“Sierra”) (together, “Mobile-
Sierra”)
6 See Farmers Union Cent. Exch., Inc. v. FERC, 734 F.2d 1486,
1501-09 (D.C. Cir. 1984); Elizabethtown Gas Co. v. FERC, 10 F.
6
such markets break down, the rates they produce
cannot be presumed to be just and reasonable, as the
Commission decisions on review concede. When that
happens — when markets become dysfunctional (to
use the Commission’s own description) — it is wrong to
conclude that rates in contracts entered into in such a
period can be presumed to be just and reasonable.
Side-stepping the issue of just and reasonable
rates, the Commission, other Petitioners, and
supporting Amici, have made much of the potential
adverse impact that reversal of the Commission may
have on the climate for investment.’ Yet, the
circumstances presented on appeal in which contracts
would be subject to review under a just and
reasonable standard are narrowly confined to those in
which the agency has itself determined that markets
are dysfunctional. In its brief opposing certiorari,
referencing reforms which FERC says will help it
ensure that markets function properly, FERC itself
commented that these circumstances are unique and
unlikely to be repeated.
Moreover, to the extent the investment climate is
taken into account, LPPC also urges the Court to
weigh the impact on the marketplace of a decision
frustrating consumers legitimate expectation of
regulatory protection from dysfunctional markets.
While FERC has recently taken steps to police
competitive markets prospectively, the assurance that
adequate remedies are available when markets go
3d 866 (D.C. Cir. 1993); California ex rel. Lockver v. FERC, 383
F.3d 1006, 1009 (9th Cir. 2004), cert. denied, 127 S. Ct. 2972
(2007) (“Lockyer’).
7 See infra note 18.
awry provides confidence in market outcomes.
Consumer confidence in the market is as important a
factor as investor confidence in creating a sound
market structure and, ultimately, a firm basis for
investment. Consumer confidence has been badly
shaken,’ and without it, those consumers who can
will vote with their feet. Surely, the climate for
competitive investment cannot be benefited by this.
Ultimately, the Court must direct the Commission
to comply with its governing statute. FPA section
205(a) stipulates that “[aJll rates and charges made,
demanded, or received by any public utility for or in
connection with....the sale of electric energy subject to
the jurisdiction of the Commission....shall be just and
reasonable, and any such rate or charge that is not
just and reasonable is hereby declared unlawful.” 16
U.S.C.A. § 824d(a). In a dysfunctional market,
adopting a presumption that contract prices affected
by such dysfunction are just and reasonable conflicts
with the agency’s statutory responsibility and
common sense.
8 See Public Power, Volume 56, No. 3, “The False Promise of
Restructuring.” See David Cay Johnston, “A New Push to
Regulate Power Costs, “ N.Y. Times, Sept. 4. 2007, at Cl. See
David Cay Johnston, “Competitive Priced Electricity Costs More,
Studies Show,” N.Y. Times, Nov. 6, 2007, at C4, corrected Nov.
15, 2007.
8
ARGUMENT
I. MARKET-BASED RATE AGREEMENTS
FORMED DURING A PERIOD OF
MARKET DYSFUNCTION CANNOT BE
PRESUMED TO BE JUST AND
REASONABLE UNDER THE MOBILE-
SIERRA DOCTRINE.
A. The Ninth Circuit is Right that a
Functional Market is an Essential
Prerequisite for Application of the
Mobile-Sierra Presumption that
Contract Rates are Just and
Reasonable in a Market-Based Rate
Setting.
FERC and Petitioners are wrong to attack the
Ninth Circuit for establishing what are said to be
unprecedented “prerequisites” to application of the
Mobile-Sierra doctrine. While the Court in Mobile
and Sierra did not speak of conditions or
“prerequisites” to the application of the doctrine,
those decisions addressed the question whether rates
were just and reasonable in the context of a tightly
regulated, cost-based rate regime. In that historical .
setting, with the regulated, cost-based rate serving as
recourse for both buyer and seller, it is entirely
reasonable to presume that rates and terms derived
by mutual agreement of the parties are just and
reasonable, absent a significant showing why it would
be otherwise. By contrast, in a market-based rate
9 FERC Br. at 25-26; Brief of Calpine Energy Services, L.P., et
al, at 48-52 (“Calpine Br.”).
9
setting, there is no basis for a presumption that —
negotiated rates are just and reasonable unless there
is reasonable assurance that the market is
functioning appropriately.
In cases subsequent to Mobile and Sierra, in which
more novel terms and conditions of service have been
at issue, with judicial blessing, FERC has in fact been
more jealous of its initial prerogative to review
agreements ab initio, and not simply to allow parties
the benefit of a presumption that their bargain is in
the public interest without substantive review. See,
e.g., Maine Public Utils Comm'n v. FERC, 454 F.3d
278, 283 (D.C. Cir. 2006), in which the court
comments that the Mobile-Sierra presumption has no
place when a contract (in that case, regarding
formation of a Regional Transmission Organization)
is submitted to FERC for the first time. See also
Potomac Elec. Power Co. v. FERC, to 210 F. 3d 403,
409 (D.C. Cir. 2000) (applying the doctrine in “first
review cases would mean that [the agency's] ability to
protect the public interest would be negligible and
public regulation would consist of little more than
rubber-stamping private contracts.” (quoting
Northeast Utils. Serv. Co., 66 FERC 4 61,332 at p.
62,087 (1994)). Further, the courts have been clear
that that the Mobile-Sierra presumption applies only
so long as “there is no reason to question what
transpired at the contract formation stage.” See e.g.,
Atlantic City Elec. Co. v FERC, 295 F.3d 1, 14 (D.C.
Cir. 2002); Town of Norwood v. FERC, 587 F. 2d
1306, 1312 (D.C. Cir. 1978).
On Brief, FERC now eschews the need to review
what at transpired at the contract formation stage,
and disputes its practicality, asserting that its order
10
granting a utility market-based rate authority
provides blanket approval of rates under contracts
entered into subsequently. 103 FERC 4 61,353 at
para. 37. JA 1246a. FERC asserts that a requirement
to approve each agreement would fundamentally
conflict with the market-based rate framework. /d.
While LPPC does not disagree that blanket approval
for market-based agreements may be provided, the
ensuing presumption that contract rates are just and
reasonable can only attach if the market place in
which these agreements are executed is functional.
In its Brief in Opposition to certiorari at 24, FERC
observed that neither this Court, nor any other, has
had reason to consider the application of the Mobile-
Sierra doctrine in the context of a market-based rate
regime. Addressing petitioners seeking certiorari,
FERC commented that none of the cases applying
Mobile-Sierra “concerned a market-based contract,
much less one entered into during the Nation’s worst
power crisis.” Jd.
Stepping into the breach, the Ninth Circuit
concluded that the Commission’s blanket approval of
market-based rate contracts would be an acceptable
predicate for invoking the Mobile-Sierra presumption
if (1) procedures had been put in place for timely
reconsideration of market-based rate authority when
warranted; and (2) consideration is given to the
market conditions at issue when contracts are
formed. !°
Put slightly differently, the Ninth Circuit correctly
held that in view of the fluid operation of the
marketplace, the Commission must assure on a
10 Pet. App. 38a, 46a, 56a - 58a.
11
current basis that market-based rates continue to be
just and reasonable if contracts entered into under
this regime are to enjoy a presumption that they meet
the statutory standard. FERC itself acknowledges
that the circumstances at the time a seller is granted
market-based rate authority can change
unpredictably. FERC Br. At 34. Without the
assurance that markets are not dysfunctional at the
time contracting parties enter into their agreements,
it simply cannot be presumed that the agreements are
just and reasonable. If, as the Commission concedes
was the case here, markets at the time of contract
formulation were dysfunctional, customers must be
permitted an opportunity to prove that their
agreements are unjust and unreasonable.
The Ninth Circuit’s approach reasonably delivers
on the statutory assurance that rates will be just and
reasonable in a market-based rate setting, while
honoring the Mobile-Sierra presumption favoring
freely negotiated contracts.?! While courts
considering the question have generally agreed that
the just and reasonable standard may be met by
reliance on a market-based rate regime, the decisions
have been equally clear that this regime carries with
it an obligation on FERC’s part to provide the ongoing
assurance that the conditions justifying market-based
rates will continue to be met. In, e.g., Elizabethtown
Gas Co. v. FERC, 10 F.3d 866 (D.C. Cir. 1993), while
satisfied that the Commission had demonstrated
'! FPA section 205(a) stipulates that “la]ll rates and charges
made, demanded, or received by any public utility for or in
connection with....the sale of electric energy subject to the
jurisdiction of the Commission....shall be just and reasonable....”
16 U.S.C.A. § 824d (2005).
12
initially that the applicants’ markets’ were
“sufficiently competitive to preclude it from exercising
significant market power,” the court further relied on
FERC’s guarantee that “it will exercise its [Natural
Gas Act) § 5 authority (upon its own motion or upon
that of a complainant) to assure that a market...rate
is just and reasonable.” /d. at 870. In Farmers Union
Cent. Exch. Inc. v. FERC, 734 F.2d 1486 (D.C. Cir.
1984), while positing the potential] for market forces
to bring rates within a just and reasonable level, the
court faulted the Commission for its “largely
undocumented reliance on market forces.” Jd. at
1508.
Similarly, in California ex rel. Lockyer v. FERC,
383 F.3d 1006, 1014 (9th Cir. 2004), cert. denied, 127
S. Ct. 2972 (2007) (‘Lockyer’), while upholding the
Commission’s reliance on market forces in order to
establish just and reasonable rates, the court faulted
the Commission for failing to administer its quarterly
reporting requirement, a mechanism that the court
concluded would have enabled the Commission to
ensure that the statutory standard is met, thereby
avoiding the charge that it effectively deregulated
prices, in violation of the statutory requirement that
rate. be filed and continue to be just and reasonable.
As the court in Lockyer pointed out, in failing to
provide a mechanism for monitoring and remedying
prices where needed, the Commission had effectively
deregulated prices administratively, in contravention
of the statute and this Court’s decisions in MC/
Telecomm. Corp. v. AT&T, 512 U.S. 218 (1994) and
Maislin Indus. US v. Primary Steel, Inc., 497 U.S. 116
(1990). Jd. at 1014.
13
The Commission is capable, as it states, of
remedying dysfunctional markets on a prospective
basis. But, as FERC itself observes, market
dysfunction may arise after the execution of a
contract and can occur unpredictably. FERC Br. at
34. Thus, unless a functioning market is held to be a
predicate for application of the Mobile-Sierra
presumption, the promise of prospective correction
essentially cuts adrift from statutory protection those
customers who have entered into long-term
agreements. This is a poor result as a matter of
policy, because it discourages parties from entering
into long-term agreements.'2 As a matter of law, it
violates the assurance in FPA section 205(a) that
“[aJll rates and charges made, demanded, or received
by any public utility for or in connection with....the
sale of electric energy subject to the jurisdiction of the
Commission....shall be just and reasonable, and any
such rate or charge that is not just and reasonable is
hereby declared unlawful.” 16 U.S.C.A. § 824d.
B. Market-Based Rate Contracts
Formed During a Period of Market
Dysfunction Cannot Be Presumed to
be Just and Reasonable.
“The California ISO and PX spot markets,” FERC
stated below, “were dysfunctional during the relevant
period” and “the rates in those markets were unjust
and unreasonable. JA 1275a. FERC further
acknowledged that its Staff Report concluded that
spot market distortions flowed through to forward
'2 This point was made by dissenting Commissioner Massey. See
JA 1308a — 1309a.
14
power prices, and to contracts entered into for future
delivery. JA 1275a. And during this same period
FERC made two commonsense observations about the
relationship between the spot markets and prices in
the long term markets. “Maintaining an accurately
priced spot market,” it said in AEP Power Mktg., Inc.,
97 FERC 4 61,219 at 61,972 (2000), is the single most
important element for disciplining longer term
transactions.” “Higher spot market prices,” it also
observed, “in turn affect the prices in forward
markets.” San Diego Gas & Elec. Co. v Sellers of Elec.
and Ancillary Servs., 93 FERC 4 61,121 at 61,367
(2000).
The Commission nevertheless held that, under the
Mobile-Sierra doctrine, none of this was relevant to
the question whether to modify contracts entered into
during this period. Denying even the need to
ascertain whether its Staff was right in determining
that spot market distortions affected prices in forward
contracts, or the conclusion that the markets were
subject to market manipulation and gaming, the
Commission held:
[Elven if we were to assume that these
allegations and/or findings were true, they
would not be determinative of the issues in the
instant proceeding. | mmissi
already concluded that the California ISO and
PX spot markets were dysfunctional during
vant peri those
mark wi ust unre. ble.'3
13 Citing San Diego Gas & Elec. Co. v. Sellers of Energy &
Ancillary Servs., 93 FERC 4 61,121 at pp. 61,359-60, 72 (2000),
order on reh®g and clarification, 97 FERC 4 61,275 at p. 62,225
(2002).
15
Evidence of market manipulation merely
suggests another cause of the spot market
dysfunctions and the unjust and unreasonable
rates in the spot markets. However, a finding
that unjust _ and unreasonable spot market
prices caused forward bilateral prices to be
unjust and unreasonable would be relevant to
nee ye pny yore Se pe peer
we wn previously concluded, the contracts om
issue in this proceeding do not have such a
standard but rather evidence an intent that
the contract may be changed only pursuant to
the “public interest” standard of review.”'4
JA 1274a - 1275a (emphasis added).
Putting aside the fact that there is only one
standard of review — a just and reasonable standard —
FERC’s orders squarely present the question whether
a presumption that contractual rates are just and
reasonable attaches to contracts executed under a
market-based rate regime regardless of whether
FERC itself has concluded that markets at the time of
contract formation are dysfunctional.
LPPC urges the Court to conclude resoundingly
that the answer is “no.” While the Commission has
determined, and the courts have agreed, that
‘4 The Commission later determined that these markets were
subject to gaming and manipulation. See Enron Power Mktg.,
Inc., 106 FERC 4 61,024 at paras. 26, 29 (2004). Further, the
Commission required refunds of sellers in the spot market in
order to constrain rates to just and reasonable levels for the
period precisely coincident with the formation of the contracts
here at issue. See San Diego Gas & Elec. Co., 96 FERC 4 61,120
(2001).
16
competitive forces may be relied on to achieve just
and reasonable rates,'5 the rates they produce cannot
be just and reasonable if the markets break down, as
the decisions on review concede. When that happens
— when markets become dysfunctional (to use the
Commission’s own description) — it is wrong to
conclude that rates in contracts entered into in such a
period can be presumed, much less conclusively
presumed to be just and reasonable.
The Commission’s decision to ignore the necessity of a
just and reasonable backstop before presuming that
negotiated agreements meet the statutory standard
stands in marked contrast to its earlier conclusion
that, in circumstances where market-based rates
cannot be justified, utilities may be permitted to
charge individually negotiated rate agreements only
where viable cost of service recourse service is
available. Alternatives to Traditional Cost-of-Service
Ratemaking for Natural Gas Pipelines, 74 FERC 4
61,076 at 61,240 (1996), clarified, 74 FERC 4 61,194
(1996), order on rehg, 75 FERC 4 61,024 (1996)
(emphasis added). There, the Commission commented
that it was
...particularly concerned about maintaining the
integrity of the recourse service. In order to be
successful, the recourse service must remain a
viable alternative to negotiated service. Otherwise,
if the recourse service remains stagnant, in time,
the recourse service will become outmoded and
'5 See Farmers Union Central Exch., Inc. v. FERC. 734 F.2d
1486, 1501-09 (D.C. Cir. 1984): Elizabethtown Gas Co. v. FERC.
10 F. 3d 866 (D.C. Cir. 1993): California ex rel. Lockver v. FERC.
383 F.3d 1006, 1009 (9th Cir. 2004), cert. denied, 127 S. Ct. 2972
(2007) (* Lockyer’).
17
will cease to be a viable alternative to negotiated
service. minen Sn pomansee Af, Win. seamenee. setzion ie
to act
re It is i ‘ssible.
74 FERC 4 61,076 at 61,240 (emphasis added).
The competitive market may provide similar
recourse for customers in a market-based setting if
the market functions correctly, a matter that the
Court in Mobile-Sierra had no reason to consider. It
would be reasonable to conclude, as urged by the
Commission and supporting Petitioners, that parties
may be held to the benefits and burdens of
agreements freely executed in a competitive market.
However, where the competitive market does not
exist — i.e., where the market is dysfunctional and the
Commission itself holds that the market has broken
down -- customers have no such backstop and there is
no assurance that the rate agreements customers
may be required to enter into are just and reasonable.
Put slightly differently, without giving customers
recourse to a rate the Commission can determine to
be just and reasonable, there is no possible way for
the Commission to provide the assurance required
under the FPA that all rates will be just and
reasonable. FPA section 205(a) states that “[aJll rates
and charges made, demanded, or received by any
public utility for or in connection with....the sale of
electric energy subject to the jurisdiction of the
Commission....shall be just and reasonable, and any
such rate or charge that is not just and reasonable is
hereby declared unlawful.” 16 U.S.C.A. § 824d(a)
(2005).
18
In his’ dissenting opinion below, FERC
Commissioner Massey made precisely this point,
commenting that
[t]he tainted atmosphere in which these contracts
were negotiated was unprecedented § and
extraordinary. The mivst influential benchmark
used in negotiating forward contacts — the spot
market and expectations of future spot prices —
was wildly dysfunctional. When these contracts
were negotiated, the Commission had already
declared that conditions in the California markets
allowed the exercise of market power and rates
were unjust and unreasonable....Those market
conditions certainly tainted any _ contracts
negotiated during this time frame. It would
simply defy logic to conclude that the high prices
in these contracts were not adversely influenced
by market conditions that included the exercise of
market power and wide spread market
manipulation.
JA 1317a —- JA 1318a.
The Commission's earlier conclusion that effective
recourse service is an essential check on pipeline
market power (and the threat to just and reasonable
rates) also serves to rebut Petitioners who have
argued that the Commission and the Court have no
reason to intervene in what amounts to a commercial
dispute among “sophisticated” parties well-aware of
the risks they took when entering into the relevant
agreements.'® To the same effect, FERC argues:
6 See, e.g., Brief for Petitioner Morgan Stanley Capital Group at
12- 14, 31 — 32 (““MSCG Br.”).
19
Once dysfunction in the spot market occurred,
it was inevitable that it would impose costs on
someone. The parties to these contracts
presumptively had equal access to information
about the functioning of the spot markets, and
they made a knowing and intelligent choice
about how to allocate risks and costs. Had the
purchasers believed that the rates in their
contracts might become unjust and
unreasonable...they could have insisted on a
clause preserving their right to seek
Commission modification of the contracts.
FERC Br. at 45.
But it may only be assumed that customers have
bargaining power equal to their utility suppliers when
customers are operating with an effective safety net
assuring that they have recourse to just and
reasonable rates. While market-based spot market
rates may supply such a safety net, dysfunction in the
market undermines that protection. With the
Commission’s concession that just and reasonable
rates were unavailable to customers as of the time
they entered into the agreements at issue, the
decision to apply a presumption that the resulting
rates are just and reasonable is directly at odds with
the FPA.
In this connection, it is particularly jarring that
Petitioners argue that the Court should adjudge
utility customers’ rights in this case just as it would
any counterparties to a commercial agreement.!’ But
“17 At 34, Morgan Stanley invokes Uniform Commercial Code
provisions stipulating that market fluctuations “are exactly the
type of business risk which business contracts made at fixed
|
20
the unqualified presumption that buyers of wholesale
power have bargaining strength equal to that of
regulated sellers has no grounding in the statute.'8
The FPA establishes an entirely different framework
for determining the parties’ rights than does an
unregulated commercial setting. It reflects “a
reasonable accommodation between the conflicting
interests of contract stability on the one hand and
public regulation on the other.” Mobile, supra, 350
U.S. at 344. To use FERC’s own words, [t]he fact that
[utilities] can dictate the terms of their contracts
entered into with their customers forms at least one
of the premises for regulation.” Tenneco Oil Co., 26
FERC 4 61,030 at 61,069 (1984). And while market
forces may play a role in satisfying the statutory
requirement that rates be just and reasonable, the
Commission abdicates its statutory responsibility in
simply entrusting customer welfare to the
marketplace without a determination that the market
is capable of ensuring just and reasonable rates. MCI
Telecomm. Corp. v. AT&T, supra; Maislin Indus. US
v. Primary Steel, Inc., supra. In the circumstances in
this case, with the Commission’s own determination
that rates in the market are unjust and unreasonable,
prices are intended to cover [citing U.C.C. § 2-615(a)].”
18 Citing dicta in this Court's decision in
Verizon Communications, Inc. v. FCC, 535 U.S. 467. 479 (2002),
Petitioners assert that buyers and sellers of wholesale electricity
have presumptively equal bargaining power. MSCG Br. at 30-
31; Calpine Br. at 34, 39; FERC Br. at 22, 34. But the statutory
presumption is exactly the opposite. The parallel provisions of
the Natural Gas Act, for example, were enacted to regulate
"monopolistic forces” controlling the sale of natural gas. FPC v.
Texaco, Inc. 417 U.S. 380, 397-98 (1974).
21
it simply cannot presume that the resulting contracts
satisfy the statutory standard.
It does not help Petitioners to argue that the term
“market dysfunction” has no defined meaning and
therefore lacks significance on appeal. See Brief of
William Baumol, et a/. as Amici Curiae in Support of
Petitioners at 21, et seg. (“Market ‘dysfunction’ is
particularly pernicious basis for abrogation because it
has no well-defined meaning.”)(“Baumol Br.”). In
fact, the orders on review make clear that the
Commission very well understood the import of its
conclusion that markets in the relevant period were
dysfunctional; it meant that rates did not meet the
statutory just and reasonable standard. The
Commission expressly “concluded that the California
ISO and PX spot markets were dysfunctional during
the relevant period and that rates in those markets
were unjust and unreasonable. JA 1275a. With
that, the Commission’s determination that the
market in all relevant periods was dysfunctional
meant that rates were unlawful during this period.
For purposes of the issues on appeal, that is all the
Court needs to know.
Il. Petitioner's Concern Over the Impact of
Contract Modification on the
Investment Climate are Overstated
and, In Any Event, No Basis for
Refusing to Remedy Unlawful Rates.
The nearly hysterical tone of Petitioners and amici
on the impact on the investment climate of a decision
removing the Mobile-Sierra presumption in this case.
belies the limited circumstances in which contracts
22
may indeed be reopened.'® In its brief opposing
certiorari in this case at 12, FERC commented that
the Ninth Circuit’s decision was confined to the
“narrow proposition that, if there is a credible claim
that severe market dysfunction has affected the
formation of a market-based rate contract, the
Commission must take that fact into account....” In
fact, even more narrowly, a decision reversing the
Commission would stand for the limited proposition
that where markets are dysfunctional, and cannot
constrain rates to just and reasonable levels, it may
not be presumed that contracts entered into for that
period are just and reasonable. And even then, upon
examination, the Commission may very well hold that
the contracts indeed meet the statutory standard.
It bears no small emphasis that contracting parties
have never been shielded from the _ risk of
Commission-ordered contract modification, even
under a “public interest standard.” As FERC has
stated:
[Wle have the authority under the public
interest standard to modify a contract
where: it may be unjust, unreasonable,
unduly discriminatory or preferential to
the detriment of purchasers that are not
parties to the contract; it is not the result
of arm's-length bargaining: or it reflects
circumstances where the_ seller has
exercised market power over’ the
purchaser.
19 See Calpine Br. at 36-42. See MSCG Br. at 36-40. See Baumo
Br. at 15-18, 24-25.
23
Northeast Utils. Serv. Co., 66 FERC 4 61,332 at
62,078 (1994), affd, Northeast Utils. Serv. Co. v.
FERC, 55 F.3d 686 (1st Cir. 1995)(emphasis added).
As the Commission observed in its brief at 12,
prior to its change of heart:
Taken as a whole, the decisions of the court of
appeals allow the Commission sufficient
discretion on remand to consider all relevant
factors in determining whether the contracts
at issue should be upheld or reformed.
Allowing the Commission to address these
issues will not “cause severe damage to the
wholesale energy markets.” 06-1457 Pet. 25.
The decisions have not, as petitioners suggest
caused'a flood of complaints by disgruntled
purchasers seeking to reform contracts. In
fact, there have been relatively few
complaints, and, more important,’ the
Commission promptly rejected those that lack
merit.
Equally to the point in considering the impact of
the decision on review is the importance of consumer
confidence in the competitive wholesale marketplace
in creating a sound market structure and a firm basis
for investment. LPPC members will attest that the
Western energy crisis of 2000-2001 badly shook that
confidence. Without it, those consumers who can will
vote with their feet in order to avoid FERC-regulated
markets. Municipalities will learn not to trust the
marketplace for their supply, and states will direct
utilities to withdraw from participation in the
24
competitive market.2° Surely, the climate for
competitive investment cannot be benefited by this.
In the final analysis, the Court must direct the
Commission to do what the statute requires. In a
dysfunctional market, adopting a presumption that
contracts customers are forced to enter into are just
and reasonable conflicts with common sense and the
agency's statutory responsibility. The Commission
must be reversed.
Ill. CHEVRON IS INAPPLICABLE
: WHERE, AS HERE, THE AGENCY’S
DECISION IS BASED, NOT ON ITS
INTERPRETATION OF THE
STATUTE IT ADMINISTERS, BUT ON
A MISTAKEN INTERPRETATION OF
THIS COURTS PRECEDENTS.
FERC maintains (Br., p. 20 - 21) that its decision
is entitled to deference under this Court’s decision in
Chevron USA v. Natural Res. Defense Council, 467
U.S. 837 (1984). This Court can quickly dispose of
20 The proposition that the public interest is not disadvantaged
as long as high rates do not cripple buyers who executed the
contracts at issue is also at variance with this Court's
observation that “[iJn the context of ratemaking, it is typically
the case that any increment in the rate will only make a small
dent in the consumer's pocket,” but that the statutory
requirement to establish just and reasonable rates “reflects a
congressional determination that potential savings for
consumers as a class are important even though rate changes
will generally not have any great economic significance for any
individual consumer.” American Paper Inst. v. American Elec.
Power, 461 U. S. 402, 417 n. 11 (1983)quoting FPC v. Texaco,
Inc., supra, 417 U.S. at 399).
iis
25
that claim. Under Chevron, this Court will defer to an
agency's reasonable interpretation of an ambiguous
statute it is charged to administer. /d. at 2782.
But FERC states repeatedly that its decision was
compelled by this Court's decisions in Mobile and
Sierra, not by its interpretation of an ambiguity in the
Federal Power Act. JA 1225a-1226a, JA 1229a, JA
1243a-JA 1245a; See JA 1229a (decision “dictated by
the Supreme Court under the Mobile-Sierra
doctrine.”) This Court owes no deference to FERC
when the agency’s reasoning is based upon what it
believes it is obligated to do by previous court
decisions rather than by its interpretation of an
ambiguity in the statute itself. See, e.g., Phillips
Petroleum Co. v. FERC, 792 F.2d 1165, 1169 (D.C.
Cir. 1986); (Chevron is inapplicable where FERC “did
not exercise its own judgment” but believed itself
bound by the Supreme court’s decision.”); New
England Motor Rate Bureau, Inc. v. Fed. Trade
Comm'n, 908 F.2d 1064, 1071-72 (1st Cir. 1990); Pril/
v. NLRB, 755 F.2d 941, 947-50 (D.C. Cir. 1985), cert.
denied, Meyers Indus., Inc. v. Prill, 474 U.S. 948
(1985).
26
CONCLUSION
For reasons articulated above, the Court should
affirm the judgment of the Court of Appeals.
Respectfully submitted,
JONATHAN D. SCHNEIDER
Counsel of Record
HARVEY L. REITER
M. DENYSE ZOSA
STINSON MORRISON HECKER LLP
1150 18TH STREET, N.W., 800
WASHINGTON, DC 20036
(202) 785-9100
jschneider@stinson.com
Counsel for the Large Public Power
Council
_danuary 14, 2008