Amicus Curiae Brief — Nazarian v. PPL Energyplus, LLC, 135 S. Ct. 1582 (2015) (No. 14-614)
Supreme Court brief2015
Ask Donna
What actually matters in this document.
Text
Nos. 14-614 & 14-623
IN THE
OFFICE OF THE CLERK
Supreme Court of the United States
W. KEVIN HUGHES, ET AL.,
Petitioners,
PPL ENERGYPLUS, LLC, ET AL.,
Respondents.
CPV MARYLAND, LLC,
Petitioner,
Vv.
PPL ENERGYPLUuS, LLC, £7 AL.,
Respondents.
On Writs of Certiorari to the
United States Court of Appeals
for the Fourth Circuit
BRIEF OF NRG ENERGY, INC., AS AMICUS
CURIAE IN SUPPORT OF PETITIONERS
ABRAHAM SILVERMAN JEFFREY A. LAMKEN
CORTNEY MADEA Counsel of Record
NRG ENERGY, INC. JAMES A. BARTA
211 Carnegie Center MOLOLAMKEN LLP
Princeton, NJ 08540 The Watergate, Suite 660
600 New Hampshire Ave., NW
Washington, D.C. 20037
(202) 556-2000
jlamken@mololamken.com
Counsel for Amicus Curiae
SSS A
WiLSON-EPES PrinTING Co. INC. — (202) 789-0096 — WASHINGTON, D.C. 20002
QUESTIONS PRESENTED
1. Is a State’s effort to facilitate the construction and
operation of a needed power plant by directing a compet-
itive procurement and by directing its local utilities to
enter into a long-term contract with the winning develop-
er at the developer’s competitively bid price “field pre-
empted” by the Federal Power Act as a State’s attempt
to set interstate wholesale rates?
2. Is a state-directed, competitively procured contract
to support construction of a power plant “conflict pre-
empted” because its long-term pricing structure provides
incentives for that construction different from the “price
signals” generated by a FERC-supervised yearly for-
ward capacity auction?
(i)
TABLE OF CONTENTS
[mterent Of Asmetens Onsr tite ...ccccccccesecscocecesecccccssocsseseces
EE eee ene a ee
I. Statutory and Regulatory Background........
A. Early Energy Markets.....................000000+:
B. The Federal Power Act ..................cce0000
C. FERC’s Restructuring of
Wholesale Markets. ...................c:cccsceseseoees
1. The Development of Regional
Markets and Minimum-Offer-
Price Rules (MOPRs) ..............0.0:0+00++:
2. Bilateral Contracts and State
Se I cenne
A. The Maryland Generation Order............
B. District Court Proceedings.....................
C. The Fourth Circuit’s Decision..................
ee
I. The Courts Below Should Not Have
Entertained Tiris Sulit ...........ccecccocccoccessesssesee
A. This Action Should Have Proceeded
Before FERC—Not in Federal
Court—Because It Challenges the
Terms of Energy Contracts..................-+:
B. Judicial Intervention Produces III-
Tailored Remedies and Undermines
icine certian iaennaditamiaiiamnaitnn
II. The Generation Order Is Not
iv
TABLE OF CONTENTS—Continued
Page
A. The Generation Order Regulates
Within a Field of Traditional State
Se icsihictnenisinemininsiiiasitediaiaeannciinmeimmscies 28
B. State-Sponsored Contracts Do Not
Conflict With Federal Policy ................... 33
EERE SM Sateeeedar ante en eae eRe ne CE 35
Vv
TABLE OF AUTHORITIES
Page(s)
CASES
Ark. Elec. Coop. Corp. v. Ark. Pub. Serv.
Comm'n, 461 U.S. 375 (19838)........cccccccseeseeeees 32, 33
Ark. La. Gas Co. v. Hall, 453 U.S. 571
Sara tineessssabeitttesteebndiitineinmmmnsatiinasineeneemmaninntateneneneen 21
Armstrong v. Exceptional Child Ctr.,
Inc., 135 S. Ct. 1878 (2015)........cccsssssorerereseeees 23
Missouri ex rel. Barrett v. Kan. Nat. Gas
8 _ 5
Chevron, U.S.A., Inc. v. Nat. Res. Def.
Council, Inc., 467 U.S. 837 (1984)... eee 25
Conn. Dep't of Pub. Util. Control v.
FERC, 569 F.3d 477 (D.C. Cir. 2009).............. 8
Conn. Light & Power Co. v. Fed. Power
Comm'n, 324 U.S. 515 (1945).........ccccceeeeee 24, 28
Eccles v. Peoples Bank of Lakewood Vill.,
EE 26
Entergy Nuclear Vt. Yankee, LLC v.
Shumlin, 733 F.3d 393 (2d Cir. 2013) ............. 29
Fed. Power Comm'n v. Hope Nat. Gas
ae 25
FPC v. Sierra Pac. Power Co., 350 U.S.
STITT itinicichahiisiieilnneiariinliiaeaeiennernnsesesineimnase 6
Frost v. Corp. Comm’n, 278 U.S. 515
ne Ee 34
Medtronic, Inc. v. Lohr, 518 U.S. 470
STI cieisetiinisienibiasien ater iepriaieaaientinnseineetemmecnenetne 31
Midwest ISO Trans. Owners v. FERC,
373 F.3d 1361 (D.C. Cir. 2004) ...........cec00000: 7,8
vi
TABLE OF AUTHORITIES—Continued
Page(s)
Miss. Power & Light Co. v. Miss. ex rel.
Moore, 487 U.S. 354 (1988) ............... 11, 21, 23, 27
Montana-Dakota Util. Co. v. Nw. Pub.
Serv. Co., 341 U.S. 246 (1951) .........cccccssseeessesees 23
Morgan Stanley Capital Grp. Inc. v. Pub.
Util. Dist. No. 1,554 U.S. 527 (2008) ...... 7, 11, 35
N.J. Bd. of Pub. Utils. v. FERC, 744 F.3d
TI icetctciiacsiaientnitianiniiinininapmeetannens 19
New England Co. v. New Hampshire, 455
I nscinricinintiaicnnignasionnmneiinnmannenne 6
New England Power Generators Ass'n,
Inc. v. FERC, 757 F.3d 283 (D.C. Cir.
Ss ceesteenesieciteiitentigaeatieeibiiieninpininisibinienrieienieannin 9
New York v. FERC, 535 U.S. 1
Eee 6, 11, 29, 30
NRG Power Mktg., LLC v. Me. Pub.
Utils. Comm’n, 558 U.S. 165 (2010)............ 8, 19
Nw. Cent. Pipeline Corp. v. State Corp.
Comm'n, 489 U.S. 493 (1989).............002 28, 33, 34
Oneok, Inc. v. Learjet, Inc., 135 S. Ct.
IIIT icniciesiestitiisinimtilatitanilindiciitiiemsptemnenineneen 31
Pac. Gas & Elec. Co. v. State Energy Res.
Conservation & Dev. Comm’n, 461
oo 8 ee 6, 28, 30, 31, 34
People’s Nat. Gas Co. v. Pub. Serv.
Comm'n, 270 U.S. 550 (1926)..........ccccccccecseeseees 5
Pub. Util. Comm’n v. United Fuel Gas
Cg SS Crees Ge GD crencserenetenenennstnesseencenes 27
Pub. Util. Comm'n v. Attleboro Steam &
Elec. Co., 273 U.S. 83 (1927) ...........ccccc0c0. 5, 6, 27
vii
TABLE OF AUTHORITIES—Continued
Page(s)
Schneidewind v. ANR Pipeline Co., 485
Reece aaa 27, 30
United Gas Pipe Line Co. v. Mobile Gas
Serv. Corp., 350 U.S. 332 (1956) ........cccccececeees 6
United States v. Pub. Util. Comm’n, 345
I ciiinsinrinnniciceneatianeieneieaateannaninenn 27
United States v. W. Pac. R.R. Co., 352
aa icin 23, 27
STATUTES
Federal Power Act of 1935, Pub. L. No.
I ercccisesinniinehintinitsincininsasens passim
ne er 6
ee eee 6
|, ERE 6, 34
4 6, 18, 23, 24
ED crtetnencecencnnenimninns 6, 18
16 U.S.C. § 824d(e) ...........ccccceceseeees 6, 10, 18, 20
SL een passim
ATER 10, 20
ES ene 20
Administrative Procedure Act, Pub. L.
Pe Se BE ccceeicsicicnseeenteninientnenennnenee 20
| ELS cere ene TT 20
ainsi siete dieindilinaltaitabalas 20
Eero 20
fk ee 20
Md. Code. Pub. Utils. § 7-501, et seq. ..............0000+ 12
Md. Code. Pub. Utils. §7-510(¢)(4)(ii) .............000+ 12
TABLE OF AUTHORITIES—Continued
Page(s)
ADMINISTRATIVE MATERIALS
| EET ea 10
ISO New England, Inc., 131 FERC
ES a 10
ISO New England, Inc., 135 FERC
ET 9,24
ISO New England, Inc., 151 FERC
ist ininsindsersentiacietienimmnienienimeenieness 22
Market-Based Rates for Wholesale Sales
of Elec. Energy, Capacity & Ancillary
Servs. by Pub. Utils., 123 FERC
RIC EER ce nO 8
Midwest Indep. Trans. Sys. Operator,
Inc., 109 FERC 961,157 (2004)... eeeeeeee 11
Midwest Indep. Trans. Sys. Operator,
Inc., 158 FERC 161,229 (2015)............cccceseseees 25
New England States Comm. on Elec. v.
ISO New England Inc., 142
FERC 961,108 (20193).................. 9, 23, 25, 32, 33
PJM Interconnection, L.L.C., 117 FERC
EERE Eo 19, 25
PJM Interconnection, L.L.C., 1385 FERC
TTT ctncnssanteneeuianaiusnaintamntite passim
PJM Interconnection, L.L.C., 1837 FERC
ee 8, 9, 19, 33
PJM Interconnection, L.L.C., 143 FERC
eR ss innicrrenniniuntianbiiteiinimeimenen 10
PJM Interconnection, L.L.C., 1538 FERC
TT icicinnrccdnnnemmnunmieiinaneenneimiinin 9
ix
TABLE OF AUTHORITIES—Continued
Page(s)
Reg Trans. Org., 89 FERC 961,285
MISCELLANEOUS
American Public Power Association,
Power Plants Are Not Built on Spec:
Se NE decactncinsenertsimtiatstsentemnnmecnses 10
Chadbourne, Renewables Face Daytime
Curtailment in California (Nov. 2014),
ici teiinineiactitieaiemnanees 30
K. Cory, et al., Innovations in Wind and
Solar PV Financing (Feb. 2008)................ 11, 12
Dozier A. DeVane, Highlights of
Legislative History of the Federal
Power Act of 1935 and the Natural Gas
Act of 1938, 14 Geo. Wash. L. Rev. 30
Electric Energy Market Competition
Task Force, Report to Congress on
Competition in Wholesale and Retail
Markets for Electric Energy
FERC, Energy Primer: A Handbook of
Energy Market Basics (July 2015)............. 5, 10
Steven Ferrey, Alternative Energy in a
Spaghetti Western: Clint Eastwood
Confronts State Renewable Energy
Policy, 32 Utah Envtl. L. Rev. 279
x
TABLE OF AUTHORITIES—Continued
Page(s)
Ezra Hausman, et al., Bilateral
Contracting in Deregulated Electricity
Markets: A Report to the American
Public Power Association
N.C. Clean Energy Technology Center,
Programs, DSIRE (2015),
http://goo.gV/tJHICP .........ccccscessseseeeeees 11, 12, 29
N.C. Clean Energy Technology Center,
Solar Policy Guide: A Resource for
State Policy Makers (Sept. 2012) ...............0000 29
PJM, 2018/2019 RPM Base Residual
Auction Results (2015).......scscesessssesersesesessees 13
PJM, PJM Markets (May 14, 2015),
https://goo.gVMVOBKL............ccccccecsseseseseseseeeee 8
Sidney A. Shapiro & Joseph P. Tomain,
Rethinking Reform of Electricity
Markets, 40 Wake Forest L. Rev. 497
Kathleen Spees, et al., Enhancing the
Efficiency of Resource Adequacy
Planning and Procurements in the
Midcontinent ISO Footprint (Nov. 2015)...... 7
Robert Swartwout, Current Utility
Regulatory Practice from a Historical
Perspective, 32 Nat. Res. J. 289 (1992).......... 4,6
Stephen L. Teichler & Ilia Levitine,
Long-Term Power Purchase
Agreements in a Restructured
Electricity Industry, 40 Wake
Forest L. Rev. 677 (2005)............... 4,5, 10, 11, 35
xi
TABLE OF AUTHORITIES—Continued
Page(s)
Jeremiah I. Williamson & Matthias L.
Sayer, Federalism in Renewable
Energy Policy, 27 Nat. Res. & Env’t 19
(EE eee 29
U.S. Energy Information Administration,
Status of Electricity Restructuring by
State (Sept. 2010),
IIIT cnenisiscnssinintsnnesmenannesetenenees 7
IN THE
Supreme Court of the Anited States
Nos. 14-614 & 14-623
W. KEVIN HUGHES, ET AL.,
Petitioners,
Vv.
PPL ENERGYPLUS, LLC, ET AL.,
Respondents.
CPV MARYLAND, LLC,
Petitioner,
Vv.
PPL ENERGYPLUS, LLC, £7 AL.,
Respondents.
On Writs of Certiorari
to the United States Court of Appeals
for the Fourth Circuit
BRIEF OF NRG ENERGY, INC., AS AMICUS
CURIAE IN SUPPORT OF PETITIONERS
INTEREST OF AMICUS CURIAE
NRG Energy, Inc. (“NRG”) is one of the largest
power generation and retail electricity businesses in the
United States.. NRG owns and operates over 50,000
' Pursuant to Supreme Court Rule 37.6, counsel for amicus curiae
states that no counsel for a party authored this brief in whole or in
part or made a monetary contribution to the preparation and
2
megawatts of generation capacity, including 16,000 mega-
watts of merchant generation in the 13-State region
overseen by PJM Interconnection, LLC (“PJM”). NRG
also purchases and markets energy and energy-related
products, including power, natural gas, and renewable
energy. And it provides electricity to 3 million retail
customers in Texas and nine northeastern States,
including six States within PJM’s footprint.
NRG and its affiliates have invested billions of dollars
in both conventional and renewable generation facilities.
Many of these investments are supported by state-
mandated contracts, while others are made on a
merchant basis (ie., without contracts or other recourse
to captive ratepayers). Because NRG often relies on
state contracts when it invests in generation facilities, it
has an interest in preserving their integrity and viability.
NRG also invests based on price signals sent by federally
regulated wholesale markets. Accordingly, it has an
interest in ensuring that market prices are not artificially
depressed or distorted—whether due to the exercise of
market power or state-sponsored contracts. NRG thus
has both an interest in and a balanced perspective on
these cases, which concern whether federal law preempts
state contracts that support the development of genera-
tion. In NRG’s view, these interests all can be harmon-
ized through the proper exercise of federal regulatory
authority. By contrast, a policy of preemption by judicial
decree harms all of them.
submission of this brief, and no person other than amicus or its
counsel made such a contribution. All parties consented to the filing
of this brief. ————
with the Clerk.
3
STATEMENT
Since 1935, the Federal Power Act (“FPA”) has
afforded the Federal Energy Regulatory Commission
(“FERC” or the “Commission”) and its predecessor
exclusive jurisdiction to regulate wholesale energy sales
in interstate commerce. But States retain the broad
authority they exercised before the FPA. That authority
encompasses a variety of state policies that affect or
require new power-plant construction and financing.
Such exercises of traditional state authority—including
the development of capacity for the benefit of local
utilities—may impact wholesale markets, where FERC
has exclusive jurisdiction. But FERC has ample authori-
ty to regulate wholesale markets—and conduct in those
markets—to prevent adverse impacts without preempt-
ing traditional state authority.
For example, FERC has exercised regulatory author-
ity over federal wholesale auctions to ensure prices are
not distorted by below-cost or other non-market bidding.
In particular, FERC has acted directly on the wholesale
auctions that are within its regulatory domain, approving
rules designed to preclude bids (regardless of source)
that might distort pricing. Such rules, properly
calibrated and applied, can harmonize the exercise of
state and federal authority: States act within their
domain to promote generation that benefits their citizens,
while FERC acts within its domain to ensure that state
or private action does not result in unjust or
unreasonable wholesale rates. Efforts to preempt state
action, by contrast, lack that harmonizing effect. Rather
than protect state and federal authority within their
respective zones, they elevate one set of interests above
the other. They intrude unnecessarily into traditional
state authority. They invite litigants to seek case-by-case
4
judicial preemption to remedy the effects of specific
contracts instead of pursuing more efficient and tailored
remedies before FERC. And they discourage FERC—
the expert body to which Congress delegated respon-
sibility for regulating federal markets—from fulfilling its
statutory mission by ensuring its market rules produce
just-and-reasonable rates.
I. STATUTORY AND REGULATORY BACKGROUND
A. Early Energy Markets
The first electric utilities formed shortly after Thomas
Edison invented a commercially viable lightbulb in 1879.
Stephen L. Teichler & Ilia Levitine, Long-Term Power
Purchase Agreements in a Restructured Electricity In-
dustry, 40 Wake Forest L. Rev. 677, 679-680 (2005).
Those utilities typically operated as vertically integrated
monopolies. For any given region, the same company
controlled electric generation (plants to create electri-
city), transmission (facilities and lines to transport it),
and retail or local distribution to customers. /d. at 679-
680 & n.9.
Initially, state legislatures and municipalities regu-
lated utilities themselves. Robert Swartwout, Current
Utility Regulatory Practice from a Historical Perspec-
tive, 32 Nat. Res. J. 289, 298-301 (1992). Legislatures set
rates by statute, and municipalities issued franchises.
Ibid. By 1920, however, nearly every State had dele-
gated regulatory responsibility to state public utility
commissions, id. at 301, which exercised “authority to
franchise the utilities; to regulate their rates, financing,
* Utilities that provide power to customers in retail markets are
often called “Load-Serving Entities.” For ease, however, this brief
uses the term “utility.”
5
and service; and to establish utility accounting systems,”
Teichler & Levitine, supra, at 679 & n.8.
Wholesale transactions burgeoned. Municipalities and
utilities sometimes found it cheaper to buy electricity to
meet peak demand than to build more plants; conse-
quently, they entered into long-term requirements con-
tracts for bundled sales of generation and transmission.
Teichler & Levitine, supra, at 680. Most transactions
were intrastate. Dozier A. DeVane, Highlights of Legis-
lative History of the Federal Power Act of 1935 and the
Natural Gas Act of 1938, 14 Geo. Wash. L. Rev. 30, 31
(1945). However, in 1927, three east-coast utilities
formed a power pool—an arrangement for sharing
electricity—that eventually developed into the
Pennsylvania-New Jersey-Maryland Interconnection.
See FERC, Energy Primer: A Handbook of Energy
Market Basics 36-37 (July 2015); Teichler & Levitine,
supra, at 680 & n.11. Between 1928 and 1933, the share
of electricity for public consumption that moved inter-
state grew from 10.07% to 17.8%. DeVane, supra, at 31.
B. The Federal Power Act
As interstate electricity sales proliferated, so did state
attempts to regulate them.’ In Public Utilities Commis-
sion v. Attleboro Steam & Electric Co., 273 U.S. 83
(1927), this Court ended the regulatory efforts, over-
turning a state order that had modified a wholesale
contract for electricity between a Rhode Island generator
and a Massachusetts utility. See id. at 85-86. The Court
declared that the order placed a “direct burden upon
interstate commerce,” and ruled that the Commerce
* See, e.g., People’s Nat. Gas Co. v. Pub. Serv. Comm'n, 270 U.S. 550,
551-553 (1926); Missouri ex rel. Barrett v. Kan. Nat. Gas Co., 265
U.S. 298, 305-306 (1924).
6
Clause precluded the state commission from exercising
authority over the wholesale contract. /d. at 89-90.
In response, Congress enacted the Federal Power Act
of 1935, Pub. L. No. 74-333, 49 Stat. 847. New England
Co. v. New Hampshire, 455 U.S. 331, 340-341 (1982). The
Act created a federal regulator, the Federal Power
Commission (now FERC), with exclusive authority to
regulate the transmission or sale “of electric energy at
wholesale in interstate commerce.” 16 U.S.C. §824(b).
Under the Act, every public utility must file wholesale
rates with FERC, id. §824d(c), which must ensure that
they are “just and reasonable,” id. §824d(a); see also id.
§§ 824d(e), 824e(a).
The FPA, however, makes clear that federal authority
over electricity markets “extend[s] only to those matters
which are not subject to regulation by the States.” 16
U.S.C. §824(a). States thus continued to regulate power-
plant construction and siting, requiring utilities to apply
for certificates of public convenience and necessity before
building them. See Pac. Gas & Elec. Co. v. State Energy
Res. Conservation & Dev. Comm'n, 461 U.S. 190, 205-
207, 212 (1983). Through those processes, state commis-
sions could determine the mix of generation resources
(gas, coal, nuclear) utilities would build and how their
power would be distributed. See New York v. FERC, 535
USS. 1, 24 (2002). And States continued to regulate retail
rates, see 16 U.S.C. §824(b)(1), adjusting them to provide
appropriate compensation and incentives, Swartwout,
supra, at 304-305.
The FPA mandates respect for private contracts for
interstate sales of electricity. Under the Mobile-Sierra
doctrine—named for this Court’s decisions in United Gas
Pipe Line Co. v. Mobile Gas Service Corp., 350 U.S. 332
(1956), and FPC v. Sierra Pacific Power Co., 350 U.S. 348
7
(1956)—FERC must “presume that the rate set out in a
freely negotiated wholesale-energy contract meets the
‘just and reasonable’ requirement imposed by law.”
Morgan Stanley Capital Grp. Inc. v. Pub. Util. Dist. No.
1, 554 U.S. 527, 530 (2008). That “presumption may be
overcome only if FERC concludes that the contract seri-
ously harms the public interest,” a finding that cannot be
made absent “‘unequivocal public necessity’ or ‘extra-
ordinary circumstances.’” /d. at 550 (citation omitted).
C. FERC’s Restructuring of Wholesale Markets
In the 1990s, many States undertook reforms to make
utilities more efficient while maintaining them as
vertically integrated monopolies. See Kathleen Spees, et
al., Enhancing the Efficiency of Resource Adequacy
Planning and Procurements in the Midcontinent ISO
Footprint 21-22 (Nov. 2015). FERC and a minority of
States implemented market-based reforms. See U.S.
Energy Information Administration, Status of Electricity
Restructuring by State (Sept. 2010), http://goo.gl/3be-
GQT. This case has its origins in FERC’s efforts to
restructure wholesale energy markets and to increase
their efficiency—and ensure just-and-reasonable rates—
by promoting effective competition. Midwest ISO Trans-
mission Owners v. FERC, 373 F.3d 1361, 1363 (D.C. Cir.
2004).
1. The Development of Regional Markets and
Minimum-Offer-Price Rules (MOPRs)
A key element of FERC’s reforms was “the develop-
ment of multi-utility regional transmission organizations
(RTOs).” Midwest ISO, 373 F.3d at 1364. Before
FERC’s reforms, the electric grid was segmented among
different local utilities. bid. Now, in much of the
Nation, utilities may join an RTO that interconnects
“different segments” of the grid owned by member utili-
8
ties, offering “open access to the regional transmission
system” for “all electricity generators” under a non-
discriminatory, “‘unbundled, grid-wide tariff.” Ibid.
(quoting Order No. 888, at 31,731).
PJM Interconnection, LLC (“PJM”) is the largest
RTO. It spans 13 States (plus the District of Columbia)
and operates the world’s largest wholesale electricity
market. PJM, PJM Markets 1 (May 14, 2015), https://
goo.gl//MV05KI. Subject to FERC’s authority to ensure
just-and-reasonable rates, see Reg7 Transmission Org.,
89 FERC 961,285, at 5 (1999), PJM runs a spot market in
which energy is bought and sold on a minute-by-minute
basis for immediate consumption. PJM, supra, at 1.
PJM also operates a forward market for another
energy product, capacity. Capacity is the ability to
supply electricity when needed. Conn. Dep’t of Pub. Util.
Control v. FERC, 569 F.3d 477, 479 (D.C. Cir. 2009).
Utilities buy capacity—“an option to buy a quantity of
electricity’"—to ensure energy is available to meet
periods of peak demand. NRG Power Mktg., LLC v. Me.
Pub. Utils. Comm’n, 558 U.S. 165, 168 (2010); see also
Conn. Dep't of Pub. Util, 569 F.3d at 479. Because
generators need lead-time to build plants that will supply
capacity, PJM’s capacity auctions occur three years
ahead of scheduled delivery. PJM, supra, at 1-2.
By efficiently matching supply and demand, these
auctions seek to keep prices competitive while ensuring
investment in new capacity sufficient to meet future
needs. PJM Interconnection, L.L.C., 137 FERC
161,145, at 192, 96 (2011). Because demand is relatively
inelastic, market prices for capacity are highly sensitive
to changes in supply or demand. Market-Based Rates for
Wholesale Sales of Elec. Energy, Capacity & Ancillary
Servs. by Pub. Utils., 123 FERC 961,055, at 9937-38
9
(2008). FERC has therefore repeatedly addressed ca-
pacity market rules, and the possible exercise of buyer or
seller market power, to fulfill its obligation to secure just-
and-reasonable rates. See, e.g., PJM Interconnection,
L.L.C., 1538 FERC 961,066 (2015); PJM Interconnection,
L.L.C., 187 FERC 961,145; ISO New England, Inc., 135
FERC 161,029 (2011).
One issue has been “uneconomic entry”—the concern
that States or utilities may find it in their interest to
bring additional capacity into the market at below-
market rates. The combination of excess supply and
lower bids can significantly depress prices, interfering
with the auction’s ability to produce just-and-reasonable
rates. PJM Interconnection, L.L.C., 1837 FERC at 196;
see also New England Power Generators Ass’n, Inc. v.
FERC, 757 F.3d 283, 287 (D.C. Cir. 2014).*
To prevent that, PJM applies a rule, called the
“minimum-offer-price rule.” Under it, PJM will adjust a
new entrant’s offer to a market-rate if PJM finds the
offer to be uneconomic. PJM Interconnection, L.L.C.,
135 FERC 961,022, at 61,088 (2011). By focusing on
conduct within federally regulated markets, those rules
foster efficient markets while “accommodat{ing] * * *
legitimate state policy objectives.” New England States
Comm. on Elec. v. ISO New England Inc., 142 FERC
‘ Capacity suppliers offer their capacity into PJM’s auction. PJM
builds a “supply curve” of all offers and determines where that curve
crosses an administratively-determined demand curve to establish
the auction clearing price, which is paid to all suppliers that “clear”
the auction. Buyers can actually profit by selling into the auctions
below cost if the resulting price decrease, multiplied by the buyer’s
total purchase obligation, exceeds losses from the below-cost bid.
PJM’s minimum-offer-price rule is intended to correct that problem
by requiring that bids reflect the actual costs of building capacity
and entering the market.
10
161,108, at 61,488 (2013); see also PJM Interconnection,
L.L.C., 143 FERC 961,090, at 154 (2013).
Market participants and affected entities regularly
challenge PJM rules they consider imperfect. See, e.g.,
PJM Interconnection, L.L.C., 185 FERC 961,022, at
798-12 (2011); JSO New England, Inc., 131 FERC
161,065, at 1710-12 (2010). When PJM proposes a rule,
interested parties may file a protest objecting to the rule
or any other element of auction design. See 16 U.S.C.
§§ 824d(e), 824e(a), 825e; 18 C.F.R. §385.211.
2. Bilateral Contracts and State Initiatives
Alongside those organized markets, utilities and
States still procure capacity and energy directly from
generators—ie., through bilateral contracts. FERC,
supra, at 56-57. Energy and capacity markets depend
heavily on bilateral contracts, which provide developers a
low-cost means of attracting capital for new power
plants, and allowing existing generators to sell power at
predictable prices. American Public Power Association,
Power Plants Are Not Built on Spec: 2014 Update 1
(2014); Teichler & Levitine, supra, at 690-691. Building a
power plant requires extensive capital outlays—in the
hundreds of millions of dollars—that take years to
recoup. Sidney A. Shapiro & Joseph P. Tomain,
Rethinking Reform of Electricity Markets, 40 Wake
Forest L. Rev. 497, 505 (2005). To offset costs and
minimize risks, developers sell energy and capacity
under long-term bilateral contracts, “guaranteeing that
*** sufficient revenues will be forthcoming regardless
of market conditions.” Ezra Hausman, et al, Bilateral
Contracting in Deregulated Electricity Markets: A
Report to the American Public Power Association 16
(Apr. 18, 2008). In the majority of States that have not
restructured their energy markets, long-term bilateral
1]
contracts remain “the single most essential requirement”
for procuring new capacity. Midwest Indep. Trans. Sys.
Operator, Inc., 109 FERC 961,157, at 61,714 (2004).
Existing generators also use bilateral contracts to
hedge against volatility. Because supply and demand are
highly inelastic in wholesale markets (at least in the short
term), spot-market prices can move “dramatically,”
jumping “more than fifteenfold” in a single summer.
Morgan Stanley, 554 U.S. at 539. Most utilities and
generators therefore apportion price-risk using a mix of
bilateral contracts. Teichler & Levitine, supra, at 690-
691. Basic contracts often call for delivery of power at
fixed prices; more complex agreements resemble finan-
cial derivatives to provide “hedges” against volatility.
See K. Cory, et al, Innovations in Wind and Solar PV
Financing 10 (Feb. 2008).
Even in restructured regions, States heavily influence
the development of new generating capacity. State regu-
lators can impose a variety of approval requirements on
firms building new generation facilities. See, e.g., Miss.
Power & Light Co. v. Miss. ex rel. Moore, 487 U.S. 354,
358 (1988). Regulators can decide whether to authorize
their construction, where they should be built, and even
the fuel-type they use. See New York, 535 U.S. at 24.
States also provide direct incentives for energy de-
velopment. The States offer at least 435 incentive pro-
grams for renewable energy alone. See N.C. Clean
Energy Technology Center, Programs, DSIRE (2015),
http://goo.g/tJHJCP. California, for instance, has 14
different incentive programs: One requires utilities to
source a certain amount of electricity from renewable
generation; another provides state financing for
renewable-energy projects; and a third awards
renewable-energy generators favorable contracts with
12
utilities. See ibid Most States have similar initiatives.
See ibid. The costs of such programs are recovered
through rates collected from retail customers.
II. PROCEEDINGS BELOW
A. The Maryland Generation Order
For most of the 20th century, Maryland utilities were
vertically integrated monopolies. Pet. App. lla. In 1999,
however, Maryland deregulated its electricity market,
requiring utilities to divest their generation resources.
See Md. Code. Pub. Utils. §7-501, et seg. Maryland
utilities now purchase electricity on federal wholesale
markets or through bilateral contracts. Pet. App. lla;
Md. Code. Pub. Utils. §7-510(c)(4)(ii).
In 2008, the Maryland Public Service Commission
(“MPSC”) expressed concern that not enough capacity
was being built in Maryland. Pet. App. 12a, 80a. The
MPSC solicited proposals for the construction of up to
1,500 MW of new capacity. /d. at 12a, 87a To mitigate
the risks involved in that sort of commitment, the MPSC
offered the winning bidder 20-year contracts for
differences—a common type of financial instrument that
transfers the risk of low prices (or the benefits of high
ones) in spot markets from the generator to its counter-
party, Cory, supra, at 10—with three Maryland utilities.
Pet. App. 12a The MPSC finalized its plan in the so-
called Generation Order. /bid.
Petitioner CPV submitted the winning bid. Pet. App.
12a. The resulting contracts required CPV to build a
power plant that can provide capacity to Maryland utili-
ties through wholesale capacity auctions. Jbid.® The
* PJM requires capacity suppliers in its region to “bid” their capacity
into the market. Starting with the lowest bid, PJM matches the
offers to forecasted demand. If a generator (such as CPV) has
13
contract-for-differences component provided protection
from the sometimes volatile prices that come out of those
auctions and made it easier for CPV to secure financing
at competitive rates. CPV was required to submit a bid
that “cleared” (ie, was accepted) at auction. If the
auction price fell below a specified threshold, the
Maryland utilities would pay CPV the difference. /d. at
12a-13a. That shielded CPV from the risk of low capacity
prices. Conversely, if the market price exceeded the
contract price, CPV would pay the utilities the difference,
protecting the utilities from the effects of higher capacity
prices with respect to CPV-supplied capacity. J.A. 392,
396-397
B. District Court Proceedings
Respondents—participants in PJM’s auctions—filed
this lawsuit. Pet. App. 13a. They alleged that the Gener-
ation Order intruded into FERC’s authority to regulate
wholesale markets. /bid. They expressed concern that
state-sponsored contracts would depress prices in federal
capacity auctions. Dist. Ct. Compl. 1967, 70, 73, 77-78.
The district court held that federal law preempted the
Generation Order. Pet. App. 129a. The court reasoned
that CPV’s contracts for differences “established” whole-
sale rates and thereby invaded FERC’s exclusive do-
main. /d at 113a. The court also “note[d]” that the
agreed to supply energy to a utility in a bilateral contract, the
generator and utility still participate in the auction, selling and
buying through PJM. They settle the bilateral contract financially,
so it acts as a hedge against auction prices for the amount of capacity
covered by the contract.
® Over the last decade, capacity prices in the main PJM auction (the
Base Residual Auction) have ranged from $110.06 per unit to $237.33
per unit—a difference of over 115%. See PJM, 2018/2019 RPM Base
Residual Auction Results 17 (2015).
14
Generation Order might be preempted under the doc-
trine of conflict preemption. Jd. at 130a.
C. The Fourth Circuit’s Decision
The Fourth Circuit affirmed. The Generation Order,
it held, improperly supplanted FERC’s exclusive power
to regulate wholesale energy sales. Pet. App. 17a. The
order intruded into that field as a “functional” matter,
the court stated, because the rate CPV received under its
contracts for differences replaced the “rates established
through a FERC-approved” auction. /d. at 17a-19a. The
court recognized that States might have authority to
encourage generation through “direct subsidies or tax
rebates, that may or may not differ in important ways
from the Maryland initiative.” Jd. at 2la But the court
held the Generation Order preempted nonetheless be-
cause its “effect” on wholesale rates was “neither indirect
nor incidental.” /bid.
The court stated that conflict-preemption principles
reinforced its holding because the Generation Order “has
the potential to seriously distort * * * price signals” in
federal capacity markets. Pet. App. 2la-22a. At the
time, FERC applied a minimum-offer-price rule to miti-
gate any distortion from state activities. Jd. at 24a. But
the court asserted that the rule’s existence “confirm[ed]
rather than refute[d] the existence of a conflict.” Jbid.
Finally, the court held that the Generation Order—which
guaranteed CPV fixed rates for 20 years through bi-
lateral contracts—amounted to a collateral attack on a
FERC rule guaranteeing new generators fixed rates for
three years. Jd. at 23a-24a.
SUMMARY OF ARGUMENT
The Federal Power Act of 1935 created a new federal
agency—vesting it with exclusive jurisdiction over whole-
15
sale sales of energy in interstate commerce—but other-
wise left intact traditional State authority to regulate and
promote the development of new generation resources.
No observer in 1935 would have thought, as the courts
below ruled, that States had been denied the ability to
create incentives for the development of additional gen-
eration resources. To the contrary, both the States and
the federal government retained critical roles. Harmon-
izing state and federal authority here requires calibrated
federal regulation, not the blunt and often random impact
of case-by-case federal preemption.
I. FERC has exclusive regulatory authority to
ensure wholesale rates are just and reasonable. To fulfill
that obligation, FERC reviews wholesale market designs
to ensure they produce just-and-reasonable rates. With
respect to federal auctions, moreover, FERC adopts
targeted solutions to ensure uneconomic bids do not
distort auction outcomes. Here, for example, FERC has
approved a minimum-offer-price rule that, rather than
attempt to prohibit States from promoting the develop-
ment of generation resources, regulates how those
efforts interface with federal auctions. In particular, by
requiring bids to reflect costs, and foreclosing below-cost
offers, the rule can ensure that uneconomic entry does
not distort auction outcomes—without intruding into or
invalidating state policies.
If that rule fails to work as intended, the answer is for
FERC to alter its rules. Here, however, respondents—
now joined by FERC’s lawyers—instead defend a
judicial decree voiding specific state-supported contracts.
That reliance on federal preemption is troubling. It
intrudes unnecessarily into state authority. It elevates
one set of interests (efficient auction outcomes) over
other equally important ones (state authority) despite the
16
availability of other solutions (such as more effective
minimum-offer-price rules) that accommodate ll
interests. And it encourages complainants and FERC
itself to address ongoing problems through case-by-case
litigation rather than efficient and effective use of
FERC’s own authority.
Il. In any event, the state order challenged here is
not preempted. Under the FPA, States may not set
wholesale rates; ensuring just-and-reasonable rates is
FERC’s obligation. States, however, have always en-
gaged in activities that can influence wholesale rates.
States can regulate the construction of new power plants;
regulate financing; and provide incentives for new gen-
eration (including renewable resources). This Court has
never held that States lack such authority simply because
it has the potential to impact federal markets.
The feature of the state-sponsored contracts faulted
below—the contract for differences—does not “set”
federal wholesale rates. It functions as a hedge,
insulating CPV against price volatility. Nor does its
putative impact on federal auctivns necessitate pre-
emption. That is an impact FERC can (and should)
address by better regulating its own wholesale markets.
This case calls for thoughtful exercise of that authority,
not the blunt instrument of federal preemption.
ARGUMENT
This case involves important interests on all sides.
State regulation and state-sponsored contracts play a
critical role in today’s energy markets. States rely on
contracts to ensure energy security for their citizens,
promoting the development of new generation resources.
Generators—competitive power suppliers and public util-
ities alike—rely on those contracts to make enormous,
multi-year investments in new generation facilities, in-
17
cluding renewable resources and next-generation tech-
nologies like battery storage. The need for just-and-rea-
sonable rates in federally regulated wholesale markets is
no less imperative. An approach that abrogates any of
those interests, even for the purpose of pursing others,
invites energy-market anarchy that serves no interest
well—not those of consumers, ind: stry, or regulators.
Experience has taught amicus the importance of each
of these interests. NRG understands first-hand the
importance of state-sponsored generation contracts: It
has invested billions of dollars in developing generation
resources, including renewable resources, in reliance on
state contracting authority. NRG likewise has experi-
enced first-hand the necessity of properly functioning
wholesale markets. NRG invests enormous sums in
developing conventional and renewable resources where
those markets are the only source of cost recovery. A
seller of capacity and other energy products, NRG suf-
fers when those markets—because of influences unre-
dressed by market rules—fail to produce just-and-
reasonable rates.
This case calls for the harmonization of those critical
interests—not preemption that elevates one set of
interests over the others. The FPA affords FERC ample
authority to condition how the contracts here interact
with federal markets. For example, FERC has approved
the use of a “minimum-offer-price rule” designed to
prevent uneconomic bids (whatever their source) from
entering wholesale capacity auctions. Properly adminis-
tered, that approach accommodates both state and
federal authority: States may pursue their regulatory
goals while FERC, by directly regulating the wholesale
markets at the core of its authority, ensures that neither
18
those state policies nor other actions render wholesale-
auction results unjust or unreasonable.
The judicial decree below preempting state authority
substitutes a blunt remedy for that calibrated approach.
It discourages FERC from fulfilling its duty of ensuring
just-and-reasonable rates through its own regulatory
efforts. And it cuts deeply and unnecessarily into an area
of traditional—and important—-state authority. It is also
mistaken. No one at the time of the FPA’s enactment in
1935 would have thought it deprived States of authority
to create incentives for the development of new power
plants. Nor does that theory make sense today.
I. THE COURTS BELOW SHOULD Not HAVE ENTER-
TAINED THIS SUIT
Congress granted FERC the authority and duty to
superintend wholesale electricity sales to ensure that
wholesale rates remain “just and reasonable.” 16 U.S.C.
§824d(a). This case calls for the appropriate exercise of
that authority to ensure the integrity of federal markets,
without resort to preemptive decrees that intrude into
the traditional state domain of promoting the develop-
ment of generation resources.
A. This Action Should Have Proceeded Before
FERC—Not in Federal Court—Because It
Challenges the Terms of Energy Contracts
FERC has broad authority to ensure that wholesale
rates are “just and reasonable.” 16 U.S.C. §824d(a); see
also id. §824e(a). Federal law requires every public util-
ity to file its wholesale rates with FERC. Jd. §824d(c). If
FERC determines the rates are “unjust, unreasonable,
unduly discriminatory or preferential,” FERC may set
them aside and modify them. /d. §824e(a); see also id.
§824d(e). Similarly, FERC may review for unreason-
19
ableness “any rule, regulation, practice, or contract
affecting” rates. Jd. §824e(a). The Act thus gives FERC
authority to modify published tariffs and, in exceptional
circumstances, bilateral contracts. NRG Power Mktg.,
LIC v. Me. Pub. Util. Comm'n, 558 U.S. 165, 171-172
(2010).
FERC also exercises authority over the real-time
energy markets and forward-looking capacity auctions
operated by RTOs like PJM. Among other things,
FERC must review and approve the rules governing
those markets to ensure they produce just-and-
reasonable rates. See, e.g., PJM Interconnection, L.L.C.,
117 FERC 961,331, at 62,652 (2006). To that end, PJIM—
like other RTOs—imposes a minimum-offer-price rule
(or “MOPR”) to ensure that uneconomic bidding does not
distort auction results. PJM Interconnection, L.L.C.,
135 FERC 161,022, at 61,088 (2011). FERC has ad-
dressed whether PJM’s minimum-offer-price rule applies
where state policies can distort auctions. Pet. App. 10a-
lla. Initially, FERC determined that the rule was
designed solely to prevent large electricity buyers from
manipulating auctions. PJM Interconnection, L.L.C.,
137 FERC 961,145, at 1205 (2011). As a result, it initially
exempted certain state-supported generators. PJM
Interconnection, L.L.C., 117 FERC at 62,671 n.75. But
FERC later revised the rule to require state-supported
generators to bid above a certain price floor. PJM
Interconnection, 135 FERC at 61,106. FERC deter-
mined that the amendment was necessary to ensure that
“wholesale capacity market prices remain at just and
reasonable levels.” Jbid.; see N.J. Bd. of Pub. Utils. v.
FERC, 744 F.3d 74, 86, 91, 98-101 (3d Cir. 2014).
1. This case reflects precisely the sort of concerns
the FPA directs to FERC in the first instance. Accord-
20
ing to the court of appeals, respondents are aggrieved by
the contract between CPV and the Maryland utilities
mandated by the MPSC. Pet. App. 17a-19a. (Indeed, the
court specifically refused to address whether direct
subsidies, not in the form of a contract for differences,
would be problematic. /d at 21a.) And respondents
complained about the same thing. They asserted that the
“Contracts”—by requiring the utilities to pay CPV a
certain rate even if auction rates drop below that
threshold—will depress CPV’s bids and “suppress
market clearing prices” as a result. Dist. Ct. Compl. 170;
see id. 1967, 73, 77-78; Pet. App. 22a-23a (expressing
concern that “the CfDs,” because of their duration, might
“seriously distort the PJM auction’s price signals”). It is
thus the contracts and their interaction with federally
regulated markets—not a state commission order itself—
that aggrieves respondents.’
Because the contracts here are wholesale agreements
within FERC’s jurisdiction, the FPA required respon-
dents to seek review at FERC, not in federal court.
Congress gave FERC authority to act on unreasonable
rates or practices, including in response to a complaint
filed by an aggrieved party. 16 U.S.C. §§824d(e),
824e(a), 825e. If a party is dissatisfied with FERC’s deci-
sion, it may seek rehearing and ultimately judicial re-
view. Jd. §825l.° The statute thus gives “exclusive
" Respondents could not claim injury if, for example, the MPSC had
issued the Generation Order but nobody had responded with bids, or
had all bids been rejected. Respondents are affected, not because
the MPSC seeks to regulate wholesale rates, but because of the
effect the contracts have on federal markets.
* Alternatively, if FERC promulgates a regulation that affects rates,
a party may seek review under the Administrative Procedure Act.
See 5 U.S.C. §§ 702-704, 706.
21
authority over rate regulation to the Commission.” Ark.
La. Gas Co. v. Hall, 453 U.S. 571, 580 (1981). Conse-
quently, “[tJhe reasonableness of rates and agreements
regulated by FERC may not be collaterally attacked in
state or federal courts.” Miss. Power & Light Co. v.
Miss. ex rel. Moore, 487 U.S. 354, 375 (1988) (emphasis
added). “The only appropriate forum for such a
challenge is before the Commission or a court reviewing
the Commission’s order.” Jbid. (emphasis added). By
challenging the agreements in federal court instead,
respondents bypassed the mandatory remedies Congress
established.’
2. Respondents, moreover, do not merely challenge
the contracts as inconsistent with federal law. They also
seek to collaterally attack the efficacy of PJM’s
minimum-offer-price rule. Respondents’ suit—and the
government’s position here—rests entirely on the prem-
ise that the rule is not adequate to prevent these con-
tracts from distorting federal auctions. Dist. Ct. Compl.
174; Govt Br. Pet. Stage at 15, 18. But a proper
minimum-offer-price rule would protect PJM’s auctions
by excluding or “mitigating” all below-cost bids. See pp.
9 & n.4, 19, supra. Indeed, FERC specifically amended
the minimum-offer-price rule for the purpose of ad-
dressing uneconomic entry and bidding by state-
supported entities. See p. 19, supra.
The premise that PJM’s minimum-offer-price rule is
ineffective underscores why this action belongs before
FERC.” If FERC is failing to ensure that PJM’s auction
* Some may argue that the CPV-utility contracts are not within
FERC’s jurisdiction to address. But if that is so, it is hard to see
how federal law could preempt them. See p. 33, infra.
© NRG too has serious doubts that PJM’s minimum-offer-price rule
is adequate to ensure just-and-reasonable rates. See Request for
22
rules produce just-and-reasonable rates—ze., if the
minimum-offer-price rule is failing to screen out un-
economic bids—FERC should change the rule. Parties
should demand that change and seek judicial review if it
is not forthcoming. See, e.g., SO New England, Inc., 151
FERC 961,226 (2015) (challenging auction results); PJM
Interconnection, L.L.C., 185 FERC 161,022 (2011)
(challenging auction rules). Indeed, that would be the
only available course of action if the claimed distortions
here resulted from purely private contracts for differ-
ences or other private agreements. As explained below,
respondents’ failure to follow that course here—and to
seek a federal-court declaration of preemption instead—
leads to problematic results.
B. Judicial Intervention Produces _Ill-Tailored
Remedies and Undermines Incentives
Despite FERC’s powers, respondents sought a pre-
emption ruling from a federal court. Obliging that
request, the court of appeals held that preemption was
appropriate to protect the “rates established through a
FERC-approved market mechanism.” Pet. App. 19a.
Such a judicial (rather than regulatory) remedy,
however, is both under- and over-inclusive. It leaves
defective federal regulations on the books, while cutting
deeply and unnecessarily into traditional areas of state
authority. And it encourages parties and FERC itself to
use case-by-case judicial preemption—rather than
calibrated action by the expert agency—as the means of
fulfilling the FPA’s mandates.
1. The core of FERC’s mission is the obligation to
ensure that wholesale rates remain “just and reason-
Rehearing of the NRG Companies in PJM Interconnection, L.L.C.,
Nos. ER13-535-000, ER13-535-001 (FERC).
23
able.” 16 U.S.C. §824d(a); see also id. §824e(a).
FERC—not the Judiciary—bears that responsibility.
This Court thus requires utilities wishing to challenge a
tariff to seek an initial hearing from FERC. See Miss.
Power & Light, 487 U.S. at 375; Montana-Dakota Util.
Co. v. Nw. Pub. Serv. Co., 341 U.S. 246, 251-252 (1951).
Federal courts are limited to reviewing FERC’s deter-
mination. Miss. Power & Light, 487 U.S. at 375;
Montana-Dakota Util., 341 U.S. at 251-252 Although
parties may ultimately obtain judicial review, that
process allows FERC to apply its “expert and specialized
knowledge” to ratemaking, United States v. W. Pac. R.R.
Co., 352 U.S. 59, 64 (1956)—a task that “administrative
agencies” often handle “far better *** than judges,”
Armstrong v. Exceptional Child Ctr., Inc., 135 S. Ct.
1378, 1388 (2015) (Breyer, J., concurring).
The minimum-offer-price rule illustrates how regula-
tory expertise can calibrate federal-market protections
while limiting intrusion into state authority. The rule is
not a blunderbuss remedy—it neither forbids state
support for generation nor bans state-supported gener-
ators from bidding in federal auctions. It does not
purport to preclude any exercise of state authority.
Instead, the rule addresses conduct in PJM wholesale
capacity auctions, an area that is FERC’s to regulate. In
particular, it uses a price floor to “promote economically
efficient markets” (ie., markets that produce reasonable
rates) but otherwise allows “(States to pursue * * *
legitimate state policy objectives.” New England States
Comm. on Elec. v. ISO New England Inc., 142 FERC
161,108, at 61,488 (2013). If a bid is below-cost, it is
mitigated to eliminate any adverse effect. The rule is the
type of nuanced remedy one expects under a federal
scheme “conceived entirely as a supplement to * * * State
24
regulation.” Conn. Light & Power Co. v. Fed. Power
Comm'n, 324 U.S. 515, 525 (1945). FERC operates in its
domain, ensuring reasonable wholesale rates through
rules governing wholesale auctions. States operate in
theirs, promoting their choice of generation resources for
the benefit of their residents.
If the minimum-offer-price rule works as intended, it
should keep auction rates reasonable—fulfilling FERC’s
statutory obligation—whether or not state-supported
generators bid. See JSO New England, Inc. v. New
England Power Pool Participants Comm., 135 FERC
161,029, at 19157, 170-171 (2011); PJM Interconnection,
135 FERC at 61,106. Federal courts need not prohibit an
array of state-sponsored contracts to solve a problem
that FERC has already addressed. Conversely, if
FERC’s auction rules are flawed, FERC should revise
them; parties should petition for those revisions; and
aggrieved parties should seek judicial review if FERC
fails to do so. See 16 U.S.C. §824d(a) (“[AJll rules and
regulations affecting or pertaining to *** rates or
charges shall be just and reasonable.” (emphasis added)).
Either way, the initial solution to state actions that
produce distorted—zie., unjust or unreasonable—prices
lies with FERC.
2. Bypassing FERC in favor of a judicial declaration
of preemption produces remedies that are simultaneously
under- and over-inclusive. A declaration is under-
inclusive because it leaves in place an inadequate federal
minimum-offer-price rule. It thus leaves wholesale auc-
tions vulnerable to the distorting effect of below-cost bids
from any other source. At the same time, a preemption
decree is over-broad, reaching into an area of traditional
authority that FERC sought to preserve. When it
developed minimum-offer-price rules and allowed for
25
their application to state-sponsored generation, FERC
did not attempt to prohibit the underlying state
regulatory actions or contracts. Instead, it decided to
remedy any effect on federal auctions by establishing
rules for the auctions’ operation.
That choice was deliberate. Like other agencies,
FERC acts on policy considerations. See Chevron,
U.S.A., Inc. v. Nat. Res. Def. Council, Inc., 467 U.S. 837,
865 (1984). They inform what rates FERC allows, see,
e.g., Fed. Power Comm'n v. Hope Nat. Gas Co., 320 U.S.
591, 614 (1944), and as here, what rules FERC approves
for federal auctions. FERC designs rules to ensure that
prices will spark sufficient investment in capacity—which
is one component of what FERC deems a reasonable
rate. See PJM Interconnection, 117 FERC at 62,652.
FERC also tries to “accommodat/e] the ability of [S}tates
to pursue * * * legitimate state policy objectives.” New
England States Comm. on Elec., 142 FERC at 161,488;
see also Midwest Indep. Transmission Sys. Operator,
Inc., 153 FERC 961,229 at 146 (2015). Here, FERC
adopted a surgical solution for price distortions caused by
state-supported generation: the minimum-offer-price
rule. FERC acted on prices in federal auctions and those
prices alone—without specifically prohibiting state
policies or certain contracts. By contrast, the preemption
ruling below sweeps broadly, invalidating state regu-
latory initiatives.
Allowing federal courts rather than FERC to take the
lead in addressing this issue, moreover, undermines
FERC’s incentive to undertake the often sensitive task of
regulating with due respect for state interests. When
acting in agency proceedings, FERC itself opted to
accommodate state contracts that support generation.
FERC did not proscribe such contracts, but instead
26
regulated their potential effect on federal markets.
Before this Court, however, FERC’s lawyers now sup-
port a decree that goes further. But that improperly
relieves FERC of its obligation to ensure just-and-
reasonable pricing in federal markets. And, by placing
the matter before courts rather than regulators, it
forecloses the sort of tailored approach that can accom-
modate multiple interests. If FERC must go beyond
pricing rules to ensure wholesale rates remain just and
reasonable—instead proscribing a category of state-
sponsored contracts—the Commission itself rather than
its lawyers should be responsible for announcing that
undertaking.
3. Those impacts could all be easily avoided. Federal
law provides a path to challenge the CPV-utility con-
tracts, and the minimum-offer-price rule if it does not
sufficiently protect PJM auction rates. See pp. 10, 20,
supra. Respondents could challenge the reasonableness
of any agreement and the adequacy of PJM’s rules. The
courts below should not have allowed respondents to
pursue this action instead. Because respondents
challenge the reasonableness of energy contracts, they
were obligated to pursue the complaint process before
FERC. See pp. 20-22, supra. And claims that the CPV-
utility contracts undermine federal ratemaking should
have been raised before FERC as well.
Respondents seek declaratory and injunctive relief,
which is inherently discretionary and equitable. See
Eccles v. Peoples Bank of Lakewood Vill., 333 U.S. 426,
431 (1948). Courts ought not contemplate such relief
where a federal agency, with expertise, may be able to
craft a regulatory solution that better harmonizes the
relevant interests—and where judicial relief may dis-
courage regulatory solutions. Even in damages cases,
27
courts often refer disputes to federal agencies in view of
their “special competence.” W. Pac. R.R. Co., 352 U.S. at
63-64 (primary jurisdiction). Here, moreover, respon-
dents are injured not by a state order but by the effect of
contracts on FERC-supervised markets. For that
reason, too, the courts should have demurred in favor of
FERC-initiated resolutions.
This Court has sometimes held state actions pre-
empted in cases where the litigants did not proceed
before FERC. See, e.g., Miss. Power & Light, 487 U.S.
354; Schneidewind v. ANR Pipeline Co., 485 U.S. 293
(1988); Pub. Util. Comm’n v. United Fuel Gas Co., 317
U.S. 456 (1943). That course might be appropriate where
there is no mechanism for challenges before FERC and
no potential claim that FERC might accommodate state
policies through calibrated regulation. But where
Congress has authorized FERC to address the contracts
that allegedly affect federal markets, and FERC has in
place means for addressing the impact of such contracts,
the remedy in the first instance should be an action
before FERC—not a federal lawsuit seeking to preempt
state policies.
Il. THE GENERATION ORDER IS NOT PREEMPTED
When Congress passed the Federal Power Act in
1935, no one would have thought the States had lost their
authority to provide incentives for the development of
generation facilities. Congress passed the Act with a
limited purpose: to “fill the gap” left by Public Utilities
Commission v. Attleboro Steam & Electric Co., 273 U.S.
83 (1927). See United States v. Pub. Util. Comm'n, 345
U.S. 295, 308 (1953). In Attleboro, the Court had held
that States lacked authority to regulate energy sold at
wholesale or transmitted in interstate commerce. 345
U.S. at 89-90. The FPA was enacted to allow federal
28
regulation of wholesale energy markets as a
“supplement,” not a “substitut{e] for,” state regulation.
Conn. Light & Power, 324 U.S. at 525-526.
States thus continue to exercise extensive regulatory
and contracting authority. That their actions can impact
federal markets, or provide incentives beyond those
provided by federal law, is an insufficient basis for
preemption. The sheer range of what States can do
means that their actions “inevitabl[y]” affect wholesale
markets. Nw. Cent. Pipeline Corp. v. State Corp.
Comm'n, 489 U.S. 498, 515 (1989).
A. The Generation Order Regulates Within a
Field of Traditional State Concern
1. “{Cyharacteristically,” States determine whether
there is a “[nJeed for new power facilities.” Pac. Gas &
Elec., 461 U.S. at 205. In States with vertically inte-
grated utilities, the State (together with the regulated
utility) determine plant size and siting. See id. at 205-
206, 213-216. Even in regions with restructured markets,
the States still control permitting, siting, and compliance
with land-use restrictions. NRG operates many power
plants—including its Marsh Landing Generating Station
and E] Segundo Energy Center, as well as many renew-
able resources—under state-approved contracts. Those
contracts allow firms to arrange more attractive
financing by mitigating market risk, and also aid States
in meeting their public policy goals. Ezra Hausman, et
al., Bilateral Contracting in Deregulated Electricity
Markets: A Report to the American Public Power
Association 15-16 (Apr. 18, 2008).
Concomitantly, many States regulate the type of
generation resources that are developed. Numerous
States have long required utilities to own a certain
portfolio of conventional generation resources, such as
29
coal, nuclear, or gas power plants. See New York v.
FERC, 535 U.S. 1, 24 (2002). More recently, some States
have sought to encourage the use of renewable energy.
Entergy Nuclear Vt. Yankee, LLC v. Shumlin, 733 F.3d
393, 417 (2d Cir. 2013). And still others seek to drive
technological innovation in the energy sector by directing
contracts in battery storage, fuel cells, and other cutting-
edge energy investments. Often, that is achieved
through a variety of incentives—or directly through long-
term contracts.
For example, since the 1970s, many States have
granted tax incentives for investments in renewable
energy. Jeremiah I. Williamson & Matthias L. Sayer,
Federalism in Renewable Energy Policy, 27 Nat. Res. &
Env't 19, 19-20 (2012). More than 20 States offer tax
credits for investment in solar power. See N.C. Clean
Energy Technology Center, Solar Policy Guide: A
Resource for State Policy Makers 18 (Sept. 2012). A
third of all States and the District of Columbia now
operate taxpayer-funded trusts that invest directly in
renewable energy projects. Steven Ferrey, Alternative
Energy in a Spaghetti Western: Clint Eastwood Con-
fronts State Renewable Energy Policy, 32 Utah Envtl. L.
Rev. 279, 293 (2012). Most States and the District of
Columbia have renewable portfolio standards, which
require utilities to obtain a portion of their energy from
renewable sources. N.C. Clean Energy Technology
Center, Programs, DSIRE (2015), http://goo.gl/tJHJCP.
And nearly every State has a net-metering program that
allows customers producing renewable energy to receive
a kilowatt-for-kilowatt credit on their utility bills for the
excess energy delivered to the utility. Jbid; Ferrey,
supra, at 297.
30
By increasing supply in the short-term, and affecting
development incentives in the long-run, such state-driven
programs inevitably impact wholesale markets." Yet
States have traditionally regulated “these aspects of
electrical generation * * * in great detail.” Pac. Gas &
Elec., 461 U.S. at 206; see also New York, 535 U.S. at 24.
2. Consistent with that, the court of appeals
observed that “not ‘every state statute that has some
indirect effect’ on wholesale rates is preempted.” Pet.
App. 2la (quoting Schneidewind, 485 U.S. at 308).
Accordingly, the court focused on the contracts for
differences, holding that such contracts intrude on
FERC’s authority to “set” wholesale rates. The court
recognized that such contracts did not “formally” set
wholesale rates, Pet. App. 19a, and properly so. Neither
the contracts nor the Generation Order purport to set
federal-auction prices. They transfer risk—protecting
CPV from the impact of low wholesale capacity prices,
while helping shield the Maryland utilities from the
impact of higher prices.
The court of appeals characterized the contracts for
differences as “functionally” setting wholesale rates. Pet.
App. 17a-19a. But contracts for differences do no such
thing. Consider, for example, a capacity supplier that
hedges using such a contract. The supplier might sell off
the right to receive any increased revenues if auction
prices exceed a certain price, and buy insurance that will
pay it additional sums if auction prices fall below that
price. No one would say the capacity supplier has “set”
" California, the State with the most renewable-energy mandates,
predicts that its solar generation will drive energy prices negative
during the day, forcing generators to pay utilities to take energy.
Chadbourne, Renewables Face Daytime Curtailment in California
(Nov. 2014), http://goo.g/S2etpG.
31
the wholesale rate. It has simply shifted the benefits and
burdens of market changes to contractual counterparties.
A contract-for-differences is no different. Nor does it
matter that these contracts are the product of state
regulation. FERC has not found it necessary to pro-
scribe the use of contracts for differences by private par-
ties to meet private needs. See pp. 33, 35, infra. A
fortiori there is no basis for precluding their use to sup-
port important state policies.”
The contracts required by the Generation Order
undoubtedly affect capacity auctions. That is why the
application of an effective minimum-offer-price rule
should be employed. For the same reason, however,
preemption is inappropriate. very state decision to
authorize a power plant, to mandate the purchase of
renewable energy, or to raise retail rates also affects
supply and demand and, as a result, wholesale prices as
well. In making those decisions, States often have the
same goal that Maryland did here: to spur new
generation. Federal law simply does not itself displace
state actions “target{ing]” the development of generation
even when those actions “affect[]” wholesale prices.
Oneok, Inc. v. Learjet, Inc., 135 S. Ct. 1591, 1599 (2015)
(emphasis omitted).
Precisely because States so often pursue policies that
promote the development of generation, the court of
appeals exempted from its holding “direct subsidies” and
“tax rebates,” which it said “may or may not differ in
® That conclusion is reinforced by the presumption that Congress
did not preempt “the historic police powers of the States” absent
“clear and manifest” indications to the contrary. Medtronic, Inc. v.
Lohr, 518 U.S. 470, 485 (1996). Regulation of electric utilities is
within the States’ traditional police powers. See Pac. Gas & Elec.,
461 U.S. at 205-206.
32
important ways from the Maryland initiative.” Pet. App.
2la But the necessity of that exemption underscores the
flaw in the court’s holding. Traditional state measures to
promote generation are permissible. They do not become
impermissible simply because the State employs con-
tracts for differences instead of some other mechanism.
If a particular contract within FERC’s jurisdiction
amounts to an unreasonable practice (state-sponsored or
not), FERC may of course review it under traditional
standards. And FERC has ample authority to approve
market rules that prevent uneconomic bidding in federal
markets regardless of cause. But Congress afforded that
authority to FERC. Federal courts should not substitute
their authority by invalidating state policies under the
rubric of preemption.
3. Longstanding federal policy buttresses that con-
clusion. The minimum-offer-price rule gives FERC
control over wholesale auction rates without impinging
on States’ abilities to support new generation. See New
England States Comm. on Elec., 142 FERC at 161,488.
That specific accommodation for state-supported
generation demonstrates that federal law does not
preempt state actions that—like the Generation Order—
may affect wholesale prices. See Ark. Elec. Coop. Corp.
v. Ark. Pub. Serv. Comm'n, 461 U.S. 375, 387-388 (1983).
Instead, FERC’s decision to act on price alone spotlights
the line between preempted and permissible state
actions: States may regulate in ways that affect
wholesale prices; they simply cannot purport to regulate
federal markets. FERC, in turn, regulates bidding
behavior in federal markets to ensure federal rates
remain just-and-reasonable nonetheless. FERC’s long-
standing approach is therefore “wholly inconsistent with
33
pre-emption of state regulatory jurisdiction.” Ark. Elec.
Coop., 461 U.S. at 387-388.
Indeed, FERC has steered clear of regulating con-
tracts, like swap agreements, that allow generators to
hedge against fluctuating prices. There is a multi-billion
market for such swaps. Many of those contracts promise
generators a fixed price, transferring the risks (and
benefits) of wholesale price changes to others. Yet
FERC has never suggested that such contracts under-
mine federal markets, much less impro erly “set” whole-
sale rates. It is hard to see why contracts for differences,
which likewise protect generators from price risk, should
be categorically different.
B. State-Sponsored Contracts Do Not Conflict
With Federal Policy
The court below also relied on conflict-preemption
principles. But those principles “must be applied sensi-
tively” to preserve the role that the Federal Power Act
expressly reserves for the States. Nw. Cent. Pipeline,
489 U.S. at 515. Here, that required sensitivity of
application was lacking.
To secure just-and-reasonable wholesale energy
pricing, FERC has imposed market rules designed to
ensure that various forces—including market manip-
ulations and_ state-sponsored contracts—do not
artificially depress prices in federal capacity auctions.
See PJM Interconnection, 137 FERC at 992, 96. But
FERC did not ban state-sponsored contracts. Instead,
recognizing the role of state authority in energy markets,
FERC accommodated the States’ “legitimate * * * policy
objectives.” New England States Comm. on Elec., 142
FERC at 161,488. It did so by directly addressing only
the conduct of—and effects within—federal markets.
See pp. 23-25, supra.
34
The Generation Order does not conflict with that
policy. It is not “impossible” for a generator to comply
with both the Generation Order and participate in
FERC’s auction process. Nw. Cent. Pipeline, 489 U.S. at
516. Rather, the Generation Order contemplates that
parties to the contracts it authorized would participate in
federal auctions. FERC is capable of crafting a policy
that ensures just-and-reasonable rates. State-sponsored
bidders may participate in federal auctions, but only
subject to a minimum-offer-price rule designed to
mitigate the ill-effects of below-cost bids. It defies
common sense to say that federal policy is thwarted by
what it specifically accommodates."
The court below, however, held that the Generation
Order conflicts with federal policy because the resulting
contract provides different incentives than those
provided by federal auctions. Pet. App. 22a-23a. To the
extent the court was concerned that the order might
affect how much new capacity is actually built, the court
overreached. Since the electric energy industry’s advent,
States have “granted or withheld” permission to build
power plants “at the[ir] pleasure.” Pac. Gas & Elec., 461
US. at 205 (quoting Frost v. Corp. Comm’n, 278 U.S. 515,
534 (1929) (Brandeis, J., dissenting)). States can order
utilities to build more power plants. See id. at 205-206.
It cannot be that preemption arises where States follow a
lesser course, using incentives rather than command-
and-control mandates.
Besides, the FPA expressly reserved to the States the
power to set retail rates. See 16 U.S.C. §824(b)(1).
8 An effective minimum-offer-price rule might also deter contracts
that seek to depress auction prices below just-and-reasonable levels.
But that too ensures the integrity of federal markets and fulfills
FERC’s obligation to ensure just-and-reasonable rates.
35
Those rates too send price signals that affect gene ation
development and wholesale markets. See Electric
Energy Market Competition Task Force, Report to
Congress on Competition in Wholesale and Retail
Markets for Electric Energy 45-46 (Apr. 5, 2007). But
States did not lose their traditional power to send price
signals through contracts rather than retail rates.
The court of appeals’ analysis also ignores the critical
role of bilateral contracts. In 2006, 92.8% of energy sales
in PJM’s spot markets reflected, or were conducted to
meet obligations under, bilateral contracts. Hausman,
supra, at 14. Those contract rates are set outside the
federal-auction process—and are often fixed for lengthy
periods. American Public Power Association, supra, at 1;
Teichler & Levitine, supra, at 690-691. Bilateral
contracts thus exhibit the very features (length and fixed
rates) that led the Fourth Circuit to invalidate CPV’s
contracts. Under the Mobile-Sierra doctrine, however,
federal law generally precludes FERC from revising
bilateral contracts absent compelling public need. See
Morgan Stanley Capital Grp. Inc. v. Pub. Util. Dist. No.
1, 554 U.S. 527, 550 (2008). The fact that federal law
allows for a market with price signals set independently
of FERC’s auctions—by private negotiation—belies the
court of appeals’ one-price-to-rule-them-all philosophy.
CONCLUSION
The judgment of the court of appeals should be
reversed.
Respectfully submitted.
ABRAHAM SILVERMAN JEFFREY A. LAMKEN
CORTNEY MADEA Counsel of Record
NRG ENERGY, INC. JAMES A. BARTA
211 Carnegie Center MOLOLAMKEN LLP
Princeton, NJ 08540 The Watergate, Suite 660
600 New Hampshire Ave., NW
Washington, D.C. 20037
(202) 556-2000
jlamken@mololamken.com
Counsel for Amicus Curiae
DECEMBER 2015