la
APPENDIX
STATUTORY PROVISIONS INVOLVED
Section 301 of the Clean Water Act (Title 33
U.S.C. § 1311) provides, in relevant part:
§ 1311. Effluent limitations
(a) Illegality of pollutant discharges except
in compliance with law
Except as in compliance with this section
and sections 1312, 1316, 1317, 1328, 1342, and
1344 of this title, the discharge of any pollut-
ant by any person shall be unlawful.
x AK KK
(e) All point discharge source application
of effluent limitations
Effluent limitations established pursuant
to this section or section 1312 of this title shall
be applied to all point sources of discharge of
pollutants in accordance with the provisions of
this chapter.
eK OK K *K
2a
Section 306(e) of the Clean Water Act (33 U.S.C.
§ 1316(e)), provides:
§ 1316. National standards of perform-
ance
* ek KK €
(e) Illegality of operation of new sources in
violation of applicable standards of perform-
ance
After the effective date of standards of per-
formance promulgated under this section, it
shall be unlawful for any owner or operator of
any new source to operate such source in vio-
lation of any standard of performance applica-
ble to such source.
Section 402 of the Clean Water Act (33 U.S.C.
§ 1342) provides, in relevant part:
§ 1342. National pollutant discharge
elimination system
(a) Permits for discharge of pollutants
(1) Except as provided in sections 1328
and 1344 of this title, the Administrator may,
after opportunity for public hearing, issue a
permit for the discharge of any pollutant, or
combination of pollutants, notwithstanding
section 1311(a) of this title, upon condition
that such discharge will meet either (A) all
applicable requirements under sections 1311,
1312, 1316, 1317, 1318, and 1343 of this title,
or (B) prior to the taking of necessary imple-
menting actions relating to all such require-
ments, such conditions as the Administrator
3a
determines are necessary to carry out the pro-
visions of this chapter.
* KK RK
(k) Compliance with permits
Compliance with a permit issued pursuant
to this section shall be deemed compliance, for
purposes of sections 1319 and 1365 of this ti-
tle, with sections 1311, 1312, 1316, 1317, and
1343 of this title, except any standard imposed
under section 1317 of this title for a toxic pol-
lutant injurious to human health. Until De-
cember 31, 1974, in any case where a permit
for discharge has been applied for pursuant to
this section, but final administrative disposi-
tion of such application has not been made,
such discharge shall not be a violation of (1)
section 1311, 1316, or 1342 of this title, or (2)
section 407 of this title, unless the Adminis-
trator or other plaintiff proves that final ad-
ministrative disposition of such application
has not been made because of the failure of the
applicant to furnish information reasonably
required or requested in order to process the
application. For the 180-day period beginning
on October 18, 1972, in the case of any point
source discharging any pollutant or combina-
tion of pollutants immediately prior to such
date which source is not subject to section 407
of this title, the discharge by such source shall]
not be a violation of this chapter if such a
source applies for a permit for discharge pur-
suant to this section within such 180-day pe-
riod.
* * KK *
4a
Section 404 of the Clean Water Act (33 U.S.C.
§ 1344) provides:
§ 1344. Permits for dredged or fill mate-
rial
(a) Discharge into navigable waters at
specified disposal sites
The Secretary may issue permits, after no-
tice and opportunity for public hearings for the
discharge of dredged or fill material into the
navigable waters at specified disposal sites.
Not later than the fifteenth day after the date
an applicant submits all the information re-
quired to complete an application for a permit
under this subsection, the Secretary shall pub-
lish the notice required by this subsection.
(b) Specification for disposal sites
Subject to subsection (c) of this section,
each such disposal site shall be specified for
each such permit by the Secretary (1) through
the application of guidelines developed by the
Administrator, in conjunction with the Secre-
tary, which guidelines shall be based upon cri-
teria comparable to the criteria applicable to
the territorial seas, the contiguous zone, and
the ocean under section 1343(c) of this title,
and (2) in any case where such guidelines un-
der clause (1) alone would prohibit the specifi-
cation of a site, through the application addi-
tionally of the economic impact of the site on
navigation and anchorage.
(c) Denial or restriction of use of defined
areas as disposal sites
5a
The Administrator is authorized to pro-
hibit the specification (including the with-
drawal of specification) of any defined area as
a disposal site, and he is authorized to deny or
restrict the use of any defined area for specifi-
cation (including the withdrawal of specifica-
tion) as a disposal site, whenever he deter-
mines, after notice and opportunity for public
hearings, that the discharge of such matcrials
into such area will have an unacceptable ad-
verse effect on municipal water supplies, shell-
fish beds and fishery areas (including spawn-
ing and breeding areas), wildlife, or recrea-
tional areas. Before making such determina-
tion, the Administrator shall consult with the
Secretary. The Administrator shall set forth in
writing and make public his findings and his
reasons for making any determination under
this subsection.
(d) “Secretary” defined
The term “Secretary” as used in this sec-
tion means the Secretary of the Army, acting
through the Chief of Engineers.
(e) General permits on State, regional, or
nationwide basis
(1) In carrying out his functions relat-
ing to the discharge of dredged or fill mate-
rial under this section, the Secretary may,
after notice and opportunity for public
hearing, issue general permits on a State,
regional, or nationwide basis for any cate-
gory of activities involving discharges of
dredged or fill material if the Secretary de-
termines that the activities in such cate-
gory are similar in nature, will cause only
6a
minimal adverse environmental effects
when performed separately, and will have
only minimal cumulative adverse effect on
the environment. Any general permit is-
sued under this subsection shall (A) be
based on the guidelines described in sub-
section (b)(1) of this section, and (B) set
forth the requirements and standards
which shall apply to any activity author-
ized by such general permit.
(2) No general permit issued under this
subsection shall be for a period of more
than five years after the date of its issu-
ance and such general permit may be re-
voked or modified by the Secretary if, after
opportunity for public hearing, the Secre-
tary determines that the activities author-
ized by such general permit have an ad-
verse impact on the environment or such
activities are more appropriately author-
ized by individual permits.
(f) Non-prohibited discharge of dredged or
fill material
(1) Except as provided in paragraph (2)
of this subsection, the discharge of dredged
or fill material—
(A) from normal farming, silvicul-
ture, and ranching activities such as
plowing, seeding, cultivating, minor
drainage, harvesting for the production
of food, fiber, and forest products, or up-
land soil and water conservation prac-
tices;
7a
(B) for the purpose of maintenance,
including emergency reconstruction of
recently damaged parts, of currently
serviceable structures such as dikes,
dams, levees, groins, riprap, breakwa-
ters, causeways, and bridge abutments
or approaches, and_ transportation
structures;
(C) for the purpose of construction
or maintenance of farm or stock ponds
or irrigation ditches, or the mainte-
nance of drainage ditches;
(D) for the purpose of construction
of temporary sedimentation basins on a
construction site which does not include
placement of fill material into the navi-
gable waters;
(E) for the purpose of construction
or maintenance of farm roads or forest
roads, or temporary roads for moving
mining equipment, where such roads
are constructed and maintained, in ac-
cordance with best management prac-
tices, to assure that flow and circulation
patterns and chemical and biological
characteristics of the navigable waters
are not impaired, that the reach of the
navigable waters is not reduced, and
that any adverse effect on the aquatic
environment will be otherwise mini-
mized;
(F) resulting from any activity with
respect to which a State has an ap-
proved program under section
1288(b)(4) of this title which meets the
8a
requirements of subparagraphs (B) and
(C) of such section, is not prohibited by
or otherwise subject to regulation under
this section or section 1311(a) or 1342 of
this title (except for effluent standards
or prohibitions under section 1317 of
this title).
(2) Any discharge of dredged or fill ma-
terial into the navigable waters incidental
to any activity having as its purpose bring-
ing an area of the navigable waters into a
use to which it was not previously subject,
where the flow or circulation of navigable
waters may be impaired or the reach of
such waters be reduced, shall be required
to have a permit under this section.
(g) State administration
(1) The Governor of any State desiring
to administer its own individual and gen-
eral permit program for the discharge of
dredged or fill material into the navigable
waters (other than those waters which are
presently used, or are susceptible to use in
their natural condition or by reasonable
improvement as a means to transport in-
terstate or foreign commerce shoreward to
their ordinary high water mark, including
all waters which are subject to the ebb and
flow of the tide shoreward to their mean
high water mark, or mean higher high wa-
ter mark on the west coast, including wet-
lands adjacent thereto) within its jurisdic-
tion may submit to the Administrator a full
and complete description of the program it
proposes to establish and administer under
9a
State law or under an interstate compact.
In addition, such State shall submit a
statement from the attorney general (or the
attorney for those State agencies which
have independent legal counsel), or from
the chief legal officer in the case of an in-
terstate agency, that the laws of such
State, or the interstate compact, as the
case may be, provide adequate authority to
carry out the described program.
(2) Not later than the tenth day after
the date of the receipt of the program and
statement submitted by any State under
paragraph (1) of this subsection, the Ad-
ministrator shall provide copies of such
program and statement to the Secretary
and the Secretary of the Interior, acting
through the Director of the United States
Fish and Wildlife Service.
(3) Not later than the ninetieth day af-
ter the date of the receipt by the Adminis-
trator of the program and statement sub-
mitted by any State, under paragraph (1) of
this subsection, the Secretary and the Sec-
retary of the Interior, acting through the
Director of the United States Fish and
Wildlife Service, shall submit any com-
ments with respect to such program and
statement to the Administrator in writing.
(h) Determination of State’s authority to
issue permits under State program; approval;
notification; transfers to State program
(1) Not later than the one-hundred-
twentieth day after the date of the receipt
by the Administrator of a program and
10a
statement submitted by any State under
paragraph (1) of this subsection, the Ad-
ministrator shall determine, taking into
account any comments submitted by the
Secretary and the Secretary of the Interior,
acting through the Director of the United
States Fish and Wildlife Service, pursuant
to subsection (g) of this ‘section, whether
such State has the following authority with
respect to the issuance of permits pursuant
to such program:
(A) To issue permits which—
(i) apply, and assure compliance
with, any applicabie requirements of
this section, including, but not lim-
ited to, the guidelines established
under subsection (b)(1) of this sec-
tion, and sections 1317 and 1343 of
this title;
(ii) are for fixed terms not ex-
ceeding five years; and
(iii) can be terminated or modi-
fied for cause including, but not lim-
ited to, the following:
(I) violation of any condition
of the permit;
(11) obtaining a permit by
misrepresentation, or failure to
disclose fully all relevant facts;
(III) change in any condition
that requires either a temporary
or permanent reduction or elimi-
lla
nation of the permitted dis-
charge.
(B) To issue permits which apply,
and assure compliance with, all appli-
cable requirements of section 1318 of
this title, or to inspect, monitor, enter,
and require reports to at least the same
extent as required in section 1318 of
this title.
(C) To assure that the public, and
any other State the waters of which
may be affected, receive notice of each
application for a permit and to provide
an opportunity for public hearing before
a ruling on each such application.
(D) To assure that the Administra-
tor receives notice of each application
(including a copy thereof) for a permit.
(E) To assure that any State (other
than the permitting State), whose wa-
ters may be affected by the issuance of a
permit may submit written recommen-
dations to the permitting State (and the
Administrator) with respect to any
permit application and, if any part of
such written recommendations are not
accepted by the permitting State, that
the permitting State will notify such af-
fected State (and the Administrator) in
writing of its failure to so accept such
recommendations together with its rea-
sons for so doing.
(F) To assure that no permit will be
issued if, in the judgment of the Secre-
12a
tary, after consultation with the Secre-
tary of the department in which the
Coast Guard is operating, anchorage
and navigation of any of the navigable
waters would be substantially impaired
thereby.
(G) To abate violations of the permit
or the permit program, including civil
and criminal penalties and other ways
and means of enforcement.
(H) To assure continued coordina-
tion with Federal and Federal-State wa-
ter-related planning and review proc-
esses.
(2) If, with respect to a State program
submitted under subsection (g)(1) of this
section, the Administrator determines that
such State—
(A) has the authority set forth in
paragraph (1) of this subsection, the
Administrator shall approve the pro-
gram and so notify (i) such State and (ii)
the Secretary, who upon subsequent no-
tification from such State that it is ad-
ministering such program, shall sus-
pend the issuance of permits under sub-
sections (a) and (e) of this section for ac-
tivities with respect to which a permit
may be issued pursuant to such State
program; or
(B) does not have the authority set
forth in paragraph (1) of this subsection,
the Administrator shall so notify such
State, which notification shall also de-
l3a
scribe the revisions or modifications
necessary so that such State may re-
submit such program for a determina-
tion by the Administrator under this
subsection.
(3) If the Administrator fails to make a
determination with respect to any program
submitted by a State under subsection
(g1) of this section within one-hundred-
twenty days after the date of the receipt of
such program, such program shall be
deemed approved pursuant to paragraph
(2)(A) of this subsection and the Adminis-
trator shali so notify such State and the
Secretary who, upon subsequent notifica-
tion from such State that it is administer-
ing such program, shall suspend the issu-
ance of permits under subsection (a) and (e)
of this section for activities with respect to
which a permit may be issued by such
State.
(4) After the Secretary receives notifi-
cation from the Administrator under para-
graph (2) or (3) of this subsection that a
State permit program has been approved,
the Secretary shall transfer any applica-
tions for permits pending before the Secre-
tary for activities with respect to which a
permit may be issued pursuant to such
State program to such State for appropri-
ate action.
(5) Upon notification from a State with
a permit program approved under this sub-
section that such State intends to adminis-
ter and enforce the terms and conditions of
l4a
a general permit issued by the Secretary
under subsection (e) of this section with re-
spect to activities in such State to which
such general permit applies, the Secretary
shall suspend the administration and en-
forcement of such general permit with re-
spect to such activities.
(i) Withdrawal of approval
Whenever the Administrator determines
after public hearing that a State is not admin-
istering a program approved under subsection
(h)(2)A) of this section, in accordance with
this section, including, but not limited to, the
guidelines established under subsection (b)(1)
of this section, the Administrator shall so no-
tify the State, and, if appropriate corrective
action is not taken within a reasonable time,
not to exceed ninety days after the date of the
receipt of such notification, the Administrator
shall (1) withdraw approval of such program
until the Administrator determines such cor-
rective action has been taken, and (2) notify
the Secretary that the Secretary shall resume
the program for the issuance of permits under
subsections (a) and (e) of this section for ac-
tivities with respect to which the State was is-
suing permits and that such authority of the
Secretary shall continue in effect until such
time as the Administrator makes the determi-
nation described in clause (1) of this subsec-
tion and such State again has an approved
program.
(j) Copies of applications for State permits
and proposed general permits to be transmit-
ted to Administrator
l5a
Each State which is administering a per-
mit program pursuant to this section shall
transmit to the Administrator (1) a copy of
each permit application received by such State
and provide notice to the Administrator of
every action related to the consideration of
such permit application, including each permit
proposed to be issued by such State, and (2) a
copy of each proposed general permit which
such State intends to issue. Not later than the
tenth day after the date of the receipt of such
permit application or such proposed gencral
permit, the Administrator shall provide copies
of such permit application or such proposed
general permit to the Secretary and the Secre-
tary of the Interior, acting through the Direc-
tor of the United States Fish and Wildlife Ser-
vice. If the Administrator intends to provide
written comments to such State with respect
to such permit application or such proposed
general permit, he shall so notify such State
not later than the thirtieth day after the date
of the receipt of such application or such pro-
posed general permit and provide such written
comments to such State, after consideration of
any comments made in writing with respect to
such application or such proposed general
permit by the Secretary and the Secretary of
the Interior, acting through the Director of the
United States Fish and Wildlife Service, not
later than the ninetieth day after the date of
such receipt. If such State is so notified by the
Administrator, it shall not issue the proposed
permit until after the receipt of such com-
ments from the Administrator, or after such
ninetieth day, whichever first occurs. Such
16a
State shall not issue‘such proposed permit af-
ter such ninetieth day if it has received such
written comments in which the Administrator
objects (A) to the issuance of such proposed
permit and such proposed permit is one that
has been submitted to the Administrator pur-
suant to subsection (h)(1)(E) of this section, or
(B) to the issuance of such proposed permit as
being outside the requirements of this section,
including, but not limited to, the guidelines
developed under subsection (b)(1) of this sec-
tion unless it modifies such proposed permit in
accordance with such comments. Whenever
the Administrator objects to the issuance of a
permit under the preceding sentence such
written objection shall contain a statement of
the reasons for such objection and the condi-
tions which such permit would include if it
were issued by the Administrator. In any case
where the Administrator objects to the issu-
ance of a permit, on request of the State, a
public hearing shall be held by the Adminis-
trator on such objection. If the State does not
resubmit such permit revised to meet such ob-
jection within 30 days after completion of the
hearing or, if no hearing is requested within
90 days after the date of such objection, the
Secretary may issue the permit pursuant to
subsection (a) or (e) of this section, as the case
may be, for such source in accordance with the
guidelines and requirements of this chapter.
(k) Waiver
In accordance with guidelines promul-
gated pursuant to subsection (i)(2) of section
1314 of this title, the Administrator is author-
17a
ized to waive the requirements of subsection
(j) of this section at the time of the approval of
a program pursuant to subsection (h)(Z)(A) of
this section for any category (including any
class, type, or size within such category) of
discharge within the State submitting such
program.
(1) Categories of discharges not subject to
requirements
The Administrator shall promulgate regu-
lations establishing categories of discharges
which he determines shall not be subject to
the requirements of subsection (j) of this sec-
tion in any State with a program approved
pursuant to subsection (h)(2)(A) of this section.
The Administrator may distinguish among
classes, types, and sizes within any category of
discharges.
(m) Comments on permit applications or
proposed general permits by Secretary of the
Interior acting through Director of United
States Fish and Wildlife Service
Not later than the ninetieth day after the
date on which the Secretary notifies the Secre-
tary of the Interior, acting through the Direc-
tor of the United States Fish and Wildlife Ser-
vice that (1) an application for a permit under
subsection (a) of this section has been received
by the Secretary, or (2) the Secretary proposes
to issue a general permit under subsection (e)
of this section, the Secretary of the Interior,
acting through the Director of the United
States Fish and Wildlife Service, shall submit
any comments with respect to such application
18a
or such proposed general permit in writing to
the Secretary.
(n) Enforcement authority not limited
Nothing in this section shall be construed
to limit the authority of the Administrator to
take action pursuant to section 1319 of this ti-
tle.
(o) Public availability of permits and per-
mit applications
A copy of each permit application and each
permit issued under this section shall be
available to the public. Such permit applica-
tion or portion thereof, shall further be avail-
able on request for the purpose of reproduc-
tion.
(p) Compliance
Compliance with a permit issued pursuant
to this section, including any activity carried
out pursuant to a general permit issued under
this section, shall be deemed compliance, for
purposes of sections 1319 and 1365 of this ti-
tle, with sections 1311, 1317, and 1343 of this
title.
(q) Minimization of duplication, needless
paperwork, and delays in issuance; agree-
ments
Not later than the one-hundred-eightieth
day after December 27, 1977, the Secretary
shall enter into agreements with the Adminis-
trator, the Secretaries of the Departments of
Agriculture, Commerce, Interior, and Trans-
portation, and the heads of other appropriate
Federal agencies to minimize, to the maximum
19a
extent practicable, duplication, needless pa-
perwork, and delays in the issuance of permits
under this section. Such agreements shall be
developed to assure that, to the maximum ex-
tent practicable, a decision with respect to an
application for a permit under subsection (a) of
this section will be made not later than the
ninetieth day after the date the notice for such
application is published under subsection (a)
of this section.
(r) Federal projects specifically authorized
by Congress
The discharge of dredged or fill material as
part of the construction of a Federal project
specifically authorized by Congress, whether
prior to or on or after December 27, 1977, is
not prohibited by or otherwise subject to regu-
lation under this section, or a State program
approved under this section, or section 1311(a)
or 1342 of this title (except for effluent stan-
dards or prohibitions under section 1317 of
this title), if information on the effects of such
discharge, including consideration of the
guidelines developed under subsection (b)(1) of
this section, is included in an environmental
impact statement for such project pursuant to
the National Environmental Policy Act of 1969
[42 U.S.C.A. § 4321 et seq.] and such environ-
mental impact statement has been submitted
to Congress before the actual discharge of
dredged or fill material in connection with the
construction of such project and prior to either
authorization of such project or an appropria-
tion of funds for such construction.
(s) Violation of permits
20a
(1) Whenever on the basis of any in-
formation available to him the Secretary
finds that any person is in violation of any
condition or limitation set forth in a permit
issued by the Secretary under this section,
the Secretary shall issue an order requiring
such person to comply with such condition
or limitation, or the Secretary shall bring a
civil action in accordance with paragraph
(3) of this subsection.
(2) A copy of any order issued under
this subsection shall be sent immediately
by the Secretary to the State in which the
violation occurs and other affected States.
Any order issued under this subsection
shall be by personal service and shall state
with reasonable specificity the nature of
the violation, specify a time for compliance,
not to exceed thirty days, which the Secre-
tary determines is reasonable, taking into
account the seriousness of the violation and
any good faith efforts to comply with appli-
cable requirements. In any case in which
an order under this subsection is issued to
a corporation, a copy of such order shall be
served on any appropriate corporate offi-
cers.
(3) The Secretary is authorized to com-
mence a civil action for appropriate relief,
including a permanent or temporary in-
junction for any violation for which he is
authorized to issue a compliance order un-
der paragraph (1) of this subsection. Any
action under this paragraph may be
brought in the district court of the United
2la
States for the district in which the defen-
dant is located or resides or is doing busi-
ness, and such court shall have jurisdiction
to restrain such violation and to require
compliance. Notice of the commencement of
such acton! shall be given immediately to
the appropriate State.
(4) Any person who violates any condi-
tion or limitation in a permit issued by the
Secretary under this section, and any per-
son who violates any order issued by the
Secretary under paragraph (1) of this sub-
section, shall be subject to a civil penalty
not to exceed $25,000 per day for each vio-
lation. In determining the amount of a civil
penalty the court shall consider the seri-
ousness of the violation or violations, the
economic benefit (if any) resulting from the
violation, any history of such violations,
any gouod-faith efforts to comply with the
applicable requirements, the economic im-
pact of the penalty on the violator, and
such other matters as justice may require.
(t) Navigable waters within State jurisdic-
tion
Nothing in this section shall preclude or
deny the right of any State or interstate
agency to control the discharge of dredged or
fill material in any portion of the navigable
waters within the jurisdiction of such State,
including any activity of any Federal agency,
and each such agency shall comply with such
1 So in original. Probably should be “action.”
22a
State or interstate requirements both substan-
tive and procedural to control the discharge of
dredged or fill material to the same extent
that any person is subject to such require-
ments. This section shall not be construed as
affecting or impairing the authority of the Sec-
retary to maintain navigation.
REGULATIONS INVOLVED
33 C.F.R. § 323.2 provides, in relevant part:
§ 323.2 Definitions.
For the purpose of this part, the following
terms are defined:
Kk KK *
(eX1) Except as specified in paragraph
(e\(3) of this section, the term fill material
means material placed in waters of the United
States where the material has the effect of:
(i) Replacing any portion of a water
of the United States with dry land; or
(ii) Changing the bottom elevation
of any portion of a water of the United
States.
(2) Examples of such fill material in-
clude, but are not limited to: rock, sand,
soil, clay, plastics, construction debris,
wood chips, overburden from mining or
other excavation activities, and materials
used to create any structure or infrastruc-
ture in the waters of the United States.
(3) The term fill material does not in-
clude trash or garbage.
23a
(f) The term discharge of fill material
means the addition of fill material into waters
of the United States. The term generally in-
cludes, without limitation, the following activi-
ties: Placement of fill that is necessary for the
construction of any structure or infrastructure
in a water of the United States; the building of
any structure, infrastructure, or impoundment
requiring rock, sand, dirt, or other material for
its construction; site-development fills for rec-
reational, industrial, commercial, residential,
or other uses; causeways or road fills; dams
and dikes; artificial islands; property protec-
tion and/or reclamation devices such as riprap,
groins, seawalls, breakwaters, and _ revet-
ments; beach nourishment; levees; fill for
structures such as sewage treatment facilities,
intake and outfall pipes associated with power
plants and subaqueous utility lines; placement
of fill material for construction or maintenance
of any liner, berm, or other infrastructure as-
sociated with solid waste landfills; placement
of overburden, slurry, or tailings or similar
mining-related materials; and artificial reefs.
The term does not include plowing, cultivat-
ing, seeding and harvesting for the production
of food, fiber, and forest products (See § 323.4
for the definition of these terms). See §
323.3(c) concerning the regulation of the
placement of pilings in waters of the United
States.
24a
40 C.F.R. § 122.3 provides, in relevant part:
§ 122.3 Exclusions.
The following discharges do not require
NPDES permits:
* kK K *
(b) Discharges of dredged or fill material
into waters of the United States which are
regulated under section 404 of CWA.
x**AK K
40 C.F.R. § 232.2 provides, in relevant part:
§ 232.2 Definitions.
Ae KK
Discharge of fill material. (1) The term
discharge of fill material means the addition of
fill material into waters of the United States.
The term generally includes, without limita-
tion, the following activities: Placement of fill
that is necessary for the construction of any
structure or infrastructure in a water of the
United States; the building of any structure,
infrastructure, or impoundment requiring
rock, sand, dirt, or other material for its con-
struction; site-development fills for recrea-
tional, industrial, commercial, residential, or
other uses; causeways or road fills; dams and
dikes; artificial islands; property protection
and/or reclamation devices such as riprap,
groins, seawalls, breakwaters, and _ revet-
ments; beach nourishment; levees; fill for
structures such as sewage treatment facilities,
intake and outfall pipes associated with power
plants and subaqueous utility lines; placement
25a
of fill material for construction or maintenance
of any liner, berm, or other infrastructure as-
sociated with solid waste landfills; placement
of overburden, slurry, or tailings or similar
mining-related materials; ... and artificial
reefs.
KA AK K *K
Fill material. (1) Except as specified in
paragraph (3) of this definition, the term fill
material means material placed in waters of
the United States where the material has the
effect of:
(i) Replacing any portion of a water of
the United States with dry land; or
(ii) Changing the bottom elevation of
any portion of a water of the United States.
(2) Examples of such fill material include,
but are not limited to: rock, sand, soil, clay,
plastics, construction debris, wood chips, over-
burden from mining or other excavation activi-
ties, and materials used to create any struc-
ture or infrastructure in the waters of the
United States.
(3) The term fill material does not include
trash or garbage.
xe KK *
40 C.F.R. § 401.11 provides, in relevant part:
§ 401.11 General definitions.
** * * *
For the purposes of Parts 402 through 699
of this subchapter:
26a
* Kk KK +
—a —_
(i) The term effluent limitation means any
restriction established by the Administrator
on quantities, rates, and concentrations of
chemical, physical, biological and other con-
stituents which are discharged from point
sources, other than new sources, into naviga-
ble waters, the waters of the contiguous zone
or the ocean.
* KK OK
40 C.F.R. § 434.10 provides, in relevant part:
§ 434.10 Applicability.
This part applies to discharges from any
coal mine at which the extraction of coal is
taking place or is planned to be undertaken
and to coal preparation plants and associated
areas.
40 C.F.R. § 440.102 provides, in relevant part:
§ 440.102 Effluent limitations repre-
senting the degree of effluent reduction
attainable by the application of the best
practicable control technology (BPT).
KKK HK
Except as provided in subpart L of this
part and 40 CFR 125.30 through 125.32, any
existing point source subject to this subpart
must achieve the following effluent limitations
representing the degree of effluent reduction
attainable by the application of the best prac-
ticable control technology currently available
(BPT):
27a
(a) The concentration of pollutants dis-
charged in mine drainage from mines oper-
ated to obtain copper bearing ores, lead
bearing ores, zinc bearing ores, gold bear-
ing ores, or silver bearing ores, or any com-
bination of these ores open-pit or under-
ground operations other than placer depos-
its shall not exceed:
Effluent limitations
Average of daily
Maximum for
values for 30 con-
Effiuent characteristic
a tanted | secutive days
/ Milligrams per liter
FEO vccccovccccccccccccosces 30 20
CU ccccccccccccscccccccsoses .30 15
BD coccccvccccscocccccoccces 1.5 75
FD coccccsccccocccessccesece 6 3
BED coccccccccccsccccceconces 002 .001
WT canniiisiitiiilibanasnaiadia (*) (*)
' Within the range 6.0 to 9.0.
* * * K
40 C.F.R. § 440.104 provides, in relevant part:
§ 440.104 New source performance
standards (NSPS).
Except as provided in Subpart L of this
part any new source subject to this subsection
must achieve the following NSPS representing
the degree of effluent reduction attainable by
28a
the application of the best available demon-
strated technology (BADT):
Ke KK
(b)(1) Except as provided in paragraph (b)
of this section, there shall be no discharge of
process wastewater to navigable waters from
mills that use the froth-flotation process alone,
or in conjunction with other processes, for the
beneficiation of copper, lead, zinc, gold, silver,
or molybdenum ores or any combination of
these ores. The Agency recognizes that the
elimination of the discharge of pollutants to
navigable waters may result in an increase in
discharges of some pollutants to other media.
The Agency has considered these impacts and
has addressed them in the preamble published
on December 3, 1982.
(2)(i) In the event that the annual pre-
cipitation falling on the treatment facility
and the drainage area contributing surface
runoff to the treatment facility exceeds the
annual evaporation, a volume of water
equal to the difference between annual pre-
cipitation falling on the treatment facility
and the drainage area contributing surface
runoff to the treatment facility and annual
evaporation may be discharged subject to
the limitations set forth in paragraph (a) of
this section.
(ii) In the event there is a build up of
contaminants in the recycle water which
significantly interferes with the ore recov-
ery process and this interference can not be
eliminated through appropriate treatment
of the recycle water, the permitting author-
29a
ity may allow a discharge of process
wastewater in an amount necessary to cor-
rect the interference problem after installa-
tion of appropriate treatment. This dis-
charge shall be subject to the limitations of
paragraph (a) of this section. The facility
shall have the burden of demonstrating to
the permitting authority that the discharge
is necessary to eliminate interference in
the ore recovery process and that the inter-
ference could not be eliminated through
appropriate treatment of the recycle water.