Petition for Writ of Certiorari — South Florida Water Management District v. Miccosukee Tribe of Indians
Supreme Court brief2003
Ask Donna
What actually matters in this document.
Text
a Supreme Court, us
fy | FILED
No. 02 626 OCT > | 2u02
In The
Supreme Court of the Gnited States
¢
SOUTH FLORIDA WATER MANAGEMENT DISTRICT,
Petitioner,
v.
MICCOSUKEE TRIBE OF INDIANS, et ai.,
Respondents.
.
On Petition For A Writ Of Certiorari
To The United States Court Of Appeals
For The Eleventh Circuit
¢
PETITION FOR A WRIT OF CERTIORARI
¢
TIMOTHY S. BISHOP JAMES EDWARD NUTT
MAYER, BROWN, ROWE Counsel of Record
& PLATT SOUTH FLORIDA WATER
190 South LaSalle Street MANAGEMENT DISTRICT
Chicago, IL 60603 3301 Gun Club Road
(312) 701-7829 West Palm Beach, FL 33406
JouN J. FUMERO (561) 682-6253
SHERYL GRIMM WooD Counsel for Petitioner
Scott ALLEN GLAZIER
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT
3301 Gun Club Road
West Palm Beach, FL 33406
(561) 682-6262
QUESTIONS PRESENTED
The South Florida Water Management District
(SFWMD) is the governmental agency that manages an
extensive system of levees and canals throughout populous
south Florida and the Everglades region. For decades it
has pumped public waters to prevent catastrophic flooding
and allocate water supply. For thirty years, the federal and
state agencies responsible for the Clean Water Act’s
National Pollutant Discharge Elimination System
(NPDES) program have considered the SFWMD’s move- —
ment of water to fall outside the scope of the federal
NPDES permit program because nothing is “added” to the
navigable waters from the pumps. The Eleventh Circuit,
in conflict with decisions from other courts of appeals and
without deference to the agencies, concluded that because
the pumped water contains some pollutants that would
not reach the receiving water “but for” the pumping, such
pumping alone constitutes an “addition” of pollutants
requiring an NPDES permit.
The questions presented, which are of great national
importance, are:
1. Whether the pumping of water by a state water
management agency that adds nothing to the water
being pumped constitutes an “addition” of a pollutant
“from” a point source triggering the need for a Na-
tional Pollutant Discharge Elimination System permit
under the Clean Water Act.
2. Whether the court below should have deferred to the
consistent and long-held federal and state agency po-
sition that the SFWMD’s pumping does not constitute
an “addition” that requires a National Pollutant Dis-
charge Elimination System permit.
ii
RULES 29.6 AND 14.1 STATEMENT
Petitioner, South Florida Water Management District, is a
governmental entity of the State of Florida created by
Section 373.069(e), Florida Statutes.
Respondents are the Miccosukee Tribe of Indians of
Florida, a federally recognized Indian tribe, and the
Friends of the Everglades, Inc., a non-profit Florida
corporation.
ili
TABLE OF CONTENTS
Page
QUESTIONS PRESENTED .........................c0ccsseeeeees i
RULES 29.6 AND 14.1 STATEMENT....................... ii
, | Foe Fin, 0 5) ere vi
na rrreecsagennegmnsnnocns 1
creer rrnrrpmnnnenenencnanesonent l
STATUTORY AND REGULATORY PROVISIONS
a ar aterennsennnsnuscasoees l
I, sresmenmuonetes 1
A. The Statutory And Regulatory Scheme... 5
1. Basic Elements Of The Federal
TTI sncccessnssnnssusessssoceseeeee 5
2. State Regulation Of Pollution Caused
By Hydrographic Modifications.......... 6
3. Delegation Of NPDES Administration .-
te renennssansensens 8
B. SFWMD And Its Water Control Facilities.. 8
C. Regulatory Oversight And mamas Of
The S-9 Pump Station ......................0..00 10
D. Respondents’ Citizen Suit Challenge To
The S-9 And The District Courts Ruling. 12
E. The Eleventh Circuit's Decision .............. 13
REASONS FOR GRANTING THE PETITION ......... 14
I. THE COURTS OF APPEALS ARE IN CON-
FLICT AS TO THE APPLICABILITY OF THE
NPDES PROGRAM TO THE MOVEMENT OF
WATER CONTAINING PRE-EXISTING POL-
saan rererencenmepnnnsnsasusceee 14
nj:seabeeecmeameaasianeasciamaaamaataaeaa it aii ee
Il.
iv
TABLE OF CONTENTS - Continued
gg RETIRES, SEN ee 16
C. The Conflict Is Deep And Should Be Im-
mediately Resolved....................cccccceeeeeeee 17
THE ELEVENTH CIRCUIT ERRED IN FIND-
ING THE MOVEMENT OF WATER TO BE AN
ADDITION OF POLLUTANTS FROM A POINT
SOURCE SUBJECT TO THE NPDBEG............... 18
A. The Plain Language Of The CWA
Requires The Point Of Discharge To Be
ESR Oe Be dc 18
B. The NPDES Program Was Intended To
Regulate Only Those Point Sources From
Which Pollutants Originate..................... 20
C. State Non-NPDES Programs Are The
Appropriate Mechanism Under The CWA
To Regulate State Water Management
ree xnasticcemmbcnintiniannantiniinesnteaaasiemmeen 21
THE COURT ERRED IN FAILING TO GIVE
ANY CONSIDERATION, MUCH LESS DEF-
ERENCE, TO THE CONSISTENT AND LONG-
STANDING POSITION OF THE RESPON-
SIBLE FEDERAL AND STATE AGENCIES
GIVEN THE COOPERATIVE FEDERALISM
INTENDED BY THE CWA’S STATUTORY
ae nccnssnssnecesoemenmsnsesmsnenecsinesiinsnnsitibiaitistioses 24
v
TABLE OF CONTENTS -— Continued
Page
A. The Eleventh Circuit Rejected EPA's
Position On Improper Grounds..........-..--.
B. Under The CWA’s Statutory Scheme,
Deference To The Implementing State
26
27
D
IV. THE PETITION SHOULD BE GRANTED,
NOT HELD, FOR BORDEN RANCH V. U.S.
ARMY CORPS OF ENGINEERS ...........-.--.-.- 29
CONCLUSION .........---:ssceceeeeeeeennenennnnnnnnnennnnsnnnsnncenees
vi
TABLE OF AUTHORITIES
Page
CASES:
American Meat Inst. v. EPA, 526 F.2d 442 (7th Cir.
Sia hnasannencennguetnenmpinpenemnseabidtimniaiindiieusindeinmisuensiments 25
Appalachian Power Co. v. Train, 545 F.2d 1351 (4th
Sy Satie iicnintetcicenrinnitaniaddiminnnsnipentnmmme 3, 13, 15, 20
Arkansas v. Oklahoma EPA, 503 U.S. 91 (1992)....... 4, 5, 27
AT&T Corp. v. lowa Utilities Bd., 525 U.S. 366
EI inicrasersennaiiensieteinanaiintainniatiamaiaiupeatietuptetemmmeniiesiial 27
Attorney's Liability Assurance Society, Inc. uv.
Fitzgerald, 174 F. Supp.2d 619 (W.D. Mich. 2001)........ 28
Bellsouth Telecommunications, Inc. v. MCI Metro
Access Trans. Ser., Inc. 97 F. Supp.2d 1363 (N.D.
Bs I cincricicsiniaetiiin amnesia reneraiideateataininiriaitidiicinnieaainiaae! 27
Borden Ranch v. United States, No. 01-1243 (2002) ...29, 30
Catskill Mountains Chapter of Trout Unlimited,
Inc. v. City of New York, 273 F.3d 481 (2nd Cir.
TTIETIEcinssinnitetiaraiientsieasnsdammaiantghitisiasssisapeuainbitiisinasiniiniindieniasiie 3, 14, 16, 17
Dubois v. U.S. Dep't of Ag., 102 F.3d 1273 (1st Cir.
IED cnscescanessussecessensssnenssnavessnansssveseemsensesens 3, 13, 14, 16, 17
EI. du Pont de Nemours and Co. v. Train, 430 U.S.
EEE ee en ee ee eee 25
Environmental Protection Agency v. California ex
rel State Water Resources Control Bd., 426 U.S.
ee ne reer ere eae ne 22
Florida Wildlife Federation v. SFWMD, Case No.
02-809 18-Civ-Middlebrooks (S.D. Fla.) ....................0.... 4
Friends of Everglades v. SFWMD, Case No. 02-
80309-Civ-Middlebrooks (S.D. Fla.) ..............ccccccccccceeeeee 4
Vii
TABLE OF AUTHORITIES — Continued
Page
Froebel v. Meyer, 13 F. Supp.2d 843 (E.D. Wis.
I hsiapneieapmnierenaesie satin temataemanaatatiieasaiataaniatatigmiemaiatamaataneenell 29
GTE South Inc. v. Morrision, 199 F.2d 733 (4th Cir.
STITT ns cheesieadanstiehdhdaeinmaaenmentetasieap tae ites denaeniainbiellitaldiieehicimttattiahictiinasl 27
International Paper Co. v. Ouellette, 479 U.S. 481
II cniseseuntdidtnatetmmninapabdetneieiguieeiiieaueimnenemecaueienl 5, 27
Miccosukee Tribe v. South Florida Water Manage-
ment District, 721 So. 2d 389 (Fla. 3d Dist. Ct.
FD, Fi crunenennsnrmnntaptntnmemnsenaiteitonmmpranianinineenennaties 12
National Wildlife Federation v. Consumers Power
Company, 862 F.2d 580 (6th Cir. 1988).................. passim
National Wildlife Federation v. Gorsuch, Admin.,
U.S. Environmental Protection Agency, 693 F.2d
CK eee passim
Owasso Independent School Dist. v. Falvo, 534 US.
(PTT hcirsstininsssiemnssitiitesiaiitianephpeeminindeniiiiiutiiniatninteedemnnrniental 28
Perry v. Downling, 95 F.3d 231 (2d Cir. 1996)................... 27
P.FZ. Properties, Inc. v. Train, 393 F. Supp. 1370
SI: IEEE ndtsnastntnseiasenecananesitaietiitaiivasieitenitiliaeasttaaiimenelaiell 20
Skidmore v. Swift & Co., 323 U.S. 134 (1944)............. 24, 25
Train v. NRDC, 421 U.S. 60 (1975) .......0.-s0+sseesssessseeeneeeenes 25
United States v. M.C.C. of Fla., Inc., 772 F.2d 1501
SETI TUTTI csscciihdnnssieniabeiaheni peat ieaeniiitghitiemasinimamenaite 30
United States v. Mead, 533 U.S. 218 (2001)................. 24, 25
United States v. South Florida Water Management
District, 28 F.3d 1563 (11th Cir. 1994)...000000000 ee. 11
United States v. South Florida Water Management
District, 847 F. Supp. 1567 (S.D. Fila. 1992).................. 11
Viii
TABLE OF AUTHORITIES - Continued
Page
United States v. South Florida Water Management
District, Case No. 88-1886-Civ-Hoeveler (U.S.
es a NITE TUN ieidcreitietesiceindiiiinilasidaiaiasiiaittin eat 11
United States v. Sinclair Oil Co., 767 F. Supp. 200
EDs SINIUTEIE cissecpccieieicsintinnesateientnentntinsasiesininiiallenitesinithidaniastisinasten 30
US West Communications Inc. v. Public Serv.
Comm of Utah, 75 F. Supp.2d 1284 (D. Utah
iia hitrrinsivsticenssennncusinmssguenniimeanppinnindaauendanisitunincciammpemnent 27
STATUTES & REGULATIONS:
ee ae IE silhiiseistictinincenesnitsinneciiintesetinuibaiinieniauaiiadaesiibisinnn 1
aa ir ee crsdiniesticteibcencoenaiineniecisiaicincapatecitahientaitiineniatsiaenigiiaiiiaie 20
a ccs icirsinncinttinesniniaitedininacina beetle 20
es Oe EE crcsiicncstemncsnensvemncninninesnsensmnnnaniestniiel 5, 8, 27
a I ciuiieiiceiniitieniaihiatieiarraiighdeienitiaciiceiaiiaiataaiiea 5, 21
Se iP Sonn Uhcsicciseentinseuiasaioniieinticietdecnatilnimpibuibeiiiiaitaiiniinmnelit 6
IED: UF SIE assinnsibcstnninigtnndtiinnnendinndeitisibiniamemniiaimantl 2, 18
Sans Ur TTTTITncrisrstcceidehiensinditiehdnipentinapeteiieninsadapalidiiasiniadiannnedtniis 5
I
iain areretenceiamneitsittaramiatiininiiesiniiiaiadll 22
Ey UF ET icsiiirsienesitninciennenanensennsinnsiniinininiiiiiaiiiints 5, 6, 21
ey Oy St cinuicnsiseicsicicsnctinntsinnnsenintnannnnisitiinsmiis 5, 6, 21
SE ES Cir SIIITTIharreiesintitdciiuiitsanaeniiieitiaiaisiiieinabantiniitnidastaniiimcaaass 19
33 U.S.C. § 1ISIA(FMQMK)...........ceesseecessreceseerees 7, 19, 23, 26
er ET Ut GIT arieresinieicinscticietinmtciieitieasinitabinieisabisibieibiaiiuad 5, 6, 21
SP EE OF tee bcnisnccectienicscnsntnsionsniscnncsintinniniiéaimesininseel 5, 29
ix
TABLE OF AUTHORITIES — Continued
Page
a icin racine nine amt dennnreinanrneiliataes 8
Ee 27
a ceaemeall 29, 30
ee sssseaesiiandamasiiaaiesliiad 19
SE tI os ninrteretespnpeusnsuensuinnemmeabianiitl 2,5, 18
i canine ariatainiatiaatiaiammaneinnnabes 2
Be I iF TnI sitnerenesincmnssunnensetnpeseusanentemsvennsenenenemeenntes 5
I Se creer E ETT 7,19
een 5
ITE SR TET 8
catalan caimeniai 4
aceasta 8
EE ee ene eee ETT 8
I i es )
NE EE NO OEE 4
II, HITTIN, TTI so senaasi ere ertneriinrentennpeneninnennndennsnetnnts 9
TI TIT ens crintaricunaaintninetannmenaninimminendiel 12
SAEED, DUEL EID, cnencnicnspedenmenniisenmtennesnmneneseatsens 12
§ 373.4592(9\(1), Fla. Stat. ............:ccccscccceseeseeeeeeeees acide 12
Een ane ane ae 12
ITI TITIII TITIITL arcs ricerinienndaaeianmagnaneuegnenniinemnat i)
KS EET eee ee eR s
Fla. Admin. Code, Ch. 62-620.200 .............ccccccccccseeseeeeeseeees 5
TABLE OF AUTHORITIES -— Continued
Page
MISCELLANEOUS:
EPA, The Control of Pollution Caused by Hydro-
graphic Modifications (19738) ...........cccccccccceceeeeeeeeseeees 7,19
Flood Control Act of 1948 § 203, 62 Stat. 1176 «0.0.0.0... 9
H.R. Rep. No. 92-911, 92d Cong., 2d Sess. 109
SESS EATER ere are eect a et Re a 7
1 Legislative History of the Water Pollution Control
Act Amendments of 1972 (Committee Print com-
piled for the Senate Committee on Public Works
by the library of Congress), Ser. No. 93-1......................5 7
3 Legislative History of the Clean Water Act of
1977, A Continuation of the Legislative History
of the Federal Water Pollution Control Act, Ser.
National Pollutant Discharge Elimination System
Memorandum of Agreement between the State of
Florida and the United States Environmental
NE i cntsnccceneenscnscietenismetiicsuincinmediimmenden 8
S. Rep. No. 370, 95th Cong., 1, Sess. 8-9, 1977 ..............0000. 6
Water Resources Development Act of 1996, § 528,
eens SU IEE iesehesicniiinsiibabinatatieecheniendiiiiaahig leicht nti 9
Water Resource Development Act of 1996, § 528(b),
Si teenie aah eats 11
Water Resource Development Act of 1996, § 528(f),
Sats MTU catchall li 11
Water Resource Development Act of 1996,
I I 11
Water Resources Development Act of 2000, Title VI,
ER eee 9
TABLE OF AUTHORITIES — Continued
Page
Water Resources Development Act of 2000, Title VI,
ITT ioc tsa daannaeniapananinaibeaieinaianntion 10
WEBSTER’S DICTIONARY OF THE ENGLISH LANGUAGE
UNABRIDGED (Encycl. Ed. 1977)...............ccccceseeeeeeeeees 6,19
P. WEISER, Chevron, Cooperative Federalism, and
Telecommunications Reform, 52 Vand. L.Rev. 1
ESSE eee nee RE ean enor a nuNE SUDA NDE DOCU 27, 28
1
PETITION FOR WRIT OF CERTIORARI
Petitioner South Florida Water Management District
(SFWMD) respectfully petitions for a writ of certiorari to
review the judgment of the United States Court of Appeals
for the Eleventh Circuit.
OPINIONS BELOW
The opinion of the court of appeals (App., infra, la-14a)
is reported at 280 F.3d 1364. The opinion of the district
court (App., infra, 15a-30a) is unofficially reported at 1999
WL 33494862 and 49 ERC 2065. The district court’s final
summary judgment (App., infra, 3la-32a) is unreported.
The court of appeals order denying rehearing and rehearing
en banc (App., infra, 33a-34a) is unreported.
JURISDICTION
The opinion of the court of appeals was entered on
February 1, 2002. Petitioner’s motion for rehearing and
rehearing en banc was denied June 21, 2002. On August
29, 2002, Justice Kennedy extended the time for filing the
petition for certiorari to and including October 21, 2002.
App., infra, 35a-36a. Jurisdiction of this Court is invoked
under 28 U.S.C. § 1254(1).
STATUTORY AND REGULATORY
PROVISIONS INVOLVED
The statutory and regulatory provisions pertinent to
this case are set forth at App., infra, 37a-42a.
STATEMENT
The fundamental issue in this case is whether a state
water management agency may pump water, to which it
adds nothing, from one side of a levee to the other without
the need for a federal National Pollutant Discharge
2
Elimination System (“NPDES”) permit or, conversely,
whether the Clean Water Act (“CWA”) NPDES program
reaches such traditionally local water management activi-
- ties. To regulate local water management under the
federal program designed to eliminate waste discharges
fundamentally alters the CWA’s statutory scheme.
A NPDES permit is required under the CWA only for
those activities that add pollutants to the navigable waters
from a point source.’ See 33 U.S.C. §§ 1311 & 1362(12). The
Eleventh Circuit, despite acknowledging that SFWMD does
not increase the amount of pollutants in the navigable
waters, concluded that because the pumped water contains
some pollutants that would not reach the receiving water
“but for” the pumping, the pumping constitutes an “addi-
tion” of pollutants to the navigable waters “from” a point
source and, therefore, that the SFWMD must obtain a
NPDES permit under the CWA.
The Eleventh Circuit’s expansive interpretation of
NPDES jurisdiction increases an already sharp conflict
among the courts of appeals and ignores the position of the
responsible federal and state agencies that no permit is
required. The District of Columbia and Sixth Circuits
adopted the position of the Environmental Protection
Agency (“EPA”) that an “addition” “from” a point source
occurs only if the point source itself physically introduces a
pollutant into the water from the outside world and that
the transfer of pre-existing pollutants from one water body
to another is not the “addition” of a pollutant to the receiv-
ing water body “from” the point source. National Wildlife
' A “point source” is broadly defined as “any discernible, confined
and discrete conveyance, including but not limited to any pipe, ditch,
channel, tunnel, conduit *** from which pollutants are or may be
discharged.” 33 U.S.C. § 1362(14). This case involves the terms
“addition” and “from” used by Congress to delineate the scope of
NPDES. See 33 U.S.C. § 1362(12).
ae
3
Federation v. Consumers Power Company, 862 F.2d 580,
581 (6th Cir. 1988); National Wildlife Federation uv.
Gorsuch, Admin., U.S. Environmental Protection Agency,
693 F.2d 156, 179 (D.C. Cir. 1982). The Fourth Circuit held
that “those constituents occurring naturally in the water-
way or occurring as the result of other industrial dis-
charges do not constitute an addition of pollutants by a
plant through which they pass,” concluding that it is
beyond EPA’s authority to require a plant through which
pre-existing pollutants pass to treat or reduce them.
Appalachian Power Co. v. Train, 545 F.2d 1351, 1377 (4th
Cir. 1975).
The First and Second Circuits, in contrast, rejected
the agencies’ interpretation and found an “addition” in the
transfer of pre-existing pollutants between wholly sepa-
rate, naturally distinct water bodies despite nothing being
added to the transferred waters. Dubois v. U.S. Dep't of
Ag., 102 F.3d 1273 (1st Cir. 1996) and Catskill Mountains
Chapter of Trout Unlimited, Inc. v. City of New York, 273
F.3d 481 (2nd Cir. 2001). The Eleventh Circuit in this case
further expanded the NPDES to regulate the states’
management of surface waters within a naturally singular
water body (separated only by manmade levees) by pumps
from which no pollutants originate.
The Eleventh Circuit’s ruling is legally erroneous. The
notion that pumping water, without adding anything to
the water being pumped, constitutes the “addition” of
pollutants is inconsistent with the plain language, legisla-
tive history and purposes of the CWA. The Eleventh
Circuit also erred in refusing to give any deference to the
reasonable and longstanding interpretation of the “addi-
tion” requirement by the responsible agencies.
Given (1) the deep divide among the circuits, (2) the
Eleventh Circuit’s failure to acknowledge the consistent
position of the federal and state agencies that are together
responsible for implementing the CWA, (3) the critical role
that states play in managing water throughout the nation,
4
and (4) the nationwide importance of effectuating the
balance intended by the CWA between federal and state
regulatory programs to resolve water quality and quantity
issues, it is time for this Court to address the questions
presented.
It is especially appropriate and necessary to review
the extension of NPDES jurisdiction in this case. So
expansive is the Eleventh Circuit’s ruling that it is diffi-
cult to imagine any significant state or municipal surface
water management system that would not require federal
permitting. Congress did not intend to federalize regula-
tion of local water management activities when it adopted
the CWA. When it set out to eliminate industrial and
municipal waste discharges into the nation’s waters,
Congress did not envision that the states’ pumping of
water from one side of a levee to the other — a traditional
water management activity — would require a state to
obtain a federal permit for the “discharge” of “pollutants”
into the navigable waters from a “point source.”
The situation here is particularly urgent. The subject
pump station is but one of 391 water control structures
and hundreds of miles of canals and levees that make the
U.S. Army Corps of Engineer’s Central & Southern Florida
Flood Control Project (C&SFFCP) for which the SFWMD
is the local sponsor. The unfounded application of NPDES
permitting to the C&SFFCP threatens to impede local
control of water management and land use decisions and
to divert scarce resources from a joint federal and state
eight billion-dollar, multi-agency effort to re-plumb the
C&SFFCP project to restore the Florida Everglades and
develop south Florida’s water resources. Additional notices
of intent to sue now threaten unprecedented litigation
against eleven more pump stations. Two additional
NPDES lawsuits have been filed against other C&SFFCP
water control structures. See Friends of Everglades v.
SFWMD, Case No. 02-80309-Civ-Middlebrooks (S.D. Fla.);
Florida Wildlife Federation v. SFWMD, Case No. 02-
80918-Civ-Middlebrooks (S.D. Fla.).
-
5
A. The Statutory And Regulatory Scheme.
The CWA envisions a close regulatory partnership
between the state and federal governments to restore and
maintain the chemical, physical and biological integrity of
the Nations’ waters. Arkansas v. Oklahoma EPA, 503 U.S.
91, 101 (1992); International Paper Co. v. Ouellette, 479
U.S. 481, 489 (1987). In creating this scheme, Congress
struck a careful balance among competing policies and
interests. Jd. The CWA relies heavily upon the states to
maintain primary responsibility to prevent, reduce and
eliminate pollution, to plan the development and use of
land and water resources, and to consult with the Envi-
ronmental Protection Agency. 33 U.S.C. §§ 1251(b),
1313(d) & (e), and 1329. Congress did not want to interfere
any more than necessary with state water management.
33 U.S.C. § 1251(g); Gorsuch, 693 F.2d at 178. Thus, CWA’s
cooperative federalism scheme was predicated upon the
value of local input and experimentation. The issue is not
whether the SFWMD can avoid regulation, but rather how
the participating agencies regulate the pumping induced
water quality changes at issue here within the framework
of the CWA.
1. Basic Elements Of The Federal NPDES
Permit Program.
Section 402 of the CWA created the NPDES program,
which gives EPA regulatory authority to eliminate the
discharge of industrial and municipal wastes into the
nation’s waters. See 33 U.S.C. § 1342; Gorsuch, 693 F.2d at
175. Section 301(a) of the CWA generally prohibits the
discharge of any effluent into a navigable body of water
unless the point source has obtained a NPDES permit. 33
U.S.C. § 1311(a); Arkansas, 503 U.S. at 102.
A “discharge” is defined as “any addition of any
pollutant to navigable waters from any point source.” 33
U.S.C. § 1362(12) & (16); 40 C.F.R. § 122.2; Fla. Admin.
———
6
Code, Ch. 62-620.200. Thus, under the statute’s plain text
a NPDES permit is only required where there is an “addi-
tion” of a pollutant “from” a point source. To “add” is “to
join or u”**e so as to increase the number, size, quantity,
etc.” Wins"eR’s DICTIONARY OF THE ENGLISH LANGUAGE
UNABRIDGED (Encycl. Ed. 1977).
2. State Regulation Of Pollution Caused By
Hydrographic Modifications.
Congress has left the regulation of nonpoint sources
up to the states under Section 319. See 33 U.S.C. § 1329.
Nonpoint source pollution is broadly defined by exclusion
to be those water quality problems not subject to the
Section 402 NPDES program. Gorsuch, 693 F.2d at 166.
The states are directed to take steps to address nonpoint
source pollution, but left to determine for themselves the
nature of those steps. 33 U.S.C. §§ 1313(d) & (e) & 1329.
In 1972, the Congress made a clear and precise
distinction between point sources, which would
be subject to direct Federal regulation, and non-
point sources, control of which was specifically
reserved to State and local governments through
[the state] process * * * judging that those mat-
ters were appropriately left to the level of gov-
ernment closest to the sources of the problem.
S.Rep.No. 370, 95th Cong., 1, Sess. 8-9, 1977; reprinted 3
Legislative History of the Clean Water Act of 1977, A
Continuation of the Legislature History of the Federal
Water Pollution Control Act 642-43, Ser. No. 95-14; 1977
U.S. Code Cong. & Ad. News, 4326, 4334-35.
* * Section 208 (33 U.S.C. § 1288) referred to in Gorsuch and the
legislative history has been in practice succeeded by Section 319 (33
U.S.C. § 1329), both establishing the mechanisms through which the
states are to establish processes to regulate nonpoint source pollution.
7
In the nonpoint source part of the CWA, Congress
explicitly contemplates that pollution’ caused by changes
to the movement, flow or circulation of any navigable
water, including changes caused by the construction of
dams, levees, channels, causeways, or flow diversion
facilities, will be controlled by the states under nonpoint
source procedures and methods develop with guidance
from EPA. 33 U.S.C. § 1314(f(2\F); See EPA, The Control
of Pollution Caused by Hydrographic Modifications (1973);
Consumers Power, 862 F.2d at 588. The legislative history
confirms that Congress intended pollution caused by
changes to the flow of water to be treated under nonpoint
source programs:
The committee . . . expects [EPA] to be most dili-
gent in gathering and distribution of the guide-
lines for identification of nonpoint sources and
the information on processes, procedures, and
methods for control of pollution from such non-
point sources as ... natural and man-made
changes in the normal flow of surface and ground
waters.
H.R. Rep. No. 92-911, 92d Cong., 2d Sess. 109 (1971),
reprinted 1 Legislative History of the Water Pollution
Control Act Amendments of 1972 at 796 (Committee Print
compiled for the Senate Committee on Public Works by the
Library of Congress), Ser. No. 93-1. (emphasis supplied).
* The term “pollution” as distinguished from a “pollutant” is more
broadly defined to “mean the man-made or man-induced alteration of
the chemical, physical, biological, and radiological integrity of water.”
Section 502(19), 33 U.S.C. § 1362(19)
8
3. Delegation Of NPDES Administration To
The State.
The CWA contemplates that states will implement the
NPDES permit program established under Section 402 of
the CWA. 33 U.S.C. § 1251(b). Section 402 establishes the
NPDES permitting regime, which provides for the states
to administer the NPDES permit program for discharges
into navigable waters within their jurisdiction. 33 U.S.C.
§ 1342(b). The Florida legislature, in turn, has expressly
authorized its Department of Environmental Protection
(“DEP”) to assume responsibility for implementing the
NPDES program in Florida. § 403.0885, Fla. Stat.
Pursuant to these statutes, EPA and DEP entered into
a Memorandum of Agreement by which EPA has author-
ized DEP to implement the federal NPDES program in
Florida. See National Pollutant Discharge Elimination
System Memorandum of Agreement between the State of
Florida and the United States Environmental Protection
Agency (1995). The memorandum of agreement creates a
close partnership under which DEP is given primary ©
responsibility to establish the State NPDES program
priorities which are consistent with national NPDES goals
and objectives with oversight by EPA. Id.
B. SFWMD And Its Water Control Facilities.
The SFWMD is one of five water management dis-
tricts established to provide stewardship over Florida’s
public water resources. § 373.069, Fla. Stat. Under DEP’s
supervision the SFWMD’s nine-member board establishes
and implements the state’s water policies throughout its
16 county jurisdiction from Orlando to Key West. See
$§ 373.069 e), 373.073 & 373.016, Fla. Stat.
Florida’s water management districts are drawn along
hydrological, not political, lines to best manage water on a
regional, watershed basis. § 373.069, Fla. Stat. SFWMD is
responsible for the Lake Okeechobee watershed, an
9
immense, integrated and unique system of hydrologically
connected lakes, rivers, bays and surface waters. See /d.;
§ 373.4595, Fla. Stat. Within this watershed lie populous
municipalities, vast agricultural communities, and pre-
cious natural] resources, including Florida’s Everglades.
The watershed is managed by the U.S. Army Corps of
Engineers’ Central & Southern Florida Flood Control
Project (C&SFFCP), for which the SFWMD is the local
sponsor. § 373.1501, Fla. Stat. The C&SFFCP is a complex
system of levees, canals, and flow diversion facilities used
to control the movement, flow and circulation of water.
The C&SFFCP was authorized by § 203 of the Flood
Control Act of 1948 (62 Stat. 1176), in response to catas-
trophic loss of life and property following two major
hurricanes in the late 1920's. Today the C&SFFCP is
operated by the SFWMD, under Corps guidelines and
regulatory schedules, to allocate a strained water supply
and provide vital flood protection.
As local sponsor. the SFWMD is charged with imple-
menting the federal government’s ongoing comprehensive
review (“Restudy”) of the C&SFFCP to restore the Ever-
glades ecosystem. § 373.1501(1)(h) & (2), Fla. Stat. The
Restudy has evolved into the Comprehensive Everglades
Restoration Plan (“CERP”), an eight billion-doliar joint
federal and state effort to re-plumb the C&SFFCP to
restore the everglades while accommodating the region’s
competing urban and agricultural interests. See Water
Resources Development Act of 1996 § 528, PL. 104-303
(“WRDA ’96”); WRDA 2000, Title VI, $601 PL. 106-541
(“WRDA ’00”).
This case involves the S-9 pump station, which is one
of 62 pump stations that move water through the canals
and levees of the C&SFFCP. See App., infra, 2a. The S-9 is
located at the juncture of the C-11 canal and the L-37 and
L-33 levees. See id. at 3a. The L-37 levee extends north
and the L-33 extends south from the S-9, creating an
10
impoundment area to the west known as Water Conserva-
tion Area 3A (“WCA 3A”). Id. The WCA 3A encompasses
over 491,000 acres of historic Everglades. The S-9 moves
water through the canal from east to west, one side of the
levees to the other, to control quantities of water in the C-
11 west basin. See id. The C-11 west basin is over 48,000
acres with a population over 135,000. As part of the
Comprehensive Everglades Restoration, Congress author-
ized $225 million for two projects that address water
quality problems resulting from the S-9 pumping, i.e., the
WCA 3A/3B Levee Seepage Management project and the
C-11 Impoundment and Stormwater Treatment Area.
WRDA ’00, § 601(b)(2\(C).
The SFWMD’s structures, including S-9, add nothing
to the waters they manage. App., infra, 3a. They are
merely tools used to move water and determine the quan-
tity of water in different parts of the system. Without the
levee system, the managed waters would naturally flow
together as a sheet across south Florida. App., infra, 3a
n.2 & 8a n8. The pre-existing pollutants within the
managed waters are naturally occurring or were added
from other sources upstream of the levees. Id. at 3a. The
C&SFFCP is the primary water system which receives
polluted waters from all other point and nonpoint sources
throughout its jurisdiction. Most pollutants are received
from the numerous municipalities, secondary drainage
districts, and others that drain water into the larger
C&SFFCP system.
C. Regulatory Oversight And Permitting Of The
S-9 Pump Station.
The C&SFFCP remains one of the most scrutinized
water programs in the nation due to federal and state
efforts to restore the Everglades while accommodating
competing urban and agricultural needs. Through both
litigation and legislation, the federal and state govern-
ments have jointly developed strategies and non-NPDES
11
permit programs for those C&SFFCP structures that
impact the Everglades area, including the S-9 pumping to
the WCA-3A.
In 1988, the federal government sued several Florida
agencies to prevent polluted water from entering Ever-
glades National Park and Loxahatchee Refuge through the
C&SFFCP. United States v. South Florida Water Manage-
ment District, Case No. 88-1886-Civ-Hoeveler (U.S. Dist.
Ct. S.D. Fla) (“USA lawsuit”). The USA lawsuit was settled
in 1992 by consent decree. United States v. SFWMD, 847
F. Supp. 1567 (S.D. Fla. 1992), rev'd on other grounds, 28
F.3d 1563 (11th Cir. 1994). The consent decree established
an ambitious strategy to restore and preserve the Ever-
glades ecosystem. 847 F. Supp. at 1569. It required strate-
gies designed to bring water entering the Everglades and
Loxahatchee refuge into compliance with applicable water
quality standards, including the development of a permit-
ting system for discharges into waters managed by the
District. Jd. EPA and other federal agencies approved the
consent decree. Jd. at 1577.
Also in 1993, the South Florida Ecosystem Restora-
tion Task Force (“Task Force”) was created by interagency
agreement between the federal agencies, including EPA
and the Corps, to oversee all aspects of Everglades resto-
ration. By 1996, the Task Force was codified and expanded
to include state, local and tribal representatives. WRDA
96 § 528(f). Task Force members include SFWMD, DEP
and Respondent Miccosukee Tribe. Jd. The Task Force
oversees all activities of the C&SFFCP’s Restudy and is
specifically directed by Congress to develop a comprehen-
sive plan to restore, preserve and protect the Everglades
and its water quality. Jd. § 528(b). The Task Force requires
EPA to oversee the efforts of DEP and the SFWMD to
improve water quality within the C&SFFCP, including of
course S-9 and WCA-3A. Id. § 528(f)(2).
-In 1994, the Florida legislature adopted the Ever-
glades Forever Act (“EFA”) to implement the Consent
36
phosphorus and other pollutants.'’ The Florida legislature
has directed a distinct numeric criterion for phosphorus for
the Everglades Protection Area, Section 373.4592(4)(e)(2),
which is not directed for other waters such as the C-11 Canal.
While the C-11 Basin may have been hydrologically
connected to the Everglades Protection Area at some historic
time, the C-11 Canal is man-made, dug out for drainage, and
its surface waters do not flow into the upgradient receiving
waters. While the C-11 Canal is a navigable water of the
United States, its backpumping is not natural flow.
Petitioner's backpumping, moreover, is causing long-term
damage in the water quality of the receiving waters. See, e.g.,
J. App. at 38-39, 135-36, 154-56, 164-69. The discharge of
pollutants, including phosphorus at levels higher than those
of the receiving waters, alters the quality of these waters and
causes “pollution” as defined in the CWA. Fidelity, 325 F.3d
at 1162 (citing PUD No. /, 511 U.S. at 705). Altering the
quality of the receiving waters, by backpumping polluted
water into it, is not beneficial to those waters. It is also a
clear example of an activity that requires an NPDES permit.
Finally, Section 101(g) directs federal agencies to
develop water quality programs “in concert with” programs
to manage water resources: “Federal agencies shall co-operate
with State and local agencies to develop comprehensive
solutions ¢ to prevent, reduce and eliminate pollution in concert
17. Both the State and the EPA have formally determined
pursuant to Section 303(d)(1)(A) aa the WCA 3A is failing to meet
its designated uses. See 33 U.S.C. § 1313(d)(1)(A). The Section
303(d) list identifies the water susie limited segments of every
Florida water body. See Sierra Club v. Meiburg, 296 F.3d 1021, 1025
(11th Cir. 2002). Pumping massive quantities of polluted water into
an already polluted section of the Everglades is irreconcilable with
the CWA’s requirement that pollution that impairs designated uses
be eliminated.
37
with programs for managing water resources.” If water supply
transfers may be made without notice to, or review or
regulation by, State NPDES permit-writers, then water
management programs can override NPDES programs,
contrary to Section 101(g)’s explicit directive that the two
types of programs operate “in concert.” See, e.g., PUD
No. 1, 511 U.S. at 704 (explaining the distinct roles of the
federal and state governments and referring to state water
quality standards as providing a supplementary basis “so that
numerous point sources, despite individual compliance with
effluent limitations, may be further regulated to prevent water
quality from falling below acceptable levels.”) (citing
California, 426 U.S. at 205).
D. The Rule Of Lenity Has No Application Here
Petitioner's argument that the criminal penalties of
33 U.S.C. §$§ 1319(c)(1) and (2) require the CWA to be Strictly
construed is mistaken. The Petitioner cites two cases in w hich
this Court has applied the rule of lenity in “a civil setting.”
However, in both cases the United States government was a
party seeking the civil application of a statute which had
“criminal applications that carried no additional requirement
of willfulness.” See, e.g., United States v. Thompson/Center
Arms Company, 504 U.S. 505, 517-18 (1992) (criminal tax
Statute); Crandon vy. United States, 494 U.S. 152. 158 (1990)
(criminal statute prohibiting private compensation for
government employees). This civil suit was brought by
private parties under the CWA, which carries criminal
penalties but only if the 7 scienter requirements are
met. Compare 33 U.S.C. § 1319(d) (strict liability for civil
claims) with 33 U.S.C. 5 1319(c) (criminal penalties for
negligent or knowing violations). Thus, there is no precedent
or basis for applying the rule of lenity in this context.
38
Even assuming the rule of lenity could apply in this civil
suit, it “applies only when, after consulting traditional canons
of statutory construction, we are left with an ambiguous
statute.” United States v. Shabani, 513 U.S. 10, 17 (1994).
The rule could have no application here because the plain
language, purpose, structure and history of the Act
unambiguously show that a permit is required for the
discharge of pollutants from the S-9 point source.
Ill. REQUIRING AN NPDES PERMIT FOR THE S-9
STRUCTURE PROMOTES FEDERALISM AND
DOES NOT CREATE AN UNDUE BURDEN UPON
WATER SUPPLY DISTRICTS OR EVERGLADES
RESTORATION
A proper federalism balance is fully maintained by
implementing the plain meaning of the CWA; and the
principles of this case do not create an undue burden upon
water supply districts or the Everglades restoration project.
A. The CWA’s Permit Requirements in This Case
Are Consistent with Principles of Federalism and
Do Not Interfere with “Traditional Powers” of
the States
Enforcement of the CWA’s NPDES permit provisions
does not raise any federalism concerns because the provisions
of the statute carefully balance these two interests. See PUD
No. 1, 511 U.S. at 704 (the CWA establishes distinct roles:
EPA is required, among other things, to establish and enforce
technology-based limitations on “individual discharges” into
the country’s navigable waters from point sources, and the
States are required, subject to federal approval, to establish
39
comprehensive water quality standards). The permitting
program provides a regulatory partnership between the state
and federal government, see Ouellette, 479 U.S. at 490. and
recognizes the important role of the states, but requires
federal supervision as a result of the states” prior failures at
self-regulation. See 118 Cong. Rec. 10,203, 10,251 (1972).
What Petitioner is requesting from this Court is to
interfere with that careful balance. distort the plain meaning
of the definitions and create new exemptions. Although
NPDES permits contain restrictions on discharges under the
provisions of the CWA, the state decides in the first instance
the contents of these restrictions. See 33 U.S.C. § 1342(a);
40 C.F.R. § 122.44(a). Permits allow discharges and do
not prevent Petitioner from continuing to develop a
comprehensive plan for water management. Nothing in any
of the federal acts cited by Petitioner displaces the clear
requirements of the CWA. Indeed, they expressly require
compliance with any applicable federal law. See WRDA 2000
§ 601(1)(3) (“Nothing in the agreement established under this
subsection shall alter or amend any existing federal or state
law, or the responsibility of any party to the agreement to
comply with any federal or state law.”); WRDA 1996
§ 528(b)(4)(B) (requiring compliance with “any applicable
federal law”). Nor would a single state permit, which is not
subject to EPA oversight, substitute for the NPDES permit
requirements of the CWA. If an NPDES permit is required,
that is the type of permit that must be obtained.
Moreover, Petitioner's exaggerated claims that this case
will violate existing federalism arrangements if an NPDES
permit is required for the S-9 pump station is contradicted
by the fact that the major components of Everglades
restoration in the Everglades Construction Project are already
40
under the NPDES permitting program. EPA first required
Florida to obtain an NPDES permit for an Everglades
restoration project in 1994 (before the State had CWA
delegation). See, e.g., EPA Permit No. FL0043885
(authorizing discharges from the Everglades Nutrient
Removal Project to receiving waters at the L-7 canal in WCA
1). Petitioner has been applying for, and receiving Everglades
NPDES permits at the very same time it is telling the courts
that NPDES permits are unworkable for Everglades
restoration. The Petitioner received NPDES permits for the
STA (stormwater treatment areas), projects which authorize
the discharge of treated waters. See, e.g., NPDES Permit No.
FL-0177946; (STA-2) FL-0177954 (STA-5); FL-0177962
(STA-1 west); Drew Dep. at 43-44. It wouid be a
contradiction indeed to require NPDES permits for discharges
from the storm treatment areas but to excuse them for the
discharges from the S-9 pump station. Such contradiction is
not found in the CWA.
B. The CWA’s Permit Requirements In This Case
Do Not Impose An Undue Burden Upon Water
Supply Districts Or Upon The Everglades
Restoration Project
A proper analysis of the legal principles supporting the
NPDES permit requirement in this case demonstrates that
these principles would not impose an undue burden on water
supply projects or upon the Everglades restoration effort
itself. Despite the doomsday scenarios of the Petitioner and
amici, the burden is not significant for several reasons:
(1) the common dam structures which are significant
components of water-supply projects are not covered by the
principles of this case; (2) structures which release or
eventually allow flow in the direction of natural flow are not
4]
covered by the principles of this case; (3) EPA can use
guidance and rulemaking to clarify other areas of
non-application (e.g., substances in water which are not listed
as statutory pollutants may be excluded as “pollutants” by
rule if not leading to “pollution” as statutorily defined):
(4) the few remaining areas of NPDES application under the
principles of this case present no significant problems
because the burden can be eased through permitting
provisions, such as general or nationwide permits and single
system-wide permits, and discharges are not likely to violate
Water quality standards in any event due to the designated
use of the receiving water body; and (5) Everglades
restoration will be aided because most restoration
components already are required to obtain NPDES permits
and such permits provide a necessary backstop to ensure that
Water quality goals are achieved.
1. Petitioner and amici make the totally unsubstantiated
claim that water allocation dams, not at issue here, will be
covered by the principles of this case. Petitioner asserts that
the EPA position in Gorsuch — that water quality effects of
flows from a dam were not a discharge from a point source
— will be overruled if the Court requires a permit for the
S-9 pump station. However, as discussed previously,
requiring a permit here is not at odds with Gorsuch or with
EPA’s informal position there that the dam releases were not
“additions” under the CWA. This case deals with classic
external pollutants, taken into the point source and discharged
from it against the natural flow, so that these external
pollutants would not have entered the receiv ing water body
without the affirmative pumping of the point source. Gorsuch
concerned temperature changes, oxidation, etc., caused by
the changed movement of the dammed water, which is an
entirely different situation. And Consumers Power, another
42
_ so-called “dam case,” returned the water to the same place
from which it was drawn. This is likewise simply not the
circumstance here.
2. The principles of this case will not require NPDES
permits for the various water supply structures which store,
release or eventually allow water to flow in the direction of
natural flow. This is because, in order to require a permit,
the point source must introduce the pollutant into navigable
water from any place outside the particular water body to
which pollutants are introduced. See Pet. App. 5a-9a; Carskill,
273 F.3d at 491-92. If the pollutants were naturally flowing
into receiving waters in any event, then a point source is not
the “instrumentality” or “cause” or “reason” of additianal
pollutants in the receiving waters; and the point source
likewise does not affect “an increase in numbers, size, or
quantity” of pollutants in the receiving waters.
3. In any event, sound statutory interpretation and the
EPA administrative implementation would still prevent
unnecessary permitting. For example, EPA could use its
guidance and rulemaking powers to address the issues
associated with discharges against natural flow of substances,
which are not listed in the statutory definition of “pollutants.”
If a material or substance is listed in the Statutory CWA
definition of pollutant, 33 U.S.C. § 1362(6), of course its
discharge requires a permit. But the major concern of water
supply districts is with substances in water which someone
might consider to be “pollutants” but which are not itemized
in the statutory definition. In some, or perhaps many
instances, these potential “pollutants” may not be harmful
either to the contributing water or to the receiving water.
While these are clearly not the facts herein, many amici have
been misled nonetheless into thinking that the principles of
43
this case would require NPDES permits in all such
circumstances but this is not a foregone conclusion.
Statutory interpretation and/or EPA rulemaking can
address these issues, which are not before the Court in this
Case, in other ways as well. For example, EPA might
determine that materials or substances not itemized as
statutory pollutants need not be classified as “pollutants” if
they do not result in “pollution” as statutorily defined (". . .
alteration of the chemical. physical, biological, and
radiological integrity of the water”). 33 U.S.C. § 1362(19).
Likewise, EPA might structure rules based upon whether
waters are moved within the same designated uses or water
quality standards.
4. Even when an NPDES permit is required, water
supply districts could still be permitted through the use of
general or nationwide permits and single system-wide
permits. See, e.g, 40 C.F.R. 122.28. 123.25. Furthermore,
permits in most instances would be readily available because
releases of water from and to water supply reservoirs and
the like are almost certain to meet applicable state water
quality standards, which are based on preserving the
designated use of the receiving water body.'* Water moved
18. The amicus briefs from the western states assert that the
Vast water collection and distribution networks contain clean water
and do not contribute to water quality violations but nonetheless
would be required by the decision below to apply for several
hundred NPDES permits, Amicus brief of the states of Colorado
etal.,atp. 3n.2, or perhaps even millions of permits, Brief of Amici
Curiae The Nationwide Public Projects Coalition, et al., at p. 9-10
Colorado, the lead state of eleven Western state amici, asserts that
only 4.6 percent of its waters are designated under CWA section
(Cont'd)
44
for water supply purposes through water supply canals and
reservoirs, all of which have been designated by the state for
water supply use, will almost by definition meet applicable
water quality standards. This is not the case here. Instead a
drainage canal, utilized for the main purpose of disposing of
surface water containing high levels of pollutants, is be .ig
backpumped into the Everglades conservation areas without
any controls on the quantity and type of water pollutants being
discharged.
5. The claim that Everglades restoration will be impaired
by the requirement for a permit here, is belied by the current
application of NPDES requirements, and the issuance of
NPDES permits, to many of the new Everglades restoration
structures (discussed previously). In fact, NPDES permitting
Serves not as a hinderance but instead as a vital backstop to
prevent backsliding from Everglades restoration.
For example, in 2002 the S-9 pump station itself was slated
for water quality clean-up by 2005. See Tribe’s App. at 4a.
But by 2003 the District had dropped this cleanup deadline
(see Tribe’s App. Sa), due to the expectation that the Florida
Legislature would eliminate the 2006 deadline (which the
Legislature changed to 2016 in general, and to 2036 for the
C-11 Basin by approving a Long Term Plan extending C-11
(Cont'd)
303(d) because of failure to meet water quality standards. It further
contends that “[t}here is no evidence that transbasin diversions/
deliveries are the cause of any of these impairments.” Amicus
Colorado at p. 3 n.2. If it is in fact true that the water transport systems
of the Western states do not create discharges that contribute to a
violation of a water quality standard in the receiving water, the
affirmance of the decision below will not impose a hardship on them.
Colorado and the Western amici should, therefore, have no fear of
NPDES permitting.
45
compliance). See previous discussion and section
373.4592(4)(e)(2), Florida Statutes; and Long Term Plan at 6-
86. If pollutants from urban development in western Broward
County discharged into the Everglades Protection Area (see
Tribe's App. at 6a, 7a) are not subjected to regulatory oversi ght
by NPDES permit requirements, the survival of this treasured
wetlands is in peril. The CWA requires a permit, and neither
Petitioner nor any of the amici have provided any basis in the
CWA for the judicially created exemptions they seek.
CONCLUSION
The judgment of the Eleventh Circuit Court of Appeals
should be affirmed.
Respectfully submitted,
Dexter W. LEHTINEN Sonia Escosio O’ DonNeELL
Counsel of Record RicHarD J. OVELMEN
Juan M. VarGas Enrique D. ARANA
CLaupio Riepi Topp M. Futter
LEHTINEN, VARGAS Jorpen Burt LLP
& Ruepi, P.A. 777 Brickell Avenue
7700 North Kendal! Drive Suite 500
Suite 303 Miami, FL 33131
Miami, FL 33156-7559
(305) 279-1166 Dione C. CARROLL
In House General Counsei
MICCOSUKEE TRIBE OF INDIANS
P.O. Box 440021
Tamiami Station
Miami, FL 33144
Counsel for Respondent
Miccosukee Tribe of Indians of Florida
la
www.dep.state.fl.us/evergladesforever/progress/map.htm (last visited 11/12/03)
Appendix A — SFWMD Map captioned, “Everglades Protection Area,” available at
.
<
.
Pa
a
a
,
. €
a .
2
-,
¥ *.
. 7 ’
» ad
nr 1%,
Ved Peney
Sead ae]
vm
ed
p= —————----—
—
BIsy praeduy snsoydsoyy a
BUY prredunu ) snsoydsoyy
BIsy PUIUIHIs | 49PH yy MHIONS
#d4y 00199014 Sapeyasany
|
pudsa’]
Basy U01}93}01g SIPLI[ZIIAY
/
5
ae |
Appendix B — SFWMD Brochure entitled “Everglades Program”, Map captioned,
“Everglades Protection Area & Surrounding Areas”
‘ r —
; ’ -
sea. ‘ * ’ x
vwery
s
3 “se
: o°
a usa
S29
a -
. v
oS
_
me .
é ‘
&
+:
AP
‘
— r
;~
‘ ‘ ,
i ons »
rod CME
*>,; “* r
$33 af ec
oss 9 >
*e 2 *
8
;
<<
SE
SE
SE
PS
Ry gy
:
5
Ns
Ss
a
26
442, 450 n.16 (1975). Both EPA and DEP have critical
expertise and experience in navigating the complexities of
the labyrinthine CWA.
A. The Eleventh Circuit Rejected EPA’s Posi-
tion On Improper Grounds.
The Eleventh Circuit improperly viewed the “addi-
tion” test as limited to dams and dam-induced water-
quality changes. App., infra, 6a fn.4. The Sixth Circuit in
Consumers Power rejected such an argument when apply-
ing the “addition” test to transfers between impoundment
areas and a lake, noting that the five elements which
make up the definition of a discharge must be present in
“any set of circumstances” for NPDES permitting re-
quirements to apply. Consumers Power, 693 F.2d at 583.
The CWA does not distinguish between dams, levees,
canals, or other flow diversion facilities in recognizing the
nonpoint source nature of pollution caused by their
changes to the movement of water. See 33 U.S.C.
§ 1314(f(2F). Given the rationale underlying EPA’s
“addition” test, it remains neither explicitly nor logically
limited to dams.
The absence of an express declaration by EPA particu-
lar to the S-9 should not diminish deference under the
circumstances of this case. Given the agencies’ close
involvement with the development of alternative permit-
ting processes and procedures, a formal written agency
action declaring that NPDES does not apply would not be
expected. Here both EPA and DEP specifically reviewed
the water quality changes resulting from S-9 and chose a
state regulatory program as the most appropriate method
to control these changes. It does not follow that the agen-
cies, for their position to be considered by the federal
courts, must affirmatively disclaim the applicability of
NPDES.
ey ee A ~a
27
B. Under The CWA’s Statutory Scheme, Def-
erence To The Implementing State Agen-
cies Is Proper.
The CWA presents a cooperative federalism model
that anticipates a partnership between the state and
federal governments to restore and maintain the chemical,
physical and biological integrity of the Nation’s waters.
See Arkansas v. Oklahoma EPA, 503 U.S. 91, 101 (1992);
International Paper Co. v. Ouellette, 479 U.S. 481, 490
(1987). Under this scheme, EPA may delegate to a state
authority to administer the NPDES program, providing
the states with a significant role in protecting their own
natural resources. Ouellette, at 489, citing 33 U.S.C.
§ 1251(b). EPA retains strong supervisory authority and
control. 33 U.S.C. § 1342(d). Through such a delegation in
Florida, DEP infused local concerns and interests into the
policies of the CWA.
In these circumstances, the Eleventh Circuit erred
when it relied on GTE South Inc. v. Morrison, 199 F.2d
733, 745 (4th Cir. 1999) and the general rule that state
agencies are not entitled to the deference afforded a
federal agency’s interpretation of its own statutes under
Chevron. This Court has noted that the question whether
federal courts must defer to a state agency's interpreta-
tions of federal law remains unresolved under circum-
stances where Congress intended the states to play a
strong role determining the policy implications of a federal
regulatory scheme. See AT&T Corp. v. Iowa Utilities Bd.,
525 U.S. 366, 385 n.10 (1999).
Several federal courts have recognized deference to a
state agency is appropriate where a state agency is given
authority for implementation of a joint federal-state
program. See Perry v. Downling, 95 F.3d 231, 337-38 (2d
Cir. 1996); US West Communications Inc. v. Public Serv.
Comm of Utah, 75 F. Supp.2d 1284 (D. Utah 1999); Bell-
south Telecommunications, Inc. v. MCI Metro Access Trans.
Ser., Inc., 97 F. Supp.2d 1363 (N.D. Ga. 2000); see also
28
Attorney’s Liability Assurance Society, Inc. v. Fitzgerald,
174 F Supp.2d 619, 629 n.2 (W.D.Michigan 2001) (state
interpretations of the federal Liability Risk Retention Act
of 1986 might warrant deference because Congress treated
the state as a federal regulator and placed faith in the
states’ interpretations). Commentators have encouraged
the federal courts to drop their skepticism toward state
agencies in light of the faith Congress has increasingly
placed in them. See P. Weiser, Chevron, Cooperative
Federalism, and Telecommunications Reform, 52 Vand.
L.Rev. 1 (Jan. 1999).
Under the CWA, Congress placed their faith not only
in the specialized knowledge of the state and administra-
tive agencies, but also in the state’s ability to infuse local
concerns and experience into its policies. Congress devel-
oped a joint federal-state regulatory program, delegated
authority to state agencies over the NPDES program and
authorized EPA to supervise states’ NPDES programs. In
this case federal and state agencies both concurred that
state permits are the appropriate mechanism to resolve
the water quality problems arising from the S-9. App.,
infra, 43a-48a. Under these circumstances deference to
both agencies is proper.
Nonetheless, the Eleventh Circuit has rejected the
agencies’ practices that were developed over thirty years.
Its decision affects a drastic alteration of the existing
allocation of responsibilities between states and the
federal government concerning the regulation of water
pollution. This Court has admonished against interpreting
a statute to effect such a substantial change in the balance
of federalism unless that is the manifest purpose of the
legislation. See Owasso Independent School Dist. v. Falvo,
534 U.S. 426 (2002).
It is the policies reflected by the agencies’ continuous
well-informed practices and actions that deserved consid-
eration and respect from the Eleventh Circuit. Because the
agencies’ interpretation was based upon and remains fully
29
consistent with the plain language of the CWA properly
read in context with the overall statutory scheme and its
policies, the court should have deferred to the agencies’
“addition” test.
IV. THE PETITION SHOULD BE GRANTED, NOT
HELD FOR BORDEN RANCH PARTNERSHIP
v. U.S. ARMY CORPS OF ENGINEERS.
The Court has granted certiorari in Borden Ranch v.
United States, No. 01-1243 (cert. granted 2002), to decide,
among other questions:
Does a rancher’s deep plowing to enhance the
soil’s agricultural viability “add” a “pollutant” to
a wetland, so as to constitute a regulated point
source “discharge” within the meaning of Section
404 of the Clean Water Act?
A ruling in Borden Ranch that provides guidance to
the meaning of an “addition” under the CWA would be
relevant to this case since the SFWMD also contends that
the “addition” requirement is not met. Nevertheless,
holding this petition for Borden Ranch would not be
appropriate. This case and Borden Ranch involve the
scope of quite different permitting programs and very
different factual situations. Whether physical alterations
caused by plowing are found to be a “discharge” requiring
a dredge and fill permit from the Corps under Section 404,
is not likely to resolve the question in this case, whether
the movement of pre-existing pollutants by a state water
management agency constitutes a “discharge” requiring a
NPDES permit from the state under Section 402.° Borden
* Lower courts note that the “addition” requirement varies in the
different contexts and separate regulatory frameworks of the § 404
dredge and fill program (33 U.S.C. § 1344) and the § 402 NPDES
program (33 U.S.C. § 1342). See, e.g., Froebel v. Meyer, 13 F. Supp.2d
(Continued on following page)
——~ a
30
Ranch also involves a number of additional issues upon
which it may be decided without any guidance on the
“addition” requirement.
The issue in this petition will remain alive and in
urgent need of this Court’s review however this Court
decides Borden Ranch. Because the courts are in disarray
as to an important issue concerning the scope of the
NPDES, which will not be settled in Borden Ranch, the
Court is urged to grant independent review.
CONCLUSION
The petition for a writ of certiorari should be granted
or, in the alternative, held for the Court’s ruling in Borden
Ranch.
Respectfully submitted,
JAMES EDWARD NUTT
Counsel of Record
TIMOTHY S. BISHOP
MAYER, BROWN, ROWE
& PLATT South Florida Water
190 South LaSalle Street Management District
Chicago, IL 60603 3301 Gun Club Road
(312) 701-7829 West Palm Beach, FL 33406
(561) 682-6253
Counsel for Petitioner
October 2002.
843 (E.D. Wis. 1998); United States v. Sinclair Oil Co., 767 F. Supp.
200, 205 n.5 (D. Mont. 1990). The Eleventh Circuit ignored basic
distinctions between Sections 402 and 404 when it relied upon Section
404 cases to support its interpretation of an “addition.” App., infra, at
7a n.5 (citing 33 U.S.C. § 1344 and United States v. M.C.C. of Fla., Inc.,
772 F.2d 1501, 1505 (11th Cir. 1985)). Such cases are inapposite.
la
[PUBLISH]
IN THE UNITED STATES COURT OF APPEALS
FOR THE ELEVENTH CIRCUIT
No. 00-15703
D. C. Docket Nos. 98-06056-CV-WDF
& 98-06057-CV-WDF
(Filed February 1, 2002)
MICCOSUKEE TRIBE OF INDIANS OF FLORIDA,
SAM POOLE,
Plaintiffs-Appellees,
versus
SOUTH FLORIDA WATER MANAGEMENT DISTRICT,
Defendant-Appellant.
eee SD. OomwWnanm—
FRIENDS OF THE EVERGLADES,
Plaintiff-Appellee,
_ versus
SOUTH FLORIDA WATER MANAGEMENT DISTRICT,
Defendant-Appellant.
Appeal from the United States District Court
for the Southern District of Florida
(Filed February 1, 2002)
2a
Before EDMONDSON and CARNES, Circuit Judges, and
MUSGRAVE ,, Judge.
EDMONDSON, Circuit Judge:
The Miccosukee Tribe of Indians (“the Tribe”) and the
Friends of the Everglades (“the Friends”) (together “Plain-
tiffs”) brought a citizen suit under the Clean Water Act
(“CWA”) against the South Florida Water Management
District (“the Water District”). The suit alleges that the
Water District was violating the Clean Water Act by
discharging pollutants from the S-9 pump station into
Water Management District 3A without a national pollu-
tion discharge elimination system (“NPDES”) permit.
The parties filed cross-motions for summary judg-
ment. The district court denied the Water District's mo-
tion, granted Plaintiffs’, and enjoined the Water District
from operating the S-9 pump station without an NPDES
permit. The Water District appeals from the district
court’s order declaring unlawful the Water District's
operation of the S-9 pump station without an NPDES
permit and from the injunction prohibiting the same.’
I. BACKGROUND
The South Florida Water Management District
manages the Central & Southern Florida Flood Control
* Honorable R. Kenton Musgrave, Judge, U.S. Court of Interna-
tional Trade, sitting by designation.
' The district court also concluded that Plaintiffs’ claims against
Defendant were not barred by the doctrine of sovereign immunity. The
Water District has not appealed this ruling.
3a
Project. This management is through the operation of
many levees, canals and water impoundment areas. The
areas now called the C-11 Basin and the Water Conserva-
tion Area-3A (“WCA-3A”) were historically part of the
Everglades. But, in the early 1900's, the Army Corps of
Engineers began digging the C-11 Canal to facilitate the
draining of the western portion of Broward County which
is part of the C-11 Basin. Then, in the 1950’s, the Corps
constructed the L-37 and L-33 levees to create WCA-3A to
the west of the C-11 Basin and completed construction of
the S-9 pump station.
The C-11 Canal runs through the C-11 Basin and
collects water run-off from the Basin and seepage through
the levees from WCA-3A. The S-9 pump station then
pumps this water through three pipes from the C-11 Canal
through the L-37 and L-33 levees into WCA-3A at a rate of
960 cubic feet per second per pipe. Without the operation
of the S-9 pump station, the populated western portion of
Broward County would flood within days.’
The water which the C-11 Canal collects and which
the S-9 pump station conveys into the WCA-3A contains
pollutants. In particular, this water contains higher levels
of phosphorus than that naturally occurring in WCA-3A.
The S-9 pump station, however, adds no pollutants to the
water which it conveys.
? But for the construction of the L-33 and L-37 levees and the C-11
canal, water would flow as a sheet across WCA-3A and the C-11 Basin
in a southerly direction. Now, because of the construction of these
structures, water from the C-11 Basin generally does not flow west into
the WCA-3A without the operation of S-9.
4a
The district court concluded that, because the waters
collected by the C-11 Canal contained pollutants and this
water would not flow into WCA-3A without the operation
of the S-9 pump station, S-9 added pollutants to the WCA-
3A in violation of the CWA. On appeal, the Water District
contends that the district court erred as a matter of law in
concluding that S-9’s conveyance of water from the C-11
Canal into the WCA-3A constituted a discharge of poisut-
ants. :
II. DISCUSSION
A. Pumping of Polluted Water
We review the district court's grant of summary
judgment to Plaintiffs de novo, applying the same legal
standard as the district court. Hendrickson v. Ga. Power
Co., 240 F.3d 966, 969 (1lth Cir. 2001). For summary
judgment to be proper, no genuine issue can exist on a
material fact; and the moving party must be entitled to
judgment as a matter of law. Fed. R. Civ. P. 56(c). In
reviewing the evidence, we must draw all reasonable,
factual inferences in favor of the non-moving party. Carri-
ers Container Council, Inc. v. Mobile S.S. Ass’n, 896 F.2d
1330, 1337 (11th Cir. 1990).
The Clean Water Act prohibits the discharge of pollut-
ants from .- point source into navigable waters without an
NPDES permit. See 33 U.S.C. §§ 1311, 1342. The “dis-
charge of a pollutant” is defined as “any addition of any
pollutant to navigable waters from any point source.” See
33 U.S.C. § 1362(12). No party disputes that the S-9 pump
5a
station and, in particular, the pipes from which water is
released constitute a point source’ or that the water
released by the station contains pollutants. Also, both
parties agree that the C-11 Canal and the WCA-3A consti-
tute navigable waters. The parties mainly dispute one
legal issue: whether the pumping of the already polluted
water constitutes an addition of pollutants to navigable
waters from a point source.
Relying on a line of hydroelectric-dam cases, the
Water District argues that no addition of pollutants from a
point source can occur unless a point source adds pollut-
ants to navigable waters from the outside world. See Nat'l
Wildlife Fed’n v. Gorsuch, 693 F.2d 156, 175 (D.C.Cir.1982)
(showing deference to EPA’s interpretation that “[an]
addition from a point source occurs only if the point source
itself physically introduces a pollutant into water from the
outside world”); Nat’l Wildlife Fed’n v. Consumers Power
Co., 862 F.2d 580, 584 (6th Cir. 1988) (same).* Under the
’ A point source is defined to be “any discernible, confined and
discrete conveyance, including but not limited to any pipe ... from
which pollutants are or may be discharged.” 33 U.S.C. § 1362(14).
‘In Gorsuch, the District of Columbia Court of Appeals gave
deference to the EPA's position that, because pollutants were the result
of dam-induced water-quality changes, a dam did not add pollutants
from the outside world and, thus, no NPDES permit was required for a
dam to release the water into a downstream river. Jd. at 174-75. In
another case involving a dam and dam-induced water-quality changes,
the Sixth Circuit also concluded that the EPA's position on this question
should be deferred to if reasonable. See Consumers Power, 862 F.2d at
584. Both the Sixth and District of Columbia Circuits, in essence, gave
Chevron deference to the EPA's position that the release of water which
had been polluted by dam-related, water-quality changes and which
flowed from a dam into another body of navigable water constituted no
“discharge of pollutants.” But see Catskill Mountains Chapter of Trout
(Continued on following page)
6a
Water District’s interpretation, when a point source
conveys one navigable water into another, no addition of
pollutants will occur unless the point source itself is the
source of the pollutants which it releases. And, because S-
9 does not itself introduce pollutants from the outside into
the water which it conveys, the Water District contends no
addition of pollutants occurs.
First, we conclude that, in determining whether
pollutants are added to navigable waters for purposes
of the CWA, the receiving body of water is the relevant
body of navigable water. Thus, we must determine
whether pollutants are being added to WCA-3A. They are.”
Unlimited, Inc. v. City of New York, 273 F.3d 481, 490 (2d Cir. 2001)
(concluding EPA's position in Gorsuch and Consumers Power which was
based on policy statements and consistent litigation positions is not
entitled to Chevron deference); see also Christensen v. Harris County,
529 U.S. 576, 587, 120 S.Ct. 1655, 1662 (2000) (“{I)nterpretations
contained in policy statements, agency manuals, and enforcement
guidelines . . . do not warrant Chevron-style deference.”).
We know of no instance in which the EPA has extended its policy on
dams and dam-induced water-quality changes to facilities like the S-9
pump station. The EPA is no party to this case; we can ascertain no
EPA position applicable to S-9 to which to give any deference, much less
Chevron deference. .
We also reject the Water District's argument that the Florida
Department of Environmental Protection's decision, using the Gorsuch
addition test, that operation of the S-9 pump does not require an
NP ES permit is entitled to Chevron deference. A state agency's
inte pretation of federal law is generally not entitled to deference by
the courts. GTE South, Inc. v. Morrison, 199 F.3d 733, 745 (4th Cir.
1999).
* We reject the Water District's argument that no addition of
pollutants can occur unless pollutants are added from the outside world
insofar as the Water District contends the outside world cannot include
another body of navigable waters. Cf. Catskill Mountains, 273 F.3d at
491 (construing “outside world” to include “any place outside the
(Continued on following page)
7a
Nevertheless, for an addition of a pollutants to navigable
waters to require an NPDES permit, that addition of
pollutants must be from a point source. And, for an addi-
tion of pollutants to be from a point source, the relevant
inquiry is whether — but for the point source — the pollut-
ants would have been added to the receiving body of
water.’ We, therefore, conclude that an addition from a
point source occurs if a point source is the cause-in-fact of
the release of pollutants into navigable waters.
When a point scurce changes the natural flow of a
body of water which contains pollutants and causes that
water to flow into another distinct body of navigable water
into which it would not have otherwise flowed, that point
\
particular water body to which pollutants are introduced”) (emphasis
added). This conclusion is also consistent with precedent concluding
that a redeposit of soil which has been dredged by a boat’s propellers
can constitute an addition of pollutants requiring regulation by the
“dredge and fill” permitting system of the CWA, 33 U.S.C. § 1344. See
United States v. M.C.C. of Fla., Inc., 772 F.2d 1501, 1505-06 (11th Cir.
1985), vacated on other grounds by 481 U.S. 1034, 107 S. Ct. 1968
(1987), reinstated in relevant part on remand, 848 F.2d 1133 (11th Cir.
1988).
© As noted above, the Water District concentrates on the fact th t
S-9 is not the original source of the pollutants in the water which it
conveys. For pollutants to be from a point source, the point source does
not necessarily have to be the source or origin of pollutants. “From a
point source” can also indicate the “agent or instrumentality” or the
“cause or reason” by which the pollutants are added to navigable
waters. See The Random House Dictionary of the English Language 770
(2d ed. 1987) (defining “from”). We conclude that this interpretation of
“from” is most apt: from = by. And no dispute exists on whether
pollutants, in fact, are added to navigable waters (WCA-3A) by a point
source (S-9) here.
8a
source is the cause-in-fact of the discharge of pollutants.’
And, because the pollutants would not have entered the
second body of water but for the change in flow caused by
the point source, an addition of pollutants from a point
source occurs. Neither party disputes that, without the
operation of the S-9 pump station, the polluted waters
from the C-11 Canal would not normally flow east into the
WCA-3A.’ The S-9 pump station, therefore, is the cause-in-
fact of the addition of pollutants to the WCA-3A. We,
’ Our conclusion is consistent with the views of the First and
Second Circuits. In Dubois v. United States Department of Agriculture,
102 F3d 1273 (1st Cir. 1996), the First Circuit concluded that the
piping of water from the polluted East Branch River for commercial use
and its propdsed release into the upstream Loon Lake would constitute
an addition of pollutants from a point source. Id. at 1296-99. Then, in
Catskill Mountains, the Second Circuit concluded that the diversion of
water from a reservoir containing pollutants by tunnel into a creek for
which the reservoir was not naturally a source would constitute an
addition of pollutants from a point source. Catskill Mountains, 273 F.3d
at 492. Both courts emphasized that the two bodies of water were
separate and that pollutants would not enter the second bouy except for
the point source.
* Both the C-11 Basin and the WCA-3A were part of the historical
Everglades. Before construction of the C-11 Canal, the Levees, and the
S-9 pump station, the surface and ground waters on both side of the
Levees intermingled. The natural flow of the waters at that time was a
southerly moving sheet of water. But for man’s intervention, these
waters would essentially be a single body of navigable water.
Since the completion of the L-33 and L-37 levees, water does not
flow from the C-11 Canal into WCA-3A. Man has made the two bodies
of water two separate and distinct bodies of water. The Water District
argues that the historical hydrological connectedness of these two
bodies of water (1) precludes a finding that the WCA-3A and the C-11
Canal are two distinct bodies of water, and (2) precludes a finding that
the operation of the S-9 changes the “natural” flow of water between
these two bodies. In the context of the circumstances of this case, we
reject the Water District’s argument.
9a
therefore, conclude that the release of water caused by the
S-9 pump station’s operation constitutes an addition of
pollutants from a point source.
B. The Injunction
Next, the Water District contends that the district
court abused its discretion by enjoining the Water District
from operating the S-9 pump station without an NPDES
permit. The Water District argues that the court erred by
not applying traditional equitable standards in its grant of
the injunction. See Weinberger v. Romero-Barcelo, 456 U.S.
305, 320, 102 S. Ct. 1798, 1807 (1982) (prohibition against
discharge of pollutants in CWA does not foreclose exercise
of equitable discretion). And, according to the Water
District, had the district court balanced the potential harm
caused by enjoining the operation of S-9 against the harm
prevented,” the court would have concluded that S-9
should not be enjoined from operating without an NPDES
permit.
We review for an abuse of discretion the district
court’s decision to grant an injunction under the CWA.
Romero-Barcelo, 456 U.S. at 320, 102 S. Ct. at 1807. in
determining whether an injunction is proper, not only
should a district court “balance[ ] the conveniences of the
parties and possible injuries to them according as they
may be affected by the granting or withholding of the
injunction[,)” but the court “should [also] pay particular
regard for the public consequences in employing the
* Without the operation of S-9, the western portion of Broward
County would flood in only days.
10a
extraordinary remedy of injunction.” Jd. at 312, 102 S. Ct.
at 1803 (citation omitted); see also Million Youth March,
Inc. v. Safir, 155 F.3d 124, 125 (2d Cir. 1998) (“An injunc-
tion is an exercise of a court’s equitable authority, and the
exercise of that authority, in the vindication of any legal
protection ... must sensitively assess all the equities of
the situation, including the public interest.”); Okaw
Drainage Dist. v. Nat'l Distillers & Chem. Corp., 882 F.2d
1241, 1248 (7th Cir. 1989) (“[Ajn injunction . .. may not be
granted without consideration of the equities, including
the costs that the injunction is likely to impose on third
parties.”). Because the cessation of the S-9 pump would
cause substantial flooding in western Broward County
which, in turn, would cause damage to and displacement
of a significant number of people,” we conclude that the
people of Broward County have a very significant interest
in whether the S-9 pump station’s operation should be
enjoined.
The district court’s injunction prohibits the Water
District from operating S-9 without an NPDES permit. If
this injunction were enforced, the Water District could not
continue to operate S-9 while applying for an NPDES
permit." And although on appeal Plaintiffs defend the
© Broward County is a highly populated county with a population
of 1,623,081 according to the 2000 United States Census. See Ranking
Tables for Counties: Population in 2000 and Population Change from
1990 to 2000 (PHC-T-4) (2001), availab’e at http:// www.census.
gov/population/cen2000/ phe-t4/tab01.pdf.
" In their briefs, Plaintiffs try to draw a distinction between a
hypothetical injunction which enjoins the operation of S-9 and the
actual injunction which enjoins the operation of S-9 without an NPDES
permit. Because S-9 currently has no NPDES permit, this distinction is
(Continued on following page)
lla
district court’s injunction, Plaintiffs have repeatedly
represented that they — because of the substantial flooding
of Broward County which would result — do not really seek
the cessation of S-9’s operation. At the summary judgment
motion hearing before the district court, Plaintiffs said
these things:
We would like [the Water District] to be enjoined
from continuing [discharging pollutants without
an NPDES permit. |]
Now, I don’t, in any way, propose turning off
the pump. That has been discussed a couple of
times here. It’s sort of a frightening option, but I
don’t think that specifically is feasc6le.
However, if [the Water District] were ordered
to apply and take all necessary and appropriate
measures to obtain as quickly as possible the
necessary permits, to actually use the permit in
compliance with the law... .
So we are not asking that you just turn off
the pump or suddenly stop every single pollut-
ant....
So, declare them in violation. Order them to
get out of violation, to obtain the necessary per-
mits, to discharge in the legal manner.
R-164 at 64-65 (emphasis added).
one without a difference. The injunction that was entered does mandate
that S-9’s operation be discontinued.
12a
After the district court enjoined the operation of S-9
without a permit, the Water District brought an emer-
gency motion for relief from the judgment. Because of the
disastrous consequences of discontinuing S-9’s operation,
Plaintiffs did not oppose this motion and agreed that a
stay of the injunction was proper.” And, in response to the
Water District’s motion for reconsideration to the district
court, Plaintiffs stated that they would agree to whatever
stays were necessary for the Water District to obtain an
NPDES permit for S-9. Plaintiffs, thus, appear to recog-
nize and admit the exceedingly serious public loss that
would result from enforcing the district court’s injunction.
From the record before us, we cannot conclude that
the district court’s injunction could ever be properly
enforced. Nor can we conclude that Plaintiffs have ever
really intended for that injunction to be enforced. The
flooding of western Broward County and the resulting
displacement of the residents there do far outweigh the
continued addition of low levels of phosphorus to WCA-3A
without an NPDES permit. No district court faced with
the record could correctly conclude otherwise.
The United States Supreme Court warns “[t]here is no
power, the exercise of which is more delicate, which
requires greater caution, deliberation, and sound discre-
tion, or more dangerous in a doubtful case, than the
“ The district court originally granted a forty-day stay of the
issuance of the injunction for the Water District to seek an NPDES
permit for S-9. See R-125, R-136. The parties then filed a joint motion to
extend the stay of injunctive relief pending resolution of this appeal or
the receipt of an NPDES permit. The district court granted this joint
motion. R-142 at 1-2.
13a
issuing [sic] an injunction.” Truly v. Wanzer, 46 U.S. (5
How.) 141, 142 (1847). “Once issued, an injunction may be
enforced.” Hutto v. Finney, 437 U.S. 678, 690, 98 S. Ct.
2565, 2573 (1978). So, we do not want injunctions to linger
in existence when they are not right. Moreover, this
“strong arm of equity,” see Truly, 46 U.S. at 142, is debased
and weakened if used to issue injunctions which cannot
rightly be enforced and are actually never intended to be
enforced. “The equity court . .. must always be alert in the
exercise of its discretion to make sure that its decree will
not be a futile and ineffective thing.” MacDougall v. Green,
335 U.S. 281, 290, 69 S.Ct. 1, 5 (1948) (Douglas, J.,
dissenting). Injunctions must be taken seriously. What the
courts order to be done should be done. And what should
not or cannot be done must not be ordered to be done.
At the hearing leading up to the injunction, some
evidence and argument pointed out that severe flooding
would occur if S-9 were shut down. But, a iot of informa-
tion about other points was also presented to the district
court at about the same time. At the later hearing on the
Water District's emergency motion for relief from judg-
ment, the district court stated, “I was not aware that the
injunction would have the dire consequences of literally
opening the flood gates.” R-165 at 2. It seems to us that, in
the light of the district court’s wrong impression of the
consequences, the district court could not have correctly
balanced the possible harms — especially the harm to the
public — caused by the enjoinment of S-9 against the
benefits when it granted its injunction. That the district
court agreed to stay the injunction, when the dire conse-
quences were brought home to the district court, does not
make the injunction any less an abuse of discretion.
14a
Instead of issuing an injunction which cannot be
rightly enforced, the district court should order the Water
District to obtain an NPDES permit within some reason-
able period. And, if the Water District fails to comply with
this order, Plaintiffs may then seek to enforce the order
through the various enforcement mechanisms available
under the CWA, such as fines and criminal penalties. See
33 U.S.C. § 1319.
For the foregoing reasons, we AFFIRM the district
court’s judgment that the Water District violated the
Clean Water Act, VACATE the judgment awarding the
injunction, and REMAND for further proceedings consis-
tent with this opinion.
AFFIRMED in part, VACATED in part, and RE-
MANDED.
15a
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF FLORIDA
MICCOSUKEE TRIBE OF Case No.
INDIANS OF FLORIDA, 98-6056-CIV-FERGUSON
Plaintiff,
vs.
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT,
and SAMUEL POOLE,
Defendants.
FRIENDS OF THE ~ Case No.
EVERGLADES, 98-6057-CIV FERGUSON
Plaintiff
v.
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT,
Defendant.
/
ORDER ON MOTION FOR SUMMARY JUDGMENT
(Filed Sep. 30, 1999)
THIS CAUSE is before the Court on the Plaintiff
Miccossukee Tribe’s Motion for Summary Judgment on All
Counts of the Tribe’s Complaint [D.E.60} and on the
Defendanit’s Motion for Final Summary Judgment
[D.E.66]. Having duly considered the motions, responses,
oral argument of counsel] and pertinent portions of the
record, it is
16a
ORDERED AND ADJUDGED that the plaintiff's
motion for summary judgment [D.E.60] is GRANTED.
The defendants’ motion for summary judgment [D.E.66] is
DENIED.
Factual Background
The Miccosukee Tribe of Indians of Florida (the
“Tribe”) is a federally-recognized Indian Tribe. For genera-
tions the Tribe and its members have resided and worked
within the Florida Everglades (the “Everglades”).' The
Tribe has land interests lying within the Everglades,
including a perpetual lease to most of Water Conservation
Area 3A (“WC 3A”). The way of life of the Tribe and its
members, including their religious, cultural, economic, and
historical identity, is based upon the Everglades ecosystem
and upon preservation of the Everglades in its natural
state, including but not limited to the quantity and quality
of the Everglades’ waters.’
The Everglades is an oligotrophic’ wetlands system
which is phosphorus limited and sensitive. The level of
phosphorus, a nutrient, is the defining chemical character-
istic of the system in that the exhaustion of the available
‘ The term Everglades as used herein refers to the areas presently
identified as the Florida Water Conservation Areas, including Water
Conservation Area 3A, and Everglades National Park, although the
Everglades ecosystem historically included a much larger area.
* The Tribe's religious activities include the planting and harvest-
ing of corn on tree islands on the Everglades; its subsistence activities
include “gathering of materials”, hunting, and fishing; its commercial
activities include frogging, airboating and other guided tours and
providing recreational and tourism facilities within the Everglades.
* A body of water poor in plant nutrient minerals and organisms
and usually rich in oxygen in all depths. ~
17a
phosphorus limits the type and distribution of aquatic
flora, and fauna. The addition of phosphorus above natural
levels causes an imbalance in flora and fauna resulting in
additional detrimental growth. Further, the Everglades
has some characteristics of ultra-oligotrophic systems,
which are even more phosphorus limited and phosphorus
sensitive than oligotrophic systems.‘
In the 1950’s the South Florida Water Management
District’s (“SFWMD”) S-9 pumping station (“S-9”) with its
three pipes,’ located in urban Broward County, was com-
pleted. SFWMD, one of the five water management dis-
tricts in Florida created by the Florida Legislature and
allegedly a state agency, is charged with the operation and
management of S-9. Samuel Poole (“Poole”) was the
executive director of SFWMD when this action com-
menced.® The Tribe alleges that S-9, is the cause of the
pollutants, and has been backpumping contaminated
water which contains nutrients, such as phosphorus, into
the Everglades specifically into WC 3A, a jurisdictional
water of the United States, without the required National
* The oligotrophic conditions of the Everglades were recognized by
the Florida Department of Environmental Protection and the South
Florida Water Management District in the 1992 Settlement Agreement
and Consent decree in case number 88-1886-CIV-HOEVELER.
* There are three pumps at the S-9. Each one of the pumps can
pump 960 cubic feet per second. There are three pipes on the west side
of S-9 from which water is discharged. If the S-9 pumps are not in
operation, water does not discharge from the pipes. Pennhurst State
Sch. & Hosp. v. Halderman, 465 U.S. 89, 101 (1984).
* Poole is no longer the executive director of SFWMD. A suit
against him in his official capacity is essentially a suit against the
SFWMD. Therefore, the Court need not consider immunity against
Pooie separately.
18a
Pollutant Discharge Elimination System (“NPDES”)’
permit. The Tribe alleges that the absorption of pollutants
in the Everglades is causing degradation not only in the
water quality but in the plant materials, soils, animal
habitat and biological life, causing long term and perhaps
permanent damage to the Everglades’ system.
The Tribe states that much of the water released from
S-9 comes from the C-11 canal which is an external source
of pollutants to the Everglades, a separate body of water,
and of significantly different water quality than the
Everglades. In addition to the pollution into the Ever-
glades allegedly caused by the S-9, the Army Corps of
Engineers has been authorized by Congress to construct
the Modified Water Deliveries project to restore water to
Everglades National Park through northeastern Shark
River Slough, which will result in further pollution to
relatively pristine areas. The project will involve creating
gaps in the L-67 Levee between WC 3A and WC 3B thus
opening up relatively pristine WC 3B and the National
Park Everglades to polluted water from the S-9 pump. It is
alleged further that if the S-9 pump is not operating the
water sits in the C-11 canal, its natural direction of flow
being from west to east, and the polluted water does not
flow into the Everglades and CW 3A.
SFWMD argues that the water released from S-9,
although containing pollutants, is not adding pollutants to
the Everglades because the water from C-11 seeps into the
" A NPDES permit is an operations permit issued by the EPA to
waste water facilities discharging pollutants through a point source or
discrete conveyance. The Tribe states that SFWMD has no pending
ications for a NPDES permit.
19a
Everglades as ground water, and both areas were part of
the historical Everglades. Consequently, SFWMD contin-
ues, S-9 merely passes water between two parts of the
same body of United States water and therefore does not
create pollutants; that they are created by the C-11 and its
adjacent land uses. For these reasons, SFWMD contends,
a NPDES permit is not needed for S-9 and neither the
U.S. Environmental Protection Agency nor the State of
Florida Department of Environmental! Regulation required
one.
Standard for Summary Judgment
Federal Rule of Civil Procedure 56(c) provides that
summary judgment shall be granted if the pleadings,
depositions, answers to interrogatories, and admissions on
file, together with the affidavits, if any, show that there is
no genuine issue as to any material fact and the moving
party is entitled to judgment as a matter of law. Fed. R.
Civ. P. 56(c). A factual dispute is “genuine” if the evidence
is such that a reasonable jury could return a verdict for
the non-movant. Anderson v. Liberty Lobby, Inc., 477 U.S.
242, 248 (1986). Similarly, a fact is “material” if it might
affect the outcome of the suit under the governing sub-
stantive law. Anderson, 477 U.S. at 247.
In considering this motion for summary judgment, the
Court must examine “whether the evidence presents a
sufficient disagreement to require submission to a jury or
whether it is so one-sided that the defendant should
prevail as a matter of law.” Jd. at 243. The movant bears
the initial burden of showing the absence of a genuine
issue as to any material fact. Celotex Corp. v. Catrett, 477
U.S. 317, 323 (1986). In deciding whether the movant has
20a
met this burden, the Court must view the evidence and all
factual inferences in the light most favorable to the non-
movant. Miranda v. B & B Cash Grocery Store, Inc., 975
F.2d 1518, 1532 (11th Cir. 1992). “If reasonable minds
could differ on the inferences arising from undisputed
facts, summary judgment should be denied.” Jd. at 1534.
Once the initial burden is met, the non-movant must
come forward with specific facts showing that there is a
genuine issue for trial that precludes summary judgment.
Matsushita Elec. Indus. Co. Ltd. v. Zenith Radio Corp.,
475 U.S. 574, 587 (1986). The evidence presented cannot
consist of conclusory allegations, legal conclusions or
evidence which would be inadmissable at trial. Avirgan v.
Hull, 932 F.2d 1572, 1577 (11th Cir. 1991). Likewise, “a
mere scintilla of evidence supporting a position will not
suffice; there must be enough of a showing that the jury
could reasonably find for the [non-movant].” Anderson, 477
U.S. at 252. Failure to make a showing sufficient to
establish the existence of any essential element of a claim
is fatal and requires the entry of summary judgment.
Celotex Corp., 477 U.S. at 322-323.
Issues Presented
The issues raised are: whether SFWMD is an arm or
agency of the state immune from federal action by the
Eleventh Amendment of the Constitution and whether
there is an addition of pollutants when water containing
pollutants is discharged from S-9, a disputed point source,
into the Everglades therefore requiring a NPDES permit
in order to operate the S-9 pump.
The Tribe moves for summary judgment on Count I
and II of its complaint which allege that both the SFWMD
2la
and Poole violated the Federal Water Pollution Control Act
(“Clean Water Act”) 33 U.S.C. § 1251 et seg. by failing to
obtain a NPDES permit before transferring water between
the C-11 canal and the Everglades through S-9. SFWMD
and Pooie have filed cross-motion for summary judgment.
The parties agree that the waters in question are
navigable waters of the United States, and that the C-11
water discharged form S-9 into the Everglades is a pollut-
ant.
Eleventh Amendment Immunity
The Eleventh Amendment grants immunity to states
in federal court. Edelman v. Jordan, 415 U.S. 651, 662-63
(1974). It provides:
The Judicial power of the United States shall not
be construed to extend to any suit in law or eq-
uity, commenced or prosecuted against one of the
United States by Citizens of another State, or by
Citizens or Subjects of any Foreign State.
U.S. Const. Amend. 11.
The Eleventh Amendment does not extend to counties
or similar municipal corporations. Mt. Healthy City Sch.
Dist. Bd. of Educ. v. Doyle, 429 U.S. 274, 280 (1977). The
states’ immunity from suit specifically applies to Indian
tribes. Blatchford v. Native Village of Noatak, 501 U.S.
775, 775 (1991). Whether an entity is an arm or agency of
the state protected by the Eleventh Amendment is @
question of federal law determined with reference to
applicable state law. Magula v. Broward Gen. Med. Ctr.
742 F.Supp. 645, 648 (S.D. Fla. 1990); Fouche v. Jekyll
Island - State Park Auth., 713 F.2d 1518, 1520 (11th Cir.
22a
1983). The Eleventh Circuit has identified the following
factors for consideration in determining if an entity is an
arm or agency of the state protected by the Eleventh
Amendment: (1) how state law defines the entity; (2) the
entity's fiscal autonomy; (3) what degree of control the
state maintains over the entity; (4) where funds for the
entity are derived; and (6) who is responsible for judg-
ments against the entity. Tuveson v. Florida Governor's
Counsel on Indian Affairs, Inc., 734 F.2d 730, 732 (11th
Cir. 1984).
Whether an entity is a state agency for the purposes
of applying certain Florida” statutes is a separate and
independent question from whether the entity is a state
agency for Eleventh Amendment purposes. Tuveson, 734
F.2d at 735. The United States Supreme Court emphasized
that a judicial analysis should focus on the Eleventh
Amendment’s fundamental purposes: to prevent judg-
ments from depleting state treasuries and to maintain the
integrity retained by each state in our federal system."
Hess v. Port Auth. Trans-Hudson, 513 U.S. 30, 51 (1994). It
is the burden of SFWMD to establish the immunity
alleged. Christy v. Pennsylvania Turnpike Comm’n, 54 F.3d
1140, 1144 (3d Cir. 1995).
* A claim seeking prospective injunctive relief against a state
officer’s ongoing violation of federal law can ordinarily proceed in
federal court, and is not barred by Eleventh Amendment. Doe v. Chiles,
136 F.3d 709, 719 (11th Cir. 1998). On that theory, arguably, this action
could proceed without addressing the Eleventh Amendment issue in
that the plaintiffs are not seeking damages.
23a
1._How the State Defines SWFMD
The Florida Water Resources Act of 1972, Fla. Stat.
§ 373.069, which created five water management districts
including the SFWMD, does not characterize SFWMD as
an arm or agency of the state. Florida Statute § 189.403(6)
defines SFWMD as a “special district”:
Water management district for purposes of this
chapter means a special taxing district which is a
regional water management district created and
operated pursuant to chapter 373 or chapter 61-
691, Laws of Florida, or a flood control district.
created and operated pursuant to chapter
252270, Laws of Florida as modified by s.
373.149.
Courts in the District are divided on the question.
Those holding that SFWMD is a state agency immune
from suit are Miccosukee Tribe of Indians of Florida v.
South Florida Water Management Dist., 980 F. Supp. 448
(S.D. Fla. 1997), Bensch v. South Florida Water Manage-
ment Dist., No. 95 Civ. 1202 (S.D. Fla. 1996) and Indian
Trails Water Control District v. South Florida Water
Management Dist., No. 96 Civ. 8528 (S.D. Fla. Dec. 12,
1996). The cases reaching the opposite conclusion include
Thomas v. South Florida Water Management Dist., No. 96
Civ. 896 (M.D. Fla. Mar. 23, 1998) and IT Corp. v. South
Florida Water Management Dist., No. 97 Civ. 8872 (S.D.
Fla. July 20, 1998). As the determination is a matter of
fact and because the factual record may be better devel-
oped here than in previous cases, the Court will undertake
an independent analysis.
Unlike a state agency SFWMD is entitled to and does
levy ad valorem taxes. Article VII §9 of the Florida
Constitution states in relevant part:
24a
(a) Counties, school districts, and municipalities
shall, and special districts may, be authorized by
law to levy ad valorem taxes... .
(b) * valorem taxes ... shall not be levied in ex-
cess .! the following millages ... for water man-
agement purposes for the remaining portions of
the state, 1.0 mill; and for all other special dis-
tricts a millage authorized by law approved by
vote of the electors who are owners of freeholds
therein not wholly exempt from taxation.
See also Fla. Stat. §§ 373.1962 and 373.503. Such author-
ity to levy ad valorem taxes is prohibited to the State as
stated in Article VII, § 1 of the Florida Constitution:
(a) No tax shall be levied except in pursuance of
law. No state ad valorem taxes shall be levied
upon real estate or tangible personal property.
All other forms of taxation shall be preempted to
the state except as provided by general law.
Contrary to SFWMD’s assertion that the Florida Constitu-
tion allows it to levy ad valorem taxes as a “state agency”
the Constitution can only be read to mean that certain
“special districts”, SFWMD being one of them, are allowed
ad valorem taxing authority but not as a state agency. Of
further significance is Poole’s deposition testimony
wherein he testifies that SFWMD is responsible for its
own judgments. The record lacks evidence showing that
the state would be liable for judgments against SFWMD.
For these reasons the Court finds that on this factor
SFWMD would not meet state law definition of an agency
of the state fer purposes of the Eleventh Amendment.
25a
2. SFWMD’s Fiscal Autonomy
The Florida Statutes show that SFWMD is a self-
funded entity with the power to tax, to borrow to pay
expenses, to issue interest bearing negotiable notes and
pledge the proceeds of taxes levied. See Fla. Stat.
§§ 373.503, 373.506, 373.5639. Section 373.501 states that
the Department of Environmental Regulation “may
allocate to the water management districts from funds
appropriated to the department such sums as may be
deemed necessary to defray the costs of administrative,
regulatory, and other activities of the district.” The state’s
discretionary authority to contribute to SFWMD’s opera-
tional expenses does not establish conclusively that
SFWMD is dependent on the state. Many other entities,
for example, school districts, are highly funded by the
state but are not considered state agencies for Eleventh
Amendment purposes.
3. The States Degree of Control over SFWMD
SFWMD claims that it is controlled by the state and
relies on Fouche and several sections of the Florida Stat-
utes to support its assertion. Statutory controls exercised
by the state over SFWMD include: (1) the Governor
appoints and the Florida Senate confirms the governing
board members of SFWMD, Fila. Stat. § 373.073; (2) the
Governor approves the executive director after the Florida
Senate has confirmed the appointment by the SFWMD’s
board, Fla. Stat. § 373.079(4)(a); (3) the Department of
Environmental Protection “shall, to the greatest extent
possible, exercise supervisory authority over all water
management districts”, Fla. Stat. §§ 373.026(7); (4) SFWMD
is required to submit an annual budget and expense report
to the Governor, Legislature and the governing body of
26a
each county, Fla. Stat. § 373.507; (5) the state’s Auditor
General may, at the direction of the Governor, audit each
district’s accounts, Fla. Stat. § 373.589; (6) the district’s
annual budget may be adopted only after adequate notice
to the public and public hearing, Fla. Stat. § 373.536.
There are indeed fiscal controls and limitations on
authority imposed upon SFWMD by statute but none are
inconsistent with legal autonomy, i.e., the power to sue
and be sued. In Fouche the park authority had additional
ties to the state that SFWMD does not have with Florida,
e.g., the state was required to approve all park land sales.
Fouche, 713 F.2d at 1521. In Fouche it was also pivotal
that a judgment against the Park Authority would proba-
bly be paid by the state. In this case the fact that SFWMD
has the power to fund itself through ad valorem taxation,
and to borrow money and that direct financial support by
the state is discretionary, leans in favor of a finding that
SFWMD is not an instrumentality of state government.
4. SFWMD’s Source of Funds and Responsibility for
Judgements Against SFWMD
As found above SFWMD through its ad valorem
taxation and borrowing powers is capable of an independ-
ent financial existence even though the state may volun-
tarily appropriate funds for its operation. On a fact not
considered in other cases in the district SFWMD’s execu-
tive director conceded in deposition testimony, that pay-
ment of a judgment against SFWMD would not come from
the state appropriations but from ad valorem taxes,
agricultural privilege tax or an insurer. Neither the
Florida Constitution, or statutes make the state responsi-
ble for paying judgments against SFWMD and no evidence
is found in the record to support the contention.
27a
Based on consideration of the factors required by the
Eleventh Circuit, this Court finds that SFWMD is not an
arm or agency of the state for Eleventh Amendment
purposes.
S-9 Pump as Polluting Point Source
The Clean Water Act is a comprehensive water quality
statute enacted by Congress to restore and maintain the
chemical, physical, and biological integrity of the nation’s
waters. 33 U.S.C. § 1251l(a). Congress established the
NPDES permit program as the primary means for enforc-
ing effluent limitations imposed to achieve the Clean
Water Act’s objectives. Weber v. Trinity Meadows Raceway,
Inc., 1996 WL 477049 (N.D. Tex. 1996). The Clean Water
Act pro:ibits the discharge of pollutants from a point
source into navigable waters of the United States, unless a
NPDES permit is issued. 33 U.S.C. § 1342; National
Wildlife Fed’n v. Consumers Power Co., 862 F.2d 580, 583
(6th Cir. 1988). The term “‘discharge of a pollutant’ and
the term ‘discharge of pollutants’ each means (A) any
addition of any pollutant to navigable waters, (B) any
addition of any pollutant to the waters of a contiguous
zone from any point source or the ocean from any point
source other than a vessel or other floating craft.” 33
U.S.C. § 1362(12). The definition of pollutant includes
solid waste, sewage, garbage, biological materials, and
wrecked or discarded equipment. 33 U.S.C. § 1362(6).
Navigable waters means the waters of the United States.
33 U.S.C. § 1362(7). The term point source is defined as
“any discernable, confined, and discrete conveyance,
including but not limited to any pipe, ditch, channel,
tunnel, conduit ... from which pollutants are or may be
discharged.” 33 U.S.C. § 1362(14).
28a
The Tribe relies on Dubois v. United States Dept. of
Agric., 102 F.3d 1273 (1st Cir. 1996) in support of its
position. Dubois is persuasive authority. Dubois involved
the use of Loon Pond’ by a ski resort as a source of water
and a repository for disposal of water for its snow making
system. The ski resort used water not only from Loon Pond
but from another river to make snow. In doing so pollut-
ants were being transferred from the river into Loon Pond.
The argument made and rejected in Dubois was that the
two bodies of water were a “single entity” so there could
have been uo “addition” of pollutants by the transfer of
water from the river to the pond. In United States v.
M.C.C. of Florida, Inc., 772 F.2d 1501, 1506 (11th Cir.
1985), as noted by Duvois, the Eleventh Circuit also
rejected the “single entity’ theory and found a “discharge
of a pollutani” in violatior of the Clean Water Act where
spoil dredged by the pronellers of a vessel were deposited
on an adjacent sea grass bed.
In this case an addition of pollutants exists because
undisputedly water containing pollutants is being dis-
charged through S-9 from C-11 waters into the Everglades,
both of which are separate bodies of United States water
with a different quality levels. They are two separate
bodies of water because the transfer of water or its con-
tents from C-11 into the Everglades would not occur
naturally. Dubois, 102 F.3d at 1297. That at one time these
two bodies of water were hydrologically connected is now
* Loon Pond is located in the White Mountain National Forest and
is classified as a Class A waterbody protected by demanding water
quality standards.
29a
irrelevant and ignores the fundamental direction of water
flow factor. Dubois, 102 F.3d at 1298.
SFWMD and Poole contend that S-9 is not a point
source because it does not create the pollutants discharged
into the Everglades. They claim the C-11 canal which
contains runoffs from developed lands eastern in Broward
county is the pollutants’ source. Under the Clean Water
Act, § 1362(14), a pipe, such as the three in S-9 is a point
source because it discharges pollutants. It is not necessary
that the conveyance be the originator of the transferred
contaminants. There is no doubt in this case, and it is
uncontested by the parties, that S-9 is discharging pollut-
ants into the Everglades. That the pollutants are not
formed solely by S-9 is immaterial in a plain reading of the
Act.
Conclusion
The Everglades, which includes the CW 3A and the C-
11 canal, are two distinct bodies of water within the
meaning of the Clean Water Act even if the waters were
hydrologically connected at one time. The seepage from
the C-11 canal that SFWMD refers to could not flow
naturally from the C-11 canal to the CW 3A and the
Everglades. The S-9 pump effects an unnatural flow,
transferring polluted water from the C-11 canal through
the S-9 pump into relatively pristine Everglades water.
Therefore the pump is a point source for which a NPDES
permit is required.
30a
DONE AND ORDERED in Chambers at Ft. Lauder-
dale, Florida, this 30th day of September, 1999.
/s/ Wilkie D.
WILKIE D. FERGUSON, JR.
UNITED STATES DISTRICT JUDGE
copies provided:
Dione C. Carroll, Esq.
John E. Childe, Esq.
Douglas H. MacLaughlin, Esq.
Perla Sole-Calas, Esq.
Barbara A. Markham, Esq.
Ruth P. Clements, Esq.
3la
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF FLORIDA
MICCOSUKEE TRIBE OF Case No. 98-6056-
INDIANS OF FLORIDA, CIV-FERGUSON
Plaintiff,
vs.
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT, and
SAMUEL POOLE,
Defendants.
/
FRIENDS OF THE Case No. 98-6057-
EVERGLADES, CIV-FERGUSON
Plaintiff,
Vv.
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT,
Defendant.
FINAL SUMMARY JUDGMENT
(Filed September 30, 1999)
IN ACCORDANCE with the Order granting plain-
tiffs summary judgment [D.E. 60], it is
ORDERED AND ADJUDGED that final judgment
is hereby entered in favor of the plaintiff enjoining
SFWMD from transferring waters from the C-11 canal
through the S-9 pump into the Everglades without a
NPDES permit. Any pending motions not ruled upon are
32a
rendered moot by this final default judgment. This case
is closed.
DONE AND ORDERED in Chambers at Ft. Lauder-
dale, Florida, this 30th day of September, 1999.
/s/ Wilkie D Ferguson, Jr.
WILKIE D. FERGUSON, JR.
UNITED STATES
DISTRICT JUDGE
copies provided:
Dione C. Carroll, Esq.
John E. Childe, Esq.
Douglas H. MacLaughlin, Esq.
Perla Sole-Calas, Esq.
Barbara A. Markham, Esq.
Ruth P. Clements, Esq.
33a
IN THE UNITED STATES COURT OF APPEALS
FOR THE ELEVENTH CIRCUIT
No. 00-15703-CC
MICCOSUKEE TRIBE OF INDIANS
OF FLORIDA, SAM POOLE,
Plaintiffs-Appellees,
versus
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT,
Defendant-Appellant.
FRIENDS OF THE EVERGLADES,
Plaintiff-Appellee,
versus
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT,
Defendant-Appellant.
On Appeal from the United States District Court for the
Southern District of Florida
ON PETITION(S) FOR REHEARING AND PETITION(S)
FOR REHEARING EN BANC
(Opinion __, llth Cir.,19___, _ F.2d
=
34a
(Filed Jun. 21, 2002)
Before. EDMONDSON, CHIEF JUDGE, CARNES, Circuit
Judge and MUSGRAVE, Judge.
PER CURIAM:
The Petition(s) for Rehearing are DENIED and no Judge
in regular active service on the Court having requested
that the Court be polled on rehearing en banc (Rule 35,
Federal Rules of Appellate Procedure), the Petition(s) for
Rehearing En Banc are DENIED.
ENTERED FOR THE COURT:
/s/ J.L. Edmondson
CHIEF JUDGE
* Honorable R. Kenton Musgrave, Judge, U.S. Court of Interna-
tional Trade, sitting by designation.
35a
SUPREME COURT OF THE UNITED STATES
OFFICE OF THE CLERK
WASHINGTON, DC 20543-0001
WILLIAM K. SUTER AREA CODE 202
CLERK OF THE COURT 479-3011
August 29, 2002
Mr. James E. Nutt
3301 Gun Club Road
West Palm Beach, FL 33406
Re: South Florida Water Management District
v. Miccosukee Tribe of Indians, et al.
Application No. 02A183
Dear Mr. Nutt:
The application for an extension of time within which
to file a petition for a writ of certiorari in the above-
entitled case has been presented to Justice Kennedy, who
on August 29, 2002, extended the time to and including
October 21, 2002.
This letter has been sent to those designated on the
attached notification list.
Sincerely,
WILLIAM K. SUTER, Clerk
By /s/ Sandra Elliott Spagnolo
Assistant Clerk en
36a
NOTIFICATION LIST
Mr. James E. Nutt
3301 Gun Club Road
West Palm Beach, FL 33406
Mr. Dexter W. Lehtinen
7700 North Kendall Drive
Suite 303
Miami, FL 33156
Mr. John E. Childe
606 Pine Road
Palmyra, PA 17078
Clerk -
United States Court of Appeals for
the Eleventh Circuit
56 Forsyth Street, N.W.
Atlanta, GA 30303
37a
33 U.S.C. § 1251 Congressional declaration of goals
and policy
(a) Restoration and maintenance of chemical,
physical and biological integrity of Nation’s waters;
national goals for achievement of objective. The
objective of this chapter is to restore and maintain the
chemical, physical, and biological integrity of the Nation’s
waters. In order to achieve this objective it is hereby
declared that, consistent with the provisions of this chap-
ter -
(1) it is the national goal that the discharge of
pollutants into the navigable waters be eliminated by
1985;
* * *
(b) Congressional recognition, preservation, and
protection of primary responsibilities and rights of
States. It is the policy of the Congress to recognize,
preserve, and protect the primary responsibilities and
rights of States to prevent, reduce, and eliminate pollu-
tion, to plan the development and use (including restora-
tion, preservation, and enhancement) of land and water
resources, and to consult with the Administrator in the
exercise of his authority under this chapter. It is the policy
of Congress that the States manage the construction grant
program under this chapter and implement the permit
programs under sections 1342 and 1344 of this title. It is
further the policy of the Congress to support and aid
research relating to the prevention, reduction, and elimi-
nation of pollution, and to provide Federal technical
services and financial aid to State and interstate agencies
and municipalities in connection with the prevention,
reduction, and elimination of pollution.
38a
(g) Authority of States over water. It is the policy of
Congress that the authority of each State to allocate
quantities of water within its jurisdiction shall not be
superseded, abrogated or otherwise impaired by this
chapter. It is the further policy of Congress that nothing in
this chapter shall be construed to supersede or abrogate
rights to quantities of water which have been established
by any State. Federal agencies shall co-operate with State
and local agencies to develop comprehensive solutions to
prevent, reduce and eliminate pollution in concert with
programs for managing water resources.
33 U.S.C. § 1311. Effluent limitations
(a) Ilegality of pollutant discharges except in
compliance with law. Except as in compliance with this
section and sections 1312, 1316, 1317, 1328, 1342, and
1344 of this title, the discharge of any pollutant by any
person shall be unlawful.
* * *
33 U.S.C. § 1314. Information and guidelines.
* * *
(f) Identification and evaluation of nonpoint
sources of pollution; processes, procedures, and
methods to control pollution. The Administrato1, after
consultation with appropriate Federal and State agencies
and other interested persons, shall issue to appropriate
Federal agencies, the States, water pollution control
agencies, and agencies designated under section 1288 of
this title, within one year after October 18, 1972 (and from
time to time thereafter) information including (1) guide-
39a
lines for identifying and evaluating the nature and extent
of nonpoint sources of pollutants, and (2) processes,
procedures, and methods to control pollution resulting
from —
* * *
(F) changes in the movement, flow, or circulation of any
navigable waters or ground waters, including changes
caused by the construction of dams, levees, channels,
causeways, or flow diversion facilities.
* * *
33 U.S.C. § 1362 Definitions
Except as otherwise specifically provided, when used in
this chapter:
* * *
(6) The term “pollutant” means dredged spoil, solid
waste, incinerator residue, sewage, garbage, sewage
sludge, munitions, chemical wastes, biological materials,
radioactive materials, heat, wrecked or discarded equip-
ment, rock, sand, cellar dirt and industrial, municipal, and
agricultural waste discharged into water... .
* *x *
(12) The term “discharge of a pollutant” and the term
“discharge of pollutants” each means (A) any addition of
any pollutant to navigable waters from any point source,
(B) any addition of any pollutant to the waters of the
contiguous zone or the ocean from any point source other
than a vessel or other floating craft.
* * *
40a
(14) The term “point source” means any discernible,
confined and discrete conveyance, including but not
limited to any pipe, ditch, channel, tunnel, conduit, well,
discrete fissure, container, rolling stock, concentrated
animal feeding operation, or vessel or other floating craft,
from which pollutants are or may be discharged. This term
does not include agricultural stormwater discharges and
return flows from irrigated agriculture.
* * *
(16) The term “discharge” when used without qualifica-
tion includes a discharge of a pollutant, and a discharge of
pollutants.
* * *
(19) The term “pollution” means the man-made or man-
induced alteration of the chemical, physical, biological,
and radiological integrity of water.
40 CFR Ch. 1 (7-1-01 Edition)
§ 122.2 Definitions.
* * *
Discharge when used without qualification means the
“discharge of a pollutant.”
Discharge of a pollutant means:
(a) Any addition of any “pollutant” or combination of
pollutants to “waters of the United States” from any “point
source,” or
(b) any addition of any pollutant or combination of
pollutants to the waters of the “contiguous zone” or the
ocean from any point source other than a vessel or other
4la
floating craft which is being used as a means of transpor-
tation.
This definition includes additions of pollutants into
waters of the United States from: surface runoff which is
collected or channeled by man; discharges through pipes,
sewers, or other conveyances owned by a State, municipal-
ity, or other person which do not lead to a treatment
works; and discharges through pipes, sewers, or other
conveyances, leading into privately owned treatment
works. This term does not include an addition of pollut-
ants by any “indirect discharger.”
Fla. Stat. § 403.0885. Establishment of federally
approved state National Pol-
lutant Discharge Elimination
System (NPDES) Program
(1) The Legislature finds and declares that it is in the
public interest to promote effective and efficient regulation
of the discharge of pollutants into waters of the state and
eliminate duplication of permitting programs by the United
States Environmental Protection agency under s. 402 of
the Clean Water Act, Pub. L. No. 92-500, as amended, 33
U.S.C. ss. 1251 et seq, and the department under this
chapter. * * *
(2) The department is empowered to establish a state
NPDES program in accordance with s. 402 of the Clean
Water Act, as amended. The department shall have the
power and authority to assume the NPDES permitting
program from the United States Environmental Protection
Agency and to implement the program, including the
general permitting program under 40 C.F.R. s. 122.28 and
the pretreatment program under 40 C.F.R. part 403, in
42a
accordance with s. 402(b) of the Clean Water Act, as
amended, and 40 C.F.R. part 123. * * * The state NPDES
permit shall be the sole permit issued by the state under
this chapter regulating the discharge of pollutants or
wastes into surface waters within the state for discharges
covered by the United States Environmental Protection
Agency approved state NPDES program. This legislative
authority is intended to be sufficient to enable the de-
partment to qualify for delegation of the federal NPDES
program to the state and operate such program in accor-
dance with federal law. * * *
Fla. Admin. Code Ch. 62-620.200 Definitions
The following words and phrases when used in this chap-
ter shall, unless the context clearly indicates otherwise,
have the following meanings: .. .
(12) “Discharge of a pollutant” means any addition of
any pollutant or combination of pollutants, as defined in
40 C.F.R. 122.2, to waters from any point source cther
than a vessel or other floating craft which is being used as
a means of transportation. This definition includes addi-
tions of pollutants into the waters from surface runoff
which is collected or channeled by man, and discharges
through pipes, sewers, or other conveyances which do not
lead to a treatment works. This term does not include an
addition of pollutants by any indirect discharger.
43a
[LOGO] Department of
Environmental Protection
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
Jeb Bush David B. Struhs
Governor Secretary
22 January 1999
Ms. Barbara A. Markham, General Counsel
South Florida Water Management District
3301 Gun Club Road
West Palm Beach, Florida 33406
Subject: NPDES Permit for S-9 Pump Station
Dear Ms-Markham Barbara:
This is in response to your letter of November 25,
1998, regarding the S-9 pumping station in Broward
County. You requested that the Department provide you
with an opinion as to whether the District is required
under section 403.0885 of the Florida Statutes to obtain an
NPDES permit for the discharge at the S-9 pump station.
Upon reviewing the information that you submitted, it is
the Department’s position that the District is not required
to obtain a permit for the S-9 structure for the following
reasons.
NPDES Permit Program
The Clean Water Act (CWA) provides that the “dis-
charge of any pollutant by any person” is unlawful. 33
U.S.C. § 1311(a). Notwithstanding this prohibition, the
44a
CWA allows the U.S. Environmental Protection Agency
(EPA) or an approved state’ to issue a permit under the
National Pollutant Discharge Elimination System
(NPDES) program for the discharge of any pollutant so
long as the discharge meets the requirements of the CWA.
33 U.S.C. §1342(a).
The CWA defines a “discharge of a pollutant” as “any
addition of any pollutant to navigable waters from any
point source.” 33 U.S.C. § 1362(12). Therefore, under the
CWA, for an NPDES permit to be required, five elements
must be present: (1) a pollutant; (2) must be added; (3) to
navigable waters; (4) from; (5) a point source. National
Wildlife Federation v. Gorsuch, 693 F.2d 156, 165 (D.C.
Cir. 1982). _
Additionally, the Department’s own rule defines the
“discharge of a pollutant” in the same manner. Rule 62-
620.200 of the Florida Administrative Code defines “dis-
charge of a pollutant” as “any addition of any pollutant or
combination of pollutants, as defined in 40 C.F.R. 122.2, to
waters from any point source other than a vessel or other
floating craft which is being used as a means of transpor-
tation.” Under the Department’s rules, the same five
elements must be present for an NPDES permit to be
required.
The S-9 pumping station does not meet all five of
these elements and therefore, no NPDES permit is needed
for this structure.
' As you know, EPA has approved the Department’s permitting
program under section 402(b) of the CWA. Therefore, permits issued by
the Department are in lieu of NPDES permits issued by EPA.
“Addition of a Pollutant”
Because the Department does not have any rules
defining what is meant by the phrase “addition of a pollut-
ant,” we rely on the CWA and the case law interpreting
the CWA in defining what is meant by this phrase. There
is a long line of case law that has interpreted this phrase
to mean that there must be an addition, or an introduc-
tion, of a pollutant, and it must be from a point source. See
Appalachian Power Co. v. Train, 545 F.2d 1351 (4th Cir.
1976) (Constituents occurring naturally in the waterways
or occurring as a result. of other industrial discharges, do
not constitute an addition of pollutants by a plant through
which they pass); Gorsuch, supra (Addition from a point
source occurs only if the point source itself physically
introduces a pollutant into water from the outside world);
National Wildlife Federation v. Consumers Power Com-
pany, 862 F.2d 580 (6th Cir. 1988) (There is no addition of
a pollutant unless the point source discharge physically
introduces a pollutant into the water from the outside
world).
Based on the information submitted by you, the S-9
pumping station will not be “adding” any pollutants as
that phrase is defined by the above-cited cases. There is no
evidence that any oils or metals from the pump itself are
entering into WCA-3A in any detectable amounts. Thus,
this element of the definition is not met.
“From”
EPA’s interpretation regarding this element is that
that addition of a pollutant must occur “from” a point
source and not merely through a point source. See Gor-
such, 693 F.2d at 175 n.58. The courts, however, have
46a
treated this element as one requiring causation. See Dague
v. City of Burlington, 935 F.2d 1343 (2nd Cir. 1991), rev'd
on other grounds, 112 S.Ct. 2638 (1992) (Where the city’s
landfill caused pollutants to enter navigable waters, and
where those pollutants were then conveyed through a
railroad culvert into additional navigable waters, the
culvert was a point source under the CWA rendering the
city responsible under the CWA).
As you pointed out in your letter, certain pollutants
are in the water in the C-11 canal that pass through the S-
9 pump station and are discharged into the canal in the
WCA-3A. However, the S-9 pump station is not the cause
of these pollutants being in the water in the C-11. Rather,
the S-9 structure is merely transferring water from one
navigable water of the U.S. to another. As such, this
element of the definition is not met.
“Point Source”
The term “point source” isdefined by the CWA as:
any discernible, confined and discrete convey-
ance, including but not limited to any pipe, ditch,
channel, tunnel, conduit, well, discrete fissure,
container, rolling stock, concentrated animal
feeding operation, or vessel or other floating
craft, from which pollutants are or may be dis-
stormwater discharges and return flows from ir-
33 U.S.C. § 1362(14). Rule 62-620.200(34), F.A.C., defines
the term “point source” in much the same way. The CWA
goes on further to define “nonpoint sources of pollution” as
pollution resulting from “changes in the movement, flow,
47a
or circulation of any navigable waters or ground waters,
including changes caused by the construction of dams,
levees, channels, causeways, or flow diversion facilities.”
The S-9 pumping station falls within the definition of a
nonpoint source of pollution, as that term is used in the
CWA, rather than a point source because it is merely
changing the movement and flow of a navigable water.
Therefore, this element of the definition also is not met.
Additionally, the Sixth Circuit court in Consumer
Power noted, as in Gorsuch, that the NPDES system
stands alongside the system of controlling nonpoint
sources of pollution and that “Congress apparently in-
tended that problems caused by dams and other flow
diversion facilities are generally to be regulated by means
other than the NPDES permitting program. Consumer
Power, at 587, 588. The S-9 facility is a flow diversion
facility and should therefore be regulated by means other
than the NPDES permitting program and it is. The De-
partment, pursuant to section 373.4596(9)(k) and (1) of the
Florida Statutes, already permits the S-9 pump station.
This permit requires that the S-9 pump station discharge
meet all state water quality standards no later than
December 31, 2006.
Conclusion
Because all five elements of the term “discharge of
pollutants” are not met, it is the Department’s position
that the S-9 pumping structure does not require an
NPDES permit for operation.
48a
If you have any questions regarding this determina-
tion, please contact either myself at (850) 488-9735 or
Jennifer Fitzwater of my office at (850) 921-9611.
Sincerely,
/s/ F. Perry Odom
F. Perry Odom
Genera! Counsel
FPO/lf
Ce: Ernie Barnett, FDEP
Jerry Brooks, FDEP
Frank Nearhoof, FDEP