Nos. 98-1701 and 98-1706

IN THE

Supreme Court of the United States

THE INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS (INTERTANKO),

Petitioner,

and

UNITED STATES OF AMERICA,

Petitioner,

Vv.

GARY LOCKE, Governor of the State of Washington, er ai.,

Respondents.

On Writ of Certiorari to the

United States Court of Appeals for the Ninth Circuit

JOINT APPENDIX

SETH P. WAXMAN C. JONATHAN BENNER

Solicitor General ECKERT SEAMANS CHERIN

Department of Justice & MELLOTT, LLC

Washington, DC 20530-0001 1250 24th Street, N.W.

(202) 514-2217 Suite 700

Counsel of Record for Washington, DC 20037

Petitioner, United States (202) 659-6600

of America Counsel of Record for

Petitioner, INTERTANKO

CHRISTINE O. GREGOIRE JEFFREY L. NEEDLE

Attorney General LAW OFFICES OF

P.O. Box 40100 JEFFREY L. NEEDLE

Olympia, WA 98504-0100 —-119 First Avenue South

(360) 753-6245 Suite 200

Counsel of Record for Seattle, WA 98104

State Respondents (206) 447-1560

Counsel of Record for

Respondent-Intervenors

—————————————————————

Petitions for Writ of Certiorari Filed April 23, 1999

Certiorari Granted September 10, 1999

i

TABLE OF JOINT APPENDIX

Page

Relevant Docket Entries, Ninth Circuit and U.S.

Demet Comst (WD. WO.) . . oss 0: emwin ws JA-1

Letter of August 25, 1993 from Adm. Henn USCG to

Barbara Herman, OMS

Declaration of Robert Bishop in Support of Plaintiff

Letter of September 15, 1995 from OMS to Chronos

Shipping with Notice of Determination... .

Letter of June 22, 1995 to Barbara Herman, OMS

from Adm. Card USCG

January 30, 1991 Memorandum from Chief Counsel,

USCG to Chief of Staff Re: Review of

California Oil Spill Prevention and Response

Affidavit of C. Jonathan Neel (States/British

Columbia Oil Spill Task Force)

Exhibit 38

Law of the Sea Treaty Provisions

Affidavit of William B. Collins

Affidavit of Stanley J. Norman.............. JA- 88

MND BE. ow as vba kok XA ee JA-128

GP cc cece cccenediele cea JA-129

SUE SY oes bene cen eee JA-133

Exhibit 33

Exhibit 34

{[Note: Exhibits 33 and 34 are oversized

exhibits that Respondent has lodged separately

with the Court.]

Affidavit of Megan N. Dethier (Shoreline Habitats). . JA-136

Affidavit of Ronald M. Thom (Coastal Aquatic

Vegetated Habitats in Washington State). . JA-145

Affidavit of Dennis Paulson (Seabirds-Valuable and

Vulnerable Resources of Washington’s Marine

Wet). 64s is eaeewc tue JA-161

Affidavit of Morris W. Barker —_................ JA-173

Affidavit of Susan Zemek ................ JA-180

Fy rn ermeery te a JA-182

Affidavit of Richard Kocan ............... JA-191

Affidavit of Ronald F. Teissere ............ JA-200

Affidavit of Arthur McKenzie in Support of Intervenors’

Motion for Summary Judgment ........ JA-203

Declaration of Sally Ann Lentz in Support of Motion

for Summary Judgment ............. JA-211

Ames Cia ctteceenmean JA-219

ph ne rp JA-223

Page

Attachments to Declaration of Darin Bartram ... JA-245

Second Affidavit of Stanley J. Norman ....... JA-253

ees gn 2 aT eeeee JA-264

Te Meals abies Ulli ts els oo « JA-266

OE ES Te a JA-292

Declaration of William Bafus with Table "A" ... JA-295

Attachment to Reply by Plaintiff Intertanko.... . JA-301

Declaration of Jeffrey Needle in Reply to Intervenors'’

Motion for Summary Judgement ....... JA-304

Attachment A-Report Of Lord Donaldson's Inquiry

Into The Prevention Of Pollution From

a JA-306

Letter of September 28, 1993 From the Washington

State Congressional Delegation to

Commandant J. William Kime USCG ... JA-327

Affidavit of Arthur McKenzie ............. JA-330

iv

The following opinions, decisions, judgments and orders have

been omitted in printing this joint appendix because they

appear on the following pages in the appendix to the printed

Petition for Certiorari:

Order and Amended Opinion Of The United States

Court of Appeals For The Ninth Circuit Dated

And Filed June 18, 1998 And Amended

August 31, 1998 (Appendix A)............

Order Of The United States District Court For The

Western District Of Washington At Seattle

Dated, Entered And Filed November 18, 1996

(AUTRE Dg ot ecko uc twee ccdesecies

Order Of The United States Court Of Appeals For

The Ninth Circuit Dated And Filed November

DE, CI EGE hc evn aticcevaces

JA-1

UNITED STATES COURT OF APPEALS

FOR THE NINTH CIRCUIT

97-35010

INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS;

Plaintiff-Appellant

USA

Intervenor-Appellant

Vv.

MIKE Lowry, Governor of the State of WA, et al

Defendants- Appellees

and

NATIONAL NATURAL RESOURCES DEFENSE COUNCIL;

WASHINGTON ENVIRONMENTAL COUNCIL;

OCEAN ADVOCATES INC.

Intervenors-Appellees

RELEVANT DOCKET ENTRIES

DATE PROCEEDINGS

4/24/97 Filed motion by the United States to

intervene; served on 4/23/97 [3218850]

(MOATT) [97-35010} (gail)

5/9/97 Received original and 15 copies amicus

curiae Int'l Chamber of Shipping's brief of

50-pgs; served on 5/7/97 (mtn to file

pending) [97-35010} (gail)

DATE

5/12/97

6/6/97

7/1/97

9/3/97

9/3/97

2/4/98

JA-2

PROCEEDINGS

Filed original and 15 copies intervenor

USA's amicus curiae brief of 56-pgs; served

on 5/7/97 [97-35010] (gail)

* * * * The mtn to intervene filed by the US

is granted. * * * *

Filed original and 15 copies Appellant's

opening brief of 92-pgs and 5 excerpts of

record (Informal: no); served on 6/30/97

[97-35010] (gail)

Filed original and 15 copies appellees (Gary

Locke, et al.)'s ans brf of 64 pgs +

appendix and 5 excerpts of record in 6 vols.:;

served on 8/25/97 [97-35010] (gail)

Received original and 15 copies intv/aple

(National Res Def Cncl, Washington Env

Cncl, and Ocean Advocates) brief of 63-pgs

(Recvd because brfs are missing proof of

service; notified cnsl.) [97-35010] (gail)

ARGUED AND SUBMITTED TO James

R. BROWNING, served on 7/31/98

(PANEL AND ALL ACTIVE JUDGES)

(97-35010] (gail)

DATE

8/31/98

8/31/98

11/24/98 °

JA-3

PROCEEDINGS

Filed order and amended opinion. The

panel's opinion, filed on 6/18/98, is

amended as follows: (For Complete Text

See Order) (FAXED TO CSL AT 2:32

P.M.) (Judges James R. BROWNING,

Diarmuid F. O'SCANNLAIN, Alfredo C.

Marquez,) (Orig. opinion id: [3472982-1])

[97-35010] (gail)

[3499649] Filed original and 40 copies aplt

Intl Assoc of Indep petition for rehearing

with suggestion for rehearing en banc 20

p.pages, served on 8/31/98 (PANEL AND

ALL ACTIVE JUDGES) [97-35010] (gail)

Filed order (James R. Browning, Diarmuid

F. O'SCANNLAIN, Alfredo C. Marquez):

The panel has unanimously voted to deny

the pet for rhrg. Judge Browning and Judge

O'Scannlain have voted to reject the sugg

for rhrg en banc, and Judge Marquez so

recommends. The full ct was advised of the

suggs for rhrg en banc. An active judge

requested a vote on whether to rehear the

matter en banc. The matter failed to receive

a majority of the votes of the nonrecused

judges in favor of en banc consideration.

FRAP 35. The pets for rhrg are DENIED

and the suggs for rhrg en banc are

REJECTED. (Judge Graber's dissent to

denial of pet for rhrg included) (See Order

for Full Text.) [3499345-1] [97-35010]

(gail)

DATE

12/2/98

3/18/99

JA-4

PROCEEDINGS

MANDATE ISSUED [97-35010] (jr)

Received letter from the Supreme Court

dated 3/15/99 re: ext of time to file pet for

writ of cert has been extended to 4/23/99

(Casefile) [97-35010] (gail)

JA-5

UNITED STATES DISTRICT COURT FOR THE

WESTERN DISTRICT OF WASHINGTON

2:95cv 1096

INTERTANKO, ef al.

V.

Lowry, et al.

RELEVANT DOCKET ENTRIES

DATE NO.

VAW/9S— 1

9/19/95 12

1/25/96 --

PROCEEDINGS

COMPLAINT of Intertanko for

declaratory relief and permanent

injunction against the enforcement of

certain statutes and regulations of the

State of WA purporting to regulate

operations, manning, and equipment of

tank vessels in interstate and

international commerce (Summons(es)

issued) Receipt # 223757 (gm) [Entry

date 07/28/95]

ANSWER to complaint [1-1] by

defendant Mike Lowry, defendant

Christine O Gregoire, defendant

Barbara J Herman (gm) [Entry date

09/22/95]

PROPOSED Intervenor's Answer by

defts Natural Resources Defense

Council & WA Environmental Council

(gm) [Entry date 01/31/96]

DATE

1/25/96

6/3/96

6/3/96

6/3/96

6/3/96

6/3/96

NO.

87

89

102

103

105

JA-6

PROCEEDINGS

ANSWER to complaint filed by

Intervening Defts Natural Resources

Defense Council & WA Environmental

Council [1-1] (gm) [Entry date

01/31/96]

MOTION by State defendants for

partial summary jgmnt; O.A. REQ'D

NOTED FOR 7/19/96 (JOINT

APPENDIX FILED IN EXPANDOS)

(gm) [Entry date 06/04/96] [Edit date

06/05/96]

MEMORANDUM by defendants in

support of motion for partial summary

jgmnt [87-1] (gm) [Entry date

06/04/96}

MOTION by intervenor National

Resources, intervenor WA Environ

Coun, intervenor Ocean Advocates Inc

for summary jgmnt; O.A. REQ'D

NOTED FOR 7/19/96 (gm) [Entry date

06/04/96}

MEMORANDUM by intervenor in

support of motion for summary jgmnt

[102-1] (gm) [Entry date 06/04/96]

MOTION by plaintiff Intertanako for

summary jgmnt; O.A. REQ'D NOTED

FOR 7/19/96 (gm) [Entry date

06/04/96]

DATE

6/3/96

6/3/96

7/2/96

7/3/96

7/3/96

NO.

107

113

116

117

JA-7

PROCEEDINGS

MEMORANDUM by ss opiaintiff

Intertanko in support of motion for

summary jgmnt [105-1] (FILED IN

EXPANDO) (gm) [Entry date

06/04/96] [Edit date 06/05/96]

APPENDIX VOLUME I thru IV filed

by plaintiff Intertanko re motion for

summary jgmnt [105-1] (FILED IN

EXPANDOS) (gm) [Entry date

06/04/96]

OPPOSTION (RESPONSE) by

defendant James H. Krider to motion

for summary jgmnt AND JOINDER of

"State Defts" OPPOSITION TO

Summary Judgment [105-1] (gm)

{Entry date 07/03/96]

MEMORANDUM OF POINTS AND

AUTHORITIES IN RESPONSE by

plaintiff Intertanko to motion for

summary jgmnt [102-1] (FILED IN

EXPANDO) (gm) [Edit date 07/08/96]

MEMORANDUM IN OPPOSITION

(RESPONSE) by plaintiff Intertanko to

motion for summary judgment [99-1]

(FILED IN EXPANDO) (gm) [Edit

date 07/08/96]

DATE

7/3/96

7/3/96

7/3/96

7/15/96

7/15/96

7/15/96

NO.

118

119

121

131

132

134

JA-8

PROCEEDINGS

MEMORANDUM OF POINTS AND

AUTHORITIES IN RESPONSE by

plaintiff Intertanko to motion for partial

summary jgmnt [87-1] (FILED IN

EXPANDO) (gm) [Edit date 07/08/96]

RESPONSE by intervenor to motion

for summary jgmnt [105-1] (gm) [Entry

date 07/08/96]

RESPONSE by State defendants to

motion for summary jgmnt; [105-1]

(gm) [Entry date 07/08/96]

REPLY by plaintiff Intertanko TO

Intervenors RESPONSE to motion for

summary jgmnt [105-1] (FILED IN

EXPANDO) (gm) [Entry date

07/17/96] [Edit date 07/17/96]

REPLY by plaintiff Intertanko TO State

Defts RESPONSE to motion for

summary jgmnt [105-1] (FILED IN

EXPANDO) (gm) [Entry date

07/17/96}

REPLY by State Defts TO pltf

Intertanko's RESPONSE to motion for

partial summary jgmnt [87-1] (gm)

[Entry date 07/17/96]

- —

DATE

7/15/96

9/24/96

9/24/96

9/24/96

9/27/96

NO.

136

147

148

150

154

JA-9

PROCEEDINGS

REPLY MEMORANDUM by

intervenor IN SUPPORT OF motion

for summary jgmnt [102-1] (gm) [Entry

date 07/17/96]

MOTION by intervenor WA Environ

Coun to supplement the summary

judgment record NOTED FOR

10/11/96 (gm) [Entry date 09/25/96]

MEMORANDUM by intervenor WA

Environ Coun in support of motion to

supplement the summary judgment

record [147-1] (gm) [Entry date

09/25/96]

SUPPLEMENTAL DOCUMENTS in

support of AND IN OPPOSITION to

Summary Judgment by intervenor WA

Environ Coun to [105-1] (gm) [Entry

date 09/25/96]

RESPONSE by plaintiff Intertanko to

motion to supplement the summary

judgment record [147-1] (gm) [Entry

date 09/30/96]

DATE

9/30/96

10/7/96

10/9/96

10/22/96

NO.

156

157

159

160

JA-10

PROCEEDINGS

MINUTE ORDER: by direction of

Judge John C. Coughenour

GRANTING Intervenors motion to

shorten time and accompanying motion

to supplement the summary judgment

record with additional documents. The

documents submitted by intervenors

and the documents submitted by pltf

with its response to intervenors' motion

to supplement are hereby added to the

summary judgment record. [147-1]

[151-1], (cc: counsel, Judge) (gm)

STATEMENT OF ADDITIONAL

AUTHORITIES by state defendants

(Attachment) (kerr)

MINUTES OF ARGUMENT: JCC;

Dep. Clerk: Julie Mahnke; CR:

Stanley-Knight (Flygare); Attys present

Henry Jameson, Jonathan Benner,

William Collins, Jeff Needle, Sean

Connaughton; cns] heard. Ct will issue

a written decision. (rs) [Entry date

10/10/96]

MOTION by plaintiff Intertanko to

supplement the record on summary

judgment NOTED FOR 11/8/96 (gm)

{Entry date 10/23/96]

DATE

10/22/96

11/1/96

11/18/96

NO.

161

166

179

JA-11

PROCEEDINGS

MEMORANDUM by ss pilaintiff

Intertanko in support of motion to

supplement the record on summary

judgment [160-1] (gm) [Entry date

10/23/96]

RESPONSE by defendant Mike Lowry,

defendant Christine O Gregoire etc to

motion to supplement the record on

summary judgment [160-1] (dm) [Entry

date 11/04/96]

ORDER by Judge John C. Coughenour

GRANTING pitf's motion to

supplement the record on summary

judgment. [160-1], DENYING dft

Krider's motion for summary jgmnt;

[105-1] GRANTING dft's &

intervenor's motion for summary

jgmnt; [102-1] DENYING pltf's motion

for summary judgment [99-1],

GRANTING dft's motion for partial

summary jgmnt; [87-1] This action is

hereby DISMISSED and the Clerk of

the Court is directed to enter judgment

accordingly. Case terminated. (cc:

counsel, Judge, JM) (dm)

DATE

11/20/96

12/11/96

NO.

180

182

JA-12

PROCEEDINGS

JUDGMENT: by court the motions for

summary jgm filed by dfts and

intervenors are GRANTED and the

motion for summary jgm filed by

Intertanko is DENIED. This action is

DISMISSED (cc: counsel, Judge, Jgm.

Book) Entered on 11/20/96 (rs)

NOTICE OF APPEAL by plaintiff

Intertanko form Dist. Court decision

[179-2, 180] (cc: CCA, JCC, Counsel)

(Ib) [Entry date 12/14/96]

AUG 25 1993

State of Washington

Office of Marine Safety

711 State Ave., NE

Olympia, WA 98504-2407

Dear Ms. Herman:

In previous recent correspondence, I advised you of my

concern regarding the application of certain provisions of

Washington State law and their application to Canada-bound

vessels transiting the Strait of Juan de Fuca. My concern

focuses on some actions that may be taken by your office that

agreements, each of which may be more beneficial overall in

protecting the environment. I hope that we can come to a

workable solution among all three governments to resolve

what I see as a near term conflict between the application of

As a legal matter, I would call your attention to the 1979

Canada-United States Agreement for a Cooperative Vessel

Traffic Management System for the Juan de Fuca Region.

Under that Agreement, the Parties have recognized the

desirability of compatibility in their respective national

regulations bearing on marine safety and environmental

protection applicable to vessels using the cooperative vessel

traffic management system (CVTMS). Specifically, Canada

and the United States have agreed that -

JA-14

In applying its regulations to vessels proceeding

through its portion of the applicable waters solely en

route to or departing from a port of the other Party,

will consider compliance with the requirements of

the other Party to be effectively equivalent to

material compliance with its own r-<wirements, so

long as the requirements and enfot erent practices

of the other Party, in their totality, continue to

provide a comparable degree of marine safety and

environmental protection.

It is the Coast Guard's opinion that the applicanon of

Washington State's regulations regarding vessel oil spill

prevention plans to vessels utilizing the (CVTMS) solely en

route to or departing from Canada would contravene the 1979

Agreement. As a consequence, such an application would be

voided by the Supremacy Clause of the United States

Constitution.

While the Coast Guard has a number of authorities,

including 33 U.S.C. 1230, which it might exercise in this

situation, we would hope to be able to work with your Office

during the course of our discussions with the Canadians on the

question of appropriate standards and requirements in waters

of mutual interest. We understand, in this connection that

your Office has authority under the applicable statute and

regulations to waive regulation application where there is a

legal basis for the waiver. We suggest that the Coast Guard

opinion referred to above would provide the legal basis for

such a waiver. Certainly such a waiver would assist in

avoiding misunderstandings as to the applicability of the

State's requirements in contravention of the Agreement, and

improve the atmosphere for my discussions with Canada.

You and I share similar goals to act swiftly to protect our

waters. To do this, we must work cooperatively with those

JA-15

who share our waters. Therefore, it is essential that we work

carefully and through diplomatic channels. Sometimes this is

a slow, deliberate process - but it works. Indeed, we have

several imitiatives in progress similar to your pollution

prevention plans. These include:

1. The proposed "International Management Code for

the Safe Operation of Ships and for Pollution

Prevention,” enclosure (1).

2. Through the International Maritime Organization

(IMO) Subcommittee on the Standards of Training and

Watchkeeping (STW), we are working on a number of

issues for revision to the Standards of Training, Crewing

and Watchkeeping (STCW) convention including:

a. Training and operating procedures for all

personnel involved in the operation or navigation of

tank vessels;

b. Human elements such as fatigue and workhour

limits;

c. Proficiency in the English language;

d. Mandatory vessel reporting schemes;

e. Simulator training; and

f. Port-State controls.

We invite you to participate in this and like efforts by

attending the SOLAS Working Group on Training and

Watchkeeping which is scheduled to meet at the Department

of Transportation Headquarters in Washington D.C., on

October 14, 1993. We have taken the liberty of adding you to

our mailing list; so a package describing the meeting and an

agenda will be sent to you in advance.

JA-16

My staff has advised me that you are interested in

working with us to promote Washington State concerns both

nationally and internationally. Please find enclosed

background information on our work with IMO as well as our

national advisory committees. I encourage you to participate

in and use these fora and the processes to vet Washington

issues to a broader community.

I hope we can resolve these issues soon.

Sincerely,

/s/ A.E. Henn

A.E. Henn

Rear Admiral, U.S. Coast Guard

Chief, Office of Marine Safety,

Enclosure

JA-17

UNITED STATES DISTRICT COURT

WESTERN DISTRICT OF WASHINGTON

HONORABLE JOHN C. COUGHENOUR

No. C95-1096C

THE INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS

Plaintiff,

VS.

MIKE Lowry, Governor of the State of Washington, et al.,

Defendants ,

and

THE WASHINGTON ENVIRONMENTAL COUNCIL, et al.,

Intervenors.

DECLARATION OF ROBERT BISHOP

IN SUPPORT OF PLAINTIFF INTERTANKO

I, Robert Macnair Bishop, declare as follows:

1. Iam an employee of INTERTANKO in the capacity of

Manager of the Marine & Environment Section. I am at least

18 years of age and am competent to testify on the matters

herein, and make this Declaration based on my current

2. lam a citizen of the United Kingdom, hold a Master's

mariner's certificate and have extensive ship-board experience

on a wide variety of vessels, including Dry Cargo Ships, Bulk

Carriers, Container Ships and Tankers.

JA-18

3. Inmy capacity as Manager of the Marine & Environment

Section I regularly represent INTERTANKO at the

International Maritime Organization and other fora. I provide

information to Members on international legislation affecting

tankers, charterers' vetting inspections and Port State Control,

and write the monthly Tanker Safety Circular letter. I am

currently engaged in providing research into the safe carriage

of oil by sea and the ISM Code.

4. Ihave reviewed a document entitled the Second Affidavit

of Stanley J. Norman and have the following comments.

5. The Second Affidavit of Stanley J. Norman contains a

number of mis-statements of fact which should be clarified:

a. On page 5, line 22-23, Mr. Norman mistakenly tries

to limit the definition of "fleet" in the BAP Regulations

to only those vessels that operate in Washington waters.

This is incorrect for a number of reasons.

(1) It is impossible and unrealistic for an owner to

determine in advance and segregate for compliance

purposes, the vessels in his fleet which will be

trading to Washington State on account of the nature

of the spot market for oil transportation. Cargoes of

oil are oftentimes sold after loading on a vessel with

a consequent change in the routing of the vessel. As

a result, a tanker owner cannot rationally designate

only a portion of his entire fleet of vessels as

"Washington eligible" and ensure compliance with

BAP Regulations for only those vessels. In order to

ensure that any vessel in his fleet is capable of

responding to any spot demand for a vessel, owners

trading to the West Coast of North America will be

obligated to comply with the BAP Regulations even

JA-19

if a particular vessel is not scheduled to call at

Washington.

(2) Mr. Norman Himself states the "the intent is to

have a universal system for a fleet of vessels to allow

owners and operators the flexibility to move trained

personnel between vessel without having to retrain

them in the three primary functions, navigation,

collision avoidance, and administration, for each

vessel on which they embark." (Second Norman

Affidavit p.61, 1-4). From a safety and efficiency

viewpoint (endorsed by Mr. Norman) it is also

essential that every vessel in a fleet maintain uniform

Norman's assertions on page 5 that a fleet owner is

only required to adopt Washington's regulations for

a portion of his fleet directly contradict his stated

desire for uniform procedures on page 6. The

Washington standards for any owner who has any

expectation of either calling in Washington, or even

for owners merely transiting Washington State

waters en route to Oregon or Canada, thus become

a minimum requirement or lowest common

denominator that applies to all of his fleet throughout

the world.

b. On page 5, lines 4 through 12, Mr. Norman asserts

that WAC 317-21-130, which requires owners and

operators of tank vessels which come into Washington

waters to report events anywhere in the world, is

intended only to collect information and will not be used

against a tank vessel owner. Rather, according to Mr.

Norman, the information will be used to measure the

effectiveness of prevention measures used by the tanker

owners in response tc events in other areas of the world.

JA-20

Whatever the use of the data, if a tanker owner fails to

comply with this requirement, OMS will (or could) deny

entry of a vessel into Washington.

c. On page 5, line 13-14, Mr. Norman asserts that

WAC 317-21-130 is consistent with current efforts in the

Internationa. *~**time Crganization ("IMO") to establish

reporting requirements. This is not correct. IMO is

currently concerned only with accident reporting not

inspection or near miss reporting as required by the BAP

Regulations. Consequently, a tanker owner would be

required by this regulation either to change its reporting

procedure for its entire fleet, including those vessels not

scheduled to call the State of Washington or to establish

a separate reporting protocol for those vessels which may

be routed to the State of Washington. Of course, it is

impossible to predict with any great certainty which

vessels are likely to be routed to any particular port.

d. WAC 317-21-200(2) requires creation of a

standardized bridge resource management system for all

vessels in a company's fleet. Mr. Norman asserts that

these rules only apply to "those vessels that may operate

in Washington waters" but also states that the "intent is

to have a universal system for a fleet of vessels to allow

owners and operators the flexibility to move trained

personnel between vessels without having to retrain

them" Second Norman Affidavit p.5-6. As is set out

above, conditions of the global spot market for oil, which

demands that owners have all vessels ready to load oil for

delivery to destinations throughout the world, including

the State of Washington, do not permit neat segregation

of assets by ultimate destination. Therefore, in order for

a fleet owner to meet the State of Washington's intent of

having the flexibility of trained personnel adequate to

JA-21

meet any specific state of national requirements, a tanker

owner would have to apply Washington's bridge resource

management system throughout its entire fleet, whether

or not the tanker owner had plans to have a specific

vessel call at Washington.

e. A tanker owner will have to apply Washington's

regulations regarding crew training, drill programs,

record keeping, and management programs across the

board throughout its entire fleet whether or not an

individual vessel is scheduled to call the State of

Washington. The State of Washington's goals of strict

international uniformity in the "three primary functions,

navigation, collision avoidance, and administration"

(Second Affidavit of Stanley J. Norman, p. 6) can only

be met by the adoption of the State of Washington's

procedures to its operations around the world.

f. As to WAC-317-21-230, which requires

implementation of crew training and drill programs, Mr.

Norman asserts that “all training and drills can be

accomplished within Washington." Second Norman

Affidavit, p. 6, 1 10. This statement is, at best,

unrealistic. In the first instance, it presupposes that OMS

would permit a vessel to enter Washington waters without

first having conducted training and drills and then, only

after the vessel enters those waters, conduct training

drills. This is simply not credible. Further, and more

importantly, under the ISM Code, a company will be

required to have training programs in line with

international requirements and recommendations. Where

those drills are at variance to the drills and training

programs set out in WAC-317-21-230, there is a

subsequent lack of uniformity which defeats the singular

purpose of having drills in the first instance - a

JA-22

uniformed, pre-conditioned response to a given set of

emergency conditions. Finally, approaches and

departures from ports are the busiest, and potentially

most hazardous parts of a voyage. For Mr. Norman to

suggest that training and drills could take place during

this time is again unrealistic and without doubt a hazard

to the environment and safety of the vessel.

g. AstoWAC-317-21-260, which requires management

systems, it would be unrealistic to expect that a vessel

would incorporate the type of systems and procedures

required by this BAP Regulation solely while in

Washington waters. No INTERTANKO member is

headquartered in Washington State. Any management

requirements must by its nature be conducted out of state.

h. Mr. Norman attempts to minimize the incongruities

between the State of Washington's regulations and

international regulations when he states that "Washington

hopes that all the BAP standards will eventually be

incorporated into international law and therefore the only

expense incurred would be to produce and submit a

prevention plan." Second Norman Affidavit, page 8 line

11. Mr. Norman's unsubstantiated hopes for the future do

not effect of the immediate and substantial impact of the

BAP Regulations on current tanker operations.

i. Similarly, Mr. Norman attempts to minimize the cost

of compliance. Second Norman Affidavit, p. 7-8. As to

the cost of compliance with the BAP Regulations,

INTERTANKO asserts that each vessel in its fleet, for

the reasons set out above, whether it has immediate plans

to call the State of Washington or not, will incur

substantial compliance costs even for vessels not

scheduled to call at Washington ports. The BAP

Regulations also create managerial, administrative, and

JA-23

personnel costs that are not dependent on port calls in

Washington.

j. Mr. Norman mistakenly states that "the U.S. Coast

Guard has no mechanism like prevention plans for

evaluating compliance of Foreign Flag vessels with

management practices and personnel policies." p. 8 line

14-15. The certifications required by various international

conventions are precisely for the purpose of enforcing

compliance. The Coast Guard checking these certificates

is no less valid a way of evaluating a vessel's

management and personnel policy as than are

Washington's BAP plans.

k. Mr. Norman discusses the BAP Regulations vis-a-vis

the SOLAS requirements for emergency towing. Norman

Aff. p. 9. The BAP Regulations require that emergency

towing equipment be remotely deployable. The federal

requirement contains no such standard. Thus, but for the

BAP Regulations vessels calling in Washington waters

would have to install remotely deployable towing

packages.

6. Animportant concern for INTERTANKO is that the State

of Washington could set a precedent by establishing unilateral

regulations. Tanker shipping is international. Tanker shipping

is regulated in most respects by the UN body of the

International Maritime Organization (IMO). If other states

within the United States impose similar, or worse yet

dissimilar requirements as the State of Washington, that

would not only increase the economic burdens, but could soon

make the tanker impossible to operate as different States’

requirements for the same equipment might not necessarily be

the same. The vessel is carefully designed to accommodate for

trading to a large variety of different ports of various sizes

and navigational environment. Often a tanker changes

JA-24

destination underway which means that the discharge port is

often not known at the time of loading. The crew onboard is

replaced at certain intervals and needs to be trained to operate

one uniform equipment set and procedures for every tanker.

The use of different types of installations, equipment, and

procedures will not only be costly and impractical, but may be

highly counterproductive to safety and pollution prevention.

It is obvious that a crew that needs to react swiftly in an

emergency situation will need to be trained on one set of

procedures and equipment.

I declare under penalty of perjury under the laws of the

United States of America that the foregoing is true and

correct.

Signed at Oslo, Norway on July 13, 1996.

/s/ RM Bishop

Robert Macnair Bishop

JA-25

UNITED STATES DISTRICT COURT

WESTERN DISTRICT OF WASHINGTON

HONORABLE JOHN C. COUGHENOUR

No. C95-1096

THE INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS (INTERTANKO),

Plaintiff,

vs.

MIKE Lowry, Governor of the State of Washington;

CHRISTINE O. GREGOIRE, Attorney General of the

State of Washington; BARBARA J. HERMAN, Administrator

of the State of Washington Office of Marine Safety;

DAVID MACEACHERN, Prosecutor of Whatcom County;

DAVID NEEDY, Prosecutor of Skagit County;

JAMES KRIDER, Prosecutor of Snohomish County; and

NORMAN MALENG, Prosecutor of King County,

Defendants.

AFFIDAVIT OF MILES KULUKUNDIS

IN SUPPORT OF PLAINTIFF INTERTANKO

I, Miles Kulukundis, testify as follows:

1. Iam the President of London and Overseas Freighters

(Bermuda), Limited ("LOF"). I am at least 18 years of age

and am competent to testify on the matters stated herein, and

make this affidavit based on my personal knowledge and

belief.

2. LOF is incorporated in Hamilton, Bermuda with its main

place of business being Bermuda. LOF is the owner of six

JA-26

tankers. Those tankers, with a combined capacity of 618,006

deadweight tons, are registered in the Port of Lon. 1, United

Kingdom. All are classed with Lloyd's Register of Shipping

("Lloyd's"). All of LOF's tankers comply with applicable

British, international, U.S. Coast Guard, and Lloyd's

operational, manning, training, equipment and safety

requirements.

3. LOF tankers routinely call at terminals and facilities on

the west coast of the United States. Recent port calls include:

Point Wells, Washington; Willsbridge, Oregon; San

Francisco, California; Richmond Long Wharf, California;

Martinez, California; Benicia, California; Los Angeles,

California; Long Beach, California; El] Segundo, California;

and Huntington Beach, California. In 1996, LOF has called

twice at a terminal on the Columbia River at Point Wells,

Washington. In April 1996, the LOF tanker LONDON

SPIRIT was boarded and inspected by personnel from the

Washington State Office of Maritime Safety (OMS) to assess

compliance with the Washington State prevention plan

requirements. That vessel was returning from Point Wells and

was berthed at Willsbridge, Oregon at the time of the

inspection.

4. LOF is currently a member of the International

Association of Independent Tanker Owners

("INTERTANKO"), Oslo, Norway. LOF has been a member

of INTERTANKO since 1971. All of LOF's tankers are

enrolled in INTERTANKO.

5. Iserved as Chairman of INTERTANKO from May 1994

to May 1995. Other INTERTANKO positions I have held

include: Vice Chairman; member of the Executive

Committee; member of the INTERTANKO Council; and

Chairman of the Worldscale Committee.

JA-27

6. I participated in the deliberations of INTERTANKO to

organization that INTERTANKO is one of the few, if not the

only, organization in the world which could protect tanker

owners’ interests in effective and uniform environmental and

safety regulations. As far as I am concerned, INTERTANKO

has always promoted rational environmental measures and has

worked to oppose unrealistic or ineffective safety measures.

INTERTANKO has opposed unilateral and discriminatory

7. Prior to issuance of the regulations challenged in this

litigation, LOF had a Best Achievable Protection (BAP) plan

developed under WAC 317-20. This plan was approved by

OMS on May 13, 1994. LOF could conform with this plan

requirement because it was identical to, and indistinguishable

from, all contemporary international, national and industry

operational, manning, training, equipage and safety

requirements. As far as I am aware, this plan was reviewed

for completeness but not substance.

8. Under existing charter agreements, LOF anticipates an

increased number of calls at terminal facilities in Puget Sound

in 1996 and 1997. Consequently, LOF submitted to OMS a

BAP plan developed under WAC 317-21. This plan was

submitted on November 1, 1995. LOF incorporated into this

plan all applicable international, national and industry

operational, manning, training, equipment and safety

requirements. For those operational, manning, training,

equipage and safety specifications and/or procedures required

by the new BAP Standards which differ from those required

by British, international, U.S. Coast Guard, and Lloyd's

authorities, LOF is seeking to comply to the extent practicable

and consistent with international and national law. As far as

JA-28

I am aware, LOF's BAP plan has been reviewed for

completeness but not substance.

9. AnLOF tanker complying in all respects with applicable

to call at ports in other states of the United States may not

lawfully call at ports in the State of Washington unless it

adopts the unique additional measures required by WAC 317-

21.

10. I regard the extraterritorial influence of the management,

training, and personnel requirements of the BAP standards as

extremely distressing. The measures required under WAC

371-21 apply to LOF's operations at all times no matter where

an LOF vessel is located. In other words, compliance with

Washington State regulations extends beyond the borders of

the State of Washington and the United States and follows

LOF's operations throughout the world.

11. LOF has spent approximately $12,000 to develop, file,

and maintain a BAP plan under WAC 317-21. Because many

of the BAP’s distinct operational, manning, training,

equipment and safety requirements are being phased-in, the

expenses for compliance are on-going. Costs for meeting the

BAP training, recordkeeping and management standards have

not been calculated but will be substantial.

12. I regard the distinct and overlapping requirements of the

BAP standards as a threat to marine safety. LOF trains its

personnel, and operates and equips its tankers, to all

applicable international and national standards. The

imposition of different or peculiar requirements which vary on

a port-by-port basis in the United States will generate

confusion and misunderstanding among vessel crews and

management. This is the reason why uniform and consistent

JA-29

I declare under penalty of perjury that the foregoing is

true and correct.

Signed at London on 31 May, 1996

/s/ Miles Kulukundis

Miles Kulukundis

JA-30

UNITED STATES DISTRICT COURT

WESTERN DISTRICT OF WASHINGTON

HONORABLE JOHN C. COUGHENOUR

No. 095-1096

THE INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS (INTERTANKO),

Plaintiff.

vs.

MIKE Lowry, Governor of the State of Washington;

CHRISTINE O. GREGOIRE, Attorney General of the

State of Washington; BARBARA J. HERMAN, Administrator

of the State of Washington Office of Marine Safety;

DAVID MACEACHERN, Prosecutor of Whatcom County;

DAVID NEEDY, Prosecutor of Skagit County;

JAMES KRIDER, Prosecutor of Snohomish County; and

NORMAN MALENG, Prosecutor of King County,

Defendants.

DECLARATION OF RICHARD T. DU MOULIN

IN SUPPORT OF PLAINTIFF INTERTANKO

Richard T. du Moulin, having been duly sworn, testifies

as follows:

1. JI am Chairman and Chief Executive Officer of Marine

Transport Lines, Inc. ("MTL"). MTL is a Delaware

Corporation and its corporate office are located at 1200

Harbor Boulevard in Weehawken, New Jersey.

2. Through directly or indirectly owned subsidiaries, MTL

owns 5 tankers which it operates in commercial trades.

JA-31

Through a directly owned subsidiary, MTL also operates 5

tankers for third parties. The tankers owned and or operated

by MTL have an aggregate deadweight capacity of 514,006

metric tons and are registered in the United States, Liberia or

Panama. All of MTL's tankers are classed with the American

Bureau of Shipping and each complies with applicable

sehen ininieaidiamahdiantilant ionet eeaien

3. In 1994, one of MTL's tankers made a single call to the

state of Washington and in 1995, one of MTL's tankers called

upon the state of Washington twice. During the first five

months of 1996, one of MTL's tankers made one call to

Washington state. The tankers which called upon Washington

state carried crude oil, molten sulphur, chemicals, anhydrous

ammonia and petroleum products to the port of Kalama.

MTL's tankers also routinely call at terminal facilities located

in California, Texas, Lake Charles, the Mississippi River,

Florida, North Carolina, Philadelphia and New Jersey.

4. MTL is currently a member of the International

Association of Independent Tanker Owners

("INTERTANKO"), Oslo, Norway and has belonged to

INTERTANKO since approximately 1982. All of MTL's

tankers are enrolled in INTERTANKO.

5. I was elected Chairman of INTERTANKO in May of

1996. Prior to becoming INTERTANKO's chairman, I served

as INTERTANKO's Vice Chairman, amember of its Executive

Committee and a member of the INTERTANKO council.

6. I participated in the careful deliberations of

INTERTANKO which led to the commencement of this

action. Consistent with its mandate to promote, on a global

basis, the interests of tanker owners and tanker operators,

INTERTANKO believes that its members, as well as the ports

JA-32

upon which their vessels call, are entitled to effective,

comprehensive and uniform environmental and safety

regulations. Given its broad based membership,

INTERTANKO believes that it is particularly well qualified

to advance these goals. It is my belief that INTERTANKO

has always promoted rational measures to protect the

environment while working to oppose unrealistic or poorly

crafted safety measures. INTERTANKO has been especially

concerned over safety and environmental regimes which

deviate from uniform international standards and has devoted

particular effort to oppose them.

7. Prior to issuance of the regulations challenged in this

action, MTL develpoed a BAP plan as required by WAC 317-

20 (the "WAC 20 Plan") which was approved by the

Washington State Office of Marine Safety (OMS). Because

the WAC 20 Plan approved by the state of Washington was

based upon the governing international, national and industry

requirements by which its tankers are bound, MTL

experienced little difficulty in meeting the requirements of the

WAC 20 Plan. It is my understanding that the WAC 20 Plan

was reviewed for completeness but that an analysis of its

substantive content was never undertaken.

8. Under the terms of the charter parties by which MTL's

tankers are employed, each tanker must be qualified for the

worldwide carriage of liquid bulk cargoes, including the

carriage of such cargoes to the State of Washington. To be

certain that MTL's tankers may be gainfully employed, MTL

submitted to OMS a BAP plan developed under WAC 317-21

(the "WAC 21 Plan"). Incorporated into the WAC 21 Plan

were all applicable international, national and industry

requirements. To the extent that the operational, manning,

JA-33

required by the WAC 21 Plan differ fform those required by

the respective registries of MTL's tankers and the governing

international, U.S. Coast Guard, and classification

requirements, MTL is seeking, to the extent practicable, to

comply with well established norms of national and

international law. It is my understanding that the WAC 21

Plan was reviewed for completeness but that an analysis of its

substantive content was never undertaken.

9. Notwithstanding perfect compliance with all applicable

national and international laws, no MTL tanker may lawfully

call upon ports located within the State of Washington unless

prescribed by WAC 317-21.

10. The management, training, and personnel requirements

arising from BAP, and the extraterritorial application of those

of requirements by the state of Washington, are of extreme

concern to me. It is my understanding that the measures

required by WAC 317-21 apply to MTL's operations at all

times, regardless of the location of a MTL vessel. This means

that the regulations of Washington State extend beyond its

borders, beyond the borders of the United States and follow

each of MTL's tankers as they trade anywhere in the world!

11. MTL has spent a substantial sum to develop, file and

maintain the WAC 21 Plan. As MTL phases in BAP's distinct

operational, manning, training, equipment and safety

requirements, the expense of compliance will increase. For

example, one MTL tanker is currently scheduled to be fitted

in September with a $50,000 towing arrangement which

complies with WAC 317-21-265(2). The cost of installation

will be at least $30,000. The cost of meeting the BAP

training, record keeping and management standards will also

be substantial and ongoing.

JA-34

12. I consider the distinct, confusing and overlapping

requirements arising from BAP to constitute a material threat

to the well established and time tested standards which govern

marine safety on a worldwide basis. MTL has a long history

of strict and comprehensive compliance with all applicable

national and international standards in the training of its

personnel, the design of ‘*s vessels, the equipment with which

they are provided and the manner in which they are operated.

Despite its good faith concerns for safety and the

environment, I believe that the imposition by the state of

Washington of different, peculiar or inconsistent requirements

is almost certain to generate precisely the kind of confusion

and misunderstanding which the current national and

international regimes were created to avoid. This confusion

and misunderstanding can only have negative consequences.

I declare under penalty of perjury under the laws of the

State of New Jersey that the foregoing is true and correct.

Signed at Weehawken, New Jersey on May 30, 1996.

/s/ Richard T. du Moulin

Richard T. du Moulin

JA-35

STATE OF WASHINGTON

OFFICE OF MARINE SAFETY

September 15, 1995

Chronos Shipping Co., Ltd.

41 Akti Miaouli

185 35 Piraeus, Greece

Re: WASHINGTON STATE OIL SPILL PREVENTION

PLAN REQUIREMENTS

Dear Sirs:

On August 24, 1995, the tank vessel ASPHALT CHAMPION

entered Washington waters en-route to Portland, Oregon.

Washington state rules require tank vessels to submit an Oil

Spill Prevention Plan before entering Washington waters. To

date, the Office of Marine Safety has not received a

prevention plan for the ASPHALT CHAMPION. Enclosed is

a Notice of Determination regarding this violation.

We note on January 27, 1994, MARISPOND Inc. submitted

a minimum compliance prevention plan to OMS for the

ASPHALT CHAMPION and other tank vessels that your

company operates. On July 7, 1995 Washington State Oil

Spill Prevention Plan rules became effective and required tank

vessel owners to submit new prevention plans. Also at this

time OMS mailed out a copy of the final rules and a copy of

the model prevention plan for tank vessels to all companies

that submitted minimum compliance prevention plans.

Under the Revised Code of Washington (RCW) 88.46.040,

88.46.80 and Chapter 317-21-020 Washington Administrative

Code (WAC) the owner of a tank vessel is required to submit

a Oil Spill Prevention Plan before the vessel enters

Washington waters. On September 6, 195 an inspector from

JA-36

this office contacted the vessel's Master and Agent to discuss

prevention plan submission requirements. Our prevention plan

rules contain Best Achievable Protection standards that tank

vessels must comply with when operating in Washington

waters. Enclosed are copies of RCW 88.46 and Chapter 317-

21 WAC. Also enclosed is a Model Oil Spill Prevention Plan

for Tankers.

If you have any questions or require assistance, please contact

me at (503) 229-6541, fax (503) 229-6954.

Sincerely,

/s/ John Jenicek

John Jenicek

Field Office Supervisor

Enclosures

cc: Rebecca Vandergriff, Assistant Attorney General

Crossway Navigation

MARISPOND

USCG Marine Safety Office Portland

Sunrise Shipping (Portland)

'

»

JA-37

Office of Marine Safety

Olympia, Washington

Date of Issuance: 09/15/95

Vessel Name: ASPHALT CHAMPION

Lloyd's Number: 7329699

NOTICE OF DETERMINATION

TO: Chronos Shipping Co., Ltd.

Address: 41 Akti Miaouli, 185 35 Pireaus, Greece

The Office of Marine Safety (OMS) has determined that you,

as Owner or operator of the M/V ASPHALT CHAMPION

have violated, are violating, or created a substantial potential

to violate the provisions of Chapter 88.46 Revised Code of

Washington (RCW) as described below. Upon receipt of this

Notice of Determination, Chronos Shipping Co., Ltd. has 30

days under RCW 88.46.070 to submit a full, written report to

the Office of Marine Safety, stating what steps you have taken

or are taking, or both, to comply with this Notice. See RCW

88.46.070(2).

Failure to timely or adequately respond to this Notice may

result in an Administrative Order requiring compliance or

assessing penalties or both.

DETERMINATION:

The vessel) ASPHALT CHAMPION entered Washington

waters on September 6, 1995. The vessel is certified by the

flag state of Malta to carry oil in bulk as cargo and, therefore,

meets the definition of a tank vessel under the Washington

Administrative Code (WAC) 317-05-020(21). Under the

Revised Code of Washington (RCW) 88.46.040, 88.46.080

and WAC 317-21-020, the vessel's owner or operator was

required to submit an Oil Spill Prevention Plan demonstrating

No. CR-95-001

JA-38

compliance with Best Achievable Protection standards for the

ASPHALT CHAMPION to the Office of Marine Safety prior

to the vessel entering Washington waters. The Office of

Marine Safety had no prevention plan on file for this vessel

prior to its entry into Washington waters. |

Within 30 days of receipt of this Notice submit the following

to Office of Marine Safety:

¢ A written report, in English, describing how you intend

to comply with Chapter 317-21 WAC. The submission of

an Oil Spill Prevention Plan, demonstrating compliance

with best achievable protection standards, will satisfy this

requirement.

By the authority granted Barbara Herman,

Director, Office of Marine Safety

/s/ John Jenicek

Field Office Supervisor, Columbia River

JA-39

U.S. Department of Transportation

United States Coast Guard

JUN 22 1995

Ms. Barbara Herman

Administrator

State of Washington

Office of Marine Safety

711 State Avenue NE

P.O. Box 42407

Olympia, WA 98504-2407

Dear Ms. Herman:

I am happy to note that the Memorandum of Agreement

(MOA) on oil pollution, prevention and response, between the

Coast Guard and the State of Washington, was signed by the

Commander, Thirteenth Coast Guard District and your

Governor an April 24, 1995. This agreement now lays a solid

foundation upon which the State of Washington and the

Thirteenth Coast Guard District can build a partnership to

minimize duplicative efforts, leverage resources, and eliminate

existing or potential barriers to trade. I strongly encourage a

continuation of the on-going cooperative dialogue with the

Thirteenth Coast Guard District in order to most effectively

pursue our mutual goals of marine safety and environmental

protection. -

I would also like to take this opportunity to further our

discussion from our meeting of December 16, 1994 and

clarify some of my concerns with your letter of April 19,

1995. In that letter, you reference a Coast Guard quote

supporting state’s rights. The referenced quote also stated, in

part, "We must, however, also be mindful of our international

agreements". This applies not only with our bilateral

agreements with Canada on vessels in U.S. waters, as a result

JA-40

of the Cooperative Vessel Traffic Management Agreement,

but also with equipment, construction, manning, licensing and

other existing regulations and initiatives, including those of

the International Maritime Organization. Many U.S. statutes

and regulations enforced by the Coast Guard are in

furtherance of our international commitment. Should widely

disparate state requirements be implemented, the possibility

arises that compliance with federal and state regulations either

becomes a physical impossibility or the state law stands as an

obstacle to the accomplishment and execution of the full

purposes and objectives of Congress. A patchwork of

differing and conflicting coastal state and local regulatory

initiatives would be confusing to the users and may actually

degrade maritime safety and environmental protection.

While section 1018 of the Oil Pollution Act of 1990 (OPA 90)

states that nothing in OPA 90 or the Act of March 3, 1851,

shall be construed as preempting the authority of any state

from imposing any additional liability or requirements

respecting the discharge of oil or any removal activities, the

Coast Guard does not regard this as a Congressional

expression altering the traditional relationship between federal

and state governments. Rather, it permits states to impose

additional liabilities or requirements with respect to the

discharge of oil or removal activities in connection with a

discharge within the State of Washington in a manner that

does not contravene the federal scheme. Thus, I continue to

believe that most standards which apply to vessels trading

internationally or between states remain the responsibility of

the federal government. It does not give the State of

Washington any additional power or authority that did not

exist prior to the passage of the act.

In addition, I do not share your opinion that federal and

international regulations are "minimal". In my view, current

JA-41

standards, and the processes in place to develop and improve

these standards, reflect decades of practical experience and the

current state of usable technology and produce a high level of

safety for today and will meet the challenges of the future.

In response to Presidential direction, the Coast Guard is

conducting a detailed review of all our existing regulations.

One of the goals of this effort is to increase consistency by

aligning our regulations to the greatest degree possible with

existing international standards. Similar efforts in Washington

State would be appreciated.

The door of the Coast Guard is always open. My headquarters

program managers continue to provide guidance and

comments to the Thirteenth Coast Guard District on

Washington State initiatives. I urge the closest possible

alignment of state regulatory efforts with federal and

international standards and initiatives. I strongly encourage

routine meetings between yourself and your staff, and

Admiral Lockwood and his staff at the Thirteenth Coast

Guard District in Washington State. I firmly believe that,

during these periods of scarce resources, there is more than

adequate room on the waterfront for many agencies to work

cooperatively and leverage our resources for the benefit of the

public. By doing so, we can build on each others successes.

Sincerely ,

/s/ J.C. Card

J.C. CARD

Rear Admiral, U.S. Coast Guard

Chief, Office of Marine Safety,

Security and Environmental Protection

JA-42

Memorandum

U.S. Department of Transportation

United States Coast Guard

Subject: REVIEW OF CALIFORNIA OIL SPILL

PREVENTION AND RESPONSE ACT

Date: 30 JAN 1991

16455

From: Chief Counsel Reply to: G-LMI 7-1527

Attn of: Mr. Presley

To: Chief of Staff

1. As you requested I have reviewed the Lempert-Keene-

Seastrand Oil Spill Prevention and Response Act ("OPRA")

enacted by the California Legislature during its last session.

OPRA is one of the several State oil pollution statutes which

have been enacted in the aftermath of the Exxon Valdez

incident. It provides a good example of the ways in which

States are extending the exercise of their police powers to

protect their citizens from oil pollution and its effects.

2. The Coast Guard’s interest in such State statutes stems

primarily from the way in which the regulatory and

enforcement regimes which they create, conflict or

complement related regimes administered by this agency. A

major consideration in this regard is whether the Federal

Preemption Doctrine restricts States’ authority to regulate

conduct or carry out enforcement in particular areas. In the

course of similar review of an emergency order issued by the

Alaska Department of Environmental Conservation, this

Office prepared a Legal Memorandum, attached herewith as

Enclosure (1), a portion of which set out the law relating to

JA-43

3. Enclosure (1) sets out a "two tier" analytical approach to

the issue of Federal preemption, based largely on principles

discussed in Ray v. Atlantic Richfield, 98 S.Ct. 988 (1978),

and Chevron v. Hammond, 726 F.2d 483 (1984). Enclosure

(2) builds on Enclosure (1), setting out a model which may be

applied to the provisions of any State oil pollution statute.

Specific provisions of OPRA are then analyzed within the

model, demonstrating thereby the manner in which the

Federal Preemption Doctrine has constrained, or may be

expected to constrain, the exercise of the State’s police

powers.

/s/ P.E. Versaw

P.E. VERSAW

Encl: (1) G-L Memo 16451/16601 of 6 Jul 89

(2) Application of the Federal Preemption Doctrine

to State Oil Pollution Statutes; an analytical

model

JA-44

APPLICATION OF THE FEDERAL PREEMPTION

DOCTRINE STATE OIL POLLUTION STATUTES:

AN ANALYTICAL MODEL

Introduction

In the aftermath of the Exxon Valdez incident, a number

of States have enacted statutes which establish, or revise

existing, laws dealing with oil pollution prevention,

preparedness, response (including response financing),

liability, and compensation.

This memorandum sets out a model by which the legal

impact and relationship of those laws to related Federal laws

administered and enforced by the Coast Guard may be

measured. It builds upon a detailed memorandum ("G-L

memo") prepared by the Chief Counsel of the Coast Guard

(file no. 16451/16601, dated 6 July 1989) which examined an

emergency order issued by the Alaska Department of

Environmental Conservation following the grounding of the

Exxon Valdez. It takes account of the effect of the recently

enacted Oil Pollution Act of 1990 (OPA90), Public Law 101-

380, and applies the model to the Lempert-Keene-Seastrand

Oil Spill Prevention and Response Act (OPRA) enacted by

California in September 1990.

I. THE ANALYTICAL MODEL

General. The model consists of three parts: (A) Whether

the State statute being examined contains elements which, per

Se, are preempted by Federal law, or, which could be

implemented in a manner which could result in application of

the preemption doctrine; (B) Whether the elements which

could be implemented in a manner which could result in

preemption are limited by provisions specifically designed to

avoid that result; and (C) Whether provisions designed to

JA-45

avoid preemption or otherwise accommodate Federal law give

rise to additional legal complications.

PartA - DOES THE STATE STATUTE CONTAIN

ELEMENTS WHICH EITHER (1) ON THEIR FACE ARE

PREEMPTED BY FEDERAL LAW OR (2) COULD BE

IMPLEMENTED IN A MANNER WHICH COULD

RESULT IN THE APPLICATION OF THE PREEMPTION

DOCTRINE?

At the outset, it must be recognized that there is a general

bias against invocation of the preemption doctrine where

federal and state oil pollution statutes are in tension. In Askew

v. American Waterways Operators, Inc., 93 S.Ct. 1590

(1973) (analyzing a Florida pollution statute), the Supreme

Court called attention to the principle “that sea-to-shore

pollution [is] historically within the reach of the police power

of the States", at 1601. A short time later the Court in Ray v.

Atlantic Richfield Co., 95 S.Ct. 988, 994, (1978) (analyzing

a Washington pollution statute) noted, " ‘we start with the

assumption that the historic police powers of the States were

not to be superseded by the Federal Act unless that was the

clear and manifest purpose of Congress.’ " (Quoting from

Rice v. Santa Fe Elevator Corp., 97 S.Ct. 1146, 1152

(1947)).

Applying that principle, the Court has devised a "two

tier" analytical approach. The "first tier" looks to "whether

Congress has either explicitly or implicitly declared that the

States are prohibited from regulating" the subject matter in

question. Ray at 994. The implication referred to may be

drawn in several ways. Again drawing from Ray's reference

to Rice: " ‘The scheme of federal regulation may be so

pervasive as to make reasonable the inference that Congress

left no room for States to supplement it. ... Or the Act of

Congress may touch a field in which the federal interest is so

JA-46

dominant that the federal system will be assumed to preclude

enforcement of state laws on the same subject. ... Likewise,

the object sought to be obtained by the federal law and the

character of obligations imposed by it may reveal the same

purpose’ ". Ray at 994. As to the last point, however, see

Florida Lime & Avocado Growers, Inc. v. Paul, 83 S.Ct.

1210 (1963), as quoted in Chevron U.S.A., Inc. v. Hammond,

726 F.2d 483, 497 (1984), " ‘The test of whether both federal

and state regulations may operate, or the state must give way,

is whether both regulations can be enforced without impairing

the federal superintendence of the field, not whether they are

aimed at similar or different objectives.’ "

The G-L memo describes the "second tier" as “even if

Congress has not entirely displaced State regulation over the

matter in question, State law is still preempted to the extent

that it actually conflicts with Federal law, [citation omitted],

or where the State law stands as an obstacle to the

accomplishment of the full purposes and objectives of

Congress. [citation omitted]." See Ray at 994.

-- First tier example

In Ray, the Supreme Court applied the explicit

pronouncement of Congress set out in 46 U.S.C. 215 and 364

(currently 46 U.S.C. 8501 and 8502) relating to pilotage, and

held: (1) that the State (Washington) law requiring enrolled

(i.e. those operating in the coastwise trade) tankers to take on

State licensed pilots was invalid, and (2) that the State was

free to require tankers operating on registry (i.e. those

operating in the foreign trade) to take on such pilots. Ray at

995.

The Court continued this first tier analysis and by

considering the implication to be drawn from _ the

comprehensive nature of the Tank Vessel Act, 46 U.S.C.

JA-47

391a (currently 46 U.S.C. Chapter 37) concluded that "[t}he

Supremacy Clause [of the Constitution] dictates that the

federal judgment that a vessel is safe to navigate United States

waters prevail over the contrary state judgment" and that

"Congress anticipated tie enforcement of federal standards

that would pre-empt state efforts to mandate different or

higher design requirements." Ray at 998.

On the other hand, the Court explained, "Similar in its

nature to a local pilotage requirement, a requirement that a

vessel take on a tug escort when entering a particular body

water is not the type of regulation that demands a uniform

national rule." Ray at 1005.

-- Second tier example

The G-L memo called attention to the conflict between a

requirement to be imposed by the Alaskan Emergency Order

under review and existing Coast Guard regulations relating to

vess.l communications issued under the Port and Waterways

Safety Act. One of the directives in the Emergency Order,

designed to improve pollution response capability, would

require “the Alyeska Marine Terminal to maintain direct

radio contact with the bridge of each inbound/outbound

tanker, accompanying tugs, and Alyeska’s oil spill response

vessels while an incoming or outgoing tanker is located at any

point between the terminal and Hinchinbrook Entrance."

The G-L memo then noted that a number of Prince

William Sound Vessel Traffic Service regulations at 33 CFR

Part 161 address radio communication requirements. The

memo concluded that the State requirement might adversely

impact on safe navigation in Prince William Sound, the

purpose underlying the Federal regulations due to the

following conflicting impacts:

JA-48

a) the difficulty for the vessel to monitor a frequency in

addition to that required for the Vessel Traffic Center;

b) the resultant background noises on the bridge

affecting concentration; and

c) the practical limitations imposed on a master’s ability

to respond quickly to an incident by the need to make multiple

reports.

Part B - ARE THE ELEMENTS OF THE STATE LAW

WHICH COULD BE IMPLEMENTED IN A MANNER SO

AS TO RESULT IN PREEMPTION LIMITED BY

PROVISIONS SPECIFICALLY DESIGNED TO AVOID

THAT RESULT?

The U.S. Court of Appeals for the Ninth Circuit, in

Chevron U.S.A., Inc. v. Hammond, 726 F.2d 483 (1984), had

before it an Alaska statute prohibiting the discharge of ballast

water from tankers into the waters of Alaska. Plaintiffs

asserted that the State statute conflicted with Federal law ina

number of ways. While the court rejected those arguments

with respect to one regulatory area (Coast Guard regulations

prohibiting certain tankers from storing ballast in cargo tanks

unless required by emergency weather conditions); the court

took pains to explain, "No party asserts that it is physically

impossible to comply with both the Alaska statute and the

relevant Coast Guard regulations. Furthermore, the Alaska

statute was amended in 1980 to make it clear that it would not

apply in cases where safety reasons dictated non-compliance."

(Emphasis added.) Hammond at 499.

The principle to be applied in this part of the model is

found in Hammond at 496 where the court quoted from

Merrill Lynch, Pierce, Penner & Smith v. Ware, 94 S.Ct. 383

390 (1973), which itself was quoting from Silver v. New York

Stock Exchange, 83 S.Ct. 1246, 1259 (1963), "Moreover state

JA-49

law should be preempted " ‘only to the extent necessary to

protect the achievement of the aims of the [federal act in

question].* " Consequently, substantial weight should be given

to any provisions in a State statute which actually

accommodate the otherwise preemptive effect of the superior

Federal Law. :

Part C - MAY THE PROVISIONS DESIGNED TO AVOID

PREEMPTION OR OTHERWISE TO ACCOMMODATE

FEDERAL LAW GIVE RISE TO ADDITIONAL LEGAL

COMPLICATIONS?

States’ attempts to avoid the effects of preemption or

otherwise to accommodate their laws to the Federal regime,

either by cross references to Federal requirements or by a

deferral to Federal action, must be examined. Sometimes State

legislatures are not familiar with the applicable provisions of

the Federal statutes and regulations to which they refer or

defer in laws they enact. While this part of the model is not

directly concerned with the application of the Federal

Preemption Doctrine it is useful to be aware of inappropriate

references so as to be prepared for the problems which may

arise when States attempt to implement such laws.

An example of an inappropriate reference which has

appeared a number of times in various state oil pollution

liability statutes or their implementing regulations concerns

financial responsibility requirements. While, Federal oil

pollution financial responsibility requirements do not preempt

similar requirements imposed by states as a l/ega/ matter,

vessel insurers have traditionally been reluctant to certify

insurance coverage against State oil pollution liability.

Consequently, as a practical matter some States were willing

to accept certification in accordance with the requirements of

subsection (p) (recently superseded by OPA 90) of section

311. Federal Water Pollution Control Act (FWPCA) as

JA-50

meeting the State law imposed requirement for coverage of

such liability. Such reliance was, of course, illusory. The

financial responsibility required under section 311 (p)

FWPCA was limited to the coverage of section 311's

prescribed liability for Federal removal costs. In the event of

an oil pollution incident, States and their citizens which relied

on this Federal certification would have found themselves

without protection. More importantly, litigation to recover

costs and damages pursuant to State liability regimes might

well have complicated recovery for Federal removal costs

under Federal regimes.

APPLICATION OF THE MODEL TO RELEVANT FEDERAL

LAWS

General. In applying a first tier analysis under Part A of

the model described above, it would be useful to keep in mind

some of the Federal statutes whose provisions may be

commonly expected to bear upon the question of preemption

as applied to State oil pollution laws. For this purpose the

relevant Federal statutes fall into the following categories:

a) those which by their terms explicitly preclude State

regulation in the same area;

b) those which, by themselves or in conjunction with

others, demonstrate an implicit Congressional intent to

preclude State regulation in the same area.

c) those which by their terms explicitly express a

Congressional intent not preclude State regulation in the same

area; and

d) those which neither explicitly nor implicitly

demonstrate a Congressional intent to preclude or not to

preclude State regulation in the same area.

JA-51

Second tier analysis ("where compliance with Federal and

State regulations is a physical impossibility" or the State law

“stands as an obstacle to the accomplishment and execution of

the full purposes and objectives of Congress") is not necessary

except for those statutes within categories (c) and (d) above.

The specific terms of the federal laws in those categories and

State law provisions must be examined, and, only when there

is an "irreconcilable conflict between the Federal and State

standards" will that specific State law provision be preempted.

(See the G-L memo for citations to the references within

quotation marks.)

The Federal statutes which most often may be expected

to relate to State oil pollution statutes are the following:

[NOTE: this list should not be considered to be

exhaustive. It focuses on those statutes whose provisions

are most directly related to provisions of the California

Statute currently being examined. ]

i) Subtitle II of title 46 U.S. Code;

ii) Port and Waterways Safety Act, (33 U.S.C. 1221 er

seq.);

ili) Federal Water Pollution Control Act, Section 311

FWPCA, (33 U.S.C. 1321);

iv) Oil Pollution Act of 1990, Title I (33 U.S.C. 2701 er

seq.).

(i) Subtitle Il of title 46 U.S. Code

This law deals with a broad range of merchant vessel and

vessel personnel regulation. As noted above, the decision in

Ray addressed the question of pilotage and tanker construction

and design standards.

JA-52

Pilotage

The provisions of this subtitle concerned with pilotage

fall within category (a) (with respect to enrolled vessels) and

category (c) (with respect to vessels under registry and

foreign vessels. )

Tanker Construction and Design

The provisions of this subtitle concerned with tanker

construction and design fall within, category (b).

Vessel Equipment for Safety

The provisions of this subtitle concerned with safety

requirements for equipment have not been addressed by the

courts. However, equipment safety regulation pursuant to the

Ports and Waterways Safety Act was referred to in Ray where

the Court found an implied Congressional intent to preclude

state regulation. Consequently, it is probable that provisions

of subtitle I] concerned with equipment regulation and

requirements for the purpose of promotion safety, fall within

category (b).

Vessel Personnel Qualification and Competence

The provisions of subtitle II concerned with vessel

personne! qualification and competence have, similarly, not

been addressed by the courts as to their preemptive effect.

However, a strong argument can be made that vessel

personnel qualification and competence regulation has been

traditionally viewed as exclusively within Federal

competence. Furthermore, the same considerations requiring

exclusivity in vessel safety regulation referred to in Ray,

would apply in this area as well. Finally the extent to which

the Coast Guard has exercised its regulatory authority in this

field with Congress’ acquiescence leads to an implication of

Congressional intention that this area should be solely the

JA-5S3

province of Federal regulation. As a consequence it is

reasonable to conclude that the provisions of subtitle II

concerned with vessel personnel and competence fall within

category (b).

(ii) Ports and Waterways Safety Act

As explained in the G-L memo, the Ports and Waterways

Safety Act places the Federal government in the primary role

insofar as vessel safety is concerned.

Vessel Equipment and Navigation for Safety

The statute provides authority for vessel navigational

regulation, including size limitation. In Ray, at 1002, the

Court expressed the view that Washington’s statutory limit on

tanker size was invalid due to the authority provided, and in

fact exercised, under the predecessor statute to the Port and

Waterways Safety Act. The Court reasoned that this was the

case even though there was no specific conflict between the

Coast Guard’s regulation and the applicable state statute.

It was enough that Congress had provided broad authority

and responsibility to consider all interests and to assure

consistency in prescribing the necessary regulatory regime.

The Coast Guard’s execution of this authority was sufficient

to oust the State of its competence to regulate in the field.

Language in Ray makes it clear that this principle applies to

vessel equipment as well as vessel navigation. Therefore, it is

clear that the provisions of the Act authorizing regulation of

vessel equipment and navigation for safety purposes fall

within category (b).

Structural Safety

There are two areas where parallel State regulatory

authority is preserved under the Port and Waterways Safety

Act. By its own terms the Act authorizes State regulation of

JA-54

structure safety. These provisions therefore fall within

category (c).

Tug Escorts

The one area where the Ray decision, at 1005, found that

the States have retained the authority to prescribe vessel

related requirements concerns [ug escorts.

(iii) Federal Water Pollution Control Act, Section 311

FWPCA, (33 U.S.C. 1321)

Matters subject to regulation under section 311 FWPCA

are:

a) the prohibition of oil and hazardous substance

discharges;

b) discharge notification requirements;

c) the authorization to undertake response measures

and to obtain judicial assistance where necessary;

d) the organization of response activities

(contingency plans, response units, response groups, area

committees, etc.);

e) liability relating to the discharge of oil or

hazardous substances;

f) methods and procedures for removal of

discharged oil and hazardous substances;

g) criteria for local and regional contingency plans;

h) procedures, methods, and equipment and other

requirements for equipment to prevent, contain and remove

discharges of oil and hazardous substances;

i) the inspection of vessels, removal equipment,

and cargoes of oil; and

JA-55

j) tank vessel and facility response plan

requirements.

As amended by OPA90, section 311(0)(2) FWPCA provides:

(2) Nothing in this section shall be construed as

preempting any State or political subdivision thereof

from imposing any requirement or liability with

respect to the discharge of oil or hazardous substance

into any waters within such State, or with respect to

any removal activities related to such discharge.

Consequently, all of the provisions of section 311 FWPCA

fall within category (c).

(iv) ‘ie Pollution Act of 1990, Title I (33 U.S.C. 2701, et

seq.

Title I of OPA90 applies to the following areas:

a) oil pollution liability:

b) funding for compensation for providing response

financing and supplementary compensation for costs and

damages related to oil pollution;

¢) compulsory financial responsibility for liability

Section 1018 of OPA90 provides that nothing in the Act

shall affect or be construed or interpreted as preempting the

authority of any State or political subdivision from imposing

any additional liability or requirements respecting the

discharge of oil or other pollution by oil within such State or

any removal activities in connection with such a discharge.

Similarly, a clear disclaimer of preemption is set out with

respect to State funds and criminal and civi) sanctions

prescribed under State law relating to the discharge or

substantial threat of a discharge of oil.

JA-56

Consequently the provisions of title | of OPA9O fall

within category (c).

{[NOTE: Section 1018 of OPA90 refers to “this Act”

in its disclaimer of preemption. Since OPA9O in other titles

amends a number of provisions of subtitle II of title 46 U.S.

Code, there may be some concerns that Congress intended to

affect the preemption situation relating to those provisions as

well. However, the provisions of section 1018 apply only to:

the discharge or substantial threat of oil or other pollution,

removal activities, and funds. These matters are not the

subject of any provision of subtitle I] amended by sections in

other titles of OPA90; therefore, Section 1018 does not apply

to those amendments. }

Summary of Model

Part A - Does the State statute contain elements which either

(1) on their face are preempted or (2) could be

implemented in a manner which would result in

preemption?

First tier: | What is the Federal statute which is most

relevant to the State statute being

examined? What is the category of that

Federal statute?

Second tier: If a category (c) or (d) Federal statute is

relevant, is there or could there be a direct

conflict between the State statute or its

implementation and the Federal Statute and

its implementation?

Part B - Are the elements of the State law which could be

implemented in a manner so as to result in

preemption limited by provisions designed to avoid

that result?

JA-57

Part C - May the provisions designed to avoid preemption or

otherwise accommodate Federal law give rise to

additional legal complications? (Are there other legal

complications of interest to the Coast Guard?

Il. APPLICATION OF ANALYTICAL MODEL TO THE

CALIFORNIA STATUTE

Introduction

The analytical model described above now will be applied

to the Lempert-Keene-Seastrand Oil Spill Prevention and

Response Act (OPRA) recently enacted by California.

Reference is made only to those provisions of OPRA which

may give rise to questions concerning the application of the

Federal Preemption Doctrine, specifically with respect to the

Federal statutes listed in Part I. The provision to be examined

will be identified together with its subject matter, followed by

the application of the model. For purposes of simplicity the

provision will be identified by the indicated section or article

number rather than by its specific location in the Codes of

California .

Section 8670.7 - Administrator's Authority Respecting

Response

Part A - Answer to question: Possible preemption.

First tier: Relevant Federal statute - section 311

FWPCA [category (c)].

Second tier: Possible conflict if Administrator uses

’ ithout Federal ade

Part B- Answer to question: Yes, Administrator must consult

with and cooperate with Federal On Scene

Coordinator

Part C - Answer to question: No other complications.

JA-S8

Section 8670.9 Administrator To Develop Compact With

Other States

Part A - Answer to question: Possible preemption.

First tier: Relevant Federal statutes: Section 311,

FWPCA [category (c)], and Ports and

Waterways Safety Act (vessel safety and

traffic) [category (b)).

Second Tier: Possible conflict if compact seeks to

regulate.

Part B- Answer to question: Yes, Administrator must

coordinate development of the compact with the

Coast Guard.

Part C - Answer to question: No other complications.

Section 8670.10 - Administrator To Conduct And Set

Standards For Drills

Part A - Answer to question: Possible preemption.

First tier; Relevant Federal statute: Section 311,

FWPCA [category (c)}.

Second tier: Possible conflict if standards conflict with

Federal standards.

Part B - Answer to question: No.

Part C - Answer to question: No other complications.

Section 8670. 16 - Administrator To Promote Federal Adoption

of Laws

Part A - Answer to question: No preemption.

JA-59

First tier: Relevant federal statute: Ports and

Waterways Safety Act (vessel equipment

and traffic) [category (b)].

Second tier: Not applicable as no conflict.

Part B - Answer to question: Yes, Administrator limited to

pressing Federal government to adopt regulations or

statutes.

Part C - Answer to question: No other complications.

Section 8670.17 - Administrator to Regulate Vessels Indirectly

Through Terminals

Part A - Answer to question: Possible preemption.

First tier: Relevant Federal statutes - Ports and

Waterways Safety Act (equipment and

operation of vessels) and subtitle II of Title

46 U.S. Code (equipment and personnel of

vessels) [both category (b)].

Second tier: Possible conflict (tug escort) [NOTE: This

section of OPRA contains authority to

impose tug escort requirements. As noted

above, the Supreme Court in Ray held that

States were not preempted from imposing

such requirements. However, a second tier

analysis might result in preemption where

such a requirement conflicts with a Coast

Guard regulation specifically addressing tug

escort. ]

Part B - Answer to question: No.

Part C - Answer to question: No other complications.

JA-60

Section 8670.18 - Administrator To Evaluate Coast Guard

Inspection Program

Part A - Answer to question: Possible preemption.

First tier: Relevant Federal statutes: Section 311,

FWPCA [category (c)]; subtitle II of Title

46 U.S. Code [category (b)).

Second tier: Possible preemption if Administrator

adopts conflicting inspection

requirements.

PartB- Answer to question: Yes, Administrator must consult

with Coast Guard concerning State inspection and

may not duplicate Coast Guard activities.

Part C - Answer to question: No other complications.

Section 8670.20 - Tanker Or Barge Disability Notification To

Coast Guard

Part A - Answer to question: No preemption.

First tier: Relevant Federal statutes: Section 311,

FWPCA [category (c)]; subtitle II of Title

46 U.S. Code [category(b)].

Second tier: Not applicable as no conflict.

Part B - Answer to question: Yes, notification must be made

to Coast Guard.

Part C - Answer to question: Possible complication since

requirement not exactly same as Coast Guard

requirement. [Compare 46 C.F.R. Part 4.05-1); also

applies to vessel within 12 miles of the shore

(probably beyond California’s competence)].

JA-61

Section 8670.21 - Administrator To Negotiate Vessel Traffic

Service System With Coast Guard

Part A - Answer to question: No preemption.

First tier: Relevant Federal statute: Ports and

Waterways Safety Act (vessel traffic

system) [category (b)).

Second tier: Not applicable as no conflict.

Part B - Answer to question: Yes, Administrator must obtain

agreement with Coast Guard.

Part C - Answer to question: No other legal complications,

nevertheless, it may be difficult to accommodate

California and Coast Guard schedules and funding

schemes.

Section 8670.22 - Prohibition Of Vessel Violating OPA90

(Amendment to 46 U.S.C. Chapter 37) Double Hull

Requirement

Part A - Answer to question: No preemption.

First tier: Relevant federal statute: Subtitle II of title

46 U.S. Code (vessel construction)

[category (b)].

Second tier: Not applicable as no conflict.

Part B - Answer to question: Yes, as merely enforcement of

Federal statute.

Part C - Answer to question: May be complications as to

enforcement.

Article 4 - Oil Spill Response and Article 5 - Contingency

Planning and Articles 6 & 7 - Funds

Part A - Answer to question: Possible preemption.

JA-62

First tier: Relevant Federal statutes: Section 311

FWPCA and OPA 90 [both category (c)].

Second tier: Possible conflict re Articles 4 & Sif

regulations in conflict with Federal regime.

Part B - Answer to question: Oil spill response subject to

Coast Guard direction.

Part C - Answer to question: No other complications.

Section 8670. 30 - Interim Vessel Contingency Plan, Including

Proof of Financial Responsibility as Provided by Federal Law

Part A - Answer to question: Possible preemption.

First Tier: Relevant Federal statutes: Section 311,

FWPCA and OPA90 [both category (c)].

Second Tier: Possible conflict if Administrator

adopts conflicting requirements.

Part B - Answer to question: Yes certain requirements must

be consistent with National Contingency Plan;

financial responsibility provided under Federal law

accepted. :

Part C - Answer to question: Virtually certain to have

additional complications stemming from acceptance

of "Federal" (i.e. presumably under OPA90)

financial responsibility proof

- complication # 1 - Federal financial

responsibility applies only to OPA90

liability regime

- complication # 2 - OPRA requires that the

State of California be named on the policy

as an additional insured; that is inconsistent

with Coast Guard requirements, and P & I

cover for vessels does not now name

JA-63

additional insured and would be most

unlikely to do so for California.

Section 8670.37.51 - Financial Responsibility

Part A - Answer to question: No preemption.

First tier: Relevant Federal statute: OPA90 [category

(c)).

Second tier: Not applicable as no conflict.

Part B - Answer to question: No attempt to accommodate

Federal law.

PartC- Answer to question: Since no attempt to

accommodate Federal law, no complications.

(NOTE: Possible Law of che Sea innocent passage

problem, as OPRA prohibits vessel transport of oil

“across marine waters of the state" without state

issued certificate of financial responsibility . }

Division 7.8 - Oil Spill Prevention and Response

Part A - Answer to question: Possible preemption.

First tier: Relevant federal statute - Section 311

FWPCA [category (c)].

Second tier: Possible conflict if regulations in conflict

with Federal regime.

Part B - Answer to question: Yes, regulations required to be

consistent with Coast Guard regulation; statute

requires consultation with Coast Guard.

Part C - Answer to question: No other complications.

JA-64

UNITED STATES DISTRICT COURT

WESTERN DISTRICT OF WASHINGTON

HONORABLE JOHN C. COUGHENOUR

CAUSE NO. C95-1096

THE INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS (INTERTANKO),

Plaintiff.

Vv.

MIKE Lowry, Governor of the State of Washington;

CHRISTINE O. GREGOIRE, Attorney General of the

State of Washington; BARBARA HERMAN, Administrator of

the State of Washington Office of Marine Safety;

DAVID MACEACHRAN, Prosecutor of Whatcom County;

DAVID NEEDY, Prosecutor of Skagit County;

JAMES KRIDER, Prosecutor of Snohomish County; and

NORMAN MALENG, Prosecutor of King County,

Defendants,

V.

THE WASHINGTON ENVIRONMENTAL COUNCIL;

THE NATURAL RESOURCES DEFENSE COUNCIL;

AND OCEAN ADVOCATES, INC.,

Intervenors.

AFFIDAVIT OF C. JONATHAN NEEL

(States/British Columbia Oil Spill Task Force)

STATE OF WASHINGTON )

) ss

COUNTY OF THURSTON )

JA-65

I, C. JONATHAN NEEL, being first duly sworn on

oath, depose and state as follows:

1. I am employed by the State of Washington

Department of Ecology. Presently, I hold the position of Spill

Program Legislative and Intergovernmental Coordinator. Past

positions have included Manager of the Ecology's Spill

Management and Enforcement Section during the Nestucca oil

spill, the Matsukaze oil spill, and MCN 5 barge oil spill. A

copy of my resume is attached.

2. Washington State had experience a number of major

marine incidents immediately prior to the Exxon Valdez

including the:

SS Mobil Oil tanker spill (incident date - 3/20/84;

location - Columbia River; material spilled - 200,000

gallons heavy oil; primary cause - improper installation

of steering pin during maintenance).

Arco Anchorage tanker spill (12/21/85; Port Angeles;

239,000 gallons of crude oil; grounding as a result of

pilot error).

MCN 5 barge oil spill (1/31/88; near Anacortes; 70,000

gallons heavy oil; improper overloading of barge).

Matsukaze double hull tanker grounding (4/28/88; rocks

at Crescent Bay; no spill; officers on bridge asleep).

Nestucca barge oil spill (12/23/88; off Grays Harbor;

231,000 gallons of bunker oil; towing hawser in

extremely poor condition).

3. All of these spills were caused by human error and

clearly avoidable with relatively simple improvements in the

marine industry’s operations. The lack of adequate standards

JA-66

and regulatory oversight of the marine industry was readily

apparent to Ecology.

4. Based upon this past risk exposure, the exceptionally

high economic value of Washington's natural resources, and

the need to better coordinate West Coast spill response

activities (particularly in the aftermath of the Nestucca barge

oil spill) Ecology and the British Columbia Ministry of

Environment decided that a formal mechanism should be

established to coordinate spill related activities. In early 1989,

British Columbia Premier Vander Zalm and Washington

Governor Booth Gardner formed the _ British

Columbia/Washington Oil Spill Task Force.

5. The day after the first Task Force meeting, the

Exxon Valdez spill occurred on March 24, 1989, in Alaska.

The states of Alaska, Oregon and California joined the Task

Force soon after the Exxon spill when the four West Coast

Governors and the British Columbia Premier signed a

memorandum of cooperation. The name of the organization

was then changed to the States/British Columbia Oil Spill

Task Force (Task Force) and we began the West Coast's

coordinated approach to oil spills. The members of the Task

Force are the heads of the agencies responsible for oil spill

prevention and response on the West Coast. One staff

representative was assigned from each agency to coordinate

input into the routine business of the Task Force. I am

Ecology's representative.

6. The day to day activities of the Task Force are now

coordinated by Jean Cameron, the organization's full time

executive coordinator in Portland, Oregon. I am the Task

Force’s contract officer and manage the budget which is

funded through member contributions through contracts with

Ecology.

JA-67

7. During my early involvement with the Task Force,

the organization completed a number of independent studies.

These studies were managed by the organization's

“Prevention Alternatives Subcommittee", to which I was

Washington's representative. The findings of this

subcommittee constituted the rationale for many of the Task

Force’s recommendations. The studies were coordinated by

a Canadian consulting firm, David Dickens and Associates.

The actual studies were carried out by Dickens and a number

of subcontractors.

| 8. The Task Force decided early on to bring all of the

information generated by its committees together in one major

technical and policy document. This document was titled the

"Final Report of the States/British Columbia Oil Spill Task

Force" and published in October 1990. See Exhibit 38: Final

Report of the States/British Columbia Oil Spill Task Force.

9. The final report's recommendations were a synthesis

of all information on oil spill prevention and response readily

available at that time. In addition to the extensive Task Force

funded studies, the final report was based upon a broad array

of studies and reports for example:

The 11 recommendations presented in the report entitled

"Improving Marine Traffic Safety on Puget Sound

Waterways - A Technology Assessment" published

December 15, 1982. The report placed emphasis on

human error as a primary causative factor in vessel

issues ranging from speed limits, mariner qualifications,

enforcement, implementation of National Transportation

bridge communications.

JA-68

The 29 recommendations presented in the "Report to the

Legislature" of the Washington State Oil Spill Advisory

Committee, December 1986. This report was mandated

after the Arco Anchorage oil spill. These

recommendations addressed a range of vessel spill

prevention and response issues including bunkering and

lightering, and anchorage areas.

The 59 recommendations presented in the report of the

Alaska Oil Spill Commission entitled "Spill - The Wreck

of the Exxon Valdez - Implications for Safe Marine

Transportation," January 1990. These recommendations

addressed a range of marine safety issues including the

need to effectively regulate foreign flagged vessels,

application of best achievable technology, and the need

for vessel owner commitment to safety.

The 14 recommendations presented in the 126 page

report entitled "Issue Paper - Spill Prevention - Means of

Preventing Spills of Petroleum and Other Hazardous

Substances in Puget Sound" published by Washington

State’s Puget Sound Water Quality Authority, March

1990. (I participated in some of the committee's

deliberations.) The recommendations dealt with training

of vessel personnel, vessel design, spiller liability. and

Puget Sound’s vessel traffic system (VTS) among other

issues.

We hoped that the weight of all of the West Csast states and

province adopting the most important ideas in all of the

studies evaluated by the Task Force would provide additional

impetus for their actual implementation. The

recommendations in the Task Force report were intended to

be forwarded to and implemested by a range of entities

including: the private sector; €derai law makers and agencies;

and state and provincial lew makers and agencies.

JA-69

10. Lead authors of the final report included one

representative from each of the West Coast states and

province of British Columbia. These individuals were: Jon

Neel, Washington (overall lead author); Amy Glad,

California; John Bones, British Columbia; Bruce Sutherland.

Oregon and Lynn Kent, Alaska. Pau! Heimowitz, who at that

time worked for Washington State’s Puget Sound Water

Quality Authority, was also a major contributor.

ll. A summary of the final report was presented at

and published in the proceedings of the 1991 International

Coastal Zone Conference in Long Beach, California.

Relationship Between the Task Force Recommendations

and Washington State Legislation.

12. The Washington State Legislature passed a

number of oil spill related bills during the 3 sessions

immediately following the Nestucca and Exxon Valdez oil

spills. As head of Ecology's Enforcement and Spill

Management Section at that time, I was involved in the

development of these legislative initiatives.

These legislative actions and requests included:

* In January 31, 1989, then Ecology Director

Christine Gregoire wrote Washington's

congressional delegation requesting a number of

changes to federal law. The requests addressed oil

spill liability, navigation requirements, cil barge

double hulling, on-board spill response equipment,

changes to the federal penalty structure, and

eee en Conee Gneee: Weenel Peatie

System (VTS).

. 1989 Session - House Bill (HB) 1853 & 1854: This

legislation established a streamlined compensation

JA-70

system for damages to state natural resources

resulting from oil spills. House Bill 2242:

* 1990 Session - House Bill 2494: This legislation

established spill response requirements for certain

vessels and facilities. The Chair of the House

Environmental Affairs committee went on record

that, while the current session would focus on spill

response, the subsequent session would focus on

spill prevention. She made it clear that the

complexity of spill prevention would require more

time to complete thoughtful legislation.

* 1991 Session - House Bill 1027: This legislation

established a wide array of spill prevention

requirements and provided for a complete

recodification of all spill related statutes. Major

features of the 1991 legislation included creation of

a new revenue source, establishment of new state

agencies (including the Office of Marine Safety), and

extensive spill prevention requirements.

The 1991 legislation was drafted by the Legislature's House

Environmental Affairs committee's chief counsel with

extensive input from Ecology and the Governor's office.

Sometime following publication of the public review Draft

Task Force report in July 1990, discussions between

legislative staff, Ecology and the Governor's office took place

in earnest as to the scope of the following year’s spill

proposed legislation. Initial and later discussions (after

adoption of the final report) consciously focused on the

recommendations outlined in Task Force report as the starting

point for considering the potential array of issues to be

addressed in the legislation.

JA-71

The legislative development team wanted to make sure

adopted by the Task Force, were addressed wherever

possible. Once the legislation was drafted, extensive

consultations took place during that fall and winter with all

key stakeholders to obtain their imput on the appropriateness

of the proposed legislative concepts. By the conclusion of the

1991 session and the passage of House Bill 1027, the

following recommendations liad been addressed to some

degree by state legislation:

Joint Recommendations

Tow Cables Response Plans

Vessel Safety Measures Local Participation

Petroleum Facility Worker Clean Up Requirements

Training Vessel Inspections

Tug Crew Training Transfer Operations

Review

Strong Sanctions Wildlife Rescue Training

Proof of Financial and Equipment

Responsibility Transfer Containment

Natural Resource Valuation Incident Command

System (ICS)

Enforcement Staff

The specific information for each of these

recommendations is found in the Final Report of the Task

Force on pages 3-8. See Exhibit 38: Final Report of the

States/British Columbia Oil Spill Task Force.

JA-72

Washington Recommendations

Pilot Qualifications Barrel Tax

Federal Consistency Harbor Safety Committees

State Agencies

The specific information for each of these

recommendations is found in the Final Report of the Task

Force on pages 80-83. See Exhibit 38: Final Report of the

States/British Columbia Oil Spill Task Force.

/s/ C. Jonathan Neel

C. JONATHAN NEEL

Signed or attested before me, Laurie L. Carley, by C.

Jonathan Neel.

DATED this 3rd day of June, 1996.

/s/ Laurie L. Carley

NOTARY PUBLIC, in and for the

State of Washington.

My commission expires: 1/31/99

[SEAL]

I. Executive Summary

A. OVERVIEW

Following the 231,000 gallon (873 m’) Nestucca oil spill off

the coast of Washington in December, 1988, British Columbia

Premier William Vander Zalm and Governor Booth Gardner

of Washington established the British Columbia/Washington

Task Force on Oil Spills. The day after the first Task Force

meeting, the Exxon Valdez struck Bligh Reef in Prince

William Sound, and the Task Force membership soon

expanded to include Alaska, Oregon, and California. (Maps

1-6 illustrate petroleum transportation flows and facilities on

the West Coast and in each individual jurisdiction).

The mandate of the Task Force was to a) investigate ways and

means of preventing oil spills; b) to review oil spill response

procedures; c) document and assess the mechanisms for

JA-74

handling compensation claims; and d) to develop a

coordinated contingency plan for preventing and responding

to oil spills in the future. This goal was to culminate in the

adoption of a comprehensive set of recommendations which,

if implemented, would minimize (to the extent practicable) the

probability of major and catastrophic spills and help assure an

effective response to such incidents. The Task Force used

periodic meetings, subcommittee investigations, training

forums, and other tools to accomplish this mandate.

B. MAJOR FINDINGS

Four Task Force subcommittees produced a detailed set of

findings, many of which underlie joint and individual

recommendations. These findings can be summarized by the

following points:

1. Recent spills from the Nestucca, Arco Anchorage,

Exxon Valdez, and American Trader have revealed

significant problems in oil transportation

management, including:

Shortcomings in vessel design and integrity

Gaps in regulatory oversight

Incomplete cost recovery by states/provinces

2. Despite research in spill cleanup technology, it is

unlikely that a large fraction of oil can be recovered

from a catastrophic spill.

3. Since response efforts can not effectively reduce the

impact of large oil spills, prevention of spills must

be the prime strategy in developing solutions to this

rssue.

4. Readiness and response to smaller size spills of oil or

eno

JA-75

refined petroleum products must still be emphasized,

since muci. of the West Coast traffic is by barge and

freighters carrying fuel.

5. Comprehensive oil spill prevention demands

icipation by ind \ here. ene '

organizations, and all governmental jurisdictions.

6. The States/B.C. Task Force on Oil Spills should

continue to promote coordination of West Coast oil

spill prevention and response efforts.

C. JOINT RECOMMENDATIONS

The following recommendations have the full support of all

Task Force members. Individual recommendations by each

Task Force member are presented in the body of the report,

beginning on page 51. Recommendations have been

subdivided by the technical nature of the issues to assist the

reviewer in analyzing recommendations with similar

characteristics.

The recommendations are not in priority order; priorities are

detailed in section IV. The recommendations vary as to the

governmental body that has authority to make the suggested

changes, and will be forwarded to the appropriate

“authorizing agent" through mechanisms identified in an

implementation strategy (page 92).

The main objective of this Task Force, as reflected in the

following recommendations, is to continue to work towards

coordinated prevention and response to oil spills for the

Pacific coast. Two aspects of this effort are particularly

important: mutual assistance among the members for

catastrophic spills, and interjurisdictional for

transboundary spills. To achieve these objectives, the Task

Force will continue to work together to implement similar

JA-76

response procedures to ensure consistency among the separate

jurisdictions. To minimize the need for any response,

recommendations to prevent spills occurring along the coast

have been developed and given high priority.

Vessel Traffic Reduction

RECOMMENDATION 1: Petroleum Conservation

Implement programs designed to reduce petroleum

consumption, such as conservation measures (including

appliance and automobile efficiency standards, recycling, and

effective mass transit), alternative energy source research, and

economic incentives.

RECOMMENDATION 2: Alternative Oil Transportation

Review proposals for alternative transportation modes which

would reduce petroleum transportation by tanker in high risk

and environmentally sensitive areas. In reviewing any

proposals, Task Force members are committed to insuring

compliance with all applicable state/provincial/federal laws,

including their processes to involve the public.

Vessel Traffic Management

RECCMMENDATION 3: Tug Escorts - Single Propulsion

Require tug escorts for all single boiler or single engine, and

single screw tank vessels carrying oil or other petroleum

products in waterways designated as high risk by an

individual state or province.

RECOMMENDATION 4: Tug Escorts’ - Tonnage

Requirements

Review and, if appropriate, reduce dead weight tonnage

specifications for tug escorts requirements.

JA-77

RECOMMENDATION 5: Vessel Traffic Service Systems

Upgrade vessel traffic service systems by replacing outdated

equipment, eliminating gaps in coverage, increasing operator

training and assignment length, and establishing mandatory

participation in vessel traffic service systems in high-risk or

congested areas.

RECOMMENDATION 6: Near Miss Reporting System

Establish, on a trial basis with a subsequent assessment of

usefulness, a near miss reporting system which links directly

with vessel inspection information, vessel traffic, and vessel

casualty database systems.

RECOMMENDATION 7: Tow Cables

Develop and implement a mandatory set of guidelines for tugs

on tow cable size and material specifications, cable

maintenance practices, cable handling equipment design and

barge recovery plan preparation.

RECOMMENDATION 8: Vessel Safety Measures

Establish regional safety measures, including speed limits,

based on escort vehicle or other limitations, for all laden tank

vessels in inland waters and their critical approaches.

RECOMMENDATION 9: Tow Systems

Require towing systems and plans on all tankers carrying oil

and other petroleum products.

Vessel Design

RECOMMENDATION 10: Double Hulls

Require double hulls for all new tank vessels designed to

carry oil or other petroleum products as cargo.

JA-78

RECOMMENDATION 11: Onboard Navigation

Improvements

Require all tankers carrying oil or other petroleum products

in coastal and inland waterways to possess and operate an

onboard navigation system, such as an Electronic Chart

Display Information System (ECDIS).

Personnel

RECOMMENDATION 12: Petroleum Facility Worker

Training

Require state/province certification of training programs for

managers, workers, and safety officers at terminals which

handle oil or other petroleum products. Program certification

requirements should include spill prevention and response

training.

RECOMMENDATION 13: Mariner Qualifications

Require more stringent mariner qualifications, including spill

prevention and response training, simulator training, vessel

class and size restrictions on deck officer certification, and

alcohol and drug testing.

RECOMMENDATION 14: Tug Crew Training

Mandate oil spill response training for all tug crews involved

in tank vessel operations.

RECOMMENDATION 15: Crew Requirements

Require two licensed officers (including pilot where

appropriate) to be present on the bridge of all tankers carrying

oil or other petroleum products while in inland waterways.

Require adequate crew levels, sufficient to meet normal and

emergency operation needs, for tank vessels carrying oil or

other petroleum products.

JA-79

RECOMMENDATION 16: _—_ Dedicated Tug Crews

Assign dedicated trug crews to specific classes of tugs and

tank barges carrying oil or other petroleum products to assure

familiarity with tug and tank barge operating characteristics.

Enforcement, Penalties, and Liability

RECOMMENDATION 17: __ Strong Sanctions

Legislate strong levels of civil and criminal sanctions for

noncompliance with oil spill regulations.

RECOMMENDATION 18: Proof of Financial!

Responsibility

Raise state/Canadian federal proof of financial responsibility

requirements to ensure spillers can finance oil spill related

cleanup and damage costs.

RECOMMENDATION 19: Natural Resource Valuation

Develop and require use of methods of natural resource

valuation which fully incorporate non-market and market

values in assessment of damages resulting from spills.

RECOMMENDATION 20: Cost Recovery

Develop responsible party contracts to aid in the recovery of

all natural resource damage and cleanup costs.

RECOMMENDATION 21: _ Liability Limits

Remove any ambiguity in federal law and guarantee a state’s

right to fully exercise its own liability standard. Increase the

maximum limit of liability for oil pollution damage under

Canadian law.

RECOMMENDATION 22: — Coast Guard Enforcement

Increase the Coast Guard’s ability to conduct routine on-water

JA-80

surveillance patrols by increasing funding to U.S. Marine

Safety Offices and Canadian Coast Guard Regional Offices.

RECOMMENDATION 23: Enforcement Staff

Establish adequate environmental resource agency staffing

level devoted to enforce compliance with spill planning

requirements, and aggressively pursue legal action against

violators.

Regulatory Oversight

RECOMMENDATION 24: _ Prevention Plans

Require all facilities (and tank vessels larger than 10,000 dwt)

which handle oil or other petroleum products to develop and

implement spill prevention plans, which would at a minimum

include risk-reducing transfer methods and personnel training

specifications.

RECOMMENDATION 25: _ Response Plans

Require all facilities (and tank vessels larger than 10,000 dwt)

which handle oil or other petroleum products to develop and

implement spill response plans, which would at a minimum

include response time, equipment, and staff support

specifications.

RECOMMENDATION 26: Local Participation

Each state/province shall recognize and utilize local citizen

expertise and knowledge in spill prevention and response

efforts. This may include a volunteer training and

coordination plan to enhance preparedness.

RECOMMENDATION 27: Clean Up Requirements

Ensure that all state, provincial, and federal agencies act in

full cooperation to require the spiller or other responsible

JA-81

party to meet all applicable state, provincial, and federal

performance requirements.

RECOMMENDATION 28: _ Vessel Inspections

Require periodic (but not less than every two years) structural

and mechanical integrity inspections of vessel equipment and

hull structures on all tank vessels carrying oil or other

petroleum products. Develop a priority inspection system for

more frequent inspections of particular tanker features

essential to safety, and for certain tankers, equipment, and

companies with a history of stress fracture incidents and other

safety problems.

JA-82

Law of “he Sea Treaty Provisions

Article 1

Use of terms and scope

** *& *

2. (1) "States Parties" means States which have consented to

be bound by this Convention and for which this Convention

is in force.

(2) This Convention applies mutatis mutandis to the entities

referred to in article 305, paragraph l(b), (c), (d), (e) and (f),

which become Parties to this Convention in accordance with

the conditions relevant to each, and to that extent "States

Parties" refers to those entities.

Article25

Rights of protection of the coastal State

1. The coastal State may take the necessary steps in its

territorial sea to prevent passage which is not innocent.

2. In the case of ships proceeding to internal waters or a call

at a port facility outside internal waters, the coastal State also

has the right to take the necessary steps to prevent any breach

of the conditions to which admission of those ships to internal

waters or such a call is subject.

3. The coastal State may, without discrimination in form or in

fact among foreign ships, suspend temporarily in specified

areas of its territorial sea the innocent passage of foreign ships

if such suspension is essential for the protection of its

security, including weapons exercises. Such suspension shall

take effect only after having been duly published.

JA-83

Article38

Right of transit passage

1. In straits referred to in article 37, all ships and aircraft

enjoy the right of transit passage, which shall not be impeded:

except that, if the strait is formed by an island of a State

bordering the strait and its mainland, transit passage shall not

apply if there exists seaward of the island a route through the

a een Seren see Of senlies

convenience with respect to navigati and j

or hy igational hydrographical

2. Transit passage mear:s the exercise in accordance with this

Part of the freedom o1 navigation and overflight solely for the

purpose of continuous and expeditious transit of the strait

between one part of the high seas or an exclusive economic

zone and another part of the high seas or an exclusive

economic zone. However, the requirement of continuous and

expeditious transit does not preclude passage through the strait

for the purpose of entering, leaving or returning from a State

+. ~ pulmo tira waratescepi aaa hada

3. Any activity which is not an exercise of the right of transit

passage through a strait remains subject to the other applicable

provisions of this Convention.

1. This Convention shall be open for signature by:

(a) all States;

(b) Namibia, represented by the United Nations

Council for Namibia;

(c) all self-governing associated States which have

chosen that status in an act of self-determination

JA-84

supervised and approved by the United Nations in

accordance with General Assembly resolution

1514 (XV) and which have competence over the

matters governed by this Convention, including

the competence to enter into treaties in respect of

those matters;

(d) all self-governing associated States which, in

accordance with their respective instruments of

association, have competence over the matters

governed by this Convention, including the

competence to enter into treaties in respect of

those matters;

(e) all territories which enjoy full internal self-

government, recognized as such by the United

Nations, but have not attained full independence in

accordance with General Assembly resolution

1514 (XV) and which have competence over the

matters governed by this Convention, including

the competence to enter into treaties in respect of

those matters;

(f) international organizations, in accordance with

Annex IX.

2. This Convention shall remain open for signature until 9

December 1984 at the Ministry of Foreign Affairs of Jamaica

and also, from 1 July 1983 until 9 December 1984, at United

Nations Headquarters in New York.

JA-85

UNITED STATES DISTRICT COURT

WESTERN DISTRICT OF WASHINGTON

HONORABLE JOHN C. COUGHENOUR

CAUSE NO. C95-1096

THE INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS (INTERTANKO),

Plaintiff.

vs.

MIKE Lowry, Governor of the State of Washington;

CHRISTINE O. GREGOIRE, Attorney General of the

State of Washington; BARBARA J. HERMAN, Administrator

of the State of Washington Office of Marine Safety;

DAVID MCEACHRAN, Prosecutor of Whatcom County;

DAVID NEEDY, Prosecutor of Skagit County;

JAMES KRIDER, Prosecutor of Snohomish County; and

NORMAN MALENG, Prosecutor of King County,

Defendants,

and

THE WASHINGTON ENVIRONMENTAL COUNCIL:

THE NATURAL RESOURCES DEFENSE COUNCIL:

Intervenors.

AFFIDAVIT OF WILLIAM B. COLLINS

I, William B. Collins, am competent to testify, and have

personal knowledge of the following:

JA-86

1. Il am a Senior Assistant Attorney General for the

State of Washington and represent the defendants Mike

Lowry, Christine O. Gregoire, and Barbara Herman in this

matter. .

2. Attached to this Affidavit are true and accurate

copies of Plaintiff Intertanko’s Response To Defendant State

Of Washington’s First Set Of Interrogatories, Nos. 11, 12,

24, and 25.

I certify under penalty of perjury under the laws of the

State of Washington that the above is true and correct to the

best of my knowledge.

DATED this 3rd day of June, in Olympia, Washington

/s/ William B. Collins

WILLIAM B. COLLINS

Subscribed and sworn to before me this 3rd day of June,

1996.

/s/ Linda Ahmuty

NOTARY PUBLIC in and for the State of Washington.

My appointment expires: 10-10-97

JA-87

****

INTERROGATORY NO. 24:

Paragraph 36 of the complaint states that by "reason

of the Supremacy Clause of the Constitution of the

United States of America (Article VI, Clause 2) the

BAP regulations are pre-empted by the federal

statues and international conventions cited above."

With regard to this pre-emption claim, do you claim

that any BAP regulation actually conflicts with a

federal statute, regulation, treaty or international

convention such that compliance with both the BAP

regulation and the federal statute, regulation treaty

Or international convention is a physical

' ‘bility?

ANSWER: INTERTANKO objects to interrogatory No.

24 because it requests information without reference to time

period and is in other respects vague, ambiguous, and

overbroad. Subject to and without waiving the foregoing

objections, INTERTANKO states that paragraph 36 reflects

INTERTANKO’s contention that Washington State standards

. incompatible with Article VI Clause 2 of the U.S.

Constitution. This pre-emption contention does not rely on an

allegation that it is a physical impossibility for tanker

operators to conform to both the federal/international regimes

and the Washington State regime.

*** *

JA-88

UNITED STATES DISTRICT COURT

WESTERN DISTRICT OF WASHINGTON

HONORABLE JOHN C. COUGHENOUR

CAUSE NO. C95-1096

THE INTERNATIONAL ASSOCIATION OF

INDEPENDENT TANKER OWNERS (INTERTANKO).

Ple’» ff,

Vv.

MIKE Lowry, Governor of the State of Washington;

CHRISTINE O. GREGOIRE, Attorney General of the

State of Washington; BARBARA J. HERMAN, Administrator

of the State of Washington Office of Marine Safety;

DAVID MCEACHRAN, Prosecutor of Whatcom County;

DAVID NEEDY, Prosecutor of Skagit County;

JAMES KRIDER, Prosecutor of Snohomish County; and

NORMAN MALENG, Prosecutor of King County,

Defendants,

and

THE WASHINGTON ENVIRONMENTAL COUNCIL;

THE NATURAL RESOURCES DEFENSE COUNCIL;

and OCEAN ADVOCATES, INC..,

Intervenors.

AFFIDAVIT OF STANLEY J. NORMAN

STATE OF WASHINGTON)

) ss.

County of Thurston )

JA-89

1. BACKGROUND

A. Position

My name is Stanley J. Norman, Commander, United

States Coast Guard (retired), and member, Nautical Institute.

The Nautical Institute is an international association of vessel

masters dedicated to marine safety and maritime

professionalism. I am a citizen of the United States, over the

age of 18, and competent to provide testimony in this matter.

I am the Program Director for Policy and Planning at the

Washington State Office of Marine Safety (OMS). My duties

include the management and supervision of the OMS tank

vessel prevention plan program, the vessel contingency plan

program and the education/technical outreach program. I am

also responsible for the development and implementation of

agency policies and regulations and agency administrative

procedures. I also serve as a custodian of the official public

records for OMS. The exhibits attached to this affidavit are

true and accurate copies of the documents contained in the

files and library of OMS. I previously served at the Office of

Marine Safety in the capacity of Senior Technical Specialist

for Policy and Pianning, and Tank Vessel Prevention Plan

Specialist. In addition, I served as supervisor of the Puget

Sound field office for the Office of Marine Safety for six

months prior to assuming my current position.

B. Education and Training

I am a 1971 graduate of the U.S. Coast Guard Academy

with majors in management and basic engineering. I am also

a graduate of the Combined and Joint Staff Officer Course of

the Armed Forces Staff College in Norfolk, Virginia. During

my 22-year Coast Guard career, I received additional training

in total quality management, personne! management, human

relations, resource management, program planning, aids to

JA-90

navigation, waterways management, search and rescue, and

law enforcement.

C. Experience

My Coast Guard career included more than eight years of

sea duty. I have served on five vessels. I served as executive

officer or chief mate on one, and commanding officer or

master of two: an ice-breaking tug, and a sea-going buoy

tender. I’ve sailed extensively throughout the Atlantic and in

parts of the Pacific Ocean. I’ve transited the Panama Canal,

operated north of the Arctic Circle, and have extensive Great

Lakes sailing time and experience with vessel management.

My service ashore with the Coast Guard included program

management and direction of several multi-million dollar

programs.

During my assignment to high-endurance Coast Guard

cutters, I supervised all deck department functions including

extensive towing, replenishment at sea, maneuvering, and

mooring. I was also assigned the additional duties of

communications officer and assistant navigator.

In 1973 I became the Executive Officer, or chief mate, of

the Coast Guard cutter Redwood in New London,

Connecticut. As Executive Officer of the Redwood I was

responsible for all aspects of administration, personnel, and

operations of the vessel. I had the opportunity to plan and

execute cargo loading, cargo storage, and liquid loading.

After four consecutive years of sea duty, I was reassigned

to the Great Lakes Operations Center of the Ninth Coast

Guard District in Cleveland, Ohio. In November 1975, I

personally directed the search for the survivors of the ore

carrier Edmond Fitzgerald, which sank in a severe Lake

Superior storm.

JA-91

From 1976 through 1979, I served as Senior Operations

Center Duty Officer and Ice Navigation Officer for the Great

Lakes. My duties included extensive vessel and boat

management, as well as direct liaison with the shipping fleets

that operated in the Great Lakes.

In 1979 I was selected to be the First Commanding

Officer of a new icebreaker tug, the U.S. Coast Guard cutter

Biscayne Bay, that was to be stationed in St. Ignace,

Michigan. As First Commanding Officer, I developed,

organized, and implemented a complete crew training

program; developed administrative procedures for the vessel;

supervised development of emergency procedures and an

organization manual, as well as station bills; and accepted the

vessel on behalf of the United States Government following

construction.

Following graduation from the staff college in January

1982, I was reassigned to U.S. Coast Guard headquarters in

Washington, D.C. as a military readiness planner.

In 1985 I returned to sea duty as Commanding Officer or

master of the U.S. Coast Guard cutter Cowslip, a 180-foot,

1000-ton seagoing buoy tender responsible for aids to

navigation, search and rescue, and law enforcement

throughout the Chesapeake Bay, Potomac River, eastern shore

of Maryland and the Virginia Capes. In 1987 I was reassigned

to the staff of Commander Naval Base, Norfolk, Virginia as

Senior Coast Guard Officer, where I served as assistant naval

base operations officer, helping to manage the world’s largest

naval facility.

In 1989 I was transferred to Seattle, Washington as the

Pacific Northwest Director of Waterways Management and

Aids to Navigation. As program manager and director, I

supervised the operations and administration of four ships,

JA-92

five aids to navigation teams, two long-range radio navigation

stations, and the Vessel Traffic Service of Puget Sound.

The Puget Sound Vessel Traffic Service is the United

States’ largest, busiest, and only international Vessel Traffic

Service. As supervisor and program manager for the Vessel

Traffic Service, I served as the U.S. member of the Canada-

U.S. Joint Coordinating Group for Vessel Traffic Service in

the Juan de Fuca region. During my tenure as program

director in Seattle, my staff and the units that I supervised

completed extensive waterways analysis and management

surveys of all waterways in Oregon, Washington, Montana,

and Idaho under federal jurisdiction. In addition, 1 worked

extensively with the Vessel Traffic Service in Seattle to

develop regulated navigation areas for Puget Sound, and the

Puget Sound-specific regulations incorporated in the National

Vessel Traffic Service Regulations. All of these federal

regulations now reside in 33 Code of Federal Regulations

(CFR).

I retired from the U.S. Coast Guard on July 1, 1993 and

began work for the Office of Marine Safety on August 23,

1993.

Il. RULE ADOPTION PROCESS

A. Phases 1, 2, 3

The Washington State Oil Spill Prevention and Response

Act of 1991 (Act) created the Office of Marine Safety and

mandated that owners or operators of tank vessels prepare and

submit to OMS oil spill prevention plans for those vessels that

meet the requirements of the Act. RCW 43.211.010 and RCW

88.46.040. The Act also mandated that OMS only approve

tank vessel prevention plans that demonstrated best achievable

protection (BAP) for Washington’s marine environment.

RCW 88.46.040(3). The Office of Marine Safety approached

JA-93

this challenge in three deliberate phases. Phase 1 and Phase 2

were designed to gather information on the tank vessel fleet

operating in Washington, and the practices used by the

owners and operators of those vessels. The phases are more

fully described in Exhibit 1.

Phase 1 began with the filing of interim prevention plans

by tank vessel owners and operators beginning on January 1,

1993. Interim prevention plans consisted of one to two pages

which briefly described the tank vessel or vessels covered by

the plan. The interim prevention plans were used to provide

a picture of tank vessel traffic in Washington. From the

interim plans, OMS learned that every year approximately

en and 150 tank barges operate in Washington

Ww ,

B. Development Process For BAPs

In March 1993, OMS adopted Phrase 2 rules in

Washington Administrative Code chapter 317-20. The order

of adoption is attached as Exhibit 2. These original tank vessel

prevention plan rules required owners and operators of tank

vessels to submit to OMS their informational prevention plans

that described the operating and management policies and

procedures used by their company, and which demonstrated

minimum compliance with existing federal and international

standards. These detailed informational prevention plans were

due for submission to OMS by September 3, 1993 or prior to

the arrival of the first covered vessel in Washington waters.

Between September and December 1993, more than 70

prevention plans were submitted to OMS covering more than

500 vessels. These plans were reviewed by OMS staff for

completeness and minimum compliance.

Beginning in November 1993, and continuing through

April 1994, OMS conducted an extensive review of those

JA-94

prevention plans. OMS researched other developments in the

industry in order to produce an extensive list of current

practices within the industry that held promise as potential

best achievable protection standards. Industry practices and

procedures were organized into four categories: Operating

procedures; personnel policies; management practices; and

technology.

OMS research included a very comprehensive library

search and a close review of the States/British Columbia Oil

Spill Task Force Reports and continuous monitoring of

International Maritime Organization (IMO) subcommittee

work. In particular, the efforts of the subcommittees on Safety

of Navigation, Standards for Training and Watchkeeping, and

Flag State Implementation were followed. OMS staff attended

U.S. workgroup sessions to develop U.S. positions for IMO

delegations to those subcommittees.

C. Advisory Group

In April 1994, OMS chartered an Advisory Group on

Best Achievable Protection Standards consisting of experts on

marine transportation and environmental protection. The

Charter is attached as Exhibit 3. The Advisory Group was

composed of representatives from both the public and private

sectors. Industry representation included tanker managers,

tanker operators, and other experts and professionals. |

chaired the Advisory Group. A list of Advisory Group

members is attached as Exhibit 4. The Advisory Group met

five times to review and refine the draft best achievable

protection standards and the draft rules for tank vessel

prevention plans that would eventually replace chapter 317-20

WAC with a new chapter, chapter 317-21 WAC. The minutes

of their meetings are attached as Exhibits 5, 6, 7, 8, and 9.

An example of the draft rules which illustrates the scope of

JA-95

the changes made by the Advisory Group is included as

Exhibit 10.

During the process of developing and implementing the

BAP standards, by agreement between OMS and the Coast

Guard, I was sent to Washington, D.C. on June 25, 1994 to

brief the senior staff at U.S. Coast Guard Headquarters,

including representatives from the Marine Safety Office, the

Navigation Office, and the Chief Counsel’s Office, of the

U.S. Coast Guard on best achievable protection standards that

had been developed by the Advisory Group at OMS. My

report of the trip is attached as Exhibit 11.

D. Public Workshops and Hearings

OMS conducted public workshops in July 1994, to solicit

public comments on the draft best achievable protection

standards. The media release and the official notice are

attached as Exhibits 12 and 13. A compilation of the

comments is attached as Exhibit 14. These comments were

provided to the Advisory Group for their use in reviewing the

draft rules for the BAP standards. The proposed rules were

published in the Washington State Register on September 21,

1994. Public hearings were held in Vancouver, Washington

on October 18, 1994, and in SeaTac, Washington on October

20, 1994, to obtain oral testimony on the proposed BAP rules.

In addition to the testimony received at the public hearings,

OMS accepted written comments through November 7, 1994.

A copy of the Hearing Examiner's Report on the proposed

rules is attached as Exhibit 15.

E. Adoption of Chapter 317-21 WAC

Chapter 317-21 WAC was adopted on December 9, 1994,

after an extensive review of all comments received. See

Exhibit 16. The rules were scheduled to become effective on

June 7, 1995.

JA-96

In order to facilitate compliance with these new rules,

OMS developed Model Tanker and Tank Barge Prevention

Plans. Because the development of these extensive model

guidance documents took longer than expected, the effective

date of the rules was pushed back to July 7, 1995 for tankers,

and July 31, 1995 for tank barges to allow owners and

operators additional time to study the models and produce

better, more comprehensive prevention plans. The model

plans provide templates for tank vessel owners and operators

to use as they develop their prevention plans and describe the

documentation required to demonstrate compliance with the

rules.

F. Amendments To BAPs In 1996

Approximately two months after adoption of the BAP

standards, in February 1995, OMS was notified by two

groups that they believed there were some problems with the

standards. One group was the State Board of Pilotage

Commissioners, who was concerned that there may be some

conflicts or some problems with clarity in those portions of

the BAP standards that affected pilots. The other group was

maritime labor, which had not been directly involved in the

Advisory Group, although they had received mailings and

other information. Maritime labor was primarily concerned

over the drug and alcohol testing requirements due to possible

impacts on collective bargaining agreements.

Between March and October 1995, a number of meetings

were held with maritime labor, the Puget Sound Pilots, and

the Board of Pilotage Commissioners in an attempt to make

technical changes to the rules that would resolve the issues

raised. Amendments to chapter 317-21 WAC were proposed

in October 1995. See Exhibit 17. The notice to the public and

the Hearing Examiner Report on the amendments are attached

as Exhibits 18 and 19. The amendments were adopted on

JA-97

January 17, 1996 and became effective on February 17, 1996.

See Exhibit 20. The changes to the BAP standards covered

three primary elements: (1) coordination with pilots, (2)

voyage planning, and (3) drug and alcoho! testing.

The changes to the Coordination with Pilots requirement

were designed to facilitate an exchange of information and to

recognize that a pre-escort conference covering many of the

same items is required under 33 C.F.R. Part 168, the tanker

escort rules issued by the Coast Guard pursuant to OPA 90.

The changes to the Voyage Planning section added the caveat

that the plan should not be adhered to without deviation; the

advice of the vessel’s state licensed pilot and varying local

conditions must be taken into consideration. The pilot will

come aboard and supplement the information that the vessel

crew has already gleaned from such documents as the Coast

Pilot, Tide Tables and nautical charts.

The other technical change added a section to clarify that

state-licensed pilots are not subject to the alcohol and illicit

drug chemical testing policies in the BAP standards because

they are already covered by the State Board of Pilotage

Commissioner’s drug and alcohol program. The amendments

also make it clear that the primary purpose for the changes in

the drug and alcohol testing program was to ensure

compatibility with federal standards which were being revised

during the six-month period between adoption and

effectiveness of the BAP standards. Those changes included

specifying that post-accident testing was required of only

those crew members who may have been directly involved in

assigned vessel of any navigation or engineering watch

stander who remains employed by the owner/operator as a

watch stander after testing positive for drugs or alcohol two

or more times during the previous 12 months of employment

JA-98

be reported to OMS. This change was at the recommendation

of labor organizations, which indicated a need for some

flexibility in reporting names due to privacy considerations.

In addition, the definition of "illicit drug” was changed to

conform exactly with the federal definition in the testing panel

used by the U.S. Coast Guard. The percentage of random

testing required was amended to equal the random testing

requirement in 46 C.F.R. Thus, the changes made to the BAP

standards in 1996 were designed to make the standards

flexible enough to take into account changes in pilot

procedures as a result of State Board of

Commissioners activities and changes in drug and

testing procedures due to changes in the federal drug

alcohol testing program. The State Board of Pilotage

Commissioners supported the amendments. See Exhibit 21. .

Ill. EXPLANATION OF BEST ACHIEVABLE

PROTECTION (BAP) STANDARDS

Washington's Best Achievable Protection Standards are

divided into four major categories: Operating Procedures,

Personnel Policies, Management Practices, and Technology.

and elements. The proposed list of categories and elements is

included as Exhibit 22.

A. Operating Procedures

1. The first subcategory under Operating Procedures is

Watch Practices. WAC 317-21-200.

a. The first element is the Navigation Watch. See

WAC 317-21-200(1). Washington requires at least two

licensed deck officers, a helmsman and a lookout. During

periods of restricted visibility only, three licensed navigation

officers are required. The reason for adding a licensed officer

eB

JA-99

during restricted visibility is in order to perform the three

primary bridge management functions that are outlined in

nevigation, collision avoidance. end séeinicwisien. Dati

periods of restricted visibility the workload should be evenly

wh ‘sibility is not icted. an individual officer is

able to combine the workload from one, two, or even three

functions, depending on the area in which he or she is

navigating. During restricted visibility, when a great deal

more attention needs to be paid to both navigation and

collision avoidance, the Advisory Group and OMS determined

that an additional officer was required so that the workload

could be balanced.

The primary function of a deck officer is to reduce the

risk of groundings and collisions which are the two primary

causes of catastrophic oil spills. Specifically, groundings are

usually caused by navigational errors. Collisions are usually

caused by collision avoidance errors. By assigning a deck

officer to each of those functions, sufficient emphasis should

be placed on each to greatly reduce the risk of a mistake.

visibility in the 70 miles west of Port Angeles, in the Strait of

Juan de Fuca. The Strait of Juan de Fuca is unique in that the

70 miles west of Port Angeles is entirely within Washington

and U.S. waters on the inbound lane, and Canadian waters on

the outbound lane. State pilots do not board vessels until they

have transited for approximately five hours through state

waters to Port Angeles. State pilots who board at Port Angeles

count as the third officer.

b. The next element of Operating Procedures,

Watch Practices, is Bridge Resource Management. See WAC

Exhibit 23: "Bridge Resource Management" by Richard T.

Johnson, National Transportation Safety Board, MITAGS

Bridge Team Management Course, Marine Institute of

Technology and Graduate Studies, October 1993, pp. 1-18

(hereinafter "MITAGS"). Washington’s standards call for

bridge resource management for all tankers. Included within

the bridge resource management system must be provisions

for accomplishment of its three functions: navigation,

collision, avoidance, and administration. Washington

standards for bridge resource management also include

requirements for comprehensive voyage planning and

coordination with pilots. These requirements are linked, just

like the navigational watch composition is, to an effective

bridge resource management system. The purpose of bridge

resource management is to avoid collisions and groundings,

the two primary causes of catastrophic oil spills.

c. The next element of Operating Procedures,

Watch Practices, is Coordination With Pilots. See WAC 317-

21-200(3). This element is linked directly to bridge resource

management. Washington requires the use of a checklist to

facilitate the communication between vessel bridge teams and

pilots. When a pilot comes aboard a merchant vessel,

particularly a merchant vessel with a crew that is not familiar

with local waters, the pilot becomes a key member of the

bridge team, providing local expertise and considerable

knowledge to assist the vessel’s crew in navigating the vessel

safely into port. It is essential that the pilot and the vessel’s

navigation team work closely together. The purpose of the

checklist required by Washington State is to ensure that the

communication is as complete as possible between the vessel

crew and the pilot and to provide redundancy in the sense that

JA-101

the vessel crew needs to know the actions the pilot plans to

take, and the pilot needs to know what actions the crew plans

to take, so that both can support each other. See Exhibit 24,

MITAGS Checklist and Exhibit 25, the Washington State

Pilotage Rules and Checklist, WAC 296-116-205 and 2051.

If an individual makes a mistake there will be additional

individuals to catch that mistake and help correct it before it

turns into a bigger mistake. The National Transportation

members on the bridge in Safety Recommendation M-93-34

issued on June 25, 1993, following the NTSB’s investigation

of the grounding of the Queen Elizabeth 2 ("QE2") in

Vineyard Sound, Massachusetts. A copy of that

recommendation is attached as Exhibit 26.

d. The next section under Operating Procedures,

Watch Practices, is Security Rounds. See WAC 317-21-

200(4). OMS and Advisory Group review of Phase 2

prevention plans indicated that nearly all tanker crews made

security rounds while in port. The primary purpose of the

security rounds is to detect fires, flooding, and other

anomalies early, so that they can be dealt with before they

become major problems. The Washington standard requires a

security round underway and at anchor as well as in port,

every two hours, or once per watch, if a vessel has installed

monitoring systems, which is fairly common. The Washington

standard allows the security rounds to be conducted by any

properly trained crew member. The primary focus of most

security rounds it detection of small fires that can grow to be

major fires. The intent related to prevention of oil spills is to

drift aground due to a fire. In addition, there is the possibility

that a vessel can catch fire and burn to the extent that enough

structural damage will be done to allow oil to escape into the

JA-102

water. The primary purpose, however, is to prevent a fire or

other casualty from disabling a vessel and allowing it to drift

aground or lose steering and collide with another vessel.

There was a great deal of discussion at the Advisory

Group about what sections of the ship should be inspected.

There was some concern that having the crew member inspect

in and around the cargo area would possibly subject the crew

member to some danger being out on deck at night. For that

reason, the Washington standard calls for the master to

designate the spaces that will be inspected, relying on the

master’s professional judgment to determine which sections of

the vessel could be safely inspected.

The Washington standard also defines the appropriate

interval. Since most of the Phase 2 prevention plans indicated

that the security round interval most frequently used in the

industry was every four hours, OMS adopted that standard.

For those few vessels without monitoring systems for flooding

and fire, OMS believed that security rounds were needed

more often.

e. The next section under Operating Procedures,

Watch Practices, is Anchor Watch. See WAC 317-21-200(5).

The Washington standard calls for a continuous anchor watch

by a navigation officer on the bridge, and plotting of the

vessel's position at anchor once per hour.

There is a history in Washington of problems with vessels

dragging anchor. Several incidents occurred in the three years

preceding the development of these standards of . ik vessels

dragging anchor in Port Angeles, and other types of vessels,

which could include tank barges, dragging anchor in South

Elliot Bay during heavy weather, and sometimes in not-so-

heavy weather. In one instance in Port Angeles, when the

VTS detected that the vessel was dragging anchor, they were

JA-103

unable to communicate this to the vessel’s crew because there

was no anchor watch monitoring the ship's radio. As a result,

a pilot had to be dispatched from the pilot station to board the

vessel and reset the anchor. The major hazard that an anchor

watch prevents is the vessel dragging anchor and subsequently

colliding with another vessel or running aground. The

objective of this standard is to prevent a small incident from

becoming a large oil spill. The provision to plot position

hourly was derived from the practices as reported by the

industry in their Phase 2 informational prevention plans. As

a practical matter, navigation officers monitor the position of

a vessel at anchor by radar ranges and bearings on fixed

objects ashore, which is relatively easy to do in a continuous

manner by setting the radar up to alert the officer whenever

the range parameters from a particular point ashore change

more than would be expected by a vessel swinging on its

anchor chain.

f. The fina! standard under Operating Procedures,

Watch Practices, is composition of the Engineering Watch.

See WAC 317-21-200(6). Many tank vessels now have a

certificate for unmanned engine room operation. OPA 90

contained a provision that required the Coast Guard to do

rulemaking regarding engine room manning. The Coast Guard

rulemaking requires in U.S. waters that all tank vessels have

a manned engine room, or manned machinery spaces. Some

modern vessels are built with machinery spaces and

engineering control rooms. In some cases, the engineering

control room is a considerable distance away from the

machinery spaces. My experience on a new Coast Guard

cutter was similar. My vessel had an engine room, and motor

a control room for all those spaces located on the main deck.

The issue then is if propulsion or steering is lost, and

machinery needs to be reset or adjusted to regain propulsion

JA-104

or steering, can all that be done from the control room, or

must some of it be done from the machinery spaces

themselves?

The experience of everyone in the Advisory Group,

myself included, was that there are some things that can be

reset from the control room, and some things that a crew

person has to be dispatched to the machinery space to reset or

adjust. As a result, there can be a substantial time lag between

loss of propulsion or steering, or electrical power for that

matter, and the ability to regain it, because the crew member,

if only assigned to the control room, must be dispatched to the

machinery spaces, evaluate the situation, and make

adjustments.

The Washington standard, therefore, calls for a licensed

engineer in both the engineering control room and the

machinery spaces, if they are located apart from each other,

while the ship is engaged in critical maneuvering. Generally,

those would be times of either mooring, unmooring,

anchoring, leaving anchorage, or reducing speed or stopping

to receive a pilot. The intent is to provide someone in each of

the two spaces capable of restoring propulsion and steering as

quickly as possible during these critical situations. The reason

for this standard is to ensure prompt restoration of steering

propulsion and electrical power in the event of a casualty. The

risk if this standard is not implemented, is that the vessel will

run aground or collide with another vessel as a result of a

machinery casualty.

2. The next subcategory under Operating Procedures is

Navigation. See WAC 317-..:-205.

a. The first element under Navigation is Fix

Intervals. See WAC 317-21-205(1). As a practical matter, to

determine set and drift, at least two fixes are required. Then

JA-105

to fix the actual progress of the vessel through the water, the

fixes are measured against planned progress. The speed that

the vessel should move, uninfluenced by currents and wind,

is measured against the direction the vesse! should move

uninfluenced by currents and wind.

This particular element was the subject of much

discussion by the Advisory Group. The Phase 2 prevention

plans indicated fix intervals everywhere from "undefined"

down to "six minutes" in some areas of Washington waters,

depending on the narrow channels and traffic levels.

Technology is available that allows vessel navigators to fix

their position electronically almost instantly, and with very

little effort. After considerable discussion, the Washington

standard became constant monitoring, in the same way that

there is the ability to constantly monitor at anchor to prevent

groundings and collisions. There is also the ability for a vessel

to monitor its position constantly while moving and to record

the position, manually or electronically, at least every 15

minutes. A tanker proceeding at its normal cruise speed

generally travels between 13 and 16 knots. Fifteen minutes

means that the vessel will move approximately four miles in

that period of time. The Advisory Group and OMS believed

that a position should be plotted every 15 minutes to give an

indicator to the vessel navigation team as to where they are,

relative to where they plan to be. Since four miles is a

considerable distance, the Advisory Group believed that 15

minutes should be a minimum interval for plotting fixes, and

that fixes in some cases should be done more often. As a

consequence, the constant monitoring provision was entered

in the standard.

b. The next element under Operating Procedures,

Navigation, is Voyage Planning. See WAC 317-21-205(2). In

a manner similar to the Washington Pilot Coordination

JA-106

Requirements, the Advisory Group and OMS maritime

experts determined that it would be helpful to provide a

checklist of items to be considered and publications to be

consulted in the course of voyage planning. The checklist, like

the pilot coordination checklist, is designed to facilitate the

crew’s accomplishment of voyage planning. It helps the crew

review all of the appropriate publications and consider all the

elements of a comprehensive voyage plan to provide a

navigation guide through state waters for that particular

voyage.

c. The next element under Operating Procedures,

Navigation, is Compass Checks. See WAC 317-21-205(3).

The Washington standard requires tanker masters to establish

a schedule for comparison of gyro-compass and magnetic

compass. A gyrocompass is an instrument that uses the

rotation of the earth and inertia to indicate true direction. A

magnetic compass indicates direction based on the location of

the earth’s magnetic poles. A comparison of the two

compasses is generally the method used to determine gyro-

compass and magnetic compass errors and then those errors

are applied to the two compasses to ensure an accurate reading

on both and to avoid faulty steering. The compass comparison

method was the method referred to most frequently in the

Phase 2 prevention plans as the method used to determine

compass error on vessels.

d. The next element of Operating Procedures,

Navigation, is Port Angeles tug assist. See WAC 317-21-

205(4). This element was not challenged in this lawsuit. This

element codifies an existing voluntary procedure developed to

provide assist tugs to vessels anchoring and departing

anchorage in Port Angeles. The reason for this element is that

the anchorage area is heavily used and subject to high winds.

This element is also based on the incident described earlier for

JA-107

anchor watch. There was a need to add some additional

capability to vessels trying to operate at slow speeds,

maneuver among other vessels, and also remain anchored

when the wind speed picked up.

3. The next subcategory under Operating Procedures is

Engineering. See WAC 317-21-210.

a. The first element under engineering addresses

standby electrical generators. See WAC 317-21-210(1).

Electrical power on a vessel is extremely critical. Most of the

navigation equipment and other electronic devices operate

from the electrical power generated in the machinery spaces

by what is called a ship service generator. Most vessels are

equipped with more than one. Most modern vessels have an

automatic switching gear, which is essentially a circuit

breaker. When the generator being used fails, the switching

gear automatically activates another generator and maintains

electrical power. With this system, very little time is lost in

regaining electrical power in the event of a failure of the

primary generator. However, some vessels do not have this

automatic standby switching gear. The Washington standard

is designed to ensure that in the event a vessel does not have

automatic standby switching gear, the standby generator is

running and immediately available to assume the electrical

load and thereby restore electrical power as quickly as

possible. Frequently, the loss of electrical power also results

in the loss of propulsion. Thus, restoration of electrical power

quickly is critical to maintaining control of the vessel.

b. The second element under Operating Procedures,

Engineering, is steering gear inspections. See WAC 317-21-

210(2). The state requirement is for hourly inspections of the

steering gear while in state waters. The steering "flat" is the

room on a ship where the steering gear is located. The

purpose of this requirement is to ensure that the steering gear

JA-108

continues to work as it did when it was inspected and tested

12 hours before entering Washington waters. The Advisory

Group believed and the OMS research indicated that steering

gear could fail between 12 hours outside state waters and

arrival at a safe mooring. These inspections of the steering

gear are designed to highlight or identify small problems

before they become major problems and control of the

direction of the vessel is lost.

There is a provision in the standard for a monitoring

system. If a company chooses to install an adequate

monitoring system, the requirement is waived for hourly

inspections by personnel. Generally, the hourly inspections of

the steering gear that were indicated in the Phase 2 prevention

plan as a practice by the industry were conducted as part of a

routine survey of all machinery and auxiliary machinery

spaces by engineering personnel.

c. The third element under Operating Procedures,

Engineering, is scoop injection systems. See WAC 317-21-

210(3). This element was added in the unlikely event that

tankers coming into Washington waters would use scoop

injection systems. The reason it’s unlikely that tankers will

have scoop injection systems is that this is a passive system of

machinery cooling that only works on high speed vessels, and

very few tankers operate at speeds high enough to make this

efficient. A scoop injection system is more efficient and

effective than pumping cooling seawater for use in the main

propulsion system. The way it works is a scoop, essentially

like an air scoop in a vehicle, located below the water line of

a vessel traveling at 20 knots or more, will allow for the

intake of cold saltwater. Due to the speed of the vessel, the

cooling water is forced into the engineering system and back

out without the sustained assistance of pumps.

JA-109

The state requirement is that these systems be secured or

turned off before entering state waters and that instead the

vessel use its installed pumps to provide cooling water to its

propulsion system and to its electrical generating systems. The

reason for this provision is that if a ship does have a scoop

injection system, it does not function properly at the lower

speeds normally used in coastal waters. Most systems will fail

if adequate cooling water is not supplied. The requirement is

designed to prevent failure in the propulsion and electrical

generating systems, thus reducing the risk of accidents.

d. The final Operating Procedure, Engineering,

element is main engine fuel changeover. See WAC 317-21-

210(4). It has become a common practice on some vessels to

use a heavier, less refined fuel when out at sea, and a more

expensive, lighter refined product when maneuvering. In

California, for many vessels the lighter refined product is

required to meet air emission requirements. That is, in

California waters, vessels will switch to a more refined,

lighter product or oil in order to reduce the sulfur emissions

that generally result from burning heavier fuel oil. OMS

discovered, and Advisory Group members confirmed, that

frequently during the process of changing from heavy fuel oil

to light fuel oil, propulsion is lost due to malfunctions within

the propulsion system. In order to prevent the loss of

propulsion within state waters where vessels have less room

to maneuver, the requirement in the BAP standards is that if

a vessel uses this system, the switchover must take place

outside of state waters.

While the Advisory Group was meeting, a cargo vessel in

the Mississippi River near New Orleans switched from heavy

to light fuel, lost propulsion, and experienced a casualty. This

incident confirmed our concern that this fuel changeover was

an engineering procedure that should best be conducted in an

JA-110

area where loss of propulsion would not have a detrimental

effect on the vessel or result in a grounding or collision.

4. The next subcategory under Operating Procedures is

Prearrival Tests And Inspections. See WAC 317-21-215..

The Washington standard defines critical navigation and

engineering equipment subsystems that should be tested. A

subsystem failure may result in a failure of the main

propulsion system, the electrical generating system, or the

steering system. The subsystems included are main lubrication

oil pumps, main fuel oil pumps, oil system strainers, settler

and service tanks, cooling water systems, including pumps,

intake air blowers, and air control systems. For steam vessels,

spare boiler burners, forced draft fans, and feed water pumps

are added. Thus, the state requirement further defines main

propulsion system checks and inspections and adds navigation

equipment. Prearrival tests and inspections elements and items

were drawn primarily from expert engineers provided by

ARCO Marine and American President Lines. Like nearly all

of the operating procedures, these standards are designed to

prevent collisions and groundings, and subsequent oil spills.

5. The final subcategory under Operating Procedures is

Emergency Procedures. See WAC 317-21-220. Station bills

are required for fire, abandon ship, man overboard, and oil

spill response. A station bill is a listing of all personnel on the

vessel, where they would go in each of these emergencies,

what they should bring with them, and what their action is to

be in response to the emergency. Station bills are generally

very comprehensive. Based on written procedures submitted

as part of the Phase 2 prevention plans by virtually all major

companies, the state standard also includes a requirement for

written procedures on how to respond to collisions,

groundings, hull breach or structural failure, loss of

propulsion, loss of steering, loss of electrical power, or

JA-111

compass malfunction. In addition, the state standard adds

situations: (1) emergency towing, (2) loss of throttle control

on the bridge, and (3) heavy weather. These procedures were

_ Outlined in the Phase 2 prevention plans as situations in which

a written procedure needed to be promulgated and

in onder to tell the crew how to handle the poteatal siuaten,

Written procedures help vessel crews avoid groundings and

collisions. They also help the crew mitigate the damage if a

grounding or collision does occur.

6. An additional subcategory within Operati

Procedures is entitled Events. See WAC 317-21-225. This

subcategory requires vessels that experience an event to

maintain the documentation that would be required to

investigate that event. The documentation surrounding an

event must be safeguarded so that investigators will be able to

reconstruct the event, and promulgate "lessons learned”

B. Personnel Policies

The next major category of BAP standards is Personnel

Policies.

1. The first subcategory within Personnel Policies is

Training. See WAC 317-21-230. Sixty-five (65%) to eighty

percent (80%) or more of all vessel accidents and casualties

are caused by human error. See Exhibit 27. Therefore, the

personnel policies standards promulgated by the state of

Washington are critical to preventing oil spills. A study done

by the National Ports and Waterways Institute at the beginning

of the Advisory Group process identified training as the single

most critical subcategory that should be addressed.

The training program required by Washington includes

three primary elements. They are (1) orientation training for

JA-112

all new crew members, (2) position-specific training for all

crew members, and (3) refresher training for crew members

to validate the position-specific training received previously.

In addition, shipboard drills or practices are also included

under training, since they are a vital part of a comprehensive

training program. Drills alles “he crew to actually practice

the procedures they have bees .cained for. An example of a

Phase 2 Training Plan from SeaRiver Maritime, Inc., is

attached as Exhibit 28. The Phase 2 Training Outline of Stolt-

Nielson, Inc. is attached as Exhibit 29.

a. The state standard for vessel orientation training

includes all new crew members or all members returning to

vessels of a type they have not served on within the past year.

See WAC 317-21-230(2). It also includes maintenance

personnel who sail on ships, because the orientation

training includes familiarization with the individual crew

member’s station assignments and responsibilities, including

both emergency responsibilities and routine responsibilities.

It also includes a walking tour of the spaces on the vessel that

are designated by the master. The purpose of the walking tour

is to familiarize the new crew member with the vessel's

layout, as well as to identify escape routes for the new crew

member from the place where he or she sleeps, and from the

place where he or she works.

b. Position-specific training requirements are laid

out in the state standard by each primary position on a vessel.

Companies have been given three years to comply with this

requirement. This means that an individual employed on a

vessel on June 7, 1995, needs to complete the training specific

to their position by

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Joint Appendix — United States v. Locke · 529 U.S. 89 | Frix